HomeMy Public PortalAboutr 03:389No. -~LO3m3~t.9~ Date of Adoption~ 2003
APPROVING CHANGE ORDER # 3
FOR THE REICON GROUP,LLC FOR THE
ARTHUR KILL RECREATION FACILITY
WHEREAS, the Governing Body of the Borough of Carteret has previously awarded a
contract to the Reicon Group in the amount of $2,201,155.00for the Arthur Kill
Recreation Facility; and
WHEREAS, the Borough's Consulting Engineer for the project, T & M Associates, has
advised the Governing Body that a modification of the contract is reasonable and
necessary and has recommended that the aforesaid contract be modified in accordance
with Contract Change Order #3 (See attached); and
WHEREAS, Change Order # 3 includes a change in the description of work to reduce
and increase quantities to reflect as built conditions and to add supplemental items
required for additional work; and
WHEREAS, Change Order # 3 provides for a net increase in the contract price in the
amount of $532,345.28 resulting in a revised contract price of $2,733,500.28, including
all previously approved Change Orders; and
WHEREAS, the Borough's Consulting Engineer, T & M Associates has advised that the
above described changes and/or modifications to the project were unforeseen at the time
of the award of the original contract.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret as follows:
1. That the Contract Change Order #3 attached hereto and made a part hereof,
resulting in a net increase of $532,354.28 in the overall contract price, including
all previous Change Orders, resulting in a revised contract price of
$2,733,500.28 is hereby approved.
2. That the appropriate Borough Officials are hereby authorized to execute Change
Order//3 based upon the recommendation of the Borough Engineer.
3. That the Borough Purchasing Department is hereby authorized to issue payment
pursuant to Payment Certification No. 11 (See Attached).
4. A copy of this resolution and a fully executed copy of Change Order #3 be
forwarded to T&M Associates for distribution to Reicon Group, LLC.
Adopted this 18th day of December, 2003
And certified as a true copy of the
Original on December 19, 2003.
LINDA A. RIVERA
Assistant Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN YES NO NV A.B. COUNCILMAN YES NO NV A.B.
KRUH x RIO~ X
NAPLES X SITARZ X
PARISI X SOSNOhlSKI X
X - Indicate Vote AB - Absent NV - Not Voting XOR - Indicates Vote to Overrule Veto
cp
Adopted at a meeting of the Municipal Council
_ December 18, 2003
~ - ~ ' CLERK
rff (_ rierei
TEL (732) $41-3800
FAX (732) 541-8925
KATHLEEN M, BARNEY, RMC/CMC 6! COOKE AVENUE
MUNICIPAL CLERK CARTERET, NEW JERSEY 0?008
Date: January 13, 200~
TO: Patrick J. DeBlasio, Treasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS:
For: Roic_on Group, LLC for the Arthur Kill Recreation Facility.
Name of Account:
AMOUNT TO BE ENCUMBERED: Net increase of Contract Price in the amount of
$532,3~4.28
KATHLEEN M. BARNEY,
Municipal Clerk
].INDA A. RIVERA, Asst. Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that there are sufficient funds available in the current
budget to enable the Municipal Council to authorize the entering into a contract between the Borough of Car~eret
and:
The funds available for this contract are in the Budget, in the account of:
By this certification, I have hereby encumbered the above named accou~fo~r t~of the contract.
PATN~CK J. DeBLASIO, Treasurer
Date:
KM~/
Affidavit of Publication
~Publisher's Fee $22.00 Affidavit Charge $20.00
State of New Jersey } ss.
MIDDLESEX COUNTY
Personally appeared LINDA DIAZ
of the I-[oma News Tribune, a newspaper printed In Freehold, NJ and published tn NEPTUNE, In said
County and State, and of general circulation In said county, who being duly sworn, deposeth and salth
that the advertisement of which the annexed Is a true copy, has been published In the said newspaper
1 (ONE) times, once In each Issue, as follows
.. /~'~ Sworn and subscribed~before me this
~/ ~-~---~. / 16th day of January, A.D., 2004
BOI~J~ Of C~(ERET
NOTICE OF AWARD
OF CHANGE ORDER
on December t. 8 2003,
the F~oroa h Cou~'~i~ of
Jersey adopted a Reso-
lution authorizing a
ELEVEN TINDALL ROAD, MIDDLETOWN, NJ 07748-2792 "'r M
(732) 671-6400 * fax (732) 671 7365 * www. tandmassociates com ASSOCIATES
CART-00562 December 16, 2003
Payment Certificate No. 11
Mayor & Borough Council
Borough of Carteret
20 Cooke Avenue
Carteret, NJ 07008
Re: Arthur Kill Waterfront Recreation Facility
Dear Mayor and Borough Council:
This is to certify that Reicon Group, LLC, 1983 Richmond Terrace, Staten Island, NY 10302, Contractor
for the above referenced project, has completed the work shown on the attached Payment Certificate
No. 11 for work completed through November 12, 2003 and is entitled to payment for same.
The costs detailed on Payment Certificate No. 11 are summarized below:
TOTAL AMOUNT OF WORK COMPLETED TO DATE $2,733,500.28
LESS ONE-HALF PERCENT (0.5%) RETAINAGE $13,667.50
SUBTOTAL $2,719,832.78
LESS PREVIOUS PAYMENTS $2,537,188.11
TOTAL AMOUNT DUE THIS CERTIFICATE NO. 11 $182,644.67
ESTIMATED BY: AP~~
?~_~~LCROSS DONALD a. NORBUT, P.E.
CONSTRUCTION SERVICES DIVISION CARTERET BOROUGH ENGINEER
CERTIFICATION OF CONTRACTOR:
I hereby certify that all items, units, quantities and prices o£work and material shown on the attached progress estimate are correct;
that all work has been performed and materials supplied and completely paid for in full accordance with the terms o£the contract
documents involved; that the £oregoing is a true and correct statement of the contract account up to and including the last day o£
the period covered by this estimate; and that no part &the "Amount Due This Certificate" has been received:
Reicon Group~, LLC TITLE DATE
DJN:SJS:ps
Attachment as Noted
cc: Patrick DeBlasio, Chief Financial Officer
Kathleen M. Barney, Borough Clerk
ENGIi~ *Gr~NIr~s * LANDSCAPE ARCHITECTS* ENVIRONMENTAL SCIENTISTS* SURVEYORS
CIVIL * ELECTRICAL * ENVIRONMENTAL * MECHANICAL * MUNICIPAL * SITE * STRUCTURAL * TRAFFIC * TRANSPORTATION
REGIONAL OFFICE IN TOMS RIVER
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00562
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 3
DATE: IDecember 16, 2003
PROJECT: IArthur Kill Waterfront Recreation Facility
OWNER: IB°r°ugh of Carteret
CONTRACTOR: IReicon Group, LLC
DESCRIPTION OF CHANGE:
~EDUCTIONS:
Steel Piles Rem 6-B reduced to reflect as-built quantity
Pavement Items 10-B and ll-B deleted and moved to Phase C Redesign Subcontract Lump Sum pay items
Topsoil and Seed: Item 13-B reduced to reflect redesign (and as-built) quantity
Plantings: Item 14-B deleted from scope of work
Site Allowance Item 25-B allocated to various Phase C Redesign items
Item 8-B Balance of Geocomposite Dralnage Layer added ii,to Phase B - Post Shutdown Base Contract
Time and Material Items TM-1 through TM-9 added to Phase C per redesign
Unit Price Rems UP-I through UP-6 added to Phase C per redesign
Lump Sum/Subcontract Items LS-I through LS-3 added to Phase C per redesign
~I/PPLEMENTARY:
Items S-13 and S-14 added to Phase B Post Shutdown Base Contract for electrical power feed supply
Item S-15 added to Phase B Post Shutdown Base Contract for US Coast Guard-required signage
Items S-16 through 22 added to Phase C Redesign to reflect increase in scope due to added work
Item S-23 added to Phase C Redesign to reflect granted extension of time
Items S-24 and S-25 added to Phase C Redesign for charter boat docking capability
Items 26a and 26b added to Phase C Redesign to reflect substitution of sod for seed and mulch
Item 27 added to Phase C Redesign for additional pedestrian wooden fencing.
APPROV~ E OMMEND SEE ATTACHED DETA1L ADDITIONAL REDUCTION
~g ~ A. TOTAL REDUCTIONS
DONALD J. NOHBUT, P.E. THIS C.O. XXXXXJCv~xxxx $117,964.54
A C C E ~..~)//~/~~ TOTAL EXTRAS
THIS C.O. $360,127.45 XXXXXXXXXXX
CONTRACTOR: ~ . TOTAL
Reicon Group, LLC SUPPLEMENTARY
THIS C.O. $140,182.37 XXXXXXXXXXX
WNER'S APPROVALS:
$1
17,964.54
~,~ ~r CHANGE ORDER $382,345.28
PREVIOUS CHANGE
ORDERS $486,539.00 $336,539.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $986,848.82 $454,503.54
Specifications. NET CHANGE IN
CONTRACT $532,345.28
ORIGINAL CONTRACT BID PRICE I $2,201,155.00
CHANGE ORDERS TO DATE [ $532,345.201
REVISED CONTRACT PRICE [ $2,733,500.28
CHANGE ORDER NO. 3 SHEET NO. 2 OF 2
PROJECT NO. CART-00562
PROJECT: [Arthur Kill Waterfront Recreation Facility
OWNER: [Borough of Carteret
CONTRACTOR: [Reicon Group, LLC
ITEM UNIT
NO. DESCRIPTION QUANTITY PRICE AMOUNT
6-B teel Piles 140.00 LF 40.00 $5,600.00
10-B 4,ggregate Base Course 30.00 CY $100.00 $3,000.00
R 11-B Asphalt Pavement Mix 5.00 CY $500.00 $2,500.00
E 13-B ropsofi and Seeding 1,056.00 SY $3.00 $3,168.00
D 14-B Planting L00 LS $30,000.00 $30,000.00
U 25-B Site Work Allowance 1.00 LS $73,696.54 $73,696.54
C
T
O
A. TOTAL REDUCTIONS $117,964.54]
e Layer 14,040.00 SF $1.00 $14,040.00
Site Clearing & Trailers/Facilities/Dumpsters 1.00 UNIT $5,302.6( $5,302.60
Removal of Concrete Sidewalk 1.00 UNIT $1,181.0( $1,181.00
1.00 UNIT $21,030.01 $21,030.00
' Piles 1.00 UNIT $24,880.01 $24,880.00
Site Contractor Equip. Remob 1.00 UNIT $5,500.01 $5,500.00
Ped. Bridge Timber Framing (.lncl Wooden Railing) (2) 1.00 UNIT $48~931.8! $48,931.85
Ped Bridge Synthetic Lumber Decking 1.00 UNIT $12,287.00 $12,287.00
Repair & Addit Pier X-Bracing w/Bolt Stiffeners in 10 Bays 1.00 UNIT $36,942.00 $36,942.00
12" RCCP Flared End Section/St Grate 1.00 UNIT $1,180.00 $1,180.00
Excavation (Rip Rap & Timber) 1,402.00 CY $31.00 $43,462.00
Backfill - Granular Material (50' & Cap Areas) 870.00 CY $30.00 $26,100.00
Backfill - Site Material 180.00 CY $21.00 $3,780.00
All Rip Rap Stone Protection at Pier 1,144.00 TON $49.50 $56,628.00
Bollards 3.00 EA $800.00 $2,400.00
Vehicular Signs 4.00 EA $450.00 $1,800.00
Wooden Pedestrian Fencing (415 Io 1.00 LS $13,915.00 $13,915.00
AB Mod Wall, Complete (740 si) & Ped Br. Fdn (2) 1.00 LS $28,008.00 $28,008.00
4"/6" DGA & 2" Th 1-5 HMA Pavement (450 sy) 1.00 LS [ $12,760.00 $12,760.00
B. TOTAL EXTRA [ $360,127.45]
S-13 Electrical Power Feed 1.00 LS $2,550.00 $2,550.00
S-14 Excavate/Backfill for Electrical Buried Conduit 1.00 UNIT $630.40 $630.40
S-15 USCG Signage 6.00 EA $450.00 $2,700.00
S S-16 Bolting/Sleeving Stiffeners in 41 Bays 1.00 UNIT $24,203.00 $24,203.00
U S-17 Addit Horiz Stiffnrs w/Bolts in 31 Orig Bays (RF1017) 1.00 UNIT $18,965.0¢ $18,965.00
P S-18 Additional Rip Rap North End 245.00 TON $49.50 $12,127.50
P S-19 Additional Rip Rap South End 60.00 TON $49.50 $2,970.00
L S-20 Boat Ramp Repair 1.00 UNIT $7,180.0¢ $7,180.00
E S-21 Additional Sheathing at Timber Wall & Pier 1.00 UNIT $4,223.0¢ $4,223.00
M S-22 Floating Dock Extension 1.00 LS $3,820.0C $3,820.00
E S-23 Schedule Extension 177 Cal. Days 1.00 LS $0.00 $0.00
N S-24 Mooring Dolphins Design 1.00 LS $1,000.0G $1,000.00
T S-25 Crane Remob & Mooring Dolphins Installation 1.00 LS $48,800.0~ $48,800.00
A S-26a Sod 3,222.00 SY $3.47 $11,164.23
R S-26b Credit for Seed & Mulch Not Used 3,222.00 SY -$0.3~ ($1,224.36]
Y S-27 Additional Wooden Fencing (32 Il) 1.00 LS $1,073.6~ $1,073.60
C. TOTAL SUPPLEMENTARY [ $140,182.37]
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00562
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 3
DATE: [December 16, 2003 ]
PROJECT: IArthur Kill Waterfront Recreation Facility ]
OWNER: [Borough of Carteret ]
CONTRACTOR: [Reicon Group, LLC ]
DESCRIPTION OF CHANGE:
REDUCTIONS:
Steel Piles Item 6-B reduced to reflect as-buill quantity
Pavement Items 10-B and II-B deleted and moved to Phase C Redesign Subcontract Lump Sum pay items
Topsoil and Seed: Item 13-B reduced to reflect redesign (and as-built) quantity
Plantings: Item 14-B deleted from scope of work
Site Allowance Item 25-B allocated to various Phase C Redesign items
EXTRA:
Item 8-11 Balance of Geocomposite Drainage Layer added into Phase B - Pnst Shutdown 1iasc Contract
Time and Material Items TM-I through TM-9 added to Phase C per redesign
Unit Price Items UP-1 through UP-6 added to Phase C per redesign
Lump Sum/Subcontract Items LS-I through LS-3 added to Phase C per redesign
SUPPLEMENTARY:
Items S-13 and S-14 added to Phase B Post Shutdown Base Contract for electrical power feed supply
Item S-15 added to Phase B Post Shutdown Base Contract for US Coast Guard-required signage
Items S-16 through 22 added to Phase C Redesign to reflect increase in scope due to added work
Item S-23 added to Phase C Redesign to reflect granted extension of time
Items S-24 and S-25 added to Phase C Redesign for charter boat docking capability
Items 26a and 26b added to Phase C Redesign to reflect substitution of sod for seed and mulch
Item 27 added to Phase C Redesign for additional pedestrian wooden fencing.
APP~OMMEN~: . SEE ATTACHED DETAIL ADDITIONAL REDUCTION
A. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E. THIS C.O. XXXXXXXXXXX $117,964.54
ACCEPTED: B. TOTAL EXTRAS
CONTRACTOR: I~ C. TOTAL
Reicou Group, LLC SUPPLEMENTARY
TtllS C.O. $140,182.37 YOLXXXXJCXXXX
OWNER'S ~PPROVALS:
PREVIOUS CHANGE
ORDERS $486,539.00 $336,539.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $986,848.82 $454,503.54
Specifications. NET CHANGE IN
CONTRACT $532,345.28
ORIGINAL CONTRACT BID PRICE [ $2,201,155.00 ]
CHANGE ORDERS TO DATE [ $532,345.28]
REVISED CONTRACT,niCE [ $Z,733,S00.28 ]
CHANGE ORDER NO. 3 SHEET NO. 2 OF 2
PROJECT NO. CART-00562
PROJECT: [Arthur Kill Waterfront Recreation Facility
OWNER: I Borough of CarteretI
CONTRACTOR: IReieon Group, LLC I
ITEM UNIT
NO. DESCRIPTION QUANTITY PRICE AMOUNT
6-B Steel Piles 140.00 LF 40.00 $5,600.00
10-B Aggregate Base Course 30.00 CY $100.00 $3,000.00
R 11-B Asphalt Pavement Mix 5.00 CY $500.00 $2,500.00
E 13-B Topsoil and Seeding 1,056.00 SY $3.00 $3,168.00
D 14-B Planting 1.00 LS $30,000.00 $30,000.00
U 25-B Site Work Allowance 1.00 LS $73,696.54 $73,696.54
C
T
O
N
A. TOTAL REDUCTIONS [ $117,964.54 J
Geocomposite Drainage Layer 14,040.00 SF $1.00 $14,040.00
Site Clearing & Trailers/Facilities/Dumpsters 1.00 UNIT $5,302.60 $5,302.60
Removal of Concrete Sidewalk 1.00 UNIT $1,181.00 $1,181.00
Crane Mobilization and Demobilization 1.00 UNIT $21,030.00 $21,030.00
l'imber Piles 1.00 UN1T $24,880.00 $24,880.00
~ite Contractor Equip. Remob 1.00 UNIT $5,500.00 $5,500.00
Ped. Bridge Timber Framing (Incl Wooden Railing) (2) 1.00 UNIT $48,931.85 $48,931.85
Ped Bridge Synthetic Lumber Decking 1.00 UNIT $12,287.00 $12,287.00
g w/Bolt Stiffeners in 10 Bays 1.00 UNIT $36,942.00 $36,942.00
12" RCCP Flared End Section/St Grate 1.00 UNIT $1,180.00 $1,180.00
Excavation (Rip Rap & Timber) 1,402.00 CY $31.00 $43,462.00
Backfill - Granular Material (50 & Cap Areas) 870.00 CY $30.00 $26,100.00
Backfill - Site Material 180.00 CY $21.00 $3,780.00
All Rip Rap Stone Protection at Pier 1,144.00 TON $49.50 $56,628.00
Bollards 3.00 EA $800.00 $2,400.00
Vehicular Signs 4.00 EA $450.00 $1,800.00
Wooden Pedestrian Fencing (415 l0 1.00 LS $13,915.00 $13,915.00
AB Mod Wall, Complete (740 st) & Ped Br. Fdn (2} 1.00 LS $28,008.00 $28,008.00
4"/6" DGA & 2 Th I-5 HMA Pavement (450 sy) 1.00 LS $12,760.00 $12,760.00
B. TOTAL EXTRA [ $360,127.45]
S-13 Electrical Power Feed 1.00 LS $2,550.00 $2,550.00
S-14 Excavate/Backfill for Electrical Buried Conduit 1.00 UNIT $630.40 $630.40
S~15 USCG Signage 6.00 EA $450.00 $2,700.00
S S-16 Bolting/Sleeving Stiffeners in 41 Bays 1.00 UNIT $24,203.00 $24,203.00
iui S-17 [ndditHorizStiffnrsw/Boltsln31OrlgBays(RFl017) 1.00UNIT $18,965.00 $18,965.00
P S-18 Additional Rip Rap North End 245.00 TON $49.50 $12,127.50
P S-I 9 Additional Rip Rap South End 60.00 TON $49.50 $2,970.00
L S-20 Boat Ramp Repair 1.00 UNIT $7,180.00 $7,180.00
E S-21 Additional Sheathing at Timber Wall & Pier 1.00 UNIT $4,223.00 $4,223.00
M S-22 Floating Dock Extension 1.00 LS $3,820.00 $3,820.00
E S-23 Schedule Extension 177 Cal. Days 1.00 LS $0.00 $0.00
N S-24 Mooring Dolphins Design 1.00 LS $1,000.00 $1,000.00
T S-25 Crane Remab & Mooring Dolphins Installation 1.00 LS $48,800.00 $48,800.00
A S-26a Sod 3,222.00 SY $3.47 $11,164.23
R S-26b Credit for Seed & Mulch Not Used 3,222.00 SY -$0.38 ($1,224.36)
Y S-27 Additional Wooden Fencing (32 Io 1.00 LS $1,073.60 $1,073.60
C. TOTAL SUPPLEMENTARY L $140,182.37 I
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00562
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 3
DATE: Ioecember 16, 2003 ]
PROJECT: [Arthur I~fi Waterfront Recreation Facility ]
OWNER: [Borough of Carteret ]
CONTRACTOR: [Reicon Group, LLC I
DESCRIPTION OF CHANGE:
REDUCTIONS:
Steel Piles Item 6-B reduced to reflect as-built quantity
Pavement Items 10-B and 11-B deleted and moved to Phase C Redesign Subcontract Lump Sum pay items
Topsoil and Seed: Item 13-B reduced to reflect redesign (and as-built) quantity
Plantings: Item 14-B deleted from scope of work
Site Allowance ltem 25-B allocated to various Phase C Redesign items
EXTRA:
Rem 8-B Balance of Geocomposite Drainage Layer added into Phase B - Post Shutdown Base Contract
Time and Material Items TM-1 through TM-9 added to Phase C per redesign
Unit Price Items UP-I through UP-6 added to Phase C per redesign
Lump Sum/Subcontract Items LS-I through LS-3 added to Phase C per redesign
SUPPLEMENTARY:
Items S-13 and S-14 added to Phase B Post Shutdown Base Contract for electrical power feed supply
Item S-15 added to Phase B Post Shutdown Base Contract for US Coast Guard-required signage
Items S-16 through 22 added to Phase C Redesign to reflect increase in scope due to added work
ltem S-23 added to Phase C Redesign to reflect granted extension of time
Items S-24 and S-25 added to Phase C Redesign for charter boat docking capability
Items 26a and 26b added to Phase C Redesign to reflect substitution of sod for seed and mulch
ltem 27 added to Phase C Redesign for additional pedestrian wooden fencing.
APP~L~ SEE ATTACHED DETAIL ADDITIONAL REDUCTION
A. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E. THIS C.O. XXXXXXXXXXX $117,964.54
ACCEPTED: B. TOTAL EXTRAS
CONT6ACTOR: C/' C. TOTAL
Rei¢on Group, LLC SUPPLEMENTARY
~. TOTALS THIS C.O. $500,309.82 $117,964.54
NET CHANGE THIS
CHANGE ORDER $382,345.28
PREVIOUS CHANGE
ORDERS $486,539.00 $336,539.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $986,848.82 $454,503.54
Specifications. NET CHANGE IN
CONTRACT $532,345.28
ORIGINAL CONTRACT BID PRICE [ $2,201,155.00]
CHANGE ORDERS TO DATE [ $532,345.28]
REVISED CONTRACT PRICE [ $2,733,500.281
CHANGE ORDER NO. 3 SHEET NO. 2 OF 2
PROJECT NO. CART-00562
PROJECT: [Arthur Kill Waterfront Recreation Facility
OWNER: IB°r°ugh of Carteret
CONTRACTOR: [Reicon Group, LLC
ITEM UNIT
NO. DESCRIPTION QUANTITY PRICE AMOUNT
6-B Steel Piles 140.00 LF 40.00 $5,600.00
10-B Aggregate Base Course 30.00 CY $100.00 $3,000.00
R 11-B Asphalt Pavement Mix 5.00 CY $500.00 $2,500.00
E 13-B Topsoil and Seeding 1,056.00 SY $3.00 $3,168.00
D 14-B Planting 1.00 LS $30,000.00 $30,000.00
U 25-B Site Work Allowance 1.00 LS $73,696.54 $73,696.54
C
T
1
O
N
A. TOTAL REDUCTIONS ] $117,964.54 J
Geocomposite Drainage Layer 14,040.00 SF $1.00 $14,040.00
Site Clearing & Trailers/Facilities/Dumpsters 1.00 UNIT $5,302.6~ $5,302.60
Removal of Concrete Sidewalk 1.00 UNIT $1,181.0~ $1,181.00
Erane Mobilization and Demobilization 1.00 UNIT $21,030.0~ $21,030.00
Fimber Piles 1.00 UNIT $24,880.0~ $24,880.00
Site Contractor Equip. Remob 1.00 UNIT $5,500.0~ $5,500.00
Ped. Bridge Timber Framing (lncl Wooden Railing) (2) 1.00 UNIT $48,931.85 $48,931.85
Ded Bridge Synthetic Lumber Decking 1.00 UNIT $12,287.00 $12,287.00
Repair & Addit Pier X-Bracing w/Bolt Stiffeners in 10 Bays 1.00 UNIT $36,942.00 $36,942.00
12" RCCP Flared End Section/St Grate 1.00 UNIT $1,180.00 $1,180.00
Excavation (Rip Rap & Timber) 1,402.00 CY $31.00 $43,462.00
Backfill - Granular Material (50' & Cap Areas) 870.00 CY $30.00 $26,100.00
Backfill - Site Material 180.00 CY $21.00 $3,780.00
~ Stone Protection at Pier 1,144.00 TON $49.50 $56,628.00
Bollards 3.00 EA $800.00 $2,400.00
Vehicular Signs 4.00 EA $450.00 $1,800.00
Wooden Pedestrian Fencing (415 If) 1.00 LS $13,915.00 $13,915.00
AB Mod Wall, Complete (740 sO & Ped Br. Fda (2) 1.00 LS $28,008.00 $28,008.00
4"/6" DGA & 2" Th 1-5 HMA Pavement (450 sy) 1.00 LS $12,760.00 $12,760.00
B. TOTAL EXTRA I $360,127.45 [
S-13 Electrical Power Feed 1.00 LS $2,550.0l $2,550.00
S-14 Excavate/Backfill for Electrical Buried Conduit 1.00 UNIT $630.4{ $630.40
S-15 USCG Signage 6.00 EA $450.0( $2,700.00
S S-I 6 Bolting/Sleeving Stiffeners in 41 Bays 1.00 UNIT $24,203.0{ $24,203.00
U S-17 Addit Horiz Stiffnrs w/Bolts in 31 Orig Bays (RFI 017) 1.00 UNIT $18,965.0( $18,965.00
P S-18 Additional Rip Rap North End 245.00 TON $49.5~ $12,127.50
P S-19 Additional Rip Rap South End 60.00 TON $49.5~ $2,970.00
L S-20 Boat Ramp Repair 1.00 UNIT $7,180.0~ $7,180.00
E S-21 Additional Sheathing at Timber Wall & Pier 1.00 UNIT $4,223.0~ $4,223.00
M S-22 Floating Dock Extension 1.00 LS $3,820.0G $3,820.00
E S-23 Schedule Extension 177 Cal. Days 1.00 LS $0.00 $0.00
N S-24 Mooring Dolphins Design 1.00 LS $1,000.0~ $1,000.00
T S-25 Erane Remob & Mooring Dolphins Installation 1.00 LS $48,800.0~ $48,800.00
A S-26a Sod 3,222.00 SY $3.47 $11,164.23
R S-26b Eredit for Seed & Mulch Not Used 3,222.00 SY -$0.38 ($1,224.36)
Y S-27 a, dditional Wooden Fencing (32 l0 1.00 LS $1,073.60 $1,073.60
C. TOTAL SUPPLEMENTARY [ $140,182.37 ]
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00562
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 3
DATE: Ioecember 16, 2003 I
PROJECT: IArthur Kill Waterfront Recreation Facility I
OWNER: IBorough of CartereI I
CONTRACTOR: IReicon Group, LLC ]
DESCRIPTION OF CHANGE:
REDUCTIONS:
Steel Piles Dem 6-B reduced to reflect as-built quantity
Pavement Items 10-B and I 1-B deleted and moved to Phase C Redesign Subcontract Lump Sum pay items
Topsoil and Seed: Item 13-B reduced to reflect redesign (and as-built) quantity
Plantings: Item 14-B deleted from scope of work
Site Allowance Item 25-B allocated to various Phase C Redesign items
EXTRA:
Item 8-B Balance of Geocomposite Drainage Layer added into Phase B - Post Shutdown Base Contracl
Time and Material items TM-1 through TM-9 added to Phase C per redesign
Unit Price Items UP-I through UP-6 added to Phase C per redesign
Lump Sum/Subcontract Items LS-I through LS-3 added to Phase C per redesign
SUPPLEMENTARY:
Items S-13 and S-14 added to Phase B Post Shutdown Base Contract for electrical power feed supply
ltem S-15 added to Phase B Post Shutdown Base Contract for US Coast Guard-required signage
Items S-16 through 22 added to Phase C Redesign to reflect increase in scope due to added work
Item S-23 added to Phase C Redesign to reflect granted extension of time
Items S-24 and S-25 added to Phase C Redesign for charter boat docking capability
Items 26a and 26b added to Phase C Redesign to reflect substitution of sod for seed and mulch
Item 27 added to Phase C Redesign for additional pedestrian wooden feneing.
APPR~ }~COMMEN~: . ~EE ATTACHED DETAIL ADDITIONAL REDUCTION
a,. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E. THIS C.O. XXXXXXXXXXX $117,964.54
~ ~//~J.. ~~. THIS C.O. $360,127.45 Y~X~G~XXXXXXX
CO C. TOTAL
Reicon Group, LLC SUPPLEMENTARY
THIS C.O. $140,182.37 Y~GXXXXXXXXX
OWN ER'S~...APPROV
NET CHANGE THIS
~ CHANGE ORDER $382,345.28
PREVIOUS CHANGE
ORDERS $486,539.00 $336,539.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $986,848.82 $454,503.54
Specifications. NET CHANGE IN
CONTRACT $532,345.28
ORIGINAL CONTRACT BID PRICE I $2,201,155.00
CHANGE ORDERS TO DATE I $532,345-2gl
REVISED CONTRACT PR1CE I $2,733,500.28
CHANGE ORDER NO. 3 SHEET NO. 2 OF 2
PROJECT NO. CART-00562
PROJECT: IArthur Kill Waterfront Recreation Facility ]
OWNER: IBorough of Carteret ]
CONTRACTOR: IReicon Group, LLC ]
ITEM UNIT
NO. DESCRIPTION QUANTITY PRICE AMOUNT
6-B Steel Piles 140.00 LF 40.00 $5,600.00
10-B ~,ggregate Base Course 30.00 CY $100.00 $3,000.00
R ll-B .Asphalt Pavement Mix 5.00 CY $500.00 $2,500.00
E 13-B Topsoiland Seeding 1,056.00 SY $3.00 $3,168.00
D 14-B Planting 1.00 LS $30,000.00 $30,000.00
U 25-B Site WorkAllowance 1.00 LS $73,696.54 $73,696.54
C
T
1
O
A. TOTAL REDUCTIONS I $117,964.54 I
Geo¢omposite Drainage Layer 14,040.00 SF $1.00 $14,040.00
Site Clearing & Trailers/Facilities/Dumpsters 1.00 UNIT $5,302.60 $5,302.60
Removal of Concrete Sidewalk 1.00 UNIT $1,181.01 $1,181.00
Crane Mobilization and Demobilization 1.00 UNIT $21,030.01 $21,030.00
Timber Piles 1.00 UNIT $24,880.01 $24,880.00
Site Contractor Equip. Remob 1.00 UNIT $5,500.01 $5,500.00
Ped. Bridge Timber Framing (lncl Wooden Railing) (2) 1.00 UNIT $48,931.8.~ $48,931.85
Ped Bridge Synthetic Lumber Decking 1.00 UNIT $12,287.01 $12,287.00
Repair & Addit Pier X-Bracing w/Bolt Stiffeners in 10 Bays 1.00 UN1T $36,942.01 $36,942.00
12 RCCP Flared End Seetion/ St Grate 1.00 UNIT $1,180.0( $1,180.00
Excavation (Rip Rap & Timber) 1,402.00 CY $31.0( $43,462.00
Backfill - Granular Material (50 & Cap Areas) 870.00 CY $30.0{ $26,100.00
Backfill - Site Material 180.00 CY $21.01 $3,780.00
All Rip Rap Stone Protection at Pier 1,144.00 TON $49.5{ $56,628.00
Bo0ards 3.00 EA $800.0{ $2,400.00
Vehicular Signs 4.00 EA $450.0{ $1,800.00
Wooden Pedestrian Fencing (415 l0 1.00 LS $13,915.0( $13,915.00
AB Mod Wall, Complete (740 so & Ped Br. Fda (2) 1.00 LS $28,008.0( $28,008.00
4"/6" DGA & 2" Th 1-5 HMA Pavement (450 sy) 1.00 LS $12,760.0( $12,760.00
B. TOTAL EXTRA [ $360,127.45]
S-13 Electrical Power Feed 1.00 LS $2,550.0¢ $2,550.00
S-14 Excavate/Backfill for Electrical Buried Conduit 1.00 UNIT $630.4~ $630.40
S-15 USCG Signage 6.00 EA $450.0~ $2,700.00
S S-16 Bolting/Sleeving Stiffeners in 41 Bays 1.00 UNIT $24,203.0{ $24,203.00
iui S-17 IndditHorizStiffnrsw/Bol(sin31OrlgBays(RFl017) 1.00UNIT $1S,965.01 $18,965.00
P S-18 Additional Rip Rap North End 245.00 TON $49.5fl $12,127.50
P S-19 Additional Rip Rap South End 60.00 TON $49.5fl $2,970.00
L S-20 Boat Ramp Repair 1.00 UNIT $7,180.0~ $7,180.00
E S-21 Additional Sheathing at Timber Wall & Pier 1.00 UNIT $4,223.05 $4,223.00
M S-22 Floating Dock Extension 1.00 LS $3,820.0~ $3,820.00
E S-23 Schedule Extension 177 Cal. Days 1.00 LS $0.00 $0.00
N S-24 Mooring Dolphins Design 1.00 LS $1,000.00 $1,000.00
lTl S-25 /Cranegemob&MooringDo,llhinslnsta0ation 1.00LS $48,800.0~1 $48,800.00
//IA S-26a Sod 3,222.00 SY $3.47 $11,164.23
R S-26b Credit for Seed & Mulch Not Used 3,222.00 SY -$0.38 ($1,224.36}
Y S-27 Additional Wooden Fencing (32 l0 1.00 LS $1,073.60 $1,073.60
C. TOTAL SUPPLEMENTARY [ $140,182.37 ]
T&M ASSOCIATES SHEET NO. 1 OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CARTb00562
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 3
DATE: IDecember 16, 2003
PROJECT: ]Arthur Kill Waterfront Recreation Facility I
OWNER: IBorough of Carleret
CONTRACTOR: IReicon Group, LLC ]
DESCRIPTION OF CHANGE:
REDUCTIONS:
Steel Piles Item 6-B reduced to reflect as-built quantity
Pavement Items 10-B and 11-B deleted and moved to Phase C Redesign Subcontract Lump Sum pay items
Topsoil and Seed: Item 13-B reduced to reflect redesign (and as-built) quantity
Plantings: Item 14-B deleted from scope of work
Site Allowance Item 25-B allocated to various Phase C Redesign items
EXTRA:
Item 8-B Balance of Geocomposite Drainage Layer added into Phase B - Post Shutdown Base Contract
Time and Material Items TM-I through TM-9 added to Phase C per redesign
Unit Price Items UP-I through UP-6 added to Phase C per redesign
Lump Sum/Subcontract Items LS-I through LS-3 added to Phase C per redesign
SUPPLEMENTARY:
Items S-13 and S-14 added to Phase B Post Shutdown Base Contract for electrical power feed supply
Item S-15 added to Phase B Post Shutdown Base Contract for US Coast Guard-required signage
Items S-16 through 22 added to Phase C Redesign to reflect increase in scope due to added work
Item S-23 added to Phase C Redesign to reflect granted extension of time
Items S-24 and S-25 added to Phase C Redesign for charter boat docking capability
Items 264 and 26b added to Phase C Redesign to reflect substitution of sod for seed and mulch
Item 27 added to Phase C Redesign for additional pedestrian wooden fencing.
APP RECOMME D: SEE ATTACHED DETAIL ADDITIONAL REDUCTION
~~ A. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E. THIS C.O. XXXXXXXXXXX $117,964.54
ACCEPTED: TOTAL EXTRAS
CONTRACT TOTAL
Reicon Group, LLC SUPPLEMENTARY
Tills C.O. $140,182.37 XXXXXXXXXXX
OWNER'SIO~VA~JAPPROVA
~' ' ~ /~~'-~--NETTOTALScHANGETHIS THIsC'O' $500,309.82 $117,964.54
CHANGE ORDER $382,345.28
PREVIOUS CHANGE
ORDERS $486,539.00 $336,539.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $986,848.82 $454,503.54
Specifications. NET CHANGE IN
CONTRACT $532,345.28
ORIGINAL CONTRACT BID PRICE [ $2,201,155.00I
CHANGE ORDERS TO DATE I $532,345.28J
REVISED CONTRACT PRICE [ $2,733,500.28J
CHANGE ORDER NO. 3 SHEET NO. 2 OF 2
PROJECT NO. CART-00562
PROJECT: IArthur Kill Waterfront Recreation Facility ]
OWNER: IBorough of Carteret ]
CONTRACTOR: IRelcnn Group, LLC ]
ITEM UNIT
NO. DESCRIPTION QUANTITY pRICE AMOUNT
6-B Steel Piles 140.00 LF 40.00 $5,600.00
10-B Aggregate Base Course 30.00 CY $100.00 $3,000.00
R lI-B Asphalt Pavement Mix 5.00 CY $500.00 $2,500.00
E 13-B l'opsoiland Seeding 1,056.00 SY $3.00 $3,168.00
D 14-B Planting 1.00 LS $30,000.00 $30,000.00
U 25-B Site Work Allowance 1.00 LS $73,696.54 $73,696.54
C
T
l
O
N
A. TOTAL ilEDUCTIONS [ $117,964.54]
Geoco~nposite Drainage Layer 14,040.00 SF $1.00 $14,040.00
Site Clearing & TraBers/Facilities/Dumpsters 1.00 UNIT $5,302.6~ $$,302.60
Removal of Concrete Sidewalk 1.00 UNIT $1,181.0~ $1,181.00
Crane Mobilization and Demobilization 1.00 UNIT $21,030.0~ $21,030.00
fimber Piles 1.00 UNIT $24,880.0~ $24,880.00
Site Contractor Equip. Remob 1.00 UNIT $5,500.00 $5,500.00
Ped. Bridge Timber Framing (Incl Wooden Railing) (2} 1.00 UNIT $48,931.85 $48,931.85
Ped Bridge Synthetic Lumber Decking 1.00 UNIT $12,287.00 $12,287.00
Repair & Addit Pier X-Bracing w/Bolt Stiffeners in 10 Bays 1.00 UNIT $36,942.00 $36,942.00
i2" RCCP Flared End Section/St Grate 1.00 UNIT $1,180.00 $1,180.00
Excavation (Rip Rap & Timber) 1,402.00 CY $31.00 $43,462.00
Backfill - Granular Material (50' & Cap Areas) 870.00 CY $30.00 $26,100.00
Backfill - Site Material 180.00 CY $21.00 $3,780.00
MI Rip Rap Stone Protection at Pier 1,144.00 TON $49.50 $56,628.00
Bollards 3.00 EA $800.00 $2,400.00
Vehicular Signs 4.00 EA $450.00 $1,800.00
Wooden Pedestrian Fencing (415 If) 1.00 LS $13,915.00 $13,915.00
AB Mod Wall, Complete (740 si) & Ped Br. Fda (2) 1.00 LS $28,008.00 $28,008.00
4"/6" DGA & 2" Th 1-5 HMA Pavement (450 sy} 1.00 LS $12,760.00 $12,760.00
B. TOTAL EXTRA [ $360,127.45 ]
S-13 Electrical Power Feed 1.00 LS $2,550.00 $2,550.00
S-14 ExcavateJBackfill for Electrical Buried Conduit 1.00 UNIT $630.40 $630.40
S-15 USCG Signage 6.00 EA $450.00 $2,700.00
S S-16 Bolting/Sleeving Stiffeners in 41 Bays 1.00 UNIT $24,203.00 $24,203.00
] u I S-17 IAddit Horiz Stiffnrs w/Bolts in 31 Orig Bays (RFI 017) 1.00 UNIT $18,965.00 $18,965.00
P S-I 9 Additional Rip Rap South End 60.00 TON $49.51 $2,970.00
L S-20 Boat Ramp Repair 1.00 UNIT $7,180.0( $7,180.00
E S-21 Additional Sheathing at Timber Wall & Pier 1.00 UNIT $4,223.01 $4,223.00
M S-22 Floating Dock Extension 1.00 LS $3,820.0( $3,820.00
E S-23 Schedule Extension 177 Cal. Days 1.00 LS $0.0£ $0.00
N S-24 Mooring Dolphins Design 1.00 LS $1,000.0( $1,000.00
T / S-25 /Crane Remob & Mooring Dolphins Installation 1.00 LS $48,800.0( $48,800.00
A/ /S'264 Sod 3,222.00 SY $3.47 $11,164.23
R S-26b Credit for Seed & Mulch Not Used 3,222.00 SY -$0.38 ($1,224.361
Y S-27 Additional Wooden Fencing (32 l0 1.00 LS $1,073.6£ $1,073.60
C. TOTAL SUPPLEMENTARY l $140,182.37]