CITY OF TYBEE ISLAND
Citv Council Agenda Item Request
CITY n1ANAGER
Shawn Gillen
CLERK OF COUNCIL
Janet LeViner
CITY ATTORNEY
Fdward M. Hughes
Agenda Item Requests must be submitted to the Clerk of Council by noon on Wednesday a week prior to
the scheduled Council meeting. If this form is received after the deadline, the item will be listed on the
next scheduled agenda. There is a three minute limit for all visitors.
Council Meeting Date for Request: AUGUST 8, 2019
Item: SITE PLAN/SPECIAL REVIEW
Explanation: MODULAR BUILDING ADDED TO THE LOT -714 LOVELL AVE. -ZONE R-2 -40005 19001—TYBEE
ISLAND CHARTER SCHOOL DBA TYBEE ISLAND MARITIME ACADEMY
Paper Work: YES Attached
Audio/Video Presentation*
• If applicable, a copy of the presentation / report must be submitted with this agenda request.
If applicable, audio / video presentations must be submitted to the IT department at City Hall at least
48 hours prior to the meeting.
• Request will be postponed if necessary information is not provided.
Submitted by: Lisa L. Schaaf
Phone / Email: Lschaaf(?citybee.org
Date given to Clerk of Council: 08/01/2019
P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328-2749
(866) 786-4573 — FAX (866) 786-5737 www.cityoftybee.org
STAFF REPORT
PLANNING COMMISSION MEETING: July 15, 2019
r. CITY COUNCIL MEETING: August 8, 2019
LOCATION: 714 Lovell Ave. PIN: 40005 19001
APPLICANT: Tybee Island Maritime Academy
EXISTING USE: School
ZONING: R-2
USE PERMITTED BY RIGHT: Yes with Special Review
COMMUNITY CHARACTER MAP: Commercial Gateway
APPLICATION: Site plan with special review
OWNER: Roman Catholic Diocese of Savannah
PROPOSED USE: School
PROPOSED ZONING: R-2
PROPOSAL: The applicant requests site plan to add a modular building beside existing school buildings.
ANALYSIS: The Tybee Island Maritime Academy has a growing enrollment but is running out of classroom space.
They are proposing a four classroom modular building on an empty portion of the existing property. The Catholic
Diocese of Savannah has given permission for the school to expand in this area. While the applicant has
agreements in place for engineering and surveying services there is no drainage plan nor survey of the property
included in the application as required. The additional classrooms would require 14 off-street parking spaces per
code. Only 10 spaces are shown, all of which are in the City's right of way. There is also no ADA space shown.
The dumpster is also shown in the City's right of way.
The Comprehensive Plan describes the Commercial Gateway in which it lies as follows:
This area frurctions as an activity center and serves as the comanercial gateway for the City. Zoning
classifications are C-1, C-2, R-1, R -IB, R -T and R-2. The mix of neighborhood coinniercial uses include
shopping, crafts, restaurants, and eco -tourism.
Comprehensive Plan — Community Character Area
Commercial Gateway
Meets
Recommended Developinent Strategies
Strategv
YIN or N/A
1.
Future development and redevelopment should be very pedestrian oriented with safe
Y
connections to adjacent neighborhoods and commercial areas
2.
Promote mixed densities of residential development, including upstairs residential over
N/A
commercial.
3.
Encourage mixed uses to provide for the daily needs of residents and tourists.
N/A
4.
Commercial uses should be low intensity and consistent with the existing character.
N/A
5.
Encourage development/redevelopment of existing vacant properties and underutilized
Y
structures
6.
Encourage the preservation, restoration and adaptive reuse of historic strictures through
N/A
STAFF FINDING
The application is incomplete. While this is a needed building for the growth of TIMA, staff cannot recommend
approval.
ATTACHMENTS
A. Site plan review application
B. Site plans
C. Property card
D. SAGIS map
W
This Staff Report was prepared by George Shaw.
incentives
7.
Beautification and fagade improvement projects should be implemented to improve area
aesthetics
N/A
8.
Preserve/retain buildings that can house small businesses.
N/A
STAFF FINDING
The application is incomplete. While this is a needed building for the growth of TIMA, staff cannot recommend
approval.
ATTACHMENTS
A. Site plan review application
B. Site plans
C. Property card
D. SAGIS map
W
This Staff Report was prepared by George Shaw.
CIN OF TYBEE ISLAND
SITE PLAN APPROVAL APPLICATION
Applicant's Name Tybee Island Charter School dba Tybee Island Maritime Academy
Address and location of subject property: 714 Lovell Avenue, Tybee Island, GA 31328
Fee
Commercial $500
Residential $250
PIN 70005- &01 Applicant's Telephone Number 912-713-0318
Applicant's Mailing Address PO Box 1519, Tybee Island, GA 31328
Brief description of the land development activity and use of the land thereafter to take place on the property:
Modular building to be added to the lot next to 714 Lovell Avenue adding school classrooms
Property Owner's Name The Most Reverend Gregory John Hartmayer, OFM Conv. Roman Catholic Bishop of
the Diocese of Savannah, St. Michael's Catholic Church_. Telephone Number 912-786-4505
Property Owner's Address: 2170 East Victory Drive, Savannah, GA 31404-3918
Is Applicant the Property Owner? Yes X No
If Applicant is the Property Owner, Proof of Ownership is attached: Yes
If Applicant is other than the Property Owner, a signed affidavit from the Property Owner granting the
Applicant permission to conduct such land development is attached hereto. X lease agreement_ Yes
Current Zoning of Property "2, Current Use Empty lot
Names and addresses of all adjacent property owners are attached: Yes 6e°^&Q-- W:0-- %tl'
If within two (2) years immediately preceding the filing of the Applicant's application for a zoning action, the
Applicant has made campaign contributions aggregating to more than $250 to the Mayor and any member of
Council or any member of the Planning Commission, the Applicant and the Attorney representing the Applicant
must disclose the following:
a. The name of the local government official to whom the campaign contribution or gift was made;
b. The dollar amount of each campaign contribution made by the applicant to the local government official
during the two (2) years immediately preceding the filing of the application for this zoning action, and
the date of each contribution;
c. An enumeration and description of each gift having a value of $250 or more made by the Applicant to
the local government official during the two (2) years immediately preceding the filing of the
application for this zoning action.
L-- C (-(-) �/,
of Applicant Date
Fee Amount $
City Official
NOTE: Other specific data is required for each type of Site Plan Approval.
Check Number
Date
NOTE: This application must be accompanied by following information:
1 copy, no smaller than 11 x 17, of the proposed site plan and architectural renderings.
1 copy, no smaller than 24 x 36, of the engineered drainage and infrastructure plan.
1 copy, no smaller than 11 x 17, of the existing tree survey and the tree removal and landscaping
plan. �.
Disclosure of Campaign Contributions
The Planning Commission may require elevations or other engineering or architectural drawings covering the
proposed development.
The Mayor and Council will not act upon a zoning decision that requires a site plan until the site plan has met
the approval of the City's engineering consultant. (Note: Section 5-080 (A) requires, "Once the engineer has
submitted comments to the zoning administrator, a public hearing shall be scheduled.")
The Applicant certifies that he/she has read the requirements for Site Plan Approval and has provided the
required information to the best of his/her ability in a truthful and honest manner.
Signatu a of Applicant Date
CITY OF TYBEE ISLAND Fee $500
SPECIAL REVIEW APPLICATION
Applicant's Name TyoEe Ts -t b C.hALT-6ti !�--i,06C U4 119ec= TscAwo 474,tirlme tA'oe�
Address and location of subject property 7/'/ Love(,(- h u e va'c
PIN '46 05 L57 i '?t-4 I Applicant's Telephone Number 911-71:3 -0 318
Applicant's Mailing Address PO kt�X /S/q % �, Fc 3�� � d, �A 3& 2.e
Brief description of the land development activity and use of the land thereafter to take place on the property:
,(- 8vt LDJ%vs &);TN 4 CCAssRftAxs vL 2 -R+ -ST /(eo.Ks
/Y1os r /?EveAtMfl 621mo&-y M#Ac! AWMAyCR-
Property Owner's Name oFM. ?omhti t&rt4uca� Rsgy Telephone Number 912 `736 —`tjr
5f&n,CA6eC1s Ce^fbLtC-- t fN4.cL-
Property Owner's Address '2)-70 EAs ► Picn.Ly D& v f , 54urtNKhN, GA
Is Applicant the Property Owner? Yes k--*' No
If Applicant is the Property Owner, Proof of Ownership is attached:
Yes
If Applicant is other than the Property Owner, a signed affidavit from the Property Owner granting the
Applicant permission to conduct such land development is attached hereto. !/ -Yes
Current Zoning of Property /Z - 2- Current Use Em.07-y Lo 7 -
Names
Names and addresses of all adjacent property owners are attached: _ Yes
If within two (2) years immediately preceding the filing of the Applicant's application for a zoning action, the
Applicant has made campaign contributions aggregating to more than $250 to the Mayor and any member of
Council or any member of the Planning Commission, the Applicant and the Attorney representing the Applicant
must disclose the following:
a. The name of the local government official to whom the campaign contribution or gift was made;
b. The dollar amount of each campaign contribution made by the applicant to the local government
official during the two (2) years immediately preceding the filing of the application for this zoning
action, and the date of each contribution;
c. An enumeration and description of each gift having a value of $250 or more made by the Applicant to
the local government official during the two (2) years immediately preceding the filing of the
application for this zoning action.
Signature of Applicant
Fee Amount $
city official
c
M7
Date
NOTE: Other specific data is required for each type of Special Review.
Check Number
Date
NOTE: This application must be accompanied by following information:
A detailed description of the proposed activities, hours of operation, or number of units.
13 copies, no smaller than 11 x 17, of the proposed site plan and architectural renderings.
Disclosure of Campaign Contributions form
The Applicant certifies that he/she has read the requirements for Site Plan Approval and has provided the
required information to the best of his/her ability in a truthful and honest manner.
Signature of Appl
i
Date
Sec. 5-070. - Standards for special review.
Land uses listed in Article A of this Land Development Code that are permitted after special review must follow
an administrative procedure prior to the issuance of any land development permit.
(A)Review criteria. The planning commission shall hear and make recommendation upon such uses in a district
that are permitted after special review. The application to establish such use shall be approved by the mayor
and council on a finding that:
(1) The proposed use will not be contrary to the purpose of this Land Development Code;
(2) The proposed use will not be contrary to the findings and recommendations of the master plan;
(3) The proposed use will not be detrimental to the use or development of adjacent properties or the general
neighborhood or adversely affect the health and safety of residents and workers;
(4) The proposed use will not constitute a nuisance or hazard because of the number of persons who will attend
or use such facility, vehicular movement associated with the use, noise or fumes generated by or as a result
of the use, or type of physical activity associated with the land use;
(5) The proposed use will not be affected adversely by the existing uses of adjacent properties;
(6) The proposed use will be placed on a lot which is of sufficient size to satisfy the space requirements of said
use;
(7) The parking and all development standards set forth for each particular use for which a permit may be
granted will be met.
(B)Additional mitigation requirements. The planning commission may suggest and the mayor and council may
impose or require such additional restrictions and standards (i.e., increased setbacks, buffer strips,
screening, etc.):
(1) As may be necessary to protect the health and safety of workers and residents in the community; and
(2) To protect the value and use of property in the general neighborhood.
(C)Adherence to requirements. Provided that wherever the mayor and council shall find in the case of any
permit granted pursuant to the provisions of these regulations, noncompliance of any term, condition, or
restrictions upon which such permit was granted, the mayor and council shall rescind and revoke such
permit after giving due notice to all parties concerned and granting full opportunity for a public hearing.
(D) Permit longevity. If a building permit or other preparations or conditions are required prior to implementing
special review approval granted by the mayor and council such permitting or other preparations or
conditions must occur within 12 months from the date of special review approval. Such approval is based on
information provided in the application. Building permits may only be granted for plans consistent with
the approved application. Any deviation from the information submitted will require separate approval by
planning commission and mayor and council. In the event of a hardship or other extenuating circumstance
the permit holder may apply to the designated city official for a one-time extension of permit approval.
Permit extensions may not be approved in extenuating circumstances for a period of no more than 180 days.
Should the permit not be exercised in the extension period it will expire.
(Ord. No. 05-2013, 1-10-2013)
CITY OF TYBEE ISLAND
CONFLICT OF INTEREST IN ZONING ACTIONS
DISCLOSURE OF CAMPAIGN CONTRIBUTIONS
Have you within the past two (2) years made campaign contributions or gave gifts having an
aggregate value of $250.00 or more to a member of the City of Tybee Island Planning
Commission, or Mayor and Council or any local government official who will be considering the
rezoning application?
YES NO X
IF YES, PLEASE COMPLETE THE FOLLOWING SECTION:
NAME OF GOVERNMENT
OFFICIAL
CONTRIBUTIONS
OF $250.00 OR MORE
GIFTS OF $250.00
OR MORE
DATE OF
CONTRIBUTION
IF YOU WISH TO SPEAK CONCERNING THE ATTACHED REZONING APPLICATION,
THIS FORM MUST BE FILED WITH THE ZONING ADMINISTRATOR FIVE (5) DAYS
PRIOR TO PLANNING COMMISSION MEETING IF CAMPAIGN CONTRIBUTIONS OR
GIFTS IN EXCESS OF $250.00 HAVE BEEN MADE TO ANY MEMBER OF THE
PLANNING COMMISSION OR MAYOR AND COUNCIL.
Signature
Printed Name Pie , L 6 IV /t,Tkv C- It -
Date 6 /.27 .A/
Chatham County, Georgia
https://www. chathamtax. org/PT/Datalets/PrintDatalet. aspx?pin=4...
ROMAN CATHOLIC DIOCESE OF SAVANNAH 713 BUTLER AVE
Most Current Owner
Current Owner Co Address 1 Address City State Zip
Owner 2
ROMAN CATHOLIC DIOCESE OF 2170 E VICTORY DR SAVANNAH GA 31404
SAVANNAH
Digest Owner (January 1)
Owner Owner Address 1 Address City State Zip
ROMAN CATHOLIC DIOCESE OF 2170 E VICTORY DR SAVANNAH GA 31404
SAVANNAH
Parcel `
Status
Parcel ID
Category Code
Bill #
Address
Unit
City
Zip Code
Neighborhood
Class
Appeal Status
Legal Description
ACTIVE
40005 19001
7300 - School (Public,St,T)
3029258
713 BUTLER AVE
TYBEE ISLAND
31328-
20500.00 - T500 TYBEE TO BULL R
E2 - Exempt - Churches
Legal Description
LOTS 16A 13B 14B 15B 16B 17B & 17A WARD2 TYBEE
Deed Book
Deed Page
Permits
Permit #
Permit Date
Status
Type
Amount
190054-6
01/22/2019
Hold
HT
$6,500.00
140821-5
12/17/2014
Complete
RF
$135.00
130439-4
07/12/2013
Complete
SN
$29,420.00
13-0327-3
05/22/2013
Complete
RN
$200,000.00
DUMMY -1
12/09/2004
Complete
CM
$0.00
1 of 4 07/05/2019, 3:38 PM
Chatham County, Georgia https://www.chathamtax.org/PT/Datalets/PrintDatalet.aspx?pin=4...
Inspection
Inspection Date
Reviewer ID
06/03/2015
LKWOMACK
04/24/2010
LALOWRIM
12/09/2004
WWROBERT
Appraised Values
Tax Year
Land
Building
Appraised Total
Method
2019
1,275,400
343,700
1,619,100
Cost - MS
2018
1,275,400
354,500
1,629,900
Cost - MS
2017
1,275,400
377,500
1,652,900
Cost - MS
2016
1,275,400
395,700
1,671,100
Cost - MS
2015
1,275,400
418,200
1,693,600
Cost - MS
2014
1,275,400
447,300
1,722,700
Cost - MS
2013
1,275,400
473,200
1,748,600
Cost - MS
2012
1,275,400
474,900
1,750,300
Cost - MS
2011
1,275,400
474,900
1,750,300
Cost - MS
Land
Line Number
1
Land Type
S - SQUARE FOOT
Land Code
G2 - GENERAL COMMERCIAL 2
Square Feet
33,126
Acres
.7605
Influence Code 1
-
Influence Code 2
-
Influence Factor
AV - AVERAGE
Land Value
1,275,350
Residential Building
Card #
3
Actual Year Built
1980
Effective Year Built
1980
Type
1 - Single Family Residence
Style/Stories
2 - TWO STORY
% Complete
100
Quality
300
Condition
AV - AVERAGE
Living Area
3,006
Basement Area
0
of 4 07/05/2019, 3:38 PM
'hatham County, Georgia
Finished Basement Area No
Bedrooms 3
Full / Half Baths 1/0
OBY
https://www.chathamtax. org/PT/Datalets/PrintDatalet. aspx?pin=4...
Card # Description Year Built: Grade: Units: Override: Area:
1 1243: Canopy, Wood Frame, Light False Mansard 1990 1 572
1 1238: Canopy, Wood Frame, Light False Mansard 1980 1 40
Commercial Building 1 of 2
Card
Actual Year Built
Effective Year Built
% Complete
Main Occupancy
Quality / Condition
Units
Total Area
Basement Area
Finished Basement Area
r
46
28 Classroom 1221
1
1978
1990
100
356: Classroom
1 / A -AVE RAGE
6,100
No
3 of 4 07/05/2019, 3:38 PM
Chatham County, Georgia
https://www.chathamtax. org/PT/Datalets/PrintDatalet. aspx?pin=4...
Sar -Y, no photo avaaeole
Ior Li" I� record
1 of 4 07/05/2019, 3:38 PM
l
i \
f
i
'f.
r f .
t
K
U
lip
AV
ko _cr
VANGUARD
OX AR BUILDING SYS-EIAS'
Vanguard Modular Building Syet erne
CD rc �'
3 Great Valley Parry, sblte 170
Malvern, PA 19355
07 -43e -W7
ywnw,vanguardmodular corn
4 CLASSROOM
FLEX PLDC
WITH RESTROOMS
This dowmentand all InPomradon contained harem,
are the proprietary data and bade secret of
Vanguard modular sullding Syshrms LvmeM,
This adoament aridnd Scrawle LeasingcCorporatioo"I � heraln
may not be reproduced, used, w disdowd in arty
in—.tr,m ,fft„$erftrW �ebe
prier to use of this fnflonnetion, in any form, Including
that which Is re�presenbed by this complete page.
Drawing Date:
3/5/15
Project:
FLEX PLEX
Drawn B!':
VANGUARD
Drawing:
4CR1G
scale:
NTs
SECOND AMENDMENT TO LEASE
Landlord and Tenant entered into a Lease Agreement on the 6t` day of March 2013,
which was later amended pursuant to that certain First Amendment to Lease dated March 7,
2014. The property which is the subject of said Lease is located at 714 Lovell Avenue, Tybee
Island, Georgia. The parties now wish to amend said lease a second time by amending the
following terms as the same are presently found in the amended lease:
5.1—Tenant shall be responsible for maintenance of the fencing around the playground.
5.2 — In addition to the provisions of Section 5.2 of the Lease Agreement, Tenant shall be
permitted to place an additional 4 classroom module with 2 restrooms, approximately 4352
square feet: on the empty plot located on Lovell Ave. as set forth in the attached Exhibit labeled
G-001 attached hereto and incorporated herein by reference. The location for the module will be
on the common ground. Tenant shall be solely responsible for all costs and expenses associated
with the placement and upkeep of the module and/or any renovation in the existing structures
which may be necessitated by the placement of the module. Tenant will pay the sum of Seven
hundred and no/100ths ($700,00) Dollars per month for the exclusive use of this common lot
area. Tenant will provide and install and maintain a privacy fence between the common ground
area where the additional new module is placed and 706 Lovell Ave. as well as the back lot line
behind the lot where the new module is placed. Tenant will place the trash dumpster receptacle
in a place acceptable to the City of Tybee and the trash company, accessible for pick-up, and
properly enclosed in accordance with City of Tybee regulations.
10.3 — Tenant shall be responsible for obtaining any additional insurance required
under this section of the lease to cover said additional classroom module and all provisions of
said section are incorporated herein in full.
IN WITNESS WHEREOF, Landlord and Tenant have caused this Second Amendment to
A -%'Lease to be signed, as of the 3c' day of , 2019.
aLt
Witness
Witness
Witness
Witness
TENANT — Tybee Island Charter School, Inc.
DBA Tybee Island Maritime Academy
BY:
f
ITS:
LANDLORD — The Most Reverend Gregory John
Hartmayer, OFM Conv., as Roman Catholic Bishop
of the Diocese of Savannah or his Successors or
Assigns
BY:
ITS:
3
6. f
rd
1
k-. ...�
Tybee Island Maritime Academy
P.O. Box 1519, Tybee Island, Georgia 31328
June 27, 2019
Parking Plan
Please see attached drawing:
A. 7 metered parking spaces (81h St)
B. 3 gravel parking spaces (Lovell Ave)
C. 12 gravel parking spaces (Lovell Ave)
D. 12 gravel parking spaces (Lovell Ave)
E. 3 Sparking spaces (8th St)
F. 6 parking spaces — used only when there are large school functions (8th St)
G. 12 parking spaces — used when extremely large school functions (2"d Ave)
H. 9 additional spaces in front of the new modular unit
I. St. Michael's Catholic Church authorization to use parking lot.
There is additional metered parking across the street from A and on Butler Avenue.
Id1404moz U I Jo gS 86ud IQ5PvdJPun0043oIvonoZ
Ro6W-€ F-gB�$i^Sr
e _
'�^ m
z
..a
Ing..
s
3`K
LIMITED LOCATION SURVEY
� EMC ENdINEERING
1� SERVICES, INC.
►'�'`■v.,,.--
E'
a,
iip�v
Q
II
•-
o AEWION osxwricw • eT w
-�- -- --
TYBEE ISLAND MARITIME ACADEMY SCHOOL
WARD NOR
CITY OF TYBEE ISLAND. CHATHAM COUNTY. GA
Prepared for.-
TYBEEISLAND MARITIME ACADEMY
-
- — - --
gumded Yt45,1891
Mr. Jason Buelterman
Mayor
City of Tybee Island
PO Box 2749
403 Butler Avenue
Tybee Island, Georgia 31328
Re: Tybee Island Maritime Academy
Zoning Application
Dear Mr. Mayor:
April 2, 2014
At a recent meeting held concerning the application by the Tybee Island Maritime
Academy for the ability to locate two (2) modular classroom units on property belonging to the
Diocese of Savannah and St. Michael's Catholic Parish, it was noted that parking might be an
issue on occasion.
At our Parish Council meeting on Thursday, March 27, 2014, the Parish Council
discussed this issued and a motion and vote was made, and it was agreed that if "overflow"
parking was needed on various occasions by the school such would be permitted in our church
parking lot, as long as said parking did not interfere with our regular church services and events.
I hope this information will help the City in reaching its decision.
Sincerely,
Rev. Thomas J. Peyton
Pastor
Cc: Parish Council
Tybee Island Maritime Academy
802 Ba ed Cain ww, go" 96&md, Qevtoa 31328
.d Pram (912) 7864505 Sax (912) 786-4166
Gammon Surveying & Associates, LLC
6 River Bluff Drive
Savannah, GA 31406
Phone: 912-655-4891
June 17, 2019
Jason Ball
Ball Maritime Group
4 Cedar View Court
Savannah, GA 31410
Re: Survey Services for
Topographic Survey
Tybee Island Maritime Academy
Chatham County, Georgia
Letter Agreement for Services
Dear Mr. Ball
Thank you for requesting our land surveying services for the above said project.
The following is a brief description of our proposed Scopes of Service to be provided:
SCOPES OF SERVICES
A. Survey Phase
Partial Tree and Topographic Survey — The Surveyor will conduct a tree and topographic survey of the
above said property. The survey will depict one foot contour intervals based on NAVD88 vertical datum.
The scale of the drawing or drawings depicting the topographic survey shall be 20 scale or agreed upon
by the Engineer and Surveyor prior to commencement of the survey. Work shall include establishing
basic horizontal (NAD 83) and vertical NAVD 88) control. The survey will consisted of locating readily
visible storm drainage structures, water distributions, sanitary sewer system, ditches, swales, roadways,
and the location of above ground readily visible improvements and surface evidence of underground
utilities within the project area. Trees 12" in diameter will be located. Deliverable will consist of a 22" x 34"
drawing.
Partial Boundary Survey — The Surveyor will conduct a Boundary Survey of a portion of the above said
property in City of Savannah, Chatham County, GA. The survey shall meet the state and local required
minimum technical standards. The survey will be depicted on the same 22 inch x 34 inch border with the
tree and topographic survey, or a size required by the governing agency and will include the property,
City and County with metes and bounds, flood hazard lines, the location of above ground readily visible
improvements to the property.
Lump Sum Fee: $ 3,000.00
Owner's Initials
Surveyor's Initials
Jason Ball
Shore Blanton Construction
June 17, 2019
Letter Agreement for Services
Page 2
If additional survey work is needed it will need to be agreed upon in writing by the Surveyor and Owner.
The additional survey work will be on a time and expense basis. See Surveying Rate Sheet.
B. Exclusions
Items not included in the scope of services are as follows:
■ Subdivision plat
■ Archaeological report and survey
■ Geotechnical investigation and/or report
■ Phase One or Phase Two Environmental Assessments
■ Endangered species survey
■ Act as an expert witness for legal activities
GENERAL CONDITIONS OF THE CONTRACT
Article 1 — Surveyor's Responsibilities
The Surveying services performed under this Agreement shall be consistent with sound Land
Surveying practices and shall incorporate that federal, state, and local regulations and standards that are
applicable at the time the Surveyor rendered his services.
The Surveyor will strive to perform services under this Agreement in a manner consistent with
that level of care and skill exercised by members of the profession currently practicing in the area under
similar conditions. No other representation, expressed or implied, and no warranty or guarantee is
included or intended in the Agreement, or in any report, opinion, document or otherwise.
Article 2 — Owner's Responsibilities
The Owner shall make all provisions for the Surveyor to enter upon public and private lands as
required to perform such work as surveys and inspections in development of the Project.
The Owner is responsible to provide the necessary building plans upon which time the Surveyor
may rely to do his work.
The Owner is responsible for payment of all fees associated with the project. Such fees include
but are not limited to plat review and application fees, and recording fees. The Surveyor will notify the
Owner regarding the amount of fees and timing of payment.
Article 3 — Payment
For services rendered, Owner shall pay Surveyor as outlined in the Letter Agreement for Services.
Owner's Initials
Surveyor's Initials
Jason Ball
Shore Blanton Construction
June 17, 2019
Letter Agreement for Services
Page 3
Payment for services on the basis of "Time & Expense" shall be paid in accordance with the schedule of
charges attached hereto.
Project related costs for printing, reproductions, materials, and travel will be billed as reimbursable
expenses.
Projects will be billed monthly or at the completion of the work, whichever comes sooner, with payment
due upon receipt. Payment shall be considered overdue after 45 days from date of invoice, with interest
changed at a monthly rate of 1.5 percent (18 percent annual rate).
Special billing and payment arrangements may be made as mutually agreed.
Surveyor reserves the right to suspend work hereunder or any other work to be performed by Surveyor for
Owner or any of its affiliates under a separate agreement or agreements with Surveyor in the event of
delinquent payment by Owner to Surveyor hereunder or in the event of delinquent payment by Owner or its
affiliates to Surveyor under a separate agreement or agreements.
Article 4 — Miscellaneou
All digital information, field data and notes calculations, and other documents prepared by the
Surveyor as instruments of service shall remain the property of the Surveyor. The Surveyor shall retain
these records for a period of two (2) years following completion of the work during which paper copies will
be made available to the Project Owner at all reasonable times for the cost of reproduction.
Services to be performed by the Surveyor under this Agreement are intended solely for the
benefit of the Owner. Nothing contained herein shall confer any rights upon or create any duties on the
part of the Surveyor toward any person or persons not a party to this Agreement including, but not limited
to, any contractor, subcontractor, supplier, or the agents, officers, employees, insurers, or sureties of any
of them.
The Owner agrees to limit the Surveyor's liability to the Owner and to Contractors, and
Subcontractors on the project, due to the Survey Professional's negligent acts, errors, or omissions, such
that the total aggregate liability of the Survey Professional to those named shall not exceed $1,000.00 or
the Survey Professional's total fee for services rendered on this project, whichever is greater.
The Owner shall indemnify and hold the Surveyor harmless from and against any and all
judgments, losses, damages, and expenses (including attorney fees and defense costs) arising from or
related to claims by third parties to challenge the issuance of permits or certificates for the Project by
agencies with jurisdiction in the premises. Defense costs shall include the time and expenses of the
Surveyor's personnel to assist in the defense of the issuance of the permit or certificate.
We propose that payment for our services will be as follows:
Topographic Survey Lump Sum Fee $ 3,000.00
We anticipate commencement of our work within ten calendar days from receipt of your written
authorization to proceed, with completion within ten business days after commencement of work.
Owner's Initials
Surveyor's Initials
Jason Ball
Shore Blanton Construction
June 17, 2019
Letter Agreement for Services
Page 4
This proposal, including the General Conditions of the Contract contained within this agreement,
represents the entire understanding between you and us with respect to the Project and may only be
modified in writing signed by both of us.
It is our understanding that this executed agreement constitutes authorization to proceed with this
project.
If the arrangements set forth in these documents are acceptable to you, please sign and initial
where designated in the spaces provided below and return a copy to us for our files. This proposal will be
open for acceptance until June 30, 2019, unless changed by us in writing.
We appreciate the opportunity to provide this proposal and look forward to working with you on
this project.
Very truly yours,
Gammon Surveying & Associates, LLC
By: Thomas G Gammon
Thomas G. Gammon, RLS
Principal
TGG / jog
ACCEPTED: 2019
By
TITLE
Owner's Initials
Surveyor's Initials
Ball Maritime Group, LLC
Junp 2t, M1,1
Mr. Perb F ortner
('.hief F-inaricial Offc ur
Tybee I I-nd Maritime Acade,oy
P(" Box 1519
Tybee I ,land. GA 51328
re: Letter Agreement for Professional Services — PN 19-1000
Engineering Support, Tybee Island Maritime Academy Expansion
Dear Perb:
Thank you for requesting the professional services of Ball Maritime Group, LLC (BMG). We understand that the project
consists of the following for Tybee Island Maritime Academy (Client): Engineering Design and Permitting for the
development of a 6,000-sf facility on 0.76 -acres on Tybee Island, Georgia (Attachment 1 & 2). The proposed effort will be
conducted under the supervision of a professional engineer with a specialty in industrial and commercial site
development. BMG understands that the Client desires to construct a new modular classroom facility with vehicle and
pedestrian access from the existing facility, additional parking spaces, a dumpster pad, and other ancillary utilities. The
project will require provisions for water, sewer, power, communications, stormwater management, and possibly irrigation.
The standards required by the City of Tybee Island will be used for this design and the approval process required to
obtain a land disturbance permit (and other approvals).
Scope of Services
The following is a brief description of our proposed Scope of Services to be provided:
BMG will conduct a field investigation of the property and review any existing information (e.g.: surveys, plans, drawings,
schematics, public data) to gain familiarity with the layout and existing conditions. After this investigation and a review of
the as -built information, BMG will compile all existing information available and develop the conceptual submittal required
for the Land Disturbance Application to the City of Tybee Island (Planning Commission included). This plan in
consideration with the modular building proposal (Attachment 3) will be used to advance the regulatory strategy for the
facility which will include the following key components: 1) National Pollution Discharge Elimination System (NPDES)
permit program and 2) City of Tybee Island Land Disturbance Activity Permitting. The planning effort provided by the
Client (Justification for classroom size) will act as the baseline for the Basis of Design (BOD) developed and used to
develop the Final Engineering Design. BMG will concurrently advance into the engineering design phase which includes
three components: 1) Drawings, 2) Specifications, and 3) Cost Estimate. The deliverables will be as follows:
A. Basis of Design including Conceptual Plan
B. Final Engineering Design for Regulatory Submittal and Construction (Utility Calculations, Stormwater
Calculations, 100% Drawings, Specifications, Cost Estimate)
C. NPDES Submittals
D. Asbuilt Drawings
Expense and Reimbursement Costs
Proposal 19-1000
BMGJTIMA
Page 2
Expenses including printing, reproduction, travel (outside of Chatham County), lodging, meals, boat, equipment, testing
and laboratory, computer charges, filing fees, courier fees, mailing costs, etc. will be billed at cost per Exhibit B. Travel in
BMG vehicles will be billed at the IRS mileage reimbursement rate.
Detailed Fee Proposal
Service
Fee Type
Budget
Task 1 —Analysis Phase
Lump Sum
$2,000
Task 2 — Basis of Design Phase
Lump Sum
$1,250
Task 3 — Design Phase
Lump Sum
$4,000
Subconsultants (Survey)
Owner Provided
Expense Costs — Miscellaneous
Cost Per Exhibit B
$250
Total Budget
Not -to -Exceed
$7,500
The above not -to -exceed fee arrangements are based on prompt payment of our invoices and the orderly and continuous
progress of the Project at the direction of the Client. We anticipate commencement of our work immediately from receipt
of your authorization to proceed with completion dictated by Task and Client requirements, anticipate submittal to the City
of Tybee Island within 60 -days from authorization. This proposal, Exhibit "A" and Exhibit "B" represent the entire
understanding between you and us with respect to the Project and may only be modified in writing signed by both parties.
It is our understanding that no work will commence until written authorization is provided to us by you for the Project.
If the arrangements set forth in these documents are acceptable to you, please sign and initial where designated in the
spaces provided below and return a copy to us for our files. This proposal will be open for acceptance until August 1,
2019, unless changed by us in writing.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project.
Regards,
Ja4n P. Ball, PE, D.PE, D.NE
President
Ball Maritime Group, LLC
ACCEPTED: 2019
TITLE
A
. etPi�r v4.
�N
W
J
DUNS Number:
063551271
EXHIBIT "A"
ADDITIONAL SERVICES OF BMG
Ball Maritime Group, LLC
If authorized by the Client in writing, BMG shall furnish or obtain from others, Additional Services of the following types
that are not considered normal or customary Basic Services:
1. Revising previously accepted studies, reports, design documents, or Contract Documents when such revisions
are due to causes beyond BMG's control;
2. Furnish the services of special consultants for other than the civil, structural, electrical, and mechanical
engineering defined in the Scope of Services. Special services include tasks such as geotechnical exploration,
underwater investigation, laboratory testing and inspections of samples, materials, and equipment;
3. Preparing to serve or serving as a consultant or witness for Client in any litigation, public hearing, or other legal or
administrative proceeding involving the Project;
4. Defending the issuance of any permit or certificate for the Project. Services for the defense against third party
actions opposing or appealing the issuance of any permit or certificate for the Project will commence with receipt
of notification of the action; and/or
5. Services after completion of the Construction Phase, such as inspections during any equipment, material, or
construction guarantee period and reporting observed discrepancies under guarantees called for in any contract
for the Project.
OF
EXHIBIT "B"
STANDARD CHARGES SHEET
Ball Maritime Group, LLC
Plannina and Enaineerina Services/Hourly Rates
Principal/Senior Port Planner/Chief Economist
$185 to $275/hour
Project Manager/Professional Engineer/Senior Analyst
$120 to $200/hour
Staff Engineer/Engineer-in-Training/Analyst
$75 to $150/hour
Designer/Technician
$65.00 to $100.00/hour
Field Representative
$75.00 to $95.00/hour
Administrative/Clerical
$55.00 to $65.00/hour
Reimbursable Expenses
Reproduction, Postage, Overnight Delivery, Courier Service At Cost
Long Distance Telephone Calls, IT Support, Modeling, Software Licensing At Cost
Travel in Town (Regional by Vehicle) IRS Rate (2019)
Travel Out of Town (Regional, National, & International) At Cost
Boat Usage (Not Including Crew) $400/day
Level/Transit $100/day
Remarks
Services and fees not listed above will be quoted upon request in writing.
Invoices will be submitted once a month for services rendered during the previous month.
Payment will be due within thirty (30) days of invoice date. Interest will be added to delinquent accounts at the rate of
1.5% for each month of delinquency.
Ball Maritime Group, LLC reserves the right to escalate these rates on an annual basis.
n F
:-- YBEE ISLAND
MARITIME ACADEMY
Tybee Island Maritime Academy
P.O. Sox 1519
Tybee Island, Georgia 31328
July 1, 2019
To Whom It May Concern,
Tybee Island Maritime Academy (TIMA) is a public charter school under the Savannah Chatham County
Public School System We have grown to 295 students and have expanded to utilize every bit of space available
to us. We expect to increase the number of students even more.
In June, the Principal (Mr. Peter Ulrich) and four teachers attended the All Hands on Deck conference in Norfolk, VA.
The conference featured speakers and panel discussions addressing broad areas of maritime workforce training. The two-
day conference addressed opportunities to enhance and expand maritime training, marine technology, ship building and
repair, as well as port management, workforce training, and education throughout the country.
They were able to collaborate with community and technical colleges, K-12 educators, Maritime Administration
(MARAD), US Coast Guard and industry partners to reach the goal of growing and sustaining a world-class maritime
workforce for the years ahead!
For the 2019-2020 school year we will be adding a Makers class and a Coding Class for our students.
Makers create, tinker with old technology, and invent new things. Maker teachers inspire their students to
dream up their own inventions, experiment, fail and experiment again until they've made something personally
meaningful. Maker education is a combination of hands-on learning and project -based learning.
Coding is essential to help students thrive in a future driven by technology. When you teach coding, you
also teach skills like critical thinking and problem solving.
The City of Tybee along with the YMCA has generously allowed us to use the gym for our physical education
classes. Live Oaks Library System has allowed us to use the library and each child has a library card. We have
had to turn part of our gym/cafeteria into classrooms to accommodate the number of students.
To meet the additional space demand due to enhancing our project based learning into STEAM (Science,
Technology, Engineering, the Arts and Math), the additional numbers of students and the need to take back our
gym/cafeteria in full, TIMA needs to add additional classrooms to our campus.
We propose to add a modular building to the lot north of the gym, which would include 4 classrooms, a large
girls' restroom and boys' restroom. This building will be connected to all utilities, internet services, security and
fire alarm services. This will only increase parking space needs by 4 spaces.
We are presenting our request for approval without engineering, surveying and expensive start up costs to
prevent wasting valuable money without approval to move forward. We assure you that we will meet all
ordinance and code requirements once we are approved to start the work as we did in 2014.
We request approval to move forward to add the structure to our footprint.
Sincerely,
CC uri Perb Fortner
President CFO
See list of attachments
LEGEND:
TREE TO BE REMOVED
DRAINAGE FLOW ARROW
8' TALL WOOD FENCE
4' TALL STEEL BOLLARD
ja
NOTES: , /a� \ PQ' P +
1. PROPOSED BUILDING IS LESS THAN 5,00 -SF IN SIZE, / % �OeJ�e \
THUS THE SITE WILL NOT REQUIRE CALCULATION IF RRv o�
AND WQv. % OI � 4
2. EXISTING DRAINAGE PATTERN DOES NOT CONVEY ff \ \ QQ-�RQp
RUN-OFF FROM SURROUNDING PROPERTIES THROUGH ,
THE PROPOSED SITE (DELINEATED BY THE GREEN f8
POLYGON). f f p og \ \
3. PROPOSED DRAINAGE PATTERN WILL CONVEY THE
RUN-OFF FROM THE SITE BENEATH THE RAISED
MODULAR BUILDING THROUGH GRAVEL AND ACROSS THE \ '_
PROPOSED CONCRETE SURFACES.
3. CONCRETE SURFACES WILL BE SLOPED A PER
FOOT, MINIMUM. /
4. THE SITE WILL BE GRADED AT 1 % FROM EAST TO f \
WEST, MINIMUM.
ONE SIGNIFICANT TREE WILL BE REMOVED, REQUIRING
MITIGATION. ' 0Ic
/ 0.� .;. � //�� � �•y _ .�s ,,s, 1, ., ,
Imo'
06
cl
i ���e��' - `�� � `9�.0� �• �'� � ,8853
cP o���tic 8�8
Pervious
C®oO\OG�S
r
SHEET ID
C-101
Lisa Schaaf
From: Downer Davis <dkdjr07l4l9@yahoo.com>
Sent: Monday, July 22, 2019 4:49 PM
To: George Shaw
Cc: Lisa Schaaf, jason@ballmaritime.com
Subject: Tybee Island Maritime Academy
After reviewing the preliminary documents in your office last Tuesday, Jason contacted me and we
discussed the design requirements. I now have sufficient detail of a drainage design concept (based
on a current topographic survey) to offer the following comments
1. The Engineer is correct that the CSS spreadsheet and related evaluations and documents are
not required based on the scope of this drainage project. Specifically, water quality and runoff
volume reduction exhibits are not required. However, as I advised Jason Ball in our phone
conversation, peak runoff in any direction will not be allowed above the predevelopment rate
for the Type III, SCS 25 -year, 24-hour storm. (Per Article 16 of the Land Development
Code). In this instance, Lovell Ave discharge appears to be the outfall area of
concern. Concrete surfaces referenced in the notes need to be clearly identified on the plan
and accounted for in a simple drainage report.
2. The Engineer is correct that there does not appear to be a dependency on this project area by
the property of others for drainage conveyance. It
does continue to convey minor yard runoff onto the lot to the east, under the same
ownership. This is not a concern of the reviewer.
3. More detail is needed on the proposed drainage pattern. Documentation is to be provided
showing this. There are no proposed elevations to show implementation of the proposed
drainage pattern referenced in phone conversation and indicated by flow arrows. The
exhibit/plan needs to clearly delineate between existing and proposed elevations, contours,
and flow direction arrows.
4. There were no dimensions shown on the lot lines.
5. The ADA ramp indicates a connecting ADA pathway, but no detail is given on the
pathway. The total parking count for this facility with the number of ADA parking spaces
(including van accessible should be noted on the plan or in other documentation acceptable to
the City.
6. If the parking is to be unpaved, the method of stabilization needs to be clarified.
7. With flow continuing beneath the building, the method of stabilizing this shaded/covered area
needs to be addressed.
8. No erosion and sedimentation controls were shown.
9. The final plans will require a signed GA PE Seal with supporting drainage calculations.
This is the same criteria that the previous school buildings were reviewed under approximately 5
years ago.
While the list may appear huge, it's not. The existing topo and the design concept presented verify
that there are no significant obstacles to completion of a full drainage design. There's not a huge
effort needed to provide the additional detail needed prior to the construction phase. I anticipate the
Engineer can address these comments well before the end of the public meetings.
Downer
Bm
\_
• x
F r
WE.V•819
�.■■ y
r^x832 3�Mf)•gL 8.52
PA III 40005 19008
r Hl] CATHOLIC BISHOP OF
TREE
LEGEND.
• THE DIOCESE OF
7 SAW NNAH
x =+ 706 LOVELL AVE
S'}i IRF 1/2
x 8.39
N/F
ICATES TREE (DOES NOT REPRESENT DRIP LINE)
PPROHIMATE CENTER OF TREE
I 20 x $41
PM SIO
IA ID 40005 19225
LALEY GRACE
oni
ENATION AT BASE OF TREE
SEWER MAANHOLE +' -EC, SIl 12 ' x - 8.30
FR. 6.13 '••
TBS BUTLER AVE
➢B 1131,111
510 _
,REE SIZE B SPECIES
DC 3.94 B.3a
814 !1 XOL
F 812 S5 6
/
9.19 8.63 CMF BROKEN
P ---S Sl6 8.58
LO = LIVE OAK TREE
( x e85
CONTROL POINT :( 8.2
x 4
N 73'fi'7.53 -- / ' k CHAlN v
'BO _ "--
8.390
OAK =OAK TREE
,'
E 065843 2 _ UHK
EL 8.30 793 'Y --
e.J2 8.3]
1 8.10'A / /�
PM =PALM TREE
/ /• 830 M6
P. 3
_
r3• Dq x 8.27
�TOD
x
WATo-WATER OAK TREE
x 7.92 x
x ..IG
8.72
HIC =HICKORY TREE
SURVEYORS CERTIFICATION
THE PLAT S A RETRACEMEN OF AN E%SING PARCEL OR
PARCELS OF LAND AND ODES NOT 5UBG VOE OR CREATE A NEW
PARCEL OR MAKE ANY CHANGES TO ANY REAL PROPERTY
BOUNOARES THE RECORDING NFORMATON OF THE DOCUMENTS,
MAPS, PLATS. OR OTHER INSTRUMENTS WH CH CREATED THE PARCE
OR PARCELS ARE STATED HEREON RECOROA`ON OF TH 5 PLAT
DOES NOT MPLY APPROVAL OF ANY LOCAL HER SO C TON,
AVA LAB LTY OF PERM IS, OGGPL AND WTHOC AL REGDLA, 3NS
OR REGO REMENTS, OR SU TAB TY FOR ANY ISE OR PURPOSE OF
THE LAND FURTHERMORE THE NDE RSGNED AND SURVEYOR
C ER TF E5, TO THE BEST OF HE KNOWLEDGE AND BELEF, THAT
THE PLA' COMPLES ATH THE MNMUM TECHNCAL STANDARDS
FOR PROPLRTY SURVEYS N GEORG A AS SET FORTH N THE RULES
AND REGULATONS OF THE GEORG A BOARD OF REG STRATON FOR
PROFESSONAL ENG NEERS AND AND SURVEYORS AND AS SET
FOR'4�/��''O C G A SECTION 'S 6 67
/� )/20/20"9
T OMAS G. GAMMON, GA RLS 3005 DATE
GEO R G/q
1576gto
3 of
PROFESSIONAL
y09� SURNf'iOIPO=
'tfgS G OPtA
EHOMA, GAMMON
GA REG LANG SURVEYOR
CENSE NO 3005
SF# 200
NOTES
FOLD EOU PMENI USED GEOMA% ZOOM BO 5" IOTA,
STATION AND CHAMPON TKO RECEVER
B CAR D S AND COORDINATES SHOWN ON I- ::IJRVEY ARE
BASED ON GEORGA STATE PI ANF COORD NATE SYSTFM
'NAD83; EAST ZONE
3ELEVA INS SHOWN ON THE DRAWNG ARE BASED ON
NAVD88, 'UNLESS 0' ERW SF NOTED CONTOUR NTERVAL
ONE FOOT
4THE ROPEPI( GENTFCL ON HUMBER (PN; )F THE
EROPE- DEE C TED HEREON 5 40005 900
5 UNUERGROUNO III lFS NO' SHOWN MAY BE
ENCOL N TEPED
THE U T L TY PRO FEC ION CEN LH SHOULD BE CON EACTED
PR UR I� BEG NN NG ANY CONSTRUCTON
IACCORDNG TO F RM MAP NO 305'10 PANEL 02 SG
EFFEC I VE 08j'6206, T 5 MY OPNUN THAT THE SUB UEC'
AREA SHOWN ON Trvl':, SEES NON
WTHN A FLOOD
HAZARD AREA N ZONE AE 9
)TREES ARE LOCATED N NC HES THE SZE OF ME SYMBOI
DOES NOT NDCATF TuE CZE OF THE DPP I NE IND, DP
CANOPY '.NE
LEGEND:
( IU/IRF
o RON REBAR SEI
A POWER POLO
® SAN IARr MAN -1
�} FRE HYDRANT
RON REBAR TIIUNI�
C)N-TO PUHI
® 'WATERVAI , F
_ nNTOIF Ne
A TREE AND TOPOGRAPHIC SURVEY OF
713 BUTLER AVE
LOTS 16A 13B 14B 15B
16B 17A &17B
PARCEL ID 40005 19001
TYBEE ISLAND
CHATHAM COUNTY, GEORGIA
PREPARED FOR:
ROMAN CATHOLIC DIOCESE OF SAVANNAH
PREPARED BY:
GAMMON SURVEYING & ASSOCIATES, LLC
n 0 D 40
im
SCALE INCH 20 FEET
FILL n DATE -19-2019
PLAT DA'E 7-20-2019
\_
• x
F r
7.96 x 8.29
�'�OB 8.52
�.■■ y
r^x832 3�Mf)•gL 8.52
? 8.13
+
= Sl2
,,,+,�y828 PPRID C 19004
�'* RDMAN
;'•,� I( 1
CATHOLIC
PM SO DIOCESE
.x 8,24 �],92 707 BUTLER AVE
�
J
7,99
/
9.19 8.63 CMF BROKEN
P ---S Sl6 8.58
�I GRPVE
'BO _ "--
8.390
7 \10.33
LD 32q T 85T
1 8.10'A / /�
99
8A3 x g S4 \8 x B.fi6 x 8.41
'
x
' 8.37 �`! _.
9 \ \
PMS12 S
/+
1
18.0] ' � ,FF.c 8.71 '
8.90
B.aB 8.09 8,89 % IN CONCRETE
1.NIF
I r•
9Vx
E}}gg2
Y '$,01 / PARID 40005 19003
1 / • __
/•
I
B,;� 70 / LOO YVONNE
709 BUTLER AVE
/St4 10 22 DB .42,272
x -E
zea
BE •.
�H=
8,3➢"
8117
PNJ S22
]
PTA ..
AVEL
GR.I-
% IN CONCRETE 9.10
9.41
'
N/F
I /
PPRID 40005 19002
LE MARY C 6 ALICE
/
I r •• 8.78 57
711
]Il BUTLER AVE
_ Be 306H,0197
CONTROL POINT ,� 19
N 73.45592
E "065797 29L
i
UNIT
d. ].96
B.84Y3�+
8.15 x 8.23 .: \
all 1/2
0.29 ' ,A
/lE ).89 :r - _
DID -_
�a� 9.31 _ x8.02
9.41•
�lf
/ /
9.27 665
NCONCRETE
METAL /BRICK
BUILDING
r
8.58 x 8.61
A/C UNIT "- 1 .77ti-�•6 Y
]99 •-' ><( 6 8.6]
I
_ `+ 858 'FG�3( N COI=
A •P?.
F.F. 8.67
r1 /
8.94
i 8.54 1
/ ' " PARID 4DID5 19001
903 9'04
_ AN CATHOLIC DIOCESE BE SAVANNAH UGC
IJJ99 ••+ ROM
/ 'c`
713 BUTLER AVE -x
B,Da 1 LOTS EGA 13B 14B 15B 168 17A 6178 8,89 /+20
,� _
(
SEWER MAANHDLE ( / : / �__ WARD 2 TYBEE ISLAND
FR. 8.11 /! / , /�/ C-_'�`��� C .{rv:F
IE _ _
FN
"t
/! "-- ��
(4-
8.66 JVQ , 6180 x 8.98
/174
B y i
!! /� � I•' i 8.18 ��~1� B 8)4�---�
�J�
-_
T85-.
-a _
RAMP �:-� "� _ 8.65•`
_ _ /
'
MODULAR " 2 4
'].88/ x•26
®'8.54 �L - `:ti•6�//>
- - -_ _ 9.-
///I/Ill
CLASSROOM
L'L. 5� :, 4
)9]'!'
L, -'¢�
L 5• J Y-'•
/C UNITS PMI SII -�'
•F nH-1E
8061
/• •
t_�•�--I'-� Y.94 \\\METE\
7
_
J /.®//Po
••.64 / 3 x 9.05
1�V.8.06X8.39
X-"_"•"-�„
+--_"""-- 8•'
" Z.97 7.70 SS 8• PVC `. METER 8.0-3--_/Ifi�,
a -•
Rl
\
BRICK
BUILDING ' _•'
``,�•!�
8.62
METE
_ 1 • 8.46
764 ! �---------1. 6
>,S2 Fes: J+ \ - `- _"=--. -.3 _------_- p�C VC1. To i_
p- -- ' GRP 8,311
3D
� 948
F X -----
■
-
7,81 - - _ \ M SI2 =444 POS`"may=
:.
--_�
+ "y-6
-~�""-- -:-
5 �i�8.2\ 35
SB 5'-'.--•,� 1Y1�!
- 913
NEl!!'!
8.34 4- .8.33 86 8,96 '�', R^ - II'- CROSSING SIGNAL
_ BT/y
957
��.34 -- ,• 9.18
_
� 08
SEWER XAANHOLE ' 9'21
9 !
v A-
.22F912
F 9 I2
SURVEYORS CERTIFICATION
THE PLAT S A RETRACEMEN OF AN E%SING PARCEL OR
PARCELS OF LAND AND ODES NOT 5UBG VOE OR CREATE A NEW
PARCEL OR MAKE ANY CHANGES TO ANY REAL PROPERTY
BOUNOARES THE RECORDING NFORMATON OF THE DOCUMENTS,
MAPS, PLATS. OR OTHER INSTRUMENTS WH CH CREATED THE PARCE
OR PARCELS ARE STATED HEREON RECOROA`ON OF TH 5 PLAT
DOES NOT MPLY APPROVAL OF ANY LOCAL HER SO C TON,
AVA LAB LTY OF PERM IS, OGGPL AND WTHOC AL REGDLA, 3NS
OR REGO REMENTS, OR SU TAB TY FOR ANY ISE OR PURPOSE OF
THE LAND FURTHERMORE THE NDE RSGNED AND SURVEYOR
C ER TF E5, TO THE BEST OF HE KNOWLEDGE AND BELEF, THAT
THE PLA' COMPLES ATH THE MNMUM TECHNCAL STANDARDS
FOR PROPLRTY SURVEYS N GEORG A AS SET FORTH N THE RULES
AND REGULATONS OF THE GEORG A BOARD OF REG STRATON FOR
PROFESSONAL ENG NEERS AND AND SURVEYORS AND AS SET
FOR'4�/��''O C G A SECTION 'S 6 67
/� )/20/20"9
T OMAS G. GAMMON, GA RLS 3005 DATE
GEO R G/q
1576gto
3 of
PROFESSIONAL
y09� SURNf'iOIPO=
'tfgS G OPtA
EHOMA, GAMMON
GA REG LANG SURVEYOR
CENSE NO 3005
SF# 200
NOTES
FOLD EOU PMENI USED GEOMA% ZOOM BO 5" IOTA,
STATION AND CHAMPON TKO RECEVER
B CAR D S AND COORDINATES SHOWN ON I- ::IJRVEY ARE
BASED ON GEORGA STATE PI ANF COORD NATE SYSTFM
'NAD83; EAST ZONE
3ELEVA INS SHOWN ON THE DRAWNG ARE BASED ON
NAVD88, 'UNLESS 0' ERW SF NOTED CONTOUR NTERVAL
ONE FOOT
4THE ROPEPI( GENTFCL ON HUMBER (PN; )F THE
EROPE- DEE C TED HEREON 5 40005 900
5 UNUERGROUNO III lFS NO' SHOWN MAY BE
ENCOL N TEPED
THE U T L TY PRO FEC ION CEN LH SHOULD BE CON EACTED
PR UR I� BEG NN NG ANY CONSTRUCTON
IACCORDNG TO F RM MAP NO 305'10 PANEL 02 SG
EFFEC I VE 08j'6206, T 5 MY OPNUN THAT THE SUB UEC'
AREA SHOWN ON Trvl':, SEES NON
WTHN A FLOOD
HAZARD AREA N ZONE AE 9
)TREES ARE LOCATED N NC HES THE SZE OF ME SYMBOI
DOES NOT NDCATF TuE CZE OF THE DPP I NE IND, DP
CANOPY '.NE
LEGEND:
( IU/IRF
o RON REBAR SEI
A POWER POLO
® SAN IARr MAN -1
�} FRE HYDRANT
RON REBAR TIIUNI�
C)N-TO PUHI
® 'WATERVAI , F
_ nNTOIF Ne
A TREE AND TOPOGRAPHIC SURVEY OF
713 BUTLER AVE
LOTS 16A 13B 14B 15B
16B 17A &17B
PARCEL ID 40005 19001
TYBEE ISLAND
CHATHAM COUNTY, GEORGIA
PREPARED FOR:
ROMAN CATHOLIC DIOCESE OF SAVANNAH
PREPARED BY:
GAMMON SURVEYING & ASSOCIATES, LLC
n 0 D 40
im
SCALE INCH 20 FEET
FILL n DATE -19-2019
PLAT DA'E 7-20-2019
PLANNING COMMISSION
NOTICE OF DETERMINATION
Meeting date: 7/15/2019
Project Name/Description: modular building added to the lot — 714 Lovell Avenue — Zone R-2 —
40005-19001 — Tybee Island Charter School dba Tybee Island Maritime Academy.
Action Requested: Site Plan approval/Special review
Special Review X Subdivision:
Site Plan Approval X Sketch Plan Approval Conceptual
Variance Preliminary Plan Approval
Map Amendment Final Plat Approval
Text Amendment Minor Subdivision _ Major Subdivision
Petitioner has met all documentation requirements, all external approval requirements, and all
code requirements, except for the following:
The Planning Commission Motion on Petition: ❑ Approval ❑ Denial ® Continued
To a special meeting called for July 23, 2019. For applicant to get required items in order
to make the August 8, 2019 City Council meeting.
Action on Motion
COMMISSIONER
FOR
AGAINST COMMENTS
Bishop
Chair
Bossick
Vice Chair - Absent
Robertson
X
Gann
X
Second
Bramble
X
Matlock
X
McNaughton
X
I Motion
Planning Commission Chair:
Planning & Zoning Manager:
r',
Date:
Date:'
PLANNING COMMISSION
NOTICE OF DETERMINATION
Meeting date: 7/23/2019
Project Name/Description: modular building added to the lot — 714 Lovell Avenue — Zone R-2 —
40005-19001— Tybee Island Charter School dba Tybee Island Maritime Academy.
Action Requested: Site Plan approval/Special review
Special Review X Subdivision:
Site Plan Approval X Sketch Plan Approval Conceptual
Variance Preliminary Plan Approval
Map Amendment Final Plat Approval
Text Amendment Minor Subdivision _ Major Subdivision
Petitioner has met all documentation requirements, all external approval requirements, and all
code requirements, except for the following:
The Planning Commission Motion on Petition: ❑ Approval ❑ Denial ❑ Continued
Motion to forward to City Council with these conditions addressed: are variances required
for setbacks and parking and satisfy drainage issues.
Action on Motion
COMMISSIONER
FOR
AGAINST COMMENTS
Bishop
Chair
Bossick
Vice Chair - Absent
Robertson
X
Gann
X
Bramble
Absent
Matlock
X
Second
McNaughton
X
Motion
Planning Commission Chair:- ` t '" Date: �i' Z 3
Planning & Zoning Manager- I _= Date: 03 ' G "
k E
1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10
�%IYB E E ISLAND
MARITIME ACADEMY
CLASSROOM EXPANSION
PROJECT NUMBERE. 19m1000
�1~
S'
~S!ti
r. Kv�l
rr
J�
]1 TJ
i
PROJECT
SITE
r' ,'vrllrllEt n
L
�Z
x
LOCATION MAP
NOT TO SCALE
SOLICITATION NO.:----
CONTRACT
NO.: 19-1000
ISSUE DATE: AUGUST 1, 2019
1000\CADD\SHEETS\CONST\19-1000 G100-COVER.DWG <> PLOT DATE: 8/1/2019 5:10:36 PM
I�
PROJECT
LOCATION
VICINITY MAP
NOT TO SCALE
�O R
�G\ STFj�,
No. 1
IE, • IONAL
IVwww.Georgia811.com gspN P P
KmwwmftbelavL
Call ndomymmg.
rn
o
Z
O
w
c)
LL] N
O Z
Q
O
<
~
U
2E
w
O
H—
o
O
0
Lu
U
cn
Q
Q
OU I
OU
-
U
>
O
U
0
wo
�O
Qo
Z o
m
}
J r
Lu
m
Q
LL
Lu
m
MLu
Lu
LD
Z
3:U
Y
~
Q
Dm
�a
TZ
F -N
U�
c=na
cn<
VCT O
N 1
� �bA
f1 O, O
M
rrO
0
C7
4- >
Zj
ct5 A
Z
O
cn
z
Q
0-
X
Lu
2E
w
O
o
Of
u)
cn
Q
U
SHEET ID
G100
6
11
A
C
L
CONTROL POINT EDGE OF PAVEMENT
_-------------- N:731455.92
E:1065787.29
" — EL: 7.96 LOVELL AVE.
SS SS _ss SS
IH
3.11 ------------
------ 8--- --------- — ----- �\
I
i
I
-8 CONTROL POINT
6" PVC N:731617.53
S E:1065843.21
SSMH
EL: 8.30 FR: 8.13
IE: 3.94 /
----- _ x- x — — — _8 — _ _
X _--- X x _ --- x --__ _ EDGE OFPAVEME ------ \ �,
NT
RAIL /
-
- - -- ❑
GRAVEL GRR VEL GRAY -L-
n' --- ----- - -- - y❑
—-
M—AV_
/ / -- -- REMOVE 1,391 SF i ❑EXISTING GRAVEL
`\ \ ❑� ❑ r
- '
-� - --- -- - -' T - - - -- �. - - -- -- - ------------ - - - - � _ _ - � IRF 1/2
---
/- A/C -UNIT ' \
I
I
REMOVE
N/F CONCRETE PAD I \
PARID 40005 19001
ROMAN CATHOLIC DIOCESE OF SAVANNAH
METAL / BRICK 713 BUTLER AVE
BUILDING LOTS 16A 13B 14B 15B 16B 17A &17B
WARD 2 TYBEE ISLAND -
FF: ± 8.71
X
REMOVE PALM - 4
TREE
X
FREOVE PALM
c J - - REMOVE (3)
' \ - - o; //; /; OAK TREES
,
I
IRF 1/2 -
A k
= -7
CM,F — _ _ _ _ \ CMF BROKEN
6 WOOD.
\ x
i
X
= x
01
-----
4
--- -
- I
A/C UNIT
lb
k I \
---
\ _ _-- -- Z000
—�� \ \
i
J
\ \
N�
- -- = -- \ PARID,0005 19004
❑ _ \ , -
'ROMAN CATHOLIC DIOCESE
�cA c J \ — ' 707 BUTLER AVE
N/F \ o s 10 20,
❑ PARID 4000 19002 \ N/F = 10'
x x Q x \ PARI D 40005 ;1 8003
E MAY ALI E
MULL C & C I
/ \ / L00 YVONNE 709
c I 711 BUTLER AVE /
\ -- ❑�DB 306H,0197 BUTLER,AVE , - 0 R
\ co c�Q ! Z / DB 1442,27 — ' �C,\ST�
\ _ i
i
❑- v /
-- - - / i' -- - n ' §IONA
Ci \ - / I 1
/ N �
1/oz, c ❑ S /
_gal ! ❑� ❑ J I / , �`
Fwww.Geor ia811.com SoJ.- -- -- -- - - /9 N P.
KmwwmftbelamL--
x (Call before you dig.
0
K:\19-1000\CADD\SHEETS\CONST\19-1000 V101 -EX COND DEMO.DWG — PLOT DATE: 8/1/2019 5:10:38 PM
Z
0
Z
O
Li
0
ov
J
wN
O
z
W
0
0-
X06
O
<
H
U
(o
O
w
O
0
U)
LU
�Z)
UHo
Of
O
U
W
UQ
o i
U I
o)
U)
Q
U
o
U
U
w
Ly
.o
w�
ao
Z
m
}
m
w�,-
�c6
M
m
m
o
o
Lu
ZLu
Y
~
C,
Q
Qm
M
Qa
LIJ
LL
w FnU
N
02
(nna
cnQ
v�
a o
N 1
f1 O� O
�o u
OM
ori
o
ct
ct
Z
o_
O
J
Z
�
Q
W
0
0-
X06
w
"'
z
O
O
o
O
z
Of
O
U
Cid
C/
Z
QU)
U
w
SHEET ID
V101
mm
11 -3 A C L 7 O A 4 A
1 I L
CONTROL POINT EDGE OF PAVEMENT
N:731455.92
I F • 1 OA;7S27 9A
I.T.IIM-r.loRr•mWm
1000\CADD\SHEETS\CONST\19-1000 EC501-ESPC PLAN.DWG — PLOT DATE: 8/1/2019 5:10:41 PM
rn
o
Z
O
w
0
O
(D
Z
Z
U
z
�U)
H
<p O
U
C7
Q
J
LU
U)Z)
O I
O(,
o
w
Q
a
U
�Q
c7)I
U-
U
U
W
0
iu U
2 L
Qo
Z o
m
m
}
Q
W
J
LL
LU
m
cLU
LDZ
3:
Y
U
~
Q
Om
Da
U2
U)
N
u�Q
v�
a o
N 1
N
na O
�v
O
OM
bfi
O
N
•1 >
7
r �
r-4 5,5
ct
z
0
U)
)
Z
0—Q
X
z
W
J
U
O
cerin
O
w
U)
Cn
Q
J
U
SHEET ID
EC501
mm
11 -3 A C L 7 O A 4 A
1 I L
CONTROL POINT EDGE OF PAVEMENT
N:731455.92
I F • 1 OA;7S27 9A
I.T.IIM-r.loRr•mWm
1000\CADD\SHEETS\CONST\19-1000 C101 -GRADING PLAN.DWG — PLOT DATE: 8/1/2019 5:10:53 PM
z
Z
O
o
O
c�
LL]
ON
Z
Z
J
X
LU
Z
H
cl�_
CD
C~J
Qo
z
0
O
Q
a
LU
U
()fo
W
C7
Z
U)Z)
_
�Q
O I
� I
O--
U
Q
U
Q
U
of
O
2LU
U
Qo
Z o
m
m
}
Q
W
J
LL
LU
m
cLU
CZJ
ZLU
�'
~
cl
Q
Om
< 00
Da
LU
U2
LL
co 00
U)
LU IF)U
N
u�Q
v�
a o
N 1
N
na O
�v
O
OM
bfi
O
N
•1 >
7
r �
r-4 5,5
ct
z
O
U)
)
Z
0-
Z
J
X
LU
cl-
CD
�
z
O
O
U)
cn
Q
J
U
SHEET ID
C101
® Ball Maritime Group, LLC
August 1, 2019
Mr. George Shaw
Planning & Zoning Manager
City of Tybee Island
P.O. Box 2749
Tybee Island, GA 31328
re: PN 19-1000 — TI MA Expansion: Stormwater Management Plan
Dear George:
This submittal has been assembled based on our understanding of the project, the requirements for stormwater
management discussed with Mr. Downer Davis, PE, and the previous responses from the Planning Commission. In order
to meet the requirements for approval, it is our understanding that the proposed site must not increase the impervious
coverage from the pre -developed site and the site must detain the post development stormwater run-off below water is
released from the site currently. Please refer to the submitted plans for information complimentary to this narrative. The
engineering drawings for the project will reflect the actual construction activities proposed below (Attachment D).
Pre -development and Post Development Considerations
The project site is considered to be the property boundaries on the north and east, the north edge of the existing gym, and
the edge of pavement along Lovell Avenue. This is approximately 0.25 -acres. The pre -development impervious coverage
on the site is 0.21 -acres. The post development conditions will include additional impervious area to accommodate the
garbage dumpster pad, but impervious area will be reduced in the existing parking areas along Lovell Avenue to balance
out the net results. The table below reflects this change. The modular building does not count as an increase in
impervious area due to it being elevated and the footprint being used as a gravel infiltration best management practice.
Unpaved parking is currently provided along Lovell Avenue and will remain that way for this project.
TABLE 1 — DRAINAGE BASIN COMPARISON
Existing
Area (SF) Proposed
Area (SF)
Impervious
Impervious
Concrete Pad
24 Concrete Pad
12
Crush & Run
1,391 Crush & Run
502
Dumpster Pad
300
Concrete Sidewalk
217
Pervious
Pervious
Open Space
9,271 Gravel Building Pad
4,352
Open Space
4,783
Metal ADA Ramp
520
Total
10,686
10,686
Percent Impervious
13%
10%
OR
srF� �
No. 31 ,o_q
PAUFU1 n1('` '_A
�a v
ANG I
v�1sON P 0P�
PN 19-1000: TIMA Expansion Page 2
BMG/GS
Based on a topographic survey performed for the site in July 2019 by Gammon Surveying (Attachment A), there is no run-
off through the site from the adjacent properties. The run-off generated from the impervious surface of the modular
building rooftop in a 25 -yr 24 -hr storm event will be pitched to eastern side into a 6" gutter. The run-off will be conveyed
downward through four 4"x4" downspouts to the ground level into energy dissipators. The run-off will then drain from the
east to the west over the re -graded site, traveling through the gravel base installed beneath the footprint of the building. It
is anticipated that no drainage will leave the site under these design conditions.
The volume of run-off generated from the roof top will be approximately 114 -cubic feet using a 25 -year 24-hour storm
event with an intensity of 0.33 -inches (from GSMM Volume 2 for Savannah). A gutter sizing spreadsheet was used to
confirm the minimum number of downspouts and gutter size required (Attachment B). This will be used for the design of
the modular building. The volume of storage provided by the 6" gravel base beneath the building is approximately 870.4 -
cubic feet using a porosity factor of 0.4 for gravel. Since the soils are Group A (Attachment C — Web Soil Survey), it
assumed that the infiltration rate is 6"/hour or 2,176 -cubic feet per hour. This means the infiltration practice will drain in
approximately 30 -minutes or less. The site will effectively accommodate the 25 -year 24-hour storm event onsite without
contributing to any conditions downstream of the site.
We look forward to any questions you may have after reviewing this submittal. Please contact our office if you have any
questions, concerns, or desire additional information.
Ke
J,
D.PE, D.NE
President
Ball Maritime Group, LLC
Attachments:
Attachment A —
Survey w/ Topography
Attachment B —
Gutter Sizing Tool
Attachment C —
Web Soil Survey
Attachment D —
Site Plans
SEWE713
FR. 8
IE. 3
CONTROL POIN
'1
EL. 8.30
8,07
N/F
PARID 40005 19008
x 8.24 k CHAIN
� INK
k �
8.69
8,30 PM S12
X 7.92
x 7,96
�,99
q8
S1� /
x 8.11
PM S12
I
7 99
x 8,10
TREE LEGEND,
N/F
PARID 40005 19225
LACEY GRACE
705 BUTLER AVE
DB 383R,439
.14
x 8.72 8,37
.,93
70 3 WOOD 04
x 8.72
X 8,32
x 8.82
9328
PM S11
x 7,92
x 8,24
x�7 99 9'19 8.63 CMF BROKEN
8.00
LO S16 x 8.58 .64
GRP�G 8,39 7 14
96 10,33
9,20
LO S24 9.79 8.53
8,10 / I 8.03 x g 4n❑
8,51 S4 8 x 8,66
/ I 8,44 8,12 x � 68
8,37 ,62 9,21
8,34 PM S12
I 8,58 8.71 \
8,07 I F.F. 8.71 8,48 x 8,09 vx 8.89
8,52
,�� I 8,58 8,8 X
01 / 70
9.
2 / L /S14 18 22
/ 9.50
x 8,72
8,08 "J \ 8,45
7,88
8,25 51 MF
x
�
/ 8,30
x 8.04 88 71
8.47 PN S22
Q
PT#
cl
X 8.41
N/F
PARID 40005 19003
L❑❑ YV❑NNE
709 BUTLER AVE
DB 1442,272
G?- ,03 8,41 8,42
N/F
95 PARID 40005 19002
MULLE MARY C & ALICE
U q 711 BUTLER AVE
/ 77 8,78 8,57 3�0 DB 306H,0197
CONTROL POINT 8 7 g,59 �
-- _, 7,98 1
- 0 A/C UNIT 40
EL. 7.96 / 11 8, 8 24 8,15 x 8,23 \
8,07 ,47 8,84 8,75
8,77 8,28 IRF 1/2
/ 7,89 8,24 8,68 8,29
8
8,00 I 8,60 .64 8,64 8,82 8,57
9,41
/ Q 8,83 6-
Q_
Q_ ,15 ,48
/ x 8,61 1 9,1
I CONCRETE 8,58 _
METAL / BRICK / A/C UNIT / BUILDING 8,51
/7199 acI 8,16 8.54 8 58
X 8,67
846 1 �G�iC IN CONCRET
/7.99
,F.F. 8.67 8.44 1
I / 8,54 1
I 1,9 8,17
,55 N/F 9,04
I / 22 PARID 40005 19001 9,03
739 8,41 ROMAN CATH❑LIC DIOCESE OF SAVANNAH GCG
I /8, 3 713 BUTLER AVE
I 8,04 / 59 LOTS 16A 13B 14B 15B 16B 17A &17B 8,89
SEWER MAANHOLE I 8,53 8'47 WARD 2 TYBEE ISLAND
E 5.00 i FR. 8.11/ 20 22 C'��9 21 8,48 A/8.48NIT
/ 8.11 7,92 8.27 8 47 37 0 8.4 7 8,6
7 0 3
/ I .38 v 8.46
818 .43 RAMP 8, 3C 8,61
8,66 Ill 9,45
8,66 1 Q 3
8,53
5 /' ,51
�
X 8,27
x 8,29
N/F
PARID 40005 19004
ROMAN CATHOLIC
DIOCESE
707 BUTLER AVE
RdBICATES TREE (DOES NOT REPRESENT DRIP LINE)
^PPROXIMATE CENTER OF TREE
38,5 EVATION AT BASE OF TREE
OAK S12
TREE SIZE & SPECIES
L❑ = LIVE OAK TREE
OAK = OAK TREE
PM = PALM TREE
WAT❑ = WATER OAK TREE
HIC = HICKORY TREE
8,90
X IN CONCRETE
X IN CONCRETE 9,10
9,31 x 8.82
9,18 9,0 8,58
9,27 .03 8,65
. 0 7 9.07
10 8,69
.16 „/ 9 8.77
1/8,78
9,18
9,17
9,20
/79,10
9,08
9,18
9,21 x 8.98
8,80
,74
/ I x 8,34 8,74 ,5 /
RAMP 8,65 8,55
8,8 .04 /
ZQ ®8,54 Ve 7
Z 8.61
0 Q MODULAR 8,32 56 8,84 i 9,51 33 8835 Q
7,88 I CLASSROOM C 8,26 8,80 / 8,88 ,35 3
g 75 PM S14
I ,36 38 8,5$87 0 8 10,01 53 90'68/
8,00 7'96 / 7,87 I 09 8,36 A/C UNIT PM S11 38 /
8,06 ( 8.53 9,03 8 g
7,79 \ \ 06 8,64 44 7 / 3 x 9,05
SEWER MAANHOLE \� 8,68 9,72 5 /
FR. 7.99 7'94 \ METER k 10,12
IE. 4,19 7,85 GRP\IEL \ \ 8,06 `� RAI 843 �\ 8,39 BRICK 10,10 364 /9.409,08
7_97 7,70 SS 8u pV � METER 8 0\ 8.34 8.45 BUILDING / 8,86
C \ 8,3 9,00
,86 \ 8, 8,50 9,48
8.62 8,88 9,09
7,64
�METER�B 41 8,46 g 9,48
8.21 8,57 �' ;g,' 66 8,84
7,52 78 ` ,9 C 8,442, CGCG PM
� GRP�E 8,30 x 8.596 0
7,81 M S12 4X4 POS v 8.58 8,65
7,65, \ fDGe OF pA�F 35 8,47 vGCS MAG S8 8.43 8,58 // 6 4 9,59
MENT SEL 8,50 \ ,0 9,13
7.58 ,16 G SSGRP 8,34 8,73 8,68 1 .3 79,64
�C 24 8,33 8,96 8,92 / CROSSING SIGNAL
9,27 9,57
vGC 8TH ST 8,34 8,68 , 02 9.05 9.18
8.92
REer 8,89 9,07
33 eDOE \ SEWER MAANHOLE i / 9'08 x 9.21
Op pgVEMeNT x 58 IE 5.13
8 /
8,63 � �.28
9,13
/
8,90 x 9,22
® 9,15
9,26 �� ® 9.22
9.12
08 8.52
3 META< 8,52
817
SURVEYORS CERTIFICATION
CATHOLIC BISHOP OF
E 11 - ---'_EL _-
F -IF _EL_ _F L - IF -1 IF ---' I I
F,L L _- F= -IE - IE.'
THE DIOCESE OF
-11 F- -L E -'_-'EF'
817
- 111 _- -E -ii-i- JHEI
SAVANNAH
_ ,,E H _ F- - IEL E= F -F _ EL
- F -F E__ -F'= _ I - EL -E- L _ I
12x
706 LOVELL AVE
L -_-L -E_--- _I - IE
E_ -I
,40
-'EI IEI - 11 1 -_' IT k,_+
-I L _ F E1- F'-' _ _.E _+
8,17
-' _ 1 = IEL L-11-1 IF = -
LF I HE -E _ _- I HI_ I
I_ ;.'_L_ _E -11.1 L ELIEF E-
PM S14
IRF 1/2
F _- F-'_E=F I i E 11 E_F i - -
-- _- k --' E I IHE E_1LE_
- IF -E -JL -I _1 _ -E -E_- --
.36
x 8,39
IF E i _F _ -11_ -- -
8,248,20
E= FF E'T FI T=
PM S10
DATE:
x 8,41
FE E=FT -1FE T=- HFFF-111
1-
8,24
� I IIFF='-F-11 IFi 1 TII --'_
11i -T
PEC S11 12
x 8.44 8,30
FI =1 TEF - F
,4 8,24
8
8,13
-=F
-= Fi FF -
8,34
8,14
8.12
T:: T 1
HOL S5 6 .30 x 885
x 8.24 k CHAIN
� INK
k �
8.69
8,30 PM S12
X 7.92
x 7,96
�,99
q8
S1� /
x 8.11
PM S12
I
7 99
x 8,10
TREE LEGEND,
N/F
PARID 40005 19225
LACEY GRACE
705 BUTLER AVE
DB 383R,439
.14
x 8.72 8,37
.,93
70 3 WOOD 04
x 8.72
X 8,32
x 8.82
9328
PM S11
x 7,92
x 8,24
x�7 99 9'19 8.63 CMF BROKEN
8.00
LO S16 x 8.58 .64
GRP�G 8,39 7 14
96 10,33
9,20
LO S24 9.79 8.53
8,10 / I 8.03 x g 4n❑
8,51 S4 8 x 8,66
/ I 8,44 8,12 x � 68
8,37 ,62 9,21
8,34 PM S12
I 8,58 8.71 \
8,07 I F.F. 8.71 8,48 x 8,09 vx 8.89
8,52
,�� I 8,58 8,8 X
01 / 70
9.
2 / L /S14 18 22
/ 9.50
x 8,72
8,08 "J \ 8,45
7,88
8,25 51 MF
x
�
/ 8,30
x 8.04 88 71
8.47 PN S22
Q
PT#
cl
X 8.41
N/F
PARID 40005 19003
L❑❑ YV❑NNE
709 BUTLER AVE
DB 1442,272
G?- ,03 8,41 8,42
N/F
95 PARID 40005 19002
MULLE MARY C & ALICE
U q 711 BUTLER AVE
/ 77 8,78 8,57 3�0 DB 306H,0197
CONTROL POINT 8 7 g,59 �
-- _, 7,98 1
- 0 A/C UNIT 40
EL. 7.96 / 11 8, 8 24 8,15 x 8,23 \
8,07 ,47 8,84 8,75
8,77 8,28 IRF 1/2
/ 7,89 8,24 8,68 8,29
8
8,00 I 8,60 .64 8,64 8,82 8,57
9,41
/ Q 8,83 6-
Q_
Q_ ,15 ,48
/ x 8,61 1 9,1
I CONCRETE 8,58 _
METAL / BRICK / A/C UNIT / BUILDING 8,51
/7199 acI 8,16 8.54 8 58
X 8,67
846 1 �G�iC IN CONCRET
/7.99
,F.F. 8.67 8.44 1
I / 8,54 1
I 1,9 8,17
,55 N/F 9,04
I / 22 PARID 40005 19001 9,03
739 8,41 ROMAN CATH❑LIC DIOCESE OF SAVANNAH GCG
I /8, 3 713 BUTLER AVE
I 8,04 / 59 LOTS 16A 13B 14B 15B 16B 17A &17B 8,89
SEWER MAANHOLE I 8,53 8'47 WARD 2 TYBEE ISLAND
E 5.00 i FR. 8.11/ 20 22 C'��9 21 8,48 A/8.48NIT
/ 8.11 7,92 8.27 8 47 37 0 8.4 7 8,6
7 0 3
/ I .38 v 8.46
818 .43 RAMP 8, 3C 8,61
8,66 Ill 9,45
8,66 1 Q 3
8,53
5 /' ,51
�
X 8,27
x 8,29
N/F
PARID 40005 19004
ROMAN CATHOLIC
DIOCESE
707 BUTLER AVE
RdBICATES TREE (DOES NOT REPRESENT DRIP LINE)
^PPROXIMATE CENTER OF TREE
38,5 EVATION AT BASE OF TREE
OAK S12
TREE SIZE & SPECIES
L❑ = LIVE OAK TREE
OAK = OAK TREE
PM = PALM TREE
WAT❑ = WATER OAK TREE
HIC = HICKORY TREE
8,90
X IN CONCRETE
X IN CONCRETE 9,10
9,31 x 8.82
9,18 9,0 8,58
9,27 .03 8,65
. 0 7 9.07
10 8,69
.16 „/ 9 8.77
1/8,78
9,18
9,17
9,20
/79,10
9,08
9,18
9,21 x 8.98
8,80
,74
/ I x 8,34 8,74 ,5 /
RAMP 8,65 8,55
8,8 .04 /
ZQ ®8,54 Ve 7
Z 8.61
0 Q MODULAR 8,32 56 8,84 i 9,51 33 8835 Q
7,88 I CLASSROOM C 8,26 8,80 / 8,88 ,35 3
g 75 PM S14
I ,36 38 8,5$87 0 8 10,01 53 90'68/
8,00 7'96 / 7,87 I 09 8,36 A/C UNIT PM S11 38 /
8,06 ( 8.53 9,03 8 g
7,79 \ \ 06 8,64 44 7 / 3 x 9,05
SEWER MAANHOLE \� 8,68 9,72 5 /
FR. 7.99 7'94 \ METER k 10,12
IE. 4,19 7,85 GRP\IEL \ \ 8,06 `� RAI 843 �\ 8,39 BRICK 10,10 364 /9.409,08
7_97 7,70 SS 8u pV � METER 8 0\ 8.34 8.45 BUILDING / 8,86
C \ 8,3 9,00
,86 \ 8, 8,50 9,48
8.62 8,88 9,09
7,64
�METER�B 41 8,46 g 9,48
8.21 8,57 �' ;g,' 66 8,84
7,52 78 ` ,9 C 8,442, CGCG PM
� GRP�E 8,30 x 8.596 0
7,81 M S12 4X4 POS v 8.58 8,65
7,65, \ fDGe OF pA�F 35 8,47 vGCS MAG S8 8.43 8,58 // 6 4 9,59
MENT SEL 8,50 \ ,0 9,13
7.58 ,16 G SSGRP 8,34 8,73 8,68 1 .3 79,64
�C 24 8,33 8,96 8,92 / CROSSING SIGNAL
9,27 9,57
vGC 8TH ST 8,34 8,68 , 02 9.05 9.18
8.92
REer 8,89 9,07
33 eDOE \ SEWER MAANHOLE i / 9'08 x 9.21
Op pgVEMeNT x 58 IE 5.13
8 /
8,63 � �.28
9,13
/
8,90 x 9,22
® 9,15
9,26 �� ® 9.22
9.12
08 8.52
3 META< 8,52
%O R G /
G IsrfRFo
SURVEYORS CERTIFICATION
FL- I - FEI--'_E 'E II -1
E 11 - ---'_EL _-
F -IF _EL_ _F L - IF -1 IF ---' I I
F,L L _- F= -IE - IE.'
F -IF _EL _F I- E -11 _H -II -E_
-11 F- -L E -'_-'EF'
L -1-11 _-F'__ IHE F'=- _ELII - 11 F
- 111 _- -E -ii-i- JHEI
-E_.. E_- _ _+ - IHEF I'_ IF II IEII
_ ,,E H _ F- - IEL E= F -F _ EL
- F -F E__ -F'= _ I - EL -E- L _ I
- E _ -'L - 111 _ -1'_. -'L- I
-' IF E i -F=
L -_-L -E_--- _I - IE
E_ -I
I- '---'F -'I I- _
-'EI IEI - 11 1 -_' IT k,_+
-I L _ F E1- F'-' _ _.E _+
E= L-1 IL F EEE' _ F = E= 1- IF =
-' _ 1 = IEL L-11-1 IF = -
LF I HE -E _ _- I HI_ I
I_ ;.'_L_ _E -11.1 L ELIEF E-
I- A IF _IE ;.' IH IHE 111 Illi-
1 1=_ E11 _ -L _ 1-1 L -F-1_
F _- F-'_E=F I i E 11 E_F i - -
-- _- k --' E I IHE E_1LE_
- IF -E -JL -I _1 _ -E -E_- --
E_ -F_ - FE -1_ F- 111 F_-
FE_FE__I_II-_ = 1- IEE+ -i IF L-11_
IF E i _F _ -11_ -- -
F'
E= FF E'T FI T=
T ❑MAS G. GAMM❑N, GA RLS 3005
DATE:
F THE
FE E=FT -1FE T=- HFFF-111
%O R G /
G IsrfRFo
ELL =_ 1 -'I I -I I
o. 3005
PROFESSIONAL
I I- I I >
Z
suIFRO So
E
E_
ELL =_ 1 -'I I -I I
I I- I I >
1 -L
1- 111 - IF E- 'E 11
1 _ F'=
-1 LF
_ LE --'11 -_ - L _'_'FL
1-1-
E-,:' I _ I 1EI'_
-' IF E i -F=
L -_-L -E_--- _I - IE
E_ -I
I- '---'F -'I I- _
-i IEII
- _-'. E - - I -_I IT
ELL - 111 -Li-i ;II I
1EI'_
L-- :II= -FE _''-
_-' I
- L =_' 1 _E_'_ _ E=-':,I_E
II.
I- lid -
II IE-' -L 1
E= FF E'T FI T=
i11
I 111='=F FI11
F THE
FE E=FT -1FE T=- HFFF-111
1-
1- = 1 1
� I IIFF='-F-11 IFi 1 TII --'_
11i -T
-H-1:1 FF
FI =1 TEF - F
-I- 1 TI IT i ='F_ -F -TI -II =FII
-=F
-= Fi FF -
i -i IT -_F
FF =F -_ FF,_1 1111 1- 11
- -
T:: T 1
-- - F 11 =1=11 II
='
II I_ =1 =
IFI
ILL Li- 11 E - _ _''- I _ I I-
I I
_FII1 _11 E- I
IHE _ IF 1E_
--'E- _H_ .''I 11 IH _ _ 1-'
E
F- IEII -
FL_ _L
E- -FL --L- I _ 11 _ -_
IF'=E'_ -F= L_ - -L 11
II HL_
IEE _1_E _F
IH=
L 1 I I IF - E I HE _
__
E= L F' -' LI IE
-11_ F
-1 _ F1 L IE
11111:0121,11113,
-.1 E _
0 F II FF F =T
0 ;EE F -L=
QS -11 -F
F1= F E F T
1 I FEE = F_ 111
®
1F HE
A TREE AND TOPOGRAPHIC SURVEY OF
713 BUTLER AVE
LOTS 16A 13B 14B 15B
16B 17A &17B
PARCEL ID 40005 19001
TYBEE ISLAND
CHATHAM COUNTY, GEORGIA
PREPARED FOR:
ROMAN CATHOLIC DIOCESE OF SAVANNAH
PREPARED BY:
GAMMON SURVEYING & ASSOCIATES, LLC
F EF' E_ 1F- C=I
20 0 10 20 40
SCALE: 1 INCH = 20 FEET
FIELD DATE 7-19-2019
PLAT DATE 7-20-2019
K-Style_Gutter - 1 of 1
CPS 558, Roof Runoff Structure - Gutter and Downspout Capacities
Project: TIMA Modular Building
Prepared By: BMG Date: 31 -Jul -19
1
ABC = Inputs XYZ = Results
Determine the rainfall intensity for a 5 -minute duration storm for a given return period(2).
Frequency = 25 years
Amount, P = 0.33 inches
2
Compute the capacity of the selected gutter size.
Gutter dimensions:
tw = 6.0 in
bw = 4.600 in
d = 4.600 in
fb = 0.5 in
Qg = 0.01184 x Ag x r^0.67
Qg = 0.35 cfs, capacity of gutter
Ag = 21.42 sq in, cross-sectional area of gutter
wp = 12.99 in, wetted perimeter of gutter
r = 1.65 in, Ag/wp, hydraulic radius
3
4
Compute the capacity of the selected downspout.
Downspout dimensions:
W = 4.000 in
L = 4.000 in
Qd = 0.010457 x Ad x h"0.5
Qd = 0.34 cfs, capacity of one downspout
Ad = 16.00 sq in, cross sectional area of downspout
h = 4.10 in, head (generally the depth of the gutter minus 0.5 in)
Comparing the above calculated capacities, Qg and Qd, Downspout capacity controls
5
Determine roof area that can be served per downspout.
The area of a roof that can be served by a gutter and downspout system is controlled by either capacity of the gutter (channel
flow) or bv the capacity of the downs out orifice flow as shown in 2 and 3 above.
Q = 0.34 cfs, capacity of single downspout system (smaller of Qg and Qd)
Ar = 3,696 sq -ft of roof area that can be served by this single downspout with P =
0.33 inches/ 5 min.
6
Determine the number of downspouts necessary to control the water from the entire roof area.
In a multiple downspout system, the number of downspouts is determiend by dividing the entire roof area draining into the gutter,
Atotal, by the roof area that can be served by one downspout, Ar, as follows:
Total roof area to be served by this gutter system, Atotal = roof length x roof width.
Roof Dimensions
T
�"
6" K SI }.fit
a
rr•
length = 64 ft
width = 68 ft
Atotal = 4,352 Sf
Number of downspouts, Nd = Atotal / Ar = 1.18
so use 2.00
Total downspout(s) capacity = 0.68 cfs
= 304 GPM
(1) Roof Runoff Management (AWMFH, Chapter 10, pgs. 10-1
thru 10-3)
(2) As an alternative for the Pacific Islands, multiply the amount
for a 15 -minute duration storm by 0.6 for a close approximation
of the amount for a 5 -minute storm.
Linking to a commercial website is NOT a USDA endorsement
Example @ www.raingutterstore.com/ - others available
http //hdsc.nws noaa.gov/hdsc/pfds/pfds map hi.html
and www egutter.com/RAIN-GUTTERS-GUTTER-SUPPL
April 12, 2011
Gutters -v2012= O7May2014_14600.xlsx 0 K-Style_Gutter 8/1/2019
Map Unit Description: Chipley-Urban land complex ---Bryan and Chatham Counties, Georgia
Bryan and Chatham Counties, Georgia
Cuc—Chipley-Urban land complex
Map Unit Setting
National map unit symbol: 46g9
Elevation: 20 to 450 feet
Mean annual precipitation: 44 to 52 inches
Mean annual air temperature: 64 to 70 degrees F
Frost -free period: 230 to 290 days
Farmland classification: Not prime farmland
Map Unit Composition
Chipley and similar soils: 60 percent
Urban land: 35 percent
Minor components: 5 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Chipley
Setting
Landform: Flats
Landform position (three-dimensional): Rise
Down-slope shape: Linear
Across -slope shape: Convex
Parent material: Marine deposits
Typical profile
H1 - 0 to 6 inches: fine sand
H2 - 6 to 77 inches: fine sand
Properties and qualities
Slope: 0 to 5 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): High to
very high (5.95 to 19.98 in/hr)
Depth to water table: About 24 to 36 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Low (about 3.7 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 3s
Hydrologic Soil Group: A
Hydric soil rating: No
Minor Components
Osier
Percent of map unit: 5 percent
TIMA Modular Building
USDA Natural Resources Web Soil Survey 8/1/2019
Conservation Service National Cooperative Soil Survey Page 1 of 2
Map Unit Description: Chipley-Urban land complex ---Bryan and Chatham Counties, Georgia
Landform: Depressions, swales, flats
Landform position (three-dimensional): Dip
Down-slope shape: Concave, linear
Across -slope shape: Concave, linear
Hydric soil rating: Yes
Data Source Information
Soil Survey Area: Bryan and Chatham Counties, Georgia
Survey Area Data: Version 13, Sep 13, 2018
TIMA Modular Building
USDA Natural Resources Web Soil Survey 8/1/2019
Conservation Service National Cooperative Soil Survey Page 2 of 2