HomeMy Public PortalAboutKorkat 4-10-19AGREEMENT WITH THE CITY OF TYBEE ISLAND, GA FOR THE
JAYCEE PARK OUTDOOR PLAYGROUND SHADE SYSTEM PROJECT
1 111 s AGREEMENT. made this I D day of 1 s�'i / , 2019. by and between the City of Tybee
Island. GA. hereinafter called the "Owner' at P.O. Box 2739, Tvbee Island, GA 31328, and Lanier Plans. Inc.
d h a Korkat. hereinafter called the "Contractor'", of 221 Cable Industrial Way. Carrollton. GA 30117.
WITNESSETH:
WHEREAS, the City of Tybee Island. GA, has heretofore solicited proposals for all material, work and
iinprovements and for the doing of all things included within the hereinafter specified installation of the outdoor
play -ground shading system.
WHEREAS. the City of Tyree Island. GA, did find that the Contractor was the lowest
responsible. responsive and preferred offeror for the hereinafter specified installation of the
outdoor playground shading system (hereinafter" Project").
NOW. THEREFORE, for and in consideration of their mutual promises. covenants.
undertakings. and agreements. the parties hereto do hereby agree as follows:
ARTICLE 1 - WORK TO BE DONE BY CONTRACTOR
WI IEREAS. the City. ofTybee Island. GA_ has heretofore solicited proposals for all material,
work and improvements and for the installation of an outdoor playground shade system for the City ofTybee
Island. Georgia (Project). all in accordance with and in compliance with and as required by the hereinafter
specified contract documents for said contract and to do. at its own cost and expense. all other things required of
the contractor by said contract documents for said work..
ARTICLE I I- CONTRACT DOCUMENTS
The Contract Documents herein named include all of the following component parts, all of
which are as fully a part of this Contract as if herein set out verbatim. subject to all stated exclusions.
or. if not attached. as if hereto attached:
SECTION 8-2
1
.4GREEA IE:\T
1.) Request for Proposal RFP No_ 2019-727
2.) Instructions to Proposers
3.) Contractor's Proposal
4.) General Conditions of the Contract
5.) Agreement
6.) Technical Requirements
7.) Any Contract Drawings
8.) All Bonds. Insurance Certificates and Insurance Policies mentioned or referred
to in the foregoing docuinents\
9. Any and all other documents or papers. including all permits issued for the Project. included or
referred to in any of the foregoing documents including all Permits
IU.)Any and all Addenda to the foregoing
A WE I C: I .1i 11 1 I- CONTRACT AMOUNT
The Contractor agrees to receive and accept the following unit prices and lump sum prices as full
compensation for furnishing all materials and equipment and for doing ail work contemplated and
embraced in this agreement. and for all loss or damage arising out of the nature of the work
aforesaid. or from the action of the elements. or from any unforeseen difficulties or obstructions
which may arise to he encountered in the prosecution of the work until its acceptance by the Owner, and
for all risks of every description connected with the work, and for well and faithfully completing the whole
and entire work. in the manner and according to and in compliance with the Contract Documents as
directed by the City or its Engineer in accordance with these documents. and for any and all other
things required by the Contract Documents:
The agreed upon amount for this Project is $75.663.84.
ARTICLE IV- SPECIAL CONDITIONS
See Article V.
ARTICLE V- STARTING ANI) COMPLETION
The Contractor shall. and agrees to, commence work for the Project within ‘7calendar
alendar
c• a -'Fa >m tadov--
da4 ns after the Permitted start date of ,reit). 'OI 9. and to complete fully all work required by the
Contract Documents to the point of Final Acceptance by the Owner within 30 Calendar days.r
SECTION B-2 2 AUREEAfENT
ARTICLE VI- PAYMENT TO CONTRACTOR
(7wner agrees with said Contractor to employ. and does hereby employ. the said Contractor to
provide the material and do all the work and do all other things herein above mentioned according to
the terms and conditions hereinafter contained or referred to, for the prices aforesaid, and hereby
contracts to pay Contractor at the time. in the manner and upon the conditions set forth or referred to in the
Contract Documents: and the Owner and the Contractor for themselves. their heirs, executors.
administrators, successors and assigns, do hereby agree to the full performance of the covenants herein
contained.
ARTICLE VII -INVALIDITY AND SEVERABILITY
The invalidity of any provision included in any of the Contract Documents shall not he deemed to
impair or affect in any manner the validity and enforceability of the remainder of the Contract Documents.
and in such event, all the other provisions of the Contract Documents shall continue in full force and effect
as if such invalid provision had never been included therein. Owner and Contractor agree that. in such
event, the Contract Documents shall be reformed to replace the stricken pro% ision or part thereof with a
valid and enforceable provision that achieves, to the maximum extent possible, the intention of the
stricken pro ision.
ARTICLE V111- CHOICE OF LAW AND FORUM SELECTION
The Contract Documents shall be construed and controlled by and under the laws of the State of
Georgia without regard to conflicts of laves principles. Further, any dispute arising out of or concerning
the Contract Documents, or any action or inaction performed thereunder. shall he adjudicated in tither ta)
the United States Court for the Southern District of Georgia, Savannah Di% ision: or (b) the State or
Superior Courts of Chatham County, Georgia. and the parties waive any defenses of personal and/or
,object matter jurisdiction to the aforesaid venues.
IN \VITNI SS WHI RI:OF.the parties hereto have caused this Instrument to be executed
in four original counterparts the day and ear first above written.
SECTION B-2
[Signatures to follow]
3 A ti REE.I I E.\ T
(SEAL)
Attest:
By:
It's
LANIER PLANS, INC. DIB/A KORKAT
(Contractor)
Title
Attest:
BS
It's
City of Tybee Island. GA
(Owner)
Title
Approved this // da1 of. . 20 !I
IMPORTANT NOTE: If the Contractor is a corporation. the legal name of the corporation shall
be set forth above together with a signature of the officer or officers authorized to sign Contracts
on behalf of the corporation: if Contract is a co -partnership. the true name of the firm shall be
set forth above together w ith the signatures of all the partners: and if Contractor is an individual.
his signatures shall be placed abos,e. If signature is b' an agent other than an officer of a
corporation or a member of a partnership, a power-of-attorney must be attached hereto.
Signature of Contractor shall also be acknowledged before a Notary Public or other person
authorized by law to execute such acknowledgment.
SECTION 13-2
4
AGREEMENT
CERTIFICATE TO BE EXECUTED IF
CONTRACTOR IS A CORPORATION
Zanier e,'/h� 7, • re" K,ri L certify
that 1 am the of the
Corporation named as Contractor hereinabove: that by Resolution of the Board or Directors at a
e.,PF meeting held on AV; / , 20 /9 , a Resolution was passed giving authority
to 5 h i to sign the foregoing Contract on behalf of the
Contractor: that said officer was then �hA of said corporation by authority' of its
governing body and is within the scope of its corporated powers. and said power has not since
been revoked.
ti
Date 1:-11'(
tr:oiporate Seal)
County akrif /
State diTrt
e Starr
SEC'TI(},'4 B-2 5 riGREEMEI1T