Loading...
HomeMy Public PortalAbout2021-763 Lighthouse Area Sewer - Addendum 2 Attachment B.pdfThis map was created using geothinQ | www.geothinQ.com | Mapping Smart Land Decisions TYBEE ISLAND DIVISION III 09/26/2021 Good Fair Poor Unknown Gravity Main APPROX. 16 LF OF 10" DIA. SEWER (PVC -SDR 26) @ 0.28% APPROX. 111 LF OF 10" DIA. SEWER (PVC -SDR 26) @ 0.28% APPROX. 223 LF OF 10" DIA. SEWER (PVC -SDR 26) @ 0.28% APPROX. 235 LF OF 10" DIA. SEWER (PVC -SDR 26) @ 0.28% APPROX. 14 LF OF 10" DIA. SEWER (PVC -SDR 26) @ 0.28% MH #4-8 RIM: 7.40 INV. IN: 0.27 (N) INV. IN: -2.17 (NE) INV. IN: -2.25 (E) INV. OUT: -2.27 (W) MH #4-9 RIM: 7.80 INV. IN: -2.02 (E) INV. OUT: -2.10 (W) MH #4-11 RIM: 6.00 INV. IN: 0.05 (N) INV. IN: 0.71 (S) INV. OUT: -0.10 (NW) INV. OUT: -0.10 (W) 10 TH S T . BU T L E R AV E . MH #1 RIM: 8.00 INV. IN: -2.03 (SE) INV. OUT: -2.13 (SW) MH #2 RIM: 8.00 INV. IN: -1.62 (SE) INV. OUT: -1.72 (NW) MH #3 RIM: 7.00' INV. IN: -0.90' (SE) INV. OUT: -1.00' (NW) MH #4 RIM: 6.00' INV. IN: -0.14' (S) INV. OUT: -0.24' (NW) TOPOGRAPHIC INFORMATION FOR TYBEE LIGHTHOUSE AREA SEWER - PHASE 2 - DIVISION III IS BASED UPON AVAILABLE LIDAR AND GIS DATA. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND OTHER SALIENT FEATURES PRIOR TO BEGINNING CONSTRUCTION. MANHOLE RIM AND INVERT ELEVATIONS ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL MANHOLE ELEVATIONS PRIOR TO BEGINNING CONSTRUCTION. PROPOSED 10" SEWER MAIN PROPOSED 4' I.D. MANHOLE 1. 10TH ST (NORTH SIDE) - CUT AND PLUG EXISTING SEWER LATERALS AND CONNECT TO PROPOSED 10" DIA. SEWER MAIN. 2. 10TH ST. (SOUTH SIDE) - EXTEND EXISTING SEWER LATERALS AND CONNECT TO PROPOSED 10" DIA. SEWER MAIN. 3. INSTALL 4" DIA. CLEANOUTS AT PROPERTY LINES. 4. THE DESIGN, INSTALLATION, OPERATION, AND MONITORING OF THE TEMPORARY BYPASS PUMPING SYSTEM SHALL BE THE CONTRACTOR'S RESPONSIBILITY. PROPOSED 4" DIA. CLEANOUT BI D S E T - N O T F O R C O N S T R U C T I O N 00710–6 071