HomeMy Public PortalAboutExhibit MSD 8 - FY 2019 CIRP Budget DocumentMetropolitan St. Louis
Sewer District
2018 -2019
Budget Supplement
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2019
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2019 (July 1, 2018 to
June 30, 2019). This document is divided into the following sections:
• Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects
that have scheduled construction starts during Fiscal Year 2019. The Wastewater Engineering Projects and
Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal
Year 2019 (which includes design, planning, and data collection/system investigation services). Due to the
magnitude and complexity of these projects and the requirements for permitting and easement acquisition,
their construction is scheduled in future years. The Contingency Projects sections detail projects that are
currently scheduled for Fiscal Year 2020, but may be expedited to begin construction during Fiscal Year
2019, if revenue becomes available and project schedules allow. The Wastewater and Stormwater Program
sections summarize the capital program by fund.
For each new project identified for funding in Fiscal Year 2019, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal
years, only the estimated construction cost and reason for continuance are provided. Specific information
regarding Continued Projects was included in previous Budget Supplement documents in the fiscal years in
which the projects were initially identified. Lastly, a listing of all Fiscal Year 2019 projects sorted by
municipality is provided in the Appendix.
On the Cover: Construction photos reflect activity and progress on the Maline Creek CSO Local Storage Facility
project. Shown are an 84-inch drill bit used to drill rock, the 46 foot diameter pump station excavation, set up of
formwork and rebar for a secant pile starter wall, and a 31 foot diameter storage cavern excavation looking west,
with fresh air supply ductwork running along the cavern top. The completed project will store 12.5 million gallons
of combined sewer flows during wet weather events, to lessen combined sewer releases to the environment.
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")")")
")
")
")")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(MS
D
B
o
u
n
d
a
ry
St. Louis County Boundary§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 44
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 55
§¨¦170
§¨¦255
152 154
167
219
218 150148
158
161
216
149
146
144
162
166
223
221
225
215
224
168
145
160
222
153
147
157
155
151
143
164
220
165
159
163
1
9
7
6
8
5
97
48
71
61
86
95
16
88
68
81
55
77
15
98
51
63
76
14
66
49
60
13
89
69
25
75
70
62
80 79
84
85
58
53
21
20
22
96
67
57
92
45
78
90
19 11
93
50
47
24
23
83
59
87
56
91
94
46
12
54
74
82
116
124
104
184
176
139
130
180
206
141
197
195
105
127
110
202
189
178
211
192
212
199
108
185
132
135
136
198
102
196
190
171
126
118
208
117
207 103
173
140
100
138
170
204
121
107
122
125
175
101
172
142
179
174
109
203
193
187
200
194
137
182
209177
201
210
214
188
106
183
123134
129
119
213
133
128
131181
111
Map produced by MSD GIS Mapping, April 2018
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2019
Legend
FISCAL YEAR 2019
!(Wastewater
!(Stormwater
FISCAL YEAR 2020
")Wastewater
")Stormwater
Combined Sewer Area
PAGE NO.SYSTEM23410171826272829303132333435363738394041424344526465727399112113114115120169186191205
PAGE NO.SYSTEM156217226
MSD DISTRICT WIDE PROJECTSFISCAL YEAR 2019
FISCAL YEAR 2020
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
1 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
2 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
5 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
6 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
7 BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE)
8 CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO
CANTERBURY DR)
9 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
10 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017)
11 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A)
12 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT B)
13 COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT
14 COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B
REHABILITATION
15 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
16 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
18 CRITICAL INFRASTRUCTURE ASSESSMENT (2017)
19 CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I-118)/OUTFALL (L-
111) ELIMINATION AND SEWER SEPARATION
20 CSO - MARY AVENUE SOUTH OF MANCHESTER. CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
21 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR)
22 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
23 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
24 E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR)
25 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES
COURT)
26 FLOW METERING AND MONITORING (2017)
27 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2019)
28 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016)
29 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018)
CONTRACT A
30 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018)
CONTRACT B
31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT A
32 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT B
33 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT C
34 GENERAL SERVICES AGREEMENT - LANDSCAPE DESIGN (2019)
35 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT
A
36 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B
37 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C
38 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT
D
39 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2019)
40 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A
41 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B
42 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C
43 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
44 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E
45 GRAND GLAIZE WWTF FLOODWALL PROTECTION
46 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
47 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE I
48 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT DESIGN (CONTRACT A)
49 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
50 LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT)
51 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
52 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A
53 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
54 LEMAY WWTF REDUNDANT WATER SERVICE
55 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES)
56 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
57 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
58 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
59 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL
IMPROVEMENTS
60 LOWER MERAMEC WWTF EXPANSION PHASE II
61 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
62 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE)
63 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION
64 PUMP STATION REPLACEMENT PROJECTS (PHASE I) (P-708)
65 RADAR RAINFALL DATA (2017)
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
66 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
67 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
68 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
69 ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD)
70 SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND
I-44)
71 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE)
72 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
73 STREAM FLOW WATER QUALITY SAMPLING (2017)
74 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN)
75 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN)
76 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO
HILDESHEIM AVE)
77 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL
78 VANCE RD PUMP STATION (P-472) UPGRADES
79 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL
BANK RD TO SPRING GARDEN DR)
80 WATKINS CREEK PUMP STATION (P-101) UPGRADES
81 WEST LOCKWOOD SANITARY RELIEF
82 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09)
83 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD)
84 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
85 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT A
86 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT C
87 BISSELL POINT WWTF REDUNDANT SLUDGE ACCEPTANCE SYSTEM
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
88 CAULKS CREEK FORCEMAIN REHABILITATION
89 CLARA 523 COMBINED SEWER IMPROVEMENT
90 COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES
ROCK RD AND ASHBY RD)
91 COLDWATER UPSTREAM PUMP STATION (P-180) STORAGE
92 CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021)
93 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
94 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE II
95 DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A
96 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
97 EARTH CITY LAKE FRONT NORTH PUMP STATION (P-711) REPLACEMENT
98 EARTH CITY SHORELINE PUMP STATION (P-704) REPLACEMENT
99 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2019)
100 ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY
101 ERA AVE. 5800 BLOCK SEWER SEPARATION
102 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF
103 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64
AND CLAYTON RD)
104 GLEN EAGLES PUMP STATION (P-189) RELOCATION / REPLACEMENT
105 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE
AVE TO PARDEE LANE)
106 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELOCATION PHASE VI
(BUCKLEY RD TO UNION RD)
107 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
108 GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN
PARK RD)
109 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD
AND GREEN PARK RD)
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
110 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON)
111 HERMITAGE SANITARY RELIEF (SKME-615)
112 INFRASTRUCTURE REPAIRS (FACILITIES) (2019)
113 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT A
114 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT B
115 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019)
116 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
117 JENNINGS STATION ROAD / NORTH BADEN BASIN
118 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD)
119 LEMAY 1 PUMP STATION (P-301) SLUICE GATE REPLACEMENT
120 LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D
121 LEMAY WWTF REDUNDANT WATER SERVICE
122 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL
IMPROVEMENTS
123 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX HALL)
124 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
125 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION
126 N CLARK AVE 49 SANITARY SEWER REPLACEMENT
127 N HIGHWAY 67 AT COLDWATER CREEK SANITARY SEWER REPLACEMENT
128 NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND
MARSHALL AVE)
129 NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S
BRENTWOOD BLVD AND MANCHESTER)
130 OLIVE / WASHINGTON - GRAND TO VANDEVENTER COMBINED SEWER RELIEF
131 RDP FOULWATER SEWER GRIT CHAMBER ELIMINATION (DEER CREEK)
132 RIVERSIDE AND YARNELL SANITARY RELIEF REHABILITATION
133 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
134 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE)
135 TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE
CENTRE DR)
136 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09)
137 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B
138 VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION
(VALCOUR RD AND WATSON RD)
139 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION
PHASE III
140 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION
PHASE IV PART 3
141 WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD
TO I-44 AND BERRY RD)
142 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN)
169 GENERAL SERVICES AGREEMENT - WATER QUALITY GENERAL SUPPORT
(2017)
170 HALL STREET STORM SEWERS
171 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT)
172 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT A)
173 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT B)
174 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT C)
175 STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT B)
176 BARKMAN STORM SEWER IMPROVEMENTS
177 BAXTER ROAD #273 AND #301 STORM SEWER
178 BRADBURY DR. #5468 STORM SEWER
179 BROGAN DALE CIRCLE STORM SEWER
180 BROOKVALE TERRACE - PARKFIELD TERRACE STORM IMPROVEMENTS
181 CORONA PARK STORM SEWER PHASE 2B
182 CRESTWICK DRIVE #9733 AND 9741 STORM SEWER (SUNSET HILLS 11)
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
183 DEER CREEK WATERSHED INITIATIVE
184 DICKENS AVENUE #470 STORM SEWER
185 DIPLOMAT LANE OUTFALL STABILIZATION
186 EASEMENT ACQUISITION FOR STORMWATER PROJECTS (2019)
187 GRAND GLEN DR. #702 STORM IMPROVEMENTS
188 HANCOCK AVENUE 5600 BLOCK STORM SEWER
189 HARVEST HILL CT. BANK STABILIZATION
190 HOFFMEISTER - PARDELLA STORM SEWER IMPROVEMENTS
191 INFRASTRUCTURE REPAIRS (REHABILITATION) STORMWATER (2019)
192 LACKLAND RD. - UCEYLE AVE. STORM SEWER
193 LADUE FARM ROAD #125 STORM SEWER
194 LIBERTY AVE. 10000 BLOCK STORM SEWER
195 MAR ANN CT. #9819 STORM IMPROVEMENT
196 MARTYRIDGE CT. #4307 STORM SEWER (MGMB-170)
197 MEAUX MART - GRAY STORM CHANNEL
198 PATRINA COURT BANK STABILIZATION
199 QUEEN ANNE PLACE AT SAPPINGTON STORM IMPROVEMENTS
200 SAXONHALL - VENUS - BRISTOL HALL STORM SEWER
201 SCHAEFFER PLACE 2000 BLOCK STORM SEWER
202 SCHUETZ ROAD AND WILLOW BROOK COVE STORM SEWERS
203 STEEPLECHASE STORM SEWER IMPROVEMENTS (FRONTENAC 3-3)
204 STONE HILL DR 4701 STORM SEWER
205 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DISTRICTWIDE
(2019)
206 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - ORIGINAL
BOUNDARY (2019)
207 SUMMER LAKE DR. #15637 STORM SEWER
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY19
PAGE NUMBER PROJECT NAME
208 SUMMERHAVEN DRIVE #11656 STORM SEWER
209 TIMBER TRAIL - BRIAR RIDGE CHANNEL IMPROVEMENTS
210 TINA TERRACE DRIVE STORM SEWER
211 VILLAGE MEAD DR. #294 STORM SEWER
212 WILLOW HILL STORM SEWER (LADUE 1614A)
213 WINCHESTER DRIVE 7120 BANK STABILIZATION
214 WISE AND WEST PARK STORM IMPROVEMENT
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY20
PAGE NUMBER PROJECT NAME
143 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09)
144 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
145 CAULKS CREEK FORCEMAIN REHABILITATION
146 CELLA - ROLLING ROCK - GLEN CREEK SANITARY SEWER AND PUBLIC I/I
REDUCTION
147 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
148 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
149 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
150 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
151 FORDER SANITARY INTERCONNECTION (FORDER RD TO RINGER RD)
152 GRAND GLAIZE WWTF FLOODWALL PROTECTION
153 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE
AVE TO PARDEE LANE)
154 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
155 HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER
REHABILITATION
156 INFRASTRUCTURE REPAIRS (FACILITIES) (2020)
157 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
158 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
159 MACKENZIE I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK,
KENRICK SEMINARY, AND NERINX HALL)
160 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
161 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
162 OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE
AND OAKLAND AVE)
163 RIVERPORT 6 PUMP STATION (P-781) REPLACEMENT
164 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY20
PAGE NUMBER PROJECT NAME
165 STONINGTON PLACE SANITARY RELIEF (CLAYTON RD TO GEORGIAN ACRES
ST)
166 TESSON CREEK I/I REDUCTION (TESSON FERRY RD AND TIFFANY SQUARE
PKY)
167 UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S WARSON RD AND LADUE
RD)
168 WATKINS CREEK PUMP STATION (P-101) UPGRADES
215 CHERRY TREE LANE STORM IMPROVEMENT
216 CHERRY TREE LANE STORM IMPROVEMENT
217 EASEMENT ACQUISITION FOR STORMWATER PROJECTS (2020)
218 GLENN DRIVE #128 STORM SEWER
219 HOLDEN AND LONGWOOD STORM SEWER
220 KAYSER AVE. - WALLER AVE. STORM SEWER
221 LALITE #6145 - 6151 STORM IMPROVEMENTS
222 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT)
223 MARMONT COURT #339 STORM SEWER
224 SHIVA COURT CHANNEL IMPROVEMENTS (CAU3-A)
225 SNELSON DRIVE STORM SEWER
226 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DISTRICTWIDE
(2020)
5 April 2018
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY19
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 81 $65,602,000
Wastewater Construction 61 $257,438,000
Stormwater Engineering 7 $5,230,000
Stormwater Construction 39 $19,436,000
TOTAL:188 $347,706,000
Wastewater Continued 6 $32,600,000
Stormwater Continued 2 $1,330,000
TOTAL:8 $33,930,000
GRAND TOTAL:196 $381,636,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 7
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 7
analysis of the system, and implement required collection system and wastewater treatment plant
repairs and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 7
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, easement plats are drafted, and easements are obtained.
In FY 2019, 47 engineering budget items have been procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated professional service firms:
Project Number Project Name Page Number Budget
Watershed Program Consultant - 11151 - Construction Management Services - Tank/Treatment/Pump Station Facilities. Consultant: Kennedy Associates / Architects, Inc.
11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION
FACILITIES 17 7,000,000
Watershed Program Consultant - 11152 - Construction Management Services - Lower and Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc.
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 15 3,400,000
Watershed Program Consultant - 11826 - Construction Management Services - Lower Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 16 7,400,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls System Improvements. Consultant: Jacobs Engineering Group, Inc.
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 49 485,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 51 50,000
12721 LEMAY WWTF REDUNDANT WATER SERVICE 54 47,000
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) 55 365,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT) 56 320,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT) 57 365,000
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 61 285,000
Watershed Program Design Consultant - 11110 - Deer Creek Sanitary System Improvements. Consultant: Parsons Water & Infrastructure, Inc.
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 23 1,500,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 7
Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri - Meramec Sanitary System Improvements. Consultant: AMEC Foster Wheeler Environment & Infrastructure, Inc.
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT A 2 85,000
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B 3 50,000
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT C 4 85,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 5 617,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 6 65,000
12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE) 7 300,000
12110 CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO CANTERBURY DR) 8 264,000
11724 COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION 14 650,000
12142 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR) 21 161,000
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) 25 400,000
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT) 50 116,000
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE) 62 332,000
12191 ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD) 69 90,000
12221 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN) 74 526,000
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) 75 452,000
Watershed Program Design Consultant - 11145 - Lemay Sanitary System Improvements. Consultant: Burns & McDonnell Engineering Co., Inc.
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR) 24 482,000
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 46 700,000
12057 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A 52 50,000
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 53 400,000
12201 SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND I-44) 70 670,000
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE) 71 332,000
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO HILDESHEIM AVE) 76 900,000
11679 WEST LOCKWOOD SANITARY RELIEF 81 432,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek) Controls System Improvements. Consultant: HDR Engineering, Inc.
12139 CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I-118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION 19 1,200,000
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER. CSO INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION 20 1,750,000
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV 22 400,000
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I 47 1,500,000
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 58 350,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 66 200,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 67 600,000
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 68 4,000,000
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL 77 2,000,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 7
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may condemn for easements in
order to ensure that a project is constructed. Any required condemnation proceedings are
performed in full compliance with state and federal law. Some projects may additionally require
specific permitting from other government agencies, such as the Missouri Department of Natural
Resources or US Army Corps of Engineers, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon ordinance passage, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 7
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets. Wastewater projects may also be
funded by various Operation, Maintenance, Construction and Improvement (OMCI) funds,
Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the Districtwide Stormwater Fund, the
Stormwater Regulatory Fund, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
• Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of terms.
• Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
• Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
• Wastewater Continued Projects – summary of wastewater projects continued from previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 7
• Wastewater Contingency Projects – summary and details on wastewater projects currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
• Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted.
• Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
• Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
• Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
• Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
• Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include locations and
quantities of work to be performed. These maps and quantities are approximate only, and final
location and extent of work may vary depending on final design and/or field conditions during
construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD The Federal Consent Decree, entered on April 27, 2012 and all appendices and all modifications or amendments thereto, between
MSD, United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows from the Combined and Separate Sewer Systems in order to improve
water quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe by lining it with a new pipe. This work does not require excavating the
pipe and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater treatment facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer system at a point prior to the headworks of a wastewater treatment facility.
FORCE MAIN A pressurized sewer pipe that can carry wastewater. Sewer force mains
are necessary when topography, or other system characteristics, do not
allow wastewater to move through the line by the influence of gravity alone. Force mains are the pipes that convey wastewater under pressure
through the work of pumps located in pump stations or lift stations.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using
infiltration, such as bioretention and bioswales.
GRADE CONTROL STRUCTURE A structure constructed in a creek or stream to control erosion. The structure allows water to pass to a lower elevation while directing the
energy and velocity of the water in a manner that minimizes erosion
that would otherwise change the shape of the stream.
GLOSSARY
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can include defective building laterals, sewer pipes, pipe joints,
connections, or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes. Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and area drains, foundation drains, manhole covers, cross connections from
storm sewers, or inlets.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LIFT STATION Lift stations are used for pumping wastewater or stormwater from a point of lower elevation to a point of higher elevation. Lift stations utilize pumps to lift the wastewater from the lower elevation to the
higher elevation. Wastewater then flows by gravity to the next location in the system.
LMRDP Lower and Middle River Des Peres, generally the river from University City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote of the people, with responsibility for wastewater and stormwater services in St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects or maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or CSO.
PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to the sanitary sewer system (inflow) or deteriorated service laterals or
broken connections (infiltration).
PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
GLOSSARY
PUMP STATION Pump stations are facilities which include pumps and ancillary
equipment, for pumping fluids from one place to another. A pump is a mechanical device that converts mechanical energy to pressure, in order
to convey wastewater or stormwater. Pumping results in pressurized
sewer pipes that are called force mains.
RAIN GARDEN A landscaped shallow swale or depression that temporarily holds water
and reduces stormwater runoff as the water infiltrates into the soil. The water is absorbed by plants and is filtered as it percolates through the
soil.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as possible to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and not stormwater, from residences, commercial buildings, industrial
plants and institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or United States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows under current and projected future conditions as defined in Paragraphs 21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow
to a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is centrally located within a watershed to which subtrunks and other
sewers are tributary.
USGS United States Geological Survey.
GLOSSARY
WASTEWATER Wastewater, also written as waste water, is any water that has been
adversely affected in quality by human influence. Wastewater can originate from a combination of domestic, industrial, commercial or
agricultural activities, and from sewer inflow or infiltration.
WATERSHED An area of land which drains to a specific creek, river, or other body of
water.
WATERSHED CONSULTANT A consulting firm retained for a multi-year design effort on a related suite of projects in a specific watershed.
WWTF Wastewater Treatment Facility, any facility, method or process which removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces or renders less obnoxious pollutants or water contaminants from wastewater before releasing it to the environment.
5 April 2018
WASTEWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$1,000,000 1
12033 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
$85,000 2
12030 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
$50,000 3
12027 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
$85,000 4
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$617,000 5
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$65,000 6
12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD
TO LEETON AVE)
$300,000 7
12110 CANTERBURY DRIVE LATERAL SANITARY
RELIEF (NELSON DR TO CANTERBURY DR)
$264,000 8
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$1,670,000 9
11999 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2017)
$2,500,000 10
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
$2,406,000 11
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
$985,000 12
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
$200,000 13
11724 COLDWATER SANITARY RELIEF SECTION B, C
& D - SECTION B REHABILITATION
$650,000 14
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$3,400,000 15
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$7,400,000 16
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$7,000,000 17
5 April 2018
WASTEWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12720 CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
$1,400,000 18
12139 CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
$1,200,000 19
12140 CSO - MARY AVENUE SOUTH OF
MANCHESTER. CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION
$1,750,000 20
12142 DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
$161,000 21
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$400,000 22
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$1,500,000 23
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
$482,000 24
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
$400,000 25
12759 FLOW METERING AND MONITORING (2017)$2,500,000 26
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
$1,500,000 27
11760 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2016)
$100,000 28
12396 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2018) CONTRACT A
$400,000 29
12894 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2018) CONTRACT B
$400,000 30
12388 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT A
$75,000 31
12389 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT B
$75,000 32
12390 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT C
$75,000 33
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
$250,000 34
5 April 2018
WASTEWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
$60,000 35
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
$60,000 36
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
$60,000 37
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
$60,000 38
12398 GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019)
$200,000 39
12408 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
$50,000 40
12409 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
$50,000 41
12410 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
$50,000 42
12411 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
$50,000 43
12412 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
$50,000 44
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
$535,000 45
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$700,000 46
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
$1,500,000 47
12695 HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
$1,920,000 48
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$485,000 49
12325 LANG ROYCE SANITARY RELIEF (FARGO DR
TO FLORIDALE CT)
$116,000 50
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$50,000 51
5 April 2018
WASTEWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12057 LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
$50,000 52
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$400,000 53
12721 LEMAY WWTF REDUNDANT WATER SERVICE $47,000 54
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
$365,000 55
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$320,000 56
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$365,000 57
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$350,000 58
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
$200,000 59
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$1,200,000 60
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$285,000 61
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD
TO SIMS AVE)
$332,000 62
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
$1,000,000 63
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I) (P-708)
$60,000 64
12005 RADAR RAINFALL DATA (2017)$120,000 65
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$200,000 66
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 67
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL $4,000,000 68
5 April 2018
WASTEWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12191 ROLAND SANITARY RELIEF (NELSON DR TO
ROLAND BLVD)
$90,000 69
12201 SHREWSBURY SANITARY RELIEF SEWER AND
I/I REDUCTION (WEIL AVE AND I-44)
$670,000 70
12208 SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
$332,000 71
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$615,000 72
12003 STREAM FLOW WATER QUALITY SAMPLING
(2017)
$280,000 73
12221 SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
$526,000 74
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR
TO JENNER LN)
$452,000 75
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
$900,000 76
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
$2,000,000 77
12490 VANCE RD PUMP STATION (P-472) UPGRADES $520,000 78
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
$1,000,000 79
12491 WATKINS CREEK PUMP STATION (P-101)
UPGRADES
$550,000 80
11679 WEST LOCKWOOD SANITARY RELIEF $432,000 81
TOTAL:$65,602,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Pre-Design Services
6660 - SanitaryReplacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENTFACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL ANDLEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDEREDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS HANDLINGSYSTEM IMPROVEMENTS.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$1,000,000
Various
Various
Various
Capital
1Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 54,900 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12273, 12269, 12980,AND 12158.
§¨¦44
§¨¦55
§¨¦270
§¨¦55
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12033
Wastewater
11
$85,000
Various
Various
Various
Capital
2Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 31,900 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12095, 12112, AND12229.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
RIVERVIEWDRST CHARLES ROCK RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12030
Wastewater
11
$50,000
Various
Various
Various
Capital
3Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT C
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 85,240 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12073 AND 12223.
§¨¦270
§¨¦270
GEYERADAMS
BALLASCLAYESSEX
UNI O N P A C IF IC TAYLORCOUCHCRAIGANNDOUGHE RTYFERRYDES PERESROSE HILL
NIRK
WOODBINE
BOAZ
LARK EVANSEDNAWAY
PEEKESIMMONSWILSON
LEEVAN BURENCRESTJEFFERSONIRIS
MONROE
FRIEDAALTUSNELDABAC
HSARAH
RAYNE R
LINWOOD
JEWEL
G A BRIELLINDGATE
ROSE
G R A N D
KIRKSHIRE
GOETHEWESTVIEW TWIN PINELILLIAN
LINDEMANSUNNY
PO N CA CAROLINEMADISON
KNIERIMNANA
BRIARGATE
SHA RIWINSLOW
PRIVATE SWAN
GRANT
CULLODENHEEGE PEARLBROOKCREEK
MOZARTBARBYGRASSY RIDGE
AMHERST
ROGER
HARVEYMCKINLEY
BALLASM O N R O E
TAYLORJEWEL
SUNNY
S KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12027
Wastewater
11
$85,000
Various
Various
Various
Capital
4Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$617,000
Various
Various
Various
Asset Management
5Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$65,000
Various
Various
Various
Asset Management
6Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL HILLS SANITARY RELIEF (ST CYR RD TOLEETON AVE)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-317 REQUIRES REMOVAL.
CONSTRUCT 2,400 FEET OF 24-INCH TO 30-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-317.
ST CYR
LEETONBUR
L
I
NGT
ON
N
O
R
T
H
E
R
N
S
A
N
T
A
FEWEST
MELANIESCRANTON
DELAIRD
LANDWEHR
LARAMIE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12096
Wastewater
11
$300,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
7Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CANTERBURY DRIVE LATERAL SANITARY RELIEF(NELSON DR TO CANTERBURY DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-612 REQUIRES REMOVAL.
CONSTRUCT 2,100 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-612.
PASADENA
LUCAS N HUNTWINCHES TER
OREON
FARLEY
ONEILLBRISTOL
CRES T LANDIRACOLONIA LBLUE SPRUCECANTERBURY ROLAND
BRETONNORTHOAKSCANTERBURY
CANTERB
URY
B R IS T OL CRESTLANDROLAND
ROLANDNATURAL BRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12110
Wastewater
11
$264,000
Northwoods
Bissell
Bissell
Capital
8Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
E DIS ON
C E N T R A L M I DL A N D
DEJOURNETCRYS
TALSP
R
I
N
GS
B RIGHTHURST
LA
NSBROOKE MEIERLING§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
11
$1,670,000
Chesterfield
Missouri
Caulks Creek
Capital
9Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2017)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMSAND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OFSELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11999
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
10Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSINGSURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDEINFRASTRUCTURE SUCH AS SOFT SEPARATION, GREENINFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION BASINS.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS.FY2019 APPROPRIATION IS FOR DESIGN OF PROJECT 12942, WHICH IS ACOMBINATION OF 3 PROJECTS.
§¨¦44
§¨¦70
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12693
Wastewater
16
$2,406,000
St. Louis City
Various
Various
Asset Management
11Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT B)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSINGSURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDEINFRASTRUCTURE SUCH AS COMBINED SEWER CONSTRUCTION ANDREPLACEMENT, SOFT SEWER SEPARATION, AND STORM SEWERCONSTRUCTION AND STORAGE.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS,INCLUDING 12740, 12741, 12702, AND 10756. THIS APPROPRIATION FUNDSDESIGN OF 12740 AND 12741.
§¨¦44
§¨¦70
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12694
Wastewater
16
$985,000
St. Louis City
Various
Various
Asset Management
12Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF FINAL CLARIFIERSREPLACEMENT
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING FOUR SQUARE FINAL CLARIFIERS ARE 50 YEARS OLD, ANDPAST THEIR USEFUL LIFE.
DEMOLISH EXISTING FOUR SQUARE CLARIFIERS AND CONSTRUCTNEW FOURTH CIRCULAR CLARIFIER. ENLARGE FEED CHANNEL ANDPIPING TO THE EXISTING THREE CIRCULAR CLARIFIERS.
PRIVATE
TREES EDGEROBBINSGROVERICHMOND FORESTBEHLMANN MEADOWSROBBINSWAY BEHLMA
N
NFARMSCARYTOWN
PRIVATE
PRIV A T E PRI
VATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12504
Wastewater
11
$200,000
Unincorporated
Coldwater
Coldwater Creek
Capital
13Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SANITARY RELIEF SECTION B, C & D- SECTION B REHABILITATION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT REHABILITATION OF SECTION B OF THE COLDWATERTRUNK SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-091,BP-115, BP-119, BP-141, BP-144, BP-473, BP-526, AND BP-527.
§¨¦70
§¨¦270
§¨¦170
§¨¦270
§¨¦70
§¨¦170 LINDBERGHNLINDBERGHBLVDSTCHARLESROCKRD
NATURALBRIDGERD
EMO
3
7
0
H
W
Y LINDBE R G H §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11724
Wastewater
11
$650,000
Unincorporated
Coldwater
Coldwater Creek
Capital
14Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES),AND THE JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TOMARTIGNEY PS).
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦64
§¨¦270
§¨¦44
§¨¦255
§¨¦70
§¨¦170
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$3,400,000
Various
Lemay/RDP
Various
Asset Management
15Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE DEER CREEK TUNNEL, MALINE CREEK STORAGE FACILITY,RDP TRIBUTARIES CSO TUNNEL, UPPER RDP CSO STORAGE TUNNEL,AND THE LOWER MERAMEC SYSTEM BAUMGARTNER TO FENTONWWTF TUNNEL.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$7,400,000
Various
Various
Various
Asset Management
16Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, ANDTREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$7,000,000
Various
Various
Various
Asset Management
17Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT (2017)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS PROJECT INSPECTION,RECONNAISSANCE, INSPECTION PRIORITIZATION, PROJECT SET-UP,FIELD VERIFICATION, MAP UPDATES, WORK ORDER MANAGEMENT,AND CCTV VIDEO REVIEW. SERVICES MAY BE RENEWED THROUGHFY2019 BASED ON PERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12720
Wastewater
16
$1,400,000
Various
Various
Various
Asset Management
18Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - BRENTWOOD AND RED BUD AVE CSOINTERCEPTOR (I-118)/OUTFALL (L-111)ELIMINATION AND SEWER SEPARATION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW INTO COMBINED SEWERS FROM PUBLIC ANDPRIVATE DEFECTS. REMOVAL OF I-118 AND L-111 REQUIRED BY THELONG TERM CONTROL PLAN.
PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN THE 1247 MERAMECSTUDY AREA, INCLUDING SEWER SEPARATION. REMOVE INTERCEPTORI-118 AND CSO OUTFALL L-111.
§¨¦64
§¨¦170
§¨¦170
CLAYTONME
T
R
O
LI
NKBRENTWOOD
DALE
DAVIS
FORES T P A R K
LINDENBOLANDYORK
WYDOWN
F
R
AN
C
I
S
PARK
SHAWPARK
S WAN HANLEYMCCUTCHEONLOUWENAUDUBONBYRON
BU
C
K
HICKS
OXFORD
POLO
LILE
DR
O
MARAEAGER
ROSE
BONHOMMEWE
N
N
E
K
E
R
PARKDALE
WESTWOODWRENWOOD
WISELANGTONCROMWELL
ARCHSOUTH
LACLEDESTATIONBRYAN
WELLINGTON
EVERETT
BUCKINGHAMEDGEWOODNORTHMOOR
BENNETTCARSWOL D
HILLSIDESNOWDON
LOVELLA
R E A R
ST ALBANS COLLINSMERAMECBE R K SHIREAGNES BEMI
STONR ID G E TO P CRESTWO
O
DSUD
BURYROBINFORESTBOBOLINKCARRSW O L D
DUMAS
ARGUSTHRUSHM E T R O L IN K
F
RANC
I
S§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12139
Wastewater
11
$1,200,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
19Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - MARY AVENUE SOUTH OF MANCHESTER.CSO INTERCEPTOR (I-132)/OUTFALL (L-106)ELIMINATION
Design Services
6660 - SanitaryReplacement Fund
AREA EXPERIENCES EXCESSIVE INFLOW THROUGH COMBINEDSEWERS. REMOVAL OF I-132 AND L-106 REQUIRED BY THE LONG TERMCONTROL PLAN.
CONSTRUCT 5,200 FEET OF 15-INCH TO 30-INCH SANITARY SEWER, AND4,100 FEET OF 15-INCH TO 27-INCH STORM SEWER. PERFORM PUBLICAND PRIVATE I/I REDUCTION. REMOVE INTERCEPTOR I-132 AND CSOOUTFALL L-106.
PINE
MCKNIGHTWHITE
LAWN
BRENTWOODSWAN
EULALIE
ROSALIE
DOROTHYHIGHSCHOOLMADGE
SALEMST CLAIRURBAN
Y O R K
CECELIAROSE
ROCKF
O
RD
MARYPARKRIDGEFLORENCE
BREMERTONMORITZ
WRENWOOD
LOUISSONORA
PENDLETONANNALEEHARRISON
EVANS
REMINGTONRUTHSTRASSNER
M E R R IT T HILLJOSEPH
LITZSINGER
POCAHONTASPOWELL KENTLANDMANDERLYCOLLIERB E R R Y
HELENWHITEHALL
S U T T O N
RARITAN
HENRIETTA
B R ID G E P O R T
HILLDALEGOLDEN GATE CANARYKENILWORTHBOMPARTPATTONR EDBIRDYORKH IL L S
UNIONPACIFIC
GENEVIEVE
WHITE
LITZSINGER
MARYLITZSINGER SWANMARYMORITZ
LA WN
BRIDGEPORT
M A NCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12140
Wastewater
11
$1,750,000
Brentwood
Lemay/RDP
Deer Creek
Capital
20Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DACEY BRANCH SANITARY RELIEF (BELLA CLAREDR TO PRIOR DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-313 REQUIRES REMOVAL.
CONSTRUCT 1,150 FEET 12-INCH TO 18-INCH SANITARY SEWER.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLBP-313.VENTURACAPI
TOLCLOVERDALEBELLA CLARE
C
R
O
W
N P
OIN
T
EMP I R ECAVALIER
TE RRITORY
EM PIRE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12142
Wastewater
11
$161,000
Unincorporated
Bissell
Maline Creek
Capital
21Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHILLS
DE N NY
GODWI NCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P I C A RDY
WINDI N G R I D G E
INDIAN
ELLSWORTHLOG CABINPARK
OVERBROOKHIGHDOWNANZEIGER
PRIVATE
TWINSPRINGS ROLLINGROCKMAYFAIRWARRIDGE
WILDROSE
WATE R BURYLYLEWOOD
RAUSC
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R CREEKPRIVATE
PRIVATE
P RIV A T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
11
$400,000
Various
Lemay/RDP
Deer Creek
Capital
22Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS $153,000,000. PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEME
T
ROLINK
ELMLAYPINE
UNIONPACIFICLANSDOWNE
WYDOWN
PERNOD
FYLER
LOCKWOOD
FOLKMCKNIGHT
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWEST
W E LLS
MURDOCHODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEPRICE
GLENARUNDEL
EUCLID
SWAN
WEST PARK
PAR K
OAKLAND
LITHIADANIEL P ACIFIC
SUMMITZEPHYROLD WARSONCELLA HANLEYFORESTLOUISMARQUETTE
WI L L I A MS
ALAMO
LAGOON
MARDEL
MADGEMCCUTCHEON
GRAYROANOAKLOUWENFLORA
G
O
R
E MARYS U T H ERLAND
BRUNO
GLADESRIDGEMOOR
JEROME
MANHATTANPRATHERIOLAELLENWOOD
RUSSEL
L
WISE
YEATMANCECELIAROSE
OXFORD
GODWIN
Y ORKLYLEDESPERESARLINGTO
NLANGTON
TAMMVILLA
KRAFTINDIAN
BRYAN
FAUQUIER
WILD ROSE
DOLAN
JAMIESONREAR
PORTERGROVECEDAR
BERRY
DROMARA
CLARK
UNIONPACIF IC TAMMYALEBANCROFT
WHITE
M A N C H ES T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
23Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
E. WATSON SANITARY RELIEF (RUDSON LN TORICHVIEW DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER.
CONSTRUCT 4,150 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-409.
WATSON
MANDARUSDONMAEBE RN
RICHVIE W
STURDYGAYLEHARWICHK
A
T
H
Y
LYNNG LENFIELD GLEN ROSEGLADLEACRESTWOOD
FOX PARKTOWNHI
LLWOODFOXWOODPARKEGGELINGF
E
R
N
GLENWATSON WOODSBARBERTON
DREW
JULIUS NORTHWAY
ROBYNRYEGATEWESTHAVEN
EDDIE N PARKSUNSET WOODSSTURDYFOX PARK§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12152
Wastewater
11
$482,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
24Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FEE FEE TRUNK SEWER RELIEF (SKME-002, LONGLEAF CIRCLE TO THAMES COURT)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,070 FEET OF 21-INCH SANITARY SEWER. CONTINGENCYPROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP-078.PEM
C H IE F T A IN
CRAIG VIEW
C
R
AIG
DECORAH
M O M ARTESCHUETZP A T T Y A N N
B ARKMAN
D
AUTEL
CHANDELLAYFRONTIERGOLD LEAF
MIR
A
N
D
YSCHULTEHOLLY SPR IN GSBARDO
T
SP RUC E HAVEN
TIMB
ERWOOD SUMMERHAVENWEATHERBYCRIM
S
O
N
VILLAG ESHALLOWBROOK
FEATHERWOO DWATERWOOD
L IN F R E D
MEADO W LA KE
LONGLEAF
JEANNE HI
LLSMEDIABR
O
NCO
QU IE T
OAKB A RKTHAMESGREENWALK
SI
GNALTOTEMG
R
E
Y
S
T
O
N
E E
S
T
A
T
E
S
S
C
H
U
L
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11745
Wastewater
11
$400,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
25Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2017)
Vendor Services
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW DATAIN ORDER TO BE ACCURATELY CALIBRATED TO FIELD CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATERSYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEMRESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION WILLBE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IFPROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12759
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
26Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2019)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12386
Wastewater
14
$1,500,000
Various
Various
Various
Asset Management
27Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2016)
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. THIS RENEWAL IS FOR FINAL DESIGN OF 12794, CITY LAKESSTORAGE MODIFICATIONS FOR CSO CONTROL.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11760
Wastewater
11
$100,000
Various
Various
Various
Asset Management
28Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2018) CONTRACT A
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12396
Wastewater
11
$400,000
Various
Various
Various
Asset Management
29Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2018) CONTRACT B
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12894
Wastewater
11
$400,000
Various
Various
Various
Asset Management
30Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2018) CONTRACT A
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12388
Wastewater
11
$75,000
Various
Various
Various
Asset Management
31Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2018) CONTRACT B
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12389
Wastewater
11
$75,000
Various
Various
Various
Asset Management
32Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2018) CONTRACT C
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12390
Wastewater
11
$75,000
Various
Various
Various
Asset Management
33Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - LANDSCAPEDESIGN (2019)
GSA - (Design)Operating Funds
1101 - General Fund
LANDSCAPE ARCHITECTURAL DESIGN SERVICES ARE NEEDED TOSUPPORT PROJECTS THROUGHOUT THE DISTRICT.
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS NEEDED DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13044
Unallocated
11
$250,000
Various
Various
Various
Asset Management
34Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12382
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
35Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12383
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
36Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12384
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
37Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12385
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
38Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWER ANDCHANNEL DESIGN (2019)
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL DESIGN.SERVICES MAY BE RENEWED THROUGH FY2020 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12398
Wastewater
11
$200,000
Various
Various
Various
Asset Management
39Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2018) CONTRACT A
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12408
Wastewater
11
$50,000
Various
Various
Various
Asset Management
40Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2018) CONTRACT B
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12409
Wastewater
11
$50,000
Various
Various
Various
Asset Management
41Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2018) CONTRACT C
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12410
Wastewater
11
$50,000
Various
Various
Various
Asset Management
42Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2018) CONTRACT D
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12411
Wastewater
11
$50,000
Various
Various
Various
Asset Management
43Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2018) CONTRACT E
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12412
Wastewater
11
$50,000
Various
Various
Various
Asset Management
44Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF FLOODWALL PROTECTION
Design Services
6660 - SanitaryReplacement Fund
MAJOR FLOODING EVENTS CAN IMPACT AND DAMAGE THE GRANDGLAIZE TREATMENT FACILITY.
CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENT PLANT AND MAINTENANCE BUILDINGS FROM FLOODING.
PRIVATE
TWIN LAKE
S
APPLE TREEWESTERMANUNION PACIFICBURLINGTONNORTHERNSANTAFEGRAND GLAIZESPINDLEUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13072
Wastewater
11
$535,000
Valley Park
Meramec
Glaize Creek
Capital
45Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTEDSSO OUTFALLS REQUIRED.
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TOSTORE WET WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTEDSSOS BP-588 AND BP-599.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$35,500,000.
PAR
D
E
E
BR
O
O
K
V
I
E
W
ARBAN
PRIVATEGRA
N
T
LODGE POLEW H IT E C L IFFPARKSILVERCRESTLURLINEPRIVATEPRIVATE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
11
$700,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
46Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEERCREEK TRUNK TO OXFORD DR) PHASE I
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALL REQUIRED.
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER.
§¨¦44
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
M E T R O L IN K
CLAYTONLAY
PINE
UN IO N PACIFICFORSYTH
HANLEYWYDOWN
FOLKMCKNIGHT
YALEBELLEVUEBRENTWOODMcCAUSLANDFOREST P A R K
MARSHALL
SOUTHWEST
DAVIS
ETHEL
ARSENAL
WHITE LINDENBREDELLPRIVATE
BOLANDSUTTONLAWN
EULALIE
GLENSWAN
PARK
BELLLITHIA
ELMPACIFIC
BRADLEY
PLATEAU
WISE
FORESTLOUIS SMILEY
WE L LS
DELNORTEWIL L IA MS
ALAMO
HIGHSCHOOLSCANLANMCCUTCHEONASBURYLOUWENGARNER
FLORA
ATALANTA SALEMB
U
C
K
WRENWOOD
ST CLAIRMARYBRUNO GLADES
ELLENWOOD
BARTOLDOAKLAND
RUSSEL
L HOYTALICIA
OXFORD
EA G E R
ROSE
FLORENCE MARTINIBREMERTONY ORKLYLED ESPERESSHEPLEY
LANGTONVILLA
ANNA KRAFTJAMES
MAPLEANNALEE FAUQUIER
BENNETTARLINGTONCOLLINSRALPH
JAMIESONECOFFSOUTHWOODDARTFORDGALLERIA
NORTHWOOD
HORNER
WARNER
BERRY RICHERTHATTONLA D U E MANOR
ALAMO
UNIONPACIFICMARY OXFORDPRIVATEYORK
YALEEAGER
WISE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12334
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
47Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF SYSTEM IMPROVEMENTDESIGN (CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE COMBINED SEWER SYSTEM IN THE HARLEM AND BADENWATERSHEDS CAUSING SURFACE FLOODING AND BUILDING BACKUPS.
DESIGN HARLEM BADEN WATERSHED SYSTEM IMPROVEMENTS TOINCLUDE SEWER SEPARATION, SEWER CONSTRUCTION, AND SEWERREHABILITATION.
CONSTRUCTION WILL BE IMPLEMENTED IN PHASES UNDER VARIOUSPROJECT NUMBERS, INCLUDING 11797, 11798, AND 11799.KIENLENTERMINALMYR
O
N
LUCAS N HUNTLOT
U
S
WELLS HAMILTON67TH69TH68THWAB
A
D
A
MARK
E
T
TERR
Y
STLOUIS
KENN
E
R
L
Y
HIGHL
A
N
D
MOUN
T
MAFFI
T
TEDMUNDVALLESALZMANERICKWELL
S
M
A
RMAYWOOD CRESCENTPERRY
IRVINGOGDENLESC
H
E
N
LULUHODIAMONTPINE GROVEGARYGLENMORE
RIDGE CHERRYKEMPWOODROW
PRIVATEOAKDALEJESS
E
J
A
C
K
S
O
NROSEBUD ARDENMYRT
L
E
GRI
M
S
H
A
W
HOBART
L UDWIGWELLSTONROOS
E
V
E
L
TMAURERCRESTONAVONDALEDARDANELLA
NORFOLKSOUTHERNVASSIERLORR
A
I
N
ECAPEHART
AUDR
E
Y
ISAB ELLA
THEO
D
O
S
I
A
LATT
A GREER
NAYL
O
RFRANCIS
MOL
L
GREE
R
MARK
E
T
IRVINGPRIVATE
OGDENST LO
U
I
S OAKDALE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12695
Wastewater
16
$1,920,000
St. Louis City
Bissell
Various
Asset Management
48Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$485,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
49Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANG ROYCE SANITARY RELIEF (FARGO DR TOFLORIDALE CT)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-291 REQUIRES REMOVAL.
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-291.
K A PP EL
FARG ODELLWOOD
H I GH M ONT
FIRSCHLUETER
GAGEPERCHWESTDELLVENICEEASTDELLROYCEF
L
O
RID
A
L
E
WARDRANDFLORWOODKIR
K§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12325
Wastewater
11
$116,000
Dellwood
Bissell
Maline Creek
Capital
50Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMPSTATION (P-303), MARTIGNEY PUMP STATION (P-306), AND JEFFERSONBARRACKS PUMP STATION (P-305).UNION PACIFICHORN
PRIVATE
H
OFF
M
EISTERVELMA
WEISS
UNION PACIFICUNION PACIFICP
RIV
A
T
E
PRIVATE
UNIONPACIFICUNION PACIFICPR IV A T EVELMA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
11
$50,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
51Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 33,140 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12201 AND 12348.
§¨¦270
§¨¦44
§¨¦55
WATSON RD
M A N C H E S T E R R D
G R A V O IS R D
TESSONFERRYRDN KIRKWOOD RDSLINDBERGHBLVDS
LIN
DBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12057
Wastewater
11
$50,000
Various
Lemay/RDP
Various
Capital
52Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦270
§¨¦55§¨¦70
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11145
Wastewater
16
$400,000
Various
Lemay/RDP
Various
Asset Management
53Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REDUNDANT WATER SERVICE
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
WATER MAIN BREAKS AND LOSS OF WATER SERVICE DISRUPT FACILITYOPERATIONS.
CONSTRUCT 1,265 FEET OF 6-INCH DUCTILE IRON POTABLE WATERPIPE, TO PROVIDE A REDUNDANT WATER FEED TO THE FACILITY.
ETTA
VELMA
H
O
FF
M
EISTER
P
RIVATE
MANN
HOLDEN
G
O
ETZ
CARTWRIGHT
JOPLINPERRINGENTRYRUBYMILITA
R
Y
VINCENT
ETTA
HOLDEN VELMAGOETZ
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12721
Wastewater
11
$47,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
54Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Miscellaneous Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMA N CHE S T E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$365,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
55Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$320,000
Various
Lemay/RDP
Various
Asset Management
56Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$365,000
Various
Lemay/RDP
Various
Asset Management
57Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Design Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
THIS PROJECT ALSO ELIMINATES MERAMEC BOTTOMS PUMP STATION489 AND FORCEMAIN, PER THE CAPACITY ASSURANCE EVALUATIONREPORT.
§¨¦55
§¨¦270
§¨¦55 KERTHMATTIS
G R A V O ISWELLSKELLERMERAMECBOTTO M AMBSKENNERLY
T
H
EI
SSEAST
CONCORD
ALL
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERBA UERBUTL E R HILL
GREENTONS
USONHILLS
POI N T E
CARIBEEHAWKINSGERALD
KEMPF
H
AGEMANNOLSENGREGORY
DIERSPRIVATE
MAIN
RIVERCURVE VALMEYERTESCORDMAN GOWA
T
S
O
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYREFERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYLE
TOWNE SO UTHPRIVATEPRIVATE
A M B S
B A U E R
PRIVATEPRIVATE
T ES S ONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$350,000
Various
Meramec
Meramec Tributary Areas
Capital
58Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF CORROSION ANDHUMIDITY CONTROL IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
INEFFICIENT HVAC SYSTEMS, EXCESSIVE HUMIDITY IN SOME AREAS,AND CORRODED COMPONENTS.
CONSTRUCT IMPROVEMENTS TO REDUCE HUMIDITY, AND REPLACECORRODED ELEMENTS.FINEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12499
Wastewater
11
$200,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
59Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Pre-Design Services
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.FI
NEPRIVATEPI
N
ETOP
S ILVERPINE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$1,200,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
60Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
ST
O R A N
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$285,000
St. Louis City
Bissell
Maline Creek
Capital
61Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDLAND SANITARY RELIEF (MIDLAND BLVD TOSIMS AVE)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-095 AND BP-145 REQUIRE REMOVAL.
CONSTRUCT 2,320 FEET OF 18-INCH SANITARY SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALLS BP-095 AND BP-145.SIMSGASSWISMERLESLIEH O L TW O O D
WALLISMI
L
T
ONCHAUCERDENNISON
SPENCERT
E
N
N
Y
S
O
N ANGELOWHISTLERTENNYSONMILTONDENNISONWISMERTENNYSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12352
Wastewater
11
$332,000
Overland
Coldwater
Coldwater Creek
Capital
62Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION
Design Services
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, ANDSTRUCTURES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS $6,200,000.
§¨¦70
§¨¦64
§¨¦44
§¨¦55 §¨¦70RIVERVIEWDRMANCHESTER R D
NATURALBRIDGERDNATURAL BRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12483
Wastewater
11
$1,000,000
St. Louis City
Various
Various
Capital
63Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPLACEMENT PROJECTS (PHASEI) (P-708)
Design Services
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION.
REPLACE PUMP STATIONS P-708 (EXPRESSWAY).
R
A
M
S
L A K E F R O N T EARTH CI
TYAMERI
CAN EAGLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11701
Wastewater
11
$60,000
Various
Missouri
Missouri River Tributary Areas
Capital
64Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2017)
Vendor Services
1101 - General Fund
SEWER SYSTEM FLOWS FROM INFLOW AND INFILTRATION DUE TORAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULICMODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12005
Wastewater
16
$120,000
Various
Various
Various
Asset Management
65Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$200,000
Various
Various
Various
Asset Management
66Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$600,000
Various
Various
Various
Asset Management
67Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, ANDCLAYTONIA WATERSHEDS REQUIRE MAJOR SYSTEM CONTROLS TOOBTAIN CONSENT DECREE COMPLIANCE.
CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 28 MILLION GALLONS.
§¨¦44
§¨¦64§¨¦170
§¨¦64
§¨¦44
§¨¦170
DALE
CLAYTON
ME
T
R
OLIN
KELMUNIONPACIFICPINE
PERNOD
FYLER
FOLK
WATSONOLEATHA TAMMNEWPORT
MARSHALL YALECLARK McCAUSLANDARSENAL
W ELLS
LACLEDESTATIONBELLEVUESOUT HWEST
ODELLBRENTWOODHANLEY
LINDENWOOD
SCANLAN
ETHEL
BRADLEY
KIRKHAMWHITE
BELLBREDELLBOLANDSUTTONLAWN
WEST PARK
EULALIE
GLEN
SWAN
PAR K
SMILEYPACIFICFORESTLOUIS
MARQUETTEDELNORTE
WINONA
WIL L IA MS
ALAMO
HIGHSCHOOLMARDEL
C A M BRIDGEGARNER
FLORA
ARTHUR
BERTHOLD
SALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYG R E E NWOODBRUNO GLADES
POTOMAC
MARMADUKE
WISE
FAIRVIEW M A NHATTANSUMMITPRATHERHANCOCK
RUSSELL
YEATMANEA G ER
ROSE
SPRINGFLORENCE MARTINIOXFORD PRIVATEBREMERTONC O M M O NWEALTHMOORLANDSTHOLOZANLYLEYORK
A R L IN G T O N
VILLA
WAYMIRE SOUTHSARAH
JAMES
MAPLEANNALEE CUTTERGREELEY JAMIESONECOFFSOUTHWOOD
V IN E
ARBOR
NORTHWOOD
PORTERMITCHELL
PLATEAU
RICHERTHATTONARLINGTON
PARK TAMMTAMMMARYFLORA
GLENYALEELM
EAGER
THOLOZANYALEARTHUR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12441
Wastewater
11
$4,000,000
Various
Lemay/RDP
Deer Creek
Capital
68Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROLAND SANITARY RELIEF (NELSON DR TOROLAND BLVD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 570 FEET OF 12-INCH TO 18-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-532.
STORM PROJECT 11016 TO BE CONSTRUCTED WITH THIS PROJECT.NELSONFLORIAN
ROLAND
GROVELAND
ONEILLMELBAROHN
WINCHESTER
MURRAY
KENW O O DCOLONIALDUCKWORTH
MATHEW
WILLOW WOOD
MARYELLENUPSHA WCRESTLANDOAKRIDGECOLONIALCRESTLAND OAKRIDGE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12191
Wastewater
11
$90,000
Northwoods
Bissell
Bissell
Capital
69Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHREWSBURY SANITARY RELIEF SEWER AND I/IREDUCTION (WEIL AVE AND I-44)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 600 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 196 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12057.
§¨¦44§¨¦44
WEIL MCCAUSLANDLACLEDESTATIONBOMPARTMURDOCH
LANSDOWNE
METROLINK
SHREWSBURYCLARK
NEWPORT
TUXEDO
GREELEY
SUMMITMARSHALL
WINONA
MARDEL
ATALANTA
RIVE
R
D
ES
P
E
R
ES
DEVONSHIRE
SUTHERLAND
NOTTINGHAMYEATMAN BANCROFTSPRING
JACKSON
M A NHA TTANOLD ORCHARDOXFORD
LINDENWOOD
PERNOD
GARDEN
A R L IN G T O N
BRUNSWICK
RHODES
PLAINVIEW
DEVILLESUSSEXLENOXCALVERTYALE SUFFOLKCHAPELFORDKAINEXETEROLEATHA
LAKEMARIONSUNNYSIDE
DALE
ST VINCENTOA
K
W
O
O
D
MICHAELWABASHKUHLMAN
GROVE
VERGUENEKI
NGWOODLOGCABINHAZELFAIRVIEW PROVIDENCE
COTTAGESANDAUTAMPA
LAURELLAOAKHOMELBART
ANNETTESUTHERLAND
WATSON RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12201
Wastewater
11
$670,000
Various
Lemay/RDP
Mackenzie Creek
Capital
70Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPRING AVE SANITARY RELIEF (YEATMAN AVE TODALE AVE)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. ELIMINATION OF CONSTRUCTEDSSO OUTFALL REQUIRED.
CONSTRUCT 2,520 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-440.
§¨¦44
NEWPORT
SUMMITSPRINGLACLEDESTATIONGREELEY
MARIONBOMPARTDALE
OAKWOODSUNNYSIDE
AMELIA YEATMANFAIRVIEW
FAIRLAWNCAROLINEPROVIDENCE
PAGEELMWOOD SUFFOLKOLDORC
H
ARDLAKEJERSEY BURLINGTONNORTHER N S A N T A FETHEATRE
ELBART
S U T H E R L A N D
MURDOCH
DEVONSHIRE
CHAMBERLAIN
PROVIDENCE
SUMMIT§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12208
Wastewater
11
$332,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
71Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$615,000
St. Louis City and County
Various
Various
Asset Management
72Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2017)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSOELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGHFY2019 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12003
Unallocated
16
$280,000
Various
Various
Various
Asset Management
73Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAMCT TO COVE LN)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP-213 REQUIREREMOVAL.
CONSTRUCT 4,400 FEET OF 18-INCH TO 21-INCH SANITARY SEWER.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLSBP-210, BP-211 AND BP-213.
§¨¦270§¨¦270DUNN
COVE
REALE
JUNE
BAYONNE CRITERIONRAYMONDDORIS
CADIGANROSARYBOWERSEDMAR
TWILLMAN
MACKIN
LILACRHEA
REDMAN
MURIEL
CROSSETT
RUESTAPETITE
SCOTT
MC QUAY
SURF SIDE
BARON
BURLINGTON NORTHERN SANTA FEPRENDERGA S TLARIMORE
CLAUDINE
PRIVATETAOS
WALKER
QUIETLAVIDAMONTICELLO
MAJORCASENATE
RIAZAP ARKMONTCOPPERGATEORTEGA
LYDIAGARD E N
ESTRADA
MUNICIPALSHERRINGTONMARBELLAMARTIN PENNINGROTHCARAWAY
ESTRADACLAUDINE
REDMAN
REALE
CLAUDINE
PRIVATECOVE
JUNE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12221
Wastewater
11
$526,000
Unincorporated
Bissell
Watkins Creek
Capital
74Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TOJENNER LN)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-214 REQUIRES REMOVAL.
CONSTRUCT 4,300 FEET OF 8-INCH TO 27-INCH SANITARY SEWER.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLBP-214.
REDMAN
LUSHERDUNNBENHAMJUNE
DORIS
ROSARYEDMAR
MACKIN
COVE
SHARDELLPOGGEMOELLER REALE
N
O
R
G
A
TEMURIEL RUESTABAYONNE
SURF SIDEPRENDERGAST
LARIMORE
CLAUDINE
SIESTA
TWILLMAN
TALISMAN
TALBOTTMONTICELLO
MAJORCACROSSETT
RIAZAFARMVIEW
CORLYNWITHERSFIELDESTRADA
DELR
OSAPORTSMOUTHSHERRINGTONJENNERMUNICIPALKINGSPORTMARBELLAMARTINMARYWELLLANETTCLAUDINEROSARY
ESTRADALEWISNCLARKBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11669
Wastewater
11
$452,000
Unincorporated
Bissell
Watkins Creek
Capital
75Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TULANE-WILBUR OUTFALL SANITARY RELIEFSEWER (WEBER RD TO HILDESHEIM AVE)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. YARD AND STRUCTUREFLOODING. CONSTRUCTED SSO OUTFALL BP-618 REQUIRES REMOVAL.
CONSTRUCT 4,630 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, AND1,235 FEET OF 12-INCH TO 18-INCH STORM SEWER. ELIMINATECONSTRUCTED SSO OUTFALL BP-618.
STORM PROJECTS 11042 AND 11643 TO BE CONSTRUCTED AS PART OFTHIS PROJECT'S SCOPE OF WORK, AND FUNDED SEPARATELY VIAAPPROPRIATION FROM FUND 5120.
WEBER
SEIBERT
KAMMERERPRIVATE
FORMANLANGLEY
WALDO HEIDELBERG
HEEGEPHILO
FATIMA JULIAHILDESHEIMA L L E Y
TIEMANN
WEBER TRAILKRAMER
STONE
OLDENBURG
V IR G IL
LAKEW
OOD
BAYBROOKNONIEFRANKFORTROSEMARYLACEYHUMMELSHEIM
PINTOHANNOVER
CANOE DECORUMHENZEOVERTONARONIACREELMAN
PAPOOSEHENLINSTEFFENMACKINAWTOMAHAWKHEIM
DON R ONWEBERTERRACECANDACE
TOMORE
HERSHEY
TIEMANNPHILOFRANKFORT
HEEGE
HEEGEGRAVOIS R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12239
Wastewater
11
$900,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
76Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER RDP (UNIVERSITY CITY) CSO STORAGETUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE UPPER RIVER DES PERES ANDTHE UNIVERSITY CITY WATERSHED IS REQUIRED BY THE CONSENTDECREE.
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 30 MILLION GALLONS.
DELMAR
PAGE
FORSYTH
C A NTON
METROLINK
ETZELHANLEY
FORESTPARK
VERNONPURDUETERMINALFERGUSON
MARYLAND
JULIAN
TULANE PENNSYLVANIASUTTERCENTRALBEMISTONMETRO LI
NKSHAFTESBURY81ST
MERAMECLYNN
PERSHING YALEBARTMER
COR N E LLNORTHNSOUTH
TRINITYWASHINGTONPARTRIDGESTANFORDWARDERLAFONTEASDALE
WAYNE
TOPTONPRI
VATEGANNON
AHERN QUENDOLAMBBRENTWOODWILSON
LINDEN78THWILLIAMSWATTSHOYTDREXEL KINGSLANDNORTHMOORGROBYDORSETGAYLINDELL LELANDCHAMBERLAINMEYERMILAN
WELLINGTON
COLGATE 66THCATES
M
O
N
A NIXONMENDELLSNOW
WESTMORELAND
AMHERST FARISBALSONFAIRVIEW
NORTHBELRUELEROY
LEECARLETON COLBYCORBITTRABEBRADFORD
CRESTVERLHAFNER
VANDERBILTWARRENHOW
MELROSE
BLANDMELVILLEWATERMANOVERHILL ENRIGHT
PRINCETON
MISSIONKINGSBURY HAYSWOODRUFFMALLARD
MAPLEMILFORDNOELGRUNER
LYLECENTERMARYLAND TRINITYPRIVATE
WASHINGTONKINGSLAND
KINGSLANDGAYLINDELL
KINGSBURY
FORESTPARKPURDUEWAYNE
CORNELL
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12440
Wastewater
11
$2,000,000
University City
Lemay/RDP
University City Branch
Capital
77Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VANCE RD PUMP STATION (P-472) UPGRADES
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION AND SYSTEMS ARE AGING AND IN NEED OFREPLACEMENT AND REHABILITATION.
CONSTRUCT UPGRADE OF ELECTRICAL, MECHANICAL, AND CONTROLSYSTEMS, REHABILITATE STRUCTURE AND WET WELL, AND ELEVATEELECTRICAL ROOM FLOOR TO REDUCE RISK FROM FLOODING.
V A N C E MAINR U T H E R G L E N PRIVATEEVAINEZPRIVATE
MAIN
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12490
Wastewater
11
$520,000
Valley Park
Meramec
Kiefer Creek
Capital
78Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)FORCEMAIN REPLACEMENT (COAL BANK RD TOSPRING GARDEN DR)
Design Services
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE CAUSED BYHYDROGEN SULFIDE AND AIR POCKETS.
CONSTRUCT 9,480 FEET OF 20-INCH FORCEMAIN.
REPLACES SYSTEM CAPACITY PROJECT 12254.
§¨¦270
§¨¦270DUNN
COALBANK
PRIVATEUPHILLMILDREDDUNDEE
LOOKAWAYRODERICK GLEN GARRYSPRINGGARDENMONTEITH
M CALPINE
BRIGADOON
PRIV ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12922
Wastewater
11
$1,000,000
St. Louis City
Bissell
Watkins Creek
Capital
79Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)UPGRADES
Design Services
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
REPLACES SYSTEM CAPACITY PROJECT 12254.
HOBATH
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
11
$550,000
Unincorporated
Bissell
Watkins Creek
Capital
80Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEST LOCKWOOD SANITARY RELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 3,660 FEET OF 12-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-187 AND BP-587.ROCK HILLLOCKWOODSWON
UNION PACIFICJACKSON
SHERWOODPAPIN JEFFERSONHOLLYWOODBAKEROAKS
SIMMONS
ALGONQUIN
SOMERSETCROFTONWOODLAWN BRISTOL
BELLEVIEW
MCDONALD
SHEFFIELD BLACKMERYORKSHIREWESTBOROUGHBARSTOW
PLANTHURSTALGONQUIN
UNION PACIFICBAKER
LOCKWOOD
CROFTON§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11679
Wastewater
11
$432,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
81Page
2019
5 April 2018
WASTEWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
$4,000,000 82
12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270
AND DOUGHERTY FERRY RD)
$463,000 83
12075 AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
$470,000 84
12029 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT A
$8,900,000 85
12026 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT C
$5,900,000 86
12828 BISSELL POINT WWTF REDUNDANT SLUDGE
ACCEPTANCE SYSTEM
$3,500,000 87
11789 CAULKS CREEK FORCEMAIN REHABILITATION $9,000,000 88
12836 CLARA 523 COMBINED SEWER IMPROVEMENT $100,000 89
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
$1,348,000 90
12126 COLDWATER UPSTREAM PUMP STATION (P-
180) STORAGE
$1,280,000 91
11729 CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
$7,000,000 92
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 93
12471 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
II
$10,500,000 94
12042 DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
$5,745,000 95
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$50,000,000 96
12154 EARTH CITY LAKE FRONT NORTH PUMP
STATION (P-711) REPLACEMENT
$550,000 97
12155 EARTH CITY SHORELINE PUMP STATION (P-
704) REPLACEMENT
$750,000 98
5 April 2018
WASTEWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12515 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2019)
$1,500,000 99
12161 ELINOR AVE. TEMPORARY SANITARY
STORAGE FACILITY
$140,000 100
10856 ERA AVE. 5800 BLOCK SEWER SEPARATION $140,000 101
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
$4,700,000 102
12186 FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
$190,000 103
12914 GLEN EAGLES PUMP STATION (P-189)
RELOCATION / REPLACEMENT
$600,000 104
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
$15,000,000 105
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI (BUCKLEY
RD TO UNION RD)
$2,500,000 106
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$18,000,000 107
12372 GREEN PARK AND LAKESHIRE I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
$231,000 108
12510 GREEN PARK AND LAKESHIRE PUBLIC I/I
REDUCTION (TESSON FERRY RD AND GREEN
PARK RD)
$2,500,000 109
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
$4,430,000 110
10863 HERMITAGE SANITARY RELIEF (SKME-615)$2,500,000 111
12896 INFRASTRUCTURE REPAIRS (FACILITIES)
(2019)
$3,000,000 112
12017 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT A
$2,500,000 113
12018 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT B
$2,500,000 114
12009 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2019)
$7,000,000 115
5 April 2018
WASTEWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$20,000,000 116
11142 JENNINGS STATION ROAD / NORTH BADEN
BASIN
$2,100,000 117
12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON
RD AND LAY RD)
$500,000 118
13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE
REPLACEMENT
$1,500,000 119
12038 LEMAY PUBLIC I/I REDUCTION (2019)
CONTRACT D
$3,050,000 120
12721 LEMAY WWTF REDUNDANT WATER SERVICE $520,000 121
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
$5,000,000 122
12511 MACKENZIE PUBLIC I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER PARK,
KENRICK SEMINARY, AND NERINX HALL)
$6,840,000 123
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$9,000,000 124
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
$4,200,000 125
12444 N CLARK AVE 49 SANITARY SEWER
REPLACEMENT
$610,000 126
12786 N HIGHWAY 67 AT COLDWATER CREEK
SANITARY SEWER REPLACEMENT
$650,000 127
12362 NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
$500,000 128
12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH
BRENTWOOD I/I REDUCTION (S BRENTWOOD
BLVD AND MANCHESTER)
$400,000 129
12702 OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
$1,450,000 130
12901 RDP FOULWATER SEWER GRIT CHAMBER
ELIMINATION (DEER CREEK)
$660,000 131
13079 RIVERSIDE AND YARNELL SANITARY RELIEF
REHABILITATION
$1,600,000 132
5 April 2018
WASTEWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
$3,300,000 133
12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE
AND COUCH AVE)
$590,000 134
12235 TOWNE SOUTH AND BRUNSTON I/I
REDUCTION (AMBS RD AND TOWNE CENTRE
DR)
$110,000 135
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-
08 AND UR-09)
$5,506,000 136
11791 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION B
$3,400,000 137
12253 VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
$500,000 138
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE
III
$600,000 139
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE
IV PART 3
$1,300,000 140
12278 WESTBOROUGH - LUTHER - MERMOD PLACE
I/I REDUCTION (N KIRKWOOD RD TO I-44 AND
BERRY RD)
$240,000 141
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
$1,375,000 142
TOTAL:$257,438,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
82ND STREET TO I-170 SANITARY RELIEF (UR-08,UR-09)
Construction
6660 - SanitaryReplacement Fund
UNDERSIZED SEWER. ELIMINATION OF CONSTRUCTED SSO BP-421REQUIRED. PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS.
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH SANITARY SEWER.ELIMINATE SSO OUTFALL BP-421, AND FACILITATE FUTUREELIMINATION OF MULTIPLE UPSTREAM CONSTRUCTED SSO OUTFALLS(BP-416, BP-417, BP-433, AND BP-476).
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS $8,000,000.INCLUDES PROJECT 12127.
§¨¦170
§¨¦170 82ND81STMCKNIGHTOLD BONHOMME GROBYHILLTOPWOODSONPR
I
CEBALSON
B
R
A
D
D
O
C
K
ELMORE
APPLETON
GRANTRICHARD
S
H
E
R
I
D
A
N
GAYORCHARD
MILAN
TULANE
C
O
O
L
I
D
G
E
ALICE CANTON
SPOON
AL
A
N
S
O
N
LE PEREBERICKFULLERTONPENNELLKEMPLAND
PRIVATEHAFNERARCHERBELL
SEVILLE LAUGHLINVILLA
IROQUOIS
B
LACKBERRYMULBERRYCOLLINGWOODBON HILLS
WATSONIA ARROWHEADLOCUST
ALDANBLANCHA
BON P RICEVA R DAMAN
VILLA CAPRICHICKASAW
ROWLANDBRISCOECOMSTOCK
ORCHARD
PRICEELMORE
RICHARD
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11993
Wastewater
15
$4,000,000
Various
Lemay/RDP
University City Branch
Capital
82Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ADAMS I/I REDUCTION (SOUTHEAST OF I-270 ANDDOUGHERTY FERRY RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 600 FEET OF 8-INCH SANITARY SEWER, 400 FEET OF12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION AT 5PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12027.
§¨¦270
§¨¦270
BALLASA D AM S
U N IO N P A C IF IC
C R A IG
ANN
COUCHBOAZ
LARK
EDNAESSEX
DES PERESCRESTHIG
HLA
N
DRIETH
NIRKIRISFRIEDAALTUS
NELDABACHRAYNER
G ABRIELWESTVIEW
THURSBY
LINDEMAN
GLENWOODOLDB IG B END
WOODBINE
BRIARGATE
VIRGINIA ROSE HILL
SH A RIJOECUL
LODENRI
F
L
ERANGE
S O M M E TWI
LDWOOD
GRASSY RIDG EWINDY HILL
A PP L E H IL L
PRIVATE
DUBOISMEYERBRYANTHORNCLIFF BALLASTHURSBYUNIONPACIFIC
WOODBINE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12073
Wastewater
15
$463,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
83Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
AFFTON I/I REDUCTION (HANOVER,HILDESHEIM-WEBER RD, SEIBERT, ANDHAMBURG)
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 161 PROPERTIES.
§¨¦55
UNIONWEBER
SEIBERT
DANAGERMANIA
KAMMERERMORGAN FORDMOHEGAN
RIVER
DESPERES
PRIVATE
FANNIE
HEIDELBERGMATHILDA
BAYLESSFORMANFABER
LANGLEY
KAYACORN OLDENBURGPILOT P
RIM
M
HILDAVINE HAMBURG
HANNOVER
AVENUE HUNIONP A C I F IC
WALDO
LODE
HEEGE STOLLEPHILOHEALY
PAPOOSEFATIMA
COLVINGENESTA STEINS
A L L E Y
BIGCHIEFHILDESHEIMDAVIS
KOELN
SANTENHARLANTIEMANN
CARONDELET
WEBER TRAILKRAMER
GRASSO PARKWOODADKINSCARLSBADRAYTIFFANYTESSO
N
BLACKHAWK WANDAPINTOHUMMELSHEIMWOLZ
WILMA
SUNSHINE
MAJE S TYMACKINAWARONIAWHIPPOORWILLSTEFFENAUTUMN
GARDEN PARK
HERSHEY
GARLYNJONMARH A M P S H IR E
FORMAN WANDAHEEGE
PRIVATE
PILOTHEEGE
FATIMA
HANNOVER
LODE
TIEMANNG RAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12075
Wastewater
15
$470,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
84Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2019) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 97,115 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12164, 12160, 12309,12226, 12238, AND 12530.
§¨¦44
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12029
Wastewater
15
$8,900,000
Various
Various
Various
Capital
85Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2019) CONTRACT C
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 76,025 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12235, 12265, 12283,AND 12293.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦170
§¨¦255
§¨¦64
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12026
Wastewater
15
$5,900,000
Various
Various
Various
Capital
86Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF REDUNDANT SLUDGEACCEPTANCE SYSTEM
Construction
6660 - SanitaryReplacement Fund
THE BISSELL WWTF LACKS A REDUNDANT SLUDGE ACCEPTANCESYSTEM TO ACCOMMODATE MAINTENANCE AND BREAKDOWN.
CONSTRUCT REDUNDANT SLUDGE ACCEPTANCE SYSTEM AT THEBISSELL PLANT.
H
A
L
L
GRANDN
O
RFOLKSOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12828
Wastewater
15
$3,500,000
St. Louis City
Bissell
Bissell
Capital
87Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN REHABILITATION
Construction
6660 - SanitaryReplacement Fund
FORCEMAIN CONVERSION TO REDUNDANT FORCEMAIN REQUIRESREHABILITATION DUE TO AGE AND CONDITION.
REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROMPUMP STATION A TO THE 36-INCH FORCEMAIN AT THE MISSOURIAMERICAN WATER PLANT.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$17,000,000.
§¨¦64THF
CENTRAL M ID L A N D LADUEEDISONW
E
S
T
APPALACHIANWILDHORSECREEK HOGHOLLOWPRIVATEW
IL
SON GREENTRAILSSWINGLEYRIDGECHESTERFIELD
WATER W O RK SW
HITE PETZOLDRA INYLAKENOONI
N
G
TREE
LYDIAHILL CONWA Y
W E S T E R NM I L L
PR IV A T E
PRIVA T E
P
RIV
A
T
E
PR IVATEOLIVEBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11789
Wastewater
15
$9,000,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
88Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLARA 523 COMBINED SEWER IMPROVEMENT
Construction
6660 - SanitaryReplacement Fund
COMBINED SEWER SURCHARGING AND BACKUPS.
CONSTRUCT 190 FEET OF 18-INCH COMBINED SEWER.CLARAWATERMAN
DELMAR
DEBALIVIEREKINGSBURY
WASHINGTON
KINGSBURY
KINGSBURY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12836
Wastewater
15
$100,000
St. Louis City
Lemay/RDP
Blackstone- Clarendon
Capital
89Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SOUTHWEST SUBWATERSHED I/IREDUCTION (ST. CHARLES ROCK RD AND ASHBYRD)
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,700 FEET OF 12-INCH TO 15-INCH STORM SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 118 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12025.
§¨¦70§¨¦70
ASHBYADIEWOODSONFEEFEELINKWRIGHTBALTIMORELONGHIGHDIXIE NORTH
AVERY
DIXSIMSJANEPOECYPRESSGUTHRIE
LITZ
BROWNREXEMINENCEBOBB
METROLINK
OLDSTCHARLES
MERT GERALDINEARGYLEKREMFALCONCOLESGORDON
HOODBURNSST FRANCISBANKS
THORPE TENNYSONS
CHAEFE
R
H O LT W OODRAYMONDPRIVATE
GASSCHAUCERBRUNOST X A V IE R
PASTEURAIRWAYMILTONHAROLD
TUDORSANJOSEST LEOWISMERHUNTER
IVAN
HERBERTPEAR TREE
VANCLEVE
BATAAN
STKATHERINE
MARVINTIPTONQUIETBENEDETTA
CALVERTISOLDAW IL WOOD
ST
PHILIP AIRFLIGHTINVER
N
E
S
SNORA MURIEL
LINDADE
S
A
X
O
N
H
A
L
L
SHE
L
L
E
Y
ANN MAR
EDMUND
ANGELOKIN
G
B
E
E
ST DAMI
A
N
G RA NDCIRCLE JOELCINNAMON HEATHOTIS
LYNROSGRABEN
ADIE WISMERSIMSST C
H
A
R
L
E
S
R
O
C
K
R
DNLINDBERGHBLVDNATURALBRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12125
Wastewater
15
$1,348,000
Various
Coldwater
Coldwater Creek
Capital
90Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER UPSTREAM PUMP STATION (P-180)STORAGE
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-180 HAS INSUFFICIENT CAPACITY AND NOPROVISIONS FOR EMERGENCY STORAGE.
CONSTRUCT 1,000 FEET OF 66-INCH PIPE IN ORDER TO PROVIDETEMPORARY STORAGE.
SILVER FOX
E PPINGHAMWILD FOXSEDGEMOOR
DUN
S
TON
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12126
Wastewater
15
$1,280,000
Unincorporated
Coldwater
Coldwater Creek
Capital
91Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CREVE COEUR CREEK SANITARY TRUNK SEWERRELIEF PHASE VI (SKME-021)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 7,750 FEET OF 15-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-036 AND BP-037.
S
C
H
O
E
T
T
L
E
R
ISLEVIEWS
T
R
A
U
BCOUNTRYRIDGECEDARMILLPRIVATE
C LAYTON
WHITE LAN E
S
C
H
O
ETTLER
V
A
LLEY
GOLDEN RAIN
GRANT L E Y
SUM M E R LAKE
H IG H CROFTMIL L S P R IN G
R IDGE LA K E
G R E E N L E AFVALLEYSTRO LLWAYS
STRAUB HILLPARASOLL
A
KECLAYSUMMERRIDGE
SILVER
W
O
O
D ROYALBROOKSQUI RES W A Y
CLAYMILLS
NA
R
R
O
WSMAN ORR I D G E
PIN
E
R
U
N
C H E Q UERBROO K HILLCHAMISAL
H
O
N
E
Y
RID
G
ECOUNTRYMILL
W O O D S B L U F F
C R ATER
P H E A S A NTHILLTWINGATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11729
Wastewater
15
$7,000,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
92Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Various
Non-recurring
93Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE II
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 7,900 FEET OF 66-INCH TO 72-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING AND FACILITATE THE FUTUREREMOVAL OF CONSTRUCTED SSOS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS$27,530,000.
PINE
MCKNIGHTWHITE
ODAYOLD WARSON
HUDSONGILBERT ST CLAIRLITZSINGER
MCKINLEYDANIELROCK HILLROCKF
O
R
DPARKRIDGEBREMERTONKORTWRIGHTROCKMANPARK
SONORA
OVERBROOKPRIV A T E
STANLEY REMINGTONOAK BENDMERRITTLINDWORTHPOCAHONTAS LAWN
RUSSE
L
L
BERRY
WHITEHALL
W ARSONCHARLEVILLESUTTON
RARITAN HATTONDANFIELD DEER CREEK WOODS
D
U
N
K
I
R
KCHARLANEOAK LEAFGOLDEN GATE
S A N TAFEBLUESTONEOAK BEND
R
A
R
I
T
A
N
M A N C H E S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12471
Wastewater
15
$10,500,000
Various
Lemay/RDP
Deer Creek
Capital
94Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2019)CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 73,510 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12244, 12230, 12218,12342, 12138, AND 12100.
§¨¦64
§¨¦170
§¨¦64
§¨¦170
C L A Y T ON
M E T R OLINKGEYERDELMAR
BRENTWOODPRICESPOEDELADUE
LAYELMFORSYTH
OLD WARSON MCKNIGHTGRAESERGAYNEWPORT
MARSHALL
DALE
LEE
FOLK
CLARKWOODLAWNDIELMANCORNELL
FOREST P A R KBEMISTON
TR ENTRUTHWARSONHANLEYPURDUEODAYDAVIS
WHITE
BELLBISMARK BOLANDBARNESLITZSINGER
WYDOWN
GLENLAFON
JACKSONSWAN
PAR KDANIELSQUIRES CELLAVOUGA
LOUISMADGE
ANDREWFLORA
BU
C
KBEAVER
MCKINLEYRIO VISTABARTOLDRUSSELL
URBAN
MAPLE
DENNY
ROCK HILLCECELIAC L E R MON T
ROSEDA
R
YLEVANSOXFOR DAMHERST
YORK
BARBY
C H IP PER
ALDEN
DROM
A
R
A
ENNISHICKORY
INDIAN
LOG CABINBALSON
JOANNA
LISA
BENNETTSUSSEXGREELEYDWYER
BERRYGREELEY
AMHERST
RUTH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12042
Wastewater
15
$5,745,000
Various
Lemay/RDP
Deer Creek
Capital
95Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS $153,000,000. PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEME
T
ROLINK
ELMLAYPINE
UNIONPACIFICLANSDOWNE
WYDOWN
PERNOD
FYLER
LOCKWOOD
FOLKMCKNIGHT
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWEST
W E LLS
MURDOCHODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEPRICE
GLENARUNDEL
EUCLID
SWAN
WEST PARK
PAR K
OAKLAND
LITHIADANIEL P ACIFIC
SUMMITZEPHYROLD WARSONCELLA HANLEYFORESTLOUISMARQUETTE
WI L L I A MS
ALAMO
LAGOON
MARDEL
MADGEMCCUTCHEON
GRAYROANOAKLOUWENFLORA
G
O
R
E MARYS U T H ERLAND
BRUNO
GLADESRIDGEMOOR
JEROME
MANHATTANPRATHERIOLAELLENWOOD
RUSSEL
L
WISE
YEATMANCECELIAROSE
OXFORD
GODWIN
Y ORKLYLEDESPERESARLINGTO
NLANGTON
TAMMVILLA
KRAFTINDIAN
BRYAN
FAUQUIER
WILD ROSE
DOLAN
JAMIESONREAR
PORTERGROVECEDAR
BERRY
DROMARA
CLARK
UNIONPACIF IC TAMMYALEBANCROFT
WHITE
M A N C H ES T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$50,000,000
Various
Lemay/RDP
Deer Creek
Capital
96Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY LAKE FRONT NORTH PUMP STATION(P-711) REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-711 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-711.
L A K E F R O N T EARTH CI
TYS
H
O
RELINE
WEDGEWAYNORFOLK SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12154
Wastewater
15
$550,000
Unincorporated
Missouri
Missouri River Tributary Areas
Capital
97Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY SHORELINE PUMP STATION (P-704)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION B-704 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-704.SHORELINENORFOLK SOUTHERNGREENA
S
H §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12155
Wastewater
15
$750,000
Unincorporated
Missouri
Missouri River Tributary Areas
Capital
98Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2019)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTYRIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12515
Wastewater
13
$1,500,000
Various
Various
Various
Asset Management
99Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ELINOR AVE. TEMPORARY SANITARY STORAGEFACILITY
Construction
6660 - SanitaryReplacement Fund
ELIMINATION OF CONSTRUCTED SSO OUTFALL REQUIRED.
CONSTRUCT 110 FEET OF 8-INCH TO 24-INCH SANITARY SEWER INORDER TO PROVIDE 1,400 GALLONS OF TEMPORARY STORAGE.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLBP-008.
HICKS
ELINOR
JONES
RANKENLACLEDE STATIONSNOWDON
BANNEKERWESTON
ST ALBANS
THOMASBERKLEYDOUGLASALABAMASTOCKARDLAVINGTONBANNEKERSTOCKARD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12161
Wastewater
15
$140,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
100Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ERA AVE. 5800 BLOCK SEWER SEPARATION
Construction
6660 - SanitaryReplacement Fund
DRIVEWAY DRAINS OVERCHARGING LATERALS CAUSING BUILDINGBACKUPS.
CONSTRUCT 190 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 2 PROPERTIES.ERAMIMIKAFLOYPAMPLINPARKNORTH POINTE ALPHAASTRAGOODFELLOW GLADYS
FLOY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10856
Wastewater
15
$140,000
St. Louis City
Bissell
Baden
Capital
101Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 6,114 FEET OF 8-INCH TO 30-INCH SANITARY SEWER, AND5,735 FEET OF 24-INCH TO 42-INCH PIPE IN TUNNEL. ELIMINATECONSTRUCTED SSO OUTFALL BP-076.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS$17,000,000.
PAGE
ADIE
SCHUETZLACKLAND
B
A
L
L
B O RM ANC
E
N
T
R
A
L
M
ID
LAND
W
E
L
DONFEE FEESCHAEFERGRISSO
MGRAELER
MILLPARK
C H IE F T A I N
VI L L A D O R A D OCHAFFEE
GAND YT IV OLI
SCHULTECONCOURSEDECORAH
PRI VATE
W E S T L IN E I N DUSTRIAL
MONT
A
UKNORFOL K S O U THERNME DIAGOLDLEAFLIMETREE D O R SETTARC
C H A N DELLAY
PAGESERVICE
ALTOMS
H
A
LLOWB R O O KCONGRESSIONAL M U E L L E R
L IN F R E DVERNABRO
NCO
PINERO WWOODLANDHAMMER LACKLAND HILL
CRAIG PARKPAGEP
RIVATEPAGESERVICE
MEDIAPRIVATEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10601
Wastewater
15
$4,700,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
102Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FRONTENAC, WINDING RIDGE, DEER CREEK HILLI/I REDUCTION (S QUAD I-64 AND CLAYTON RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
CLAYTON
GEYERSPOEDEOLD WARSON
T R ENTWARSONSOUTHFORTY
LITZSINGER
DANIELCELLAKENTBARNESROANOVERHILLS
D E N NY
HICKO R Y
CH IPPE R MAGNOLIACONWAYSPRINGWOOD
ARTHUR
P IC A RDY
WIND I N GR I D G E
INDIANLOG CABINOVERBROOKHI
GHDOWNP RIV AT E
TREGARON
ANZEIGER
TWINSPRINGSMAYFAIRWARRIDGELYLEWOOD TIRRILL FARMSOAK BENDDWYERWOO DACREOAK GATE
CAPITOL
D E E R CREEK
L Y N N B R O O KPRIVATE
PRIVATEPRIVATE
PRIVATE
LITZSINGER
S LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12186
Wastewater
15
$190,000
Ladue
Lemay/RDP
Deer Creek
Capital
103Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEN EAGLES PUMP STATION (P-189)RELOCATION / REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
DEVELOPING SINKHOLE THREATENING PUMP STATION FACILITY.
RELOCATE AND RECONSTRUCT EXISTING DUPLEX SUBMERSIBLE PUMPSTATION TO ADJACENT SITE, INCLUDING DETENTION STORAGE.VAILEPRIVATEEAGLEESTATESFLEURDUBOIS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12914
Wastewater
15
$600,000
Unincorporated
Coldwater
Mill Creek (County)
Capital
104Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYREHABILITATION (FANNIE AVE TO PARDEE LANE)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 37,000 FEET OF 36-INCH TO 72-INCH SANITARY TRUNKSEWER AND REHABILITATE 95 MANHOLES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$30,000,000.
§¨¦55
§¨¦270 UNIONMACKENZIEROCKHILL
PARDEEMUSICKELMGREGGG
RA
N
T
REAVISBARRAC
KS
WILL
GERMANIA
RIVERVALCOURMORGANFORDWACHTELBAYLESS
ZEISSH
ALE
SEIBERT
CCCGREENPARK PARDELLAIO NELACLEDE STATIONCH
ESHIRE
RIVER
DESPERES
BAPTIST CHURCHTELFORDMATTIS ELTONCORDESBLOW
ARLEE
TULIP
LIT TIE
GENTRYMATHILDAFAIN
I
VYSHERMAN JOPLINREAVIS
RADIOSHARPP R IV A TE
ALICETON
MOHEGAN
ELISE NEW HAMPSHIREKAYEDGAR
RIPASELMA
MUELLERHEIDELBERG
KITWEBER
GRANDCLIFFRUSTYDIERSVAUK
LUCIABUXTONLARKFORMAN
OUTE RWELLSSUN
R
A
Y ACORNTESCORDGATESBURY
SUNSHINE
SEDANALTHEAVASELFLORIJEFFLEIGHCAMINOMAYOLANZINZER
HALS EYVIRGOBUFFTON
LINCORDAFFTON
JAMIEJAN
PECANASHBURY
PICKWICKREGINABUCKLEYLAKESIDE
LARKINSIGSBEE
HEEGE
VICTORY PHILOHEALY
FATIMA
CECIL
JOELOLEDELKOERBER
SONATAEIFFEL
ALLEN WANDARAYPINOAKJUBI
LPEARHEEGE
GRANT
WEBER
GRANTLEMAYFERRYRDTESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10496
Wastewater
15
$15,000,000
Various
Lemay/RDP
Gravois Creek
Capital
105Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELOCATION PHASE VI (BUCKLEY RD TO UNIONRD)
Construction
6660 - SanitaryReplacement Fund
EXPOSED SANITARY TRUNK SEWER CROSSING GRAVOIS CREEK.
CONSTRUCT 1,530 FEET OF 54-INCH SANITARY SEWER, 220 FEET OF8-INCH TO 15-INCH SANITARY SEWER, 7 MANHOLES, AND BANKSTABILIZATION.
WILL
DILLONBUCKLEYUNIONVIA M I R A LESTACALEFCAMINO BURBECKEDWARDSRODAPA JACINTO
SUNRISE WAY
CAUSEWAYCAROUSELTHREE ACRESCHANUTELAN SHORESPARK HILLCORONATION
HA LLMARKBUCKLEY
BUCKLEY
BUCKLEYLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11766
Wastewater
15
$2,500,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
106Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTEDSSO OUTFALLS REQUIRED.
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TOSTORE WET WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTEDSSOS BP-588 AND BP-599.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$35,500,000.
PARDEE
BROOKVIEW
A R BA NPRIVATEGRANT
LODGE POLEW H IT E C L IFFPARKSILVERCRESTLURLINEPRIVATEPRI VATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
15
$18,000,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
107Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GREEN PARK AND LAKESHIRE I/I REDUCTION(TESSON FERRY RD AND GREEN PARK RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 28 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12510.
§¨¦55
§¨¦270 §¨¦55 UNIONMUSICKGRANT
WILLCONCORD
H
ALEGREEN PARK IONEP R IV A TE
BAPTIST CHURCHWEBER
PARDEELITTIE
I
VYREAVIS RADIOALICETON
ELISE
CORDESRIPA
THEISS MUELLERRADIOMKITLUCIA FORMANVAUK
FAINTESCORDTIBERLEMONAALTHEA
DORSIE
VARGAS
VASEL
RUSTYALIX JEFFLEIGHCAMINOMAYOBONNIE
LANZINZER
M ULLALLYZENITHFARADAY BRENDABUFFTON
LINCORDAFFTONGARBEREDEN
SAKURA
JOSSEJAN
PECANYUMA
MEA T H
PICKWICKBUCKLEYDANALARKINEVANDALEMCNAR
YFIVEOAKSBULL RUN
PAPOOSEWIL BESSTOLZ
KOERBER
B
ELLEWOOD
PANCHO
EIFFEL
BANISTERGENELMALUS
ARVIN
SOLAR
SEQUOIA
MADAFORDFLORINDA WAYNEJUENGEL
OPAL
LOIS
LETA
SAXON GENEL A R KSPUR
WEBER
BUCKLEY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12372
Wastewater
15
$231,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
108Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GREEN PARK AND LAKESHIRE PUBLIC I/IREDUCTION (TESSON FERRY RD AND GREEN PARKRD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 24,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12372.
§¨¦55
§¨¦270 §¨¦55 UNIONMUSICKGRANT
WILLCONCORD
H
ALEGREEN PARK IONEP R IV A TE
BAPTIST CHURCHWEBER
PARDEELITTIE
I
VYREAVIS RADIOALICETON
ELISE
CORDESRIPA
THEISS MUELLERRADIOMKITLUCIA FORMANVAUK
FAINTESCORDTIBERLEMONAALTHEA
DORSIE
VARGAS
VASEL
RUSTYALIX JEFFLEIGHCAMINOMAYOBONNIE
LANZINZER
M ULLALLYZENITHFARADAY BRENDABUFFTON
LINCORDAFFTONGARBEREDEN
SAKURA
JOSSEJAN
PECANYUMA
MEA T H
PICKWICKBUCKLEYDANALARKINEVANDALEMCNAR
YFIVEOAKSBULL RUN
PAPOOSEWIL BESSTOLZ
KOERBER
B
ELLEWOOD
PANCHO
EIFFEL
BANISTERGENELMALUS
ARVIN
SOLAR
SEQUOIA
MADAFORDFLORINDA WAYNEJUENGEL
OPAL
LOIS
LETA
SAXON GENEL A R KSPUR
WEBER
BUCKLEY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12510
Wastewater
15
$2,500,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
109Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(GOODFELLOW TO HAMILTON)
Construction
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH SEWER, AND 3,000 FEETOF SEWER LINING.
THIS PROJECT MAY BE BID AND CONSTRUCTED BY THE CORPS OFENGINEERS UNDER A COOPERATIVE AGREEMENT.
TE R M I N A L
ST LOUIS
TERRY
MAFFITT
GOODFELLOWHAMILTONCLARAWABADA
ROOSEVELT
HIGHLAND
LOTUS
GREER
LABADIE
KENNERLY BURDKIENLENS
ELBER
POWERS
ASHLAND
IDADALE
ELMBANK
ROWANBLACKSTONEHIGHLAND
TERRY
MAFFITT
GREER
KENNERLY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11769
Wastewater
15
$4,430,000
St. Louis City
Bissell
Harlem
Capital
110Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HERMITAGE SANITARY RELIEF (SKME-615)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. CONSTRUCTED SSOOUTFALLS REQUIRE REMOVAL.
CONSTRUCT 3,700 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 1 PROPERTY. ELIMINATECONSTRUCTED SSO OUTFALLS BP-181, BP-333, BP-343, AND BP-555.GEYEREASTCHIPPER
DIVOTCOUNTRYSID E
FIRETHORNPORTLAND
H IC KORYF O X RUN
FOX RIDGE
WILLOWLEAFHUNTLEIGHWOODSOUTER LADUE
COACH N FOUR
PRIVATESTEEPLECHASE
HERMITAGE HILL §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10863
Wastewater
15
$2,500,000
Frontenac
Lemay/RDP
Deer Creek
Capital
111Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2019)
Work Order Repair Costs(Capital)
4102 - ImprovementFund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT POSEMAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT FORCAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TOADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS ANDPUMP STATIONS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12896
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
112Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2019) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12017
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
113Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2019) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12018
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
114Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2019)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12009
Wastewater
17
$7,000,000
Various
Various
Various
Asset Management
115Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$20,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
116Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JENNINGS STATION ROAD / NORTH BADEN BASIN
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS , OVERCHARGED SEWERS, AND FLOODING.
CONSTRUCT DETENTION BASIN, 1,300 FEET OF 12-INCH TO 36-INCHSTORM SEWER, AND RAIN GARDENS.JANETHELENHARN
E
YGAYLORDJENNINGS STATIONPRI
V
A
T
EPAISLEY
HODIAMONTMANETTEROSLYN
MINNI
E
BR
A
N
D
O
N
GREENHAVEN GLENBOROGREENHAVEN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11142
Wastewater
15
$2,100,000
St. Louis City
Bissell
Baden
Capital
117Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAY RD - GALLERIA I/I REDUCTION (CLAYTON RDAND LAY RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 49 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
§¨¦64
§¨¦170
§¨¦64 LAYCLAYTON
MCKNIGHTBRENTWOODEAGER
SWANMCCUTCHEON F
R
A
N
C
ISLOUWEN
GODWIN
YORKPRICELADUECREST
LIN D WORTH
WILD ROSE SUSSEXLANGTONTHORNDELL
BLACK CREEK
HAL I F A X
MONM O U T HFA IROAKSN ORTH C OTE
B ERKSHIREWRENWOOD
COL M A RTWIN OAKS
R ID G ETO P SUDBURY
CRICKETSCARSDALE
ORIOLEWHITBURNLAYTON
PEACOCKFLAMINGO EAG E R§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12327
Wastewater
15
$500,000
Various
Lemay/RDP
Deer Creek
Capital
118Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY 1 PUMP STATION (P-301) SLUICE GATEREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
50 YEAR OLD SLUICE GATES ARE DETERIORATED, AND SOME ARE NOTOPERABLE.
REMOVE AND REPLACE 6 SLUICE GATES IN THE LEMAY 1 PUMPSTATION WET WELL, AND INSTALL ADDITIONAL STOP LOGS.
MARCEAU
HURCK
CATALANVIRGINIAMINNESOTAESPENSCHIED
ADELIA
NELLIE
PENNSYLVANIAMICHIGANMICHIGAN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13041
Wastewater
15
$1,500,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
119Page
2019
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
Scope of ProjectREHABILITATE 45,600 FEET OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12240.
§¨¦55
§¨¦255
§¨¦270
§¨¦255
§¨¦55
§¨¦270 UNIONT
H
E
I
S
S
KINSWOOD
MATTIS
WIL
L
REAVISBARR
A
C
K
SGRE
E
N
P
A
R
KMUSICK
CONCORD
LINDIONECORDESFAIN
RINGER CLIFFMACKENZIERIPA
TESSHIRE
MUELLERPOP
L
A
RRUSTY
ELICLAGERRAINBOWBERVIEWLIN TELSEDANGEMINI
DO
R
S
I
EDANDRIDGE AVENUE HVERMILION
ALIX SPOKANEJEFFLEIGHMAYOMARCHISOUTHVIEW
ZENITHFARADAY
SUMMIT
JAN
PECANCHEVRON
KINGBOLTMEAT H W OLFFJACI
N
T
O
SOUTHSHIRE
LAURABUCKLEYLARKINHAWKSTONEROSSMOORVICTORYFIVEOAKSBIMINIARCTICSUNNYVIEW OLEDELSONATASUNHILL
J A D E F O R E S TEIFF
E
L
BANISTERWILL
I
N
D
A
SOL
A
R
ADWORTH
MA
L
C
O
L
M
DOHACKWAL
D
E
N
WILLD
A
N
RIDGELY
OPA
L BIRCHLOISLAVINIA NA
V
A
J
O
LARKSPUR
KINSWOODLEMAY FERRY RDTELEGRAPH RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12038
Wastewater
15
$3,050,000
Various
Lemay/RDP
Gravois Creek
Capital
120Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REDUNDANT WATER SERVICE
Construction
6660 - SanitaryReplacement Fund
WATER MAIN BREAKS AND LOSS OF WATER SERVICE DISRUPT FACILITYOPERATIONS.
CONSTRUCT 1,265 FEET OF 6-INCH DUCTILE IRON POTABLE WATERPIPE, TO PROVIDE A REDUNDANT WATER FEED TO THE FACILITY.
ETTA
VELMA
H
O
F
F
M
E
I
S
T
E
R
P
R
I
V
A
T
E
MANN
HOLDEN
G
O
E
T
Z
CARTWRIGHT
JOPLINPERRINGENTRYRUBYMILITA
R
Y
VINCENT
ETTA
HOLDEN VELMAGOE
T
Z
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12721
Wastewater
15
$520,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
121Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF CORROSION ANDHUMIDITY CONTROL IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
INEFFICIENT HVAC SYSTEMS, EXCESSIVE HUMIDITY IN SOME AREAS,AND CORRODED COMPONENTS.
CONSTRUCT IMPROVEMENTS TO REDUCE HUMIDITY, AND REPLACECORRODED ELEMENTS.FINEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12499
Wastewater
15
$5,000,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
122Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE PUBLIC I/I REDUCTION(RESURRECTION CEMETERY, WEHNER PARK,KENRICK SEMINARY, AND NERINX HALL)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 46,500 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12336.
§¨¦44
§¨¦44ELM
HEEGE
WEIL
EDGARLACLEDE STATIONCHESHIRELANSDOWNELOCKWOOD
MAPLEMURDOCH
LILACRIV
E
R
D
E
S
PERESFLETAJACKSON
STAELY
MCC
A
U
SLANDSELMAGRAMOND
OAK TREEPLANTGLENDALE JOYBURLINGTONNORTHERNSANTAFEWINONA
SYLVESTERGENESTABANCROFT
WELLSGLEN
ROSE
S UTHERLAND
CIRCLEVIEW
ROCKHILL VALCOURRIDGE
BELTONPARK
GARDEN
PLAINVIEW
COLLEENSUMMITALBANYSOUTHSIDE
P RIVATE
FOREST
LANVALEINNISFAIL
SAVIO
BRUNSWICK
RHODESCHAPELFORDCEDARLENOX
SOUTHERN
YALE
JOELBOMPARTHARLANKAINMATHILDAGENERAL S H ERIDAN
SWONHAZEL
CHESTNUT
LARKHILL
BUSCH
CHIVVISHURSTGREEN
KENRIDGE
LA BELLECARM
E
L
PONTIACCATALPA
NORMALAMBERGATE
KIRKY
PI
L
G
R
IM
FRISCO
KENORA
CHESHIRESELMAPRIVATEPLANTMAPLEWA TSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12511
Wastewater
15
$6,840,000
Various
Lemay/RDP
Mackenzie Creek
Capital
123Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
S
T
ORAN
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$9,000,000
St. Louis City
Bissell
Maline Creek
Capital
124Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION
Construction, Design-Build (Supplemental
Appropriation)
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, ANDSTRUCTURES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS $6,200,000.
§¨¦70
§¨¦64
§¨¦44
§¨¦55 §¨¦70RIVERVIEWDRMANCHESTER RD
NATURALBRIDGERDNATU
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12483
Wastewater
15
$4,200,000
St. Louis City
Various
Various
Capital
125Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
N CLARK AVE 49 SANITARY SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
THE CAST IRON PORTION OF THE SEWER HAS SEVERE CORROSION ANDBUILDUP.
CONSTRUCT 507 FEET OF 8-INCH SANITARY SEWER, INCLUDING 313FEET OF 8-INCH PIPE IN TUNNEL, TO REPLACE EXISTING SANITARYSEWER.CLARKSPRINGNORFOLK SOUTHERN
EMMETTAIRPORT DARSTCUNNINGHAMBANGERT
C H U R C H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12444
Wastewater
15
$610,000
Ferguson
Bissell
Maline Creek
Capital
126Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
N HIGHWAY 67 AT COLDWATER CREEK SANITARYSEWER REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
SAGS, FAILED PIPE, AND OPEN JOINTS CAUSING BLOCKAGES.
CONSTRUCT 310 FEET OF 8-INCH SANITARY SEWER, INCLUDING 150FEET OF PIPE IN TUNNEL.
CANDLEWYCK CLUBCHURCHILLCANDLEBROOK VI
LLA GREENC
A
N
D
L
E
WYCKCL
U
BLINDBERGHLINDBERGH §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12786
Wastewater
15
$650,000
Florissant
Coldwater
Coldwater Creek
Capital
127Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH FOREST AND BROOKSIDE I/I REDUCTION(SUMMIT AVE AND MARSHALL AVE)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 67 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
§¨¦44
TUXEDO
MARSHALL
CLARK
BOMPARTUNION PACIFIC
NEWPORT
ATALANTAGLEN M
ETROLINK
FOREST
LACLEDESTATIONFLORA
SUMMITHANL
EYFAIRVIEW
YEATMANSPRINGSHREWSBURYP
A
RKOXFORD
SUTHERLAND
A R L IN G T O NHAWTHORNE
JOYEUNICE
SUFFOLKCOLEMANMARYGREELEY
MARIONBARTOLDOA K WOOD DALE SUNN EN
KUHLMAN
J
AGUAR
EXETERMARGARETAMELIA
COMFORT
PROVIDENCE
TAMPA
THEATREBROOKS ID E
MILDREDCORNELIAQUTTONJAMESONUNIONPACIFIC
SUMMITCOMFORT
PARK
PARK
GREELEYGLEN
OAKWOOD METROLI
NKSUMMITGLENMARION
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12362
Wastewater
15
$500,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
128Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH WEBSTER CC, POCAHONTAS, SOUTHBRENTWOOD I/I REDUCTION (S BRENTWOODBLVD AND MANCHESTER)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 84 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.ELMLITZSINGER
BRENTWOODMCKNIGHTODAYBELLBISMARK GLENEUCLID DOROTHYLITHIA
WHITE
BACON
THORN T O N
MADGE
UNION PACIFICOLD WARSON
KIRKHAMCORNELLMARYCLARK
MARSHALL
HOLLANDEULALIE
MCKINLEYFAIRVIEW
MADISON TUXEDO
ROSALIE
RUSSELLROCK HILLKORTWRIGHTELDRIDGE
R
O
CKF
O
R
DBREMERTONST CLAIRMORITZ
FLORENCE
DESPERESENNISWAYMIRE
PRIVATE
LAFAYETTEROCKMANPARK
SONORA
ANNALEEMAN
IT
O
U ATALANTAPARKRIDGEB
L
OS
S
O
MHARRISON
STANLEY
GREELEY
T
AV
AL
O
N
LEONARDFOX BRAZEAUJOSEPHPOCAHONTAS
KENTLANDOAKBENDGARDEN
COLLIERBAHIACOUNTYHILLS
OVERBROOKDANIEL
HELENMASON
W A RSONS U T T O N
RARITAN
HENRIETTA
BRIDGEPORT
BROWNBERT
ALLISONCHARLANE
CYRILHINSDALEMARYROCK HILLWHITE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12363
Wastewater
15
$400,000
Various
Lemay/RDP
Deer Creek
Capital
129Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OLIVE / WASHINGTON - GRAND TO VANDEVENTERCOMBINED SEWER RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AT COMMERCIAL PROPERTIES DUE TOOVERCHARGED COMBINED SEWERS.
CONSTRUCT 3,000 FEET OF 12-INCH TO 36-INCH STORM SEWER, TOSEPARATE STORM FLOWS FROM THE COMBINED SEWER SYSTEM.
OLIVE
LINDELLSPRING WASHINGTONVANDEVENTER DELMAR
FRANKLIN
WESTMINSTER
BELL
MCPHERSON
GRANDEL SQUARE
ENRIGHT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12702
Wastewater
15
$1,450,000
St. Louis City
Bissell
Western Mill Creek
Capital
130Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP FOULWATER SEWER GRIT CHAMBERELIMINATION (DEER CREEK)
Construction
6660 - SanitaryReplacement Fund
EXISTING GRIT CHAMBER IS A MAJOR SOURCE OF RDP AND MISSISSIPPIRIVER BACKWATER INTO THE FOULWATER SEWER IMPACTING THELEMAY WWTF.
CONSTRUCT 185 FEET OF 72-INCH SANITARY SEWER AND ELIMINATEGRIT CHAMBER.
§¨¦44
§¨¦44 METROLINKWINONA
WABASHMARDEL
LINDENWOOD
BANCROFT
MELBOURNE
THOLOZAN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12901
Wastewater
15
$660,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
131Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERSIDE AND YARNELL SANITARY RELIEFREHABILITATION
Construction
6660 - SanitaryReplacement Fund
INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE APPROXIMATELY 1,110 FEET OF 36-INCH TO 48-INCHSANITARY SEWER USING THE CURED IN PLACE PIPE METHOD.GRAVOISLARKIN WILLIAMS
MAIN
GREEN ACRES
WATSONNEWSMIZERMILL
OLDSMIZERMILL
PRIVATE
DART
WATER
FABICK
FURY
SO U T H ROCK ALVAPEFFER
OPPSYARNELLVALIANTRIVERSIDEFORESTKNOLLSENNAWOODSWEANEYOAKWOODRIVERHILLS
CHRYSLER
OLDGRAVOIS
S U M M ER TO
P
HA Y S HILLWOODW A YVILL
AGRAN
CENT E RRAINTREE FRING
E
WEST
FR
E
D
E
GRAVEFE
N
T
O
N VIE
W
S
KIN
K
E
RDUSTYTRAILS GOODEFENTONPARK WA
T
S
O
N
PRIVATE
PRIVATE
PRIVATEE MO 30 HWYW MO30 HW YNMO141HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13079
Wastewater
15
$1,600,000
Fenton
Meramec
Meramec Tributary Areas
Capital
132Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERSIDE AND YARNELL SANITARY RELIEFREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PIPE WITH LEAKING JOINTS AND GROUND SURFACE SUBSIDENCE.
REPLACE APPROXIMATELY 5,700 FEET OF 42-INCH TO 48-INCHSANITARY SEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS $6,300,000.GRAVOISLARKIN WILLIAMS
FABICKWATSONMAIN
PRIVATE
DART
WATER
FURY
ROCK ALVAOPPSFORESTKNOLLFERRY
GRA V O I S B LUFFS
GAR YPL AYE R
GREEN ACRES
S W E A N E Y
GREGORYR I V E RHILLSOLDSMIZER
MILL
NEWSMIZERMILL OLDGRAVOIS
HA Y S HILLYARNELLOLD
HIGHWAY141VALIANTRAINTREEWEST
F
RE
DE
S
KIN
K
E
R
HEATHWOOD
FENTONPARK
PRIVATEPRIVATEPRIVATEPRIVATE
PRIVATEWA
T
S
O
N
PRIVA T EPRIVATEE MO30 HWY W MO30 HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12840
Wastewater
15
$3,300,000
Fenton
Meramec
Fenton Creek
Capital
133Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUGAR CREEK I/I REDUCTION (W ADAMS AVE ANDCOUCH AVE)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 61 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12027.
§¨¦270
§¨¦44§¨¦270
ADAMS
GEYERCLAYU N I ON PACIFIC DICKSONTAYLORCOUCHWOODLAWNC R A IG
ANN
ROSE HILL
WOODBINE
BALLASNIRK
JEFFERSON
LARK EVANSEDNAWAY
BOAZ DOUGHERTYFERRYPEEKE WOODSIMMONSMADISON
WILSON QUAN
LEEVAN BURENBODLEY
CRESTSARAH
FILLMOREGILL
PAR
RI
ETH IRISCLARKMONROE
ESSEX
B U R L IN G T O N N O R T H E R N S A N T A F EFRIEDAALTUSBACHLEFFINGWELL
LINWOOD
MAPLE
LONGVIEWTWIN PINESCOTT
JEWELNANA
ARGONNE
G A BRIELLINDGATE
ROSE
KIRKSHIRE
GOETHEGRUPPBOGEY
LILLIAN
ATTUCKS
LINDEMANSUNNY
CAROLINECOULTERKNIERIM
GRANDVIEW
JULIAN
CLINTON
SWAN
GRANT
MIDWAY MIRIAMHEEGE PEARLMOZARTBARBYLYNKIRK
ORRICK
AMHERST
MAGNOLIAERBERALFRED
DUBOISCHESTERCLARIDGEMONROECLAYLYNKIRK
CLINTON
BALLAS
ROSE HILL
PAR
ESSEX
JEWEL
N KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12223
Wastewater
15
$590,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
134Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TOWNE SOUTH AND BRUNSTON I/I REDUCTION(AMBS RD AND TOWNE CENTRE DR)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 8 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12026.
§¨¦270
§¨¦55
§¨¦255
MATTIS
KERTHBUTLER HILLKELLERAMBSKENNERLY
T
H
E
IS
S
RINGEREAST
CONCORD
SCHU E S SLER
BURLINGTONNORTHERNSANTAFELEEBUR
WELLSS
U
SONHILLS
B AUERALSWELLSUNSETCARIBEEGERALD
KEMPF
VIENTOGREGORY
DIERSGREENTONMENTZHILLA
NTO
N
TOWNECENTRE TESCORDGATESBURY
PRIVATEGEMINI
DORSIE
FAROVALLEYSIDESAPPINGTON
STANHOPE
FIJILO
NGVIEW
BAHNFYRETEALBYED LOUCLAYRIDGEEIMELONGSPURJOSSE YUMA
BRITTINGERCHERYLK
A
S
S
E
B
A
U
MLARKINSAKURA
R E G A L W AYLITTL EROCKVENARDESIR BORSPOCASSETTAMMY
KAY
M C I L R O Y
TIOGA
JUENGEL
DU BOURGADAMSPEBBLE OAK
OLD TESSONA M B S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12235
Wastewater
15
$110,000
Unincorporated
Meramec
Mattese Creek
Capital
135Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - EAST (UR-08AND UR-09)
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION.
CONSTRUCT 7,000 FEET OF 12-INCH TO 42-INCH STORM SEWER,CONSTRUCT 1,400 FEET OF 10-INCH TO 12-INCH REPLACEMENTSANITARY SEWER, PERFORM PRIVATE I/I REDUCTION AT 221PROPERTIES, AND CONSTRUCT 380 FEET OF BERM.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12437.
§¨¦170
PAGE
DELMAR HANLEYCANTON
TERMINAL
82NDWOODSONRIDGE
GROBY NORTH N SOUTHCORNELL
MIRIAM
MCKNIGHTU N I O N P A CIFIC
O L D B O N H O M M E 81STLYNNWALTON
SHAFTESBURY
LE PEREPRICEWAYNE
TEASDALE
MONROE
HILLTOPLAFON
GANNON
AHERN LAMB78THWILSON
B
RADDOCK
A
L
E
R
T
ELMORE GRANTBERICKRICHARDBELT WAY
BURNSS
H
E
RID
A
N
GAYMILAN
AMHERSTGULF BLOO
M
BARBYENFIELDPICKERINGBON AIREPRIVATELINK
BALSONSPENCERFAIRVIEWWELLINGTON
HARNEY
BELL
CARLETON
TULANEBRASSIE
GARFIELD
BON HILLS RABEFULLERTONPENNELL
ALBEYGEOFFRYHOW
BUCHANAN
WASHINGTON
MELROSEELBRING
DUKEDELCRESTRYECRIXDALE
VILLA
IROQUOIS CRYSTALREAR
STANFORDELKINGTONWATSONIA
LOCUST BLANCHA
PARAMOUNT
ANNAERITH
PRIVATEPRICEPRIV
A
T
E
VILLA
PRICEPAGE
HARNEYWAYNE
BALSON
P
R
I
V
A
T
E
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11984
Wastewater
15
$5,506,000
Various
Lemay/RDP
University City Branch
Capital
136Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION B
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,000 FEET OF 8-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALLBP-597.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS$10,400,000.
§¨¦70 HERNH
A
NLE
Y
S U B U R B A N
ENIDKINGS P R IN G D A L E MABLEHUGO
PLAZAMARTINLUTHERKINGDADEHILL
E VA N S
GROVE
COOLI
DGESMITHMUELLERE D N A
OAK
ANITABROTHERTONWALLINGFORDBRYA
N
RAMONAL A K E
LY
O
N
S SMI
THHUGO
C O O L ID GEKIN
G
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11791
Wastewater
15
$3,400,000
Various
Bissell
Maline Creek
Capital
137Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALCOUR AND BURLINGTON RR SANITARYRELIEF AND I/I REDUCTION (VALCOUR RD ANDWATSON RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 355 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 60 PROPERTIES.
ROCKHILL
WEBER
HEEGE
VALCOURCHESHIRELACLEDE STATIONEDGARI
VYALICETONSELMANEW HAMPSHIREELMOAK TREE
WELLSROSE
BELTONSU
N
RA
Y
BONNIE
SOUTHSIDE
R ALEIGHLANVALE DELMAPINETREE
ROCK FORESTARDALE
BUL
L
R
U
N CRAIGHILLWEXFORDFIELDSTON
GENERAL GRANTIDAMOR
NAVAR REGEN E R A L S HERIDAN
PRIVA
TE
STAFFORD
LARKHILL
HOSMER
ST GEORGE
LANGLEY
GRANTPARKRONALDMISSY
HURSTGREEN
BURNTOAKFERNALDDALGREN
CREEKVIEW
MARLTONMARVALEAMBERGATE
RABETHVILLAWO ODGENERAL M E A D E
ASHBURY
CYRUSINLETPINETREELANVALEWATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12253
Wastewater
15
$500,000
Various
Lemay/RDP
Mackenzie Creek
Capital
138Page
2019
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEBSTER GROVES TRUNK E SANITARYREHABILITATION AND I/I REDUCTION PHASE III
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
Scope of Project
CONSTRUCT 800 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦44BERRYUNIONPACIFICLOCKWOOD
KIRKHAM
GRAYDICKSONEDGARLACLEDESTATIONGOREOLDWARSON
NEWPORT
GLENDALE
BURLINGTON
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
LEE
ELMCLARK HANL
EYSAPPINGTONESSEX
HOLMESMAPLEODAYLILACBELLBAKER
BISMARK
JACKSON
ARGONNE
ATALANTA
GLENBRENTWOODOAK TREE
LITHIABENNETT
PLANTSUMMITJOYLOUISADAMS
MADGE
ANDREWJEFFERSONSCOTT OAKGILBERTOAK L A N D SALEMMARYFAIRVIEWMCKINLEY
IOLAREAVISNORTH
YEATMANGAR D E NROCK HILLG
R
A
NTPAPIN
IMSEBEVERLY KORTWRIGHTRAVINE
SPRINGFO R ESTDWYER
CLARADESPERES WILSHUSENSELMAEUNICE
DOBBIN
RAVENSRIDGE
HIGHHAMP T O NFIELDSTONMANITOU
SWON
OAKSFOX
F
A
I
R
D
A
L
E RUTHBUSCHTYLERPORTER
GROVE
COLLEGE HILLDALECROFTONWOODLAWNMABELMINTURN ROCK HILLGLENBERRY
U N IO N P A C IFICELMELMELM§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11677
Wastewater
15
$600,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
139Page
2019
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEBSTER GROVES TRUNK E SANITARYREHABILITATION AND I/I REDUCTION PHASE IVPART 3
Construction, Phase III
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
Scope of ProjectCONSTRUCT 1,200 FEET OF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION AT 45 PROPERTIES.
A PORTION OF THIS PROJECT MAY BE APPROPRIATED OUT OF FUND5566 DEER CREEK OMCI, DEPENDING ON AVAILABLE OMCI FUNDBALANCE.
§¨¦44BERRYUNIONPACIFICLOCKWOOD
KIRKHAM
GRAYDICKSONEDGARLACLEDESTATIONGOREOLDWARSON
NEWPORT
GLENDALE
BURLINGTON
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
LEE
ELMCLARK HANL
EYSAPPINGTONESSEX
HOLMESMAPLEODAYLILACBELLBAKER
BISMARK
JACKSON
ARGONNE
ATALANTA
GLENBRENTWOODOAK TREE
LITHIABENNETT
PLANTSUMMITJOYLOUISADAMS
MADGE
ANDREWJEFFERSONSCOTT OAKGILBERTOAK L A N D SALEMMARYFAIRVIEWMCKINLEY
IOLAREAVISNORTH
YEATMANGAR D E NROCK HILLG
R
A
NTPAPIN
IMSEBEVERLY KORTWRIGHTRAVINE
SPRINGFO R ESTDWYER
CLARADESPERES WILSHUSENSELMAEUNICE
DOBBIN
RAVENSRIDGE
HIGHHAMP T O NFIELDSTONMANITOU
SWON
OAKSFOX
F
A
I
R
D
A
L
E RUTHBUSCHTYLERPORTER
GROVE
COLLEGE HILLDALECROFTONWOODLAWNMABELMINTURN ROCK HILLGLENBERRY
U N IO N P A C IFICELMELMELM§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11678
Wastewater
15
$1,300,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
140Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WESTBOROUGH - LUTHER - MERMOD PLACE I/IREDUCTION (N KIRKWOOD RD TO I-44 AND BERRYRD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 130 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 21 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12059. INCLUDES SCOPEOF WORK FROM PROJECT 12348.
§¨¦44GEYER BERRYCLAYADAMS
UNIONPACIFICDICKSONTAYLORHARRISONKIRKHAM
JEFFERSON ELMESSEX
MADISONMONROE
HOLMESEVANSWOODWAY
ROSE HILL GRA
NT
WOODBINE
B U R L IN G T O N N O R T H E R N S A N T A F ESIMMONS BROWNELL
LOCKWOODWILSON QUAN
LEE EDWINWASHINGTON
VAN BURENLIG
G
E
TT
BODLEY
SARAH
FILLMOREGILL
PAR
SCOTT
FOOTE
S
ANDERS
HILL
DIVERSEY
BACON
PARKLANDIOLAMAPLE
LONGVIE
W
BEVERLY
ARGONNE
ELLIOTTROSE
G R A N D CURRANDWYER
F R IS C O
L INUMOAKPARKD
E
VONBRENTCHELSEA
BURNSJULIAN
VICTORIA
BAKER
B O NITA
JO ANNWARWICK
OAKSBARRONCLINTON
GLENMOOR
WINGFIELD
SCHULTZHARTJEWEL
SAPPINGTONPEARLH
A
W
KIN
S
ORRICK
BERRYWOOD
GASLITE
ERBERIDLEWILD
ALFRED
MINTURNEARLF O R E S T O N
MADISONCLAYARGONNE IOLAARGONNE
CHELSEA
BODLEY
CLAYSCOTT LEE
ESSEX
HOLMESCLAYMADISON MONROEHARRISON
CLINTON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12278
Wastewater
15
$240,000
Various
Lemay/RDP
Gravois Creek
Capital
141Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODS MILL SANITARY RELIEF (I-64 TO BROOKMILL LN)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS.
CONSTRUCT 2,790 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64§¨¦64
SAVVISSOUTHOUTERFORTY
BRO O K MILLOLDWOODSMILLNORTH OUTER FORTY
WOO
D
S
MI
LLP R IVA TE
LAKEMILLK E L L W OODCEDAR SPRINGS
MILLFIELD MA
RYVILLECENTRE
WOODLAKE
S MO141 HWYN MO141 HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12296
Wastewater
15
$1,375,000
Town and Country
Missouri
Creve Coeur Creek
Capital
142Page
2019
5 April 2018
WASTEWATER CONTINUED PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11790 CAULKS CREEK
FORCEMAIN (RIVER
VALLEY RD TO L-52)
PROJECT CONTINUED DUE TO COORDINATION WITH
PREVIOUS PHASE. ANTICIPATE BOARD INTRODUCTION IN
JUNE, 2018.
$15,000,000
12794 CITY LAKES STORAGE
MODIFICATIONS FOR CSO
CONTROL
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF ST. LOUIS. ANTICIPATE BOARD INTRODUCTION
IN APRIL, 2019.
$325,000
11155 DAMMERT AND
BROADWAY SANITARY
RELIEF (SKME-551) PART 2
PROJECT CONTINUED DUE TO COORDINATION WITH
COUNTY PARKS AND PORT AUTHORITY. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER, 2018.
$4,500,000
12841 ENGELHOLM RELIEF
SANITARY STORAGE
FACILITY (ENGELHOLM
AVENUE AND ST.
CHARLES ROCK ROAD)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF PAGEDALE. ANTICIPATE BOARD INTRODUCTION
IN MAY, 2019.
$2,000,000
10018 FF-18 VILLA DORADO -
LACKLAND - PAGE
SANITARY RELIEF (ADIE
RD TO VILLA DORADO DR)
PROJECT CONTINUED DUE TO COORDINATION WITH
PREVIOUS PHASE. ANTICIPATE BOARD INTRODUCTION IN
JANUARY, 2019.
$7,075,000
11992 UNIVERSITY CITY
SANITARY STORAGE
FACILITY
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF UNIVERSITY CITY. ANTICIPATE BOARD
INTRODUCTION IN MAY, 2019.
$3,700,000
TOTAL: $32,600,000
5 April 2018
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
$4,000,000 143
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$15,000,000 144
11789 CAULKS CREEK FORCEMAIN REHABILITATION $8,000,000 145
11917 CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER AND PUBLIC I/I REDUCTION
$2,170,000 146
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$1,500,000 147
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$37,000,000 148
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$1,000,000 149
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$15,000,000 150
12180 FORDER SANITARY INTERCONNECTION
(FORDER RD TO RINGER RD)
$190,000 151
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
$2,750,000 152
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
$15,000,000 153
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$17,500,000 154
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
$6,500,000 155
12897 INFRASTRUCTURE REPAIRS (FACILITIES)
(2020)
$3,000,000 156
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$50,000 157
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$5,000,000 158
12336 MACKENZIE I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK
SEMINARY, AND NERINX HALL)
$441,000 159
5 April 2018
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$500,000 160
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$8,200,000 161
12460 OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND OAKLAND
AVE)
$1,000,000 162
12188 RIVERPORT 6 PUMP STATION (P-781)
REPLACEMENT
$1,000,000 163
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
$3,000,000 164
12218 STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
$300,000 165
12228 TESSON CREEK I/I REDUCTION (TESSON
FERRY RD AND TIFFANY SQUARE PKY)
$280,000 166
12244 UPPER LADUE CREEK I/I REDUCTION (NE
QUAD OF S WARSON RD AND LADUE RD)
$375,000 167
12491 WATKINS CREEK PUMP STATION (P-101)
UPGRADES
$5,500,000 168
TOTAL:$154,256,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
82ND STREET TO I-170 SANITARY RELIEF (UR-08,UR-09)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
UNDERSIZED SEWER. ELIMINATION OF CONSTRUCTED SSO BP-421REQUIRED. PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS.
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH SANITARY SEWER.ELIMINATE SSO OUTFALL BP-421, AND FACILITATE FUTUREELIMINATION OF MULTIPLE UPSTREAM CONSTRUCTED SSO OUTFALLS(BP-416, BP-417, BP-433, AND BP-476).
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS $8,000,000.INCLUDES PROJECT 12127.
§¨¦170
§¨¦170 82ND81STMCKNIGHTOLD BONHOMME GROBYHILLTOPWOODSONPR
I
CEBALSON
B
R
A
D
D
O
C
K
ELMORE
APPLETON
GRANTRICHARD
S
H
E
R
I
D
A
N
GAYORCHARD
MILAN
TULANE
C
O
O
L
I
D
G
E
ALICE CANTON
SPOON
AL
A
N
S
O
N
LE PEREBERICKFULLERTONPENNELLKEMPLAND
PRIVATEHAFNERARCHERBELL
SEVILLE LAUGHLINVILLA
IROQUOIS
B
LACKBERRYMULBERRYCOLLINGWOODBON HILLS
WATSONIA ARROWHEADLOCUST
ALDANBLANCHA
BON P RICEVA R DAMAN
VILLA CAPRICHICKASAW
ROWLANDBRISCOECOMSTOCK
ORCHARD
PRICEELMORE
RICHARD
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11993
Wastewater
15
$4,000,000
Various
Lemay/RDP
University City Branch
Capital
143Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND THIRTY YEARS OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF36-INCH SANITARY SEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$30,000,000.RIVER VALLEYCENTRAL MIDLANDCRE
V
E
COE
UR
MILLHOG HOLLOWAMIOTW ATER W O R K S
G L EN COVEWATERWORKSPRIVATE
W HITERIDGECR E S T
R ID G E TRAIL
HIGHVA LLEYWOODSMILLLAKERIVER B E N D
TOREADOR
H IG H L A NDPARKWESTER NMILLC O L IS E U M
PRIVATEPRIVATE
OLIVEBLVD
E MO364 HWY
WMO364HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
15
$15,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
144Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN REHABILITATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
FORCEMAIN CONVERSION TO REDUNDANT FORCEMAIN REQUIRESREHABILITATION DUE TO AGE AND CONDITION.
REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROMPUMP STATION A TO THE 36-INCH FORCEMAIN AT THE MISSOURIAMERICAN WATER PLANT.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$17,000,000.
§¨¦64THF
CENTRAL M ID L A N D LADUEEDISONW
E
S
T
APPALACHIANWILDHORSECREEK HOGHOLLOWPRIVATEW
IL
SON GREENTRAILSSWINGLEYRIDGECHESTERFIELD
WATER W O RK SW
HITE PETZOLDRA INYLAKENOONI
N
G
TREE
LYDIAHILL CONWA Y
W E S T E R NM I L L
PR IV A T E
PRIVA T E
P
R
I
V
A
T
E
PR IVATEOLIVEBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11789
Wastewater
15
$8,000,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
145Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CELLA - ROLLING ROCK - GLEN CREEK SANITARYSEWER AND PUBLIC I/I REDUCTION
Construction
6660 - SanitaryReplacement Fund
DEFECTIVE 8-INCH SEWER CONTRIBUTING TO BUILDING BACKUPSAND SANITARY SEWER OVERFLOWS.
CONSTRUCT 9,200 FEET OF 8-INCH SANITARY SEWER, TO REPLACEDEFICIENT 8-INCH SANITARY SEWER.
§¨¦64
§¨¦170
LADUE
LAYMCKNIGHTPRICECLAYTONWARSON BARNESCELLAKENTMCCUTCHEONROANOVERHILLS
G LEN E A G L E SDANIELSW A NEAGER
YO RKCONWAYLITZSINGER LINDWOR T H
DROM
A
RADIELMANSPRINGWOOD
P IC A RDY
MIDPARKINDIANLOG CABINCLE R MO N T
LAWN
WIN D ING RID G E
TWINSPRINGS BERKLEYWARRIDGEPRIVATE
RAUSC
H
E
RTIRRILL FARMSAPPLE TREEFORDYCES A R A NACEXMOORLORENZOD E E R CREEK
DEER CREEK WOODS CANARYPAXTON
PRIVATE
YORK
PRIVATE
LITZSINGER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11917
Wastewater
15
$2,170,000
Ladue
Lemay/RDP
Deer Creek
Capital
146Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS $153,000,000. PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEME
T
ROLINK
ELMLAYPINE
UNIONPACIFICLANSDOWNE
WYDOWN
PERNOD
FYLER
LOCKWOOD
FOLKMCKNIGHT
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWEST
W E LLS
MURDOCHODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEPRICE
GLENARUNDEL
EUCLID
SWAN
WEST PARK
PAR K
OAKLAND
LITHIADANIEL P ACIFIC
SUMMITZEPHYROLD WARSONCELLA HANLEYFORESTLOUISMARQUETTE
WI L L I A MS
ALAMO
LAGOON
MARDEL
MADGEMCCUTCHEON
GRAYROANOAKLOUWENFLORA
G
O
R
E MARYS U T H ERLAND
BRUNO
GLADESRIDGEMOOR
JEROME
MANHATTANPRATHERIOLAELLENWOOD
RUSSEL
L
WISE
YEATMANCECELIAROSE
OXFORD
GODWIN
Y ORKLYLEDESPERESARLINGTO
NLANGTON
TAMMVILLA
KRAFTINDIAN
BRYAN
FAUQUIER
WILD ROSE
DOLAN
JAMIESONREAR
PORTERGROVECEDAR
BERRY
DROMARA
CLARK
UNIONPACIF IC TAMMYALEBANCROFT
WHITE
M A N C H ES T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
147Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS $153,000,000. PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEME
T
ROLINK
ELMLAYPINE
UNIONPACIFICLANSDOWNE
WYDOWN
PERNOD
FYLER
LOCKWOOD
FOLKMCKNIGHT
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWEST
W E LLS
MURDOCHODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEPRICE
GLENARUNDEL
EUCLID
SWAN
WEST PARK
PAR K
OAKLAND
LITHIADANIEL P ACIFIC
SUMMITZEPHYROLD WARSONCELLA HANLEYFORESTLOUISMARQUETTE
WI L L I A MS
ALAMO
LAGOON
MARDEL
MADGEMCCUTCHEON
GRAYROANOAKLOUWENFLORA
G
O
R
E MARYS U T H ERLAND
BRUNO
GLADESRIDGEMOOR
JEROME
MANHATTANPRATHERIOLAELLENWOOD
RUSSEL
L
WISE
YEATMANCECELIAROSE
OXFORD
GODWIN
Y ORKLYLEDESPERESARLINGTO
NLANGTON
TAMMVILLA
KRAFTINDIAN
BRYAN
FAUQUIER
WILD ROSE
DOLAN
JAMIESONREAR
PORTERGROVECEDAR
BERRY
DROMARA
CLARK
UNIONPACIF IC TAMMYALEBANCROFT
WHITE
M A N C H ES T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$37,000,000
Various
Lemay/RDP
Deer Creek
Capital
148Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$37,200,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
11
$1,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
149Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$37,200,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$15,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
150Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FORDER SANITARY INTERCONNECTION (FORDERRD TO RINGER RD)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER.
FORDERRINGER RING
F
O
R
D
FOR D E R R I D G E
FORDER CROSS
ING
PATIO
FORDER OAKS
SAJA
K
E
E
DTIFFANY TRAILFORDER MANORFORDER CIRCLEFORDER
C
R
O
S
SI
NGFOR
D
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12180
Wastewater
15
$190,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
151Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF FLOODWALL PROTECTION
Construction
6660 - SanitaryReplacement Fund
MAJOR FLOODING EVENTS CAN IMPACT AND DAMAGE THE GRANDGLAIZE TREATMENT FACILITY.
CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENT PLANT AND MAINTENANCE BUILDINGS FROM FLOODING.
PRIVATE
TWIN LAKE
S
APPLE TREEWESTERMANUNION PACIFICBURLINGTONNORTHERNSANTAFEGRAND GLAIZESPINDLEUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13072
Wastewater
15
$2,750,000
Valley Park
Meramec
Glaize Creek
Capital
152Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYREHABILITATION (FANNIE AVE TO PARDEE LANE)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 37,000 FEET OF 36-INCH TO 72-INCH SANITARY TRUNKSEWER AND REHABILITATE 95 MANHOLES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$30,000,000.
§¨¦55
§¨¦270 UNIONMACKENZIEROCKHILL
PARDEEMUSICKELMGREGGGR
A
N
T
REAVISBARRAC
KS
WIL
L
GERMANIA
RIVERVALCOURMORGANFORDWACHTELBAY
L
E
S
S
ZEISSH
ALE
SEIBERT
CCCGREENPARK PARDELLAIO NELACLEDE STATIONCH
ESHIRE
RIVER
DESPERES
BAPTIST CHURCHTELFORDMA
T
T
I
S ELTONCORDESBLO
W
ARLEE
TULIP
LIT TIE
GENTRYMATHILDAFAIN
IVY
SHERMAN JOPLINREAVIS
RADIOSHARPP R IV A TE
ALICETON
MOHEGAN
ELIS
E NEW HAMPSHIREKAYEDGAR
RIPASELMA
MUELLERHEI
D
E
L
B
E
R
G
KITWEBER
GRANDCLIFFRUSTYDIERSVAUK
LUCIABUXTONLARKFORMAN
OUTE RWELLSSUN
R
A
Y ACORNTESCORDGATESBURY
SUN
S
H
I
N
E
SEDANALTHEAVASELFLORIJEFFLEIGHCAMINOMAYOLANZINZER
HALS EYVIRGOBUF
F
T
O
N
LINCORDAFFTON
JAMIEJAN
PECANASHBURY
PICKWICKREGINABUCKLEYLAK
E
S
I
D
E
LARKINSIGS
B
E
E
HEE
G
E
VIC
T
O
R
Y PHILOHEA
L
Y
FATIM
A
CECI
L
JOELOLEDELKOERBER
SONATAEIFF
E
L
ALL
E
N WANDARAYPINOAKJUBIL PEARHEEGE
GRANT
WEBER
GRANTLEMAYFERRYRDTESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10496
Wastewater
15
$15,000,000
Various
Lemay/RDP
Gravois Creek
Capital
153Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTEDSSO OUTFALLS REQUIRED.
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TOSTORE WET WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTEDSSOS BP-588 AND BP-599.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$35,500,000.
PAR
D
E
E
BR
O
O
K
V
I
E
W
ARBAN
PRIVATEGRA
N
T
LODGE POLEW H IT E C L IFFPARKSILVERCRESTLURLINEPRIVATEPRIVATE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
15
$17,500,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
154Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -TRUNK SEWER REHABILITATION
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240 FEET OFCIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS, ALONG 7,000FEET OF 8 TO 12 FOOT DIAMETER SEWER.
Comments/RemarksTHIS PROJECT MAY BE BID AND CONSTRUCTED BY THE CORPS OF ENGINEERS UNDER A COOPERATIVE AGREEMENT.KIENLENTERMINA
L
CLARAGOODFELLOWBELTSTLOUIS
LOTU
S
MYRON
TERR
Y
GREE
R
BURDMAFFI
T
T
LABA
D
I
E
WEL
L
S
ROOS
E
V
E
L
T
HODIAMONTELWA
R
D
EDMUNDF
ERRIS
VALLEERICKWELL
S
M
A
R
SEMPLECRESCENTPERRY
HERBERTHAMILTON
IRVINGDARBYWAB
A
D
A
THE
O
D
O
S
I
A
RIDG
E
HIGHL
A
N
D
KENN
E
R
L
YCHERRYCOT
E
B
R
I
L
L
I
A
N
T
E67TH MCAR
THUR
PRIVATEOAKDALEOVERLEAROSEBUDARDENSELBER
MYRT
L
E DRES
SELL
ASH
L
A
N
D
DARDANELLA
LORR
A
I
N
E
STI
L
L
W
E
L
L
MOUNT PINEGROVELESCHEN
WELLSTONALLEY
SIEMERSEVANSTON
NAYL
O
R
JAMES A HARVEYELMB
A
N
KCHEVROLET
HIGHL
A
N
D
MAFF
I
T
T
ST LOUIS
WABA
D
A
ST LO
U
I
S OAKDALEHAMILTONGREE
R
KENN
E
R
L
Y
PRIVA
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11800
Wastewater
15
$6,500,000
Various
Bissell
Bissell
Capital
155Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2020)
Work Order Repair Costs(Capital)
4102 - ImprovementFund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT POSEMAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT FORCAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TOADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS ANDPUMP STATIONS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12897
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
156Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$50,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
157Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$2,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
158Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE I/I REDUCTION (RESURRECTIONCEMETERY, WEHNER PARK, KENRICK SEMINARY,AND NERINX HALL)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 78 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12511.
§¨¦44
§¨¦44ELM
HEEGE
WEIL
EDGARLACLEDE STATIONCHESHIRELANSDOWNELOCKWOOD
MAPLEMURDOCH
LILACRIV
E
R
D
E
S
PERESFLETAJACKSON
STAELY
MCC
A
U
SLANDSELMAGRAMOND
OAK TREEPLANTGLENDALE JOYBURLINGTONNORTHERNSANTAFEWINONA
SYLVESTERGENESTABANCROFT
WELLSGLEN
ROSE
S UTHERLAND
CIRCLEVIEW
ROCKHILL VALCOURRIDGE
BELTONPARK
GARDEN
PLAINVIEW
COLLEENSUMMITALBANYSOUTHSIDE
P RIVATE
FOREST
LANVALEINNISFAIL
SAVIO
BRUNSWICK
RHODESCHAPELFORDCEDARLENOX
SOUTHERN
YALE
JOELBOMPARTHARLANKAINMATHILDAGENERAL S H ERIDAN
SWONHAZEL
CHESTNUT
LARKHILL
BUSCH
CHIVVISHURSTGREEN
KENRIDGE
LA BELLECARM
E
L
PONTIACCATALPA
NORMALAMBERGATE
KIRKY
PI
L
G
R
IM
FRISCO
KENORA
CHESHIRESELMAPRIVATEPLANTMAPLEWA TSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12336
Wastewater
15
$441,000
Shrewsbury
Lemay/RDP
Mackenzie Creek
Capital
159Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
S
T
ORAN
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$500,000
St. Louis City
Bissell
Maline Creek
Capital
160Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
S
T
ORAN
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$8,200,000
St. Louis City
Bissell
Maline Creek
Capital
161Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OAKLAND COMBINED SEWER DETENTION ANDSTORAGE (CLAYTON AVE AND OAKLAND AVE)
Construction
6660 - SanitaryReplacement Fund
IMPERVIOUS AREA CONTRIBUTING TO OVERCHARGED COMBINEDSEWERS AND BUILDING BACKUPS.
DETENTION AND STORAGE IMPROVEMENTS TO BE MADE INCONJUNCTION WITH REDEVELOPMENT OF THE FOREST PARKHOSPITAL GROUNDS.
NEEDED DETENTION AND STORAGE IMPROVEMENTS TO BECONSTRUCTED BY THE ST. LOUIS ZOO AND REIMBURSED BY THEDISTRICT.
§¨¦64§¨¦64
TAMMCLAYTON
OAKLAND
BERTHOLD
VICTORIA WISE OAKVIEWCRESCENTGRAHAM
HALFWEST PARK RAMP I64VICTORIAGRAHAM §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12460
Wastewater
15
$1,000,000
St. Louis City
Lemay/RDP
Oakland
Capital
162Page
2020
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERPORT 6 PUMP STATION (P-781)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-781 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
Scope of Project
REHABILITATE CONCRETE AND REPLACE PUMPS, PIPING,
VALVES, AND GENERATOR AT PUMP STATION P-781.MAGELLANRIVERPORT
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12188
Wastewater
15
$1,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
163Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERSIDE AND YARNELL SANITARY RELIEFREPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
PIPE WITH LEAKING JOINTS AND GROUND SURFACE SUBSIDENCE.
REPLACE APPROXIMATELY 5,700 FEET OF 42-INCH TO 48-INCHSANITARY SEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS $6,300,000.GRAVOISLARKIN WILLIAMS
FABICKWATSONMAI
N
PRIVATE
DART
WAT
E
R
FURY
ROCK ALVAOPP
SFORESTKNOLLFERRY
GRA V O I S B LUFFS
GAR YPL AYE R
GREEN ACRES
S W E A N E Y
GREGORYR I V E RHILLSOLDSMIZER
MILL
NEWSMIZERMILL OLDGRAVOIS
HA Y S HILLYARNELLOLD
HIGHWAY141VALIANTRAINTREEWEST
F
R
E
D
E
S
K
I
N
K
E
R
HEA
T
H
W
O
O
D
FENTONPARK
PRIVATEPRIVATEPRIVATEPRIVATE
PRIVATEWA
T
S
O
N
PRIVA T EPRIVATEE MO30 HWY W MO30 HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12840
Wastewater
15
$3,000,000
Fenton
Meramec
Fenton Creek
Capital
164Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STONINGTON PLACE SANITARY RELIEF (CLAYTONRD TO GEORGIAN ACRES ST)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 238 FEET OF 12-INCH SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042.
§¨¦64
CLAYTON
GEYERTREGARON SPOEDESOUTHFORTY
FRONTENAC WOODS
COUN T R Y E S TATES STONINGTONG E O R G IA N ACRES
C LAYTON DOWNS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12218
Wastewater
15
$300,000
Frontenac
Lemay/RDP
Deer Creek
Capital
165Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TESSON CREEK I/I REDUCTION (TESSON FERRYRD AND TIFFANY SQUARE PKY)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 360 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 5 PROPERTIES
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12059.MACKENZIEREAVIS
ELISELENOR
TESSHIRESTONELL
JEFFLEIGHBUFFTON
BURLI
NGTONNORTHERNSANTAFEW OLFFLAKESIDE
PUTTINGTON
GREEN PARK WIL BESANTONIAUPLAND
KOERBER
PANCHO
JAD E FORE S T
DORISANN
ARVELLEN
TESSONCREEKESTATES
P A R K MANLINDHALL
SEQUOIA
MADAFORDCASAROSA BONTONWILLDAN
MARLENE
JACHURST
L A KESHIRE
SONTAG
GREENPA RK INDUSTRIALMARKHALL SHUFFLEE U CALYPTUS
GRANTMEADOW
WAGER
APLEYAFFTON VIEW
MARBLE ARCHT E SSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12228
Wastewater
15
$280,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
166Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER LADUE CREEK I/I REDUCTION (NE QUADOF S WARSON RD AND LADUE RD)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 44 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042.
§¨¦64
§¨¦64
LADUE
CLAYTONSPOEDE WARSONDIELMANBARNESSOUTHFORTY CELLAKENTOVERHILLS
G L E N EAG L E S
B RAEBURN RIO VISTAGRANADAC LERM ON T GRAYBRIDGEOAKPARKCONWAYALDE N
MAGNOLIAARTHUR
DONOHO
INDIANLOG CABINPRIVATE
WHITEBRIDGE
ANZEIGER
TWINSPRINGS ENFIELDWARRIDGELYLEWOOD
SHERWYN
RAUSCHER
FIE L D IN G
TIRRILL FARMSCOUNTRY FAIRM A R Y HILL
CLERBROOK
DWYERTERRYQUA IL W A Y S
BRIAROAK
BRAZILLIANOAK GATE
CAPITOLNOTRE DAMEL Y N N B R O O K
SUFFIELD
PRIVATEP
RI
VATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12244
Wastewater
15
$375,000
Ladue
Lemay/RDP
Deer Creek
Capital
167Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)UPGRADES
Construction
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
REPLACES SYSTEM CAPACITY PROJECT 12254.
HOBATH
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
15
$5,500,000
Unincorporated
Bissell
Watkins Creek
Capital
168Page
2020
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $617,000
11999 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2017)
Various $2,500,000
12720 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
Various $1,400,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017)Various $2,500,000
13044 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
Various $250,000
12382 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT A
Various $60,000
12383 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT B
Various $60,000
12384 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT C
Various $60,000
12385 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT D
Various $60,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $400,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $365,000
12005 Vendor
Services
RADAR RAINFALL DATA (2017)Various $120,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$615,000
12003 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2017)
Various $280,000
FUND TOTAL: $14,887,000
4102 - IMPROVEMENT FUND
12896 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2019)
Various $3,000,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $3,000,000
6660 - SANITARY REPLACEMENT FUND
11993 Construction 82ND STREET TO I-170 SANITARY RELIEF
(UR-08, UR-09)
Various $4,000,000
12073 Construction ADAMS I/I REDUCTION (SOUTHEAST OF I-
270 AND DOUGHERTY FERRY RD)
Kirkwood $463,000
12075 Construction AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
Unincorporated $470,000
12565 Pre-Design
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $1,000,000
12029 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT A
Various $8,900,000
12026 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT C
Various $5,900,000
12033 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $85,000
12030 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
Various $50,000
12027 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
Various $85,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $65,000
12096 Design Services BISSELL HILLS SANITARY RELIEF (ST CYR
RD TO LEETON AVE)
Bellefontaine
Neighbors
$300,000
12828 Construction BISSELL POINT WWTF REDUNDANT
SLUDGE ACCEPTANCE SYSTEM
St. Louis City $3,500,000
12110 Design Services CANTERBURY DRIVE LATERAL SANITARY
RELIEF (NELSON DR TO CANTERBURY DR)
Northwoods $264,000
12248 Design Services CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $1,670,000
11790 Construction CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
11789 Construction CAULKS CREEK FORCEMAIN
REHABILITATION
Chesterfield $9,000,000
12794 Construction CITY LAKES STORAGE MODIFICATIONS
FOR CSO CONTROL
St. Louis City $325,000
12693 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
St. Louis City $2,406,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12694 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
St. Louis City $985,000
12836 Construction CLARA 523 COMBINED SEWER
IMPROVEMENT
St. Louis City $100,000
12504 Engineering
During
Construction
Services
COLDWATER CREEK WWTF FINAL
CLARIFIERS REPLACEMENT
Unincorporated $200,000
11724 Design Services COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $650,000
12125 Construction COLDWATER SOUTHWEST SUBWATERSHED
I/I REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
Various $1,348,000
12126 Construction COLDWATER UPSTREAM PUMP STATION (P-
180) STORAGE
Unincorporated $1,280,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $3,400,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $7,400,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $7,000,000
11729 Construction CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
Chesterfield $7,000,000
12139 Design Services CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $1,200,000
12140 Design Services CSO - MARY AVENUE SOUTH OF
MANCHESTER. CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION
Brentwood $1,750,000
12142 Design Services DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
Unincorporated $161,000
11155 Construction,
Phase II
DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551) PART 2
Unincorporated $4,500,000
12471 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE II
Various $10,500,000
12472 Design Services DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Various $400,000
12042 Construction DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
Various $5,745,000
11731 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $1,500,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $50,000,000
12152 Design Services E. WATSON SANITARY RELIEF (RUDSON LN
TO RICHVIEW DR)
Crestwood $482,000
12154 Construction EARTH CITY LAKE FRONT NORTH PUMP
STATION (P-711) REPLACEMENT
Unincorporated $550,000
12155 Construction EARTH CITY SHORELINE PUMP STATION (P-
704) REPLACEMENT
Unincorporated $750,000
12515 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2019)
Various $1,500,000
12161 Construction ELINOR AVE. TEMPORARY SANITARY
STORAGE FACILITY
Richmond Heights $140,000
12841 Land Purchase ENGELHOLM RELIEF SANITARY STORAGE
FACILITY (ENGELHOLM AVENUE AND ST.
CHARLES ROCK ROAD)
Pagedale $2,000,000
10856 Construction ERA AVE. 5800 BLOCK SEWER SEPARATION St. Louis City $140,000
11745 Design Services FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
Maryland Heights $400,000
10601 Construction
(Supplemental
Appropriation)
FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $4,700,000
10018 Construction FF-18 VILLA DORADO - LACKLAND - PAGE
SANITARY RELIEF (ADIE RD TO VILLA
DORADO DR)
Maryland Heights $7,075,000
12186 Construction FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
Ladue $190,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $1,500,000
11760 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2016)
Various $100,000
12396 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2018)
CONTRACT A
Various $400,000
12894 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2018)
CONTRACT B
Various $400,000
12388 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT A
Various $75,000
12389 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT B
Various $75,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12390 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT C
Various $75,000
12398 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019)
Various $200,000
12408 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
Various $50,000
12409 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
Various $50,000
12410 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
Various $50,000
12411 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
Various $50,000
12412 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
Various $50,000
12914 Construction GLEN EAGLES PUMP STATION (P-189)
RELOCATION / REPLACEMENT
Unincorporated $600,000
13072 Design Services GRAND GLAIZE WWTF FLOODWALL
PROTECTION
Valley Park $535,000
10496 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE
TO PARDEE LANE)
Various $15,000,000
11766 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI
(BUCKLEY RD TO UNION RD)
Unincorporated $2,500,000
12569 Construction GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $18,000,000
12569 Engineering
During
Construction
Services
GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $700,000
12372 Construction GREEN PARK AND LAKESHIRE I/I
REDUCTION (TESSON FERRY RD AND
GREEN PARK RD)
Unincorporated $231,000
12510 Construction GREEN PARK AND LAKESHIRE PUBLIC I/I
REDUCTION (TESSON FERRY RD AND
GREEN PARK RD)
Unincorporated $2,500,000
12334 Design Services HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $1,500,000
11769 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $4,430,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $1,920,000
10863 Construction HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $2,500,000
12017 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT A
St. Louis City And
County
$2,500,000
12018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT B
St. Louis City And
County
$2,500,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12009 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2019)
Various $7,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $20,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $485,000
11142 Construction JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $2,100,000
12325 Design Services LANG ROYCE SANITARY RELIEF (FARGO
DR TO FLORIDALE CT)
Dellwood $116,000
12327 Construction LAY RD - GALLERIA I/I REDUCTION
(CLAYTON RD AND LAY RD)
Various $500,000
13041 Construction LEMAY 1 PUMP STATION (P-301) SLUICE
GATE REPLACEMENT
St. Louis City $1,500,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $50,000
12038 Construction LEMAY PUBLIC I/I REDUCTION (2019)
CONTRACT D
Various $3,050,000
12057 Design Services LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $50,000
12721 Engineering
During
Construction
Services
LEMAY WWTF REDUNDANT WATER
SERVICE
Unincorporated $47,000
12721 Construction LEMAY WWTF REDUNDANT WATER
SERVICE
Unincorporated $520,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $365,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $320,000
11746 Design Services LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $350,000
12499 Design Services LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
Unincorporated $200,000
12499 Construction LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
Unincorporated $5,000,000
12255 Pre-Design
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,200,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12511 Construction MACKENZIE PUBLIC I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX
HALL)
Various $6,840,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $285,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $9,000,000
12352 Design Services MIDLAND SANITARY RELIEF (MIDLAND
BLVD TO SIMS AVE)
Overland $332,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12483 Construction,
Design-Build
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $4,200,000
12444 Construction N CLARK AVE 49 SANITARY SEWER
REPLACEMENT
Ferguson $610,000
12786 Construction N HIGHWAY 67 AT COLDWATER CREEK
SANITARY SEWER REPLACEMENT
Florissant $650,000
12362 Construction NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
Webster Groves $500,000
12363 Construction NORTH WEBSTER CC, POCAHONTAS,
SOUTH BRENTWOOD I/I REDUCTION (S
BRENTWOOD BLVD AND MANCHESTER)
Various $400,000
12702 Construction OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
St. Louis City $1,450,000
11701 Design Services PUMP STATION REPLACEMENT PROJECTS
(PHASE I) (P-708)
Various $60,000
12901 Construction RDP FOULWATER SEWER GRIT CHAMBER
ELIMINATION (DEER CREEK)
St. Louis City $660,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $200,000
12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
13079 Construction RIVERSIDE AND YARNELL SANITARY
RELIEF REHABILITATION
Fenton $1,600,000
12840 Construction RIVERSIDE AND YARNELL SANITARY
RELIEF REPLACEMENT
Fenton $3,300,000
12191 Design Services ROLAND SANITARY RELIEF (NELSON DR TO
ROLAND BLVD)
Northwoods $90,000
12201 Design Services SHREWSBURY SANITARY RELIEF SEWER
AND I/I REDUCTION (WEIL AVE AND I-44)
Various $670,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12208 Design Services SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
Webster Groves $332,000
12221 Design Services SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
Unincorporated $526,000
11669 Design Services SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $452,000
12223 Construction SUGAR CREEK I/I REDUCTION (W ADAMS
AVE AND COUCH AVE)
Kirkwood $590,000
12235 Construction TOWNE SOUTH AND BRUNSTON I/I
REDUCTION (AMBS RD AND TOWNE
CENTRE DR)
Unincorporated $110,000
12239 Design Services TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $900,000
11984 Construction UNIVERSITY CITY I/I REDUCTION - EAST
(UR-08 AND UR-09)
Various $5,506,000
11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $3,700,000
11791 Construction
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION B
Various $3,400,000
12440 Pre-Design
Services
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $2,000,000
12253 Construction VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
Various $500,000
12490 Design Services VANCE RD PUMP STATION (P-472)
UPGRADES
Valley Park $520,000
12922 Design Services WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $1,000,000
12491 Design Services WATKINS CREEK PUMP STATION (P-101)
UPGRADES
Unincorporated $550,000
11677 Construction WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $600,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV PART 3
Webster Groves $1,300,000
11679 Design Services WEST LOCKWOOD SANITARY RELIEF Webster Groves $432,000
12278 Construction WESTBOROUGH - LUTHER - MERMOD
PLACE I/I REDUCTION (N KIRKWOOD RD TO
I-44 AND BERRY RD)
Various $240,000
12296 Construction WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
Town And Country $1,375,000
FUND TOTAL: $337,753,000
5 April 2018
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
GRAND TOTAL:$355,640,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2020)
Various $1,400,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $1,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017)Various $2,500,000
13044 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
Various $200,000
12382 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT A
Various $60,000
12383 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT B
Various $60,000
12384 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT C
Various $60,000
12385 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT D
Various $60,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $375,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $800,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$625,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
FUND TOTAL: $16,390,000
4102 - IMPROVEMENT FUND
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12897 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2020)
Various $3,000,000
FUND TOTAL: $3,000,000
6660 - SANITARY REPLACEMENT FUND
11993 Construction
(Supplemental
Appropriation)
82ND STREET TO I-170 SANITARY RELIEF
(UR-08, UR-09)
Various $4,000,000
12847 Construction BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE)
St. Louis City $10,000,000
12092 Construction BELLEFONTAINE #2 SANITARY RELIEF
(CHAMBERS RD TO COBURG LANDS DR)
Bellefontaine
Neighbors
$1,435,000
12565 Pre-Design
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $6,000,000
12033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $4,967,000
12030 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
Various $3,120,000
12027 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
Various $7,869,000
12508 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $176,000
12509 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
Various $243,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $1,040,000
12494 Construction BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR REPLACEMENT
St. Louis City $5,700,000
12566 Design Services BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $2,600,000
12100 Construction BRENTWOOD FOREST, FAIR OAKS,
MIDDLESEX I/I REDUCTION (I-64 AND LAY
RD)
Brentwood $1,000,000
12103 Design Services BRINWOOD SANITARY RELIEF (SHARON DR
TO CORTEZ DR AND SHACKELFORD RD TO
DANNELLE DR)
Florissant $500,000
12104 Construction BROOKSHIRE SANITARY RELIEF
(BROOKSHIRE DR TO COUGAR DR)
Unincorporated $3,075,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12111 Construction CAPILIA SANITARY RELIEF (GRANT RD TO
CAPILIA DR)
Crestwood $1,790,000
12112 Construction CARSON VILLA, ROSARY LANE AND
THURSTON I/I REDUCTION
Bel-Ridge $1,563,000
11790 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
11789 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN
REHABILITATION
Chesterfield $8,000,000
11917 Construction CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER AND PUBLIC I/I
REDUCTION
Ladue $2,170,000
12851 Design Services CHATHAM MANOR PUMP STATION (P-520)
ELIMINATION
Unincorporated $250,000
12121 Design Services CHRISTOPHER DR I/I REDUCTION
(ENGLAND TOWN RD TO BECKER RD)
Unincorporated $20,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $7,400,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $6,000,000
12131 Construction CONWAY VILLAGE SANITARY RELIEF
(CONWAY RD TO I-64)
Town And Country $3,905,000
12629 Design Services CREVE COEUR CREEK (L-52) FORCEMAIN
REHABILITATION (P-718 TO MO RIVER
WWTF)
Maryland Heights $500,000
12432 Construction CREVE COEUR CREEK PUBLIC I/I
REDUCTION SOUTH
Various $4,800,000
12472 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Various $1,000,000
12472 Construction DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Various $20,000,000
11731 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $1,500,000
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $37,000,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12615 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $1,000,000
12615 Construction DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $15,000,000
11136 Construction DEGIVERVILLE COMBINED SEWER
IMPROVEMENTS
St. Louis City $2,000,000
12148 Design Services DIX SANITARY RELIEF (DIX AVE TO
AIRWAY AVE)
Breckenridge Hills $290,000
12516 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2020)
Various $1,000,000
12158 Design Services ED LOU LANE I/I REDUCTION (BROOKTON
WAY AND GREENTON WAY)
Unincorporated $57,000
12160 Construction EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK
WEST I/I REDUCTION
Various $595,000
12376 Design Services EVA WABASH I/I REDUCTION (I-170 AND
FROST AVE)
Various $2,000,000
12166 Design Services FENTON CREEK PUMP STATION (P-425)
ELIMINATION
Unincorporated $480,000
12173 Design Services FISHPOT TRUNK WEST I/I REDUCTION
(SMITH DR AND VLASIS DR)
Ballwin $110,000
12180 Construction FORDER SANITARY INTERCONNECTION
(FORDER RD TO RINGER RD)
Unincorporated $190,000
12843 Pre-Design
Services
FOREST VIEW SANITARY TRUNK SEWER Sunset Hills $250,000
12183 Design Services FOX CREEK SANITARY RELIEF (HOLLOWAY
RD TO CLAYMONT DR)
Ballwin $270,000
12184 Design Services FRANCES I/I REDUCTION (NORTHEAST OF I-
270 AND DOUGHERTY FERRY RD)
Kirkwood $30,000
12845 Design Services FRIENDSHIP VILLAGE PUMP STATION (P-
516) ELIMINATION
Sunset Hills $350,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $1,500,000
12397 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT A
Various $400,000
13059 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT B
Various $400,000
12391 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
Various $75,000
12392 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
Various $75,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12393 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
Various $75,000
12398 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019)
Various $200,000
12413 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
Various $50,000
12416 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
Various $50,000
12417 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
Various $50,000
12418 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
Various $50,000
12419 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
Various $50,000
12175 Construction GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD
TO WINDSOR SPRINGS DR)
Kirkwood $2,680,000
12272 Design Services GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT
COVE CT)
Ballwin $140,000
13072 Construction GRAND GLAIZE WWTF FLOODWALL
PROTECTION
Valley Park $2,750,000
10496 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE
TO PARDEE LANE)
Various $15,000,000
12569 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $17,500,000
12334 Design Services HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $500,000
11800 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - TRUNK SEWER
REHABILITATION
Various $6,500,000
12311 Design Services HUNTERS FIELD I/I REDUCTION
(DOUGHERTY FERRY RD TO MANCHESTER
RD NEAR I-270)
Des Peres $150,000
12020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT A
St. Louis City And
County
$2,500,000
12021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT B
St. Louis City And
County
$2,500,000
12010 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2020)
Various $7,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,000,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $50,000
11957 Construction JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Various $1,825,000
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Various $40,000
12319 Design Services LADUE ESTATES SANITARY RELIEF (DEER
CREEK TRUNK SEWER TO S LADUE
ESTATES DR)
Westwood $60,000
12322 Design Services LAFAYETTE SANITARY RELIEF (STRECKER
RD TO DURANGO PASS CT)
Wildwood $516,000
11817 Construction LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $12,170,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $190,000
11817 Construction,
Phase II
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $4,500,000
12057 Construction LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $3,849,000
12059 Design Services LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $230,000
12328 Design Services LINDBERGH PARK COMBINED SEWER
RELIEF (BREDELL AVE TO PRINCETON PL)
Maplewood $650,000
11820 Engineering
During
Construction
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $1,000,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $310,000
11820 Construction LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $66,755,000
12333 Design Services LOHMEYER COMBINED SEWER RELIEF
(BENTLEY DR TO BREDELL AVE)
Maplewood $170,000
12489 Design Services LOUISA AND ARSENAL PUMP STATIONS (P-
112 AND P-113) UPGRADES
St. Louis City $1,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $320,000
12255 Design Services LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $4,000,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12255 Construction
Management
Services During
Design
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $500,000
12336 Construction MACKENZIE I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX
HALL)
Shrewsbury $441,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $500,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $8,200,000
12339 Design Services MANCHESTER RD AND S BIG BEND BLVD
COMBINED SEWER RELIEF (HAMPTON
CREEK TO LYNDOVER PL)
Maplewood $930,000
12342 Construction MARK TWAIN I/I REDUCTION
(MANCHESTER RD AND BOMPART AVE)
Brentwood $500,000
10024 Design Services MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $1,100,000
12850 Design Services MERAMEC BLUFFS (RIVER RIDGE P-501,
PINE TREE ESTATES P-466, AND SUNSET
RIDGE P-504) PUMP STATION ELIMINATIONS
Unincorporated $286,000
12484 Construction MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE II
St. Louis City $2,600,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $4,500,000
10716 Construction NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,500,000
12460 Construction OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
12364 Design Services OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
Ballwin $85,000
11409 Construction PAISLEY-ROSLYN-GAYLORD STORM
SEWER SEPARATION
Flordell Hills $2,000,000
11877 Work Order
Repair Costs
(Capital)
PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM
Various $500,000
12698 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT B)
Various $50,000
11701 Construction,
Phase II
PUMP STATION REPLACEMENT PROJECTS
(PHASE I) (P-708)
Various $1,300,000
12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12188 Construction RIVERPORT 6 PUMP STATION (P-781)
REPLACEMENT
Maryland Heights $1,000,000
12840 Construction
(Supplemental
Appropriation)
RIVERSIDE AND YARNELL SANITARY
RELIEF REPLACEMENT
Fenton $3,000,000
12200 Design Services SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $1,000,000
10161 Design Services SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
Creve Coeur $178,000
12205 Construction SOUTH COUNTY SANITARY RELIEF (P-419
TO CRIPPLE CREEK DR)
Unincorporated $6,140,000
12207 Construction SPIRIT OF ST. LOUIS 2 PUMP STATION (P-
736) REPLACEMENT
Chesterfield $754,000
12212 Design Services ST. GEORGE CREEK SANITARY RELIEF
(DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
Unincorporated $560,000
12213 Design Services ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $167,000
12218 Construction STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
Frontenac $300,000
12228 Construction TESSON CREEK I/I REDUCTION (TESSON
FERRY RD AND TIFFANY SQUARE PKY)
Unincorporated $280,000
12230 Construction TILLES PARK, LITZSINGER AND PARKRIDGE
I/I REDUCTION (LITZSINGER RD AND S
MCKNIGHT RD)
Ladue $1,800,000
12232 Design Services TM-03 TWO MILE CREEK SANITARY RELIEF
(TWO MILE TRUNK TO FIRETHORN DR)
Des Peres $30,000
11992 Construction UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12244 Construction UPPER LADUE CREEK I/I REDUCTION (NE
QUAD OF S WARSON RD AND LADUE RD)
Ladue $375,000
12247 Construction UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION C PUBLIC I/I REDUCTION
Berkeley $4,400,000
12249 Design Services UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $1,433,000
12440 Design Services UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12252 Design Services UR-11 BALSON AVENUE SANITARY RELIEF University City $1,000,000
12507 Design Services VALLEY PUBLIC I/I REDUCTION
(CLARKSON RD AND KEHRS MILL RD)
Clarkson Valley $87,000
12490 Construction VANCE RD PUMP STATION (P-472)
UPGRADES
Valley Park $3,440,000
11676 Design Services VILLA COUBLAY SANITARY RELIEF Creve Coeur $80,000
12491 Construction WATKINS CREEK PUMP STATION (P-101)
UPGRADES
Unincorporated $5,500,000
11212 Construction WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
Brentwood $2,733,000
13 April 2018
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12583 Construction WHITE BIRCH PUMP STATION (P-725)
REHABILITATION OR ELIMINATION
Hazelwood $1,160,000
12302 Design Services WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Warson Woods $760,000
FUND TOTAL: $470,244,000
GRAND TOTAL:$489,634,000
5 April 2018
STORMWATER ENGINEERING PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12716 GENERAL SERVICES AGREEMENT - WATER
QUALITY GENERAL SUPPORT (2017)
$300,000 169
10070 HALL STREET STORM SEWERS $2,100,000 170
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
$250,000 171
12688 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT A)
$1,200,000 172
12689 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT B)
$300,000 173
12690 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT C)
$875,000 174
12687 STORMWATER STREAMBANK STABILIZATION
DESIGN (CONTRACT B)
$205,000 175
TOTAL:$5,230,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - WATERQUALITY GENERAL SUPPORT (2017)
GSA - (Planning)Operating Funds
5110 - StormwaterRegulatory Fund
WATER QUALITY EXPERTISE IS NEEDED TO SUPPORT THE DISTRICT'SREGULATORY AND LEGAL EFFORTS.
RETAIN ENGINEERING FIRM FOR AS NEEDED WATER QUALITY SUPPORTSERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12716
Stormwater
11
$300,000
Various
Various
Various
Asset Management
169Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Design Services
5120 - DistrictwideStormwater Fund
STREET FLOODING ALONG HALL STREET FROM RIVERVIEW TO GRAND.
CONSTRUCT 10,350 FEET OF 12-INCH TO 36-INCH STORM SEWER, 2MILES OF CURB AND GUTTER, AND 130 FEET OF 60-INCH TUNNEL,ALONG HALL STREET.
§¨¦70
§¨¦70
H
ALLLEEUNIONSWITZERPARKCARTER
MCLARAN
SHREVEERAWRENPRARIEMIMIKAADELAIDETHRUSHBEACONFAIRCHURCHNEWBYROBINTARAT E R M IN A LRUSKINKOSSUTHEMERSONCARRIEHARRISPENROSE
H
A
R
N
E
Y
B
U
L
W
E
R
TAYLORHOLLYFLOYR
O
S
ALIE
M
C
KIS
S
O
C
K
PALM LINTONEUCLIDCO ZENSPOPEHORNSBY
CALVARYGERALDINEWALL
FARLIN
ELIAS
ORIOLEM ELVINHORD
P
R
A
N
G
E
O R ANATHLONEDUENKE
SELLS LOWELLB ER K A YQUEENSGRANDTHATCHERWESCOTTCHRISTIANACACIAAUBERTCA TALIN ARAFORD
PENROSERIVERVIEWDR §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
11
$2,100,000
St. Louis City
Bissell
Various
Capital
170Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MAINTENANCE YARD VEHICLE STORAGEBUILDING (MINTERT)
Design Services
5120 - DistrictwideStormwater Fund
ADDITIONAL STORM SEWER CLEANING VEHICLES ARE BEINGORDERED TO BE STORED AT THIS FACILITY.
CONSTRUCT A NEW TRUCK STORAGE BUILDING AND MODIFICATIONSTO AN EXISTING BUILDING AT THE MINTERT CONSTRUCTION YARD.
PROJECT DEPENDENT ON PURCHASE OF ADDITIONAL PROPERTYADJACENT TO THE EXISTING SITE.BERMUDAROWLES
MINTERT INDUSTRIAL
BEHLEPAYNEDUPREEEMERALDMINTE R TMANOR§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10282
Stormwater
11
$250,000
St. Louis County
Various
Various
Capital
171Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE IMPROVEMENTDESIGN (CONTRACT A)
Professional Services
5120 - DistrictwideStormwater Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN THE BISSELL AND COLDWATERWATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS.
§¨¦44
§¨¦64
§¨¦70
§¨¦270 §¨¦170
§¨¦70
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12688
Stormwater
16
$1,200,000
Various
Various
Various
Asset Management
172Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE IMPROVEMENTDESIGN (CONTRACT B)
Professional Services
5120 - DistrictwideStormwater Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN THE LEMAY WATERSHED.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS.
§¨¦64
§¨¦44
§¨¦270
§¨¦55
§¨¦70
§¨¦170
§¨¦55
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12689
Stormwater
16
$300,000
Various
Lemay/RDP
Various
Asset Management
173Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE IMPROVEMENTDESIGN (CONTRACT C)
Professional Services
5120 - DistrictwideStormwater Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN THE MISSOURI AND LOWER MERAMECWATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS.
§¨¦44
§¨¦55
§¨¦70
§¨¦170
§¨¦44
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12690
Stormwater
16
$875,000
Various
Various
Various
Asset Management
174Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER STREAMBANK STABILIZATIONDESIGN (CONTRACT B)
Professional Services
5120 - DistrictwideStormwater Fund
EROSION AT VARIOUS STREAMBANK LOCATIONS THROUGHOUT THEDISTRICT THREATENING STRUCTURES AND ROADWAYS, ANDDEGRADING WATER QUALITY.
DESIGN STREAMBANK STABILIZATION ENGINEERING SOLUTIONS INTHE MISSOURI AND LOWER MERAMEC WATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS.
§¨¦44
§¨¦55
§¨¦70
§¨¦170
§¨¦44
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12687
Stormwater
16
$205,000
Various
Various
Various
Asset Management
175Page
2019
5 April 2018
STORMWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11392 BARKMAN STORM SEWER IMPROVEMENTS $75,000 176
11593 BAXTER ROAD #273 AND #301 STORM SEWER $185,000 177
11613 BRADBURY DR. #5468 STORM SEWER $100,000 178
10380 BROGAN DALE CIRCLE STORM SEWER $495,000 179
11600 BROOKVALE TERRACE - PARKFIELD TERRACE
STORM IMPROVEMENTS
$700,000 180
10210 CORONA PARK STORM SEWER PHASE 2B $500,000 181
11514 CRESTWICK DRIVE #9733 AND 9741 STORM
SEWER (SUNSET HILLS 11)
$220,000 182
11065 DEER CREEK WATERSHED INITIATIVE $100,000 183
11299 DICKENS AVENUE #470 STORM SEWER $50,000 184
11447 DIPLOMAT LANE OUTFALL STABILIZATION $641,000 185
12682 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2019)
$1,500,000 186
11611 GRAND GLEN DR. #702 STORM
IMPROVEMENTS
$235,000 187
11954 HANCOCK AVENUE 5600 BLOCK STORM
SEWER
$135,000 188
11569 HARVEST HILL CT. BANK STABILIZATION $770,000 189
11647 HOFFMEISTER - PARDELLA STORM SEWER
IMPROVEMENTS
$573,000 190
13043 INFRASTRUCTURE REPAIRS
(REHABILITATION) STORMWATER (2019)
$4,000,000 191
11304 LACKLAND RD. - UCEYLE AVE. STORM SEWER $270,000 192
5 April 2018
STORMWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11397 LADUE FARM ROAD #125 STORM SEWER $150,000 193
11306 LIBERTY AVE. 10000 BLOCK STORM SEWER $657,000 194
11488 MAR ANN CT. #9819 STORM IMPROVEMENT $210,000 195
11594 MARTYRIDGE CT. #4307 STORM SEWER
(MGMB-170)
$205,000 196
11171 MEAUX MART - GRAY STORM CHANNEL $582,000 197
11018 PATRINA COURT BANK STABILIZATION $530,000 198
12767 QUEEN ANNE PLACE AT SAPPINGTON STORM
IMPROVEMENTS
$350,000 199
11420 SAXONHALL - VENUS - BRISTOL HALL STORM
SEWER
$140,000 200
11621 SCHAEFFER PLACE 2000 BLOCK STORM SEWER $205,000 201
11511 SCHUETZ ROAD AND WILLOW BROOK COVE
STORM SEWERS
$200,000 202
11239 STEEPLECHASE STORM SEWER
IMPROVEMENTS (FRONTENAC 3-3)
$215,000 203
11033 STONE HILL DR 4701 STORM SEWER $225,000 204
12674 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2019)
$3,000,000 205
12678 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - ORIGINAL BOUNDARY (2019)
$500,000 206
11592 SUMMER LAKE DR. #15637 STORM SEWER $250,000 207
11395 SUMMERHAVEN DRIVE #11656 STORM SEWER $200,000 208
11224 TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
$249,000 209
5 April 2018
STORMWATER CONSTRUCTION PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11407 TINA TERRACE DRIVE STORM SEWER $100,000 210
11604 VILLAGE MEAD DR. #294 STORM SEWER $40,000 211
12938 WILLOW HILL STORM SEWER (LADUE 1614A)$500,000 212
11026 WINCHESTER DRIVE 7120 BANK
STABILIZATION
$249,000 213
11477 WISE AND WEST PARK STORM IMPROVEMENT $130,000 214
TOTAL:$19,436,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BARKMAN STORM SEWER IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
MINOR STREET AND YARD FLOODING AND EROSION.
CONSTRUCT 220 FEET OF 12-INCH TO 15-INCH STORM SEWER.
BARKMAN
C
R
A
I
G
CRAIG VIE
W
TIMBERWOOD
JEANNE
H
ILLS
SUMMERHAVEN
MOMART
EHEN
RIE
TTEHIL
L
S
O
A
K
B
A
RK
CHANDELLAY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11392
Stormwater
15
$75,000
Unincorporated
Missouri
Fee Fee Creek
Capital
176Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BAXTER ROAD #273 AND #301 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
STRUCTURE AND YARD FLOODING.
CONSTRUCT 200 FEET OF 12-INCH STORM SEWER.SHADY MEADOWSCLEA
R
M
EADOWS
OAKLEIGH WOODS
L
E
A M
E
A
D
O
W
S
STEPHANIEMOREWOODOAK PATHFORESTLEAFHIGHMEADOWS§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11593
Stormwater
15
$185,000
Ballwin
Meramec
Grand Glaize Creek
Capital
177Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRADBURY DR. #5468 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
INADEQUATE STORM SEWER SYSTEM CAUSES FREQUENT FLOODINGOF TWO HOMES.
CONSTRUCT 168 FEET OF 30-INCH STORM SEWER.
YAEGER
STONEHURSTDANFORTHFORDHAM EDELWEISSBRADBURYCHARGLOWSOUTHFIELD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11613
Stormwater
15
$100,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
178Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BROGAN DALE CIRCLE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
FLOODING OF THREE STRUCTURES AND RESTRICTION OF EMERGENCYACCESS.
CONSTRUCT 420 FEET OF 12-INCH TO 38-INCH BY 60-INCH STORMSEWER, AND 60 FEET OF BIOSTABILIZATION.PRIVATEG L E NCULLEN
HAGEMANNPATCHINTIMBERLINEPLACE
HAGEM
ANNCROSSING BROGANDALEFINN ROCK§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10380
Stormwater
15
$495,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
179Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BROOKVALE TERRACE - PARKFIELD TERRACESTORM IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
STRUCTURAL FLOODING FROM OVERLAND FLOW AND YARDFLOODING.
CONSTRUCT 1,540 FEET OF 12-INCH TO 90-INCH STORM SEWER.
PROJECT TO BE DESIGNED AND CONSTRUCTED BY THE CITY OFMANCHESTER, WITH PARTIAL REIMBURSEMENT FOR CONSTRUCTIONTO BE PROVIDED BY THE DISTRICT.PARKFIELDBROOKVALE
BRIARHURSTHANN
AVILLAVIEW
DOVER FALLSTIMBERLEIGHGLENMILLHOLGATESHERWICKGRENADIERHANNA VALLEY ESTATESCOTTAGEMILL
HANNA OAKS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11600
Stormwater
15
$700,000
Manchester
Meramec
Fishpot Creek
Capital
180Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CORONA PARK STORM SEWER PHASE 2B
Construction
5583 - Sugar CreekOMCI Fund
YARD AND STREET FLOODING.
CONSTRUCT 1,110 FEET OF 12-INCH TO 24-INCH STORM SEWER.
ADAMSGEYERKNIERIM
WAY
BURNSDICKENSCLEMENSWASHINGTON LONGFELLOWWILCOXSUGAR CREEKPLEASANTPL
AYGROUND
WASHINGTON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10210
Stormwater
15
$500,000
Kirkwood
Meramec
Sugar Creek
Capital
181Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRESTWICK DRIVE #9733 AND 9741 STORM SEWER(SUNSET HILLS 11)
Construction
5120 - DistrictwideStormwater Fund
BASEMENT FLOODING.
CONSTRUCT 317 FEET OF 12-INCH TO 18-INCH STORM SEWER.
HELTAPRIVATELOCKHAVEN
SAPPINGTON BARRACKS
BARRIN
GTONSOUTHGATEMEPPEN
LOMBARDY CRESTWICKROSALIND GE
YE
RCR
ES
THAVEN SOUTHGATEGRAVOIS RDGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11514
Stormwater
15
$220,000
Sunset Hills
Meramec
Mattese Creek
Capital
182Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK WATERSHED INITIATIVE
Construction
5566 - Deer CreekOMCI Fund
MISSOURI BOTANICAL GARDEN HAS REQUESTED PARTNERING COSTSHARE FOR THE DEER CREEK WATERSHED INITIATIVE, WHICH ISSUPPORTED BY A 319 GRANT FROM MDNR.
GREEN INFRASTRUCTURE CONSTRUCTION TO BE COST SHARED BYMSD.
§¨¦270
§¨¦64
§¨¦170
§¨¦64
§¨¦170 OLIVEBLVD
MA N C H E S T E R R DS LINDBERGH BLVDWATSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11065
Stormwater
15
$100,000
Various
Lemay/RDP
Deer Creek
Non-recurring
183Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DICKENS AVENUE #470 STORM SEWER
Construction
5583 - Sugar CreekOMCI Fund
YARD FLOODING.
CONSTRUCT 106 FEET OF 15-INCH STORM SEWER.
ESSEX
GEYERG O E T H E
KNIERIM BURNSCENTRAL
DICKENSWILCOXCLEMENSLONGFELLOWWAY SIMMONSVILLA GARDENS
CLEMENSWILCOXCLEMENS§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11299
Stormwater
15
$50,000
Kirkwood
Meramec
Sugar Creek
Capital
184Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DIPLOMAT LANE OUTFALL STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
BANK FAILURES AND EROSION AT OUTFALL.
RECONSTRUCT OUTFALL PIPE, STABILIZE STREAM BANK, ANDPERFORM PREVENTATIVE CHANNEL IMPROVEMENTS.
DIPL
O
M
A
T
CHATEAUGAYGLEN HOLLOW
FORESTVALEGLEN V A L L E Y
S T ATESMANHEATHER CRESTCOBBLE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11447
Stormwater
15
$641,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
185Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR STORMWATERPROJECTS (2019)
Property RightsAcquisition
5120 - DistrictwideStormwater Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM REQUIRES PROPERTY RIGHTS ACQUISITIONFOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM STORMWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12682
Stormwater
13
$1,500,000
Various
Various
Various
Asset Management
186Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLEN DR. #702 STORM IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
BASEMENT AND YARD FLOODING FROM OVERLAND FLOW.
CONSTRUCT 340 FEET OF 12-INCH TO 24-INCH STORM SEWER, 310 FEETOF SWALE, AND 65 FEET OF EARTHEN BERM.
PARK HENRY
OLD SULPHUR SPRING BUBLIN
GRANDGLEN
BALLWIN
ORCHARD
HILLCREST DEAN REITERMANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11611
Stormwater
15
$235,000
Manchester
Meramec
Grand Glaize Creek
Capital
187Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HANCOCK AVENUE 5600 BLOCK STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND GARAGE FLOODING.
CONSTRUCT 110 FEET OF 12-INCH STORM SEWER.REGALFYLER
ARTHUR
POTOMAC
MARQUETTE
OLEATHA TEDMARHANCOCK
JANUARYMACKLINDVOLOMARQUETTE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11954
Stormwater
15
$135,000
St. Louis City
Lemay/RDP
Southwestern
Capital
188Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARVEST HILL CT. BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK EROSION TO STRUCTURES.
CONSTRUCT 400 FEET OF BANK STABILIZATION.
TWIGWOOD
BALLWOOD
GREATHILLLEMONWOOD
FARHILLRUSTIC V A L L E YECHOHILL
H
A
RV
E
S
T HIL
L GOLFWOODTURFWOOD
C E DARRU
N ECHOHILL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11569
Stormwater
15
$770,000
Ballwin
Meramec
Fishpot Creek
Non-recurring
189Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HOFFMEISTER - PARDELLA STORM SEWERIMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND EROSION DUE TO LACK OF A STORM SEWERSYSTEM.
CONSTRUCT 1,160 FEET OF 15-INCH TO 30-INCH STORM SEWER.
THIS PROJECT INCLUDES THE SCOPE OF WORK FOR PROJECTS 11369AND 11641.REEDZEISSPARDELLAWEISSHOFFMEISTER
ORIENT
REGINALAGROVEGAS
ERSKINEPAULERUP RECHTORIENT LEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11647
Stormwater
15
$573,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
190Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)STORMWATER (2019)
Construction
5120 - DistrictwideStormwater Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED SEWERS, AND STREET AND YARD FLOODING.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13043
Stormwater
15
$4,000,000
Various
Various
Various
Capital
191Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LACKLAND RD. - UCEYLE AVE. STORM SEWER
Construction
5584 - University CityOMCI Fund
BASEMENT FLOODING ALONG KORANDO DUE TO INADEQUATE STORMSEWER SYSTEM.
CONSTRUCT 1,005 FEET OF 12-INCH TO 30-INCH STORM SEWER.
OAK
DYERLACKLAND
UCEYLELAKEKORANDOOCONNELLMORVENMADDOX
FAIRVIEWHIGHLANDUCEYLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11304
Stormwater
15
$270,000
Overland
Lemay/RDP
University City Branch
Capital
192Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LADUE FARM ROAD #125 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND EROSION.
CONSTRUCT 410 FEET OF 12-INCH TO 18-INCH STORM SEWER.
LADUE
LADUEFARM
PRIVATE
CEDAR
B
R
I
DGE
P
OI
NTECONWA Y PRIVATEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11397
Stormwater
15
$150,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
193Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LIBERTY AVE. 10000 BLOCK STORM SEWER
Construction
5584 - University CityOMCI Fund
INADEQUATE ROAD DRAINAGE AND INADEQUATE PARKING LOTDRAINAGE.
CONSTRUCT 850 FEET OF 12-INCH TO 36-INCH STORM SEWER.RELOCATE STORM SEWER FROM UNDERNEATH BUILDING.
PAGE
ASHBYLIBERTY
TRENTON FAIRVIEWMORVENMIDWESTINDUSTRIAL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11306
Stormwater
15
$657,000
Overland
Lemay/RDP
University City Branch
Capital
194Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MAR ANN CT. #9819 STORM IMPROVEMENT
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND INFREQUENT BASEMENT FLOODING.
CONSTRUCT 440 FEET OF 18-INCH STORM SEWER AND A BIOSWALE.
CONCORDJOSSE TESCORDCHARWICKTHEISSWINKEL
KRAMPERCOLD SPRINGS BAYFIELDMAR ANN
WEIMANN
SOUTHWICK ROSSMOOR§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11488
Stormwater
15
$210,000
Unincorporated
Meramec
Mattese Creek
Capital
195Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARTYRIDGE CT. #4307 STORM SEWER(MGMB-170)
Construction
5120 - DistrictwideStormwater Fund
BASEMENT FLOODING AND YARD EROSION.
CONSTRUCT 420 FEET OF 15-INCH TO 24-INCH STORM SEWER.
POTTLE MARTYRIDGEGOLDENVALLEY
FORDERPEGASUS
MASSABIELLEEL PAULO CHERBOURGCHINONMARSEILLETELEGRAPH RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11594
Stormwater
15
$205,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
196Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MEAUX MART - GRAY STORM CHANNEL
Construction
5566 - Deer CreekOMCI Fund
STREAMBANK EROSION.
CONSTRUCT 320 FEET OF 6-FOOT TO 8-FOOT HIGH MODULAR BLOCKWALL AND ONE GRADE CONTROL STRUCTURE.BOPPGRAYO
A
K
ANDREPOINTOAK
CHALTENHAM
CAMBERLYDOUBLETREE
LONGROVE
MEAUX MART
MORRISPLACE
POINT OAK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11171
Stormwater
15
$582,000
Des Peres
Lemay/RDP
Two Mile Creek
Capital
197Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PATRINA COURT BANK STABILIZATION
Construction
5571 - Gravois CreekOMCI Fund
HIGH RISK STRUCTURAL EROSION.
CONSTRUCT 700 FEET OF ROCK BLOCK TOE WALL ANDBIOSTABILIZATION.
LITTIE
PATRINA
FAWNHAVEN
TEAKWOOD
VALDAMERE BAPTIST CHURCHKINGSMERE
ABDELLOASIS
MUGAN
ELLA MARYTHREE COURT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11018
Stormwater
15
$530,000
Unincorporated
Lemay/RDP
Gravois Creek
Non-recurring
198Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
QUEEN ANNE PLACE AT SAPPINGTON STORMIMPROVEMENTS
Construction
5566 - Deer CreekOMCI Fund
SLOW DRAINAGE CAUSING FLOODING AT 11 YARDS AND ONE GARAGE.
CONSTRUCT 430 FEET OF IMPROVED STORM CHANNEL.
PROJECT TO BE DESIGNED AND CONSTRUCTED BY THE CITY OFGLENDALE, WITH PARTIAL REIMBURSEMENT FOR CONSTRUCTION TOBE PROVIDED BY THE DISTRICT.
VICTORIA
WARWICK
GLEN ELM
QUE EN ANNE
SAPPINGTONGLENMOOR
BROOKSIDE
GLENBROOK
NANCY CAROL
GLENWAYANDREWSAPPINGTONVICTORIA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12767
Stormwater
15
$350,000
Glendale
Lemay/RDP
Deer Creek
Capital
199Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAXONHALL - VENUS - BRISTOL HALL STORMSEWER
Construction
5120 - DistrictwideStormwater Fund
STRUCTURE FLOODING DUE TO INADEQUATE STORM SEWER.
CONSTRUCT 116 FEET OF 12-INCH TO 18-INCH STORM SEWER ATSAXONHALL. CONSTRUCT 204 FEET OF 12-INCH STORM SEWER BEHINDVENUS & BRISTOL HALL.
WILWOOD
S
A
X
O
N
H
A
LL
M
A
R
G
AT
E
H
A
LL
VE N US
W
HITB
Y
H
A
LLBRISTOLHALL
GALAXYW
HITE
H
ALL M
A
N
O
R
BRIERHALLW
A
R
WIC
K
H
ALL
FRONTAGE
BRIERHALL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11420
Stormwater
15
$140,000
Various
Missouri
Fee Fee Creek
Capital
200Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCHAEFFER PLACE 2000 BLOCK STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND ALLEY PONDING.
CONSTRUCT 300 FEET OF 12-INCH TO 15-INCH STORM SEWER.KRAFTMITCHELL
GARNER
GLADES
UNION PACIFICMARTHASCHAEFFERWALDE
M
A
R UNION PACIFICM A N C H E S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11621
Stormwater
15
$205,000
St. Louis City
Lemay/RDP
MISSISSIPPI RIVER (CITY)
Capital
201Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCHUETZ ROAD AND WILLOW BROOK COVESTORM SEWERS
Construction
5120 - DistrictwideStormwater Fund
STREET FLOODING OF SCHUETZ ROAD AND BASEMENT FLOODING OFTWO HOMES.
CONSTRUCT 325 FEET OF 6-INCH TO 30-INCH STORM SEWER.
SCHUETZ
WILLOW
B
R
OOKGUELBRETHQUEENSWAY
PRIVATEDUNSTONPEBBLEBROOKGLENRIDGE
CRICKETT
HIL
L MILLSTONECAMPUSC H IM NEYRO C K
BROOKSIDE
FOREST BROOKOX
FORDHILL
MEADOWLA
R
K
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11511
Stormwater
15
$200,000
Unincorporated
Missouri
Fee Fee Creek
Capital
202Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STEEPLECHASE STORM SEWER IMPROVEMENTS(FRONTENAC 3-3)
Construction
5566 - Deer CreekOMCI Fund
STRUCTURAL FLOODING.
CONSTRUCT 900 FEET OF 12-INCH TO 21-INCH STORM SEWER AND ONEBIORETENTION CELL.
PROJECT TO BE DESIGNED AND CONSTRUCTED BY THE CITY OFFRONTENAC, WITH PARTIAL REIMBURSEMENT FOR CONSTRUCTION TOBE PROVIDED BY THE DISTRICT.
FOX RIDGEGEYER HUNTLEIGH WOODSCOACH N FOURSTEEPLECHASE
GEYER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11239
Stormwater
15
$215,000
Frontenac
Lemay/RDP
Deer Creek
Capital
203Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STONE HILL DR 4701 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
FREQUENT BASEMENT FLOODING FROM OVERLAND FLOW.
CONSTRUCT 235 FEET OF 12-INCH STORM SEWER.AMBSFOULK FUCHSSTONE HILL
STANHOPE
VALMEYERTOWNECENTRE
AMBSDALEOAKBRIERHIGHWOODSWEET SPRING
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11033
Stormwater
15
$225,000
Unincorporated
Meramec
Mattese Creek
Capital
204Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - DISTRICTWIDE (2019)
Work Order Repair Costs(Capital)
5120 - DistrictwideStormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12674
Stormwater
17
$3,000,000
Various
Various
Various
Asset Management
205Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - ORIGINAL BOUNDARY (2019)
Work Order Repair Costs(Capital)
5130 - StormwaterOperations andMaintenance Fund
DAMAGED AND DETERIORATING INLETS, MANHOLES, SEWERS, ANDOTHER INFRASTRUCTURE ARE IN NEED OF REPAIR AND/ORREPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF INFRASTRUCTURETHROUGHOUT THE ORIGINAL AREA OF THE DISTRICT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦170
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12678
Stormwater
17
$500,000
Various
Various
Various
Asset Management
206Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUMMER LAKE DR. #15637 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND HOME FLOODING DUE TO OVERLAND FLOW.
CONSTRUCT 495 FEET OF 12-INCH TO 24-INCH STORM SEWER.SUMMERLAKEHEATHERCROFTHIGHCROFTGOLDENLAKEORCHARDHILL
C
A
Y
M
A
N
CED A R M IL L
Y ORK RIDG
E IR O N LAKE
SILVERLAKECOUNTR YM ILL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11592
Stormwater
15
$250,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
207Page
2019
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUMMERHAVEN DRIVE #11656 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
Scope of ProjectCONSTRUCT 375 FEET OF 12-INCH TO 24-INCH STORM SEWER.
SUM
MERHAVEN
CRAIG VIEW
MOMARTE
TIMBERWOOD
BARDOTB
A
R
K
M
A
N
O
AKBAR KTHAMESS
C
H
U
L
T
E
SILVE
RL
E
AFGREENGA TE
M O M ARTE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11395
Stormwater
15
$200,000
Unincorporated
Missouri
Fee Fee Creek
Capital
208Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TIMBER TRAIL - BRIAR RIDGE CHANNELIMPROVEMENTS
Construction
5566 - Deer CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 130 FEET OF MODULAR BLOCK WALL, 100 FEET OF ROCKBLOCK WALL, AND 140 FEET OF COMBINATION SLOPE PROTECTION.
PROJECT TO BE DESIGNED AND CONSTRUCTED BY THE CITY OFFRONTENAC, WITH PARTIAL REIMBURSEMENT FOR CONSTRUCTION TOBE PROVIDED BY THE DISTRICT.GEYERTWIN FAWNS
BAMBURY
TIMBER
BRIAR RIDGE
TIMBERWYCK
DELCHESTER FOREST AIREDOMINION
RUTHWYNCLIFF§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11224
Stormwater
15
$249,000
Frontenac
Lemay/RDP
Two Mile Creek
Capital
209Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TINA TERRACE DRIVE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 210 FEET OF 15-INCH STORM SEWER.
FEE FEE
WESTPORT PEPPERWOODFAIRHILLSBENNINGTONTINATERRACEGREEN HILLRED ROBINVOLTAIREP A RKWAY ESTATES
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11407
Stormwater
15
$100,000
Unincorporated
Missouri
Fee Fee Creek
Capital
210Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VILLAGE MEAD DR. #294 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 60 FEET OF 12-INCH STORM SEWER.
VILL
A
G
E C
R
E
E
K
A
S
P
E
N VILL
A
G
E
F O R E STVILLA G E
V
IL
L
A
G
E
M
E
A
D
W E S T G LENVILLAGEVILLAGE MEADOW
V I L L A G E BROOKCEDARVILLAGEF
O
X
VILLAG
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11604
Stormwater
15
$40,000
Ballwin
Meramec
Fishpot Creek
Capital
211Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WILLOW HILL STORM SEWER (LADUE 1614A)
Construction
5566 - Deer CreekOMCI Fund
STRUCTURE FLOODING AND YARD FLOODING FROM OVERLAND FLOW.
CONSTRUCT 2,435 FEET OF 12-INCH TO 42-INCH STORM SEWER.
PROJECT TO BE DESIGNED AND CONSTRUCTED BY THE CITY OFLADUE, WITH PARTIAL REIMBURSEMENT FOR CONSTRUCTION TO BEPROVIDED BY THE DISTRICT.MCKNIGHTLORE N Z O
LADUELOREN WOODS
KINGSBURY
WILLOWHILLN A SSAU
SEDWICK
NARRAGANSETT
MCKN IGHTKINGS B U RY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12938
Stormwater
15
$500,000
Ladue
Lemay/RDP
Black Creek
Capital
212Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WINCHESTER DRIVE 7120 BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 170 FEET OF 6-FOOT TO 9-FOOT HIGH MODULAR BLOCKWALL.
ORE ON
LUCAS N HUNTFARLEY
ONEILLPASADENACRESTLANDWINCHESTER
BRISTOL
BLUE SPRUCE
COLONIALCANTERBURY BRETONPASADENA CRESTLANDONEILLBR ISTOL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11026
Stormwater
15
$249,000
Northwoods
Bissell
Baden
Capital
213Page
2019
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WISE AND WEST PARK STORM IMPROVEMENT
Construction
5120 - DistrictwideStormwater Fund
YARD PONDING AND STREET FLOODING.
CONSTRUCT 170 FEET OF 12-INCH TO 15-INCH COMBINED SEWER.
§¨¦64
§¨¦64
WISE
BELLEVUEYALEPARK
NASHVILLE BLENDONPRIVATE BERTHOLD
HOOVER
YALEYALEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11477
Stormwater
15
$130,000
Richmond Heights
Lemay/RDP
River Des Peres
Capital
214Page
2019
5 April 2018
STORMWATER CONTINUED PROJECTS - FY19
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10289 LINDEN #1064 STORM
SEWER
PROJECT CONTINUED DUE TO PROPERTY OWNER
COORDINATION AND DESIGN REVISIONS. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER, 2018.
$1,300,000
10289 LINDEN #1064 STORM
SEWER
PROJECT CONTINUED DUE TO PROPERTY OWNER
COORDINATION AND DESIGN REVISIONS. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER, 2018.
$30,000
TOTAL: $1,330,000
5 April 2018
STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10209 CHERRY TREE LANE STORM IMPROVEMENT $60,000 215
10209 CHERRY TREE LANE STORM IMPROVEMENT $600,000 216
12683 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2020)
$500,000 217
11426 GLENN DRIVE #128 STORM SEWER $320,000 218
11266 HOLDEN AND LONGWOOD STORM SEWER $150,000 219
11545 KAYSER AVE. - WALLER AVE. STORM SEWER $500,000 220
11419 LALITE #6145 - 6151 STORM IMPROVEMENTS $282,000 221
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
$1,000,000 222
11489 MARMONT COURT #339 STORM SEWER $85,000 223
10262 SHIVA COURT CHANNEL IMPROVEMENTS
(CAU3-A)
$641,000 224
10336 SNELSON DRIVE STORM SEWER $260,000 225
12675 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2020)
$3,000,000 226
TOTAL:$7,398,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHERRY TREE LANE STORM IMPROVEMENT
Construction
5584 - University CityOMCI Fund
INADEQUATE STORM SEWER SYSTEM.
CONSTRUCT 1,190 FEET OF 12-INCH TO 36-INCH STORM SEWER, 150FEET OF 12-INCH CMP CULVERT, AND 370 FEET OF 4 FOOT WIDE BY 1.5FOOT HIGH CONCRETE BOX CULVERT.
PROJECT SPLIT FUNDED BETWEEN FUNDS 5120 AND 5584, TOFACILITATE SPEND DOWN OF FUND 5584.
ENGEL
RADFORDASHMONTHARVESTCORDELLENGELTONBONHOMMEWOODS
M
ANSFIELD
CRABAPPLE
CRABAPPLEHARVEST
CRABAPPLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10209
Stormwater
15
$60,000
Olivette
Lemay/RDP
University City Branch
Capital
215Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHERRY TREE LANE STORM IMPROVEMENT
Construction
5120 - DistrictwideStormwater Fund
INADEQUATE STORM SEWER SYSTEM.
CONSTRUCT 1,190 FEET OF 12-INCH TO 36-INCH STORM SEWER, 150FEET OF 12-INCH CMP CULVERT, AND 370 FEET OF 4 FOOT WIDE BY 1.5FOOT HIGH CONCRETE BOX CULVERT.
PROJECT SPLIT FUNDED BETWEEN FUNDS 5120 AND 5584, TOFACILITATE SPEND DOWN OF FUND 5584.
ENGEL
RADFORDASHMONTHARVESTCORDELLENGELTONBONHOMMEWOODS
M
ANSFIELD
CRABAPPLE
CRABAPPLEHARVEST
CRABAPPLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10209
Stormwater
15
$600,000
Olivette
Lemay/RDP
University City Branch
Capital
216Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR STORMWATERPROJECTS (2020)
Property RightsAcquisition
5120 - DistrictwideStormwater Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM REQUIRES PROPERTY RIGHTS ACQUISITIONFOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM STORMWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12683
Stormwater
13
$500,000
Various
Various
Various
Asset Management
217Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLENN DRIVE #128 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
STRUCTURE AND YARD FLOODING.
CONSTRUCT 680 FEET OF 12-INCH TO 30-INCH STORM SEWER.HOLLOWAYS P R A GUESMILLGLENNPARK
STODDARDS MILL
KEHRS MILLGILLAMONROE MILLKEHRSMILLBEND
RENEHALE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11426
Stormwater
15
$320,000
Ballwin
Meramec
Grand Glaize Creek
Capital
218Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HOLDEN AND LONGWOOD STORM SEWER
Construction
5574 - Loretta JoplinOMCI Fund
BASEMENT AND STREET FLOODING DUE TO INADEQUATE ROADWAYDRAINAGE.
CONSTRUCT 450 FEET OF 12-INCH TO 18-INCH STORM SEWER.CLYDEGENTRYFELTON
ETTA
LORETTA
VELMA
HOLDEN
NAERT
FORBES
LENHARDT
LONGWOODSTELLADAMMERTHOLDENLORETTA
HOLDEN
FELTONFORBES §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11266
Stormwater
15
$150,000
Unincorporated
Lemay/RDP
Mississippi River Tributary Areas
Capital
219Page
2020
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KAYSER AVE. - WALLER AVE. STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND STREET FLOODING.
Scope of Project
CONSTRUCT 625 FEET OF 12-INCH TO 15-INCH STORM SEWER.
FAN
N
I
EMILITARY
HOR
N
KAY
S
E
RWACHTEL
WAL
L
E
R
BAY
L
E
S
S
LUX
E
M
B
U
R
GDAMMERT
BAY
L
E
S
S
WAL
L
E
R
KAY
S
E
R
KAY
S
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11545
Stormwater
15
$500,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
220Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LALITE #6145 - 6151 STORM IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
OVERLAND YARD AND STRUCTURE FLOODING.
CONSTRUCT 410 FEET OF 12-INCH TO 15-INCH STORM SEWER.MIMIKALALIT
EGOODFELLOW GARE
S
C
H
E
SHER
R
Y
LAUR
A
LUCIL
L
E
THEO
D
O
R
EWILBORNSHER
R
Y
GARE
S
C
H
E
LALIT
E
GARE
S
C
H
E
SHER
R
Y
LAUR
A
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11419
Stormwater
15
$282,000
St. Louis City
Bissell
Baden
Capital
221Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MAINTENANCE YARD VEHICLE STORAGEBUILDING (MINTERT)
Construction
5120 - DistrictwideStormwater Fund
ADDITIONAL STORM SEWER CLEANING VEHICLES ARE BEINGORDERED TO BE STORED AT THIS FACILITY.
CONSTRUCT A NEW TRUCK STORAGE BUILDING AND MODIFICATIONSTO AN EXISTING BUILDING AT THE MINTERT CONSTRUCTION YARD.
PROJECT DEPENDENT ON PURCHASE OF ADDITIONAL PROPERTYADJACENT TO THE EXISTING SITE.BERMUDAROWLES
MINTERT INDUSTRIAL
BEHLEPAYNEDUPREEEMERALDMINTE R TMANOR§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10282
Stormwater
15
$1,000,000
St. Louis County
Various
Various
Capital
222Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARMONT COURT #339 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
EROSION.
CONSTRUCT 100 FEET OF 12-INCH STORM SEWER.PETZOLDSTABLESTONEPEMBURY
MARKHAM
MILLB R IARWES T E R N M IL L
MARMONT COUNTRYOAKCYPRESS HILLGREENSTONE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11489
Stormwater
15
$85,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
223Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHIVA COURT CHANNEL IMPROVEMENTS(CAU3-A)
Construction
5120 - DistrictwideStormwater Fund
CHANNEL BANK EROSION THREATENING SEVEN PROPERTIES.
CONSTRUCT 345 FEET OF 8 TO 11 FOOT HIGH ROCK BLOCK WALL.SHI
VAFORESTLEAFF O REST PINE
BALAJIPEACEFULBAJAFUL L E R T O N MEADOWS
ELMFORESTNEWPOINTOAKFO R E S T
HOLLISTERC R O S S IN G
WINTER LEAF
SHIVA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10262
Stormwater
15
$641,000
Unincorporated
Missouri
Caulks Creek
Non-recurring
224Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SNELSON DRIVE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND EROSION.
CONSTRUCT 300 FEET OF 12-INCH TO 24-INCH STORM SEWER.
P
OT
T
L
E
MAGOFFIN SNELSONBORDEAUXMALONE
FREEMAN
CONLETHCRESTLINEARRASFERRERNIAGARA
AMEND
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10336
Stormwater
15
$260,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
225Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - DISTRICTWIDE (2020)
Work Order Repair Costs(Capital)
5120 - DistrictwideStormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATERINFRASTRUCTURE THROUGHOUT THE DISTRICT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12675
Stormwater
17
$3,000,000
Various
Various
Various
Asset Management
226Page
2020
5 April 2018
STORMWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12716 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY GENERAL SUPPORT (2017)
Various $300,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11392 Construction BARKMAN STORM SEWER IMPROVEMENTS Unincorporated $75,000
11593 Construction BAXTER ROAD #273 AND #301 STORM
SEWER
Ballwin $185,000
11613 Construction BRADBURY DR. #5468 STORM SEWER Unincorporated $100,000
10380 Construction BROGAN DALE CIRCLE STORM SEWER Unincorporated $495,000
11600 Construction BROOKVALE TERRACE - PARKFIELD
TERRACE STORM IMPROVEMENTS
Manchester $700,000
11514 Construction CRESTWICK DRIVE #9733 AND 9741 STORM
SEWER (SUNSET HILLS 11)
Sunset Hills $220,000
11447 Construction DIPLOMAT LANE OUTFALL STABILIZATION Chesterfield $641,000
12682 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
STORMWATER PROJECTS (2019)
Various $1,500,000
11611 Construction GRAND GLEN DR. #702 STORM
IMPROVEMENTS
Manchester $235,000
10070 Design Services HALL STREET STORM SEWERS St. Louis City $2,100,000
11954 Construction HANCOCK AVENUE 5600 BLOCK STORM
SEWER
St. Louis City $135,000
11569 Construction HARVEST HILL CT. BANK STABILIZATION Ballwin $770,000
11647 Construction HOFFMEISTER - PARDELLA STORM SEWER
IMPROVEMENTS
Unincorporated $573,000
13043 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) STORMWATER (2019)
Various $4,000,000
11397 Construction LADUE FARM ROAD #125 STORM SEWER Chesterfield $150,000
10282 Design Services MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $250,000
11488 Construction MAR ANN CT. #9819 STORM IMPROVEMENT Unincorporated $210,000
11594 Construction MARTYRIDGE CT. #4307 STORM SEWER
(MGMB-170)
Unincorporated $205,000
11420 Construction SAXONHALL - VENUS - BRISTOL HALL
STORM SEWER
Various $140,000
5 April 2018
STORMWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11621 Construction SCHAEFFER PLACE 2000 BLOCK STORM
SEWER
St. Louis City $205,000
11511 Construction SCHUETZ ROAD AND WILLOW BROOK
COVE STORM SEWERS
Unincorporated $200,000
11033 Construction STONE HILL DR 4701 STORM SEWER Unincorporated $225,000
12688 Professional
Services
STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT A)
Various $1,200,000
12689 Professional
Services
STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT B)
Various $300,000
12690 Professional
Services
STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT C)
Various $875,000
12674 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2019)
Various $3,000,000
12687 Professional
Services
STORMWATER STREAMBANK
STABILIZATION DESIGN (CONTRACT B)
Various $205,000
11592 Construction SUMMER LAKE DR. #15637 STORM SEWER Chesterfield $250,000
11395 Construction SUMMERHAVEN DRIVE #11656 STORM
SEWER
Unincorporated $200,000
11407 Construction TINA TERRACE DRIVE STORM SEWER Unincorporated $100,000
11604 Construction VILLAGE MEAD DR. #294 STORM SEWER Ballwin $40,000
11026 Construction WINCHESTER DRIVE 7120 BANK
STABILIZATION
Northwoods $249,000
11477 Construction WISE AND WEST PARK STORM
IMPROVEMENT
Richmond Heights $130,000
FUND TOTAL: $19,863,000
5130 - STORMWATER OPERATIONS AND MAINTENANCE FUND
12678 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - ORIGINAL BOUNDARY
(2019)
Various $500,000
FUND TOTAL: $500,000
5566 - DEER CREEK OMCI FUND
11065 Construction DEER CREEK WATERSHED INITIATIVE Various $100,000
10289 Construction LINDEN #1064 STORM SEWER Richmond Heights $1,300,000
10289 Engineering
During
Construction
Services
LINDEN #1064 STORM SEWER Richmond Heights $30,000
5 April 2018
STORMWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11171 Construction MEAUX MART - GRAY STORM CHANNEL Des Peres $582,000
12767 Construction QUEEN ANNE PLACE AT SAPPINGTON
STORM IMPROVEMENTS
Glendale $350,000
11239 Construction STEEPLECHASE STORM SEWER
IMPROVEMENTS (FRONTENAC 3-3)
Frontenac $215,000
11224 Construction TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
Frontenac $249,000
12938 Construction WILLOW HILL STORM SEWER (LADUE
1614A)
Ladue $500,000
FUND TOTAL: $3,326,000
5571 - GRAVOIS CREEK OMCI FUND
11018 Construction PATRINA COURT BANK STABILIZATION Unincorporated $530,000
FUND TOTAL: $530,000
5583 - SUGAR CREEK OMCI FUND
10210 Construction CORONA PARK STORM SEWER PHASE 2B Kirkwood $500,000
11299 Construction DICKENS AVENUE #470 STORM SEWER Kirkwood $50,000
FUND TOTAL: $550,000
5584 - UNIVERSITY CITY OMCI FUND
11304 Construction LACKLAND RD. - UCEYLE AVE. STORM
SEWER
Overland $270,000
11306 Construction LIBERTY AVE. 10000 BLOCK STORM SEWER Overland $657,000
FUND TOTAL: $927,000
GRAND TOTAL:$25,996,000
5 April 2018
STORMWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
FUND TOTAL: $100,000
5120 - DISTRICTWIDE STORMWATER FUND
11501 Construction BELDON DRIVE STORM SEWER Flordell Hills $670,000
10209 Construction CHERRY TREE LANE STORM
IMPROVEMENT
Olivette $600,000
11587 Construction CRAIG ROAD #1485 STORM SEWER
IMPROVEMENTS
Unincorporated $372,000
12683 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
STORMWATER PROJECTS (2020)
Various $500,000
11639 Construction FAIRCHILD #6816 STORM SEWER Northwoods $450,000
11426 Construction GLENN DRIVE #128 STORM SEWER Ballwin $320,000
11030 Construction GUENEVERE DR - BARHAM DOWN STORM
IMPROVEMENTS
Ballwin $450,000
11589 Construction HICKORY TREE LN. STORM SEWER Ballwin $245,000
11608 Construction HUNTER'S GLEN CT. #305 STORM SEWER Ellisville $180,000
11545 Construction KAYSER AVE. - WALLER AVE. STORM
SEWER
Unincorporated $500,000
11476 Construction KENWOOD - JUNE CREEK BANK
STABILIZATION
Northwoods $1,643,000
11419 Construction LALITE #6145 - 6151 STORM IMPROVEMENTS St. Louis City $282,000
10282 Construction MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $1,000,000
11489 Construction MARMONT COURT #339 STORM SEWER Chesterfield $85,000
11520 Construction MIDRIDGE DRIVE STORM SEWER Riverview $200,000
11424 Construction SCOTT AVE #1213 STORM SEWER Unincorporated $240,000
10262 Construction SHIVA COURT CHANNEL IMPROVEMENTS
(CAU3-A)
Unincorporated $641,000
10336 Construction SNELSON DRIVE STORM SEWER Unincorporated $260,000
12675 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2020)
Various $3,000,000
5 April 2018
STORMWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10366 Construction UNION ROAD 100 BLOCK STORM
IMPROVEMENTS
Unincorporated $712,000
11618 Construction WHITNEY POINTE DR. #2210 CHANNEL
IMPROVEMENTS
Clarkson Valley $478,000
11046 Construction WOODLAKE VILLAGE 1009 BANK
STABILIZATION
Chesterfield $237,000
FUND TOTAL: $13,065,000
5130 - STORMWATER OPERATIONS AND MAINTENANCE FUND
12679 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - ORIGINAL BOUNDARY
(2020)
Various $500,000
FUND TOTAL: $500,000
5563 - CLAYTON CENTRAL OMCI FUND
12986 Design Services CLAYTON CENTRAL OMCI STORMWATER
IMPROVEMENTS
Clayton $400,000
FUND TOTAL: $400,000
5574 - LORETTA JOPLIN OMCI FUND
11266 Construction HOLDEN AND LONGWOOD STORM SEWER Unincorporated $150,000
FUND TOTAL: $150,000
5584 - UNIVERSITY CITY OMCI FUND
10209 Construction CHERRY TREE LANE STORM
IMPROVEMENT
Olivette $60,000
11450 Construction MIRIAM AND BURNS STORM SEWER Overland $400,000
FUND TOTAL: $460,000
GRAND TOTAL:$14,675,000
5 April 2018
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
FUND TOTAL: $100,000
5120 - DISTRICTWIDE STORMWATER FUND
11494 Construction BARTOLET TO PAULE AVE. STORM SEWER
REPLACEMENT
Unincorporated $590,000
11623 Construction BRUNSTON DR. #4875 BANK STABILIZATION Unincorporated $209,000
10391 Construction CARL AVE., AVIS ST., AND MAIN ST. STORM
SEWER
Jennings $440,000
11418 Construction DRURY - SWITZER STORM SEWER St. Louis City $207,000
11474 Construction GLEASON #656 STORM SEWER Bellefontaine
Neighbors
$105,000
10070 Construction HALL STREET STORM SEWERS St. Louis City $4,100,000
11438 Construction KENNY DR.- BOUNDARY RD. STORM SEWER Unincorporated $158,000
11432 Construction LARKWOOD - JAYWOOD - SPARROWWOOD
BANK STABILIZATION (CRE-07)
Unincorporated $808,000
11522 Construction LOUISIANA AND HOLLY HILLS STORM
SEWER
St. Louis City $265,000
11481 Construction MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
Unincorporated $1,195,000
11389 Construction NOTTINGHAM - MAYFAIR STORM SEWER Clarkson Valley $202,000
11263 Construction OAKSHIRE LN. TO GEYER RD. STORM
SEWER
Kirkwood $1,200,000
11506 Construction RAFORD CT. STORM SEWER SEPARATION Bellefontaine
Neighbors
$197,000
11630 Construction REYNOSA - MELITTA STREAMBANK
STABILIZATION
Unincorporated $1,060,000
11016 Construction ROLAND BLVD STORM IMPROVEMENTS Northwoods $350,000
11482 Construction SAN BERNADINO AVENUE STORM SEWER Normandy $33,000
11573 Construction SAPPINGTON RD. AND SAPPHIRE RIDGE CT.
STORM SEWER
Unincorporated $645,000
11442 Construction STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
Normandy $2,580,000
5 April 2018
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13004 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2021)
Various $3,000,000
11430 Construction WILBORN DRIVE #5361 STORM SEWER Jennings $200,000
11620 Construction WINDSOR PLACE #3640 STORM SEWER St. Louis City $170,000
FUND TOTAL: $17,714,000
5587 - WATKINS CREEK OMCI FUND
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $385,000
FUND TOTAL: $385,000
GRAND TOTAL:$18,199,000
5 April 2018
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
FUND TOTAL: $100,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Construction
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $4,000,000
11530 Construction LARIMORE STORM SEWER Unincorporated $2,870,000
13005 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2022)
Various $3,000,000
FUND TOTAL: $9,870,000
5563 - CLAYTON CENTRAL OMCI FUND
12986 Construction CLAYTON CENTRAL OMCI STORMWATER
IMPROVEMENTS
Clayton $1,500,000
FUND TOTAL: $1,500,000
GRAND TOTAL:$11,470,000
5 April 2018
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5120 - DISTRICTWIDE STORMWATER FUND
11416 Construction BOXFORD COURT BANK STABILIZATION Chesterfield $267,000
11408 Construction BROADHEAD #921 STORM SEWER Unincorporated $225,000
11535 Construction DEKAMAY DRIVE STORM SEWER (MGJB-
130)
Unincorporated $500,000
11558 Construction GENTLE COURT CHANNEL IMPROVEMENT
(WILL-06)
Unincorporated $100,000
10356 Construction HEMPLINE COURT STORM SEWER Unincorporated $120,000
11544 Construction LARKIN LN. #8 STORM IMPROVEMENTS
(ME-260)
Unincorporated $380,000
11507 Construction MINNIE AVE. TO GREEN HAVEN STORM
SEWER
Jennings $306,000
11536 Construction NOTTINGHAM ESTATES DR. #5217 STORM
SEWER
Unincorporated $190,000
11598 Construction ORCHARD AND WINDSOR LANE STORM
SEWER
Kirkwood $509,000
13006 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2023)
Various $3,000,000
11396 Construction WEATHERBY DRIVE STORM SEWER Unincorporated $280,000
FUND TOTAL: $5,877,000
5584 - UNIVERSITY CITY OMCI FUND
10595 Construction FAIRVIEW AVE. #1250 STORM SEWER University City $535,000
FUND TOTAL: $535,000
GRAND TOTAL:$6,412,000
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11569 HARVEST HILL CT. BANK STABILIZATION STORMWATER BALLWIN 189
11593 BAXTER ROAD #273 AND #301 STORM SEWER STORMWATER BALLWIN 177
11604 VILLAGE MEAD DR. #294 STORM SEWER STORMWATER BALLWIN 211
12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD
TO LEETON AVE)
WASTEWATER BELLEFONTAINE
NEIGHBORS
7
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER.
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION
WASTEWATER BRENTWOOD 20
11397 LADUE FARM ROAD #125 STORM SEWER STORMWATER CHESTERFIELD 193
11447 DIPLOMAT LANE OUTFALL STABILIZATION STORMWATER CHESTERFIELD 185
11592 SUMMER LAKE DR. #15637 STORM SEWER STORMWATER CHESTERFIELD 207
11729 CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
WASTEWATER CHESTERFIELD 92
11789 CAULKS CREEK FORCEMAIN REHABILITATION WASTEWATER CHESTERFIELD 88
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 9
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
WASTEWATER CRESTWOOD 24
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 46
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 107
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO
FLORIDALE CT)
WASTEWATER DELLWOOD 50
11171 MEAUX MART - GRAY STORM CHANNEL STORMWATER DES PERES 197
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
WASTEWATER FENTON 133
13079 RIVERSIDE AND YARNELL SANITARY RELIEF
REHABILITATION
WASTEWATER FENTON 132
12444 N CLARK AVE 49 SANITARY SEWER
REPLACEMENT
WASTEWATER FERGUSON 126
12786 N HIGHWAY 67 AT COLDWATER CREEK
SANITARY SEWER REPLACEMENT
WASTEWATER FLORISSANT 127
10863 HERMITAGE SANITARY RELIEF (SKME-615)WASTEWATER FRONTENAC 111
11224 TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
STORMWATER FRONTENAC 209
11239 STEEPLECHASE STORM SEWER
IMPROVEMENTS (FRONTENAC 3-3)
STORMWATER FRONTENAC 203
12767 QUEEN ANNE PLACE AT SAPPINGTON STORM
IMPROVEMENTS
STORMWATER GLENDALE 199
10210 CORONA PARK STORM SEWER PHASE 2B STORMWATER KIRKWOOD 181
11299 DICKENS AVENUE #470 STORM SEWER STORMWATER KIRKWOOD 184
12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270
AND DOUGHERTY FERRY RD)
WASTEWATER KIRKWOOD 83
12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE
AND COUCH AVE)
WASTEWATER KIRKWOOD 134
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12186 FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
WASTEWATER LADUE 103
12938 WILLOW HILL STORM SEWER (LADUE 1614A)STORMWATER LADUE 212
11600 BROOKVALE TERRACE - PARKFIELD TERRACE
STORM IMPROVEMENTS
STORMWATER MANCHESTER 180
11611 GRAND GLEN DR. #702 STORM IMPROVEMENTS STORMWATER MANCHESTER 187
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
WASTEWATER MARYLAND
HEIGHTS
102
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
WASTEWATER MARYLAND
HEIGHTS
25
11026 WINCHESTER DRIVE 7120 BANK
STABILIZATION
STORMWATER NORTHWOODS 213
12110 CANTERBURY DRIVE LATERAL SANITARY
RELIEF (NELSON DR TO CANTERBURY DR)
WASTEWATER NORTHWOODS 8
12191 ROLAND SANITARY RELIEF (NELSON DR TO
ROLAND BLVD)
WASTEWATER NORTHWOODS 69
11304 LACKLAND RD. - UCEYLE AVE. STORM SEWER STORMWATER OVERLAND 192
11306 LIBERTY AVE. 10000 BLOCK STORM SEWER STORMWATER OVERLAND 194
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD
TO SIMS AVE)
WASTEWATER OVERLAND 62
11477 WISE AND WEST PARK STORM IMPROVEMENT STORMWATER RICHMOND
HEIGHTS
214
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12139 CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
WASTEWATER RICHMOND
HEIGHTS
19
12161 ELINOR AVE. TEMPORARY SANITARY
STORAGE FACILITY
WASTEWATER RICHMOND
HEIGHTS
100
10070 HALL STREET STORM SEWERS STORMWATER ST. LOUIS CITY 170
10856 ERA AVE. 5800 BLOCK SEWER SEPARATION WASTEWATER ST. LOUIS CITY 101
11142 JENNINGS STATION ROAD / NORTH BADEN
BASIN
WASTEWATER ST. LOUIS CITY 117
11621 SCHAEFFER PLACE 2000 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 201
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 61
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 124
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
WASTEWATER ST. LOUIS CITY 110
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 55
11954 HANCOCK AVENUE 5600 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 188
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 63
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 125
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
WASTEWATER ST. LOUIS CITY 11
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
WASTEWATER ST. LOUIS CITY 12
12695 HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
WASTEWATER ST. LOUIS CITY 48
12702 OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
WASTEWATER ST. LOUIS CITY 130
12828 BISSELL POINT WWTF REDUNDANT SLUDGE
ACCEPTANCE SYSTEM
WASTEWATER ST. LOUIS CITY 87
12836 CLARA 523 COMBINED SEWER IMPROVEMENT WASTEWATER ST. LOUIS CITY 89
12901 RDP FOULWATER SEWER GRIT CHAMBER
ELIMINATION (DEER CREEK)
WASTEWATER ST. LOUIS CITY 131
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
WASTEWATER ST. LOUIS CITY 79
13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE
REPLACEMENT
WASTEWATER ST. LOUIS CITY 119
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
72
12017 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2019) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
113
12018 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2019) CONTRACT B
WASTEWATER ST. LOUIS CITY
AND COUNTY
114
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
STORMWATER ST. LOUIS
COUNTY
171
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11514 CRESTWICK DRIVE #9733 AND 9741 STORM
SEWER (SUNSET HILLS 11)
STORMWATER SUNSET HILLS 182
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
WASTEWATER TOWN AND
COUNTRY
142
10380 BROGAN DALE CIRCLE STORM SEWER STORMWATER UNINCORPORAT
ED
179
11018 PATRINA COURT BANK STABILIZATION STORMWATER UNINCORPORAT
ED
198
11033 STONE HILL DR 4701 STORM SEWER STORMWATER UNINCORPORAT
ED
204
11392 BARKMAN STORM SEWER IMPROVEMENTS STORMWATER UNINCORPORAT
ED
176
11395 SUMMERHAVEN DRIVE #11656 STORM SEWER STORMWATER UNINCORPORAT
ED
208
11407 TINA TERRACE DRIVE STORM SEWER STORMWATER UNINCORPORAT
ED
210
11488 MAR ANN CT. #9819 STORM IMPROVEMENT STORMWATER UNINCORPORAT
ED
195
11511 SCHUETZ ROAD AND WILLOW BROOK COVE
STORM SEWERS
STORMWATER UNINCORPORAT
ED
202
11594 MARTYRIDGE CT. #4307 STORM SEWER
(MGMB-170)
STORMWATER UNINCORPORAT
ED
196
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11613 BRADBURY DR. #5468 STORM SEWER STORMWATER UNINCORPORAT
ED
178
11647 HOFFMEISTER - PARDELLA STORM SEWER
IMPROVEMENTS
STORMWATER UNINCORPORAT
ED
190
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR
TO JENNER LN)
WASTEWATER UNINCORPORAT
ED
75
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
49
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
116
11724 COLDWATER SANITARY RELIEF SECTION B, C
& D - SECTION B REHABILITATION
WASTEWATER UNINCORPORAT
ED
14
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI (BUCKLEY
RD TO UNION RD)
WASTEWATER UNINCORPORAT
ED
106
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
51
12075 AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
WASTEWATER UNINCORPORAT
ED
84
12126 COLDWATER UPSTREAM PUMP STATION (P-180)
STORAGE
WASTEWATER UNINCORPORAT
ED
91
12142 DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
WASTEWATER UNINCORPORAT
ED
21
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12154 EARTH CITY LAKE FRONT NORTH PUMP
STATION (P-711) REPLACEMENT
WASTEWATER UNINCORPORAT
ED
97
12155 EARTH CITY SHORELINE PUMP STATION (P-704)
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
98
12221 SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
WASTEWATER UNINCORPORAT
ED
74
12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION
(AMBS RD AND TOWNE CENTRE DR)
WASTEWATER UNINCORPORAT
ED
135
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
WASTEWATER UNINCORPORAT
ED
76
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
60
12372 GREEN PARK AND LAKESHIRE I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
WASTEWATER UNINCORPORAT
ED
108
12491 WATKINS CREEK PUMP STATION (P-101)
UPGRADES
WASTEWATER UNINCORPORAT
ED
80
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
59
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
122
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
13
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12510 GREEN PARK AND LAKESHIRE PUBLIC I/I
REDUCTION (TESSON FERRY RD AND GREEN
PARK RD)
WASTEWATER UNINCORPORAT
ED
109
12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT
ED
54
12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT
ED
121
12914 GLEN EAGLES PUMP STATION (P-189)
RELOCATION / REPLACEMENT
WASTEWATER UNINCORPORAT
ED
104
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
WASTEWATER UNIVERSITY
CITY
77
12490 VANCE RD PUMP STATION (P-472) UPGRADES WASTEWATER VALLEY PARK 78
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
WASTEWATER VALLEY PARK 45
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
WASTEWATER VARIOUS 105
11065 DEER CREEK WATERSHED INITIATIVE STORMWATER VARIOUS 183
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 56
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 57
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 5
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 6
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 53
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 93
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 17
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 15
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 66
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 67
11420 SAXONHALL - VENUS - BRISTOL HALL STORM
SEWER
STORMWATER VARIOUS 200
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I) (P-708)
WASTEWATER VARIOUS 64
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 23
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 96
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 58
11760 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
WASTEWATER VARIOUS 28
11791 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION B
WASTEWATER VARIOUS 137
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 16
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09)
WASTEWATER VARIOUS 136
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
WASTEWATER VARIOUS 82
11999 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2017)
WASTEWATER VARIOUS 10
12003 STREAM FLOW WATER QUALITY SAMPLING
(2017)
UNALLOCATED VARIOUS 73
12005 RADAR RAINFALL DATA (2017)WASTEWATER VARIOUS 65
12009 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2019)
WASTEWATER VARIOUS 115
12026 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT C
WASTEWATER VARIOUS 86
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT C
WASTEWATER VARIOUS 4
12029 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT A
WASTEWATER VARIOUS 85
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT B
WASTEWATER VARIOUS 3
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT A
WASTEWATER VARIOUS 2
12038 LEMAY PUBLIC I/I REDUCTION (2019)
CONTRACT D
WASTEWATER VARIOUS 120
12042 DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
WASTEWATER VARIOUS 95
12057 LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
WASTEWATER VARIOUS 52
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
WASTEWATER VARIOUS 90
12201 SHREWSBURY SANITARY RELIEF SEWER AND
I/I REDUCTION (WEIL AVE AND I-44)
WASTEWATER VARIOUS 70
12253 VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD AND
WATSON RD)
WASTEWATER VARIOUS 138
12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I
REDUCTION (N KIRKWOOD RD TO I-44 AND
BERRY RD)
WASTEWATER VARIOUS 141
12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON
RD AND LAY RD)
WASTEWATER VARIOUS 118
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
WASTEWATER VARIOUS 47
12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH
BRENTWOOD I/I REDUCTION (S BRENTWOOD
BLVD AND MANCHESTER)
WASTEWATER VARIOUS 129
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
UNALLOCATED VARIOUS 35
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
UNALLOCATED VARIOUS 36
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
UNALLOCATED VARIOUS 37
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
UNALLOCATED VARIOUS 38
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
WASTEWATER VARIOUS 27
12388 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT A
WASTEWATER VARIOUS 31
12389 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT B
WASTEWATER VARIOUS 32
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12390 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT C
WASTEWATER VARIOUS 33
12396 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT A
WASTEWATER VARIOUS 29
12398 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2019)
WASTEWATER VARIOUS 39
12408 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
WASTEWATER VARIOUS 40
12409 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
WASTEWATER VARIOUS 41
12410 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
WASTEWATER VARIOUS 42
12411 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
WASTEWATER VARIOUS 43
12412 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
WASTEWATER VARIOUS 44
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 68
12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE II
WASTEWATER VARIOUS 94
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER VARIOUS 22
12511 MACKENZIE PUBLIC I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER PARK,
KENRICK SEMINARY, AND NERINX HALL)
WASTEWATER VARIOUS 123
12515 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2019)
WASTEWATER VARIOUS 99
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 1
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12674 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2019)
STORMWATER VARIOUS 205
12678 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - ORIGINAL BOUNDARY (2019)
STORMWATER VARIOUS 206
12682 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2019)
STORMWATER VARIOUS 186
12687 STORMWATER STREAMBANK STABILIZATION
DESIGN (CONTRACT B)
STORMWATER VARIOUS 175
12688 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT A)
STORMWATER VARIOUS 172
12689 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT B)
STORMWATER VARIOUS 173
12690 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT C)
STORMWATER VARIOUS 174
12716 GENERAL SERVICES AGREEMENT - WATER
QUALITY GENERAL SUPPORT (2017)
STORMWATER VARIOUS 169
12720 CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
WASTEWATER VARIOUS 18
12759 FLOW METERING AND MONITORING (2017)WASTEWATER VARIOUS 26
12894 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT B
WASTEWATER VARIOUS 30
12896 INFRASTRUCTURE REPAIRS (FACILITIES) (2019)WASTEWATER VARIOUS 112
13043 INFRASTRUCTURE REPAIRS (REHABILITATION)
STORMWATER (2019)
STORMWATER VARIOUS 191
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
UNALLOCATED VARIOUS 34
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE III
WASTEWATER WEBSTER
GROVES
139
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
PART 3
WASTEWATER WEBSTER
GROVES
140
11679 WEST LOCKWOOD SANITARY RELIEF WASTEWATER WEBSTER
GROVES
81
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE
TO DALE AVE)
WASTEWATER WEBSTER
GROVES
71
12362 NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
WASTEWATER WEBSTER
GROVES
128
MSD Project Clear is the initiative to improve water quality and
alleviate many wastewater concerns in the St. Louis region. It will
invest billions of dollars over a generation in planning, designing,
and building community rainscaping, system improvements, and an
ambitious program of maintenance and repair.