Loading...
HomeMy Public PortalAboutExhibit MSD 37H - MSD Stormwater Prioritization Scoring ExamplesMSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Amherst -Blackberry 7500 Block Channel Improvements (UCMB-120) (2007079P) DATE: 2/5/2007 PROBLEM SOLVED CATEGORY Note: Problem points are awarded only for those problems solved by the proposed solution. 1.0 STREAM (D z 0 O J ti 1.1.1. Structure Flooding Chronic (<=2-Yr) Flooding Frequent (>2<=1.5 Yr) Flooding Infrequent (>15-Yr) Flooding . z< a, .12 o aU ItJ 2 z< Ca Q U z< Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: 300 150 25 Basement (1 lot per structure) Address: 200 100 15 Attached Garage (1 lot per structure) Address: 100 50 8 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 25 4 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: 300 150 25 Yard Flooding (1 per lot) Address: 10 5 0 1 1 2 Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 200 100 15 Traffic obstruction (> 6" of water) on arterial street Address: 50 25 4 Traffic obstruction (> 6" of water) on collector street Address: 25 12 2 Traffic obstruction (> 6" of water) on residential street Address: 10 5 1 1.2. EROSION 1.2.1. Threatening Structure (Ratio=Height of bank / distance from structure) Habitable structures, residential (1 lot per structure) Address: 7591 Amherst 300 200 A z 0 tY A `o C eo 50 0 z 1 50 Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 3 Graves at 848 North and South Industrial, office, commercial and warehouse (1 lot per structure) Address: 150 300 3 100 200 25 50 450 1.2.2. No. of lots (from 1.2.1) on outside of bend 2 lots 10 points per lot 20 1.2.3. Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Arterial Road: Address: 75 0 J z 50 3 0 z 0 m in in 12. 0 z Collector Road: Address: Residential Road: Address: 35 25 20 12 6 10/01/06 1 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Amherst -Blackberry 7500 Block Channel Improvements (UCMB-120) (2007079P) DATE: 2/5/2007 CONTINUED: 2.0 STORM SEWER 1 OVERLAND FLOW 2.1. FLOODING PROBLEM SOLVED CATEGORY, CONT. Note: Problem points are awarded only for those problems solved by the proposed solution. 2.1.1. Structure Flooding Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding J z< 83 a. U I z° a a. Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)* Address: 350 250 65 Basement (1 lot per structure)* Address: 250 200 50 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded)* Address: 300 200 50 if there is an existing public system and points are taken for any of the 3 items above, add 50 points. Attached Garage (1 lot per structure) Address: Existing System YIN 100 75 25 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 35 12 Yard Flooding (1 per lot) Address: 10 6 0 2.1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 200 150 25 Traffic obstruction (> 6" of water) on arterial street Address: 50 35 6 Traffic obstruction (> 6" of water) on collector street Address: 25 15 2 Traffic obstruction (> 6" of water) on residential street Address: 10 6 1 Ponding (per ponding area) Address: No. Ponds: Points/pond: 5 2.2. Moderate Risk Erosion of misc. structures Address: No. Lots: Points/lot: 20 2.3. Yard Erosion (1 per lot) Address: No. Lots: Points/lot: 10 2.4. Age of Existing System Points for Age >50 yrs (30 pts) 26-50 yrs (15 pts) <25 yrs (0 pts) Note: Problem points are awarded only for those problems solved by the proposed solution. TOTAL PROBLEM POINTS 520 10/01/06 2 of 3 MSS Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Amherst -Blackberry 7500 Block Channel improvements (UCMB-120) (2007079P) DATE: 2/5/2007 CONTINUED: SOLUTION BENEFIT CATEGORY I 3.1. Reduction of flowrate leaving site % reduction of peak flowrate : Max points: 1000 3.2. Combines smaller projects into regional solution (see note) No. Add'l Projects: Points per Add' Proj.: 50 4.0 ENVIRONMENTAL I WATER QUALITY 4.1. Addresses pollutants: No. Units Points per Unit Bioswales PER 100 LF 10 Forebays AC 200 Wet Ponds AC 100 Wetlands AC 50 Biostabilization of banks (per bank) 1 PER 100 LF 10 10 Riffle Pool Complex PER 100 LF 10 4.2. Eliminates combined sewer (per project) EA 100 Eliminates inflow into sanitary system (1 each per basement 4.3. flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.) EA 10 C) 0 go 5.1. Ease of Implementation (No. of Easements) 0 0 fl. cb 0 •A Points for Easements 10 10 5.2. Recreational/Educational Yes = 100, no=Opts TOTAL SOLUTION POINTS 20 TOTAL BENEFIT POINTS 540 Note: A regional solution combines several smaller projects into a watershed or subwatershed solution. TOTAL COST IN THOUSANDS= BENEFIT/ COST RATIO= TOTAL POINTS! TOTAL COST IN THOUSANDS= Place "X" in one box below: MSD Project Project by Others 475 1.14 10/01/06 3 of 3 MS_ Aormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Burton - Walton Storm Sewer DATE: 8/17/2009 PROBLEM SOLVED CATEGORY Note: Problem points are awarded only for those problems solved by the proposed solution. Chronic (<=2-Yr) Flooding Frequent (>2. 15-Yr) Flooding Infrequent (>15-Yr) Flooding e 0' O c at a. 01 (1)J 0 o z< m� a .4. ED c a - Ts J za 0 0. O 0- U 0 za C 0 a 0 1.0 STREAM 1.1. FLOODING 1.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: 300 150 25 Basement (1 lot per structure) Address: 200 100 15 Attached Garage (1 lot per structure) Address: 100 50 8 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 25 4 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: 300 150 25 Yard Flooding (1 per lot) Address: 10 5 0 Roadway Flooding (allocate 1 lot per 250' of roadway 1.1.2. impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 200 100 15 Traffic obstruction (> 6" of water) on arterial street Address: 50 25 4 Traffic obstruction (> 6" of water) on collector street Address: 25 12 2 Traffic obstruction (> 6" of water) on residential street Address: 10 5 1.2. EROSION 1.2.1. Threatening Structure (Ratio=Height of bank / distance from structure) Habitable structures, residential (1 lot per structure) Address: 0 O 0 00 n 300 J 0 z 0 `-0 g 200 0 J 0 z 50 Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 150 100 25 Industrial, office, commercial and warehouse (1 lot per structure) Address: 300 200 50 1.2.2. No. of lots (from 1.2.1) on outside of bend 2 10 points per lot 1.2.3. Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Arterial Road: Address: 75 m 0 J 0 z 50 m J 0 z 0 C O ao 12 O J 0 z Collector Road: Address: 35 25 6 Residential Road: Address: 20 12 3 10/01/06 1 of 3 C4, Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Burton - Walton Storm Sewer CONTINUED: DATE 6/17/2009 2.0 STORM SEWER 1 OVERLAND FLOW a Z 0 O J CV PROBLEM SOLVED CATEGORY, CONT. Note: Problem points are awarded only for those problems solved by the proposed solution. 2.1.1. Structure Flooding Chronic (2-Yr) Flooding Frequent (>2�15-Yr) Flooding Infrequent (>15-Yr) Flooding o J t z Q 1. 2" c m a. 2< az B a998 J tl z°¢ 0 tL 2 Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)* Address: 350 250 65 Basement (1 lot per structure)" Address: 8657 Burton 250 200 1 50 200 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded)* Address: 300 200 50 If there is an existing public system and points are taken for any of the 3 items above, add 50 points. Existing System Y/N Attached Garage (1 lot per structure) Address: 100 75 25 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 35 12 Yard Flooding (1 per lot) Address: 8661 Burton Avenue 10 1 6 0 10 2.1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12' water over only access route to habitable structure), pts per structure Address: 200 150 25 Traffic obstruction (> 6" of water) on arterial street Address: 50 35 6 Traffic obstruction (> 6" of water) on collector street Address: 25 15 2 Traffic obstruction (> 6" of water) on residential street Address: 8661 Burton Avenue 10 1 6 1 10 Ponding (per ponding area) Address: No. Ponds: Points/pond: 5 2.2. Moderate Risk Erosion of misc. structures Address: No. Lots: Points/lot: 20 2.3. Yard Erosion (1 per lot) Address: 8661 Burton, 8657 Burton 2.4. Age of Existing System Points for Age No. Lots: >50 yrs (30 pts) 2 Points/lot: 26-50 yrs (15 pts) 10 <25 yrs (0 pts) 20 Note: roblem points are awarded only for those problems solved by the proposed solution. TOTAL PROBLEM POINTS 240 10/01/06 2 of 3 Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Burton - Walton Storm Sewer CONTINUED: DATE: 8/17/2009 SOLUTION BENEFIT CATEGORY J o raaa, W CC 3.1. Reduction of flowrate leaving site % reduction of peak flowrate : Max points: 1000 3.2. Combines smaller projects into regional solution (see note) No. Add l Projects: Points per Add'I Proj.: 50 4.1. Addresses pollutants: No. Units Points per Unit Bioswales PER 100 IF 10 Forebays AC 200 Wet Ponds AC 100 Wetlands AC 50 Biostabilization of banks (per bank) PER 100 LF 10 Riffle Pool Complex PER 100 LF 10 4.2. Eliminates combined sewer (per project) EA 100 Eliminates inflow into sanitary system (1 each per basement 4.3. flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.) 1 EA 10 10 5.1. Ease of Implementation a N 6 Q a L a. a. O A Points for Easements: 20 20 5.2. Recreational/Educational Yes = 100, no=Opts TOTAL SOLUTION POINTS 30 TOTAL BENEFIT POINTS 270 Note: A regional solution combines several smaller projects into a watershed or subwatershed solution. TOTAL COST IN THOUSANDS= BENEFIT/ COST RATIO= TOTAL POINTS/ TOTAL COST IN THOUSANDS= Place "X" in one box below: f X MSD Project Project by Others 210 1.29 10/01/06 3of3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Deliwood Creek Storm Channel (MCDW-150) DATE: 7/7/2009 PROBLEM SOLVED CATEGORY Note: Problem points are awarded only for those problems solved by the proposed solution. Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding Q0 N C d aci 2 AI J t z O C J t z N o O1 C @ act o J za Total Points 1.0 STREAM 0 z 5 0 0 U- 1.1.1. Structure Flooding Habitable lst floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: 300 150 25 Basement (1 lot per structure) Address: 200 100 15 Attached Garage (1 lot per structure) Address: 100 50 8 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 25 4 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: 300 150 25 Yard Flooding (1 per lot) Address: 10 5 0 1 1 2 Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 200 100 15 Traffic obstruction (> 6" of water) on arterial street Address: 50 25 4 Traffic obstruction (> 6" of water) on collector street Address: 25 12 2 Traffic obstruction (> 6" of water) on residential street Address: 10 5 1.2. EROSION 1.2.1. Threatening Structure (Ratio=Height of bank / distance from structure) Habitable structures, residential (1 lot per structure) Address: 2042 Bella Clare, 10085 Bon Oak, 10064 Green Valley, 10067 Green Valley, 10064 Pepper, 10067 Pepper, 10067 Winkler, 10068 Winkler, 10073 14rnkler Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 10078 Ventura 300 150 J 0 z 3 200 100 J Z 4 50 25 In J 0 z 2 1800 150 Industrial, office, commercial and warehouse (1 lot per structure) Address: 300 200 50 1.2.2. No. of lots (from 1.2.1) on outside of bend 8 lots 10 points per lot 80 1.2.3. Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Arterial Road: Address: 0 O G n 75 J 0 z 50 .8 0 J z° 12 2 J Collector Road: Address: 35 25 6 Residential Road: Address: 20 12 3 10/01/06 1 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Dellwood Creek Storm Channel (MCDW-150) CONTINUED: 2.0 STORM SEWER 1 OVERLAND FLOW Z 0 0 0 J u- N DATE: 7/7/2009 PROBLEM SOLVED CATEGORY, CONT. Note: Problem points are awarded only for those problems solved by the proposed solution. Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding Total Points Q L. m a_ G] .0a 0' Z Q Points per Category Z S c_ m ti U No. Lots I Affected 2.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)'" Address: 350 250 65 Basement (1 lot per structure)* Address: 250 200 50 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded)* Address: . 300 200 50 * If there is an existing public system and points are taken for arty of the 3 items above, add 50 points. Existing System YIN Attached Garage (1 lot per structure) Address: 100 75 25 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 35 12 Yard Flooding (1 per lot) Address: 10 6 0 .'1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 200 150 25 Traffic obstruction (> 6" of water) on arterial street Address: 50 35 6 Traffic obstruction (> 6" of water) on collector street Address: 25 15 2 Traffic obstruction (> 6" of water) on residential street Address: 10 6 1 Ponding (per pending area) Address: No. Ponds: Points/pond: 5 2.2. Moderate Risk Erosion of misc. structures Address: No. Lots: Points/lot: 20 2.3. Yard Erosion (1 per lot) Address: No. Lots: Points/lot: 10 2.4. Age of Existing System Points for Age >50 yrs (30 pts) 26-50 yrs (15 pts) <25 yrs (0 pts) Note: Problem points are awarded only for those problems solved by the proposed solution. TOTAL PROBLEM POINTS 2030 10/01/06 2 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Dellwood Creek Storm Channel (MCDW-150) CONTINUED: DATE: 7/7/2009 SOLUTION BENEFIT CATEGORY J a QO CI 5 3.1. Reduction of flowrate leaving site % reduction of peak flowrate : Max points: 1000 3.2. Combines smaller projects into regional solution (see note) No. Add'I Projects: Points per Add'I Proj.: 50 4.0 ENVIRONMENTAL I WATER QUALITY 4.1. Addresses pollutants: No. Units Points per Unit Bioswales PER 100 LF 10 Forebays AC 200 Wet Ponds AC 100 Wetlands AC 50 Biostabilization of banks (per bank) 2.07 PER 100 LF 10 21 Riffle Pool Complex PER 100 LF 10 4.2. Eliminates combined sewer (per project) EA 100 Eliminates inflow into sanitary system (1 each per basement 4.3. flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.) EA 10 5.1. Ease of Implementation (No. of Easements) Points for Easements 5.2. Recreational/Educational Yes = 100, no = 0 pts TOTAL SOLUTION POINTS 21 TOTAL BENEFIT POINTS 2051 Note: A regional solution combines several smaller projects into a watershed or subwatershed solution. TOTAL COST IN THOUSANDS= BENEFIT! COST RATIO= TOTAL POINTS! TOTAL COST IN THOUSANDS= Place "X" in one box below: n MSD Project Project by Others 1404 1A6 10/01/06 3of3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Hillsdale Dr. #7501 Storm Sewer (11063) PROBLEM SOLVED CATEGORY Note: Problem points are awarded only for those problems solved by the proposed solution. 1.0 STREAM 1.1. FLOODING 1.2. EROSION 1.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: Basement (1 lot per structure) Address: Attached Garage (1 lot per structure) Address: Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: Yard Flooding (1 per lot) Address: 1.1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address. - Traffic obstruction (> 6" of water) on arterial street Address: Chronic (<=2-Yr) Flooding Frequent (>2c=15-Yr) Flooding DATE: 4/17/2015 Infrequent (>15-Yr) Flooding 300 200 100 50 300 10 200 50 OQ�Q Z Q Q o C N 00 150 100 50 25 150 5 100 25 z 25 15 8 4 25 0 15 4 z Q Traffic obstruction (> 6" of water) on collector street Address: Traffic obstruction (> 6" of water) on residential street Address: 1.2.1. Threatening Structure (Ratio=Height of bank / distance from structure) Habitable structures, residential (1 lot per structure) Address: Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: Industrial, office, commercial and warehouse (1 lot per structure) Address: 1.2.2. No. of lots (from 1.2.1) on outside of bend 1.2.3. Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Arterial Road: Address: Collector Road: Address: Residential Road: Address: 25 10 300 150 300 0 a go n 75 35 20 lots 12 5 200 100 200 50 25 12 3 0 z 2 1 o_ 8 cn o 50 25 50 10 points per lot Cop 3 d 12 6 3 21 3 0 z 2p 3 0 z 10/01/06 1 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Hillsdale Dr. #7501 Storm Sewer (11063) CONTINUED: 2.0 STORM SEWER I OVERLAND FLOW 2.1. FLOODING DATE: 4/17/2015 Chronic (<=2-Yr) Flooding Frequent (>2r_15-Yr) Flooding infrequent (>15-Yr) Flooding ' rr� .o PROBLEM SOLVED CATEGORY, CONT. Note: Problem points are awarded only for those problems solved by the proposed solution. a jg g 0 U S' Z< a �, c m a O 3 I Z Q a z, f m tl c) 3 1 Z Q a 12 2.1.1. Structure Flooding Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)* Address: 350 250 65 Basement (1 lot per structure)* Address:7501 Hillsdale 250 200 1 50 200 industrial, office, commercial and warehouse (1 lot per 2,500 sr of floor space flooded)* Address: 300 200 50 * If there is an existing public system and points are taken for any of the 3 items above, add 50 points. Existing System YIN Yes 50 Attached Garage (1 lot per structure) Address: 100 75 25 Misc. structures including patio/decks, pools, sheds, tennis• courts, aetacnea garages, etc.(1 lot per structure) Address: Yard Flooding (1 per lot) Address:7505 Hillsdale 2.1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 50 10 200 35 6 150 1 12 0 25 6 Traffic obstruction (> 6" of water) on arterial street Address: 50 35 6 Traffic obstruction (> 6" of water) on collector street Address: 25 15 2 Traffic obstruction (> 6" of water) on residential street Address: 10 6 1 Ponding (per ponding area) Address: 2.2. Moderate Risk Erosion of misc. structures Address: No. Ponds: Points/pond: 5 No. Lots: Points/lot: 20 2.3. Yard Erosion (1 per lot) Address: 2.4. Age of Existing System Points for Age No. Lots: >50 yrs (30 pts) 30 Points/lot 26-50 yrs (15 pts) 10 <25 yrs (0 pts) 30 Note: Problem points are awarded only for those problems solved by the proposed solution. TOTAL PROBLEM POINTS 286 10/01/06 2 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Hillsdale Dr. #7501 Storm Sewer (11063) CONTINUED: DATE: 4/17/2015 SOLUTION BENEFIT CATEGORY J Z3.1. o Reduction of flowrate leaving site % reduction of peak flowrate : Max points: 1000 co 5 W Ui No. Add'I 3.2. Combines smaller projects into regional solution (see note) Projects: Points per - Add! Proj.: 50 J a I 4.1. Addresses pollutants: No. Units Points per Unit Bioswales PER 100 LF 10 Forebays AC 200 Wet Ponds AC 100 Wetlands AC 50 Biostabilization of banks (per bank) PER 100 LF 10 Riffle Pool Complex PER 100 LF 10 4.2. Eliminates combined sewer (per project) EA 100 Eliminates inflow into sanitary system (1 each per basement 4.3. flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.) 1 EA 10 10 N 5.1. Ease of Implementation (No. of Easements) 0 0 0 a 2 0 u) n Points for Easements 10 10 5.2. Recreational/Educational Yes = 100, no=0pts TOTAL SOLUTION POINTS 20 TOTAL BENEFIT POINTS 306 Note: A regional solution combines several smaller projects into a watershed or subwatershed solution. TOTAL COST IN THOUSANDS= BENEFIT/ COST RATIO= TOTAL POINTS/ TOTAL COST IN THOUSANDS= Place "X" In one box below: MSD Project Project by Others $220 1.39 10/01/06 3 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Longford Dr. #1851 DATE: 6/17/2009 PROBLEM SOLVED CATEGORY Note: Problem points are awarded only for those problems solved by the proposed solution. 1.0 STREAM 0 Z 0 O tL T 1.1.1. Structure Flooding Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding a 0 C co o_ 2D J t o Z < 2 D J Z k3 'a J t Z < a 0` a 3 H Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure) Address: 300 150 25 Basement (1 lot per structure) Address: 200 100 15 Attached Garage (1 lot per structure) Address: 100 50 8 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 25 4 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded) Address: 300 150 25 Yard Flooding (1 per lot) Address: 10 5 0 Roadway Flooding (allocate 1 lot per 250' of roadway 1.1.2. impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure -• • Address: 200 100 15 Traffic obstruction (> 6" of water) on arterial street Address: 50 25 4 Traffic obstruction (> 6" of water) on collector street Address: 25 12 2 Traffic obstruction (> 6" of water) on residential street Address: 10 5 1 1.2. EROSION 1.2.1. Threatening Structure (Ratio=Height of bank / distance from structure) Habitable structures, residential (1 lot per structure) Address: 300 J O z 200 50 Misc structures including pools, patio/decks, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 150 100 25 Industrial, office, commercial and warehouse (1 lot per structure) Address: 300 200 50 1.2.2. No. of lots (from 1.2.1) on outside of bend lots 10 points per lot 1.2.3. Threatening Roadway (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Arterial Road: Address: 75 J O z 0 o o • f co 0 50 a J Z 0 Lo ro O • • u1 i 12 0 J O z Collector Road: Address: 35 Residential Road: Address: 20 25 6 12 3 10/01/06 1 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Longford Dr. #1851 CONTINUED: DATE: 6/17/2009 2.0 STORM SEWER 1 OVERLAND FLOW 2.1. FLOODING PROBLEM SOLVED CATEGORY, CONT. Note: Problem points are awarded only for those problems solved by the proposed solution. 2.1.1. Structure Flooding Chronic (<=2-Yr) Flooding Frequent (>2<=15-Yr) Flooding Infrequent (>15-Yr) Flooding !3 m J i Z o. C 0) rs a0 to N J -6 Z C OD t0 a, 0 Z Habitable 1st floor, residential; includes spaces with mechanical equipment (1 lot per structure)* Address: 350 250 65 Basement (1 lot per structure)* Address: 250 200 50 Industrial, office, commercial and warehouse (1 lot per 2,500 sf of floor space flooded)* Address: 300 200 50 * If there is an existing public system and points are taken for any of the 3 items above, add 50 points. Existing System Y/N Attached Garage (1 lot per structure) Address: 100 75 25 Misc. structures including patio/decks, pools, sheds, tennis courts, detached garages, etc.(1 lot per structure) Address: 50 35 12 Yard Flooding (1 per lot) Address: 1847 Longford, 1851 Longford 2.1.2. Roadway Flooding (allocate 1 lot per 250' of roadway impacted & 2 lots per intersection impacted) Emergency Access restricted (>12" water over only access route to habitable structure), pts per structure Address: 10 200 2 6 150 0 25 20 Traffic obstruction (> 6" of water) on arterial street Address: 50 35 6 Traffic obstruction (> 6" of water) on collector street Address: 25 15 2 Traffic obstruction (> 6" of water) on residential street Address: 10 6 1 Ponding (per ponding area) Address: No. Ponds: Points/pond: 5 2.2. Moderate Risk Erosion of misc. structures Address: No. Lots: Points/lot: 20 2.3. Yard Erosion (1 per lot) Address: No. Lots: Points/lot: 10 2.4. Age of Existing System Points for Age >50 yrs (30 pts) 26-50 yrs (15 pts) <25 yrs (0 pts) Note: Problem points are awarded only for those problems solved by the proposed solution. TOTAL PROBLEM POINTS 20 10/01/06 2 of 3 MSD Stormwater Projects Prioritization System Revised Benefit Points Allocation Schedule PROJECT NAME: Longford Dr. #1851 CONTINUED: DATE: 6/17/2009 SOLUTION BENEFIT CATEGORY 3.1. Reduction of flowrate leaving site 3.2. Combines smaller projects into regional solution (see note) % reduction of peak flowrate : No. Add'I Projects: Max points: Points per Add'I Proj.: 1000 50 4.1. Addresses pollutants: No. Units Points per Unit Bioswales PER 100 LF 10 Forebays AC 200 Wet Ponds AC 100 Wetlands AC 50 Biostabilization of banks (per bank) PER 100 LF 10 Riffle Pool Complex PER 100 LF 10 4.2. Eliminates combined sewer (per project) EA 100 Eliminates inflow into sanitary system (1 each per basement 4.3. flooded, yard vent overtopped, street inlet or driveway drain connected to sanitary/combined system, etc.) EA 10 co 2 U) 5.1. Ease of Implementation (No. of Easements) a 0 A Points for Easements 20 20 5.2. Recreational/Educational Yes = 100, no = 0 pts TOTAL SOLUTION POINTS 20 TOTAL BENEFIT POINTS 40 Note: A regional solution combines several smaller projects into a watershed orsubwatershed solution. TOTAL COST IN THOUSANDS= BENEFIT! COST RATIO= TOTAL POINTS! TOTAL COST IN THOUSANDS= Place "X" in one box below: MSD Project Project by Others 29 1.38 10/01/06 3 of 3