Loading...
HomeMy Public PortalAboutTOL PR 2010-06-18 roadway network changes Town of Leesburg News Release For Immediate Release Contact: Calvin Grow Transportation Engineer cgrow@leesburgva.gov 703-771-2791 Mark Browning Senior Planner mbrowning@leesburgva.gov 703-771-2763 Changes to the Town’s Roadway Network Policy Map Proposed Informational meeting scheduled for June 24, 2010 to discuss Town Plan amendment Leesburg, VA (June 18, 2010) – On Thursday, June 24, 2010, at 7:00 p.m. in the Lower Level of Town Hall (25 West Market Street), Town of Leesburg officials will hold a public informational meeting to discuss several proposed changes to the Town’s Roadway Network Policy Map. A part of the Town Plan, this map outlines the ultimate configuration of the Town’s transportation infrastructure and planned improvements to the road network. The proposed changes are all located within the Route 7 (East Market Street) corridor on the east side of Leesburg, outside the bypass. The Roadway Network Policy Map was last amended in 2005, when the current Town Plan was adopted by the Council. Since then, a number of development projects have been proposed, approved or completed, changing the current and projected traffic demands in this area. These proposed changes to planned roadway improvements will be the subject of a Town Plan amendment (TLTA-2010-0001) and include: • Replacing the planned overpass of Battlefield Parkway at Russell Branch Parkway with an at-grade intersection. • Removing the planned overpass of Keystone Drive at Route 7 (East Market Street), with Keystone Drive to terminate in cul-de-sacs north and south of Route 7. TOL PR 2010-06-18 roadway network changes Page 2 • Removing the planned section of Trailview Boulevard between Keystone Drive and Battlefield Parkway. At the informational meeting on June 24, 2010, Town staff will provide details about these changes to the Roadway Network Policy Map, answer questions from the public and explain the Town Plan amendment process. # # #