Loading...
HomeMy Public PortalAboutGENERAL GEORGE BLV_106-CO.pdf[a] 14 11,14 9114 111'' Ili 1! 111 � I t 111` 1,111 This Certificate issued pursuant tothe requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances oft a Jurisdiction regulating building construction or use. 0 . , WITINAWWWWWWW"I I -WA 16 F.11 22MIldrait"Ay F& P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-5737 www.cityoftybee.org clf�( Cram reference to Book *Page gAiYItNA'Y65MNIA4 i Ig41 All •' r 14 31 OIL r t a _ 1V WA r+rri Permit #: 19-0077 Property Owner: MATT & NUCHAEL S. & SANDRA E. Address: 106 GIENERAL EQ. PIN: AQQQI� � Base Flood Elcvation at the site is i feet (NGVD) t .> . :� :-�i# .,r .=1� "F9 i' '. y.t i ♦ i3d t' i', .! � /i ..,1 � .±' i i ;' ... 4it t.,f .: i t 1 � t, ..'. i 1 t" ♦.: i i t" i i i i; # t' t 1. 1 1 ,• STEVEN H Notary Public 364902 Commonwealth i i �A my Commission res 1,31/2 Tj 7- a Ntefs =,Lv tF7j7*7X-aC4'&;1 er,74 Address: 106 (ierv(�eorgeMcwshaU1B1vd1 Permit Builder/Design Prof.: Phonjr Envelope SummaW. a List the R -Value for the following components: Flat ceiling/roof: 919 Sloped/vault ceiling: 'IR19 Exterior wall: IZ1 3 Above grade mass wall: NA Attic kneewall: NA Attic kneewall sheathing: NA Basement stud wall: NA Basement continuous: NA Crawlspace stud wall: NA Crawlspace continuous: XA Foundation slab: NA Floors over unconditioned space: 1219 Cantilevered Floor: NA Other insulation: NA • Fenestration Components: Window U -factor: Skylight U -factor: Glazed Door U -factor: 0 Building Envelope Tightness (BET): Window SHGC: Skylight SHGC: Opaque Door U -factor: (<50% glazed) BET test conducted by: (iv*e49*VSS- Phone: 912 -721 -2013 Fan Flow at 50 Pascals= 3253 CFM50 Total Conditioned Volume = 28412 ft, ACH50 = CFM50 x 60 / Volume= 6.8 7 ACH50 (must be less than 7 ACH5o Low Rise Multifamily Visual Inspection Option (The visual inspection option may be conducted by a third -party instead of the BET test for R-2 buildings only.) Visual inspection conducted by: NA Phone: Mechanical SummAW. Water Heater Energy Factor: -Ef Fuel type: [] Gas 0 Electric Ej Other Number of Heating and Cooling Systems: Heating System Type: R Gas: - AFUE El Air -Source Heat Pump: HSPF 0 Other: Efficiency: Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.): Cooling System Efficiency: El SEER El EER El Other Heating/Cooling Load Calculations Performed by: Phone: Total Heating Load (Based on ACCA Man. 3 or other approved methodology): Btu/h Total Cooling Load (Based on ACCA Man. 3 or other approved methodology): Btu/h Cooling Sensible Load: Btu/h Cooling Latent Load Btu/h Total Air Handler CFM (based on design calculations): CFM Duct Tightness Test Conducted by: NA Phone: CFM25 per 100 fe of conditioned floor area = CFM25 X 100 / Conditioned floor area served If all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors (PCO) is :5 8%, the post construction total duct leakage (PCT) is :5 12%, or the rough -in total duct leakage (IT) with air handier installed is :5 6%. State which method was used to conduct the duct tightness test: duct blower (D13), modified blower door subtraction method (BS), or automated multipoint blower door (AM1311)). System Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT) CFM25 Area served (ft) Result (%) 2 3 *Note: This permanent certificate shall be posted on or in the electrical distribution panel or air handler. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area. MAILING: 103 NASSAU DRIVE OFFICE: 4 II SA wwNAHA, GroRGzA 314 10 912-897-6932 LAHBOSOBELLSOUTHWET December 4, 201 9 George Shaw / Lisa Schaaf Planning and Zoning Department Tybee 151and, Georgia Ke : Chris Koncul Project I OG General George Marshall Tybee Island, Georgia George / L15a, At the reciuest of the Owner, we have inspected the project referenced above for compliance with the approved Site plan. After a brief inspection of the project, it 15 our opinion that the project is in basic compliance with the approved site plan including final stabilization in the form of Sodding. A small area remains to be Sodded when the site dumpster 65 removed. Thank you for your a55i5tance and please do not hesitate to contact us if you should reciuire more information. We may be reached at 897-0932 or e-mail to lahb050,bell5outh.net. Sincerely, Mark Boswell