Loading...
HomeMy Public PortalAboutRIVER OAK LN_3-FILE.pdffewer - Savannah Area GIS http://www.sagis.org/Home/Map t ^ d' ip } l l 9 ��� 5�. ak'• t xly rf'" a4 4 k S 'W w a �4p w l ON eA "'+..""':». •" ''+ 1 ,,. �s «rf r `x ""`., ``w �' ��ti,`��,"° �„,�x �„ � �a�"� ,•.;.�' �,v`x� add rx^� ,1 r' � �,�.� '� „" �—,�»-;.. err y` d�%a'"¢.,, �`'"#d" <�'� 6. .w d � 4M t'' `k. '„ «,p+"'" : w 54C� '*• w „, w�j`P 1'° A x ^... u.rd Y t C1 p p.= ,} y ti a ?� � �'x � 1 ¢ 't��,. 'u vw ,� •@� � �4. _ n x le a � x CJ IN, t 14 U 150 300ft m 1 of 1 1/7/2015 9:57 AM BOSWELL DESIGNSERVICES, INC. 1031VASSAUDRIVE SA VANNAH, GEORGIA 3141 O 912-897-6932 LAHBOSGDBELLSO UTH.1yET November 12, 2015 Lisa Schaaf City of Tybee Island P.O. Box 2749 Tybee 151and, Georgia 31328 RE : Mike Sharpe Project No. 3, River Oaks Lane Tybee 15land, Georgia L15a, At the re6Jue5t of the Contractor/Owner, we have in5pected the project referenced above for compliance with the approved 51te plan. Please keep in mind that we were not the original design engneer5 for the 51te but are inspecting for drainage plan compliance based on the plans that were 5upplied to u5 by the contractor and the City of Tybee 151and. Based on the limited information on the plans and after a brief in5pection of the project, it 15 our opinion that the project 15 in 51-1b5tantial compliance with the approved 5ite plan including final Stabilization in the form of sod. The 5wale5 which are in place on the east and west 5005 are only half formed and are centered on the property llne5 and the intent 15 to complete the 5wale5 when the adjacent propertie5 are completed. Thank you for your a5515tance and should you require more information please feel free to contact U5 at Boswell De5]gn Services, Inc. 897-6932, e-mail to lahbo5C�bC1150uth.11et or fax to 897-2287. Sincerely, Mark Boswell ®G�, No. 2_8372 PROFESSIONAL r FNGINc�Q A. g05`� 877-/S'/.?- 7/4' 5 ever Oo,� . LK �5� LAW OFFICES CALLAWAY, BRAUN, RIDDLE & HUGHES P.C. A PROFESSIONAL CORPORATION TIMOTHY F. CALLAWAY, III DANA F. BRAUN R. KRANNERT RIDDLE EDWARD M. HUGHES D. SCOTT PORCH, IV THOMAS E. BRANCH, III Mayor and Council City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 301 WEST CONGRESS STREET SAVANNAH, GEORGIA 31401 TELEPHONE (9121238-2750 FACSIMILE (912) 238 2767 September 4, 2014 RE: River Oak Lane / White Oak Lane — Drainage Issues Our File No. 572.14536.889 Dear Mayor and Council: REPLY TO: POST OFFICE BOX 9150 SAVANNAH, GEORGIA31412 N Voice Mail Extension -108 E -Mail- Bhuahes()cbrhiaw.com VIA EMAIL ONLY I wanted to snake you aware of a situation concerning a subdivision off of South Campbell where the goals of tree preservation and stolmwater management have become in conflict. The lots in the subdivision are on White Oak Lane and River Oak Lane. The subdivision was approved in the Fall of 2004 and the minutes from September 9, 2004 and October 14, 2004 indicate that the developer at the time, Mr. Keitzman, was willing to make concessions with respect to curving drainage lines and driveways in order to preserve trees. While some of that may have been accomplished, when the economic problems impacted development, some changes in ownership and other developments occurred. Now there are lots that have been individually platted and an overall drainage plan was apparently not completely installed. Downer Davis did not get involved in this process until pretty much after the fact when the lots were already subdivided and the confusing plans by the original engineer, Mr. Millikan, make interpretations of the plans showing compliance difficult, if not impossible. Further, it is my understanding that the subdivision preceded the as -built requirements. In any event, some lots are ready to be developed; however, problems have arisen with implementing appropriate drainage on the property due to the presence of trees. There are three trees on or near one particular lot that will have to be removed in order for the drainage to work to be accomplished and there is insufficient room for curving the drainage lines or lanes. Under these circumstances, I feel there is virtually no opportunity for preservation of the trees in question. Mayor and Council September 4, 2014 Page 2 y t As far as 1 know, the suggestions by council members dealing with preserving trees were not directed to any particular trees on a plat. At least there is no record of such a designation of which I am aware. It could be that on the particular lots in question, all efforts have been made to preserve the trees but, under the circumstances, I do not believe the City could deny the removal of the trees in light of the City insisting upon the implementation of appropriate drainage. I will be glad to discuss this with anyone. I did, however, want to let you know that the issue has come up so that if trees were being cut, you would be aware of the situation and could respond to questions with at least some explanation. I look forward to discussing this with you. With kindest regards, I am Very truly yours, \` Edward M. Hughes EMH/md cc: Ms. Diane Schleicher, via email Ms. Dianne Otto, via email Ms. Jan LeViner, via email Mr. Downer Davis, via email Council Minutes Ic� 6+7 �� ��� Da k LyN . CC g -12 -Zoo+ Douglasville, Ga. Epps said he had experience in working with auditors and the items listed in the reports. He said he plans on addressing the most critical items first and intends on reducing the items listed in future auditor' s letters. Sessions welcomed Epps aboard. I o � 8+9 ` ,ver Oak �r+. Buelterman opened the meeting, asked for comments an ccs losed-the following public hearings according to law. Dick Smith, Chairman of the Planning Commission, presented a request for preliminary approval for a major subdivision for Lots 6 & 7 to be divided into 8 single-family lots on S. Campbell Avenue, PIN 4-0019-04-002, for Louis Keitzman. Smith said the application complies with all requirements, the City engineer has approved the drainage plan and no variances are being requested. Smith said PC approved the request after asking for additional information 3 times. Sessions said she was confused regarding all of the different letters that she had received concerning the approval of the drainage plans. Downer Davis, Engineer for the City, said there had been concerns, which have been addressed, and the final approval letter was sent yesterday. Sessions asked if the plans she had been given today had all the revisions. Davis answered yes, the letter dated August 12th states that all of the concerns have been addressed. Pearce asked Davis if he had any further concerns, and Davis said from an engineering standpoint, in his opinion, there are no further concerns. Harold Yellin, speaking for the petitioner, said Bob Millikan, engineer on the project was also here. Yellin said this request is to subdivide Lots 6 & 7 into 8 lots, it is in a R2 Zone, where the minimum lot size requirement is 4500 sq. ft. He said the petitioner is asking for no variance and has made several changes to satisfy the concerns of the Planning Commission. He said all of the lots are 60 feet wide, the roadway has been increased to 18 feet wide, a fire hydrant has been added for safety reasons and we feel we have met all of the concerns. Yellin said there are rumors that this area will be changed from R2 and also that lot sizes might be increased. He said that is certainly in Council' s power, but this petition is governed by what is on the books now. Sessions asked why are there requests for 2 subdivisions. Yellin said that combining the request was never an issue, and that Mr. Keitzman wanted 2 different subdivisions. Yellin said when they come back with the final plat, the issues of subdivision names and trees will be addressed. Sessions asked if Council could require that information now, and Hughes said they were asking for a preliminary plan approval and not final plat to be recorded. Rachel Perkins read from a memo she had written regarding concern for the trees that would be lost in the plan that was presented. (Copy of this memo becomes a part of these minutes.) Mayor Pro Tem Buelterman broke into the proceedings for a weather update from the Fire Chief. Chief Sasser said the weather was getting worse and he recommended that the meeting be adjourned and everyone goes home. Hughes said we had advertised public hearings and if there was any way to complete them, he would advise Council to do that. Sessions motioned to finish all of the public hearings and adjourn. There was no second. There was some discussion as to adjourn or not. Crone motioned to stay, Sessions seconded. Vote was 4, Wolff, Sessions, Crone and Pearce, in favor, and 2, Buelterman and Youmans, opposed. Bob Millikan, engineer for the project, answered concerns raised by Perkins and said they would redirect the drainage swales to save as many tree as possible. Wyman Sharpe said he owned 5 lots on S. Campbell Avenue and had no objections to the subdivision. Mr. Cantrell, Rusty Fleetwood, Denise Butler, a letter from Ruth VerBott, a letter from Gail Brown, Roxanne Fleetwood, Sandy Major, Bill Walsh, and Dr. Jim Porter, all residents who own property on S. Campbell Avenue, opposed the subdivision. These neighbors Page 131 of 202 Council Minutes C -C g-12-2c0�4 raised concerns of density, water and sewer issues, marsh pollution, traffic, quality of life, as well as some other issues. Shell Solomon spoke in favor. Sessions raised a concern of these single-family homes being rented to as many as 20 people each.. Hughes said there is no ordinance now but one is in the works to limit and control rental property in residential zones. Most of the residents asked Council to table the petition for further study on the drainage, pollution issues and density. Smith presented the next request for a major subdivision for Louis Keitzman and James Stettler for Lots 7 & 8 S. Campbell Avenue, PIN 4-0019-04-003, to be divided into 7 lots. Smith said all of the requirements have been met and no variances are requested. He said the PC voted to approve. It was noted that the comments heard on the previous request apply to this request as well. Sarah Porter, who said she lives across the street, requested to speak to Council. Porter said the garbage truck would not go down the private street and she did not want to see 15 garbage cans lined up directly across the street from her home. She also cited drainage as a potential problem. Harold Yellin said the street is wide enough for the garbage truck, as well as emergency vehicles, to drive on. Yellin asked Council to listen to the facts and not to fiction. Keitzman said that several people, who were in favor of the subdivision, had left because of the weather. Kathryn Williams also spoke against the subdivision. Smith presented a request for a sketch plan approval for a major subdivision to divide 4 lots into 6 single-family lots for Jones Cottages LLC. at 1009 & 1011 Jones Avenue, PIN 4-0006-11-011 & 4-0006-11-012. Smith said that the petitioner had asked that this be changed to a preliminary plan approval, which is how it was advertised. Smith said there are no variances requested and the engineer has approved the drainage plan. He said the PC approved the request. Sessions questioned the 10 ft. setback fronting Jones Avenue. Smith said this was the side setback and that the front would be facing the access easement and the 20 ft. front setback would be located there. Sessions had concerns regarding only having 10 feet next to a busy street, Jones Avenue. Smith said the PC had a lot of discussion regarding this same issue and the zoning staff said the front could be facing the lane. Smith also said the City just had a court case about this same issue. Hughes said that as the Code is now, the property owner could declare his front for setback reasons in the subdivision design. Sessions asked about safety and Hughes said safety could be taken into consideration in the decision. Wolff said he thought the intent was for new subdivisions and not established neighborhoods. Youmans said even in new subdivisions, 20 feet would taken off of 2 sides of the property, and in some zones another 20 feet would come off the back. Youmans said this would leave very little of a lot left to build on. Richard Guerrard, the property owner, said he was advised by the Zoning Department of what was required and that is why this plan was done this way. Pearce asked Guerrard was aware that Lot 108 was wetlands, and Guerrard replied yes. Guerrard said he purchased that lot in order have enough square footage to subdivide and meet the lot size requirement. Pearce said that the DNR delineation line is missing and that State law, under the Sediment and Erosion Act, requires a 25 ft. setback or buffer. Guerrard said that you could canter -lever over the buffer. The footprint of the house on the plat is not the actual footprint. Buelterman asked Dee Anderson to address this issue. Anderson said the subdivision plat has to show the setback line and the EPD buffer line. The construction plans actually show the footprint of the structure, with the delineation lines. Guerrard said that you could set pilings inside the buffer if you do it by the EPD regulations. Sessions asked if Davis, City Engineer, had approved the drainage plans, and Anderson said yes, Page 132 of 202 Council Minutes CC �-Q-ZoOy Mayor Pro Tem called the meeting back to order, and opened the meeting for business legally presented. Hughes told Council that they had before them the ordinances that control the subdivision process and the approval of subdivisions. Hughes said those would be considered in making the decisions regarding subdivisions. He said that the ordinance regarding variances, as well, should be considered. Wolff said that based on Sections 10-080, 7-035 and 5-040, he would motion to table this petition for a major subdivision of Lots 6 & 7 S. Campbell Avenue for Mr. Keitzman, pending further study of the water issues, significant trees and drainage. Sessions seconded the motion to table. Youmans said we are paying good money to an engineer to study these things and he has said these things are all right. Youmans said if we are not going to listen to him, he recommends we not use him any longer. Pearce asked if Wolff was referring to Rachel Perkins' s issue with the trees. Wolff said yes and that the ordinance states that reasonable effort should be made to preserve the large trees. Wolff said that he also would like to suggest that Mr. Keitzman consider combining these 2 subdivisions and put in a horseshoe road, thereby saving more trees. Vote was 4, Wolff, Sessions, Buelterman and Pearce, in favor, and 2, Youmans and Crone, opposed. Pearce said he thought that this petition met all of the requirements but he wanted to make sure the issues mentioned in the motion, which pertain to the density, is done right. Wolff motioned to table the petition for a major subdivision of Lots 8 & 9 S. Campbell Avenue for Mr. Keitzman for the same reasons as in the previous petition. Sessions seconded the motion to table. Youmans said he states the same discussion as he did previously. Vote was 4, Wolff, Sessions, Buelterman and Pearce, in favor, and 2, Youmans and Crone, opposed. Dick Smith, Chairman of the Planning Commission, asked Council if they were sending these petitions back to the Planning Commission. Buelterman said it would come back to Council. Wolff said he was not trying to delay this any longer than necessary. Pearce motioned to table the major subdivision for Jones Cottages, Inc. at 1009 & 1011 Jones Avenue because of the unresolved issue of the wetlands and he would like to have the most recent plans so he could study the drainage ditch that crosses the property. Wolff seconded the motion to table. Youmans said the engineer and the Planning Commission said everything was fine. Sessions said she was not sure of the reasons for tabling. Pearce the wetlands issue had not been addressed and a new set of plans was presented tonight. He said he felt that he needed more time to look at the most recent plans. Sessions said she thought this was an issue where Davis expertise came into play and asked him to address the wetlands issue. Davis said he had spoken with DNR and looked at the plans very carefully. Davis said that DNR said you could canter lever over the buffer and if the builder wanted to put in pilings, DNR, in all probability, would approve it. Davis said, in his opinion, the plan meets the requirements. Pearce said he was concerned about the DNR delineation line and that it had not been marked. Davis said it was shown on the plans. Pearce said no flags were on the property delineating the line and he spoke with the person who does this and she said she had not delineated the property. Mr. Guerrard said she had and the flags were there, and that she may have been referring to the lot Page 134 of 202 Council Minutes CC 9-R-2oc)4 property management companies. Gay said that all of the rental agencies that he knows of have parking requirements in their agreements. He said some of the rental properties, not handled by agencies but by the owners, do not have requirements, do not pay hotel/motel taxes. He said if this were passed, who would enforce, will it be based on complaints, what would the penalty be and who would pay the fine, the owner or the agency. Hughes said it would be based on who the violator is. Gay said he agrees that parking is a problem but there has to be another solution. Gay said he is against placing another unenforceable law on the books. Henry Levy said that he has had problems in the past at his residence with cars parking everywhere. He said some of the owners couldn' t even get to their residences because of renter' s vehicles blocking the drive. Stacye Smith said that all of us love Tybee. She said if anyone has a problem with one of her renters to please call her. Smith said part of the problem is that the City did not require adequate parking when building permits were issued. She said as a property manager, she takes pride in providing adequate amenities to her renters. John Major said if anyone has a problem, they should call the agent. He asked if they were supposed to get rid of bedrooms so they would have enough parking. Pam O' Brien said that she thought legislation was not the answer to the parking problem. Smith said that City Council had asked the Planning Commission to consider the pros and cons of rezoning South Campbell Avenue from R2 to RIB. He said the PC was asked to recommend whether to go forward with this action. Smith said they had discussed this issue thoroughly, listened to residents, both of S. Campbell and other parts of the Island. He said the PC recommends that City Council take the appropriate action that they feel is warranted. Pearce asked Smith when the Planning Commission would make a proposal in regards to the Growth Control Ordinance that they have had for some time. Smith said the PC hopes to make a recommendation at the next meeting. Smith said they have asked repeatedly for information from the City and have not yet received that information. Smith said they have asked for the number of buildable lots on Tybee. Smith said he hopes that information would be available at the agenda meeting Monday night. Mayor Parker said that additional information was requested at the last meeting on several requests and he would like to hear those issues at this time. The first of these is 2 major subdivisions for Lots 6,7,8 & 9 S. Campbell Avenue for Mr. Keitzman. Harold Yellin, Agent, spoke to Council and said the changes and issues Council had, have all been addressed. He said they had redesigned the drainage to save more trees, and Davis Engineering has written a letter approving the plans. Yellin said no variances were being requested. Pearce asked if they would be willing to curve some of the drainage lines and driveways to preserve more trees. Yellin said absolutely, they would. Rusty Fleetwood said the issue here was density. He said there would be 8 lots on 1 of the subdivisions and 7 lots on the other. He said that issue still exists. Rachel Perkins said the plans show 2 drainage ditches side by side on the 2 subdivisions and asked why couldn' t they be combined into 1 to serve both subdivisions. She also suggested that the required number of trees per lot be upheld and mitigation is by lot. Several residents spoke in support of subdivisions. Roxanne Fleetwood spoke in opposition. Pearce asked if the developer would be willing to mitigate on a lot -by -lot basis, and Mr. Keitzman agreed. Sessions said that for the record and to answer Shell Solomon' s statement that Keitzman was asked to provide more than anyone else in his subdivision request, that a recent request on Bay & Byers was sent back several times. e.Aeg Page 145 of 202 Council Minutes CC 4- 4-Z o o�L firm would address that in their study and whomever is interested, could work with them on this issue. Youmans motioned to deny the proposed Text Amendment for parking requirements for rental property, Buelterman seconded. Buelterman said he would like for the planning firm to look into this and come back with some proposals. Buelterman asked what a citizen could do if someone parks on their property or blocks their access to their property. Chief Price said they could call the police and have the car towed. Parker said for anyone interested in working with the planning firm, to get their name to him. Pearce said he acknowledges the problem and thinks that we need some kind of ordinance, but not necessarily this one. Vote was unanimous to deny the amendment. Pearce motioned for approval for the major subdivision of Lots 6 & 7 S. Campbell Avenue contingent on the developer working with staff to improve plans to save as many trees as possible and curving the drainage lines, Buelterman seconded. Wolff said he still thought this should be done as 1 major subdivision. Youmans said he had talked with some of the neighbors and they were happy that the lots would be 4500 square feet for single-family and not any larger for duplexes. Pearce said he still had some density concerns but under current ordinances could not vote to deny. Vote was 4, Youmans, Buelterman, Crone and Pearce, in favor, and 2, Wolff and Sessions, opposed. Crone motioned for approval for the major subdivision of Lots 8 & 9 S. Campbell Avenue with the same contingency as in the previous request, Buelterman seconded. Vote was 4, Youmans, Buelterman, Crone and Pearce, in favor, and 2, Wolff and Sessions, opposed. Crone motioned for approval of the major subdivision at 1009 and 1011 Jones Avenue, Buelterman seconded. Buelterman said his concern was the issue of 10 feet from Jones Avenue. Buelterman said we couldn' t force this on Mr. Guerrard but we could change the ordinance to reflect if the property is on a well -traveled street, 20 feet is required. Sessions said she thought the intent of the Code is a matter of interpretation. Vote was 3, Youmans, Buelterman and Crone, in favor, and 3, Wolff, Sessions and Pearce, opposed. Mayor Parker voted in favor and broke the tie vote. Crone motioned for approval of the variance for Holloway and Vining at 5 2nd Place, Buelterman seconded. Vote was unanimous. Sessions asked how the noise ordinance is enforced now and how we could keep the noise more contained. She said she had talked with several residents who voiced concerns about this on Highway 80 and Butler Avenue. Chief Price said they enforce the ordinance against loud music and that doesn' t seem to be a problem. He said they are ticketing speeders and will continue to enforce the speed limit. Chief Price said he would like to address the golf cart issue. He said he is afraid this would open up a lot of problems. He said he would like to only allow the carts from sun -up to sundown. Hughes said that restriction has been added to the ordinance. Hughes said that signs, stating what the regulations are, have to be put in place. Price said when people come in for the permit, they would be given a copy of the ordinance, read it and sign, stating that they have read the ordinance, so that they would know what the rules are. Parker asked what designates a handicap decal. Price said he is going by Georgia State Law and the people would have to go to the driver' s license office to get one. That would have to be shown when they apply for a golf cart permit. He said this permit is a lot more restrictive than a handicap -parking permit. Hughes said there is a State law that designates who can get a handicap drivers license. Page 147 of 202 Council Minutes The issue of the skate park was also postponed. CC. 10-Iq-2oOq- Sessions said she attended a meeting to discuss the establishment of a Cultural Affairs Committee. Sessions motioned to approve a list of people (this list is attached and becomes a part of these minutes) who attended the meeting, to become members of this committee. She said they would elect officers and bring recommendations to Council. Sessions read the list of nominees and they are: Maria Watts, Bonnie Kaar, Bob Hearn, Jack Boylston, Paul DeVivo, Sonjia Dittmar, Susie Morris, Amy Gaster, Cullen Chambers, L. F. Rumpel, Joe Roachfort, Bob Thomson, Claire Price, Paul Wolff, Jason Buelterman, and Shirley Sessions. Wolff motioned to establish this committee and appoint the people named, Pearce seconded. Youmans said we had people from many cultures on the Island and we need people from all of these cultures on this committee. Sessions said everyone is encouraged to participate, and asked everyone interested to call Bob Thomson. Vote was unanimous. .5 k o j l A �e.(0 O 5 ? Crone motioned for approval of the subdivision for lots 5 & 7 South Campbell Avenue for Louis Keitzman, Youmans seconded. Pearce asked that Mr. Keitzman take care in the development around the drip line of the trees. Vote was 4, Wolff, Youmans, Crone, and Pearce, in favor, and 1, Sessions, opposed. Crone motioned for approval of the subdivision for lots 8 & 9 South Campbell Avenue for Louis Keitzman, Youmans seconded. Vote was 4, Wolff, Youmans, Crone, and Pearce, in favor, and 1, Sessions, opposed. Pearce said Mr. Rhangos is considering applying for a land trust and has applied for a permit. Pearce said this discussion is premature as he has not been given the permit. Pearce said the requirements for tree removal mitigation has a cap of $1500.00. Pearce said he would motion that this be sent to the Planning Commission to consider that this fee if for every lot in subdivisions and not the entire subdivision. Hughes said it doesn' t have to go to the Planning Commission nor does it need a public hearing. He said the fee is not part of the ordinance, but this falls under the resolution we have with the RDC. Hughes said you have to have 1" and 2nd readings if it is going to be part of an ordinance. Hughes said hopefully the RDC would have their recommendations soon. Hughes said he would prefer that the mitigation be put in as an ordinance. He said there has been a lot of confusion over the mitigation fees and fines, and it should be clarified. Hughes said fines are the courts' department and not the zoning department' s. Wolff said he appreciated everyone' s patience regarding recycling and thanked everyone for participating. Wolff said we are currently out of bins but items may be placed in any type of container and they will pick it up. Parker asked who had the authority to name new streets. Hughes said if it were a City street, the City would name it. He said if it is a subdivision, the developer names the streets and it is part of the specifications on the plat. Wolff said he would like to propose a real estate transfer fee to be used to acquire green space. Wolff said he had a letter from the metro Atlanta mayors stating they are doing a similar resolution, asking for .2% fee on transfer of property. He said it would only affect people buying or selling property. He said it would be included in the mortgage and it would only amount to a few dollars a month. Wolff said he would like to propose a .25% or .2% to go into a green space fund. Wolf said this would have to go, by request from the Council, to the Legislature. Wolff said he talked to Rep. Burke Day about this and Day said if Council approves it, he would help us in the process. Parker asked if this would have to be a statewide referendum. Wolff said it does but according to this letter, the metro Atlanta mayors are Page 172 of 202 Chatham County Board of Assessors: 2016 Property Record Card 4-... http://boa.chathamcounty.org/DesktopModules/ChathamCounty/Boar.. I jpiijii�iijij ?111111 APPRAISER MWTHOMASI LOT M SUB OF LOTS 8 & 9 HORSE PEN HAMMOCK FORT WD SMB LASTINSP 02/04/2016 31561 APPR 000008 ZONE SALES BOOK/ INS VI QU RSN PRICE PAGE 13 Nov 674787 WD Q 400,000 2015 GRANTOR.-SHARPE MICHAEL W & CATHERINE D GRANTEE:SNYDER MATTHEW L & COUi 12 Apr 304T 0402 QC V U UQ 2006 GRANTOR.-SHARPE WYMAN W GRANTEE.-SHARPE MICHAEL W & GATHER 29 Nov 279Q0149WDI 0 QX 1,450,000 2004 GRANTOR.-KIETZMAN LOUIS "W GRANTEE.,SHARPE WYMAN H ETAL PERMITS TYPE DATE 140727 SF 04 Feb 2016 Comp 130,000 140727 CO 04 Feb 2016Comp -.m_ _- J COMMENTS: ------ COMMENTS: 30 Nov 2015 TY16 SVSHP 09 Mar 2010 TY01 0 RET VAL ENT 01 Mar 2005 TY2005; NEW PIN; SPLIT OUT OF 4-19-4-003, 3/1/05, MEF 4-0019-04-026 3 RIVER OAK LN TYBEE ISLAND SNYDER MATTHEW L & COURTNEY CAMA ASMT A* 96,900 96,900 LAND 1 PO BOX 240 TYBEE ISLAND GA 31328 160,600 160,600 BLDG I OBXF 0 257,500 257,500 Cost - MS MS PROPERTY 0006 RESIDENTIAL USE Came UTA 0004 Tybee Island NBHD 020222,00 T222 TYBEE 2013 HORSE PEN [EXEMPTIONS HISTORY LAND rtYY4IMPR TOTAL 2015 94,900 94,900 Came 2014 94,900 94,900 Came 2013 125,000 125,000 Over 2013 94,900 94,900 Carria 2012 154,900 154,900 Came 2012 125,000 125,000 Over 2011 154,900 154,900 Came 2010 204,600 204,600 Came 2009 292,000 292,000 Over 2008 292,000 A/C 2007 245,000 245,000 Came 2006 279,500 279,600 Came 2005 103,500 103,500 Cama LAND ID# USE DESC FRONT DEPTH UNITS/TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 111649 SINGLE FAMILY RES 0 0 1.00 -LT 96900.00 R2 96900 1 of 2 08/10/201611:13 AM Chatham County Board of Assessors: 2016 Property Record Card 4-., LT47 &a • TIM'"I 0 Tmvb"Z�� I I 'e Property Record Card http://boa.chathamcounty.org/DesktopModules/ChathamCounty/Boar.. BUILDING SECTION I CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 118022-1-2016 Residential 200,806 2015 MS .00 0:00 0:00 0:00 :00 200,806 160,600 SECTION TYPE I - Main AREA 1900 TYPE 1 -Single-family Residence FRAME 1 - Stud Frame STYLE 2 - Two Story QUALITY 4;00 CONDITION 3.00 # UNITS 0 # OF BEDS /BATHS 3/2,10 COMPONENTS Units % DUAL Rl 105 Frame, Siding 100.00 R2 214 Metal, Preformed 100:00 R3 351 Warmed & Cooled Air 100:00 R4 402 Automatic Floor Cover Allowance R5 502 Automatic Appliance Allowance R6 601 Plumbing Fixtures (#) 11,00 R6 602 Plumbing Rough -ins (#) 1.00- .00R6 R6 622 Raised Subfloor (% or SF) 100.00 R7 721 Carport, Flat Roof (SF) 950.00 Fill 904 Slab Porch (SF) with Roof 168;00 2 of 2 08/10/201611:13 AM Dianne Otto From: Downer Davis <dkdbus@gmail.com> Sent: Friday, September 26, 2014 1:32 PM To: Mike Thomas Cc: Dianne Otto Subject: Re: FW: Lot M River Oaks Lane Diane, I'll send in my invoice and concurrence over the weekend. Downer On Fri, Sep 26, 2014 at 10:50 AM, Mike Thomas <mthomas(o)thomasreel.com> wrote: Dianne, See attached revised drawings to reflect Downer's comments. I added a cut section to reflect two swales..a deeper swale at rear per approved drainage and a slightly smaller swale on the sides of the lot. I also added the silt fence to the front of the lots for erosion control. Also added notes on the drainage for Swale invert elevations. Hopefully this addresses all issue . thanks Michael I Thomas MEng,PE Thomas & Reel Engineering Consultants , Inc. 9100 White Bluff Road Building 300 Suite 306 I Savannah Ga 31406 PO Box 15818 Savannah,Ga 31416 office 912-920-0950 fax 912-920-0948 cell 912-272-7068 mthomas@thomasreel.com www.thomasreel.com From: Dianne Otto [mai Ito: Dotto(&cityoftybee.org] Sent: Tuesday, September 09, 2014 11:10 AM To: Michael Thomas Cc: Downer K. Davis Jr. Subject: FW: FW: Lot M River Oaks Lane Welcome back, Mike. Below are Downer's comments on your attached 9/3/2014 revised plans for Lot M River Oak Lane. Also attached is page 3 of 4 from the Millikan plans. That is the page Downer refers to in his email. We look forward to your next submittal. Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Downer Davis [mailto:dkdbusCa)gmail.com] Sent: Tuesday, September 09, 2014 11:05 AM To: Dianne Otto Subject: Re: FW: Lot M River Oaks Lane K Yes. Thanks. Mike's plans show the side swales conforming to the 1' depth & with 5:1 side slopes, but not the rear ditch/swale. Milikan's plans call for both to be the same. We can bend on the side not being quite that deep, but not the rear. Also, Mike's included a part of the drainage plan that shows the trees overlaid. He hasn't provided the drainage plan that showed the design Swale inverts. You and I identified the correct one in your office. To end this cycle, I offer the following thought. The subdivision design is still in effect until Tybee approves changes. Tybee could advise Mike Sharpe that he's entitled to a permit using the drainage plan currently in effect for this subdivision. Datum change to '88 shouldn't be a big issue but it'd be best if an engineer provided the conversions. I concur with the E&S design except for the absence of sediment barrier across the front. I previously overlooked the front not having sediment barrier from the corners to the construction exit. As Bruce will be inspecting this, if he's ok with a markup on the plans, that's fine with me. Downer On Tue, Sep 9, 2014 at 10:12 AM, Dianne Otto <Dotto(a)cityoftybee.org> wrote: Downer, 3 After you sent this email you came here to review the Millikan plans. Do you want anything below changed before I forward it to Mike Thomas? He is gone for several weeks but I want to go ahead and get this in his emails. Thanks, Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Downer Davis [mailto:dkdbus(sbgmail.com] Sent: Thursday, September 04, 2014 9:46 AM To: Dianne Otto Subject: Fwd: Lot M River Oaks Lane Diane, Mike's plans show the side swales conforming to the 1' depth but not the rear ditch/swale. I cannot recall the depth of the side yard swales from Milikan's plans, but the rear has to be shown as 1' depth and to the grades on Millikan's plans. Also, Mike's included a part of the drainage plan that shows the tree's overlaid. He hasn't provided the drainage plan. To end this cycle, I offer the following thought. The subdivision design is still in effect until Tybee approves changes. Tybee could advise Mike Sharpe that he's entitled to a permit using the drainage plan currently in effect for this subdivision. The 1' datum change shouldn't be a big issue for him. I concur with the E&S design except for the absence of sediment barrier across the front. I previously overlooked the front not having sediment 4 barrier from the corners to the construction exit. As Bruce will be inspecting this, if he's ok with a markup on the plans, that's fine with me. Downer ---------- Forwarded message ---------- From: Mike Thomas <mthomas(a-)thomasreel.com> Date: Wed, Sep 3, 2014 at 12:23 PM Subject: RE: Lot M River Oaks Lane To: Dianne Otto <Dotto ancityoft bbee_org> Cc: "Downer K. Davis Jr." <dkdbus@gxnail.com> See attached revised drainage plans for lot M on River Oak lane. The Swale detail has been updated to reflect the approved subdivision design. Michael I Thomas MEng,PE Thomas & Reel Engineering Consultants , Inc. 9100 White Bluff Road Building 300 Suite 306 Savannah Ga 31406 PO Box 15818 Savannah,Ga 31416 office 912-920-0950 fax 912-920-0948 cell 912-272-7068 mthomas@thomasreel.com www.thomasreel.com 5 From: Dianne Otto [mailto:Dotto cityoftybee.org] Sent: Tuesday, August 26, 2014 4:50 PM To: Michael Thomas Cc: Downer K. Davis Jr. Subject: FW: Lot M River Oaks Lane Below are comments from Downer Davis on the 3 River Oak Lane submittal received yesterday from owner Mike Sharpe. Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 9I2.472.5031 Fax: gi2.786.9539 From: Downer Davis [mailto:dkdbus@gmail.com] Sent: Tuesday, August 26, 2014 10:16 AM To: Dianne Otto Subject: Lot M River Oaks Lane I offer the following comments on the E&S and grading plans. I concur with the E&S portion. The drainage design is not accepted. As shown on the 2nd sheet of Michael's plans set (Millikan's design on which the subdivision permit was issued), the subdivision was designed and permitted under the condition that there be a rear lot ditch extending from South Campbell eastward to the marsh / tidal waters. This ditch was never fully installed. Michael, the Engineer & Owner, proposes a drainage plan on ST -5 that appears to be of the same drainage pattern, but with less detail than L Millikan's other than to show a shallower rear ditch. You will have to refer to other sheets of Millikan's to see that the rear ditch was deeper. If a drainage pattern other than Millikan's is to be followed, a revised drainage study and more detailed plans, meeting current standards and considering all affected lots, will need to be provided for me to issue concurrence on a new drainage plan to the City If reference to any new drainage plan is removed and the intent to follow the old one is stated, then there I could concur with the drainage plan. However, the presence of the large oak near the rear commons side lot line of Lots M & N would need to be removed to allow installation of the rear ditch required for this subdivision. There may be other trees requiring removal for adherence to the approved drainage plan. Downer 6957262 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 No virus found in this message. Checked by AVG - www.avg_com Version: 2014.0.4716 / Virus Database: 4007/8104 - Release Date: 08/26/14 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 M This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 CITY OF TYBEE ISLAND 403 Butler Ave PO Box 2749 Tybee Island, GA 31328-2749 Ph (912) 786-4573 FAX (912) 786-5832 Vendor #: 0 1 - 0 0 2 0 5 5 Issued to: DAVIS ENGINEERING, INC P 0 BOX 1663 TYBEE ISLAND, GA 31328 PURCHASE ORDER PO Number: ,e _? g 162 This number must appear on I elate correspondence, shipping papers and invoices. Date: 1 0/ 01 / 2 01 4 Requisition #: 1 5- 2 8 1 6 2 Ship to: CITY HALL 403 BUTLER AVENUE TYBEE ISLAND, GA 31328 F.O.B. Point - Tybee Island, GA Terms - Net 30 days Authorized by For the City of Tybee Island I agree to provide the items/services listed on this purchase order and accept the Purchase Order Terms and Conditions that accompany this form. Supplier Acknowledgement Date Date DAVIS ENGINEERING, INC. P.O. Box 1663 Tybee Island, GA 31328 Tel. (912) 695-7262 dkdbus@gmail.com 0— October _ INVOICE October 1, 2014 Diane Otto City of Tybee Island P.O. Box 2749 Phone (912) 786-4573 Fax: (912) 786-9539 RE: Lot M River Oaks Drive 3 R • ver Oak L, 08-26-14 0.75 plan & submittal review 09-04-14 0.50 review of resubmittal 09-26-14 0.25 Invoice #21402501 Tybee Island, GA 31328 / M ;�" Sh QrP2& 1.50 hours @ $175/hour = $262.50 Total Due This Invoice � -kI I absj (o -t-14 `oo --722.0-SZ-I-203 p 14, -ul 21 Po 15- 2T1(02 DAVIS ENGINEERING, INC. PO Box 1663 Tybee Island, Georgia 31328 Tel. (912) 695-7262 dkdbus@gmail.comt October 1, 2014 Diane Otto City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786-4573 Fax: (912) 786-9539 RE: Lot M River Oaks Drive Dear Ms. Otto: have reviewed the plans for the above referenced site. My review is limited to drainage issues and land disturbing activities. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning, tree protection or subdivision regulation issues. Within the scope of my design review, to the best of my knowledge and belief, it is my opinion that this drainage plan meets the requirements of the Land Development Code of the City of Tybee Island. Any recommendations do not relieve the project of the requirement to obtain any other required permits, approvals, etc... by any other governmental body or authority having jurisdiction over any portion of this project. Please contact me if you have any questions on this matter. Sincerely, Downer K. Davis, Jr., P.E. President 2140250B LOT I AS -BUILT, TREE, AND TOPOGRAPHIC SURVEY OF OF LOT h1 QQ(4_6M_Ie2 OF A SUBDIVISION OF LOTS AND 9 g p A � qpe NOW 01.4 F'RLY 'Am,9 t $ "r"'` Tm r a * d PCAISE G. SIEGEL i' wAl V11111 V. 4 pA r 4I., I NORSE PEN HAMMOCK LU Lir •. KNOWN AS 0 RIVER OAK LANE J Qtll9-Qd-Q23 y �� TYBEE ISLAND, GEORGIA FOR si -J-J-J--J-1 fJJ_j _ /fit MICHAEL W. AND CATHERINE Il• SHARPE I J j _j - _f -..f J _.l _ .1 J f 10 05 0 10 20 y s4s J -j—I ' J _. J J_ f J p fes_ j j _1 f `J - J_ 1 %J_ lY = tD _ _J� � f " -Ata ff J 1_Jry r J f f_ a GATE of CAS-BUILT2,2 suRVEv ,D f_ f MARCH 02, sola +~ 1 f J 1 J --f f J _ _ J J`,I, f _J -J -J } J- K f ti -i-1 J HATE rr PE �Ta 9.5 + _J J f J J 1 J J J f J > 1 w E a •mA1. 6vN .I J MARCH ail, 2014 L2393 1, Jap _� _j _j J J- BQ J J f J rrv,w Q; 9:gz J_,1 J --J f -J .J_1 J+ J J_? r r- SC eE.. % .sG "'^'tiJ...: �...,I,-..! ,�_.,f—j 'h3 z l 1 _ f J `f IJJ J_ «BMJ f J J J,_J� 7 v t, a Q E J 9 J_ J J _l. ). J J J J a -�f f a J_ x µ f J J J_ 1 _, / f f !_1 j J,J_I J 1 J f_ J f f_ 9T J J J J J 1 Q - J J f J J J J .4E I J J_,.J _ j _I _J J rte- - _ _f �J�� J J J J TZ J f_J J -, - -f �J:.J 1 J _t J 1._.1. 'J 1 JmJ J !. J 1} _ _J_J J� f..J_/ J - f_j_J� f_ f_ 1J� -<I J J{ 1 J J f � J J. J.., J J J 1. J J -_a. SWix«R-f 95J L'i E 1 J r% w«,ear' 92Q 1 J l J --f J_J --I -I _1 :_,._f l J f f l £_I A 3' J J, JJ a� 2 +gz� LtL�_11J;J1J JJJJJJ1�1ffJJJJfJ c +;�: > N�. _ ® f,_1 J l _ 1 _..1 /._ f J .J� f J_I.J PINE J f tt zo ?uTtnry -- " 9 wWw �__r I.JJ 1 1 J f: 1.a 9.49 4,12 J -_.! SETBACK "",^-.._ X23 �...,,�.-.-...f-..f,-.J _J f J �_J J A _ f_J f J�T� f- J . f �J J -f _ 6 �T°----_.- `'� f ` `J-J,J-.(-1�1 1 as f, f% 1 l J rJ. 4 j ._ P VA`RJa1vEwAv 'f _ jI. J J BENCHMARK { C�j '-J-....J..�j -....1 `"' .1 T.S'II 9IT . �� :RR SPIKE IN 22- PINE �m--.f....J IIItf `F-...{.oI 867 (NAVD 1988) 7,95 942 J _ 969 1 .�', ` w w v �� LOT > �"'^ «.... ,. CHATHAM SURVEYING SERVICES, INC., HAS PERFORMED A .:954 ----.-Ti.-�.---- * A t9 �y TOPOGRAPIC SURVEY Of- THIS PROPERTY AS EXISTED ON -� 87i� 4 :a. MARCH 02,420 7�1 THIS DRAWING MAY NET BE ALTERED ! OR AMENDED IN ANY WAY WITHOUT THE. EXPERESSED m: OD WRITTEN PERMISSION OF CHATHAM SURVEYING SERVICES, INC. III ID '4.at a P.LN:. 4-'0019-04-026 I3' 4IQ 9is REFERENCES, SNR 31-S PAGE fit +tnsi 'Sao IN ACCORDANCE WITH FI RM.. MAP NUMBER 1305100213 F, INDEX DATED AUGUST 05, 2013, LET (. P3, r`" THI S: PROPERTY .DOES LIE WITHIN A DESIGNATED li d-Qo.s-od 0r5 LU za• tivE oae .. L1%_ N FLOOD HAZARD AREA. (ZONE;. II ELEV988) I1? I�.as 4 OR FORMERLY (NAND T98t3a ASHI.EY 1Np SNT6. -e+ e L... � MTC.ELE T�MASY Vt.HALMSA TsDWSOre :v (, �.. ERROR OF CLOSURE CLOT AS:HOWN ON THIS PLATY . ERROR OF CLOSURE (PI -Al): I t 52,639. ANGULAR EPROR- c2' PER POINT W Ie• LITE EPA � O th TOTAL LOT AREA, 0.1245 ACRE (5,421 SF) METHOD OF AN USTMENT, NOT ADJUSTED -.---:3,1� °3 CG1llIPMENT USED:. SOKKIA SET 4116 TOTAL STATION aaTa t. sT o5 �9.T9 ELEVAYll3NS ARE: BASED ISN.USGS Disk 'TIDAL 6' LOCATED IN ',#` THE WALT. OF THE TYREE LIGHTHOUSE '.0,Y7! l THE LOT AS SHC7WN ON THE SUBDIVISION PLAT OF RECORD ON radQ. -- '-' FILL WITH HE :CLERK OF SUPERIOR COURT OF CHATHAM COUNTY, ...--,+f Ip,IT 71. UflD1NG SETBACK ,,,:. r sas GEORGIA RECORDED 1N SUBDIVISION MAP BOOK 31-3, PAGE Sl DOES 946 ._--•-. "_ 1R... lQ:Il9 ( • � 1,6Q Tro LY. SUALE "fw9 NE4171 N MATHEMATICALLY CLOSE. THE DIMENSIONS OF THIS lOT. AS svuc Swn�s-.;;w y-� ggT SHOWN ON THIS .SURVEY HAVE BEEN ADJUSTED TO FIT FOUND. : i- .. ®._ ®..;::.- Ex IST ION PROPERT MONUMENTS ON SITE: -- 9.92 in Qe 21 ❑A%. 4ts.--�_ ss�jsT: 134- 1tt 24 pAK `-. ---- .'99z Trn-bli; 9T&�'*"�-- .' .. -+--- - THIS SURVEY IS; :PREPARED FOR THE EXCLUSIVE USE OF THE ENTITIES 1Q.b3 102Q .....� +-- -- to, Q� :SvniS :906 992 NAMED IN THE CERTIFICATION HEREON, SAID CERTIFICATION DIES NOT ;.y ,. EXTEND TO ANY'UNAMED ENTITIES 'WITHOUT AN EXPRESS RECERTIFICATION' LINK ROD 6D.OQ +-- N 5 ,x22' .32.00 W r'^ -IRON gag BY THE SURVEYOR NAMING.: SAID ENTITIES, 11D 'a - BUILDING SETBACKS SHOWN ON THIS PLAT ARE TAKEN FROM THE SUBDIVISION PLAT Of RECORD, ALL SETBACKS MUST BE CONFIRMED WITH: THE CITY OF TYREE ISLAND PRIOR TO ANY DESIGN OR CONSTRUCTION: THE SHOWN EASEMENT ALONG THE FRONT OF THIS LOT IS SHOWN ON {: THE SUBDIVISION PLAT OF RECORD. BUT IT'S USE OR TYPE IS NOT STALED. 42003 +1021 d9.6T +fo2Q \\ +443. + LOTS to a 11 HORSE PEN HAMMDCK — CHATHAM SURVEY I NCI SERV I C:ES,. INC ,;m, Na -Q7 :. JAMES M. KEATCIN NDw I'My VOOTEN TAYLOR Suw-ImB, R ETM G t s r 0l w G., ROD No. 2743 P, CJ. BOX 61649 lI SAVANNAH, GEDRGIA 31420 Ira. 2743 912-303-0302 .. �- tq.. e ? THIS: SURVEY WAS PREPARED IN C04 ORMITY WITH THE TECHNICAL. STANDARDS FOR: v,, = Tu0" tiR PROPERTY SURVEYS IN GEORGIA AS SET FORTH IN CHAPTER "180-7 OF THE RULES. f y, Kt .. OF THE GEORGIA BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND --:. LAND SURVEYORS AND AS SET FORTH IN THE GEORGIA PIAT ACT O.C.G.A 15-6-67; $ ter r+}+' a�+i►` « i 174 " y 44 `� •"' '�� ``� y . ,: '. l' } �.« �f ems-'" " •.. It K� ............. z �34 /0 rt �' 0 'Y P, -'7 11"t Oak t pine40t To 4� �/f/fyI ' •t A, t Y 4 r 4 q � a 4 » • ,may } .. r r.,w:.,« f .t __ t` xR 73 P �• � � `mayyy fir' x p 7 i • PZ-741 �« fP t` 4 .., as .. �•�� • ryr,,� �''* "�t }...Mc �^:, l � 4�`. A»* y. ,� • , :4 ,fir"". g • � �,�«s } CITY OF TYBEE ISLAND BUILDING PERMIT WATER METER PICKUP DATE ISSUED: 12-17-2014 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION NEW RESIDENTIAL BLDG - SF 3 RIVER OAK LN MICHAEL SHARPE 315 SUNCREST BLVD SAVANNAH GA 31410-2211 MICHAEL WYMAN SHARPE 315 SUNCREST BLVD SAVANNAH GA 314102211 1580 P $ 6,653.90 4-0019-04-026 $130,000.00 PERMIT #: 140727 1 INCH METER TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org DATE ISSUED: 10-29-2014 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION q q„ CITY OF TYBEE ISLAND BUILDING PERMIT NEW RESIDENTIAL BLDG - SF 3 RIVER OAK LN MICHAEL SHARPE 315 SUNCREST BLVD SAVANNAH GA 31410-2211 MICHAEL WYMAN SHARPE 315 SUNCREST BLVD SAVANNAH GA 314102211 1580 P $ 6,653.90 4-0019-04-026 $130,000.00 TOTAL BALANCE DUE: PERMIT #: 140727 $6,653.90 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org lC `J Y Tq i CITY OF TYBEE ISLAND CERTIFICATE OF OCCUPANCY DATE COMPLETED: 11/12/2015 This Certificate issued pursuant to the requirements of the Standard Building Code Certifying that at the time of issuance this structure was in compliance with the various ordinances of the Jurisdiction regulating building construction or use. PERMIT #: PROPOSED USE: OCCUPANCY TYPE: CONTACT NAME CONTACT ADDRESS CONTACT CITY STATE ZIP PROPERTY ADDRESS APPROVED BY: 140727 NEW RESIDENTIAL BLDG - SF F& MICHAEL SHARPE 315 SUNCREST BLVD SAVANNAH GA 31410-2211 3 RIVER OAK LN P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-5737 www.cityoftybee.org Building Permit Number: l4—Ur7c2,7 Applicant's Name: J �(� r Owner's Name: S!'10.Y Site Address, Tax #, Parcel #: 3 1 V Address: `j \ V e_K Telephone: 6(0s- — 1 7P& Telephone: I. All development - Base Flood Elevation Data provided. A. The as -built elevation certification from a registered land surveyor or \ professional engineer has been submitted? " c►" No B. The lowest floor elevation is at or above the required lowest floor elevation? "e " No C. Electrical, heating, ventilation, plumbing, air conditioning equipment (including duct work) and other service facilities are located above BFE or floodproofed? " es " No II. Development in Zones A, AE, Al -A30 and AH. A. Solid foundation perimeter walls located below BFE.: 1. There are at least two (2) openings? Y No 2. Square footage of enclosed area subject to flooding 3. Square inches of venting required 4. Square inches per opening (multiply I by w) JeNo 5. Number of required vents (3 above divided by 4 above) 6. Foundation contains the minimum number of vents? 7. The bottom of each opening is no higher than one (1) foot above grade? " �j" No 8. Any cover on openings will permit the automatic flow of floodwaters in both directions? t No B. Base flood elevation and/or floodway data not available orAO Zones: 1. The lowest floor is at least three (3) feet above the highest adjacent grade? " Yes " No 2. The development meets the setback requirements of the ordinance? " Yes " No 3. If 2 above was "no", has a No -Rise Certification been submitted? " Yes " No Reviewer's Name: Date reviewed: C. Floodway data is provided. 1. Did this development encroach in the floodway? " Yes " No 2. Do the actual field conditions meet the proposed actions and technical data requirements? " Yes " No 3. If C1 was "yes", has a No -Rise Certification been submitted? " Yes " No Reviewer's Name: Date reviewed: III. Development in Zones V, VE, and V! -V30, VO (Coastal High Hazard Areas). A. Development location complies with all coastal setback requirements? " Yes " No B. Structure is securely anchored to pilings or columns and certification by a registered, professional architect or engineer has been submitted? " Yes " No Reviewer's Name: Date reviewed: C. Walls permitted below the base flood elevation consist of decorative lattice work or, where permitted, are breakaway and have been certified by a registered, professional architect or engineer? " Yes " No Reviewer's Name: Date reviewed: Local Administrator's Signature: Date : G ` l �7- -15- Figure 15Figure 7-3. Sample permit review checklist Ordinance Administration 7-30 C • RIVER 0 S 42"37"5514 K SNE 38 , ° -5 j`;, '�"-�.5,�4, 2°13'14.. E'SMZ' �.r F'ND E 60 00' LOT L 1 .4 OI 01 WI RETRACEMENT SURVEY 19' EASEI�NT PAVERS LOT M DECK ,06138 nE PND 35_ 57o , PXD'vn OD 2 STORY ' co FRAME HOUSE A C 11/2- RBF N 51°26'33"W 59.95' LOT 10, HORSEPEN HAMMOCK LOT N PLAT OF LOT M OF A SUBDIVISION OF LOTS 8 & 9, HORSE PEN HAMMOCK, FORT WARD, TYBEE ISLAND, CHATHAM COUNTY, GEORGIA STREET ADDRESS: 3 RIVER OAK LANE FOR: MIKE SHARPE THIS SURVEY WAS PREPARED IN CONFORMITY WITH THE TECHNICAL STANDARDS FOR PROPERTY SURVEYS IN GEORGIA AS SET FORTH IN CHAPTER 180-7 OF THE RULES OF THE GEORGIA BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS AN AS SET FORTH IN THE GEORGIA PLAT ACT O.C.G.A. 15-6-67. AUTHORITY O.C.G.A. 15-6-67, 43-15-4, 43-15-6, 43-15-19, 43-15-22. i J. Wfff= REYNOLDS LAND SURVEYOR 636 STEPHENSON AVENUE SUITE C SAVANNAH, GEORGIA. 31405 TELEPHONE: 912-352-0464 FAX: 912-352-7787 THIS BUILDING IS 33.3' ABOVE THE ADJACENT GRADE. REFERENCE: SMB 31—S 61 EQUIPMENT: TOPCON AP—L1A ERROR OF CLOSURE: LINEAR: 1/— ANG: —"/ANGLE BALANCED BY:— PLAT: 1/68,500 0 20 SCALE: 1" = 20' DATE: OCTOBER 20, 2015 SURV DATE: OCTOBER 22, 2015 PLAT FILE NO. 15-46 Georgia Residential Energy Code Compliance Certificate* Builder/Design Professional: Envelope Summary: List the R -Value for the following components: Flat ceiling/roof: Exterior wall: K0 Attic kneewall: Basement stud wall: Crawlspace stud wall: Foundation slab: Cantilevered Floor: Fenestration Components: Window U -factor: '0 Skylight U -factor: Glazed Door U -factor: • Building Envelope Tightness (BET): Phone: Sloped/vault ceiling: Above grade mass wall: Attic kneewall sheathing: Basement continuous: Crawlspace continuous: Floors over unconditioned space: Q Other insulation: Window SHGC: „-7,y Skylight SHGC: Opaque Door U -factor: (<50% glazed) BET test conducted by: 3rva+it (Du4uy Phone: 912-313-4677 Fan Flow at 50 Pascals= 1296 CFM50 Total Conditioned Volume = 15,560 ft, ACH50 = CFM50 x 60 / Volume= 5 ACH50 (must be less than 7 ACH50 ) Low Rise Multifamily Visual Inspection Option (The visual inspection option may be conducted by a third -party instead of the BET test for R-2 buildings only.) Visual inspection conducted by: Phone: Mechanical Summary: Water Heater Energy Factor:— 6,R6-1 Ef Fuel type: ❑ Gas JElectric ❑ Other Number of Heating and Cooling Systems: Heating System Type (choose one): ❑ Gas: AFUEAir-Sourceat Pum �� HSPF ❑ Other: Efficiency: i ''EC 4 Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.): 14{'z !"kM Cooling System Efficiency: /Y, c4c-p' ❑ SEER ❑ EER El Other Heating/Cooling Load Calculations Performed by: _ i`1irrh �e1,r. Phone: Total Heating Load (Based on RCCA Man. J or other approved methodology): Btu/h Total Cooling Load (Based on ACCA Man. J or other approved methodology): Btu/h Cooling Sensible Load: Btu/h Cooling Latent Load : Btu/h Total Air Handler CFM (based on design calculations): Ocf ? CFM Duct Tightness Test Conducted by: 3rya vttQa4ivv Phone: 912-313-4677 CFM25 per 100 ft2 of conditioned floor area = CFM25 x 100 / Conditioned floor area served If all ducts are not located within conditioned space, builder must verify that either the postconstruction dud leakage to outdoors (PCO) is <_ 8 cfm/100 ftZ, the post construction total dud leakage (PCT) is <_ 12 cfm/100 ftZ, or the rough -in test (RIT) with air handler installed is _< 6 cfm/100 ftZ. State which method was used to conduct the duct tightness test: duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD). System Method (DB, MEDS, AMBD) Test (PCO, PCT, RrT) CFM25 Area served (ft) Test Result 1 !".3 PCT 118 1000 11.8 2 D3 PCT 74 880 8.4 3 *Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate shall be completed by the builder or registered design professional. Where there is more than one value for each component, certificate shall list the value covering the largest area. . NCONVERSION AGREENW. T Chatham, Ga. Clerk Superior Court Daniel Masse; Clerk Superior Court 133 Montgomery Street Suite 304 Savannah, GA 31401 Phone Number: (912)652-7214 Fax Number: (912)652-7523 E -Mail: dmassey@chathamcounty.org Official Receipt: 2015-00025337 Printed on 11/06/2015 at 08:11:53 AM By 38. on SCC -C71937 GOUhTNEY A SNYDER Date Recorded: 11/06/2015 Instrument ID Recorded Time Amount Bk fi60 Pg� 155 08:11:29 AM $10.00 AGREEMENT SHARPE, MARK TO:SHARPE, MARE( Itemized Check Listing Check # 334 $10.00 Total Due: $10.00 Paid By Check: $10.00 Change Tendered: $0.00 HAVE A NICE DAY RUCTURES IN THE FLOODPLAIN �. ` Address of Property -3 lG `'`^h'e✓ feet (NAVD) Panel Number , effective date teContractor 5G� Lion Ordinance of the City of Tybee Island, Georgia, the Property Owner agrees to the od Elevation shall be used solely for parking of vehicles, limited storage, or access to the in habitation without first becoming fully compliant with the Flood Damage Prevention )n. s below the Base Flood Elevation shall be unfinished or constructed of flood -resistant ;vices shall not be installed below the Base Flood Elevation. the Base Flood Elevation shall be equipped with at least two vents which permit the h total openings of at least one square inch for every square foot of enclosed area below two different walls, and the bottoms of the vents shall be no more than one foot above alls are required. ;ct to increased premium rates for flood insurance available from the National Flood special Flood Hazard Area. vhat is permitted shall consti ute a violation and be abatable as such. a .......... ..... �.r'y � ,.'�l Date Printed Na;ne of Property 0 ner of Name 9f Property I IIIIIII IIIIII III VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII IIII IIII Doc ID: 029191560001 Type: AGRE Recorded: 11/06/2015 at 08:11:29 AM J-2-01 j Fee Amt: $10.00 Pape 1 of i Chatham, Ga. Clerk Superior Court Date Daniel Massey Clerk Superior Court 6 SK68 PG155 STATE OF GEORGIA COUNTY OF CHATHAM I hereby certify that yn th�7/_Tlday of , 20, before me, a Notary Public of the State of Georgia, personally appeared M- , known to me, or satisfactorily proven to be the person whose name is subscribed to Oie foregoing i trument, who acknowledged that he/she has executed it for the purposes therein set forth, and that it is his act and deed. In witness whereof, I have set my hand and Notarial Seal. /MARIA M. MONROE :' o NOTARY L�Q--C�(� ' L� Z�� Notary Public, Chatham County, GAy; „ My Commission expires on _ My Commission Expires April 2tSe�p1;F, = a WITNESS SIGNATU �i Printed Name114 < V" Address % v, r. ' _40S - AV) Note: A Nonconversio Agreement must be used whenever an enclosed structure or portion of a structure is built or substantially improved within the 100 -year Floodplain below the Base Flood Elevation. A Nonconversion Agreement must satisfy all of the above conditions and requires proper recordation in the land records of Chatham County, Georgia. i, L` • CERTIFICATE OF OCCUPANCY REQUIREMENTS Permit # Job Address Job Name �Q.0 12� Owner/Contractor post house number (and unit numbers if applicable) no attic storage signs, if applicable V Energy Code Compliance Certificate pass Final Building inspection Elevation Certificate, Finished Construction As -built Survey V Height Certification, if required Drainage Certification from Project Engineer Nonconversion Agreement (attached) — must be recorded with Chatham County _ Breakaway Wall Certificate (V -Zone only) Mitigation of Trees, if required Payment of outstanding fees, if applicable City of Tybee Island City staff will coordinate these items when the needed documents from the list above have been submitted. Please do not contact the engineer or director. Drainage Certification from the City's Consulting Engineer, if applicable Drainage Certification from the Director of Public Works Department, if applicable FEMA Inspection from Planning & Zoning Manager 1110312014 BOSWELL DESIGN SERVICES, INC. 103 NASSAU DRIVE SA VANNAH, GEORGIA 3141 O 912-897-6932 LAHB0S91BELLS0UTH. NET November 12. 2015 Lisa Schaaf City of Tybee Island P.O. Box 2749 Tybee Island, Georgia 31328 RE : Mike Sharpe Project No. 3, River Oaks Lane Tybee Island, Georgia At the request of the Contractor/Owner, we have inspected the project referenced above for compliance with the approved site plan. Please keep in mind that we were not the original design engineers for the site but are inspecting for drainage plan compliance based on the plans that were suppled to us by the contractor and the City of Tybee Island. Based on the limited information on the plans and after a brief inspection of the project, it is our opinion that the project is in substantial compliance with the approved site plan including final stabllization in the form of sod. The swales which are in place on the east and west 5ide5 are only half formed and are centered on the property Imes and the intent is to complete the swales when the adjacent properties are completed. Thank you for your a5515tance and should you require more information please feel free to contact us at Boswell Design Services, Inc. 897-6932, e-mail to 1ahb05 a?bell5outh_.net or fax to 897-2287. Sincerely, t "t� G�. >� G1s }.Q Mark Boswell No. 28372 PROFESSIONAL * i City ofeee Island - Cc�nmun;lty DeveloWnt Dept. Inspection Report a� 403 Butler Ave. - P.O. Box 2749 Tybee Island, GA 31328 310 9 Phone 912.472-5032 - Fax 912.786.9539 INTERM�104AL MEMBER Permit No. 1 '" Q / a -a r/ Date Requested l �l/.� Owner's Name `– Date Needed / qAs Gen. Contractor Subcontractor Contact Information 1 /PEo -- )&CBOX Project Address �1 L h _ Scope of Work i V P (,kJ S Inspector i Date of Inspection 0-7-0 CaCt1. i� �s Inspection � Fail ❑ Fee Inspection T� 1LtV1'1�."s Fail Fee ❑ �s Inspection '- � , Pail Fee 4-' y., Fee F1 Irl Gl `- �SS Fail Inspection ❑ C'1ty ofee Island Community Develo$nt Dept.' Inspection Report 403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328 .�.. Phone 912.472-5032 • Fax 912.786.9539 CODECOUNCIC Permit No. Owner's Name :SkaF_ C Gen. Contractor r� MtMIfCK Date Requested Date Needed Subcontractor Contact Information�jt Project Address 1 U e r Ock- �, r� . Scope of Work Iye(A-) y- S P Inspector Date of Inspection Inspection I ! t �' C1. " P Pass -1 Fa Fee 1v CD e II Inspection i rpt HT1 t Pass ❑ Fail Fee Inspection E �e-c-, - r Pass ❑ Inspection` 14�C�� Pass .11 Fail Er Fee Fail Fee Enter Approval Details Welcome lisaroseschaaf 93 Inspection Agency Information: TYBEEISLAND https://wiringapproval.southemcompany.com/CreateApproval.aspx Site Map I Home I Contact lis User ID: Ilsaroseschaaf Help I Log Out W/A Approval Portal Home My Approvals Enter Approval Details Add Approval ' Search Approval Information Manage Defaults Inspection Agency *Select One User Profile Customer service Inspector Select One FAQs " Contact Us Data 10/13/2015 8:19:52 M Learn Mora PermiVApproval # GeorgiaPower.com Type *Select Type Classification Select One Electrician\Contact Contact Phone Wiring Approval Submitted Service Order Status Address Customer Name Phone Number Street k " Unit/Suite/LotB Street Name " Select One Also Known As Zip " Select City Select State Select Wiring Date Approval Number 10/13/2015 140727 02011 Southern Company. All rights reserved. Privacy statement Terms of use Save & Copy 1 , Save Only Print Inspector's Notes Type Address Inspector's Note 3 River Oak Ln. Permanent Tybee Island, GA Temp power to house Edit 31328 Submit r. 1 of 1 10/13/2015 8:19 AM City of 4ee Island - Community Developitnt Dept. Inspection Report 403 Butler Ave. P.O. Box 2749 - Tybee Island, GA 31328 D Phone 912.472-5032 - Fax 912.786.9539 Permit No/ZZ — . Owner's Name�'- Gen. Contractor Contact Information Project Address Date Requested %^ AS7 Date Needed Subcontractor Scope of Work, Inspector Date of Inspection Inspectionr.'i��i` t ufU�'i� Pa � FailEl Fee Inspection Inspection Inspection Pass ❑ Fail ❑ Fee Pass n Fail ❑ Fee Pass ❑ Fail n Fee MEMBER f s City of Ty Island - Community Developmept. a Inspection Report 1 403 Butler Ave. • P.O. Box 2749 - Tybee Island, GA 31328 i isum INTERNATIONAL ..ted Phone 912.472-5032 - Fax 912.786.9539 cooEcouNar MEMBER Permit No. 1 ` 07cP-7 Date Requested &13/�� Owner's Name e,- tt:;"P— Date Needed Gen. Contractor Subcontractor Contact Information In(0 s---- Project Address VC Y'05kK L4-\. e– Scope of Work A)c(.i Inspector Date of Inspection pVltt ll�.�c� Ins ection P1Fail Fee a Inspection Inspection Inspection Pass ❑ Fail ❑ Fee Pass Fail Fee Pass ❑ Fail 1:1 Fee' City ot*ee Island Community Develoat Dept. Inspection Report iiirl 403 Butler Ave. - P.O. . Box 2749 - Tybee Island, GA 31328 ieroui Phone 912.472-5032 - Fax 912.786.9539 cooEcouxdr MEMBER Permit No. Date Requested Owner's Name Date Needed 71k AS Gen. Contractor Subcontractor Contact Information Project Address Ve "Scope of Work A),f6& -SF Inspector Date of Inspection Ir Inspection 1 S-�2 )h Pass ❑ Fee t 66 , is + 5 5 I -t (7, �� Inspection -e,' Pass Fail Fee Inspection �'�2 ZOt q, -3/D I Pf ri - �KAM Pass 1:1 Fail M Fee Inspection Pass I El Fail M " dee OCity of"ee Island - Community Develont Dept. Inspection Report 403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 ID Phone 912.472-5032 - Fax 912.786.9539 o -'7.2t - MEMBER / Permit No. / / Date Requested Owner's Name .J { Vii' Date Needed /C; Gen. Contractor Subcontractor Contact Information Project Address 0. Scope of Work / V e u)—SF— Inspector SF— Inspector 7%7 Date of Inspection s Inspection Vn6 s Fail ❑ Fee r A Inspections U1'1 y s Inspection Inspection Pass ❑ Fail ❑ Fee r Fail ❑ Fee Pass Fail Fee City of'ee Island • Community Develont Dept. Inspection Report 403 Butler Ave. P.O. Box 2749 Tybee Island, GA 31328 �.•� Phone 912..072-5032 • Fax 912.786.9539 Permit No. 14��- c" Owner's Name 7 GirtD- Gen. Contractor Date Requests Date Needed Subcontractor MEMBER Contact Information�ku�. Cr�EP t' Project Address 3 .l"'`A \1 `e Y Scope of Work- New �S F Inspector Date of Inspection Inspection rneck R Pass El F Fee yj a4— :51 OCA Oct Inspection �S Fail Fee Inspection Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee City o4ee Island Com'munity Develo*nt Dept. Inspection Report 403 Butler Ave. - P.O. Box 2.749 - Tybee Island, GA 31328 Phone 912.47275032 - Fax 912.786.9539 MEMBER Permit No. ~ J V 7 Date Requested Owner's Name D Aite Needed Ll Gen. Contractor Subcontractor Contact information Ll K in a� 10 - 0c, al� Project Address 'RI ve(- 05k� Ln Scope of Work Inspector Date, of Inspection .-Z7 Inspection Fall ❑ Fee 4 Inspection Pass Fail Fee Inspection Pass El Fail ❑ Fee Inspection I Pass M Fail M Fee City 04ee Island • Community Develo�nt Dept. Inspection Report as, 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 SEEN INTERNATIONAL .,�.. a Phone 942.472-5032 • Fax 912.786.9539 CODECOUNCIC MEMBER Permit No. ` ` Date Requested Owner's Name Date Needed - 4--- Gen. Contract6r Subcontractor(( ! Contact Information'Gc �• a Project Address kV t' �C- 05l , Scope of Work �>I-- Inspe for 77V Date of Inspection S Inspection 11 C.cY►'i Pass ` Fee aLj 95 � Inspection Pass ❑ Fail ❑ Fee Inspection Pass FailFee Inspection Pass 11 Fail ❑ Fee ��a City ofybee Island Community Develo t Dept. Inspection Report 403 Butler Ave. " P.O. Box 2749 - T bee Island GA 31328 ��05�� y INTERNATIONAL Phone 912.472-5032 - Fax 912.786.9539 MDECDUNCIC Permit No. 111 1��71 Owner's Namef u ��' Gen. Contractor f Date Requested cfc Date Needed !"2 7// 5 Subcontractor Contact Information ��JRk �� 7-  ! 3 ���� ������ K Project Address V ��'' i i Yl " Scope of Work l " '' e(AJ Inspector Date of Inspection Inspection Inspection Inspection Inspection Fail Q' Fee Pass 1:1 Fail R Fee Pass 1:1 Fail 1:1 Fee Pass 11 Fail Q' Fee MEMBER _. City of Tybee. Island Community Development Dept. a� Inspection Report 403 Butler Ave. • P.9. Box.2749 • Tybee Island, GA 31328 INTERNATIONAL s Phone 912 7 2 NATION 5 • Fax 912.786.9539 GODEL" MEMBER Permit No. ! 0 7a 7 Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information M Project Address ty e Il!'•t K /Pv • Scope of Work Inspector Date of Inspection Inspection 1 +P Y 5 P Fa 1❑ ee Inspection Pass Inspection Pass Fail n Fee Fail ❑ Fee City of See Island - Community Develo 'wt Dippt. a, Inspection Report ��� 403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31328 OINTRM Phone 912.472-5032 - Fax 912.786.9539 CODECDUNGr j / MEMBER 14 -07o -Z Permit No. I Date Requested / �S Owner's Name Date Needed Gen. Contractor !e; Subcontractor Contact Information — rylid,hapsl RKProject Address = l li(fr, �--h • Scope of Work u)S iiQ 1 Inspector ''� VDate of Inspection Inspectionail Fee ow Inspection Pass ❑ Fail ❑ Fee Inspection Pass Fail 1:1 Fee Inspection Pass ❑ FailElFee 1' NOU City ofoee" Island - Community Devel'oAL Dept Inspection Report 403 Butler Ave. - P.O. Box 2749 - Ty bee Island, GA 31328 INTE RNATIONAL Phone 912172-5032 - Fax 912.786.9539 cobEadar MEMBER ry n Permit No. 6 r/ Date Requested Owner's Name Date Needed / h Gen. Contractor Subcontractor Contact Information MJ I C-6a� F Mob � e64 - 40,31 Project Address A,3 yek- LN, Scope of Work &e(4iT?-e--S1A-&b+--haA Inspector Date of Inspection' Inspection F6 ey-s Pass -'n ee Re'r to A ' a 0'a IV4 I'V44 4' Inspection Pass ❑ Fall ❑ Fee Inspection Inspection Pass 13 Fail El Fee Pass Fail ❑ Fee City of 'r ee'Island Community Develo tt-Dept. awl Inspection Report �' I- a 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 1�CG INTERNATIONAL .�• Phone 912.472-5032 • Fax 912.786.9539 CODECODNCIC' MEMBER r Permit No.y Date Requested ile Owner's Name �'_ Date Needed 7 �! Gen: Contractor M 10-ka P_ 4 '5t ar ubcontractor Contact Information Project Address -4 _ R'IV(fY- 00A5 i-- Q h C_ t Scope of Work N e u) InspectorDate of Inspection z�-5 i Inspection E' s Pass a Fee /v '9 S .w Inspection i Inspection Inspection' Pass ❑ Fail ❑ Fee Pass 1 -1 Fail 1:1 Fee Pass ❑ Fail ❑ Fee City of Tybee Island Comm6nity Development Dept. Inspection Report 403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 ..� s Phone 912.472-5032 • Fax 912.786.9539 Permit No. lq-C12 1 Owner's Name Gen. Contractor , < J J mom Contact Information �� t Project Address Scope of Work MEMBER Date Requested 0-14 Date Needed Subcontractor Q k (ick i p� O P Inspector Date of Inspection Inspection s d U D Inspection Inspection --� Inspection s o 'i - -7 Pass L\y Fail I1 Fee Pass ❑ Fail 1:1 Fee Pass 13 Fail M Fee Pass ❑� Fail 1:1 Fee Fax Transmission Result Repdw W Page[l]of[l] Date/Time Model Name Machine Serial Number Linel Linel Name Line2 Line2 Name 10-31-2014 11:11 AM CLX -9352 Z94UB 1 ED500022H City of Tybee 9127869539 is not available is not available Job Destination Start Time Duration Mode Job Type Page User Result 21541 Georgia Power rele 10-31-2014 11:10 00'58" G3 H -Tx 1/1 LocalUser OK ase/18888514411 AM 0 Tybee Island, GA GEORGIA POWER RELEASE FOR ELECTRIC SERVICE PHONE: 1-888-748-6843, Press 1, Extension 32855 or 32856 FAX: i-888-851-4411 Location Address: 3 R:Vtr Dak Ln. -Release Date: $ palm Type of Release: Temporary _Permanent Permit # 14-67 17 Electrician: ALtn`, Phone# RIZ -507--13t(o Builder: Au.) �l,u,nn� Phone#_"t1Z-to(.5—(72-6 Owner: N1: k t- Phone 8 Q12 - L, t�5,1 -7 21b Location Address: Release Date: Type of Release: _Temporary _Permanent Permit If _ Electrician: Phone If Builder: Phone # Owner: Phone # Planning and Zoning an 912.472-5033 H -Rx: Host Rx M -S: Memory Save P -Rx: Poll Rx D -Tx: Delay Tx H -Tx: Host Tx S -Rx: Secure Rx P -Tx: Poll Tx BC -Tx: BroadCast Tx Tybee Island, GA GEORGIA POWER RELEASE FOR ELECTRIC SERVICE PHONE: 1-888-748-6843, Press 1, Extension 32855 or 32856 FAX: 1-888-851-4411 Location Address: 3 -Ver Dak L- n • Release Date: - Sac..j pole) Type of Release: Temporary Permanent Permit # 0 1 Z-7 Electrician: n7gj Phone # Rk -L-1 3 t Builder: M , kle� 1� c-- ns) Phone # "l - �� � 7 Z _ r Owner: e, 5;; , a..X 3;zl� Phone # Q12 - (� � S- 1 -7 2 kh Location Address: Type of Release: Electrician: Builder: Owner: Planning and Zoning 4errrf ryan 912-472-5033 Temporary Release Date: Permanent Permit # Phone # Phone # Phone # ��}^t1e )""Cci ��J CITY OF TYBEE ISOND Application for a New Construction Permit P.O. Box 2749. 403 Butler Ave., Tybee Island, GA 31328 Phone 912.472.5030 - Fax 912.786.9539 pages 1 - 7 of permit application Required submittals: ./ 2 sets building plans 7 1 copy REScheck or COMcheck I p"1 2 ��1 ' 1 copy certified survey showing existing ground elevations, flood zone(s), and trees 1 3 sets certified hydrology, drake and erosion control plans $250 plan deposit (will be forfeited if project is aba on check # 34e.VeW�� Street address L -G he/ PI N # .- bO K 1 0 �� _ t Z-4 NAME MAILING AD -DRESS PHONE Owner j tr135�� HoJ2 Ycl " 7 - 15-1 r � IOD t,��1��;(�� JNkf r 4, t3(��3a�� l l L" LYhCCS r��". 'J7-o��i5 t�� Architect or Engineer of t `t (`l :5(-'( 3DB CE' Contractor t ��e��s "��d5t " /- rr 31 ��(o office: _ __ jj t `(,.l ' Cell: 44 Check all that apply.- Details pply. Details of project: EI'Kew Construction Q' Other Q' Commercial IVt,4J OA4'c.tA-o4 0-14-c idential ingle Family Q' Duplex Q' Multi -Family units i ,'c i 4 V-6 ( le,%C,e, Estimated cost of construction: $ ��j ��, OOu A copy of the contract may be requested. Construction type: fj 1. wood frame 2. wood & masonry (select appropriate number below) 3. brick veneer 5. steel & masonry 4. masonry 6. other: Lot areasq. ft. # buildings ( # units # floors # bedrooms 3 # bathrooms T t # of egresses An elevator is not an accepted means of egress. i iS h Heigh0 __ Vertical distance is measured from the average adjacent grade of the lot to the extreme high point of the building (roof ridge, handrail, etc.), exclusive of chimneys, HVAC units, elevators, and similar appurtenances. Total heated/cooled square footage 5 Q Flood Zone 14 P (AE or VE) Base Flood Elevation t t Design Flood Elevation (BFE + 1 -foot) As -built setbacks: Front Rear %3 Sides (L) 1 Z (R) Total driveway(s) width feet # of openings Culvert? Swale? Number of off-street parking spaces Number of trees to be removed A separate tree removal permit is required. 3/10/2013 1 0 During construction on-site restrooms will b ovided dy d�► S 0 t S Construction debris will be disposed byZ. C- IKl Ily means of N Section 22-169 — When active work ceases on the project for the day a SECURE COVER shall be placed over the dumpster or container so as to prevent trash or construction debris from being blown out. I understand that I must comply with zoning, erosion control, building, fire, shore protection, and wetland ordinances, FEMA regulations, and all other applicable codes and regulations. I understand a foundation survey and certification letter are required as soon as the foundation is in place to ensure that the setback requirements will be met. I understand an Elevation Certificate — Building Under Construction is required immediately after lowest floor or flood proofing is completed. I realize that an as -built survey, Elevation Certificate — Finished Construction, Breakaway Wall Certification, Recorded Nonconversion Agreement, Energy Code Compliance Certificate, tree mitigation, height certification, drainage certification, and site acceptance by the City will be required. 1 accept financial responsibility for any expenses the city incurs for third -party engineering services related to this project. I agree to construct/place all equipment such as air conditioning compressors, ducts, water heaters, furnaces, electrical outlets, etc., at or above the required Design Flood Elevation (Base Flood Elevation + 1 -foot). Projects must demonstrate they are in compliance with the City of Tybee Island Stormwater Management requirements as outlined in Article 16 of the Land Development Code. As part of the approval process, applicants must illustrate how these requirements will be met, including how stormwater naturally flowed on the property prior to any development activity, and what changes in stormwater flow will occur. A permit normally requires 7 to 10 business days to process. Signature of applicant Ak4 Printed name: Date: �/7 u /I L( The following will be completed by City of Tybee Island personnel. Zoning District :2 - I — Flood Zone BFE DFE Approved zoning action? IV J A Verified street address W A New _ Existing If new, has it been reported to MPC, CRC, etc.? Number of egresses? 2 Average adjacent grade "! . ip feet Drainage and Erosion Control plans approved? Approval Si nature pap Building Official Water/Sewer Public Works fit'i L Fire Chief Lr _ Planning & Zoning 15 90 S1,- T4, k 4ioo — 1158,000 2 FEES Permit Inspections Water Tap Recovery I Sewer Stub Aid to Construction Engineering 4 Plan deposit refund TOTAL In L S 39O A The following deficiencies are the most common on the projects in the City of Tybee Island. While the deficiencies are not necessarily the fault of the owner or his agent, they are their responsibilities. The two most common areas of deficiencies are for the two most basic BMPs on projects: Co — Construction Exit Sd1 — Sediment Barrier Correct installation information can be found in the Green Book and in the Field Manual for Erosion and Sediment Control in Georgia, which is available at: http://www.gaswcc.org/docs/field manual 4ed.pdf. The Georgia Soil and Water Conservation Commission is located at 4310 Lexington Road, P.O. Box 8024, Athens, Georgia, 30603. The telephone number is 706.542.3065. Their website is: http://gaswcc.-qeorgia.-gov/. Also see pages 9 through 12 of this packet. Attention to the Construction Exit is not limited to the installation, but must also include the material. Specifically, job site personnel are not checking to ensure the stone delivered is the 1.5 -inch to 3.5 -inch stone they requested. Gradations that are obviously smaller will not be tolerated. The smaller stone allows for a smoother surface with smaller voids, thereby reducing the function of the Construction Exit. Type A sediment barriers are not allowed where Type C is required as shown on the approved permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant: steel or wood posts, post spacing, Type C or A, etc. Past violations have resulted in: 1) Sediment discharge from the site which causes unsightliness, inconvenience to others, unnecessary cleanup, and Violation Notices. 2) Increased maintenance efforts by the Department of Public Works on downstream lines. 3) Due to item 2, higher costs to island taxpayers. While these deficiencies are not the only ones, they are the most common. Heeding the above cautions should result in fewer infractions. Downer Davis City of Tybee Island Consulting Engineer Signature of contractor: Printed name: 3 Date: 0 2) I(({ February 2013 0 CITY OF TYBEE ISLA* P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328 Phone 912.472.5030 • Fax 912.786.9539 Water Tap and Sewer Stub Application Street address of project J / (11 & A 4_1`1 Plumbing company WAL fJLAPU� (' hGH Plumbing contact person & phone numbers l�tJZ5� UVB ffice Name of property owner(s) Phone numbers of property owner(s) p� 11 _ office Details of project / �i �(�,uJ R)k1�! f, (eit T Residential i_ Commercial Enter the required number of water taps/meters and sewer stubs: WATER TAP/METER SEWER STUB Number Meter Number Stub of Taps Size of Stubs Size 3/4" QA 4„ Nil / 1„ 6„ 1-1/2" 8" 2" D --H cell �-- /--W6 Unauthorized use of water prior to installation of a water meter is prohibited. Installation of lines and meters are the responsibility of the owner/contractor. Contact the Water/Sewer Department at 912.472.5051 for line and tie-in locations and for inspections. Contact the Planning & Zoning Department at 912.472.5030 to arrange for water meter pick up. It is the responsibility of the owner to establish a water/sewer account with the City. An application and deposit are required. Contact 912.472.5025. Signature of o Printed name: Signature of c Printed name: wner: Date: )ntractor: Date: 2 D 1 L! A SEPARATE PERRIS REQUIRED FOR INFRASTRL&RE ALTERATIONS Any alteration to City owned streets, curbs, sidewalks, waterlines, sewer lines, drainage pipes, catch basins, or other elements of the City's infrastructure, requires a separate permit from the City, and an acknowledgement by the individual seeking to accomplish the alteration, that: a. The City's infrastructure will not be degraded in any way. b. All necessary safety precautions will be undertaken. c. The City will inspect the work in process and upon completion. d. The work will be accomplished to the City's satisfaction. e. The City shall be held harmless of any liability or damages of any variety. f. The individual has read applicable portion of the City's Code of Ordinance dealing with the alteration, and agrees to fully comply with such provisions. Will the proposed project at 3 4ila-- 6,14 t require an infrastructure alteration permit? El Yes �o street address of project Description of alteration: A site plan must be provided illustrating the planned alteration. City Design Standards and Specifications: Any alteration to the City's infrastructure shall be accomplished in such a fashion so as to restore the infrastructure to essentially the same condition that existed prior to the alteration, or to an improved condition, as determined by the City. Certification: I hereby acknowledge the above requirements, and certify that I will obtain a separate permit prior to performing any alteration in accordance with these provisions. Signature of c Printed name: 5 ontractor: Date: 21,E 4l i 5 Street address of project: CITY OF TYBEE ISLAND ! Temporary Electrical Service Affidavit 3 Wc This notice is to confirm the understanding of the owner and contractor of the compliance requirement of the Georgia State Minimum Construction Codes. It is understood and agreed by the undersigned that the requested temporary electrical power is intended for the completion of the construction process and the testing of equipment installed within the structure. It is understood and agreed by the undersigned that the issuance of temporary power DOES NOT constitute the approval to occupy the structures. A Certificate of Occupancy must be issued by the City of Tybee Island prior to the structure being furnished and/or occupied. The owner and contractor are hereby held responsible for any violations to this policy. A violation of this policy may result in discontinuance of the electrical service. Temporary electrical service will be granted as an aid to complete construction only. It may be revoked as circumstances dictate. Means shall be provided to disconnect all conductors from the service -entrance conductors. NEC 230.70 State Energy Code Affidavit I hereby declare that the design and construction of the above referenced project is in compliance with the Georgia State Energy Code for Buildings, 2009 Edition, with Georgia Amendments. A Georgia Energy Code Compliance Certificate will be required at project completion. It is understood and agreed by the undersigned owner and contractor (if applicable) that the approval of the permit does not constitute a privilege to violate the Code and that any omission of or misrepresentation of fact, with or without intention, of the permit issued which was based on the approval of this application. The owner will be held responsible for insuring that all permits have been obtained and that all required inspections have been made. The owner will be held legally liable for any violations which may occur with or without his knowledge. The owner shall be allowed to request a Certificate of Occupancy when all inspections (building and site) have been approved. Signature of owner: Printed name: i r i -ICS u_, -)H14 ,,, I Signature of contractor: Printed name:A - 0 Date: 70 (` l Date: Z 0 Subcontractor List Street address of project: Provide the company name, business type, address, contact person, and phone numbers of all subcontractors. The City of Tybee Island requires annual Contractor Registration for all contractors. Company xog 4�Jbti✓ Address (,30W - 4e4 �l-a(S� ( `ED 1 Contact person M-1 A b0x Business type WSOI„LL, Cell number �31 - 031� Office number 2. Company W-ebj) Business type jkty\ 1A Address 3Z�0 c( r, S�v 6--z- Cell number 36L `N 15 1h3Contact person W4 Office number 3 q1,61" - 3. . Company ('41 Alt h Business type6-1 Address fW U4� Vt-e— � 3to�Cell number Contact person L,Z�Lsl-e-� -t-+ Office number 4. Company _4 Address -1t3 : Contact person i 5. (� an I rr Address Contact person 6. Company �f s��C,sL 14f"o I- Business type s 4 OGj Address 76- 6 C ll (s )�Uc-, 4116� `T �� Cell number Contact person w kf4et Office number Attach additional sheets if needed. 7 0 Subcontractor List 0 Street address of project: Provide the company name, business type, address, contact person, and phone numbers of all subcontractors. The City of Tybee Island requires annual Contractor Registration for all contractors. 1. Company �4r�rf Business type Address &'40 ��. ` y �sl ����� Cell number 4�5�' `gq( Contact person (16yL1 dk (�� Office number 1�' ���5 2. Company �jd U U Address LXC--rtg��Jr,. heIv `sl- 3 3 ZC�Contact person � '(40-1 3. Company hjpc F(Operkr� AddressZ � D �s c,(� Seo S Contact person 4. Company �-�A ���yGJ aj-S' k C�y 11 Address Z _ Aeye**,,04, 50 & 0(O� Contact person ( I1 U kA 5. Company LAG � Address 03 1 Contact person Business type ll` Cell number �f 2� Y0� T 2 Z7 -q Office number �� 5 Business type �l dDr-r Cell number Office number Business type Cell number Office number Business type Cell number dZ,JJ Office number 6. Company —,ec.. (�, �-�-� Business type LaA Address y -I ^] g �(L. es Cl Cell number Contact person X eAej-� 3 o 4- 3 '� Office number q l Z - (p 3 S'-- '�bZ3 Attach additional sheets if needed. 2- 33- 7 7 Dianne Otto From: Dianne Otto Sent: Wednesday, November 05, 2014 8:27 AM To: Diane Schleicher Subject: RE: 6 contractor registrations Diane, Please schedule a short meeting so we can discuss the breakdown that occurred on this and therefore prevent it from happening again. The prior process has been for Sharon to pass her invoices to P&Z to be put with the building permit invoice. I need to have input if that method has been changed. I'm available any time today. Thanks, Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Diane Schleicher Sent: Tuesday, November 04, 2014 12:07 PM To: Dianne Otto Subject: FW: 6 contractor registrations Dianne, FYI Thanks, Diane From: Sharon Shaver Sent: Thursday, October 30, 2014 3:37 PM To: Diane Schleicher Subject: RE: 6 contractor registrations Diane, Michael Sharpe turned in the paper work on all of the contractors except Affordable Renovations and Above the Sky Roofing on October 16. Mr. Sharpe came in yesterday to pay fees of $6600. He said that he assumed that Ms. Otto had coordinated with the contractor registration and that the fees to register were included in the $6600. He is going to call the cashier to pay the fees today. (I tried to transfer him to pay, but she had a customer at the window.) He said that he is not using Affordable Renovations and Above the Sky Roofing. I asked him to notify Zoning. Sharon S. Shaver mailto:sshaver@cityoftybee.or� Administrative Assistant to City ManaQ City of Tybee Island 403 Butler Ave PO Box 2749 Tybee Island, GA 31328 Phone: 912-472-5072 Fax: 912-786-5832 From: Diane Schleicher Sent: Thursday, October 30, 2014 2:59 PM To: Sharon Shaver Subject: FW: 6 contractor registrations FYI From: Dianne Otto Sent: Thursday, October 30, 2014 2:50 PM To: Diane Schleicher Subject: 6 contractor registrations Diane, http://www.cityoftybee.org/ Michael Sharpe is the General Contractor for a new single-family to be built at 3 River Oak Lane. The building permit was issued yesterday. The first inspection is scheduled for tomorrow. I had guided Michael to work with Sharon for his and his sub -contractors' registrations. Michael indicated he would be gathering all the paperwork and paying the fees. Five of the contractors are in InCode showing $20 balances. One is not in InCode. Has the needed paperwork and payments been received for the following companies? 1. Mobley Masonry #02876 I " 2. Webb Plumbing #02872 -pi. 3. Witt Air Conditioning #01273 �d"3 4. Affordable Renovations #02625 -- rr c �' us 'S _ o Pc�,�P 5. Michael Wyman Sharpe #02877 T J. 10-30 6. Above the Sky Roofing (not in InCode) - r ok uS.r%g If you want, I can contact Michael Sharpe if documents and/or payments have not been submitted. If Sharon would prefer to contact him the cell number is 912-665-1726. I'll need to hold inspections if these contractor registrations are not processed soon. Thank you, Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 2 CGenerated by REScheck-Web Software �(J Compliance Certificate Project Tybee Lot M Energy Code: 2009 IECC Location: Tybee Island, Georgia Construction Type: Single-family Project Type: New Construction Orientation: Bldg. faces 45 deg. from North Conditioned Floor Area: 1,580 ft2 Glazing Area 16% Climate Zone: 2 (1851 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: Lot'M' Horse Pen Hammock, river Michael Sharpe Thomas & Reel engineering Oak Lane Lot'M' River Oak Lane Consultants Tybee Island, Georgia 31328 Tybee Island, Georgia 31328 9100 White Bluff road, Building 300 Suite 306 Savannah, Georgia 31406 912-920-0950 mthomas@thomasreel.com Compliance: 38.8% Better Than Code Maximum UA: 456 Your UA: 279 Maximum SHGC: 0.30 Your SHGC: 0.28 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Envelope Assemblies 1st Floor: All -Wood joist/Truss Over Outside Air Wall: Wood Frame, 16in. D.C. Orientation: Front Window: Vinyl Frame, Double Pane SHGC: 0.28 Orientation: Front Door: Glass SHGC: 0.28 Orientation: Front Door: Glass SHGC: 0.28 Orientation: Front Wall: Wood Frame, 16in. o.c. Orientation: Right side Window: Vinyl Frame, Double Pane SHGC: 0.28 Orientation: Right side Wall: Wood Frame, 16in. o.c. Orientation: Back Project Title: Tybee Lot M Data filename: 904 33.0 4.0 0.027 24 312 19.0 0.0 0.060 11 33 0.360 12 46 46 279 19.0 10 312 19.0 0.360 17 0.360 17 0.0 0.060 16 0.360 4 0.0 0.060 17 Report date: 08/07/14 Page 1 of 9 Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Back Wall: Wood Frame, 16in. o.c. 279 19.0 0.0 0.060 13 Orientation: Left side Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Left side Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Left side Wall: Wood Frame, 16in. o.c. 312 19.0 0.0 0.060 13 Orientation: Front Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Left side Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Front Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Front Wall: Wood Frame, 16in. o.c. 279 19.0 0.0 0.060 17 Orientation: Right side Wall: Wood Frame, 16in. o.c. 312 19.0 0.0 0.060 17 Orientation: Back Window: Vinyl Frame, Double Pane 33 0.360 12 SHGC: 0.28 Orientation: Front Wall: Wood Frame, 16in. o.c. 279 19.0 0.0 0.060 17 Orientation: Back Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 5.5.0 and to comply with the mandatory requi is liste in the REVheck Inspection Checklist. `, D2 ✓1 V 19 't '�w (� NaThe - Title Signature Date Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 2 of 9 " 0 REScheck Software Version 5.5.0 Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section # Pre-inspection/Plan Review Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 103.2 Construction drawings and Q'Complies [PR1]1 documentation demonstrate Q'Does Not 0, energy code compliance for the []Not Observable building envelope. []Not Applicable 103.2, Construction drawings and Q'Complies 403.7 documentation demonstrate []Does Not [PR3]1 energy code compliance for []Not Observable a, lighting and mechanical systems. []Not Applicable Systems serving multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: Q'Complies [PR2]2 sized per ACCA Manual S based Btu/hr Btu/hr Q'Does Not on loads per ACCA Manual J or Cooling: Cooling: []Not Observable other approved methods. Btu/hr Btu/hr Q'Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 3 of 9 Foundation Inspection I Complies? I Comments/Assumptions 303.2.1 A protective covering is installed to ❑Complies [F011]2 protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below grade. ❑Not Observable ❑Not Applicable 403.8 Snow- and ice -melting system controls []Complies [FO12]2 installed. ❑Does Not io� Additional Comments/Assumptions: []Not Observable []Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 4 of 9 Section # Framing / Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 402.1.1, Glazing U -factor (area -weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.5 ❑Not Observable [FR2]1 ❑Not Applicable !; 402.1.1, Glazing SHGC value (area- SHGC: SHGC: []Complies See the Envelope Assemblies 402.3.2, weighted average). ❑Does Not table for values. 402.3.3, 402.5 ❑Not Observable [FR3I1 ❑Not Applicable t 303.1.3 U -factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or []Not Observable taken from the default table. []Not Applicable 402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies [FR811 space have a maximum []Does Not ,V, fenestration U -factor of 0.50 in [:]Not Observable Climate Zones 4-8. New glazing ❑Not Applicable separating the sunroom from conditioned space must meet code requirements. 402.4.4 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting []Does Not 1�01 AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable or has infiltration rates per NFRC ❑Not Applicable 400 that do not exceed code limits. 402.4.5 IC -rated recessed lighting fixtures [Complies [FR16]2 sealed at housing/interior finish []Does Not and labeled to indicate :52.0 cfm []Not Observable leakage at 75 Pa. []Not Applicable 403.2.1 Supply ducts in attics are R- R- [Complies [FR12]1 insulated to _>R-8. All other ducts R- R- ❑Does Not in unconditioned spaces or ❑Not Observable outside the building envelope are ❑Not Applicable insulated to >_R-6. 403.2.2 All joints and seams of air ducts, [Complies [FR13]1 air handlers, filter boxes, and ❑Does Not building cavities used as return ❑Not Observable ducts are sealed. []Not Applicable 403.2.3 Building cavities are not used for ❑Complies [FR15]3 supply ducts. []Does Not ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- [Complies [FR17]2 above 105 QF or chilled fluids []Does Not below 55 QF are insulated to >R- []Not Observable 3 ❑Not Applicable 403.4 Circulating service hot water R- R- ❑Complies [FR18]2 pipes are insulated to R-2. ❑Does Not V ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air []Does Not intakes and exhausts. []Not Observable ❑Not Applicable 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 5 of 9 C Additional Comments/Assumptions: L J 1 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 6 of 9 Section # Insulation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled ❑Complies [IN13]2 or the installed R -values ❑Does Not provided. ❑Not Observable []Not Applicable 402.1.1, Floor insulation R -value. R- R- ❑Complies See the Envelope Assemblies 402.2.5, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 [IN1]1 ❑ Steel ❑ Steel []Not Observable ❑Not Applicable 303.2, Floor insulation installed per ❑Complies 402.2.6 manufacturer's instructions, and ❑Does Not [IN2]1 in substantial contact with the ❑Not Observable underside of the subfloor. ❑Not Applicable 402.1.1, Wall insulation R -value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.4, mass wall with at least 1/2 of the ❑ Wood ❑ Wood []Does Not table for values. 402.2.5 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior, the exterior insulation ❑Steel ❑Steel [:]Not Applicable requirement applies. 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not 'b+ -]Not Observable ❑Not Applicable 402.2.11 Sunroom wall insulation has a R- R- ❑Complies [IN8]1 minimum R -value of R-13. New ❑Does Not walls separating the sunroom ❑Not Observable from conditioned space must ❑Not Applicable meet code requirements. 303.2 Sunroom wall insulation installed ❑Complies [IN9]1 per manufacturer's Instructions. ❑Does Not ❑Not Observable ❑Not Applicable 402.2.11 Sunroom ceiling minimum R- R- ❑Complies [IN10]1 insulation R -value of R-19 in []Does Not ly, Climate Zones 1-4, and R-24 in ❑Not Observable Climate Zones 5-8. []Not Applicable 303.2 Sunroom ceiling insulation is ❑Complies [IN11]1 installed per manufacturer's ❑Does Not instructions. []Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 7 of 9 Section # Final Inspection Provisions Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 402.2.3 Attic access hatch and door R- R- ❑Complies [F[3]1 insulation >_R -value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.2, Building envelope tightness ACH 50 = ACH 50 = []Complies 402.4.2.1 verified by blower door test result ❑Does Not [F117]1 of <7 ACH at 50 Pa. This []Not Observable �_ requirement may instead be met ❑Not Applicable via visual inspection, in which case verification may need to occur during Insulation Inspection. 402.4.3 Wood -burning fireplaces have ❑Complies [FI8]2 gasketed doors and outdoor ❑Does Not vi combustion air. ❑Not Observable ❑Not Applicable 403.2.2 Post construction duct tightness cfm cfm ❑Complies [FI411 test result of <_8 cfm to outdoors, []Does Not or :512 cfm across systems. Or, ❑Not Observable rough -in test result of <_6 cfm ❑Not Applicable across systems or 54 cfm without air handler. Rough -in test verification may need to occur during Framing Inspection. 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed on forced air furnaces. ❑Does Not +' ❑Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI1012 on heat pumps. ❑Does Not []Not Observable ❑Not Applicable 403.4 Circulating service hot water []Complies [FI11]2 systems have automatic or []Does Not accessible manual controls. []Not Observable ❑Not Applicable 403.9.1 Readily accessible switch on []Complies [FI12]3 heaters for swimming pools. ❑Does Not is []Not Observable ❑Not Applicable 403.9.2 Timer switches on pool heaters ❑Complies [FI19]3 and pumps are present. ❑Does Not ❑Not Observable ❑Not Applicable 403.9.3 Heated swimming pools have a ❑Complies [F120]3 cover. Covers on pools heated ❑Does Not over 90 4F are insulated to R-12. [-]Not Observable ❑Not Applicable 404.1 50% of lamps in permanent ❑Complies [FI611 fixtures are high efficacy lamps. ❑Does Not []Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies [FI7]2 ❑Does Not to) ❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 8 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 303.3 Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Tybee Lot M Report date: 08/07/14 Data filename: Page 9 of 9 a �(2009 IECC Energy j Efficiency Certificate Wall 19.00 Floor 37.00 Ceiling / Roof 0.00 Ductwork (unconditioned spaces): Window 0.36 0.28 Door 0.36 0.28 Heating System: Cooling System:. Water Heater: Name: Date: Comments