Loading...
HomeMy Public PortalAbout2021-759 Pavilion Renovation Addendum #1.pdf Date: 03/03/2021 Attn: Bidders To: Bidders Via: E-Mail 2 pages total Address/#: From: ---- Project #: 20.033 Project name: City of Tybee Island- Memorial Park Pavilion For Bid- March 9, 2021 PRE-BID - RFI Response Addendum #1 Date requested: 03/02/2021 RE: Questions on ITB 2021-759- Renovation to Memorial Park Pavilion Questions for Clarification 1.) Question: Are the new 2 by 8 roof rafters at along the lower perimeter with exposed edges at the rafter tails to be pressure treated per note 5 under ROUGH CARPENTRY on drawing S0.1? Or can they be standard SYP per note 3 under ROUGH CARPENTRY on drawing S0.1? Response: Due to a rise in lumber cost- all underside exposed 2x8 rafters to be standard #2 SYP. All wood in contact with ground, concrete or masonry to be pressure treated per structural notes 2.) Question: Wall section 5 on drawing A3.1 shows 1 by 6 PT exposed ceiling boards. Are these to be T&G or square butt edges? Do these need to be no 1 grade KDAT since it will be painted or can these be standard #2 grade treated material? Response: The boards on underside of ceiling are square butt edges / board to board, and not T&G. Due to rise in lumber cost, please price 1x ceiling board material as standard #2 SYP material. 3.) Question: Confirm scope of electrical work. Confirm quantity and size of new fixtures. The Project Manual provides a light spec but not specific sizes or a scope of work. Response: The electrical service is existing on site, and due to removal of roof- new wiring in conduit from the existing panel will need to be run for new lights. Conduit will be run tight/clean to underside of structure and along roof/rafter to light fixture. New fixtures are 4ft. long fixtures per spec, (10) total. Cont. 2 4.) Question: Drawing #A1.2 seems to indicate light fixtures on the reflected ceiling plan however they are not labelled. Please confirm these are the new fixture locations. Response: See drawing below. There are 10 lights total to be added under open deck. 5.) Question: Is pavilion to be painted? Response: Please delete all painting from the project, including the slab floor finish. Owner will handle all painting. CC: File; Owner; All bidders End of Document.