Loading...
HomeMy Public PortalAboutExhibit MSD 30K - Prioritization WorksheetMSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME:DATE: Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding Points per CategoryNo. Lots AffectedPoints per CategoryNo. Lots AffectedPoints per CategoryNo. Lots Affected1.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: Basement (1 lot per structure) Address: Attached Garage (1 lot per structure) Address: Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: Yard Flooding (1 per lot) Address: 1.1.2.Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: Traffic obstruction (> 6" of water) on arterial street Address: Traffic obstruction (> 6" of water) on collector street Address: Traffic obstruction (> 6" of water) on residential street Address: 1.2.1.Threatening Structure (Ratio=Height of bank / distance from structure)Pts. for Ratio > 0.70No. LotsPts. for Ratio 0.36 - 0.70No. LotsPts. for Ratio 0.15- 0.35 No. LotsHabitable structures, residential (1 lot per structure) Address: Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: Industrial, office, commercial and warehouse (1 lot per structure) Address: 1.2.2.No. of lots (from 1.2.1) on outside of bend lots 1.2.3.Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted)Pts. for Ratio > 0.70No. LotsPts. for Ratio 0.36 - 0.70No. LotsPts. for Ratio 0.15- 0.35 No. LotsArterial Road: Address: Collector Road: Address: Residential Road: Address:1.0 STREAM10 points per lot 300 Total Points1.1. FLOODING1.2. EROSIONPROBLEM SOLVED CATEGORY 15 150 25 100 50 200 100 8 50 25 4 10 5 0 300 200 100 25150 15 50 25 4 10 5 1 25 300 200 212 50 150 100 25 75 50 12 300 35 25 50200 6 20 12 3 Note: Problem points are awarded only for those problems solved by the proposed solution. 10/01/06 1 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME:DATE: CONTINUED: Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding Points per CategoryNo. Lots AffectedPoints per CategoryNo. Lots AffectedPoints per CategoryNo. Lots Affected2.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)* Address: Basement (1 lot per structure)* Address: Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded)* Address: *If there is an existing public system and points are taken for any of the 3 items above, add 50 points. Attached Garage (1 lot per structure) Address: Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: Yard Flooding (1 per lot) Address: 2.1.2.Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: Traffic obstruction (> 6" of water) on arterial street Address: Traffic obstruction (> 6" of water) on collector street Address: Traffic obstruction (> 6" of water) on residential street Address: Ponding (per ponding area) Address:2.2.Moderate Risk Erosion of misc. structures Address: 2.3.Yard Erosion (1 per lot) Address: 2.4.Age of Existing System Points for Age Note: Problem points are awarded only for those problems solved by the proposed solution.TOTAL PROBLEM POINTS PROBLEM SOLVED CATEGORY, CONT.2.1. FLOODING2.0 STORM SEWER / OVERLAND FLOWTotal PointsExisting System Y/N 26-50 yrs (15 pts) >50 yrs (30 pts) <25 yrs (0 pts) 50 35 250 200 50 350 300 200 65250 100 75 25 12 50 200 150 25 10 50 35 06 6 25 15 2 No. Ponds:Points/pond: 10 6 No. Lots: No. Lots: 1 Points/lot: Points/lot: 5 20 10 Note: Problem points are awarded only for those problems solved by the proposed solution. 10/01/06 2 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME:DATE: CONTINUED: 3.1. Reduction of flowrate leaving site Max points:1000 3.2. Combines smaller projects into regional solution (see note)50 4.1. Addresses pollutants:No. Units Points per Unit Bioswales Forebays Wet Ponds Wetlands Biostabilization of banks (per bank) Riffle Pool Complex 4.2. Eliminates combined sewer (per project) 4.3. 5.1. Ease of Implementation (No. of Easements)0-5 (20 pts)>15 (0 pts)Points for Easements 5.2. Recreational/Educational TOTAL SOLUTION POINTS TOTAL BENEFIT POINTS Note: A regional solution combines several smaller projects into a watershed or subwatershed solution. MSD Project Project by Others 200 100 Points per Add'l Proj.: 10 10 10 100 Place "X" in one box below: 50 % reduction of peak flowrate : AC AC PER 100 LF No. Add'l Projects: 10 SOLUTION BENEFIT CATEGORY 4.0 ENVIRONMENTAL / WATER QUALITY3.0 REGIONALEliminates inflow into sanitary system (1 each per basement flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.)6-10 (10 pts)11-15 (5 pts)Yes = 100, no = 0 pts5.0 MISC.BENEFIT/ COST RATIO= TOTAL POINTS/ TOTAL COST IN THOUSANDS= AC PER 100 LF EA EA PER 100 LF TOTAL COST IN THOUSANDS= #DIV/0! 10/01/06 3 of 3