Loading...
HomeMy Public PortalAbout10607 FAIRHALL ST_Mechanical__ 6. A3p4'% CE 818 - 9-71 ` 1 � APPLICATION FOR PERMIT HEATING - VENTILATING - AIR CONDITIONING COUNTY OF LOS ANGELES BUILDING DEPARTMENT OF COUNTY ENGINEER ADDRESS BUILDING AND SAFETY DIVISION LOCALITY MXR AD NEAREST CROSS ST. FOR APPLICANT TO FILL IN OWNER (PRINT OR TYPE ONLY) MAIL NO. TYPE OF APPLIANCE OR EQUIPMENT FEE ADDRESS CITY :TENO. ABSORPTION UNIT, BTU CONTRACTOR AIR HANDLING UNIT, CFM ADDRESS BOILER, BTU CITY - O. ' COMPRESSOR, BTU_� STATE LIC. Q_CLICENSE NO. � CLASS C- VENTILATION SYSTEM LDDIISTRICT NO. GROUP 70NE PROCESSED BY EVAPORATIVE COOLER +'O� FURNACE: FAUGPAVITY 1 Q INSPECTION RECORD FLOOR BTU_�L77 HEATER: SUSPENDED UNIT_ o I-- WALL w a. Cn Z Plan check fee 2570 of above. See reverse. PERMIT ISSUING FEE S 3 Oo TOTAL FEE ` PLAN CHECK APPLICANT NAME ADDRESS CITY TEL NO. I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION AND STATE THAT THE ABOVE IS CORRECT AND AGREE TO COMPLY WITH ALL ORDINANCES AND LAWS REGULATING HEATING, VENTI- APPROVALS DATE INS CTOR'S ATURE LATING, AIR CONDITIONING. - ROUGH I HEREBY CERTIFY THAT I AM NOT ACTING IN VIOLATION OF CHAPTER 9, DIVISION 3, OF THE BUSINESS AND PROFESSIONAL_ FINAL CODE OF THE STATE OF CALIFORNIA.. 'Je SIGNATURE ' PERMIT VALIDATION CK. M.O. CASH OF PERMITTEE-U-) J_ . PLAN CHECK VALIDATION CK. M.O. CASH 12 4 1 0 1 3.0-0.N SEE BACK OF APPLICATION FOR COMPLETE FEE SCHEDULE ,