HomeMy Public PortalAboutTybee - Draft PPA Transmittal to SAD 080619.pdfCECW-I DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 MEMORANDUM FOR COMMANDER, SOUTH ATLANTIC DIVISION 0 6 AUG 2019 SUBJECT: Tybee Island, Georgia — Beach Erosion Control Project — Project Partnership Agreement (PPA) 1. Reference is made to the following: a. Bipartisan Budget Act of 2018 (Public Law 115-123) Construction Account Long Term Disaster Recovery Investment Plan, dated 14 June 2019; b. Assistant Secretary of the Army (Civil Works) Memorandum to the Deputy Commanding General for Civil and Emergency Operations, dated 9 August 2018, subject: Policy Guidance on Implementation of Supplemental Appropriations in the Bipartisan. Budget Act of 2018; c. CESAD-PD memorandum dated 25 October 2018, subject: Endorsement of Proposed Strategies for Adding/Modifying Sand Dunes and for Development of a "Coastal Consequences Factory" to Support Modeling of Coastal Storm Risk Management (CSRM) Projects; d. CESAD-PD memorandum electronically signed 30 January 2019, subject: Endorsement of Proposed Strategies for Incorporating Resiliency Features in Existing Federal CSRM Projects within SAD; e. Engineering Documentation Report (EDR), Resiliency Effort for Tybee Island, Georgia Shore Protection Project, City of Tybee Island, Georgia dated April 2019; and f. CECW-I email to South Atlantic Division dated 16 July 2019 providing HQUSACE comments regarding the dune features proposed in the April 2019 EDR. 2. Enclosed is a draft PPA for a cycle of periodic nourishment for the Tybee Island Beach Erosion Control Project, authorized by Section 201 of the Flood Control Act of 1965, as modified by Section 301(b)(4) and Section 506 of the Water Resources Development Act of 1996. The South Atlantic Division (SAD) has advised that no additional real property interests, relocations, or placement area improvements are required to undertake the periodic nourishment work covered by the PPA. 3. Although the referenced April 2019 EDR recommended the project be modified to include the construction of new dunes, repair of damaged non-federal dunes, and CECW-I SUBJECT: Tybee Island, Georgia — Beach Erosion Control Project — Project Partnership Agreement (PPA) incorporation of existing non-federal dunes, such modifications would be new features that go beyond the Corps' authority to include minor modifications to the project for purposes of resiliency. Modification of the project to include these features would require additional Congressional authorization. Consequently, the PPA for periodic nourishment does not include the addition of these dune features. 4. The draft PPA includes provisions to allow the non-federal sponsor to request the Government to undertake on their behalf additional work as long as the non-federal sponsor pays for the work upfront. Also enclosed is an Agreement Checklist to be completed by the district. The checklist, including the identified attachments, will provide the division pertinent information to be considered during the PPA approval process. 5. The enclosed draft PPA is approved for use in negotiations with the non-federal sponsor. The SAD Commander is authorized to approve execution of the PPA if no substantive deviations to the provided draft PPA are proposed. Division Counsel review of, and recommendation to approve the PPA is required prior to approval by the Division Commander. If there are any questions whether a deviation is substantive, the Headquarters, U.S. Army Corps of Engineers Project Partnership Agreements Team is available for consultation. The Division Commander is authorized to delegate to the Jacksonville District Commander authority to sign the PPA, once approved. 6. Prior to coordinating the draft PPA with the non-federal sponsor, ensure that all required insertions to the draft PPA are made. The required Certificate of Authority, Certification Regarding Lobbying, and the Non -Federal Sponsor's Self -Certification of Financial Capability are available on the Corps of Engineers "Project Partnership Agreements" website under the "Forms" tab. 7. Please forward electronic copies (pdf files) of the executed PPA to Yvonne Prettyman -Beck, Senior Program Manager, FY18 Supplemental Long -Term Disaster Recovery Investment Plan Program Manager, and to John Lucyshyn, Project Partnership Agreements Team, within five days after execution. 8. Please direct any questions to Yvonne Prettyman -Beck, at 202-761-4670, or to John Lucyshyn, at 202-761-4515. Encls JAMES C. DALTON, P.E. Director of Civil Works 2