HomeMy Public PortalAbout1958_04_24 150
of these new residents .
Mr. Gill then read a letter from Mr. C . C . Gore with respect
to a proposed violation notice to be placed on the cars of out of
State visitors to Leesburg, Virginia.
Mr. Hollandsworth was requested to contact the Town Police
with respect to service cars that had been parking in front of
the. Post Office for long periods of time and thus occupying a
parking space that was needed by people receiving and depositing
mail.
A discussion then followed with respect to the purchase of
the Claude Honicon well. Upon motion of Mr. Johnson, seconded
by Mrs . Mitchell, the following resolution was unanimoudly adopted:
BE IT RESOLVED, by the Council of the Town of Leesburg, that
the Mayor be instructed and directed to obtain the chemical
analysis and any other necessary- data suggested by the Town
Engineer with respect to the character of the water at the Honicon
well, and that this set of analysis tests be obtained at the lowest
possible cost . .':4• •
The Town Attorney recommended that Mr. Honicon be given a • ,
copy of the aforementioned analysis , with which recommendation the
Town Council concurred. .
Mr. Vesey tendered his oral resignation as Town Attorey as
•
of May 1, 1958, but advised that he would do whatever work is
necessary for the bond issue and the completion of the annexation
Problem. He further stated that it had":been a}_pleasure.;tbfnave
been:of; service to the Town Council and that by the 1st of -May
the amendments to the Zoning Ordinance would be completed; also
the electrical, building, sanitation and plumbing codes would
be in order for the consideration of the Town Council.
Upon motion of Mr. Gill, seconded by Mr. Hollandsworth and
unanimously adopted, it was :
RESOLVED, that a special meeting of the Town Council of the
Town of Leesburg, in Virginia, be held April 24, 1958 at 7 : 30
P. M. in Council Chambers. for the purpose of considering the Zoning
Ordinance amendments .
There being no further business to come before the meeting ,
the meeting upon motion duly made andseconded, adjourned.
•
_
Heco er
ar AP , Wil _
, or /
SPECIAL METING, April 24, 195.8
At a special meeting of the Council of the Town of Leesourg, in
Virginia, held in the Council Chambers on April 24, 1958, at 7:30
P. M. , there were present : George J. Durfey, Mayor ; Elinor M.
Cunningham, Recorder ; Howard W. Gill, C. R. Hollandsworth, Mae
• Bass Mitchell, Oden Semones, Reed Johnson, J. Austin Wri'ght ;. Mr.
Johnson arriving late .
The first order of business was the discussion of the accept-
ance of the bids of Perry Engineering Company for the construction
of the Douglass Elementary School water and sewer line .
•
•
yg
1:61:
•
Upon motion of Mr. Gill, seconded by Mr . Hollandsworth,
the following resolution was unanimously adopted:
WHEREAS, the Mayor and the Town Attorney of the Town of Lees-
burg were authorized and directed to negotiate a contract with
the Loudoun County School Board for the construction of a water •
line and sanitary sewer to serve the Douglass Elementary School,
and for the taking over by the Town of Leesburg, in Virginia , of
the water and sanitary sewer lines in Ayr Street in the corporate
limits of the Town of Leesburg, now owned by the Loudoun County
- School Board; and,
WHEREAS, the said Mayor and the Town Attorney have negotiated
and completed said agreement, which agreement is as follows :
"AGREEMENT AND UNDERTAKING
• THIS AGREEMENT AND UNDERTAKING, entered into this day of
C9 April, 1958, by and between THE TOWN OF LEESBURG, IN VIRGINIA , a
municipal corporation created by act of the General Assembly of the
Commonwealth of Virginia, sometimes hereinafter referred to as the
Q "Town, " or Party of the First Part, and THE LOUDOUN OOUNIY SCHOOL
BOARD for Loudoun County, Virginia, a domestic corporation, some -
times hereinafter referred to as The School Board, or as the Party
• of the Second Part ;
W I T N E S SET H :
WHEREAS,. the Loudoun County SchoolBoard desires to provide water
and sewer facilities for the Jouglass Elementary School now being con-
structed, and for the Douglass High School, both located within the
Corporate limits of the Town of Leesburg, in Virginia , and to provide
for the furnishing of water and sewer ftcilities by the Party of the
First Part at reasonable minimum rates ; and,
WHEREAS, the Town of Leesburg, in Virginia , Party of the First
Part, desires to accommodate the Loudoun County School Board by
supplying the requisite and necessary water and sewer facilities for
schools within the corporate limits of the Town of Leesburg, owned
and operated by the Loudoun County School Board, and for the supply-
ing of said facilities at reasonaole minimum rates ;•
-
NOW, THEREFORE, it is agreed by and between the Parties hereto ,
• for and in consideration of the sum of Ten Dollars ($10.00 ) in hand
paid by each Party to the' other prior to the ensealing of this Agree-
ment, and as further consideration the mutual promises , undertakings
and convnittments hereinafter set forth as follows :
( 1) The Town of Leesburg, in Virginia, Party of the First Part,
by these presents hereby agrees to construct a cast iron and V. C.
10 inch sewer line, including all manholes and connections, and
concrete supports, all as more particularly shown on that certain
Field Survey made by Robert K. Wilson, C .L. S. , Leesburg, Virginia,
dated March 10, 1958, which is attached hereto and made a part
hereof and marked Exhibit A, on or before September 1, 1958, and
available for use by the Loudoun County School Board on or before
September 1,1958, and to permit the Loudoun County School Board to
connect thereto .
( 2) The Town of Leesburg, in Virginia , Party of the First Part ,
by these presents hereby agrees to construct an 8 inch water main
in Parker Road, including the connection with the 4 inch main in
South Street, together with all valves, fittings and other con-
nections, eand to complete .same on or before .eptember 1 , 1958, ao
as to provide for a sufficient supply of water at adequate pressures
for all Parties connected thereto, including the Loudoun County
School Board.
152
( 3) The Town of Leesburg, in Virginia , does hereby agree
to complete on or before September 1, 1958, the construction
and installation of a 6 inch cast iron water main running from
the 8 inch water main to be constructed and installed in Parker
Road, as provided for in Paragraph ( 2) next above, together with
all valves, fittings and hydrants, to a point within 200 feet
of the present location of Douglass High School, and to a point
within 200 feet of the location of the Douglass Elementary
School now under construction; and in addition thereto to cog- -
struct and install a water hydrant within 200 feet of the
Douglass High School, and a water hydrant within 200 feet of
Douglass Elementary School ; and in addition thereto , to run a
three inch water line from said 6 inch line to the Douglass High
Schooj,and a three inch line from the aforesaid 6 inch line to •
the Douglass Elementary School.
• (4) It is agreed by and between the Parties hereto., and
by these presents they do hereby agree that upon the completion
of the construction of the water and sewer lines specified in
Paragtaphs ( 1) , (2) and ( 3) next above , the Loudoun County School
Board will, within ten (10) days from receipt of invoice , to pay
to the Town of Leesburg, in Virginia, the sum of Ten Thousand
Eight Hundred Dollars ($10,800.00) in full and complete payment
for said water and sewer installations, except the water meters
which shall be furnished and installed by the Loudoun County
School Board.
•
( 5) It is further agreed by and between the Parties hereto,
and by these presents the Loudoun County School Board does hereby
grant and convey unto the Town of Leesburg, in Virginia, all of
its right, title and interest in and to that certain sanitary
sewer line, and that certain water line now located in Ayr Street
in the Town of Leesburg, tn Virginia, heretofore constructed and
installed by the Loudoun County School Board, from the former
corporate limits of the Town of Leesburg to the manhole in Ayr
Street in front of the Loudoun County High School, at which point
the Loudoun County High School ' s connecting main connects, and
the consideration for this grant and conveyance is by the Agree -
ments and Undertakings of theTown of Leesburg, in Virginia , as
set forth in Paragraphs ( 1) (2) and (3) above .
(6) It is further agreed by and between the Parties hereto ,
and by these presents the Loudoun County School Board does hereby
agree to execute, upon presentation to it, permanent easements
across the lands of the Loudoun County School Board, for the pur-
pose of construction and installation of the water and sewer lines
herein provided for, together with the right of ingress and egress
to the Town of Leesburg, in Virginia, and its agents, for the oon-
• . str•uction and maintenance of all of said water and sewer lines.
( 7) It is agreed by and between the Parties hereto, and by
these presents they do hereby agree that the Town of Leesburg, in
Virginia , will, on bnd after the effective date of this agreement ,
furnishto the Party of the Second Part, the Loudoun County School
Board, for all schools owned and operated by it, within the Cor-
porate limits of the Town of Leesburg, water and sewer facilities ;
and it is further agreed by the Parties hereto that the Town of
Leesburg will make no service charge for the furnishing of 'said
sewer facilities and will furnish said water facilities in accor-
dance with its established effective rates .
. WITNESS our hands and seals this day of April, 1958.
THE ACNN OF LEESB•G, IN VIRGINIA
By L �1/ --
ATTEST:
Recorder
( SEAL) ) Party of the First Part
. 1.5.E
THE LOUDOUN COUNTY SCHOOL BOARD
By __
• Chairman •
Party of the Second Part
( ( SEAL) ) .
i
Attes :
•
Clerk
STATE OF VIRGINIA, •
COUNTY OF LOUDOUN, to-wit :
N I, , a Notary Public in and for the
M County and State aforesaid, do hereby ceritfy that on the
M day of April, 1958, GEORGE J. DURFEY and ELINOR M. CUNNINGHAM ,
et personally known to me to be the Mayor and Recorder of the Tovn
.et of Leesburg, in Virginia, and JAMES W. ASHTON and RUTH M . EMERICK ,
. personally known to me as the Chairman and Clerk of the Loudoun
County School Board, after being first duly sworn on oath, affixed
• their names and the Corporate seal of the Town of Leesburg and the •
Loudoun County School Board to the above document.
. GIVEN under my hand this day of April, 1958.
Notary ?ubile
IIMy Commission expires :
•
Upon motion made by Mr . Wright, seconded by Mr . Gill, the
following resolution was unanimously adopted: •
RESOLVED, by the Mayor and the Council of the Town of Leesburg
that the Mayor and the Town Attorney be authorized and instructed •
to negotiate with the Loudoun County School Board with respect to
the relocation of the water line running from Parker Road to the
Douglass Elementary School, and that said water line would be in-
stalled down Route No. 7, which would be of more benefit to the •
Town of Leesburg for present and future residents on said Route No. 7.
Upon motion of Mr. Wright, seconded by Mrs . Mitchell, the
following resolution was unanimously adopted:
WHEREAS?, the Town of Leesburg, in Virginia, advertised for
bids for the construction of an eight inch water line in Parker
Road in the Town of Leesburg, the construction of a six inch water
line along and through the easement of the Loudoun County School
Board' from its intersection with Parker Road and thence to the new
II
Douglass Elementary School, and the construction of a ten inch sewer
line from the sanitary disposal plant of the Town of Leesbt g, . in
• Virginia, to serve the Douglass Elementary School, all as more
particularly shown on the plat of the "Proposed Water and Sanitary
Sewer Extension' to Serve Douglass Elementary School, " prepared by
Warren C. Perrow, Consulting Engineer, Richmond, Virginia , dated
March 10, 1958, as Project No. 58-A-M, which is incorporated herein
• by reference the same as• if fully set forth, andwhich is on file in
the office of the Auditor-Treasurer of the Town of Leesburg, in
Virginia ; and,
•
1-.5.4
WHEREAS, sealed bids were receibed and opened at 2:00 P. M.
on April 15, 1958, covering the aforesaid project, pursuant to
public notice thereof; and,
•
WHEREAS, the Perry Engineering Company, Inc . , Winchester,
Virginia, submitted the low bid on the work aforesaid in the
amount of Thirteen Thousand Eight Hundred Eighty Eight Dollars
and Eight Cents ($13,881.08) , and Warren C. Perrow, Consulting .
Engineer has certified to the Town of Leesburg, in Virgiria,his -
approval of the aforesaid bid of the Perry EngineeringCompany,
Inc . , Winchester, Virginia, and has recommended the acceptance
of said bid.;
NOW, THEREFORE, Be it resolved by the Mayor and the Council
of the Town of Leesburg, in Virginia, at a duly called meeting
held on April 24, 1958, that the bid of the Perry Engineering
Company, Inc . to construct and install the aforesaid water and
sewer extension' to the new Douglass Elementary School, all as
more particularly shown on the plat and survey of Warren C.
Perrow, designated "Proposed Water and Sanitary Sewer Extension
to Serve Douglass Elementary School, " dated March 10, 1958,
Project No. 58-A-M, for the sum of $13,881.08) , as submitted on
the "Proposed Form" of the Town of Leesburg, in Virginia, reading
as follows:
"PROPOSAL FORM
Proposal form covering the furnishing of all labor , equipment
and materials and the installation of a water and sewer main ex-
tension to. serve the Douglass Elementary School, in Leesburg,
Virginia, all to be completed in accordance with the accompany-
ing plans, specifications, etc. , and ready for use :
1. I/we hereby propose to construct a cast iron and V. C. sewer
line, including all manholes, etc . as shown ( 1,581' 1. Pb.
10" sewer) for the lump sum of $ 6, 182.57
2. I/we hereby propose to construct a 603 L. Ft . extension of
the 8 inch water main in Parker Road, including the connec-
tion with the 4 inch main in South Street, all valves,
fittings, etc. for the lump sum of $ 2, 933 .44
3. I/we hereby propose to construct a 990 L. Ft. extension of
6 inch C. I. water main from the main in Parker Road to aril
including a 3 inch C. I. connection to the school lot, to-
gether with all valves, fittings and hydrants shown, for
the lump sum of $ 4,765.07
Total Base Bid ( Items 1, 2. 3) $13,881 .08
4. Extra allowances for unforeseen conditions : /-
a . For rock excavation in sewer trench as defined in the
specification and based upon actual quantities obtained
• as measured from 3" below subgrade to surface of rock
. for trench width of 2.5 ft . $ 15.00 per C.Y.
b. For earth trench excavation on school lot from present
ground surface to approximate finished grade as shown,
if not graded by others prior to the cons truc tbn of
the sewer, 2.5 ft. trench width, $ 2.00 per C.Y. II5. It is understood that the above lump sum bid includes the -
cost of restoration of roadway in Route 643 as required
by the Va. Dept . of Highways . Parker Road is not under - •
the jurisdiction of this Dept . , however, surfaces of
service roads to abutting property damaged in trenching
operations shall be restored to as good a conditbn as
found at no extra cost to the Owner.
We, the undersigned, agree to perform all of this work in
accordance with the Advertisement, Plans, Specifications,
Special Provisions , Contract and Bond, and to execute the ac-
companying contract within ten ( 10) days after notice from the
Owner of the Award of Contract .
155
The undersigned further agrees to bear flzll cost of main -
taining the work until final acceptance as approved and provided
in . the Contract.
Accompanying this Proposal is a certified check or bidders
bond made payable to the Owner in the sum. of ?$ , which
security is to be forfeited as liquidated damages if in case this
Proposal is accepted, the undersigned shall fail to execute the
contract under the conditions of this Proposal, otherwise, said
security is to be returned to the undersigned by the Owner upon.
delivery of a satisfactory bond.
We, the undersigned, agree to commence work on the date to
be specified in a wti.tten order of the Owner and to complete the
work within sixty days after date of written notice by the Owner
to proceed. If the said work is not completed by thedats spec if ied
for completion of said work, it is agreed that there shall be
deducted from the contract price, not only as penalty , but as
liquidated damages the amount of $25.00 per day for each and
CO every calendar day delay in the completion of the work beyond
Qthe time specified, except , that if the work is delayed by any
Q act, negligence, or default on the part of the Owner,' equivalent
extension of time shall be granted.'
It is further understood and agreed that after . time stated
for completion is reached, unless an extension of time is allowed,
that no further estimates for partial payments will be approved
until final estimate is paid.
Registered as a Contractor under _
Title 54, Chapter 7, Code of Contractor
Virginia, 1950,
Certificate No. , 19 By _
Add re s s
be accepted; and,
BE IT FURTHER RESOLVED, That the Town Attorney be and he is
hereby authorized and directed to advise the Perry Engineerirg
Company, Inc. , Winchester, Virginia, of the acceptance of their
aforesaid bid opened April 15, 1958, and the construction contract
heretofore prepared by the Town Attorney to be executed by the
Perry Engineering Company, Inc . and by the Town of Leesburg, in
Virginia, by the signing thereof by the Mayor and the attesting
to his signature by the Recorder and the affixtation thereon of
the corporate seal of the Town, all of which is hereby approved,
authorized and directed, in the form as hereinafter set forth ;
" CONSTRUCTION CONTRACT
•
This contract made this day of , in the year
of 1958 oy and oetween PERRY ENGINEERING COMPANY, INC . of Winchester ,
Virginia, hereinafter called the Contractor, and THE '[OWN Off, LEES-
BURG, IN VIRGINIA, hereinafter called the Owner.
WITNESSETH: That the Contracbor and the Owner for the herein-
after named considerations, do agree as follows :
The Contractor shall furnish all of the materiala and perform
all of the work called for by the plans and the specifications,
which plans and specifications are as fully a part hereof as if
hereto attached, and described in the following enumerated plans ,
specifications, addendas and bulletins :
SPECIFICATIONS - PLANS - ADDENDAS - SPECIAL PROVISIONS
The advertisement for bids, information to bidders, the accepted
proposal, general conditions, performance bond and the above
. 56 •
•
enumerated plans and specifications are hereby made a part of
this contract to the same extent as if incorporated herto in
full. •
The Contractor shall commence the work to be performed under
this contract on a date to be specified in a written order of
' the Owner and shall fully complete all work hereinunder within
sixty days (consecutive calendar days) from and including said
date .
The Contractor is to keep in repair for twelve ( 12) mon
after date of final acceptance of the entire work embraced in
this contract and is to replace any defective work, and upon
his failure to do so, such repairs may be made and such defective
work replaced by the Owner at the cost of the Contractor who
agrees to pay for same .
The Owner shall pay the Contractor for the performance of
the contract, subject to additions and deductions provided in
the specifications and proposals, in current funds as follows :
On or before the tenth (10th) day of each calendar month ,
the Onner will make partial payment to the Contractor as set
forth in the Specifications . .
Final payment on account of this contract shall be made
within 30 days after the final completion and acceptance by the
Owner of all said work covered by this contract.
Before final payment shall be made the Contractor shall
submit evidence satisfactory to the Owner that all payrolls,
material bills, and other indebtedness connected with the v.ork
have been paid.
•
IN WITNESS WHEREOF, the parties have executed the contract
the day and year first above written in four counterparts, each
of which shall, without proff of the accounting for the other
counterpart, be deemed an original contract .
PERRY ENGINEERING COMPANY y INC.
By •
( (SEAL) )
ATTEST:
TOW ` LEESBURG, VIRGINIA
By Alor ---
ay r
( ( SEAL) )
ATTEST:
tifk
Recorder.
II
BE IT FURTHER RESOLVED, That the form of Bond prepared by
the Town Attorney be and it is hereby a;iproved and the Town
Attorney is hereby directed to submit said form of Band to the
Perry Engineering Company, Inc . , Winchester , Virginia, for
execution by it and by such corporate surety as shall be appro%d
by the Town Attorney. Said form of bond being ard reading as
follows:
•
157:
"FORM OP BOND •
- KNOW ALL MEN: That we,
• hereinafter called the Principal and
hereinafter called the Surety or Sureties, are held and firmly
bonded unto
hereinafter called the Owner, in the sum of
Dollars (S ) for the payment thereof ,
IIthe Principal and the Surety Sr Sureties bind themselves, their
heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents .
• WHEREAS, the Principal has, by means of a written agreement
dated the day of , 1958, entered into a contract
with the Onner for
which agreement is by reference thereto hereby expressly made a
:1 part of this bond.
;r. NOW, THEREFORE, the condition of this obligation is such
G that if the Principal shall faithfully perform the Contract on
his part and satisfy all claims and demands incurred for the
same , and shall fully indemnify and save harmless the Owner
• from all cost and damage which he may suffer by reason of a
failure so to do, and. shall fully reimburse andrepay the Owner
all outlay and expense which the Owner may incur in making good
any default and shall pay all sub-contractors or persons fur-
nishing labor or materials in connection with the performance
of -said contract, then this obligation shall be null and void;
- otherwise, it shall remain in full force and .effect .
Provided, that any alterations which may be made in the
terms of the Contract, or in the work to be done under it , or
the giving by the Owner of any extensions of time for the per-
formance of the contract; or any other forebearance on the part
of the Owner or the Principal to the other shall not in any case
release the Principal and the Surety or Sureties of any such
alterations, extensions or forebearance being hereby waived.
_1i1 WITNESS V:!HPREOF, the above bounden parties have executed
this instrument under ',heir several seals this day of.
1958, the name and corporate seal of such corporate party being
- hereto affixed and these presents duly signed by its undersigned
representative; pursuant to authority of its governing body.
In presence of : •
Pri cn ioa�By
Address
Address
TOWN OF LEES5URG, IN VIRGINIA •
By
II
Attest : •
Recorder
1513
After a rediscussion of the Subdivision Ordinance of the
Town of Leesburg, in Virginia, upon motion of Mrs . Mitchell ,
seconded by Mr . Hollandsworth, the following resolution was
unanimously adopted:
BE IT RESOLVED, by the MayoAl ndhe Council of the Town of •
Leesburg, that the Subdivision d V. Town of Leesburg, in
Virginia, be amended as follows : (The amendments appear on .
Page 148 in the Minutes of the meeting of April 14, 1958j . IIWith the exception of the addition of Subsection D to
Section I the amendments were approved.
•
Mr. E. B. White, Attorney at Law, then brought pp the sub-
ject of theGeorge Jason Corporation transferring a park area to
the Town under the committments made by the Town of Leesburg, the
Town acquiring title to same and agreeing to pay ; 100.00 a year
• for the maintenance of said park area under the supersision of
the Leesburg Garden Club. Mr. White stated that the deed wodld
be transferred to five trustees ; namely, The Peoples National
Bank, the Loudoun National Bank, the Mayor, the President of the
Garden Club andthe Town Attorney. It was generally agreed that
the Town Attorney and Mr. White get together with respect to
drafting a trust agreement along such acceptance to the Town, all
of the aforesaid being predicated upofi the Planning Commission
approving the subdivision plat of the George Jason Corporation.
It was decided that the Town Attorney, Mr. White, the Chairman
of the Board of Zoning Appeals and the Chairman of the Planning
Commission meet on Saturday, April 26, 1958 at 1:O0uorelock
in order to work out the problems involved with respect to the
George Jason Corporation. -
•
The Town Attorney then discussed the proposed changes to
the Zoning Ordinance for the Town of Leesburg, It was decided
that a special meeting of the Town Council would be held Wednesday ,
April 30, 1958, at 7 :30 P. M. in the Council Chambers in order to
permit each councilman before that time to familiarize himself with
the proposed changes .
The Mayor read a letter from Mrs. Sybil W. Wanner, Zoning
Administrator, with respedt to a joint meeting of the Planning
Commission, at which meeting Mr. Richard C. Dynes , Chief of Local
Planning in the State Department of Planning and Economical
ilevelopment was present and showed a baselof the Town of Abington.
At the aforesaid meeting, upon motion of Mr. Maurice Lowenbach, Jr. ,
seconded by Colonel George Isaacs, and unanimous±y approved, it
was respectfui7.y' re,quested that this Town Council direct:: &be
Planning Commission to have a base map made for the Tonn of Lees-
burg at a price not to excees $431.00, less 1/3 off to the Town
for Planning purposes, from the State Division of Planning and
- Economic Development in Richmond;' Virginia.
Upon motion of Mr. Gill, seconded by Mr. Wright, and unanimously
carried, it was :
RESOLVED, by the Mayor and the Council of the Town of Leesourg,
that the Planning Commission obtain a base map of the Town of
Leesburg for a price not to exceed 6431 .00 less 1/3 off, the cost
for planning purposes . •
I/The Mayor then read a letter from Mrs . Sybil W. Wanner with
• respect to;Aanmeeting of the Plandin_g Commission and the Board of
Zoning Appeals .
Upon motion of Mr . Mr. Wright, seconded by Mrs. Micthall,
and unanimously adopted, the following resolution was unanimously
adopted:
•
1-5:9
BE IT RESOLVED, by the Mayor and the Council of the Town
of Leesourg, that there be included in their 1958-69 budget
a sum of $500.00 for the Planning Commission, excluding the
cost of the base map ; and, •
BE IT FURTHER RESOLVED, by the Mayor and the Council of
the Town of Leesburg; in Virginia, a further sum of $150.00
for the Board of Zoning Appeals .
Mr.Hollandsworth brought up• the question of some residents
on the Fort Evans Road who Wished to hook onto the Honicon
Water line, The Torn Attorney advised that it was to the bast
interests of the Town to wait until the property owners -were
willing to deposit the cost of running the water line that far.
The Mayor then asked if the council was in a position to
nominate a replacement for the Town Attorney who had heretofore--
tendered his resignation. At the time there were no suggestions.
Cg
M There being no further business to come before the meeting,
01 the meeting upon motion duly made and seconded, adjourned.
AttQ
/O .
Recorder_�J ) Recorder
/PYA.^ . _
SPECIAL MEETING, May 1, 1958
At a special meeting of the Council of the Town Council of
the Tovin Council of the Town of Leesburg, in Virginia, at 7 : 30
P. M. May 1, 1958, there Were present : george J. Durfey, Mayor;
"Elinor M. Cunningham, Recorder ; Howard B. Gill, C. R. Hollandsworth,
Heed Johnson, Oden Semones and J. Austin Wright, Mr. Johnson arriving
late .
The first order of business was a discussion of the proposed
Zoning Ordinance amendments which had• heretofore been brought:,be-
fore the Council .
Upon motion of Mr. Gill, seconded by Mr. Hollandsworth, the
following resolution was adopted:
BE IT RESOLVED, by the Mayor and the Council of the Town of
- Leesburg, that the Zoning Ordinance be adopted with the changes
as read. (Said Zoning Ordinance appears later in this Minute
Book in detail) ; and, is incorporated herein by reference and
appended hereto) .
BE IT FURTHER RESOLVED, Thatthe Zoning Administrator be in-
structed and directed to publish the proposed changes in the
Zoning Ordinance in some newspaper having general circulation. in.
the Town of Leesburg for two consecutive weeks , after which time
a public hearing of interested citizens will be held.
,
The Town Attorney then discussed the matter of the Town of
IILeesburg supplying the Douglass High School and the Douglass
Elementary School with water and sewer facilities and that the
Loudoun County School Board was willing to contribute $10.800 . 00
in lieu of the cost to the School Board for running separate lines
and pitting in.a pumping station. The Mayor advised thtt the Town
Engineer , Warren C. Perrow, had been in Leesburg all day and had
obtained some figures 'with respect to the relocation of the afore-
said ater line running to the. Douglass Elementary School and the
Douglass High School , which re location would give the school Board
what they are asking for and permit the Town to have some additional
water lines . The proposed relocation of the water lines would
take said water line off the school property and place it where
other pdople in the Town of Leesburg would benefit . Mr . Perrow
stated that the added cost of the proposed relocation would be
$$7288.02 for _.the 8 inch water line and ,33944.85 for the 6 inch line .