Loading...
HomeMy Public PortalAboutExhibit MSD 7 - 2008 Rate ProposalProposed Rate Change January 18, 2008 Exhibit MSD 7 METROPOLITAN ST. LOUIS SEWER MSD METROPOLITAN ST. LOUIS SEWER MSD Proposed Rate Change Proposed Rate Change January 18, 2008 January 18, 2008 Table of Contents Table of Contents Page 1 Page Introduction ..................................................................................................................................2 Summary of Proposed Rate Change ............................................................................................4 Evolution of Rate Plan .................................................................................................................5 Synopsis of Customer Advocacy Discussions .............................................................................6 Proposed Rate Change Summary Tables .....................................................................................7 Summary of Key Components of Proposal Changes ..........................................................7 Table A – Rate Plan Evolution ...........................................................................................8 Table B – Summary of Change in Debt Service ...............................................................11 Table C – Impact on Wastewater Rates ............................................................................12 Table D – Impact on Stormwater Rates ............................................................................13 Table E-1 – Impact on Average Monthly Bills; Residential and Multi-Family Customers ........................................................................................14 Table E-2 – Impact on Average Monthly Bills; Normal Strength Non-Residential and Extra Strength Customers ......................................................................................15 Compliance with MSD Charter .................................................................................................16 Table F – Wastewater Bond Option............................................................................................17 Compliance with Rate Commission Operational Rules, Regulations and Procedures ..............18 Conclusion .................................................................................................................................19 Proposed Rate Change Appendix ..............................................................................................20 MSD 2008 Proposed Rate Change January 18, 2008 1 METROPOLITAN ST. LOUIS SEWER MSD METROPOLITAN ST. LOUIS SEWER MSD Proposed Rate Change Proposed Rate Change January 18, 2008 January 18, 2008 Introduction 2 Introduction The Metropolitan St. Louis Sewer MSD (“MSD”) respectfully submits this Proposed Rate Change to the Rate Commission for consideration according to Section 7.280.b of the MSD’s Charter (“Plan”), as amended on November 7, 2000. This Proposed Rate Change consists of the following documents: 1. Transmittal Letter to MSD Rate Commission – MSD Exhibit 2.1a 2. MSD Proposed Rate Change – MSD Exhibit 2.2 3. MSD Proposed Rate Change Appendix – MSD Exhibit 2.3 4. MSD Audited Financial Information as of June 30, 2007 – MSD Exhibit 2.4 5. MSD Comprehensive Annual Financial Report (CAFR) as of June 30, 2007 – MSD Exhibit 2.5 6. Initial MSD Exhibit Index – MSD Exhibit 3.1 The MSD Exhibit Index from the prior Rate Change Process (beginning March 2, 2007) has been submitted with this Proposed Rate Change as supporting material (MSD Exhibit 2.3b). In order to differentiate the prior index from the index associated with the January 18, 2008 Proposed Rate Change, all rate deliberation Exhibits begin with a prefix of 2. All administrative Exhibits begin with a prefix of 3 and are contained on a separate index. The MSD respectfully requests all documents resulting from the Rate Commission’s 2007 deliberations and related to the actions of the District’s Board of Trustees (“Board”) to date be accepted as supporting material to the submitted Proposed Rate Change for purposes of this deliberation. A complete Exhibit Index from the Rate Commission deliberations ending August 13, 2007 and the journal of the above referenced Board action are included in the Proposed Rate Change Appendix (MSD Exhibit 2.3) accompanying this document. MSD 2008 Proposed Rate Change January 18, 2008 2 This Proposed Rate Change is in response to substantial input from customer advocacy groups as presented to the Board after acknowledgement of the Rate Commission’s August 13, 2007 report on September 13, 2007 but prior to the adoption of any rate increases. Customer concerns centered on the rate shock considered inherent in the wastewater and stormwater rate increases as recommended by the Rate Commission on August 13, 2007. Based on these customer concerns, this Proposed Rate Change proposes a mixture of debt and cash financing in order to lower the wastewater rates and fund $661 million of wastewater capital improvements as recommended in the Rate Commission August 13, 2007 Recommendation Report. This Proposed Rate Change also proposes an adjustment to stormwater rates to lessen the short-term impact of the transition to an impervious-based stormwater rate structure. The wastewater rates proposed in this Proposed Rate Change are contingent upon the approval of additional revenue bond authority by the qualified voters of the MSD. Pending the outcome of Rate Commission consideration of this Proposed Rate Change, the MSD hopes to submit a ballot initiative for the August 2008 election to request voter approval to issue an additional $275 million of wastewater debt. Per Section 7.280.f of the Plan, the Rate Commission has a maximum of 165 days from date of receipt, in which to review this proposal. However, in order to provide the rate relief requested by the customer advocacy groups, minimize a delay in the MSD’s ongoing efforts to address wastewater and stormwater problems effecting St. Louis residents, and given the Rate Commission’s familiarity with the recent rate change proceedings, the MSD respectively requests this Proposed Rate Change be reviewed as expeditiously as possible in the hopes the next set of wastewater and stormwater rates may be implemented on July 1, 2009 and January 1, 2009, respectively. Should the proposed bond initiative fail, the next wastewater rate increase will take effect September 1, 2008 per the rate plan introduced by the Board on October 11, 2007. In order to implement the January 18, 2008 Proposed Rate Change, and place the bond authorization request on the earliest reasonable ballot, the MSD respectfully requests a written report of the Rate Commission’s recommendations be delivered to the Board of Trustees by May 1, 2008 if at all possible. MSD 2008 Proposed Rate Change January 18, 2008 3 Summary of Proposed Rate Change The Proposed Rate Change is unchanged from that adopted by Board on December 13, 2007 except for two variables. It should be noted only the first wastewater and stormwater rate increases of the rate plan introduced on October 11, 2007 were adopted. The effective date for these adopted wastewater and stormwater rates is January 1, 2008 and March 1, 2008, respectively, per MSD Ordinances #12561 and #12560. Should the bond initiative proposed in this Proposed Rate Change fail, the remaining years of the October 11, 2007 rate plan, FY09 through FY14, will begin implementation with the second wastewater increase becoming effective September 1, 2008, followed by the a stormwater rate increase on January 1, 2010. Also on December 13, 2007, the Board instructed Staff to prepare and submit for Rate Commission consideration a Proposed Rate Change using debt to partially fund the wastewater improvement program in years FY09 through FY12 in order to relieve the wastewater and stormwater rate shock concerns expressed by the customer advocacy groups. Staff was instructed to submit this Proposed Rate Change to the Rate Commission as soon as practical. This document represents the Proposed Rate Change submittal in accordance with the Board action taken on December 13, 2007. This submittal consists of two separate documents, the Proposed Rate Change and an accompanying Appendix. The two changes represented by the Proposed Rate Change are as follows: 1. Use of $275 million in bonds. These bonds would be in addition to the MSD existing $500 million in bonds for a total of $775 million. Impact: ∗ Reduction in wastewater rates compared to the Board’s October 11, 2007 rate plan (see Table C – Impact on Wastewater Rates, page 12 and Table E-1 and E-2 – Impact on Average Monthly Bills, pages 14 and 15). ∗ Increase in debt service cost over the life of the bonds of $642 million (see Table B – Summary of Change in Debt Service, page 11) ∗ Reduction of the currently available total MSD debt capacity from $900 million to $625 million (assumes total MSD debt capacity of $1.4 billion.). ∗ Earliest possible bond election, contingent on a Rate Commission expedited deliberation is August 2008. MSD 2008 Proposed Rate Change January 18, 2008 4 (2) The extension of the wastewater subsidy funding of the stormwater program from two to three years. The subsidy is eliminated by July 1, 2011. Impact: ∗ Reduction in stormwater rates compared to the rate plan introduced by the Board on October 11, 2007 (see Table D – Impact on Stormwater Rates, page 13 and Tables E-1 and E-2 – Impact on Average Monthly Bills, pages 14 and 15). Evolution of Rate Plan The MSD submitted its initial rate proposal to the Rate Commission on March 2, 2007. This proposal consisted of a 5-year series of wastewater and stormwater rate increases. The Rate Commission reviewed the MSD’s proposal and those of the following interveners: 1. The Missouri Industrial Energy Consumers (“MIEC”); 2. The Missouri Energy Group (“MEG”); 3. The Monarch-Chesterfield Levee MSD (et.al.) (“The Levee Districts”); 4. AGC of St. Louis in conjunction with SITE Improvement Association (“AGC/SITE”); 5. Michael Cohen. The Rate Commission delivered its recommendation to the Board on August 13, 2007 in accordance within the maximum 165 review period provided by Section 7.280(f) of the Plan. The Rate Commission’s recommendation was based on its deliberations of all proposals and supporting material presented during the rate proceedings. The Board acknowledged delivery of the Rate Commission Recommendation Report on September 13, 2007, but took no formal action (see journal of Board, Appendix Section II). Upon review of the Rate Commission Recommendation Report, the Board adjusted the time frame of the proposed stormwater rate implementation from 5-years to 7-years, thereby spreading the impact of the impervious-based stormwater rate increases on MSD customers over two more years, The Board formally introduced this adjusted rate plan at the October 11, 2007 meeting of MSD Trustees (see journal of Board, Appendix Section II). The Board formally adopted the first year only of wastewater and stormwater increases of this adjusted rate plan at the December 13, 2007 meeting of MSD Trustees (see journal of Board, Appendix Section II). Throughout September 2007 through mid-January 2008, The Board heard from customer advocacy groups not previously engaged in the Rate Commission proceedings. These groups MSD 2008 Proposed Rate Change January 18, 2008 5 included AARP and ACORN. Interveners MIEC and MEG also approached the Board with concerns. These discussions also included representatives from the Office of the Mayor of the City of St. Louis and the Office of the St. Louis County Executive. Synopsis of Customer Advocacy Discussions The Board acknowledged the Rate Commission’s August 13, 2007 Recommendation Report at its September 6, 2007 public meeting. At that time, a broad array of public comment from a number of customer groups approached the Board. In order to acknowledge all points of view, MSD Staff met, on several occasions with the various entities mentioned above about their expressed concerns. These discussions encompassed the following: November 20, 2007 – Meeting between MSD representatives and those of ACORN, AARP, MIEC, MEG, the Office of the Mayor of the City of St. Louis and the Office of the St. Louis County Executive. A wastewater funding plan using $230 million of additional debt to lower wastewater rates in the near term obtained tentative consensus from all present. Those with stormwater rate concerns requested the exploration of additional options to provide similar relief to near term stormwater rates. December 6, 2007 – Meeting between MSD representatives and those of ACORN, AARP, MIEC, MEG, the Office of the Mayor of the City of St. Louis and the Office of the St. Louis County Executive. A wastewater funding plan using $275 million of additional debt was discussed. Tentative consensus of all present was obtained with the understanding the additional $45 million in debt compared to that discussed on December 6, 2007 would be used to supplant a portion of the wastewater cash financing of the MSD Capital Improvement and Repair Program (“CIRP”) in order to extend the subsidy of the stormwater program thereby providing near term rate relief for those with stormwater concerns. The use of additional debt for stormwater rate relief was tentatively agreed to by all present. December 13, 2007 - In response to these customer concerns the Board adopted the first year only (FY2008) of the wastewater and stormwater rate increases introduced on October 11, 2007. In conjunction with this adoption the Board instructed Staff to prepare and submit for Rate Commission consideration a Proposed Rate Change using debt to partially fund the wastewater improvement program in FY09 through FY12. Per the Board’s instruction, this Proposed Rate Change was to be delivered to the Rate Commission at the earliest reasonable date with the MSD 2008 Proposed Rate Change January 18, 2008 6 understanding if the proposed necessary voter authorization for additional debt is rejected by qualified voters of the St. Louis Region, the FY09 through FY12 wastewater and stormwater rate increases would be adopted as introduced on October 11, 2007. December 20, 2007 – A revised set of data based on the $275 million wastewater funding plan as discussed on December 6, 2007 was distributed to all customer advocacy groups participating in the discussions to date. This data reflected the use of $275 million in additional debt to partially fund the MSD’s CIRP; extend the wastewater subsidy of the stormwater program, and a consequential reduction in the near term stormwater rate increases with the concluding 7th year increase unchanged from prior approaches discussed. January 16, 2008 – Meeting between MSD representatives and those of MIEC, MEG, the Office of the Mayor of the City of St. Louis and the Office of the St. Louis County Executive. The $275 million wastewater debt plan distributed on December 20, 2007 was discussed, receiving consensus of all present. This $275 million wastewater funding plan is the basis of the January 18, 2008 Proposed Rate Change. Proposed Rate Change Summary Tables The summary tables contained in this document compare changes, where applicable, between each of the following rate plans considered to date: 1. The Rate Commission’s August 13, 2007 Recommendation Report (Appendix Section III; MSD Exhibit 2.3d); 2. The Rate Commission’s Recommendation Report as adjusted by the Board and introduced October 11, 2007 (Appendix Section IV; MSD Exhibit 2.3e), and 3. The January 18, 2008 Proposed Rate Change as represented by this document (Appendix Section V; MSD Exhibit 2.2 and MSD Exhibit 2.3f). Changes between each of the rate plans as chronologically considered are highlighted in green in each applicable table. Summary of Key Components of Proposal Changes – Table A Table A, page 8 compares the key components of each of the rate plans considered to date as listed above. The impact on wastewater and stormwater rates and average monthly customer bills are contained on Tables C, D, E-1 and E-2 on pages 12, 13, 14 and 15, respectively, of this document. MSD 2008 Proposed Rate Change January 18, 2008 7 MSD 2008 Proposed Rate Change January 18, 2008 8TABLE A = Indicates change frRate Plan EvolutionSummary of Proposal Changes (Key Components) January 18, 2008Key Components2008 - 2012 (over 5 Yrs)Key Parameters:Total CIRP Program660.9$ 660.9$ Total Add'l Bonds (over existing $500M)- - Debt Service: Total Debt Service (over 6 yrs)162.6 162.6 Total Debt Service (through 2026) (b)1,072.5 1,072.5 Total Incremental Change ($$$ & %)NA- 0%Subsidy from WW: FY07 (Rate increases do not include19.2$ 19.2$ FY07. Yr ended 6/30/07) FY0810.8 10.8 FY09- - FY10- - FY11- - FY12- - Total 30.0$ 30.0$ 2008 - 2014 (over 7 Yrs)$$$ Chgom prior alternative660.9$ 275.0 189.6 1,714.4 641.9 60%19.2$ (c)10.8 8.3 4.4 - - 42.7$ $$$ Chg$$$ ChgTotal SW Program (over 7 Yrs)NA (a) NA399.2$ NA Total SW Program (over 5 Yrs)350.5 NA250.5 (100.0)$ See Tables E-1 and E-2 for comparision of impact on average monthly customer bills.(a) Rate Commission Recommendation Report contains a 5-Year Stormwater Program vs. a 7-Year program in Alternatives II (b) Debt Service Costs do not represent total life of all bonds assumed issued. Total life of bonds is projected to end in 2046 wAppendix Reference - Sections III, IV, V; Tables 3-7, 3-8, 3-9 and 4-8$2753 Y7 Y$0 Additional Debt2 Yr WW Subsidy5 Yr SW Program$0 Additional Debt2 Yr WW Subsidy7 Yr SW Program(in Millions)8/13/2007(FY08 Increases Adopted 12/13/07)MSD RaAlt IRate CommissionRecommendation Report (a)(In Millions)Alt IIMSD BoT Introduced10/11/2007397.5$ (1.7)$ 244.8 (5.7) and III.hich adds additional debt service cost over the $641.9M shown on this table.(c) At the time the January 18, 2008 Proposed Rate Change was prepared, MSD's fiscal year 2007 was concluded. As a result the FY07 subsidy in Proposed Rate Changte is not included in describing the 3-year subsidy.M Additional Debtr WW Subsidyr SW ProgramAlt IIIte Change Notice1/18/2008 Change between Rate Commission Report and Introduced Rate Plan The changes between the Rate Commission’s August 13, 2007 Recommendation Report (Alternative I), (MSD Exhibit 2.3d) and the Rate Plan introduced by the Board on October 11, 2007 (Alternative II), (MSD Exhibit 2.3e) are as follows: (1) An extension of the stormwater rate increases from over five years to seven years, and (2) An adjustment in the effective date of the first stormwater rate increase from January 1, 2008 to March 1, 2008. These changes provided moderate rate shock relief by slowing the pace of the near term stormwater increases (see Tables D, E-1 and E-2 on pages 13, 14 and 15, respectively). The rate plan introduced on October 11, 2007 maintained the use of additional wastewater bonds at zero as recommended by the Rate Commission. Change between Introduced Rate Plan and Proposed Rate Change The changes between the Rate Plan introduced by the Board on October 11, 2007 (Alternative II), (MSD Exhibit 2.3e) and the January 18, 2008 Proposed Rate Change (Alternative III), (MSD Exhibits 2.2 and 2.3f) are as follows: (1) The use of $275 million in additional wastewater bonds; (2) An increase in total debt service costs: (a) A $27 million increase from $163 million to $190 million over the 5 year wastewater rate proposal, and (b) A 60% or $640 million increase from $1.07 billion to $1.71 billion through 2026. This incremental increase does not reflect the total debt service cost over the life of the assumed bonds which is projected to end in 2046. (3) The extension of the wastewater subsidy funding of the stormwater program from two to three years. The subsidy is eliminated by July 1, 2011. This extension results in $13 million increase in the total subsidy from $30 million to $43 million over the five year horizon of the wastewater rate proposal; (4) A $1 million reduction in the total stormwater program from $399 to $ 398 million over the seven year horizon of the stormwater rate proposal. These changes lower the near term wastewater rates and provides additional stormwater rate shock relief from that introduced by the Board on October 11, 2007. The January 18, 2008 Proposed Rate Change provides this rate relief through the proposed use of $275 million in additional wastewater bonds as compared to zero additional bonds as recommended by the Rate Commission on August 13, 2007 and originally introduced by the Board on October 11, 2007. MSD 2008 Proposed Rate Change January 18, 2008 9 Summary of Change in Debt Service – Table B Table B, page 11 compares the impact of the proposed additional use of bonds on the MSD’s debt service cost. Since both the Rate Commission Recommendation and the Rate Plan introduced by the Board on October 11, 2007 assume no additional use of bonds, the change is debt service cost solely reflects the use of additional wastewater bonds proposed in the January 18, 2008 Proposed Rate Change. As previously noted, these changes are as follows: (1) An increase in total debt service costs: a. A $27 million increase from $163 million to $190 million over the 5 year rate horizon of the Proposed Rate Change wastewater proposal, and b. A 60% or $640 million increase from $1.07 billion to $1.71 billion through 2026. This incremental increase does not reflect the total debt service cost increase over the life of the assumed bonds which is projected to end in 2046. Impact on Wastewater Rates – Table C Table C, page12 compares the change in wastewater rates between each of the rate plans considered to date as previously listed on page 7. The use of an additional $275 million in wastewater bonds assumed in the Proposed Rate Change results in a deferral of the next wastewater rate increase from July 1, 2008 to July 1, 2009. The remaining wastewater rate increases are effective each July 1st thereafter, but at lower levels than contained in the rate plan introduced by the Board on October 11, 2007. Impact on Stormwater Rates – Table D Table D, page 13 compares the change in stormwater rates between each of the rate plans considered to date as previously listed on page 7. The extension of the implementation of the stormwater rate increases from five to seven years as introduced by the Board on October 11, 2007 resulted in the slowing of the pace of stormwater increases. The January 18, 2008 Proposed Rate Change provides further rate relief in the near term with a steeper slope of stormwater rate increases in years FY12, FY13 and FY14 needed to maintain the total level of the stormwater program. Impact on Average Monthly Customer Bills – Tables E-1 and E-2 Tables E-1 and E-2 on pages 14 and 15 respectively, compares the change in the average monthly bills for each customer class in each of the rate plans considered to date as previously listed on page 7. Changes in these bills correlate with impact of the proposed additional bonds MSD 2008 Proposed Rate Change January 18, 2008 10 MSD 2008 Proposed Rate Change January 18, 2008 11TABLE BRate Change Alternatives = Indicates changeSummary of Change in Debt Service from prior alternativeJanuary 18, 2008Key Compone2008 - 2012 (ovTotal Add'l BondsDebt ServiceFYFYFY0FY1FY1FY1Long Term De (a) Adopted by implemented.(b) Represents debt (c) Debt Servic projected to end table.Appendix Reference - Sections III, IV, V; Table 3-8Alt I Alt II Alt IIIRate Comm BoTMSD RateReport Introduced Change Noticents8/13/2007 10/11/07 (a)1/18/2008er 5 Yrs) (over existing $500M)-$ -$ 275.0$ Change:BondBondBondHolders HoldersHolders07 (Existing Bonds Only)21.4$ 21.4$ 21.4$ 08 " " "26.4 26.4 26.4 9 (Beginning of New Bonds)27.1 27.1 27.7 028.8 28.8 32.3 129.5 29.5 37.6 229.4 29.4 44.2 Total 162.6$ 162.6$ 189.6$ Incremental Chg $$$ NA-$ 27.0$ % Chg NA0%17%TOTAL $$$ CHG 27.0$ Total % Chg 17%bt Service Impact:(b)(b)FY1331.2$ 31.2$ 53.2$ FY1437.2 37.2 62.8 FY1543.1 43.1 72.6 FY1647.9 47.9 81.0 FY1753.2 53.2 89.8 FY1858.4 58.4 98.0 FY1963.6 63.6 106.2 FY2068.6 68.6 114.5 FY2173.7 73.7 122.5 FY2278.6 78.6 130.6 FY2382.8 82.8 138.1 FY2487.0 87.0 145.5 FY2590.8 90.8 152.2 FY2693.8 93.8 157.8 Through 2026 (c) 1,072.5$ 1,072.5$ 1,714.4$ Incremental Chg $$$ NA-$ 641.9$ % Chg NA0%60%TOTAL $$$ CHG 641.9$ Total % Chg 60% District Board 12/13/07. Only first FY08 wastewater and stormwater rate increasesservice costs associated with bonds issued per original $500 M voter authorization.e Costs do not represent total life of all bonds assumed issued. Total life of bonds is in 2046 which adds additional debt service cost over the $641.9M shown on this(in Millions) MSD 2008 Proposed Rate Change January 18, 2008 12TABLE C = Indicates change from prior Proposal.Impact on Wastewater RatesJanuary 18, 2008SuResidential NonTotalEachEachBase ResidentialNon Metered Each Water Each SeparateRate Proposals DiscussedResidential Compliance Residential $/ccf Room Closet Bath ShowerAlt I : Rate Commission Recommendation Report 8/13/07:FY07 7.90$ 12.55$ 20.45$ 1.81$ 1.18$ 4.42$ 3.69$ 3.69$ $Proposed Effective: 12/1/07 10.70 27.35 38.05 1.88 1.23 4.59 3.83 3.83 | 7/1/08 11.85 28.35 40.20 2.13 1.39 5.20 4.34 4.34 | 7/1/09 13.10 29.65 42.75 2.37 1.55 5.79 4.82 4.82 | 7/1/10 14.25 30.90 45.15 2.59 1.69 6.32 5.27 5.27 \/ 7/1/11 14.95 32.10 47.05 2.73 1.78 6.67 5.56 5.56 Alt II: BoT Introduced 10/11/07FY07 7.90$ 12.55$ 20.45$ 1.81$ 1.18$ 4.42$ 3.69$ 3.69$ $ Adopted 12/13/07 > FY0810.70 27.40 38.10 1.88 1.23 4.59 3.83 3.83 (Effective 1/1/08) To be Adopted if Bond 7/1/08 11.85 28.35 40.20 2.13 1.39 5.20 4.34 4.34 Initiative Proposed in Rate 7/1/09 13.10 29.65 42.75 2.37 1.55 5.79 4.82 4.82 Appendix Reference - Sections III, IV, V; Table 3-19WASTEWATER RATESUnmetered - $/BillEVolume ChargesService Charges - $/BillspendedSolids BOD CODover over over300 mg/l 300 mg/l 600 mg/l218.90 461.44$ 230.72$ 218.90 529.56 264.78 220.22 600.76 300.38 239.58 659.84 329.84 260.16 722.40 361.20 270.74 752.92 376.46 218.90 461.44$ 230.72$ 218.90 529.56 264.78 220.22 600.76 300.38 239.58 659.84 329.84 Rate Amendment Fails 7/1/10 14.25 30.90 45.15 2.59 1.69 6.32 5.27 5.27 260.16 722.40 361.20 '7/1/11 14.95 32.10 47.05 2.73 1.78 6.67 5.56 5.56 270.74 752.92 376.46 Alt III: MSD Rate Change Notice 1/18/08Rates assume successful Bond ElectionFY07 7.90$ 12.55$ 20.45$ 1.81$ 1.18$ 4.42$ 3.69$ 3.69$ 218.90$ 461.44$ 230.72$ Adopted 12/13/07 > FY0810.70 27.40 38.10 1.88 1.23 4.59 3.83 3.83 218.90 529.56 264.78 (Effective 1/1/08)Proposed Effective: No change> 10.70 27.40 38.10 1.88 1.23 4.59 3.83 3.83 218.90 529.56 264.78 | 7/1/09 10.90 29.65 40.55 1.92 1.25 4.69 3.91 3.91 218.90 551.52 275.76 | 7/1/10 11.40 30.85 42.25 2.02 1.32 4.93 4.11 4.11 222.62 596.72 298.36 \/ 7/1/11 11.85 31.95 43.80 2.11 1.38 5.15 4.30 4.30 231.35 620.14 310.07 xtra Strength Surcharges - $/ton MSD 2008 Proposed Rate Change January 18, 2008 13TABLE DImpact on Stormwater Rates January 18, 2008 = Indicates change from prior Proposal.StormwaterImperviousChargeFlatAd Valorum Subdistrict(per 100Rate Proposals DiscussedCharge Taxes TaxesSq. Feet)Alt I: Rate Commission Recommendation Report 8/13/07(a) FY07 0.24$ 0.07$ 0.10$ -$ (Ends 11/30/08)Proposed Effective: 12/1/07 FY08 0.24 0.07 - 0.12 | 7/1/08 FY09 - - - 0.27 | 7/1/09 FY10 - - - 0.28 | 7/1/10 FY11 - - - 0.28 \/ 7/1/11 FY12 - - - 0.29 Alt II: BoT Introduced 10/11/07(a)(a) FY07 0.24$ 0.07$ 0.10$ -$ (Ends 2/29/08) Adopted 12/13/07 > FY080.24 0.07 - 0.12 (Effective 3/1/08)Effective: 1/1/09 FY09 - - - 0.17 1/1/10 FY10 - - - 0.20 1/1/11 FY11 - - - 0.23 1/1/12 FY12 - - - 0.25 1/1/13 FY13 - - - 0.27 1/1/14 FY14 - - - 0.29 Alt III: MSD Rate Rate Change Notice 1/18/08(a)(a)(c)FY07 0.24$ 0.07$ 0.10$ -$ (Ends 2/29/08) Adopted 12/13/07 > FY080.24 0.07 - 0.12 (Effective 3/1/08)Effective: 1/1/09 FY09 - - - 0.14 1/1/10 FY10 - - - 0.17 1/1/11 FY11 - - - 0.22 1/1/12 FY12 - - - 0.26 1/1/13 FY13 - - - 0.28 1/1/14 FY14 - - - 0.29 (a) Funding from Ad Valorum and Subdistrict (OMCI) Taxes are replaced by one impervious-based Stormwater Rate by 2009.(b) Implementation of Impervious-based Stormwater Rate extended from 5 to 7 years.(c) Stormwater Rate lowered in short-term through use of extended wastewater subsidy.Appendix Reference - Sections III, IV, V; Table 5-8Monthly ChargeTaxes(per $100 Assessed Value) MSD 2008 Proposed Rate Change January 18, 2008 14TABLE E-1 = Indicates change from prior Proposal.Impact on Average Monthly BillsResidential and Multi-Family CustomersJanuary 18, 2008Key ComponentsTotal Avg. RESIDENTIALFiscal YearEffective (a)TotalTotalWWFlat Fee Impervious Taxes (c)Bill WWFlat Fee Impervious Taxes (c)Bill WWFlat Fe FY0722.38$ 0.24$ -$ 5.83$ 28.45$ 22.38$ 0.24$ -$ 5.83$ 28.45$ 22.38$ 0$ FY08 WW 1/1/2008 25.74 5.83 31.81 25.74 < Adopted 12/13/075.83 31.81 25.74 < Adop WW 12/1/07\/SW 3/1/2008- 3.11 34.68 - 3.00 34.57 - FY09WW 7/1/2008 28.89 32.00 28.89 31.89 25.74 SW 1/1/2009- 6.67 - 35.56 - 4.25 - 33.14 - FY10WW 7/1/2009 32.06 38.73 32.06 36.31 26.26 SW 1/1/2010- 6.95 - 39.01 - 5.00 - 37.06 - FY11WW 7/1/2010 34.97 41.92 34.97 39.97 27.56 1/1/2011- 7.11 - 42.08 - 5.75 - 40.72 - FY12WW 7/1/2011 36.79 43.90 36.79 42.54 28.73 1/1/2012- 7.26 - 44.05 - 6.25 - 43.04 - FY13NA - - - 1/1/2013NA - NA6.75 - 43.54 NA - - - FY141/1/2014NTotale Impervious Taxes (c)Bill.24-$ 5.83$ 28.45$ ted 12/13/075.83 31.81 \/3.00 34.57 28.74 3.50 - 29.24 29.76 4.25 - 30.51 31.81 5.50 - 33.06 34.23 6.50 - 35.23 7.00 - 35.73 A- NA7.25 - 44.04 - Total Avg. MULTI-FAMILY Fiscal YearEffective(a)TotalTotalWWFlat Fee Impervious Taxes (c)Bill WWFlat Fee Impervious Taxes (c)Bill WWFlat Fe FY0780.30$ 0.24$ -$ 23.33$ 103.87$ 80.30$ 0.24$ -$ 23.33$ 103.87$ 80.30$ 0$ FY08 WW 1/1/2008 85.90 23.33 109.47 85.90 23.33 109.47 85.90 WW 12/1/07SW 3/1/2008- 3.36 112.59 - 3.24 112.47 - FY09WW 7/1/2008 97.05 100.41 97.05 100.29 85.90 SW 1/1/2009- 7.20 - 104.25 - 4.59 - 101.64 - 7.25 - 35.98 Totale Impervious Taxes (c)Bill.24-$ 23.33$ 103.87$ 23.33 109.47 3.24 112.47 89.14 3.78 - 89.68 FY10WW 7/1/2009 107.90 115.10 107.90 112.49 87.70 91.48 SW 1/1/2010- 7.51 - 115.41 - 5.40 - 113.30 - 4.59 - 92.29 FY11WW 7/1/2010 117.85 125.36 117.85 123.25 92.20 96.79 1/1/2011- 7.67 - 125.52 - 6.21 - 124.06 - 5.94 - 98.14 FY12WW 7/1/2011 124.15 131.82 124.15 130.36 96.25 102.19 1/1/2012- 7.84 - 131.99 - 6.75 - 130.90 - 7.02 - 103.27 FY13NA - - 1/1/2013NA - NA7.29 - 131.44 7.56 - 103.81 NA - - FY141/1/2014NA- NA7.83 - 131.98 - 7.83 - 104.08 (a) Wastewater Bill assumes 8 ccfs (Hundred Cubic Feet) per month for Residential Customers and 40 ccfs for Mult-Family Customers.(b) Stormwater Bill based on rate per $100 square feet of impervious area. Assumes 2,500 sq. ft. for Residential customers and 2,700 sq. ft. for Multi-Family Customers.1/18/200808 Increased Adopted 12/13/07)5 Million Additional DebtSW (b)SW (b)SD Rate Change NoticeAlt IIIAppendix Reference - Sections III, IV, V; Table 5-9, 5-10 and 5-11(FY08 Increased Adopted 12/13/07)(FY8/13/200710/11/2007Zero Additional DebtZero Additional Debt$27SW (b)SW (b)SW (b)(in Dollars)SW (b)(in Dollars)Rate Commission Recommendation ReportBoT IntroducedMAlt I Alt II MSD 2008 Proposed Rate Change January 18, 2008 15TABLE E-2 = Indicates change from prior Proposal.Impact on Average Monthly BillsNon-Residential and Extra Strength CustomersJanuary 18, 2008Key ComponentsTotal Avg. NON-RESIDENTIAL (a), (b)Fiscal YearEffectiveTotalTotalWWFlat Fee Impervious Taxes (c)Bill WWFlat Fee Impervious Taxes (c)Bill WWFlat F FY07242.18$ 0.24$ -$ 87.50$ 329.92$ 242.18$ 0.24$ -$ 87.50$ 329.92$ 242.18$ $ FY08 WW 1/1/2008 268.35 87.50 356.09 268.40 < Adopted 12/13/0787.50 356.14 268.40 < A WW 12/1/07\/SW 3/1/2008- 32.62 388.47 - 31.44 387.34 FY09WW 7/1/2008 301.13 333.75 301.13 332.57 268.40 SW 1/1/2009- 69.85 - 370.98 - 44.54 - 345.67 FY10WW 7/1/2009 333.08 402.93 333.08 377.62 275.75 SW 1/1/2010- 72.84 - 405.91 - 52.40 - 385.48 FY11WW 7/1/2010 362.43 435.26 362.43 414.83 289.70 1/1/2011- 74.46 - 436.89 - 60.26 - 422.69 FY12WW 7/1/2011 381.48 455.94 381.48 441.74 302.28 1/1/2012- 76.09 - 457.56 - 65.50 - 446.98 FY13NA - - - 1/1/2013NA - NA70.74 - 452.22 NA - - - FY141/1/2014NA - NA75.98 - 457.46 - Total Avg. EXTRA STRENGTH (a),(d)Fiscal YeaTotalee Impervious Taxes (c)Bill0.24-$ 87.50$ 329.92$ dopted 12/13/0787.50 356.14 \/- 31.44 387.34 299.84 - 36.68 - 305.08 312.43 - 44.54 - 320.29 334.24 - 57.64 - 347.34 359.92 - 68.12 - 370.40 73.36 - 375.64 75.98 - 378.26 rEffectiveTotalTotalWWFlat Fee Impervious Taxes (c)Bill WWFlat Fee Impervious Taxes (c)Bill WWFlat F FY07281.18$ 0.24$ -$ 87.50$ 368.92$ 281.18$ 0.24$ -$ 87.50$ 368.92$ 281.18$ $ FY08 WW 1/1/2008 311.26 87.50 399.00 311.31 < Adopted 12/13/0787.50 399.05 311.31 < A WW 12/1/07\/SW 3/1/2008- 32.62 431.38 - 31.44 430.25 FY09WW 7/1/2008 348.19 380.81 348.19 379.63 311.31 SW 1/1/2009- 69.85 - 418.04 - 44.54 - 392.73 FY10WW 7/1/2009 384.63 454.48 384.63 429.17 319.92 SW 1/1/2010- 72.84 - 457.47 - 52.40 - 437.03 FY11WW 7/1/2010 418.75 491.59 418.75 471.15 336.67 Appendix Reference - Sections III, IV, V; Tables 5-9, 5-10 and 5-11Rate Commission Recommendation ReportBoT IntroducedMAlt IAlt IISW (c)SW (c)(in Dollars)(FY08 Increased Adopted 12/13/07)8/13/200710/11/2007Zero Additional DebtZero Additional Debt$275 (in Dollars)SW (c)SW (c)Totalee Impervious Taxes (c)Bill0.24-$ 87.50$ 368.92$ dopted 12/13/0787.50 399.05 \/- 31.44 430.25 342.75 - 36.68 - 347.99 356.60 - 44.54 - 364.46 381.21 1/1/2011- 74.46 - 493.21 - 60.26 - 479.01 - 57.64 - 394.31 FY12WW 7/1/2011 440.16 514.62 440.16 500.42 351.09 408.73 1/1/2012- 76.09 - 516.25 - 65.50 - 505.66 - 68.12 - 419.21 FY13NA - - - 1/1/2013NA - NA70.74 - 510.90 73.36 - 424.45 NA - - - FY141/1/2014NA - NA75.98 - 516.14 - 75.98 - 427.07 (a) Wastewater Bill assumes 123 ccfs (Hundred Cubic Feet) per month for Non-Residential and Extra Strength Customers. Extra Strength customers assume BOD and SOD excess strength of 150 mg/l each.(b) Based on average of monthly bills for Small, Medium and Large normal strength non-residential customers (see Tables 5-10 and 5-11 in Appendix).(c) Stormwater Bill based on rate per 100 square feet of impervious area. Assumes 26,200 sq. ft. for both Non-Residential Customers and Extra Strength Customers.(d) Based on average of monthly bills for Small, Average and Large extra strength non-residential customers (see Tables 5-10 and 5-11 in Appendix).SD Rate Change NoticeAlt IIISW (c)1/18/2008Million Additional DebtSW (c) and extension of the stormwater rate implementation schedule as previously discussed in this document. Wastewater Bond Election Options – Table F Table F on page 17 presents the change in the average monthly residential bill should the proposed bond initiative be approved or rejected by St. Louis voters. If the proposed bond initiative passes, the wastewater and stormwater rates will increases as outlined in the January 18, 2008 Proposed Rate Change. Under this scenario, the next stormwater and wastewater rate increases will occur on January 1, 2009 and July 1, 2009, respectively. Should the proposed bond initiative fail, the wastewater and stormwater rate increases as contained in the rate plan introduced by the Board on October 11, 2007 will take effect. Under this scenario, the next wastewater and stormwater rate increases will occur on September 1, 2008 and January 1, 2009, respectively. Compliance with MSD Charter Section 7.270 – Criteria Governing Rates Any change in Rate recommended to the Board by the Rate Commission must meet five criteria as outlined in Section 7.270 of the Plan. In the MSD’s opinion, this Proposed Rate Change meets all required criteria as outlined below. (1) The Proposed Rate Change is consistent with constitutional, statutory and common law as amended from time to time; (2) The Proposed Rate Change enhances MSD’s ability to provide adequate sewer and drainage systems and facilities, or related services; (3) The Proposed Rate Change is consistent with and not in violation of any covenant or provision relating to any outstanding bonds or indebtedness of MSD; (4) The Proposed Rate Change does not impair the ability of MSD to comply with applicable Federal or State laws or regulations as amended from time to time, and (5) The Proposed Rate Change imposes a fair and reasonable burden on all classes of ratepayers. MSD 2008 Proposed Rate Change January 18, 2008 16 MSD 2008 Proposed Rate Change January 18, 2008 17TABLE F = Indicates change from Option AWastewater Bond Option January 18, 2008AdoptedAdopted12/13/200712/13/2007Total Bond YR 1 YR 2 YR 5 YR 7 YR 1Customer ClassAuthorization 2008 2009 2012 2014 2008275,000,000$ Wastewater:Residential25.74$ 25.74$ 28.73$ NA 25.74$ Appendix Reference - Section III and IV; Tables 3- 7, 5-9, 5-10 and 5-11WithWW BondsOPTION AAverage Monthly Customer BillYR 2 YR 5 YR 72009 2012 201428.89$ 36.79$ NAMulti-Family85.90 85.90 96.25 85.90 97.05 124.15 Non-Residential - Normal Strength268.40 268.40 302.28 268.40 301.13 381.48 Non-Residential - Extra Strength311.31 311.31 351.09 311.31 348.19 440.16 Stormwater:Residential3.00$ 3.50$ 6.50$ 7.25$ 3.00$ 4.25$ 6.25$ 7.25$ Multi-Family3.24 3.78 7.02 7.83 3.24 4.59 6.75 7.83 Non-Residential - Normal Strength31.44 36.68 68.12 75.98 31.44 44.54 65.50 75.98 Non-Residential - Extra Strength31.44 36.68 68.12 75.98 31.44 44.54 65.50 75.98 WithoutWW BondsOPTION B Compliance with Rate Commission Operational Rules, Regulations and Procedures Section 3(2) (adopted 1/18/08) Per Section 3(2) for the Rate Commission’s Operational Rules, Regulations and Procedures as adopted at its January 18, 2008 meeting, the items (a) through (h), listed below, will be addressed in MSD’s Direct Testimony to be submitted by January 24, 2008 as also dictated by Section 3(2). Items (a) – (h) per Section 3(2): (a) Why the Proposed Rate Change set forth in the Rate Change Notice is necessary, fair and reasonable; (b) How the Proposed Rate Change will enhance the District’s ability to provide adequate sewer and drainage systems and facilities, or related services; (c) Whether and to what extent the Proposed Rate Change is necessary to enable the District to comply with any covenant or provision relating to any outstanding bonds or indebtedness of the MSD, together with a specific quantification of the amount of the Proposed Rate Change that is necessary for such purposes; (d) Whether and to what extent the Proposed Rate Change is necessary to enable the District to comply with applicable federal or State laws or regulations as amended front time to time, together with a specific quantification of the amount of the Proposed Rate Change that is necessary for such purposes; (e) Why the burden imposed on each class of ratepayers by the Proposed Rate Change is fair and reasonable, including whether and how cost of service considerations, cost causation principles, customer impact data, economic development considerations, environmental effects and other factors have or have not been factored into such determination; (f) The measures taken by the District to ensure that the cost of constructing and maintaining the MSD’s facilities and providing related services are being incurred in a reasonable and efficient manner, including copies of all internal and external audit reports that address such matters; (g) The name, address and telephone number of each person submitting and sponsoring such direct testimony, and (h) If the Rate Setting Documents are voluminous in nature, such Documents may be referenced and described in the District’s direct testimony, provided that copies of such Documents shall be made available to any Commission member upon request. MSD 2008 Proposed Rate Change January 18, 2008 18 MSD is prepared to advertise public notice of this Proposed Rate Change as required by Section 7.280 (b) of the Plan upon submittal of the Proposed Rate Change to the Rate Commission. Conclusion As this Proposed Rate Change and its referenced support material indicate, MSD is in need of a series of prompt wastewater and stormwater rate changes to address funding needs quickly looming on the horizon. This Proposed Rate Change will provide District rate payers a choice of meeting the wastewater funding challenges facing the St. Louis region over the next five years through the PAYGO option introduced by the Board on October 11, 2007 or the use of a combination of debt and PAYGO to provide temporary near term rate relief and distribute annual capital costs between current and future ratepayers. For these reasons, MSD respectfully submits this Proposed Rate Change to the Rate Commission for full and prompt consideration. The Proposed Rate Change and supporting Appendix have also been distributed to the MSD Board Trustees for informational purposes. Questions regarding this proposal should be directed to Mr. Jeffrey Theerman, Executive Director, (314-768-6201), jthee@stlmsd.com, or Ms. Janice M. Zimmerman, Director of Finance (314-768-6299), jzimmer@stlmsd.com. . MSD 2008 Proposed Rate Change January 18, 2008 19 Proposed Rate Change Appendix The Proposed Rate Change Appendix (accompanying separate document) contains a complete set of rate tables supporting each of the rate change proposals outlined in this document as generated by the MSD’s rate model. The sections of the Appendix are as follows: I. Rate Commission MSD Exhibit Index – Deliberations ending August 13, 2007. II. Journal of Board action pertinent to the Proposed Rate Change. III. Rate Tables ALT I – Rate Commission Recommendation Report – August 13, 2007. IV. Rate Tables ALT II - Rate Change Introduced by Board – October 11, 2007. Appendix Section II also contains the first year of wastewater and stormwater rates adopted by Board on December 13, 2007. It should be noted, years two (FY09) through seven (FY14) of this rate plan will only be implemented should the bond initiative proposed in the Proposed Rate Change be rejected by St. Louis voters. V. Rate Tables ALT III – MSD Rate Change Proposed Rate Change – January 18, 2008. In order to simplify review of this material, the listing below indicates those rate tables containing changes from the prior chronological rate alternative within this Appendix. RCR = Rate Commission Recommendation Report (Section III) BoT = Rate Plan Introduced by Board (Section IV) PRC = Proposed Rate Change (Section V) Table Changes ALT I to ALT II ALT II to ALT III (RCR) (BoT) (BoT) (PRC) 2-7 2-8 3-7 3-8 3-9 3-9 3-10 3-11 3-13 3-15 3-16 3-17 3-19 3-19 3-20 4-4 4-4 4-6 4-6 4-8 4-8 All Tables in All Tables in Section 5 Section 5 MSD 2008 Proposed Rate Change January 18, 2008 20 Proposed Rate Change Appendix TABLE OF CONTENTS Metropolitan St. Louis Sewer District Proposed Rate Change Appendix Rate Change Exhibit Index – Deliberations ending August 13, 2007................................................Section I Journal of District Board action pertinent to the Proposed Rate Change.........................................Section II Rate Tables ALT I - Rate Commission Recommendation Report - August 13, 2007 ....................Section III Rate Tables ALT II - Rate Change Introduced by District Board - October 11, 2007......................Section IV Appendix Section II also contains the first year of wastewater and stormwater rates adopted by District Board on December 13, 2007. It should be noted, years two (FY09) through seven (FY14) of this rate plan will only be implemented should the bond initiative proposed in the Proposed Rate Change be rejected by St. Louis voters. Rate Tables ALT III - MSD Rate Change Proposed Rate Change - January 18, 2008 ...................Section V In order to simplify review of this material, the listing below indicates those rate tables containing changes from the prior chronological rate alternatives within this Appendix. RCR = Rate Commission Recommendation Report (Section III) BoT = Rate Plan Introduced by District Board (Section IV) PRC = Proposed Rate Change (Section V) Table Changes ALT I to ALT II ALT II to ALT III (RCR) (BoT) (BoT) (PRC) 2-7 2-8 3-7 3-8 3-9 3-9 3-10 3-11 3-13 3-15 3-16 3-17 3-19 3-19 3-20 4-4 4-4 4-6 4-6 4-8 4-8 All Tables in All Tables in Section V Section V Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies1. MSD Wastewater and Stormwater Rate Change Proposal document MSD 1 X 3/2/2007TBRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (4); Court Reporter (2); General Public As Needed2. Rate Change Notice Cover Letters from Jeff Theerman:A. Cover Letter from J.Theerman to BoT Chair MSD 1A X 3/2/2007JThMSD BoT Members (6); MSD Staff (11)B. Cover Letter from J. Theerman to Rate Commission ChairMSD 1B Moved to MSD DX 3/2/2007JThRate Commission (15); RC Attorneys (2); Copies for BoT Members (6); MSD Staff (11)3. Rate Commission Exhibit IndexMSD 1C Moved to MSD EX 3/2/2007JF4. PowerPoint Rate Proposal presentation to MSD BoT January 11, 2007 MSD 2 X 3/2/2007TBRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (4); Court Reporter (2); General Public As Needed5. Phase II CIRP Project List (2007 - 2012) MSD 3 X 3/2/2007BHRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (7); MSD Rate Consultants (2); Court Reporter (2)6. Rate Model Workpapers (per Theresa Bellville) NA 3/2/2007TBMSD Staff (4); MSD Rate Consultants (2)7. All Rate Model Tables (hard copy print out) MSD 4 X 3/2/2007TBRC Rate Consultants (1); MSD Staff & Rate Consultants (1)8. All Rate Model Formulas (hard copy print out) MSD 5 X 3/2/2007TBRC Rate Consultants (1 +CD); MSD Staff & Rate Consultants (1)9. CDM I&I Study Documents:TBRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (7); MSD Rate Consultants (2); Court Reporter (2)A. Rate Commission Requested Policy Analysis - January 2005 MSD 6 X 3/2/2007||B. Wet Weather Flow Cost Allocation Study EXECUTIVE SUMMARY - January 2005 MSD 6A X 3/2/2007||C. Wet Weather Flow Cost Allocation Study - January 2005 MSD 6B X 3/2/2007||D. PowerPoint Presentation: Wet Weather Flow Allocation Study and Other Rate|| Commission Policy Issues MSD 6C X 3/2/2007\/\/10. 2003 Rate Commission Recommendation Report (Prior Deliberations) MSD 7 X 3/2/2007KTRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (7); MSD Rate Consultants (2); Court Reporter (2)11. Bond Feasiability Study - Revenue Bond Series 2006C (Most Recent) MSD 8 X3/2/2007KTRC Rate Consultants (2); MSD Staff (3); MSD Rate Consultants (2)12. Bond Covenant Summary MSD 9 X 3/2/2007KTRC Rate Consultants (2); MSD Staff (3); MSD Rate Consultants (2)13. Rating Agency Summaries (As of Nov. 2006, Moody's; S&P; Fitch's) MSD 10 X 3/2/2007KTRC Rate Consultants (2); MSD Staff (3); MSD Rate Consultants (2)14. FY07 Budget Documents:RC Rate Consultants (2); MSD Staff (2); MSD Rate Consultants (2)A. Operating Budget Document MSD 11 X 3/2/2007TB|B. CIRP Budget Document MSD 11A X 3/2/2007TB\/15. PowerPoint Rate Proposal Presentation to Rate Commission March 2, 2007 MSD 12 X 3/6/2007JThRate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)16. Rate Proposal Group Meetings (Jeff Theerman)MSD 13 Moved to MSD FX 3/6/2007JThRate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)17. Rate Commission Procedural ScheduleL&B 14 Moved to L&B AX 3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)18. Rate Commission Operational Rules, Regulations and ProceduresL&B 15 Moved to L&B BX 3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)19. Public NoticeL&B 16 Moved to L&B CX 3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2) Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies20. Direct Testimony Question Matrix MSD 17 X 3/7/2007JZRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (2); Court Reporter (2)A. Direct Testimony: Jeffrey Theerman, MSD MSD 17A X 3/7/2007||B. Direct Testimony: Randy Hayman, MSD MSD 17B X 3/7/2007||C. Direct Testimony: Jan Zimmerman, MSD MSD 17C X 3/7/2007||D. Direct Testimony: Brian Hoelscher, MSD MSD 17D X 3/7/2007||E. Direct Testimony: David St. Pierre, MSD MSD 17E X 3/7/2007||F. Direct Testimony: Karl Tyminski, MSD MSD 17F X 3/7/2007||G. Direct Testimony: Steve Sedgwick, CDM MSD 17G X 3/7/2007||H. Direct Testimony: Keith Barber, Black & Veatch MSD 17H X 3/7/2007|| Formal Submission Cover Memo to Nancy Bowser, RC Secretary MSD 17I X 3/7/2007\/\/21. 2005 Stormwater Utility Survey MSD 18 X 3/8/2007JFRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (2); Court Reporter (2)22. Rate Commission Exhibit Index - UPDATEDMSD 19 Moved to MSD GX 3/8/2007JFRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (2); Court Reporter (2)23. Discovery Request L&B 3/27/07L&B 20(1)X 3/27/2007L&B MSD Response to Discovery Request L&B 3/27/07 MSD 20 X 4/6/2007JZRate Commission Secretary (1); RC Attorney (1); RC Rate Consultant (1); MSD Rate Consultants 4/9/07 (2); Interveners 4/11/07 (5)Exhibit Index MSD Response to Discovery Request 3/27/07 MSD 20A X 4/6/2007||MSD Finance Plan MSD 20B X 4/6/2007||Bond Document 2006B MSD 20C X 4/6/2007||Bond Document 2004B MSD 20D X 4/6/2007||Bond Document 2006A MSD 20E X 4/6/2007||Bond Document 2004A MSD 20F X 4/6/2007||Bond Document 2005A MSD 20G X 4/6/2007||Gilmore & Bell Letter MSD 20H X 4/6/2007||Summary of Bond Covenants MSD 20I X 4/6/2007||MSD User Charge Rate Affordability Study MSD 20J X 4/6/2007||Rate Proposal - Alternative Scenarios with Additional Bonds MSD 20K X 4/6/2007||06/07 Operations Budget-Monnie Projects MSD 20L X 4/6/2007||MSD 20M X 4/6/2007||Flow Chart for the State Revolving Fund MSD 20N X 4/6/2007||Master Bond Certificate MSD 20O X 4/6/2007||2007 Median Ratios for Water Sewer Revenue Bonds MSD 20P X 4/6/2007||Fitch MSDF Debt Assumptions MSD 20Q X 4/6/2007||Fitch Calculations MSD 20R X 4/6/2007||1377th Meeting of the Board of Trustees Agenda MSD 20S X 4/6/2007||1378th Journal Certification MSD 20T X 4/6/2007||1389th Meeting of the Board of Trustees Agenda MSD 20U X 4/6/2007||2507th Certified Resolution MSD 20V X 4/6/2007||CAFR 2005 MSD 20W X 4/6/2007||CAFR 2006MSD 20X X 4/6/2007||Ordinance 12221 MSD 20Y X 4/6/2007||Certificate Ordinance 12221 MSD 20Z X 4/6/2007||Certified Resolution 2643 MSD 20A1 X 4/6/2007||Stormwater Uilities by States and Provinces MSD 20A2 X 4/6/2007||Representative Stormwater Utility Experience MSD 20A3 X 4/6/2007||Storm Water Activities Funding Survey Results MSD 20A4 X 4/6/2007||Florida Stormwater Utility Rates MSD 20A5 X 4/6/2007||Stormwater Utility Rates in Iowa MSD 20A6 X 4/6/2007||Stormwater Utility Rates in Tennessee MSD 20A7 X 4/6/2007||Stormwater Utility Rates in Illinois MSD 20A8 X 4/6/2007||Comparison of Wisconsin Stormwater Utilities MSD 20A9 X 4/6/2007||MSD 20A10 X 4/6/2007||MDNR Clean Water State Revolving Fund Intended Use Plan, State Grant and Loan Priority List and Program Application Forms & InstructionsMonthly NC Stormwater Fees for an Average Single-Family Detached Residential Unit Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of CopiesTable 2 University of South Carolina MSD 20A11 X 4/6/2007||2005 Stormwater Utility Survey MSD 20A12 X 4/6/2007||Table 1 Summary of Municipal Stormwater Fee Structures in Canada MSD 20A13 X 4/6/2007||Percent II Workpapers MSD 20A14 X 4/6/2007||Supporting Documents - City and County Assessors' Offices MSD 20A15 X 4/6/2007||Ordinance 9183 MSD 20A16 X 4/6/2007||Ordinance 9030 MSD 20A17 X 4/6/2007||Water Priority System MSD 20A18 X 4/6/2007||AMSA 1999 Financial Survey MSD 20A19 X 4/6/2007||MOU - Local 513; MOU - Local 2000 MSD 20A20 X 4/6/2007||GASB 45 Projection MSD 20A21 X 4/6/2007||NACWAMSD 20A22 X 4/6/2007||Meramec Project March 31, 2003 MSD 20A23 X 4/6/2007||Meramec Project June 30, 2003 MSD 20A24 X 4/6/2007||Meramec Project October 31, 2003 MSD 20A25 X 4/6/2007||Meramec Project February 29, 2004 MSD 20A26 X 4/6/2007||Meramec Project June 30, 2004 MSD 20A27 X 4/6/2007||Meramec Project March 31, 2005 MSD 20A28 X 4/6/2007||Meramec Project December 31, 2005 MSD 20A29 X 4/6/2007||Internal Audit Review Construction Review FY 2006 MSD 20A30 X 4/6/2007||Delinquent Accounts and Billing Adjustments MSD 20A31 X 4/6/2007||Collections Perspective Aging of Sewer Service MSD 20A32 X 4/6/2007||Finance Activity Update FY07 2nd Quarter Performance MSD 20A33 X 4/6/2007||Low Income Program Cost Analysis MSD 20A34 X 4/6/2007||Low Income Program Workpapers MSD 20A35 X 4/6/2007||EPA 122.26MSD 20A36 X 4/6/2007||EPA 122.32MSD 20A37 X 4/6/2007||EPA 122.33MSD 20A38 X 4/6/2007||EPA 122.34MSD 20A39 X 4/6/2007||EPA 122.41MSD 20A40 X 4/6/2007||EPA 122.41MSD 20A41 X 4/6/2007||CSR DNRMSD 20A42 X 4/6/2007||Missouri State Operating Permit MO-R100010 MSD 20A43 X 4/6/2007||Missouri State Operating Permit MO-R040005 MSD 20A44 X 4/6/2007||St. Louis County Phase II Storm Water Management Plan MSD 20A45 X 4/6/2007||Federal CSO Policy MSD 20A46 X 4/6/2007||Revised Long-Term CSO Control Plan MSD 20A47 X 4/6/2007||Ordinance 11713 MSD 20A48 X 4/6/2007||Lower Meramec Settlement Agreement with MDNR MSD 20A49 X 4/6/2007||Settlement Agreement dated July 29, 2002 MSD 20A50 X 4/6/2007||Modification to July 29, 2002 Settlement Agreement MSD 20A51 X 4/6/2007|Significant Events NPDES Compliance MSD 20A52 X 4/6/2007||Major Challenges Regulatory Quality Control Compliance MSD 20A53 X 4/6/2007||Latest Draft of Proposed CMOM Rules MSD 20A54 X 4/6/2007||MSD 20A55 X 4/6/2007||Stormwater Project Database MSD 20A56 X 4/6/2007||1993 Rate Report MSD 20A57 X 4/6/2007||New York City Water Board Water and Wastewater Rate Schedule MSD 20A58 X 4/6/2007||Ordinance 7543 MSD 20A59 X 4/6/2007||Business Case (Operating Budget) MSD 20A60 X 4/6/2007||Stormwater User Charge Study August 2003 MSD 20A61 X 4/6/2007||Stormwater Advisory Committee Reports MSD 20A62 X 4/6/2007||Report from the Stormwater Advisory Committee MSD 20A63 X 4/6/2007||Certificate Stormwater Committee Minutes MSD 20A64 X 4/6/2007\/\/Note: All Exhibits to date distributed to Interveners 4/11/07Guide of Evaluating Capacity, Management, Operation and Maintenance Program (CMOM) Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies24. Amendment to Direct Testimony of Randy Hayman MSD 21 X 4/18/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD Directors Via Electronic Mail; Court ReporterMSD 21A X 4/18/2007||Amendment to Direct Testimony of Jeff Theerman MSD 21B X 4/18/2007||Amended Direct Testimony Question Matrix MSD 21C X 4/18/2007\/\/MSD 22 X 4/23/2007KTRate Commission Secretary (1); RC Attorney (1); RC Rate Consultant (1); MSD Rate Consultants (2); Interveners (5); Court ReporterThe St. Louis American 3/15/07 MSD 22A X 4/23/2007|\/St. Louis Post-Dispatch MSD 22B X 5/8/2007KTRC Attorney (1)Arch City Chronicle MSD 22C X 5/8/2007||St. Louis Chinese American News MSD 22D X 5/8/2007||Call Publishing Inc. MSD 22E X 5/8/2007||St. Louis American 3/29/07 MSD 22F X 5/8/2007\/\/26. Discovery Request Monarch-Chesterfield 4/11/07 MON 23(1) X 4/11/2007MON MSD Response to Discovery Request Monarch-Chesterfield 4/11/07 MSD 23 X 4/23/2007JZRate Commission Secretary (1); RC Attorney (1); RC Rate Consultant (1); MSD Rate Consultants (2); Interveners (5); Court ReporterExhibit Index MSD Response to Discovery Request 4/11/07 MSD 23A X 4/23/2007||Facility Map of Monarch-Chesterfield Levee District MSD 23B X 4/23/2007||Facility Map of Howard Bend Levee District MSD 23C X 4/23/2007||Facility Map of Earth City Levee; Facility Map of Riverport Levee District MSD 23D X 4/23/2007||Work Order Listing MSD 23E X 4/23/2007||Ordinance 9030 (Certified) MSD 23F X 4/23/2007||MSD Dept. Direct Operating Cost Allocation Workpapers MSD 23G X 4/23/2007||Fin/IS Projected SW Operating Costs MSD 23H X 4/23/2007||Adjustments and Credit Policy Modifications Levee District 23I X 4/23/2007||2003 & 2006 Credit Policy Support Allocations MSD 23J X 4/23/2007||SW Advisory Committee Report MSD 23K X 4/23/2007||SW Advisory Committee Composition MSD 23L X 4/23/2007\/\/Amendment to MSD Response 4/23/07 to Discovery Request Monarch 4/11/07 MSD 23M X 5/2/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court Reporter27. WEF Financing and Charges for Wastewater Systems MSD 24 X 4/23/2007JZRate Commission Secretary (1); RC Attorney (1); RC Rate Consultant (1); MSD Rate Consultants (2); Interveners (5); Court Reporter28. Discovery Request AGC/SITE 4/17/07 AGC/SITE 25(1) X 4/17/2007AGC/SITE MSD Response to Discovery Request AGC/SITE 4/17/07 MSD 25 X 4/24/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court Reporter29. Discovery Request MEG 4/16/07 MEG 26(1) X 4/16/2007MEG MSD Response to Discovery Request MEG 4/16/07 MSD 26 X 4/26/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to Discovery Request 4/16/07 MSD 26A X 4/26/2007||MSD 40 Year Preliminary User Charge Rate Projection MSD 26B X 4/26/2007||Debt Alternatives MSD 26C X 4/26/2007||Plant FlowsMSD 26DX4/26/2007\/\/30. Second Discovery Request AGC/SITE 4/23/07 AGC/SITE 27(1)X4/23/2007AGC/SITE MSD Response to 2nd Discovery Request AGC/SITE 4/23/07 MSD 27 X 5/1/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 2nd Discovery Request AGC/SITE 4/23/07 MSD 27A X 5/1/2007||CDM Comparable Utilities Stormwater Credit Provision Historical Data Reports MSD 27B - MSD 27B13 X 5/1/2007\/\/Amendment to MSD Response 5/1/07 to Discovery Request AGC/SITE 4/23/07 MSD 27C X 5/7/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index to MSD Amended Response to Discovery Request 4/23/07 MSD 27D X 5/7/2007||Stormwater Credit and Procedure Manuals MSD 27E - MSD 27E11 X 5/7/2007\/\/25. Affadavit - St. Louis Business JournalNotice of Intent to Bring Civil Suit under 33 U.S.C 1363 for Violations of the Clean Water Act Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies31. Discovery Request MIEC 4/23/07 MIEC 28(1) X 4/23/2007MIEC MSD Response to Discovery Request MIEC 4/23/07 MSD 28 X 5/3/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to Discovery Request MIEC 4/23/07 MSD 28A X 5/3/2007||Rate Model Table K-3 MSD 28B X 5/3/2007||FY03, FY04, & FY05 MSD Annual Reports MSD 28C - 28C2 X 5/3/2007||Debt Rating Support Documents MSD 28D - 28D4 X 5/3/2007||Fitch Median Ratios for Water and Sewer Revenue Bonds MSD 28E X 5/3/2007||Rate Commission 5 Year Plan MSD 28F X 5/3/2007\/\/32. Second Discovery Request MEG 4/25/07 MEG 29 (1) X 4/25/2007MEG MSD Response to 2nd Discovery Request MEG 4/25/07 MSD 29 X 5/7/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 2nd Discovery Request MEG 4/25/07 MSD 29A X 5/7/2007||Exhibit # MSD 20J in Microsoft Excel electronic format MSD 29B & MSD 29B1 X 5/7/2007||Table 3.7MSD 29C X 5/7/2007||Dropped Projects MSD 29D X 5/7/2007||MSD BoT Finance Committee Minutes / PFM Draft Finance Plan MSD 29E X 5/7/2007||Financial Ratios MSD 29F X 5/7/2007||CIRP Project Average Depreciation Life MSD 29G X 5/7/2007\/\/33. Second Discovery Request L&B 4/25/07 L&B 30 (1) X 4/25/2007L&B MSD Response to 2nd Discovery Request L&B RC 4/25/07 MSD 30 X 5/7/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD Directors; Court ReporterExhibit Index MSD Response to 2nd Discovery Request L&B RC 4/25/07 MSD 30A X 5/7/2007||CDM Resistance Factor Workpapers MSD 30B X 5/7/2007||MSD 2008 - 2012 Strategic Operating Plan MSD 30C X 5/7/2007||CDM Comparable Utilties Bad Debt Provision Historical Data Reports MSD 30D - 30D13 X 5/7/2007||Ordinance 9031 MSD 30E X 5/7/2007||Ordinance 12356 MSD 30F X 5/7/2007||Updated Treatment Plant Facility Plans MSD 30G - MSD 30G5 X 5/7/2007||EPA Section 308 Letters MSD 30H & 30H1 X 5/7/2007||SKME ReportMSD 30I X 5/7/2007||Ordinance 8656 MSD 30J X 5/7/2007||Ordinance 9249 MSD 30K X 5/7/2007||Ordinance 10007 MSD 30L X 5/7/2007||MSD 30M - 30M5 X 5/7/2007\/\/34. Second Discovery Request Monarch 4/27/07 MON 31(1) X 4/27/2007MON MSD Response to 2nd Discovery Request Monarch 4/27/07 MSD 31 X 5/1/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD Directors; Court Reporter35. Second Discovery Request MIEC 4/30/07 MIEC 32(1) X 4/30/2007MIEC MSD Response to 2nd Discovery Request MIEC 4/30/07 MSD 32 X 5/7/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD Directors; Court ReporterCOHEN 33 X 5/2/2007COHENHard Copy Available for RC at 2350 Market Street37. Rebuttal - Monarch: Testimony of Robert G. Butchko MON 34 X 5/2/2007MON|Testimony of Ryan Hodges MON 34A X 5/2/2007MON|38. Rebuttal - MEG: Testimony of Drazen Consulting Group MEG 35 X 5/2/2007MEG|39. Rebuttal - MIEC - Testimony of Michael Gorman MIEC 36 X 5/2/2007MIEC|40. Rebuttal - L&B - Testimony of William Stannard L&B 37 X 5/2/2007L&B|William Stannard Bio L&B 37A X 5/2/2007L&B|Resistance Factor Analysis L&B 37B X 5/2/2007L&B|City of Portland Oregon Bond Series 2007 Series A L&B 37C X 5/2/2007L&B|City Sewer Bond Ratings Upgraded L&B 37D X 5/2/2007L&B|Table 3-7L&B 37E X 5/2/2007L&B\/36. Rebuttal - Testimony of Intervenor Michael CohenMSD Wastewater Revenue Bonds, Series 2006C Closing Certificate and Opinion of Counsel to the Board Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies41. Third Discovery Request MEG 5/10/07 MEG 38(1) X 5/10/2007MEG MSD Response to 3rd Discovery Request MEG 5/10/07 MSD 38 X 5/21/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 3rd Discovery Request MEG 5/10/07 MSD 38A X 5/21/2007||Rate Model Table G-15 MSD 38B X 5/21/2007\/\/42. Third Discovery Request AGC/SITE 5/11/07 AGC/SITE 39(1) X 5/11/2007AGC/SITE MSD Response to 3rd Discovery Request AGC/SITE 5/11/07 MSD 39 X 5/21/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 3rd Discovery Request AGC/SITE 5/11/07 MSD 39A X 5/21/2007||Charter (Plan) of the Metropolitan St. Louis Sewer District MSD 39B X 5/21/2007\/\/43. Fourth Discovery Request MEG 5/18/07 MEG 40(1) X 5/15/2007MEG MSD Response to 4th Discovery Request MEG 5/18/07 MSD 40 X 5/22/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 4th Discovery Request MEG 5/18/07 MSD 40A X 5/22/2007||Estimated Stormwater Charges MSD 40B X 5/22/2007\/\/Amended Response to 4th Discovery Request MEG 5/18/07 MSD 40D X 5/24/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterProposed Wastewater (WW) Rates Projection MSD 40C X 5/24/2007\/44. Third Discovery Request L&B 5/14/07 L&B 41(1) X 5/14/2007L&B MSD Response to 3rd Discovery Request L&B 5/14/07 MSD 41 X 5/22/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterExhibit Index MSD Response to 3rd Discovery Request RC L&B 5/14/07 MSD 41A X 5/22/2007||Comparitive CIRP Level MSD 41B X 5/22/2007\/\/45. Surrebuttal Testimony Question Matrix MSD 42 X 5/23/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterFormal Submittal Document of Surrebuttal Testimony MSD 42A X 5/23/2007|| A. Testimony: Jeffrey Theerman, MSD MSD 42B X 5/23/2007|| B. Testimony: Jan Zimmerman, MSD MSD 42C X 5/23/2007|| C. Testimony: Brian Hoelscher, MSD MSD 42D X 5/23/2007|| D. Testimony: Karl Tyminski, MSD MSD 42E X 5/23/2007|| E. Testimony: Steve Sedgwick, CDM MSD 42F X 5/23/2007|| F. Testimony: Keith Barber, B&V MSD 42G X 5/23/2007||Financing Alternatives MSD 42H X 5/23/2007||B&V Drazen Surrebuttal Cost Analysis MSD 42I X 5/23/2007||Fitch Ratings 2005 Special Report MSD 42J X 5/23/2007||Standard & Poors 2004 Research Report MSD 42K X 5/23/2007||1984 Wastewater Rate Design Manual MSD 42L X 5/23/2007||M1 Water Rates Manual MSD 42M X 5/23/2007||2007 Median Bond Ratios MSD 42N X 5/23/2007\/\/46. Surrebuttal - Michael Gorman MIEC 43 X 5/23/2007MIECEmailed to All by MIEC47. Discovery Request AGC/SITE to Monarch-Chesterfield Levee District 5/11/07 AGC/SITE 44(1) X 5/11/2007AGC/SITE Response to AGC Discovery Request to Monarch-Chesterfield Levee District MON 44 X 5/23/2007MONRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court ReporterEarth City Levee District MON 44A X 5/23/2007||Riverport Levee District MON 44B X 5/23/2007||Howard Bend Levee District MON 44C X 5/23/2007\/\/48. Letter from John B. Askew EPA MSD 45 X 5/24/2007JThRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail; Court Reporter49. Letter from Kurt U. Schaefer DNR MSD 46 X 6/1/2007JThRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail50. MSD Prehearing Conference Report Summary MSD 47 X 6/11/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail51. Public Hearing 6/7/07 Fishpot Creek Photos - Pepperdine Ct. PEPPERDINE 48 X 6/18/2007Rate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail52. Public Hearing 6/9/07 Pepperdine Ct. Videos PEPPERDINE 49 X 6/18/2007MSD DirectorsVia Electronic Mail; RC Rate Consultant; MSD Rate Consultants (2); RC Attorney (1) Interveners (5) 6/20/07 Exhibit MSD 2.3bRate Commission SubmittalFINAL Rate Setting Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepRecipient(s)Submittal Materials:NumberSubmitted DateOwner# of Copies53. MEG Prehearing Conference Report Summary MEG 50 X 6/11/2007MEGRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail54. L&B Prehearing Conference Report Summary L&B 51 X 6/11/2007L&BRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail55. MSD Prehearing Conference Report MSD 52 X 6/18/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailUSA & The State of Missouri v. MSD MSD 52A X 6/18/2007||Fitch Ratings March 22, 2007 Report MSD 52B X 6/18/2007||S&P June 1, 2007 Report MSD 52C X 6/18/2007\/\/56. L&B Prehearing Conference Report L&B 53 X 6/18/2007L&BRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail57. MIEC Prehearing Conference Report MIEC 54 X 6/18/2007MIECRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail58. COHEN Prehearing Conference Report COHEN 55 X 6/18/2007COHENRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail59. Monarch-Chesterfield Levee District Prehearing Conference Report MON 56 X 6/18/2007MONRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail60. AGC/SITE Prehearing Conference Report AGC/SITE 57 X 6/18/2007AGC/SITERate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail61. MEG Prehearing Conference Report MEG 58 X 6/18/2007MEGRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail62. EPA Testimony before RC @ 6/14/07 Public Hearing EPA 59 X 6/20/2007EPARate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail63. Public Hearing 6/14/07 Grand Glen Document & Photos GRAND GLEN 60 X 6/25/2007Rate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail64. Final Exhibit Index Submittal June 26, 2007 MSD 61 X 6/26/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail65. MSD Final Closing Arguments MSD 62 X 7/6/2007JZ66. AGC/SITE Closing Argument AGC/SITE 63 X 7/6/2007AGC/SITERate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail67. Proposed Intergovernmental Cooperation Agreement between MSD and Levee DistrictsMON 64 X 7/12/2007MONRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail68. MSD Response to AGC/SITE Closing Arguments MSD 65 X 7/11/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailMIEC 66 X 7/11/2007MIECRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailMEG 67 X 7/11/2007MEGRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail71. Adjusted FINAL Exhibit Index MSD 68 X 7/12/2007JFRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailMSD 69 X 7/23/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailMSD 70 X 8/6/2007JZRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic MailMEG 71 X 8/8/2007MEGRate Commission; RC Attorney (2); RC Rate Consultant; MSD Rate Consultants (2);Interveners (5); MSD DirectorsVia Electronic Mail74. MEG Analysis73. MSD Fiscal Note72. MSD' s 7/23/07 Rate Commission Deliberation Letter 69. MIEG Response to AGC/SITE Closing Arguments70. MEG Response to AGC/SITE Closing Arguments Exhibit MSD 2.3bRate Commission SubmittalAdministrative Document IndexDeliberations ending August 13, 2007Original EXHIBIT # MSD 68ExhibitOriginals DistributionPrepSubmittal Materials: NumberSubmitted DateOwner# of Copies1. Rate Change Notice Cover Letters from Jeff Theerman:B. Cover Letter from J. Theerman to Rate Commission Chair MSD 1BMoved to Admn Index Exibit MSD D3/2/2007JThRate Commission (15); RC Attorneys (2); Copies for BoT Members (6); MSD Staff (11)2. Rate Commission Exhibit Index MSD 1CMoved to Admn Index Exibit MSD E3/2/2007JF3. Rate Proposal Group Meetings (Jeff Theerman) MSD 13Moved to Admn Index Exibit MSD F3/6/2007JThRate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)4. Rate Commission Procedural Schedule L&B 14Moved to Admn Index Exibit L&B A3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)5. Rate Commission Operational Rules, Regulations and Procedures L&B 15Moved to Admn Index Exibit L&B B3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)6. Public Notice L&B 16Moved to Admn Index Exibit L&B C3/6/2007JFARate Commission (15); RC Attorneys (2); MSD Staff (10); Court Reporter (2)7. Rate Commission Exhibit Index - UPDATED MSD 19Moved to Admn Index Exibit MSD G3/8/2007JFRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (2); Court Reporter (2)8. 2007 Rate Deliberation Interveners MSD HX4/11/2007JFRate Commission (15); RC Attorneys (2); RC Rate Consultant (2);MSD Staff (10); MSD Rate Consultants (2); Court Reporter (2); Intervenors 9. Resolution of the Rate Commission (Executed) L&B IX4/26/2007JFARate Commision Secretary (1); MSD Office File (1)10. Transcript of Technical Conference April 19, 2007 MSD JX5/2/2007PBRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors 11. Transcript for Technical Conference April 20, 2007 MSD KX5/8/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors 12. Transcript for Technical Conference May 9, 2007 MSD LX5/15/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors 13. Transcript for Technical Conference May 10, 2007 MSD MX5/24/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors 14. Transcript for Technical Conference May 30, 2007 MSD NX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors 15. Transcript Public Hearing June 7, 2007 MSD OX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic Mail16. Transcript Public Hearing June 9, 2007 MSD PX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic MailMSD QX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic Mail18. Transcript Public Hearing June 12, 2007 MSD RX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic Mail19. Transcript Public Hearing June 13, 2007 MSD SX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic Mail20. Transcript Public Hearing June 14, 2007 MSD TX6/26/2007KTRate Commision (15); RC Attorneys (1); MSD Rate Consultants (2); MSD Directors Via Electronic Mail21. Issues/Determinations/Checklist L&B UX7/11/2007JFAVia Electronic Mail by Lashly & BaerNote: All Exhibits to date distributed to Interveners 4/11/0717. Transcript Pre-Hearing Conference June 11, 2007 JOURNAL OF THE (1448th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT August 9, 2007 – 5:00 P.M. The Trustees of the District met in Room 110 at 2350 Market on the above date. Present at meeting: Board of Trustees Staff Members D. B. Rosenberg, Chair J. L. Theerman, Executive Director J. H. Goffstein, Vice Chair R. E. Hayman, General Counsel E. Harshman K. J. Tyminski, Secretary-Treasurer D. J. Hayes J. M. Zimmerman, Director of Finance C. Karam (excused) B. L. Hoelscher, Director of Engineering J. H. Buford J. C. Sprague, Director of Operations Also present were Mr. Tom Sullivan, 35 N. Central; Ed Sweet, Parsons Water; Shameka Watts, KPMG; Andy Gottschalk, KPMG; Doug Lambert, Geotechnology; Mary Jane Barry, TGB; Bob Welsch, FMSM; Jim Coll, Jacobs; Elkin Kistner, TGB; Stephen Tielke, TGB; Sharon Tielke, TGB; Jon Bergenthal, Jacobs; Kim Diamond, Levee Districts; Mike Jones, St. Louis County; Tom Ratzki; Black & Veatch; Bill Niehoff, Paric; Bob Januska, RJN; Jessica Perkins, Vector Communications; Mark Kollitz, Woolpert; Tim Tappendorf, CMT; Robert Bella, HDR; Joe Christian, Netelligent; Vicki Taylor Edwards, Director of Human Resources; Lance LeComb, Public Affairs Specialist; Barbara Mohn, Director of Information Systems; Steve Brown, Asst. Director of Human Resources; Debbie Johnson, Public Affairs; Marie Collins, Asst. Director of Engineering, and Pam Bell, Secretary to the Executive Director. - - - - Mr. David Rosenberg opened the meeting pursuant to notice and call. - - - - Upon motion made by Ms. Joyce-Hayes, seconded by Ms. Harshman, the Journal of the July 12, 2007 meeting was approved by unanimous voice vote. - - - - The Chair reported that in 2000, changes to MSD’s Charter were approved by area voters that allowed for the creation of a Rate Commission. Composed of 15 member organizations representing a broad cross-section of MSD’s customers and the community it serves, the Rate Commission is designed to provide public input into how the District sets rates. The Rate 2 Commission process is a lengthy and deliberative process – much like a formal legal case – that includes multiple public hearings. This process begins when a rate proposal is formally referred to the Rate Commission. In March of this year, staff referred a proposal for both wastewater and stormwater rates to the Rate Commission. Since that time, the Commission has met 18 times to consider the proposal. The Commission will conclude their deliberations and issue a report to the Board early next week. Included in the report will be a recommendation from the Commission on the rate proposal. Once the Rate Commission has issued its report, the Board of Trustees must wait a minimum of 45 days before adopting any ordinance that would change rates. However, during the 45 day period, the Board will review the recommendation for compliance with the 5 criteria that are laid out in the District’s charter and were a part of the changes approved by area voters in 2000. The 5 criteria are: 1) Is the Rate Commission’s recommendation contrary to constitutional, statutory, or common law? 2) Does the recommendation substantially impair the District’s ability to provide adequate sewer and drainage systems and facilities or related services to the point where public health or institutional safety may be jeopardized? 3) Is the recommendation contrary to or in violation of any covenant or provision relating to any outstanding bonds or debts owed by the District? 4) Does the recommendation fail to meet federal or state laws or regulations? 5) Does the recommendation impose an unfair or excessive burden on one or more classes of ratepayers? For those members of the public that maybe interested, sections 7.040 through 7.310 of the District’s charter provides further details on the next steps in the rate setting process. In closing, and as has been stated in the past, I wish to underscore the District’s commitment to protecting the environment and managing stormwater issues on behalf of our St. Louis community, and to protecting the household budgets of ratepayers, especially the budgets of ratepayers on low or fixed incomes. Balancing those responsibilities can be difficult, but MSD has worked very hard for many years to find the right approach. Whatever the outcome of the current rate setting process, the District is committed to moving forward with a focus on those responsibilities. - - - - Mr. Tyminski provided the Trustees with the quarterly pension investment report for the period ending June 30, 2007. He noted that the plan experienced an above average return for the quarter and year-to-date period. The year-to-date return through June 30th was 6.5% which is ahead of the bench mark. He also noted that the diversifying investment classes work well and that the small/mid cap search is due to be complete within the next month. He also noted that the Investment sub-committee would be meeting for the first time in late August. He also updated the Board on the volatility experienced in the financial markets due to the sub-prime mortgage problems. He explained that the District has no direct sub-prime mortgage exposure but the market 3 volatility did hurt the performance of the District’s high yield bond manager. Mr. Goffstein asked what the District’s investment performance was through December 31, 2006. Mr. Tyminski responded that the plan earned 12.3% for calendar 2006 versus a targeted rate of 7.5%. - - - - Ms. Joyce-Hayes reported that the Program Management Committee met on July 30, 2007 at 7:30 a.m. The meeting was attended by trustees Karam, Rosenberg, Joyce-Hayes, and Goffstein. The minutes of the July 5, 2007 meeting were approved, as amended. Staff presented and discussed the agenda items to be introduced tonight. There was a detailed discussion regarding the following items: Items 25 & 26 – CSO Interceptor Access and Monitoring and Fenton Wastewater Treatment Plant Odor Controls – The Committee discussed the introduction and adoption status of these two projects on the Agenda. Representatives of TGB attended the meeting and answered questions concerning their compliance with prevailing wage requirements. TGB agreed to send MSD that portion of their labor contract dealing with the payment of prevailing wage. Trustees Goffstein and Karam requested copies of the results of past prevailing wage audits by MSD and the State of Missouri. Item 28 – Valdamere Drive Sewer Replacement – In-house design staff was able to save an estimated $200,000 on the cost to replace this collapsed sanitary sewer line by relocating it instead of replacing in place. Item 30 – Watershed Facility Planning – This is the first year of an anticipated four- year contract, with two option years, to provide resources to supplement in-house planning staff. Jacobs will make 150 individuals available to provide 34 FTEs of support. Staff reviewed the anticipated and past deliverables listed in the project write-up. The Committee requested a list of contractors, costs, and activities performed in FY2007 and those anticipated to be performed in FY2008. The meeting was adjourned at 9:00 a.m. The next meeting is tentatively scheduled for Wednesday, September 5, 2007 at 7:30 a.m. - - - - Ms. Harshman reported that the Stakeholder Relations Committee met 7:30 a.m. on July 26, 2007 at the District’s headquarters. Trustees Harshman and Rosenberg were in attendance. 4 The first item was a discussion regarding the possible renewal of the contract for the District’s Annual Report. On the September agenda, there will be a resolution for the exercising of a contract option year for Falk Harrison Creative to provide development services for the 2007 Annual Report. The cost of these services will be $37,645, the same cost paid for the 2006 Annual Report. Falk Harrison Creative has provided the District with annual reporting services since 2003, and has played a key role in helping staff to lower the cost of these services by over $50,000 per year. The exercising of this contract option year is being done under terms of a “Request for Proposal” (RFP) issued in 2005. Mr. LeComb brought forth discussion on the contract for customer service surveying. This item will also be on the September agenda. There will be a resolution for the exercising of a contract option year for the ETC Institute to provide Customer Service Surveying in 2008. The District currently surveys all of its external customer service functions. Staff uses the results to implement customer service focused improvements throughout the District’s operations. The cost of these surveying services in 2007 is $61,845. The cost for 2008 will be $62,873. The exercising of this contract option year is being done under terms of an RFP issued in 2006. During the committee meeting, staff discussed as part of the Rate Commission process a proposed Intergovernmental Cooperation Agreement between MSD and the Levee Districts designed to address the issue of stormwater services. The proposed agreement defines which stormwater services to be funded by an impervious rate in MSD’s rate proposal will be performed by MSD and which services will be performed by the Levee Districts. Levee District will be reimbursed for performing the described services through a credit to the impervious rate stormwater charge. Basic services include operation and maintenance of the public storm sewer system (sewers, inlets, and manholes), stormwater planning, non-permitted development review, and stormwater quality regulatory requirements under the area’s Phase II stormwater permit. The main activity to be performed by the Levee District’s is the maintenance and operation of the public stormwater system included in the basic services. The credit for this service has already been calculated at 50% in MSD’s Rate Proposal and is similar to the credit properties that drain directly to the Mississippi, Missouri, or Meramec Rivers and don’t use the area’s storm water systems are eligible for. Additional services to be performed by the Levee Districts include stormwater planning, non-permitted development review in accordance with the Levee District’s design standards, and individual billing and revenue collection per parcel within the Levee Districts. This results in an additional 45% credit. The remaining services consist of compliance with the area’s Phase II stormwater permit and maintenance of the impervious database, the vast majority of which will be performed by MSD. This is 5% of the total basic service charge and resulting in a 95% credit to the Levee District. The agreement is Item No. 32 on tonight’s agenda. Mr. Hoelscher informed the Committee that in response to a customer service survey, the District will re-engineer its plan review and permitting processes based on comments received during the survey and from a stakeholders group. The re-engineering will consist of short-term and long-term changes. Technical members of the stakeholders group will participate in the re- engineering process. Staff anticipates having all changes implemented by February 2008 except for those changes requiring possible Charter changes. 5 Finally, the Committee reviewed the selection process used to choose a firm for implementation of the federally required public participation that must take place as part of the District’s Long-Term Control Plan development. The basis of this conversation was a July 24th memo prepared for the Board by staff. Included in the review discussion were details of the six proposals that were submitted; the qualifications of each of the firms that submitted proposals; and the criteria that was used to rate the proposals. It was decided that this item should be brought to the full Board at its next meeting. The meeting adjourned at 8:20 a.m. - - - - Mr. Rosenberg reported that the Finance Committee held its monthly meeting at 8:00 a.m. on Tuesday, August 7, 2007. In attendance were Trustees David Rosenberg, James Buford, and Dr. Ellen Harshman. Minutes from the prior Finance Committee on July 10th were approved and accepted into the record. Ms. Zimmerman presented the June 2007 Adjustment Review Committee report. The report reflected a decrease in customer account receivables of $301,154 for the month of June and a decrease of $549,137 year-to-date. A motion was made to accept the report into the Committee record per ordinance. Ms. Zimmerman then updated the Committee on the June 2007 financial results. Compared to the prior year, Total Assets increased 6.1%, Income before Contribution was up 6.3%, and End of Month Cash increased 86.9%. Ms Zimmerman indicated General Fund expenditures are projected to be approximately $6.5 million or 5.0% under budget for fiscal year 2007 primarily due to improved cost containment efforts, reductions in wages associated with outstanding position vacancies and less than anticipated contractual services costs. Ms. Zimmerman also indicated that the District had reached a settlement with Missouri American Water that will result in a $430,000 reduction in annual water agency data costs beginning December 2007. Ms. Zimmerman then presented an update on Collection Activity for the FY07, and indicated the District’s FY07 collections totaled $19.7 million or 37% greater than FY06. More significantly, this represented a $3.3 million or 20% increase over the District’s record collection year in FY05. FY07 collections from legal action were also up increasing 47.8% from prior year for a total of $1.9 million. Ms. Zimmerman communicated Net Sewer Service Receivables greater than 30 days delinquent as of June 30, 2007 totaled $17.3 million while the collection probability of these receivables totaled $22 million. Ms. Zimmerman also briefed the Committee on the Low Income assistance program. During January 2007 notices and applications were sent to the 2,949 customers on the existing low- income program. Since this mailing a total of 3,213 applications were processed, 634 were approved, 149 were incomplete, 143 denied, 40 returned undeliverable and 2,247 expired. Mr. Theerman provided an update on the Rate Commission proceedings indicating the 6 Rate Commission may submit its Rate Recommendation Report to the full board at Thursday’s Board Meeting. He indicated, however, the Rate Commission has until August 13th to complete its work per District Charter. Once the Rate Commission’s report is received the Board will have 45 days before any action on a rate ordinance may be taken. Mr. Tyminski presented the District’s Pension results for the second quarter of calendar year 2007 and indicated the District’s Pension Fund investment balances totaled $185.4 million as of June 30, 2007, an increase of $9.4 million over the prior quarter, reflecting investment earnings of $7.6 million and net inflows of $1.8 million. Despite a conservative investment posture, the fund posted a 4.3% return in the quarter, ranking in the 37th percentile of public funds, nationwide. Mr. Tyminski also indicated that the Investment Sub-Committee would be meeting on Thursday, August 16th to continue reviewing the Plans progress and investment managers’ performance. Mr. Theerman reported as other business that Staff would be bringing a GASB 45 Post Retirement Benefits presentation to the next Finance Committee Meeting. There being no further business, the meeting adjourned at 9:00 a.m. - - - - Ms. Joyce-Hayes commented that 2,274 customers currently in the Low Income status category have not signed up for the new program and she questioned what the District would be doing about this. Ms. Zimmerman responded that a minority of this group had an increase in their income level that exempted them from that category. The majority of customers either did not renew their application or did not send it back. The District will continue to advertise the low income program, work with the Unite Way referral list, and continue to accept applications. - - - - Mr. Theerman reported that The Board of Trustees will have a special board meeting to consider approval of revisions to tax rates which will be levied this winter. We anticipate that revisions will be required which lower the tax rates for the District’s Administrative tax and the OMCI tax in the Sugar Creek Sub-district. These revisions are anticipated because tax assessments make a lower tax rate necessary to maintain compliance with Missouri’s Hancock Amendment. The Special Board Meeting has been set for 7:30 am, Friday, August 24, 2007 here at the District Headquarters. The Staff is attempting to reschedule the September Board Meeting. The originally scheduled September 13th Board Meeting falls on the Rash Hashanah Holiday. When rescheduled the District will post a notice of the revised board meeting date and time on our website. One of the Districts strengths is our knowledgeable and experienced workforce. A number of dedicated employees will be retiring from District service on September 1st. On tonight’s 7 agenda resolutions 37 through 43 honor the careers of 7 employees with a combined 195 years of service to MSD. It has certainly been a pleasure working with these people and we wish them well in their retirement. - - - - Mr. Sullivan addressed the Board and commented on the composition of the Rate Commission and questioned if there’s a conflict of interest on the part of the chairman of the Rate Commission who is also with AGC. He praised the District for not having a closed session. He also questioned if the Risk Management position had been filled and asked for the status of the Ernst & Young audit. Mr. Tyminski responded that the Ernst & Young audit of the Lower Meramec project is scheduled to be released at the August 14, 2007 audit committee meeting and copies are available upon request. Mr. Theerman responded that the Manager of Risk Management position has been filled and that Mike Grace has been hired in that capacity. Mr. Sullivan commented that the Vector Communication contract appears to be frivolous and that this contract should be re-bid because of a scope change. Mr. Sullivan questioned the necessity for the contract with Jacobs. He questioned if the 32 easement acquisitions should not be approved individually. He also questioned the wisdom of entering into an Intergovernmental Agreement with the Levee District and commented on the salary of the Executive Director. Mr. Sullivan commented on a Channel 2 piece regarding homes being threatened by erosion. There was a discussion between Ms. Joyce-Hayes and Mr. Sullivan where it was established that the District could not legally move funds from another area to assist this group. - - - - Mr. Elkin Kistner addressed the Board and indicated that the represented TGB whose contracts were under consideration at this meeting. He emphasized that TGB is a highly qualified contractor who is eager to do work for the District and recommended that the District move as quickly as possible to provide funding for their projects. - - - - CONSENT AGENDA Mr. Goffstein requested that Proposed Ordinance Number 11-08 be voted on separately. ADOPTION OF PROPOSED ORD.NO. 01-08 (ORDINANCE NO. 12482) APPROPRIATING $514,500.00 FROM THE GENERAL FUND FOR THE PROCUREMENT OF SERVICES AND EQUIPMENT REQUIRED IN THE ENTERPRISE SYSTEMS RETOOLING PHASE I – TELEPHONE COMMUNICATIONS SYSTEM PROJECT TO REPLACE THE DISTRICT’S 8 CURRENT PBX SYSTEM AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH NETELLIGENT CORPORATION, FOR THE PROCUREMENT OF THE AFOREMENTIONED SERVICES AND EQUIPMENT. ADOPTION OF PROPOSED ORD. NO. 03-08 (ORDINANCE NO. 12483) APPROPRIATING $6,950,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF MC-01 WEBSTER AND MARLBOROUGH TRUNK SEWER RELIEF (90060); IN UNINCORPORATED ST. LOUIS COUNTY, THE VILLAGE OF MACKENZIE, AND THE CITY OF ST. LOUIS MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH BATES UTILITY COMPANY, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 04-08 (ORDINANCE NO. 12484) APPROPRIATING $650,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF CSO – MIDDLESEX AND YORK DRIVE (L-110) SEWER SEPARATION (2000060); IN THE CITY OF BRENTWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH PURLER- CANNON-SCHULTE, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 05-08 (ORDINANCE NO. 12485) APPROPRIATING $1,100,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF BISSELL POINT WWTP BELT FILTER PRESS IMPROVEMENTS (2002044); IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH KCI CONSTRUCTION COMPANY FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 06-08 (ORDINANCE NO. 12486) APPROPRIATING $1,250,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF CSO – INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE II (NEW MILL SEWER) (2003054C); IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH GERSHENSON CONST. CO., INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 07-08 (ORDINANCE NO. 12487) APPROPRIATING $3,500,000.00 FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR SEPARATE SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (2007140); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1214 WITH WOOLPERT CONSULTANTS, INC. FOR THE AFORESAID ENGINEERING SERVICES. ADOPTION OF PROPOSED ORD. NO. 08-08 (ORDINANCE NO. 12488) APPROPRIATING $4,500,000.00 FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR COMBINED SEWER AREA – INFLOW/INFILTRATION ASSESSMENT (2007141); AND 9 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACTE-1215 WITH RJN GROUP, INC. FOR THE AFORESAID ENGINEERING SERVICES. ADOPTION OF PROPOSED ORD. NO. 09-08 (ORDINANCE NO. 12489) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 1 OF CONTRACT E-1201 WITH HORNER & SHIFRIN, INC. FOR GENERAL SERVICES AGREEMENT – SEWER AND PROCESS DESIGN (2007039). ADOPTION OF PROPOSED ORD. NO. 10-08 (ORDINANCE NO. 12490) APPROPRIATING $10,000,000.00 FROM THE SANITARY REPLACEMENT FUND TO REIMBURSE THE MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION FOR SEWER RELOCATION AND BETTERMENTS DURING THE DESIGN AND CONSTRUCTION OF IMPROVEMENTS TO ROUTE I-64 FROM WEST OF SPOEDE ROAD IN ST. LOUIS COUNTY TO SARAH STREET IN ST. LOUIS CITY IN I-64/40 RECONSTRUCTION BETTERMENTS ALLOWANCE (2007170). ADOPTION OF PROPOSED ORD. NO. 12-08 (ORDINANCE NO. 12492) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH SHOOK, HARDY & BACON LLP, WHEREBY SHOOK, HARDY & BACON LLP WILL PROVIDE LEGAL CONSULTING SERVICES IN THE AREA OF ENVIRONMENTAL LAW. Plan Approval Balson Ave. 7800 Block Storm Sewer (2006131) This project, located in University City, is to relieve backyard and garage flooding. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $89,000. 61 Conway Close Storm Sewer (2006193) This project, located in Ladue, is to relieve backyard and garage flooding. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $54,000. Wildwood Lane #75 Storm Sewer (89100) This project, located in the City of Kirkwood, is to relieve street and garage flooding. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $124,000. Ridgetop Drive Storm Sewer (2006107) This project, located in Richmond Heights, is to alleviate yard flooding at 22, 23, 26, 37, and 40 Ridgetop Drive and garage flooding at 23 Ridgetop Drive. This project is 10 in the Fiscal Year 2007 Budget and the estimated construction cost is $154,000. ADOPTION OF PROPOSED ORD. NO. 11-08 (ORDINANCE NO. 12491) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH VECTOR COMMUNICATIONS FOR REGULATORY REQUIRED PUBLIC ENGAGEMENT SERVICE IN THE CSO LONG-TERM CONTROL PLAN PUBLIC PARTICIPATION PROGRAM. Mr. Rosenberg indicated that Vector Communications has done work for the Great Rivers Greenway while he was a member of their Board but had no involvement in their selection. Mr. Buford indicated that Vector did work for St. Louis Connect Care, a non-profit organization that he is involved with. The selection of Vector by St. Louis Connect Care happened prior to his involvement with MSD and was handled by the staff of Connect Care. Mr. Goffstein indicated that he did not have adequate information regarding the contract for Vector and that Mr. Karam was not present. Since both trustees raised questions about the contract, he motioned that the Vector contract be tabled. There was a discussion between the Board members and staff that a delay of this contract could impact the future deadline for the deliverables of this contract. It was also noted that additional information was sent out in an email on July 28, 2007. It was noted by staff with the additional scope change resulting from the EPA lawsuit, Vector remained the low cost proposer. Mr. Rosenberg declared that the motion to table failed due to lack of a second. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 11-08 be adopted. Motion passed – 4 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye Motion made by Mr. Rosenberg, seconded by Ms. Harshman, that the Consent Agenda be adopted. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye The Chair declared the Consent Agenda adopted and proposed Ord. Nos. 01-08, 03-08, 04-08, 05- 08, 06-08, 07-08, 08-08, 09-08, 10-08, 11-08, and 12-08, and were assigned Ordinance Nos. 12482, 12483, 12484, 12485, 12486, 12487, 12488, 12489, 12490, 12491, and 12492. - - - - 11 UNFINISHED BUSINESS Ordinances ADOPTION OF PROPOSED ORD. NO. 214-07 (ORDINANCE NO. 12493) APPROPRIATING $355,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF CSO – INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE II (BP INTERCEPTOR LEVEL SENSORS) (2003054D), IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH TGB, INC. FOR THE AFORESAID CONSTRUCTION. (INTRO. 6/14/07). Mr. Tyminski explained that it is necessary to vote a proposed ordinance off the table before it can be acted on. Motion made by Ms. Joyce-Hayes, seconded by Ms. Harshman to consider TGB at this point. Motion passed – 4 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye Mr. Tyminski indicated that the measure is on the floor for consideration and has passed with a simple majority. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 214-07 be adopted. Motion passed – 4 ayes, 0 nays, 1 abstain Poll taken: J. Goffstein abstain J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye (Introduced) Renewal of Introduction of proposed Ord. No. 02-08 appropriating $466,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of the Fenton Wastewater Treatment Plant Odor Improvements (2006171), in the City of Fenton and St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with TGB, Inc. for the construction of the aforesaid wastewater treatment plant improvements. Mr. Tyminski explained that the vote on this ordinance was inconclusive at the last meeting because one Trustee asked for additional information and did not vote. He further 12 explained that the requested information has been disseminated and reviewed the existing vote with the Trustees. He then asked, based on the additional information, if any Trustee wished to reconsider their vote. Mr. Buford indicated that he wished to change his vote from nay to aye. Mr. Tyminski acknowledged the change in vote and noted that this item has received the necessary votes for introduction. Motion passed – 4 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye Resolutions None - - - - NEW BUSINESS Ordinances INTRODUCTION OF PROPOSED ORD. NO. 14-08 APPROPRIATING $366,000.00 FROM THE BLACK JACK – DELLWOOD OMCI FUND TO BE USED FOR PROJECT COSTS FOR STORM CHANNEL BIOSTABILIZATION PRENTICE – GRANGER STORM CHANNEL (MCBJ-110) PHASE II (2000110A), IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH XL CONTRACTING, INC. FOR STORM CHANNEL BIOSTABILIZATION. Proposed Ord. No. 14-08 was presented and read. The work to be done under this contract consists of the construction of approximately 800 lineal feet of bank stabilization including energy dissipating and grade control gabion structures. This construction is the second phase of a two-phase storm channel improvement program. The purpose of this project is to alleviate erosion representing a moderate risk to 12 homes and a park area along Prentice Drive in north St. Louis County, Missouri. This project is scheduled to be completed in 362 days. Motion made by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 14-08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye 13 INTRODUCTION OF PROPOSED ORD. NO. 15-08 APPROPRIATING $74,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE REMOVAL AND REPLACEMENT OF SANITARY SEWERS OF THE VALDAMERE DRIVE #11125 SANITARY SEWER REPLACEMENT (2007160) PROJECT, IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH D.H.I. CONTRACTING, LLC FOR THE AFORESAID CONSTRUCTION. Proposed Ord. No. 15-08 was presented and read. The work to be done under this contract consists of the removal and replacement of approximately 282 lineal feet of 8-inch sanitary sewer and approximately 100 lineal feet of 6-inch sewer lateral and appurtenances. The purpose of this project is to address WBUs in the area. This project is scheduled to be completed in 45 days. Motion by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 15-08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye INTRODUCTION OF PROPOSED ORD. NO. 16-08 AMENDING ORDINANCE NO. 12287, AS ADOPTED AUGUST 31, 2006, BY REPEALING SECTION ONE, AND ENACTING A NEW SECTION ONE IN LIEU THEREOF IN ORDER TO CORRECT A SCRIVENER’S ERROR IN SAID SECTION ONE PERTAINING TO THE APPROPRIATION FUND. Proposed Ord. No. 16-08 was presented and read. This project consists of the design and preparation of construction documents for approximately 20,000 feet of 2-inch to 4-inch diameter low-pressure force main sewers, 730 feet of 8-inch diameter gravity sewer, and appurtenances. This project will provide for the elimination of septic tanks and provide sanitary service for approximately 97 properties. The preliminary construction cost estimate is $1,660,000.00. The non-construction costs are 15% of the total estimated program costs. The design costs are 17% of the estimated construction costs. Motion by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 16-08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye INTRODUCTION OF PROPOSED ORD. NO. 17-08 APPROPRIATING $6,600,000.00 FROM THE 14 SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR PLANNING FUNCTIONS IN WATERSHED FACILITY PLANNING (E-1216 & 2007139); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH JACOBS ENGINEERING GROUP, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 17-08 was presented and read. This ordinance appropriates funds and authorizes the District to enter into a contract with Jacobs Engineering Group Inc. The purpose of the contract is to provide the necessary planning staff of 150 individuals (34 FTEs) to support the District’s planning staff to maintain the District’s planning program. Motion by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 17-08 be introduced. Motion passed – 3 ayes, 1 nay, 1 abstain Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes abstain E. Harshman aye INTRODUCTION OF PROPOSED ORD. NO. 18-08 MAKING A SUPPLEMENTAL APPROPRIATION OF $83,000.00 FROM THE GRAVOIS CREEK OMCI FUND FOR ADDITIONAL ENGINEERING SERVICES FOR THE DESIGN OF SAPPINGTON CREEK MEATH TO GRAVOIS (GCXR-110); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 5 OF CONTRACT E-1145 WITH REITZ & JENS, INC., FOR THE AFORESAID ADDITIONAL ENGINEERING SERVICES. Proposed Ord. No. 18-08 was presented and read. This ordinance appropriates supplemental funds and authorizes the District to enter into Amendment No. 5 with Reitz & Jens Inc. This project consists of the design and preparation of construction documents for approximately 870 feet of heavy stone bank stabilization, rock wedge slope protection and biostabilization. This project will alleviate flooding and severe erosion for approximately five properties. The amended design appropriation is $458,000. The initial appropriation was for a Pre-design Study for Sappington Creek between Gravois Creek and Meath. This appropriation is for the final design for the highest priority channel repair project evaluated, referred as Sappington Creek at Kamping Lane Storm Channel Improvements (2003034). Motion by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 18- 08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye 15 INTRODUCTION OF PROPOSED ORD. NO. 19-08 APPROPRIATING $1,200,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR EASEMENT ACQUISITION FOR COMBINED/SANITARY PROJECTS (FY2008) (2005115) THROUGHOUT THE ENTIRE DISTRICT. Proposed Ord. No. 19-08 was presented and read. This ordinance appropriates funds for staff to acquire necessary easement rights in order to construct combined and sanitary sewer projects related to the CIRP. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 19-08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye INTRODUCTION OF PROPOSED ORD. NO. 20-08 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT (“MSD”) TO ENTER INTO AN INTERGOVERNMENTAL AGREEMENT WITH THE LEVEE DISTRICT, WHEREBY MSD AND THE LEVEE DISTRICT WILL AGREE ON THE CONTRACTED SERVICES TO BE PROVIDED BY THE LEVEE DISTRICT AND THOSE SERVICES THAT WILL BE EXCLUDED AS SPECIFIED IN THE INTERGOVERNMENTAL AGREEMENT. Proposed Ord. No. 20-08 was presented and read. The District will enter into an agreement with the Levee Districts whereby they will provide various stormwater services within the Levee District boundaries under agreement with MSD. The stormwater services to be provided by the Levee Districts consist of most of the “basic services” included in the stormwater portion of MSD’s Rate Proposal except for the activities included in the area’s Phase II stormwater permit. In exchange for providing these services, the Levee Districts will be initially provided a 95% credit for the impervious area charges within the Levee District boundaries associated with “basic services”. The agreement includes provisions for adjustments to the credit level if the cost or scope of “basic service” levels change and for MSD to take over various stormwater services in the future if the Levee Districts are no longer able or willing to provide those services. Mr. Hayman indicated that on paragraph 3 of the ordinance, a scriveners error is being corrected that will change the word ‘basic’ to ‘storm’. He then read the entire third paragraph to the full Board. Motion by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 20-08 be introduced. Motion passed – 5 ayes, no nays 16 Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye INTRODUCTION OF PROPOSED ORD. NO. 21-08 PRESCRIBING THE SALARY OF THE EXECUTIVE DIRECTOR OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT. Proposed Ord. No. 21-08 was presented and read. Section 8.070 of the District Charter requires that the salary of the Executive Director be set by ordinance. This ordinance increases the salary for the position of Executive Director to $185,947.00 Ms. Joyce-Hayes pointed out that the District is the fourth largest in the United States and that Mr. Theerman’s salary is certainly in line with an agency of that magnitude. Mr. Buford indicated that Mr. Theerman is an asset to the District and supported his efforts. Mr. Goffstein concurred with Mr. Buford’s comment. Motion by Mr. Rosenberg, seconded by Ms. Harshman that proposed Ord. No. 21-08 be introduced. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 22-08 VACATING A PORTION OF A TEN-FOOT (10’) WIDE EASEMENT RECORDED IN DEED BOOK 7413, PAGE 1856 AND A VARIABLE WIDTH EASEMENT RECORDED IN DEED BOOK 15821, PAGE 2348, BOTH LOCATED ON THE MARK J. LINCOLN PROPERTY AS RECORDED IN DEED BOOK 9920, PAGE 1456 OF THE ST. LOUIS COUNTY RECORDS, CITY OF LADUE, ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 22-08 was presented and read. The District has been requested to vacate its rights to two easements after sewers were abandoned when the Warson Road bridge was replaced by the City of Ladue at no cost to the District. The District has no further use for the existing easements being vacated. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 22-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 22-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 22-08 be adopted. 17 Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye The Chair declared proposed Ord. No. 22-08 adopted and it was assigned Ordinance No. 12494. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 23-08 VACATING VARIOUS EASEMENTS IN LOTS 1, 2, 3, AND 4 OF THE RESUBDIVISION OF “HILL-SEA TERRACE” A SUBDIVISION ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 214, PAGE 23 AND PART OF LOT 1 OF “PRILWETZ SUBDIVISION” A SUBDIVISION ACCORDING TO THE PLAT THEREOF RECORDED PLAT BOOK 45, PAGE 36, AND PART OF LOT 2 OF THE “SUBDIVISION OF JOHN REICHARDT’S ESTATE” ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 1, PAGE 200 OF THE ST. LOUIS COUNTY RECORDS, CITY OF CRESTWOOD, ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 23-08 was presented and read. The District has been requested to vacate its rights to eight easements on five lots after sewers were relocated at no cost to the District. The District did not pay for these easements. The District has no further use for these easements. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 23-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 23-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 23-08 be adopted. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye The Chair declared proposed Ord. No. 22-08 adopted and it was assigned Ordinance No. 12495. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 24-08 VACATING A PORTION OF A TEN-FOOT (10’) WIDE EASEMENT LOCATED IN LOTS 5C AND 5D OF THE RESUBDIVISION OF ADJUSTED LOT 5 OF WEST PALISADES ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 307, PAGE 80 AND PLAT BOOK 234, PAGE 19 OF THE ST. LOUIS COUNTY RECORDS, CITY OF WILDWOOD, ST. LOUIS COUNTY, MISSOURI. 18 Proposed Ord. No. 24-08 was presented and read. The District has been requested to vacate its rights to a ten foot (10’) wide easement after consolidation of Lots 5C and 5D at no cost to the District. There are no sewers in the easement on these residential lots. The District has no further use for the easement. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 24-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 24-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 24-08 be adopted. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye The Chair declared proposed Ord. No. 24-08 adopted and it was assigned Ordinance No. 12496. Resolutions ADOPTION OF RESOLUTION NO. 2723 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO DANNY R. WEBB FOR HIS 32 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM SEPTEMBER 16, 1974, TO HIS RETIREMENT EFFECTIVE AUGUST 1, 2007. Resolution No. 2723 was presented and read. ADOPTION OF RESOLUTION NO. 2728 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO RANDALL C. CANTRELL FOR HIS 32 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM MARCH 3, 1975, TO HIS RETIREMENT EFFECTIVE SEPTEMBER 1, 2007. Resolution No. 2728 was presented and read. ADOPTION OF RESOLUTION NO. 2729 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO STEVEN F. LINDHARDT FOR HIS 20 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM SEPTEMBER 23, 1986, TO HIS RETIREMENT EFFECTIVE SEPTEMBER 1, 2007. Resolution No. 2729 was presented and read. ADOPTION OF RESOLUTION NO. 2730 EXPRESSING THE BOARD OF TRUSTEES’ 19 APPRECIATION TO CHRISTIAN R. QUERNHEIM FOR HIS 29 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM JULY 31, 1978 TO HIS RETIREMENT EFFECTIVE SEPTEMBER1, 2007. Resolution No. 2730 was presented and read. ADOPTION OF RESOLUTION NO. 2731 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO DANNY J. WESTBROCK FOR HIS 40 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM JUNE 12, 1967, TO HIS RETIREMENT EFFECTIVE SEPTEMBER 1, 2007. Resolution No. 2731 was presented and read. ADOPTION OF RESOLUTION NO. 2732 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO LINDA M. NEWCOMB FOR HER 21 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM JUNE 30, 1986 TO HER RETIREMENT EFFECTIVE SEPTEMBER 1, 2007. Resolution No. 2732 was presented and read. ADOPTION OF RESOLUTION NO. 2733 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO HOMER R. HAISLIP FOR HIS 21 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM FEBRUARY 18, 1986 TO HIS RETIREMENT EFFECTIVE SEPTEMBER 1, 2007. Resolution No. 2733 was presented and read. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that Resolution Nos. 2723, 2728, 2729, 2730, 2731, 2732, and 2733 be adopted. Motion passed – voice vote; 5 ayes, no nays - - - - Upon motion made Ms. Harshman, seconded by Mr. Buford, and unanimously passed, the meeting adjourned at 6:00 p.m. Secretary-Treasurer JOURNAL OF THE (1449th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT August 24, 2007 – 7:30 A.M. The Trustees of the District met in Room 109 at 2350 Market on the above date. Present at meeting: Board of Trustees Staff Members D. B. Rosenberg, Chair J. L. Theerman, Executive Director J. H. Goffstein, Vice Chair R. E. Hayman, General Counsel E. Harshman (via telephone) K. J. Tyminski, Secretary-Treasurer D. J. Hayes J. M. Zimmerman, Director of Finance C. Karam B. Hoelscher, Director of Engineering J. H. Buford J. C. Sprague, Director of Operations Also present were Mr. Tom Sullivan, 35 N. Central ; Paul Lawless, KBS; Paul Murdich, TSI; John Schilling, Black & Veatch; Rob Kuenzel, RJN; Jonathon Sprague, Director of Operations; Susan Myers, General Counsel; Debbie Johnson, Public Affairs; Vicki Edwards, Director of Human Resources; Steve Brown, Asst. Director of Human Resources; Mike Grace, Manager of Risk Management, and Pam Bell, Secretary to the Executive Director. - - - - Mr. Rosenberg opened the meeting pursuant to notice and call and indicated that he did not have any comments. - - - - Mr. Sullivan addressed to Board and indicated he provided them with a letter about the problems that the Jacobs firm had in Chicago. He also indicated that he provided a letter regarding the Rate Commission proceedings noting that there is some vagueness in the District’s charter related to the Rate Commission and cautioned the Board on how it proceeds with handling the rate submittal. Mr. Rosenberg commented that Mr. Sullivan seems to raise concerns about all the vendors the District does business with. He particularly cited Jacobs and Black & Veatch as being two examples. Mr. Sullivan responded that he has never raised a question about Black & Veatch, but Jacobs has a long history of ethical problems. 2 - - - - NEW BUSINESS Ordinances INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 25-08 REPEALING ORDINANCE NO. 12453, ADOPTED JUNE 14, 2007, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF, DETERMINING THE AMOUNT OF TAXES WHICH SHALL BE LEVIED, ASSESSED, AND COLLECTED IN THE YEAR 2007 ON ALL TAXABLE TANGIBLE PROPERTY IN THE DISTRICT WITHIN THE CORPORATE LIMITS OF THE CITY OF ST. LOUIS AND ST. LOUIS COUNTY, RESPECTIVELY, AND IN SUBDISTRICTS WITHIN THE CORPORATE LIMITS OF ST. LOUIS COUNTY AS FOLLOWS: COLDWATER CREEK TRUNK SUBDISTRICT, GRAVOIS CREEK TRUNK SUBDISTRICT, MALINE CREEK TRUNK SUBDISTRICT, WATKINS CREEK TRUNK SUBDISTRICT, SUBDISTRICT NO. 88 (FOUNTAIN CREEK), SUBDISTRICT NO. 89 (LORETTA-JOPLIN), BENEFIT SUBDISTRICT NO. 111 (MARLBOROUGH), SUBDISTRICT NO. 325 (PADDOCK CREEK), SUBDISTRICT NO. 342 (CLAYTON-CENTRAL), SUBDISTRICT NO. 366 (UNIVERSITY CITY BRANCH OF RIVER DES PERES STORMWATER SUBDISTRICT), SUBDISTRICT NO. 367 (DEER CREEK STORMWATER SUBDISTRICT), SUBDISTRICT NO. 369 (SUGAR CREEK), SUBDISTRICT NO. 374 (WEDGEWOOD CREEK), SUBDISTRICT NO. 376 (BLACK JACK-DELLWOOD CREEK), SUBDISTRICT NO. 380 (UPPER PADDOCK CREEK), SUBDISTRICT NO. 448 (MISSOURI RIVER - BONFILS), SUBDISTRICT NO. 449 (MERAMEC RIVER BASIN - M.S.D. SOUTHWEST), SUBDISTRICT NO. 453 (SHREWSBURY BRANCH OF RIVER DES PERES), SUBDISTRICT NO. 454 (SEMINARY BRANCH OF RIVER DES PERES), SUBDISTRICT NO. 455 (BLACK CREEK), SUBDISTRICT NO. 1 OF THE RIVER DES PERES WATERSHED (CREVE COEUR-FRONTENAC AREA), SUBDISTRICT NO. 4 OF THE RIVER DES PERES WATERSHED (NORTH AFFTON AREA), AND SUBDISTRICT NO. 7 OF THE RIVER DES PERES WATERSHED (WELLSTON AREA), WITH AN EMERGENCY CLAUSE. Proposed Ord. No. 25-08 was presented and read. Tax rates adopted in June were based on the limits set by the Hancock Amendment. The amount of revenue growth is limited to the lower of the actual growth rate, the CPI, or 5%. Post BOE assessed values are received mid August and the tax rates must be re-calculated in order to comply with Missouri State Laws. Motion by Mr. Karam, seconded by Ms. Joyce-Hayes that proposed Ord. No. 25- 08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 25-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 25-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye 3 D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 25-08 adopted and it was assigned Ordinance No. 12497. - - - - Ms. Joyce-Hayes indicated that the Board has received a letter from Senator Gibbons related to the tax roll back. She read the attached letter into the record. Mr. Tyminski read the ordinance related to the additional tax roll backs. He noted that in particular, additional roll backs are being taken for the general administration tax from 2¢ to 1.67¢ and there would be roll backs in the Sugar Creek, Black Jack-Dellwood, and Shrewsbury Branch of the River Des Peres sub-district. He indicated that the Hancock amendment prohibits municipalities from having windfall profits associated with sharp increases with assessed valuations. There was a general discussion amongst the Board members regarding Mr. Gibbons’ letter where the trustees requested the staff to respond to the Senator’s letter. - - - - Upon motion made Mr. Buford, seconded by Ms. Joyce-Hayes, and unanimously passed, the meeting adjourned at 7:42 a.m. Secretary-Treasurer JOURNAL OF THE (1451st) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 11, 2007 – 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above date. Present at meeting: Board of Trustees Staff Members D. B. Rosenberg, Chair J. L. Theerman, Executive Director J. H. Goffstein, Vice Chair R. E. Hayman, General Counsel E. Harshman (via phone) K. J. Tyminski, Secretary-Treasurer D. J. Hayes T. A. Bellville, Asst. Director of Finance C. Karam B. L. Hoelscher, Director of Engineering J. H. Buford J. C. Sprague, Director of Operations (excused) Also present were Mr. Tom Sullivan, 35 N. Central; Shameka Watts, KPMG; Robert Merlo, Anheuser-Busch; Diana Vuylstke, MIEC; Bob Offerman, HBC; Tammy Alsop, HBC; Jeff Rensing, Oates Associates; Rob Kuenzel, RJN; Jeff King, CDI; Mark Drazen, MO Energy Group; Phil Sutin, St. Louis Post-Dispatch; Bentley Green, CH2M; John Kindschuh, MIEC; Jon Bergenthal, Jacobs; Terry Endres, Bank of America; Bruce Wood, KAI; Clayton Stockwell, Pepperdine Court; John Coffman, AARP; Burke Wasson, Call Newspapers; John Schilling, Black & Veatch; Cary Duchene, Black & Veatch; Robert Bella, HDR; Ted Guln, Tarlton; A.R. Elliott, Yeager; Lance LeComb, Public Affairs Specialist; Barbara Mohn, Director of Information Systems; Mike Grace, Manager of Risk Management; Gene Rhodes, Audit Administrator; Debbie Johnson, Public Affairs; Marie Collins, Asst. Director of Engineering, and Pam Bell, Secretary to the Executive Director. - - - - Mr. David Rosenberg opened the meeting pursuant to notice and call. - - - - Motion made by Mr. Karam, seconded by Ms. Joyce-Hayes, that the Board go into closed session to discuss confidential or privileged matters under §610.021(1), RSMO 1988 SUPP. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye D. Joyce-Hayes aye D. Rosenberg aye J. Buford aye C. Karam aye During closed session the Board had discussion regarding confidential, legal, or privileged matters under § 610.021 (1) RSMO 1988 SUPP. No votes were taken. Motion made by Mr. Buford, seconded by Ms. Joyce-Hayes, to reconvene into open session. Motion passed – 5 ayes, no nays Poll taken: J. Goffstein aye D. Joyce-Hayes aye D. Rosenberg aye J. Buford aye C. Karam aye - - - - Upon motion made by Ms. Joyce-Hayes, seconded by Mr. Karam, the Journal of the September 12, 2007 meeting was approved by unanimous voice vote. - - - - The Chair reported that in 2000, changes to MSD’s Charter were approved by area voters that allowed for the creation of a Rate Commission. Composed of 15 member organizations representing a broad cross-section of MSD’s customers and the community it serves, the Rate Commission was designed to provide public input into how the District sets rates. The Rate Commission process is a lengthy and deliberative process – much like a formal legal case – that includes multiple public hearings. This process begins when a rate proposal is formally referred to the Rate Commission. In March of this year, staff referred a proposal for both wastewater and stormwater rate changes to the Rate Commission. The Commission met 18 times to consider the proposal, and issued a report and recommendation on August 13. Since the report was issued, the Board has undertaken its own deliberations on the rate proposal and the Commission’s findings. In addition to many hours spent by individual Trustees reviewing the Commission’s recommendation on their own, the Board’s Finance Committee held two public meetings to discuss details of the proposed rate changes. These deliberations have concluded that the Commission’s recommendation complies with the criteria laid out in the District’s Charter for rate changes. As such, the Finance Committee recommends the Board accept the Commission’s report as presented, with the exception of one aspect of the new stormwater rate. Instead of the new impervious stormwater rate being implemented over five years, the implementation should take place over seven years. Items 32, 33, and 34 on tonight’s agenda pertain to the acceptance of the Rate Commission’s report by the Board and the related changes to wastewater and stormwater rates. Item 32 is a resolution. If approved tonight, it will require no further action by the Board. Items 33 and 34 are proposed ordinances for introduction. If those items are approved tonight, both will be considered for final adoption at the November Board meeting. In closing, and as has been stated in the past, I wish to underscore the District’s commitment to protecting the environment and managing stormwater issues on behalf of our St. Louis community. While carrying out these important duties, the Board is also aware that MSD has a concurrent obligation to protect the household budgets of ratepayers - especially the budgets of ratepayers on low or fixed incomes. Balancing these responsibilities can be difficult, but MSD has worked very hard for many years to find the right approach. It is a balance our customers and the St. Louis community expect MSD to achieve. We believe that the current rate setting process and the rate changes to be voted on this evening achieves that balance. - - - - Mr. Karam reported that the Program Management Committee met on October 2, 2007 at 7:30 a.m. The meeting was attended by trustees Karam and Rosenberg. The minutes of the September 5, 2007 meeting were approved. Staff presented and discussed the agenda items to be introduced tonight. There was a detailed discussion regarding the following items: Items 25 through 28 – General Surveying Services – These four contracts will provide the District with surveying services for internal design and planning activities. The total MWBE participation for these contracts is 40%. Item 40 – Resolution No. 2739 – This resolution adds two stormwater and one sanitary sewer projects to the capital program as part of the Revised 2007 – 2008 Budget Appropriation. Emerling – Evans is a stormwater project located in Cool Valley and funded through the Maline Creek OMCI. Ferguson and Salerno is a stormwater project located in Pagedale and funded through the Wellston OMCI. Eva – Wabash Phase II is a sanitary relief project located in Berkeley. A budget surplus from the FY2007 Operating Budget is allowing this project to be built two years earlier than programmed and will result in the elimination of five constructed SSOs. The District has scheduled a public hearing for Tuesday, October 30, 2007 at 7:30 a.m. to review these projects. Item 43 – Resolution No. 2743 – This resolution acknowledges the District’s support for the use of Green Technology to protect the environment. The Executive Director will discuss the details of this resolution in his report. The Committee went into closed session at 8:10 a.m. and resumed open session at 8:20 a.m. The meeting was adjourned at 8:20 a.m. The next meeting will be scheduled prior to the November 2007 Board Meeting. - - - - Mr. Goffstein reported that The Audit Committee met October 9, 2007 at 8:05 a.m. The meeting was attended by Trustees John Goffstein, Dee Joyce-Hayes and James Buford. The audit committee was presented with the status of the FY07 and FY08 audit plans. The committee was informed that the FY07 audit plan had been completed. The committee also approved the Benefits Management audit report. Hochschild Bloom & Co. discussed the Independent Auditors Draft Reports for the Fiscal Year ending June 30, 2007. The following draft reports were discussed: Enterprise Financial Report, Report on Federal Awards, Agreed-upon Procedures Report “Schedule of Net Pledged Revenues”, Report on Schedule of Project Expenditures Under Resolution 2533, Internal Control Management Comments and Recommendations, and Fund Financial Statements and Other Financial Information report. HBC discussed the financial changes between FY06 and FY07 for all reports. HBC indicated that they would be completing the documentation for MSD to receive the Government Finance Officer Association awards for distinguished financial reporting and budget presentation. The meeting adjourned at 8:35 a.m. Mr. Goffstein, then introduced Bob Offerman and Tammy Alsop, who provided a report to the Board on the annual financial audit. Mr. Offerman reported that the audit was completed within 90 days of the end of the fiscal year. There was no fraud or errors detected. The financial statements received an unqualified opinion and present fairly the financial condition of the District as of June 30, 2007. He noted that no new accounting methods have been adopted and the District is working on its GASB 45 post-retirement medical liability. He called upon Ms. Alsop who discussed the various changes in the District’s financial positions between 2006 & 2007. Mr. Offerman indicated that certain of the District’s financial ratios were very strong. In particular, he cited that the District’s current ratio is 3:1, which means the District has three times the money available to pay its debts. He also cited the District’s debt-to-equity ratio as being .25:1, which means that for every dollar of debt, the District has four dollars of equity. Mr. Offerman thanked the District staff and indicated that they were very professional to deal with. - - - - Ms. Rosenberg reported that on September 20, 2007 the Stakeholder Relations Committee met at 7:30 a.m. at the District’s headquarters. In attendance were Trustees Harshman, Rosenberg and staff. The only item of discussion was the District’s Post Retirement Medical Insurance. Ms. Edwards explained that GASB 45 is a new regulation that requires governmental agencies to recognize the liability for post-employment benefits beginning fiscal 2008. This change impacts the medical coverage offered to the District's retirees. Under the current program District, employees are able to retire with full benefits with the Rule of 75, (age and years of service total 75). Medical coverage continues for the pre-65 retiree until they become eligible for Medicare. In addition, the District offers post-65 retirees a Medicare supplemental plan. Cost of this coverage is paid by retiree. As part of GASB 45, the District conducted actuarial studies for pre and post-65 retirees. She informed the Committee that the District has agreed to accept liability for coverage as part of the retirement package for all pre-65 retirees. As for post- 65 retirees, the liability associated with this group is estimated to be $21 million. To eliminate the liability, the monthly cost for this coverage would need to increase more than $200 per month above the $320 they are currently paying. This increase would be cost-prohibited for most retirees. Staff's recommendation is to offer an alternative program to the post-65 retirees. The Medicare supplemental program being proposed is comparable in benefits and costs, to the plan currently being offered, thus eliminating the GASB 45 liability and the increase in cost. The proposed change would be effective February 1, 2008. Mr. Theerman briefed the Committee on his recent trip to Washington, DC where he met with Senate and House staff. He informed the group that the House had passed a bill for $14 billion in funding for water infrastructure. There being no further business, the meeting adjourned at 8:07 a.m. - - - - Mr. Rosenberg reported that Since the last Board meeting the Finance Committee met on September 26th and again on October 9th. At the September 26th meeting Trustees Rosenberg, Harshman, Buford, Karam, and Goffstein were in attendance. The meeting was held to discuss the Rate Commission report and the corresponding Wastewater and Stormwater rate proposals. The meeting was facilitated through a presentation made by Ms. Zimmerman who went through an overview of: the Rate Process, the task facing the Trustees, and a summary of both the Wastewater and Stormwater Rate Proposals. She emphasized that the Wastewater Rate Proposal is based on 100% Pay-as-you-go financing. The Stormwater proposal recommends an impervious area charge to fund both basic and enhanced service. The District’s proposal differs from the Rate Commission recommendation by ramping–up the enhanced service charge over a seven-year period versus the five-year period recommended by the Rate Commission. Public comment was also accepted at this meeting. Mr. Mark Drazen, a consultant for the large energy users, expressed concern that the pay-as-you-go financing for the wastewater rate creates an artificially inflated rate in the near term versus the use of an equal mix of bond and pay-as-you- go financing. Mr. Tyminski presented the advantages and disadvantages of both using bond and pay-as you go financing. He emphasized that it is the District’s preference to defer the use of bond financing to a point in time when uncertainty surrounding the capital improvement program has been resolved. At the October 9th meeting, Trustees Buford, Harshman, Joyce-Hayes, Goffstein and Rosenberg were in attendance. The Committee approved the minutes of both the September 11th and 26th meetings. Ms. Bellville, Assistant Director of Finance, presented the Adjustment Review Committee report which was formally accepted by the Committee. Mr. Tyminski addressed the Committee and recommended that the District renew the banking agreement with Bank of America for the third and final year of their contract. He noted that Bank of America is the lowest cost provider for the services required by the District and they also have the best platform to support the District’s e-banking initiatives. The Committee voted to recommend the extension of the Bank of America contract for a one-year period. This item is on tonight’s agenda. Mrs. Taylor-Edwards addressed the Committee and indicated that as part of the routine competitive procurement process, proposals were received for security services. The firm of Wackenhut is the lowest cost qualified provider for these services. The Committee voted to recommend an agreement with Wackenhut for consideration at the November Board of Trustees meeting. The Committee discussed the Waste and Stormwater Rate proposals and received public comment on this topic. Mr. Mark Gorman, a consultant for the large energy users, addressed the Committee and reiterated their position that the use of an equally proportioned debt to pay-as-you-go financing structure would provide a lower user rate in the near term. The Committee had a discussion regarding Mr. Gorman’s proposal. The committee voted to present to the full board the Wastewater proposal as recommended by the Rate Commission, and the Stormwater proposal, as modified by ramping-up the enhanced service area charge over a seven versus a five-year period. These will be items 32, 33 and 34 on tonight’s agenda. The Finance Committee voted to go into closed session to discuss legal, confidential and privileged communication as defined in RSMO 610.021 (1). No votes were taken in closed session. This concludes the report of the Finance Committee - - - - Mr. Theerman reported that as the District develops solutions to wastewater and stormwater problems that exist in our community, we continually seek to understand the best methods used by others. Some of the challenges in handling stormwater can be addressed through the use of Green Infrastructure alternatives at a lower cost than traditional solutions. Green Infrastructure refers to a set of stormwater management solutions that utilize natural systems to reduce runoff volume and improve the quality of water that reaches local streams and rivers. Green infrastructure solutions include rain gardens, vegetated roofs, vegetated swales, infiltration planters, to name a few. Item 43 on tonight’s agenda is a resolution that states the District’s support of green infrastructure alternatives in combination with traditional hard infrastructure improvements or as stand-alone solutions to the regulatory needs of our service area. That support is extended to recognizing the appropriate use of green infrastructure solutions in privately funded projects that require permitting by the District. The resolution also recognizes the numerous benefits beyond stormwater control that can be achieved through these options including: reduced urban temperatures, increased energy efficiency, cleaner air, and community aesthetics. The terms of five of the 15 seats on the Districts Rate Commission have expired. The Board of Trustees elected to wait until the conclusion of the recent rate change deliberation by the commission to start the process of filling these seats. By Charter, the District advertises for interested organizations in the community to express their interest in serving on the commission. The Board strives to appoint organizations that are collectively reflective of the community we serve. The District will be accepting letter of interest from organizations through November 15th. Any organization that desires to be considered in serving on the commission should send a letter of interest to Pam Bell here at MSD. The Board of Trustees will determine which organizations to include on the commission. The selected organizations will then determine whom to appoint as a delegate to the commission. We expect to conclude the selection process by the end of January 2008. - - - - Mr. Sullivan addressed the Board and indicated that he believes the method in which the District forwarded the rate proposal to the Rate Commission was flawed. It is his opinion that the Board of Trustees should take an action on the submittal prior to it being forwarded to the Rate Commission. Mr. Tyminski responded that the methodology for submitting a proposal to the Rate Commission is a policy decision that was discussed at great length at the time the first submission was made. The ownership of the submittal is that of the District and should come from the District staff. The Board, by interjecting it’s authority at the early stage of the process could be viewed as an impairment of the independence of the Rate Commission. Ms. Joyce-Hayes questioned if the legality of the submission process had been reviewed. Mr. Hayman indicated that it had been reviewed and the process followed by the District is on solid legal ground. - - - - Mr. Clay Stockwell, of Peppertree Village, addressed to Board and briefly discussed the severe erosion problems faced by some residents of his sub-division. He concluded by indicating that some of the homes are in great danger and he thanked the Board for what they have done. - - - - Mr. John Coffman, a utility rate attorney, spoke on behalf of the American of Association of Retired Persons (AARP). He indicated that members of this organization, which totals approximately 775,000 across the state of Missouri, have voiced concern over the steep increase. He urged the District to use debt financing to help mollify the wastewater rate increase. - - - - Mr. Mark Drazen addressed to Board and also pointed out that the District’s residents would be better served by bond financing a portion of the capital program. this will allow for a reduced impact of the increase in the wastewater rate. - - - - CONSENT AGENDA Ms. Joyce-Hayes requested that Proposed Ordinance Number 37-08 be voted on separately. ADOPTION OF PROPOSED ORD. NO. 26-08 (ORDINANCE NO. 12514) APPROPRIATING $45,000,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF THE LEMAY WWTP WET WEATHER EXPANSION (2003067), IN ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH TARLTON CORPORATION FOR THE CONSTRUCTION OF THE AFORESAID WASTEWATER TREATMENT PLANT. ADOPTION OF PROPOSED ORD. NO. 27-08 (ORDINANCE NO. 12515) APPROPRIATING $84,500.00) FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF UNIVERSITY CITY BRANCH OF RIVER DES PERES TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN BALSON AVE. 7800 BLOCK STORM SEWER (2006131), IN THE CITY OF UNIVERSITY CITY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH UNNERSTALL CONTRACTING CO., LTD., FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. 28-08 (ORDINANCE NO. 12516) APPROPRIATING $134,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF BLACK CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN RIDGETOP DRIVE STORM SEWER (2006107), IN THE CITY OF RICHMOND HEIGHTS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH UNNERSTALL CONTRACTING CO., LTD. FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 29-08 (ORDINANCE NO. 12517) APPROPRIATING $35,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK TO BE USED FOR THE CONSTRUCTION OF STORM SEWERS IN 130 ST. EDWARD LANE STORM SEWER (2006194), IN THE CITY OF FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH D.H.I. CONTRACTING, LLC FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 30-08 (ORDINANCE NO. 12518) APPROPRIATING $49,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN 61 CONWAY CLOSE STORM SEWER (2006193), IN THE CITY OF LADUE, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH RST CONTRACTING LLC FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 31-08 (ORDINANCE NO. 12519) APPROPRIATING $115,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF SUGAR CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN WILDWOOD LN. #75 STORM SEWER (89100), IN THE CITY OF KIRKWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH HEARTLAND CONSTRUCTION & EXCAVATING FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 32-08 (ORDINANCE NO. 12520) APPROPRIATING $92,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK TO BE USED FOR THE CONSTRUCTION OF STORM SEWERS IN MUNDY #1480 STORM SEWER (2007045), IN THE CITY OF FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH SOUTHERN DITCHING & EXCAVATING COMPANY FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. 33-08 (ORDINANCE NO. 12521) APPROPRIATING $265,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN LC - 01 FELTON, ARLEE AND VIDA TO CLYDE SANITARY RELIEF PHASE III (90056B), IN ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH FRED M. LUTH & SONS, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 34-08 (ORDINANCE NO. 12522) APPROPRIATING $395,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF UNIVERSITY CITY BRANCH OF RIVER DES PERES TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF ALBIN AVE. –BRENNER AVE. STORM SEWER (2001091), IN ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH XL CONTRACTING, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 35-08 (ORDINANCE NO. 12523) APPROPRIATING $1,100,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF GRAVOIS CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN KIRKWOOD ROAD - COMMERCE - REARDON (GCKC-140) PHASE II (94025), IN ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH MULLIGAN CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 36-08 (ORDINANCE NO. 12524) APPROPRIATING $500,000.00 FROM THE GENERAL FUND OF THE DISTRICT FOR THE OPERATION AND MAINTENANCE OF STREAM FLOW GAUGES IN STREAM FLOW GAUGE OPERATION AND MAINTENANCE (2007266A); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO EXTEND AGREEMENT M-561 WITH THE UNITED STATES DEPARTMENT OF THE INTERIOR (U.S. GEOLOGICAL SURVEY) FOR THE AFORESAID SERVICES. Plan Approval Lindbergh/Warson Pump Station Elimination (2006081) This project, located in the city of Creve Coeur at the intersection of Baur and Andes Blvd., is to design and construct approximately 513 feet of 8” inch gravity sanitary sewer and eliminate deteriorating pump station. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $235,000. 23 Girard Place #149 Storm Sewer (89052) This project, located in an area southeast of the intersection of Manchester Road and North Kirkwood Road, in the City of Kirkwood, is to alleviate yard flooding. This project is in the Fiscal Year 2007 Budget and the estimated construction cost is $343,700. 24 Garden Lane Storm Sewer Phase II (2005074) This project, located in an area southeast of the intersection of Manchester Road and North Kirkwood Road, in the City of Kirkwood, is to alleviate yard and street flooding. This project is in the Fiscal Year 2006 Budget and the estimated construction cost is $450,000. Motion made by Mr. Rosenberg, seconded by Mr. Karam, that the Consent Agenda be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye ADOPTION OF PROPOSED ORD. NO. 37-08 (ORDINANCE NO. 12525) APPROPRIATING $375,000.00 FROM THE GENERAL FUND OF THE DISTRICT FOR THE OPERATION AND MAINTENANCE OF WATER QUALITY SAMPLING IN STREAM FLOW GAUGE OPERATION AND MAINTENANCE (2007266B); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT 07-131 WITH THE MEC WATER RESOURCES, INC. FOR THE AFORESAID SERVICES. Motion made by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 37-08 be adopted. Motion passed – 5 ayes, no nays, 1 abstain Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes abstain E. Harshman aye C. Karam aye The Chair declared the Consent Agenda adopted and proposed Ord. Nos. 26-08, 27-08, 28-08, 29-08, 30-08, 31-08, 32-08, 33-08, 34-08, 35-08, 36-08 and 37-08, and were assigned Ordinance Nos. 12514, 12515, 12516, 12517, 12518, 12519, 12520, 12521, 12522, 12523, 12524 and 12525. - - - - UNFINISHED BUSINESS Ordinances None Resolutions None - - - - NEW BUSINESS Ordinances INTRODUCTION OF PROPOSED ORD. NO. 45-08 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1217 WITH VOLZ INCORPORATED FOR GENERAL SERVICES AGREEMENT -SURVEYING SERVICES (2008031) FOR THE SURVEYING SERVICES INCLUDING LAND SURVEYS, PROPERTY STRIP MAPS, EASEMENTS, AND OTHER GENERAL SURVEYING SERVICES. Proposed Ord. No. 45-08 was presented and read. This ordinance authorizes the District to enter into a contract with Volz Incorporated for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum of $150,000, which is included in the FY2008 Engineering Department’s Operating Budget. Motion made by Ms. Joyce-Hayes, seconded by Mr. Karam that proposed Ord. No. 45-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 46-08 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1218 WITH THE STERLING COMPANY FOR GENERAL SERVICES AGREEMENT -SURVEYING SERVICES (2008032) FOR SURVEYING SERVICES INCLUDING LAND SURVEYS, PROPERTY STRIP MAPS, EASEMENTS, AND OTHER GENERAL SURVEYING SERVICES. Proposed Ord. No. 46-08 was presented and read. This ordinance authorizes the District to enter into a contract with The Sterling Company for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum of $150,000, which is included in the FY2008 Engineering Department’s Operating Budget. Motion by Ms. Joyce-Hayes, seconded by Mr. Karam that proposed Ord. No. 46- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 47-08 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1219 WITH FERGUSON SURVEYING, LLC FOR GENERAL SERVICES AGREEMENT - SURVEYING SERVICES (2008033) FOR THE SURVEYING SERVICES INCLUDING LAND SURVEYS, PROPERTY STRIP MAPS, EASEMENTS, AND OTHER GENERAL SURVEYING SERVICES. Proposed Ord. No. 47-08 was presented and read. This ordinance authorizes the District to enter into a contract with Ferguson Surveying, LLC for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum of $100,000, which is included in the FY2008 Engineering Department’s Operating Budget. Motion by Ms. Joyce-Hayes, seconded by Mr. Karam that proposed Ord. No. 47- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 48-08 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1220 WITH SABUR SURVEYING, INC. FOR GENERAL SERVICES AGREEMENT -SURVEYING SERVICES (2008034) FOR THE SURVEYING SERVICES INCLUDING LAND SURVEYS, PROPERTY STRIP MAPS, EASEMENTS, AND OTHER GENERAL SURVEYING SERVICES. Proposed Ord. No. 48-08 was presented and read. This ordinance authorizes the District to enter into a contract with Sabur, Inc. for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum of $100,000, which is included in the FY2008 Engineering Department’s Operating Budget. Motion by Mr. Buford, seconded by Mr. Rosenberg that proposed Ord. No. 48-08 be introduced. Motion passed – 5 ayes, no nays, 1 abstain Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam abstain INTRODUCTION OF PROPOSED ORD. NO. 49-08 APPROPRIATING $262,000.00 FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF SEWER IMPROVEMENTS IN ST. LOUIS CITY PARKS PHASE IV (2007169) IN THE CITIES OF ST. LOUIS AND UNIVERSITY CITY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. E-1221 WITH OATES ASSOCIATES, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 49-08 was presented and read. This project consists of a condition assessment of the River Des Peres tubes under Forest Park and University City, and the identification and location of sanitary connections which will assist in future sewer separation design. The results will be used to identify future Operations’ and Capital Improvement projects. Motion by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 49-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 50-08 APPROPRIATING $222,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR ENGINEERING SERVICES FOR THE DESIGN OF DEER CREEK WATERSHED STORM SEWER IMPROVEMENTS (2007242), IN THE CITIES OF KIRKWOOD, LADUE AND CREVE COEUR, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1222 WITH KOWELMAN ENGINEERING, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 50-08 was presented and read. This project consists of the design and preparation of construction documents for two projects involving approximately 2,620 feet of 12-inch to 48-inch diameter storm sewer and appurtenances. The two projects include Woodleaf Court Storm Sewer Improvements (2006069) and Tealbrook Estates Storm Sewer (2007128). These projects will alleviate yard, street, and basement flooding. The preliminary construction cost estimate is $965,000. The non-construction costs are 19% of the total estimated program costs. The design costs are 17% of the estimated construction costs. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 50-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 51-08 APPROPRIATING $295,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK TO BE USED FOR ENGINEERING SERVICES FOR THE DESIGN OF COLDWATER CREEK WATERSHED STORM SEWER IMPROVE-MENTS (2007241), IN THE CITIES OF OVERLAND AND FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT E-1223 WITH CIVIL DESIGN, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 51-08 was presented and read. This project consists of the design and preparation of construction documents for three projects involving approximately 4,925 feet of 12-inch to 48-inch diameter storm sewers and appurtenances. The three projects include Goodale and Verona Storm Improvements (2006140), Midland & Angelo Storm Sewer Improvements (2006146), and Ridgelawn Court Storm Sewer (2007120). These projects will alleviate yard, street, and structure flooding. The preliminary construction cost estimate is $1,217,000. The non-construction costs are 20% of the total estimated program costs. The design costs are 19% of the estimated construction costs. Motion by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 51-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye ADOPTION OF RESOLUTION NO. 2742 ACCEPTING THE AUGUST 13, 2007 REPORT OF THE RATE COMMISSION REGARDING PROPOSED CHANGES IN THE DISTRICT’S WASTEWATER RATES AND STORMWATER RATES. Resolution No. 2742 was presented and read. Pursuant to section 7.280(f) of the District’s Charter, the Board is asked to accept or reject the Rate Commission Report. This resolution formally acknowledges the Board of Trustees acceptance of the Rate Commission Report dated August 13, 2007. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that Resolution No. 2742 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 52-08 REPEALING AND SUPERSEDING ORDINANCE NO. 12019, ADOPTED JULY 14, 2005, AND ENACTING IN LIEU THEREOF AN ORDINANCE ESTABLISHING A SCHEDULE OF WASTEWATER USER CHARGES, AND ESTABLISHING THE ADJUSTMENT REVIEW COMMITTEE. Proposed Ord. No. 52-08 was presented and read. This Ordinance enacts new wastewater user charge rate schedule as recommended by Rate Commission to support wastewater capital improvement, operational and maintenance requirements for fiscal years 2007/2008 through 2011/2012. Motion by Mr. Buford, seconded by Ms. Joyce-Hayes that proposed Ord. No. 52- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 53-08 REPEALING AND SUPERSEDING ORDINANCE NO. 9183 ADOPTED JANUARY 12, 1994, ORDINANCE NO. 9030, ADOPTED JUNE 16, 1993, AND ORDINANCE NO. 8657, ADOPTED MAY 3, 1992, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF WHICH ESTABLISHES A SCHEDULE OF STORMWATER USER CHARGES AND AUTHORIZES AN ADJUSTMENT REVIEW COMMITTEE. Proposed Ord. No. 53-08 was presented and read. This Ordinance enacts new impervious area based stormwater user charge rate per 2007 Rate Commission proceedings. This new user charge supports the stormwater capital improvement, operational and maintenance requirements for fiscal years 2007/2008 through 2013/2014. Motion by Mr. Karam, seconded by Ms. Harshman that proposed Ord. No. 53-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 54-08 REPEALING ORDINANCE NO. 12466, ADOPTED JUNE 14, 2007, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF, MAKING APPROPRIATIONS FOR CURRENT EXPENSES OF THE DISTRICT, THE WASTEWATER REVENUE FUND, THE STORMWATER REVENUE FUND, THE GENERAL FUND, THE REAL PROPERTY IMPROVEMENTS & ALTERATIONS FUND, THE WATER BACKUP INSURANCE & REIMBURSEMENT FUND, THE EMERGENCY FUND, AND THE WASTEWATER REVENUE BOND SERVICE FUND FOR THE FISCAL YEAR BEGINNING JULY 1, 2007 AND ENDING JUNE 30, 2008, NOT INCLUDING SUMS HEREBY SET APART FOR AND TRANSFERRED TO SPECIAL FUNDS, AMOUNTING IN THE AGGREGATE TO $174,390,980.00, WHICH SUM IS HEREBY APPROPRIATED FROM THE GENERAL AND SPECIAL FUNDS NAMED TO PAY INTEREST FALLING DUE ON BONDS ISSUED, THE COSTS OF SUPPORT, OPERATION, AND MAINTENANCE OF THE DISTRICT AND ITS VARIOUS SUBDISTRICTS, AND EMERGENCIES. Proposed Ord. No. 54-08 was presented and read. The purpose of this ordinance is to revise the annual budget to include the Wastewater rate increase and the implementation of a Stormwater impervious rate. It authorizes the various District departments to expend funds during 2007-2008 for wastewater and stormwater operations of the District. Motion by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 54-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 55-08 REPEALING ORDINANCE NO. 12497, ADOPTED AUGUST 24, 2007, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF, DETERMINING THE AMOUNT OF TAXES WHICH SHALL BE LEVIED, ASSESSED, AND COLLECTED IN THE YEAR 2007 ON ALL TAXABLE TANGIBLE PROPERTY IN THE DISTRICT WITHIN THE CORPORATE LIMITS OF THE CITY OF ST. LOUIS AND ST. LOUIS COUNTY, RESPECTIVELY, AND IN SUBDISTRICTS WITHIN THE CORPORATE LIMITS OF ST. LOUIS COUNTY AS FOLLOWS: COLDWATER CREEK TRUNK SUBDISTRICT, GRAVOIS CREEK TRUNK SUBDISTRICT, MALINE CREEK TRUNK SUBDISTRICT, WATKINS CREEK TRUNK SUBDISTRICT, SUBDISTRICT NO. 88 (FOUNTAIN CREEK), SUBDISTRICT NO. 89 (LORETTA-JOPLIN), BENEFIT SUBDISTRICT NO. 111 (MARLBOROUGH), SUBDISTRICT NO. 325 (PADDOCK CREEK), SUBDISTRICT NO. 342 (CLAYTON-CENTRAL), SUBDISTRICT NO. 366 (UNIVERSITY CITY BRANCH OF RIVER DES PERES STORMWATER SUBDISTRICT), SUBDISTRICT NO. 367 (DEER CREEK STORMWATER SUBDISTRICT), SUBDISTRICT NO. 369 (SUGAR CREEK), SUBDISTRICT NO. 374 (WEDGEWOOD CREEK), SUBDISTRICT NO. 376 (BLACK JACK-DELLWOOD CREEK), SUBDISTRICT NO. 380 (UPPER PADDOCK CREEK), SUBDISTRICT NO. 448 (MISSOURI RIVER - BONFILS), SUBDISTRICT NO. 449 (MERAMEC RIVER BASIN - M.S.D. SOUTHWEST), SUBDISTRICT NO. 453 (SHREWSBURY BRANCH OF RIVER DES PERES), SUBDISTRICT NO. 454 (SEMINARY BRANCH OF RIVER DES PERES), SUBDISTRICT NO. 455 (BLACK CREEK), SUBDISTRICT NO. 1 OF THE RIVER DES PERES WATERSHED (CREVE COEUR-FRONTENAC AREA), SUBDISTRICT NO. 4 OF THE RIVER DES PERES WATERSHED (NORTH AFFTON AREA), AND SUBDISTRICT NO. 7 OF THE RIVER DES PERES WATERSHED (WELLSTON AREA), WITH AN EMERGENCY CLAUSE. Proposed Ord. No. 55-08 was presented and read. The purpose of this ordinance is to make a revision of the 2007 Tax Levy for Shrewsbury Branch River des Peres only. Shrewsbury RDP Tax rates adopted in August were calculated based upon information provided by the State Auditor’s office. The District was provided with inaccurate tax rate ceilings and assessed values for 2006, which is the starting point for determining the 2007 rates. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 55-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 58-08. Motion made by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 55-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 56-08 VACATING A VARIABLE WIDTH EASEMENT LOCATED IN LOT 17 OF CHESTERFIELD RIDGE ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 350, PAGES 371-372 OF THE ST. LOUIS COUNTY RECORDS, IN ST. LOUIS COUNTY, CITY OF CHESTERFIELD, ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 56-08 was presented and read. The District has been requested to vacate its rights to a variable width easement. The property owner(s) want to vacate the easement to avoid encroaching on the easement. The District did not pay for the easement and has no future use for the easement. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 56-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 56-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 56-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 56-08 adopted and it was assigned Ordinance No. 12527. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 57-08 VACATING A FIVE- FOOT (5’) WIDE EASEMENT LOCATED IN LOTS 14-C AND 15-A OF “THE VILLAS AT LINDBERGH PLACE PLAT TWO SUBDIVISION”, A SUBDIVISION ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 355, PAGE 542 OF THE ST. LOUIS COUNTY RECORDS, IN ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 57-08 was presented and read. The District has been requested to vacate its rights to an existing ten-foot (10’) wide easement. There are no sewers in the easement but there is a retaining wall. Vacating the easement avoids an encroachment. The District has no future use for the easement. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 57-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 57-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 57-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 57-08 adopted and it was assigned Ordinance No. 12528. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 58-08 VACATING A THIRTY- FOOT (30’) WIDE EASEMENT LOCATED IN A TRACT OF LAND IN THE SOUTHWEST ONE- FOURTH PORTION OF SECTION 35, TOWNSHIP 45 NORTH, RANGE 5 EAST, AS RECORDED IN DEED BOOK 3457, PAGE 390 OF THE ST. LOUIS COUNTY RECORDS, IN ST. LOUIS COUNTY, CITY OF KIRKWOOD, ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 58-08 was presented and read. The District has been requested to vacate its rights to a thirty-foot (30’) wide sewer easement. The easement was granted by an individual to a commercial business for installation of sewer and septic tank. The District did not pay for the easement and has no future use for the existing easement to be vacated. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 58-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 58-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 58-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 58-08 adopted and it was assigned Ordinance No. 12529. Resolutions ADOPTION OF RESOLUTION NO. 2739, THE EXECUTIVE DIRECTOR HAS PREPARED A LIST OF PROPOSED EXPENDITURES FOR THE DISTRICT IN THE FORM OF A CAPITAL IMPROVEMENT & REPLACEMENT PROGRAM FOR FISCAL YEAR 2007-2008 IN COMPLIANCE WITH SECTION 7.130 OF THE DISTRICT'S PLAN. Resolution No. 2739 was presented and read. This resolution will amend the District’s adopted Capital Improvement & Replacement Program for fiscal year 2007-2008 by adding the following projects to the Program: Emerling-Evans Drainage Improvements; Ferguson Ave. and Salerno Ct. Storm Improvement; and Eva-Wabash Sanitary Relief Phase II. This authorizes staff to begin implementation of these additional projects and to request adoption of contract authorizations and appropriations during FY2008. Motion made by Mr. Buford, seconded by Mr. Rosenberg that Resolution No. 2739 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye ADOPTION OF RESOLUTION NO. 2740 SECTION 9.3 OF THE PENSION PLAN OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT PROVIDES THAT THE BOARD OF TRUSTEES OF THE DISTRICT, MAY FROM TIME TO TIME, APPOINT ONE OR MORE INVESTMENT MANAGERS TO ACT ON BEHALF OF ANY TRUSTEE OR TRUSTEES OF THE PENSION PLAN WITH RESPECT TO ALL OR A SPECIFIED PORTION OF THE ASSETS OF THE PENSION FUND HELD BY SAID TRUSTEE. SUCH INVESTMENT MANAGERS SHALL BE EITHER (A) REGISTERED AS AN INVESTMENT ADVISER UNDER THE INVESTMENT ADVISERS ACT OF 1940, (B) THE SECURITIES OF INVESTMENT COMPANIES (MUTUAL FUNDS) REGISTERED UNDER THE INVEST-MENT COMPANY ACT OF 1940, (C) A BANK COMMON OR COLLECTIVE TRUST FUND AS DEFINED IN THE INVESTMENT ADVISERS ACT OF 1940, (D) A LEGAL INSURANCE COMPANY QUALIFIED TO MANAGE, ACQUIRE OR DISPOSE OF PLAN ASSETS UNDER THE LAWS OF MISSOURI. Resolution No. 2740 was presented and read. This action formally authorizes a management agreement and the transfer of assets to Kennedy Capital Management. Motion made by Ms. Joyce-Hayes, seconded by Mr. Buford that Resolution No. 2740 be adopted. Motion passed – voice vote; 6 ayes, no nays ADOPTION OF RESOLUTION NO. 2741, WHEREAS ORDINANCE NO. 12102, ADOPTED OCTOBER 13, 2005, AUTHORIZED THE DISTRICT TO ENTER INTO A SERIES OF CONTRACTS AND AGREEMENTS WITH BANK OF AMERICA N.A., WHEREBY BANK OF AMERICA WOULD PROVIDE BANKING AND SAFEKEEPING SERVICES FOR THE DISTRICT. Resolution No. 2741 was presented and read. The District re-prices its day-to-day banking services through an RFP process every three years. The incumbent banking institution is Bank of America whose contract is for a two-year fixed term and has a one-year optional renewal provision. Bank of America was chosen from a field of six candidates in 2005 and has provided quality service on a cost effective basis. Part of the District’s requirements and objectives is the further migration into the e-banking area which is targeted for the next contract year. This ordinance allows the District to exercise the one-year contract renewal option with Bank of America. Motion made by Mr. Rosenberg, seconded by Mr. Buford that Resolution No. 2741 be adopted. Motion passed – voice vote; 6 ayes, no nays ADOPTION OF RESOLUTION NO. 2743, WHEREAS GREEN INFRASTRUCTURE CAN BE BOTH A COST EFFECTIVE AND AN ENVIRONMENTALLY PREFERABLE APPROACH TO REDUCE STORMWATER AND OTHER EXCESS FLOW ENTERING COMBINED OR SEPARATE SEWER SYSTEMS IN COMBINATION WITH, OR IN LIEU OF, CENTRALIZED HARD INFRASTRUCTURE SOLUTIONS. Resolution No. 2743 was presented and read. The use of green infrastructure for the management of stormwater is of increasing interest in the community. Green infrastructure methods have the potential to address stormwater quantity and quality issues in the District’s service area. In approving this statement of support, the District joins other local and national organizations in advancing the use of green infrastructure to solve water quality problems. Ms. Joyce-Hayes asked what this resolution does. Mr. Theerman indicated that it lends MSD support to the development of green infrastructure. Motion made by Mr. Rosenberg, seconded by Mr. Buford that Resolution No. 2743 be adopted. Motion passed – voice vote; 6 ayes, no nays - - - - Upon motion made Ms. Joyce-Hayes, seconded by Mr. Rosenberg, and unanimously passed, the meeting adjourned at 6:15 p.m. Secretary-Treasurer JOURNAL OF THE (1453rd) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT December 13, 2007 – 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above date. Present at meeting: Board of Trustees Staff Members D. B. Rosenberg, Chair J. L. Theerman, Executive Director J. H. Goffstein, Vice Chair R. E. Hayman, General Counsel E. Harshman K. J. Tyminski, Secretary-Treasurer D. J. Hayes J. M. Zimmerman, Director of Finance C. Karam B. L. Hoelscher, Director of Engineering J. H. Buford J. C. Sprague, Director of Operations Also present were Mr. Tom Sullivan, 35 N. Central; Shameka Watts, KPMG; Robert Merlo, Anheuser-Busch; Ed Sweet, Parsons; Robert Bella, HDR; Tom Ratzki, Black & Veatch; Clarence Harmon, Wackenhut; E. Goggin, Wackenhut; Bob Welsch, FMSM; Bently Green, CH2M Hill; Dennis Boehle, CH2M Hill; Vicki Slarosa, CDI; Jim Coll, Jacobs; Mark Kollitz, Woolpert; Burke Wasson, Call Newspapers; Diane Vuylsteke, Bryan-Cave; Tom Curran, Piper Jaffram; Phil Sutin, Post-Dispatch; Kim Diamond, Husch & Eppenberger; Lynn Oldham, Acorn; Monte Scott, Acorn; Vicki Taylor-Edwards, Director of Human Resources; Lance LeComb, Public Affairs Specialist; Barbara Mohn, Director of Information Systems; Mike Grace, Manager of Risk Management; Gene Rhodes, Audit Administrator; Debbie Johnson, Public Affairs; Marie Collins, Asst. Director of Engineering, and Pam Bell, Secretary to the Executive Director. - - - - Mr. David Rosenberg opened the meeting pursuant to notice and call. - - - - Motion made by Mr. Karam, seconded by Mr. Rosenberg, that the Board go into closed session to discuss confidential or privileged matters under §610.021(1), RSMO 1988 SUPP.; leasing, purchase or sale of real estate under §610.021(2). Motion passed – 5 ayes, no nays Poll taken: D. Joyce-Hayes aye C. Karam aye D. Rosenberg aye J. Buford aye E. Harshman aye During closed session the Board had discussion regarding confidential, legal, or privileged matters under § 610.021 (1) RSMO 1988 SUPP.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3). One vote was taken relating to the sale and/or lease of real property. The details of this vote will be disclosed when the transaction is complete. Motion made by Mr. Buford, seconded by Mr. Rosenberg, to reconvene into open session. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye D. Joyce-Hayes aye D. Rosenberg aye J. Buford aye C. Karam aye E. Harshman aye Mr. Goffstein arrived during closed session. - - - - Upon motion made by Ms. Joyce-Hayes, seconded by Ms. Harshman, the Journal of the November 8, 2007 meeting was approved by unanimous voice vote. - - - - Mr. Tyminski gave the Pension Investment report for the period ending September 30, 2007. He noted that this report was delayed a month to allow for a greater focus on the rate issues. As of September 30, 2007, the asset allocation for the pension plan was on target and the investment performance of the plan was in the top 40% of the country. There are no recommendations for changes being made at this time and any new recommendations would come in early 2008 after the asset allocation assumptions have been reviewed. He did note that the transition from Ark to Kennedy Capital Management was proceeding on schedule. - - - - The Chair had no comments. - - - - Ms. Harshman reported that on November 15, 2007 the Stakeholder Relations Committee met at 7:30 a.m. at the District’s headquarters. In attendance were Trustees Harshman, Goffstein, Buford and Rosenberg (via phone). Also in attendance were Kyna Iman, MSD State Lobbyist, Brent Franzel, MSD Federal Lobbyist (via phone), Rebeccah Bennett, Curtis Royston, III and staff. Ms. Harshman called the meeting to order at 7:30 a.m. The first item was a discussion regarding the District’s State and Federal Legislative Priorities, which staff is required to present to the Board each year. General Counsel, Randy Hayman, presented to the Committee the State and Federal Legislative Priorities for 2008. The Federal Legislatives priorities include, but are not limited to: securing funding for wastewater and stormwater projects through federal grants and SRF funding; support legislation establishing a Cleanwater America Trust Fund for water infrastructure; and seeking federal funding of drainage improvements in North St. Louis City and County and on the River Des Peres. At the State level, MSD will also seek additional SRF funding; support legislation authorizing bond sales at the State level consistent with revenue rulings; and support legislation that increases the penalties for stealing manhole covers. Consistent with past years, the District will make every effort to obtain government funding for projects and develop legislation that best protects the District’s interest. After Mr. Hayman’s presentation, the Committee voted to present the State and Federal Legislative Priorities to the full Board for their consideration. Staff updated the Committee on the status of the long-term control plan’s public participation requirements. The long-term control plan will serve as a blueprint for how MSD intends to address our area’s combined sewer overflows. A federal requirement of the long- term control plan is formal public participation. In accordance with the public participation plan that was reviewed with the Stakeholder Relations Committee earlier this year, MSD will be forming a Stakeholder Advisory Committee to assist in gathering public input. Staff will meet with the Advisory Committee regularly over the projected 18-month timeline for the public participation process. While the Advisory Committee will serve an important role in the process, they will not have final say over the public recommendations that become part of the LTCP. Rather, their specific role will be the following: • Provide third-party advice on strategies and tactics to move the public participation process forward; • Serve as an ambassador for MSD in the community; and • Provide feedback and information that the District might not be able to obtain on its own. Given the future importance of the long-term control plan for our community, the Stakeholder Relations Committee has asked staff to make a presentation on public participation activities at a future Board meeting. Executive Director, Jeff Theerman, informed the Committee that under the Charter, the District is required to consider Charter changes every ten years. Staff is currently reviewing items that would help streamline the operations of the District. Staff recommended working towards developing an Advisory Committee to review and assist with Charter changes to occur in 2010. The Director of Information Systems, Barb Mohn, brought forth discussion regarding the donation of District cell phones to the “Cell Phones for Soldiers” program. The District attempts to return older cell phones to vendors for trade-in credit on newer model phones. It was suggested that in recognition of MSD colleagues who have served in Operation Freedom, that the District would donate all cell phones that are functionally obsolete and have no trade-in value to the “Cell Phones for Soldiers” program that provides pre-paid calling cards to soldiers serving overseas. Motion was made to forward this item for Board review. This is Item No. 60, Resolution No. 2751, on tonight’s agenda. Vicki Edwards, Director of Human Resources, briefed the Committee on the District’s annual pension comparison as required by the pension plan. The District’s plan was compared to four governmental plans in the State of Missouri. It was concluded that the staff is not recommending a change in the pension for this coming year. There being no further business, motion to adjourn was made by Mr. Rosenberg, seconded by Ms. Harshman. The meeting adjourned at 8:45 a.m. As noted, the Stakeholder Committee voted to bring to the full Board, for its consideration, the Federal and State Legislative Priorities as presented by staff. A copy of each document was placed in front of each trustee. Ms. Joyce-Hayes asked what legislation the District is seeking regarding the theft of manhole covers. Mr. Theerman responded that the District seeks to strengthen the existing laws. Mr. Rosenberg motioned that the Board accept the Federal and State Legislative Priorities for the upcoming session. Mr. Goffstein seconded motion. Motion passed - voice vote, all ayes. - - - - Mr. Karam reported that the Program Management Committee met on December 5, 2007 at 11:30 a.m. The meeting was attended by trustees Karam, Rosenberg, and Joyce- Hayes. The minutes of the November 1, 2007 meeting were approved. Staff made a presentation on the storm sewer collapse that occurred on November 26, 2007 at #1106 South Florissant Road. Agenda item #57 is an ordinance confirming the Executive Director’s Emergency Declaration and appropriating funds for repairs. A summary of that presentation will be made as part of the Executive Director’s report. The Committee requested that staff review all potential liability considering the site was developed with full knowledge of the location of the stormwater box culvert. The Committee also requested that a full engineering inspection of the convenience store located next to the collapse be performed by the District. Staff then presented and discussed the agenda items to be introduced tonight. There was a detailed discussion regarding the following items: Item 39 – Missouri River Bonfils Phase VI – Staff is recommending amendment and adoption of this project. Due to the competitive bids received, staff is requesting that the appropriation be amended from $3 million to $1.6 million. Item 45 – Fine Road Lagoon Closure – In November, the City of Arnold transferred all sanitary flows from the existing lagoons to the new Meramec Treatment Plant. This project will abandon the existing lagoons at the Fine Road site per MDNR requirements. Items 46 & 47 – CCTV Inspection – Staff is seeking to enter the first option years on these contracts. Both contractors exceeded their performance objectives during the past year and have provided quality service. Item 48 – Black Creek Sanitary Relief Phase I – Staff is seeking an appropriation and the right to enter into an agreement with Citadel Construction Management to construct part of the District’s Capital program in coordination with redevelopment at the University Club Towers site in Clayton, Missouri. The developer will be compensated for the construction of 500 feet of sanitary sewer just above this development, but the developer will be responsible for any improvements within the development. Staff estimates a cost savings of $135,000 by coordinating this work with this development. Item 55 – Coldwater Treatment Plant – This action will transfer dollars from the appropriation providing power for the plant expansion to the construction appropriation with no net increase in project cost. Work originally appropriated to be performed by AmerenUE was required to be performed by the construction contractor. Items 64a through 64c – Staff briefly discussed why these items will require introduction and adoption at the January Board meeting. Construction of the UR-06 project must be coordinated with the County’s schedule to maintain construction traffic detours during the I-40 construction. The Black Creek project must start and finish in coordination with redevelopment at the Galleria and the start of the 2008 holiday season. Finally, the chiller piping at the Lemay Plant needs to be completed before cooling at the facility is required this spring. A detailed presentation of each project will be made by staff at the next Committee meeting. The meeting was adjourned at 12:45 p.m. - - - - Mr. Goffstein reported that the Audit Committee met on December 11, 2007 at 11:00 a.m. The meeting was attended by Board Trustees John Goffstein and Charles Karam. The audit committee was presented with the status of the FY08 audit plans. The committee was informed that Karen Vangyia, KPMG Partner out of St. Louis, will be the engagement Partner going forward for MSD with Andy Gottschalk would be moving to the role of IT Partner and Client Service Partner. The Trustees were presented with the following audit reports: Legal review, Construction review, and Collection Agency review. All reports were approved by the committee. The Trustees were then informed by Mr. Gene Rhodes that approximately 60 employees of the District completed a control self assessment questionnaire and the questionnaire is currently being analyzed. Mr. Rhodes indicated that he plans to present a report of his analysis at the next audit committee meeting. The control self assessment is an evaluation that will help the District determine it’s strengths and weaknesses along with helping to identify potential improvements for the departments and the District as a whole. Mr. Rhodes then indicated that the Fraud Abuse Hotline was implemented in 2003 and was contracted with Pinkerton, which later changed its name to Global Compliance. This year the District completed an RFP for the Fraud Abuse Hotline and received 4 responsive bidders. The lowest responsive bidder was Lighthouse for $1000 per year. Mr. Karam made a motion to accept Lighthouse as the lowest responsive bidder for the Fraud Abuse Hotline RFP and the motion was approved. Mr. Rhodes also provided the committee with an analysis of the previously issued audit findings. This analysis showed that the District has been diligently working to clear the findings, as the number open items went from 52 to 29. A closed session was not convened and the meeting was adjourned at 11:55 a.m. - - - - Mr. Rosenberg reported that The Finance Committee met Monday December 10th at 7:30 am. In attendance were Trustees Buford, Harshman and Rosenberg. At this meeting Mr. Rosenberg updated the Committee on the status of the stormwater and wastewater rate change proposals that were withheld for consideration at the November Board meeting to allow for further input and discussion with stakeholder groups. Two informal meetings were held with ad hoc stakeholder groups that included the representatives from the City, County, Acorn, AARP, the various hospitals, the large industrial users, and the Catholic Archdiocese. From these meetings a consensus of those present was reached that the District should implement only the first wastewater rate increase in January 2008 and only the first stormwater rate increase in March 2008. All future rate increases for both waste and stormwater would be subject to the District’s resubmittal of a rate plan to the Rate Commission covering the time period through 2012 that would include a debt financing option for the wastewater rate and would consider an extension of the subsidy to stormwater. Items 36 and 37 on tonight’s agenda are the rate change ordinances. The Committee voted to support consensus rate change proposal and bring that consensus to the full Board for consideration. Mrs. Zimmerman reviewed the Districts ARC (Adjustment Review Committee) for both September 2007 and October 2007 with a combined reduction in outstanding receivables of ($248,000) due from customers. This report was presented and reviewed and accepted into the record by the Committee. Mrs. Zimmerman then reviewed the Districts Financial Position as of October 2007 with total Assets of $2,577.00 billion and forecast of Expenses of $123.2 million for FY08 in line with projections. She also reported the District’s collection activity for the 1st Quarter FY08 from collection agencies and law firms as $5.2 million and projected annualized FY08 collections of $19 million. Also Receivables Aging & Collection Probabilities were presented and discussed. As of September 30th, the District had $22.9 million in outstanding receivables. Mrs. Zimmerman then updated the Low Income Program with the Committee and indicated that we were taking more proactive steps to communicate the program to the Community. Mr. Tyminski distributed to Finance Committee as well as all Trustees via E-mail a report titled “Report on Sub-Prime Mortgage Impact to Non-Pension Investment Portfolio” and discussed the actions the District had taken to tighten its credit standards to minimize the risk associated with Commercial Paper Investments. Mr. Tyminski briefly discussed the performance of the Employees’ Pension Plan investments, noting that they were in the top 10 percent as compared with other municipal plans for the 3rd quarter ending September 30th, and indicated that we would be making our required actuarial remaining contribution of $3.4 million in December. He also indicated that the District would be liquidating its position with Ark Management in order to fund the new Smidcap manager Kennedy the first of next year. The meeting adjourned at 9:10 am. Motion made by Mr. Goffstein, seconded by Mr. Karam that the consensus recommendation to amend the rate proposal be accepted. This recommendation calls for the ratification of the first rate increase and the re-submittal of any future increases to the Rate Commission with the use of bonding to reduce the burden to the rate payers. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes nay E. Harshman aye C. Karam aye - - - - Mr. Theerman reported that each year the Regional Commerce and Growth Association in collaboration with the St. Louis office of Deloitte presents the Top 50 Awards that have made an economic and civic impact on the St. Louis Region. I am proud to announce that MSD was selected from a field of 120 nominees to be recognized in the year’s awards. The District has over 800 dedicated employees that are working hard to provide excellent wastewater and stormwater services to the community. This award is recognition for their efforts. Item 39 on tonight’s agenda, the Missouri River Bonfils Infiltration and Inflow Correction Phase IV, is a pilot project aimed at reducing extraneous water that enters the sewer system through imperfections in service laterals. It is estimated that nearly 50% of the storm and ground water entering the MSD sewer system comes through the private system. The elimination of system overflows depends on the successful reduction in this inflow and infiltration. Staff is recommending that this item be held tonight to allow time to answer questions that were raised by Trustees at the Program Management committee meeting. We will discuss this ordinance further with the Program Management committee at its next meeting tentatively scheduled for December 28, 2007 at 11:30 a.m. On the evening of Monday, November 26, 2007, a 50 year old Stormwater box culver collapsed near a convenience store in Ferguson. This event swallowed two parked vehicles including one that had a passenger who was not seriously injured. These types of events are infrequent, but do occur in sewers the size and age of the MSD system. MSD has an emergency declaration process that allows me to enter into emergency contracts to expeditiously address these sorts of issues and assure that the infrastructure is returned to a working condition as rapidly as practical. In this process, we have a list of pre-qualified contractors for various types of work. The operations and engineering staff investigate the situation and advise the Executive Director of the need to perform an emergency contract. To properly address the situation in a timely manner, the contract is initiated as soon as possible and the details are reported to the Board of Trustees at the next regularly scheduled meeting. I have authorized a time and materials contract with Karsten Equipment Company for the repair of the portion of the box culvert which requires immediate action. This is item 57 on tonight’s agenda. Mr. Jonathon Sprague, with the aid of photographs, reported that around 9:30 p.m. on November 26, 2007, a sewer collapse occurred at a service station and convenience store located at the corner of S. Florissant and Woodstock Roads. Two vehicles were impacted in the sewer collapse, one of those vehicles contained a passenger that had minor injuries. The collapse was caused by the failure of a cover on a box culvert. On the site of the Shell Station. This collapse impacted a 10x12 storm sewer. There will be a 217’ stretch sewer that will need to be repaired and will take approximately six weeks to complete. Karsten equipment will perform the work on this project at approximately $645,000. Mr. Sprague indicated that $700,000 will be appropriated, the difference being contingencies. Mr. Goffstein asked what the contractual mark-ups cost. Mr. Hoelscher responded that there is a 35% mark-up for benefits and labor, 15% for materials, and either 5% or 10% for profit. Mr. Goffstein asked if this construction could be done in-house. Mr. Sprague indicated that it is not typical for us to do this type of project in-house. - - - - Mr. Sullivan addressed the Board and indicated that he’s confused about the rate ordinance and understood that it is to be amended. Mr. Rosenberg explained that the District is seeking to adopt the first year of the rate increase. Mr. Tyminski explained that later in the meeting both the wastewater and stormwater rate ordinances would be voted on. For both increases, only the first rate change is being considered at this meeting. Earlier in the report of the finance committee, a motion was passed to accept the consensus recommendation. That recommendation calls for the first rate increase being ratified and any future rate increases being sent back to the Rate Commission to discuss their impact after bonding is used to finance the projects. Mr. Tyminski emphasized that before an amendment could be placed before the Board, their intention to amend was needed because of the prior ordinances and resolutions in place. Mr. Sullivan indicated that the process seemed complicated and questioned if the Board had responded to the Rate Commission as to their intentions, as required by Charter. Mr. Sullivan was pleased to see that Item 39 (Missouri River Bonfils Infiltration and Inflow Correction Phase VI) was being held. He asked if the Fine Road lagoon closure would be audited and questioned the amount of money being spent on video inspections. Mr. Theerman responded that the amount being spent on video inspections was discussed at the May 3, 2007 finance committee meeting. - - - - CONSENT AGENDA ADOPTION OF PROPOSED ORD. NO. 59-08 (ORDINANCE NO. 12543) APPROPRIATING $3,500,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN FF-08 FEE FEE CREEK SANITARY RELIEF (89137), IN THE CITY OF MARYLAND HEIGHTS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH GERSHENSON CONST. CO., INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 60-08 (ORDINANCE NO. 12544) APPROPRIATING $34,000.00 FROM THE OPERATION, MAINTENANCE, AND CONSTRUCTION IMPROVEMENT FUND OF UNIVERSITY CITY TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF BRIAR COURT NO. 8011 STORM SEWER (2006132), IN THE CITY OF UNIVERSITY CITY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH HEARTLAND CONSTRUCTION & EXCAVATING FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. 61-08 (ORDINANCE NO. 12545) APPROPRIATING $115,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN LINDBERGH/WARSON PUMP STATION ELIMINATION (P-706) (2006081), IN THE CITY OF CREVE COEUR, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH HEARTLAND CONSTRUCTION & EXCAVATING FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 62-08 (ORDINANCE NO. 12546) APPROPRIATING $3,150,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN FF - 15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF - PHASE II (89157A), IN THE CITY OF MARYLAND HEIGHTS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH J & J BORING, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 63-08 (ORDINANCE NO. 12547) APPROPRIATING $280,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN FREDERICK LANE STORM SEWER IMPROVEMENTS (2006056), IN THE CITY OF GLENDALE, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH K.J.U. INC. FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 64-08 (ORDINANCE NO. 12548) APPROPRIATING $330,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN GARDEN LANE STORM SEWER PHASE II (2005074), IN THE CITY OF KIRKWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH GERSHENSON CONSTRUCTION CO., INC. FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 65-08 (ORDINANCE NO. 12549) APPROPRIATING $372,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN GIRARD PLACE NO. 149 STORM SEWER IMPROVEMENTS (89052), IN THE CITY OF KIRKWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH SOUTHERN DITCHING & EXCAVATING COMPANY FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. ADOPTION OF PROPOSED ORD. NO. 66-08 (ORDINANCE NO. 12550) APPROPRIATING $5,900,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN UPPER MALINE TRUNK SANITARY RELIEF PHASE III SECTION A (90080A), IN UNINCORPORATED ST. LOUIS COUNTY AND THE CITIES OF FERGUSON AND JENNINGS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH PURLER-CANNON-SCHULTE, INC. FOR THE AFORESAID CONSTRUCTION. ADOPTION OF PROPOSED ORD. NO. 67-08 (ORDINANCE NO. 12551) MAKING A SUPPLEMENTAL APPROPRIATION OF $1,450,000.00 FROM THE SANITARY REPLACEMENT FUND FOR ADDITIONAL COSTS INCURRED IN THE LOWER MERAMEC RIVER IMPROVEMENTS – BAUMGARTNER LAGOON CLOSURE (95066N) CONSTRUCTION PROJECT. ADOPTION OF PROPOSED ORD. NO. 69-08 (ORDINANCE NO. 12552) APPROPRIATING $1,200,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR EASEMENT ACQUISITION FOR COMBINED/SANITARY PROJECTS (FY2008) (2005115) THROUGHOUT THE ENTIRE DISTRICT. ADOPTION OF PROPOSED ORD. NO. 70-08 (ORDINANCE NO. 12553) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 1 OF CONTRACT E-1199 WITH GEORGE BUTLER ASSOCIATES, INC. FOR GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2007037). ADOPTION OF PROPOSED ORD. NO. 71-08 (ORDINANCE NO. 12554) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH UNITED HEALTHCARE DENTAL FOR DENTAL PLAN BENEFITS FOR THE DISTRICT'S EMPLOYEES AND FAMILY MEMBERS. ADOPTION OF PROPOSED ORD. NO. 72-08 (ORDINANCE NO. 12555) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH FORT DEARBORN LIFE INSURANCE COMPANY, A WHOLLY-OWNED SUBSIDIARY OF HEALTH CARE SERVICES CORPORATION, FOR THE DISTRICT’S EMPLOYEE GROUP LIFE AND ACCIDENTAL DEATH & DISMEMBERMENT INSURANCE. ADOPTION OF PROPOSED ORD. NO. 73-08 (ORDINANCE NO. 12556) AUTHORIZING THE EXECUTIVE DIRECTOR AND THE SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH TRI- STAR BENEFIT SYSTEMS, INC. TO ADMINISTER THE DISTRICT’S FLEXIBLE BENEFIT PLAN AND PRESCRIPTION EYEWEAR PLAN. ADOPTION OF PROPOSED ORD. NO. 74-08 (ORDINANCE NO. 12557) AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH THE WACKENHUT CORPORATION WHEREBY THE WACKENHUT CORPORATION WILL PROVIDE SECURITY FOR THE DISTRICT'S HEADQUARTERS BUILDING, DISTRICT EMPLOYEES AND THROUGHOUT THE DISTRICT AS NEEDED. ADOPTION OF PROPOSED ORD. NO. 75-08 (ORDINANCE NO. 12558) AUTHORIZING A TAX AND REVENUE ANTICIPATION NOTE IN CONNECTION WITH THE FINANCING OF CAPITAL IMPROVEMENTS IN SUBDISTRICT NO. SEVEN OF THE RIVER DES PERES WATERSHED (WELLSTON AREA) OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT. ADOPTION OF PROPOSED ORD. NO. 77-08 (ORDINANCE NO. 12559) REPEALING AND SUPERSEDING ORDINANCE NO. 8472, ADOPTED AUGUST 14, 1991, AND ENACTING IN LIEU THEREOF AN ORDINANCE REGULATING THE USE OF RESIDENTIAL AND NON- RESIDENTIAL, PUBLIC AND PRIVATE SEWERS, DRAINS, AND WASTEWATER PRETREATMENT AND TREATMENT SYSTEMS AND THE DISCHARGE OF WATERS AND WASTES INTO THE DISTRICT'S SYSTEM; AND PROVIDING PENALTIES FOR THE VIOLATION THEREOF. Plan Approval Infrastructure Repairs (Rehabilitation) (FY2008) The project is within the Metropolitan St. Louis Sewer District Boundaries which includes all of St. Louis City and parts of St. Louis County in the state of Missouri. The work to be done under this contract consists of the rehabilitation of approximately 229,396 lineal feet of sewers using CIPP methods, varying in size from 6 inch to (42 inch x 54 inch). This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $7,000,000.00. Bissell Point-Sewer Solid Waste Transfer Station (2006165) This project, located in the City of St. Louis, is to provide a contained dumping area where solids can be dewatered. This project is in the Fiscal Year 2000 Budget and the estimated construction cost is $ 358,000.00. Ferguson Ave. and Salerno Ct. Storm Improvement (2003139) This project, located in the City of Pagedale, is to alleviate property loss and damage due to stormwater flooding. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $328,000. CSO - Interceptor & Outfall Modifications (LM-143, BP-003, BP-006, BP-019, BP-030, BP-037, BP-043) (2003053A) This project, located in City of St. Louis, is to comply with Environmental Protection Agency requirements for control of combined sewer overflows. This project is in the Fiscal Year 2006 Budget and the estimated construction cost is $5,224,000. Tanqueray Lane #4953 Sanitary Sewer Replacement (Infrastructure Repair) (2006184) This project, located South of Interstate 270\255 and West of Lemay Ferry Road, in unincorporated St. Louis County, Missouri. This project is in the Fiscal Year 2008 Infrastructure Repair Budget (2007173) and the estimated construction cost is $120,000. Black Creek Sanitary Relief (Highway 40 to Wenlou Drive) (2002103) This project, located in the city of Richmond Heights, is to alleviate basement backups and overcharged sanitary sewers, and to separate a combined sewer. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $1,912,000. UR-06 Upper River Des Peres Sanitary Relief Phase II (89170) This project, located in the Cities of University City, Overland, and Olivette, is to alleviate basement backups and overcharged sanitary sewers. This project is in the Fiscal Year 2005 Budget and the estimated construction cost is $2,998,000. Lemay WWTP Secondary Chiller Piping Replacement (2007154) This project, located in unincorporated St. Louis County, is to replace all secondary chiller piping at the Lemay WWTP. This project is in the Fiscal Year 2008 Budget and the estimated construction cost is $212,000. Motion made by Ms. Joyce-Hayes, seconded by Mr. Rosenberg, that the Consent Agenda be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared the Consent Agenda adopted and proposed Ord. Nos. 59-08, 60-08, 61-08, 62-08, 63-08, 64-08, 65-08, 66-08, 67-08, 69-08, 70-08, 71-08, 72-08, 73-08, 74-08, 75-08 and 77-08, and were assigned Ordinance Nos. 12543, 12544, 12545, 12546, 12547, 12548, 12549, 12550, 12551, 12552, 12553, 12554, 12555, 12556, 12557, 12558, and 12559. - - - - UNFINISHED BUSINESS Ordinances ADOPTION OF PROPOSED ORD. NO. 53-08 (ORDINANCE NO. 12560) REPEALING AND SUPERSEDING ORDINANCE NO. 9030, ADOPTED JUNE 16, 1993, ORDINANCE NO 8657, ADOPTED MAY 3, 1992, AND ORDINANCE NO. 9183 ADOPTED JANUARY 12, 1994, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF WHICH ESTABLISHES A SCHEDULE OF STORMWATER USER CHARGES AND ESTABLISHES AN ADJUSTMENT REVIEW COMMITTEE. This ordinance was amended to only reflect the first column entitled March 1, 2008 Change. This would result in the implementation of an impervious area charge of 12¢ per 100 square feet of impervious area. Ms. Harshman stated that during the meeting the Finance Committee report touched on the communities concern related to overall affordability of the District’s rate change proposal through 2012. In keeping with the communities concern over rate affordability we passed a motion of support for the consensus recommendation. She then motioned for the amendment of Appendix II, which sets forth a schedule of user rates in proposed ordinance 53- 08 dealing with the stormwater rate increase to reflect only the first column entitled “March 1, 2008 change”. This would result in the implementation of an impervious area charge of $.12 per 100 square feet of impervious area. Motion by Ms. Harshman, seconded by Mr. Karam that proposed Ord. No. 53-08 be amended. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes nay E. Harshman aye C. Karam aye Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 53-08. Motion made by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 53-08 be adopted. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes nay E. Harshman aye C. Karam aye ADOPTION OF PROPOSED ORD. NO. 52-08 (ORDINANCE NO. 12561) REPEALING AND SUPERSEDING ORDINANCE NO. 12019, ADOPTED JULY 14, 2005, AND ENACTING IN LIEU THEREOF AN ORDINANCE ESTABLISHING A SCHEDULE OF WASTEWATER USER CHARGES, AND ESTABLISHING THE ADJUSTMENT REVIEW COMMITTEE. This ordinance was amended to reflect only the first column entitled December 1, 2007 Change and that the wording of that column was also amended to read “January 1, 2008 Change.” Ms. Harshman stated that earlier in this meeting the Finance Committee report touched on the communities concern related to overall affordability of the District’s rate change proposal through 2012. She then motioned for the amendment of Appendix I, which sets forth a schedule of user rates in proposed ordinance 52-08 dealing with the wastewater rate increase be amended to reflect only the first column entitled “December 1, 2007 Change” and that the wording of that column also be amended to read “January 1, 2008 Change”. Motion by Ms. Harshman, seconded by Mr. Karam that proposed Ord. No. 52-08 be amended. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes nay E. Harshman aye C. Karam aye Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 52-08. Motion made by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 52-08 be adopted. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes nay E. Harshman aye C. Karam aye AMENDMENT AND ADOPTION OF PROPOSED ORD. NO. 54-08 (ORDINANCE NO. 12562) REPEALING ORDINANCE NO. 12466, ADOPTED JUNE 14, 2007, AND ENACTING A NEW ORDINANCE IN LIEU THEREOF, MAKING APPROPRIATIONS FOR CURRENT EXPENSES OF THE DISTRICT, THE WASTEWATER REVENUE FUND, THE STORMWATER REVENUE FUND, THE GENERAL FUND, THE REAL PROPERTY IMPROVEMENTS & ALTERATIONS FUND, THE WATER BACKUP INSURANCE & REIMBURSEMENT FUND, THE EMERGENCY FUND AND THE WASTEWATER REVENUE BOND SERVICE FUND FOR THE FISCAL YEAR BEGINNING JULY 1, 2007 AND ENDING JUNE 30, 2008, NOT INCLUDING SUMS HEREBY SET APART FOR AND TRANSFERRED TO SPECIAL FUNDS, AMOUNTING IN THE AGGREGATE TO $174,440,980.00, WHICH SUM IS HEREBY APPROPRIATED FROM THE GENERAL AND SPECIAL FUNDS NAMED TO PAY INTEREST FALLING DUE ON BONDS ISSUED, THE COSTS OF SUPPORT, OPERATION, AND MAINTENANCE OF THE DISTRICT AND ITS VARIOUS SUBDISTRICTS, AND EMERGENCIES. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 54-08 be amended. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 54-08. Motion made by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 54-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye Resolutions None - - - - NEW BUSINESS Ordinances INTRODUCTION OF PROPOSED ORD. NO. 84-08 APPROPRIATING $3,500,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF MARBENDALE – LEMP SANITARY FACILITIES CONSOLIDATION (2001139), IN THE CITY OF KIRKWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN KIRKWOOD SEWER DISTRICT TO ENTER INTO A CONTRACT WITH UNNERSTALL CONTRACTING CO., LTD. FOR THE AFORESAID CONSTRUCTION. Proposed Ord. No. 84-08 was presented and read. The work to be done under this contract consists of the construction of approximately 4,100 lineal feet of pipe sewers varying in size from 6-inches to 8-inches in diameter, 1,000 feet of 6-inch force main, and appurtenances. A duplex pump station will also be constructed with 70 lineal feet of 96-inch storage pipe. The purpose of this project is to eliminate five pump stations and three pump station overflows in sub-area #3 of the Lower Meramec River service area. This project is scheduled to be completed in 370 days. Motion made by Ms. Joyce-Hayes, seconded by Mr. Karam that proposed Ord. No. 84-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 85-08 APPROPRIATING $19,000,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF CREVE COEUR CREEK (L-52) PUMP STATION IMPROVEMENTS (2003062A) IN THE CITY OF MARYLAND HEIGHTS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH KCI CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF THE AFORESAID PUMP STATION IMPROVEMENTS. Proposed Ord. No. 85-08 was presented and read. The work to be done under this contract consists of the construction of a new 60 mgd pump station including two channel grinders, odor control system, emergency generator, meter vault, associated gravity and force main piping, and the demolition of the existing pump station. The purpose of this project is to replace the existing pump station with a new station with increased capacity, and to allow for the future removal of 21 constructed SSOs. This project is scheduled to be completed in 540 days. Motion by Mr. Karam, seconded by Ms. Joyce-Hayes that proposed Ord. No. 85- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 86-08 APPROPRIATING $66,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE PROCUREMENT OF PUMP STATION EQUIPMENT AS PART OF THE LEMAY PUMP STATION NO. 3 (DRIVE PROCUREMENT) (2003078A) AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH GRAYBAR ELECTRIC CO., INC. FOR THE FURNISHING OF THE AFORESAID PUMP STATION EQUIPMENT. Proposed Ord. No. 86-08 was presented and read. The work to be done under this contract consists of the procurement of variable frequency drives, soft starters, and appurtenances for the Lemay Pump Station No. 3 and the Jefferson Barracks Pump Station. This equipment will be installed by District staff. The purpose of this project is to replace inadequate and deteriorating equipment with new drives and soft starters to reduce excessive staff and maintenance repair costs, and alleviate property loss and damage due to mechanical outages. This project is scheduled to be completed in 210 days. Motion by Mr. Rosenberg, seconded by Mr. Karam that proposed Ord. No. 86-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 87-08 APPROPRIATING $100,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE PROCUREMENT OF PUMP STATION EQUIPMENT AS PART OF THE LEMAY PUMP STATION NO. 3 (PUMP PROCUREMENT) (2003078B) AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH VANDEVANTER ENGINEERING A DIVISION OF LEE MATTHEWS EQUIPMENT, INC. FOR THE FURNISHING OF THE AFORESAID PUMP STATION EQUIPMENT. Proposed Ord. No. 87-08 was presented and read. The work to be done under this contract consists of the procurement of a spare pump and appurtenances for the Lemay Pump Station No. 3. This equipment will be installed by District staff. The purpose of this project is to provide a spare pump for the Lemay Pump Station No. 3 to reduce excessive staff and maintenance repair costs, and alleviate property loss and damage due to mechanical outages. This project is scheduled to be completed in 210 days. Motion by Ms. Joyce-Hayes, seconded by Mr. Buford that proposed Ord. No. 87- 08 be introduced. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 88-08 APPROPRIATING $385,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE REHABILITATION AND EXPANSION OF THE EXISTING FACILITY IN BISSELL POINT - SEWER SOLID WASTE TRANSFER STATION (2006165) IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH XL CONTRACTING, INC. FOR THE REHABILITATION OF THE AFORESAID SANITARY SEWERS. Proposed Ord. No. 88-08 was presented and read. The work to be done under this contract consists of the construction of approximately 670 square yards of concrete pavement, 202 cubic yards of reinforced concrete construction, 419 lineal feet of pipe sewers varying in size from 10-inches to 12-inches in diameter, a solids-separator manhole, and appurtenances. The purpose of this project is to provide a contained dumping area where solids that are combined with sewer cleaning waste can be dewatered. This project is scheduled to be completed in 150 days. Motion by Mr. Buford, seconded by Ms. Joyce-Hayes that proposed Ord. No. 88- 08 be introduced. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 89-08 APPROPRIATING $3,300,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS ASSOCIATED WITH THE LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS – FINE ROAD LAGOON CLOSURE (95066N1) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH SYNAGRO CENTRAL, LLC FOR THE CLOSURE OF THE FINE ROAD LAGOON. Proposed Ord. No. 89-08 was presented and read. The work to be done under this contract consists of the construction for demolition and closure of the Lower Meramec River System Improvements – Fine Road Lagoon Closure including furnishing all labor, material, tools, equipment and supervision necessary for demolition and removal of aeration equipment and piping, process piping, above and below grade utilities and structures, and biosolids removal, processing, transportation and disposal from the existing two-cell aerated lagoon, construction of approximately 900 feet of haul road, disposal of a construction trailer, including demolition and removal of all ancillary facilities. This project is scheduled to be completed in 360 days. Motion by Mr. Karam, seconded by Ms. Joyce-Hayes that proposed Ord. No. 89- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 90-08 MAKING A SUPPLEMENTAL APPROPRIATION OF $1,125,000.00 FROM THE SANITARY REPLACEMENT FUND FOR CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS – NORTH (2007236A) AND CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS – SUPPORT SERVICES (2006166A) AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 1 OF THE CONTRACT WITH ADS ENVIRONMENTAL SERVICES, LLC FOR THE AFORESAID CCTV AND PHYSICAL INSPECTION AND SUPPORT SERVICES. Proposed Ord. No. 90-08 was presented and read. This ordinance appropriates funds and authorizes the District to enter into Amendment No. 1 for the first option year with ADS Environmental Services, LLC. The purpose of this contract is to provide District staff with information regarding sewer condition by the use of Closed Circuit Television (CCTV) and physical inspection. These inspections will determine sewer conditions and system defects and will form the basis for preventative maintenance activities, inflow/infiltration investigations, and sewer system models. This contract amendment for CCTV Inspection and Physical Inspection of Sewers – North is for $1,125,000, which includes $125,000 of support services for sewer cleaning and locating and raising of manholes. Approximately 70% of the CCTV investigations will provide support data for the Watershed Planning efforts and the remaining 30% will support specific design projects, pre-design studies, and miscellaneous inspection requests. This contract is renewable for one (1) additional year after this action. It has an unencumbered balance of $456,000. This remaining balance has been assigned to work tasks amounting to approximately $500,000 (250,000 lineal feet of sewer). It is anticipated that this balance will be expended by April 2007. Currently, there is a backlog of unassigned work tasks totaling $2,680,000 (1,340,000 lineal feet) to be addressed by this and future actions. Motion by Mr. Buford, seconded by Ms. Joyce-Hayes that proposed Ord. No. 90- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 91-08 MAKING A SUPPLEMENTAL APPROPRIATION OF $1,125,000.00 FROM THE SANITARY REPLACEMENT FUND FOR CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS – SOUTH (2007236B) AND CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS – SUPPORT SERVICES (2006166B) AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 1 OF THE CONTRACT WITH ACE PIPE CLEANING, INC. FOR THE AFORESAID CCTV AND PHYSICAL INSPECTION AND SUPPORT SERVICES. Proposed Ord. No. 91-08 was presented and read. This ordinance appropriates funds and authorizes the District to enter into Amendment No. 1 for the first option year with Ace Pipe Cleaning, Inc. The purpose of this contract is to provide District staff with information regarding sewer condition by the use of Closed Circuit Television (CCTV) and physical inspection. These inspections will determine sewer conditions and system defects and will form the basis for preventive maintenance activities, inflow/infiltration investigations, and sewer system models. This contract amendment for CCTV Inspection and Physical Inspection of Sewers – South is for $1,125,000, which includes $125,000 of support services for sewer cleaning and locating and raising of manholes. Approximately 70% of the CCTV investigations will provide support data for the Watershed Planning efforts and the remaining 30% will support specific design projects and miscellaneous inspection requests. This contract is renewable for one (1) additional year after this action. It has an unencumbered balance of $472,000. This remaining balance has been assigned to work tasks amounting to approximately $500,000 (250,000 lineal feet of sewer). It is anticipated that this balance will be expended by April 2007. Currently, there is a backlog of unassigned work tasks totaling $1,536,000 (786,000 lineal feet) to be addressed by this and future actions. Motion by Ms. Joyce-Hayes, seconded by Ms. Harshman that proposed Ord. No. 91-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 92-08 APPROPRIATING $270,000.00 FROM THE SANITARY REPLACEMENT FUND TO REIMBURSE CITADEL CONSTRUCTION MANAGEMENT, LLC FOR THE COSTS OF CONSTRUCTION OF SANITARY SEWERS AS UNDERTAKEN BY CITADEL CONSTRUCTION MANAGEMENT, LLC IN BLACK CREEK SANITARY RELIEF (HIGHWAY 40 TO WENLOU DRIVE) PHASE I (2002103A) IN THE CITY OF CLAYTON, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH CITADEL CONSTRUCTION MANAGEMENT, LLC WHEREBY THE DISTRICT WILL REIMBURSE CITADEL CONSTRUCTION MANAGEMENT, LLC FOR THE CONSTRUCTION OF SAID SANITARY SEWERS. Proposed Ord. No. 92-08 was presented and read. The work to be done under this contract consists of the construction of approximately 504 lineal feet of pipe sewers 8- inches in diameter and appurtenances. The purpose of this project is to alleviate property damage due to basement backups and overcharged sanitary sewers. This project will also provide for separation of a combined sewer and for future elimination of a combined sewer overflow. This project is scheduled to be completed in 120 days. Motion by Mr. Karam, seconded by Ms. Joyce-Hayes that proposed Ord. No. 92- 08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 93-08 APPROPRIATING $430,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE II (BP-012, BP-038) (2003053B6) IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH KARSTEN EQUIPMENT CO. FOR THE CONSTRUCTION OF THE AFORESAID SANITARY SEWERS. Proposed Ord. No. 93-08 was presented and read. The work to be done under this contract consists of the construction of approximately 365 lineal feet of pipe sewers varying in size from 8-inches to 24-inches in diameter and appurtenances. The purpose of this project is to construct modifications to remove direct sanitary connections to the combined sewer outfalls. This project is scheduled to be completed in 234 days. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 68-08 be introduced. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein nay J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 94-08 APPROPRIATING $7,000,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE REHABILITATION OF SANITARY SEWERS IN INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2008) (2007172) IN THE CITY OF ST. LOUIS AND ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH INSITUFORM TECHNOLOGIES USA, INC. FOR THE REHABILITATION OF THE AFORESAID SANITARY SEWERS. Proposed Ord. No. 94-08 was presented and read. The work to be done under this contract consists of the rehabilitation of approximately 229,396 lineal feet of sewers using CIPP methods, varying in size from 6-inches to 42-inches x 54-inches in diameter, and manhole rehabilitation of approximately 2,250 lineal feet. The purpose of this project is to rehab older, damaged and deteriorated sewers that are causing pipe collapses, blocked mains, and leaking pipes. This project is scheduled to be completed in 365 days. Motion by Mr. Karam, seconded by Mr. Rosenberg that proposed Ord. No. 94-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 95-08 APPROPRIATING $53,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN AVIGNON CT. #1685 STORM SEWER (2006130), IN THE CITY OF WARSON WOODS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH DIRTBUSTERS, INC. FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. Proposed Ord. No. 95-08 was presented and read. The work to be done under this contract consists of the construction of approximately 205 lineal feet of pipe sewers varying in size from 12-inches to 15-inches in diameter and appurtenances. The purpose of this project is to alleviate yard and basement flooding at #1685 Avignon Ct. This project is scheduled to be completed in 30 days. Motion by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 95-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 96-08 APPROPRIATING $82,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF FOUNTAIN CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN HARRISON AVE. #1375 STORM SEWER CONSOLIDATION AND OUTFALL (2006142), IN THE CITY OF FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH HEARTLAND CONSTRUCTION & EXCAVATING FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. Proposed Ord. No. 96-08 was presented and read. The work to be done under this contract consists of the construction of approximately 415 lineal feet of pipe sewers varying in size from 12-inches to 18-inches in diameter and appurtenances. The purpose of this project is to alleviate rear yard and basement flooding in the north side of Harrison Street, east of Aubuchon Street. This project is scheduled to be completed in 90 days. Motion by Mr. Karam, seconded by Mr. Buford that proposed Ord. No. 96-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 97-08 APPROPRIATING $760,000.00 FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF DEER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN KORTWRIGHT - NORTH OF SHERRELL AND O’DAY STORM IMPROVEMENT (2005050), IN THE CITY OF ROCK HILL, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH SOUTHERN DITCHING & EXCAVATING COMPANY FOR THE CONSTRUCTION OF THE AFORESAID STORM SEWERS. Proposed Ord. No. 97-08 was presented and read. The work to be done under this contract consists of the construction of approximately 2,370 lineal feet of pipe sewers varying in size from 8-inches to 30-inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding and house flooding due to inadequate sinkholes. This project is scheduled to be completed in 427 days. Motion by Mr. Buford, seconded by Mr. Karam that proposed Ord. No. 97-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION OF PROPOSED ORD. NO. 98-08 APPROPRIATING $60,000.00 FROM THE OPERATION, MAINTENANCE AND DESIGN IMPROVEMENT FUND OF MALINE CREEK TO REIMBURSE THE CITY OF COOL VALLEY, MISSOURI FOR THE COSTS OF DESIGN OF STORMWATER IMPROVEMENTS AS UNDERTAKEN BY SAID CITY IN EMERLING - EVANS DRAINAGE IMPROVEMENTS (2007166); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH THE CITY OF COOL VALLEY, MISSOURI WHEREBY THE DISTRICT WILL REIMBURSE SAID CITY FOR THE DESIGN OF SAID STORMWATER IMPROVEMENTS. Proposed Ord. No. 98-08 was presented and read. This project provides for the installation of various drainage improvements to address flooding of properties on Evans Avenue and yard erosion of properties on Emerling Drive in an area north of I-70 and west of Florissant Road (S) in the City of Cool Valley. The City is contracting with Palladian Consulting Engineers, LLC for the design of the proposed improvements including engineering, surveys, soils investigation, and preparation of construction plans and specifications. The District is providing $60,000 in financial assistance to the City to complete the design of this project in order to be eligible for possible State Stormwater Program funding. Motion by Ms. Harshman, seconded by Mr. Rosenberg that proposed Ord. No. 98- 08 be introduced. Motion passed – 5 ayes, 1 nay Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam nay INTRODUCTION OF PROPOSED ORD. NO. 99-08 TRANSFERRING FUNDS BY RETURNING $634,000.00 AS APPROPRIATED BY ORDINANCE NO. 12151, ADOPTED JANUARY 12, 2006, FOR THE COLDWATER TREATMENT PLANT IMPROVEMENTS (99077) TO THE SANITARY REPLACEMENT FUND BALANCE, AND APPROPRIATING $634,000.00 FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF COLDWATER TREATMENT PLANT IMPROVEMENTS (99077); IN ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 99-08 was presented and read. The work to be done under this contract consists of the construction of a new headworks building, including pumping and screening equipment, four new primary clarifiers, a sludge and grit pump station, flow spitting facilities, a new blower building, modifications to the existing aeration basins, a new final clarifier, a new sludge thickener, a new maintenance building, carbon absorption odor control system, building demolition, new site grading and piping, electrical and HVAC upgrades, plant controls system, and miscellaneous other plant improvements. Motion by Mr. Rosenberg, seconded by Ms. Harshman that proposed Ord. No. 994-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam nay INTRODUCTION OF PROPOSED ORD. NO. 100-08 MAKING A SUPPLEMENTAL APPROPRIATION OF $575,000.00 FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE FINAL DESIGN OF CREVE COEUR CREEK (L-52) PUMP STATION IMPROVEMENTS (2003062); AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AMENDMENT NO. 2 OF CONTRACT E-1101 WITH CAMP DRESSER & MCKEE, INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 100-08 was presented and read. This ordinance appropriates supplemental funds and authorizes the District to enter into Amendment No. 2 with Camp Dresser & McKee Inc. This project consists of the design and preparation of construction documents for approximately 1,800 lineal feet of 18-inch diameter force main, pump station, and appurtenances. Separate construction documents were prepared for pump station and force main improvements. The preliminary construction cost estimate for the two construction contracts is $31,200,000.00. This amendment provides for engineering services during construction. The amended design appropriation is $2,073,000.00. This project will increase the capacity of the pump station from 34 to 60 million gallons per day. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 100-08 be introduced. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 101-08 APPROPRIATING $700,000.00 FROM THE EMERGENCY FUND FOR EMERGENCY SEWER REPAIRS IN EMERGENCY REPAIR #042 – 1106 S. FLORISSANT ROAD (2007249A) IN THE CITY OF FERGUSON, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH KARSTEN EQUIPMENT COMPANY FOR THE AFORESAID EMERGENCY REPAIRS. Proposed Ord. No. 101-08 was presented and read. The work to be done on the emergency contract consists of the repair of an approximately 220-foot reach of 10’ x 12’ reinforced concrete box culvert. The repair is needed to expeditiously restore the sewer to service, prevent pollution to Maline Creek in North St. Louis County, and prevent future property damage. The District staff declared the project an emergency on November 27, 2007. The contractor, Karsten Equipment Company, has been selected per MSD Emergency Declaration Policy. The repair has started and is expected to be complete before January 31, 2008. District staff has taken appropriate measures to assure the environment is protected and any leaking hazardous waste is captured and properly disposed. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 101-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 101-08. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 101-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 101-08 adopted and it was assigned Ordinance No. 12563. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 102-08 APPROPRIATING $583,723.41 FROM THE SANITARY REPLACEMENT FUND FOR THE CSO LONG-TERM CONTROL PLAN PUBLIC PARTICIPATION PROGRAM PROJECT (2007238). Proposed Ord. No. 102-08 was presented and read. This action will correct a scrivener’s error (clerical error) in ordinance number 12491, which was adopted on August 9, 2007. This action will authorize an appropriation - via an ordinance separate from ordinance number 12491 - to fund a contract with Vector Communications. Motion by Ms. Joyce-Hayes, seconded by Mr. Rosenberg that proposed Ord. No. 102-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 102-08. Motion made by Mr. Rosenberg, seconded by Mr. Buford that proposed Ord. No. 102-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 79-08 adopted and it was assigned Ordinance No. 12564. INTRODUCTION AND ADOPTION OF PROPOSED ORD. NO. 103-08 VACATING A PORTION OF A TEN-FOOT (10’) WIDE EASEMENT LOCATED IN LOT 3 OF PART OF LOT 4A OF THE SUBDIVISION OF LOT 4 OF THE WILLIAMS H. ERKER SUBDIVISION LOCATED IN PART OF LOT 25 OF JOHN COULTER’S SUBDIVISION OF HOWELL PRAIRIE TRACT IN U.S. SURVEY 1669, TOWNSHIP 46 NORTH, RANGE 3 EAST AS RECORDED IN THE ST. LOUIS COUNTY RECORDS IN ST. LOUIS COUNTY, MISSOURI. Proposed Ord. No. 103-08 was presented and read. The District has been requested to vacate its rights to a ten-foot (10’) wide easement in Lot 3 and common ground of this commercial property. The District did not pay for this easement being vacated, and it has no future use for the easement being vacated. Motion by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that proposed Ord. No. 103-08 be introduced. Motion made, seconded and unanimously adopted to suspend the rules to allow for adoption of proposed Ord. No. 103-08. Motion made by Mr. Rosenberg, seconded by Ms. Harshman that proposed Ord. No. 103-08 be adopted. Motion passed – 6 ayes, no nays Poll taken: J. Goffstein aye J. Buford aye D. Rosenberg aye D. Joyce-Hayes aye E. Harshman aye C. Karam aye The Chair declared proposed Ord. No. 80-08 adopted and it was assigned Ordinance No. 12565. Resolutions ADOPTION OF RESOLUTION NO. 2751 WHEREAS, IT WAS THE SUGGESTION OF A DISTRICT EMPLOYEE THAT THE DISTRICT DONATE ITS TECHNOLOGICALLY OBSOLETE CELLULAR PHONES THAT HAVE NO RESIDUAL VALUE TO THE “CELL PHONES FOR SOLDIERS” PROGRAM; AND THE DONATION OF THESE CELL PHONES IS IN RECOGNITION OF FIVE MSD COLLEAGUES WHO HAVE SERVED PAST AND PRESENT IN “OPERATION FREEDOM”. Resolution No. 2751 was presented and read. Donations to non-profit philanthropic private organizations are supported under Ordinance No. 9845, section seventeen. The Cell Phone for Soldiers program has been in place since 2004. It is a registered 501(c)3 non-profit organization that has to date raised approximately $1 million in donations and has distributed more than 400,000 prepaid calling cards to US soldiers serving overseas. (www.cellphonesforsoldiers.com). The program works as follows: Donated phones are set to “factory default” by the company/organization/individual making the donation. This ensures that all proprietary data is removed from the phone. The Cell Phone for Soldiers program works with a vendor that recycles and buys the phone components. The dollars for the components are then used by the Cell Phone for Soldiers program to purchase calling cards which are sent to soldiers serving overseas. (Cell phones are not donated directly to soldiers because of military security restrictions on what can be sent to a soldier serving in a war zone and the fact that most older phones are not GSM enabled and would not work in regions such as the Middle East.) Motion made by Mr. Rosenberg, seconded by Ms. Harshman that Resolution No. 2751 be adopted. Motion passed – voice vote; 6 ayes, no nays ADOPTION OF RESOLUTION NO. 2752 WHEREAS, UNDER PROVISIONS OF ORDINANCE NO. 12010, SECTION TWO, ADOPTED ON JUNE 9, 2005, THE LIST OF APPROVED DEPOSITARY BANKS MAY BE MODIFIED FROM TIME TO TIME BY RESOLUTION OF THE BOARD OF TRUSTEES OF THE DISTRICT. Resolution No. 2752 was presented and read. At least annually, the District updates the list of approved banking institutions which it may deposit funds with. Typically, the District will invest in collateralized certificates of deposit, collateralized money market funds and collateralized time deposits with local banking institutions. This resolution authorizes a list of institutions that have been pre-qualified by the District. It also authorizes a list of security dealers that may execute investment transactions on the District’s behalf. Motion made by Mr. Buford, seconded by Mr. Karam that Resolution No. 2752 be adopted. Motion passed – voice vote; 6 ayes, no nays ADOPTION OF RESOLUTION NO. 2753 TRANSFERRING UNENCUMBERED APPROPRIATED BALANCES TOTALING $35,000.00 FROM CERTAIN CLASSIFICATIONS OF EXPENDITURE WITHIN THE GENERAL FUND TO OTHERS WITHIN THE GENERAL FUND TO MEET THE OPERATING NEEDS OF THE DISTRICT FOR THE REMAINDER OF THE FISCAL YEAR 2007-2008. Resolution No. 2753 was presented and read. This resolution transfers unencumbered appropriated balances from Operations Utility Accounts (300’s) to Secretary- Treasurer Contractual Services Accounts (400’s) in the amount of $35,000 to meet the operating needs of the District for the remainder of the Fiscal Year 2007-2008, said transfer to be made between accounts and in the amounts as indicated in the resolution. Motion made by Mr. Rosenberg, seconded by Ms. Harshman that Resolution No. 2753 be adopted. Motion passed – voice vote; 6 ayes, no nays ADOPTION OF RESOLUTION NO. 2750 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO ROOSEVELT THURMOND FOR HIS 31 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM SEPTEMBER 27, 1976, TO HIS RETIREMENT EFFECTIVE JANUARY 1, 2008. Resolution No. 2746 was presented and read. Motion made by Mr. Rosenberg, seconded by Ms. Joyce-Hayes that Resolution No. 2750 be adopted. Motion passed – voice vote; 6 ayes, no nays - - - - Upon motion made Mr. Buford, seconded by Ms. Joyce-Hayes, and unanimously passed, the meeting adjourned at 6:00 p.m. Secretary-Treasurer Table 2-1 Historical Wastewater and Stormwater Operating Costs Line Historical_________________________________________________________ No Department 2002 2003 2004 2005 2006____ _________________ ________ ________ ________ ________ ________ $$$$$ 1 Board of Trustees 11,824 37,969 28,457 5,176 6,761 2 Rate Commission (a) 43,534 390,486 25,723 (10,905) 47,287 3 Civil Service Commission 1,120 9,150 855 3,775 1,297 4 Secretary - Treasurer 1,064,844 1,372,369 1,500,279 1,232,054 1,433,320 5 Executive Director 1,798,836 1,405,250 749,193 765,912 669,301 6 General Counsel 1,504,086 1,284,039 1,478,876 1,319,763 1,486,452 7 Office of Human Resources 15,270,097 17,554,305 19,328,048 8,248,765 8,093,929 8 Engineering 14,902,810 15,735,615 14,323,870 18,910,094 18,687,163 Operations 9 Collection System (b) 20,166,072 18,990,542 16,802,592 19,868,112 18,610,464 10 Pump Stations 6,259,912 6,238,792 6,255,158 6,529,714 6,966,237 11 Wastewater Treatment (c) 24,040,770 25,689,660 21,909,729 26,194,117 27,602,538 12 Support 2,733,903 2,564,527 6,392,528 3,978,080 6,078,589__________ __________ __________ __________ __________ 13 Total Operations 53,200,657 53,483,521 51,360,006 56,570,023 59,257,827 14 Finance 6,237,874 6,803,699 8,291,439 14,166,470 14,161,194 15 Information Systems 4,368,929 4,770,762 5,172,781 4,812,767 6,063,356__________ __________ __________ __________ __________ 16 Subtotal (General Fund) 98,404,611 102,847,165 102,259,527 106,023,893 109,907,887 17 Water Backup Program 2,548,000 3,824,000 4,276,000 6,104,781 4,858,510 18 Headquarters Building (d) 0 0 1,140,000 1,001,854 1,380,134__________ __________ __________ __________ __________ 19 Total O&M 100,952,611 106,671,165 107,675,527 113,130,528 116,146,531 (a) 2005 reflects reversal of prior year encumbrance. (b) Includes Mintert, Sulphur, and Grand Glaize. (c) Includes Lemay, Bissell, and County Treatment Plants. (d) Expenditures offset by rental income. ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-2 Allocation of Direct Operating Costs Between Wastewater and Stormwater Wastewater Stormwater Direct Direct Indirect________ ________ ________ Personnel Services Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 65.2% 29.4% 5.4% Operations Collection System 69.0% 31.0% 0.0% Pump Stations 67.6% 32.4% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 64.0% 15.2% 20.8% Finance 30.7% 20.5% 48.8% Information Systems 5.8% 3.9% 90.3% All Other Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 55.3% 44.3% 0.4% Operations Collection System 76.0% 24.0% 0.0% Pump Stations 76.0% 24.0% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 86.1% 13.9% 0.0% Finance 54.4% 36.3% 9.3% Information Systems 5.8% 3.9% 90.3% Utilities Operations Pump Stations 84.9% 15.1% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-3Projected Wastewater Operating CostsLineProjectedNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 28,100 22,900 14,200 14,800 15,400 16,0002 Rate Commission (a) 214,900 1,800 1,100 1,100 250,500 2,2003 Civil Service Commission 4,000 4,200 4,400 4,600 4,800 5,0004 Secretary - Treasurer 1,096,800 945,100 979,300 1,206,800 1,051,500 1,089,5005 Executive Director 656,500 679,800 703,800 728,700 754,500 781,4006 General Counsel 1,495,200 1,549,200 1,605,200 1,663,300 1,723,600 1,786,1007 Office of Human Resources 7,321,600 12,001,800 12,784,500 13,631,100 14,548,000 15,542,7008 Engineering 14,599,000 15,134,900 15,791,700 16,459,500 17,016,100 17,592,000Operations9 Collection System (b) 14,474,500 14,952,200 15,446,100 15,956,400 16,484,100 17,029,30010 Pump Stations 5,388,300 5,560,000 5,737,200 5,921,200 6,111,300 6,308,50011 Wastewater Treatment (c) 30,985,000 31,985,400 33,019,000 34,091,300 35,199,200 36,348,50012 Support 6,351,200 6,557,200 6,770,100 6,989,700 7,216,800 7,451,500__________ __________ __________ __________ __________ __________ 13 Total Operations 57,199,000 59,054,800 60,972,400 62,958,600 65,011,400 67,137,80014 Finance 10,061,000 10,444,700 10,843,200 11,257,100 11,687,000 12,133,30015 Information Systems 3,936,600 4,073,500 4,215,200 4,362,000 4,514,000 4,671,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 96,612,700 103,912,700 107,915,000 112,287,600 116,576,800 120,757,40017 Water Backup Program 7,200,000 5,700,000 5,700,000 5,700,000 5,700,000 5,700,00018 Headquarters Building (d) 971,600 1,300,700 1,039,700 1,070,900 1,103,000 1,136,100__________ __________ __________ __________ __________ __________ 19 Total O&M 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,50020 Capital Outlay 2,393,700 2,394,600 2,536,500 2,619,600 2,698,200 2,779,10021 Construction & Engineering 3,755,100 4,000,000 4,000,000 0 0 0__________ __________ __________ __________ __________ __________ 22 Subtotal Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100__________ __________ __________ __________ __________ __________ 23 Total Operating Expense 110,933,100 117,308,000 121,191,200 121,678,100 126,078,000 130,372,600(a) It is assumed that the Rate Commission will review proposed changes in wastewater rates every four years.(b) Includes Mintert, Sulphur, and Grand Glaize.(c) Includes Lemay, Bissell, and County Treatment Plants.(d) Expenditures offset by rental income.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-4Projected Existing Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 10,000 10,400 10,800 11,200 11,6002 Rate Commission 73,900 76,800 79,800 83,000 86,300 89,8003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 218,100 225,900 234,000 242,400 251,0006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 2,497,000 2,609,700 2,728,700 2,854,900 2,989,1008 Engineering 7,307,100 7,556,500 7,814,600 8,081,700 8,358,100 8,644,200Operations9 Collection System (a) 6,156,500 6,359,400 6,569,000 6,785,700 7,009,600 7,241,00010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,324,800 1,367,900 1,412,400 1,458,500 1,506,100__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 9,509,400 9,821,400 10,143,900 10,477,100 10,821,40014 Finance 6,707,300 6,963,200 7,228,800 7,504,700 7,791,100 8,088,60015 Information Systems 2,624,400 2,715,700 2,810,200 2,908,000 3,009,400 3,114,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 30,429,400 31,515,900 32,643,400 33,813,800 35,029,40017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 30,737,800 31,833,600 32,970,600 34,150,800 35,376,50020 Capital Outlay 751,400 773,800 796,900 820,700 845,300 870,50021 Construction & Engineering 950,000 978,5000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 32,490,100 32,630,500 33,791,300 34,996,100 36,247,000(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-7Projected Incremental Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 0 (2,200) (5,600) (5,800) (6,000) (6,200)2 Rate Commission 0 (76,400) (79,400) (82,600) (300) (89,100)3 Civil Service Commission0000004 Secretary - Treasurer0000005 Executive Director 0 144,000 14,800 15,400 16,000 16,6006 General Counsel0000007 Office of Human Resources 0 1,341,300 1,225,400 1,363,000 1,514,900 1,682,6008 Engineering 0 45,000 100,000 239,000 248,500 258,500Operations9 Collection System (a) 0 2,494,700 6,781,300 9,501,700 9,829,600 10,169,00010 Pump Stations00000011 Wastewater Treatment (b)00000012 Support (c) 0 87,800 179,800 185,200 190,800 196,500__________ __________ __________ __________ __________ __________ 13 Total Operations 0 2,582,500 6,961,100 9,686,900 10,020,400 10,365,50014 Finance 0 590,000 498,300 516,900 536,200 556,20015 Information Systems 0 78,000 3,100 3,200 3,300 3,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 0 4,702,200 8,717,700 11,736,000 12,333,000 12,787,50017 Water Backup Program00000018 Headquarters Building000000__________ __________ __________ __________ __________ __________ 19 Total O&M 0 4,702,200 8,717,700 11,736,000 12,333,000 12,787,50020 Capital Outlay 0 3,192,000 408,500 419,800 432,400 445,30021 Construction & Engineering 0 (978,500)0000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 0 6,915,700 9,126,200 12,155,800 12,765,400 13,232,800(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.(d) Adjustment for costs presented in Table 2-4 that are being projected as part of the 2008 CIRP budget.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-8Projected Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 7,800 4,800 5,000 5,200 5,4002 Rate Commission 73,900 400 400 400 86,000 7003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 362,100 240,700 249,400 258,400 267,6006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 3,838,300 3,835,100 4,091,700 4,369,800 4,671,7008 Engineering 7,307,100 7,601,500 7,914,600 8,320,700 8,606,600 8,902,700Operations9 Collection System (a) 6,156,500 8,854,100 13,350,300 16,287,400 16,839,200 17,410,00010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,412,600 1,547,700 1,597,600 1,649,300 1,702,600__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 12,091,900 16,782,500 19,830,800 20,497,500 21,186,90014 Finance 6,707,300 7,553,200 7,727,100 8,021,600 8,327,300 8,644,80015 Information Systems 2,624,400 2,793,700 2,813,300 2,911,200 3,012,700 3,117,800__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 35,131,600 40,233,600 44,379,400 46,146,800 47,816,90017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 35,440,000 40,551,300 44,706,600 46,483,800 48,164,00020 Capital Outlay 751,400 3,965,800 1,205,400 1,240,500 1,277,700 1,315,80021 Construction & Engineering 950,00000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 39,405,800 41,756,700 45,947,100 47,761,500 49,479,800(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-9Historical Other Operating RevenueLineHistoricalNo. Description 2002 2003 2004 2005 2006_____ ____________ ________ ________ ________ ________ ________$$$$$1 Wastewater Billing Adjustment (a) (919,826) 831,456 3,310,200 2,324,443 2,084,885Other Fees2 Construction Inspection Fees 640,214 643,406 663,642 631,530 548,1463 Waste Hauler Permits 957,812 953,453 1,089,798 1,709,052 1,080,1324 All Other Fees (b) 453,094 454,645 424,149 495,755 490,171_________ _________ _________ _________ _________ 5 Subtotal 2,051,120 2,051,504 2,177,589 2,836,337 2,118,4496 Miscellaneous Revenue (c) 650,853 2,424,625 1,419,834 1,648,545 2,118,745_________ _________ _________ _________ _________ 7 Total Other Operating Revenue 1,782,147 5,307,585 6,907,623 6,809,325 6,322,0798 Connection Fee Revenue (d) 3,862,355 7,429,469 4,941,721 3,715,365 3,096,339_________ _________ _________ _________ _________ 9 Total Other Revenue 5,644,502 12,737,054 11,849,344 10,524,690 9,418,418(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold. Negative balance in 2002 due to $4.7 million for Bad Debt and Adjustments.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-10 Allocation of Other Operating Revenue Between Wastewater and Stormwater Wastewater Stormwater Allocation Allocation________ ________ Connection and Other Fees Construction Inspection Fees (105) 50.0% 50.0% Plan Review Fees (106) 50.0% 50.0% Submittal Fees (107) 50.0% 50.0% Waste Hauler Permits (109) 100.0% 0.0% Wastewater Monitoring Costs Fees (110) 100.0% 0.0% Pretreatment Discharge Permits (111) 100.0% 0.0% All Other Machine Tap Fees (101) 100.0% 0.0% Conn Permits and Insp. (103) 50.0% 50.0% Construction Permits Fees (104) 50.0% 50.0% Miscellaneous Revenue Reimbursements Reimbursement of District Costs 75.0% 25.0% Other Reimbursements 75.0% 25.0% Reimbursement of Engr., Survey, Inspection, and Other Engr. Costs 75.0% 25.0% Sale of Fixed Assets 75.0% 25.0% All Other Sale of Scrap (Metal, Paper) 75.0% 25.0% Provision for Doubtful Misc. Receivables 75.0% 25.0% Engineering Prints and Specifications 75.0% 25.0% Refund of Court Cts & Attorney fees 75.0% 25.0% Rental Income 75.0% 25.0% Liquidation of Contractual Encumbrances 75.0% 25.0% NSF Fees 75.0% 25.0% Miscellaneous Income 75.0% 25.0% Forfeited Deposits 75.0% 25.0% Project Bid Fees 75.0% 25.0% Wastewater Revenue Adjustments Late Charges 99.0% 1.0% Refunds 99.0% 1.0% Adjustments 99.0% 1.0% Bad Debt Provision 99.0% 1.0% Wastewater Lien Interest and Fees 99.0% 1.0% Other (Includes revenue from Arnold) 99.0% 1.0% Capital Improvement Related Miscellaneous Revenue Connection and Other Fees Construction Funds Caulks Creek Surcharge 100.0% 0.0% Williams Creek 100.0% 0.0% Improvement Fund Connection Fees 100.0% 0.0% Miscellaneous Revenue Construction Funds 100.0% 0.0% Liquidation of Contractual Encumbrances 100.0% 0.0% Special Funds (Except WBU Fund) 100.0% 0.0% ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-11Projected Wastewater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$1 Wastewater Billing Adjustment (a) 2,018,600 2,024,300 2,017,800 2,011,800 2,005,800 2,000,100Other Fees2 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5003 Waste Hauler Permits 1,200,000 1,206,000 1,212,000 1,218,000 1,224,000 1,230,0004 All Other Fees (b) 370,000 545,000 834,500 834,500 834,500 857,000_________ _________ _________ _________ _________ _________ 5 Subtotal 1,920,000 2,160,500 2,517,000 2,523,000 2,529,000 2,571,5006 Miscellaneous Revenue (c) 734,700 738,100 741,800 745,600 749,300 753,100_________ _________ _________ _________ _________ _________ 7 Total Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7008 Connection Fee Revenue (d) 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000_________ _________ _________ _________ _________ _________ 9 Total Other Revenue 9,273,300 9,568,900 9,968,600 10,019,400 10,070,100 10,158,700(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-12Projected Stormwater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$Stormwater Billing Adjustment1 Late Charges 39,200 39,700 39,600 39,500 39,400 39,3002 Refunds (6,000) (6,100) (6,100) (6,100) (6,100) (6,000)3 Adjustments (5,000) (5,100) (5,100) (5,100) (5,100) (5,000)4 Stormwater Lien Interest and Fees 700 700 700 700 700 7005 Other (Includes revenue from Arnold) 2,500 2,500 2,500 2,500 2,500 2,500_________ _________ _________ _________ _________ _________ 6 Subtotal 31,400 31,700 31,600 31,500 31,400 31,500Other Fees7 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5008 Plan Review Fees 75,000 112,500 209,500 209,500 209,500 216,0009 Submittal Fees 55,000 113,500 227,000 227,000 227,000 234,00010 Waste Hauler Permits 0 0 0 0 0 011 Stormwater Monitoring Costs Fees 0 0 0 0 0 012 Pretreatment Discharge Permits 0 0 0 0 0 013 All Other 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 14 Subtotal 480,000 635,500 907,000 907,000 907,000 934,500Miscellaneous Revenue15 Reimbursements 7,000 7,000 7,000 7,000 7,000 7,00016 Sale of Fixed Assets 11,200 11,200 11,200 11,200 11,200 11,20017 Reimbursable Engr. & Maint. 50,000 50,200 50,500 50,700 51,000 51,20018 All Other 176,600 177,500 178,500 179,500 180,500 181,500_________ _________ _________ _________ _________ _________ 19 Subtotal 244,800 245,900 247,200 248,400 249,700 250,900_________ _________ _________ _________ _________ _________ 20 Total Other Operating Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,90021 Connection Fee Revenue 0 0 0 0 0 0ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-1 Historical Wastewater Charges Fiscal Year Ending June 30,________________________________________________________ Line No. Type of Monthly Charge 1994 1998 2004 2005 2006____ _____________________ ________ ________ ________ ________ ________ (a) (c) Ordinance 9029 10177 11553 11692 12019 Adopted Date 06/16/93 09/11/97 07/24/03 03/11/04 07/14/05 Effective Date 07/01/93 10/01/97 08/01/03 07/01/04 07/01/05 Base Charge - $/Bill 1 Billing & Collection Charge 0.37 0.74 0.85 0.85 0.85 2 System Availability Charge 3.72 4.83 5.30 6.45 7.05 ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 4.09 5.57 6.15 7.30 7.90 4 Compliance Charge - $/Bill (b) 7.40 8.56 11.80 12.15 12.55____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 11.49 14.13 17.95 19.45 20.45 Volume Charge 6 Metered - $/Ccf 0.99 1.05 1.34 1.66 1.81 Unmetered - $/Bill 7 Each Room 0.64 0.69 0.88 1.08 1.18 8 Each Water Closet 2.41 2.58 3.28 4.04 4.42 9 Each Bath 2.01 2.15 2.74 3.37 3.69 10 Each Separate Shower 2.01 2.15 2.74 3.37 3.69 Extra Strength Surcharges - $/ton (b) 11 Suspended Solids over 350 mg/l 127.40 87.20 12 Suspended Solids over 300 mg/l 162.88 200.15 218.90 13 Biochemical Oxygen Demand over 300 mg/l 244.10 217.90 319.24 412.58 461.44 14 Chemical Oxygen Demand over 600 mg/l 122.05 108.95 159.62 206.29 230.72 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50 percent of the general service charges. (b) Applicable only to non-residential customers. (c) Current rates as recommended by the Rate Commission and adopted by the Board of Trustees. These rates were also adopted by Ordinance 11692 and reaffirmed by Ordinance 12019. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-2 Existing Wastewater Rates (Effective July 1, 2005) Metered_____________________ Line No.Type of Monthly Charge Unmetered Residential Residential Non- Residential____ ____________________ __________ __________ __________ $$$ 1 Billing and Collection Charge 0.85 0.85 0.85 2 System Availability Charge 7.05 7.05 7.05 3 Compliance Charge 12.55 Volume Charge 4 per Ccf 1.81 1.81 5 per room 1.18 6 per water closet 4.42 7 per bath 3.69 8 per separate shower 3.69 Extra Strength Surcharge - $/ton 9 Suspended Solids over 300 mg/l 218.90 10 BOD over 300 mg/l 461.44 11 COD over 600 mg/l 230.72 Ccf - hundred cubic feet mg/l - milligrams per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-3Historical and Projected Wastewater Customer AccountsLine Historical Projected________________________________________________________ __________________________________________________________________No. 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Metered Customers1 Single Family 296,713 296,811 297,921 299,383 301,122 300,600 301,800 303,000 304,200 305,400 306,6002 Multifamily 21,244 21,110 21,367 20,982 20,825 21,000 20,900 20,800 20,700 20,600 20,5003 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 4 Total 343,787 343,591 345,127 345,565 347,659 347,300 348,400 349,400 350,500 351,500 352,600Unmetered Customers5 Single Family 60,275 60,415 60,621 60,365 60,010 60,400 60,200 60,000 59,800 59,600 59,4006 Multifamily 23,965 23,837 23,898 23,820 23,757 23,700 23,700 23,700 23,700 23,700 23,700_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 7 Total 84,240 84,252 84,518 84,185 83,767 84,100 83,900 83,700 83,500 83,300 83,100Total Customer Accounts8 Single Family 356,988 357,226 358,541 359,748 361,132 361,000 362,000 363,000 364,000 365,000 366,0009 Multifamily 45,209 44,947 45,264 44,802 44,582 44,700 44,600 44,500 44,400 44,300 44,20010 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 11 Total 428,027 427,843 429,645 429,750 431,426 431,400 432,300 433,100 434,000 434,800 435,70012 Annual Percentage Increase N/A 0.0% 0.4% 0.0% 0.4% 0.0% 0.2% 0.2% 0.2% 0.2% 0.2%ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-4Historical and Projected Contributed Wastewater VolumeLine Historical Projected________________________________________________________ _____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf CcfMetered CustomersB-7B-7 B-7 B-7 B-7 B-9B-9 B-9 B-9 B-9 B-91 Single Family 27,084,987 26,738,437 27,386,280 27,228,682 27,437,644 27,356,400 27,470,500 27,585,100 27,699,700 27,814,300 27,928,9002 Multifamily 10,467,778 10,334,643 10,115,069 9,731,407 9,763,965 10,189,700 10,137,200 10,084,700 10,032,100 9,979,600 9,927,1003 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 4 Total 70,938,324 69,441,136 67,708,196 62,252,977 68,802,145 66,948,100 66,911,900 66,877,300 66,869,900 66,862,900 66,881,700Unmetered Customers (a)5 Single Family 7,100,437 7,061,615 7,082,767 7,112,749 7,068,871 7,274,900 7,231,800 7,187,400 7,142,600 7,098,100 7,053,6006 Multifamily 5,154,386 5,120,587 5,117,850 5,098,445 5,044,805 5,062,000 5,059,000 5,056,200 5,053,800 5,051,000 5,048,500_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 7 Total 12,254,824 12,182,202 12,200,617 12,211,193 12,113,676 12,336,900 12,290,800 12,243,600 12,196,400 12,149,100 12,102,100Total Contributed Wastewater Volume8 Single Family 34,185,424 33,800,052 34,469,047 34,341,431 34,506,515 34,631,300 34,702,300 34,772,500 34,842,300 34,912,400 34,982,5009 Multifamily 15,622,164 15,455,230 15,232,919 14,829,852 14,808,770 15,251,700 15,196,200 15,140,900 15,085,900 15,030,600 14,975,60010 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 11 Total 83,193,148 81,623,338 79,908,813 74,464,170 80,915,821 79,285,000 79,202,700 79,120,900 79,066,300 79,012,000 78,983,80012 Annual Percentage Increase N/A -1.9% -2.1% -6.8% 8.7% -2.0% -0.1% -0.1% -0.1% -0.1% 0.0%(a) Ccf = hundred cubic feet (748 gallons)Unmetered wastewater volume is determined by multiplying the number of fixtures by their respective unit usage values. Unit usage values are 16 gallons per day (gpd) per room, 60 gpd per water closet, and 50 gpd per bath or separate shower.ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-5Historical and Projected Billed Wastewater Service RevenueUnder Existing RatesLine Historical Projected________________________________________________________ ____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Metered CustomersB-13B-13 B-13 B-13 B-13 B-15B-15 B-15 B-15 B-15 B-151 Single Family 48,091,200 47,747,300 57,669,200 71,210,200 77,985,843 77,779,100 77,853,000 77,904,700 77,956,200 78,007,800 78,059,4002 Multifamily 12,409,100 12,260,100 14,874,700 17,992,100 19,646,971 20,435,700 20,330,400 20,225,100 20,119,700 20,014,400 19,909,100 Non-Residential3 Normal Strength 39,434,700 38,339,200 45,245,300 47,867,600 63,506,777 59,522,400 59,335,200 59,149,900 59,014,100 58,878,800 58,790,2004 Excess Strength 3,451,700 3,728,700 5,301,200 5,713,700 6,782,384 7,260,600 7,100,200 7,100,200 7,100,200 7,100,200 7,100,200__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 5 Total 103,386,700 102,075,300 123,090,400 142,783,600 167,921,974 164,997,800 164,618,800 164,379,900 164,190,200 164,001,200 163,858,900Unmetered Customers6 Single Family 11,364,600 11,344,300 13,625,600 16,858,100 18,282,428 18,676,900 18,318,700 17,931,900 17,544,700 17,157,500 16,770,7007 Multifamily 7,042,800 7,000,400 6,941,400 10,539,300 11,399,822 11,429,400 11,422,800 11,416,600 11,411,100 11,404,900 11,399,100__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 8 Total 18,407,400 18,344,700 20,567,000 27,397,400 29,682,249 30,106,300 29,741,500 29,348,500 28,955,800 28,562,400 28,169,800Total Wastewater Service Revenue9 Single Family 59,455,800 59,091,600 71,294,800 88,068,300 96,268,271 96,456,000 96,171,700 95,836,600 95,500,900 95,165,300 94,830,10010 Multifamily 19,451,900 19,260,500 21,816,100 28,531,400 31,046,793 31,865,100 31,753,200 31,641,700 31,530,800 31,419,300 31,308,20011 Non-Residential 42,886,400 42,067,900 50,546,500 53,581,300 70,289,161 66,783,000 66,435,400 66,250,100 66,114,300 65,979,000 65,890,400__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 12 Total Wastewater 121,794,100 120,420,000 143,657,400 170,181,000 197,604,224 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,70013 Annual Percentage Increase N/A -1.1% 19.3% 18.5% 16.1% -1.3% -0.4% -0.3% -0.3% -0.3% -0.3%ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-6Wastewater Capital Improvement and Replacement ProgramLine Fiscal Year Ending June 30, ______________________________________________________________________No. Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Sanitary Sewer System1 Sanitary Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,500,000 40,500,0002 Sanitary Sewer Overflows 102,171,000 20,935,000 28,580,000 14,467,000 75,397,000 114,405,000 355,955,000__________ __________ __________ __________ __________ __________ __________ 3 Subtotal 109,671,000 27,935,000 35,080,000 20,967,000 81,897,000 120,905,000 396,455,000Combined Sewer System4 Combined Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,000,000 40,000,0005 Combined Sewer Overflows 33,039,000 4,035,000 9,857,000 17,806,000 15,595,000 3,000,000 83,332,0006 Cityshed - Condition 2,000,000 255,00000002,255,0007 Cityshed - Capacity 20,510,000 0 0 1,000,000 0 6,400,000 27,910,000__________ __________ __________ __________ __________ __________ __________ 8 Subtotal 63,049,000 11,290,000 16,357,000 25,306,000 22,095,000 15,400,000 153,497,000Other Sewer Projects9 District Wide Planning 9,650,000 8,850,000 7,800,000 7,100,000 7,100,000 6,100,000 46,600,00010 CMOM Regulations (a) 7,500,000 10,000,000 7,000,000 8,000,000 10,000,000 10,000,000 52,500,000__________ __________ __________ __________ __________ __________ __________ 11 Subtotal 17,150,000 18,850,000 14,800,000 15,100,000 17,100,000 16,100,000 99,100,000Wastewater Treatment12 Baumgartner 4,000,000000004,000,00013 Bissell Point 1,000,000000001,000,00014 Coldwater Creek 0 0 0 10,000,000 0 0 10,000,00015 Fenton 670,00000000670,00016 Grand Glaize 33,600,0000000033,600,00017 Lemay 10,150,000 45,000,000 42,220,000 0 0 3,000,000 100,370,00018 Lower Meramec River 6,145,000 0 2,386,000 26,500,000 0 5,569,000 40,600,00019 Missouri River 53,300,000 0 500,000 36,500,000 30,000,000 0 120,300,000__________ __________ __________ __________ __________ __________ __________ 20 Subtotal 108,865,000 45,000,000 45,106,000 73,000,000 30,000,000 8,569,000 310,540,000__________ __________ __________ __________ __________ __________ __________ 21 Total 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,000ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-7Wastewater Capital Improvement Program FinancingLine Fiscal Year Ending June 30,___________________________________________________________________No Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Source of Funds1 Beginning of Year Balance 163,317,300 2,117,800 6,784,700 3,214,500 2,031,400 3,231,200 163,317,3002 Revenue Bond Proceeds 63,400,000 0000063,400,0003 State Revolving Loan Proceeds 14,205,000 0000014,205,0004 Commercial Paper 0 40,000,000000040,000,0005 Cash Financing of Construction 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,000 676,997,0006 Grants & Contributions (a) 1,504,400 1,526,300 1,549,200 1,573,100 1,598,000 1,624,000 9,375,0007 Interest Income (b) 10,552,700 3,894,600 2,031,600 1,177,800 1,207,800 1,292,500 20,157,000__________ __________ __________ __________ __________ __________ __________ 8 Total Funds Available 313,079,400 112,384,700 116,557,500 138,404,400 156,323,200 168,081,700 987,451,300Application of Funds9 Major Capital Improvements 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,00010 Improvement Fund Projects 4,072,000 2,500,000 2,000,000 2,000,000 2,000,000 2,000,000 14,572,00011 Issuance Costs (c) 972,800 25,0000000997,80012 Revenue Bond Reserve Fund (d) 7,181,800 000007,181,800__________ __________ __________ __________ __________ __________ __________ 13 Total Application of Funds 310,961,600 105,600,000 113,343,000 136,373,000 153,092,000 162,974,000 982,343,60014 End of Year Fund Balance 2,117,800 6,784,700 3,214,500 2,031,400 3,231,200 5,107,700 5,107,700 (a) Includes anticipated contributions from the City of Arnold to reserve capacity in the Lower Meramec River Wastewater Treatment Plant. (b) Interest Income is estimated at 3.5% of the average of the beginning and end of year balances. (c) (d) The required balance in the Revenue Bond Reserve Fund is determined to be the maximum principal and interest payment on senior debt.Issuance Costs are estimated at 1.40% of the issue amount for Revenue Bonds, 0.60% of the issue amount for SRF Loans, and $25,000 per issue for commercial paper.ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-8 Projected Debt Service Requirements Existing Proposed Existing Proposed Commercial Fiscal Revenue Revenue SRF SRF Paper Year Bonds Bonds Loans Loans Notes Total________ ________ ________ ________ ________ ________ ________ $$$$$$ Payments to Sinking Fund 2007 9,636,600 1,717,000 11,467,000 125,700 0 22,946,300 2008 9,611,000 2,902,000 12,127,700 202,000 2,000,000 26,842,700 2009 9,593,400 2,902,000 13,949,200 903,000 2,000,000 29,347,600 2010 9,643,900 2,902,000 13,709,600 902,900 2,000,000 29,158,400 2011 9,778,600 2,902,000 13,938,400 902,700 2,000,000 29,521,700 2012 9,903,100 2,902,000 13,780,700 907,300 2,000,000 29,493,100 2013 10,038,800 8,793,300 13,701,300 907,300 2,000,000 35,440,700 2014 10,174,000 14,193,700 13,788,500 906,100 2,000,000 41,062,300 2015 10,322,300 19,148,900 13,671,700 905,200 2,000,000 46,048,100 2016 10,461,100 23,875,000 14,041,900 904,200 2,000,000 51,282,200 2017 10,616,800 28,948,000 13,958,300 907,900 2,000,000 56,431,000 2018 10,778,400 34,053,800 13,984,100 910,700 2,000,000 61,727,000 2019 10,968,700 38,799,600 14,006,000 908,600 2,000,000 66,682,900 2020 11,137,000 43,872,600 14,018,800 906,300 2,000,000 71,934,700 2021 11,304,900 48,474,300 14,129,400 913,800 2,000,000 76,822,400 2022 11,485,500 52,814,300 14,138,400 914,900 2,000,000 81,353,100 2023 11,679,500 56,774,500 14,051,400 915,500 2,000,000 85,420,900 2024 11,871,000 60,702,000 14,051,800 915,500 2,000,000 89,540,300 2025 12,596,400 63,909,500 12,334,500 920,000 2,000,000 91,760,400 2026 15,393,200 67,358,200 6,815,300 918,800 2,000,000 92,485,500 Payments to Bondholders 2007 9,640,700 1,233,400 10,481,200 0 0 21,355,300 2008 9,615,600 2,902,000 11,679,800 226,700 2,000,000 26,424,100 2009 9,587,900 2,902,000 12,443,900 202,000 2,000,000 27,135,800 2010 9,621,100 2,902,000 13,361,400 899,500 2,000,000 28,784,000 2011 9,758,200 2,902,000 13,901,800 899,400 2,000,000 29,461,400 2012 9,880,400 2,902,000 13,760,200 899,100 2,000,000 29,441,700 2013 10,016,800 4,683,300 13,617,300 903,700 2,000,000 31,221,100 2014 10,148,800 10,574,600 13,585,000 903,100 2,000,000 37,211,500 2015 10,299,800 16,157,100 13,783,900 902,400 2,000,000 43,143,200 2016 10,435,200 20,979,700 13,557,200 901,500 2,000,000 47,873,600 2017 10,591,000 25,811,500 13,921,300 900,300 2,000,000 53,224,100 2018 10,746,000 30,917,300 13,829,100 901,100 2,000,000 58,393,500 2019 10,940,500 35,904,300 13,844,500 906,500 2,000,000 63,595,800 2020 11,109,400 40,736,100 13,865,800 904,300 2,000,000 68,615,600 2021 11,275,300 45,675,600 13,888,700 901,900 2,000,000 73,741,500 2022 11,453,000 50,160,300 14,076,100 906,300 2,000,000 78,595,700 2023 11,647,700 54,361,800 13,890,100 907,200 2,000,000 82,806,800 2024 11,838,800 58,289,300 13,896,600 907,500 2,000,000 86,932,200 2025 12,032,300 61,979,300 13,887,800 907,300 2,000,000 90,806,700 2026 15,417,300 65,002,600 10,439,700 911,500 2,000,000 93,771,100 ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-9 Comparison of Projected Wastewater Revenue Under Existing Rates With Projected Revenue Requirements Line Fiscal Year Ending June 30,_____________________________________________________________________ No. Description 2007 2008 2009 2010 2011 2012__________________________________________________________________________ $$$$$$ 1 Revenue Under Existing Rates (a) 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,700 Additional Revenue Required Fiscal Revenue Months Year Increase Effective____________________ 2 2007 0.0% 12 000000 3 2008 13.0% 7 13,516,000 25,185,000 25,109,000 25,033,000 24,964,000 4 2009 12.0% 12 24,089,000 26,191,000 26,112,000 26,039,000 5 2010 11.0% 12 24,657,000 26,808,000 26,733,000 6 2011 9.0% 12 22,326,000 24,279,000 7 2012 5.0% 12 13,482,000__________ __________ __________ __________ __________ __________ 8 Total Additional Revenue 0 13,516,000 49,274,000 75,957,000 100,279,000 115,497,000__________ __________ __________ __________ __________ __________ 9 Total Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,700 10 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,700 11 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 12 Interest Income - Reserve Funds 2,493,500 2,767,400 2,828,000 2,824,900 2,830,700 2,830,300 13 Interest Income - Operations 198,700 86,100 107,100 115,100 115,200 115,200 14 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 15 Subtotal Other Revenue 13,270,500 13,705,500 14,163,900 14,195,700 14,227,300 14,289,500__________ __________ __________ __________ __________ __________ 16 Total Revenue 208,374,600 221,581,800 257,166,300 283,298,700 307,069,900 321,815,200 17 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,500 18 Stormwater Program Support (b) 19,223,100 10,798,500 0000__________ __________ __________ __________ __________ __________ 19 Net Revenue 84,367,200 99,869,900 142,511,600 164,240,200 183,690,100 194,221,700 Debt Service 20 Existing Senior Revenue Bonds 9,636,600 9,611,000 9,593,400 9,643,900 9,778,600 9,903,100 21 Proposed Senior Revenue Bonds 1,717,000 2,902,000 2,902,000 2,902,000 2,902,000 2,902,000 __________ __________ __________ __________ __________ __________ 22 Total Senior Revenue Bonds 11,353,600 12,513,000 12,495,400 12,545,900 12,680,600 12,805,100 23 Existing State Revolving Fund Loans (c) 11,467,000 12,127,700 13,949,200 13,709,600 13,938,400 13,780,700 24 Proposed State Revolving Fund Loans (c) 125,700 202,000 903,000 902,900 902,700 907,300 __________ __________ __________ __________ __________ __________ 25 Total State Revolving Fund Loans 11,592,700 12,329,700 14,852,200 14,612,500 14,841,100 14,688,000 26 Commercial Paper 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 __________ __________ __________ __________ __________ __________ 27 Total Debt Service 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,100 28 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100 29 Cash Financing of Major Improvements 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,000 30 Additions to Operating Reserve 2,366,700 1,024,700 0000 31 Net Annual Balance (d) (7,194,600) 761,900 435,500 23,200 (15,800) 15,500 32 Beginning of Year Balance (e) 9,274,400 2,079,800 2,841,700 3,277,200 3,300,400 3,284,600 33 End of Year Balance (e) 2,079,800 2,841,700 3,277,200 3,300,400 3,284,600 3,300,100 Actual Debt Service (f) 34 Senior Bonds 10,874,100 12,517,600 12,489,900 12,523,100 12,660,200 12,782,400 35 SRF Loans 10,481,200 11,906,500 12,645,900 14,260,900 14,801,200 14,659,300 Debt Service Coverage 36 Revenue Bonds (g) 776.0% 798.0% 1141.0% 1311.0% 1451.0% 1519.0% 37 Total Debt (h) 395.0% 409.0% 567.0% 613.0% 669.0% 708.0% (a) Existing wastewater rates effective July 1, 2005. (b) Transitional support of the stormwater program during conversion of tax based to user charge based revenues. (c) Debt service on SRF Loans are net of the state's interest subsidy. (d) Negative balances indicate need to drawdown available fund balance. (e) Does not include funds set aside for a minimum operating reserve equal to 60 days of operating expenses. (f) Payment to Bondholders per Table 3-8, paid through Sinking Fund. (g) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual debt service. (h) The Bond Ordinance requires net revenue to equal or exceed 1.15x actual debt service. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-10 Wastewater Cost of Service Test Year 2008 Line No. Operating Capital Total______ ________ ________ ________ $$$ Revenue Requirements 1 Operation & Maintenance Expense 110,913,400 110,913,400 2 Debt Service 26,842,700 26,842,700 3 Routine Capital Improvements 6,394,600 6,394,600 4 Cash Financing of Major Improvements 64,846,000 64,846,000 5 Additions to Operating Reserve 1,024,700 1,024,700 6 Stormwater Support 10,798,500 10,798,500__________ __________ __________ 7 Total 122,736,600 98,083,300 220,819,900 Revenue Requirements met from Other Sources Other Operating Revenue 8 Wastewater Billing Adjustments 2,024,300 2,024,300 9 Inspection and Other Fees 2,160,500 2,160,500 10 Miscellaneous Revenue 738,100 738,100 __________ __________ __________ 11 Subtotal 4,922,900 0 4,922,900 12 Interest Income 4,136,600 4,136,600 13 Connection Fee Revenue 4,646,000 4,646,000 14 Change in Available Fund Balances (761,900) (761,900) 15 Rate Adjustments (a) (11,751,000) (11,751,000)__________ __________ __________ 16 Total (2,691,500) 3,884,100 1,192,600__________ __________ __________ 17 Net Costs to be met from Charges 125,428,100 94,199,200 219,627,300 Net Operating Capital Cost (a) Required to adjust for any partial year implementation of increased wastewater rates, and allowance for one month billing and collection lag. Total Cost of Service Net Operating Cost 57% Capital Cost 43% ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-11 Allocation of Estimated Wastewater Plant Investment and Other Capital Costs to Functional Cost Components Test Year 2008 (1) (2) (3) (4) (5) Line Suspended No. Description Total (a) Volume Capacity Solids BOD____ __________________ __________ __________ __________ __________ __________ $$$$$ Collection System 1 Sanitary Sewers 688,176,000 688,176,000 2 Combined Sewers 72,102,000 72,102,000 3 Pumping Stations 62,537,000 62,537,000____________ __________ 4 Total Collection System 822,815,000 822,815,000 Treatment Facilities 5 Raw Wastewater Pumping 84,735,000 84,735,000 6 Preliminary Treatment 15,303,000 15,303,000 7 Primary Sedimentation 11,779,000 11,779,000 8 Aeration/Reaeration/Nitrification 85,640,000 85,640,000 9 Basins 10 Equipment 11 Secondary Sedimentation 56,828,000 56,828,000 12 Recirculation Pumping 3,706,000 3,706,000 13 Chlorination 1,810,000 1,810,000 14 Lagoons & Aeration Equipment 3,964,000 3,964,000 15 Sludge Treatment 50,955,000 25,478,000 25,477,000 16 Dewatering 18,578,000 9,289,000 9,289,000 17 Incineration 56,622,000 28,311,000 28,311,000 18 By Pass & Outfall Works 16,794,000 16,794,000 19 Administrative & General (b) 188,876,000 34,423,000 54,256,000 29,293,000 70,904,000____________ __________ __________ __________ __________ 20 Total Treatment Facilities 595,590,000 108,546,000 171,088,000 92,371,000 223,585,000____________ __________ __________ __________ __________ 21 Subtotal Estimated Plant Investment 1,418,405,000 108,546,000 993,903,000 92,371,000 223,585,000 22 Land & General Plant (c) 40,448,000 3,095,000 28,343,000 2,634,000 6,376,000____________ __________ __________ __________ __________ 23 Total Estimated Plant Investment 1,458,853,000 111,641,000 1,022,246,000 95,005,000 229,961,000 24 Routine Capital Improvements (d) 6,394,600 489,400 4,480,800 416,400 1,008,000 Cash Financing of Improvements 25 Collection System 43,860,800 43,860,800 26 Wastewater Treatment (e) 20,985,200 3,824,500 6,028,200 3,254,600 7,877,900 27 Land & General Plant (c) 0 0 0 0 0 28 Less: Connection Fee Revenue 4,646,000 355,500 3,255,500 302,600 732,400 29 Change in Funds Available (d) (761,900) (58,300) (533,900) (49,600) (120,100)__________ __________ __________ __________ __________ 30 Net Cash Financed Capital Costs 67,356,500 4,016,700 51,648,200 3,418,000 8,273,600 31 Debt Service (d) 26,842,700 2,054,100 18,809,200 1,748,100 4,231,300__________ __________ __________ __________ __________ 32 Total Net Capital Costs 94,199,200 6,070,800 70,457,400 5,166,100 12,504,900 33 Annual Depreciation Expense (d) 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ 34 Net Other Capital Cost 37,591,100 1,738,800 30,791,000 1,479,600 3,581,700 (a) Excludes $623,912,000 of investment related to the Stormwater system. (b) Allocated based on all other Treatment Facilities. (c) Allocated based on Line 21. (d) Allocated based on Line 23. (e) Allocated based on Line 20. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-12 Percentage of Wastewater Operation and Maintenance Expense by Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers_______________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 0.0% 100.0% 0.0% 2 Engineering 100.0% 5.4% 94.6% 5.7% 43.3% 0.5% 0.5% 50.1% Operations 3 Collection System 100.0% 0.0% 100.0% 100.0% 4 Pump Stations 100.0% 0.0% 100.0% 100.0% 5 Wastewater Treatment 100.0% 0.0% 100.0% 18.3% 12.1% 28.8% 40.8% 6 Support 100.0% 20.8% 79.2% 6.9% 44.2% 10.9% 15.4% 22.5% 7 Finance 100.0% 48.8% 51.2% 100.0% 8 Information Systems 100.0% 90.3% 9.7% 100.0% 9 Average 100.0% 7.6% 50.4% 9.6% 13.6% 5.1% 13.6% All Other 10 Administration and Management (a) 0.0% 100.0% 0.0% 11 Engineering 100.0% 0.4% 99.6% 5.5% 78.1% 0.5% 0.5% 15.4% Operations 12 Collection System 100.0% 0.0% 100.0% 100.0% 13 Pump Stations 100.0% 0.0% 100.0% 100.0% 14 Wastewater Treatment 100.0% 0.0% 100.0% 17.9% 17.4% 25.4% 39.3% 15 Support 100.0% 0.0% 100.0% 11.9% 44.7% 16.9% 26.1% 0.5% 16 Finance 100.0% 9.3% 90.7% 100.0% 17 Information Systems 100.0% 90.3% 9.7% 100.0% 18 Average 100.0% 7.8% 34.3% 10.4% 16.0% 30.1% 1.4% Utilities Operations 19 Pump Stations 100.0% 0.0% 100.0% 56.0% 44.0% 20 Wastewater Treatment 100.0% 0.0% 100.0% 16.9% 16.9% 23.0% 43.2% 21 Average 100.0% 23.6% 21.6% 19.0% 35.7% 0.0% 0.0% 22 Water Backup Program 100.0% 0.0% 100.0% 100% 0.0% 23 Headquarters Building 100.0% 0.0% 100.0% 100.0% 24 Total O&M Expense 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% 25 Allocations to Operating Reserve 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% Less Costs Met From Other Revenue Other Revenue 26 Wastewater Revenue Adjustments 100.0% 90.0% 0.0% 0.0% 0.0% 10.0% 0.0% 27 Connection and Other Fees 100.0% 21.0% 19.9% 28.5% 26.2% 0.0% 4.4% 28 Miscellaneous Revenue 100.0% 25.0% 0.0% 0.0% 0.0% 75.0% 0.0% 29 Interest Income 100.0% 11.3% 31.5% 8.2% 12.7% 30.0% 6.3% 30 Stormwater Program Revenues 0.0% 31 Full Year Rate Adjustment 100.0% 17.7% 49.4% 12.9% 20.0% 0.0% 0.0% 32 Average 100.0% -31.4% 151.3% 20.9% 46.6% -74.2% -13.1% 33 Net O&M Expense 100.0% 12.0% 47.1% 9.7% 15.2% 9.4% 6.7% (a) Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-13 Allocation of Wastewater Operation and Maintenance Expense to Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers__________________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 8,244,400 8,244,400 0 2 Engineering 13,421,000 724,700 12,696,300 723,600 5,495,000 59,700 59,700 6,358,300 Operations 3 Collection System 12,632,700 0 12,632,700 12,632,700 4 Pump Stations 2,356,200 0 2,356,200 2,356,200 5 Wastewater Treatment 14,312,500 0 14,312,500 2,619,200 1,731,800 4,122,000 5,839,500 6 Support 3,603,900 749,600 2,854,300 197,700 1,262,300 311,200 440,900 642,200 7 Finance 2,887,700 1,409,000 1,478,700 1,478,700 8 Information Systems 2,848,800 2,572,500 276,300 276,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 9 Total 60,307,200 13,700,200 46,607,000 3,540,500 23,478,000 4,492,900 6,340,100 2,397,200 6,358,300 All Other 10 Administration and Management (a) 5,483,000 5,483,000 0 11 Engineering 2,097,800 8,400 2,089,400 115,000 1,631,800 10,400 10,400 321,800 Operations 12 Collection System 2,684,700 0 2,684,700 2,684,700 13 Pump Stations 1,062,100 0 1,062,100 1,062,100 14 Wastewater Treatment 7,496,700 0 7,496,700 1,341,900 1,304,400 1,904,200 2,946,200 15 Support 3,056,700 0 3,056,700 363,000 1,366,300 515,100 797,000 15,300 16 Finance 7,632,700 707,200 6,925,500 6,925,500 17 Information Systems 1,292,200 1,166,900 125,300 125,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 18 Total 30,805,900 7,365,500 23,440,400 1,819,900 8,049,300 2,429,700 3,753,600 7,066,100 321,800__________ __________ __________ __________ __________ __________ __________ 19 Subtotal Direct Expenses 70,047,400 5,360,400 31,527,300 6,922,600 10,093,700 9,463,300 6,680,100 20 Total Indirect (b) 21,065,700 21,065,700 1,612,100 9,481,400 2,081,900 3,035,500 2,845,900 2,008,900 Utilities Operations 21 Pump Stations 2,209,500 2,209,500 1,237,300 972,200 22 Wastewater Treatment 10,590,100 10,590,100 1,789,800 1,789,700 2,435,700 4,574,900__________ __________ __________ __________ __________ __________ 23 Subtotal 12,799,600 12,799,600 3,027,100 2,761,900 2,435,700 4,574,900 24 Water Backup Program 5,700,000 5,700,000 5,700,000 25 Headquarters Building 1,300,700 1,300,700 1,300,700 __________ __________ __________ __________ __________ __________ __________ __________ 26 Total O&M Expense 110,913,400 110,913,400 15,699,600 43,770,600 11,440,200 17,704,100 13,609,900 8,689,000 0 27 Add't to Operating Reserve (c) 1,024,700 1,024,700 145,000 404,400 105,700 163,600 125,700 80,300 Less Costs Met From Other Revenue Other Revenue 28 Wastewater Revenue Adjustments 2,024,300 2,024,300 1,821,900 0 0 0 202,400 0 29 Connection and Other Fees 2,160,500 2,160,500 453,700 429,900 615,100 566,800 0 95,000 30 Miscellaneous Revenue 738,100 738,100 184,500 0 0 0 553,600 0 31 Interest Income (d) 4,136,600 4,136,600 467,300 1,302,500 340,400 526,800 1,241,000 258,600 32 Full Year Rate Adjustment (e) (11,751,000) (11,751,000) (2,081,900) (5,804,300) (1,517,100) (2,347,700)__________ __________ __________ __________ __________ __________ __________ __________ 33 Total (2,691,500) (2,691,500) 845,500 (4,071,900) (561,600) (1,254,100) 1,997,000 353,600 34 Net O&M Expense 114,629,600 114,629,600 14,999,100 48,246,900 12,107,500 19,121,800 11,738,600 8,415,700 35 Stormwater Program Support 10,798,500 10,798,500 10,798,500__________ __________ __________ __________ __________ __________ __________ __________ 36 Adjusted Net O&M Expense 125,428,100 125,428,100 14,999,100 59,045,400 12,107,500 19,121,800 11,738,600 8,415,700 (a) (b) Allocated based on Line 19. (c) Allocated based on Line 26. (d) Allocated 30.0% of interest income directly to All Customers based on relative revenue receipts with remainder allocated based on Line 26 less All Customer costs. (e) Allocated based on Line 26 less All Customers, and Nonresidential Customers costs. Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-14Wastewater Units of ServiceTest Year 2008(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)Volume Capacity Wastewater Strength Non-________________________________ ________________________________ ____________________Line Infiltration Total Infiltration Total Suspended All ResidentialNo. Customer Class Contributed Inflow Treated Contributed Inflow Treated Solids BODCustomers Customers____ __________________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf/day Ccf/day Ccf/day pounds pounds bills billsJ-7J-7(1) + (2)J-7 J-7(4) + (5)J-6J-6 J-5Metered Customers1 Single Family 27,470,500 38,599,800 66,070,300 130,203 443,105 573,307 54,897,100 36,019,400 3,621,0602 Multifamily 10,137,200 7,614,800 17,752,000 48,048 87,414 135,461 18,189,800 12,257,700 250,9003 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,802__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 4 Total 66,911,900 65,677,200 132,589,100 317,144 753,938 1,071,082 124,873,800 83,313,500 4,179,762 307,802Unmetered Customers5 Single Family 7,231,800 8,750,900 15,982,700 34,277 100,456 134,732 14,011,900 9,262,200 722,2906 Multifamily 5,059,000 4,774,700 9,833,700 23,978 54,811 78,789 9,381,700 6,269,300 284,750__________ __________ __________ __________ __________ __________ __________ __________ __________ 7 Total 12,290,800 13,525,600 25,816,400 58,255 155,266 213,522 23,393,600 15,531,500 1,007,0408Surcharge21,700,000 20,600,000Total System9 Single Family 34,702,300 47,350,700 82,053,000 164,479 543,560 708,039 68,909,000 45,281,600 4,343,35010 Multifamily 15,196,200 12,389,500 27,585,700 72,026 142,225 214,250 27,571,500 18,527,000 535,65011 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,80212 Surcharge21,700,000 20,600,000__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 13 Total 79,202,700 79,202,800 158,405,500 375,399 909,205 1,284,604 169,967,400 119,445,000 5,186,802 307,802Ccf - Hundred Cubic FeetALT I - Rate Commission Recommendation Report 8/13/07 Table 3-15 Allocation of Wastewater Cost of Service to Customer Classes Test Year 2008 (1) (2) (3) (4) (5) (6) (7) Line Wastewater Strength All Non- Residential____________________ No. Description Total Volume Capacity TSS BOD Customers Customers____ ________________ ________ ________ ________ ________ ________ ________ ________ Costs of Service 1 Net O&M Expense 125,428,100 14,999,100 59,045,400 12,107,500 19,121,800 11,738,600 8,415,700 2 Net Replacements 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ __________ __________ 3 Total OM&R 182,036,200 19,331,100 98,711,800 15,794,000 28,045,000 11,738,600 8,415,700 4 Net Capital Costs 37,591,100 1,738,800 30,791,000 1,479,600 3,581,700__________ __________ __________ __________ __________ __________ __________ 5 Total 219,627,300 21,069,900 129,502,800 17,273,600 31,626,700 11,738,600 8,415,700 Number of Units 6 Units of Service 158,405,500 1,284,604 169,967,400 119,445,000 5,186,802 307,802 Ccf Ccf/day pounds pounds Bills Bills Unit Costs - $/unit 7 OM&R Line 3 / Line 6 0.12204 76.84221 0.09292 0.23479 2.26317 27.34128 8 Total Line 5 / Line 6 0.13301 100.81147 0.10163 0.26478 2.26317 27.34128 Single Family Metered 9 Units of Service 66,070,300 573,307 54,897,100 36,019,400 3,621,060 10 Cost - $Line 9 x Line 8 89,895,500 8,788,200 57,795,900 5,579,100 9,537,200 8,195,100 Unmetered 11 Units of Service 15,982,700 134,732 14,011,900 9,262,200 722,290 12 Cost - $Line 11 x Line 8 21,219,600 2,125,900 13,582,600 1,424,000 2,452,400 1,634,700 Multi Family Metered 13 Units of Service 17,752,000 135,461 18,189,800 12,257,700 250,900 14 Cost - $Line 13 x Line 8 21,679,300 2,361,200 13,656,100 1,848,600 3,245,600 567,800 Unmetered 15 Units of Service 9,833,700 78,789 9,381,700 6,269,300 284,750 16 Cost - $Line 15 x Line 8 12,508,800 1,308,000 7,942,900 953,500 1,660,000 644,400 Non-Residential 17 Units of Service 48,766,800 362,314 51,786,900 35,036,400 307,802 307,802 18 Cost - $Line 17 x Line 8 66,664,200 6,486,600 36,525,300 5,263,000 9,277,000 696,600 8,415,700 Surcharge 19 Units of Service 21,700,000 20,600,000 20 Cost - $Line 19 x Line 8 7,659,900 2,205,400 5,454,500__________ __________ __________ __________ __________ __________ __________ 21 Total Cost - $ 219,627,300 21,069,900 129,502,800 17,273,600 31,626,700 11,738,600 8,415,700 Ccf - hundred cubic feet ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-16 Comparison of Wastewater Cost of Service With Revenue Under Existing Rates Test Year 2008 (1) (2) (3) Revenue Allocated Under Indicated Line Cost of Existing Revenue No. Customer Class Service Rates Increase____ _____________ _________ _________ _________ $$% Metered Customers J-9 B-15 (1) / (2) 1 Single Family 89,895,500 77,853,000 15.5 2 Multifamily 21,679,300 20,330,400 6.6 3 Non-Residential (a) 74,324,100 66,435,400 11.9__________ __________ 4 Total 185,898,900 164,618,800 12.9 Unmetered Customers 5 Single Family 21,219,600 18,318,700 15.8 6 Multifamily 12,508,800 11,422,800 9.5__________ __________ 7 Total 33,728,400 29,741,500 13.4 Total System 8 Single Family 111,115,100 96,171,700 15.5 9 Multifamily 34,188,100 31,753,200 7.7 10 Non-Residential 74,324,100 66,435,400 11.9__________ __________ 11 Total 219,627,300 194,360,300 13.0 (a) Includes Cost of Service associated with Surcharges. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-17 Proposed Wastewater Rates User/Capital Charge Breakdown (Rates Effective December 1, 2007) Total Line User Capital Wastewater No.Type of Monthly Charge Charge Charge Charge____ ____________________ __________ __________ __________ Base Charge - $/Bill 1 Billing & Collection Charge 2.30 0.00 2.30 2 System Availability Charge 6.59 1.81 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 8.89 1.81 10.70 4 Compliance Charge - $/Bill (a) 27.35 0.00 27.35_____ _____ _____ 5 Total Nonresidential Service Charge 36.24 1.81 38.05 Volume Charge 6 Metered - $/Ccf 1.53 0.35 1.88 Unmetered - $/Bill 7 Each Room 1.00 0.23 1.23 8 Each Water Closet 3.75 0.84 4.59 9 Each Bath 3.13 0.70 3.83 10 Each Separate Shower 3.13 0.70 3.83 Extra Strength Surcharges - $/ton (a) 11 Suspended Solids over 300 mg/l 185.85 33.05 218.90 12 BOD over 300 mg/l 469.59 59.97 529.56 13 COD over 600 mg/l 234.80 29.99 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) Applicable only to nonresidential customers. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-18 Proposed Wastewater Rates by Customer Class (Rates Effective December 1, 2007) Metered_____________________ Line Unmetered Non- No Type of Monthly Charge Residential Residential Residential____ _____________________ _________ _________ _________ $$$ Base Charge - $/Bill 1 Billing and Collection Charge 2.30 2.30 2.30 2 System Availability Charge 8.40 8.40 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 10.70 10.70 10.70 4 Compliance Charge 27.35_____ 5 Total Nonresidential Service Charge 38.05 Volume Charge 6 per Ccf 1.88 1.88 7 per room 1.23 8 per water closet 4.59 9 per bath 3.83 10 per separate shower 3.83 Extra Strength Surcharge - $/ton 11 Suspended Solids over 300mg/l 218.90 12 BOD over 300 mg/l 529.56 13 COD over 600 mg/l 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-19Comparison of Existing and Proposed Wastewater RatesLineProposed Wastewater Charges____________________________________________________________________No. Type of Monthly Charge Existing 2007 2008 (a) 2009 2010 2011 2012____ _____________________ ________ ________ ________ ________ ________ ________ ________Base Charge - $/Bill1 Billing & Collection Charge 0.85 0.85 2.30 2.30 2.45 2.55 2.702 System Availability Charge 7.05 7.05 8.40 9.55 10.65 11.70 12.25 ____ ____ ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 7.90 7.90 10.70 11.85 13.10 14.25 14.954 Compliance Charge - $/Bill (b) 12.55 12.55 27.35 28.35 29.65 30.90 32.10____ ____ ____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 20.45 20.45 38.05 40.20 42.75 45.15 47.05Volume Charge6 Metered - $/Ccf 1.81 1.81 1.88 2.13 2.37 2.59 2.73 Unmetered - $/Bill7 Each Room 1.18 1.18 1.23 1.39 1.55 1.69 1.788 Each Water Closet 4.42 4.42 4.59 5.20 5.79 6.32 6.679 Each Bath 3.69 3.69 3.83 4.34 4.82 5.27 5.5610 Each Separate Shower 3.69 3.69 3.83 4.34 4.82 5.27 5.56Extra Strength Surcharges - $/ton (b)11 Suspended Solids over 300 mg/l 218.90 218.90 218.90 220.22 239.58 260.16 270.7412 BOD over 300 mg/l 461.44 461.44 529.56 600.76 659.68 722.40 752.9213 COD over 600 mg/l 230.72 230.72 264.78 300.38 329.84 361.20 376.46Typical Residential Bill - $/Bill (c)14 User Charge Portion 21.12 21.12 21.13 19.90 20.74 21.60 22.6515 Capital Charge Portion 1.26 1.26 4.61 8.99 11.32 13.37 14.14 ____ ____ ____ ____ ____ ____ ____ 16 Total 22.38 22.38 25.74 28.89 32.06 34.97 36.79 Ccf - Hundred Cubic Feet mg/l - milligram per liter(a) 2008 rates effective December 1, 2007.(b) Applicable only to nonresidential customers.(c) Based on contributed wastewater volume of 8 Ccf per month.ALT I - Rate Commission Recommendation Report 8/13/07 Table 3-20 Comparison of Wastewater Cost of Service With Revenue Under Proposed Rates Test Year 2008 (1) (2) (3) Revenue Revenue As Under Allocated a Percent Line Proposed Cost of of Cost of No. Customer Class Rates Service Service____ _________________ _________ _________ _________ $$% Metered Customers K-3 J-9 (1) / (2) 1 Single Family 89,842,700 89,895,500 99.9 2 Multifamily 21,742,500 21,679,300 100.3 3 Non-Residential (a) 74,601,600 74,324,100 100.4__________ __________ 4 Total 186,186,800 185,898,900 100.2 Unmetered Customers 5 Single Family 20,794,189 21,219,600 98.0 6 Multifamily 12,584,893 12,508,800 100.6__________ __________ 7 Total 33,379,082 33,728,400 99.0 Total System 8 Single Family 110,636,889 111,115,100 99.6 9 Multifamily 34,327,393 34,188,100 100.4 10 Non-Residential (a) 74,601,600 74,324,100 100.4__________ __________ 11 Total 219,565,882 219,627,300 100.0 (a) Includes revenue and allocated cost of service associated with surcharge customers. ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-1 Existing Stormwater Rates and Taxes Type of Monthly Charge City Original Co. Boundary County Annexed____________________ __________ __________ __________ $$$ Flat Charge per Bill 0.24 0.24 0.24 Administrative Tax per $100 Assessed Value (a) 0.0186 0.0186 0.0186 Stormwater Tax per $100 Assessed Value 0.05 0.05 (a) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value. ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-2Historical and Projected Billed Stormwater RevenueUnder Existing Rates and TaxesLine Historical Projected________________________________________________________ ______________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Stormwater User Charge Revenue1 Flat Rate (a) 1,226,668 1,226,517 1,232,056 1,232,816 1,237,938 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,5002 Impervious Area Charges (b)00000000000Ad Valorem Taxes3 Administration (c) 4,069,968 4,271,100 4,266,241 4,698,139 4,601,860 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9004 Stormwater (c) 6,022,435 6,608,058 6,588,126 6,919,560 6,749,957 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,100 _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 5 Total 11,319,070 12,105,675 12,086,423 12,850,515 12,589,755 13,593,100 13,905,500 14,217,600 14,529,500 14,841,400 15,153,500(a) Flat Rate Charge anticipates 5 month of revenue and is intended to be phased out by December 2008.(b) 2008 Impervious Area Charges anticipate 7 months of revenue and are intended to be in effect December 2008. This new revenue source will replace revenues now derived from the flat rate user c(c) Ad Valorem Taxes are expected to be phased out by December 2008.ALT I - Rate Commission Recommendation Report 8/13/07 charges and ad valorem taxeALT I - Rate Commission Recommendation Report 8/13/07 Table 4-3Historical and Projected Stormwater OMCI RevenueUnder Existing Rates and TaxesLineHistorical Projected________________________________________________________ ____________________________________________________________________No. Subdistrict 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Historical Assessed Value (C-14) x Tax Rate (C-9) Projected Assessed Value (C-16) x Tax Rate (C-9)1 Coldwater Creek ($0.07/$100) 1,447,686 1,477,498 1,483,563 1,482,672 1,525,934 1,599,600 1,628,300 1,657,000 1,685,700 1,714,400 1,743,1002 Wedgewood ($0.06/$100) 24,457 24,202 25,599 26,383 28,330 33,600 34,700 35,800 36,900 38,000 39,0003 Upper Paddock Creek ($0.06/$100) 17,971 19,156 18,714 18,760 20,831 21,300 21,500 21,700 21,900 22,000 22,2004 Paddock Creek ($0.06/$100) 80,340 81,146 82,484 82,536 92,257 93,400 94,300 95,200 96,100 97,000 97,9005 Fountain Creek ($0.10/$100) 112,274 114,330 115,371 117,383 131,107 134,400 135,100 135,800 136,500 137,200 137,9006 Maline Creek ($0.07/$100) 411,292 419,525 417,656 430,655 445,722 469,100 471,200 473,300 475,400 477,500 479,6007 Black Jack-Dellwood ($0.06/$100) 135,111 134,462 136,195 141,060 146,409 150,100 151,000 151,900 152,800 153,700 154,6008 Watkins Creek ($0.06/$100) 93,229 87,627 89,305 91,981 94,877 95,100 95,700 96,300 96,900 97,500 98,1009 Sugar Creek Reservoir ($0.063/$100) 166,685 174,676 191,957 203,621 216,404 238,900 251,700 264,600 277,500 290,400 303,20010 Deer Creek ($0.06/$100) 1,854,961 1,847,565 1,937,889 1,977,280 2,101,960 2,232,200 2,304,200 2,376,200 2,448,200 2,520,200 2,592,20011 Clayton Central ($0.06/$100) 187,547 197,406 198,150 202,957 184,064 212,900 220,100 227,300 234,500 241,700 248,90012 Creve Coeur/Frontenac ($0.05/$100) 232,613 223,561 236,262 247,669 252,882 265,000 274,500 284,000 293,500 303,000 312,50013 Black Creek ($0.06/$100) 722,550 729,123 762,953 770,930 788,464 873,300 900,300 927,300 954,300 981,300 1,008,30014 University City RDP ($0.07/$100) 580,324 579,846 603,599 618,579 651,082 676,600 692,700 708,800 724,900 741,000 757,10015 Gravois Creek ($0.06/$100) 825,786 834,842 872,601 885,859 958,305 1,007,600 1,037,600 1,067,600 1,097,600 1,127,600 1,157,60016 Loretta-Joplin ($0.06/$100) 12,511 12,491 12,946 13,733 15,337 15,000 15,200 15,400 15,600 15,700 15,90017 N. Affton Area ($0.06/$100) 36,799 36,654 38,531 39,296 43,800 44,000 45,200 46,400 47,600 48,800 50,00018 Wellston ($0.08/$100) 36,272 34,758 35,158 35,984 35,677 36,700 35,600 34,600 33,600 32,500 31,50019 Seminary Branch-RDP ($0.06/$100) 156,255 155,235 169,981 165,118 183,575 185,700 190,800 195,900 201,000 206,100 211,20020 Marlborough ($0.04/$100) 21,485 21,312 22,313 21,680 24,025 24,600 25,000 25,400 25,900 26,300 26,80021 Shrewsbury-RDP ($0.06/$100) 13,913 13,621 14,071 15,138 16,893 17,100 17,500 17,900 18,400 18,800 19,200________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ 22 Total 7,170,061 7,219,036 7,465,298 7,589,274 7,957,935 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,800ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-4Comparison of Projected Stormwater Revenue Under ExistingRates and Taxes With Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$Stormwater OperationsStormwater User Charge Revenue1 Flat Rate 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,500Ad Valorem Taxes2 Administration 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9003 Stormwater 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,1004 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9005 Interest Income - Reserve Funds 0 0 15,400 51,200 91,400 133,7006 Wastewater Support 19,223,100 10,798,500 0 0 0 0_________ _________ _________ _________ _________ _________ 7 Total Stormwater Operating Revenue 33,572,400 25,617,100 15,418,800 15,767,600 16,120,900 16,504,1008 Operation and Maintenance Expense 29,681,800 35,440,000 40,551,300 44,706,600 46,483,800 48,164,0009 Capital Outlay 1,701,400 3,965,800 1,205,400 1,240,500 1,277,700 1,315,80010 Cash Financing of Basic Services (a) 2,000,000 4,300,000 5,250,000 4,000,000 4,000,000 4,000,00011 Additions to Operating Reserve 0 0 768,900 1,021,600 988,400 1,126,800_________ _________ _________ _________ _________ _________ 12 Total Revenue Requirements - Basic Service 33,383,200 43,705,800 47,775,600 50,968,700 52,749,900 54,606,60013 Net Annual Balance 189,200 (18,088,700) (32,356,800) (35,201,100) (36,629,000) (38,102,500)14 Beginning of Year Balance 0 189,200 (17,899,500) (50,256,300) (85,457,400) (122,086,400)15 End of Year Balance 189,200 (17,899,500) (50,256,300) (85,457,400) (122,086,400) (160,188,900)OMCI Fund16 OMCI Revenue Under Existing Rates 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,80017 Interest Income 1,263,600 1,144,600 1,053,000 1,083,600 1,235,600 1,438,50018 Less: OMCI Existing Major Improvements (a) 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,00019 Net Annual Balance (3,976,200) (2,826,200) (2,409,600) 4,158,400 4,526,300 7,070,30020 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 28,880,190 33,038,590 37,564,89021 End of Year Balance 34,115,990 31,289,790 28,880,190 33,038,590 37,564,890 44,635,190(a) Items are considered a component of the District's Capital Improvement and Replacement Program for 2007 and 2008.ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-5 Projected Stormwater Impervious Billable Area (a) Line Projected No. Customer Class 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. City Single Family 1 General 1,235,600 1,250,500 1,264,000 1,277,100 1,289,900 1,302,300 2 Low Income 25,000 52,700 83,700 115,200 147,300 180,000 3 Low Income - Credit (12,500) (26,350) (41,850) (57,600) (73,650) (90,000) Multi Family 4 General 754,500 753,600 752,700 751,700 750,800 749,800 5 Low Income 1,000 1,000 1,000 1,000 1,000 1,000 6 Low Income - Credit (500) (500) (500) (500) (500) (500) 7 Commercial 2,641,800 2,644,500 2,647,100 2,649,800 2,652,400 2,655,000 8 Industrial 701,700 701,700 701,700 701,700 701,700 701,700 9 Anheuser-Busch 69,600 69,600 69,600 69,600 69,600 69,600 10 Tax Exempt (b) 56,500 56,500 56,500 56,500 56,500 56,500 _________ _________ _________ _________ _________ _________ 11 Total 5,472,700 5,503,250 5,533,950 5,564,500 5,595,050 5,625,400 County Single Family 12 General 8,563,500 8,601,800 8,630,800 8,658,400 8,684,500 8,709,100 13 Low Income 36,100 86,800 142,900 199,600 256,900 314,900 14 Low Income - Credit (18,100) (43,400) (71,500) (99,800) (128,500) (157,500) Multi Family 15 General 1,209,800 1,217,100 1,224,300 1,231,400 1,238,400 1,245,300 16 Low Income 100 100 100 100 100 100 17 Low Income - Credit (50) (50) (50) (50) (50) (50) 18 Commercial 3,596,600 3,703,400 3,809,900 3,916,100 4,022,100 4,127,700 19 Industrial 1,522,100 1,531,800 1,541,500 1,551,300 1,561,000 1,570,700 20 Anheuser-Busch 8,000 8,000 8,000 8,000 8,000 8,000 21 Tax Exempt (b) 3,613,100 3,636,900 3,660,600 3,684,300 3,707,900 3,731,400 _________ _________ _________ _________ _________ _________ 22 Total 18,531,150 18,742,450 18,946,550 19,149,350 19,350,350 19,549,650 _________ _________ _________ _________ _________ _________ 23 Total Impervious Area 24,003,850 24,245,700 24,480,500 24,713,850 24,945,400 25,175,050 24 Levee Districts - Credit (c) (875,800) (875,800) (875,800) (875,800) (875,800) (875,800) _________ _________ _________ _________ _________ _________ 25 Billable Impervious Area 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,250 (a) The impervious area shown in this table is impervious area billed, not actual impervious area. (b) (c) The Tax Exempt customer class consists of churches, schools and government organizations that, under existing stormwater funding structure, do not pay ad valorem based taxes. Per the Intergovernment Cooperation Agreement, the Levee Districts will be billed at five percent of the basic services stormwater user charge. Therfore, 95 percent of their impervious area must be subtracted from total impervious area for user charge calculation purposes. ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-6Calculation and Projection of Stormwater Impervious Rates and RevenueLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$1 Total Revenue Requirements - Basic Services 33,383,200 43,705,800 47,775,600 50,968,700 52,749,900 54,606,6002 Total Revenue Requirements - Enhanced Services 0 0 25,112,800 25,771,900 26,448,400 27,142,6003 Less: Flat Rate Revenue (a) (1,237,600) (514,500)00004 Less: Ad Valorem Administration Tax (b) (4,787,400) (4,914,900)00005 Less: Ad Valorem Stormwater Tax (b) (7,568,100) (7,755,900)00006 Less: Other Revenue (756,200) (913,100) (1,185,800) (1,186,900) (1,188,100) (1,216,900)7 Less: Interest Income - Reserve Funds 0 0 (15,400) (51,200) (91,400) (133,700)8 Plus: Stormwater Policy Credit (c) 779,000 1,887,000 1,987,000 2,050,000 2,116,0009 Plus: Bad Debt Provisions (c) 189,200 779,000 1,887,000 1,987,000 2,050,000 2,116,000_________ _________ _________ _________ _________ _________ 10 Net Cost to be met from Charges 19,223,100 31,165,400 75,461,200 79,476,500 82,018,800 84,630,60011 Basic Services 19,223,100 31,165,400 49,026,700 52,348,200 54,178,400 56,059,40012 Enhanced Services 0 0 26,434,500 27,128,300 27,840,400 28,571,200Projected Billable Impervious Area - 100 sq. ft.13 Basic Services 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,25014 Enhanced Services 23,081,950 23,323,800 23,558,600 23,791,950 24,023,500 24,253,150Projected annual stormwater service charge (d) - $/100 sq. ft.15 Basic Services 0.0000 1.4940 2.0770 2.1960 2.2509 2.307016 Enhanced Services 0.0000 0.0000 1.1221 1.1402 1.1589 1.1780______ ______ ______ ______ ______ ______ 17 Total Charge 0.0000 1.4940 3.1991 3.3362 3.4098 3.485018 Stormwater Service Charge Revenue 0 20,366,900 75,462,100 79,475,900 82,019,100 84,628,60019 Indicated Wastewater Support Requirement 19,223,100 10,798,5000000(a) Flat Rate Charge anticipates 5 month of revenue and is intended to be phased out by December 2008.(b) Ad Valorem Taxes are expected to be phased out by December 2008.(c) Based on 2.5% of annual Stormwater revenue.(d) 2008 Impervious Area Charges anticipate 7 months of revenue and are intended to be in effect December 2008. This new revenuesource will replace revenues now derived from the flat rate user charges and ad valorem taxes.ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-7Projected Stormwater OMCI RevenueUnder Projected Rates and TaxesLineNo. Customer Class 2007 2008 2009 2010 2011 2012____ ________________________________________ ________ ________ ________ ________ ________ ________$$$$$$Tax per Schedule Tax Rate $0.00 per $100 Assessed Value_____________________ ________________________________________1 Coldwater Creek ($0.07/$100) 1,599,600 1,628,3002 Wedgewood ($0.06/$100) 33,600 34,7003 Upper Paddock Creek ($0.06/$100) 21,300 21,5004 Paddock Creek ($0.06/$100) 93,400 94,3005 Fountain Creek ($0.10/$100) 134,400 135,100________ ________ ________ ________ ________ ________ 6 Coldwater Creek Watershed 1,882,300 1,913,90000007 Maline Creek ($0.07/$100) 469,100 471,2008 Black Jack-Dellwood ($0.06/$100) 150,100 151,0009 Watkins Creek ($0.06/$100) 95,100 95,700________ ________ ________ ________ ________ ________ 10 Bissell Point Watershed 714,300 717,900000011 Sugar Creek Reservoir ($0.063/$100) 238,900 251,700________ ________ ________ ________ ________ ________ 12 Lower Meramec Watershed (a) 238,900 251,700000013 Deer Creek ($0.06/$100) 2,232,200 2,304,20014 Clayton Central ($0.06/$100) 212,900 220,10015 Creve Coeur/Frontenac ($0.05/$100) 265,000 274,50016 Black Creek ($0.06/$100) 873,300 900,30017 University City RDP ($0.07/$100) 676,600 692,70018 Gravois Creek ($0.06/$100) 1,007,600 1,037,60019 Loretta-Joplin ($0.06/$100) 15,000 15,20020 N. Affton Area ($0.06/$100) 44,000 45,20021 Wellston ($0.08/$100) 36,700 35,60022 Seminary Branch-RDP ($0.06/$100) 185,700 190,80023 Marlborough ($0.04/$100) 24,600 25,00024 Shrewsbury-RDP ($0.06/$100) 17,100 17,500________ ________ ________ ________ ________ ________ 25 River Des Peres Watershed 5,590,700 5,758,700000026 Missouri River Watershed (b)0000_________ _________ _________ _________ _________ _________ 27 Total 8,426,200 8,642,2000000(a) Includes the Meramec River Basin subdistrict in 2009 and subsequent years.(b) Includes the Missouri River-Bonfils subdistrict in 2009 and subsequent years.ALT I - Rate Commission Recommendation Report 8/13/07 Table 4-8 Comparison of Projected Stormwater Revenue Under Proposed Rates and Taxes Projected Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______ $$$$$$ Stormwater Operations Stormwater User Charge Revenue 1 Flat Rate (a) 1,237,600 514,5000000 2 Impervious Area Charges (a) 0 20,366,900 75,462,100 79,475,900 82,019,100 84,628,600 Ad Valorem Taxes (b) 3 Administration 4,787,400 4,914,9000000 4 Stormwater 7,568,100 7,755,9000000 5 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,900 6 Interest Income - Reserve Funds 0 0 15,400 51,200 91,400 133,700 7 Wastewater Support 19,223,100 10,798,5000000_________ _________ _________ _________ _________ _________ 8 Total Stormwater Operating Revenue 33,572,400 45,263,800 76,663,300 80,714,000 83,298,600 85,979,200 9 Operation and Maintenance Expense 29,681,800 35,440,000 40,551,300 44,706,600 46,483,800 48,164,000 10 Capital Outlay 1,701,400 3,965,800 1,205,400 1,240,500 1,277,700 1,315,800 11 Cash Financing of Basic Services 2,000,000 4,300,000 5,250,000 4,000,000 4,000,000 4,000,000 12 Cash Financing of Enhanced Services 0 0 25,112,800 25,771,900 26,448,400 27,142,600 13 Additions to Operating Reserve 0 0 768,900 1,021,600 988,400 1,126,800 14 Stormwater Policy Credit (c) 0 779,000 1,887,000 1,987,000 2,050,000 2,116,000 15 Bad Debt Provision (c) 189,200 779,000 1,887,000 1,987,000 2,050,000 2,116,000_________ _________ _________ _________ _________ _________ 16 Total Revenue Requirements 33,572,400 45,263,800 76,662,400 80,714,600 83,298,300 85,981,200 17 Net Stormwater Operations Annual Balance 0 0 900 (600) 300 (2,000) 18 Beginning of Year Balance 0 0 0 900 300 600 19 End of Year Balance 0 0 900 300 600 (1,400) OMCI Fund 20 OMCI Revenue Under Proposed Rates 8,426,200 8,642,2000000 21 Interest Income 1,263,600 1,144,600 895,200 600,800 408,400 247,100 22 Less: OMCI Existing Major Improvements (d 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 23 Less: OMCI Reconfigured Enhanced Service 000000 24 Net OMCI Fund Annual Balance (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) 25 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 26 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 (a) (b) Ad Valorem Taxes are expected to be phased out by December 2007. (c) Based on 2.5% of annual Stormwater revenue. (d) Represents the use of current subdistrict revenue until total depletion, at which time reconfigured subdistrict revenues will replenish. 2008 Impervious Area Charges anticipate 7 months of revenue and are intended to be in effect December 2008. This new revenue source will replace revenues now derived from the flat rate user charges and ad valorem taxes. ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-1Wastewater Revenue with Projected RatesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$1 Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,7002 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7003 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,0004 Interest Income - Reserve Funds 2,493,500 2,767,400 2,828,000 2,824,900 2,830,700 2,830,3005 Interest Income - Operations 198,700 86,100 107,100 115,100 115,200 115,2006 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 7 Total Revenue 208,374,600 221,581,800 257,166,300 283,298,700 307,069,900 321,815,200ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-2Stormwater Revenue with Projected Rates and TaxesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$Stormwater User Charge Revenue1 Flat Rate 1,237,600 514,50000002 Impervious Area Charges 0 20,366,900 75,462,100 79,475,900 82,019,100 84,628,600Ad Valorem Taxes3 Administration 4,787,400 4,914,90000004 Stormwater 7,568,100 7,755,90000005 OMCI Taxes 8,426,200 8,642,20000006 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9007 Interest Income - Reserve Funds 0 0 15,400 51,200 91,400 133,7008 Wastewater Support 19,223,100 10,798,50000009 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100_________ _________ _________ _________ _________ _________ 10 Total Stormwater Revenue 43,262,200 55,050,600 77,558,500 81,314,800 83,707,000 86,226,300ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-3Wastewater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,5002 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,1003 Debt Service 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,1004 Cash Financing of Major Improvements 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,0005 Addition to Operating Reserve 2,366,700 1,024,70000006 Stormwater Support 19,223,100 10,798,5000000__________ __________ __________ __________ __________ __________ 7 Total Revenue Requirements 215,569,200 220,819,900 256,730,800 283,275,500 307,085,700 321,799,700ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-4Stormwater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 29,681,800 35,440,000 40,551,300 44,706,600 46,483,800 48,164,0002 Routine Annual Improvements 1,701,400 3,965,800 1,205,400 1,240,500 1,277,700 1,315,8003 Cash Financing of Basic Services 2,000,000 4,300,000 5,250,000 4,000,000 4,000,000 4,000,0004 Cash Financing of Enhanced Services 0 0 25,112,800 25,771,900 26,448,400 27,142,6004 Additions to Operating Reserve 0 0 768,900 1,021,600 988,400 1,126,8005 Stormwater Policy Credit 0 779,000 1,887,000 1,987,000 2,050,000 2,116,0006 Bad Debt Provisions 189,200 779,000 1,887,000 1,987,000 2,050,000 2,116,0007 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,0008 OMCI Reconfigured Enhanced Services 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 9 Total Revenue Requirements 47,238,400 57,876,800 88,983,400 86,714,600 89,298,300 89,856,200ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-5 Wastewater and Stormwater Revenue with Projected Rates and Taxes and Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______ $$$$$$ Wastewater & Stormwater Operations Revenue 1 Wastewater Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,700 2 Wastewater Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 Stormwater User Charge Revenue 3 Flat Rate 1,237,600 514,500 0000 4 Impervious Area Charges 0 20,366,900 75,462,100 79,475,900 82,019,100 84,628,600 Ad Valorem Taxes 5 Administration 4,787,400 4,914,900 0000 6 Stormwater 7,568,100 7,755,900 0000 7 Other Revenue 5,429,500 5,836,000 6,462,400 6,467,300 6,472,200 6,541,600 8 Interest Income - Reserve Funds 2,493,500 2,767,400 2,843,400 2,876,100 2,922,100 2,964,000 9 Interest Income - Operations 198,700 86,100 107,100 115,100 115,200 115,200 10 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 11 Total Revenue 222,723,900 256,047,100 333,829,600 364,012,700 390,368,500 407,794,400 Revenue Requirements 12 Operation and Maintenance Expense 134,466,100 146,353,400 155,206,000 163,765,100 169,863,600 175,757,500 13 Routine Annual Improvements 7,850,200 10,360,400 7,741,900 3,860,100 3,975,900 4,094,900 14 Debt Service 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,100 15 Cash Financing of Major Improvements 62,100,000 69,146,000 136,554,800 162,210,900 181,934,400 193,076,600 16 Additions to Operating Reserve 2,366,700 1,024,700 768,900 1,021,600 988,400 1,126,800 17 Stormwater Policy Credit 0 779,000 1,887,000 1,987,000 2,050,000 2,116,000 18 Bad Debt Provisions 189,200 779,000 1,887,000 1,987,000 2,050,000 2,116,000__________ __________ __________ __________ __________ __________ 19 Total Revenue Requirements 229,918,500 255,285,200 333,393,200 363,990,100 390,384,000 407,780,900 20 Surplus (Deficit) Revenue (7,194,600) 761,900 436,400 22,600 (15,500) 13,500 21 Surplus (Deficit) Stormwater Revenue 0 0 900 (600) 300 (2,000) 22 Beginning of Year Balance 0 0 0 900 300 600 23 End of Year Balance 0 0 900 300 600 (1,400) 24 Surplus (Deficit) Wastewater Revenue (7,194,600) 761,900 435,500 23,200 (15,800) 15,500 25 Beginning of Year Balance 9,274,400 2,079,800 2,841,700 3,277,200 3,300,400 3,284,600 26 End of Year Balance 2,079,800 2,841,700 3,277,200 3,300,400 3,284,600 3,300,100 Stormwater OMCI Fund 27 OMCI Taxes 8,426,200 8,642,200 0000 28 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100 29 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 30 OMCI Reconfigured Enhanced Services 000000 31 Surplus (Deficit) Stormwater OMCI Fund (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) 32 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 33 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-6aDistribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,895,500 89,842,700 14,823,543 104,666,243 47.4%2 Multifamily 21,679,300 21,742,500 1,126,625 22,869,125 10.4% Non-Residential (a)3 Anheuser-Busch 8,218,500 8,344,000 115,934 8,459,934 3.8%4 All Other 66,105,600 66,257,600 18,338,551 84,596,151 38.3%___________ ___________ ___________ ___________ ______ 5 Total 185,898,900 186,186,800 34,404,654 220,591,454 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.Table 5-6Distribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,895,500 89,842,700 14,823,543 104,666,243 47.4%2 Multifamily 21,679,300 21,742,500 1,126,625 22,869,125 10.4%3 Non-Residential (a) 74,324,100 74,601,600 18,454,486 93,056,086 42.2%___________ ___________ ___________ ___________ ______ 4 Total 185,898,900 186,186,800 34,404,654 220,591,454 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-7Existing and Proposed Wastewater Rates(Effective July 1, 2005) (Effective December 1, 2007)Metered Metered_____________________ _____________________LineNo.Type of Monthly ChargeUnmetered ResidentialResidentialNon-ResidentialUnmetered ResidentialResidentialNon-Residential____ ____________________ __________ __________ __________ __________ __________ __________$$$1 Billing and Collection Charge 0.85 0.85 0.85 2.30 2.30 2.302 System Availability Charge 7.05 7.05 7.05 8.40 8.40 8.403 Compliance Charge 12.55 27.35Volume Charge4 per Ccf 1.81 1.81 1.88 1.885 per room 1.18 1.236 per water closet 4.42 4.597 per bath 3.69 3.838 per separate shower 3.69 3.83Extra Strength Surcharge - $/ton9 Suspended Solids over 300 mg/l 218.90 218.9010 BOD over 300 mg/l 461.44 529.5611 COD over 600 mg/l 230.72 264.78Ccf - hundred cubic feetmg/l - milligrams per literNote: Rates for qualified low income residential users are 50 percent of the regular rates above.ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-8Existing and Projected Stormwater Rates and Taxes (a)2007 and 2008Type of Monthly Charge CityOriginal Co. BoundaryCounty Annexed____________________ __________ __________ __________$$$Flat Charge per Monthly Bill 0.24 0.24 0.24Administrative Tax per $100 Assessed Value (b) 0.0186 0.0186 0.0186Stormwater Tax per $100 Assessed Value 0.05 0.05 0.002007 2008 2009 2010 2011 2012_______ _______ _______ _______ _______ _______$$$$$$Projected stormwater service charge 0.0000 1.4940 3.1991 3.3362 3.4098 3.4850per 100 square feet impervious area(annualized rate - billable monthly)Implemented December 1, 2007Projected monthly charge per: 100 square feet of impervious area 0.0000 0.1245 0.2666 0.2780 0.2842 0.2904 acre of impervious area 0.00 54.23 116.13 121.10 123.80 126.50(a)(b) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value.The Flat Rate Charge, Administrative Tax and Stormwater Tax are projected to be phased out by December 2007. Revenue derived from the flat rate charge is based on five months of collection. All administrative and stormwater tax revenues due are expected to be collected in fiscal year 2008.ALT I - Rate Commission Recommendation Report 8/13/07 Table 5-9Typical Monthly Bill Comparison - ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Single Family1 Small 5 City Avg. 15.00 0.1245 50,000 16.95 3.16 20.11 20.10 1.87 21.97County Avg. 25.00 0.1245 100,000 16.95 6.07 23.02 20.10 3.11 23.212 Medium 8 City Avg. 15.00 0.1245 100,000 22.38 6.07 28.45 25.74 1.87 27.61County Avg. 25.00 0.1245 150,000 22.38 8.99 31.37 25.74 3.11 28.853 Medium - 50 Largest Cities 10 City Avg. 15.00 0.1245 150,000 26.00 8.99 34.99 29.50 1.87 31.37County Avg. 25.00 0.1245 200,000 26.00 11.91 37.91 29.50 3.11 32.614 Large 20 City Avg. 15.00 0.1245 200,000 44.10 11.91 56.01 48.30 1.87 50.17County Avg. 25.00 0.1245 250,000 44.10 14.82 58.92 48.30 3.11 51.41Multifamily5 Small 20 13.00 0.1245 200,000 44.10 11.91 56.01 48.30 1.62 49.926 Medium 40 27.00 0.1245 400,000 80.30 23.57 103.87 85.90 3.36 89.267 Large 60 33.00 0.1245 600,000 116.50 35.24 151.74 123.50 4.11 127.61(a) Stormwater Monthly Charge is equal to $54.23 per acre.LineBilled Wastewater Impervious ExistingStormwater MonthlyAverage AssessedExisting WastewaterExisting StormwaterALT I - Rate Commission Recommendation Report 8/13/07 Table 5-10Typical Monthly Bill Comparison - Non-ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 0.1245 147.15 0.24 147.39 169.65 14.07 183.729 Medium 100 Tax Exempt Co. 230 0.1245 201.45 0.24 201.69 226.05 28.64 254.6910 Large 160 City Avg. 268 0.1245 1,000,000 310.05 58.57 368.62 338.85 33.37 372.22County Avg. 437 0.1245 2,000,000 310.05 116.91 426.96 338.85 54.41 393.26Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 0.1245 169.44 0.24 169.68 194.17 14.07 208.2412 Average 100 Tax Exempt Co. 230 0.1245 233.29 0.24 233.53 261.08 28.64 289.7113 Large 160 City Avg. 268 0.1245 1,000,000 360.99 58.57 419.56 394.89 33.37 428.26County Avg. 437 0.1245 2,000,000 360.99 116.91 477.90 394.89 54.41 449.30(a) Stormwater Monthly Charge is equal to $54.23 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.ExistingImpervious LineAverage AssessedBilled WastewaterExisting WastewaterExisting StormwaterStormwater MonthlyALT I - Rate Commission Recommendation Report 8/13/07 Table 5-11Typical Monthly Bill ComparisonProposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to beEffective July 1, 2008 Effective July 1, 2009 Effective July 1, 2010 Effective July 1, 2011____________________________________________________________________________________________________________________________________No. Customer Class Volume Area Wastewater Stormwater Total Wastewater Stormwater Total Wastewater Stormwater Total Wastewater Stormwater Total_______________________________________________________________________________________________________________________________________________________Ccf 100 sq. ft.$$$$$$$$$$$$Single Family1 Small 5 City Avg. 15.00 22.50 4.00 26.50 24.95 4.17 29.12 27.20 4.26 31.46 28.60 4.36 32.96County Avg. 25.00 22.50 6.67 29.17 24.95 6.95 31.90 27.20 7.11 34.31 28.60 7.26 35.862 Medium 8 City Avg. 15.00 28.89 4.00 32.89 32.06 4.17 36.23 34.97 4.26 39.23 36.79 4.36 41.15County Avg. 25.00 28.89 6.67 35.56 32.06 6.95 39.01 34.97 7.11 42.08 36.79 7.26 44.053 Medium - 50 Largest Cities 10 City Avg. 15.00 33.15 4.00 37.15 36.80 4.17 40.97 40.15 4.26 44.41 42.25 4.36 46.61County Avg. 25.00 33.15 6.67 39.82 36.80 6.95 43.75 40.15 7.11 47.26 42.25 7.26 49.514 Large 20 City Avg. 15.00 54.45 4.00 58.45 60.50 4.17 64.67 66.05 4.26 70.31 69.55 4.36 73.91County Avg. 25.00 54.45 6.67 61.12 60.50 6.95 67.45 66.05 7.11 73.16 69.55 7.26 76.81Multifamily5 Small 20 13.00 54.45 3.47 57.92 60.50 3.61 64.11 66.05 3.69 69.74 69.55 3.78 73.336 Medium 40 27.00 97.05 7.20 104.25 107.90 7.51 115.41 117.85 7.67 125.52 124.15 7.84 131.997 Large 60 33.00 139.65 8.80 148.45 155.30 9.17 164.47 169.65 9.38 179.03 178.75 9.58 188.33Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 189.30 30.13 219.43 208.65 31.41 240.06 226.45 32.11 258.56 238.15 32.82 270.979 Medium 100 Tax Exempt Co. 230 253.20 61.32 314.52 279.75 63.94 343.69 304.15 65.37 369.52 320.05 66.79 386.8410 Large 160 City Avg. 268 381.00 71.45 452.45 421.95 74.50 496.45 459.55 76.17 535.72 483.85 77.83 561.68County Avg. 437 381.00 116.50 497.50 421.95 121.49 543.44 459.55 124.20 583.75 483.85 126.90 610.75Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 216.20 30.13 246.32 238.11 31.41 269.52 258.64 32.11 290.75 271.69 32.82 304.5012 Average 100 Tax Exempt Co. 230 291.62 61.32 352.94 321.84 63.94 385.78 350.13 65.37 415.50 367.96 66.79 434.7513 Large 160 City Avg. 268 442.47 71.45 513.92 489.29 74.50 563.79 533.12 76.17 609.29 560.50 77.83 638.33County Avg. 437 442.47 116.50 558.98 489.29 121.49 610.77 533.12 124.20 657.32 560.50 126.90 687.41(a) Stormwater Monthly Charge is equal to $54.23 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.LineBilled Wastewater Impervious ALT I - Rate Commission Recommendation Report 8/13/07 Table 2-1 Historical and Projected Wastewater and Stormwater Operating Costs Line Historical_________________________________________________________ No Department 2002 2003 2004 2005 2006____ _________________ ________ ________ ________ ________ ________ $$$$$ 1 Board of Trustees 11,824 37,969 28,457 5,176 6,761 2 Rate Commission (a) 43,534 390,486 25,723 (10,905) 47,287 3 Civil Service Commission 1,120 9,150 855 3,775 1,297 4 Secretary - Treasurer 1,064,844 1,372,369 1,500,279 1,232,054 1,433,320 5 Executive Director 1,798,836 1,405,250 749,193 765,912 669,301 6 General Counsel 1,504,086 1,284,039 1,478,876 1,319,763 1,486,452 7 Office of Human Resources 15,270,097 17,554,305 19,328,048 8,248,765 8,093,929 8 Engineering 14,902,810 15,735,615 14,323,870 18,910,094 18,687,163 Operations 9 Collection System (b) 20,166,072 18,990,542 16,802,592 19,868,112 18,610,464 10 Pump Stations 6,259,912 6,238,792 6,255,158 6,529,714 6,966,237 11 Wastewater Treatment (c) 24,040,770 25,689,660 21,909,729 26,194,117 27,602,538 12 Support 2,733,903 2,564,527 6,392,528 3,978,080 6,078,589__________ __________ __________ __________ __________ 13 Total Operations 53,200,657 53,483,521 51,360,006 56,570,023 59,257,827 14 Finance 6,237,874 6,803,699 8,291,439 14,166,470 14,161,194 15 Information Systems 4,368,929 4,770,762 5,172,781 4,812,767 6,063,356__________ __________ __________ __________ __________ 16 Subtotal (General Fund) 98,404,611 102,847,165 102,259,527 106,023,893 109,907,887 17 Water Backup Program 2,548,000 3,824,000 4,276,000 6,104,781 4,858,510 18 Headquarters Building (d) 0 0 1,140,000 1,001,854 1,380,134__________ __________ __________ __________ __________ 19 Total O&M 100,952,611 106,671,165 107,675,527 113,130,528 116,146,531 (a) 2005 reflects reversal of prior year encumbrance. (b) Includes Mintert, Sulphur, and Grand Glaize. (c) Includes Lemay, Bissell, and County Treatment Plants. (d) Expenditures offset by rental income. ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-2 Allocation of Direct Operating Costs Between Wastewater and Stormwater Wastewater Stormwater Direct Direct Indirect________ ________ ________ Personnel Services Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 65.2% 29.4% 5.4% Operations Collection System 69.0% 31.0% 0.0% Pump Stations 67.6% 32.4% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 64.0% 15.2% 20.8% Finance 30.7% 20.5% 48.8% Information Systems 5.8% 3.9% 90.3% All Other Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 55.3% 44.3% 0.4% Operations Collection System 76.0% 24.0% 0.0% Pump Stations 76.0% 24.0% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 86.1% 13.9% 0.0% Finance 54.4% 36.3% 9.3% Information Systems 5.8% 3.9% 90.3% Utilities Operations Pump Stations 84.9% 15.1% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-3Projected Wastewater Operating CostsLineProjectedNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 28,100 22,900 14,200 14,800 15,400 16,0002 Rate Commission (a) 214,900 1,800 1,100 1,100 250,500 2,2003 Civil Service Commission 4,000 4,200 4,400 4,600 4,800 5,0004 Secretary - Treasurer 1,096,800 945,100 979,300 1,206,800 1,051,500 1,089,5005 Executive Director 656,500 679,800 703,800 728,700 754,500 781,4006 General Counsel 1,495,200 1,549,200 1,605,200 1,663,300 1,723,600 1,786,1007 Office of Human Resources 7,321,600 12,001,800 12,784,500 13,631,100 14,548,000 15,542,7008 Engineering 14,599,000 15,134,900 15,791,700 16,459,500 17,016,100 17,592,000Operations9 Collection System (b) 14,474,500 14,952,200 15,446,100 15,956,400 16,484,100 17,029,30010 Pump Stations 5,388,300 5,560,000 5,737,200 5,921,200 6,111,300 6,308,50011 Wastewater Treatment (c) 30,985,000 31,985,400 33,019,000 34,091,300 35,199,200 36,348,50012 Support 6,351,200 6,557,200 6,770,100 6,989,700 7,216,800 7,451,500__________ __________ __________ __________ __________ __________ 13 Total Operations 57,199,000 59,054,800 60,972,400 62,958,600 65,011,400 67,137,80014 Finance 10,061,000 10,444,700 10,843,200 11,257,100 11,687,000 12,133,30015 Information Systems 3,936,600 4,073,500 4,215,200 4,362,000 4,514,000 4,671,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 96,612,700 103,912,700 107,915,000 112,287,600 116,576,800 120,757,40017 Water Backup Program 7,200,000 5,700,000 5,700,000 5,700,000 5,700,000 5,700,00018 Headquarters Building (d) 971,600 1,300,700 1,039,700 1,070,900 1,103,000 1,136,100__________ __________ __________ __________ __________ __________ 19 Total O&M 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,50020 Capital Outlay 2,393,700 2,394,600 2,536,500 2,619,600 2,698,200 2,779,10021 Construction & Engineering 3,755,100 4,000,000 4,000,000 0 0 0__________ __________ __________ __________ __________ __________ 22 Subtotal Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100__________ __________ __________ __________ __________ __________ 23 Total Operating Expense 110,933,100 117,308,000 121,191,200 121,678,100 126,078,000 130,372,600(a) It is assumed that the Rate Commission will review proposed changes in wastewater rates every four years.(b) Includes Mintert, Sulphur, and Grand Glaize.(c) Includes Lemay, Bissell, and County Treatment Plants.(d) Expenditures offset by rental income.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-4Projected Existing Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 10,000 10,400 10,800 11,200 11,6002 Rate Commission 73,900 76,800 79,800 83,000 86,300 89,8003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 218,100 225,900 234,000 242,400 251,0006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 2,497,000 2,609,700 2,728,700 2,854,900 2,989,1008 Engineering 7,307,100 7,556,500 7,814,600 8,081,800 8,358,200 8,644,300Operations9 Collection System (a) 6,156,500 6,359,400 6,568,900 6,785,500 7,009,600 7,240,90010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,324,800 1,367,900 1,412,500 1,458,600 1,506,200__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 9,509,400 9,821,300 10,143,800 10,477,200 10,821,40014 Finance 6,707,300 6,963,100 7,228,700 7,504,500 7,790,900 8,088,40015 Information Systems 2,624,400 2,715,700 2,810,200 2,908,000 3,009,400 3,114,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 30,429,300 31,515,700 32,643,200 33,813,800 35,029,30017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 30,737,700 31,833,400 32,970,400 34,150,800 35,376,40020 Capital Outlay 751,400 773,800 796,900 820,700 845,300 870,60021 Construction & Engineering 950,000 978,5000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 32,490,000 32,630,300 33,791,100 34,996,100 36,247,000(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-7Projected Incremental Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 0 (2,200) (5,600) (5,800) (6,000) (6,200)2 Rate Commission 0 (76,400) (79,400) (82,600) (300) (89,100)3 Civil Service Commission0000004 Secretary - Treasurer0000005 Executive Director 0 144,000 14,800 15,400 16,000 16,6006 General Counsel0000007 Office of Human Resources 0 (164,900) (431,400) 340,500 390,100 445,3008 Engineering 0 (50,000) (52,000) 545,900 567,700 590,400Operations9 Collection System (a) 0 1,269,400 1,407,600 6,749,900 6,989,300 8,737,40010 Pump Stations00000011 Wastewater Treatment (b)00000012 Support (c) 0 87,800 90,400 243,100 250,400 257,900__________ __________ __________ __________ __________ __________ 13 Total Operations 0 1,357,200 1,498,000 6,993,000 7,239,700 8,995,30014 Finance 0 161,100 228,200 238,000 248,200 258,90015 Information Systems 0 56,800 2,300 2,400 2,500 2,600__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 0 1,425,600 1,174,900 8,046,800 8,457,900 10,213,80017 Water Backup Program00000018 Headquarters Building000000__________ __________ __________ __________ __________ __________ 19 Total O&M 0 1,425,600 1,174,900 8,046,800 8,457,900 10,213,80020 Capital Outlay 0 1,386,500 1,410,200 2,151,500 2,216,000 2,282,40021 Construction & Engineering 0 (978,500)0000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 0 1,833,600 2,585,100 10,198,300 10,673,900 12,496,200(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.(d) Adjustment for costs presented in Table 2-4 that are being projected as part of the 2008 CIRP budget.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-8Projected Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 7,800 4,800 5,000 5,200 5,4002 Rate Commission 73,900 400 400 400 86,000 7003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 362,100 240,700 249,400 258,400 267,6006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 2,332,100 2,178,300 3,069,200 3,245,000 3,434,4008 Engineering 7,307,100 7,506,500 7,762,600 8,627,700 8,925,900 9,234,700Operations9 Collection System (a) 6,156,500 7,628,800 7,976,500 13,535,400 13,998,900 15,978,30010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,412,600 1,458,300 1,655,600 1,709,000 1,764,100__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 10,866,600 11,319,300 17,136,800 17,716,900 19,816,70014 Finance 6,707,300 7,124,200 7,456,900 7,742,500 8,039,100 8,347,30015 Information Systems 2,624,400 2,772,500 2,812,500 2,910,400 3,011,900 3,117,000__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 31,854,900 32,690,600 40,690,000 42,271,700 45,243,10017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,20020 Capital Outlay 751,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,00021 Construction & Engineering 950,00000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 34,323,600 35,215,400 43,989,400 45,670,000 48,743,200(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-9Historical Other Operating RevenueLineHistoricalNo. Description 2002 2003 2004 2005 2006_____ ____________ ________ ________ ________ ________ ________$$$$$1 Wastewater Billing Adjustment (a) (919,826) 831,456 3,310,200 2,324,443 2,084,885Other Fees2 Construction Inspection Fees 640,214 643,406 663,642 631,530 548,1463 Waste Hauler Permits 957,812 953,453 1,089,798 1,709,052 1,080,1324 All Other Fees (b) 453,094 454,645 424,149 495,755 490,171_________ _________ _________ _________ _________ 5 Subtotal 2,051,120 2,051,504 2,177,589 2,836,337 2,118,4496 Miscellaneous Revenue (c) 650,853 2,424,625 1,419,834 1,648,545 2,118,745_________ _________ _________ _________ _________ 7 Total Other Operating Revenue 1,782,147 5,307,585 6,907,623 6,809,325 6,322,0798 Connection Fee Revenue (d) 3,862,355 7,429,469 4,941,721 3,715,365 3,096,339_________ _________ _________ _________ _________ 9 Total Other Revenue 5,644,502 12,737,054 11,849,344 10,524,690 9,418,418(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold. Negative balance in 2002 due to $4.7 million for Bad Debt and Adjustments.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-10 Allocation of Other Operating Revenue Between Wastewater and Stormwater Wastewater Stormwater Allocation Allocation________ ________ Connection and Other Fees Construction Inspection Fees (105) 50.0% 50.0% Plan Review Fees (106) 50.0% 50.0% Submittal Fees (107) 50.0% 50.0% Waste Hauler Permits (109) 100.0% 0.0% Wastewater Monitoring Costs Fees (110) 100.0% 0.0% Pretreatment Discharge Permits (111) 100.0% 0.0% All Other Machine Tap Fees (101) 100.0% 0.0% Conn Permits and Insp. (103) 50.0% 50.0% Construction Permits Fees (104) 50.0% 50.0% Miscellaneous Revenue Reimbursements Reimbursement of District Costs 75.0% 25.0% Other Reimbursements 75.0% 25.0% Reimbursement of Engr., Survey, Inspection, and Other Engr. Costs 75.0% 25.0% Sale of Fixed Assets 75.0% 25.0% All Other Sale of Scrap (Metal, Paper) 75.0% 25.0% Provision for Doubtful Misc. Receivables 75.0% 25.0% Engineering Prints and Specifications 75.0% 25.0% Refund of Court Cts & Attorney fees 75.0% 25.0% Rental Income 75.0% 25.0% Liquidation of Contractual Encumbrances 75.0% 25.0% NSF Fees 75.0% 25.0% Miscellaneous Income 75.0% 25.0% Forfeited Deposits 75.0% 25.0% Project Bid Fees 75.0% 25.0% Wastewater Revenue Adjustments Late Charges 99.0% 1.0% Refunds 99.0% 1.0% Adjustments 99.0% 1.0% Bad Debt Provision 99.0% 1.0% Wastewater Lien Interest and Fees 99.0% 1.0% Other (Includes revenue from Arnold) 99.0% 1.0% Capital Improvement Related Miscellaneous Revenue Connection and Other Fees Construction Funds Caulks Creek Surcharge 100.0% 0.0% Williams Creek 100.0% 0.0% Improvement Fund Connection Fees 100.0% 0.0% Miscellaneous Revenue Construction Funds 100.0% 0.0% Liquidation of Contractual Encumbrances 100.0% 0.0% Special Funds (Except WBU Fund) 100.0% 0.0% ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-11Projected Wastewater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$1 Wastewater Billing Adjustment (a) 2,018,600 2,024,300 2,017,800 2,011,800 2,005,800 2,000,100Other Fees2 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5003 Waste Hauler Permits 1,200,000 1,206,000 1,212,000 1,218,000 1,224,000 1,230,0004 All Other Fees (b) 370,000 545,000 834,500 834,500 834,500 857,000_________ _________ _________ _________ _________ _________ 5 Subtotal 1,920,000 2,160,500 2,517,000 2,523,000 2,529,000 2,571,5006 Miscellaneous Revenue (c) 734,700 738,100 741,800 745,600 749,300 753,100_________ _________ _________ _________ _________ _________ 7 Total Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7008 Connection Fee Revenue (d) 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000_________ _________ _________ _________ _________ _________ 9 Total Other Revenue 9,273,300 9,568,900 9,968,600 10,019,400 10,070,100 10,158,700(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-12Projected Stormwater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$Stormwater Billing Adjustment1 Late Charges 39,200 39,700 39,600 39,500 39,400 39,3002 Refunds (6,000) (6,100) (6,100) (6,100) (6,100) (6,000)3 Adjustments (5,000) (5,100) (5,100) (5,100) (5,100) (5,000)4 Stormwater Lien Interest and Fees 700 700 700 700 700 7005 Other (Includes revenue from Arnold) 2,500 2,500 2,500 2,500 2,500 2,500_________ _________ _________ _________ _________ _________ 6 Subtotal 31,400 31,700 31,600 31,500 31,400 31,500Other Fees7 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5008 Plan Review Fees 75,000 112,500 209,500 209,500 209,500 216,0009 Submittal Fees 55,000 113,500 227,000 227,000 227,000 234,00010 Waste Hauler Permits 0 0 0 0 0 011 Stormwater Monitoring Costs Fees 0 0 0 0 0 012 Pretreatment Discharge Permits 0 0 0 0 0 013 All Other 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 14 Subtotal 480,000 635,500 907,000 907,000 907,000 934,500Miscellaneous Revenue15 Reimbursements 7,000 7,000 7,000 7,000 7,000 7,00016 Sale of Fixed Assets 11,200 11,200 11,200 11,200 11,200 11,20017 Reimbursable Engr. & Maint. 50,000 50,200 50,500 50,700 51,000 51,20018 All Other 176,600 177,500 178,500 179,500 180,500 181,500_________ _________ _________ _________ _________ _________ 19 Subtotal 244,800 245,900 247,200 248,400 249,700 250,900_________ _________ _________ _________ _________ _________ 20 Total Other Operating Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,90021 Connection Fee Revenue 0 0 0 0 0 0ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-1 Historical Wastewater Charges Fiscal Year Ending June 30,________________________________________________________ Line No. Type of Monthly Charge 1994 1998 2004 2005 2006____ _____________________ ________ ________ ________ ________ ________ (a) (c) Ordinance 9029 10177 11553 11692 12019 Adopted Date 06/16/93 09/11/97 07/24/03 03/11/04 07/14/05 Effective Date 07/01/93 10/01/97 08/01/03 07/01/04 07/01/05 Base Charge - $/Bill 1 Billing & Collection Charge 0.37 0.74 0.85 0.85 0.85 2 System Availability Charge 3.72 4.83 5.30 6.45 7.05 ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 4.09 5.57 6.15 7.30 7.90 4 Compliance Charge - $/Bill (b) 7.40 8.56 11.80 12.15 12.55____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 11.49 14.13 17.95 19.45 20.45 Volume Charge 6 Metered - $/Ccf 0.99 1.05 1.34 1.66 1.81 Unmetered - $/Bill 7 Each Room 0.64 0.69 0.88 1.08 1.18 8 Each Water Closet 2.41 2.58 3.28 4.04 4.42 9 Each Bath 2.01 2.15 2.74 3.37 3.69 10 Each Separate Shower 2.01 2.15 2.74 3.37 3.69 Extra Strength Surcharges - $/ton (b) 11 Suspended Solids over 350 mg/l 127.40 87.20 12 Suspended Solids over 300 mg/l 162.88 200.15 218.90 13 Biochemical Oxygen Demand over 300 mg/l 244.10 217.90 319.24 412.58 461.44 14 Chemical Oxygen Demand over 600 mg/l 122.05 108.95 159.62 206.29 230.72 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50 percent of the general service charges. (b) Applicable only to non-residential customers. (c) Current rates as recommended by the Rate Commission and adopted by the Board of Trustees. These rates were also adopted by Ordinance 11692 and reaffirmed by Ordinance 12019. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-2 Existing Wastewater Rates (Effective July 1, 2005) Metered_____________________ Line No.Type of Monthly Charge Unmetered Residential Residential Non- Residential____ ____________________ __________ __________ __________ $$$ 1 Billing and Collection Charge 0.85 0.85 0.85 2 System Availability Charge 7.05 7.05 7.05 3 Compliance Charge 12.55 Volume Charge 4 per Ccf 1.81 1.81 5 per room 1.18 6 per water closet 4.42 7 per bath 3.69 8 per separate shower 3.69 Extra Strength Surcharge - $/ton 9 Suspended Solids over 300 mg/l 218.90 10 BOD over 300 mg/l 461.44 11 COD over 600 mg/l 230.72 Ccf - hundred cubic feet mg/l - milligrams per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-3Historical and Projected Wastewater Customer AccountsLine Historical Projected________________________________________________________ __________________________________________________________________No. 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Metered Customers1 Single Family 296,713 296,811 297,921 299,383 301,122 300,600 301,800 303,000 304,200 305,400 306,6002 Multifamily 21,244 21,110 21,367 20,982 20,825 21,000 20,900 20,800 20,700 20,600 20,5003 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 4 Total 343,787 343,591 345,127 345,565 347,659 347,300 348,400 349,400 350,500 351,500 352,600Unmetered Customers5 Single Family 60,275 60,415 60,621 60,365 60,010 60,400 60,200 60,000 59,800 59,600 59,4006 Multifamily 23,965 23,837 23,898 23,820 23,757 23,700 23,700 23,700 23,700 23,700 23,700_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 7 Total 84,240 84,252 84,518 84,185 83,767 84,100 83,900 83,700 83,500 83,300 83,100Total Customer Accounts8 Single Family 356,988 357,226 358,541 359,748 361,132 361,000 362,000 363,000 364,000 365,000 366,0009 Multifamily 45,209 44,947 45,264 44,802 44,582 44,700 44,600 44,500 44,400 44,300 44,20010 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 11 Total 428,027 427,843 429,645 429,750 431,426 431,400 432,300 433,100 434,000 434,800 435,70012 Annual Percentage Increase N/A 0.0% 0.4% 0.0% 0.4% 0.0% 0.2% 0.2% 0.2% 0.2% 0.2%ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-4Historical and Projected Contributed Wastewater VolumeLine Historical Projected________________________________________________________ _____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf CcfMetered CustomersB-7B-7 B-7 B-7 B-7 B-9B-9 B-9 B-9 B-9 B-91 Single Family 27,084,987 26,738,437 27,386,280 27,228,682 27,437,644 27,356,400 27,470,500 27,585,100 27,699,700 27,814,300 27,928,9002 Multifamily 10,467,778 10,334,643 10,115,069 9,731,407 9,763,965 10,189,700 10,137,200 10,084,700 10,032,100 9,979,600 9,927,1003 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 4 Total 70,938,324 69,441,136 67,708,196 62,252,977 68,802,145 66,948,100 66,911,900 66,877,300 66,869,900 66,862,900 66,881,700Unmetered Customers (a)5 Single Family 7,100,437 7,061,615 7,082,767 7,112,749 7,068,871 7,274,900 7,231,800 7,187,400 7,142,600 7,098,100 7,053,6006 Multifamily 5,154,386 5,120,587 5,117,850 5,098,445 5,044,805 5,062,000 5,059,000 5,056,200 5,053,800 5,051,000 5,048,500_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 7 Total 12,254,824 12,182,202 12,200,617 12,211,193 12,113,676 12,336,900 12,290,800 12,243,600 12,196,400 12,149,100 12,102,100Total Contributed Wastewater Volume8 Single Family 34,185,424 33,800,052 34,469,047 34,341,431 34,506,515 34,631,300 34,702,300 34,772,500 34,842,300 34,912,400 34,982,5009 Multifamily 15,622,164 15,455,230 15,232,919 14,829,852 14,808,770 15,251,700 15,196,200 15,140,900 15,085,900 15,030,600 14,975,60010 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 11 Total 83,193,148 81,623,338 79,908,813 74,464,170 80,915,821 79,285,000 79,202,700 79,120,900 79,066,300 79,012,000 78,983,80012 Annual Percentage Increase N/A -1.9% -2.1% -6.8% 8.7% -2.0% -0.1% -0.1% -0.1% -0.1% 0.0%(a) Ccf = hundred cubic feet (748 gallons)Unmetered wastewater volume is determined by multiplying the number of fixtures by their respective unit usage values. Unit usage values are 16 gallons per day (gpd) per room, 60 gpd per water closet, and 50 gpd per bath or separate shower.ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-5Historical and Projected Billed Wastewater Service RevenueUnder Existing RatesLine Historical Projected________________________________________________________ ____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Metered CustomersB-13B-13 B-13 B-13 B-13 B-15B-15 B-15 B-15 B-15 B-151 Single Family 48,091,200 47,747,300 57,669,200 71,210,200 77,985,843 77,779,100 77,853,000 77,904,700 77,956,200 78,007,800 78,059,4002 Multifamily 12,409,100 12,260,100 14,874,700 17,992,100 19,646,971 20,435,700 20,330,400 20,225,100 20,119,700 20,014,400 19,909,100 Non-Residential3 Normal Strength 39,434,700 38,339,200 45,245,300 47,867,600 63,506,777 59,522,400 59,335,200 59,149,900 59,014,100 58,878,800 58,790,2004 Excess Strength 3,451,700 3,728,700 5,301,200 5,713,700 6,782,384 7,260,600 7,100,200 7,100,200 7,100,200 7,100,200 7,100,200__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 5 Total 103,386,700 102,075,300 123,090,400 142,783,600 167,921,974 164,997,800 164,618,800 164,379,900 164,190,200 164,001,200 163,858,900Unmetered Customers6 Single Family 11,364,600 11,344,300 13,625,600 16,858,100 18,282,428 18,676,900 18,318,700 17,931,900 17,544,700 17,157,500 16,770,7007 Multifamily 7,042,800 7,000,400 6,941,400 10,539,300 11,399,822 11,429,400 11,422,800 11,416,600 11,411,100 11,404,900 11,399,100__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 8 Total 18,407,400 18,344,700 20,567,000 27,397,400 29,682,249 30,106,300 29,741,500 29,348,500 28,955,800 28,562,400 28,169,800Total Wastewater Service Revenue9 Single Family 59,455,800 59,091,600 71,294,800 88,068,300 96,268,271 96,456,000 96,171,700 95,836,600 95,500,900 95,165,300 94,830,10010 Multifamily 19,451,900 19,260,500 21,816,100 28,531,400 31,046,793 31,865,100 31,753,200 31,641,700 31,530,800 31,419,300 31,308,20011 Non-Residential 42,886,400 42,067,900 50,546,500 53,581,300 70,289,161 66,783,000 66,435,400 66,250,100 66,114,300 65,979,000 65,890,400__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 12 Total Wastewater 121,794,100 120,420,000 143,657,400 170,181,000 197,604,224 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,70013 Annual Percentage Increase N/A -1.1% 19.3% 18.5% 16.1% -1.3% -0.4% -0.3% -0.3% -0.3% -0.3%ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-6Wastewater Capital Improvement and Replacement ProgramLine Fiscal Year Ending June 30, ______________________________________________________________________No. Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Sanitary Sewer System1 Sanitary Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,500,000 40,500,0002 Sanitary Sewer Overflows 102,171,000 20,935,000 28,580,000 14,467,000 75,397,000 114,405,000 355,955,000__________ __________ __________ __________ __________ __________ __________ 3 Subtotal 109,671,000 27,935,000 35,080,000 20,967,000 81,897,000 120,905,000 396,455,000Combined Sewer System4 Combined Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,000,000 40,000,0005 Combined Sewer Overflows 33,039,000 4,035,000 9,857,000 17,806,000 15,595,000 3,000,000 83,332,0006 Cityshed - Condition 2,000,000 255,00000002,255,0007 Cityshed - Capacity 20,510,000 0 0 1,000,000 0 6,400,000 27,910,000__________ __________ __________ __________ __________ __________ __________ 8 Subtotal 63,049,000 11,290,000 16,357,000 25,306,000 22,095,000 15,400,000 153,497,000Other Sewer Projects9 District Wide Planning 9,650,000 8,850,000 7,800,000 7,100,000 7,100,000 6,100,000 46,600,00010 CMOM Regulations (a) 7,500,000 10,000,000 7,000,000 8,000,000 10,000,000 10,000,000 52,500,000__________ __________ __________ __________ __________ __________ __________ 11 Subtotal 17,150,000 18,850,000 14,800,000 15,100,000 17,100,000 16,100,000 99,100,000Wastewater Treatment12 Baumgartner 4,000,000000004,000,00013 Bissell Point 1,000,000000001,000,00014 Coldwater Creek 0 0 0 10,000,000 0 0 10,000,00015 Fenton 670,00000000670,00016 Grand Glaize 33,600,0000000033,600,00017 Lemay 10,150,000 45,000,000 42,220,000 0 0 3,000,000 100,370,00018 Lower Meramec River 6,145,000 0 2,386,000 26,500,000 0 5,569,000 40,600,00019 Missouri River 53,300,000 0 500,000 36,500,000 30,000,000 0 120,300,000__________ __________ __________ __________ __________ __________ __________ 20 Subtotal 108,865,000 45,000,000 45,106,000 73,000,000 30,000,000 8,569,000 310,540,000__________ __________ __________ __________ __________ __________ __________ 21 Total 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,000ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-7Wastewater Capital Improvement Program FinancingLine Fiscal Year Ending June 30,___________________________________________________________________No Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Source of Funds1 Beginning of Year Balance 163,317,300 2,117,800 6,784,700 3,214,500 2,031,400 3,231,200 163,317,3002 Revenue Bond Proceeds 63,400,000 0000063,400,0003 State Revolving Loan Proceeds 14,205,000 0000014,205,0004 Commercial Paper 0 40,000,000000040,000,0005 Cash Financing of Construction 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,000 676,997,0006 Grants & Contributions (a) 1,504,400 1,526,300 1,549,200 1,573,100 1,598,000 1,624,000 9,375,0007 Interest Income (b) 10,552,700 3,894,600 2,031,600 1,177,800 1,207,800 1,292,500 20,157,000__________ __________ __________ __________ __________ __________ __________ 8 Total Funds Available 313,079,400 112,384,700 116,557,500 138,404,400 156,323,200 168,081,700 987,451,300Application of Funds9 Major Capital Improvements 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,00010 Improvement Fund Projects 4,072,000 2,500,000 2,000,000 2,000,000 2,000,000 2,000,000 14,572,00011 Issuance Costs (c) 972,800 25,0000000997,80012 Revenue Bond Reserve Fund (d) 7,181,800 000007,181,800__________ __________ __________ __________ __________ __________ __________ 13 Total Application of Funds 310,961,600 105,600,000 113,343,000 136,373,000 153,092,000 162,974,000 982,343,60014 End of Year Fund Balance 2,117,800 6,784,700 3,214,500 2,031,400 3,231,200 5,107,700 5,107,700 (a) Includes anticipated contributions from the City of Arnold to reserve capacity in the Lower Meramec River Wastewater Treatment Plant. (b) Interest Income is estimated at 3.5% of the average of the beginning and end of year balances. (c) (d) The required balance in the Revenue Bond Reserve Fund is determined to be the maximum principal and interest payment on senior debt.Issuance Costs are estimated at 1.40% of the issue amount for Revenue Bonds, 0.60% of the issue amount for SRF Loans, and $25,000 per issue for commercial paper.ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-8 Projected Debt Service Requirements Existing Proposed Existing Proposed Commercial Fiscal Revenue Revenue SRF SRF Paper Year Bonds Bonds Loans Loans Notes Total________ ________ ________ ________ ________ ________ ________ $$$$$$ Payments to Sinking Fund 2007 9,636,600 1,717,000 11,467,000 125,700 0 22,946,300 2008 9,611,000 2,902,000 12,127,700 202,000 2,000,000 26,842,700 2009 9,593,400 2,902,000 13,949,200 903,000 2,000,000 29,347,600 2010 9,643,900 2,902,000 13,709,600 902,900 2,000,000 29,158,400 2011 9,778,600 2,902,000 13,938,400 902,700 2,000,000 29,521,700 2012 9,903,100 2,902,000 13,780,700 907,300 2,000,000 29,493,100 2013 10,038,800 8,793,300 13,701,300 907,300 2,000,000 35,440,700 2014 10,174,000 14,193,700 13,788,500 906,100 2,000,000 41,062,300 2015 10,322,300 19,148,900 13,671,700 905,200 2,000,000 46,048,100 2016 10,461,100 23,875,000 14,041,900 904,200 2,000,000 51,282,200 2017 10,616,800 28,948,000 13,958,300 907,900 2,000,000 56,431,000 2018 10,778,400 34,053,800 13,984,100 910,700 2,000,000 61,727,000 2019 10,968,700 38,799,600 14,006,000 908,600 2,000,000 66,682,900 2020 11,137,000 43,872,600 14,018,800 906,300 2,000,000 71,934,700 2021 11,304,900 48,474,300 14,129,400 913,800 2,000,000 76,822,400 2022 11,485,500 52,814,300 14,138,400 914,900 2,000,000 81,353,100 2023 11,679,500 56,774,500 14,051,400 915,500 2,000,000 85,420,900 2024 11,871,000 60,702,000 14,051,800 915,500 2,000,000 89,540,300 2025 12,596,400 63,909,500 12,334,500 920,000 2,000,000 91,760,400 2026 15,393,200 67,358,200 6,815,300 918,800 2,000,000 92,485,500 Payments to Bondholders 2007 9,640,700 1,233,400 10,481,200 0 0 21,355,300 2008 9,615,600 2,902,000 11,679,800 226,700 2,000,000 26,424,100 2009 9,587,900 2,902,000 12,443,900 202,000 2,000,000 27,135,800 2010 9,621,100 2,902,000 13,361,400 899,500 2,000,000 28,784,000 2011 9,758,200 2,902,000 13,901,800 899,400 2,000,000 29,461,400 2012 9,880,400 2,902,000 13,760,200 899,100 2,000,000 29,441,700 2013 10,016,800 4,683,300 13,617,300 903,700 2,000,000 31,221,100 2014 10,148,800 10,574,600 13,585,000 903,100 2,000,000 37,211,500 2015 10,299,800 16,157,100 13,783,900 902,400 2,000,000 43,143,200 2016 10,435,200 20,979,700 13,557,200 901,500 2,000,000 47,873,600 2017 10,591,000 25,811,500 13,921,300 900,300 2,000,000 53,224,100 2018 10,746,000 30,917,300 13,829,100 901,100 2,000,000 58,393,500 2019 10,940,500 35,904,300 13,844,500 906,500 2,000,000 63,595,800 2020 11,109,400 40,736,100 13,865,800 904,300 2,000,000 68,615,600 2021 11,275,300 45,675,600 13,888,700 901,900 2,000,000 73,741,500 2022 11,453,000 50,160,300 14,076,100 906,300 2,000,000 78,595,700 2023 11,647,700 54,361,800 13,890,100 907,200 2,000,000 82,806,800 2024 11,838,800 58,289,300 13,896,600 907,500 2,000,000 86,932,200 2025 12,032,300 61,979,300 13,887,800 907,300 2,000,000 90,806,700 2026 15,417,300 65,002,600 10,439,700 911,500 2,000,000 93,771,100 ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-9 Comparison of Projected Wastewater Revenue Under Existing Rates With Projected Revenue Requirements Line Fiscal Year Ending June 30,____________________________________________________________ No. Description 2007 2008 2009 2010 2011 2012____ ______________________ ________ ________ ________ ________ ________ ________ $$$$$$ 1 Revenue Under Existing Rates (a) 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,700 Additional Revenue Required Fiscal Revenue Months Year Increase Effective____ ________ ________ 2 2007 0.0% 12 000000 3 2008 13.0% 7 13,516,000 25,185,000 25,109,000 25,033,000 24,964,000 4 2009 12.0% 12 24,089,000 26,191,000 26,112,000 26,039,000 5 2010 11.0% 12 24,657,000 26,808,000 26,733,000 6 2011 9.0% 12 22,326,000 24,279,000 7 2012 5.0% 12 13,482,000__________ __________ __________ __________ __________ __________ 8 Total Additional Revenue 0 13,516,000 49,274,000 75,957,000 100,279,000 115,497,000__________ __________ __________ __________ __________ __________ 9 Total Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,700 10 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,700 11 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 12 Interest Income - Reserve Funds 2,493,500 2,773,000 2,839,100 2,836,000 2,841,800 2,841,400 13 Interest Income - Operations 198,700 81,300 97,400 105,500 105,700 105,700 14 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 15 Subtotal Other Revenue 13,270,500 13,706,300 14,165,300 14,197,200 14,228,900 14,291,100__________ __________ __________ __________ __________ __________ 16 Total Revenue 208,374,600 221,582,600 257,167,700 283,300,200 307,071,500 321,816,800 17 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,500 18 Stormwater Program Support (b) 19,223,100 10,799,0000000__________ __________ __________ __________ __________ __________ 19 Net Revenue 84,367,200 99,870,200 142,513,000 164,241,700 183,691,700 194,223,300 Debt Service 20 Existing Senior Revenue Bonds 9,636,600 9,611,000 9,593,400 9,643,900 9,778,600 9,903,100 21 Proposed Senior Revenue Bonds 1,717,000 2,902,000 2,902,000 2,902,000 2,902,000 2,902,000 __________ __________ __________ __________ __________ __________ 22 Total Senior Revenue Bonds 11,353,600 12,513,000 12,495,400 12,545,900 12,680,600 12,805,100 23 Existing State Revolving Fund Loans (c) 11,467,000 12,127,700 13,949,200 13,709,600 13,938,400 13,780,700 24 Proposed State Revolving Fund Loans (c) 125,700 202,000 903,000 902,900 902,700 907,300 __________ __________ __________ __________ __________ __________ 25 Total State Revolving Fund Loans 11,592,700 12,329,700 14,852,200 14,612,500 14,841,100 14,688,000 26 Commercial Paper 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 __________ __________ __________ __________ __________ __________ 27 Total Debt Service 144,363,500 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,100 28 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100 29 Cash Financing of Major Improvements 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,000 30 Additions to Operating Reserve 2,366,700 1,302,5000000 31 Net Annual Balance (d) (7,194,600) 484,400 436,900 24,700 (14,200) 17,100 32 Beginning of Year Balance (e) 9,274,400 2,079,800 2,564,200 3,001,100 3,025,800 3,011,600 33 End of Year Balance (e) 2,079,800 2,564,200 3,001,100 3,025,800 3,011,600 3,028,700 Actual Debt Service (f) 34 Senior Bonds 10,874,100 12,517,600 12,489,900 12,523,100 12,660,200 12,782,400 35 SRF Loans 10,481,200 11,906,500 12,645,900 14,260,900 14,801,200 14,659,300 Debt Service Coverage 36 Revenue Bonds (g) 776.0% 798.0% 1141.0% 1312.0% 1451.0% 1519.0% 37 Total Debt (h) 395.0% 409.0% 567.0% 613.0% 669.0% 708.0% (a) Existing wastewater rates effective July 1, 2005. (b) Transitional support of the stormwater program during conversion of tax based to user charge based revenues. (c) Debt service on SRF Loans are net of the state's interest subsidy. (d) Negative balances indicate need to drawdown available fund balance. (e) Does not include funds set aside for a minimum operating reserve equal to 60 days of operating expenses. (f) Payment to Bondholders per Table 3-8, paid through Sinking Fund. (g) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual debt service. (h) The Bond Ordinance requires net revenue to equal or exceed 1.15x actual debt service. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-10 Wastewater Cost of Service Test Year 2008 Line No. Operating Capital Total______ ________ ________ ________ $$$ Revenue Requirements 1 Operation & Maintenance Expense 110,913,400 110,913,400 2 Debt Service 26,842,700 26,842,700 3 Routine Capital Improvements 6,394,600 6,394,600 4 Cash Financing of Major Improvements 64,846,000 64,846,000 5 Additions to Operating Reserve 1,302,500 1,302,500 6 Stormwater Support 10,799,000 10,799,000__________ __________ __________ 7 Total 123,014,900 98,083,300 221,098,200 Revenue Requirements met from Other Sources Other Operating Revenue 8 Wastewater Billing Adjustments 2,024,300 2,024,300 9 Inspection and Other Fees 2,160,500 2,160,500 10 Miscellaneous Revenue 738,100 738,100 __________ __________ __________ 11 Subtotal 4,922,900 0 4,922,900 12 Interest Income 4,137,400 4,137,400 13 Connection Fee Revenue 4,646,000 4,646,000 14 Change in Available Fund Balances (484,400) (484,400) 15 Rate Adjustments (a) (11,751,000) (11,751,000)__________ __________ __________ 16 Total (2,690,700) 4,161,600 1,470,900__________ __________ __________ 17 Net Costs to be met from Charges 125,705,600 93,921,700 219,627,300 Net Operating Capital Cost (a) Required to adjust for any partial year implementation of increased wastewater rates, and allowance for one month billing and collection lag. Total Cost of Service Net Operating Cost 57% Capital Cost 43% ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-11 Allocation of Estimated Wastewater Plant Investment and Other Capital Costs to Functional Cost Components Test Year 2008 (1) (2) (3) (4) (5) Line Suspended No. Description Total (a) Volume Capacity Solids BOD____ __________________ __________ __________ __________ __________ __________ $$$$$ Collection System 1 Sanitary Sewers 688,176,000 688,176,000 2 Combined Sewers 72,102,000 72,102,000 3 Pumping Stations 62,537,000 62,537,000____________ __________ 4 Total Collection System 822,815,000 822,815,000 Treatment Facilities 5 Raw Wastewater Pumping 84,735,000 84,735,000 6 Preliminary Treatment 15,303,000 15,303,000 7 Primary Sedimentation 11,779,000 11,779,000 8 Aeration/Reaeration/Nitrification 85,640,000 85,640,000 9 Basins 10 Equipment 11 Secondary Sedimentation 56,828,000 56,828,000 12 Recirculation Pumping 3,706,000 3,706,000 13 Chlorination 1,810,000 1,810,000 14 Lagoons & Aeration Equipment 3,964,000 3,964,000 15 Sludge Treatment 50,955,000 25,478,000 25,477,000 16 Dewatering 18,578,000 9,289,000 9,289,000 17 Incineration 56,622,000 28,311,000 28,311,000 18 By Pass & Outfall Works 16,794,000 16,794,000 19 Administrative & General (b) 188,876,000 34,423,000 54,256,000 29,293,000 70,904,000____________ __________ __________ __________ __________ 20 Total Treatment Facilities 595,590,000 108,546,000 171,088,000 92,371,000 223,585,000____________ __________ __________ __________ __________ 21 Subtotal Estimated Plant Investment 1,418,405,000 108,546,000 993,903,000 92,371,000 223,585,000 22 Land & General Plant (c) 40,448,000 3,095,000 28,343,000 2,634,000 6,376,000____________ __________ __________ __________ __________ 23 Total Estimated Plant Investment 1,458,853,000 111,641,000 1,022,246,000 95,005,000 229,961,000 24 Routine Capital Improvements (d) 6,394,600 489,400 4,480,800 416,400 1,008,000 Cash Financing of Improvements 25 Collection System 43,860,800 43,860,800 26 Wastewater Treatment (e) 20,985,200 3,824,500 6,028,200 3,254,600 7,877,900 27 Land & General Plant (c) 0 0 0 0 0 28 Less: Connection Fee Revenue 4,646,000 355,500 3,255,500 302,600 732,400 29 Change in Funds Available (d) (484,400) (37,100) (339,400) (31,500) (76,400)__________ __________ __________ __________ __________ 30 Net Cash Financed Capital Costs 67,079,000 3,995,500 51,453,700 3,399,900 8,229,900 31 Debt Service (d) 26,842,700 2,054,100 18,809,200 1,748,100 4,231,300__________ __________ __________ __________ __________ 32 Total Net Capital Costs 93,921,700 6,049,600 70,262,900 5,148,000 12,461,200 33 Annual Depreciation Expense (d) 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ 34 Net Other Capital Cost 37,313,600 1,717,600 30,596,500 1,461,500 3,538,000 (a) Excludes $623,912,000 of investment related to the Stormwater system. (b) Allocated based on all other Treatment Facilities. (c) Allocated based on Line 21. (d) Allocated based on Line 23. (e) Allocated based on Line 20. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-12 Percentage of Wastewater Operation and Maintenance Expense by Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers_______________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 0.0% 100.0% 0.0% 2 Engineering 100.0% 5.4% 94.6% 5.7% 43.3% 0.5% 0.5% 50.1% Operations 3 Collection System 100.0% 0.0% 100.0% 100.0% 4 Pump Stations 100.0% 0.0% 100.0% 100.0% 5 Wastewater Treatment 100.0% 0.0% 100.0% 18.3% 12.1% 28.8% 40.8% 6 Support 100.0% 20.8% 79.2% 6.9% 44.2% 10.9% 15.4% 22.5% 7 Finance 100.0% 48.8% 51.2% 100.0% 8 Information Systems 100.0% 90.3% 9.7% 100.0% 9 Average 100.0% 7.6% 50.4% 9.6% 13.6% 5.1% 13.6% All Other 10 Administration and Management (a) 0.0% 100.0% 0.0% 11 Engineering 100.0% 0.4% 99.6% 5.5% 78.1% 0.5% 0.5% 15.4% Operations 12 Collection System 100.0% 0.0% 100.0% 100.0% 13 Pump Stations 100.0% 0.0% 100.0% 100.0% 14 Wastewater Treatment 100.0% 0.0% 100.0% 17.9% 17.4% 25.4% 39.3% 15 Support 100.0% 0.0% 100.0% 11.9% 44.7% 16.9% 26.1% 0.5% 16 Finance 100.0% 9.3% 90.7% 100.0% 17 Information Systems 100.0% 90.3% 9.7% 100.0% 18 Average 100.0% 7.8% 34.3% 10.4% 16.0% 30.1% 1.4% Utilities Operations 19 Pump Stations 100.0% 0.0% 100.0% 56.0% 44.0% 20 Wastewater Treatment 100.0% 0.0% 100.0% 16.9% 16.9% 23.0% 43.2% 21 Average 100.0% 23.6% 21.6% 19.0% 35.7% 0.0% 0.0% 22 Water Backup Program 100.0% 0.0% 100.0% 100% 0.0% 23 Headquarters Building 100.0% 0.0% 100.0% 100.0% 24 Total O&M Expense 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% 25 Allocations to Operating Reserve 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% Less Costs Met From Other Revenue Other Revenue 26 Wastewater Revenue Adjustments 100.0% 90.0% 0.0% 0.0% 0.0% 10.0% 0.0% 27 Connection and Other Fees 100.0% 21.0% 19.9% 28.5% 26.2% 0.0% 4.4% 28 Miscellaneous Revenue 100.0% 25.0% 0.0% 0.0% 0.0% 75.0% 0.0% 29 Interest Income 100.0% 11.3% 31.5% 8.2% 12.7% 30.0% 6.3% 30 Stormwater Program Revenues 0.0% 31 Full Year Rate Adjustment 100.0% 17.7% 49.4% 12.9% 20.0% 0.0% 0.0% 32 Average 100.0% -31.4% 151.3% 20.9% 46.6% -74.2% -13.1% 33 Net O&M Expense 100.0% 12.0% 47.1% 9.7% 15.2% 9.4% 6.7% (a) Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-13 Allocation of Wastewater Operation and Maintenance Expense to Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers__________________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 8,244,400 8,244,400 0 2 Engineering 13,421,000 724,700 12,696,300 723,600 5,495,000 59,700 59,700 6,358,300 Operations 3 Collection System 12,632,700 0 12,632,700 12,632,700 4 Pump Stations 2,356,200 0 2,356,200 2,356,200 5 Wastewater Treatment 14,312,500 0 14,312,500 2,619,200 1,731,800 4,122,000 5,839,500 6 Support 3,603,900 749,600 2,854,300 197,700 1,262,300 311,200 440,900 642,200 7 Finance 2,887,700 1,409,000 1,478,700 1,478,700 8 Information Systems 2,848,800 2,572,500 276,300 276,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 9 Total 60,307,200 13,700,200 46,607,000 3,540,500 23,478,000 4,492,900 6,340,100 2,397,200 6,358,300 All Other 10 Administration and Management (a) 5,483,000 5,483,000 0 11 Engineering 2,097,800 8,400 2,089,400 115,000 1,631,800 10,400 10,400 321,800 Operations 12 Collection System 2,684,700 0 2,684,700 2,684,700 13 Pump Stations 1,062,100 0 1,062,100 1,062,100 14 Wastewater Treatment 7,496,700 0 7,496,700 1,341,900 1,304,400 1,904,200 2,946,200 15 Support 3,056,700 0 3,056,700 363,000 1,366,300 515,100 797,000 15,300 16 Finance 7,632,700 707,200 6,925,500 6,925,500 17 Information Systems 1,292,200 1,166,900 125,300 125,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 18 Total 30,805,900 7,365,500 23,440,400 1,819,900 8,049,300 2,429,700 3,753,600 7,066,100 321,800__________ __________ __________ __________ __________ __________ __________ 19 Subtotal Direct Expenses 70,047,400 5,360,400 31,527,300 6,922,600 10,093,700 9,463,300 6,680,100 20 Total Indirect (b) 21,065,700 21,065,700 1,612,100 9,481,400 2,081,900 3,035,500 2,845,900 2,008,900 Utilities Operations 21 Pump Stations 2,209,500 2,209,500 1,237,300 972,200 22 Wastewater Treatment 10,590,100 10,590,100 1,789,800 1,789,700 2,435,700 4,574,900__________ __________ __________ __________ __________ __________ 23 Subtotal 12,799,600 12,799,600 3,027,100 2,761,900 2,435,700 4,574,900 24 Water Backup Program 5,700,000 5,700,000 5,700,000 25 Headquarters Building 1,300,700 1,300,700 1,300,700 __________ __________ __________ __________ __________ __________ __________ __________ 26 Total O&M Expense 110,913,400 110,913,400 15,699,600 43,770,600 11,440,200 17,704,100 13,609,900 8,689,000 0 27 Add't to Operating Reserve (c) 1,302,500 1,302,500 184,500 514,000 134,300 207,900 159,800 102,000 Less Costs Met From Other Revenue Other Revenue 28 Wastewater Revenue Adjustments 2,024,300 2,024,300 1,821,900 0 0 0 202,400 0 29 Connection and Other Fees 2,160,500 2,160,500 453,700 429,900 615,100 566,800 0 95,000 30 Miscellaneous Revenue 738,100 738,100 184,500 0 0 0 553,600 0 31 Interest Income (d) 4,137,400 4,137,400 467,300 1,302,800 340,500 527,000 1,241,200 258,600 32 Full Year Rate Adjustment (e) (11,751,000) (11,751,000) (2,081,900) (5,804,300) (1,517,100) (2,347,700)__________ __________ __________ __________ __________ __________ __________ __________ 33 Total (2,690,700) (2,690,700) 845,500 (4,071,600) (561,500) (1,253,900) 1,997,200 353,600 34 Net O&M Expense 114,906,600 114,906,600 15,038,600 48,356,200 12,136,000 19,165,900 11,772,500 8,437,400 35 Stormwater Program Support 10,799,000 10,799,000 10,799,000__________ __________ __________ __________ __________ __________ __________ __________ 36 Adjusted Net O&M Expense 125,705,600 125,705,600 15,038,600 59,155,200 12,136,000 19,165,900 11,772,500 8,437,400 (a) (b) Allocated based on Line 19. (c) Allocated based on Line 26. (d) Allocated 30.0% of interest income directly to All Customers based on relative revenue receipts with remainder allocated based on Line 26 less All Customer costs. (e) Allocated based on Line 26 less All Customers, and Nonresidential Customers costs. Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-14Wastewater Units of ServiceTest Year 2008(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)Volume Capacity Wastewater Strength Non-________________________________ ________________________________ ____________________Line Infiltration Total Infiltration Total Suspended All ResidentialNo. Customer Class Contributed Inflow Treated Contributed Inflow Treated Solids BODCustomers Customers____ __________________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf/day Ccf/day Ccf/day pounds pounds bills billsJ-7J-7(1) + (2)J-7 J-7(4) + (5)J-6J-6 J-5Metered Customers1 Single Family 27,470,500 38,599,800 66,070,300 130,203 443,105 573,307 54,897,100 36,019,400 3,621,0602 Multifamily 10,137,200 7,614,800 17,752,000 48,048 87,414 135,461 18,189,800 12,257,700 250,9003 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,802__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 4 Total 66,911,900 65,677,200 132,589,100 317,144 753,938 1,071,082 124,873,800 83,313,500 4,179,762 307,802Unmetered Customers5 Single Family 7,231,800 8,750,900 15,982,700 34,277 100,456 134,732 14,011,900 9,262,200 722,2906 Multifamily 5,059,000 4,774,700 9,833,700 23,978 54,811 78,789 9,381,700 6,269,300 284,750__________ __________ __________ __________ __________ __________ __________ __________ __________ 7 Total 12,290,800 13,525,600 25,816,400 58,255 155,266 213,522 23,393,600 15,531,500 1,007,0408Surcharge21,700,000 20,600,000Total System9 Single Family 34,702,300 47,350,700 82,053,000 164,479 543,560 708,039 68,909,000 45,281,600 4,343,35010 Multifamily 15,196,200 12,389,500 27,585,700 72,026 142,225 214,250 27,571,500 18,527,000 535,65011 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,80212 Surcharge21,700,000 20,600,000__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 13 Total 79,202,700 79,202,800 158,405,500 375,399 909,205 1,284,604 169,967,400 119,445,000 5,186,802 307,802Ccf - Hundred Cubic FeetALT II - Rate Change Introduced by District Board 10/11/07 Table 3-15 Allocation of Wastewater Cost of Service to Customer Classes Test Year 2008 (1) (2) (3) (4) (5) (6) (7) Line Wastewater Strength All Non- Residential____________________ No. Description Total Volume Capacity TSS BOD Customers Customers____ ________________ ________ ________ ________ ________ ________ ________ ________ Costs of Service 1 Net O&M Expense 125,705,600 15,038,600 59,155,200 12,136,000 19,165,900 11,772,500 8,437,400 2 Net Replacements 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ __________ __________ 3 Total OM&R 182,313,700 19,370,600 98,821,600 15,822,500 28,089,100 11,772,500 8,437,400 4 Net Capital Costs 37,313,600 1,717,600 30,596,500 1,461,500 3,538,000__________ __________ __________ __________ __________ __________ __________ 5 Total 219,627,300 21,088,200 129,418,100 17,284,000 31,627,100 11,772,500 8,437,400 Number of Units 6 Units of Service 158,405,500 1,284,604 169,967,400 119,445,000 5,186,802 307,802 Ccf Ccf/day pounds pounds Bills Bills Unit Costs - $/unit 7 OM&R Line 3 / Line 6 0.12228 76.92769 0.09309 0.23516 2.26970 27.41178 8 Total Line 5 / Line 6 0.13313 100.74553 0.10169 0.26478 2.26970 27.41178 Single Family Metered 9 Units of Service 66,070,300 573,307 54,897,100 36,019,400 3,621,060 10 Cost - $Line 9 x Line 8 89,892,500 8,795,800 57,758,100 5,582,500 9,537,400 8,218,700 Unmetered 11 Units of Service 15,982,700 134,732 14,011,900 9,262,200 722,290 12 Cost - $Line 11 x Line 8 21,218,200 2,127,700 13,573,700 1,424,900 2,452,500 1,639,400 Multi Family Metered 13 Units of Service 17,752,000 135,461 18,189,800 12,257,700 250,900 14 Cost - $Line 13 x Line 8 21,675,200 2,363,300 13,647,100 1,849,700 3,245,600 569,500 Unmetered 15 Units of Service 9,833,700 78,789 9,381,700 6,269,300 284,750 16 Cost - $Line 15 x Line 8 12,507,100 1,309,100 7,937,700 954,000 1,660,000 646,300 Non-Residential 17 Units of Service 48,766,800 362,314 51,786,900 35,036,400 307,802 307,802 18 Cost - $Line 17 x Line 8 66,673,100 6,492,300 36,501,500 5,266,200 9,277,100 698,600 8,437,400 Surcharge 19 Units of Service 21,700,000 20,600,000 20 Cost - $Line 19 x Line 8 7,661,200 2,206,700 5,454,500__________ __________ __________ __________ __________ __________ __________ 21 Total Cost - $ 219,627,300 21,088,200 129,418,100 17,284,000 31,627,100 11,772,500 8,437,400 Ccf - hundred cubic feet ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-16 Comparison of Wastewater Cost of Service With Revenue Under Existing Rates Test Year 2008 (1) (2) (3) Revenue Allocated Under Indicated Line Cost of Existing Revenue No. Customer Class Service Rates Increase____ _____________ _________ _________ _________ $$% Metered Customers J-9 B-15 (1) / (2) 1 Single Family 89,892,500 77,853,000 15.5 2 Multifamily 21,675,200 20,330,400 6.6 3 Non-Residential (a) 74,334,300 66,435,400 11.9__________ __________ 4 Total 185,902,000 164,618,800 12.9 Unmetered Customers 5 Single Family 21,218,200 18,318,700 15.8 6 Multifamily 12,507,100 11,422,800 9.5__________ __________ 7 Total 33,725,300 29,741,500 13.4 Total System 8 Single Family 111,110,700 96,171,700 15.5 9 Multifamily 34,182,300 31,753,200 7.6 10 Non-Residential 74,334,300 66,435,400 11.9__________ __________ 11 Total 219,627,300 194,360,300 13.0 (a) Includes Cost of Service associated with Surcharges. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-17 Proposed Wastewater Rates User/Capital Charge Breakdown (Rates Effective December 1, 2007) Total Line User Capital Wastewater No.Type of Monthly Charge Charge Charge Charge____ ____________________ __________ __________ __________ Base Charge - $/Bill 1 Billing & Collection Charge 2.30 0.00 2.30 2 System Availability Charge 6.60 1.80 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 8.90 1.80 10.70 4 Compliance Charge - $/Bill (a) 27.40 0.00 27.40_____ _____ _____ 5 Total Nonresidential Service Charge 36.30 1.80 38.10 Volume Charge 6 Metered - $/Ccf 1.53 0.35 1.88 Unmetered - $/Bill 7 Each Room 1.00 0.23 1.23 8 Each Water Closet 3.75 0.84 4.59 9 Each Bath 3.13 0.70 3.83 10 Each Separate Shower 3.13 0.70 3.83 Extra Strength Surcharges - $/ton (a) 11 Suspended Solids over 300 mg/l 186.19 32.71 218.90 12 BOD over 300 mg/l 470.33 59.23 529.56 13 COD over 600 mg/l 235.17 29.62 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) Applicable only to nonresidential customers. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-18 Proposed Wastewater Rates by Customer Class (Rates Effective December 1, 2007) Metered_____________________ Line Unmetered Non- No Type of Monthly Charge Residential Residential Residential____ _____________________ _________ _________ _________ $$$ Base Charge - $/Bill 1 Billing and Collection Charge 2.30 2.30 2.30 2 System Availability Charge 8.40 8.40 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 10.70 10.70 10.70 4 Compliance Charge 27.40_____ 5 Total Nonresidential Service Charge 38.10 Volume Charge 6 per Ccf 1.88 1.88 7 per room 1.23 8 per water closet 4.59 9 per bath 3.83 10 per separate shower 3.83 Extra Strength Surcharge - $/ton 11 Suspended Solids over 300mg/l 218.90 12 BOD over 300 mg/l 529.56 13 COD over 600 mg/l 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-19Comparison of Existing and Proposed Wastewater RatesLineProposed Wastewater Charges____________________________________________________________________No. Type of Monthly Charge Existing 2007 2008 (a) 2009 2010 2011 2012 2013 2014____ _____________________ ________ ________ ________ ________ ________ ________ ________ ________ ________Base Charge - $/Bill1 Billing & Collection Charge 0.85 0.85 2.30 2.30 2.45 2.55 2.70 2.80 2.952 System Availability Charge 7.05 7.05 8.40 9.55 10.65 11.70 12.25 12.95 13.65 ____ ____ ____ ____ ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 7.90 7.90 10.70 11.85 13.10 14.25 14.95 15.75 16.604 Compliance Charge - $/Bill (b) 12.55 12.55 27.40 28.35 29.65 30.90 32.10 33.40 34.75____ ____ ____ ____ ____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 20.45 20.45 38.10 40.20 42.75 45.15 47.05 49.15 51.35Volume Charge6 Metered - $/Ccf 1.81 1.81 1.88 2.13 2.37 2.59 2.73 2.86 3.01 Unmetered - $/Bill7 Each Room 1.18 1.18 1.23 1.39 1.55 1.69 1.78 1.87 1.968 Each Water Closet 4.42 4.42 4.59 5.20 5.79 6.32 6.67 6.98 7.359 Each Bath 3.69 3.69 3.83 4.34 4.82 5.27 5.56 5.82 6.1210 Each Separate Shower 3.69 3.69 3.83 4.34 4.82 5.27 5.56 5.82 6.12Extra Strength Surcharges - $/ton (b)11 Suspended Solids over 300 mg/l 218.90 218.90 218.90 220.22 239.58 260.16 270.74 281.66 291.1212 BOD over 300 mg/l 461.44 461.44 529.56 600.76 659.68 722.40 752.92 782.98 808.0013 COD over 600 mg/l 230.72 230.72 264.78 300.38 329.84 361.20 376.46 391.49 404.00Typical Residential Bill - $/Bill (c)14 User Charge Portion 21.12 21.12 21.14 19.90 20.74 21.60 22.65 23.66 24.8715 Capital Charge Portion 1.26 1.26 4.60 8.99 11.32 13.37 14.14 14.97 15.81 ____ ____ ____ ____ ____ ____ ____ ____ ____ 16 Total 22.38 22.38 25.74 28.89 32.06 34.97 36.79 38.63 40.68 Ccf - Hundred Cubic Feet mg/l - milligram per liter(a) 2008 rates effective December 1, 2007.(b) Applicable only to nonresidential customers.(c) Based on contributed wastewater volume of 8 Ccf per month.ALT II - Rate Change Introduced by District Board 10/11/07 Table 3-20 Comparison of Wastewater Cost of Service With Revenue Under Proposed Rates Test Year 2008 (1) (2) (3) Revenue Revenue As Under Allocated a Percent Line Proposed Cost of of Cost of No. Customer Class Rates Service Service____ _________________ _________ _________ _________ $$% Metered Customers K-3 J-9 (1) / (2) 1 Single Family 89,842,700 89,892,500 99.9 2 Multifamily 21,742,500 21,675,200 100.3 3 Non-Residential (a) 74,616,900 74,334,300 100.4__________ __________ 4 Total 186,202,100 185,902,000 100.2 Unmetered Customers 5 Single Family 20,794,189 21,218,200 98.0 6 Multifamily 12,584,893 12,507,100 100.6__________ __________ 7 Total 33,379,082 33,725,300 99.0 Total System 8 Single Family 110,636,889 111,110,700 99.6 9 Multifamily 34,327,393 34,182,300 100.4 10 Non-Residential (a) 74,616,900 74,334,300 100.4__________ __________ 11 Total 219,581,182 219,627,300 100.0 (a) Includes revenue and allocated cost of service associated with surcharge customers. ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-1 Existing Stormwater Rates and Taxes Type of Monthly Charge City Original Co. Boundary County Annexed____________________ __________ __________ __________ $$$ Flat Charge per Bill 0.24 0.24 0.24 Administrative Tax per $100 Assessed Value (a) 0.0186 0.0186 0.0186 Stormwater Tax per $100 Assessed Value 0.05 0.05 (a) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value. ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-2Historical and Projected Billed Stormwater RevenueUnder Existing Rates and TaxesLine Historical Projected________________________________________________________ ______________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Stormwater User Charge Revenue1 Flat Rate (a) 1,226,668 1,226,517 1,232,056 1,232,816 1,237,938 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,5002 Impervious Area Charges (b)00000000000Ad Valorem Taxes3 Administration (c) 4,069,968 4,271,100 4,266,241 4,698,139 4,601,860 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9004 Stormwater (c) 6,022,435 6,608,058 6,588,126 6,919,560 6,749,957 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,100 _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 5 Total 11,319,070 12,105,675 12,086,423 12,850,515 12,589,755 13,593,100 13,905,500 14,217,600 14,529,500 14,841,400 15,153,500(a) Flat Rate Charge anticipates 8 month of revenue and is intended to be phased out by March 2008.(b) 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue source will replace revenues now derived from the flat rate user charg(c) Ad Valorem Taxes are expected to be phased out by March 2008.ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-3Historical and Projected Stormwater OMCI RevenueUnder Existing Rates and TaxesLineHistorical Projected________________________________________________________ ____________________________________________________________________No. Subdistrict 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Historical Assessed Value (C-14) x Tax Rate (C-9) Projected Assessed Value (C-16) x Tax Rate (C-9)1 Coldwater Creek ($0.07/$100) 1,447,686 1,477,498 1,483,563 1,482,672 1,525,934 1,599,600 1,628,300 1,657,000 1,685,700 1,714,400 1,743,1002 Wedgewood ($0.06/$100) 24,457 24,202 25,599 26,383 28,330 33,600 34,700 35,800 36,900 38,000 39,0003 Upper Paddock Creek ($0.06/$100) 17,971 19,156 18,714 18,760 20,831 21,300 21,500 21,700 21,900 22,000 22,2004 Paddock Creek ($0.06/$100) 80,340 81,146 82,484 82,536 92,257 93,400 94,300 95,200 96,100 97,000 97,9005 Fountain Creek ($0.10/$100) 112,274 114,330 115,371 117,383 131,107 134,400 135,100 135,800 136,500 137,200 137,9006 Maline Creek ($0.07/$100) 411,292 419,525 417,656 430,655 445,722 469,100 471,200 473,300 475,400 477,500 479,6007 Black Jack-Dellwood ($0.06/$100) 135,111 134,462 136,195 141,060 146,409 150,100 151,000 151,900 152,800 153,700 154,6008 Watkins Creek ($0.06/$100) 93,229 87,627 89,305 91,981 94,877 95,100 95,700 96,300 96,900 97,500 98,1009 Sugar Creek Reservoir ($0.063/$100) 166,685 174,676 191,957 203,621 216,404 238,900 251,700 264,600 277,500 290,400 303,20010 Deer Creek ($0.06/$100) 1,854,961 1,847,565 1,937,889 1,977,280 2,101,960 2,232,200 2,304,200 2,376,200 2,448,200 2,520,200 2,592,20011 Clayton Central ($0.06/$100) 187,547 197,406 198,150 202,957 184,064 212,900 220,100 227,300 234,500 241,700 248,90012 Creve Coeur/Frontenac ($0.05/$100) 232,613 223,561 236,262 247,669 252,882 265,000 274,500 284,000 293,500 303,000 312,50013 Black Creek ($0.06/$100) 722,550 729,123 762,953 770,930 788,464 873,300 900,300 927,300 954,300 981,300 1,008,30014 University City RDP ($0.07/$100) 580,324 579,846 603,599 618,579 651,082 676,600 692,700 708,800 724,900 741,000 757,10015 Gravois Creek ($0.06/$100) 825,786 834,842 872,601 885,859 958,305 1,007,600 1,037,600 1,067,600 1,097,600 1,127,600 1,157,60016 Loretta-Joplin ($0.06/$100) 12,511 12,491 12,946 13,733 15,337 15,000 15,200 15,400 15,600 15,700 15,90017 N. Affton Area ($0.06/$100) 36,799 36,654 38,531 39,296 43,800 44,000 45,200 46,400 47,600 48,800 50,00018 Wellston ($0.08/$100) 36,272 34,758 35,158 35,984 35,677 36,700 35,600 34,600 33,600 32,500 31,50019 Seminary Branch-RDP ($0.06/$100) 156,255 155,235 169,981 165,118 183,575 185,700 190,800 195,900 201,000 206,100 211,20020 Marlborough ($0.04/$100) 21,485 21,312 22,313 21,680 24,025 24,600 25,000 25,400 25,900 26,300 26,80021 Shrewsbury-RDP ($0.06/$100) 13,913 13,621 14,071 15,138 16,893 17,100 17,500 17,900 18,400 18,800 19,200________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ 22 Total 7,170,061 7,219,036 7,465,298 7,589,274 7,957,935 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,800ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-4Comparison of Projected Stormwater Revenue Under ExistingRates and Taxes With Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$Stormwater OperationsStormwater User Charge Revenue1 Flat Rate 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,500Ad Valorem Taxes2 Administration 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9003 Stormwater 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,1004 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9005 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,1006 Wastewater Support 19,223,100 10,799,000 0 0 0 0_________ _________ _________ _________ _________ _________ 7 Total Stormwater Operating Revenue 33,572,400 25,617,600 15,433,800 15,797,300 16,154,600 16,541,5008 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,2009 Capital Outlay 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,00010 Cash Financing of Basic Services (a) 2,000,000 1,000,000 3,496,600 2,996,200 3,999,400 3,911,20011 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,700_________ _________ _________ _________ _________ _________ 12 Total Revenue Requirements - Basic Service 33,383,200 35,323,600 40,234,400 47,985,200 50,880,500 53,744,10013 Net Annual Balance 189,200 (9,706,000) (24,800,600) (32,187,900) (34,725,900) (37,202,600)14 Beginning of Year Balance 0 189,200 (9,516,800) (34,317,400) (66,505,300) (101,231,200)15 End of Year Balance 189,200 (9,516,800) (34,317,400) (66,505,300) (101,231,200) (138,433,800)OMCI Fund16 OMCI Revenue Under Existing Rates 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,80017 Interest Income 1,263,600 1,144,600 1,053,000 1,083,600 1,235,600 1,438,50018 Less: OMCI Existing Major Improvements (a) 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,00019 Net Annual Balance (3,976,200) (2,826,200) (2,409,600) 4,158,400 4,526,300 7,070,30020 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 28,880,190 33,038,590 37,564,89021 End of Year Balance 34,115,990 31,289,790 28,880,190 33,038,590 37,564,890 44,635,190(a) Items are considered a component of the District's Capital Improvement and Replacement Program for 2007 and 2008.ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-5 Projected Stormwater Impervious Billable Area (a) Line Projected No. Customer Class 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. City Single Family 1 General 1,235,600 1,250,500 1,264,000 1,277,100 1,289,900 1,302,300 2 Low Income 25,000 52,700 83,700 115,200 147,300 180,000 3 Low Income - Credit (12,500) (26,350) (41,850) (57,600) (73,650) (90,000) Multi Family 4 General 754,500 753,600 752,700 751,700 750,800 749,800 5 Low Income 1,000 1,000 1,000 1,000 1,000 1,000 6 Low Income - Credit (500) (500) (500) (500) (500) (500) 7 Commercial 2,641,800 2,644,500 2,647,100 2,649,800 2,652,400 2,655,000 8 Industrial 701,700 701,700 701,700 701,700 701,700 701,700 9 Anheuser-Busch 69,600 69,600 69,600 69,600 69,600 69,600 10 Tax Exempt (b) 56,500 56,500 56,500 56,500 56,500 56,500 _________ _________ _________ _________ _________ _________ 11 Total 5,472,700 5,503,250 5,533,950 5,564,500 5,595,050 5,625,400 County Single Family 12 General 8,563,500 8,601,800 8,630,800 8,658,400 8,684,500 8,709,100 13 Low Income 36,100 86,800 142,900 199,600 256,900 314,900 14 Low Income - Credit (18,100) (43,400) (71,500) (99,800) (128,500) (157,500) Multi Family 15 General 1,209,800 1,217,100 1,224,300 1,231,400 1,238,400 1,245,300 16 Low Income 100 100 100 100 100 100 17 Low Income - Credit (50) (50) (50) (50) (50) (50) 18 Commercial 3,596,600 3,703,400 3,809,900 3,916,100 4,022,100 4,127,700 19 Industrial 1,522,100 1,531,800 1,541,500 1,551,300 1,561,000 1,570,700 20 Anheuser-Busch 8,000 8,000 8,000 8,000 8,000 8,000 21 Tax Exempt (b) 3,613,100 3,636,900 3,660,600 3,684,300 3,707,900 3,731,400 _________ _________ _________ _________ _________ _________ 22 Total 18,531,150 18,742,450 18,946,550 19,149,350 19,350,350 19,549,650 _________ _________ _________ _________ _________ _________ 23 Total Impervious Area 24,003,850 24,245,700 24,480,500 24,713,850 24,945,400 25,175,050 24 Levee Districts - Credit (c) (875,800) (875,800) (875,800) (875,800) (875,800) (875,800) _________ _________ _________ _________ _________ _________ 25 Billable Impervious Area 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,250 (a) The impervious area shown in this table is impervious area billed, not actual impervious area. (b) (c) The Tax Exempt customer class consists of churches, schools and government organizations that, under existing stormwater funding structure, do not pay ad valorem based taxes. Per the Intergovernment Cooperation Agreement, the Levee Districts will be billed at five percent of the basic services stormwater user charge. Therfore, 95 percent of their impervious area must be subtracted from total impervious area for user charge calculation purposes. ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-6Calculation and Projection of Stormwater Impervious Rates and RevenueLineNo. 2007 2008 2009 2010 2011 2012 2013 2014____ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$1 Total Revenue Requirements - Basic Services 33,383,200 35,323,600 40,234,400 47,985,200 50,880,500 53,744,100 55,627,000 57,494,3002 Total Revenue Requirements - Enhanced Services 0 0 0 3,549,900 9,409,400 14,099,600 17,200,000 20,700,0003 Less: Flat Rate Revenue (a) (1,237,600) (823,100)0000004 Less: Ad Valorem Administration Tax (b) (4,787,400) (4,914,900)0000005 Less: Ad Valorem Stormwater Tax (b) (7,568,100) (7,755,900)0000006 Less: Other Revenue (756,200) (913,100) (1,185,800) (1,186,900) (1,188,100) (1,216,900) (1,246,100) (1,275,700)7 Less: Interest Income - Reserve Funds 0 0 (30,400) (80,900) (125,100) (171,100) (268,500) (350,400)8 Plus: Stormwater Policy Credit (c) 550,000 1,027,000 1,323,000 1,552,000 1,749,000 1,877,000 2,015,0009 Plus: Bad Debt Provisions (c) 189,200 550,000 1,027,000 1,323,000 1,552,000 1,749,000 1,877,000 2,015,000_________ _________ _________ _________ _________ _________ _________ _________ 10 Net Cost to be met from Charges 19,223,100 22,016,600 41,072,200 52,913,300 62,080,700 69,953,700 75,066,400 80,598,20011 Basic Services 19,223,100 22,016,600 41,072,200 49,176,600 52,176,100 55,112,000 56,961,100 58,808,70012 Enhanced Services 0 0 0 3,736,700 9,904,600 14,841,700 18,105,300 21,789,500Projected Billable Impervious Area - 100 sq. ft.13 Basic Services 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,250 24,071,250 24,000,00014 Enhanced Services 23,081,950 23,323,800 23,558,600 23,791,950 24,023,500 24,253,150 24,025,150 23,953,900Projected annual stormwater service charge (d) - $/100 sq. ft.15 Basic Services 0.0000 1.4400 2.0400 2.0900 2.2500 2.2900 2.4300 2.480016 Enhanced Services 0.0000 0.0000 0.0000 0.3100 0.5100 0.7100 0.8100 1.0000______ ______ ______ ______ ______ ______ ______ ______ 17 Total Charge 0.0000 1.4400 2.0400 2.4000 2.7600 3.0000 3.2400 3.480018 Stormwater Service Charge Revenue 0 11,217,600 41,072,200 52,913,300 62,080,700 69,953,700 75,067,300 80,598,30019 Indicated Wastewater Support Requirement 19,223,100 10,799,0000000000.1200 0.1700 0.2000 0.2300 0.250000(a) Flat Rate Charge anticipates 8 month of revenue and is intended to be phased out by March 2008.(b) Ad Valorem Taxes are expected to be phased out by March 2008.(c) Based on 2.5% of annual Stormwater revenue.(d) 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue 2,008source will replace revenues now derived from the flat rate user charges and ad valorem taxes. 4 2,008ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-7Projected Stormwater OMCI RevenueUnder Projected Rates and TaxesLineNo. Customer Class 2007 2008 2009 2010 2011 2012____ ________________________________________ ________ ________ ________ ________ ________ ________$$$$$$Tax per Schedule Tax Rate $0.00 per $100 Assessed Value_____________________ ________________________________________1 Coldwater Creek ($0.07/$100) 1,599,600 1,628,3002 Wedgewood ($0.06/$100) 33,600 34,7003 Upper Paddock Creek ($0.06/$100) 21,300 21,5004 Paddock Creek ($0.06/$100) 93,400 94,3005 Fountain Creek ($0.10/$100) 134,400 135,100________ ________ ________ ________ ________ ________ 6 Coldwater Creek Watershed 1,882,300 1,913,90000007 Maline Creek ($0.07/$100) 469,100 471,2008 Black Jack-Dellwood ($0.06/$100) 150,100 151,0009 Watkins Creek ($0.06/$100) 95,100 95,700________ ________ ________ ________ ________ ________ 10 Bissell Point Watershed 714,300 717,900000011 Sugar Creek Reservoir ($0.063/$100) 238,900 251,700________ ________ ________ ________ ________ ________ 12 Lower Meramec Watershed (a) 238,900 251,700000013 Deer Creek ($0.06/$100) 2,232,200 2,304,20014 Clayton Central ($0.06/$100) 212,900 220,10015 Creve Coeur/Frontenac ($0.05/$100) 265,000 274,50016 Black Creek ($0.06/$100) 873,300 900,30017 University City RDP ($0.07/$100) 676,600 692,70018 Gravois Creek ($0.06/$100) 1,007,600 1,037,60019 Loretta-Joplin ($0.06/$100) 15,000 15,20020 N. Affton Area ($0.06/$100) 44,000 45,20021 Wellston ($0.08/$100) 36,700 35,60022 Seminary Branch-RDP ($0.06/$100) 185,700 190,80023 Marlborough ($0.04/$100) 24,600 25,00024 Shrewsbury-RDP ($0.06/$100) 17,100 17,500________ ________ ________ ________ ________ ________ 25 River Des Peres Watershed 5,590,700 5,758,700000026 Missouri River Watershed (b)0000_________ _________ _________ _________ _________ _________ 27 Total 8,426,200 8,642,2000000(a) Includes the Meramec River Basin subdistrict in 2009 and subsequent years.(b) Includes the Missouri River-Bonfils subdistrict in 2009 and subsequent years.ALT II - Rate Change Introduced by District Board 10/11/07 Table 4-8 Comparison of Projected Stormwater Revenue Under Proposed Rates and Taxes Projected Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012 2013 2014____ _______ _______ _______ _______ _______ _______ _______ _______ $$$$$$$$ Stormwater Operations Stormwater User Charge Revenue 1 Flat Rate (a) 1,237,600 823,100 000000 2 Impervious Area Charges (a) 0 11,217,600 41,072,200 52,913,300 62,080,700 69,953,700 75,067,300 80,598,300 Ad Valorem Taxes (b) 3 Administration 4,787,400 4,914,900 000000 4 Stormwater 7,568,100 7,755,900 000000 5 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,900 1,246,100 1,275,700 6 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,100 268,500 350,400 7 Wastewater Support 19,223,100 10,799,000 000000_________ _________ _________ _________ _________ _________ _________ _________ 8 Total Stormwater Operating Revenue 33,572,400 36,423,600 42,288,400 54,181,100 63,393,900 71,341,700 76,581,900 82,224,400 9 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,200 47,259,400 48,995,900 10 Capital Outlay 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,000 3,247,500 3,344,800 11 Cash Financing of Basic Services 2,000,000 1,000,000 3,496,600 2,996,200 3,999,400 3,911,200 4,004,000 3,989,000 12 Cash Financing of Enhanced Services 0 0 0 3,549,900 9,409,400 14,099,600 17,200,000 20,700,000 13 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,700 1,116,100 1,164,600 14 Stormwater Policy Credit (c) 0 550,000 1,027,000 1,323,000 1,552,000 1,749,000 1,877,000 2,015,000 15 Bad Debt Provision (c) 189,200 550,000 1,027,000 1,323,000 1,552,000 1,749,000 1,877,000 2,015,000_________ _________ _________ _________ _________ _________ _________ _________ 16 Total Revenue Requirements 33,572,400 36,423,600 42,288,400 54,181,100 63,393,900 71,341,700 76,581,000 82,224,300 17 Net Stormwater Operations Annual Balance 000000900100 18 Beginning of Year Balance 0000000900 19 End of Year Balance 0000009001,000 OMCI Fund 20 OMCI Revenue Under Proposed Rates 8,426,200 8,642,200 000000 21 Interest Income 1,263,600 1,144,600 895,200 600,800 408,400 247,100 91,800 0 22 Less: OMCI Existing Major Improvements (d 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 5,337,090 0 23 Less: OMCI Reconfigured Enhanced Service 00000000 24 Net OMCI Fund Annual Balance (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) (5,245,290) 0 25 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 0 26 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 0 0 (a) (b) Ad Valorem Taxes are expected to be phased out by March 2008. (c) Based on 2.5% of annual Stormwater revenue. (d) Represents the use of current subdistrict revenue until total depletion, at which time reconfigured subdistrict revenues will replenish. 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue source will replace revenues now derived from the flat rate user charges and ad valorem taxes. ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-1Wastewater Revenue with Projected RatesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$1 Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,7002 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7003 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,0004 Interest Income - Reserve Funds 2,493,500 2,773,000 2,839,100 2,836,000 2,841,800 2,841,4005 Interest Income - Operations 198,700 81,300 97,400 105,500 105,700 105,7006 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 7 Total Revenue 208,374,600 221,582,600 257,167,700 283,300,200 307,071,500 321,816,800ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-2Stormwater Revenue with Projected Rates and TaxesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$Stormwater User Charge Revenue1 Flat Rate 1,237,600 823,10000002 Impervious Area Charges 0 11,217,600 41,072,200 52,913,300 62,080,700 69,953,700Ad Valorem Taxes3 Administration 4,787,400 4,914,90000004 Stormwater 7,568,100 7,755,90000005 OMCI Taxes 8,426,200 8,642,20000006 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9007 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,1008 Wastewater Support 19,223,100 10,799,00000009 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100_________ _________ _________ _________ _________ _________ 10 Total Stormwater Revenue 43,262,200 46,210,400 43,183,600 54,781,900 63,802,300 71,588,800ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-3Wastewater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,5002 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,1003 Debt Service 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,1004 Cash Financing of Major Improvements 60,100,000 64,846,000 106,192,000 132,439,000 151,486,000 161,934,0005 Addition to Operating Reserve 2,366,700 1,302,50000006 Stormwater Support 19,223,100 10,799,0000000__________ __________ __________ __________ __________ __________ 7 Total Revenue Requirements 215,569,200 221,098,200 256,730,800 283,275,500 307,085,700 321,799,700ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-4Stormwater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,2002 Routine Annual Improvements 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,0003 Cash Financing of Basic Services 2,000,000 1,000,000 3,496,600 2,996,200 3,999,400 3,911,2004 Cash Financing of Enhanced Services 0 0 0 3,549,900 9,409,400 14,099,6004 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,7005 Stormwater Policy Credit 0 550,000 1,027,000 1,323,000 1,552,000 1,749,0006 Bad Debt Provisions 189,200 550,000 1,027,000 1,323,000 1,552,000 1,749,0007 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,0008 OMCI Reconfigured Enhanced Services 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 9 Total Revenue Requirements 47,238,400 49,036,600 54,609,400 60,181,100 69,393,900 75,216,700ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-5 Wastewater and Stormwater Revenue with Projected Rates and Taxes and Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______ $$$$$$ Wastewater & Stormwater Operations Revenue 1 Wastewater Service Charge Revenue 195,104,100 207,876,300 243,002,400 269,103,000 292,842,600 307,525,700 2 Wastewater Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 Stormwater User Charge Revenue 3 Flat Rate 1,237,600 823,100 0000 4 Impervious Area Charges 0 11,217,600 41,072,200 52,913,300 62,080,700 69,953,700 Ad Valorem Taxes 5 Administration 4,787,400 4,914,900 0000 6 Stormwater 7,568,100 7,755,900 0000 7 Other Revenue 5,429,500 5,836,000 6,462,400 6,467,300 6,472,200 6,541,600 8 Interest Income - Reserve Funds 2,493,500 2,773,000 2,869,500 2,916,900 2,966,900 3,012,500 9 Interest Income - Operations 198,700 81,300 97,400 105,500 105,700 105,700 10 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 11 Total Revenue 222,723,900 247,207,200 299,456,100 337,481,300 370,465,400 393,158,500 Revenue Requirements 12 Operation and Maintenance Expense 134,466,100 143,076,700 147,663,000 160,075,700 165,988,500 173,183,700 13 Routine Annual Improvements 7,850,200 8,554,900 8,743,600 5,591,800 5,759,500 5,932,100 14 Debt Service 22,946,300 26,842,700 29,347,600 29,158,400 29,521,700 29,493,100 15 Cash Financing of Major Improvements 62,100,000 65,846,000 109,688,600 138,985,100 164,894,800 179,944,800 16 Additions to Operating Reserve 2,366,700 1,302,500 1,522,400 999,600 1,211,100 1,089,700 17 Stormwater Policy Credit 0 550,000 1,027,000 1,323,000 1,552,000 1,749,000 18 Bad Debt Provisions 189,200 550,000 1,027,000 1,323,000 1,552,000 1,749,000__________ __________ __________ __________ __________ __________ 19 Total Revenue Requirements 229,918,500 246,722,800 299,019,200 337,456,600 370,479,600 393,141,400 20 Surplus (Deficit) Revenue (7,194,600) 484,400 436,900 24,700 (14,200) 17,100 21 Surplus (Deficit) Stormwater Revenue 000000 22 Beginning of Year Balance 000000 23 End of Year Balance 000000 24 Surplus (Deficit) Wastewater Revenue (7,194,600) 484,400 436,900 24,700 (14,200) 17,100 25 Beginning of Year Balance 9,274,400 2,079,800 2,564,200 3,001,100 3,025,800 3,011,600 26 End of Year Balance 2,079,800 2,564,200 3,001,100 3,025,800 3,011,600 3,028,700 Stormwater OMCI Fund 27 OMCI Taxes 8,426,200 8,642,200 0000 28 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100 29 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 30 OMCI Reconfigured Enhanced Services 000000 31 Surplus (Deficit) Stormwater OMCI Fund (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) 32 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 33 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-6aDistribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,892,500 89,842,700 14,287,752 104,130,452 47.5%2 Multifamily 21,675,200 21,742,500 1,085,904 22,828,404 10.4% Non-Residential (a)3 Anheuser-Busch 8,218,100 8,344,000 111,744 8,455,744 3.9%4 All Other 66,116,200 66,272,900 17,675,712 83,948,612 38.3%___________ ___________ ___________ ___________ ______ 5 Total 185,902,000 186,202,100 33,161,112 219,363,212 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.Table 5-6Distribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,892,500 89,842,700 14,287,752 104,130,452 47.5%2 Multifamily 21,675,200 21,742,500 1,085,904 22,828,404 10.4%3 Non-Residential (a) 74,334,300 74,616,900 17,787,456 92,404,356 42.1%___________ ___________ ___________ ___________ ______ 4 Total 185,902,000 186,202,100 33,161,112 219,363,212 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-7Existing and Proposed Wastewater Rates(Effective July 1, 2005) (Effective December 1, 2007)Metered Metered_____________________ _____________________LineNo.Type of Monthly ChargeUnmetered ResidentialResidentialNon-ResidentialUnmetered ResidentialResidentialNon-Residential____ ____________________ __________ __________ __________ __________ __________ __________$$$1 Billing and Collection Charge 0.85 0.85 0.85 2.30 2.30 2.302 System Availability Charge 7.05 7.05 7.05 8.40 8.40 8.403 Compliance Charge 12.55 27.40Volume Charge4 per Ccf 1.81 1.81 1.88 1.885 per room 1.18 1.236 per water closet 4.42 4.597 per bath 3.69 3.838 per separate shower 3.69 3.83Extra Strength Surcharge - $/ton9 Suspended Solids over 300 mg/l 218.90 218.9010 BOD over 300 mg/l 461.44 529.5611 COD over 600 mg/l 230.72 264.78Ccf - hundred cubic feetmg/l - milligrams per literNote: Rates for qualified low income residential users are 50 percent of the regular rates above.ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-8Existing and Projected Stormwater Rates and Taxes (a)2007 and 2008Type of Monthly Charge CityOriginal Co. BoundaryCounty Annexed____________________ __________ __________ __________$$$Flat Charge per Monthly Bill 0.24 0.24 0.24Administrative Tax per $100 Assessed Value (b) 0.0186 0.0186 0.0186Stormwater Tax per $100 Assessed Value 0.05 0.05 0.002007 2008 2009 2010 2011 2012 2013 2014_______ _______ _______ _______ _______ _______ _______ _______$$$$$$$$Projected stormwater service charge 0.0000 1.4400 2.0400 2.4000 2.7600 3.0000 3.2400 3.4800per 100 square feet impervious area(annualized rate - billable monthly)Implemented December 1, 2007Projected monthly charge per: 100 square feet of impervious area 0.0000 0.1200 0.1700 0.2000 0.2300 0.2500 0.2700 0.2900 acre of impervious area 0.00 52.27 74.05 87.12 100.19 108.90 117.61 126.320.1200(a)(b) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value.The Flat Rate Charge, Administrative Tax and Stormwater Tax are projected to be phased out by December 2007. Revenue derived from the flat rate charge is based on five months of collection. All administrative and stormwater tax revenues due are expected to be collected in fiscal year 2008.ALT II - Rate Change Introduced by District Board 10/11/07 Table 5-9Typical Monthly Bill Comparison - ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Single Family1 Small 5 City Avg. 15.00 0.1200 50,000 16.95 3.16 20.11 20.10 1.80 21.90County Avg. 25.00 0.1200 100,000 16.95 6.07 23.02 20.10 3.00 23.102 Medium 8 City Avg. 15.00 0.1200 100,000 22.38 6.07 28.45 25.74 1.80 27.54County Avg. 25.00 0.1200 150,000 22.38 8.99 31.37 25.74 3.00 28.743 Medium - 50 Largest Cities 10 City Avg. 15.00 0.1200 150,000 26.00 8.99 34.99 29.50 1.80 31.30County Avg. 25.00 0.1200 200,000 26.00 11.91 37.91 29.50 3.00 32.504 Large 20 City Avg. 15.00 0.1200 200,000 44.10 11.91 56.01 48.30 1.80 50.10County Avg. 25.00 0.1200 250,000 44.10 14.82 58.92 48.30 3.00 51.30Multifamily5 Small 20 13.00 0.1200 200,000 44.10 11.91 56.01 48.30 1.56 49.866 Medium 40 27.00 0.1200 400,000 80.30 23.57 103.87 85.90 3.24 89.147 Large 60 33.00 0.1200 600,000 116.50 35.24 151.74 123.50 3.96 127.46(a) Stormwater Monthly Charge is equal to $52.27 per acre.LineBilled Wastewater Impervious ExistingStormwater MonthlyAverage AssessedExisting WastewaterExisting StormwaterALT II - Rate Change Introduced by District Board 10/11/07 Table 5-10Typical Monthly Bill Comparison - Non-ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 0.1200 147.15 0.24 147.39 169.70 13.56 183.269 Medium 100 Tax Exempt Co. 230 0.1200 201.45 0.24 201.69 226.10 27.60 253.7010 Large 160 City Avg. 268 0.1200 1,000,000 310.05 58.57 368.62 338.90 32.16 371.06County Avg. 437 0.1200 2,000,000 310.05 116.91 426.96 338.90 52.44 391.34Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 0.1200 169.44 0.24 169.68 194.22 13.56 207.7812 Average 100 Tax Exempt Co. 230 0.1200 233.29 0.24 233.53 261.13 27.60 288.7313 Large 160 City Avg. 268 0.1200 1,000,000 360.99 58.57 419.56 394.94 32.16 427.10County Avg. 437 0.1200 2,000,000 360.99 116.91 477.90 394.94 52.44 447.38(a) Stormwater Monthly Charge is equal to $52.27 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.ExistingImpervious LineAverage AssessedBilled WastewaterExisting WastewaterExisting StormwaterStormwater MonthlyALT II - Rate Change Introduced by District Board 10/11/07 Table 5-11Typical Monthly Bill ComparisonBilled Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to beWastewater Effective July 1, 2008 Effective July 1, 2009 Effective July 1, 2010 Effective July 1, 2011 Effective July 1, 2012 Effective July 1, 2013____________________ ____________________ ____________________ ____________________ ____________________ ____________________No. Customer Class Volume Area WW SW Total WW SW Total WW SW Total WW SW Total WW SW Total WW SW Total____ _______________________ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______Ccf 100 sq. ft.$$$$$$$$$$$$$$$$$$Single Family1 Small 5 City Avg. 15.00 22.50 2.55 25.05 24.95 3.00 27.95 27.20 3.45 30.65 28.60 3.75 32.35 30.05 4.05 34.10 31.65 4.35 36.00County Avg. 25.00 22.50 4.25 26.75 24.95 5.00 29.95 27.20 5.75 32.95 28.60 6.25 34.85 30.05 6.75 36.80 31.65 7.25 38.902 Medium 8 City Avg. 15.00 28.89 2.55 31.44 32.06 3.00 35.06 34.97 3.45 38.42 36.79 3.75 40.54 38.63 4.05 42.68 40.68 4.35 45.03County Avg. 25.00 28.89 4.25 33.14 32.06 5.00 37.06 34.97 5.75 40.72 36.79 6.25 43.04 38.63 6.75 45.38 40.68 7.25 47.933 Medium 10 City Avg. 15.00 33.15 2.55 35.70 36.80 3.00 39.80 40.15 3.45 43.60 42.25 3.75 46.00 44.35 4.05 48.40 46.70 4.35 51.05County Avg. 25.00 33.15 4.25 37.40 36.80 5.00 41.80 40.15 5.75 45.90 42.25 6.25 48.50 44.35 6.75 51.10 46.70 7.25 53.954 Large 20 City Avg. 15.00 54.45 2.55 57.00 60.50 3.00 63.50 66.05 3.45 69.50 69.55 3.75 73.30 72.95 4.05 77.00 76.80 4.35 81.15County Avg. 25.00 54.45 4.25 58.70 60.50 5.00 65.50 66.05 5.75 71.80 69.55 6.25 75.80 72.95 6.75 79.70 76.80 7.25 84.05Multifamily5 Small 20 13.00 54.45 2.21 56.66 60.50 2.60 63.10 66.05 2.99 69.04 69.55 3.25 72.80 72.95 3.51 76.46 76.80 3.77 80.576 Medium 40 27.00 97.05 4.59 101.64 107.90 5.40 113.30 117.85 6.21 124.06 124.15 6.75 130.90 130.15 7.29 137.44 137.00 7.83 144.837 Large 60 33.00 139.65 5.61 145.26 155.30 6.60 161.90 169.65 7.59 177.24 178.75 8.25 187.00 187.35 8.91 196.26 197.20 9.57 206.77Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 189.30 19.21 208.51 208.65 22.60 231.25 226.45 25.99 252.44 238.15 28.25 266.40 249.35 30.51 279.86 262.05 32.77 294.829 Medium 100 Tax Exempt Co. 230 253.20 39.10 292.30 279.75 46.00 325.75 304.15 52.90 357.05 320.05 57.50 377.55 335.15 62.10 397.25 352.35 66.70 419.0510 Large 160 City Avg. 268 381.00 45.56 426.56 421.95 53.60 475.55 459.55 61.64 521.19 483.85 67.00 550.85 506.75 72.36 579.11 532.95 77.72 610.67County Avg. 437 381.00 74.29 455.29 421.95 87.40 509.35 459.55 100.51 560.06 483.85 109.25 593.10 506.75 117.99 624.74 532.95 126.73 659.68Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 216.20 19.21 235.41 238.11 22.60 260.71 258.64 25.99 284.63 271.69 28.25 299.94 284.23 30.51 314.74 298.06 32.77 330.8312 Average 100 Tax Exempt Co. 230 291.62 39.10 330.72 321.84 46.00 367.84 350.13 52.90 403.03 367.96 57.50 425.46 384.98 62.10 447.08 403.79 66.70 470.4913 Large 160 City Avg. 268 442.47 45.56 488.03 489.29 53.60 542.89 533.12 61.64 594.76 560.50 67.00 627.50 586.47 72.36 658.83 615.25 77.72 692.97County Avg. 437 442.47 74.29 516.76 489.29 87.40 576.69 533.12 100.51 633.63 560.50 109.25 669.75 586.47 117.99 704.46 615.25 126.73 741.98WW - Wastewater; SW - Stormwater(a) Stormwater Monthly Charge is equal to $52.27 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.Line Imp. ALT II - Rate Change Introduced by District Board 10/11/07 Table 2-1 Historical and Projected Wastewater and Stormwater Operating Costs Line Historical_________________________________________________________ No Department 2002 2003 2004 2005 2006____ _________________ ________ ________ ________ ________ ________ $$$$$ 1 Board of Trustees 11,824 37,969 28,457 5,176 6,761 2 Rate Commission (a) 43,534 390,486 25,723 (10,905) 47,287 3 Civil Service Commission 1,120 9,150 855 3,775 1,297 4 Secretary - Treasurer 1,064,844 1,372,369 1,500,279 1,232,054 1,433,320 5 Executive Director 1,798,836 1,405,250 749,193 765,912 669,301 6 General Counsel 1,504,086 1,284,039 1,478,876 1,319,763 1,486,452 7 Office of Human Resources 15,270,097 17,554,305 19,328,048 8,248,765 8,093,929 8 Engineering 14,902,810 15,735,615 14,323,870 18,910,094 18,687,163 Operations 9 Collection System (b) 20,166,072 18,990,542 16,802,592 19,868,112 18,610,464 10 Pump Stations 6,259,912 6,238,792 6,255,158 6,529,714 6,966,237 11 Wastewater Treatment (c) 24,040,770 25,689,660 21,909,729 26,194,117 27,602,538 12 Support 2,733,903 2,564,527 6,392,528 3,978,080 6,078,589__________ __________ __________ __________ __________ 13 Total Operations 53,200,657 53,483,521 51,360,006 56,570,023 59,257,827 14 Finance 6,237,874 6,803,699 8,291,439 14,166,470 14,161,194 15 Information Systems 4,368,929 4,770,762 5,172,781 4,812,767 6,063,356__________ __________ __________ __________ __________ 16 Subtotal (General Fund) 98,404,611 102,847,165 102,259,527 106,023,893 109,907,887 17 Water Backup Program 2,548,000 3,824,000 4,276,000 6,104,781 4,858,510 18 Headquarters Building (d) 0 0 1,140,000 1,001,854 1,380,134__________ __________ __________ __________ __________ 19 Total O&M 100,952,611 106,671,165 107,675,527 113,130,528 116,146,531 (a) 2005 reflects reversal of prior year encumbrance. (b) Includes Mintert, Sulphur, and Grand Glaize. (c) Includes Lemay, Bissell, and County Treatment Plants. (d) Expenditures offset by rental income. ALT III - MSD Rate Change Notice 1/18/08 Table 2-2 Allocation of Direct Operating Costs Between Wastewater and Stormwater Wastewater Stormwater Direct Direct Indirect________ ________ ________ Personnel Services Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 65.2% 29.4% 5.4% Operations Collection System 69.0% 31.0% 0.0% Pump Stations 67.6% 32.4% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 64.0% 15.2% 20.8% Finance 30.7% 20.5% 48.8% Information Systems 5.8% 3.9% 90.3% All Other Administration and Management Board of Trustees 0.0% 100.0% Rate Commission 0.0% 100.0% Civil Service Commission 0.0% 100.0% Office of Secretary - Treasurer 0.0% 100.0% Executive Director 0.0% 100.0% Office of General Counsel 0.0% 100.0% Office of Human Resources 0.0% 100.0% Engineering 55.3% 44.3% 0.4% Operations Collection System 76.0% 24.0% 0.0% Pump Stations 76.0% 24.0% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% Support 86.1% 13.9% 0.0% Finance 54.4% 36.3% 9.3% Information Systems 5.8% 3.9% 90.3% Utilities Operations Pump Stations 84.9% 15.1% 0.0% Wastewater Treatment 100.0% 0.0% 0.0% ALT III - MSD Rate Change Notice 1/18/08 Table 2-3Projected Wastewater Operating CostsLineProjectedNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 28,100 22,900 14,200 14,800 15,400 16,0002 Rate Commission (a) 214,900 1,800 1,100 1,100 250,500 2,2003 Civil Service Commission 4,000 4,200 4,400 4,600 4,800 5,0004 Secretary - Treasurer 1,096,800 945,100 979,300 1,206,800 1,051,500 1,089,5005 Executive Director 656,500 679,800 703,800 728,700 754,500 781,4006 General Counsel 1,495,200 1,549,200 1,605,200 1,663,300 1,723,600 1,786,1007 Office of Human Resources 7,321,600 12,001,800 12,784,500 13,631,100 14,548,000 15,542,7008 Engineering 14,599,000 15,134,900 15,791,700 16,459,500 17,016,100 17,592,000Operations9 Collection System (b) 14,474,500 14,952,200 15,446,100 15,956,400 16,484,100 17,029,30010 Pump Stations 5,388,300 5,560,000 5,737,200 5,921,200 6,111,300 6,308,50011 Wastewater Treatment (c) 30,985,000 31,985,400 33,019,000 34,091,300 35,199,200 36,348,50012 Support 6,351,200 6,557,200 6,770,100 6,989,700 7,216,800 7,451,500__________ __________ __________ __________ __________ __________ 13 Total Operations 57,199,000 59,054,800 60,972,400 62,958,600 65,011,400 67,137,80014 Finance 10,061,000 10,444,700 10,843,200 11,257,100 11,687,000 12,133,30015 Information Systems 3,936,600 4,073,500 4,215,200 4,362,000 4,514,000 4,671,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 96,612,700 103,912,700 107,915,000 112,287,600 116,576,800 120,757,40017 Water Backup Program 7,200,000 5,700,000 5,700,000 5,700,000 5,700,000 5,700,00018 Headquarters Building (d) 971,600 1,300,700 1,039,700 1,070,900 1,103,000 1,136,100__________ __________ __________ __________ __________ __________ 19 Total O&M 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,50020 Capital Outlay 2,393,700 2,394,600 2,536,500 2,619,600 2,698,200 2,779,10021 Construction & Engineering 3,755,100 4,000,000 4,000,000 0 0 0__________ __________ __________ __________ __________ __________ 22 Subtotal Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100__________ __________ __________ __________ __________ __________ 23 Total Operating Expense 110,933,100 117,308,000 121,191,200 121,678,100 126,078,000 130,372,600(a) It is assumed that the Rate Commission will review proposed changes in wastewater rates every four years.(b) Includes Mintert, Sulphur, and Grand Glaize.(c) Includes Lemay, Bissell, and County Treatment Plants.(d) Expenditures offset by rental income.ALT III - MSD Rate Change Notice 1/18/08 Table 2-4Projected Existing Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 10,000 10,400 10,800 11,200 11,6002 Rate Commission 73,900 76,800 79,800 83,000 86,300 89,8003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 218,100 225,900 234,000 242,400 251,0006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 2,497,000 2,609,700 2,728,700 2,854,900 2,989,1008 Engineering 7,307,100 7,556,500 7,814,600 8,081,800 8,358,200 8,644,300Operations9 Collection System (a) 6,156,500 6,359,400 6,568,900 6,785,500 7,009,600 7,240,90010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,324,800 1,367,900 1,412,500 1,458,600 1,506,200__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 9,509,400 9,821,300 10,143,800 10,477,200 10,821,40014 Finance 6,707,300 6,963,100 7,228,700 7,504,500 7,790,900 8,088,40015 Information Systems 2,624,400 2,715,700 2,810,200 2,908,000 3,009,400 3,114,400__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 30,429,300 31,515,700 32,643,200 33,813,800 35,029,30017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 30,737,700 31,833,400 32,970,400 34,150,800 35,376,40020 Capital Outlay 751,400 773,800 796,900 820,700 845,300 870,60021 Construction & Engineering 950,000 978,5000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 32,490,000 32,630,300 33,791,100 34,996,100 36,247,000(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT III - MSD Rate Change Notice 1/18/08 Table 2-7Projected Incremental Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 0 (2,200) (5,600) (5,800) (6,000) (6,200)2 Rate Commission 0 (76,400) (79,400) (82,600) (300) (89,100)3 Civil Service Commission0000004 Secretary - Treasurer0000005 Executive Director 0 144,000 14,800 15,400 16,000 16,6006 General Counsel0000007 Office of Human Resources 0 (164,900) (431,400) 340,500 390,100 445,3008 Engineering 0 (50,000) (52,000) 545,900 567,700 590,400Operations9 Collection System (a) 0 1,269,400 1,407,600 6,749,900 6,989,300 8,737,40010 Pump Stations00000011 Wastewater Treatment (b)00000012 Support (c) 0 87,800 90,400 243,100 250,400 257,900__________ __________ __________ __________ __________ __________ 13 Total Operations 0 1,357,200 1,498,000 6,993,000 7,239,700 8,995,30014 Finance 0 161,100 228,200 238,000 248,200 258,90015 Information Systems 0 56,800 2,300 2,400 2,500 2,600__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 0 1,425,600 1,174,900 8,046,800 8,457,900 10,213,80017 Water Backup Program00000018 Headquarters Building000000__________ __________ __________ __________ __________ __________ 19 Total O&M 0 1,425,600 1,174,900 8,046,800 8,457,900 10,213,80020 Capital Outlay 0 1,386,500 1,410,200 2,151,500 2,216,000 2,282,40021 Construction & Engineering 0 (978,500)0000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 0 1,833,600 2,585,100 10,198,300 10,673,900 12,496,200(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.(d) Adjustment for costs presented in Table 2-4 that are being projected as part of the 2008 CIRP budget.ALT III - MSD Rate Change Notice 1/18/08 Table 2-8Projected Stormwater Operating CostsLineNo Department 2007 2008 2009 2010 2011 2012____ _________________ ________ ________ ________ ________ ________ ________$$$$$$1 Board of Trustees 9,600 7,800 4,800 5,000 5,200 5,4002 Rate Commission 73,900 400 400 400 86,000 7003 Civil Service Commission 1,200 1,200 1,200 1,200 1,200 1,2004 Secretary - Treasurer 360,500 373,800 387,700 402,000 416,900 432,4005 Executive Director 210,600 362,100 240,700 249,400 258,400 267,6006 General Counsel 489,900 507,700 526,200 545,400 565,200 585,7007 Office of Human Resources 2,390,500 2,332,100 2,178,300 3,069,200 3,245,000 3,434,4008 Engineering 7,307,100 7,506,500 7,762,600 8,627,700 8,925,900 9,234,700Operations9 Collection System (a) 6,156,500 7,628,800 7,976,500 13,535,400 13,998,900 15,978,30010 Pump Stations 1,767,800 1,825,200 1,884,500 1,945,800 2,009,000 2,074,30011 Wastewater Treatment (b)00000012 Support (c) 1,283,100 1,412,600 1,458,300 1,655,600 1,709,000 1,764,100__________ __________ __________ __________ __________ __________ 13 Total Operations 9,207,400 10,866,600 11,319,300 17,136,800 17,716,900 19,816,70014 Finance 6,707,300 7,124,200 7,456,900 7,742,500 8,039,100 8,347,30015 Information Systems 2,624,400 2,772,500 2,812,500 2,910,400 3,011,900 3,117,000__________ __________ __________ __________ __________ __________ 16 Subtotal (General Fund) 29,382,400 31,854,900 32,690,600 40,690,000 42,271,700 45,243,10017 Water Backup Program00000018 Headquarters Building 299,400 308,400 317,700 327,200 337,000 347,100__________ __________ __________ __________ __________ __________ 19 Total O&M 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,20020 Capital Outlay 751,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,00021 Construction & Engineering 950,00000000__________ __________ __________ __________ __________ __________ 22 Total Operating Expense 31,383,200 34,323,600 35,215,400 43,989,400 45,670,000 48,743,200(a) Includes Mintert, Sulphur, and Grand Glaize.(b) Includes Lemay, Bissell, and County Treatment Plants.(c) Includes Garage/Shop and Materials Management.ALT III - MSD Rate Change Notice 1/18/08 Table 2-9Historical Other Operating RevenueLineHistoricalNo. Description 2002 2003 2004 2005 2006_____ ____________ ________ ________ ________ ________ ________$$$$$1 Wastewater Billing Adjustment (a) (919,826) 831,456 3,310,200 2,324,443 2,084,885Other Fees2 Construction Inspection Fees 640,214 643,406 663,642 631,530 548,1463 Waste Hauler Permits 957,812 953,453 1,089,798 1,709,052 1,080,1324 All Other Fees (b) 453,094 454,645 424,149 495,755 490,171_________ _________ _________ _________ _________ 5 Subtotal 2,051,120 2,051,504 2,177,589 2,836,337 2,118,4496 Miscellaneous Revenue (c) 650,853 2,424,625 1,419,834 1,648,545 2,118,745_________ _________ _________ _________ _________ 7 Total Other Operating Revenue 1,782,147 5,307,585 6,907,623 6,809,325 6,322,0798 Connection Fee Revenue (d) 3,862,355 7,429,469 4,941,721 3,715,365 3,096,339_________ _________ _________ _________ _________ 9 Total Other Revenue 5,644,502 12,737,054 11,849,344 10,524,690 9,418,418(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold. Negative balance in 2002 due to $4.7 million for Bad Debt and Adjustments.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT III - MSD Rate Change Notice 1/18/08 Table 2-10 Allocation of Other Operating Revenue Between Wastewater and Stormwater Wastewater Stormwater Allocation Allocation________ ________ Connection and Other Fees Construction Inspection Fees (105) 50.0% 50.0% Plan Review Fees (106) 50.0% 50.0% Submittal Fees (107) 50.0% 50.0% Waste Hauler Permits (109) 100.0% 0.0% Wastewater Monitoring Costs Fees (110) 100.0% 0.0% Pretreatment Discharge Permits (111) 100.0% 0.0% All Other Machine Tap Fees (101) 100.0% 0.0% Conn Permits and Insp. (103) 50.0% 50.0% Construction Permits Fees (104) 50.0% 50.0% Miscellaneous Revenue Reimbursements Reimbursement of District Costs 75.0% 25.0% Other Reimbursements 75.0% 25.0% Reimbursement of Engr., Survey, Inspection, and Other Engr. Costs 75.0% 25.0% Sale of Fixed Assets 75.0% 25.0% All Other Sale of Scrap (Metal, Paper) 75.0% 25.0% Provision for Doubtful Misc. Receivables 75.0% 25.0% Engineering Prints and Specifications 75.0% 25.0% Refund of Court Cts & Attorney fees 75.0% 25.0% Rental Income 75.0% 25.0% Liquidation of Contractual Encumbrances 75.0% 25.0% NSF Fees 75.0% 25.0% Miscellaneous Income 75.0% 25.0% Forfeited Deposits 75.0% 25.0% Project Bid Fees 75.0% 25.0% Wastewater Revenue Adjustments Late Charges 99.0% 1.0% Refunds 99.0% 1.0% Adjustments 99.0% 1.0% Bad Debt Provision 99.0% 1.0% Wastewater Lien Interest and Fees 99.0% 1.0% Other (Includes revenue from Arnold) 99.0% 1.0% Capital Improvement Related Miscellaneous Revenue Connection and Other Fees Construction Funds Caulks Creek Surcharge 100.0% 0.0% Williams Creek 100.0% 0.0% Improvement Fund Connection Fees 100.0% 0.0% Miscellaneous Revenue Construction Funds 100.0% 0.0% Liquidation of Contractual Encumbrances 100.0% 0.0% Special Funds (Except WBU Fund) 100.0% 0.0% ALT III - MSD Rate Change Notice 1/18/08 Table 2-11Projected Wastewater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$1 Wastewater Billing Adjustment (a) 2,018,600 2,024,300 2,017,800 2,011,800 2,005,800 2,000,100Other Fees2 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5003 Waste Hauler Permits 1,200,000 1,206,000 1,212,000 1,218,000 1,224,000 1,230,0004 All Other Fees (b) 370,000 545,000 834,500 834,500 834,500 857,000_________ _________ _________ _________ _________ _________ 5 Subtotal 1,920,000 2,160,500 2,517,000 2,523,000 2,529,000 2,571,5006 Miscellaneous Revenue (c) 734,700 738,100 741,800 745,600 749,300 753,100_________ _________ _________ _________ _________ _________ 7 Total Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7008 Connection Fee Revenue (d) 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000_________ _________ _________ _________ _________ _________ 9 Total Other Revenue 9,273,300 9,568,900 9,968,600 10,019,400 10,070,100 10,158,700(a)(b)(c)(d) Revenue available for improvements financed out of improvement fund.Includes Late Charges, Refunds, Adjustments, Bad Debt Provision, Wastewater Lien Interest and Fees, and Other Adjustments including revenue from Arnold.Includes Plan Review Fees, Submittal Fees, Wastewater Monitoring Cost Fees, Pretreatment Discharge Permits, and all other fees.Includes Reimbursements, Sale of Fixed Assets, Reimbursable Engineering & Maintenance, and all other miscellaneous revenue.ALT III - MSD Rate Change Notice 1/18/08 Table 2-12Projected Stormwater Other Operating RevenueLineNo. Description 2007 2008 2009 2010 2011 2012_____ ____________ ________ ________ ________ ________ ________ ________$$$$$$Stormwater Billing Adjustment1 Late Charges 39,200 39,700 39,600 39,500 39,400 39,3002 Refunds (6,000) (6,100) (6,100) (6,100) (6,100) (6,000)3 Adjustments (5,000) (5,100) (5,100) (5,100) (5,100) (5,000)4 Stormwater Lien Interest and Fees 700 700 700 700 700 7005 Other (Includes revenue from Arnold) 2,500 2,500 2,500 2,500 2,500 2,500_________ _________ _________ _________ _________ _________ 6 Subtotal 31,400 31,700 31,600 31,500 31,400 31,500Other Fees7 Construction Inspection Fees 350,000 409,500 470,500 470,500 470,500 484,5008 Plan Review Fees 75,000 112,500 209,500 209,500 209,500 216,0009 Submittal Fees 55,000 113,500 227,000 227,000 227,000 234,00010 Waste Hauler Permits 0 0 0 0 0 011 Stormwater Monitoring Costs Fees 0 0 0 0 0 012 Pretreatment Discharge Permits 0 0 0 0 0 013 All Other 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 14 Subtotal 480,000 635,500 907,000 907,000 907,000 934,500Miscellaneous Revenue15 Reimbursements 7,000 7,000 7,000 7,000 7,000 7,00016 Sale of Fixed Assets 11,200 11,200 11,200 11,200 11,200 11,20017 Reimbursable Engr. & Maint. 50,000 50,200 50,500 50,700 51,000 51,20018 All Other 176,600 177,500 178,500 179,500 180,500 181,500_________ _________ _________ _________ _________ _________ 19 Subtotal 244,800 245,900 247,200 248,400 249,700 250,900_________ _________ _________ _________ _________ _________ 20 Total Other Operating Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,90021 Connection Fee Revenue 0 0 0 0 0 0ALT III - MSD Rate Change Notice 1/18/08 Table 3-1 Historical Wastewater Charges Fiscal Year Ending June 30,________________________________________________________ Line No. Type of Monthly Charge 1994 1998 2004 2005 2006____ _____________________ ________ ________ ________ ________ ________ (a) (c) Ordinance 9029 10177 11553 11692 12019 Adopted Date 06/16/93 09/11/97 07/24/03 03/11/04 07/14/05 Effective Date 07/01/93 10/01/97 08/01/03 07/01/04 07/01/05 Base Charge - $/Bill 1 Billing & Collection Charge 0.37 0.74 0.85 0.85 0.85 2 System Availability Charge 3.72 4.83 5.30 6.45 7.05 ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 4.09 5.57 6.15 7.30 7.90 4 Compliance Charge - $/Bill (b) 7.40 8.56 11.80 12.15 12.55____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 11.49 14.13 17.95 19.45 20.45 Volume Charge 6 Metered - $/Ccf 0.99 1.05 1.34 1.66 1.81 Unmetered - $/Bill 7 Each Room 0.64 0.69 0.88 1.08 1.18 8 Each Water Closet 2.41 2.58 3.28 4.04 4.42 9 Each Bath 2.01 2.15 2.74 3.37 3.69 10 Each Separate Shower 2.01 2.15 2.74 3.37 3.69 Extra Strength Surcharges - $/ton (b) 11 Suspended Solids over 350 mg/l 127.40 87.20 12 Suspended Solids over 300 mg/l 162.88 200.15 218.90 13 Biochemical Oxygen Demand over 300 mg/l 244.10 217.90 319.24 412.58 461.44 14 Chemical Oxygen Demand over 600 mg/l 122.05 108.95 159.62 206.29 230.72 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50 percent of the general service charges. (b) Applicable only to non-residential customers. (c) Current rates as recommended by the Rate Commission and adopted by the Board of Trustees. These rates were also adopted by Ordinance 11692 and reaffirmed by Ordinance 12019. ALT III - MSD Rate Change Notice 1/18/08 Table 3-2 Existing Wastewater Rates (Effective July 1, 2005) Metered_____________________ Line No.Type of Monthly Charge Unmetered Residential Residential Non- Residential____ ____________________ __________ __________ __________ $$$ 1 Billing and Collection Charge 0.85 0.85 0.85 2 System Availability Charge 7.05 7.05 7.05 3 Compliance Charge 12.55 Volume Charge 4 per Ccf 1.81 1.81 5 per room 1.18 6 per water closet 4.42 7 per bath 3.69 8 per separate shower 3.69 Extra Strength Surcharge - $/ton 9 Suspended Solids over 300 mg/l 218.90 10 BOD over 300 mg/l 461.44 11 COD over 600 mg/l 230.72 Ccf - hundred cubic feet mg/l - milligrams per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT III - MSD Rate Change Notice 1/18/08 Table 3-3Historical and Projected Wastewater Customer AccountsLine Historical Projected________________________________________________________ __________________________________________________________________No. 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Metered Customers1 Single Family 296,713 296,811 297,921 299,383 301,122 300,600 301,800 303,000 304,200 305,400 306,6002 Multifamily 21,244 21,110 21,367 20,982 20,825 21,000 20,900 20,800 20,700 20,600 20,5003 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 4 Total 343,787 343,591 345,127 345,565 347,659 347,300 348,400 349,400 350,500 351,500 352,600Unmetered Customers5 Single Family 60,275 60,415 60,621 60,365 60,010 60,400 60,200 60,000 59,800 59,600 59,4006 Multifamily 23,965 23,837 23,898 23,820 23,757 23,700 23,700 23,700 23,700 23,700 23,700_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 7 Total 84,240 84,252 84,518 84,185 83,767 84,100 83,900 83,700 83,500 83,300 83,100Total Customer Accounts8 Single Family 356,988 357,226 358,541 359,748 361,132 361,000 362,000 363,000 364,000 365,000 366,0009 Multifamily 45,209 44,947 45,264 44,802 44,582 44,700 44,600 44,500 44,400 44,300 44,20010 Non-Residential 25,831 25,670 25,839 25,200 25,712 25,700 25,700 25,600 25,600 25,500 25,500_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ 11 Total 428,027 427,843 429,645 429,750 431,426 431,400 432,300 433,100 434,000 434,800 435,70012 Annual Percentage Increase N/A 0.0% 0.4% 0.0% 0.4% 0.0% 0.2% 0.2% 0.2% 0.2% 0.2%ALT III - MSD Rate Change Notice 1/18/08 Table 3-4Historical and Projected Contributed Wastewater VolumeLine Historical Projected________________________________________________________ _____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf Ccf CcfMetered CustomersB-7B-7 B-7 B-7 B-7 B-9B-9 B-9 B-9 B-9 B-91 Single Family 27,084,987 26,738,437 27,386,280 27,228,682 27,437,644 27,356,400 27,470,500 27,585,100 27,699,700 27,814,300 27,928,9002 Multifamily 10,467,778 10,334,643 10,115,069 9,731,407 9,763,965 10,189,700 10,137,200 10,084,700 10,032,100 9,979,600 9,927,1003 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 4 Total 70,938,324 69,441,136 67,708,196 62,252,977 68,802,145 66,948,100 66,911,900 66,877,300 66,869,900 66,862,900 66,881,700Unmetered Customers (a)5 Single Family 7,100,437 7,061,615 7,082,767 7,112,749 7,068,871 7,274,900 7,231,800 7,187,400 7,142,600 7,098,100 7,053,6006 Multifamily 5,154,386 5,120,587 5,117,850 5,098,445 5,044,805 5,062,000 5,059,000 5,056,200 5,053,800 5,051,000 5,048,500_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 7 Total 12,254,824 12,182,202 12,200,617 12,211,193 12,113,676 12,336,900 12,290,800 12,243,600 12,196,400 12,149,100 12,102,100Total Contributed Wastewater Volume8 Single Family 34,185,424 33,800,052 34,469,047 34,341,431 34,506,515 34,631,300 34,702,300 34,772,500 34,842,300 34,912,400 34,982,5009 Multifamily 15,622,164 15,455,230 15,232,919 14,829,852 14,808,770 15,251,700 15,196,200 15,140,900 15,085,900 15,030,600 14,975,60010 Non-Residential 33,385,559 32,368,056 30,206,847 25,292,888 31,600,536 29,402,000 29,304,200 29,207,500 29,138,100 29,069,000 29,025,700_________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 11 Total 83,193,148 81,623,338 79,908,813 74,464,170 80,915,821 79,285,000 79,202,700 79,120,900 79,066,300 79,012,000 78,983,80012 Annual Percentage Increase N/A -1.9% -2.1% -6.8% 8.7% -2.0% -0.1% -0.1% -0.1% -0.1% 0.0%(a) Ccf = hundred cubic feet (748 gallons)Unmetered wastewater volume is determined by multiplying the number of fixtures by their respective unit usage values. Unit usage values are 16 gallons per day (gpd) per room, 60 gpd per water closet, and 50 gpd per bath or separate shower.ALT III - MSD Rate Change Notice 1/18/08 Table 3-5Historical and Projected Billed Wastewater Service RevenueUnder Existing RatesLine Historical Projected________________________________________________________ ____________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Metered CustomersB-13B-13 B-13 B-13 B-13 B-15B-15 B-15 B-15 B-15 B-151 Single Family 48,091,200 47,747,300 57,669,200 71,210,200 77,985,843 77,779,100 77,853,000 77,904,700 77,956,200 78,007,800 78,059,4002 Multifamily 12,409,100 12,260,100 14,874,700 17,992,100 19,646,971 20,435,700 20,330,400 20,225,100 20,119,700 20,014,400 19,909,100 Non-Residential3 Normal Strength 39,434,700 38,339,200 45,245,300 47,867,600 63,506,777 59,522,400 59,335,200 59,149,900 59,014,100 58,878,800 58,790,2004 Excess Strength 3,451,700 3,728,700 5,301,200 5,713,700 6,782,384 7,260,600 7,100,200 7,100,200 7,100,200 7,100,200 7,100,200__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 5 Total 103,386,700 102,075,300 123,090,400 142,783,600 167,921,974 164,997,800 164,618,800 164,379,900 164,190,200 164,001,200 163,858,900Unmetered Customers6 Single Family 11,364,600 11,344,300 13,625,600 16,858,100 18,282,428 18,676,900 18,318,700 17,931,900 17,544,700 17,157,500 16,770,7007 Multifamily 7,042,800 7,000,400 6,941,400 10,539,300 11,399,822 11,429,400 11,422,800 11,416,600 11,411,100 11,404,900 11,399,100__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 8 Total 18,407,400 18,344,700 20,567,000 27,397,400 29,682,249 30,106,300 29,741,500 29,348,500 28,955,800 28,562,400 28,169,800Total Wastewater Service Revenue9 Single Family 59,455,800 59,091,600 71,294,800 88,068,300 96,268,271 96,456,000 96,171,700 95,836,600 95,500,900 95,165,300 94,830,10010 Multifamily 19,451,900 19,260,500 21,816,100 28,531,400 31,046,793 31,865,100 31,753,200 31,641,700 31,530,800 31,419,300 31,308,20011 Non-Residential 42,886,400 42,067,900 50,546,500 53,581,300 70,289,161 66,783,000 66,435,400 66,250,100 66,114,300 65,979,000 65,890,400__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 12 Total Wastewater 121,794,100 120,420,000 143,657,400 170,181,000 197,604,224 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,70013 Annual Percentage Increase N/A -1.1% 19.3% 18.5% 16.1% -1.3% -0.4% -0.3% -0.3% -0.3% -0.3%ALT III - MSD Rate Change Notice 1/18/08 Table 3-6Wastewater Capital Improvement and Replacement ProgramLine Fiscal Year Ending June 30, ______________________________________________________________________No. Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Sanitary Sewer System1 Sanitary Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,500,000 40,500,0002 Sanitary Sewer Overflows 102,171,000 20,935,000 28,580,000 14,467,000 75,397,000 114,405,000 355,955,000__________ __________ __________ __________ __________ __________ __________ 3 Subtotal 109,671,000 27,935,000 35,080,000 20,967,000 81,897,000 120,905,000 396,455,000Combined Sewer System4 Combined Sewers 7,500,000 7,000,000 6,500,000 6,500,000 6,500,000 6,000,000 40,000,0005 Combined Sewer Overflows 33,039,000 4,035,000 9,857,000 17,806,000 15,595,000 3,000,000 83,332,0006 Cityshed - Condition 2,000,000 255,00000002,255,0007 Cityshed - Capacity 20,510,000 0 0 1,000,000 0 6,400,000 27,910,000__________ __________ __________ __________ __________ __________ __________ 8 Subtotal 63,049,000 11,290,000 16,357,000 25,306,000 22,095,000 15,400,000 153,497,000Other Sewer Projects9 District Wide Planning 9,650,000 8,850,000 7,800,000 7,100,000 7,100,000 6,100,000 46,600,00010 CMOM Regulations (a) 7,500,000 10,000,000 7,000,000 8,000,000 10,000,000 10,000,000 52,500,000__________ __________ __________ __________ __________ __________ __________ 11 Subtotal 17,150,000 18,850,000 14,800,000 15,100,000 17,100,000 16,100,000 99,100,000Wastewater Treatment12 Baumgartner 4,000,000000004,000,00013 Bissell Point 1,000,000000001,000,00014 Coldwater Creek 0 0 0 10,000,000 0 0 10,000,00015 Fenton 670,00000000670,00016 Grand Glaize 33,600,0000000033,600,00017 Lemay 10,150,000 45,000,000 42,220,000 0 0 3,000,000 100,370,00018 Lower Meramec River 6,145,000 0 2,386,000 26,500,000 0 5,569,000 40,600,00019 Missouri River 53,300,000 0 500,000 36,500,000 30,000,000 0 120,300,000__________ __________ __________ __________ __________ __________ __________ 20 Subtotal 108,865,000 45,000,000 45,106,000 73,000,000 30,000,000 8,569,000 310,540,000__________ __________ __________ __________ __________ __________ __________ 21 Total 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,000ALT III - MSD Rate Change Notice 1/18/08 Table 3-7Wastewater Capital Improvement Program FinancingLine Fiscal Year Ending June 30,___________________________________________________________________No Description 2007 2008 2009 2010 2011 2012 Total____ ______________________ ________ ________ ________ ________ ________ ________ ________$$$$$$ $Source of Funds1 Beginning of Year Balance 163,317,300 2,117,800 6,784,700 4,346,900 4,838,400 5,854,000 163,317,3002 Revenue Bond Proceeds 63,400,000 0 0 25,000,000 45,000,000 105,000,000 238,400,0003 State Revolving Loan Proceeds 14,205,000 0 35,000,000 35,000,000 30,000,000 0 114,205,0004 Commercial Paper 0 40,000,000000040,000,0005 Cash Financing of Construction 60,100,000 64,846,000 71,892,000 75,539,000 79,286,000 76,634,000 428,297,0006 Grants & Contributions (a) 1,504,400 1,526,300 1,549,200 1,573,100 1,598,000 1,624,000 9,375,0007 Interest Income (b) 10,552,700 3,894,600 2,674,000 2,276,200 2,568,400 3,302,500 25,268,400__________ __________ __________ __________ __________ __________ __________ 8 Total Funds Available 313,079,400 112,384,700 117,899,900 143,735,200 163,290,800 192,414,500 1,018,862,700Application of Funds9 Major Capital Improvements 298,735,000 103,075,000 111,343,000 134,373,000 151,092,000 160,974,000 959,592,00010 Improvement Fund Projects 4,072,000 2,500,000 2,000,000 2,000,000 2,000,000 2,000,000 14,572,00011 Issuance Costs (c) 972,800 25,000 210,000 560,000 810,000 1,470,000 4,047,80012 Revenue Bond Reserve Fund (d) 7,181,800 0 0 1,963,800 3,534,800 8,247,800 20,928,200__________ __________ __________ __________ __________ __________ __________ 13 Total Application of Funds 310,961,600 105,600,000 113,553,000 138,896,800 157,436,800 172,691,800 999,140,00014 End of Year Fund Balance 2,117,800 6,784,700 4,346,900 4,838,400 5,854,000 19,722,700 19,722,700 (a) Includes anticipated contributions from the City of Arnold to reserve capacity in the Lower Meramec River Wastewater Treatment Plant. (b) Interest Income is estimated at 3.5% of the average of the beginning and end of year balances. (c) (d) The required balance in the Revenue Bond Reserve Fund is determined to be the maximum principal and interest payment on senior debt.Issuance Costs are estimated at 1.40% of the issue amount for Revenue Bonds, 0.60% of the issue amount for SRF Loans, and $25,000 per issue for commercial paper.ALT III - MSD Rate Change Notice 1/18/08 Table 3-8 Projected Debt Service Requirements Existing Proposed Existing Proposed Commercial Fiscal Revenue Revenue SRF SRF Paper Year Bonds Bonds Loans Loans Notes Total________ ________ ________ ________ ________ ________ ________ $$$$$$ Payments to Sinking Fund 2007 9,636,600 1,717,000 11,467,000 125,700 0 22,946,300 2008 9,611,000 2,902,000 12,127,700 202,000 2,000,000 26,842,700 2009 9,593,400 2,902,000 13,949,200 3,255,500 2,000,000 31,700,100 2010 9,643,900 4,865,800 13,709,600 5,607,900 2,000,000 35,827,200 2011 9,778,600 8,400,600 13,938,400 7,624,200 2,000,000 41,741,800 2012 9,903,100 16,648,400 13,780,700 7,628,800 2,000,000 49,961,000 2013 10,038,800 26,467,200 13,701,300 7,628,800 2,000,000 59,836,100 2014 10,174,000 35,467,800 13,788,500 9,196,000 2,000,000 70,626,300 2015 10,322,300 44,206,600 13,671,700 10,539,400 2,000,000 80,740,000 2016 10,461,100 52,487,100 14,041,900 11,882,700 2,000,000 90,872,800 2017 10,616,800 60,734,900 13,958,300 13,230,700 2,000,000 100,540,700 2018 10,778,400 68,622,600 13,984,100 14,577,800 2,000,000 109,962,900 2019 10,968,700 76,837,700 14,006,000 15,920,000 2,000,000 119,732,400 2020 11,137,000 84,725,400 14,018,800 17,262,000 2,000,000 129,143,200 2021 11,304,900 92,580,400 14,129,400 18,613,800 2,000,000 138,628,500 2022 11,485,500 100,075,400 14,138,400 19,959,200 2,000,000 147,658,500 2023 11,679,500 107,537,700 14,051,400 21,304,100 2,000,000 156,572,700 2024 11,871,000 114,280,000 14,051,800 22,648,400 2,000,000 164,851,200 2025 12,596,400 120,236,800 12,334,500 23,997,200 2,000,000 171,164,900 2026 15,393,200 126,074,700 6,815,300 25,340,300 2,000,000 175,623,500 Payments to Bondholders 2007 9,640,700 1,233,400 10,481,200 0 0 21,355,300 2008 9,615,600 2,902,000 11,679,800 226,700 2,000,000 26,424,100 2009 9,587,900 2,902,000 12,443,900 727,000 2,000,000 27,660,800 2010 9,621,100 3,495,800 13,361,400 3,777,000 2,000,000 32,255,300 2011 9,758,200 5,934,600 13,901,800 6,054,400 2,000,000 37,649,000 2012 9,880,400 10,894,400 13,760,200 7,620,600 2,000,000 44,155,600 2013 10,016,800 19,617,200 13,617,300 7,925,200 2,000,000 53,176,500 2014 10,148,800 29,436,000 13,585,000 7,624,600 2,000,000 62,794,400 2015 10,299,800 38,898,500 13,783,900 7,623,900 2,000,000 72,606,100 2016 10,435,200 47,420,400 13,557,200 7,623,000 2,000,000 81,035,800 2017 10,591,000 55,668,200 13,921,300 7,621,800 2,000,000 89,802,300 2018 10,746,000 63,797,200 13,829,100 7,622,600 2,000,000 97,994,900 2019 10,940,500 71,771,000 13,844,500 7,628,000 2,000,000 106,184,000 2020 11,109,400 79,900,000 13,865,800 7,625,800 2,000,000 114,501,000 2021 11,275,300 87,755,000 13,888,700 7,623,400 2,000,000 122,542,400 2022 11,453,000 95,491,300 14,076,100 7,627,800 2,000,000 130,648,200 2023 11,647,700 102,953,600 13,890,100 7,628,700 2,000,000 138,120,100 2024 11,838,800 110,178,400 13,896,600 7,629,000 2,000,000 145,542,800 2025 12,032,300 116,617,700 13,887,800 7,628,800 2,000,000 152,166,600 2026 15,417,300 122,271,500 10,439,700 7,633,000 2,000,000 157,761,500 ALT III - MSD Rate Change Notice 1/18/08 Table 3-9 Comparison of Projected Wastewater Revenue Under Existing Rates With Projected Revenue Requirements Line Fiscal Year Ending June 30,____________________________________________________________ No. Description 2007 2008 2009 2010 2011 2012____ ______________________ ________ ________ ________ ________ ________ ________ $$$$$$ 1 Revenue Under Existing Rates (a) 195,104,100 194,360,300 193,728,400 193,146,000 192,563,600 192,028,700 Additional Revenue Required Fiscal Revenue Months Year Increase Effective____ ________ ________ 2 2007 0.0% 12 000000 3 2008 13.0% 7 13,516,000 25,185,000 25,109,000 25,033,000 24,964,000 4 2009 0.0% 12 0000 5 2010 2.4% 12 4,891,000 5,318,000 5,303,000 6 2011 4.7% 12 9,649,000 10,493,000 7 2012 4.3% 12 9,240,000__________ __________ __________ __________ __________ __________ 8 Total Additional Revenue 0 13,516,000 25,185,000 30,000,000 40,000,000 50,000,000__________ __________ __________ __________ __________ __________ 9 Total Service Charge Revenue 195,104,100 207,876,300 218,913,400 223,146,000 232,563,600 242,028,700 10 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,700 11 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 12 Interest Income - Reserve Funds 2,493,500 2,773,000 2,876,700 2,981,900 3,186,600 3,553,800 13 Interest Income - Operations 198,700 81,300 91,000 92,900 93,700 95,000 14 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 15 Subtotal Other Revenue 13,270,500 13,706,300 14,196,500 14,330,500 14,561,700 14,992,800__________ __________ __________ __________ __________ __________ 16 Total Revenue 208,374,600 221,582,600 233,109,900 237,476,500 247,125,300 257,021,500 17 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,500 18 Stormwater Program Support (b) 19,223,100 10,799,000 8,252,300 4,403,000 0 0__________ __________ __________ __________ __________ __________ 19 Net Revenue 84,367,200 99,870,200 110,202,900 114,015,000 123,745,500 129,428,000 Debt Service 20 Existing Senior Revenue Bonds 9,636,600 9,611,000 9,593,400 9,643,900 9,778,600 9,903,100 21 Proposed Senior Revenue Bonds 1,717,000 2,902,000 2,902,000 4,865,800 8,400,600 16,648,400 __________ __________ __________ __________ __________ __________ 22 Total Senior Revenue Bonds 11,353,600 12,513,000 12,495,400 14,509,700 18,179,200 26,551,500 23 Existing State Revolving Fund Loans (c) 11,467,000 12,127,700 13,949,200 13,709,600 13,938,400 13,780,700 24 Proposed State Revolving Fund Loans (c) 125,700 202,000 3,255,500 5,607,900 7,624,200 7,628,800 __________ __________ __________ __________ __________ __________ 25 Total State Revolving Fund Loans 11,592,700 12,329,700 17,204,700 19,317,500 21,562,600 21,409,500 26 Commercial Paper 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 __________ __________ __________ __________ __________ __________ 27 Total Debt Service 22,946,300 26,842,700 31,700,100 35,827,200 41,741,800 49,961,000 28 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,100 29 Cash Financing of Major Improvements 60,100,000 64,846,000 71,892,000 75,539,000 79,286,000 76,634,000 30 Additions to Operating Reserve 2,366,700 1,302,5000000 31 Net Annual Balance (d) (7,194,600) 484,400 74,300 29,200 19,500 53,900 32 Beginning of Year Balance (e) 9,274,400 2,079,800 2,564,200 2,638,500 2,667,700 2,687,200 33 End of Year Balance (e) 2,079,800 2,564,200 2,638,500 2,667,700 2,687,200 2,741,100 Actual Debt Service (f) 34 Senior Bonds 10,874,100 12,517,600 12,489,900 13,116,900 15,692,800 20,774,800 35 SRF Loans 10,481,200 11,906,500 13,170,900 17,138,400 19,956,200 21,380,800 Debt Service Coverage 36 Revenue Bonds (g) 776.0% 798.0% 882.0% 869.0% 789.0% 623.0% 37 Total Debt (h) 395.0% 409.0% 429.0% 377.0% 347.0% 307.0% (a) Existing wastewater rates effective July 1, 2005. (b) Transitional support of the stormwater program during conversion of tax based to user charge based revenues. (c) Debt service on SRF Loans are net of the state's interest subsidy. (d) Negative balances indicate need to drawdown available fund balance. (e) Does not include funds set aside for a minimum operating reserve equal to 60 days of operating expenses. (f) Payment to Bondholders per Table 3-8, paid through Sinking Fund. (g) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual debt service. (h) The Bond Ordinance requires net revenue to equal or exceed 1.15x actual debt service. ALT III - MSD Rate Change Notice 1/18/08 Table 3-10 Wastewater Cost of Service Test Year 2008 Line No. Operating Capital Total______ ________ ________ ________ $$$ Revenue Requirements 1 Operation & Maintenance Expense 110,913,400 110,913,400 2 Debt Service 26,842,700 26,842,700 3 Routine Capital Improvements 6,394,600 6,394,600 4 Cash Financing of Major Improvements 64,846,000 64,846,000 5 Additions to Operating Reserve 1,302,500 1,302,500 6 Stormwater Support 10,799,000 10,799,000__________ __________ __________ 7 Total 123,014,900 98,083,300 221,098,200 Revenue Requirements met from Other Sources Other Operating Revenue 8 Wastewater Billing Adjustments 2,024,300 2,024,300 9 Inspection and Other Fees 2,160,500 2,160,500 10 Miscellaneous Revenue 738,100 738,100 __________ __________ __________ 11 Subtotal 4,922,900 0 4,922,900 12 Interest Income 4,137,400 4,137,400 13 Connection Fee Revenue 4,646,000 4,646,000 14 Change in Available Fund Balances (484,400) (484,400) 15 Rate Adjustments (a) (11,751,000) (11,751,000)__________ __________ __________ 16 Total (2,690,700) 4,161,600 1,470,900__________ __________ __________ 17 Net Costs to be met from Charges 125,705,600 93,921,700 219,627,300 Net Operating Capital Cost (a) Required to adjust for any partial year implementation of increased wastewater rates, and allowance for one month billing and collection lag. Total Cost of Service Net Operating Cost 57% Capital Cost 43% ALT III - MSD Rate Change Notice 1/18/08 Table 3-11 Allocation of Estimated Wastewater Plant Investment and Other Capital Costs to Functional Cost Components Test Year 2008 (1) (2) (3) (4) (5) Line Suspended No. Description Total (a) Volume Capacity Solids BOD____ __________________ __________ __________ __________ __________ __________ $$$$$ Collection System 1 Sanitary Sewers 688,176,000 688,176,000 2 Combined Sewers 72,102,000 72,102,000 3 Pumping Stations 62,537,000 62,537,000____________ __________ 4 Total Collection System 822,815,000 822,815,000 Treatment Facilities 5 Raw Wastewater Pumping 84,735,000 84,735,000 6 Preliminary Treatment 15,303,000 15,303,000 7 Primary Sedimentation 11,779,000 11,779,000 8 Aeration/Reaeration/Nitrification 85,640,000 85,640,000 9 Basins 10 Equipment 11 Secondary Sedimentation 56,828,000 56,828,000 12 Recirculation Pumping 3,706,000 3,706,000 13 Chlorination 1,810,000 1,810,000 14 Lagoons & Aeration Equipment 3,964,000 3,964,000 15 Sludge Treatment 50,955,000 25,478,000 25,477,000 16 Dewatering 18,578,000 9,289,000 9,289,000 17 Incineration 56,622,000 28,311,000 28,311,000 18 By Pass & Outfall Works 16,794,000 16,794,000 19 Administrative & General (b) 188,876,000 34,423,000 54,256,000 29,293,000 70,904,000____________ __________ __________ __________ __________ 20 Total Treatment Facilities 595,590,000 108,546,000 171,088,000 92,371,000 223,585,000____________ __________ __________ __________ __________ 21 Subtotal Estimated Plant Investment 1,418,405,000 108,546,000 993,903,000 92,371,000 223,585,000 22 Land & General Plant (c) 40,448,000 3,095,000 28,343,000 2,634,000 6,376,000____________ __________ __________ __________ __________ 23 Total Estimated Plant Investment 1,458,853,000 111,641,000 1,022,246,000 95,005,000 229,961,000 24 Routine Capital Improvements (d) 6,394,600 489,400 4,480,800 416,400 1,008,000 Cash Financing of Improvements 25 Collection System 43,860,800 43,860,800 26 Wastewater Treatment (e) 20,985,200 3,824,500 6,028,200 3,254,600 7,877,900 27 Land & General Plant (c) 0 0 0 0 0 28 Less: Connection Fee Revenue 4,646,000 355,500 3,255,500 302,600 732,400 29 Change in Funds Available (d) (484,400) (37,100) (339,400) (31,500) (76,400)__________ __________ __________ __________ __________ 30 Net Cash Financed Capital Costs 67,079,000 3,995,500 51,453,700 3,399,900 8,229,900 31 Debt Service (d) 26,842,700 2,054,100 18,809,200 1,748,100 4,231,300__________ __________ __________ __________ __________ 32 Total Net Capital Costs 93,921,700 6,049,600 70,262,900 5,148,000 12,461,200 33 Annual Depreciation Expense (d) 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ 34 Net Other Capital Cost 37,313,600 1,717,600 30,596,500 1,461,500 3,538,000 (a) Excludes $623,912,000 of investment related to the Stormwater system. (b) Allocated based on all other Treatment Facilities. (c) Allocated based on Line 21. (d) Allocated based on Line 23. (e) Allocated based on Line 20. ALT III - MSD Rate Change Notice 1/18/08 Table 3-12 Percentage of Wastewater Operation and Maintenance Expense by Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers_______________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 0.0% 100.0% 0.0% 2 Engineering 100.0% 5.4% 94.6% 5.7% 43.3% 0.5% 0.5% 50.1% Operations 3 Collection System 100.0% 0.0% 100.0% 100.0% 4 Pump Stations 100.0% 0.0% 100.0% 100.0% 5 Wastewater Treatment 100.0% 0.0% 100.0% 18.3% 12.1% 28.8% 40.8% 6 Support 100.0% 20.8% 79.2% 6.9% 44.2% 10.9% 15.4% 22.5% 7 Finance 100.0% 48.8% 51.2% 100.0% 8 Information Systems 100.0% 90.3% 9.7% 100.0% 9 Average 100.0% 7.6% 50.4% 9.6% 13.6% 5.1% 13.6% All Other 10 Administration and Management (a) 0.0% 100.0% 0.0% 11 Engineering 100.0% 0.4% 99.6% 5.5% 78.1% 0.5% 0.5% 15.4% Operations 12 Collection System 100.0% 0.0% 100.0% 100.0% 13 Pump Stations 100.0% 0.0% 100.0% 100.0% 14 Wastewater Treatment 100.0% 0.0% 100.0% 17.9% 17.4% 25.4% 39.3% 15 Support 100.0% 0.0% 100.0% 11.9% 44.7% 16.9% 26.1% 0.5% 16 Finance 100.0% 9.3% 90.7% 100.0% 17 Information Systems 100.0% 90.3% 9.7% 100.0% 18 Average 100.0% 7.8% 34.3% 10.4% 16.0% 30.1% 1.4% Utilities Operations 19 Pump Stations 100.0% 0.0% 100.0% 56.0% 44.0% 20 Wastewater Treatment 100.0% 0.0% 100.0% 16.9% 16.9% 23.0% 43.2% 21 Average 100.0% 23.6% 21.6% 19.0% 35.7% 0.0% 0.0% 22 Water Backup Program 100.0% 0.0% 100.0% 100% 0.0% 23 Headquarters Building 100.0% 0.0% 100.0% 100.0% 24 Total O&M Expense 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% 25 Allocations to Operating Reserve 100.0% 0.0% 100.0% 14.2% 39.5% 10.3% 16.0% 12.3% 7.8% Less Costs Met From Other Revenue Other Revenue 26 Wastewater Revenue Adjustments 100.0% 90.0% 0.0% 0.0% 0.0% 10.0% 0.0% 27 Connection and Other Fees 100.0% 21.0% 19.9% 28.5% 26.2% 0.0% 4.4% 28 Miscellaneous Revenue 100.0% 25.0% 0.0% 0.0% 0.0% 75.0% 0.0% 29 Interest Income 100.0% 11.3% 31.5% 8.2% 12.7% 30.0% 6.3% 30 Stormwater Program Revenues 0.0% 31 Full Year Rate Adjustment 100.0% 17.7% 49.4% 12.9% 20.0% 0.0% 0.0% 32 Average 100.0% -31.4% 151.3% 20.9% 46.6% -74.2% -13.1% 33 Net O&M Expense 100.0% 12.0% 47.1% 9.7% 15.2% 9.4% 6.7% (a) Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT III - MSD Rate Change Notice 1/18/08 Table 3-13 Allocation of Wastewater Operation and Maintenance Expense to Functional Cost Components Test Year 2008 Direct_______________________________________________________________________________ Non- Line Suspended All Residential No. Description Total Indirect Total Volume Capacity Solids BOD Customers Customers__________________________________________________________________________________________________ $$$$$$$$$ Personnel Services 1 Administration and Management (a) 8,244,400 8,244,400 0 2 Engineering 13,421,000 724,700 12,696,300 723,600 5,495,000 59,700 59,700 6,358,300 Operations 3 Collection System 12,632,700 0 12,632,700 12,632,700 4 Pump Stations 2,356,200 0 2,356,200 2,356,200 5 Wastewater Treatment 14,312,500 0 14,312,500 2,619,200 1,731,800 4,122,000 5,839,500 6 Support 3,603,900 749,600 2,854,300 197,700 1,262,300 311,200 440,900 642,200 7 Finance 2,887,700 1,409,000 1,478,700 1,478,700 8 Information Systems 2,848,800 2,572,500 276,300 276,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 9 Total 60,307,200 13,700,200 46,607,000 3,540,500 23,478,000 4,492,900 6,340,100 2,397,200 6,358,300 All Other 10 Administration and Management (a) 5,483,000 5,483,000 0 11 Engineering 2,097,800 8,400 2,089,400 115,000 1,631,800 10,400 10,400 321,800 Operations 12 Collection System 2,684,700 0 2,684,700 2,684,700 13 Pump Stations 1,062,100 0 1,062,100 1,062,100 14 Wastewater Treatment 7,496,700 0 7,496,700 1,341,900 1,304,400 1,904,200 2,946,200 15 Support 3,056,700 0 3,056,700 363,000 1,366,300 515,100 797,000 15,300 16 Finance 7,632,700 707,200 6,925,500 6,925,500 17 Information Systems 1,292,200 1,166,900 125,300 125,300__________ __________ __________ __________ __________ __________ __________ __________ __________ 18 Total 30,805,900 7,365,500 23,440,400 1,819,900 8,049,300 2,429,700 3,753,600 7,066,100 321,800__________ __________ __________ __________ __________ __________ __________ 19 Subtotal Direct Expenses 70,047,400 5,360,400 31,527,300 6,922,600 10,093,700 9,463,300 6,680,100 20 Total Indirect (b) 21,065,700 21,065,700 1,612,100 9,481,400 2,081,900 3,035,500 2,845,900 2,008,900 Utilities Operations 21 Pump Stations 2,209,500 2,209,500 1,237,300 972,200 22 Wastewater Treatment 10,590,100 10,590,100 1,789,800 1,789,700 2,435,700 4,574,900__________ __________ __________ __________ __________ __________ 23 Subtotal 12,799,600 12,799,600 3,027,100 2,761,900 2,435,700 4,574,900 24 Water Backup Program 5,700,000 5,700,000 5,700,000 25 Headquarters Building 1,300,700 1,300,700 1,300,700 __________ __________ __________ __________ __________ __________ __________ __________ 26 Total O&M Expense 110,913,400 110,913,400 15,699,600 43,770,600 11,440,200 17,704,100 13,609,900 8,689,000 0 27 Add't to Operating Reserve (c) 1,302,500 1,302,500 184,500 514,000 134,300 207,900 159,800 102,000 Less Costs Met From Other Revenue Other Revenue 28 Wastewater Revenue Adjustments 2,024,300 2,024,300 1,821,900 0 0 0 202,400 0 29 Connection and Other Fees 2,160,500 2,160,500 453,700 429,900 615,100 566,800 0 95,000 30 Miscellaneous Revenue 738,100 738,100 184,500 0 0 0 553,600 0 31 Interest Income (d) 4,137,400 4,137,400 467,300 1,302,800 340,500 527,000 1,241,200 258,600 32 Full Year Rate Adjustment (e) (11,751,000) (11,751,000) (2,081,900) (5,804,300) (1,517,100) (2,347,700)__________ __________ __________ __________ __________ __________ __________ __________ 33 Total (2,690,700) (2,690,700) 845,500 (4,071,600) (561,500) (1,253,900) 1,997,200 353,600 34 Net O&M Expense 114,906,600 114,906,600 15,038,600 48,356,200 12,136,000 19,165,900 11,772,500 8,437,400 35 Stormwater Program Support 10,799,000 10,799,000 10,799,000__________ __________ __________ __________ __________ __________ __________ __________ 36 Adjusted Net O&M Expense 125,705,600 125,705,600 15,038,600 59,155,200 12,136,000 19,165,900 11,772,500 8,437,400 (a) (b) Allocated based on Line 19. (c) Allocated based on Line 26. (d) Allocated 30.0% of interest income directly to All Customers based on relative revenue receipts with remainder allocated based on Line 26 less All Customer costs. (e) Allocated based on Line 26 less All Customers, and Nonresidential Customers costs. Includes Board of Trustees, Rate Commission, Civil Service Commission, Office of Secretary - Treasurer, Executive Director, Office of General Counsel, and Office of Human Resources. ALT III - MSD Rate Change Notice 1/18/08 Table 3-14Wastewater Units of ServiceTest Year 2008(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)Volume Capacity Wastewater Strength Non-________________________________ ________________________________ ____________________Line Infiltration Total Infiltration Total Suspended All ResidentialNo. Customer Class Contributed Inflow Treated Contributed Inflow Treated Solids BODCustomers Customers____ __________________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Ccf Ccf Ccf Ccf/day Ccf/day Ccf/day pounds pounds bills billsJ-7J-7(1) + (2)J-7 J-7(4) + (5)J-6J-6 J-5Metered Customers1 Single Family 27,470,500 38,599,800 66,070,300 130,203 443,105 573,307 54,897,100 36,019,400 3,621,0602 Multifamily 10,137,200 7,614,800 17,752,000 48,048 87,414 135,461 18,189,800 12,257,700 250,9003 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,802__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 4 Total 66,911,900 65,677,200 132,589,100 317,144 753,938 1,071,082 124,873,800 83,313,500 4,179,762 307,802Unmetered Customers5 Single Family 7,231,800 8,750,900 15,982,700 34,277 100,456 134,732 14,011,900 9,262,200 722,2906 Multifamily 5,059,000 4,774,700 9,833,700 23,978 54,811 78,789 9,381,700 6,269,300 284,750__________ __________ __________ __________ __________ __________ __________ __________ __________ 7 Total 12,290,800 13,525,600 25,816,400 58,255 155,266 213,522 23,393,600 15,531,500 1,007,0408Surcharge21,700,000 20,600,000Total System9 Single Family 34,702,300 47,350,700 82,053,000 164,479 543,560 708,039 68,909,000 45,281,600 4,343,35010 Multifamily 15,196,200 12,389,500 27,585,700 72,026 142,225 214,250 27,571,500 18,527,000 535,65011 Non-Residential 29,304,200 19,462,600 48,766,800 138,894 223,420 362,314 51,786,900 35,036,400 307,802 307,80212 Surcharge21,700,000 20,600,000__________ __________ __________ __________ __________ __________ __________ __________ __________ __________ 13 Total 79,202,700 79,202,800 158,405,500 375,399 909,205 1,284,604 169,967,400 119,445,000 5,186,802 307,802Ccf - Hundred Cubic FeetALT III - MSD Rate Change Notice 1/18/08 Table 3-15 Allocation of Wastewater Cost of Service to Customer Classes Test Year 2008 (1) (2) (3) (4) (5) (6) (7) Line Wastewater Strength All Non- Residential____________________ No. Description Total Volume Capacity TSS BOD Customers Customers____ ________________ ________ ________ ________ ________ ________ ________ ________ Costs of Service 1 Net O&M Expense 125,705,600 15,038,600 59,155,200 12,136,000 19,165,900 11,772,500 8,437,400 2 Net Replacements 56,608,100 4,332,000 39,666,400 3,686,500 8,923,200__________ __________ __________ __________ __________ __________ __________ 3 Total OM&R 182,313,700 19,370,600 98,821,600 15,822,500 28,089,100 11,772,500 8,437,400 4 Net Capital Costs 37,313,600 1,717,600 30,596,500 1,461,500 3,538,000__________ __________ __________ __________ __________ __________ __________ 5 Total 219,627,300 21,088,200 129,418,100 17,284,000 31,627,100 11,772,500 8,437,400 Number of Units 6 Units of Service 158,405,500 1,284,604 169,967,400 119,445,000 5,186,802 307,802 Ccf Ccf/day pounds pounds Bills Bills Unit Costs - $/unit 7 OM&R Line 3 / Line 6 0.12228 76.92769 0.09309 0.23516 2.26970 27.41178 8 Total Line 5 / Line 6 0.13313 100.74553 0.10169 0.26478 2.26970 27.41178 Single Family Metered 9 Units of Service 66,070,300 573,307 54,897,100 36,019,400 3,621,060 10 Cost - $Line 9 x Line 8 89,892,500 8,795,800 57,758,100 5,582,500 9,537,400 8,218,700 Unmetered 11 Units of Service 15,982,700 134,732 14,011,900 9,262,200 722,290 12 Cost - $Line 11 x Line 8 21,218,200 2,127,700 13,573,700 1,424,900 2,452,500 1,639,400 Multi Family Metered 13 Units of Service 17,752,000 135,461 18,189,800 12,257,700 250,900 14 Cost - $Line 13 x Line 8 21,675,200 2,363,300 13,647,100 1,849,700 3,245,600 569,500 Unmetered 15 Units of Service 9,833,700 78,789 9,381,700 6,269,300 284,750 16 Cost - $Line 15 x Line 8 12,507,100 1,309,100 7,937,700 954,000 1,660,000 646,300 Non-Residential 17 Units of Service 48,766,800 362,314 51,786,900 35,036,400 307,802 307,802 18 Cost - $Line 17 x Line 8 66,673,100 6,492,300 36,501,500 5,266,200 9,277,100 698,600 8,437,400 Surcharge 19 Units of Service 21,700,000 20,600,000 20 Cost - $Line 19 x Line 8 7,661,200 2,206,700 5,454,500__________ __________ __________ __________ __________ __________ __________ 21 Total Cost - $ 219,627,300 21,088,200 129,418,100 17,284,000 31,627,100 11,772,500 8,437,400 Ccf - hundred cubic feet ALT III - MSD Rate Change Notice 1/18/08 Table 3-16 Comparison of Wastewater Cost of Service With Revenue Under Existing Rates Test Year 2008 (1) (2) (3) Revenue Allocated Under Indicated Line Cost of Existing Revenue No. Customer Class Service Rates Increase____ _____________ _________ _________ _________ $$% Metered Customers J-9 B-15 (1) / (2) 1 Single Family 89,892,500 77,853,000 15.5 2 Multifamily 21,675,200 20,330,400 6.6 3 Non-Residential (a) 74,334,300 66,435,400 11.9__________ __________ 4 Total 185,902,000 164,618,800 12.9 Unmetered Customers 5 Single Family 21,218,200 18,318,700 15.8 6 Multifamily 12,507,100 11,422,800 9.5__________ __________ 7 Total 33,725,300 29,741,500 13.4 Total System 8 Single Family 111,110,700 96,171,700 15.5 9 Multifamily 34,182,300 31,753,200 7.6 10 Non-Residential 74,334,300 66,435,400 11.9__________ __________ 11 Total 219,627,300 194,360,300 13.0 (a) Includes Cost of Service associated with Surcharges. ALT III - MSD Rate Change Notice 1/18/08 Table 3-17 Proposed Wastewater Rates User/Capital Charge Breakdown (Rates Effective December 1, 2007) Total Line User Capital Wastewater No.Type of Monthly Charge Charge Charge Charge____ ____________________ __________ __________ __________ Base Charge - $/Bill 1 Billing & Collection Charge 2.30 0.00 2.30 2 System Availability Charge 6.60 1.80 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 8.90 1.80 10.70 4 Compliance Charge - $/Bill (a) 27.40 0.00 27.40_____ _____ _____ 5 Total Nonresidential Service Charge 36.30 1.80 38.10 Volume Charge 6 Metered - $/Ccf 1.53 0.35 1.88 Unmetered - $/Bill 7 Each Room 1.00 0.23 1.23 8 Each Water Closet 3.75 0.84 4.59 9 Each Bath 3.13 0.70 3.83 10 Each Separate Shower 3.13 0.70 3.83 Extra Strength Surcharges - $/ton (a) 11 Suspended Solids over 300 mg/l 186.19 32.71 218.90 12 BOD over 300 mg/l 470.33 59.23 529.56 13 COD over 600 mg/l 235.17 29.62 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter (a) Applicable only to nonresidential customers. ALT III - MSD Rate Change Notice 1/18/08 Table 3-18 Proposed Wastewater Rates by Customer Class (Rates Effective December 1, 2007) Metered_____________________ Line Unmetered Non- No Type of Monthly Charge Residential Residential Residential____ _____________________ _________ _________ _________ $$$ Base Charge - $/Bill 1 Billing and Collection Charge 2.30 2.30 2.30 2 System Availability Charge 8.40 8.40 8.40_____ _____ _____ 3 Total Base (Residential) Service Charge 10.70 10.70 10.70 4 Compliance Charge 27.40_____ 5 Total Nonresidential Service Charge 38.10 Volume Charge 6 per Ccf 1.88 1.88 7 per room 1.23 8 per water closet 4.59 9 per bath 3.83 10 per separate shower 3.83 Extra Strength Surcharge - $/ton 11 Suspended Solids over 300mg/l 218.90 12 BOD over 300 mg/l 529.56 13 COD over 600 mg/l 264.78 Ccf - Hundred Cubic Feet mg/l - milligram per liter Note: Rates for qualified low income residential users are 50 percent of the regular rates above. ALT III - MSD Rate Change Notice 1/18/08 Table 3-19Comparison of Existing and Proposed Wastewater RatesLineProposed Wastewater Charges____________________________________________________________________No. Type of Monthly Charge Existing 2007 2008 (a) 2009 2010 2011 2012 2013 2014____ _____________________ ________ ________ ________ ________ ________ ________ ________ ________ ________Base Charge - $/Bill1 Billing & Collection Charge 0.85 0.85 2.30 2.30 2.40 2.55 2.65 2.75 2.852 System Availability Charge 7.05 7.05 8.40 8.40 8.50 8.85 9.20 10.50 12.05 ____ ____ ____ ____ ____ ____ ____ ____ ____ 3 Total Base (Residential) Service Charge 7.90 7.90 10.70 10.70 10.90 11.40 11.85 13.25 14.904 Compliance Charge - $/Bill (b) 12.55 12.55 27.40 27.40 29.65 30.85 31.95 33.20 34.45____ ____ ____ ____ ____ ____ ____ ____ ____ 5 Total Nonresidential Service Charge 20.45 20.45 38.10 38.10 40.55 42.25 43.80 46.45 49.35Volume Charge6 Metered - $/Ccf 1.81 1.81 1.88 1.88 1.92 2.02 2.11 2.37 2.67 Unmetered - $/Bill7 Each Room 1.18 1.18 1.23 1.23 1.25 1.32 1.38 1.55 1.748 Each Water Closet 4.42 4.42 4.59 4.59 4.69 4.93 5.15 5.79 6.529 Each Bath 3.69 3.69 3.83 3.83 3.91 4.11 4.30 4.82 5.4310 Each Separate Shower 3.69 3.69 3.83 3.83 3.91 4.11 4.30 4.82 5.43Extra Strength Surcharges - $/ton (b)11 Suspended Solids over 300 mg/l 218.90 218.90 218.90 218.90 218.90 222.62 231.35 251.51 269.2112 BOD over 300 mg/l 461.44 461.44 529.56 529.56 551.52 596.72 620.14 679.34 732.3813 COD over 600 mg/l 230.72 230.72 264.78 264.78 275.76 298.36 310.07 339.67 366.19Typical Residential Bill - $/Bill (c)14 User Charge Portion 21.12 21.12 21.14 21.14 21.03 21.55 22.50 23.69 24.8215 Capital Charge Portion 1.26 1.26 4.60 4.60 5.23 6.01 6.23 8.52 11.44 ____ ____ ____ ____ ____ ____ ____ ____ ____ 16 Total 22.38 22.38 25.74 25.74 26.26 27.56 28.73 32.21 36.26 Ccf - Hundred Cubic Feet mg/l - milligram per liter(a) 2008 rates effective December 1, 2007.(b) Applicable only to nonresidential customers.(c) Based on contributed wastewater volume of 8 Ccf per month.ALT III - MSD Rate Change Notice 1/18/08 Table 3-20 Comparison of Wastewater Cost of Service With Revenue Under Proposed Rates Test Year 2008 (1) (2) (3) Revenue Revenue As Under Allocated a Percent Line Proposed Cost of of Cost of No. Customer Class Rates Service Service____ _________________ _________ _________ _________ $$% Metered Customers K-3 J-9 (1) / (2) 1 Single Family 89,842,700 89,892,500 99.9 2 Multifamily 21,742,500 21,675,200 100.3 3 Non-Residential (a) 74,616,900 74,334,300 100.4__________ __________ 4 Total 186,202,100 185,902,000 100.2 Unmetered Customers 5 Single Family 20,794,189 21,218,200 98.0 6 Multifamily 12,584,893 12,507,100 100.6__________ __________ 7 Total 33,379,082 33,725,300 99.0 Total System 8 Single Family 110,636,889 111,110,700 99.6 9 Multifamily 34,327,393 34,182,300 100.4 10 Non-Residential (a) 74,616,900 74,334,300 100.4__________ __________ 11 Total 219,581,182 219,627,300 100.0 (a) Includes revenue and allocated cost of service associated with surcharge customers. ALT III - MSD Rate Change Notice 1/18/08 Table 4-1 Existing Stormwater Rates and Taxes Type of Monthly Charge City Original Co. Boundary County Annexed____________________ __________ __________ __________ $$$ Flat Charge per Bill 0.24 0.24 0.24 Administrative Tax per $100 Assessed Value (a) 0.0186 0.0186 0.0186 Stormwater Tax per $100 Assessed Value 0.05 0.05 (a) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value. ALT III - MSD Rate Change Notice 1/18/08 Table 4-2Historical and Projected Billed Stormwater RevenueUnder Existing Rates and TaxesLine Historical Projected________________________________________________________ ______________________________________________________________________No. Customer Class 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Stormwater User Charge Revenue1 Flat Rate (a) 1,226,668 1,226,517 1,232,056 1,232,816 1,237,938 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,5002 Impervious Area Charges (b)00000000000Ad Valorem Taxes3 Administration (c) 4,069,968 4,271,100 4,266,241 4,698,139 4,601,860 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9004 Stormwater (c) 6,022,435 6,608,058 6,588,126 6,919,560 6,749,957 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,100 _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ 5 Total 11,319,070 12,105,675 12,086,423 12,850,515 12,589,755 13,593,100 13,905,500 14,217,600 14,529,500 14,841,400 15,153,500(a) Flat Rate Charge anticipates 8 month of revenue and is intended to be phased out by March 2008.(b) 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue source will replace revenues now derived from the flat rate user charg(c) Ad Valorem Taxes are expected to be phased out by March 2008.ALT III - MSD Rate Change Notice 1/18/08 Table 4-3Historical and Projected Stormwater OMCI RevenueUnder Existing Rates and TaxesLineHistorical Projected________________________________________________________ ____________________________________________________________________No. Subdistrict 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$$$$Historical Assessed Value (C-14) x Tax Rate (C-9) Projected Assessed Value (C-16) x Tax Rate (C-9)1 Coldwater Creek ($0.07/$100) 1,447,686 1,477,498 1,483,563 1,482,672 1,525,934 1,599,600 1,628,300 1,657,000 1,685,700 1,714,400 1,743,1002 Wedgewood ($0.06/$100) 24,457 24,202 25,599 26,383 28,330 33,600 34,700 35,800 36,900 38,000 39,0003 Upper Paddock Creek ($0.06/$100) 17,971 19,156 18,714 18,760 20,831 21,300 21,500 21,700 21,900 22,000 22,2004 Paddock Creek ($0.06/$100) 80,340 81,146 82,484 82,536 92,257 93,400 94,300 95,200 96,100 97,000 97,9005 Fountain Creek ($0.10/$100) 112,274 114,330 115,371 117,383 131,107 134,400 135,100 135,800 136,500 137,200 137,9006 Maline Creek ($0.07/$100) 411,292 419,525 417,656 430,655 445,722 469,100 471,200 473,300 475,400 477,500 479,6007 Black Jack-Dellwood ($0.06/$100) 135,111 134,462 136,195 141,060 146,409 150,100 151,000 151,900 152,800 153,700 154,6008 Watkins Creek ($0.06/$100) 93,229 87,627 89,305 91,981 94,877 95,100 95,700 96,300 96,900 97,500 98,1009 Sugar Creek Reservoir ($0.063/$100) 166,685 174,676 191,957 203,621 216,404 238,900 251,700 264,600 277,500 290,400 303,20010 Deer Creek ($0.06/$100) 1,854,961 1,847,565 1,937,889 1,977,280 2,101,960 2,232,200 2,304,200 2,376,200 2,448,200 2,520,200 2,592,20011 Clayton Central ($0.06/$100) 187,547 197,406 198,150 202,957 184,064 212,900 220,100 227,300 234,500 241,700 248,90012 Creve Coeur/Frontenac ($0.05/$100) 232,613 223,561 236,262 247,669 252,882 265,000 274,500 284,000 293,500 303,000 312,50013 Black Creek ($0.06/$100) 722,550 729,123 762,953 770,930 788,464 873,300 900,300 927,300 954,300 981,300 1,008,30014 University City RDP ($0.07/$100) 580,324 579,846 603,599 618,579 651,082 676,600 692,700 708,800 724,900 741,000 757,10015 Gravois Creek ($0.06/$100) 825,786 834,842 872,601 885,859 958,305 1,007,600 1,037,600 1,067,600 1,097,600 1,127,600 1,157,60016 Loretta-Joplin ($0.06/$100) 12,511 12,491 12,946 13,733 15,337 15,000 15,200 15,400 15,600 15,700 15,90017 N. Affton Area ($0.06/$100) 36,799 36,654 38,531 39,296 43,800 44,000 45,200 46,400 47,600 48,800 50,00018 Wellston ($0.08/$100) 36,272 34,758 35,158 35,984 35,677 36,700 35,600 34,600 33,600 32,500 31,50019 Seminary Branch-RDP ($0.06/$100) 156,255 155,235 169,981 165,118 183,575 185,700 190,800 195,900 201,000 206,100 211,20020 Marlborough ($0.04/$100) 21,485 21,312 22,313 21,680 24,025 24,600 25,000 25,400 25,900 26,300 26,80021 Shrewsbury-RDP ($0.06/$100) 13,913 13,621 14,071 15,138 16,893 17,100 17,500 17,900 18,400 18,800 19,200________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ 22 Total 7,170,061 7,219,036 7,465,298 7,589,274 7,957,935 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,800ALT III - MSD Rate Change Notice 1/18/08 Table 4-4Comparison of Projected Stormwater Revenue Under ExistingRates and Taxes With Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$Stormwater OperationsStormwater User Charge Revenue1 Flat Rate 1,237,600 1,234,700 1,231,500 1,228,100 1,224,700 1,221,500Ad Valorem Taxes2 Administration 4,787,400 4,914,900 5,042,400 5,169,900 5,297,400 5,424,9003 Stormwater 7,568,100 7,755,900 7,943,700 8,131,500 8,319,300 8,507,1004 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9005 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,1006 Wastewater Support 19,223,100 10,799,000 8,252,300 4,403,000 0 0_________ _________ _________ _________ _________ _________ 7 Total Stormwater Operating Revenue 33,572,400 25,617,600 23,686,100 20,200,300 16,154,600 16,541,5008 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,2009 Capital Outlay 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,00010 Cash Financing of Basic Services (a) 2,000,000 1,000,000 3,500,000 3,500,000 3,600,000 3,800,00011 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,700_________ _________ _________ _________ _________ _________ 12 Total Revenue Requirements - Basic Service 33,383,200 35,323,600 40,237,800 48,489,000 50,481,100 53,632,90013 Net Annual Balance 189,200 (9,706,000) (16,551,700) (28,288,700) (34,326,500) (37,091,400)14 Beginning of Year Balance 0 189,200 (9,516,800) (26,068,500) (54,357,200) (88,683,700)15 End of Year Balance 189,200 (9,516,800) (26,068,500) (54,357,200) (88,683,700) (125,775,100)OMCI Fund16 OMCI Revenue Under Existing Rates 8,426,200 8,642,200 8,858,400 9,074,800 9,290,700 9,506,80017 Interest Income 1,263,600 1,144,600 1,053,000 1,083,600 1,235,600 1,438,50018 Less: OMCI Existing Major Improvements (a) 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,00019 Net Annual Balance (3,976,200) (2,826,200) (2,409,600) 4,158,400 4,526,300 7,070,30020 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 28,880,190 33,038,590 37,564,89021 End of Year Balance 34,115,990 31,289,790 28,880,190 33,038,590 37,564,890 44,635,190(a) Items are considered a component of the District's Capital Improvement and Replacement Program for 2007 and 2008.ALT III - MSD Rate Change Notice 1/18/08 Table 4-5 Projected Stormwater Impervious Billable Area (a) Line Projected No. Customer Class 2007 2008 2009 2010 2011 2012_____ _____________ ________ ________ ________ ________ ________ ________ 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. 100 sq. ft. City Single Family 1 General 1,235,600 1,250,500 1,264,000 1,277,100 1,289,900 1,302,300 2 Low Income 25,000 52,700 83,700 115,200 147,300 180,000 3 Low Income - Credit (12,500) (26,350) (41,850) (57,600) (73,650) (90,000) Multi Family 4 General 754,500 753,600 752,700 751,700 750,800 749,800 5 Low Income 1,000 1,000 1,000 1,000 1,000 1,000 6 Low Income - Credit (500) (500) (500) (500) (500) (500) 7 Commercial 2,641,800 2,644,500 2,647,100 2,649,800 2,652,400 2,655,000 8 Industrial 701,700 701,700 701,700 701,700 701,700 701,700 9 Anheuser-Busch 69,600 69,600 69,600 69,600 69,600 69,600 10 Tax Exempt (b) 56,500 56,500 56,500 56,500 56,500 56,500 _________ _________ _________ _________ _________ _________ 11 Total 5,472,700 5,503,250 5,533,950 5,564,500 5,595,050 5,625,400 County Single Family 12 General 8,563,500 8,601,800 8,630,800 8,658,400 8,684,500 8,709,100 13 Low Income 36,100 86,800 142,900 199,600 256,900 314,900 14 Low Income - Credit (18,100) (43,400) (71,500) (99,800) (128,500) (157,500) Multi Family 15 General 1,209,800 1,217,100 1,224,300 1,231,400 1,238,400 1,245,300 16 Low Income 100 100 100 100 100 100 17 Low Income - Credit (50) (50) (50) (50) (50) (50) 18 Commercial 3,596,600 3,703,400 3,809,900 3,916,100 4,022,100 4,127,700 19 Industrial 1,522,100 1,531,800 1,541,500 1,551,300 1,561,000 1,570,700 20 Anheuser-Busch 8,000 8,000 8,000 8,000 8,000 8,000 21 Tax Exempt (b) 3,613,100 3,636,900 3,660,600 3,684,300 3,707,900 3,731,400 _________ _________ _________ _________ _________ _________ 22 Total 18,531,150 18,742,450 18,946,550 19,149,350 19,350,350 19,549,650 _________ _________ _________ _________ _________ _________ 23 Total Impervious Area 24,003,850 24,245,700 24,480,500 24,713,850 24,945,400 25,175,050 24 Levee Districts - Credit (c) (875,800) (875,800) (875,800) (875,800) (875,800) (875,800) _________ _________ _________ _________ _________ _________ 25 Billable Impervious Area 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,250 (a) The impervious area shown in this table is impervious area billed, not actual impervious area. (b) (c) The Tax Exempt customer class consists of churches, schools and government organizations that, under existing stormwater funding structure, do not pay ad valorem based taxes. Per the Intergovernment Cooperation Agreement, the Levee Districts will be billed at five percent of the basic services stormwater user charge. Therfore, 95 percent of their impervious area must be subtracted from total impervious area for user charge calculation purposes. ALT III - MSD Rate Change Notice 1/18/08 Table 4-6Calculation and Projection of Stormwater Impervious Rates and RevenueLineNo. 2007 2008 2009 2010 2011 2012 2013 2014____ ________ ________ ________ ________ ________ ________ ________ ________$$$$$$$$1 Total Revenue Requirements - Basic Services 33,383,200 35,323,600 40,237,800 48,489,000 50,481,100 53,632,900 55,823,000 57,505,3002 Total Revenue Requirements - Enhanced Services 0 0 0 2,500,000 4,329,700 14,539,800 19,689,400 22,000,0003 Less: Flat Rate Revenue (a) (1,237,600) (823,100)0000004 Less: Ad Valorem Administration Tax (b) (4,787,400) (4,914,900)0000005 Less: Ad Valorem Stormwater Tax (b) (7,568,100) (7,755,900)0000006 Less: Other Revenue (756,200) (913,100) (1,185,800) (1,186,900) (1,188,100) (1,216,900) (1,246,100) (1,275,700)7 Less: Interest Income - Reserve Funds 0 0 (30,400) (80,900) (125,100) (171,100) (268,500) (350,400)8 Plus: Stormwater Policy Credit (c) 550,000 1,027,000 1,308,000 1,408,000 1,757,000 1,947,000 2,049,0009 Plus: Bad Debt Provisions (c) 189,200 550,000 1,027,000 1,308,000 1,408,000 1,757,000 1,947,000 2,049,000_________ _________ _________ _________ _________ _________ _________ _________ 10 Net Cost to be met from Charges 19,223,100 22,016,600 41,075,600 52,337,200 56,313,600 70,298,700 77,891,800 81,977,20011 Basic Services 19,223,100 22,016,600 41,075,600 49,705,600 51,756,000 54,993,600 57,166,100 58,819,30012 Enhanced Services 0 0 0 2,631,600 4,557,600 15,305,100 20,725,700 23,157,900Projected Billable Impervious Area - 100 sq. ft.13 Basic Services 23,128,050 23,369,900 23,604,700 23,838,050 24,069,600 24,299,250 24,071,250 24,000,00014 Enhanced Services 23,081,950 23,323,800 23,558,600 23,791,950 24,023,500 24,253,150 24,025,150 23,953,900Projected annual stormwater service charge (d) - $/100 sq. ft.15 Basic Services 0.0000 1.4400 1.6800 1.8400 2.4400 2.3200 2.4600 2.580016 Enhanced Services 0.0000 0.0000 0.0000 0.2000 0.2000 0.8000 0.9000 0.9000______ ______ ______ ______ ______ ______ ______ ______ 17 Total Charge 0.0000 1.4400 1.6800 2.0400 2.6400 3.1200 3.3600 3.480018 Stormwater Service Charge Revenue 0 11,217,600 36,823,300 44,334,200 56,313,600 69,958,800 77,951,700 82,038,50019 Indicated Wastewater Support Requirement 19,223,100 10,799,000 8,252,300 4,403,00000000.1200 0.1400 0.1700 0.2200 0.260000(a) Flat Rate Charge anticipates 8 month of revenue and is intended to be phased out by March 2008.(b) Ad Valorem Taxes are expected to be phased out by March 2008.(c) Based on 2.5% of annual Stormwater revenue.(d) 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue 2,008source will replace revenues now derived from the flat rate user charges and ad valorem taxes. 4 2,008ALT III - MSD Rate Change Notice 1/18/08 Table 4-7Projected Stormwater OMCI RevenueUnder Projected Rates and TaxesLineNo. Customer Class 2007 2008 2009 2010 2011 2012____ ________________________________________ ________ ________ ________ ________ ________ ________$$$$$$Tax per Schedule Tax Rate $0.00 per $100 Assessed Value_____________________ ________________________________________1 Coldwater Creek ($0.07/$100) 1,599,600 1,628,3002 Wedgewood ($0.06/$100) 33,600 34,7003 Upper Paddock Creek ($0.06/$100) 21,300 21,5004 Paddock Creek ($0.06/$100) 93,400 94,3005 Fountain Creek ($0.10/$100) 134,400 135,100________ ________ ________ ________ ________ ________ 6 Coldwater Creek Watershed 1,882,300 1,913,90000007 Maline Creek ($0.07/$100) 469,100 471,2008 Black Jack-Dellwood ($0.06/$100) 150,100 151,0009 Watkins Creek ($0.06/$100) 95,100 95,700________ ________ ________ ________ ________ ________ 10 Bissell Point Watershed 714,300 717,900000011 Sugar Creek Reservoir ($0.063/$100) 238,900 251,700________ ________ ________ ________ ________ ________ 12 Lower Meramec Watershed (a) 238,900 251,700000013 Deer Creek ($0.06/$100) 2,232,200 2,304,20014 Clayton Central ($0.06/$100) 212,900 220,10015 Creve Coeur/Frontenac ($0.05/$100) 265,000 274,50016 Black Creek ($0.06/$100) 873,300 900,30017 University City RDP ($0.07/$100) 676,600 692,70018 Gravois Creek ($0.06/$100) 1,007,600 1,037,60019 Loretta-Joplin ($0.06/$100) 15,000 15,20020 N. Affton Area ($0.06/$100) 44,000 45,20021 Wellston ($0.08/$100) 36,700 35,60022 Seminary Branch-RDP ($0.06/$100) 185,700 190,80023 Marlborough ($0.04/$100) 24,600 25,00024 Shrewsbury-RDP ($0.06/$100) 17,100 17,500________ ________ ________ ________ ________ ________ 25 River Des Peres Watershed 5,590,700 5,758,700000026 Missouri River Watershed (b)0000_________ _________ _________ _________ _________ _________ 27 Total 8,426,200 8,642,2000000(a) Includes the Meramec River Basin subdistrict in 2009 and subsequent years.(b) Includes the Missouri River-Bonfils subdistrict in 2009 and subsequent years.ALT III - MSD Rate Change Notice 1/18/08 Table 4-8 Comparison of Projected Stormwater Revenue Under Proposed Rates and Taxes Projected Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012 2013 2014____ _______ _______ _______ _______ _______ _______ _______ _______ $$$$$$$$ Stormwater Operations Stormwater User Charge Revenue 1 Flat Rate (a) 1,237,600 823,100 000000 2 Impervious Area Charges (a) 0 11,217,600 36,823,300 44,334,200 56,313,600 69,958,800 77,951,700 82,038,500 Ad Valorem Taxes (b) 3 Administration 4,787,400 4,914,900 000000 4 Stormwater 7,568,100 7,755,900 000000 5 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,900 1,246,100 1,275,700 6 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,100 268,500 350,400 7 Wastewater Support 19,223,100 10,799,000 8,252,300 4,403,000 0 0 0 0_________ _________ _________ _________ _________ _________ _________ _________ 8 Total Stormwater Operating Revenue 33,572,400 36,423,600 46,291,800 50,005,000 57,626,800 71,346,800 79,466,300 83,664,600 9 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,200 47,259,400 48,995,900 10 Capital Outlay 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,000 3,247,500 3,344,800 11 Cash Financing of Basic Services 2,000,000 1,000,000 3,500,000 3,500,000 3,600,000 3,800,000 4,200,000 4,000,000 12 Cash Financing of Enhanced Services 0 0 0 2,500,000 4,329,700 14,539,800 19,689,400 22,000,000 13 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,700 1,116,100 1,164,600 14 Stormwater Policy Credit (c) 0 550,000 1,027,000 1,308,000 1,408,000 1,757,000 1,947,000 2,049,000 15 Bad Debt Provision (c) 189,200 550,000 1,027,000 1,308,000 1,408,000 1,757,000 1,947,000 2,049,000_________ _________ _________ _________ _________ _________ _________ _________ 16 Total Revenue Requirements 33,572,400 36,423,600 42,291,800 53,605,000 57,626,800 71,686,700 79,406,400 83,603,300 17 Net Stormwater Operations Annual Balance 0 0 4,000,000 (3,600,000) 0 (339,900) 59,900 61,300 18 Beginning of Year Balance 0 0 0 4,000,000 400,000 400,000 60,100 120,000 19 End of Year Balance 0 0 4,000,000 400,000 400,000 60,100 120,000 181,300 OMCI Fund 20 OMCI Revenue Under Proposed Rates 8,426,200 8,642,200 000000 21 Interest Income 1,263,600 1,144,600 895,200 600,800 408,400 247,100 91,800 0 22 Less: OMCI Existing Major Improvements (d 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 5,337,090 0 23 Less: OMCI Reconfigured Enhanced Service 00000000 24 Net OMCI Fund Annual Balance (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) (5,245,290) 0 25 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 0 26 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 0 0 (a) (b) Ad Valorem Taxes are expected to be phased out by March 2008. (c) Based on 2.5% of annual Stormwater revenue. (d) Represents the use of current subdistrict revenue until total depletion, at which time reconfigured subdistrict revenues will replenish. 2008 Impervious Area Charges anticipate 4 months of revenue and are intended to be in effect March 2008. This new revenue source will replace revenues now derived from the flat rate user charges and ad valorem taxes. ALT III - MSD Rate Change Notice 1/18/08 Table 5-1Wastewater Revenue with Projected RatesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$1 Service Charge Revenue 195,104,100 207,876,300 218,913,400 223,146,000 232,563,600 242,028,7002 Other Operating Revenue 4,673,300 4,922,900 5,276,600 5,280,400 5,284,100 5,324,7003 Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,0004 Interest Income - Reserve Funds 2,493,500 2,773,000 2,876,700 2,981,900 3,186,600 3,553,8005 Interest Income - Operations 198,700 81,300 91,000 92,900 93,700 95,0006 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 7 Total Revenue 208,374,600 221,582,600 233,109,900 237,476,500 247,125,300 257,021,500ALT III - MSD Rate Change Notice 1/18/08 Table 5-2Stormwater Revenue with Projected Rates and TaxesLineNo. 2007 2008 2009 2010 2011 2012____ ________ ________ ________ ________ ________ ________$$$$$$Stormwater User Charge Revenue1 Flat Rate 1,237,600 823,10000002 Impervious Area Charges 0 11,217,600 36,823,300 44,334,200 56,313,600 69,958,800Ad Valorem Taxes3 Administration 4,787,400 4,914,90000004 Stormwater 7,568,100 7,755,90000005 OMCI Taxes 8,426,200 8,642,20000006 Other Revenue 756,200 913,100 1,185,800 1,186,900 1,188,100 1,216,9007 Interest Income - Reserve Funds 0 0 30,400 80,900 125,100 171,1008 Wastewater Support 19,223,100 10,799,000 8,252,300 4,403,000 0 09 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100_________ _________ _________ _________ _________ _________ 10 Total Stormwater Revenue 43,262,200 46,210,400 47,187,000 50,605,800 58,035,200 71,593,900ALT III - MSD Rate Change Notice 1/18/08 Table 5-3Wastewater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 104,784,300 110,913,400 114,654,700 119,058,500 123,379,800 127,593,5002 Routine Annual Improvements 6,148,800 6,394,600 6,536,500 2,619,600 2,698,200 2,779,1003 Debt Service 22,946,300 26,842,700 31,700,100 35,827,200 41,741,800 49,961,0004 Cash Financing of Major Improvements 60,100,000 64,846,000 71,892,000 75,539,000 79,286,000 76,634,0005 Addition to Operating Reserve 2,366,700 1,302,50000006 Stormwater Support 19,223,100 10,799,000 8,252,300 4,403,000 0 0__________ __________ __________ __________ __________ __________ 7 Total Revenue Requirements 215,569,200 221,098,200 233,035,600 237,447,300 247,105,800 256,967,600ALT III - MSD Rate Change Notice 1/18/08 Table 5-4Stormwater Projected Revenue RequirementsLineNo. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______$$$$$$1 Operation and Maintenance Expense 29,681,800 32,163,300 33,008,300 41,017,200 42,608,700 45,590,2002 Routine Annual Improvements 1,701,400 2,160,300 2,207,100 2,972,200 3,061,300 3,153,0003 Cash Financing of Basic Services 2,000,000 1,000,000 3,500,000 3,500,000 3,600,000 3,800,0004 Cash Financing of Enhanced Services 0 0 0 2,500,000 4,329,700 14,539,8004 Additions to Operating Reserve 0 0 1,522,400 999,600 1,211,100 1,089,7005 Stormwater Policy Credit 0 550,000 1,027,000 1,308,000 1,408,000 1,757,0006 Bad Debt Provisions 189,200 550,000 1,027,000 1,308,000 1,408,000 1,757,0007 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,0008 OMCI Reconfigured Enhanced Services 0 0 0 0 0 0_________ _________ _________ _________ _________ _________ 9 Total Revenue Requirements 47,238,400 49,036,600 54,612,800 59,605,000 63,626,800 75,561,700ALT III - MSD Rate Change Notice 1/18/08 Table 5-5 Wastewater and Stormwater Revenue with Projected Rates and Taxes and Revenue Requirements Line No. 2007 2008 2009 2010 2011 2012____ _______ _______ _______ _______ _______ _______ $$$$$$ Wastewater & Stormwater Operations Revenue 1 Wastewater Service Charge Revenue 195,104,100 207,876,300 218,913,400 223,146,000 232,563,600 242,028,700 2 Wastewater Connection Fee Revenue 4,600,000 4,646,000 4,692,000 4,739,000 4,786,000 4,834,000 Stormwater User Charge Revenue 3 Flat Rate 1,237,600 823,100 0000 4 Impervious Area Charges 0 11,217,600 36,823,300 44,334,200 56,313,600 69,958,800 Ad Valorem Taxes 5 Administration 4,787,400 4,914,900 0000 6 Stormwater 7,568,100 7,755,900 0000 7 Other Revenue 5,429,500 5,836,000 6,462,400 6,467,300 6,472,200 6,541,600 8 Interest Income - Reserve Funds 2,493,500 2,773,000 2,907,100 3,062,800 3,311,700 3,724,900 9 Interest Income - Operations 198,700 81,300 91,000 92,900 93,700 95,000 10 Interest Income - Arnold 1,305,000 1,283,100 1,260,200 1,236,300 1,211,300 1,185,300__________ __________ __________ __________ __________ __________ 11 Total Revenue 222,723,900 247,207,200 271,149,400 283,078,500 304,752,100 328,368,300 Revenue Requirements 12 Operation and Maintenance Expense 134,466,100 143,076,700 147,663,000 160,075,700 165,988,500 173,183,700 13 Routine Annual Improvements 7,850,200 8,554,900 8,743,600 5,591,800 5,759,500 5,932,100 14 Debt Service 22,946,300 26,842,700 31,700,100 35,827,200 41,741,800 49,961,000 15 Cash Financing of Major Improvements 62,100,000 65,846,000 75,392,000 81,539,000 87,215,700 94,973,800 16 Additions to Operating Reserve 2,366,700 1,302,500 1,522,400 999,600 1,211,100 1,089,700 17 Stormwater Policy Credit 0 550,000 1,027,000 1,308,000 1,408,000 1,757,000 18 Bad Debt Provisions 189,200 550,000 1,027,000 1,308,000 1,408,000 1,757,000__________ __________ __________ __________ __________ __________ 19 Total Revenue Requirements 229,918,500 246,722,800 267,075,100 286,649,300 304,732,600 328,654,300 20 Surplus (Deficit) Revenue (7,194,600) 484,400 4,074,300 (3,570,800) 19,500 (286,000) 21 Surplus (Deficit) Stormwater Revenue 0 0 4,000,000 (3,600,000) 0 (339,900) 22 Beginning of Year Balance 0 0 0 4,000,000 400,000 400,000 23 End of Year Balance 0 0 4,000,000 400,000 400,000 60,100 24 Surplus (Deficit) Wastewater Revenue (7,194,600) 484,400 74,300 29,200 19,500 53,900 25 Beginning of Year Balance 9,274,400 2,079,800 2,564,200 2,638,500 2,667,700 2,687,200 26 End of Year Balance 2,079,800 2,564,200 2,638,500 2,667,700 2,687,200 2,741,100 Stormwater OMCI Fund 27 OMCI Taxes 8,426,200 8,642,200 0000 28 Interest Income - OMCI 1,263,600 1,144,600 895,200 600,800 408,400 247,100 29 OMCI Existing Major Improvements 13,666,000 12,613,000 12,321,000 6,000,000 6,000,000 3,875,000 30 OMCI Reconfigured Enhanced Services 000000 31 Surplus (Deficit) Stormwater OMCI Fund (3,976,200) (2,826,200) (11,425,800) (5,399,200) (5,591,600) (3,627,900) 32 Beginning of Year Balance 38,092,190 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 33 End of Year Balance 34,115,990 31,289,790 19,863,990 14,464,790 8,873,190 5,245,290 ALT III - MSD Rate Change Notice 1/18/08 Table 5-6aDistribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,892,500 89,842,700 14,287,752 104,130,452 47.5%2 Multifamily 21,675,200 21,742,500 1,085,904 22,828,404 10.4% Non-Residential (a)3 Anheuser-Busch 8,218,100 8,344,000 111,744 8,455,744 3.9%4 All Other 66,116,200 66,272,900 17,675,712 83,948,612 38.3%___________ ___________ ___________ ___________ ______ 5 Total 185,902,000 186,202,100 33,161,112 219,363,212 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.Table 5-6Distribution of Costs/Revenue per Customer ClassTest Year 2008Allocated Cost Revenue Under Revenue UnderLine of Service Proposed Rates Proposed Rates Revenue % ofNo. Customer Class Wastewater Wastewater Stormwater Total Total____ _______________ _________ _________ _________ _________ _________$$$$1 Single Family 89,892,500 89,842,700 14,287,752 104,130,452 47.5%2 Multifamily 21,675,200 21,742,500 1,085,904 22,828,404 10.4%3 Non-Residential (a) 74,334,300 74,616,900 17,787,456 92,404,356 42.1%___________ ___________ ___________ ___________ ______ 4 Total 185,902,000 186,202,100 33,161,112 219,363,212 100.0%(a) Includes revenue and allocated cost of service associated with surcharge customers.ALT III - MSD Rate Change Notice 1/18/08 Table 5-7Existing and Proposed Wastewater Rates(Effective July 1, 2005) (Effective December 1, 2007)Metered Metered_____________________ _____________________LineNo.Type of Monthly ChargeUnmetered ResidentialResidentialNon-ResidentialUnmetered ResidentialResidentialNon-Residential____ ____________________ __________ __________ __________ __________ __________ __________$$$1 Billing and Collection Charge 0.85 0.85 0.85 2.30 2.30 2.302 System Availability Charge 7.05 7.05 7.05 8.40 8.40 8.403 Compliance Charge 12.55 27.40Volume Charge4 per Ccf 1.81 1.81 1.88 1.885 per room 1.18 1.236 per water closet 4.42 4.597 per bath 3.69 3.838 per separate shower 3.69 3.83Extra Strength Surcharge - $/ton9 Suspended Solids over 300 mg/l 218.90 218.9010 BOD over 300 mg/l 461.44 529.5611 COD over 600 mg/l 230.72 264.78Ccf - hundred cubic feetmg/l - milligrams per literNote: Rates for qualified low income residential users are 50 percent of the regular rates above.ALT III - MSD Rate Change Notice 1/18/08 Table 5-8Existing and Projected Stormwater Rates and Taxes (a)2007 and 2008Type of Monthly Charge CityOriginal Co. BoundaryCounty Annexed____________________ __________ __________ __________$$$Flat Charge per Monthly Bill 0.24 0.24 0.24Administrative Tax per $100 Assessed Value (b) 0.0186 0.0186 0.0186Stormwater Tax per $100 Assessed Value 0.05 0.05 0.002007 2008 2009 2010 2011 2012 2013 2014_______ _______ _______ _______ _______ _______ _______ _______$$$$$$$$Projected stormwater service charge 0.0000 1.4400 1.6800 2.0400 2.6400 3.1200 3.3600 3.4800per 100 square feet impervious area(annualized rate - billable monthly)Implemented December 1, 2007Projected monthly charge per: 100 square feet of impervious area 0.0000 0.1200 0.1400 0.1700 0.2200 0.2600 0.2800 0.2900 acre of impervious area 0.00 52.27 60.98 74.05 95.83 113.26 121.97 126.320.1200(a)(b) The Administrative Tax has fluctuated between $0.019 per $100 assessed value and $0.02 per $100 assessed value. Revenues have been projected based on $0.0186 per $100 assessed value.The Flat Rate Charge, Administrative Tax and Stormwater Tax are projected to be phased out by December 2007. Revenue derived from the flat rate charge is based on five months of collection. All administrative and stormwater tax revenues due are expected to be collected in fiscal year 2008.ALT III - MSD Rate Change Notice 1/18/08 Table 5-9Typical Monthly Bill Comparison - ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Single Family1 Small 5 City Avg. 15.00 0.1200 50,000 16.95 3.16 20.11 20.10 1.80 21.90County Avg. 25.00 0.1200 100,000 16.95 6.07 23.02 20.10 3.00 23.102 Medium 8 City Avg. 15.00 0.1200 100,000 22.38 6.07 28.45 25.74 1.80 27.54County Avg. 25.00 0.1200 150,000 22.38 8.99 31.37 25.74 3.00 28.743 Medium - 50 Largest Cities 10 City Avg. 15.00 0.1200 150,000 26.00 8.99 34.99 29.50 1.80 31.30County Avg. 25.00 0.1200 200,000 26.00 11.91 37.91 29.50 3.00 32.504 Large 20 City Avg. 15.00 0.1200 200,000 44.10 11.91 56.01 48.30 1.80 50.10County Avg. 25.00 0.1200 250,000 44.10 14.82 58.92 48.30 3.00 51.30Multifamily5 Small 20 13.00 0.1200 200,000 44.10 11.91 56.01 48.30 1.56 49.866 Medium 40 27.00 0.1200 400,000 80.30 23.57 103.87 85.90 3.24 89.147 Large 60 33.00 0.1200 600,000 116.50 35.24 151.74 123.50 3.96 127.46(a) Stormwater Monthly Charge is equal to $52.27 per acre.LineBilled Wastewater Impervious ExistingStormwater MonthlyAverage AssessedExisting WastewaterExisting StormwaterALT III - MSD Rate Change Notice 1/18/08 Table 5-10Typical Monthly Bill Comparison - Non-ResidentialProposed Charges to beEffective December 1, 2007_________________________________No. Customer Class Volume Area Charge (a) Value Bill Fee & Taxes Total Wastewater Stormwater Total____ _____________________________ _________ _________ _________ _________ _________ _________ _________ _________ _________Ccf 100 sq. ft. $/100 sq. ft.$$$$$$$Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 0.1200 147.15 0.24 147.39 169.70 13.56 183.269 Medium 100 Tax Exempt Co. 230 0.1200 201.45 0.24 201.69 226.10 27.60 253.7010 Large 160 City Avg. 268 0.1200 1,000,000 310.05 58.57 368.62 338.90 32.16 371.06County Avg. 437 0.1200 2,000,000 310.05 116.91 426.96 338.90 52.44 391.34Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 0.1200 169.44 0.24 169.68 194.22 13.56 207.7812 Average 100 Tax Exempt Co. 230 0.1200 233.29 0.24 233.53 261.13 27.60 288.7313 Large 160 City Avg. 268 0.1200 1,000,000 360.99 58.57 419.56 394.94 32.16 427.10County Avg. 437 0.1200 2,000,000 360.99 116.91 477.90 394.94 52.44 447.38(a) Stormwater Monthly Charge is equal to $52.27 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.ExistingImpervious LineAverage AssessedBilled WastewaterExisting WastewaterExisting StormwaterStormwater MonthlyALT III - MSD Rate Change Notice 1/18/08 Table 5-11Typical Monthly Bill ComparisonBilled Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to be Proposed Charges to beWastewater Effective July 1, 2008 Effective July 1, 2009 Effective July 1, 2010 Effective July 1, 2011 Effective July 1, 2012 Effective July 1, 2013____________________ ____________________ ____________________ ____________________ ____________________ ____________________No. Customer Class Volume Area WW SW Total WW SW Total WW SW Total WW SW Total WW SW Total WW SW Total____ _______________________ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______Ccf 100 sq. ft.$$$$$$$$$$$$$$$$$$Single Family1 Small 5 City Avg. 15.00 20.10 2.10 22.20 20.50 2.55 23.05 21.50 3.30 24.80 22.40 3.90 26.30 25.10 4.20 29.30 28.25 4.35 32.60County Avg. 25.00 20.10 3.50 23.60 20.50 4.25 24.75 21.50 5.50 27.00 22.40 6.50 28.90 25.10 7.00 32.10 28.25 7.25 35.502 Medium 8 City Avg. 15.00 25.74 2.10 27.84 26.26 2.55 28.81 27.56 3.30 30.86 28.73 3.90 32.63 32.21 4.20 36.41 36.26 4.35 40.61County Avg. 25.00 25.74 3.50 29.24 26.26 4.25 30.51 27.56 5.50 33.06 28.73 6.50 35.23 32.21 7.00 39.21 36.26 7.25 43.513 Medium 10 City Avg. 15.00 29.50 2.10 31.60 30.10 2.55 32.65 31.60 3.30 34.90 32.95 3.90 36.85 36.95 4.20 41.15 41.60 4.35 45.95County Avg. 25.00 29.50 3.50 33.00 30.10 4.25 34.35 31.60 5.50 37.10 32.95 6.50 39.45 36.95 7.00 43.95 41.60 7.25 48.854 Large 20 City Avg. 15.00 48.30 2.10 50.40 49.30 2.55 51.85 51.80 3.30 55.10 54.05 3.90 57.95 60.65 4.20 64.85 68.30 4.35 72.65County Avg. 25.00 48.30 3.50 51.80 49.30 4.25 53.55 51.80 5.50 57.30 54.05 6.50 60.55 60.65 7.00 67.65 68.30 7.25 75.55Multifamily5 Small 20 13.00 48.30 1.82 50.12 49.30 2.21 51.51 51.80 2.86 54.66 54.05 3.38 57.43 60.65 3.64 64.29 68.30 3.77 72.076 Medium 40 27.00 85.90 3.78 89.68 87.70 4.59 92.29 92.20 5.94 98.14 96.25 7.02 103.27 108.05 7.56 115.61 121.70 7.83 129.537 Large 60 33.00 123.50 4.62 128.12 126.10 5.61 131.71 132.60 7.26 139.86 138.45 8.58 147.03 155.45 9.24 164.69 175.10 9.57 184.67Non-Residential - Normal Strength8 Small 70 Tax Exempt City 113 169.70 15.82 185.52 174.95 19.21 194.16 183.65 24.86 208.51 191.50 29.38 220.88 212.35 31.64 243.99 236.25 32.77 269.029 Medium 100 Tax Exempt Co. 230 226.10 32.20 258.30 232.55 39.10 271.65 244.25 50.60 294.85 254.80 59.80 314.60 283.45 64.40 347.85 316.35 66.70 383.0510 Large 160 City Avg. 268 338.90 37.52 376.42 347.75 45.56 393.31 365.45 58.96 424.41 381.40 69.68 451.08 425.65 75.04 500.69 476.55 77.72 554.27County Avg. 437 338.90 61.18 400.08 347.75 74.29 422.04 365.45 96.14 461.59 381.40 113.62 495.02 425.65 122.36 548.01 476.55 126.73 603.28Non-Residential - Excess Strength (b)11 Small 70 Tax Exempt City 113 194.22 15.82 210.04 200.19 19.21 219.40 210.49 24.86 235.35 219.39 29.38 248.77 242.84 31.64 274.48 269.06 32.77 301.8312 Average 100 Tax Exempt Co. 230 261.13 32.20 293.33 268.61 39.10 307.71 282.60 50.60 333.20 294.65 59.80 354.45 327.01 64.40 391.41 363.22 66.70 429.9213 Large 160 City Avg. 268 394.94 37.52 432.46 405.44 45.56 451.00 426.80 58.96 485.76 445.16 69.68 514.84 495.35 75.04 570.39 551.55 77.72 629.27County Avg. 437 394.94 61.18 456.12 405.44 74.29 479.73 426.80 96.14 522.94 445.16 113.62 558.78 495.35 122.36 617.71 551.55 126.73 678.28WW - Wastewater; SW - Stormwater(a) Stormwater Monthly Charge is equal to $52.27 per acre.(b) Assumes suspended solids excess strength of 150 mg/l and biochemical oxygen demand excess strength of 150 mg/l.Line Imp. ALT III - MSD Rate Change Notice 1/18/08