HomeMy Public PortalAboutGateway District Work Session 1Date of Meeting: March 5, 2020
TOWN OF LEESBURG
PLANNING COMMISSION WORK SESSION
Subject: Amendments to the Official Zoning Map and Article 7 of the Zoning
Ordinance to establish the Gateway District (Overlay)
Staff Contact: Susan Berry-Hill, Director
Brian Boucher, Deputy Director
Lauren Murphy, Preservation Planner
Debi Parry, Planning and Zoning Analyst
Applicant: None - Town Council initiated amendments.
Proposal: These Official Zoning Map and Zoning Ordinance text amendments
would establish the Gateway District, an overlay district intended to
achieve a higher standard of architecture and site design in the main
transportation corridors leading to the downtown H-1, Overlay, Old and
Historic District.
Planning Commission Critical Action Date: June 13, 2020
Recommendation: Staff recommends the Planning Commission consider the Official
Zoning Map amendments and the zoning text amendments to be
presented at the work session.
Initiation Date: These Zoning Ordinance and Official Zoning Map amendments
were initiated by Town Council on February 27, 2018.
Suggested Motions: None at this time. This meeting is a work session to familiarize the
Planning Commission with the proposed amendments.
Background: In October, 2016 the Town Council initiated the H-2 Work Group to
consider updating or replacing the H-2, Historic Corridor Architectural Control Overlay
District. In February, 2018, after receiving the H-2 Work Group’s recommendations,
Town Council initiated amendments to the Official Zoning Map and the Zoning
Ordinance, including design guidelines, to establish the Gateway District as an overlay
district on portions of the following five major corridors into town:
1. West Market Street
2. North King Street
3. South King Street
4. Edwards Ferry Road
5. East Market Street
Gateway District (Overlay)
Planning Commission Work Session Staff Report
March 5, 2020
Page 2 of 2
In Attachment 1, each of these five proposed segments to the Gateway District is shown
on its individual map. If adopted, this would expand architectural and/or site design
authority in some areas, such as along Edwards Ferry Road, where no architectural
review is currently required. These segments and the reason for their inclusion in the
Gateway District will be presented at the work session.
The Zoning Ordinance amendments are intended to establish the procedures for Gateway
District review, such as whether an application will be administrative (reviewed by the
Preservation Planner) or require Board of Architectural Review approval. They are also
intended to add building and design standards to the Gateway District to give the Town
more ability to require, and achieve, a better standard of architectural and site design than
can currently be required under the H-2 Overlay District. These text amendments will be
presented to familiarize the Planning Commission with their nature and extant in
preparation for the work session scheduled for March 19th.
Note that an important part of the Gateway District will be new and improved design
guidelines that will come before the Planning Commission later this year. In the interim,
the H-2 Design Guidelines would still be utilized in conjunction with the more
prescriptive Gateway District zoning standards.
The reason for bringing these amendments to the Official Zoning Map and the Zoning
Ordinance forward at this time is to establish the Gateway District with its upgraded
requirements as soon as possible to give the Town more ability to demand a higher, more
traditional level of architecture in these corridors to better protect these major entryways
into Leesburg.
The Gateway Project Schedule is attached (Attachment 2). Note that the Planning
Commission public hearings at the Planning Commission is scheduled for April 2nd.
In an effort to inform affected property owners about the Gateway District, staff is
recommending that an informational Open House be held the week of March 23rd.
Attachments:
1. Boundaries of Gateway District
2. Gateway Project Schedule
Gateway District - West Market Street
= Proposed Gateway District boundary
= New zoning overlay area
= New streetscape enhancement area
= Conservation/open space/common area
= Proposed Town gateway sign
= Existing historic district or wayfinding sign
= Current H-2 Corridor District boundary
= Old & Historic District (H-1)
= Residential areas
$+
#*
$+
#*
´
WilliamSt
WestMarketStreet
LoudounStreetSW
WestMarketStreet
MosbyDr MorvenParkRdWilsonAvePershingAveFairviewAvePhillipsDr
CatoctinCircleSWAyrStreetDryMillRd!(
!(
Gateway District - North King Street
= Proposed Gateway District boundary
= New zoning overlay area
= New streetscape enhancement area
= Conservation/open space/common area
= Existing Town gateway sign
= Existing historic district or wayfinding sign
= Current H-2 Corridor boundary
= Old & Historic District (H-1)
= Residential areas
= Town limits
$+
#*
$+
#*
´
!(
!(
B a t tlefieldPkwy
UnionSt
Oakcrest M a n o rD rD ryH ollow R dIda Lee Park
UnionCemetary
TuscaroraHigh School
Smart's MillMiddleSchool
F.H. ReidElementary
Bridge t te P lColleenCtS toneledgeP lTudorCtNorthKingStGeorgetownCt
Gateway District - South King Street= Proposed Gateway District boundary
= New zoning overlay area
= New streetscape enhancement area
= Conservation/open space/common area
= Existing Town gateway sign
= Existing historic district or wayfinding sign
= Current H-2 Corridor District boundary
= Old & Historic District (H-1)
= Crescent Design District
= Other commercial areas
= Residential areas
= Town limits
= Waterway in floodplain
$+
#*
$+
#*
´
!(
BattlefieldPkwy
SouthKingStEvergreenMillsRd
Route7
CatoctinCircleDavisAveDryMillRd !(
Route15Bypass
Gateway District - East Market Street= Proposed Gateway District boundary
= New zoning overlay area
= Proffered H-2 overlay areas
= Other proffered architectural guidelines
= New streetscape enhancement area
= Conservation/open space/common area
= Existing Town gateway sign
= Existing wayfinding sign
= Current H-2 corridor boundary
= Crescent Design District
= Other commercial areas
= Residential areas
= Waterway in floodplain
$+
$+
´
!(
!(
EastMarketSt
BattlefieldPkwyRussellBranchPkwy RiverCreekPkwyPotomacStationDrRoute7/15BypassFortEvansRd
CardinalParkDrCrosstrailBlvdP
otomacStation Dr
G
G
G
G
Gateway District - Edwards Ferry Road
= Proposed Gateway District boundary
= New zoning overlay area
= New streetscape enhancement area
= Conservation/open space/common area
= Proposed Town gateway sign
= Proposed historic district sign
= Existing wayfinding sign
= Proffered H-2 Corridor areas
= Old & Historic District (H-1)
= Crescent Design District
= Other commercial areas
= Residential areas
= Town limits
= Waterway in floodplain
$+
#*
$+
´
Edwar ds F err y Rd
!(
!(PlazaStreetHeritageWayWoodberryRoadCat o c t i n C ircleRout
e15By
pas
s
E dwar ds Fe rr y Rd
BattlefieldPkwy
FortEvansRd
EastMarketStRoute15Bypass#*
500' from ROW edge
GATEWAY DISTRICT REGULATIONS AND GUIDELINES WORK SCHEDULE 3/4/20
Date Who Task Deadline
Feb Restart Gateway project
Draft Zoning Ordinance Regulation
Staff Draft Zoning Ordinance regulations and Guiding Principles topics. 2/28
H2WG Organizational Meeting – Review and provide direction on:
-work plan
-schedule
-Table of Contents: regulatory and guideline topics for site, building and
streetscape design for general Gateway
2/5
Mar Finalize Zoning Ordinance regulations and prepare for public hearing
Draft Site Design Guidelines
Staff Revisions to Draft Zoning Ordinance regulations per H2WG
Ad due for PCPH
3/13
H2WG Review Draft ZO regulations, Guiding Principles, District Boundaries
Review new Section 7.12 and Revisions to March 4 agenda items
3 / 4
3/18
PC Preview and introduction to Draft ZO regulations 3/5 and
3/19
BAR Work Session on Draft ZO regulations 3/16
Apr Public Hearings on Zoning Ordinance regulations
Staff Development of Site Design Guidelines/H2WG Review
Staff Draft Site Plan Guidelines 4/17
H2WG Review Site Plan Guidelines 4/22
PC Public Hearing on ZO regulations, Section 7.12 including Design
Regulations and District boundaries (work session on 4/16, if necessary)
4/2
TC Public Hearing on ZO regulations, Section 7/12 including design
regulations and District boundaries
4/28
May Streetscape Design Guidelines: Staff Development/H2WG Review
BAR/PC review of Site Design Guidelines
Staff Draft Streetscape Guidelines 5/15
H2WG Review Streetscape Guidelines 5/20
BAR Review Site Design Guidelines 5/4
PC Review Site Design Guidelines 5/7
June Building Design Guidelines (Part 1) : Staff Development/H2WG
Review
BAR/PC review of Streetscape Design Guidelines
Staff Draft Building Design Guidelines (part 1) 6/12
H2WG Review Building Design Guidelines (part 1) 6/17
BAR Review Streetscape Design Guidelines 6/1
PC Review Streetscape Design Guidelines 6/4
July Building Design Guidelines (Part 2): Staff Development/H2WG Review
Staff Draft Building Design Guidelines (part 2) 7/17
GATEWAY DISTRICT REGULATIONS AND GUIDELINES WORK SCHEDULE 3/4/20
H2WG Review Building Design Guidelines(part 2) 7/22
BAR Review Building Design Guidelines (part 1) 7/6
PC Review Building Design Guidelines (part 1) 7/2
Aug Building Design Guidelines: (Part 3) Staff Development/H2WG Review
BAR/PC review of Building Design Guidelines (part 2)
Staff Draft Building Design Guidelines (part 3) 8/14
H2WG Review Building Design Guidelines (part 3) 8/19
BAR Review Building Design Guidelines (part 2) 8/3
PC Review Building Design Guidelines (part 2) 8/6
Sept Comprehensive Review of Building, Site and Streetscape Guidelines
Staff Revisions to all Guidelines 9/4
H2WG Comprehensive Review and recommendations 9/10
9/24
BAR Review Building Design Guidelines (part 3)
Comprehensive Review
9/9
9/23
PC Review Building Design Guideline (part 3) 9/3
Oct BAR Recommendations on Gateway District Standards and Guidelines
PC Public Hearing on Gateway District Guidelines
BAR Recommendations on Guidelines 10/5
PC PCPH on Design Guidelines 10/15
Nov Town Council Public Hearing on Guidelines
TC TCPH 11/10
TC work session 11/23
TC Action 11/24 or
12/15
Dec Finalize Document with Consultant