Loading...
HomeMy Public PortalAbout1-30-19 Community Meeting notes submitted to DCDP 190201 BOYLSTON PROPERTIES February 1, 2019 Boylston Properties Arsenal Mall - Building G Community Meeting#01 01/30/2019, Scheduled 6:30pm - 8:OOpm Notes complied by Corey Chang, ASG Presenters: Andrew Copelotti - Boylston Properties William McQuillan - Boylston Properties Adam Gross - Ayers Saint Gross Steve Woods - CRJA-IBI Q 1. Will there be a rooftop restaurant? RESPONSE-a. No. Q 2. [David Gamble] How is the project's connection to the site and park being developed? A desire was expressed for the west side/entry opening up to the park/plaza and not being"hidden". RESPONSE-a. [Adam G]The building has two entrance with a more public entrance on the West that, in fact, opens up to the park. Building G is in the concept design phase and remains much potential to continue developing inviting entry sequences as the design progresses. RESPONSE-b. [Andrew C] Boylston is willing to continue working with CDM and the park plan in coordination with the design of Building G. RESPONSE-c. [Steve W]There is enough space in the park to allow for a gradual grade change to connect the park to the West entrance of the building and the walkway/connection to the Charles River. Q 3. What will be the impact to the park due to the proposed design for the hardscape/walkway connection from the Charles River? RESPONSE-a. [Steve Woods] The proposed revision to the approved park design fronting Building G has reduced the paved area by 400 to 500 sf. Q 4. How many existing trees will be removed? Is there an opportunity to add new trees? It would be beneficial to show the impact comparison between the old walkway/connection design and the new design. RESPONSE-a. [Steve Woods]The approved design planned for the removal of 12 trees. The proposed revision is believed to remove no more than 12 trees and will be confirmed. Yes, there will be opportunity to add new trees as the site plan continues to develop. A comparison document will be created to illustrate the changes for the betterment to the site,the reduced paved area, exiting trees to be removed, and proposed new trees. A comparison document on the impact of the walkway/connection will also be developed. RESPONSE-b. [Bill M]Overtime the existing landscape and trees have been neglected. Boylston is committed to improving the condition of the site. Boylston emphasized that the renovations to Arsenal Mall,the new buildings, and site improvements are a significant investment in the community, and the landscape and trees are important components to the success of the project. RESPONSE-c. [Steve Magoon] Boylston Properties is committed to making the park the best that it can be for the betterment of the community. Q 5. How will the potential for light pollution from Building G as a "glass" building be managed? Soo Boylston St. Suite 1390 Boston, MA 02199 1 617-262-4646 1 boylstonproperties.com 1hBOYLSTON PROPERTIES RESPONSE-a. [Adam G] It was noted that the design is still in early concepts, and used Ayers Saint Gross' University of Baltimore Law School project,a LEED Platinum building,as a precedent to discuss many options available to attenuate light spill from within a building including "fritting"/patterning of clear glass which diffuses light, spandrel/opaque coatings on the glass which blocks light, smaller windows within masonry (vs all glass as in the north elevation of Building G), and interior window shades. Q 6. Has a traffic study been performed? What will be the impact on traffic given the change in use of Building G from residential to lab (or business) use? RESPONSE-a. [Andrew C]Traffic analysis is in its early stages. Preliminary feedback from the analysis as well as data from the Linx, as a precedent, indicate a favorable reduction in traffic because of the change in use.Additionally,structured parkingfor BuildingG tenants will be provided within the basement floor. Q 7. [Lisa]Will the public be able to access/enter the lobby of Building G? What might be consider allowing for more public interaction with the ground floor? RESPONSE-a. [Andrew C] Boylston is committed to continue working with the City and CDM to find opportunities to develop the site plan to best engage with the building. RESPONSE-b. [Bill M] Building G as a residential facility would have had a private lobbywhich will bethe same for a lab facilityfor similar and numerous reasons including safety,security,confidentiality,etc. Boylston needs to respect the privacy and security of the tenants. Q 8. [Steve Magoon] Describe the space between Building G and Building F? RESPONSE-a. [Andrew C]There are 24 feet of separation between the buildings. Service access and loading for Building G occurs in this area. Acknowledging that pedestrians may use this "alley" to access the western side of the campus,the team continues to study design options to animate the space. Q 9. What is the plan to market the lab space to the BioMed community and ensure occupancy? RESPONSE-a. [Bill M] We are listening to the lab community, like the CEOs for C4 and SQZ, and they are desperate for space in Watertown with amenities. Those that are currently in the community and expanding,do not want to leave Watertown. Startups are lookingto relocate out of Kendall Square in Cambridge. Linx tenants sought to relocate to Watertown. New, 2 to 3-year-old companies, that want to rent out smaller spaces (8,000 to 16,000 sf) will find the smaller footprint of Building G very attractive. RESPONSE-b. [Adam G] Successful national innovation district precedents, in keeping with the mission of Arsenal and Building G, includes University of California San Francisco,the Cortex in St. Louis, and Kendall Square in Cambridge. They all provide a blend of mixed uses including retail,office, residential, restaurant, and research space. The difference with Watertown than other innovation districts is that the amenities are already in place making this site very attractive for companies to move to. Q 10. What was the anticipated occupant density for Building G as a residential tower? RESPONSE-a. [Andrew C]Approximately 450 people. Q 11. Concern expressed for the grading and the existing steep transition from the edge of Charles River up towards Building G. RESPONSE-a. [Steve W]The proposed sitework will be"seamless"with the walkways sloped at less than 5% (1:20)allowing for hand and guardrail-free walkways. Soo Boylston St. Suite 1390 Boston, MA oz199 1 617-262-4646 1 boylstonproperties.com 1hBOYLSTON PROPERTIES Q 12. Would tenants consider giving"science talks" as part of a community engagement/education? RESPONSE-a. [Andrew C]The building is in early stages of design and the team will explore this as the design develops. Q 13. Will shuttle bus service be provided? RESPONSE-a. [Bill M]Yes. The Meeting was ended at approximately 7:48 p.m. Respectfully submitted, Corey Chang,Ayers Saint Gross Soo Boylston St. Suite 1390 Boston, MA 02199 1 617-262-4646 1 boylstonproperties.com