HomeMy Public PortalAboutExhibit MSD 43 - CIRP Project Listing FY2017-FY2020Wastewater CIRP Project Listing
FY 2017 to FY 2020
1 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-
09)
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH SANITARY SEWER. ELIMINATE SSO
OUTFALL BP-421, AND FACILITATE FUTURE ELIMINATION OF MULTIPLE UPSTREAM
CONSTRUCTED SSO OUTFALLS (BP-416, BP-417, BP-433, AND BP-476).
4,000,000 FY19 Construction Consent Decree
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-
09)
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH SANITARY SEWER. ELIMINATE SSO
OUTFALL BP-421, AND FACILITATE FUTURE ELIMINATION OF MULTIPLE UPSTREAM
CONSTRUCTED SSO OUTFALLS (BP-416, BP-417, BP-433, AND BP-476).
4,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND
DOUGHERTY FERRY RD)
CONSTRUCT 600 FEET OF 8-INCH SANITARY SEWER, 400 FEET OF 12-INCH STORM SEWER,
AND PERFORM PRIVATE I/I REDUCTION AT 5 PROPERTIES.
171,000 FY17 Design Services Consent Decree
12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND
DOUGHERTY FERRY RD)
CONSTRUCT 600 FEET OF 8-INCH SANITARY SEWER, 400 FEET OF 12-INCH STORM SEWER,
AND PERFORM PRIVATE I/I REDUCTION AT 5 PROPERTIES.
470,000 FY19 Construction Consent Decree
12075 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-
WEBER RD, SEIBERT, AND HAMBURG)
PERFORM PRIVATE I/I REDUCTION AT 161 PROPERTIES.300,000 FY19 Construction Consent Decree
12078 APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I
REDUCTION (LEMAY FERRY RD AND BAYLESS AVE)
CONSTRUCT 800 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
630,000 FY18 Construction Consent Decree
12080 ASHBROOK I/I REDUCTION (ASHBROOK DR AND
CHAMBERS RD)
CONSTRUCT 680 FEET OF 10-INCH SANITARY SEWER, 75 FEET OF 12-INCH STORM SEWER,
AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
240,500 FY17 Construction Consent Decree
13219 BADEN AND MILL CREEK ORS PUMP STATIONS -
PUMP REHABILITATION
REHABILITATE 6 MAJOR PUMPS.4,500,000 FY20 Construction Consent Decree
13232 BADEN CITYSHED MITIGATION BASINS (CALVARY,
FREDERIK, PARTRIDGE AND TILLIE)
CONSTRUCT 4 STORMWATER DETENTION BASINS, AND 3 RAIN GARDENS.19,750,000 FY20 Construction Consent Decree
11777 BADEN CREEK EXTENSION (BP-001) - I/I REDUCTION CONSTRUCT 4,860 FEET OF 12-INCH TO 18-INCH STORM SEWER, REMOVE PRIVATE I/I 2,450,000 FY17 Construction Consent Decree
11682 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.140,000 FY17 Construction, Phase II Consent Decree
12092 BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS
RD TO COBURG LANDS DR)
CONSTRUCT 3,340 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-287.
325,000 FY18 Design Services Consent Decree
12092 BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS
RD TO COBURG LANDS DR)
CONSTRUCT 3,340 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-287.
1,435,000 FY20 Construction Consent Decree
12023 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT A
REHABILITATE 55,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
2,850,000 FY17 Construction Consent Decree
12024 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT B
REHABILITATE 56,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
3,000,000 FY17 Construction Consent Decree
12025 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT C
REHABILITATE 45,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
1,560,000 FY17 Construction Consent Decree
12617 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT F
REHABILITATE 44,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
4,000,000 FY17 Construction Consent Decree
12029 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT A
REHABILITATE 97,115 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
81,000 FY18 Design Services Consent Decree
12029 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT A
REHABILITATE 97,115 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
8,900,000 FY19 Construction Consent Decree
12026 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT C
REHABILITATE 76,025 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
88,000 FY18 Design Services Consent Decree
12026 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT C
REHABILITATE 76,025 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
4,100,000 FY19 Construction Consent Decree
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT A
REHABILITATE 54,900 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
84,000 FY19 Design Services Consent Decree
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT A
REHABILITATE 54,900 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
4,967,000 FY20 Construction Consent Decree
Exhibit MSD 43
Wastewater CIRP Project Listing
FY 2017 to FY 2020
2 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT B
REHABILITATE 31,900 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
50,000 FY19 Design Services Consent Decree
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT B
REHABILITATE 31,900 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
3,120,000 FY20 Construction Consent Decree
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT C
REHABILITATE 85,240 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
85,000 FY19 Design Services Consent Decree
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT C
REHABILITATE 85,240 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
7,869,000 FY20 Construction Consent Decree
12508 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE
METHOD, TO REDUCE PUBLIC I/I.
142,000 FY20 Design Services Consent Decree
12509 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT B
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE
METHOD, TO REDUCE PUBLIC I/I.
85,000 FY20 Design Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
787,000 FY17 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
634,000 FY18 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
800,000 FY18 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
617,000 FY19 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
65,000 FY19 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS TO MEET CONSENT DECREE REQUIREMENTS.
650,000 FY20 Professional Services Consent Decree
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
1,040,000 FY20 Professional Services Consent Decree
12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD TO
LEETON AVE)
CONSTRUCT 2,400 FEET OF 24-INCH TO 30-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-317.
300,000 FY19 Design Services Consent Decree
11847 BLACK CREEK - HADDINGTON COURT RELIEF
SEWERS
CONSTRUCT 8,350 FEET OF 8-INCH TO 42-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-013, BP-017, BP-018, AND BP-151.
890,000 FY18 Design Services Consent Decree
11883 BLACK CREEK SANITARY SEWER AND I/I REDUCTION CONSTRUCT 2,200 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATE I/I SOURCES
AT 22 PROPERTIES.
500,000 FY17 Construction, Phase II Consent Decree
11883 BLACK CREEK SANITARY SEWER AND I/I REDUCTION CONSTRUCT 2,200 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATE I/I SOURCES
AT 22 PROPERTIES.
75,000 FY18 Construction, Phase II Consent Decree
12098 BRADFORD WOODS PUMP STATION (P-429) REPLACE PUMP STATION P-429. 290,000 FY18 Construction Consent Decree
12099 BRENTMORE PUMP STATION (P-773) REPLACEMENT REPLACE PUMP STATION P-773. 275,000 FY18 Construction Consent Decree
12100 BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I
REDUCTION (I-64 AND LAY RD)
CONSTRUCT 665 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 46 PROPERTIES.
260,000 FY18 Design Services Consent Decree
12100 BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I
REDUCTION (I-64 AND LAY RD)
CONSTRUCT 665 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 46 PROPERTIES.
1,000,000 FY20 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
3 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12104 BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR
TO COUGAR DR)
CONSTRUCT 4,700 FEET OF 10-INCH TO 30-INCH SANITARY SEWER. 525,000 FY18 Design Services Consent Decree
12104 BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR
TO COUGAR DR)
CONSTRUCT 4,700 FEET OF 10-INCH TO 30-INCH SANITARY SEWER.5,200,000 FY20 Construction Consent Decree
12110 CANTERBURY AND ROLAND SANITARY RELIEF
(NELSON DR TO ROLAND BLVD)
CONSTRUCT 2,670 FEET OF 8-INCH TO 18-INCH SANITARY SEWER AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-612 AND BP-532. CONSTRUCT 610 FEET OF ROCK LINED
CHANNEL, INCLUDING 185 FEET OF RETAINING WALL.
264,000 FY19 Design Services Consent Decree
12111 CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA
DR)
CONSTRUCT 2,630 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, REHABILITATE 1,600
FEET OF 8-INCH SANITARY SEWER, AND ABANDON 1,900 FEET OF 8-INCH SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-370 AND BP-581.
260,000 FY18 Design Services Consent Decree
12111 CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA
DR)
CONSTRUCT 2,630 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, REHABILITATE 1,600
FEET OF 8-INCH SANITARY SEWER, AND ABANDON 1,900 FEET OF 8-INCH SEWER.
1,561,000 FY20 Construction Consent Decree
12112 CARSON VILLA, ROSARY LANE AND THURSTON I/I
REDUCTION
CONSTRUCT 1,015 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 104 PROPERTIES.
300,000 FY18 Design Services Consent Decree
12112 CARSON VILLA, ROSARY LANE AND THURSTON I/I
REDUCTION
CONSTRUCT 1,015 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 104 PROPERTIES.
1,563,000 FY20 Construction Consent Decree
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750. 1,506,500 FY19 Design Services Consent Decree
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-
52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF 36-INCH SANITARY
SEWER.
450,000 FY18 Engineering During Construction Services Consent Decree
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-
52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF 36-INCH SANITARY
SEWER.
15,000,000 FY19 Construction Consent Decree
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-
52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF 36-INCH SANITARY
SEWER.
15,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
12892 CAULKS CREEK FORCEMAIN (WATERWORKS ROAD
TO RIVER VALLEY)
CONSTRUCT 3,070 FEET OF 30-INCH DIAMETER FORCEMAIN. 2,840,000 FY18 Construction Consent Decree
11789 CAULKS CREEK FORCEMAIN REHABILITATION REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROM PUMP STATION A TO
THE 36-INCH FORCEMAIN AT THE MISSOURI AMERICAN WATER PLANT.
9,000,000 FY19 Construction Consent Decree
11789 CAULKS CREEK FORCEMAIN REHABILITATION REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROM PUMP STATION A TO
THE 36-INCH FORCEMAIN AT THE MISSOURI AMERICAN WATER PLANT.
8,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
11788 CAULKS CREEK PUMP STATION B FORCEMAIN CONSTRUCT 1,000 FEET OF 8-INCH FORCE MAIN FROM PUMP STATION B TO 36-INCH
FORCE MAIN.
5,900,000 FY18 Construction Consent Decree
11788 CAULKS CREEK PUMP STATION B FORCEMAIN CONSTRUCT 1,000 FEET OF 8-INCH FORCE MAIN FROM PUMP STATION B TO 36-INCH
FORCE MAIN.
100,000 FY19 Construction Consent Decree
11720 CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I CONSTRUCT 16,225 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARY SEWER. 5,600,000 FY17 Construction (Supplemental Appropriation)Consent Decree
11999 CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2017)
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OF SELECTED SEWERS.
SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
2,500,000 FY17 Vendor Services Consent Decree
11999 CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2017)
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OF SELECTED SEWERS.
SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
2,300,000 FY18 Vendor Services Consent Decree
11999 CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2017)
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OF SELECTED SEWERS.
SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
2,500,000 FY19 Vendor Services Consent Decree
12000 CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2020)
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OF SELECTED SEWERS.
SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE.
2,500,000 FY20 Vendor Services Consent Decree
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-561)CONSTRUCT 1,300 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
AT 11 PROPERTIES.
72,000 FY18 Construction, Phase III Consent Decree
11917 CELLA - ROLLING ROCK - GLEN CREEK SANITARY
SEWER IMPROVEMENTS
CONSTRUCT 9,200 FEET OF 8-INCH SANITARY SEWER, TO REPLACE DEFICIENT 8-INCH
SANITARY SEWER.
650,000 FY17 Design Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
4 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11917 CELLA - ROLLING ROCK - GLEN CREEK SANITARY
SEWER IMPROVEMENTS
CONSTRUCT 9,200 FEET OF 8-INCH SANITARY SEWER, TO REPLACE DEFICIENT 8-INCH
SANITARY SEWER.
2,170,000 FY20 Construction Consent Decree
12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 50,000 FY17 Construction Consent Decree
12794 CITY LAKES STORAGE MODIFICATIONS FOR CSO
CONTROL
MODIFY LAKES AND BASINS WITHIN ST. LOUIS CITY PARKS AND CSO LOCATIONS TO
PROVIDE WET WEATHER STORAGE AND REDUCE COMBINED SEWER OVERFLOWS.
325,000 FY19 Construction Consent Decree
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE INFRASTRUCTURE SUCH AS
SOFT SEPARATION, GREEN INFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION
BASINS.
800,000 FY17 Professional Services Consent Decree
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE INFRASTRUCTURE SUCH AS
SOFT SEPARATION, GREEN INFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION
BASINS.
3,073,000 FY18 Professional Services Consent Decree
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE INFRASTRUCTURE SUCH AS
SOFT SEPARATION, GREEN INFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION
BASINS.
2,371,000 FY19 Professional Services Consent Decree
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE INFRASTRUCTURE SUCH AS
COMBINED SEWER CONSTRUCTION AND REPLACEMENT, SOFT SEWER SEPARATION, AND
STORM SEWER CONSTRUCTION AND STORAGE.
840,000 FY17 Professional Services Consent Decree
12694 CITYSHED MITIGATION PROGRAM DESIGN DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE INFRASTRUCTURE SUCH AS 920,000 FY19 Professional Services Consent Decree
12836 CLARA 523 COMBINED SEWER IMPROVEMENT CONSTRUCT 190 FEET OF 18-INCH COMBINED SEWER. 100,000 FY19 Construction Consent Decree
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BY REHABILITATING 6000
FEET OF PIPE SEWERS AND MANHOLES AND BY REMOVING PRIVATE DEFECTS. ALSO
575,000 FY17 Construction, Phase II Consent Decree
12124 CLAYTONIA CREEK SANITARY RELIEF (HAMPTON
CREEK TRUNK SEWER TO CLAYTON ROAD)
CONSTRUCT 6,900 OF 18-INCH TO 48-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-605.
160,000 FY17 Pre-Design Services Consent Decree
11724 COLDWATER SANITARY RELIEF SECTION B, C & D -
SECTION B REHABILITATION
CONSTRUCT REHABILITATION OF SECTION B OF THE COLDWATER TRUNK SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-091, BP-115, BP-119, BP-141, BP-144, BP-473,
BP-526, AND BP-527.
650,000 FY19 Design Services Consent Decree
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD)
CONSTRUCT 1,700 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 118 PROPERTIES.
1,120,000 FY19 Construction Consent Decree
12882 COLDWATER UPSTREAM PUMP STATION (P-180)
FORCE MAIN REPLACEMENT
CONSTRUCT 2,900 FEET OF 10-INCH REPLACEMENT FORCE MAIN. 1,375,000 FY18 Construction Consent Decree
12126 COLDWATER UPSTREAM PUMP STATION (P-180)
STORAGE
CONSTRUCT 1,000 FEET OF 66-INCH PIPE IN ORDER TO PROVIDE TEMPORARY STORAGE. 200,000 FY17 Design Services Consent Decree
12126 COLDWATER UPSTREAM PUMP STATION (P-180)
STORAGE
CONSTRUCT 1,000 FEET OF 66-INCH PIPE IN ORDER TO PROVIDE TEMPORARY STORAGE. 1,280,000 FY19 Construction Consent Decree
12128 CONCORD I/I REDUCTION (TESSON FERRY RD AND E
CONCORD RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 175,000 FY18 Construction Consent Decree
11964 CONCORDIA I/I REDUCTION (NE QUAD CLAYTON RD
AND BIG BEND BLVD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 575,000 FY17 Construction Consent Decree
11964 CONCORDIA I/I REDUCTION (NE QUAD CLAYTON RD
AND BIG BEND BLVD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 80,000 FY18 Construction Consent Decree
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER
AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE LMRDP
CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES), AND THE JEFFERSON BARRACKS
TUNNEL (LEMAY WWTP TO MARTIGNEY PS).
1,300,000 FY17 Professional Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
5 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER
AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE LMRDP
CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES), AND THE JEFFERSON BARRACKS
TUNNEL (LEMAY WWTP TO MARTIGNEY PS).
2,600,000 FY18 Professional Services Consent Decree
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER
AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE LMRDP
CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES), AND THE JEFFERSON BARRACKS
TUNNEL (LEMAY WWTP TO MARTIGNEY PS).
3,400,000 FY19 Professional Services Consent Decree
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER
AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE LMRDP
CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES), AND THE JEFFERSON BARRACKS
TUNNEL (LEMAY WWTP TO MARTIGNEY PS).
1,200,000 FY20 Professional Services Consent Decree
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER
MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE DEER
CREEK TUNNEL, MALINE CREEK STORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL,
UPPER RDP CSO STORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEM BAUMGARTNER
TO FENTON WWTF TUNNEL.
6,300,000 FY17 Professional Services Consent Decree
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER
MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE DEER
CREEK TUNNEL, MALINE CREEK STORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL,
UPPER RDP CSO STORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEM BAUMGARTNER
TO FENTON WWTF TUNNEL.
3,600,000 FY18 Professional Services Consent Decree
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER
MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE DEER
CREEK TUNNEL, MALINE CREEK STORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL,
UPPER RDP CSO STORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEM BAUMGARTNER
TO FENTON WWTF TUNNEL.
7,400,000 FY19 Professional Services Consent Decree
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER
MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE DEER
CREEK TUNNEL, MALINE CREEK STORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL,
4,300,000 FY20 Professional Services Consent Decree
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK,
TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT.
3,750,000 FY17 Professional Services Consent Decree
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK,
TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT.
250,000 FY17 Vendor Services Consent Decree
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK,
TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT.
4,500,000 FY18 Professional Services Consent Decree
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK,
TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT.
7,000,000 FY19 Professional Services Consent Decree
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK,
TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT.
8,500,000 FY20 Professional Services Consent Decree
12131 CONWAY VILLAGE SANITARY RELIEF (CONWAY RD
TO I-64)
CONSTRUCT 4,800 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. 415,000 FY18 Design Services Consent Decree
12131 CONWAY VILLAGE SANITARY RELIEF (CONWAY RD
TO I-64)
CONSTRUCT 4,800 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.4,012,000 FY20 Construction Consent Decree
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH REHABILITATE 91,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
4,800,000 FY20 Construction Consent Decree
11729 CREVE COEUR CREEK SANITARY TRUNK SEWER
RELIEF PHASE VI (SKME-021)
CONSTRUCT 7,750 FEET OF 15-INCH TO 24-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-036 AND BP-037.
760,000 FY17 Design Services Consent Decree
11729 CREVE COEUR CREEK SANITARY TRUNK SEWER
RELIEF PHASE VI (SKME-021)
CONSTRUCT 7,750 FEET OF 15-INCH TO 24-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-036 AND BP-037.
7,000,000 FY19 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
6 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12720 CRITICAL INFRASTRUCTURE ASSESSMENT (2017)PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND CCTV VIDEO REVIEW. SERVICES MAY BE RENEWED THROUGH FY2019
BASED ON PERFORMANCE.
1,400,000 FY17 Vendor Services Consent Decree
12720 CRITICAL INFRASTRUCTURE ASSESSMENT (2017)PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND CCTV VIDEO REVIEW. SERVICES MAY BE RENEWED THROUGH FY2019
BASED ON PERFORMANCE.
1,500,000 FY18 Vendor Services Consent Decree
12720 CRITICAL INFRASTRUCTURE ASSESSMENT (2017)PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND CCTV VIDEO REVIEW. SERVICES MAY BE RENEWED THROUGH FY2019
BASED ON PERFORMANCE.
1,500,000 FY19 Vendor Services Consent Decree
12907 CRITICAL INFRASTRUCTURE ASSESSMENT (2020)PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION, MAP UPDATES, WORK ORDER
1,400,000 FY20 Vendor Services Consent Decree
12138 CROSSROADS, HANLEY INDUSTRIAL, LITZSINGER
EAST I/I REDUCTION (SW I-64 AND S HANLEY RD)
PERFORM PRIVATE I/I REDUCTION AT 18 PROPERTIES. 175,000 FY18 Design Services Consent Decree
12139 CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111) ELIMINATION
AND SEWER SEPARATION
PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN THE 1247 MERAMEC STUDY AREA,
INCLUDING SEWER SEPARATION. REMOVE INTERCEPTOR I-118 AND CSO OUTFALL L-111.
1,100,000 FY19 Design Services Consent Decree
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO
INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION
CONSTRUCT 5,200 FEET OF 15-INCH TO 30-INCH SANITARY SEWER, AND 4,100 FEET OF 15-
INCH TO 27-INCH STORM SEWER. PERFORM PUBLIC AND PRIVATE I/I REDUCTION. REMOVE
INTERCEPTOR I-132 AND CSO OUTFALL L-106.
1,550,000 FY19 Design Services Consent Decree
10851 CSO - MCKNIGHT ROAD #2737 CSO INTERCEPTOR (I-
298)/OUTFALL (L-161)
CONSTRUCT 4,300 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, AND 2,300 FEET OF 12-
INCH TO 36-INCH STORM SEWER. REMOVE PRIVATE I/I SOURCES FROM SANITARY
3,600,000 FY18 Construction Consent Decree
11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
5,000,000 FY17 Construction, Phase II Consent Decree
11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
5,000,000 FY18 Construction, Phase II Consent Decree
11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
5,000,000 FY19 Construction Consent Decree
11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
5,000,000 FY20 Construction Consent Decree
13078 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
- RIVER DES PERES
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES ENTERING THE COMBINED SEWER SYSTEM IN THE RIVER DES PERES
2,000,000 FY20 Construction Consent Decree
12142 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR
TO PRIOR DR)
CONSTRUCT 1,150 FEET 12-INCH TO 18-INCH SANITARY SEWER. CONTINGENCY PROJECT
TO ELIMINATE CONSTRUCTED SSO OUTFALL BP-313.
161,000 FY19 Design Services Consent Decree
11155 DAMMERT AND BROADWAY SANITARY RELIEF (SKME-
551)
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-515 AND BP-624, AND PUMP STATION P-327.
280,000 FY17 Construction Consent Decree
11155 DAMMERT AND BROADWAY SANITARY RELIEF (SKME-
551)
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-515 AND BP-624, AND PUMP STATION P-327.
4,700,000 FY19 Construction, Phase II Consent Decree
12144 DARTMOUTH AVENUE SEWER SEPARATION CONSTRUCT 1,700 FEET OF 21-INCH TO 30-INCH STORM SEWER, TO SEPARATE STORM
FLOWS FROM THE COMBINED SEWER SYSTEM.
230,000 FY18 Design Services Consent Decree
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE I
CONSTRUCT 7,900 FEET OF 6-INCH TO 78-INCH SANITARY SEWER TO ALLEVIATE SYSTEM
SURCHARGING. FACILITATE FUTURE REMOVAL OF CONSTRUCTED SSO OUTFALLS BP-545,
BP-170, BP-198, BP-348, BP-349, BP-155, AND BP-591.
11,750,000 FY17 Construction (Supplemental Appropriation)Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
7 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE I
CONSTRUCT 7,900 FEET OF 6-INCH TO 78-INCH SANITARY SEWER TO ALLEVIATE SYSTEM
SURCHARGING. FACILITATE FUTURE REMOVAL OF CONSTRUCTED SSO OUTFALLS BP-545,
BP-170, BP-198, BP-348, BP-349, BP-155, AND BP-591.
4,000,000 FY18 Construction (Supplemental Appropriation)Consent Decree
12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE II
CONSTRUCT 7,900 FEET OF 66-INCH TO 72-INCH SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING AND FACILITATE THE FUTURE REMOVAL OF CONSTRUCTED SSOS.
16,990,000 FY18 Construction Consent Decree
12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE II
CONSTRUCT 7,900 FEET OF 66-INCH TO 72-INCH SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING AND FACILITATE THE FUTURE REMOVAL OF CONSTRUCTED SSOS.
10,500,000 FY19 Construction (Supplemental Appropriation)Consent Decree
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE III AND PHASE IV
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-155, BP-170, BP-348, BP-349,
BP-198, BP-545, AND BP-591.
400,000 FY19 Design Services Consent Decree
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE III AND PHASE IV
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-155, BP-170, BP-348, BP-349,
BP-198, BP-545, AND BP-591.
20,000,000 FY20 Construction Consent Decree
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD
TO CONWAY RD) PHASE III AND PHASE IV
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-155, BP-170, BP-348, BP-349,
1,000,000 FY20 Engineering During Construction Services Consent Decree
11997 DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD AND
LADUE RD)
CONSTRUCT 505 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
375,000 FY18 Construction Consent Decree
12036 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
REHABILITATE 69,000 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
3,300,000 FY17 Construction Consent Decree
12037 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
REHABILITATE 61,000 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
4,900,000 FY17 Construction Consent Decree
12039 DEER CREEK PUBLIC I/I REDUCTION (2018)
CONTRACT A
REHABILITATE 78,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
80,000 FY17 Design Services Consent Decree
12039 DEER CREEK PUBLIC I/I REDUCTION (2018)
CONTRACT A
REHABILITATE 78,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
6,500,000 FY18 Construction Consent Decree
12042 DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
REHABILITATE 73,510 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
70,000 FY18 Design Services Consent Decree
12042 DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
REHABILITATE 73,510 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
4,100,000 FY19 Construction Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
1,500,000 FY17 Engineering During Construction Services Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
315,000 FY18 Capital Training Cost Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
50,000,000 FY18 Construction Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
35,000 FY18 Non-Capital Training Costs Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
50,000,000 FY19 Construction (Supplemental Appropriation)Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
1,500,000 FY19 Engineering During Construction Services Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
37,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL AND DIVERSION
STRUCTURES.
1,500,000 FY20 Engineering During Construction Services Consent Decree
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP) - PUMP STATION
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEK TUNNEL
PROJECT.
15,000,000 FY20 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
8 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP) - PUMP STATION
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEK TUNNEL
PROJECT.
1,000,000 FY20 Engineering During Construction Services Consent Decree
11136 DEGIVERVILLE COMBINED SEWER IMPROVEMENTS PERFORM POINT REPAIRS AND REHABILITATION OF LATERAL CONNECTIONS, AND
IMPROVE ACCESS TO MANHOLES WITHIN METRO RIGHT-OF-WAY FOR MAINTENANCE.
2,000,000 FY20 Construction Consent Decree
11735 DELCREST SANITARY RELIEF (SKME-565) I/I CONSTRUCT 1,500 FEET OF 12-INCH STORM SEWERS, AND REMOVE PRIVATE I/I SOURCES 239,000 FY17 Construction, Phase II Consent Decree
12148 DIX SANITARY RELIEF (DIX AVE TO AIRWAY AVE)CONSTRUCT 2,842 FEET OF 21-INCH SANITARY SEWER.536,000 FY20 Design Services Consent Decree
11739 DUCHESNE AND GOTT I/I REDUCTION CONSTRUCT 1,220 FEET OF 12-INCH SANITARY SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALL BP-129.
375,000 FY17 Construction Consent Decree
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
CONSTRUCT 4,150 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-409.
482,000 FY19 Design Services Consent Decree
12154 EARTH CITY LAKE FRONT NORTH PUMP STATION (P-
711) REPLACEMENT
REPLACE PUMP STATION P-711. 590,000 FY19 Construction Consent Decree
12155 EARTH CITY SHORELINE PUMP STATION (P-704)
REPLACEMENT
REPLACE PUMP STATION P-704. 750,000 FY19 Construction Consent Decree
12513 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2017)
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM WASTEWATER PROJECTS.
2,500,000 FY17 Property Rights Acquisition Consent Decree
12514 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2018)
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM WASTEWATER PROJECTS.
2,100,000 FY18 Property Rights Acquisition Consent Decree
12515 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2019)
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM WASTEWATER PROJECTS.
1,500,000 FY19 Property Rights Acquisition Consent Decree
12516 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2020)
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM WASTEWATER PROJECTS.
1,000,000 FY20 Property Rights Acquisition Consent Decree
12158 ED LOU LANE I/I REDUCTION (BROOKTON WAY AND
GREENTON WAY)
PERFORM PRIVATE I/I REDUCTION AT 22 PROPERTIES.57,000 FY20 Design Services Consent Decree
12160 EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK WEST I/I
REDUCTION
CONSTRUCT 270 FEET OF 8-INCH SANITARY SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 82 PROPERTIES.
68,000 FY18 Design Services Consent Decree
12160 EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK WEST I/I
REDUCTION
CONSTRUCT 270 FEET OF 8-INCH SANITARY SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 82 PROPERTIES.
595,000 FY20 Construction Consent Decree
12161 ELINOR AVE. TEMPORARY SANITARY STORAGE
FACILITY
CONSTRUCT 110 FEET OF 8-INCH TO 24-INCH SANITARY SEWER IN ORDER TO PROVIDE
1,400 GALLONS OF TEMPORARY STORAGE. CONTINGENCY PROJECT TO ELIMINATE
140,000 FY19 Construction Consent Decree
10856 ERA AVE. 5800 BLOCK SEWER SEPARATION CONSTRUCT 190 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 2 PROPERTIES.
140,000 FY19 Construction Consent Decree
12164 ESSEX I/I REDUCTION (W. ADAMS AVE AND SUGAR
CREEK RIDGE DR)
PERFORM PRIVATE I/I REDUCTION AT 16 PROPERTIES. 59,000 FY18 Design Services Consent Decree
12457 FARMERS MILL PUMP STATION (P-774)
REPLACEMENT
REPLACE PUMP STATION P-774. 450,000 FY18 Construction Consent Decree
11996 FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I
REDUCTION (MANCHESTER RD W OF N GEYER RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 200,000 FY18 Construction Consent Decree
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG
LEAF CIRCLE TO THAMES COURT)
CONSTRUCT 3,070 FEET OF 21-INCH SANITARY SEWER. CONTINGENCY PROJECT TO
ELIMINATE CONSTRUCTED SSO OUTFALL BP-078.
389,000 FY19 Design Services Consent Decree
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-425 AND CONSTRUCT 1,585 FEET OF
ASSOCIATED FORCEMAIN.
215,000 FY20 Design Services Consent Decree
11737 FERGUSON SEWER RELIEF SANITARY STORAGE
FACILITY (ELTORA AVE AND PENNSYLVANIA AVE)
CONSTRUCT A 2 MILLION GALLON SANITARY STORAGE TANK, PUMP STATION, AND
COLLECTION SEWERS.
1,000,000 FY17 Land Purchase Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
9 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11747 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES
COURT TO FIESTA CIRCLE)
CONSTRUCT 2,180 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-086.
1,400,000 FY17 Construction Consent Decree
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
CONSTRUCT 4,200 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-069.
600,000 FY18 Design Services Consent Decree
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY
RELIEF
CONSTRUCT 6,114 FEET OF 8-INCH TO 30-INCH SANITARY SEWER, AND 5,735 FEET OF 24-
INCH TO 42-INCH PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-076.
12,300,000 FY18 Construction Consent Decree
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY
RELIEF
CONSTRUCT 6,114 FEET OF 8-INCH TO 30-INCH SANITARY SEWER, AND 5,735 FEET OF 24-
INCH TO 42-INCH PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-076.
4,700,000 FY19 Construction (Supplemental Appropriation)Consent Decree
10018 FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY
RELIEF (ADIE RD TO VILLA DORADO DR)
CONSTRUCT 2,093 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, AND 2,683 FEET OF 21-
INCH TO 24-INCH PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-087.
7,075,000 FY19 Construction Consent Decree
12173 FISHPOT TRUNK WEST I/I REDUCTION (SMITH DR
AND VLASIS DR)
REHABILITATE 36,400 FEET OF 6-INCH TO 8-INCH SANITARY SEWERS, REPLACE 343 FEET
OF 8-INCH SANITARY SEWERS, AND PERFORM PRIVATE I/I AT 3 PROPERTIES
90,000 FY20 Design Services Consent Decree
11748 FLORISSANT I/I REDUCTION CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER AND REMOVE PRIVATE
I/I SOURCES FROM SANITARY SEWERS.
325,000 FY17 Construction, Phase II Consent Decree
12759 FLOW METERING AND MONITORING (2017)CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATER SYSTEM TO
COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEM RESPONSE DURING WET
WEATHER EVENTS. THIS INFORMATION WILL BE USED TO CALIBRATE HYDRAULIC MODELS
TO DETERMINE IF PROJECTS ARE REQUIRED.
2,500,000 FY17 Vendor Services Consent Decree
12759 FLOW METERING AND MONITORING (2017)CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATER SYSTEM TO
COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEM RESPONSE DURING WET
WEATHER EVENTS. THIS INFORMATION WILL BE USED TO CALIBRATE HYDRAULIC MODELS
TO DETERMINE IF PROJECTS ARE REQUIRED.
2,500,000 FY18 Vendor Services Consent Decree
12759 FLOW METERING AND MONITORING (2017)CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATER SYSTEM TO
COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEM RESPONSE DURING WET
WEATHER EVENTS. THIS INFORMATION WILL BE USED TO CALIBRATE HYDRAULIC MODELS
TO DETERMINE IF PROJECTS ARE REQUIRED.
2,500,000 FY19 Vendor Services Consent Decree
12759 FLOW METERING AND MONITORING (2017)CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATER SYSTEM TO
COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEM RESPONSE DURING WET
2,500,000 FY20 Vendor Services Consent Decree
12180 FORDER SANITARY INTERCONNECTION (FORDER RD
TO RINGER RD)
CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER. 58,000 FY17 Design Services Consent Decree
12180 FORDER SANITARY INTERCONNECTION (FORDER RD
TO RINGER RD)
CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER.110,000 FY20 Construction Consent Decree
11750 FORESTATE AND TEXAS SANITARY RELIEF (SKME-
513)
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER. REHABILITATE 12,500 FEET OF 8-
INCH TO 24-INCH SANITARY AND STORM SEWERS. I/I CONTROL MEASURES FOR VARIOUS
35,000 FY18 Construction Consent Decree
12183 FOX CREEK SANITARY RELIEF (HOLLOWAY RD TO
CLAYMONT DR)
CONSTRUCT 2,900 FEET OF 15-INCH SANITARY SEWER.300,000 FY20 Design Services Consent Decree
12186 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I
REDUCTION (S QUAD I-64 AND CLAYTON RD)
PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 150,000 FY17 Design Services Consent Decree
12186 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I
REDUCTION (S QUAD I-64 AND CLAYTON RD)
PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 90,000 FY19 Construction Consent Decree
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS CONSTRUCT 6,300 FEET OF 8-INCH TO 24-INCH SANITARY SEWER AND ONE PUBLIC WET
WEATHER PUMP STATION.
1,450,000 FY20 Pre-Design Services Consent Decree
11752 GENERAL SERVICES AGREEMENT - CONSTRUCTION
MANAGEMENT (2016)
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE.
250,000 FY18 General Services - Construction Inspection Consent Decree
12386 GENERAL SERVICES AGREEMENT - CONSTRUCTION
MANAGEMENT (2019)
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
1,500,000 FY19 General Services - Construction Inspection Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
10 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12386 GENERAL SERVICES AGREEMENT - CONSTRUCTION
MANAGEMENT (2019)
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
4,000,000 FY20 General Services - Construction Inspection Consent Decree
11760 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. THIS
RENEWAL IS FOR FINAL DESIGN OF 12794, CITY LAKES STORAGE MODIFICATIONS FOR
CSO CONTROL.
300,000 FY17 General Services - Design CIRP Funds Consent Decree
11760 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. THIS
RENEWAL IS FOR FINAL DESIGN OF 12794, CITY LAKES STORAGE MODIFICATIONS FOR
60,000 FY19 General Services - Design CIRP Funds Consent Decree
12396 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
400,000 FY18 GSA - (Design) CIRP Funds Consent Decree
12396 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
400,000 FY19 GSA - (Design) CIRP Funds Consent Decree
12894 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
400,000 FY18 GSA - (Design) CIRP Funds Consent Decree
12894 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
400,000 FY19 GSA - (Design) CIRP Funds Consent Decree
12397 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
400,000 FY20 GSA - (Design) CIRP Funds Consent Decree
13059 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
400,000 FY20 GSA - (Design) CIRP Funds Consent Decree
12389 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2018) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY18 GSA - Geotechnical CIRP Funds Consent Decree
12389 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2018) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
75,000 FY19 GSA - Geotechnical CIRP Funds Consent Decree
12390 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2018) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY18 GSA - Geotechnical CIRP Funds Consent Decree
12390 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2018) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
75,000 FY19 GSA - Geotechnical CIRP Funds Consent Decree
12391 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2020) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
75,000 FY20 GSA - Geotechnical CIRP Funds Consent Decree
12392 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2020) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
75,000 FY20 GSA - Geotechnical CIRP Funds Consent Decree
12393 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(2020) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
75,000 FY20 GSA - Geotechnical CIRP Funds Consent Decree
10615 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2012) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE.
225,000 FY17 GSA - (Geotech) - Operating Funds Consent Decree
11753 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2015) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Geotechnical Consent Decree
11753 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2015) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
150,000 FY18 GSA - (Geotech) CIRP Funds Consent Decree
11754 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2015) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Geotechnical Consent Decree
12064 GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2015) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Geotechnical Consent Decree
13044 GENERAL SERVICES AGREEMENT - LANDSCAPE
DESIGN (2019)
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS NEEDED DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
250,000 FY19 GSA - (Design) Operating Funds Consent Decree
13044 GENERAL SERVICES AGREEMENT - LANDSCAPE
DESIGN (2019)
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS NEEDED DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
200,000 FY20 GSA - (Design) Operating Funds Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
11 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11758 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
70,000 FY17 Appraisal Services Consent Decree
12379 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
70,000 FY17 Appraisal Services Consent Decree
12380 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
70,000 FY17 Appraisal Services Consent Decree
12381 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
70,000 FY17 Appraisal Services Consent Decree
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY18 Appraisal Services Consent Decree
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY19 Appraisal Services Consent Decree
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY20 Appraisal Services Consent Decree
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY18 Appraisal Services Consent Decree
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY19 Appraisal Services Consent Decree
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY20 Appraisal Services Consent Decree
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY18 Appraisal Services Consent Decree
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY19 Appraisal Services Consent Decree
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY20 Appraisal Services Consent Decree
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY18 Appraisal Services Consent Decree
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY19 Appraisal Services Consent Decree
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM.
SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
60,000 FY20 Appraisal Services Consent Decree
11759 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
90,000 FY17 General Services - Design CIRP Funds Consent Decree
12398 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2019)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL DESIGN. SERVICES MAY BE
RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
100,000 FY19 GSA - (Design) CIRP Funds Consent Decree
12398 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2019)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL DESIGN. SERVICES MAY BE
RENEWED THROUGH FY2020 BASED ON PERFORMANCE.
200,000 FY20 GSA - (Design) CIRP Funds Consent Decree
11779 GENERAL SERVICES AGREEMENT - SEWER DESIGN
(FY2013) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
90,000 FY17 General Services - Design CIRP Funds Consent Decree
11780 GENERAL SERVICES AGREEMENT - SEWER DESIGN
(FY2013) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
90,000 FY17 General Services - Design CIRP Funds Consent Decree
12394 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Survey Consent Decree
12395 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Survey Consent Decree
12405 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Survey Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
12 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12406 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.
50,000 FY17 General Services - Survey Consent Decree
12408 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY19 GSA - (Survey) CIRP Funds Consent Decree
12409 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY18 GSA - (Survey) CIRP Funds Consent Decree
12409 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY19 GSA - (Survey) CIRP Funds Consent Decree
12410 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY18 GSA - (Survey) CIRP Funds Consent Decree
12410 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY19 GSA - (Survey) CIRP Funds Consent Decree
12411 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY18 GSA - (Survey) CIRP Funds Consent Decree
12411 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY19 GSA - (Survey) CIRP Funds Consent Decree
12412 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2019 BASED ON PERFORMANCE.
50,000 FY19 GSA - (Survey) CIRP Funds Consent Decree
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
50,000 FY20 GSA - (Survey) CIRP Funds Consent Decree
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
50,000 FY20 GSA - (Survey) CIRP Funds Consent Decree
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
50,000 FY20 GSA - (Survey) CIRP Funds Consent Decree
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
50,000 FY20 GSA - (Survey) CIRP Funds Consent Decree
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
50,000 FY20 GSA - (Survey) CIRP Funds Consent Decree
12175 GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-
521 STORAGE (BIG BEND BLVD TO WINDSOR
SPRINGS DR)
CONSTRUCT 6,020 FEET OF 6-INCH FORCEMAIN, UPGRADE WINDSOR SPRINGS PUMP
STATION, AND PERFORM PRIVATE I/I REDUCTION AT 11 PROPERTIES.
578,000 FY17 Design Services Consent Decree
12175 GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-
521 STORAGE (BIG BEND BLVD TO WINDSOR
CONSTRUCT 6,020 FEET OF 6-INCH FORCEMAIN, UPGRADE WINDSOR SPRINGS PUMP
STATION, AND PERFORM PRIVATE I/I REDUCTION AT 11 PROPERTIES.
2,400,000 FY20 Construction Consent Decree
12914 GLEN EAGLES PUMP STATION (P-189) RELOCATION /
REPLACEMENT
RELOCATE AND RECONSTRUCT EXISTING DUPLEX SUBMERSIBLE PUMP STATION TO
ADJACENT SITE, INCLUDING DETENTION STORAGE.
600,000 FY19 Construction Consent Decree
12177 GLENDALE SECTION D SANITARY RELIEF PHASE V CONSTRUCT 1,675 FEET OF 12-INCH TO 18-INCH STORM SEWER AND REMOVE PRIVATE I/I 1,066,000 FY18 Construction Consent Decree
12719 GRAHAM RD 100 - 232 SANITARY SEWER REPLACE 875 FEET OF 12-INCH SANITARY SEWER. 740,000 FY17 Construction Consent Decree
12719 GRAHAM RD 100 - 232 SANITARY SEWER REPLACE 875 FEET OF 12-INCH SANITARY SEWER. 140,000 FY18 Construction Consent Decree
12272 GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN
GOLF CLUB TO CLAYMONT COVE CT)
CONSTRUCT 1,600 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.260,000 FY20 Design Services Consent Decree
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
REHABILITATION (FANNIE AVE TO PARDEE LANE)
REHABILITATE 37,000 FEET OF 36-INCH TO 72-INCH SANITARY TRUNK SEWER AND
REHABILITATE 95 MANHOLES.
50,000 FY18 Design Services Consent Decree
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
REHABILITATION (FANNIE AVE TO PARDEE LANE)
REHABILITATE 37,000 FEET OF 36-INCH TO 72-INCH SANITARY TRUNK SEWER AND
REHABILITATE 95 MANHOLES.
15,000,000 FY19 Construction Consent Decree
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
REHABILITATION (FANNIE AVE TO PARDEE LANE)
REHABILITATE 37,000 FEET OF 36-INCH TO 72-INCH SANITARY TRUNK SEWER AND
REHABILITATE 95 MANHOLES.
15,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
13 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELOCATION PHASE VI (BUCKLEY RD TO UNION RD)
CONSTRUCT 1,530 FEET OF 54-INCH SANITARY SEWER, 220 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER, 7 MANHOLES, AND BANK STABILIZATION.
445,000 FY17 Design Services Consent Decree
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELOCATION PHASE VI (BUCKLEY RD TO UNION RD)
CONSTRUCT 1,530 FEET OF 54-INCH SANITARY SEWER, 220 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER, 7 MANHOLES, AND BANK STABILIZATION.
2,500,000 FY19 Construction Consent Decree
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TO STORE WET
WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTED SSOS BP-588 AND BP-599.
2,100,000 FY17 Design Services Consent Decree
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TO STORE WET
WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTED SSOS BP-588 AND BP-599.
18,000,000 FY19 Construction Consent Decree
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TO STORE WET
WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTED SSOS BP-588 AND BP-599.
700,000 FY19 Engineering During Construction Services Consent Decree
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TO STORE WET
WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTED SSOS BP-588 AND BP-599.
7,100,000 FY20 Construction (Supplemental Appropriation)Consent Decree
12372 GREEN PARK AND LAKESHIRE I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
PERFORM PRIVATE I/I REDUCTION AT 28 PROPERTIES. 470,000 FY17 Design Services Consent Decree
12372 GREEN PARK AND LAKESHIRE I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
PERFORM PRIVATE I/I REDUCTION AT 28 PROPERTIES. 231,000 FY19 Construction Consent Decree
12510 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
REHABILITATE 24,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
65,000 FY18 Design Services Consent Decree
12510 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
REHABILITATE 24,000 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
2,500,000 FY19 Construction Consent Decree
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE I
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER. 150,000 FY17 Pre-Design Services Consent Decree
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE I
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER. 1,250,000 FY19 Design Services Consent Decree
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE I
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER.500,000 FY20 Design Services Consent Decree
12369 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE II
CONSTRUCT 7,960 FEET OF 30-INCH TO 54-INCH SANITARY SEWER, AND 710 FEET OF 36-
INCH PIPE-IN-TUNNEL UNDER I-64. CONSTRUCT 2,600 FEET OF VERTICAL WALL CHANNEL,
180,000 FY17 Pre-Design Services Consent Decree
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS & FLOODING IN LOW
ELEVATION AREA CONTAINING TWO MAJOR TRUNK SEWERS.
600,000 FY17 Construction Consent Decree
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH SEWER, AND 3,000 FEET OF SEWER
LINING.
1,500,000 FY19 Construction Consent Decree
11770 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK)
CONSTRUCT 5,550 FEET OF 12-INCH TO 108-INCH STORM SEWERS, 540 FEET OF SANITARY
SEWERS, AND 3,240 FEET OF SEWER LINING IN THE CITY OF ST. LOUIS.
3,900,000 FY17 Construction Consent Decree
11770 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK)
CONSTRUCT 5,550 FEET OF 12-INCH TO 108-INCH STORM SEWERS, 540 FEET OF SANITARY
SEWERS, AND 3,240 FEET OF SEWER LINING IN THE CITY OF ST. LOUIS.
6,400,000 FY18 Construction (Supplemental Appropriation)Consent Decree
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK
SEWER REHABILITATION
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240 FEET OF CIPP LINING,
AND 6,400 SQUARE FEET OF SPOT REPAIRS, ALONG 7,000 FEET OF 8 TO 12 FOOT
DIAMETER SEWER.
440,000 FY17 Design Services Consent Decree
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK
SEWER REHABILITATION
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240 FEET OF CIPP LINING,
AND 6,400 SQUARE FEET OF SPOT REPAIRS, ALONG 7,000 FEET OF 8 TO 12 FOOT
1,800,000 FY19 Construction Consent Decree
12695 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT
DESIGN (CONTRACT A)
DESIGN HARLEM BADEN WATERSHED SYSTEM IMPROVEMENTS TO INCLUDE SEWER
SEPARATION, SEWER CONSTRUCTION, AND SEWER REHABILITATION.
1,920,000 FY19 Professional Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
14 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12297 HARMANN ESTATES PUMP STATION (P-709)
REPLACEMENT
REPLACE PUMP STATION P-709. 300,000 FY18 Construction Consent Decree
12298 HARRISON SANITARY RELIEF (GRAND AVE TO W
ROSE HILL AVE)
CONSTRUCT 700 FEET OF 18-INCH SANITARY SEWER. 90,000 FY17 Design Services Consent Decree
12298 HARRISON SANITARY RELIEF (GRAND AVE TO W
ROSE HILL AVE)
CONSTRUCT 700 FEET OF 18-INCH SANITARY SEWER. 290,000 FY18 Construction Consent Decree
12846 HEIMOS PUMP STATION (P-503) FORCEMAIN
REPLACEMENT
CONSTRUCT 2,100 FEET OF 12-INCH SANITARY SEWER, INCLUDING 2,010 FEET OF PIPE IN
TUNNEL.
160,000 FY18 Design Services Consent Decree
12304 HELTA, SAPPINGTON, AND GREGORY COURT I/I
REDUCTION (SAPPINGTON RD AND I-270)
CONSTRUCT 260 FEET OF 12-INCH TO 27-INCH STORM SEWER, AND REMOVE PRIVATE I/I
AT 65 PROPERTIES.
450,000 FY18 Construction Consent Decree
10863 HERMITAGE SANITARY RELIEF (SKME-615)CONSTRUCT 3,700 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 1 PROPERTY. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-181, BP-333,
BP-343, AND BP-555.
400,000 FY17 Design Services Consent Decree
10863 HERMITAGE SANITARY RELIEF (SKME-615)CONSTRUCT 3,700 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 1 PROPERTY. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-181, BP-333,
2,500,000 FY19 Construction Consent Decree
12306 HOLLENBERG PUMP STATION (P-713) REPLACEMENT REPLACE PUMP STATION P-713. 450,000 FY17 Construction Consent Decree
11994 HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK I/I
REDUCTION (S LINDBERGH BLVD SOUTH OF
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 560,000 FY18 Construction Consent Decree
10656 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A
(P-750) PHASE VI
CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN. 2,600,000 FY17 Construction, Phase II Consent Decree
12011 INFRASTRUCTURE REPAIRS (REHABILITATION) (2017)
CONTRACT A
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL
OCCUR VIA REHABILITATION CONTRACTS.
2,250,000 FY17 Construction Consent Decree
12012 INFRASTRUCTURE REPAIRS (REHABILITATION) (2017)
CONTRACT B
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL
OCCUR VIA REHABILITATION CONTRACTS.
1,700,000 FY17 Construction Consent Decree
12014 INFRASTRUCTURE REPAIRS (REHABILITATION) (2018)
CONTRACT A
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL
OCCUR VIA REHABILITATION CONTRACTS.
2,000,000 FY18 Construction Consent Decree
12015 INFRASTRUCTURE REPAIRS (REHABILITATION) (2018)
CONTRACT B
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL
2,075,000 FY18 Construction Consent Decree
12017 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019)
CONTRACT A
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTION EFFORTS.
1,900,000 FY19 Construction Consent Decree
12018 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019)
CONTRACT B
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTION EFFORTS.
2,500,000 FY19 Construction Consent Decree
12020 INFRASTRUCTURE REPAIRS (REHABILITATION) (2020)
CONTRACT A
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTION EFFORTS.
2,500,000 FY20 Construction Consent Decree
12021 INFRASTRUCTURE REPAIRS (REHABILITATION) (2020)
CONTRACT B
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTION EFFORTS.
2,500,000 FY20 Construction Consent Decree
12007 INFRASTRUCTURE REPAIRS (WASTEWATER) (2017)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
5,500,000 FY17 Work Order Repair Costs (Capital)Consent Decree
12007 INFRASTRUCTURE REPAIRS (WASTEWATER) (2017)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
1,500,000 FY17 Work Order Repair Costs (Non-Capital)Consent Decree
12008 INFRASTRUCTURE REPAIRS (WASTEWATER) (2018)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
6,000,000 FY18 Work Order Repair Costs (Capital)Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
15 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12008 INFRASTRUCTURE REPAIRS (WASTEWATER) (2018)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
2,500,000 FY18 Work Order Repair Costs (Non-Capital)Consent Decree
12009 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
3,500,000 FY19 Work Order Repair Costs (Capital)Consent Decree
12009 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
1,500,000 FY19 Work Order Repair Costs (Non-Capital)Consent Decree
12010 INFRASTRUCTURE REPAIRS (WASTEWATER) (2020)CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER INFRASTRUCTURE
DISTRICTWIDE.
7,000,000 FY20 Work Order Repair Costs (Capital)Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
18,900,000 FY17 Construction Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
410,000 FY17 Engineering During Construction Services Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
26,100,000 FY18 Construction (Supplemental Appropriation)Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
410,000 FY18 Engineering During Construction Services Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
20,000,000 FY19 Construction (Supplemental Appropriation)Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
485,000 FY19 Engineering During Construction Services Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
2,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO
MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE
MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS.
50,000 FY20 Engineering During Construction Services Consent Decree
11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION
SEWERS
CONSTRUCT 6,160 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, AND REHABILITATE
2,800 FEET OF 30-INCH TO 36-INCH SANITARY SEWER, TO CONVEY FLOW TO THE NEW
JEFFERSON BARRACKS TUNNEL.
2,000,000 FY20 Construction Consent Decree
11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION
SEWERS
CONSTRUCT 6,160 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, AND REHABILITATE
2,800 FEET OF 30-INCH TO 36-INCH SANITARY SEWER, TO CONVEY FLOW TO THE NEW
40,000 FY20 Engineering During Construction Services Consent Decree
11142 JENNINGS STATION ROAD / NORTH BADEN BASIN CONSTRUCT DETENTION BASIN, 1,300 FEET OF 12-INCH TO 36-INCH STORM SEWER, AND
RAIN GARDENS.
2,100,000 FY19 Construction Consent Decree
11140 JENNINGS STATION ROAD / NORTH BADEN BASIN
(PROPERTY ACQUISITION)
ACQUISITION OF 25 PROPERTIES FOR CONSTRUCTION OF STORAGE BASIN. 70,000 FY18 Land Purchase Consent Decree
12314 KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND
GLEN OWEN DR)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 48,000 FY17 Construction Consent Decree
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE FACILITY. 2,000,000 FY18 Land Purchase Consent Decree
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE FACILITY. 2,000,000 FY19 Land Purchase Consent Decree
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE FACILITY.8,000,000 FY20 Construction Consent Decree
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE FACILITY.450,000 FY20 Engineering During Construction Services Consent Decree
12317 KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S
KIRKWOOD RD)
CONSTRUCT 900 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
440,000 FY18 Construction Consent Decree
11995 KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W
SARAH I/I REDUCTION (MANCHESTER RD AND
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 310,000 FY18 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
16 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11712 LACKLAND I/I REDUCTION CONSTRUCT 2,550 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
1,450,000 FY17 Construction, Phase II Consent Decree
11712 LACKLAND I/I REDUCTION CONSTRUCT 2,550 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
70,000 FY18 Construction, Phase II Consent Decree
12320 LADUE FARMS PUMP STATION (P-733)
REPLACEMENT
REPLACE PUMP STATION P-733. 370,000 FY18 Construction Consent Decree
11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-654)CONSTRUCT 80 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
450,000 FY17 Construction Consent Decree
12322 LAFAYETTE SANITARY RELIEF (STRECKER RD TO
DURANGO PASS CT)
CONSTRUCT 3,300 FEET OF 8-INCH TO 12-INCH SANITARY SEWER.516,000 FY20 Design Services Consent Decree
12324 LANDMARK OFFICE PUMP STATION (P-411)
REPLACEMENT
REPLACE PUMP STATION P-411. 460,000 FY17 Construction Consent Decree
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO
FLORIDALE CT)
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-291.
116,000 FY19 Design Services Consent Decree
12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND
LAY RD)
PERFORM PRIVATE I/I REDUCTION AT 49 PROPERTIES. 155,000 FY17 Design Services Consent Decree
12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND
LAY RD)
PERFORM PRIVATE I/I REDUCTION AT 49 PROPERTIES. 290,000 FY19 Construction Consent Decree
13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE
REPLACEMENT
REMOVE AND REPLACE 6 SLUICE GATES IN THE LEMAY 1 PUMP STATION WET WELL, AND
INSTALL ADDITIONAL STOP LOGS.
1,500,000 FY19 Construction Consent Decree
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE
MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-
306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
50,000 FY19 Engineering During Construction Services Consent Decree
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE
MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-
306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
13,000,000 FY20 Construction Consent Decree
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE
MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-
306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
3,500,000 FY20 Construction, Phase II Consent Decree
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE
MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-
190,000 FY20 Engineering During Construction Services Consent Decree
12048 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A REHABILITATE 53,900 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
2,170,000 FY17 Construction Consent Decree
12049 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B REHABILITATE 64,200 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
4,300,000 FY17 Construction Consent Decree
12050 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C REHABILITATE 43,800 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
2,235,000 FY17 Construction Consent Decree
12051 LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A REHABILITATE 12,710 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
31,000 FY17 Design Services Consent Decree
12051 LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A REHABILITATE 12,710 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
690,000 FY18 Construction Consent Decree
12038 LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D REHABILITATE 54,500 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
3,050,000 FY19 Construction Consent Decree
12057 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A REHABILITATE 33,140 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
50,000 FY19 Design Services Consent Decree
12057 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A REHABILITATE 33,140 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
3,849,000 FY20 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
17 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12059 LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE
METHOD, TO REDUCE PUBLIC I/I.
230,000 FY20 Design Services Consent Decree
12488 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADE ELECTRICAL SYSTEMS AND
SWITCH GEAR, AND UPGRADE PUMPS.
4,200,000 FY17 Construction Consent Decree
12488 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADE ELECTRICAL SYSTEMS AND
SWITCH GEAR, AND UPGRADE PUMPS.
230,000 FY18 Engineering During Construction Services Consent Decree
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED TO MEET CONSENT DECREE REQUIREMENTS.
790,000 FY17 Professional Services Consent Decree
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED TO MEET CONSENT DECREE REQUIREMENTS.
650,000 FY18 Professional Services Consent Decree
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED TO MEET CONSENT DECREE REQUIREMENTS.
400,000 FY19 Professional Services Consent Decree
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED TO MEET CONSENT DECREE REQUIREMENTS.
650,000 FY20 Professional Services Consent Decree
11716 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON
CREEK
CONSTRUCT 18,180 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE
I/I SOURCES FROM SANITARY SEWERS.
2,152,000 FY17 Construction Consent Decree
12470 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH
HAMPTON CREEK
REHABILITATE 38,600 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE
METHOD.
2,800,000 FY17 Construction Consent Decree
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
CONSTRUCT 7,000 FEET OF 8-INCH TO 21-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476 AND WET WEATHER
PUMP STATION P-790.
820,000 FY18 Design Services Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
IN THE LEMAY WATERSHED.
7,500,000 FY17 Design Services Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
IN THE LEMAY WATERSHED.
4,000,000 FY17 Land Purchase Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
IN THE LEMAY WATERSHED.
514,000 FY17 Miscellaneous Services Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
IN THE LEMAY WATERSHED.
520,000 FY18 Miscellaneous Services Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
IN THE LEMAY WATERSHED.
365,000 FY19 Miscellaneous Services Consent Decree
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP
TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250 FOOT DEEP
STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THE RIVER DES PERES ALIGNMENT,
INCLUDING SEVERAL CONNECTING TUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES,
310,000 FY20 Miscellaneous Services Consent Decree
11958 LMRDP CSO STORAGE TUNNEL CONSOLIDATION
SEWERS I/O STRUCTURES - FIELDS (I-019/L-011) AND
GERMANIA (I-012/L-014) TO LOUIS (I-007/L-012)
CONSTRUCT THE FIELDS AND GERMANIA TO LOUIS CONSOLIDATION SEWERS TO DELIVER
FLOWS TO THE DEEP STORAGE TUNNEL SYSTEM.
180,000 FY17 Design Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
18 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11959 LMRDP CSO STORAGE TUNNEL CONSOLIDATION
SEWERS I/O STRUCTURES - PERNOD (I-056/L-031) TO
CONSTRUCT THE PERNOD TO MARDEL CONSOLIDATION SEWER TO DELIVER FLOWS TO
THE DEEP STORAGE TUNNEL SYSTEM.
70,000 FY17 Design Services Consent Decree
11816 LMRDP TUNNEL DEWATERING PUMP STATION CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWAGE FROM THE TUNNEL
STORAGE SYSTEM TO THE LEMAY TREATMENT PLANT.
1,890,000 FY17 Design Services Consent Decree
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-
113) UPGRADES
CONSTRUCT UPGRADE OF MECHANICAL VALVE AND PIPING SYSTEMS.500,000 FY20 Design Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
500,000 FY17 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
320,000 FY17 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
500,000 FY18 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
320,000 FY18 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
365,000 FY19 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
320,000 FY19 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
375,000 FY20 Professional Services Consent Decree
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES,
FIELD INVESTIGATIONS AND PRELIMINARY STUDIES.
320,000 FY20 Professional Services Consent Decree
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS -
BAUMGARTNER TO FENTON WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO CONVEY WASTEWATER
FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF
FLOWS AT THE LOWER MERAMEC WWTF.
3,700,000 FY17 Design Services Consent Decree
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS -
BAUMGARTNER TO FENTON WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO CONVEY WASTEWATER
FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF
FLOWS AT THE LOWER MERAMEC WWTF.
2,650,000 FY18 Design Services Consent Decree
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS -
BAUMGARTNER TO FENTON WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO CONVEY WASTEWATER
FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF
FLOWS AT THE LOWER MERAMEC WWTF.
1,000,000 FY18 Property Rights Acquisition Consent Decree
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS -
BAUMGARTNER TO FENTON WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO CONVEY WASTEWATER
FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF
260,000 FY19 Design Services Consent Decree
13164 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION
PHASE I
REHABILITATE 2,150 FEET OF 60-INCH DIAMETER SANITARY SEWER.21,000 FY20 Design Services Consent Decree
13165 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION
PHASE II
REHABILITATE 5,250 FEET OF 8-INCH TO 48-INCH SANITARY SEWERS AND 120
STRUCTURES.
28,000 FY20 Design Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
19 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR ADDITIONAL FLOW, AND
UPGRADE THE FACILITY TO ENABLE ACCOMMODATION OF POTENTIAL NUTRIENT
REMOVAL REQUIREMENTS.
1,058,000 FY19 Pre-Design Services Consent Decree
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR ADDITIONAL FLOW, AND
UPGRADE THE FACILITY TO ENABLE ACCOMMODATION OF POTENTIAL NUTRIENT
REMOVAL REQUIREMENTS.
400,000 FY20 Construction Management Services During
Design
Consent Decree
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR ADDITIONAL FLOW, AND
UPGRADE THE FACILITY TO ENABLE ACCOMMODATION OF POTENTIAL NUTRIENT
4,000,000 FY20 Design Services Consent Decree
11928 LUCAS & HUNT AND I-70 SANITARY SEWER RELOCATE 935 FEET OF 10-INCH SANITARY SEWER FROM BENEATH INTERSTATE
HIGHWAY.
200,000 FY17 Construction Consent Decree
11653 MACKENZIE I/I REDUCTION CONSTRUCT 3,000 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
2,000,000 FY17 Construction Consent Decree
12336 MACKENZIE I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK SEMINARY,
AND NERINX HALL)
PERFORM PRIVATE I/I REDUCTION AT 78 PROPERTIES. 485,000 FY17 Design Services Consent Decree
12336 MACKENZIE I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK SEMINARY,
AND NERINX HALL)
PERFORM PRIVATE I/I REDUCTION AT 78 PROPERTIES.441,000 FY20 Construction Consent Decree
12511 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK SEMINARY,
AND NERINX HALL)
REHABILITATE 46,500 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
70,000 FY18 Design Services Consent Decree
12511 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK SEMINARY,
AND NERINX HALL)
REHABILITATE 46,500 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
6,840,000 FY19 Construction Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
450,000 FY17 Capital Training Cost Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
30,000,000 FY17 Construction (Supplemental Appropriation)Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
485,000 FY17 Engineering During Construction Services Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
50,000 FY17 Non-Capital Training Costs Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
29,000,000 FY18 Construction (Supplemental Appropriation)Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
470,000 FY18 Engineering During Construction Services Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
9,000,000 FY19 Construction (Supplemental Appropriation)Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
20 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
285,000 FY19 Engineering During Construction Services Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
COLLECTION SEWERS.
8,200,000 FY20 Construction (Supplemental Appropriation)Consent Decree
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE
FACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION, AND ASSOCIATED
500,000 FY20 Engineering During Construction Services Consent Decree
12342 MARK TWAIN I/I REDUCTION (MANCHESTER RD AND
BOMPART AVE)
CONSTRUCT 2,030 FEET OF 12-INCH TO 18-INCH SANITARY SEWER, 250 FEET OF 12-INCH
STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION AT 31 PROPERTIES.
420,000 FY18 Design Services Consent Decree
12342 MARK TWAIN I/I REDUCTION (MANCHESTER RD AND
BOMPART AVE)
CONSTRUCT 2,030 FEET OF 12-INCH TO 18-INCH SANITARY SEWER, 250 FEET OF 12-INCH
STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION AT 31 PROPERTIES.
500,000 FY20 Construction Consent Decree
11661 MARTIGNEY I/I REDUCTION CONSTRUCT 664 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
585,000 FY17 Construction Consent Decree
11930 MARTIGNEY PUBLIC I/I REDUCTION REHABILITATE 20,200 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
2,470,000 FY17 Construction Consent Decree
11662 MCNULTY - PALLARDY I/I REDUCTION CONSTRUCT 4,360 FEET OF 12-INCH TO 24-INCH STORM SEWER, 710 FEET OF 8-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
1,630,000 FY17 Construction, Phase II Consent Decree
12348 MEACHAM AND SPELLMAN I/I REDUCTION (I-44 AND S
KIRKWOOD RD)
PERFORM PRIVATE I/I REDUCTION AT 3 PROPERTIES. 40,000 FY18 Design Services Consent Decree
10869 MERAMEC BOTTOMS PUMP STATION (P-489)
INTERCEPTOR SEWER
CONSTRUCT 3,400 FEET OF 6-INCH TO 30-INCH SANITARY SEWER, AND DECOMMISSION
EXISTING PUMP STATION AND FORCEMAIN.
310,000 FY18 Design Services Consent Decree
11663 MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I
REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 110,000 FY17 Construction, Phase II Consent Decree
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS
AVE)
CONSTRUCT 2,320 FEET OF 18-INCH SANITARY SEWER, AND ELIMINATE CONSTRUCTED
SSO OUTFALLS BP-095 AND BP-145.
332,000 FY19 Design Services Consent Decree
12444 N CLARK AVE 49 SANITARY SEWER REPLACEMENT CONSTRUCT 507 FEET OF 8-INCH SANITARY SEWER, INCLUDING 313 FEET OF 8-INCH PIPE
IN TUNNEL, TO REPLACE EXISTING SANITARY SEWER.
370,000 FY19 Construction Consent Decree
12786 N HIGHWAY 67 AT COLDWATER CREEK SANITARY
SEWER REPLACEMENT
CONSTRUCT 310 FEET OF 8-INCH SANITARY SEWER, INCLUDING 150 FEET OF PIPE IN
TUNNEL.
890,000 FY19 Construction Consent Decree
12536 NATURAL BRIDGE RD - DARBY TO CHEVROLET
COMBINED SEWER RELIEF
REPLACE 1,100 FEET OF 36-INCH TO 42-INCH COMBINED SEWER WITH 54-INCH COMBINED
SEWER, AND REPLACE 10 SINGLE INLETS WITH DOUBLE INLETS.
1,800,000 FY18 Construction Consent Decree
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-
323) IMPROVEMENTS
CONSTRUCT 2,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 1,600 FEET OF 6-INCH
FORCEMAIN, AND REPLACE SANITARY PUMP STATION P-323.
220,000 FY18 Design Services Consent Decree
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-
323) IMPROVEMENTS
CONSTRUCT 2,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 1,600 FEET OF 6-INCH
FORCEMAIN, AND REPLACE SANITARY PUMP STATION P-323.
4,500,000 FY20 Construction Consent Decree
10716 NEW ENGLAND TOWN QUARRY PUMP STATION (P-
307) (SKME-544) IMPROVEMENTS
CONSTRUCT 2,500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, 1,200 FEET OF 10-INCH
SANITARY FORCEMAIN, AND REPLACE SANITARY PUMP STATION P-307.
400,000 FY18 Design Services Consent Decree
10716 NEW ENGLAND TOWN QUARRY PUMP STATION (P-
307) (SKME-544) IMPROVEMENTS
CONSTRUCT 2,500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, 1,200 FEET OF 10-INCH
SANITARY FORCEMAIN, AND REPLACE SANITARY PUMP STATION P-307.
3,500,000 FY20 Construction Consent Decree
11693 NORTH BADEN CREEK I/I REDUCTION (BP-532)
(WINCHESTER DR)
CONSTRUCT 2,110 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
2,175,000 FY17 Construction, Phase II Consent Decree
11694 NORTH BADEN CREEK I/I REDUCTION (BP-612)
(CANTERBURY DR)
CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
75,000 FY17 Construction Consent Decree
12362 NORTH FOREST AND BROOKSIDE I/I REDUCTION
(SUMMIT AVE AND MARSHALL AVE)
PERFORM PRIVATE I/I REDUCTION AT 67 PROPERTIES. 240,000 FY17 Design Services Consent Decree
12362 NORTH FOREST AND BROOKSIDE I/I REDUCTION
(SUMMIT AVE AND MARSHALL AVE)
PERFORM PRIVATE I/I REDUCTION AT 67 PROPERTIES. 250,000 FY19 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
21 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH
BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD
AND MANCHESTER)
PERFORM PRIVATE I/I REDUCTION AT 84 PROPERTIES. 525,000 FY17 Design Services Consent Decree
12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH
BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD
PERFORM PRIVATE I/I REDUCTION AT 84 PROPERTIES. 400,000 FY19 Construction Consent Decree
12460 OAKLAND COMBINED SEWER DETENTION AND DETENTION AND STORAGE IMPROVEMENTS TO BE MADE IN CONJUNCTION WITH 1,000,000 FY20 Construction Consent Decree
12799 ODELL 6942 - 44 FLOOD MITIGATION BUYOUT FLOOD PRONE PROPERTY AS PART OF THE CITYSHED EFFORT. 200,000 FY18 Land Purchase Consent Decree
12702 OLIVE / WASHINGTON - GRAND TO VANDEVENTER
COMBINED SEWER RELIEF
CONSTRUCT 3,000 FEET OF 12-INCH TO 36-INCH STORM SEWER, TO SEPARATE STORM
FLOWS FROM THE COMBINED SEWER SYSTEM.
1,450,000 FY19 Construction Consent Decree
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)CONSTRUCT 300 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
51,000 FY17 Construction, Phase II Consent Decree
11409 PAISLEY-ROSLYN-GAYLORD STORM SEWER
SEPARATION
CONSTRUCT 1,600 FEET OF 15-INCH TO 54-INCH STORM SEWER, TO REDUCE
STORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
2,000,000 FY20 Construction Consent Decree
11989 PARDEE - BLACKTHORN - HOLLY I/I REDUCTION
(WATSON RD AND S ROCK HILL RD)
CONSTRUCT 2,200 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALL BP-631
1,320,000 FY17 Construction Consent Decree
12163 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE)
CONSTRUCT 5,100 FEET OF 12-INCH TO 36-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-451 AND BP-621.
1,480,000 FY17 Design Services Consent Decree
12163 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE)
CONSTRUCT 5,100 FEET OF 12-INCH TO 36-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-451 AND BP-621.
450,000 FY18 Design Services Consent Decree
12163 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE)
CONSTRUCT 5,100 FEET OF 12-INCH TO 36-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-451 AND BP-621.
2,603,000 FY20 Construction Consent Decree
11698 PICKWICK - BERNADINE - BIMINI SANITARY RELIEF CONSTRUCT 1,100 FEET OF 12-INCH TO 15-INCH REPLACEMENT SANITARY SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-401.
375,000 FY18 Construction, Phase II Consent Decree
11877 PRIVATE INFLOW AND INFILTRATION REDUCTION
PROGRAM
CONTINUE PROGRAM TO REDUCE SOURCES OF PRIVATE INFLOW AND INFILTRATION INTO
THE SANITARY SEWER SYSTEM.
500,000 FY18 Work Order Repair Costs (Capital)Consent Decree
11877 PRIVATE INFLOW AND INFILTRATION REDUCTION
PROGRAM
CONTINUE PROGRAM TO REDUCE SOURCES OF PRIVATE INFLOW AND INFILTRATION INTO
THE SANITARY SEWER SYSTEM.
1,000,000 FY18 Work Order Repair Costs (Non-Capital)Consent Decree
11877 PRIVATE INFLOW AND INFILTRATION REDUCTION
PROGRAM
CONTINUE PROGRAM TO REDUCE SOURCES OF PRIVATE INFLOW AND INFILTRATION INTO
THE SANITARY SEWER SYSTEM.
500,000 FY20 Work Order Repair Costs (Capital)Consent Decree
11700 PROVIDENCE SANITARY RELIEF (SKME-640)CONSTRUCT 780 FEET OF 8-INCH SANITARY SEWER, 215 FEET OF 12-INCH STORM SEWER,
AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
150,000 FY17 Construction Consent Decree
12697 PUMP STATION REPAIR AND IMPROVEMENT DESIGN
(CONTRACT A)
DESIGN PUMP STATION FACILITY IMPROVEMENTS TO INCLUDE NEEDED REPAIR,
RENOVATION, RECONSTRUCTION, OR ELIMINATION.
600,000 FY18 Professional Services Consent Decree
11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I)REPLACE PUMP STATIONS P-708 (EXPRESSWAY). 1,720,000 FY17 Construction Consent Decree
11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I)REPLACE PUMP STATIONS P-708 (EXPRESSWAY). 60,000 FY19 Design Services Consent Decree
11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I)REPLACE PUMP STATIONS P-708 (EXPRESSWAY).1,300,000 FY20 Construction, Phase II Consent Decree
12005 RADAR RAINFALL DATA (2017)INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON
PERFORMANCE.
135,000 FY17 Vendor Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
22 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12005 RADAR RAINFALL DATA (2017)INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON
PERFORMANCE.
140,000 FY18 Vendor Services Consent Decree
12005 RADAR RAINFALL DATA (2017)INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON
PERFORMANCE.
120,000 FY19 Vendor Services Consent Decree
12006 RADAR RAINFALL DATA (2020)INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
150,000 FY20 Vendor Services Consent Decree
12901 RDP FOULWATER SEWER GRIT CHAMBER
ELIMINATION (DEER CREEK)
CONSTRUCT 185 FEET OF 72-INCH SANITARY SEWER AND ELIMINATE GRIT CHAMBER. 2,050,000 FY19 Construction Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
615,000 FY17 Professional Services Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
250,000 FY17 Professional Services Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
750,000 FY18 Professional Services Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
600,000 FY19 Professional Services Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
200,000 FY19 Professional Services Consent Decree
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS TO MEET CONSENT DECREE
REQUIREMENTS.
800,000 FY20 Professional Services Consent Decree
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
5,000,000 FY17 Design Services Consent Decree
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
3,800,000 FY18 Design Services Consent Decree
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
3,000,000 FY18 Land Purchase Consent Decree
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
4,000,000 FY19 Design Services Consent Decree
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
4,000,000 FY20 Design Services Consent Decree
12420 REAVSDALE I/I REDUCTION (MACKENZIE RD AND
REAVIS BARRACKS RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 110,000 FY17 Construction Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
23 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12789 RIVERSIDE AND YARNELL SANITARY RELIEF -
FORENSIC TESTING
INVESIGATION OF POTENTIAL DESIGN AND CONSTRUCTION CLAIMS ASSOCIATED WITH
THE RIVERSIDE AND YARNELL SANITARY RELIEF (SKME-400) PROJECT, 10146.
600,000 FY17 Vendor Services Consent Decree
13079 RIVERSIDE AND YARNELL SANITARY RELIEF
REHABILITATION
REHABILITATE APPROXIMATELY 1,110 FEET OF 36-INCH TO 48-INCH SANITARY SEWER
USING THE CURED IN PLACE PIPE METHOD.
1,600,000 FY19 Construction Consent Decree
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
REPLACE APPROXIMATELY 5,700 FEET OF 42-INCH TO 48-INCH SANITARY SEWER. 3,300,000 FY19 Construction Consent Decree
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
REPLACE APPROXIMATELY 5,700 FEET OF 42-INCH TO 48-INCH SANITARY SEWER.3,000,000 FY20 Construction (Supplemental Appropriation)Consent Decree
12190 ROBYN I/I REDUCTION (S LINDBERGH BLVD AND
ROBYN RD)
REMOVE PRIVATE I/I SOURCES AT 12 PROPERTIES. 35,000 FY17 Design Services Consent Decree
11069 ROCK HILL SANITARY RELIEF (SKME-618)CONSTRUCT 70 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES AT 2
PROPERTIES.
18,000 FY17 Construction, Phase II Consent Decree
12191 ROLAND SANITARY RELIEF (NELSON DR TO ROLAND
BLVD)
CONSTRUCT 570 FEET OF 12-INCH TO 18-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-532.
90,000 FY19 Design Services Consent Decree
11919 ROLENS AND TELEGRAPH SANITARY STORAGE CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE, AND 220 FEET OF 8-
INCH TO 10-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-222
590,000 FY17 Construction Consent Decree
12530 ROSARY LANE SANITARY RELIEF (CLAUDINE DRIVE
TO MAKIN AVE)
CONSTRUCT 200 FEET OF 12-INCH STORM SEWER AND PERFORM PRIVATE I/I REDUCTION
AT 5 PROPERTIES. ELIMINATE CONSTRUCTED SSO OUTFALL BP-640.
57,000 FY18 Design Services Consent Decree
11680 ROXBURY I/I REDUCTION CONSTRUCT 1,600 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
AT 15 PROPERTIES.
596,000 FY18 Construction, Phase II Consent Decree
12193 ROYAL PINES PUMP STATION (P-739) REPLACEMENT REPLACE PUMP STATION P-739. 625,000 FY18 Construction Consent Decree
11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RD
AND SAPPINGTON RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 300,000 FY17 Construction Consent Decree
12200 SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR
TO S GREENTRAILS DR)
CONSTRUCT 3,920 FEET OF 18-INCH SANITARY SEWER.630,000 FY20 Design Services Consent Decree
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK
LN TO SUNNY WOOD CT)
CONSTRUCT 1,010 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.180,000 FY20 Design Services Consent Decree
11059 SENECA PRIVATE I/I REDUCTION CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
1,840,000 FY17 Construction Consent Decree
12201 SHREWSBURY SANITARY RELIEF SEWER AND I/I
REDUCTION (WEIL AVE AND I-44)
CONSTRUCT 600 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 196 PROPERTIES.
670,000 FY19 Design Services Consent Decree
12205 SOUTH COUNTY SANITARY RELIEF (P-419 TO
CRIPPLE CREEK DR)
CONSTRUCT 8,900 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. 800,000 FY17 Design Services Consent Decree
12205 SOUTH COUNTY SANITARY RELIEF (P-419 TO
CRIPPLE CREEK DR)
CONSTRUCT 8,900 FEET OF 12-INCH TO 21-INCH SANITARY SEWER.6,140,000 FY20 Construction Consent Decree
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO
DALE AVE)
CONSTRUCT 2,520 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-440.
332,000 FY19 Design Services Consent Decree
12209 SPRINGDALE I/I REDUCTION (ROLLING DR AND
SMITHFIELD PL)
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 75,000 FY17 Construction Consent Decree
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO
GRAVOIS RD TO NEW HAMPSHIRE AVE)
CONSTRUCT 4,410 FEET OF 18-INCH TO 21-INCH SANITARY SEWER 660,000 FY20 Design Services Consent Decree
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO
N LAFAYETTE ST)
CONSTRUCT 1,375 FEET OF 12-INCH SANITARY SEWER, AND ELIMINATE CONSTRUCTED
SSO OUTFALL BP-110.
171,000 FY20 Design Services Consent Decree
11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL CONSTRUCT 700 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 15 PROPERTIES.
2,700,000 FY17 Construction Consent Decree
11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL CONSTRUCT 700 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 15 PROPERTIES.
550,000 FY18 Construction, Phase II Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
24 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
10350 STONINGTON - GEORGIAN ACRES STORM SEWER CONSTRUCT 1,135 FEET OF 15-INCH TO 33-INCH STORM SEWER, 295 FEET OF 8-INCH AND
12-INCH DIP SANITARY SEWER, AND 12 RAIN GARDENS.
270,000 FY18 Construction Consent Decree
12218 STONINGTON PLACE SANITARY RELIEF (CLAYTON
RD TO GEORGIAN ACRES ST)
CONSTRUCT 238 FEET OF 12-INCH SANITARY SEWER. 90,000 FY18 Design Services Consent Decree
12218 STONINGTON PLACE SANITARY RELIEF (CLAYTON
RD TO GEORGIAN ACRES ST)
CONSTRUCT 238 FEET OF 12-INCH SANITARY SEWER.300,000 FY20 Construction Consent Decree
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM IN CONJUNCTION WITH
WASTEWATER AND STORMWATER PLANNING AND DESIGN EFFORTS, AND TO SUPPORT
REPORTING WHICH IS REQUIRED PURSUANT TO THE CONSENT DECREE.
590,000 FY17 Vendor Services Consent Decree
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM IN CONJUNCTION WITH
WASTEWATER AND STORMWATER PLANNING AND DESIGN EFFORTS, AND TO SUPPORT
REPORTING WHICH IS REQUIRED PURSUANT TO THE CONSENT DECREE.
605,000 FY18 Vendor Services Consent Decree
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM IN CONJUNCTION WITH
WASTEWATER AND STORMWATER PLANNING AND DESIGN EFFORTS, AND TO SUPPORT
REPORTING WHICH IS REQUIRED PURSUANT TO THE CONSENT DECREE.
500,000 FY19 Vendor Services Consent Decree
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM IN CONJUNCTION WITH
WASTEWATER AND STORMWATER PLANNING AND DESIGN EFFORTS, AND TO SUPPORT
REPORTING WHICH IS REQUIRED PURSUANT TO THE CONSENT DECREE.
625,000 FY20 Vendor Services Consent Decree
12003 STREAM FLOW WATER QUALITY SAMPLING (2017)PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
251,945 FY17 Vendor Services Consent Decree
12003 STREAM FLOW WATER QUALITY SAMPLING (2017)PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
259,504 FY18 Vendor Services Consent Decree
12003 STREAM FLOW WATER QUALITY SAMPLING (2017)PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
273,789 FY19 Vendor Services Consent Decree
12004 STREAM FLOW WATER QUALITY SAMPLING (2020)PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE.
300,000 FY20 Vendor Services Consent Decree
12221 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT
TO COVE LN)
CONSTRUCT 4,400 FEET OF 18-INCH TO 21-INCH SANITARY SEWER. CONTINGENCY
PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP-213.
526,000 FY19 Design Services Consent Decree
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO
JENNER LN)
CONSTRUCT 4,300 FEET OF 8-INCH TO 27-INCH SANITARY SEWER. CONTINGENCY
PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP-214.
452,000 FY19 Design Services Consent Decree
12222 SUBURBAN I/I REDUCTION (HARRISON DR AND
SUBURBAN AVE)
CONSTRUCT 780 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
569,000 FY17 Construction Consent Decree
12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
REHABILITATE 29,000 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE
METHOD.
2,500,000 FY17 Construction Consent Decree
12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND
COUCH AVE)
PERFORM PRIVATE I/I REDUCTION AT 61 PROPERTIES. 226,000 FY17 Design Services Consent Decree
12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND
COUCH AVE)
PERFORM PRIVATE I/I REDUCTION AT 61 PROPERTIES. 375,000 FY19 Construction Consent Decree
12228 TESSON CREEK I/I REDUCTION (TESSON FERRY RD
AND TIFFANY SQUARE PKY)
CONSTRUCT 360 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 5 PROPERTIES
110,000 FY18 Design Services Consent Decree
12228 TESSON CREEK I/I REDUCTION (TESSON FERRY RD
AND TIFFANY SQUARE PKY)
CONSTRUCT 360 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 5 PROPERTIES
202,000 FY20 Construction Consent Decree
12229 THURSTON I/I REDUCTION (CHURCH ST AND N
FLORISSANT RD)
PERFORM PRIVATE I/I REDUCTION AT 21 PROPERTIES. 52,000 FY18 Design Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
25 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12230 TILLES PARK, LITZSINGER AND PARKRIDGE I/I
REDUCTION (LITZSINGER RD AND S MCKNIGHT RD)
CONSTRUCT 1,055 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 24 PROPERTIES.
320,000 FY18 Design Services Consent Decree
12230 TILLES PARK, LITZSINGER AND PARKRIDGE I/I
REDUCTION (LITZSINGER RD AND S MCKNIGHT RD)
CONSTRUCT 1,055 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 24 PROPERTIES.
1,800,000 FY20 Construction Consent Decree
11139 TILLIE BADEN NEWBY SEWER IMPROVEMENTS
(PROPERTY ACQUISITION)
ACQUISITION OF 50 PROPERTIES. 900,000 FY17 Land Purchase Consent Decree
12232 TM-03 TWO MILE CREEK SANITARY RELIEF (TWO
MILE TRUNK TO FIRETHORN DR)
CONSTRUCT 350 FEET OF 18-INCH SANITARY SEWER. CONTINGENCY PROJECT TO
ELIMINATE CONSTRUCTED SSO OUTFALL BP-556.
50,000 FY20 Design Services Consent Decree
12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION
(AMBS RD AND TOWNE CENTRE DR)
PERFORM PRIVATE I/I REDUCTION AT 8 PROPERTIES. 260,000 FY17 Design Services Consent Decree
12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION
(AMBS RD AND TOWNE CENTRE DR)
PERFORM PRIVATE I/I REDUCTION AT 8 PROPERTIES. 115,000 FY19 Construction Consent Decree
12238 TREASURE COVE I/I REDUCTION (RIES RD AND
BROOKSIDE LN)
CONSTRUCT 300 FEET OF 8-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I AT 32
PROPERTIES.
120,000 FY18 Design Services Consent Decree
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER
(WEBER RD TO HILDESHEIM AVE)
CONSTRUCT 4,630 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, AND 1,235 FEET OF 12-
INCH TO 18-INCH STORM SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP-618.
739,000 FY19 Design Services Consent Decree
12240 UNION CREEK I/I REDUCTION (I-55 BETWEEN S
LINDBERGH BLVD AND BUCKLEY RD)
CONSTRUCT 90 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
250,000 FY18 Construction Consent Decree
11991 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY
HILLS AND BEL-NOR)
CONSTRUCT 3,920 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
2,400,000 FY18 Construction Consent Decree
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND CONSTRUCT 7,000 FEET OF 12-INCH TO 42-INCH STORM SEWER, CONSTRUCT 1,400 FEET 5,506,000 FY19 Construction Consent Decree
11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10)REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 170,000 FY17 Construction Consent Decree
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-
02, & WC-03)
CONSTRUCT 3,000 FEET OF 12-INCH TO 27-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
150,000 FY17 Construction Consent Decree
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-
02, & WC-03)
CONSTRUCT 3,000 FEET OF 12-INCH TO 27-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
1,260,000 FY18 Construction, Phase II Consent Decree
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-
02, & WC-03)
CONSTRUCT 3,000 FEET OF 12-INCH TO 27-INCH STORM SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.
60,000 FY19 Construction, Phase II Consent Decree
12437 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-
08 AND UR-09)
REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
4,330,000 FY17 Construction Consent Decree
12438 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-
10)
REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE
METHOD.
1,950,000 FY17 Construction Consent Decree
11992 UNIVERSITY CITY SANITARY STORAGE FACILITY CONSTRUCT A 9 MILLION GALLON STORAGE FACILITY, PUMP STATION, AND COLLECTION
SEWERS.
3,700,000 FY19 Land Purchase Consent Decree
11681 UPPER COLDWATER SECTION D I/I REDUCTION CONSTRUCT 3,200 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
875,000 FY17 Construction, Phase II Consent Decree
12244 UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S
WARSON RD AND LADUE RD)
PERFORM PRIVATE I/I REDUCTION AT 44 PROPERTIES. 175,000 FY18 Design Services Consent Decree
12244 UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S
WARSON RD AND LADUE RD)
PERFORM PRIVATE I/I REDUCTION AT 44 PROPERTIES.375,000 FY20 Construction Consent Decree
10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION A
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN
TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-305.
225,000 FY17 Capital Training Cost Consent Decree
10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION A
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN
TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-305.
10,400,000 FY17 Construction (Supplemental Appropriation)Consent Decree
10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION A
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN
TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-305.
25,000 FY17 Non-Capital Training Costs Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
26 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11791 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION B
CONSTRUCT 6,000 FEET OF 8-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN
TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-597.
7,000,000 FY18 Construction Consent Decree
11791 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION B
CONSTRUCT 6,000 FEET OF 8-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN
TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP-597.
3,400,000 FY19 Construction (Supplemental Appropriation)Consent Decree
12247 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV
SECTION C PUBLIC I/I REDUCTION
REHABILITATE 20,000 FEET OF 8-INCH TO 42-INCH SEWER.4,400,000 FY20 Construction Consent Decree
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS.
1,500,000 FY17 Pre-Design Services Consent Decree
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS.
700,000 FY18 Pre-Design Services Consent Decree
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS.
1,900,000 FY19 Design Services Consent Decree
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION,
AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS.
4,000,000 FY20 Design Services Consent Decree
10027 UR-10 MENDELL AND WOLTER SANITARY RELIEF
(SKME-595)
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARY RELIEF SEWERS AND
APPURTENANCES. CONSTRUCTED SANITARY SEWER OVERFLOWS TO BE REMOVED.
550,000 FY17 Construction Consent Decree
12253 VALCOUR AND BURLINGTON RR SANITARY RELIEF
AND I/I REDUCTION (VALCOUR RD AND WATSON RD)
CONSTRUCT 355 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 60 PROPERTIES.
500,000 FY19 Construction Consent Decree
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND
KEHRS MILL RD)
REHABILITATE 11,000 FEET OF 8-INCH SEWER.87,000 FY20 Design Services Consent Decree
12490 VANCE RD PUMP STATION (P-472) UPGRADES CONSTRUCT UPGRADE OF ELECTRICAL, MECHANICAL, AND CONTROL SYSTEMS,
REHABILITATE STRUCTURE AND WET WELL, AND ELEVATE ELECTRICAL ROOM FLOOR TO
REDUCE RISK FROM FLOODING.
520,000 FY19 Design Services Consent Decree
12490 VANCE RD PUMP STATION (P-472) UPGRADES CONSTRUCT UPGRADE OF ELECTRICAL, MECHANICAL, AND CONTROL SYSTEMS, 4,160,000 FY20 Construction Consent Decree
11676 VILLA COUBLAY SANITARY RELIEF CONSTRUCT 510 FEET OF 12-INCH SANITARY SEWER.85,000 FY20 Design Services Consent Decree
12922 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN
REPLACEMENT (COAL BANK RD TO SPRING GARDEN
CONSTRUCT 9,480 FEET OF 20-INCH FORCEMAIN. 993,000 FY19 Design Services Consent Decree
12491 WATKINS CREEK PUMP STATION (P-101) UPGRADES CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATE LOCATION OUTSIDE
OF THE FLOODPLAIN.
500,000 FY17 Design Services Consent Decree
12491 WATKINS CREEK PUMP STATION (P-101) UPGRADES CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATE LOCATION OUTSIDE
OF THE FLOODPLAIN.
478,000 FY19 Design Services Consent Decree
12491 WATKINS CREEK PUMP STATION (P-101) UPGRADES CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATE LOCATION OUTSIDE
OF THE FLOODPLAIN.
5,500,000 FY20 Construction Consent Decree
12273 WAYFARER EAST I/I REDUCTION (HANNA RD AND BIG
BEND WOODS DR)
REMOVE PRIVATE I/I AT 5 PROPERTIES. 20,000 FY18 Design Services Consent Decree
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE III
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. 440,000 FY19 Construction Consent Decree
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
CONSTRUCT 3,200 FEET OF 12-INCH TO 21-INCH STORM SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 40 PROPERTIES.
1,300,000 FY19 Construction, Phase III Consent Decree
11679 WEST LOCKWOOD SANITARY RELIEF CONSTRUCT 3,660 FEET OF 12-INCH TO 24-INCH SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-187 AND BP-587.
432,000 FY19 Design Services Consent Decree
Wastewater CIRP Project Listing
FY 2017 to FY 2020
27 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
11965 WEST WISE I/I REDUCTION (NW QUAD I-64 AND BIG
BEND BLVD)
CONSTRUCT 5,000 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.
3,650,000 FY17 Construction Consent Decree
12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I
REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY
RD)
CONSTRUCT 130 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 21 PROPERTIES.
180,000 FY17 Design Services Consent Decree
12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I
REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY
RD)
CONSTRUCT 130 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 21 PROPERTIES.
270,000 FY19 Construction Consent Decree
11212 WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
CONSTRUCT 1,900 FEET OF 12-INCH TO 30-INCH STORM SEWER, 1,400 FEET OF 12-INCH TO
15-INCH SANITARY SEWER, AND PERFORM PRIVATE I/I REDUCTION AT 7 PROPERTIES.
500,000 FY18 Design Services Consent Decree
12296 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL
LN)
CONSTRUCT 2,790 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. 276,000 FY17 Design Services Consent Decree
12296 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL
LN)
CONSTRUCT 2,790 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. 1,375,000 FY19 Construction Consent Decree
10237 WOODS MILL SANITARY RELIEF (SKME-020)CONSTRUCT 5,950 FEET OF 8-INCH TO 24-INCH DIAMETER SANITARY RELIEF SEWERS AND
APPURTENANCES.
2,000,000 FY17 Construction Consent Decree
12302 WW-2 AND WW-3 WARSON WOODS SANITARY
RELIEF
CONSTRUCT 5,960 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.1,631,000 FY20 Design Services Consent Decree
12309 YARNELL CREEK WEST I/I REDUCTION (BOWLES AVE
AND 141)
PERFORM PRIVATE I/I REDUCTION AT 3 PROPERTIES. 19,000 FY18 Design Services Consent Decree
1,189,329,238 Consent Decree Total
12832 FENTON WWTF LEVEE IMPROVEMENTS CONSTRUCT LEVEE IMPROVEMENTS TO RAISE THE CREST ELEVATION OF THE LEVEE,
INCLUDING GATE AND FENCING, AND HIGH WATER PUMP STATION MODIFICATIONS.
190,000 FY18 Construction Other
13072 GRAND GLAIZE WWTF FLOODWALL PROTECTION CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENT PLANT AND
MAINTENANCE BUILDINGS FROM FLOODING.
535,000 FY19 Design Services Other
13072 GRAND GLAIZE WWTF FLOODWALL PROTECTION CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENT PLANT AND
MAINTENANCE BUILDINGS FROM FLOODING.
2,750,000 FY20 Construction Other
13072 GRAND GLAIZE WWTF FLOODWALL PROTECTION CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENT PLANT AND
MAINTENANCE BUILDINGS FROM FLOODING.
200,000 FY20 Engineering During Construction Services Other
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 705,000 FY17 Design Services Other
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,000,000 FY18 Construction Other
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 4,400,000 FY19 Construction, Design-Build (Supplemental
Appropriation)
Other
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 1,000,000 FY19 Design Services Other
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES.1,200,000 FY20 Design Services Other
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES.5,200,000 FY20 Construction Other
11094 PROSPECT HILL LANDFILL VERTICAL EXPANSION CONSTRUCT IMPROVEMENTS TO ENABLE FULL UTILIZATION OF PERMITTED LANDFILL
CAPACITY.
370,000 FY18 Construction, Phase II Other
12835 SULPHUR YARD - VACTOR TRUCK DISPOSAL
BUILDING
CONSTRUCT A 2,600 SQUARE FOOT PREFABRICATED METAL BUILDING. 835,000 FY18 Construction Other
12835 SULPHUR YARD - VACTOR TRUCK DISPOSAL
BUILDING
CONSTRUCT A 2,600 SQUARE FOOT PREFABRICATED METAL BUILDING. 50,000 FY19 Construction Other
19,435,000 Other Total
Wastewater CIRP Project Listing
FY 2017 to FY 2020
28 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND LEMAY WASTEWATER
TREATMENT FACILITIES, TO INCLUDE REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND
SOLIDS HANDLING SYSTEM IMPROVEMENTS.
1,000,000 FY19 Pre-Design Services Regulatory / Permit Compliance
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND LEMAY WASTEWATER
TREATMENT FACILITIES, TO INCLUDE REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND
SOLIDS HANDLING SYSTEM IMPROVEMENTS.
6,000,000 FY20 Design Services Regulatory / Permit Compliance
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR REPLACEMENT
CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR.5,700,000 FY20 Construction Regulatory / Permit Compliance
12547 BISSELL POINT WWTF PRELIMINARY AND PRIMARY
TREATMENT MCC REPLACEMENT
REPLACE MOTOR CONTROL CENTERS.1,600,000 FY20 Construction Regulatory / Permit Compliance
12828 BISSELL POINT WWTF REDUNDANT SLUDGE
ACCEPTANCE SYSTEM
CONSTRUCT REDUNDANT SLUDGE ACCEPTANCE SYSTEM AT THE BISSELL PLANT. 3,500,000 FY19 Construction Regulatory / Permit Compliance
12691 BISSELL POINT WWTF REPAIR AND IMPROVEMENT
DESIGN (CONTRACT A)
DESIGN REPAIRS AND IMPROVEMENTS AT THE BISSELL POINT WWTF, TO INCLUDE
FACILITIES SUCH AS SLUICE GATES, MOTOR CONTROL CENTERS, BELT CONVEYORS,
SUBSTATION SWITCHGEAR, ASH LAGOON FLOORS, AND SLUDGE ACCEPTANCE SYSTEM.
2,690,000 FY18 Professional Services Regulatory / Permit Compliance
12566 BISSELL POINT WWTF TRICKLING FILTER MEDIA
REPLACEMENT
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELL PLANT.1,600,000 FY20 Design Services Regulatory / Permit Compliance
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
DEMOLISH EXISTING FOUR SQUARE CLARIFIERS AND CONSTRUCT NEW FOURTH
CIRCULAR CLARIFIER. ENLARGE FEED CHANNEL AND PIPING TO THE EXISTING THREE
CIRCULAR CLARIFIERS.
4,300,000 FY18 Construction Regulatory / Permit Compliance
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
DEMOLISH EXISTING FOUR SQUARE CLARIFIERS AND CONSTRUCT NEW FOURTH
CIRCULAR CLARIFIER. ENLARGE FEED CHANNEL AND PIPING TO THE EXISTING THREE
CIRCULAR CLARIFIERS.
200,000 FY19 Engineering During Construction Services Regulatory / Permit Compliance
12727 COUNTY TREATMENT FACILITY DESIGN (CONTRACT
A)
DESIGN COUNTY TREATMENT FACILITY REPAIRS AND IMPROVEMENTS TO INCLUDE ITEMS
SUCH AS SWITCHGEAR REPLACEMENT, REPAIRS TO TANKS, BUILDINGS, AND INFLUENT
SCREENS, SLUDGE PROCESSING IMPROVEMENTS, AND PROCESS BUILDING ADDITIONS.
1,134,000 FY17 Professional Services Regulatory / Permit Compliance
12495 GRAND GLAIZE WWTF BUILDING, SWITCHGEAR,
TANK AND SCREEN REPAIRS
CONSTRUCT REPAIRS TO ADDRESS BUILDING SETTLING, TANK DETERIORATION,
SWITCHGEAR PROBLEMS, AND INFLUENT PUMPING STATION SCREEN ISSUES.
5,800,000 FY18 Construction Regulatory / Permit Compliance
12893 INFRASTRUCTURE REPAIRS (FACILITIES) (2018)CONSTRUCT NEEDED REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TO
ADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS, PUMP STATIONS, AND
FORCE MAINS.
3,000,000 FY18 Work Order Repair Costs (Capital)Regulatory / Permit Compliance
12896 INFRASTRUCTURE REPAIRS (FACILITIES) (2019)CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TO ADDRESS NEEDS
AT FACILITIES SUCH AS TREATMENT PLANTS AND PUMP STATIONS.
3,000,000 FY19 Work Order Repair Costs (Capital)Regulatory / Permit Compliance
12897 INFRASTRUCTURE REPAIRS (FACILITIES) (2020)CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TO ADDRESS NEEDS
AT FACILITIES SUCH AS TREATMENT PLANTS AND PUMP STATIONS.
3,000,000 FY20 Work Order Repair Costs (Capital)Regulatory / Permit Compliance
12428 LEMAY WWTF CONCRETE PRESERVATION REPAIR AND/OR REPLACE DETERIORATED CONCRETE DECKS IN ALL OUTSIDE PROCESS
AREAS AND FINAL SETTLING TANK EFFLUENT CHANNEL.
2,000,000 FY17 Construction Regulatory / Permit Compliance
12721 LEMAY WWTF REDUNDANT WATER SERVICE CONSTRUCT 1,265 FEET OF 6-INCH DUCTILE IRON POTABLE WATER PIPE, TO PROVIDE A
REDUNDANT WATER FEED TO THE FACILITY.
130,000 FY18 Design Services Regulatory / Permit Compliance
12721 LEMAY WWTF REDUNDANT WATER SERVICE CONSTRUCT 1,265 FEET OF 6-INCH DUCTILE IRON POTABLE WATER PIPE, TO PROVIDE A
REDUNDANT WATER FEED TO THE FACILITY.
520,000 FY19 Construction Regulatory / Permit Compliance
12721 LEMAY WWTF REDUNDANT WATER SERVICE CONSTRUCT 1,265 FEET OF 6-INCH DUCTILE IRON POTABLE WATER PIPE, TO PROVIDE A
REDUNDANT WATER FEED TO THE FACILITY.
42,000 FY19 Engineering During Construction Services Regulatory / Permit Compliance
12501 LOWER MERAMEC RIVER WWTF SCREEN CHANNEL
IMPROVEMENTS
INSTALL SCREEN CHANNEL COATING SYSTEM TO REPAIR AND PROTECT THE STRUCTURE
FROM CHEMICAL DAMAGE.
290,000 FY17 Construction Regulatory / Permit Compliance
12501 LOWER MERAMEC RIVER WWTF SCREEN CHANNEL
IMPROVEMENTS
INSTALL SCREEN CHANNEL COATING SYSTEM TO REPAIR AND PROTECT THE STRUCTURE
FROM CHEMICAL DAMAGE.
274,000 FY17 Construction, Phase II Regulatory / Permit Compliance
Wastewater CIRP Project Listing
FY 2017 to FY 2020
29 of 29
Project
Number
Project Name Scope of Work Appropriation /
Budget
Fiscal
Year
Task Category
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO REDUCE HUMIDITY, AND REPLACE CORRODED
ELEMENTS.
500,000 FY18 Design Services Regulatory / Permit Compliance
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO REDUCE HUMIDITY, AND REPLACE CORRODED
ELEMENTS.
5,000,000 FY19 Construction Regulatory / Permit Compliance
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO REDUCE HUMIDITY, AND REPLACE CORRODED
ELEMENTS.
200,000 FY19 Design Services Regulatory / Permit Compliance
12616 MISSOURI RIVER WWTF BERM AND WATER FEED
UPGRADE
CONSTRUCT EARTH BERM TO PROTECT THE SOLIDS HANDLING BUILDING FROM THE 100
YEAR STORM EVENT AND INSTALL AN ADDITIONAL POTABLE SUPPLY LINE.
690,000 FY17 Construction Regulatory / Permit Compliance
12502 MISSOURI RIVER WWTF POWER FEEDER
REPLACEMENT
REPLACE POWER FEEDER CABLES THAT CONNECT THE PRIMARY CLARIFIER BUILDING
AND EFFLUENT PUMP STATION TO THE MOTOR CONTROL CENTER.
825,000 FY18 Construction Regulatory / Permit Compliance
12643 MISSOURI RIVER WWTF SECONDARY TREATMENT
ELECTRICAL / MECHANICAL MODIFICATIONS
CONSTRUCT ELECTRICAL AND MECHANICAL IMPROVEMENTS AT THE MISSOURI RIVER
TREATMENT PLANT.
380,000 FY17 Construction Regulatory / Permit Compliance
53,375,000 Regulatory / Permit Compliance
1,262,139,238 Grand Total