Loading...
HomeMy Public PortalAbout2014_M029 Authorizing Letter to BOS re Transportation Improvements to Rt. 15 North COUNCIL MEETING September 23, 2014 MOTION 2014-029 I move to authorize the Mayor to sign the letter to the Board of Supervisors addressing the possibility of improvements to Rt. 15 north of the corporate limits 1 I Page Town of Kristen C.Umstattd Council Members Mayor Kevin D.Wright Thomas S.Dunn,II �Cs Katie Sheldon Hammier Kelly Burk David S.Butler Fernando"'Marty"Martinez Virginia Vice Mayor 25 West Market Street,Leesburg,VA 20175 • (703)771-2733/(703)771-2727 fax council®leesburgva.gov • www.leesburgva.gov September 23,2014 The Honorable Scott K. York Chairman At-Large Loudoun County Board of Supervisors 1 Harrison Street SE, 5h Floor,Mailstop#01 PO Box 7000 Leesburg,VA 20177-7000 Re: Route 15 Bypass and Route 15 North of Leesburg Dear Chairman York: The frequent afternoon traffic backup on the Route 15 Bypass is due to inadequate roadway capacity of U.S. Route 15 north of Leesburg. This roadway has only one lane in each direction. The traffic engineering firm of Wells and Associates was hired by the Town of Leesburg to prepare a model of the existing roadway and traffic conditions and perform an analysis to evaluate improvements that will reduce the traffic congestion and backup caused by the limited road capacity on Route 15 north of Battlefield Parkway. Wells and Associates provided the Town Council with a presentation on this operational analysis for the Route 15 Bypass at the September 22, 2014 Work Session. Most of the studied improvements are located outside the Leesburg Corporate Limits on Route 15, a VDOT maintained road. Further study and analysis will need to be performed by VDOT with cooperation and coordination from the Town and Loudoun County. The Town needs the assistance and support of Loudoun County because the improvements to reduce congestion and improve safety will be outside the corporate limits. We request that County Transportation staff be authorized to help refine the operational analysis that has been performed by the Town's Consultant and work together with the Town and VDOT. Through this joint effort an improvement plan can be identified and a transportation project defined and implemented. We greatly appreciate past support of safety improvement projects and your willingness to address Leesburg and Loudoun County transportation issues. The Council wishes to thank Chairman York, Supervisors Higgins and Reid, who represent the Town of Leesburg, and the rest of the Board of Supervisors for securing $2 million for the interchange study of the Rt. 15 Bypass at Battlefield Parkway. We hope that these funds will be moved from FY 2018 to FY 2016 to accelerate the overall safety effort at that intersection. Hometown of the 21's Century The Honorable Scott K. York September 23,2014 Page 2 If you need information, or if we can assist in any way, please do not hesitate to contact me or the Director of Public Works, Thomas A. Mason, P.E., at 703-771-2790 or Transportation Engineer, Calvin Grow, at 703-771-2791. Very sincerely yours, cflY.:4 + Kristen C. Umstattd Mayor cc: Loudoun County Board of Supervisors Tim Hemstreet, County Administrator Leesburg Town Council John Wells, Town Manager Kaj Dentler, Deputy Town Manager Thomas A. Mason, P.E., Director of Public Works Calvin K. Grow,Transportation Engineer