Loading...
HomeMy Public PortalAbout1978_07_26_O020ORDINANCE NO. 78-0-20 AN ORDINANCE: TOWN OF LEESBURG IN LOUDOUN COUNTY, VIRGINIA PRESENTED July 26, 1978 ADOPTED July 26, 1978 AMENDING SECTIONS 15-12, 15-13, 19-21 and 19-22 OF THE TOWN CODE. ORDAINED by the Council of the Town of Leesburg, Virginia as follows: SECTION I. Sections 15-12, 15-13, 19-21 and 19-22 of the Town Code are amended to read as follows: Sec. 15-12. Fee for sewer connection--within corporate limits. Before any person connects with or discharges sewage into the sewer system, a fee for the connection permit issued under Sec. 15-10 of the Code shall be paid in amounts provided below: (a) The fee for a 4-inch diameter connection within the town where the town provides all materials, equipment and labor for installation of a sewer connection shall be $300.00. (b) The fee for a 4-inch diameter connection within the town where a developer or subdivider provides all materials, equipment and labor for installation of a sewer connection shall be $50.00. (c) The fee for any connection to the town sewer system larger than 4-inches diameter inside the town where the town provides all materials, equipment and labor shall be $50.00 plus the cost of materials, equipment and labor for installation of the sewer connection. (d) Connection permit fees shall be paid prior to the issuance of a zoning permit. Sec. 15-13. Fee for sewer connection--without corporate limits. Before any person connects with or discharges sewage into the town sewer system, a fee for the connection permit issued under Sec. 15-10 of the Code shall be paid in the amounts provided below: (a) The fee for a 4-inch diameter connection outside the town where the town provides all materials, equipment and labor for installation of a sewer connection shall be $450.00. (b) The fee for a 4-inch diameter connection outside the town where a developer or subdivider provides all materials, equipment and labor for installation of a sewer connection shall be $75.00. (c) The fee for any connection larger than 4-inches diameter outside the town where the town provides all materials, equipment and labor shall be $75.00 plus 1.5 times the cost of materials, equipment and labor for installation of the sewer connection. -2- (d) Connection permit fees shall be paid prior to issuance of a zoning permit. Sec. 19-21. Connection fee--within corporate limits. Before any person connects with or withdraws water from the town water system, a fee for the connection permit issued under Sec. 19-19 of the Code shall be paid in amounts provided below: (a) The fee for a 3/4-inch diamet'er connection within the town where the town provides all materials, equipment and labor for installa- tion of a water connection shall be $300.00. (b) The fee for a 3/4-inch diameter connection within the town where a developer or subdivider provides all materials except the meter, meter box, lid and setting, all equipment and labor for installation of a water connection shall be $150.00. (c) The fee for any connection larger than 3/4-inch diameter inside the town where the town provides all materials, equipment and labor shall be $50.00 plus the cost of all materials, equipment and labor for installation of the water connection. (d) Connection permit fees shall be paid prior to the issuance of a zoning permit. Sec. 19-22. Connection fee--without corporate limits. Before any person connects with or withdraws water from the town water system, a fee for the connection permit issued under Sec. 19-19 of the Code shall be paid in amounts provided below: (a) The fee for a 3/4-inch diameter connection outside the town where the town provides all materials, equipment and labor for installa- tion of a water connection shall be $450.00. (b) The fee for a 3/4-inch diameter connection outside the town where a developer or subdivider provides all materials except the meter, meter box, lid and setting, all equipment and labor for installation of a water connection shall be $225.00. (c) The fee for any connection larger than 3/4-inch diameter outside the town where the town provides all materials, equipment and labor shall be $75.00 plus 1.5 times the cost of materials, equipment and labor for installation of the water connection. (d) Connection permit fees shall be paid prior to the issuance of a zoning permit. SECTION II. This ordinance shall be effective upon its passage. PASSED this 26th day of ATTEST: Clerk of Cour~l' -3- July , 1978. Kenneth B. Roll±ns, Mayor Town of Leesburg