HomeMy Public PortalAboutWest Construction Contract Phases 1 and 2 - GMP2.pdfDocument Al 33" — 2009 Exhibit A
Guaranteed Maximum Price Amendment
for the following PROJECT:
(Name and address or location)
Tybee Island Marine Science Center, North Beach Facility
Lot 2367
Fort Screven Ward
Tybee Island, GA 31328
THE OWNER:
(Name, legal status and address)
The City of Tybee Island, Georgia a Georgia municipal corporation
403 Butler Avenue, P.O. Box 2749, Tybee Island, Georgia 31328
THE CONSTRUCTION MANAGER:
(Name, legal status and address)
West Construction Company GA, LLC a Georgia Limited Liability Company
41 Park of Commerce Way, Ste 308 Savannah, GA 31405
ARTICLE A.1
§ A.1.1 Guaranteed Maximum Price for Phases 1 & 2 ("GMP 2")
Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby
amend the Agreement to establish a Guaranteed Maximum Price for Phases 1 & 2 ("GMP
2"). As agreed by the Owner and Construction Manager, the GMP 2 is an amount that the
Contract Sum for Phases 1 and 2 shall not exceed. The Contract Sum consists of the
Construction Manager's Fee plus the Cost of the Work for Phases 1 and 2, as that term is
defined in Article 6 of this Agreement. This Amendment supersedes the Guaranteed
Maximum Price Amendment for Phase 1 of the Project ("GMP V).
§ A.1.1.1 The Contract Sum for Phases 1 and 2 is guaranteed by the Construction Manager
not to exceed Three Million, Five Hundred Eight Thousand, Eight Hundred Seventy -Two
Dollars ($ $3,508,872.00 ), subject to additions and deductions by Change Order as
provided in the Contract Documents.
§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an
itemized statement of the Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2")
organized by trade categories, allowances, contingencies, alternates, the Construction
Manager's Fee, and other items that comprise GMP 2.
(Provide below or reference an attachment.)
An Itemized Statement of GMP 2 entitled "Tybee Island Marine Science Center" and
dated April 12, 2019, which is attached as GMP 2 - Exhibit 1
§ A.1.1.3 The Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2") is based on the
following alternates, if any, which are described in the Contract Documents and are hereby
accepted by the Owner:
(State the numbers or other identification of accepted alternates. If the Contract
Documents permit the Owner to accept other alternates subsequent to the execution of this
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed. A
vertical line in the left margin of this
document indicates where the author
has added necessary information
and where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
to its completion or modification.
AIA Document A201 Tm-2007,
General Conditions of the Contract
for Construction, is adopted in this
document by reference. Do not use
with other general conditions unless
this document is modified.
Init. AIA Document A133T —2009 Exhibit A. Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA'
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
I produced by AIA software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020, and is not for resale.
User Notes: (1631024468)
Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount
expires.)
A Value Engineering statement entitled "TIMSC" and dated April 11, 2019, which is attached as GMP 2- Exhibit 2
§ A.1.1.4 Allowances included in the Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2"), if any:
(Idents allowance and state exclusions, if any, from the allowance price.)
Item
Dumpster Enclosure
Price ($0.00)
$12,000
§ A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2") is based:
GMP 2 is based on the assumptions set forth in the attached document entitled "Tybee Island Marine Science Center
Clarifications" dated April 15, 2019, which is attached as GMP 2- Exhibit "3"
§ A.1.1.6 The Guaranteed Maximum Price is based upon the following Supplementary and other Conditions of the
Contract:
Document Title Date Pages
A201-2007 General Conditions of Approved by City of
the Contract for Tybee on 7/12/18
Construction
§ A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications:
(Either list the Specifications here, or refer to an exhibit attached to this Agreement)
"Tybee Island Marine Science Center Clarifications" dated April 15, 2019, and attached as GMP 2- Exhibit "3"
Section
Title
Date
Pages
§ A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings:
(Either list the Drawings here, or refer to an exhibit attached to this Agreement.)
Plan of Tybee Island Marine Science Center, KC Project #120418 dated November 13, 2018 which are hereby
incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "4".
Construction Drawings for Proposed Drawings for Tybee Marine Science Center by Kern & Co. LLC dated March
19, 2019, which are hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2 -
Exhibit "5"
Floor Plan Markups Sheet Al. I for Proposed Drawings for Tybee Marine Science Center by Kern & Co. LLC dated
3/28/19, which are hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2 -
Exhibit "6"
Proposed Drawings for Tybee Marine Science Center Sheet No. A6.2 by Kern & Co. LLC dated 12/20/18, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "7"
Proposed Drawings for Tybee Marine Science Center Sheet No. A6.3 by Kern & Co. LLC dated 4/1/19, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "8"
Proposed Drawings for Tybee Marine Science Center Sheet No. S1.0 by Kern & Co. LLC dated 3/21/19, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "9"
Proposed Drawings for Tybee Marine Science Center Sheet No. S1.1 by Kern & Co. LLC dated 3/21/19, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "10"
Proposed Drawings for Tybee Marine Science Center by Kern & Co. LLC with Sottile Notes dated 3/29/19, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "11"
Number
Title
Date
§ A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information:
(List any other documents or information here, or refer to an exhibit attached to this Agreement.)
AIA Document A733" —2009 Exhibit A. Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIAm
Init. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any 2
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
t produced by AIA software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020, and is not for resale.
User Notes: (1631024468)
June 13, 2018 Report of Geotechnical Evaluation Services by Whitaker Laboratory, Inc. attached hereto as GMP 1 -
Exhibit "12"
ARTICLE A.2
§ A.2.1 The anticipated date of Substantial Completion for Phase I established by this Amendment:
Wed June 5, 2019
The anticipated date of Substantial Completion for Phase 2 established by this Amendment:
Thursday, February 20, 2020
- O (Signature)
(Printed name and title)
CON TRU MAN R (Signature)
47
(Printed name and title)
AIA Document A133* — 2009 Exhibit A. Copyright C 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA®
Init. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any 3
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020, and is not for resale.
User Notes: (1631024468)
Additions and Deletions Report for
AIA® Document A 133" — 2009 Exhibit A
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added
to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original
AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part
of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by
AIA software at 08:59:13 ET on 04/17/2019.
PAGE
Tybee Island Marine Science Center, North Beach Facility
Lot 2367
Fort Screven Ward
Tybee Island, GA 31328
The City of Tybee Island, Georgia a Georgia municipal corporation
403 Butler Avenue, P.O. Box 2749, Tybee Island, Georgia 31328
West Construction Company GA, LLC a Georgia Limited Liability Company
41 Park of Commerce Way, Ste 308 Savannah, GA 31405
§ A.1.1 Guaranteed Maximum Price for Phases 1 & 2 ("GMP 2")
Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to
establish a Guaranteed Maximum Mise -Price for Phases 1 & 2 ("GMP 2"). As agreed by the Owner and Construction
Manager, the GMP 2 is an amount that the Contract Sum for Phases 1 and 2 shall not
exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the WeFk, Work for Phases 1
and 2, as that term is defined in Article 6 of this Agreement. This Amendment supersedes the Guaranteed Maximum
Price Amendment for Phase 1 of the Project ("GMP 1 ").
§ A.1.1.1 The Contract Sum for Phases 1 and 2 is guaranteed by the Construction Manager not to exceed Three Million,
Five Hundred Eight Thousand, Eight Hundred Seventy -Two Dollars ($ $3,508,872.00 ), subject to additions and
deductions by Change Order as provided in the Contract Documents.
§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the
Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2") organized by trade categories, allowances, contingencies,
alternates, the Construction Manager's Fee, and other items that comprise *he Qua-^n*eea M aiiiinuf-. Pr -ie &. -GMP 2
An Itemized Statement of GMP 2 entitled "Tybee Island Marine Science Center" and dated April 12, 2019, which is
attached as GMP 2 - Exhibit 1
§ A,1.1.3 The Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2") is based on the following alternates, if any,
which are described in the Contract Documents and are hereby accepted by the Owner:
PAGE 2
Additions and Deletions Report for AIA Document A1133--2009 Exhibit A. Copyright ® 1991, 2003 and 2009 by The American Institute of Architects. All
rights reserved. WARNING: This AIA's Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent
possible under the law. This document was produced by AIA software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020,
and is not for resale.
User Notes: (1631024468)
A Value Env
gineeringstatement entitled "'l IMSC" and dated A ril 11 2019 which is attached as GMP 2- Exhibit 2
§ A.1.1.4 Allowances included in the Guaranteed Maximum P +iee Price for Phases 1 and 2 ("GMP 2"l, if any:
Dumpster Enclosure $12,000
§ A,1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price for Phases 1 and 2 ("GMP 2") is based:
GMP 2 is based on the assumptions set forth in the a_ttached document entitled "Ty bee Island Marine Science Center
Clarifications" dated April 15, 2019, which is attached as GMP 2- Exhibit "3"
A201-2007 General Conditions of Approved by City of
the Contract for Tybee on 7/12/18
Construction
"Tvbee Island Marine Science Center Clarifications" dated April 15, 2019, and attached as GMP 2- Exhibit "3"
Plan of T bee Island Marine Science Center KC Proiect 9120418 dated November 13 20 18 which are hereby
incorporated by this reference. The cover page far these drawings is attached as GMP 2- Exhibit "4".
Construction Drawin s for Proposed Drawings for Tybee Marine Science Center by Kern & Co. LLC dated March
19 2019 which are hereby ince orated by this reference. The cover page for these drawings is attached as GMP 2 -
Exhibit "5"
Floor Plan Markus Sheet Al.I for Proposed Drawings for Tybee Marine Science Center by Kern & Co. LLC dated
3/28119 which are hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2 -
Exhibit "6"
Proposed Drawings for Ty bee Marine Science Center Sheet No. AU by Kern & Co. GLC dated 12/20/18 which are
hereby incorporated by this reference. "Che cover page for these drawings is attached as GMP 2- Exhibit "7"
Proposed Drawing=s for Tybee Marine Science Center Sheet No. A6.3 by Kern & Co. LLC dated 411/19, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- E liibit "8"
Proposed Drawings for Tybee Marine Science Center Sheet No. S1.0 by Kern & Co. LLC dated 3/21119, which are
hereby incorporated by this reference. The cover page for these drawings is attached as GMP 2- Exhibit "9"
Proposed Drawings for Tybee Marine Science Center Sheet No. S I.1 by Kern & Co. LLC dated 3/21119 which are
hereby incorporated by this reference, The cover page for these drawings_ is attached as GMP 2- Exhibit "10"
Proposed Drawings for Tybee Marine Science Center by Kern & Co, LLC with Sottile Notes dated 3/29/19, which are
h creby i ncoERorated by this reference. The cover Rage for these drawin gs is attached as GMP 2- Exhibit "I I"
PAGE 3
June 13 2018 Report of Geotechnical Evaluation Services by Whitaker Laboratory, Inc. attached hereto as GMP (-
Exhibit "12"
§ A.2,1 The anticipated date of Substantial Completion for Phase 1 established by this Amendment:
Wed June 5, 2019
The anticipated date of Substantial Completion for Phase 2 established by this Amendment:
Thursday, February 20, 2020
Additions and Deletions Report for AIA Document A133' —2009 Exhibit A. Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All
rights reserved. WARNING: This AIAs Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent
possible under the law. This document was produced by AIA software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020,
and is not for resale.
User Notes: (1631024468)
Certification of Document's Authenticity
AIA® Document D401 TM —2003
I, E-RHoiiNiday, hereby certify, to the best of my knowledge, information and belief, that I created the attached final
document simultaneously with its associated Additions and Deletions Report and this certification at 08:59:13 ET on
04/17/2019 under Order No. 9586693323 from AIA Contract Documents software and that in preparing the attached
final document I made no changes to the original text of AIA® Document A133TM — 2009 Exhibit A, Guaranteed
Maximum Price Amendment, as published by the AIA in its software, other than those additions and deletions shown
in the associated Additions and Deletions Report.
,G:
(Signed)
(Title)
711
(Dated)
AIA Document D401 T" — 2003. Copyright O 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may
result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA
software at 08:59:13 ET on 04/17/2019 under Order No.9586693323 which expires on 04/16/2020, and is not for resale.
User Notes: (1631024468)
GMP 2- Exhibit 1
WE
WEST CONSTRUCTION COMPANY
General Conditions
265,522.00
Temporary Toilets
3,360.00
Temporary Utilities
10,000.00
Temporary Office Trailer
9,980.00
Project Manager
54,180.00
Superintendent
120,400.00
Project Administration
7,000.00
Interim Clean-up
8,428.00
Dum ster
15,925.00
Rental Equipment
12,040.00
Final Cl aning
2,459.00
Temporary Protection
9,030.00
Temporary Site Fencing
7,720.00
Legal Fees
3,500.00
Plan Reproduction
1,500.00
Testing & Special Inspections
By Others
Sitework
182,091.00
Site Pre eration
24,260.00
Field Engineering
3,500.00
Earthwork
36,625.00
Soil Treatments
738.00
Utilities within 5' of building)
55,163.00
Paying
43,005.00
Landscaping & Irrigation
6,800.00
Site Improvements dum ster enclosure
12,000.00
Concrete
664,066.00
Foundation, Piers & PT Slab
560,403.00
Pavers & Header Curb
60,480.00
Cistern
40,683.00
Equipment Pads
2,500.00
Metals
201,270.00
Structural Steel
70,200.00
Metal Railings
58,410.00
Metal Railings
72,660.00
Woods, Plastics & Composites
692,285.00
Rough Carpentry
268,720.00
Exterior Finish Carpentry
280,986.00
Interior Finish Carpentry
142,579.00
Architectural Woodwork
-
Thermal & Moisture Protection
297,667.00
Insulation
15,764.00
Membrane Roofing
55,683.00
Pedastal Paver System
186,905.00
Joint Sealants
9,441.00
Flashings & Window Pans
23,321.00
Column Cas
6,553.00
O enin s
420,317.00
Doors, Frames & Hardware
62,732.00
Aluminum Storefront
249,113.00
Bi -Folding Doors
58,372.00
Aluminum Gate Frames
50,100.00
Finishes
82,249.00
Drywall
5,380.00
Tiling
3,968.00
Painting
72,901.00
Specialties
4,339.00
Fire Extinguishers
2,908.00
Toilet Accessories
1,431.00
Equipment
-
A fiances
By Others
Conveying Equipment
81,550.00
LULA Lift
81,550.00
Mechanical
147,138.00
Plumbing
40,318.00
HVAC
106,820.00
Electrical
123,830.00
Electrical
113,930.00
Fixtures
In Above
Data Wiring, Security System, A/V, Fire Alarm
By Others
Generator
9,900.00
Sub -Total:
Permitting Allowance:
Builder's Risk
P & P Bond
Fee:
3,162,324.00
By Owner
26,973.00
54,036.00
163,848.00
BUILDING TOTAL: $ 3,407,181.00
PROJECT TOTAL $ 4,008,872.00
GMP 2- Exhibit 2
WE
PO Box 61388 Savannah, GA 31420 / 912-721-4820 Page 1
Alternate Pricing Options
Price Adjustment
Accepted
Budget
Base Bid
$ 3,703,973.00
1
Delete air barrier (Zip Wall will meet requirements with Boral Nickel Ga
(47,854.00)
Y
(47.854.00)
2
Electrical changes:
a Alternate electrical plan & revised fixtures
30,278.00
Y
OR
b Per Craig's mark-ups
17,835.00
17,835.00)
c Reduce generator load
29,742.00
Y
29,742.00
3
Delete fire alarm
7,892.00
Y
,892.00
4
Alternate education room wall design
,995.00
Y
,995.00
5
Black Locust wood deck tiles in lieu of Bamboo
61,265.00
Y
61,265.00
G
Alternate decking:
a I e decking in lieu of Bamboo
1,786.00
OR
b) Garappa in lieu of Bamboo
20,649.00)
Y
(20,649.00)
Alternate ext trim scheme oral
80,759.00
Y
(80,759.00)
8
Metal panels in lieu of aluminum frames & wood slats
9
Add for deck brackets
a wood
57,482.00
OR
b steel
62.491.00
Y
62,491.00
10
Alternate water pipe routing at ground floor(per Crai 's sketch
4,654.00
Y
4,654.00
11
Add fluid a lied waterproofing at PT deck
21,263.00
12
Reduced structural steel scope per permit drawings
20,328.00)
Y
(20,328.00
13
Revised Framing package
27,156.00
Y
27,156.00
14
Reduce H&I sotrefront elevations in height to eliminate curtain wall
19,301 00)
Y
19,301.00
15
Add for accurate elevator quote
17,954.00
Y
17,954.00
16
Add file scope to bid (originally omitted from estimate
4.245.00
Y
4,245.00
1
Will 's piling cap in lieu of allowance
(5,828.00)
Y
5,828.00
18
TPO in lieu of standing seam at East Gallery roof
(8,412.00)
Y
8,412.00
19)
Alternate metal frames with mesh panels Includes adding metal panels at undercroft
in lieu of the hog pen fence.
(17,677.00)
Y
(17,677.00)
Total Recommended Reductions
(292,657.00)
Revised Budget with Recommended Reductions
$ 3,411,316.00
Recreational Allowance
500.000.00
Contin en ,
102.339.00
PROJECT TOTAL
$ 4,013,655.00
November Budget
4,008,872.00
Delta
4.783.00
PO Box 61388 Savannah, GA 31420 / 912-721-4820 Page 1
GMP 2- Exhibit 3
Tybee Island Marine Science Center
Clarifications
April 15, 2019
1. i'ricing is based on the civil plans by Bern & Co dated 11/13/18 and the March Permit
Drawings dated 3/19/19. Additionally, the fallowing VE sketch or revisions were included:
a. 51.0 & Sl.l dated 3/21/19
b. S14 & S3.2 progress prints dated 4/3/19
c. Al Moor Plan Mark-ups by Kern & Co dated 3/28/19
d. A6.2 & A6.3 revisions dated 4/1/19
e. Sottile Notes — TIMSC — 3/29/19
2. The cost of the building permit is not included and is to be handled internally by the City.
3. We have not included the cost of the water meter or any associated utility tap or impact fees.
4. Third party special inspections are not included in our proposal. It is assumed these are by -
owner.
5. Our schedule allots for a construction period of 14 months for the complete project.
1. Includes all erosion controls, civil demo and fill to install the building pad.
2. Removal and replacement of any unsuitable soils is not included in this estimate and will be
handled on a unit cost basis as discovered. The unit cost for muck & fill of unsuitable soils is
$35/CY.
3. Removal and replacement of any underground structures are not included in this estimate
and will be handled on a time and material basis if discovered.
4. We have not included any allowance for dewatering in our estimate. Any dewatering required
5. will be bill on a time and material basis.
6. No site lighting fixtures or conduits are included in this estimate.
7. Any demolition of utility services is. to be by others.
8. No testing or abatement of hazardous materials is included.
9. An allowance of $12,000 is included for the dumpster enclosure.
10. We have included the landscaping included in the civil drawings in our pricing as the base,
code required landscape package. Additional landscapes and hardscapes pending design are
not included in our budget.
1. The concrete estimate includes the earth formed footings, concrete piers, the concrete
cistern and post -tensioned slab.
2. The ramp structure is included per the revisions by Kern & Co. to S1.0 & S1.1 dated
3/21/19.
3. The walls of the ramp & the cistern will have a "board form" finish.
1. The structural steel & metal fabrications package includes the following:
a. Fabrication, delivery, erection & shop drawings
b. all embedded items shown on plans
c. 16 HSS columns with saddles
d. '/a" A36 galvanized vertical rod braces with clevis', turnbuckles and connection plates
e. 3 x 3 x 3/4 galvanized rolled angle to support 1 14" grating at the cistern
f. Structural steel in conditioned space will receive 2.0 mils of standard shop primer
gg Expposed steel will be hot dip galvanized
h. Galvanized brackets for all deck to concrete column connections per MacAljon's
preliminary design. Final design to be provided by Dern & Co.
2. The metal tailings are based on powder coated aluminum railings. Our supplier feels that
these will hold up in the environment that the building is in but will require twice monthly
rinsing with fresh water.
Wood, Plastics & Composites
1. The rough carpentry includes the labor and materials to frame the building and decks. The
truss package is included in this line item. The wood truss package budget is based on the
information available at the time of this pricing exercise. Any changes while finalizing the
truss design will be subject to additional cost. The following information was included in the
final truss pricing:
a. Email dated 4/3/19 from Rachel Lancaster with comments on preliminary truss
package drawings entitled `vTIMSC Prelim Truss Review."
b. S1.4 &S3.2 — Progress Print 4/3/19
2. The exterior trimpackage is based on the following:
a. Al Floor Plan Mark-ups by Dern & Co dated 3/28/19
b. Boral channel siding
c. Boral trim at the eaves & soffit with Boral beadboard
d. Corners, pilasters, casings, watertable (with PT drip cap), porch column wrap (6x6
PT columns).
e. Sills to be KDAT
f. Any hog pen fencing locations are KDAT frames with BJDATslats
g. Decking based on 5/4" x 6" Garappa, eased edge with exposed stainless-steel
fasteners
3. The interior finish carpentry includes the following:
a. Trim boards to be 1x "C" SYP material
b. Ceilings and walls to be 1x6 shi lap wall paneling with #2 pine
c. Stair stringers and treads to be 41 Common SU
d. Mesh riser will be in a frame and not "kerfed" into the stair tread
4. All cabinetry and countertops are by others.
The insulation scheme is based on R-19 open call foam in the walls & R-30 open cell foam
in the roof deck. An ignition barrier was not included.
The Gip -Wall system was included in the framing package for the wall sheathing so no .air
barrier is required.
The roofin system will be a 60 mil, fully adhered TPQ membrane roof with 1" of ISO
insolation. The gravel stop will be pre -painted, 24 Ga Kynar painted steel in standard colors.
This roofing system comes with a 20 -year manufacturer's warranty and a 2 -year
workmanship warranty.
a. The standing seam roof shown in the plans has been changed to a TPO membrane
roof.
4. The waterproofing membrane at the covered deck area will be a 3 -ply Ruberoid Torch
smooth membrane over tapered ISO insulation at 1/4",per foot slope.
5. Over the concrete deck we have included a 1" layer of insulation board. No waterproofing is
included at the interior concrete deck.
6. A pedestal paver system with 2' x 2' RobiDecking Black Locust wood deck tiles is included
at all interior floor locations as noted.
7. Joint sealants are included at the slab saw joints and in the concrete pavement and sidewalk
joints.
8. Copper flashings are included at all openings and at the watertable per drawings. Copper
window pans are included at all openings.
9. We have included the Copper Half Crone Piling Cap by Willy's Metal Piling Caps at 24
locations.
1. The hollow metal door and frame are galvanized, heavy duty series and wind loaded.
2. The interior stile & rail wood doors are by Harring. They are paint grade 1 panel
configuration with wood frames and pre -machined.
3. The hardware package is in accordance with the hardware specifications provided. Chanes
have been made toinclude wind load certified products were not specified. The exit devices
on single exterior doors were changed from a surface vertical rod to a rim device. The
closers were changed from Sargent 351 to Sargent 1431. Hardware at the Hog Pen doors to
includes continuous bin es, surface. bolts., pulls and door closers.
4. Exterior windows and bin
oors are as follows:
a. Aluminum storefront system to be YKK THS 50 Tu 2-1/2" x 5" which is an impact
rated, thermally improved storefront system for insulated glass. Finish to be dark
bronze anodized. Glazing to be 1-5/16" impact rated, clear laminated units with
Solarban60#2.
b. Entrances to be YKK 35H which are medium stile, impact rated doors. Doors to be
provided with YKK impact rated hardware to included surface mounted closers, butt
hinges and ms locks. l�inish to be dairk bronze anodized. Glazing to be 9/16" impact
rated, clear laminated units with Solarban60#2.
c. Interior storefront system to be YKK YES 45 FS 1-3/4" x 4-1/2" which is a non-
rated, center set storefront system for monolithic glass. Finish to be dark bronze
anodized.
d. Shop drawings with PE stamp included.
a. The curtainwall storefront system has been eliminated from the scope with the H&J
openings being reduced in size per A6.2 & A6.3 revisions dated 4/1/19.
S. The three bi-fold units are to be stain grade Sapele, fully glazed wood doors hung from a
ceiling mounted track. The Education Room doors were changed per A6.2 & A6.3 revisions
dated 4/1/19.
1. Drywall walls and ceilings are included in the bathrooms and elevator shaft.
2. A tile floor is included at the bathrooms. A material allowance of $5/SF is included.
3. Painting includes finishing of all interior & exterior wall and ceiling surfaces. Concrete deck,
columns, ramp walls, etc are to remain unfinished. Garappa deck to receive a penetrating
sealer.
1. Five fire extinguishers and semi -recessed cabinets are included.
2. Toilet accessories as specified are included in the bathroom.
Conveying Equipment i
1. The L UL.A lift is based on the Savaria )= lift. It has a 1,400 lb capacity and travels at 30
fpm. There are two stops over an approximately 11 -foot travel span with two openings. The
car enclosure is white steel and the fixtures are stainless steel. The entrances have a standard
grey finish.
1. The plumbing system budget is bayed on the plans and specifications provided by Kern &
Co. The water piping to the exterior hose bibbs has been reduced per the Sottile Notes —
TIMSC — 3/29/19.
2. A fire sprinkler system is not included in the budget.
3. The HVAC system is per the plans and specifications.
1. 'Me electrical system is based on the plans and specifications as well as the Sottile Notes —
TIMSC — 3/29/19. The lighting and power below the building is based on these mark-ups.
2. Theenerator is based on a Generac — G007029-1 per the email From Nick Forteriberry date
4/9/19 entitled "Re: J�ybee MSC Lighting Re-selecuons." The propane tank will be provided
and filled by others. We have included a woos] framed platform for the generator but no
foundation for the propane tank.
3. A low voltage wiring & systems for A/V, security, fire alarm and data is to be by others.
GMP Z- Exhibit 4
Q
Z
a
00
N
W
W
O
<z
K
0
0
0
z
USE=e
- J(
------------
V
�
a
z
ryo
USE=e
- J(
V
z
GMP 2- Exhibit 5
U21I I213 93NROS HNIUVW 21219A.L ia�srino� O
'D11 ` OD 2g uaa}I xoa SONIAvxa aasoaoxa
z
3 - 6aa p. 6Spp p ease p pp pa� i6i iaa Sap s s ss sEM - E rgx
E _ ___ _ _____ lin
16;
q�
5 e
irl
i�
���� r. '"' 2 WSS tl �� 5� •'�' � S: !-C � �444�� � �Q 29�4d �
i'iyIT �FaE: ':a@sa"s'- iai ire: C9
e
W
g f
On �
n aLu
y5yp❑®aoo 6 �'�9 rr�
n❑®O❑ Lim 1(4
Z
Lu H ..
V-
W Z W H F
A }
♦/� � � � i;e3 � i�iy 9
v O w is
a 1 19
€ !€- xll I
MU -
a a@fix
GMP 2- Exhibit 6
t ' ]' -UT I)jai oa a
a s�lsr�vxaIso oax
���
C
X s
z
$< S7
+ry IL i5a
_ a
Y' t
T�r7 §=YO Ug
fir` ...
A
F
r
.. O
T
^ f v
GMP 2- Exhibit 7
HRJNgZ) 9DNaI3S aNIUVW 99
RAI
OD 2- ul;�iNwl HOd S9NIMV2IG GHSOdOldd
o.
Ffl
4 A
-1 11 p
19, 19 0 El.
I 1
O
I �4 7, i
LU
Lou
uj
F=
U) Q
U)
l
mmmmmmmw_-Z�
JIM III
iq 14
oa
I I WOM
a 6 JIM
JIM I
11
�- , WE
lim
O
GMP 2- Exhibit 8
I
el
....�.a �n • «Z�ri • �••••���-.�• •
?I�ZN�� ��AI�I�S �AII2IVLII ��9.I,L
JII`' o uja}I
t
2103 S9NIMVH(I QASOdONd
o
az
-
l
I
el
GMP 2- Exhibit 9
I--
GMP 2- Exhibit 10
..—.—.....�',�'.� �`. � �•••"W,v� ' �
z
'?': .,mnnnu-�avn�ma. uea
2
;.
C F
s�Y�q iw.�r�� nyn,Y ri,rj. s,wwl
.:
7
D �
Uz
1 27 ��I
2loa S`JAII VH(l a3Soao2l a
sb'g
X / 45
C s
w^
is
z
sb'g
X / 45
C s
GMP 2-- Exhibit 11
'"m
w
uj
0 z
LL W
Cl) u
CD w
Z L)
z
LLJ
C/)
LLI
Z
w
Cl)
0
a.
0 Lu
W Lu
CL
- - - - --- - - - - - -
. . . . . . . . a`:8
O
m
, ;q
z
N
I IN
I
NO lilt I'M Rh
M, fill
Hod SONUMU U21sodoud
..........
. .......... ......
_Seas.... ......... ........
.....................
H WSH�,
.. .. .........
HM�aj�
---Tq sj;aj_�J%
'"m
w
uj
0 z
LL W
Cl) u
CD w
Z L)
z
LLJ
C/)
LLI
Z
w
Cl)
0
a.
0 Lu
W Lu
CL
- - - - --- - - - - - -
. . . . . . . . a`:8
O
m
, ;q
z
N
I IN
I
NO lilt I'M Rh
M, fill
" - " ` " "