Loading...
HomeMy Public PortalAboutPCM 2014-06-25FRASER PLANNING COMMISSION MINUTES DATE: Wednesday, June 25, 2014 MEETING: Planning Commission Regular Meeting PLACE: Fraser Town Hall Board Room PRESENT Commission: Commissioners: Chair Jean Wolter, Steve Sumrall, Peggy Smith, Jane Mather, Parnell Quinn, Herb Meyring Staff: Town Planner, Catherine Trotter; Town Clerk, Lu Berger Others: See attached list Chairperson called the meeting to order at 6:33 p.m. 1. Roll Call: 2. Approval of Agenda: Minutes of May 14, 2014 Commissioner Sumrall moved, and Commissioner Meyring seconded the motion to approve the Agenda. Motion carried: 6-0. 3. Open Forum: 4. Public Hearing/Regarding: a. Major Subdivision — Final Plat The Willows at Grand Park - Filing No. 1 The Willows at Grand Park - Filing No. 2 The Willows at Grand Park - Filing No. 3 The Willows at Grand Park - Filing No. 4 Commissioner Smith moved, and Commissioner Quinn seconded the motion to open the public hearing on Major Subdivision — Final Plat; The Willows at Grand Park - Filing No. 1; The Willows at Grand Park - Filing No. 2; The Willows at Grand Park - Filing No. 3; The Willows at Grand Park - Filing No. 4. Motion carried: 6-0. Proof of publication was entered into the record. TP Trotter briefed the Commission on the status of the Final Plat submittal. Nine conditions were outlined and discussed; 1. Add dimensions of rear setbacks to all final plats. Clarify side setbacks as discussed. 2. MPEI needs the following language on the four final plats for the Willows: o Perpetual non-exclusive 10 -foot utility easements are hereby granted and shall apply upon, across, above, over, under, and through the Page 2 of 3 utility easements shown on this plat for the purpose of ingress to and egress from, and the installation, repair, replacement, operation and maintenance of all utility lines and equipment. Any construction and placement of lines, equipment, or structures or changes in grade shall comply with the standards of all utility providers utilizing the easements. o The Town of Fraser hereby agrees above ground utility equipment shall be allowed in the Fraser Town right-of-way as depicted on this plat when placed a minimum of 2' behind the sidewalk. 3. Clarify and simplify plat note #12. 4. On all plats, delete reference to "Portion of Town of Fraser Improvement Agreement Reception # 2009-001742 to be defined by separate document." 5. Snow storage tracts are referenced incorrectly on several of the plats. 6. Submit for review and approval any and all required off-site easements (snow storage, water/sewer service lines). 7. Submit for review and approval Subdivision Improvement Agreement. 8. All revised engineering documentation must address all comments in the JRS memo dated June 11, 2014 and is subject to review and approval by the Town Engineer. Final plats will not be scheduled for Town Board review until such time as these documents have been reviewed and approved by the Town Engineer. 9. All revised legal documentation must address all comments in the CMW memo dated June 12, 2014 and is subject to review and approval by the Town Attorney. Final plats will not be scheduled for Town Board review until such time as these documents have been reviewed and approved by the Town Attorney. Commissioner Sumrall moved, and Commissioner Quinn seconded the motion to close the public hearing on Major Subdivision — Final Plat; The Willows at Grand Park - Filing No. 1; The Willows at Grand Park - Filing No. 2; The Willows at Grand Park - Filing No. 3; The Willows at Grand Park - Filing No. 4. Motion carried: 6-0. Commissioner Smith moved, and Commissioner Sumrall seconded the motion approve Resolution 2014-06-01 approving the Major Subdivision — Final Plat; The Willows at Grand Park - Filing No. 1; The Willows at Grand Park - Filing No. 2; The Willows at Grand Park - Filing No. 3 with the following conditions: 1. Add dimensions of rear setbacks to all final plats. Clarify side setbacks as discussed. 2. MPEI needs the following language on the four final plats for the Willows: o Perpetual non-exclusive 10 -foot utility easements are hereby granted and shall apply upon, across, above, over, under, and through the utility easements shown on this plat for the purpose of ingress to and egress from, and the installation, repair, replacement, operation and maintenance of all utility lines and equipment. Any construction and 5 Page 3of3 placement of lines, equipment, or structures or changes in grade shall comply with the standards of all utility providers utilizing the easements. o The Town of Fraser hereby agrees above ground utility equipment shall be allowed in the Fraser Town right-of-way as depicted on this plat when placed a minimum of 2' behind the sidewalk. 3. Clarify and simplify plat note #12. 4. On all plats, delete reference to "Portion of Town of Fraser Improvement Agreement Reception # 2009-001742 to be defined by separate document." 5. Snow storage tracts are referenced incorrectly on several of the plats. 6. Submit for review and approval any and all required off-site easements (snow storage, water/sewer service lines). 7. Submit for review and approval Subdivision Improvement Agreement. 8. All revised engineering documentation must address all comments in the JRS memo dated June 11, 2014 and is subject to review and approval by the Town Engineer. Final plats will not be scheduled for Town Board review until such time as these documents have been reviewed and approved by the Town Engineer. 9. All revised legal documentation must address all comments in the CMW memo dated June 12, 2014 and is subject to review and approval by the Town Attorney. Final plats will not be scheduled for Town Board review until such time as these documents have been reviewed and approved by the Town Attorney. Smith: Aye Meyring: Aye Sumrall: Aye Quinn: Aye Wolter: Aye Mather: Nay Discussion Items a. Community Trails Plan TP Trotter updated the Commission on the status of the trails plan and proposed signage. The project is moving forward with sign placement beginning in July. Commissioner Smith moved, and Commissioner Meyring seconded the motion to recommend approval of the Community Trails Plan to the Town Board. Motion carried: 6-0. 6. Adiourn Commissioner Sumrall moved, and Commissioner Smith seconded the motion to adjourn. Motion c Meeting adjourned at 9:10 p.m. nEA ! Lu Berger, Town Cle