Loading...
HomeMy Public PortalAboutExhibit MSD 18U Current Status of 2008 Rate Proceeding CIRP ProjectQ12 - 2nd Discovery Request Exhibit MSD 18U CURRENT STATUS OF 2008 RATE PROCEEDING CIRP PROJECTS NOT COMPLETED. 1D_N PROD NU PROD NAME 7222 2002044B 7263 2005112A 7106 89155A 3501 89157A 6606 2003078 7424 2005129 7223 2003085 BISSELL POINT WWTP BELT FILTER PRESS IMPROVEMENTS PHASE I I I (INSTALLATION) CSO - PAGE AVE. OUTFALL L-167. 1-296 SEPARATION PHASE II (DESIGN) FF-13 WALTZ RD./MCKELVEY SANITARY RELIEF PHASE 11 FF-15 MCKELVEY/R.R. TO ADZE SANITARY RELIEF - PHASE 1 & 11 LEMAY PUMP STATION NO. 3 AND FORCE MAIN IMPROVEMENTS LOWER MERAMEC RIVER WWTP SECURITY SYSTEM RADAR RAINFALL DATA 7842 89151A UR-02 RIVER DES PERES SANITARY RELIEF - PRIVATE STORM WATER DISCONNECTS 7840 90084D UR-03 RIVER DES PERES SANITARY RELIEF PHASE II - INFLOW REDUCTION 7839 90084C1 UR-03 RIVER DES PERES SANITARY RELIEF PHASE II - PRIVATE STORM WATER DISCONNECTS (PACKAGE 1) 6820 90033 ALERT & HH-02 AND HH-03 OLIVE TO PAGE SANITARY RELIEF (SKME-597) (DESIGN) 6914 2006113 AUTUMN VIEW SANITARY RELIEF (SKME-010) 8058 2008080 BISSELL WWTP INCINERATOR SCRUBBER MODIFICATIONS 6821 2007050 BLACK CREEK TRUNK SEWER RELIEF (SKME-567) (DESIGN) 6907 2006034 CAULKS CREEK TRUNK SEWER (SKME-011) (DESIGN) 7901 2006166 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - SUPPORT SERVICES (SUPPLEMENTAL APPROPRIATION) 6938 2007053 CEDARCREST SANITARY RELIEF (SKME-561) (DESIGN) 6587 2006036 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (DESIGN) (SKME -240) 8008 2003083 CONSTRUCTION MANAGEMENT SERVICES - COLDWATER WET WEATHER STORAGE FACILITY TANK A 6951 2003063D CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE IV (DESIGN) (SKME -021) 5686 2005101 CSO - BREDELL AVE - WESTON PL. TO ST. ALBANS AVE CSO INTERCEPTOR (1-182) SEPARATION 5687 2005102 CSO - BREDELL AVE AND LINDBERGH DR CSO INTERCEPTOR (1-90) SEPARATION 7329 2003096A CSO - DROMARA DRIVE SEWER SEPARATION PHASE II (REHABILITATION) 5693 2005108 CSO - HAMPTON PARK AND CENTER DR 1133 CSO INTERCEPTOR/OUTFALL (I-92) STRUCTURE 5696 2005107 CSO - HAMPTON PARK DR CSO INTERCEPTOR (I-115) SEPARATION 8063 200305388 CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE II (BP-009,BP-034135) 7980 2003054E CSO - INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE!! (PEVELY PUMP STATION) 7693 2003076D CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72 INTERCEPTOR (1-122) SEPARATION 7421 2007051 CSO - MCKNIGHT RD 82737 CSO INTERCEPTOR (I-298)/OUTFALL 5757 2007051 CSO - MCKNIGHT RD 82737 CSO INTERCEPTOR (I-298)I'OUTFALL (DESIGN) 5728 2005110 CSO - MENDELL DR - WAYNE TO MILAN DR CSO INTERCEPTOR (I-137, 166/L-100,101) STRUCTURE 7256 2005111 CSO - OLIVE & 1-170 CSO INTERCEPTOR (I-97)/OUTFALL 7264 2005112A CSO - PAGE AVE. OUTFALL L-167, 1-296 SEPARATION PHASE II 7263 2005112A CSO - PAGE AVE, OUTFALL L-167, 1-296 SEPARATION PHASE 11 (DESIGN) 5694 2009058 CSO - PARK DR CSO INTERCEPTOR (I-146A,146B) SEPARATION 5726 2005114 CSO - SHAFTESBURY AVE AND WILD CHERRY LN CSO INTERCEPTOR (1-186,178) ELIMINATION 7632 2003077D CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71 INTERCEPTOR (I-161) SEPARATION 7694 2003031A CSO - V.A. HOSPITAL SUBSYSTEM NO. 73 INTERCEPTOR (174 AND 175) SEPARATION 6523 2003031A CSO - V.A. HOSPITAL SUBSYSTEM NO. 73 INTERCEPTOR (174 AND 175) SEPARATION (DESIGN) 635 89133A DC -03 DEER CREEK SANITARY RELIEF PHASE I (RDP TO NORTH FOREST) 8037 89133A DC -03 DEER CREEK SANITARY RELIEF PHASE I (RDP TO NORTH FOREST) (ENGINEERING CONSTRUCTION SERVICES) 6955 89133B DC -03 DEER CREEK SANITARY RELIEF PHASE II (DESIGN) 8693 2005115 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2007-2010) 8692 2005115 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2007-2010) 6813 2006040 FEE FEE TRUNK SEWER (SKME-002) 6812 2006040 FEE FEE TRUNK SEWER (SKME-002) (DESIGN) 6611 891578 FF-15 MCKELVEY/R. R. TO ADZE SANITARY RELIEF PHASE I I I 2007 Tentatively Deferred - Date Addressed via Other BUDGETED Deferred To: To Be Determined Project/Fund Dropped: Notes: COST 5350,000 5500,000 5500,000 56,200,000 521,300000 $395,000 5200,000 5500,000 51,000,000 51,800,000 52,400,000 $175,000 53,000,000 S2,800,000 S2,000,000 5250,000 5700,000 51,000,000 5875,000 $1,000,000 5500,000 5500,000 S202,000 5570,000 5354,000 51,000,000 5825,000 $593,600 53,000.000 5300,000 S2,593,000 S2,415,000 52,540,000 $500,000 51,383,000 51,630,000 0432,000 51,200,000 5300,000 520,000,000 51,200,000 54,000,000 51,200,000 51,200,000 51,290,000 5270,000 50,300,000 2017 2018 2028 2014 2013 2019 2016 2019 2017 2014 2016 2015 2017 2016 2014 2014 X X Combined with and completed under 2002044 Combined with and completed under 89157B Completed under project nos. 89157/89157A Will be constructed under JB Tunnel project Included in main WWTP appropriation Completed under 2007261 Deferred pending completion of SSO Master Plan Deferred pending completion of SSO Master Plan Deferred pending completion of SSO Master Plan Deferred pending completion of SSO Master Plan Folded into solids handling analysis for District To be addressed via storage tank project Appropriated under 2006166AB Deferred pending completion of SSO Master Plan Potential In-house design for this project Combined w treatment plant cm services Delayed pending completion of downstream phases Delayed pending completion & approval of CSO Plan Delayed pending completion & approval of CSO Plan Rehab performed via general rehab contract, not separal Delayed pending completion & approval of CSO Plan Delayed pending completion & approval of CSO Plan Combined w 2003053B7 Completed via Phase I Delayed pending completion & approval of CSO Plan Delayed pending completion & approval of CSO Plan Project will likely become an I/1 reduction effort Delayed pending completion & approval of CSO Plan X Private site development eliminated need for project X Private site development eliminated need for project Folded into Deer Creek San System Improvements Folded into Deer Creek San System Improvements Appropriated under 2009059 Appropriated under 2009059 Q12 - 2nd Discovery Request CURRENT STATUS OF 2008 RATE PROCEEDING CIRP PROJECTS NOT COMPLETED. ID_N PROD NU PROD NAME 2007 Tentatively Deferred - Date Addressed via Other BUDGETED Deferred To: To Be Determined Project/Fund Dropped: Notes: COST 7222 2002044B BISSELL POINT WWTP BELT FILTER PRESS IMPROVEMENTS PHASE 1 1 1 (INSTALLATION) 9350,000 X Combined with and completed under 2002044 6808 2006116 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) (DESIGN) 5100,000 X Deferred pending completion of SSO Master Plan 7870 2009102 GRAND GLAIZE TRUNK SANITARY RELIEF 1/1 REDUCTION (SKME-417) (DESIGN) 5100,000 2014 6376 900326 GRAVOIS TRUNK (W HITECLIFF TO RDP) SANITARY RELIEF PHASE I I I (SKME -521) 59,800,000 2013 5529 99038 1-70 TO LUCAS & HUNT SANITARY RELIEF PHASE II $935,000 2015 Incorporated into CSO - Gingras 7837 99038 1-70 TO LUCAS & HUNT SANITARY RELIEF PHASE II (DESIGN) 5265,000 2013 Incorporated into CSO - Gingras 7232 2005116 JEFFERSON BARRACKS PUMP STATION ELIMINATION 521,100,000 2018 Will be constructed under JB Tunnel project 8027 2005116 JEFFERSON BARRACKS PUMP STATION ELIMINATION (ENGINEERING CONSTRUCTION SERVICES) $600,000 2018 Will be constructed under JB Tunnel project 6897 2006044 KIEFER TRUNK SEWER RELIEF (SKME-415) (DESIGN) 51,000,000 X Determined project not needed 6828 2005062 LACLEDE STATION SANITARY RELIEF PHASE I (SKME-576) (DESIGN) $2,000,000 X Deferred pending completion of SSO Master Plan 8035 2003078 LEMAY PUMP STATION NO. 3 AND FORCE MAIN IMPROVEMENTS (ENGINEERING CONSTRUCTION SERVICES) 5630,000 2018 Will be constructed under JB Tunnel project 8029 2007239A LEMAY WWTP AERATION BLOWER MODIFICATIONS PHASE II $2,000,000 X Ops to incorporate via operating budget 7912 2007044 LEMAY WWTP INCINERATOR SCRUBBER MODIFICATIONS 83,000,000 X Folded into solids handling analysis for District 6877 2006045 LEONARD SANITARY RELIEF (SKME-429) (DESIGN) 52,000,000 X Project on hold pending verification of need 8012 2009105 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - FENTON WWTP TO BAUMGARTNER DEEP TUNNEL (EASEMENT ACQUISITION) 5500,000 X 3603 95066F LOWER MERAMEC RIVER WWTP EDUCATIONAL/RECREATIONAL FACILITY 53,127,000 2013 3793 95066J LOWER MERAMEC RIVER WWTP NATURAL TREATMENT AREA $2,441,600 X Project unfeasible due to MDNR requirements 8011 2006167 LOWER MERAMEC RIVER WWTP PHASE II (ODOR CONTROL) 55,000,000 X Potential incorporation in other WWTP Improvements 4713 94048 MAPLEWOOD - BLENDON COMBINED SEWER RELIEF PHASE I 511,750,000 2013 6803 20060468 MASON VALLEY SANITARY RELIEF (LOWER) (SKME-420) 51,150,000 X Paid for out of fund 591. 7836 2006046A MASON VALLEY SANITARY RELIEF (UPPER) (SKME-420A) 51,870,000 X Paid for out of fund 591. 6903 2006122 MCKELVEY PROJECT"A" SANITARY RELIEF (SKME-005A) 51,400,000 2013 To be constructed under 2006122 7426 2006122 MCKELVEY PROJECT'S" SANITARY RELIEF (SKME-0058) 51,300,000 2013 To be constructed under 2006122 6594 2005063 MIDLAND SANITARY RELIEF (SKME-226) 5970,000 X Project not needed 8041 2006168 MISSOURI WWTP SECONDARY TREATMENT EXPANSION AND DISINFECTION AT VARIOUS TREATMENT PLANTS (ENGINEERING CONSTRUCTION SERVICES) 51,800,000 X Appropriated under ID 9244 7176 2003111 PADDOCK CREEK SANITARY RELIEF (SKME-206) (DESIGN) $1,000,000 X May not be needed depending on success of Itl reductior 6800 2005064 REINKE SANITARY RELIEF (SKME-407) 52,100,000 X Paid for out of fund 591. 6876 2006050 RIVERSIDE AND YARNELL SANITARY RELIEF (SKME-400) (PARTIAL FUNDING) 56,700,000 2013 6935 2007065 ROCK HILL SANITARY RELIEF (SKME-618) (DESIGN) 51,000,000 2013 6794 2005065 TAYLOR - FILLMORE - HARRISON SANITARY RELIEF (SKME-502 & 503) 53,600,000 2013 3415 2003088A TOWER GROVE- MANCHESTER COMBINED SEWER SYSTEM PHASE I (PARK - THURMAN DIVERSION STRUCTURE) 51,000,000 X Project not needed 3414 2003088B TOWER GROVE- MANCHESTER COMBINED SEWER SYSTEM PHASE II (TOWER GROVE PLACE STORM RELIEF SEWERS) 55,000,000 2013 8010 2008130 TREATMENT PLANT CONSTRUCTION PHASE SERVICES - MISSOURI & COLDWATER (DISINFECTION AND EXPANSION) (SUPPLEMENTAL APPROPRIATION) 56,500 000 X Appropriated under Mo. River CM contract 8013 2009107 TUNNEL CONSTRUCTION PHASE SERVICES (LOWER MERAMEC, DC -3, AND JO) 55,000,000 2014 Under CM -Tunnel contract 6926 2007052 TWO MILE "B" SANITARY RELIEF (SKME-614) (DESIGN) 52,000,000 2021 6911 2006124 UPPER CAULKS CREEK SANITARY RELIEF (SKME-013) 5450,000 X Deferred pending completion of SSO Master Plan 6763 2006125 UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-314) $1,050,000 2013 5397 89151 UR-02 RIVER DES PERES SANITARY RELIEF $3,500,000 X Project not needed 5437 90084A UR-03 RIVER DES PERES SANITARY RELIEF PHASE II 55,000,000 X Deferred pending completion of SSO Master Plan 2525 89088 UR-07 BON HILLS SANITARY RELIEF PHASE II S1,700,000 2026 5400 90087 UR-10 MENDELL AND W'OLTER SANITARY RELIEF (SKME-595) 94,000,000 2015 6919 2006052 VALLEY SANITARY RELIEF (SKME-014) 56,500,000 X Constructed under project nos 2006052A/B 7205 2006099 WATERSHED FACILITY MAPPING VERIFICATION - INFRASTRUCTURE (FY2008) 5750,000 X Work to be done internally 7982 2007155 WC -03!02/01 BOEKLER & WELLSTON SANITARY RELIEF (DESIGN) 5280,000 X Deferred pending completion of SSO Master Plan 6775 2003095 WEBSTER GROVES TRUNK "E" SANITARY RELIEF (SKME-628) 96,400,000 X Potentially eliminated due to planned rehab of system 6835 2003095 WEBSTER GROVES TRUNK "E" SANITARY RELIEF (SKME-628) (DESIGN) 51,000,000 X Potentially eliminated due to planned rehab of system 6972 2003082A WESTERN ROCKY BRANCH SEWER SYSTEM (DESIGN) 51,000,000 X Deferred pending completion of study 5761 2003082 WESTERN ROCKY BRANCH SEWER SYSTEM PHASE I $5,500,000 X Deferred pending completion of study 6754 2003117 WIEGEL LATERAL SANITARY RELIEF (SKME 313) 51,705,000 2016 6753 2003117 WIEGEL LATERAL SANITARY RELIEF (SKME-313) (DESIGN) $395,000 2013