Loading...
HomeMy Public PortalAbout15510 Wet Weather Optimization Study (13436)ORDINANCE NO. 15510 AN ORDINANCE, appropriating One Million Five Hundred Thousand Dollars ($1,500,000.00) from the General Fund to be used for planning, design, and engineering during construction phase services in Wet Weather Optimization Study (13436) in Various Locations Within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21958 with Jacobs Engineering Group Inc. for planning, design, and engineering during construction phase services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Five Hundred Thousand Dollars ($1,500,000.00) is hereby appropriated from the General Fund to be used for planning, design, and engineering during construction phase services in Wet Weather Optimization Study (13436) in Various Locations Within the District. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 21958 with Jacobs Engineering Group Inc. for planning, design, and engineering during construction phase services in Wet Weather Optimization Study (13436) in Various Locations Within the District; and said contract shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted on October 8, 2020.