Proposed Revitalization Program The Proponent proposes to construct several new buildings on its
campus that includes mixed-use, civic anctof cp uses, supported by
The Proponent proposes to embark on an exciting and a new parking structure, and totals`249,558 GSF This will result in a
transformational Campus Plan for The Arsenal on the Charles total parking supply on campus of 3,10`TFhere will be a net reduction
Campus in Watertown, MA. The key principle that guided the of surface parking on the campus that results in an overall increase of
design team was articulated by Jonathan Bush, CEO, at the outset two acres of usable open space available to the entire community.
of the planning process: Rather than a sealed off campus, Development Summary
we're going to open the Arsenal up to the community as a public Building
Building GSF Coverage Floors Use
resource. And we'd like to fit it into the historic context." This (Footprint)
document, together with the "Arsenal on the Charles Design Existing Buildings
Guidelines" and the technical plans outline the Proponent's vision Building37 48,807 26,565 2 Office
for the campus and serves as a guide for future revitalization Building39 128,055 40,975 5 Office/Storage
Initiatives. Building43 38,650 21,464 2 Office/Restaurant
Building 60 19,131 12,144 2 Office
Building 97 23,864 11,591 3 Office
In addition to accommodating the measured growth of Athena Building 117 2,976 1,081 2 Office
Arsenal, LLC, the Campus Plan will accomplish a number of key Building 118 5,714 3,169 2 Office
Building 131 56,247 20,364 4 Office/Day Care
objectives that include: Building311 428,794 147,255 2-NW Corner Office,Health Club
5-South Ridge
• Providing for the expeditious and efficient redevelopment of Building312 81,614 31,829 3 Restaurants/Theater
Building 313 70,692 38,780 2 Office
the Army Materials Technology Laboratory property which Total Existing GSF 904,542 355,217
will enhance the community's quality of life and economic
well-being; Proposed Buildings
• Promoting the preservation of the historic resources and Building 1 75,400 18,850 5 Office
character of the property; Building2 " 30,,T25� �-8,so61.\ 3 Commercial/Civic
BuTBi'ng Yf136S�"5,0 1 2 Office
• Allowing for a density which is appropriate for economic Building 11,308 5,574 j ,� 2 Office
revitalization; Building 13,292 8,536 �) 1 Retail
Building 6A 49,020 10,320� 5 Office/Parking
• Facilitating the expansion of retail, restaurant, cultural, and Building6B 57,893 12,188 5 Office/Parking
other community amenity uses of the redeveloped Army Covered Ope
Materials Technology Laboratory property to better serve Total Proposed GSF 249,806 70,442
the Arsenal Overlay Develop District (AODD) occupants, the (Y-otalCamQusGSF(no garages) 1,154,348 425,659
nearby neighborhoods, and other visitors; and
Garages
• Opening the campus to the community with expanded
green space and multi-modal connectivity. Existing East Garage 57,775 6 Parking
Proposed West Garage 72,620 7-N.Beacon St. Parking
8-Arsenal St.
B THE ARSENAL Project Summary
®0 ON THE CHARLES
June 27, 2016
LEGEND
PROPERTY LINE
—-.:......zONINB BElBAOK
RIVER
--------------200'RIVER—AREA
100 YEAR FLOODPLAIN
�TLAND
-----------EO'WETLAND NO&MILD ZONE
100'PETLPND BJFFER ZONE
311 _IBO'WETLAND BUFFER ZONE
ELILDING
PROPOSED — -- ARSENAL STREET -
BUILDINGS t�—ate"
—__--� - WILDIN631IR 1
25'
D V•�............ _...
BUILDING311 �_ � � • ..���
/ PROPOSED-
-KING GARAGE
O
ju
�� ?e� 0 BUILDING 43
r FROPOSED OFFICE . -. '•
V✓OOLEYgy lA z u u` J MOLEYAVENUE /
u,
i
BUI ING 31
1
x
u
BUILDING 38 �
• RQ4
9� �
• / o
BUILDING 31S /
Bi
OORiMBEAG i��y„� / • n a
PARKwe GARAGE
BUILDING 37 -
1
a
r
•i":en "P a �..
ga II
r
NGSBUR NU
0 F73 PROPOSE PROPOSED
P b,
aw.w.x,ti a..svwux.rs _o
�� 0 CE80 < OFFICE
amLDlrvceo
BUILDING 131
11B u
G PROPOSED
t OFFICE
N3FLOG
\ 117
PROPOSED r,25 •`
OFFICE
NORTH
B THE ARSENAL Site Development Plan
ON THE CHARLES
June 27, 2016
AODD HEIGHT ENVELOPE
EXISTING BUILDING PROFILE(BEHIND)
ELEVATOR AND BULKHEAD(BEHIND)
88.0'BUILDING SETBACK PARAPEr,$,
99.7" F
.............92.8' 95.7'
................ ..................
........................ . ..................... 91.3'
PARAPET BUILDI �' ..�..!:
�G 84.5'j "EL
3.9.....................
80.01
BUILDING LEVE-7
-7 L FACE OF 311.4r ARSENAL
,.O-CEV
�,!L 6 IIIIIIIIIIIIIIR Mill 'Mom
LEVEL 5 ............. .............
55.5'LEVEL 4
'?'-4 ...................
..........
...........
.0!
4�1. �21
m .............-.................
22.3'
�PL
-011.19
NORTH BEACON STREET NORTH BEACON PARK WEST GARAGE BUILDING 2 ARSENAL STREET
0 10' 20' 40' 80'
WEST GARAGE SECTION
THE ARSENAL Proposed West Garage Section
ON THE CHARLES
May 6,2916
June 27, 2016
Existing Campus
Land Use Size Units Town Zoning Units Parking Required Per Town Parking Supply
Requirement Zoning
Office(1st Fir) 245,123 sf 1.0 spaces/350 sf 700 Existing Proposed
Office(Other Fir) 483,137 sf 1.0 spaces/400 sf 1,208 Existing Garage 1,130 1,118
Restaurant 412 seats 1.0 spaces/4 seats 103 Surface Parking 828 138
Retail(1st Fir) 0 sf 1.0 spaces/350 sf 0 Proposed West Garage 1,623
Retail(Other Fir) 0 sf 1.0 spaces/400 sf 0 Proposed Garage at Building 6 (288
Fitness Center 57,926 sf 1 0 spaces/400 sf 145 Total 1,958 3,167
Public Assembly 484 seats 1.0 spaces/5 seats 97
Total Required 2,253
Proposed New Uses
Land Use Size Units
Town Zoning Units Parking Required Per Town Proposed Short-Term Parking(2-Hour)
Requirement Zoning Existing Garage 40
Office(1st Fir) 53,000 sf 1.0 spaces/350 sf 151 Surface Parking 53
Office(Other Fir) 171,447 sf 1.0 spaces/400 sf 429 Total 93
Restaurant 100 seats 1.0 spaces/4 seats 25
Retail(1st Fir) 14,750 sf 1.0 spaces/350 sf 42
Retail(Other Fir) 24,175 sf 1 0 spaces/400 sf 60 Proposed Accessible Parking
Fitness Center 0 sf 1.0 spaces/400 sf 0 Total Proposed)Spaces 3,162
Public Assembly 0 seats 1.0 spaces/5 seats 0 Hanidcapped Spaces Required(MAAB) 42
Total Required 708 Proposed Handicapped Parking
West Garage 26
East Garage 22
Total Existing and New Proposed Office 6 7
Land Use Size Units
Town Zoning Units Parking Required Per Town Surface Parking 15
Requirement Zoning
Total Proposed Handicapped
Office(1stFir) 298,123 sf 1.0 spaces/350 sf 852 Parking 70 1
Office(Other Fir) 654,584 sf 1.0 spaces/400 sf 1,636
Restaurant 512 seats 1.0 spaces/4 seats 128
Retail(1st Fir) 14,750 sf 1.0 spaces/350 sf 42
Retail(Other Fir) 24,175 sf 10 spaces/400sf 60
Fitness Center 57,926 sf 1.0 spaces/400 sf 145
Public Assembly 484 seats 1.0 spaces/5seats 97
Total Required 2,960
B THE ARSENAL Parking Requirements Summary
®^ ON THE CHARLES
i
June 27, 2016
r__________ PrOr�1 — �___________
L__—
I � I
I
I
L j J am
I
II
I '
' I
� 4t
Arsenal Street Floor Plan
B THE ARSENAL Proposed West Garage
®^ ON THE CHARLES tune 27, 2016
j�
Atit A
RSENAL STREET
2 I --- .
we
st
311 a `.-
garage _ per',--. c 6 43
._pniry'4,
` gip' 3z3 ��� ° r �
,a f�iy 39 tf C, entry 9
0
97 j� existing
r east parking 5 I• co'ered open'space ".'"+, Ahih
S garage 1 1 N -
tt
NO " 37 <
R` T
leis. _ H
_•. "--�_• PO / STREET
"CON
w SRO a
w -V
t
i
-V
>: '.
4 �:_ �,ti-
r
A
1401-i
v
B THE ARSENAL Illustrative Campus Plan
ON THE CHARLES
June 27, 2016
ARS—
AL STREET-------J
,.
S
pa king -�. :......_� _
43
4 � 31
.. � 3
39
312
BEA 97 parking
NORT ��
C N S37
S
� r rr
r f 0 60 131
0. i � r _ _ _ _ __
F-------> Shared Street(Vehicular/Pedestrian/Bicycle)
Vehicular Circulation (Vehicular/Bicycle)
-----..-----> Limited Vehicular Access(Emergency/Service)
............> Limited Vehicular Shared Street(Emergency/Service/Bicycle)
SO Existing Traffic Signal
I
- ;S� Proposed Traffic Signal NORTH
Site Plan Review Criteria
THE ARSENAL Proposed Vehicular Circulation
®^ ON THE CHARLES
i
June 27, 2016
• w _
ARSENALSTREE
( - .
T
A. s
2
311
fJ 4
_.r
' 1 e - too.
�
_ -NORTH BEACON ®� 97 •b
.�-- - - • STREET _ 5 �" ._
37
1313
..- QJJ _i h `�
131
•�. y. L 3 '
jr
E-------> Shared Street(Vehicular/Pedestrian/Bicycle) '
Vehicular Circulation(Vehicular/Bicycle) I ^�
............
> Limited Vehicular Access(Emergency/Service)
<••••••••••••> Limited Vehicular Shared Street(Emergency/Service/Bicycle)
Surface Parking
Parking Garage
0Loading Zone
Site Plan Review Criteria
THE ARSENAL Proposed Parking Plan
ON THE CHARLES
June 27, 2016
` ARSENAL STREET
2
311
parking -
43
39
•
(� NpRTNg N �� 312
- E—U .. 97 parking �, �,,`,,,ea
�.�
•-� - _ '�- STREET- ---
60
E______ Shared Street(Vehicular/Pedestrian/Bicycle) r�
Primary Pedestrian Path
( .......... Secondary Pedestrian Path \
Existing Traffic Signal
�1TH
NORTH
;S Proposed Traffic Signal
Site Plan Review Criteria
THE ARSENAL Proposed Pedestrian Circulation
®^ ON THE CHARLES �q g1
i
June 27, 2016
� A
SI __
ARSENALS ERT ET
S -
lawn
i
irking -- -
p
I, t
312 1
I
97 parking
60
1 1 a
C ^ II t
4 , . r
E------ Shared Street(Vehicular/Pedestrian/Bicycle) _ _ #
F------ Proposed TAOTC Shared Street(Vehicular/Bicycle)
Proposed TAOTC Dedicated Shared Path
F-------� Shared Path (Pedestrian/Bicycle)
Dedicated Bike Lane
F--—--> Shared-Road
Watertown Greenway/Cycle Track
SO Existing Traffic Signal r
NORTH K
Proposed Traffic Signal
m
K.
Site Plan Review Criteria
THE ARSENAL Proposed Bicycle Circulation
ON THE CHARLESMay 6, 16
June 27, 2016
_ ,S: WATERTOWNGREENWAY
ARSENALS RR EET T -
, - S
80 ---
S ��•
arking - -
313
,.. }- ♦ 39 — n a i
- �� < 312 i
7, � 97 parking
37
18
KINGSBURY
r
13
- r
pP o _ d 6 -�
(S - 131
Ode
,4
BIKE STORAGE EXISTING PROPOSED REQUIRED ; Y
total 103 243 198* ♦ _
long term 63 143 99**
short term 40 100 99** ;
O Existing Bike Storage(long term) . Proposed ;
Bike Share ; e.
QExisting Bike Storage(short term)
Proposed Bike Storage (long term) yIL'
Proposed Bike Storage (short term)
NORTH
1/15 required parking spaces ,
50%long term and 50%short term
lug
Site Plan Review Criteria
THE ARSENAL Proposed Bicycle Parking
®^ ON THE CHARLES �q g1
i
June 27, 2016
r
Aw
ARSENAE ST E--- -
,�—-- -
___-_
__
�% 311
1/ A
�431�
39
_ a II
NORTHB N'S 97parking312 I�
—� EACO
T37
REET
— --,
131
�. ,�_a,�„�. .- �r ESQ• * � 1
LI I�
Total Property:1,281,839 SF(29.4 Acres)
Total Existing Open Space:
287,000 SF(6.6 Acres)
B THE ARSENAL Existing Open Space
ON THE CHARLES
June 27, 2016
-— ARSENAL STREET311
_-
parking 43� -
-
bog
313 r {
39 - �Y
1- .__N=THSENS � 97 parking s 312
37 — _. ..
t
60
131
� -
,. 3 l
Proposed Open Space:409,800 SF(9.4 acres) \
jjProposed Pervious Pavers(1.1 acres)
NUhI H
Proposed Open Space(8.3 acres)
eo
B THE ARSENAL Proposed Open Space
®^ ON THE CHARLES June 27, 2016
- - „��i��115i�1�E4111
1��'';n'11�4�
I1 � . �� ,� �'•� l
� ��.M1ti
�.,,►..
�.
��j�i�i, l .• � r
�; � � •
w� .4�.
�.!i
��.
ti i 1 •
i
.�
,�.
- _ _• .�
.: n= :�• *' .. '�i �i�illlllllHilEllllill!!I�" �;���!:
� ?� � '� .
M
-_ �__
___ ��---
� • -
• •
�') • - -
ti•.
f +
� fry�,,..,•.,. .+r.+'�.. Imam=mo
�i►`,i - �5�., r((r
wr. ❑ oo � ❑ deo
S ❑ 4Ufl ❑ ❑ ❑ 6 ❑ ❑ ❑ OC ❑
t+
X
1
j -4-wit W
v I
i
v
B THE ARSENAL East Campus
C{� ON THE CHARLES
June 27, 2016
r1
- ,r. •.
1 S
Woo,
0000
0000V 00000
00000
000001,
Aft
i :�rh5
A
THE ARSENAL Proposed Retail Building 5 and Retail Corridor
®^ ON THE CHARLES May 6, 2016
i
June 27, 2016