ORDAINED by the Council of the Town of Leesburg, Virginia as follows:
SECTION I. Sections 15-12, 15-13, 19-21 and 19-22 of the Town Code are
amended to read as follows:
Sec. 15-12. Fee for sewer connection--within corporate limits.
Before any person connects with or discharges sewage into the sewer
system, a fee for the connection permit issued under Sec. 15-10 of the
Code shall be paid in amounts provided below:
(a) The fee for a 4-inch diameter connection within the town where
the town provides all materials, equipment and labor for installation
of a sewer connection shall be $300.00.
(b) The fee for a 4-inch diameter connection within the town where
a developer or subdivider provides all materials, equipment and
labor for installation of a sewer connection shall be $50.00.
(c) The fee for any connection to the town sewer system larger than
4-inches diameter inside the town where the town provides all
materials, equipment and labor shall be $50.00 plus the cost of
materials, equipment and labor for installation of the sewer
connection.
(d) Connection permit fees shall be paid prior to the issuance of a
zoning permit.
Sec. 15-13. Fee for sewer connection--without corporate limits.
Before any person connects with or discharges sewage into the town sewer
system, a fee for the connection permit issued under Sec. 15-10 of the Code
shall be paid in the amounts provided below:
(a) The fee for a 4-inch diameter connection outside the town where the
town provides all materials, equipment and labor for installation
of a sewer connection shall be $450.00.
(b) The fee for a 4-inch diameter connection outside the town where a
developer or subdivider provides all materials, equipment and labor
for installation of a sewer connection shall be $75.00.
(c) The fee for any connection larger than 4-inches diameter outside
the town where the town provides all materials, equipment and labor
shall be $75.00 plus 1.5 times the cost of materials, equipment and
labor for installation of the sewer connection.
-2-
(d) Connection permit fees shall be paid prior to issuance of a
zoning permit.
Sec. 19-21. Connection fee--within corporate limits.
Before any person connects with or withdraws water from the town water
system, a fee for the connection permit issued under Sec. 19-19 of the Code
shall be paid in amounts provided below:
(a) The fee for a 3/4-inch diamet'er connection within the town where
the town provides all materials, equipment and labor for installa-
tion of a water connection shall be $300.00.
(b) The fee for a 3/4-inch diameter connection within the town where
a developer or subdivider provides all materials except the meter,
meter box, lid and setting, all equipment and labor for installation
of a water connection shall be $150.00.
(c) The fee for any connection larger than 3/4-inch diameter inside
the town where the town provides all materials, equipment and labor
shall be $50.00 plus the cost of all materials, equipment and labor
for installation of the water connection.
(d) Connection permit fees shall be paid prior to the issuance of a
zoning permit.
Sec. 19-22. Connection fee--without corporate limits.
Before any person connects with or withdraws water from the town water
system, a fee for the connection permit issued under Sec. 19-19 of the Code
shall be paid in amounts provided below:
(a) The fee for a 3/4-inch diameter connection outside the town where
the town provides all materials, equipment and labor for installa-
tion of a water connection shall be $450.00.
(b) The fee for a 3/4-inch diameter connection outside the town where
a developer or subdivider provides all materials except the meter,
meter box, lid and setting, all equipment and labor for installation
of a water connection shall be $225.00.
(c) The fee for any connection larger than 3/4-inch diameter outside the
town where the town provides all materials, equipment and labor
shall be $75.00 plus 1.5 times the cost of materials, equipment and
labor for installation of the water connection.
(d) Connection permit fees shall be paid prior to the issuance of a
zoning permit.
SECTION II. This ordinance shall be effective upon its passage.