HomeMy Public PortalAboutPC Resolution 2015-05-01 Recommending Approval of East Mountain Filing 9 (EMF9) - Final Planned Development Plan and Preliminary Plat Planning Area 9 FRASER PLANNING COMMISSION
RESOLUTION NO. 2015-05-01
A RESOLUTION RECOMMENDING APPROVAL OF EAST MOUNTAIN FILING 9 (EMF9) -
FINAL PLANNED DEVELOPMENT PLAN (FPDP) AND PRELIMINARY PLAT PLANNING
AREA 9 RENDEZVOUS PLANNED DEVELOPMENT DISTRICT, LOCATED IN SECTION 28,
TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE 6TH P.M., TOWN OF FRASER, GRAND
COUNTY, COLORADO
At the special meeting of the Fraser Planning Commission held on May 13, 2015,
Rendezvous Colorado, LLC requested a recommendation of approval for a Final Planned
Development Plan (FPDP) and Preliminary Plat for East Mountain Filing 9; and
WHEREAS, Rendezvous Colorado LLC is the current owner of Planning Area 9; and
WHEREAS, Rendezvous Colorado LLC is requesting FPDP and preliminary plat
approval which would create 54 homesites to be platted; and
WHEREAS, Staff has determined that this application is in compliance with the
subdivision and zoning regulations of the Town of Fraser.
NOW THEREFORE BE IT RESOLVED that the Fraser Planning Commission has voted
to recommend approval of EMF9 with the following conditions:
1. Revise documentation to delete reference to condos.
2. Plat note #4 needs to clarify ownership and maintenance of trails and sidewalks.
3. Delete plat note #6 and #7.
4. Provide any and all off-site easements. Reception numbers of any such easements
shall be listed on the plat.
5. Clarify ownership of streets and open space on plat.
6. Provide rendering of dumpster enclosure and add cost to engineer's estimate for
Subdivision Improvement agreement (SIA).
7. Delete Planning Commission certificate from plat.
8. Provide new street names for Trailside Loop and Osprey Point.
9. Add the well site on the Site Analysis to the Final Plan sheet 2 of 5.
10. Setback language on plat and plan needs to be consistent.
11. Add detention facility recorded easement location and information to all documentation.
12. Add Mountain Parks Electric language to plat notes.
13. Address all of Jim Swanson's comments in the JRS memo dated March 26, 2015 and
revise documentation accordingly.
14. Add the following plat note: Existing sanitary sewer lines and water lines to be
abandoned and located within the boundary of Filing 9, shall be physically removed from
the site. The infrastructure shall be adequately capped at the boundary of Filing 9 in a
manner described in Chapter 14— Design Criteria and Construction Standards of the
Fraser Code and approved by Fraser.
15. All Town Attorney comments pursuant to the Annexation Agreement shall be forwarded
to the Town Board for review and consideration.
16. Provide off-site easement or dedicate the adjacent portion of 4E to the Town as it
appears that facilities are encroaching onto 4E.
17. Any third-party utility easements to be vacated will require written approval of the utility
providers using the easements.
APPROVED AND ADOPTED THIS 13th DAY OF May, 2015.
FRASER PLANNING COMMMISSION
41111A db.. A
Chairma1
ATTEST: OF FR,q6,,,
C�" l �-
&rt ‘;;:3
SEAL
Town Clerk