HomeMy Public PortalAboutExhibit MSD 16K 2011 CIRP Supplemental Budget1 ` E -:-I']
Metropolitan St. Louis Sewer District
2010-2011
Budget Supplement
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2010-2011
PREFACE
1
This annual Budget Supplement provides information about the Metropolitan St. Louis
Sewer District's intended Capital Improvement and Replacement Program during Fiscal Year 2011
(July 1, 2010 to June 30, 2011). This document is divided into the following sections:
• Program Summary • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Multi Year Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Multi Year Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list
projects for which the District intends to award construction contracts during Fiscal Year 2011. The
Wastewater Engineering Projects and Stormwater Engineering Projects sections lists projects for
which the District intends to award engineering contracts during Fiscal Year 2011 (for design,
planning, and data collection/system investigation services). Due to the magnitude and complexity
of these projects and the requirements for permitting and easement acquisition, their construction is
planned for future years. The Contingency Projects sections detail projects that may be expedited
and constructed, if revenue should become available and project schedules allow.
For each new project identified for funding in Fiscal Year 2011, this document provides
information regarding the project scope, estimated cost, and projected schedule. For projects
continued from previous fiscal years, only the estimated construction cost and reason for
continuance are provided. Specific information regarding the continued projects was included in
previous Budget Supplement documents for the fiscal year in which the projects were initially
identified. This fiscal year is indicated in parentheses following the project name. Lastly, a listing
of all Fiscal Year 2011 projects sorted by municipality is provided in the Appendix.
On the Cover: Smoke testing of the sanitary sewer system enables defects to be located and
identified. These defects include improper connections that allow inflow of stormwater directly into
the sanitary system. Smoke emanating from gutters, downspouts, and yard vents during smoke
testing provides direct evidence of improper connections and sources of inflow, which overcharge
sanitary sewers and can cause basement backups for customers. The District is aggressively
engaged in implementing a program for removing these improper connections.
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(MSD Bo
u
n
d
a
r
ySt.Louis County Boundary¡¢44
¡¢55
¡¢40
¡¢270
¡¢70
¡¢170
¡¢255¡¢44
¡¢70
¡¢40
¡¢270 ¡¢70
¡¢55
¡¢170
¡¢255
55
61
54
22
68
24
64
27
28
45
43
62
32
19
63
58
31
53
47
67
30
56
69
48
70
42
4465
38
36
29
26
71
25
18
57
51
52
171
157
158
126
162
166
142
131
128
153
141
139
169
150
129
161
145
134
138
146
155
102
127
113
149
130
164
114
147
170
163
154
137
152
136
132
160 159
115
143
151
140
144
156
168
133
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement Program
Map produced by MSD Mapping, February 2010
LEGEND
!(COMBINED
!(SANITARY
!(STORM
MSD DISTRICT WIDE PROJECTS
Fiscal Year 2010-2011
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
AYRES SANITARY RELIEF AND I/I REDUCTION (DESIGN)18
CC-17 FOUR SEASONS BRANCH SANITARY RELIEF PHASE II (DESIGN)19
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - NORTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
20
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - SOUTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
21
COLDWATER WET WEATHER STORAGE FACILITY TANK A (ENGINEERING CONSTRUCTION
SERVICES)
22
COMBINED SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (FY2011) (SUPPLEMENTAL
APPROPRIATION)
23
CREVE COEUR CREEK WATERSHED SANITARY SEWER REHABILITATION (DESIGN)24
DUCHESNE PARQUE NO. 1 PUMP STATION ELIMINATION (P-407) (DESIGN)25
FEE FEE TRUNK SEWER (SKME-002) REHABILITATION AND I/I REDUCTION (DESIGN)26
GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF (DESIGN)27
GLENDALE SECTION D SANITARY RELIEF PHASE III (SKME-624) I/I REDUCTION (DESIGN)28
HERMITAGE I/I REDUCTION (SKME-615) (DESIGN)29
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS (DESIGN)30
NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS (DESIGN)31
OLD MILL CREEK SEWER REHABILITATION PHASE III - 14TH TO 2ND STREET (DESIGN)32
PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM33
RADAR RAINFALL DATA (FY2011)34
SEPARATE SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (FY2011) (SUPPLEMENTAL
APPROPRIATION
35
UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-314) (DESIGN)36
WATERSHED FACILITY PLANNING (FY2011 SUPPLEMENTAL APPROPRIATION)37
WISE AND MABEL SEWER SEPARATION (DESIGN)38
BOPP SANITARY RELIEF I/I REDUCTION (SKME -611)42
3
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
BRIGHTWELL SANITARY RELIEF (SKME-213)43
CAPILIA SANITARY RELIEF (SKME-511) (REHABILITATION)44
CC-15 SEVEN PINES TO BENNINGTON PLACE SANITARY RELIEF PHASE II (SKME-033)45
COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK A46
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE III47
CSO VOLUME REDUCTION - GREEN INFRASTRUCTURE (PILOT PROGRAM)48
EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2011)49
EMERGENCY REPAIR FUND APPROPRIATION (FY2011)50
FALLBROOK - DEVONDALE I/I REDUCTION (SKME -644 & 645)51
FOUNTAIN/ANTHONY LATERAL SANITARY RELIEF (SKME 236)52
GLENDALE SECTION D SANITARY RELIEF (SKME-624)53
GLENDALE SECTION D SANITARY RELIEF PHASE II (SKME-624) (I/I REDUCTION)54
GRAND GLAIZE WWTP IMPROVEMENTS - MEDIUM VOLTAGE SWITCHGEAR (INSTALLATION)55
INFRASTRUCTURE REPAIR #015P BURNCOATE (P-321)56
INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE V57
INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE VI CASING PIPE58
INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2011)59
INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2011)60
LEMAY WWTP WET WEATHER EXPANSION OUTFALL SEWER61
LOWER MERAMEC RIVER WWTP PHASE II (DISINFECTION)62
MANCHESTER AVENUE COMBINED SEWER RELIEF - PHASE II63
PORTIS #3242 COMBINED SEWER IMPROVEMENTS64
4
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
POWER SUPPLY IMPROVEMENTS AT VARIOUS SANITARY PUMP STATIONS PHASE III65
PROGRAM TO ELIMINATE BASEMENT BACKUPS PHASE VI66
STONINGTON SANITARY RELIEF (SKME -652) (I/I REDUCTION)67
TOWER GROVE- MANCHESTER COMBINED SEWER SYSTEM PHASE II (UTAH & HUMPHREY
STORM RELIEF SEWERS)
68
UPPER SUGAR CREEK SANITARY RELIEF SEC. C PHASE II69
UR-07 BON HILLS SANITARY RELIEF PHASE II (REHABILITATION)70
VALLEY SANITARY RELIEF (SKME-014) PHASE II71
CHERRY TREE LANE STORM IMPROVEMENT (DESIGN)102
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL DESIGN (FY2011)103
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL DESIGN (FY2011)104
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL DESIGN (FY2011)105
GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2011)106
GENERAL SERVICES AGREEMENT - STORMWATER PLANNING (FY2011)107
GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011)108
GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011)109
GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011)110
GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011)111
GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011)112
LINDEN #1064 STORM SEWER (DESIGN)113
RIDGEMOOR DRIVE STORM IMPROVEMENTS AND I/I REDUCTION (SKME-574) (DESIGN)114
ROSEWOOD LANE & WOODARD DR. STORM SEWER (DESIGN)115
STORMWATER INFRASTRUCTURE IMPROVEMENTS (DESIGN) (2011)116
5
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
STREAM FLOW GAUGE OPERATION (USGS) (FY 2011)117
STREAM FLOW WATER QUALITY SAMPLING (FY 2011)118
STREAMBANK STABILIZATION IMPROVEMENTS (DESIGN) (2011)119
ALPINE & RAMBLER STORM SEWER126
ARLEE & HOFFMEISTER STORM SEWER127
BOPP AND CLAYCHESTER STORM SEWER128
BRANFORD DRIVE #30 STORM SEWER129
BURNING TREE AND FOX RUN DRIVE STORM SEWER130
CHALET COURT STORM SEWER131
CONWAY ROAD #11632 STORM SEWER132
CORNELL AVE. #8360 STORM SEWER (RAIN GARDENS)133
COUNT DRIVE #10556 STORM SEWER134
EASEMENT ACQUISITION FOR STORMWATER PROJECTS (FY 2011)135
EAST WATSON AND KATHY CT. STORM IMPROVEMENT136
FIELDCREST AND FOURNIER CHANNEL IMPROVEMENTS (GCMB-130)137
FIELDING ROAD #10 CHANNEL IMPROVEMENTS138
GALLANT FOX DRIVE STORM SEWER139
GRAHAM ROAD #630 STORM SEWER140
HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230) (PARTIAL FUNDING TO CLOSE OUT 576)141
HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230) (PARTIAL FUNDING)142
HOWDERSHELL PARK STORM IMPROVEMENTS143
INNISFAIL #217 STORM CHANNEL144
6
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
IRENE & BOPP STORM SEWER145
IRIS LANE BANK STABILIZATION146
JACOBS OLD COAL ROAD & NOTTINGHAM STORM SEWER (PARTIAL FUNDING TO CLOSE FUND
592)
147
JACOBS OLD COAL ROAD & NOTTINGHAM STORM SEWER (PARTIAL FUNDING)148
LANETT CT. #11390 STORM IMPROVEMENT149
LATTY TO LAUPHER LANE STORM SEWER150
LINDSCOTT STORM SEWER151
LINWOOD & LANYARD STORM SEWER152
MABLE AVE. AND CARSON ROAD STORM SEWER (PARTIAL FUNDING TO CLOSE 580)153
MABLE AVE. AND CARSON ROAD STORM SEWER (PARTIAL FUNDING)154
MALUS & GREEN PARK STORM SEWER155
MARY AVENUE FLOOD MITIGATION156
MINERVA - WENGLER - BURNS STORM SEWER157
MONTOUR 12000 BLOCK STORM SEWER158
NORMTON DRIVE BANK STABILIZATION159
PAXTON LANE TO RICARDO LANE STORM IMPROVEMENTS160
RISSANT DRIVE #39 STORM SEWER161
RUTH-HELEN-CECELIA OUTFALL SEWER162
SELMA & LANVALE STORM SEWER163
SHIREFORD LANE STORM IMPROVEMENT164
STORMWATER INFRASTRUCTURE REPAIR PROJECTS165
TEALBROOK ESTATES STORM SEWER166
7
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2010 - 2011
MAP
NO.PROJECT NAME
THUNDERBIRD AND CARDINAL DRIVE STORM SEWER167
TREADWAY LANE #4315 STORM SEWER168
WENNEKER - TREEBROOK LANE STORM CHANNEL169
WHITE BIRCH WAY - QUEEN ANN DRIVE STORM SEWER170
WOODLEAF COURT STORM SEWER IMPROVEMENTS171
8
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
9
The identification and prioritization of projects to be included in the Capital
Improvement and Replacement Program is a multi-step process, requiring monitoring and
updating to ensure that the highest priority problems within the District are addressed in a
timely manner, given funding limitations. These stages include: project identification,
conceptual solution, preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it
continues to meet regulatory requirements and customers’ needs. The project cost is
updated based on available information, and the project’s priority is assessed with the
goal that the highest priority projects are funded first.
Project cost estimates used in the budget preparation process and shown in the
Budget Supplement are usually based on the preliminary study stage of the process. At
this stage there is typically a minimal amount of detailed information available regarding
geotechnical conditions, utility relocation requirements, easement requirements, and
other site-specific issues that have the potential of significantly affecting the project’s
construction cost. Preliminary study cost estimates are designed to be within thirty
percent of the final design engineer’s estimates. Individual projects may vary to a greater
degree than the average, due to unanticipated site-specific conditions that impact the
project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
10
Protection Agency and Missouri Department of Natural Resources, to address customer
storm or sanitary problems, remedy deficiencies identified through planning studies and
hydraulic analysis of the system, and implement required collection system and
wastewater treatment plant maintenance or upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost
estimate, and priority ranking of the project relative to similar projects. This solution and
associated cost estimate are general, based on a single site visit and a “table-top” analysis
of the problem. The project may then be incorporated into the Capital Improvement and
Replacement Program in a specific fiscal year, based on the availability of funds and
priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study
is performed. In this study, scope is reevaluated in greater detail to ensure that the
conceptual solution is still viable, given current conditions, regulatory requirements, and
updated project cost estimate and priority ranking. In performing this preliminary study,
the District may make multiple site visits to inspect the problem area and estimate
alignment of the sewer or channel to be constructed. Preliminary survey information may
be obtained and a more detailed hydraulic analysis performed than was done at the
conceptual solution level. Preliminary studies are typically performed by the Engineering
Department. However, the District may use engineering consultant services to perform
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
11
preliminary studies during periods of heavy workload, or for large, complex projects such
as new treatment plants, upgrades to existing treatment plants, or major outfall sewer
upgrades.
Upon completion of a preliminary study, the project’s priority ranking is
reevaluated relative to other, similar projects. A project may be rescheduled to a later
fiscal year within the Capital Improvement and Replacement Program, should its priority
ranking be reduced due to increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering
Department staff or engineering consultant services. As part of the final design process,
topographic and geotechnical information is collected, utility conflicts are identified,
construction plans and specifications are prepared, and easement and temporary
construction license plats are drafted.
For projects of significant scope and impact, coordination with property owners
who will benefit or who will be affected by the construction of the project is achieved at
"open-line" meetings hosted by the District. For smaller projects, property owners are
individually contacted during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in
delays in the planned construction schedule. When necessary, the District may condemn
for easements in order to ensure that a project is constructed. Any required
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
12
condemnation proceedings are performed in full compliance with state and federal law.
Some projects may additionally require specific permitting from other government
agencies, such as the Missouri Department of Natural Resources, prior to bidding.
A project is advertised for public bidding a minimum of three weeks, followed by
a formal bid opening. Bids are evaluated to determine the lowest responsive, responsible
bidder. Appropriation and contract ordinances are submitted to the Board of Trustees for
their approval. Upon ordinance passage, contracts are executed and notices to proceed
are issued.
In addition to wastewater and stormwater projects, the District may construct
sanitary sewer sub-district projects at the request of property owners currently served by
private systems or individual septic tank systems. These sub-districts are financed by the
benefiting property owners, using special benefit assessments. The affected property
owners initiate the projects by submitting a petition to the District, which provides design
and construction management assistance. Because of the uncertainty of the viability
and/or schedule of sub-district projects, they are not always listed in the Budget
Supplement.
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
13
Number of
Type of Project Individual Projects Project Cost
Wastewater Construction 30 $ 93,045,000
Stormwater Construction 46 $ 18,029,000
Wastewater Engineering 21 $ 25,287,000
Stormwater Engineering 18 $ 5,210,000
Proposed Projects Subtotal: 115 $141,571,000
Continued Wastewater Projects 5 $ 2,690,000
Continued Stormwater Projects 16 $ 6,656,000
Continued Projects Subtotal: 21 $ 9,346,000
FISCAL YEAR 2011 PROJECT TOTALS 136 $150,917,000
r -
L J
WASTEWATER ENGINEERING PROJECTS
15
The projects described in this section relate to the preliminary or final design of
new or rehabilitated sanitary and combined sewer systems. Also included in this section
are projects relating to combined and separate sewer overflow elimination and separation
projects, additional appropriations for combined and separate sewer area
inflow/infiltration assessments, combined and separate sewer area CCTV inspections and
physical inspection of sewers, construction management services, and continued funding
of the District’s Watershed Facilities Planning efforts. The construction phase of
preliminary and final design projects are planned in later fiscal years due to the
complexity of the design, the size of the project, and the time required to obtain needed
easements.
Twenty-one (21) wastewater engineering projects are planned at a total estimated
cost of $25,287,000. The cost estimates indicated are for only the required engineering
work and do not include construction. The project scopes are fully described in the
Budget Supplement document.
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF WASTEWATER ENGINEERING PROJECTS
AYRES SANITARY RELIEF AND I/I
REDUCTION (DESIGN)
18$420,0002007156
CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II (DESIGN)
19$300,0002007056
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH (FY2011)
(SUPPLEMENTAL APPROPRIATION)
20$1,500,0002009162
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH (FY2011)
(SUPPLEMENTAL APPROPRIATION)
21$1,500,0002009163
COLDWATER WET WEATHER STORAGE
FACILITY TANK A (ENGINEERING
CONSTRUCTION SERVICES)
22$350,0002003083
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2011) (SUPPLEMENTAL APPROPRIATION)
23$5,000,0002007141
CREVE COEUR CREEK WATERSHED
SANITARY SEWER REHABILITATION
(DESIGN)
24$400,0002009278
DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407) (DESIGN)
25$152,0002008172
FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION
(DESIGN)
26$270,0002006040A
GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF (DESIGN)
27$850,00090027
GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
(DESIGN)
28$870,0002006117B
16
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF WASTEWATER ENGINEERING PROJECTS
HERMITAGE I/I REDUCTION (SKME-615)
(DESIGN)
29$175,0002010095
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS (DESIGN)
30$350,0002010159
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
(DESIGN)
31$650,0002009218
OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET (DESIGN)
32$800,0002010116
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM
33$500,0002010232
RADAR RAINFALL DATA (FY2011)34$120,0002009164
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2011) (SUPPLEMENTAL APPROPRIATION
35$3,800,0002007140
UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314) (DESIGN)
36$330,0002006125
WATERSHED FACILITY PLANNING (FY2011
SUPPLEMENTAL APPROPRIATION)
37$6,200,0002007139
WISE AND MABEL SEWER SEPARATION
(DESIGN)
38$750,00093078
$25,287,000TOTAL:
17
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007156
2011
St. Louis County
Lemay/RDP
Gravois Creek
SANITARY REPLACEMENT
CONSULTANT
$420,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND THREE SANITARY SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS FOR CONSTRUCTION OF 3,510 FEET OF 8-INCH TO 12-INCH SEWER, REHAB 12,970 FEET OF SEWER, AND 63 PRIVATE
I/I REDUCTIONS.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $3,200,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $420,000
SCHEDULE
AYRES SANITARY RELIEF AND I/I REDUCTION (DESIGN)
INFRASTRUCTURE
660
2011 836618ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 3/1/2012 4/1/2013 8/1/2013
3/1/2012 4/1/2013 8/1/2013 8/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10523
TASK #
011.2.1
10523 011.2.2 $85,000.00
$335,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007056
2011
Chesterfield
Missouri
Creve Coeur Creek
SANITARY REPLACEMENT
CONSULTANT
$300,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS DURING WET WEATHER EVENTS. REMOVAL NEEDED OF
CONSTRUCTED SSO.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN PHASE II OF PROJECT TO CONSTRUCT 3,320 FT OF 8-INCH TO 15-INCH DIAMETER SANITARY SEWER AND APPURTENANCES.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $1,500,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $300,000
SCHEDULE
CC-17 FOUR SEASONS BRANCH SANITARY RELIEF PHASE
II (DESIGN)
INFRASTRUCTURE
660
2011 861219ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 12/1/2011 12/1/2012 4/1/2013
12/1/2011 12/1/2012 4/1/2013 4/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10549
TASK #
011.2 $300,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009162
2011
Various
Various
Various
SANITARY REPLACEMENT
ADS ENVIRONMENTAL SERVICES
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
PROCUREMENT OF THESE SERVICES WAS COMPLETED BY PURCHASING IN FY 2010. ANTICIPATE BOARD INTRODUCTION JANUARY,
2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - NORTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
INFRASTRUCTURE
660
2011 757920ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10376
TASK #
016.2 $1,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009163
2011
Various
Various
Various
SANITARY REPLACEMENT
ACE PIPE CLEANING, INC.
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
PROCUREMENT OF THESE SERVICES WAS COMPLETED BY PURCHASING IN FY 2010. ANTICIPATE BOARD INTRODUCTION JANUARY,
2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - SOUTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
INFRASTRUCTURE
660
2011 817321ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10377
TASK #
016.2 $1,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003083
2011
St. Louis County
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
CRAWFORD MURPHY & TILLY INC.
$350,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE ENGINEERING DESIGN SUPPORT SERVICES DURING THE CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGE
FACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT IN THE COLDWATER WATERSHED.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2011, FOR $14,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $350,000
SCHEDULE
COLDWATER WET WEATHER STORAGE FACILITY TANK A
(ENGINEERING CONSTRUCTION SERVICES)
INFRASTRUCTURE
660
2011 803622ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010
12/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10434
TASK #
011.4 $350,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007141
2011
Various
Various
Various
SANITARY REPLACEMENT
RJN GROUP, INC.
$5,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO SANITARY SEWER SYSTEM CAUSES BASEMENT BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. I/I REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION PROJECTS.
REMARKS
THIS BUDGET INCLUDES $500,000 FOR THE INVESTIGATION OF CRITICAL SEWERS IN THE CITY OF ST. LOUIS. ANTICIPATE BOARD
INTRODUCTION JUNE, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $5,000,000
SCHEDULE
COMBINED SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2011) (SUPPLEMENTAL APPROPRIATION)
INFRASTRUCTURE
660
2011 757823ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10232
TASK #
016.1 $5,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009278
2011
St. Louis County
Missouri
Creve Coeur Creek
SANITARY REPLACEMENT
CONSULTANT
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
DETERIORATED VCP PIPES ALLOW ROOT INTRUSION AND INFILTRATION/INFLOW LEADING TO EXCESSIVE WET-WEATHER FLOWS,
SEWER BACKUPS AND OVERFLOWS IN AREAS WITH CONSTRUCTED SSOS: BP-033, BP-035, BP-036, BP-037, BP-038, BP-039, BP-611.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN TO REHABILITATE APPROXIMATELY 100,000 FT OF SEWER MAIN, 750 MANHOLES, AND CONNECTIONS USING LINING
TECHNOLOGIES TO ACHIEVE A TARGET WET WEATHER FLOW REDUCTION OF 4 MGD.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2013, FOR $4,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
CREVE COEUR CREEK WATERSHED SANITARY SEWER
REHABILITATION (DESIGN)
INFRASTRUCTURE
660
2011 873024ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 4/1/2012 8/1/2012
4/1/2011 8/1/2012 8/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10568
TASK #
011.2 $400,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008172
2011
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
CONSULTANT
$152,000
St. Louis Metropolitan Sewer District - Fiscal Year
PUMP STATION AND FORCE MAIN CAN BE ELIMINATED BY CONNECTING GRAVITY SYSTEM TO EXISTING 8-INCH SANITARY SEWER ON
HEATHER BLUFF COURT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN APPROXIMATELY 765 FEET OF 8-INCH SANITARY SEWER AND APPURTENANCES, AND MAKE ALTERATIONS AS NECESSARY
TO ELIMINATE PUMP STATION.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $531,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $152,000
SCHEDULE
DUCHESNE PARQUE NO. 1 PUMP STATION ELIMINATION (P-
407) (DESIGN)
INFRASTRUCTURE
660
2011 870025ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 11/1/2011 11/1/2012 3/1/2013
11/1/2011 11/1/2012 3/1/2013 3/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10335
TASK #
011.2 $152,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006040A
2011
Unincorporated
Missouri
Fee Fee Creek
SANITARY REPLACEMENT
CONSULTANT
$270,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARATION OF PLANS AND SPECIFICATIONS FOR THE REHABILITATION OF SEWERS TO REMOVE I/I.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $2,400,000. IT WILL ALLEVIATE BP-078 & 086, WHICH MAY
BE ELIMINATED, PENDING POST CONSTRUCTION MONITORING.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $270,000
SCHEDULE
FEE FEE TRUNK SEWER (SKME-002) REHABILITATION AND
I/I REDUCTION (DESIGN)
INFRASTRUCTURE
660
2011 867726ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 1/1/2012 6/1/2012
12/1/2011 5/1/2012 6/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10597
TASK #
011.2 $270,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
90027
2011
Unincorporated
Lemay/RDP
Gravois Creek
SANITARY REPLACEMENT
CONSULTANT
$850,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS, OVERCHARGED SANITARY SEWERS, AND SSO.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE INSTALLATION OF APPROXIMATELY 12,300 FEET OF 24-INCH TO 36-INCH SANITARY
SEWERS.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $5,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $850,000
SCHEDULE
GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES
SANITARY RELIEF (DESIGN)
INFRASTRUCTURE
660
2011 836527ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2011 4/1/2012 6/1/2013 10/1/2013
4/1/2012 6/1/2013 10/1/2013 4/1/2015
EXPENSE TYPE = C
ORACLE PROJECT #
10611
TASK #
011.2 $850,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006117B
2011
Glendale
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
CONSULTANT
$870,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR PHASE III OF THE PROJECT, TO INCLUDE REHABILITATION OF 100 PRIVATE LATERALS,
DISCONNECTION OF ROOF DRAINS, AND OTHER DISCONNECTIONS.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $2,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $870,000
SCHEDULE
GLENDALE SECTION D SANITARY RELIEF PHASE III (SKME-
624) I/I REDUCTION (DESIGN)
INFRASTRUCTURE
660
2011 845128ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2010 N/A 1/1/2012 5/1/2012
1/1/2012 N/A 5/1/2012 5/1/2013
EXPENSE TYPE = N
ORACLE PROJECT #
10458
TASK #
011.2 $870,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010095
2011
Frontenac
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
CONSULTANT
$175,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER SURCHARGING, SANITARY SEWER OVERFLOWS DURING WET WEATHER, AND FOUR CONSTRUCTED SSOS.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE REHABILITATION OF APPROXIMATELY 17,000 FEET OF 8-INCH TO 36-INCH SEWERS,
217 MANHOLES, AND THE REMOVAL OF PRIVATE SOURCES OF I/I ON 24 PROPERTIES.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2012, FOR $2,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $175,000
SCHEDULE
HERMITAGE I/I REDUCTION (SKME-615) (DESIGN)
INFRASTRUCTURE
660
2011 864529ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 2/1/2012 6/1/2012
2/1/2012 6/1/2012 6/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10645
TASK #
011.2.1
10645 011.2.2 $135,000.00
$40,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010159
2011
Unincorporated
Lemay/RDP
Martigney Creek
SANITARY REPLACEMENT
CONSULTANT
$350,000
St. Louis Metropolitan Sewer District - Fiscal Year
LIFT STATION IS AT THE END OF ITS LIFE CYCLE.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF 2,700 FEET OF 8-INCH TO 10-INCH SEWER TO ELIMINATE THE
PUMP STATION.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $1,565,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $350,000
SCHEDULE
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323)
IMPROVEMENTS (DESIGN)
INFRASTRUCTURE
660
2011 869530ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 12/1/2011 12/1/2012 4/1/2013
11/1/2011 12/1/2012 4/1/2013 6/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10715
TASK #
011.2 $350,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009218
2011
Unincorporated
Lemay/RDP
Martigney Creek
SANITARY REPLACEMENT
CONSULTANT
$650,000
St. Louis Metropolitan Sewer District - Fiscal Year
LIFT STATION IS AT THE END OF ITS LIFE CYCLE, AND RECEIVING ADDITIONAL FLOWS DUE TO ELIMINATION OF ANOTHER PUMP
STATION.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF 3,340 FEET OF 15-INCH GRAVITY SEWER AND ELIMINATION OF
PUMP STATION.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $5,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $650,000
SCHEDULE
NEW ENGLAND TOWN QUARRY PUMP STATION (P-307)
(SKME-544) IMPROVEMENTS (DESIGN)
INFRASTRUCTURE
660
2011 857231ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2010 10/1/2011 10/1/2012 2/1/2013
10/1/2011 10/1/2012 2/1/2013 8/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10716
TASK #
011.2 $650,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010116
2011
St. Louis City
Bissell
Mill Creek (City)
SANITARY REPLACEMENT
CONSULTANT
$800,000
St. Louis Metropolitan Sewer District - Fiscal Year
DETERIORATED 20 FEET x 15 FEET BRICK AND STONE SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN THE REHABILITATION OF THE OLD MILL CREEK SEWER BETWEEN 14TH AND 2ND.
REMARKS
THIS DESIGN EFFORT IS INTENDED TO ENABLE THIS PROJECT TO RECEIVE 75% FEDERAL FUNDING THROUGH THE CORPS OF
ENGINEERS, UNDER ITS CSO REDUCTION PROJECT IN THE CITY OF ST. LOUIS. CONSTRUCTION IS TENTATIVELY PROGRAMMED IN
FISCAL YEAR 2013, FOR $5,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $800,000
SCHEDULE
OLD MILL CREEK SEWER REHABILITATION PHASE III - 14TH
TO 2ND STREET (DESIGN)
INFRASTRUCTURE
660
2011 866332ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2011 1/1/2012 1/1/2013 5/1/2013
1/1/2012 1/1/2013 5/1/2013 12/1/2015
EXPENSE TYPE = C
ORACLE PROJECT #
10722
TASK #
011.2 $800,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010232
2011
Various
Various
Various
SANITARY REPLACEMENT
VENDOR
$500,000
St. Louis Metropolitan Sewer District - Fiscal Year
PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWER SYSTEM CAUSING OVERFLOWS AND BASEMENT BACKUPS.
PROJECT PROBLEM
PROJECT SOLUTION
INITIATE A PUBLIC ENGAGEMENT PROGRAM TO INFORM THE PUBLIC ON THE BENEFITS OF REMOVAL OF PRIVATE SOURCES OF
STORMWATER FROM THE SEWER SYSTEM.
REMARKS
PROCUREMENT OF VENDOR SERVICES FOR THIS PROGRAM WILL BE IMPLEMENTED BY PURCHASING, IN CONJUNCTION WITH MSD'S
PUBLIC INFORMATION OFFICE. AT A POINT TO BE DETERMINED DURING IMPLEMENTATION OF THE I/I REMOVAL PROGRAM, THIS
PUBLIC ENGAGEMENT PROGRAM WILL EVOLVE INTO PUBLIC EDUCATION ON MSD'S WET WEATHER ISSUES AND WET WEATHER
CIRP. ANTICIPATE BOARD INTRODUCTION JANUARY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $500,000
SCHEDULE
PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT
PROGRAM
INFRASTRUCTURE
660
2011 924733ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10739
TASK #
016.2 $500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009164
2011
Various
Various
Various
SANITARY REPLACEMENT
VENDOR
$120,000
St. Louis Metropolitan Sewer District - Fiscal Year
ACTUAL FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS IS NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM
MODELS, WHICH ARE UTILIZED FOR PROJECT EVALUATION AND PLANNING.
PROJECT PROBLEM
PROJECT SOLUTION
INTEGRATION OF EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING AND
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS.
REMARKS
A NEW PROCUREMENT THROUGH PURCHASING FOR THESE SERVICES WILL OCCUR THIS YEAR. ANTICIPATE BOARD INTRODUCTION
DECEMBER, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $120,000
SCHEDULE
RADAR RAINFALL DATA (FY2011)
INFRASTRUCTURE
660
2011 757634ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10743
TASK #
016.2 $120,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007140
2011
St. Louis County
Various
Various
SANITARY REPLACEMENT
WOOLPERT CONSULTANTS, INC.
$3,800,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO SANITARY SEWER SYSTEM CAUSES BASEMENT BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION TECHNIQUES.
REMARKS
THIS BUDGET ITEM INCLUDES $300,000 FROM THE MISSOURI RIVER BONFILS OMCI FOR WORK IN THAT AREA. ANTICIPATE BOARD
INTRODUCTION JUNE, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,800,000
SCHEDULE
SEPARATE SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2011) (SUPPLEMENTAL APPROPRIATION
INFRASTRUCTURE
660
2011 757335ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10231
TASK #
016.1 $3,800,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006125
2011
Ferguson
Bissell
Maline Creek
SANITARY REPLACEMENT
CONSULTANT
$330,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS, OVERCHARGED SANITARY SEWER, AND SSO.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF 2,750 FEET OF 15-INCH DIAMETER SANITARY SEWER,
REHAB OF 14,000 FEET OF SEWER, AND I/I REDUCTION ON 8 PROPERTIES.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $3,500,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $330,000
SCHEDULE
UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-
314) (DESIGN)
INFRASTRUCTURE
660
2011 676236ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2010 1/1/2012 3/1/2013 7/1/2013
12/1/2011 1/1/2013 7/1/2013 7/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10781
TASK #
011.2.1
10871 011.2.2 $45,000.00
$285,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007139
2011
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
JACOBS ENGINEERING GROUP, INC.
$6,200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITAL IMPROVEMENT PROGRAM EXCEEDS THE ABILITY OF EXISTING
DISTRICT STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT, ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND
ACTIVITIES, INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THE DISTRICT, INFLOW/INFILTRATION PROFESSIONAL
SERVICES, AND SPECIALTY VENDORS.
REMARKS
VENDOR WAS SELECTED IN 2007, WITH A 4 YEAR LENGTH OF CONTRACT, PLUS 2 OPTION YEARS. THIS AMOUNT INCLUDES
ADDITIONAL FUNDING FOR FORCE MAIN AND TREATMENT PLANT RELATED STUDY EFFORTS REQUESTED BY OPERATIONS.
ANTICIPATE BOARD INTRODUCTION JUNE, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $6,200,000
SCHEDULE
WATERSHED FACILITY PLANNING (FY2011 SUPPLEMENTAL
APPROPRIATION)
INFRASTRUCTURE
660
2011 757737ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10230
TASK #
016.1 $6,200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
93078
2011
Richmond Heights
Lemay/RDP
Black Creek
SANITARY REPLACEMENT
CONSULTANT
$750,000
St. Louis Metropolitan Sewer District - Fiscal Year
STREET AND YARD FLOODING, AND BASEMENT BACKUPS DUE TO UNDERSIZED COMBINED AND STORM SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 9,225 FEET OF 12-INCH TO 72-INCH DIAMETER
STORM SEWERS, AND 1,080 FEET OF 12-INCH DIAMETER COMBINED SEWERS, PRIVATE I/I REDUCTION .AND APPURTENANCES.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2014, FOR $3,500,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $750,000
SCHEDULE
WISE AND MABEL SEWER SEPARATION (DESIGN)
INFRASTRUCTURE
660
2011 825138ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2010 5/1/2012 6/1/2013 10/1/2013
5/1/2012 5/1/2013 10/1/2013 4/1/2015
EXPENSE TYPE = C
ORACLE PROJECT #
10029
TASK #
011.2.1 $750,000.00
AMOUNT
WASTEWATER CONSTRUCTION PROJECTS
39
The projects described in this section are related to constructing, rehabilitating or
maintenance repair of sanitary and combined sewers, improvements to existing treatment
plants, and the reduction of inflow and infiltration into the sewer system. These types of
projects help alleviate basement backups, address regulatory issues, enable the removal
of Sanitary and Combined Sewer Overflows, and rebuild part of our aging infrastructure
system. Over one-third of the Infrastructure Construction budget is for required
Treatment Plant improvements, and over one-third for Sanitary Sewer Overflow
reduction projects. Thirty (30) projects are to be funded at a total estimated cost of
$93,045,000.
The District's revenue source for constructing the majority of these projects is the
Sanitary Replacement Fund, which receives money from wastewater user charges and
from the sale of revenue bonds. The remaining projects will be funded with revenues
from various Operation, Maintenance, Construction, and Improvement (OMCI) Funds,
Construction Funds, Special Funds, or the Improvement Fund. The property taxes
collected within the boundaries of OMCI Taxing Districts must be spent for
improvements within their specific areas of collection. The Construction Fund and
Improvement Fund receive revenues from various connection fees.
CONTENTS OF WASTEWATER CONSTRUCTION PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
BOPP SANITARY RELIEF I/I REDUCTION (SKME
-611)
42$1,070,0002008073A
BRIGHTWELL SANITARY RELIEF (SKME-213)43$2,647,0002005053
CAPILIA SANITARY RELIEF (SKME-511)
(REHABILITATION)
44$900,0002005054
CC-15 SEVEN PINES TO BENNINGTON PLACE
SANITARY RELIEF PHASE II (SKME-033)
45$1,500,0002001130A
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK A
46$15,000,0002003083
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS
PHASE III
47$960,0002006188
CSO VOLUME REDUCTION - GREEN
INFRASTRUCTURE (PILOT PROGRAM)
48$3,000,00011048
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2011)
49$2,000,0002009060
EMERGENCY REPAIR FUND APPROPRIATION
(FY2011)
50$250,0002010161
FALLBROOK - DEVONDALE I/I REDUCTION (SKME
-644 & 645)
51$1,848,0002009197
FOUNTAIN/ANTHONY LATERAL SANITARY
RELIEF (SKME 236)
52$5,300,0002005059
GLENDALE SECTION D SANITARY RELIEF
(SKME-624)
53$750,0002006117
GLENDALE SECTION D SANITARY RELIEF PHASE II
(SKME-624) (I/I REDUCTION)
54$1,000,0002006117A
GRAND GLAIZE WWTP IMPROVEMENTS - MEDIUM
VOLTAGE SWITCHGEAR (INSTALLATION)
55$250,0002003061F
INFRASTRUCTURE REPAIR #015P BURNCOATE
(P-321)
56$400,00090044
40
CONTENTS OF WASTEWATER CONSTRUCTION PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
INFRASTRUCTURE REPAIR #087P CAULKS CREEK
"A" (P-750) PHASE V
57$2,500,00093077D
INFRASTRUCTURE REPAIR #087P CAULKS CREEK
"A" (P-750) PHASE VI CASING PIPE
58$300,00093077J
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY 2011)
59$10,000,0002009065
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2011)
60$4,000,0002009063
LEMAY WWTP WET WEATHER EXPANSION
OUTFALL SEWER
61$11,900,0002003067B
LOWER MERAMEC RIVER WWTP PHASE II
(DISINFECTION)
62$7,150,0002006167A
MANCHESTER AVENUE COMBINED SEWER RELIEF
- PHASE II
63$3,820,0002003064A
PORTIS #3242 COMBINED SEWER IMPROVEMENTS 64$1,250,0002006049
POWER SUPPLY IMPROVEMENTS AT VARIOUS
SANITARY PUMP STATIONS PHASE III
65$700,0002009099
PROGRAM TO ELIMINATE BASEMENT BACKUPS
PHASE VI
66$1,000,0002010224
STONINGTON SANITARY RELIEF (SKME -652) (I/I
REDUCTION)
67$350,0002006170A
TOWER GROVE- MANCHESTER COMBINED SEWER
SYSTEM PHASE II (UTAH & HUMPHREY STORM
RELIEF SEWERS)
68$3,500,0002003088B1
UPPER SUGAR CREEK SANITARY RELIEF SEC. C
PHASE II
69$2,000,00087154A
UR-07 BON HILLS SANITARY RELIEF PHASE II
(REHABILITATION)
70$3,000,00089088A
VALLEY SANITARY RELIEF (SKME-014) PHASE II 71$4,700,0002006052B
$93,045,000TOTAL:
41
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008073A
2011
Des Peres
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
KOWELMAN ENGINEERING, INC.
$1,070,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
I/I REDUCTION OF PUBLIC AND PRIVATE INFLOW/INFILTRATION SOURCES IN THE PROJECT AREA.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,070,000
SCHEDULE
BOPP SANITARY RELIEF I/I REDUCTION (SKME -611)
INFRASTRUCTURE
660
2011 926342ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2007 1/1/2009 8/1/2010 12/1/2010
1/1/2008 8/1/2010 12/1/2010 12/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10298
TASK #
015.1.1
10298 015.1.2 $110,000.00
$960,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005053
2011
Florissant
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
BURNS & MCDONNEL ENGINEERING
CO.
$2,647,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 3,860 FEET OF 15-INCH TO 21-INCH DIAMETER SANITARY SEWER FROM FLORISSANT ROAD
SOUTH OF WOODRIDGE, THEN WEST TO WOODRIDGE AND THEN SOUTH TO LINDBERGH AND WEST TO BRIGHTWELL COURT.
REMOVE BP-131.
REMARKS
PROJECT DESIGN FUNDED IN FISCAL YEAR 2006 FOR $340,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,647,000
SCHEDULE
BRIGHTWELL SANITARY RELIEF (SKME-213)
INFRASTRUCTURE
660
2011 659643ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2009 1/1/2011 5/1/2011
1/1/2011 5/1/2011 2/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10447
TASK #
015.1.1 $2,647,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005054
2011
Grantwood Village
Lemay/RDP
Gravois Creek
SANITARY REPLACEMENT
VANCE ENGINEERING, INC.
$900,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVE INFLOW/INFILTRATION FROM THE SANITARY SYSTEM.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $250,000. SCOPE WAS REVISED TO REMOVE I/I FROM THE
SANITARY SYSTEM.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $900,000
SCHEDULE
CAPILIA SANITARY RELIEF (SKME-511) (REHABILITATION)
INFRASTRUCTURE
660
2011 681844ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2005 9/1/2010 1/1/2011
9/1/2010 1/1/2011 1/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10115
TASK #
015.1.1 $900,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001130A
2011
Unincorporated
Missouri
Creve Coeur Creek
SANITARY REPLACEMENT
DONOHUE AND ASSOCIATES, INC.
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 4,160 FEET OF 8-INCH TO 21-INCH DIAMETER SANITARY RELIEF SEWER.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $250,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
CC-15 SEVEN PINES TO BENNINGTON PLACE SANITARY
RELIEF PHASE II (SKME-033)
INFRASTRUCTURE
660
2011 755345ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2005 3/1/2007 1/1/2009 8/1/2008 12/1/2010
7/1/2006 1/1/2008 8/1/2010 12/1/2010 12/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10406
TASK #
015.1.1 $1,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003083
2011
St. Ann
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
CRAWFORD MURPHY & TILLY INC.
$15,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFILTRATION CAUSING OVERLOADED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
THE CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGE FACILITIES AS PART OF THE OVERALL PROJECT SANITARY
RELIEF PROJECT.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2009, FOR $1,000,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $15,000,000
SCHEDULE
COLDWATER SANITARY RELIEF SECTION B, C & D WET
WEATHER STORAGE FACILITY TANK A
INFRASTRUCTURE
660
2011 762346ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2009 12/1/2010 4/1/2011
9/1/2010 4/1/2011 8/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10434
TASK #
015.2.1 $15,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006188
2011
St. Louis City
Various
Various
SANITARY REPLACEMENT
KUHLMANN DESIGN GROUP, INC.
$960,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL DETERIORATION IDENTIFIED DURING PERIODIC INSPECTION OF FLOOD CONTROL FACILITIES AND OUTFALL
STRUCTURES BY THE CORPS OF ENGINEERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF REHABILITATION, MODIFICATIONS, AND RIVERBED AND BANK REVETMENT PROTECTION TO THE BADEN AND MILL
CREEK OUTFALLS IN THE COMBINED SEWER AREAS IN THE CITY OF ST. LOUIS.
REMARKS
HIGH MISSISSIPPI RIVER LEVELS FLOODING OUTFALLS DELAYED DESIGN PROCESS.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $960,000
SCHEDULE
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE III
INFRASTRUCTURE
660
2011 789047ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 6/1/2010 10/1/2010
6/1/2010 10/1/2010 1/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10190
TASK #
015.1.1 $960,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11048
2011
St. Louis City
Various
Various
SANITARY REPLACEMENT
CITY OF ST. LOUIS
$3,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
CONTROL OF COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
DEMOLITION OF EXISTING STRUCTURES AND INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER
VOLUMES TO THE COMBINED SEWER SYSTEM.
REMARKS
PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITY OF ST. LOUIS. ANTICIPATE BOARD INTRODUCTION JULY, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,000,000
SCHEDULE
CSO VOLUME REDUCTION - GREEN INFRASTRUCTURE
(PILOT PROGRAM)
INFRASTRUCTURE
660
2011 934748ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
11048
TASK #
015.1.1 $3,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009060
2011
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$2,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY AND COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM COMBINED AND SANITARY RELIEF
SEWER PROJECTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION JUNE, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,000,000
SCHEDULE
EASEMENT ACQUISITION FOR COMBINED / SANITARY
PROJECTS (FY 2011)
INFRASTRUCTURE
660
2011 799749ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10584
TASK #
013.0 $2,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010161
2011
Various
Various
Various
EMERGENCY FUND
MSD
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUT NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE
DISTRICT MUST ACT IMMEDIATELY, PURSUANT TO ITS CHARTER, TO EFFECT SEWER REPAIRS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCY FUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
REMARKS
ANTICIPATE BOARD INTRODUCTION JULY, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
EMERGENCY REPAIR FUND APPROPRIATION (FY2011)
INFRASTRUCTURE
122
2011 854550ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10593
TASK #
015.1.1 $250,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009197
2011
Westwood
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
VANCE ENGINEERING, INC.
$1,848,000
St. Louis Metropolitan Sewer District - Fiscal Year
WET WEATHER SANITARY BACKUPS AND A CONSTRUCTED SSO.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATE APPROXIMATELY 17,500 FEET OF 8-INCH TO 18-INCH SEWERS AND 98 MANHOLES, AND PERFORM PRIVATE I/I
REDUCTION ON 40 PROPERTIES. REMOVE ONE SSO.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2010, FOR $156,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,848,000
SCHEDULE
FALLBROOK - DEVONDALE I/I REDUCTION (SKME -644 &
645)
INFRASTRUCTURE
660
2011 853851ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 11/1/2010 3/1/2011
11/1/2010 3/1/2011 5/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10381
TASK #
015.1.1
10381 015.1.2 $348,000.00
$1,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005059
2011
Florissant
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
HORNER & SHIFRIN
$5,300,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 9,340 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARY RELIEF SEWERS FROM MENKE PLACE,
EAST ALONG FOUNTAIN CREEK TO NORTH FLORISSANT ROAD. REMOVE BP-111, 132, 528, 571, & 572.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006 FOR $880,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $5,300,000
SCHEDULE
FOUNTAIN/ANTHONY LATERAL SANITARY RELIEF (SKME
236)
INFRASTRUCTURE
660
2011 660052ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2005 5/1/2010 5/1/2011 9/1/2011
6/1/2007 5/1/2011 9/1/2011 3/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10118
TASK #
015.1.1 $5,300,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006117
2011
Glendale
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
EDM, INCORPORATED
$750,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 1,150 FEET OF 8-INCH TO 21-INCH DIAMETER SANITARY RELIEF SEWER IN GLENDALE.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2008, FOR $160,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $750,000
SCHEDULE
GLENDALE SECTION D SANITARY RELIEF (SKME-624)
INFRASTRUCTURE
660
2011 692553ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2009 4/1/2010 12/1/2010 4/1/2011
4/1/2010 12/1/2010 4/1/2011 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10162
TASK #
015.1.1 $750,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006117A
2011
Glendale
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
MSD
$1,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE I/I IN SYSTEM CAUSING SSO ACTIVATION AND BASEMENT BACKUPS. I/I DEFECTS HAVE BEEN IDENTIFIED BY I/I
INVESTIGATION STUDIES. PUBLIC I/I REDUCTION IS REQUIRED.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATION OF APPROXIMATELY 6,600 FEET OF SEWER PIPES AND APPROXIMATELY 570 MANHOLES.
REMARKS
DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2009, FOR $179,000. THIS PROJECT MAY INCLUDE SEPARATE PUBLIC AND
PRIVATE I/I REDUCTION CONTRACTS.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,000,000
SCHEDULE
GLENDALE SECTION D SANITARY RELIEF PHASE II (SKME-
624) (I/I REDUCTION)
INFRASTRUCTURE
660
2011 845054ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2010 N/A 3/1/2011 4/1/2011
11/1/2010 N/A 3/1/2011 11/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10457
TASK #
015.1.1 $1,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003061F
2011
Valley Park
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
HDR ENGINEERING, INC.
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
POWER SUPPLY RELIABILITY IMPROVEMENTS ARE NEEDED.
PROJECT PROBLEM
PROJECT SOLUTION
THIS APPROPRIATION WILL FUND THE INSTALLATION OF PREVIOUSLY PROCURED SWITCHGEAR AND CABINETS.
REMARKS
PREVIOUSLY PROCURED SWITCHGEAR WILL BE INSTALLED AS PART OF THIS CONTRACT.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
GRAND GLAIZE WWTP IMPROVEMENTS - MEDIUM
VOLTAGE SWITCHGEAR (INSTALLATION)
INFRASTRUCTURE
660
2011 872255ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2009 8/1/2010 12/1/2010
8/1/2010 12/1/2010 4/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10423
TASK #
015.1.2 $250,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
90044
2011
Unincorporated
Lemay/RDP
Martigney Creek
SANITARY REPLACEMENT
MSD
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE SEWERAGE PUMPING FACILITY.
PROJECT PROBLEM
PROJECT SOLUTION
ELIMINATE PUMPING FACILITY AT 4577 BURNCOATE DRIVE WITH GRAVITY SEWERS MEETING CURRENT METROPOLITAN ST. LOUIS
SEWER DISTRICT STANDARDS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
INFRASTRUCTURE REPAIR #015P BURNCOATE (P-321)
INFRASTRUCTURE
660
2011 540756ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2010 7/1/2010
6/1/2010 12/1/2010
EXPENSE TYPE = C
ORACLE PROJECT #
10650
TASK #
015.1.1 $400,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
93077D
2011
Chesterfield
Missouri
Caulks Creek
SANITARY REPLACEMENT
CRAWFORD MURPHY & TILLY, INC.
$2,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE SANITARY PUMP STATION.
PROJECT PROBLEM
PROJECT SOLUTION
FIFTH PHASE OF A MULTI- PHASE PROJECT. THIS PHASE CONSISTS OF UPGRADING OF THE THREE EXISTING PUMPS AND
ASSOCIATED APPURTENANCES WITHIN THE PUMP STATION (P-750).
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEARS 1996 AND 1997 FOR $978,000. A BUILDING PERMIT WILL BE REQUIRED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,500,000
SCHEDULE
INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-
750) PHASE V
INFRASTRUCTURE
660
2011 633757ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2010 12/1/2010 4/1/2011
10/1/2010 4/1/2011 4/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10655
TASK #
015.1.1 $2,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
93077J
2011
Chesterfield
Missouri
Caulks Creek
CAULKS CREEK CONSTRUCTION
FUND
CRAWFORD, MURPHY & TILLY, INC.
$300,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING FORCE MAIN IS DETERIORATED.
PROJECT PROBLEM
PROJECT SOLUTION
REIMBURSE ST. LOUIS COUNTY FOR CONSTRUCTION OF A CASING PIPE AS PART OF A COUNTY ROAD PROJECT, WHICH WILL BE
USED FOR FUTURE 36-INCH FORCE MAIN CONSTRUCTION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $300,000
SCHEDULE
INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-
750) PHASE VI CASING PIPE
INFRASTRUCTURE
610
2011 869458ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10657
TASK #
015.1.1 $300,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009065
2011
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$10,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
OLDER, DAMAGED, AND DETERIORATED SEWER SYSTEMS (6-36 INCH DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS,
AND LEAKING PIPES RESULTING IN STREET COLLAPSES, WATER BACK-UPS, COMBINED AND SANITARY SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
AS REPAIR OR REHABILITATION PROBLEMS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE WILL TAKE PLACE PROMPTLY UTILIZING BLANKET REHABILITATION CONTRACTS. IT IS ANTICIPATED THAT
REHABILITATION WILL CONTINUE FOR A 10 YEAR PERIOD OR UNTIL ALL SEWERS HAVE BEEN CLEANED, INSPECTED, AND
REHABILITATED AS NECESSARY.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $10,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2011)
INFRASTRUCTURE
660
2011 800059ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2010 N/A 10/1/2010 2/1/2011
9/1/2010 N/A 1/1/2011 1/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10660
TASK #
015.1.1
11068 015.1.1 $5,000,000.00
$5,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009063
2011
Various
Various
Various
SANITARY REPLACEMENT
MSD
$4,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.
PROJECT PROBLEM
PROJECT SOLUTION
AS THE REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE
PROMPTLY ISSUED.
REMARKS
ANTICIPATE BOARD INTRODUCTION SEPTEMBER, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $4,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS (SANITARY/COMBINED -
FY2011)
INFRASTRUCTURE
660
2011 741360ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = I
ORACLE PROJECT #
10662
TASK #
017.1
10662 017.2 $1,500,000.00
$2,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003067B
2011
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
BLACK AND VEATCH
$11,900,000
St. Louis Metropolitan Sewer District - Fiscal Year
WET WEATHER EXPANSION OF TREATMENT PLANT REQUIRES NEW OUTFALL SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT OUTFALL SEWER TO MISSISSIPPI RIVER.
REMARKS
THIS IS THE FINAL PORTION OF THE LEMAY WET WEATHER EXPANSION EFFORT, WHICH WAS DESIGNED IN FISCAL YEAR 2005, FOR
$3,100,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $11,900,000
SCHEDULE
LEMAY WWTP WET WEATHER EXPANSION OUTFALL
SEWER
INFRASTRUCTURE
660
2011 867561ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2009 8/1/2010 1/1/2011
8/1/2010 1/1/2011 1/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10683
TASK #
015.1.1 $11,900,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006167A
2011
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
HDR ENGINEERING, INC.
$7,150,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING TREATMENT FACILITY NEEDS ENHANCED FACILITIES FOR DISINFECTION TO MEET DEPARTMENT OF NATURAL RESOURCES
NPDES DISCHARGE PERMIT.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT DISINFECTION FACILITIES AT THE LOWER MERAMEC RIVER WWTP.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $2,500,000. 6 MONTH MDNR PERMIT REVIEW REQUIRED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $7,150,000
SCHEDULE
LOWER MERAMEC RIVER WWTP PHASE II (DISINFECTION)
INFRASTRUCTURE
660
2011 805762ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2010 9/1/2010
9/1/2010 9/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10463
TASK #
015.1.1 $7,150,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003064A
2011
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
CDG ENGINEERS
$3,820,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF PHASE II OF THE RECOMMENDED IMPROVEMENTS TO THE COMBINED SEWER SYSTEM ALONG PIERCE AVENUE
BETWEEN WISE AND MANCHESTER, AND ALONG SULPHUR AVENUE BETWEEN MANCHESTER AND RIVER DES PERES.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005, FOR $1,139,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,820,000
SCHEDULE
MANCHESTER AVENUE COMBINED SEWER RELIEF - PHASE
II
INFRASTRUCTURE
660
2011 867663ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2010 11/1/2010
11/1/2010 3/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10078
TASK #
015.2.1 $3,820,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006049
2011
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
PARSONS WATER &
INFRASTRUCTURE
$1,250,000
St. Louis Metropolitan Sewer District - Fiscal Year
LOCALIZED PROPERTY AND STREET FLOODING IN THE 3200 BLOCK OF PORTIS AVENUE.
PROJECT PROBLEM
PROJECT SOLUTION
PROPERTY ACQUISITION AND CONSTRUCT OF DETENTION BASINS. SUPPLEMENTAL DESIGN EFFORTS WILL ALSO BE REQUIRED AND
ARE INCLUDED.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $160,000. ORACLE PROJECT NUMBER 10145, TASK NUMBERS
011.2 ($130,000), 013.2 ($500,000), AND 015.1 ($620,000).
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,250,000
SCHEDULE
PORTIS #3242 COMBINED SEWER IMPROVEMENTS
INFRASTRUCTURE
660
2011 468364ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2010 7/1/2011 7/1/2012 11/1/2012
7/1/2011 7/1/2012 11/1/2012 11/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
SEE REMARKS
TASK #
$1,250,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009099
2011
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
HORNER & SHIFRIN, INC.
$700,000
St. Louis Metropolitan Sewer District - Fiscal Year
POWER FAILURES AT PUMP STATIONS WITH INADEQUATE STORAGE FACILITIES OR WITHOUT BACKUP GENERATORS CAUSE
SANITARY AND COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
INSTALL POWER SUPPLY IMPROVEMENTS AT VARIOUS SITES, INCLUDING BACKUP GENERATORS AND NATURAL GAS SUPPLY, OR
STORAGE DETENTION PIPES, TO REDUCE PUMP STATION OVERFLOWS IN THE EVENT OF POWER FAILURES.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2010, FOR $400,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $700,000
SCHEDULE
POWER SUPPLY IMPROVEMENTS AT VARIOUS SANITARY
PUMP STATIONS PHASE III
INFRASTRUCTURE
660
2011 843465ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2010 10/1/2010 2/1/2011 6/1/2011
10/1/2010 2/1/2011 6/1/2011 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10364
TASK #
015.1.1 $700,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010224
2011
St. Louis City and County
Various
Various
IMPROVEMENT FUND
MSD
$1,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
OVERCHARGED SANITARY SEWERS DURING WET WEATHER CAUSE BASEMENT BACKUPS.
PROJECT PROBLEM
PROJECT SOLUTION
MODIFICATION OF EXISTING BUILDING PLUMBING FACILITIES TO ELIMINATE RISK OF BASEMENT BACKUPS FROM OVERCHARGED
SEWER MAINS.
REMARKS
ANTICIPATE BOARD INTRODUCTION MARCH, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,000,000
SCHEDULE
PROGRAM TO ELIMINATE BASEMENT BACKUPS PHASE VI
INFRASTRUCTURE
102
2011 922666ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
ORACLE PROJECT #
10740
TASK #
017.1
10740 017.2 $500,000.00
$500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006170A
2011
Frontenac
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
BENHAM COMPANIES, LLC
$350,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER SURCHARGING, OVERFLOWS, WET WEATHER SANITARY BACK-UPS, AND ONE BYPASS STRUCTURE.
PROJECT PROBLEM
PROJECT SOLUTION
I/I REDUCTION, AND REMOVAL OF PRIVATE STORM INFLOWS TO THE SANITARY SYSTEM.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $350,000
SCHEDULE
STONINGTON SANITARY RELIEF (SKME -652) (I/I
REDUCTION)
INFRASTRUCTURE
660
2011 926067ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 9/1/2010 1/1/2011
9/1/2010 1/1/2011 1/1/2012
EXPENSE TYPE = N
ORACLE PROJECT #
10185
TASK #
015.2.1 $350,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003088B1
2011
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
PARSONS BRINCKERHOFF
$3,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
OVERLAND FLOODING CAUSED BY INSUFFICIENT INLET AND COLLECTOR SEWER CAPACITY AT THE UTAH & HUMPHREY LOCATION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 4,500 FEET OF 12-INCH TO 48-INCH DIAMETER STORM RELIEF SEWERS AND APPURTENANCES, TO
MINIMIZE THE POTENTIAL FOR BASEMENT BACKUPS AND SURFACE FLOODING DUE TO OVERCHARGED COMBINED SEWERS.
REMARKS
THE DESIGN OF THE TOTAL PROJECT WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $1,491,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,500,000
SCHEDULE
TOWER GROVE- MANCHESTER COMBINED SEWER SYSTEM
PHASE II (UTAH & HUMPHREY STORM RELIEF SEWERS)
INFRASTRUCTURE
660
2011 830968ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 7/1/2010 11/1/2010
5/1/2010 11/1/2010 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10778
TASK #
015.1.1 $3,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
87154A
2011
Des Peres
Meramec
Sugar Creek
SANITARY REPLACEMENT
CIVIL DESIGN, INC.
$2,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE SANITARY SEWER PUMP STATIONS.
PROJECT PROBLEM
PROJECT SOLUTION
ELIMINATE TWO PUMP STATIONS IN KIRKWOOD (KIRKWOOD NO. 5, AND GREENBRIAR ESTATES LIFT STATIONS NO. 3). INSTALL
APPROXIMATELY 3,820 FEET OF 8-INCH TO 10-INCH DIAMETER SANITARY SEWER FROM GLENWOOD LANE AND WILDWOOD LANE
NORTH BEYOND DOUGHERTY FERRY ROAD. ONE EMERGENCY OVERFLOW TO BE REMOVED. PRIVATE I/I CONTRIBUTORS WITHIN
THE TRIBUTARY AREA WILL BE REMOVED.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2008, FOR $250,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,000,000
SCHEDULE
UPPER SUGAR CREEK SANITARY RELIEF SEC. C PHASE II
INFRASTRUCTURE
660
2011 694769ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2009 2/1/2010 7/1/2010 11/1/2010
2/1/2010 7/1/2010 11/1/2010 1/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10477
TASK #
015.1.1 $2,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
89088A
2011
Olivette
Lemay/RDP
University City Branch
SANITARY REPLACEMENT
CRAWFOR, MURPHY, & TILLY, INC.
$3,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
REPLACE AND REHABILITATE VARIOUS SANITARY SEWERS AND STRUCTURES TO REMOVE PUBLIC I/I.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $309,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,000,000
SCHEDULE
UR-07 BON HILLS SANITARY RELIEF PHASE II
(REHABILITATION)
INFRASTRUCTURE
660
2011 850170ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 6/1/2010 10/1/2010
4/1/2009 10/1/2010 12/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10481
TASK #
015.1.1 $3,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006052B
2011
Clarkson Valley
Missouri
Caulks Creek
SANITARY REPLACEMENT
GEORGE BUTLER ASSOCIATES
$4,700,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 17,000 FEET OF 8-INCH TO 24-INCH DIAMETER SANITARY RELIEF SEWERS. REMOVE BP-026.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $1,200,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $4,700,000
SCHEDULE
VALLEY SANITARY RELIEF (SKME-014) PHASE II
INFRASTRUCTURE
660
2011 871571ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10147
TASK #
015.2.1 $4,700,000.00
AMOUNT
r -
L J
WASTEWATER CONTINUED PROJECTS
Some of the District's wastewater projects are continued from previous
fiscal years due to difficulties in easement acquisition, the permit process from
other agencies, design revisions or status, or other special requirements or issues.
There are five (5) projects that were identified in previous budget
supplements that are still in the design, permitting, and/or easement acquisition
process. These projects have a total estimated cost of $2,690,000.
The fiscal year indicated in parentheses at the end of each project title
indicates the budget year that the project was originally planned. The revenue to
construct these projects comes from the Sanitary Replacement Fund, the
appropriate Operation, Maintenance, Construction, and Improvement (OMCI)
Fund, or Special Funds.
73
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED WASTEWATER PROJECTS
$360,0001CSO - GREENBRIAR COMBINED SEWER
SEPARATION (FY06)
LADUE PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2010.
$280,0002CSO - MACKLIND OUTFALL L-062 SEPARATION
(FY08)
ST. LOUIS CITY PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN FEBRUARY,
2011.
$1,200,0003LEMAY WWTP AERATION BLOWER
MODIFICATIONS PHASE I (FY08)
UNINCORPORATED PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER,
2010.
$200,0004WEST WATSON ROAD.- NANELL LANE PHASE
II (FY07)
SUNSET HILLS PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN AUGUST,
2010.
$650,0005WHARF STREET PUMP STATION
REPLACEMENT (P-110) (WW) (FY09)
ST. LOUIS CITY PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2010.
$2,690,000TOTAL:
74
CONTINGENCY WASTEWATER PROJECTS
75
During the fiscal year, construction projects, when bid, may come in under budget.
As well, projects may be delayed due to permitting or easement acquisition issues.
When this occurs, there is unused funding in the Capital Program. This unused
funding can be reallocated to allow additional projects to proceed during the fiscal year,
if other projects planned in future fiscal years are ready to be bid.
The projects described in this section are not programmed in the 2010-2011
Capital Improvement and Replacement Program, but there is the possibility that their
schedules may proceed in such a manner as to enable them to start construction in Fiscal
Year 2011, if unused funding becomes available.
These 13 projects, totaling $ 61,505,000, are being presented in the Budget
Supplement to fulfill the requirements for public hearings for projects in the Capital
Program. If unused funding becomes available, and scheduling allows, the District may
seek Board approval to add these projects to the 2010-2011 Capital Improvement and
Replacement Program.
CONTENTS OF WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
77$136,0002009267
BOND PLACE SANITARY SEWERS (S.D. #2010094)78$94,0002010094
CHAI HOUSE PUMP STATION (P-747) ELIMINATION 79$141,0002010173
COLDWATER TREATMENT PLANT DISINFECTION
FACILITIES
80$7,500,0002008179
CREVE COEUR CREEK SANITARY TRUNK SEWER
RELIEF PHASE IIA
81$5,734,0002003063B1
CSO - CLAYTONIA TERRACE AND DALE AVE CSO
INTERCEPTOR (I-101A, 101B/L-126, 127)
SEPARATION
82$700,0002005104
CSO - MCKNIGHT RD SE OF HWY 40 CSO
INTERCEPTOR (I-292)/OUTFALL
83$3,200,0002006037
LEMAY WWTP MAINTENANCE BUILDING
STRUCTURAL REPAIR
84$150,0002008137
MERAMEC AND FOREST PARK PARKWAY
SANITARY SEWER IMPROVEMENTS
85$480,0002001070A
MISSOURI RIVER WWTP SECONDARY TREATMENT
EXPANSION AND DISINFECTION FACILITIES
(PARTIAL FUNDING)
86$42,000,0002006168A
SPRINGDALE LATERAL SANITARY RELIEF
(SKME-305)
87$220,0002006051
ST. LOUIS FLOOD PROTECTION SYSTEM - CORPS
OF ENGINEERS
88$150,0002006109C
VALLEY PARK/GRAND GLAIZE DIVERSION &
PUMP STATION
89$1,000,0002009255
$61,505,000TOTAL:
76
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009267
2012
University City
Lemay/RDP
University City Branch
SANITARY REPLACEMENT
MSD
$136,000
St. Louis Metropolitan Sewer District - Fiscal Year
18-INCH STORM SEWER IS DIRECTLY CONNECTED TO 21-INCH SANITARY SEWER ALONG OLIVE BLVD.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 240 FEET OF 18-INCH TO 24-INCH STORM SEWER FROM NEW MANHOLE ON EXISTING 18-
INCH LINE TO AN EXISTING STORM CHANNEL.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $136,000
SCHEDULE
BLANCHA DR. TO OLIVE BLVD. SEWER SEPARATION
INFRASTRUCTURE
660
2012 860677ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10393
TASK #
015.1.1 $136,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010094
2012
Sunset Hills
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
MSD
$94,000
St. Louis Metropolitan Sewer District - Fiscal Year
TWELVE PROPERTIES ARE SERVED BY A PRIVATE SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 60 FEET OF 8-INCH SANITARY SEWER, 6 MANHOLES, AND REHABILITATE 570 FEET OF 8-INCH SANITARY SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $94,000 $0 $0
SCHEDULE
BOND PLACE SANITARY SEWERS (S.D. #2010094)
INFRASTRUCTURE
660
2012 864478ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
11067
TASK #
15.1.1 $94,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010173
2012
Unincorporated
Missouri
Fee Fee Creek
SANITARY REPLACEMENT
ERM
$141,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING PUMP STATION CAN BE ELIMINATED.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 450 FEET OF 8-INCH SANITARY AND 80 FEET OF 18-INCH STORM SEWERS, AND ELIMINATE THE PUMP STATION.
REMARKS
CONSTRUCTION DESIGNED UNDER PROJECT 2009099.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $141,000
SCHEDULE
CHAI HOUSE PUMP STATION (P-747) ELIMINATION
INFRASTRUCTURE
660
2012 872379ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10550
TASK #
015.1.1 $141,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008179
2012
St. Louis County
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
BLACK AND VEATCH CORPORATION
$7,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
DISINFECT PLANT EFFLUENT TO COMPLY WITH FUTURE MDNR PERMITTING REQUIREMENTS BY 2013.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT DISINFECTION FACILITIES AT THE COLDWATER TREATMENT PLANT TO TREAT EFFLUENT DURING VARIOUS FLOW
CONDITIONS.
REMARKS
THE DESIGN OF THESE DISINFECTION FACILITIES WAS COMPLETED BY PROJECT 2006168. 6 MONTH MDNR PERMIT REVIEW
REQUIRED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $7,500,000
SCHEDULE
COLDWATER TREATMENT PLANT DISINFECTION FACILITIES
INFRASTRUCTURE
660
2012 763780ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10558
TASK #
015.1.1 $7,500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003063B1
2012
Chesterfield
Missouri
Creve Coeur Creek
SANITARY REPLACEMENT
ABNA ENGINEERING, INC.
$5,734,000
St. Louis Metropolitan Sewer District - Fiscal Year
GROWTH AND WET WEATHER INFILTRATION AND INFLOW OCCURRING WITHIN THE WATERSHED HAS RESULTED IN OVERCHARGING
OF THE TRUNK SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 3,100 FEET OF 8-INCH TO 60-INCH SANITARY RELIEF SEWER AND APPURTENANCES.
REMARKS
PHASE II WILL BE BUILT AS PART OF A ROAD CONSTRUCTION PROJECT BY MODOT, FUNDED VIA INTERGOVERNMENTAL
AGREEMENT. THIS PHASE WILL BE CONSTRUCTED BY MSD AFTER WORK IS COMPLETED BY MODOT.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $5,734,000
SCHEDULE
CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF
PHASE IIA
INFRASTRUCTURE
660
2012 836181ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2006 4/1/2010 2/1/2011 6/1/2011
5/1/2010 2/1/2011 6/1/2011 12/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10427
TASK #
015.2 $5,734,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005104
2012
Richmond Heights
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
WOOLPERT
$700,000
St. Louis Metropolitan Sewer District - Fiscal Year
IMPLEMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROL PLAN TO ADDRESS COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,030 FEET OF CIPP LINING, 1,150 FEET OF 15-INCH TO 21-INCH DIAMETER STORM SEWERS, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $700,000
SCHEDULE
CSO - CLAYTONIA TERRACE AND DALE AVE CSO
INTERCEPTOR (I-101A, 101B/L-126, 127) SEPARATION
INFRASTRUCTURE
660
2012 569182ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10449
TASK #
015.1.1 $700,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006037
2012
Brentwood
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
FARNSWORTH GROUP
$3,200,000
St. Louis Metropolitan Sewer District - Fiscal Year
IMPLEMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROL PLAN TO ADDRESS COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF A SEPARATE STORM SYSTEM FROM THE COMBINED SYSTEM, COMBINED SYSTEM IMPROVEMENTS, AND
REMOVAL OF BP-023 & BP-478.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $500,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,200,000
SCHEDULE
CSO - MCKNIGHT RD SE OF HWY 40 CSO INTERCEPTOR (I-
292)/OUTFALL
INFRASTRUCTURE
660
2012 574983ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10141
TASK #
015.1.1 $3,200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008137
2012
Unincorporated
Lemay/RDP
Lemay Creek
SANITARY REPLACEMENT
MSD
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL DAMAGE TO FLOOR IN AREA OF WATER SOFTENER IN MAINTENANCE BUILDING.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM INSPECTION, ANALYSIS AND REPAIR OF REINFORCED CONCRETE FLOORS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
LEMAY WWTP MAINTENANCE BUILDING STRUCTURAL
REPAIR
INFRASTRUCTURE
660
2012 827784ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = O
ORACLE PROJECT #
10682
TASK #
015.1.1 $150,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001070A
2012
Clayton
Lemay/RDP
Black Creek
CLAYTON CENTRAL OMCI
MSD
$480,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE AND SUBSTANDARD SANITARY SEWER SYSTEMS ALONG FOREST PARK PARKWAY BETWEEN MERAMEC AND
BRENTWOOD.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 1,300 FEET OF EXISTING 6-INCH AND 8-INCH
DIAMETER SANITARY SEWER WITH 8-INCH AND 12-INCH DIAMETER SANITARY SEWER, AND ABANDON EXISTING, PARALLEL 10-INCH
SANITARY SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $480,000
SCHEDULE
MERAMEC AND FOREST PARK PARKWAY SANITARY
SEWER IMPROVEMENTS
INFRASTRUCTURE
563
2012 862485ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10704
TASK #
015.1.1 $480,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006168A
2012
Maryland Heights
Missouri
Missouri River Tributary Areas
SANITARY REPLACEMENT
BLACK AND VEATCH CORP.
$42,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
MISSOURI RIVER WWTP IS CURRENTLY APPROACHING ITS DESIGN CAPACITY FOR PEAK FLOW WET WEATHER OPERATION AND FOR
MEETING MDNR DISCHARGE REQUIREMENTS FOR SECONDARY TREATMENT AND FLOW DISINFECTION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF ADDITIONAL SECONDARY TREATMENT AND DISINFECTION FACILITIES AT THE MISSOURI RIVER WWTP TO
ACCOMMODATE PEAK FLOWS AND TO MEET MDNR DISCHARGE REQUIREMENTS.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2008, FOR $5,700,000. 6 MONTH MDNR PERMIT REVIEW REQUIRED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $42,000,000
SCHEDULE
MISSOURI RIVER WWTP SECONDARY TREATMENT
EXPANSION AND DISINFECTION FACILITIES (PARTIAL
FUNDING)
INFRASTRUCTURE
660
2012 763686ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10710
TASK #
015.1.1 $42,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006051
2012
Bel-Ridge
Bissell
Maline Creek
SANITARY REPLACEMENT
MSD
$220,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 700 FEET OF 12-INCH DIAMETER SANITARY RELIEF SEWERS, NEAR SPRINGDALE AVENUE
AND TORCHLITE LANE, AND ELIMINATE BP-318.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $220,000
SCHEDULE
SPRINGDALE LATERAL SANITARY RELIEF (SKME-305)
INFRASTRUCTURE
660
2012 676487ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10759
TASK #
015.1.1 $220,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006109C
2012
St. Louis City
Bissell
VARIOUS
SANITARY REPLACEMENT
CORPS OF ENGINEERS
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
A CORPS OF ENGINEERS EVALUATION OF THE FLOODWALL PUMP STATIONS IS NEEDED FOR FUTURE REHABILITATION EFFORTS.
PROJECT PROBLEM
PROJECT SOLUTION
THE CORPS IS TO PERFORM A STUDY OF THE PUMP STATIONS, IN ORDER TO ENABLE FUTURE FEDERAL FUNDING OF
REHABILITATION EFFORTS.
REMARKS
THIS APPROPRIATION REPRESENTS MSD'S LOCAL MATCH SHARE REQUIRED FOR THE CORPS' STUDY.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
ST. LOUIS FLOOD PROTECTION SYSTEM - CORPS OF
ENGINEERS
INFRASTRUCTURE
660
2012 932288ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = N
ORACLE PROJECT # TASK #
$150,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009255
2012
Valley Park
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
MSD
$1,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
DURING HEAVY RAINS THE TREATMENT PLANT CANNOT HANDLE THE FLOW AND SEWAGE BACKUPS OCCUR INTO BASEMENTS IN
VALLEY PARK.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT PUMP STATION AND ASSOCIATED PIPING TO DIVERT FLOWS INTO THE STORAGE LAGOONS AT THE GRAND GLAIZE
TREATMENT PLANT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,000,000
SCHEDULE
VALLEY PARK/GRAND GLAIZE DIVERSION & PUMP STATION
INFRASTRUCTURE
660
2012 859689ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10787
TASK #
015.1.1 $1,000,000.00
AMOUNT
r -
L J
PROJECTED MULTI-YEAR CAPITAL IMPROVEMENT
AND REPLACEMENT PROGRAM
FOR WASTEWATER PROJECTS
91
This section sorts by Fiscal Year and by Fund Name the projected list of
wastewater projects to be implemented by the District in the near future, beginning with
Fiscal Year 2011. As funding, priorities, and regulatory requirements change over time,
the projected capital program will also change.
The majority of the wastewater projects in the District will be funded from the
Sanitary Replacement Fund. This fund receives its revenue from the Sanitary User
Charge.
The remaining projects will be funded with revenues from various Operation,
Maintenance, Construction, and Improvement (OMCI) Funds, Construction Funds,
Special Funds, or the Improvement Fund. The property taxes collected within the
boundaries of OMCI Taxing Districts must be spent for improvements within their
specific areas of collection. The Construction Fund and Improvement Fund receive
revenues from various connection fees.
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
CAULKS CREEK CONSTRUCTION FUND
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI CASING PIPE
$300,000CHESTERFIELD
1 $300,000SUBTOTALNUMBER OF PROJECTS =
EMERGENCY FUND
EMERGENCY REPAIR FUND APPROPRIATION
(FY2011)
$250,000VARIOUS
1 $250,000SUBTOTALNUMBER OF PROJECTS =
IMPROVEMENT FUND
PROGRAM TO ELIMINATE BASEMENT BACKUPS
PHASE VI
$1,000,000ST. LOUIS CITY AND
COUNTY
1 $1,000,000SUBTOTALNUMBER OF PROJECTS =
SANITARY REPLACEMENT
AYRES SANITARY RELIEF AND I/I REDUCTION
(DESIGN)
$420,000ST. LOUIS COUNTY
BOPP SANITARY RELIEF I/I REDUCTION (SKME
-611)
$1,070,000DES PERES
BRIGHTWELL SANITARY RELIEF (SKME-213)$2,647,000FLORISSANT
CAPILIA SANITARY RELIEF (SKME-511)
(REHABILITATION)
$900,000GRANTWOOD
VILLAGE
CC-15 SEVEN PINES TO BENNINGTON PLACE
SANITARY RELIEF PHASE II (SKME-033)
$1,500,000UNINCORPORATED
CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II (DESIGN)
$300,000CHESTERFIELD
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - NORTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
$1,500,000VARIOUS
92
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - SOUTH (FY2011) (SUPPLEMENTAL
APPROPRIATION)
$1,500,000VARIOUS
COLDWATER SANITARY RELIEF SECTION B, C &
D WET WEATHER STORAGE FACILITY TANK A
$15,000,000ST. ANN
COLDWATER WET WEATHER STORAGE
FACILITY TANK A (ENGINEERING
CONSTRUCTION SERVICES)
$350,000ST. LOUIS COUNTY
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2011)
(SUPPLEMENTAL APPROPRIATION)
$5,000,000VARIOUS
CREVE COEUR CREEK WATERSHED SANITARY
SEWER REHABILITATION (DESIGN)
$400,000ST. LOUIS COUNTY
CSO - GREENBRIAR COMBINED SEWER
SEPARATION
$360,000LADUE
CSO - INTERCEPTOR & OUTFALL
MODIFICATIONS PHASE III
$960,000ST. LOUIS CITY
CSO - MACKLIND OUTFALL L-062 SEPARATION $280,000ST. LOUIS CITY
CSO VOLUME REDUCTION - GREEN
INFRASTRUCTURE (PILOT PROGRAM)
$3,000,000ST. LOUIS CITY
DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407) (DESIGN)
$152,000UNINCORPORATED
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2011)
$2,000,000ST. LOUIS CITY AND
COUNTY
FALLBROOK - DEVONDALE I/I REDUCTION
(SKME -644 & 645)
$1,848,000WESTWOOD
FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION (DESIGN)
$270,000UNINCORPORATED
FOUNTAIN/ANTHONY LATERAL SANITARY
RELIEF (SKME 236)
$5,300,000FLORISSANT
GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF (DESIGN)
$850,000UNINCORPORATED
GLENDALE SECTION D SANITARY RELIEF
(SKME-624)
$750,000GLENDALE
GLENDALE SECTION D SANITARY RELIEF
PHASE II (SKME-624) (I/I REDUCTION)
$1,000,000GLENDALE
93
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION (DESIGN)
$870,000GLENDALE
GRAND GLAIZE WWTP IMPROVEMENTS -
MEDIUM VOLTAGE SWITCHGEAR
(INSTALLATION)
$250,000VALLEY PARK
HERMITAGE I/I REDUCTION (SKME-615)
(DESIGN)
$175,000FRONTENAC
INFRASTRUCTURE REPAIR #015P BURNCOATE
(P-321)
$400,000UNINCORPORATED
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE V
$2,500,000CHESTERFIELD
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY 2011)
$10,000,000ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2011)
$4,000,000VARIOUS
LEMAY WWTP AERATION BLOWER
MODIFICATIONS PHASE I
$1,200,000UNINCORPORATED
LEMAY WWTP WET WEATHER EXPANSION
OUTFALL SEWER
$11,900,000UNINCORPORATED
LOWER MERAMEC RIVER WWTP PHASE II
(DISINFECTION)
$7,150,000UNINCORPORATED
MANCHESTER AVENUE COMBINED SEWER
RELIEF - PHASE II
$3,820,000ST. LOUIS CITY
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS (DESIGN)
$350,000UNINCORPORATED
NEW ENGLAND TOWN QUARRY PUMP STATION
(P-307) (SKME-544) IMPROVEMENTS (DESIGN)
$650,000UNINCORPORATED
OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET (DESIGN)
$800,000ST. LOUIS CITY
PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
$1,250,000ST. LOUIS CITY
POWER SUPPLY IMPROVEMENTS AT VARIOUS
SANITARY PUMP STATIONS PHASE III
$700,000ST. LOUIS CITY AND
COUNTY
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM
$500,000VARIOUS
RADAR RAINFALL DATA (FY2011)$120,000VARIOUS
94
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2011)
(SUPPLEMENTAL APPROPRIATION
$3,800,000ST. LOUIS COUNTY
STONINGTON SANITARY RELIEF (SKME -652) (I/I
REDUCTION)
$350,000FRONTENAC
TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (UTAH & HUMPHREY
STORM RELIEF SEWERS)
$3,500,000ST. LOUIS CITY
UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314) (DESIGN)
$330,000FERGUSON
UPPER SUGAR CREEK SANITARY RELIEF SEC. C
PHASE II
$2,000,000DES PERES
UR-07 BON HILLS SANITARY RELIEF PHASE II
(REHABILITATION)
$3,000,000OLIVETTE
VALLEY SANITARY RELIEF (SKME-014) PHASE II $4,700,000CLARKSON VALLEY
WATERSHED FACILITY PLANNING (FY2011
SUPPLEMENTAL APPROPRIATION)
$6,200,000ST. LOUIS CITY AND
COUNTY
WEST WATSON ROAD.- NANELL LANE PHASE II $200,000SUNSET HILLS
WHARF STREET PUMP STATION REPLACEMENT
(P-110) (WW)
$650,000ST. LOUIS CITY
WISE AND MABEL SEWER SEPARATION
(DESIGN)
$750,000RICHMOND HEIGHTS
53 $119,472,000SUBTOTALNUMBER OF PROJECTS =
$121,022,000NUMBER OF PROJECTS = 56GRAND TOTALS:
95
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
CAULKS CREEK CONSTRUCTION FUND
CAULKS CREEK TRUNK SEWER LINE A
SANITARY REPLACEMENT (DESIGN)
$300,000CHESTERFIELD
1 $300,000SUBTOTALNUMBER OF PROJECTS =
CLAYTON CENTRAL OMCI
MERAMEC AND FOREST PARK PARKWAY
SANITARY SEWER IMPROVEMENTS
$480,000CLAYTON
1 $480,000SUBTOTALNUMBER OF PROJECTS =
EMERGENCY FUND
EMERGENCY REPAIR FUND APPROPRIATION
(FY2012)
$250,000VARIOUS
1 $250,000SUBTOTALNUMBER OF PROJECTS =
IMPROVEMENT FUND
PROGRAM TO ELIMINATE BASEMENT BACKUPS
PHASE VI (SUPPLEMENTAL APPROPRIATION)
$1,000,000ST. LOUIS CITY AND
COUNTY
1 $1,000,000SUBTOTALNUMBER OF PROJECTS =
MO RIVER BONFIL OMCI
MISSOURI RIVER BONFILS SANITARY SEWER
REHABILITATION
$2,500,000BRIDGETON
1 $2,500,000SUBTOTALNUMBER OF PROJECTS =
SANITARY REPLACEMENT
BISSELL WWTP DISINFECTION FACILITIES $20,740,000ST. LOUIS CITY
BISSELL WWTP DISINFECTION FACILITIES
(ENGINEERING CONSTRUCTION SERVICES)
$2,400,000ST. LOUIS CITY
96
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
$136,000UNIVERSITY CITY
BOND PLACE SANITARY SEWERS (S.D. #2010094)$94,000SUNSET HILLS
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - NORTH (FY2012) (SUPPLEMENTAL
APPROPRIATION)
$1,500,000VARIOUS
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - SOUTH (FY2012) (SUPPLEMENTAL
APPROPRIATION)
$1,500,000VARIOUS
CHAI HOUSE PUMP STATION (P-747)
ELIMINATION
$141,000UNINCORPORATED
COLDWATER TREATMENT PLANT
DISINFECTION FACILITIES
$7,500,000ST. LOUIS COUNTY
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2012)
(SUPPLEMENTAL APPROPRIATION)
$5,000,000VARIOUS
CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE IIA
$5,734,000CHESTERFIELD
CSO - CLAYTONIA TERRACE AND DALE AVE
CSO INTERCEPTOR (I-101A, 101B/L-126, 127)
SEPARATION
$700,000RICHMOND HEIGHTS
CSO - MCKNIGHT RD SE OF HWY 40 CSO
INTERCEPTOR (I-292)/OUTFALL
$3,200,000BRENTWOOD
DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION (DESIGN)
$400,000VARIOUS
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2012)
$2,000,000ST. LOUIS CITY AND
COUNTY
ELTON PUMP STATION (P-307) ELIMINATION $400,000UNINCORPORATED
HARMONY-ACORN SEWER SEPARATION AND I/I
REDUCTION (DESIGN)
$400,000UNINCORPORATED
HERMITAGE I/I REDUCTION (SKME-615)$2,000,000FRONTENAC
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2012)
$4,000,000VARIOUS
INFRASTRUCTURE REPAIRS(REHABILITATION)
(FY 2012)
$10,000,000ST. LOUIS CITY AND
COUNTY
97
PROJECT NAME MUNICIPALITY
PROJECT LISTING
WASTEWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
LEMAY WWTP DISINFECTION FACILITIES $22,312,000UNINCORPORATED
LEMAY WWTP DISINFECTION FACILITIES
(ENGINEERING CONSTRUCTION SERVICES)
$2,200,000UNINCORPORATED
LEMAY WWTP MAINTENANCE BUILDING
STRUCTURAL REPAIR
$150,000UNINCORPORATED
LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
$500,000UNINCORPORATED
MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION AND DISINFECTION
FACILITIES (PARTIAL FUNDING)
$42,000,000MARYLAND HEIGHTS
RADAR RAINFALL DATA (SUPPLEMENTAL
APPROPRIATION FY2012)
$130,000VARIOUS
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2012)
(SUPPLEMENTAL APPROPRIATION)
$3,500,000VARIOUS
SPRINGDALE LATERAL SANITARY RELIEF
(SKME-305)
$220,000BEL-RIDGE
ST. LOUIS FLOOD PROTECTION SYSTEM - CORPS
OF ENGINEERS
$150,000ST. LOUIS CITY
VALLEY PARK/GRAND GLAIZE DIVERSION &
PUMP STATION
$1,000,000VALLEY PARK
WATERSHED FACILITY PLANNING (FY2012
SUPPLEMENTAL APPROPRIATION)
$5,000,000ST. LOUIS CITY AND
COUNTY
30 $145,007,000SUBTOTALNUMBER OF PROJECTS =
$149,537,000NUMBER OF PROJECTS = 35GRAND TOTALS:
98
STORMWATER ENGINEERING PROJECTS
99
There are eighteen (18) projects included in this section. The total estimated
cost of these projects is $5,210,000. The program provides supplemental funding to
continue several programs, including the program for stream flow monitoring of
local streams for water quantity and water quality. General Services Agreements
are included in this section. Six (6) design contracts to assist with design of select
stormwater projects during Fiscal Year 2011 are also included.
PAGEPROJECT NAME
CONTENTS OF STORMWATER ENGINEERING PROJECTS
COST ESTIMATEPROJECT
NUMBER
CHERRY TREE LANE STORM IMPROVEMENT
(DESIGN)
102$150,0002007089
GENERAL SERVICES AGREEMENT - SEWER
& CHANNEL DESIGN (FY2011)
103$200,0002010251
GENERAL SERVICES AGREEMENT - SEWER
& CHANNEL DESIGN (FY2011)
104$200,0002010252
GENERAL SERVICES AGREEMENT - SEWER
& CHANNEL DESIGN (FY2011)
105$200,0002010253
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2011)
106$300,0002010250
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
107$250,0002010254
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
108$200,0002010247
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
109$200,0002010246
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
110$200,0002010245
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
111$200,0002010248
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
112$200,0002010249
LINDEN #1064 STORM SEWER (DESIGN)113$140,0002008050
RIDGEMOOR DRIVE STORM IMPROVEMENTS
AND I/I REDUCTION (SKME-574) (DESIGN)
114$360,0002009245
100
PAGEPROJECT NAME
CONTENTS OF STORMWATER ENGINEERING PROJECTS
COST ESTIMATEPROJECT
NUMBER
ROSEWOOD LANE & WOODARD DR. STORM
SEWER (DESIGN)
115$160,0002008224
STORMWATER INFRASTRUCTURE
IMPROVEMENTS (DESIGN) (2011)
116$600,0002010221
STREAM FLOW GAUGE OPERATION (USGS)
(FY 2011)
117$550,0002007266A
STREAM FLOW WATER QUALITY SAMPLING
(FY 2011)
118$400,0002010172
STREAMBANK STABILIZATION
IMPROVEMENTS (DESIGN) (2011)
119$700,0002010222
$5,210,000TOTAL:
101
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007089
2011
Olivette
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
CONSULTANT
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE STORM SEWER SYSTEM
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN 1,190 FEET OF 12-INCH TO 36-INCH DIAMETER STORM SEWER, 150 FEET OF 12-INCH DIAMETER CMP CULVERT, AND 370 FEET
OF 4 FOOT WIDE BY 1.5 FOOT HIGH CONCRETE BOX CULVERT.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2013, FOR $573,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
CHERRY TREE LANE STORM IMPROVEMENT (DESIGN)
STORMWATER
584
2011 9223102ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 11/1/2011 11/1/2012 3/1/2013
11/1/2011 11/1/2012 3/1/2013 3/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10209
TASK #
011.2 $150,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010251
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & CHANNEL DESIGN. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE
EITHER STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2011)
STORMWATER DISTRICTWIDE
102
2011 9283103ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10620
TASK #
011.6 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010252
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & CHANNEL DESIGN. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE
EITHER STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2011)
STORMWATER DISTRICTWIDE
102
2011 9285104ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10621
TASK #
011.6 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010253
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & CHANNEL DESIGN. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE
EITHER STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2011)
STORMWATER DISTRICTWIDE
102
2011 9287105ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10622
TASK #
011.6 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010250
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$300,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE
EITHER STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $300,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & PROCESS
DESIGN (FY2011)
STORMWATER DISTRICTWIDE
102
2011 9281106ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10623
TASK #
011.6 $300,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010254
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
PLANNING NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN FIRM FOR AS NEEDED STORMWATER PLANNING SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE
EITHER STORMWATER OR WASTEWATER.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
GENERAL SERVICES AGREEMENT - STORMWATER
PLANNING (FY2011)
STORMWATER DISTRICTWIDE
102
2011 9298107ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10624
TASK #
011.9 $250,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010247
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY
STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE EITHER
STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SURVEY SERVICES
(FY2011)
STORMWATER DISTRICTWIDE
102
2011 9275108ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10628
TASK #
011.8 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010246
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY
STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE EITHER
STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SURVEY SERVICES
(FY2011)
STORMWATER DISTRICTWIDE
102
2011 9274109ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10627
TASK #
011.8 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010245
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY
STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE EITHER
STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SURVEY SERVICES
(FY2011)
STORMWATER DISTRICTWIDE
102
2011 9271110ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10626
TASK #
011.8 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010248
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY
STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE EITHER
STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SURVEY SERVICES
(FY2011)
STORMWATER DISTRICTWIDE
102
2011 9277111ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10629
TASK #
011.8 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010249
2011
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY
STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES. SERVICES WILL BE FOR FY 2011 AND 2012, AND MAY INCLUDE EITHER
STORMWATER OR WASTEWATER SERVICES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SURVEY SERVICES
(FY2011)
STORMWATER DISTRICTWIDE
102
2011 9280112ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10630
TASK #
011.8 $200,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008050
2011
Richmond Heights
Lemay/RDP
Deer Creek
BLACK CREEK OMCI
CONSULTANT
$140,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT FLOODING IN THE 1000 BLOCKS OF EAST LINDEN AVENUE AND TERRACE DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 1,200 FEET OF 12-INCH TO 72-INCH DIAMETER
STORM SEWER AND APPURTENANCES.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2013, FOR $540,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $140,000
SCHEDULE
LINDEN #1064 STORM SEWER (DESIGN)
STORMWATER
594
2011 8284113ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 11/1/2011 11/1/2012 3/1/2013
11/1/2011 11/1/2012 3/1/2013 3/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10289
TASK #
011.2 $140,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009245
2011
Clayton
Lemay/RDP
Black Creek
BLACK CREEK OMCI
CONSULTANT
$360,000
St. Louis Metropolitan Sewer District - Fiscal Year
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARY SEWER SURCHARGING, I/I ENTERING SANITARY SEWER SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 2,825 FEET OF 12-INCH TO 30-INCH DIAMETER
STORM SEWER, DETENTION BASIN, AND APPURTENANCES, AND ADDRESS PRIVATE I/I.
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2013, FOR $1,095,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $360,000
SCHEDULE
RIDGEMOOR DRIVE STORM IMPROVEMENTS AND I/I
REDUCTION (SKME-574) (DESIGN)
STORMWATER
594
2011 8609114ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 11/1/2011 11/1/2012 3/1/2013
11/1/2011 11/1/2012 3/1/2013 3/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10390
TASK #
011.2.1
10390 011.2.2 $50,000.00
$310,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008224
2011
Kirkwood
Meramec
Sugar Creek
SUGAR CREEK OMCI
CONSULTANT
$160,000
St. Louis Metropolitan Sewer District - Fiscal Year
STREET AND YARD FLOODING AT RESIDENCES ALONG ROSEWOOD LANE AND WOODARD DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 1835 FEET OF 12-INCH TO 33-INCH DIAMETER
STORM SEWER AND APPURTENANCES.
REMARKS
CONSTRUCTION IS TENTATIVELY ANTICIPATED IN FISCAL YEAR 2013, FOR $560,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $160,000
SCHEDULE
ROSEWOOD LANE & WOODARD DR. STORM SEWER
(DESIGN)
STORMWATER
583
2011 8555115ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2010 11/1/2011 11/1/2012 3/1/2013
11/1/2011 11/2012 3/1/2013 3/1/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10347
TASK #
011.2 $160,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010221
2011
St. Louis City and County
Various
Various
STORMWATER FACILITIES FUND
CONSULTANT
$600,000
St. Louis Metropolitan Sewer District - Fiscal Year
VARIOUS STORMWATER INFRASTRUCTURE PROBLEMS/NEEDS THROUGHOUT THE DISTRICT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN STORMWATER INFRASTRUCTURE IMPROVEMENTS FOR SIX PROJECTS WITHIN THE DISTRICT: EVERMAN, CORONA, LAVEN
DEL, STONINGTON, KINGSLAND, & COTTAGE.
REMARKS
CONSTRUCTION OF THESE PROJECTS IS TENTATIVELY PROGRAMMED IN FISCAL YEARS 2012 AND 2013.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $600,000
SCHEDULE
STORMWATER INFRASTRUCTURE IMPROVEMENTS
(DESIGN) (2011)
STORMWATER DISTRICTWIDE
700
2011 9221116ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2011 2/1/2012
2/1/2012 2/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10762
TASK #
011.2 $600,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007266A
2011
Various
Various
Various
STORMWATER FACILITIES FUND
U.S. GEOLOGICAL SURVEY
$550,000
St. Louis Metropolitan Sewer District - Fiscal Year
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND THE WATER
QUANTITY OF AREA STREAMS FOR USE IN HYDROLOGIC AND HYDRAULIC SYSTEM MODELS, PHASE II STORMWATER PROGRAM, AND
SANITARY SEWER OVERFLOW & TOTAL MAXIMUM DAILY LOAD RULES.
PROJECT PROBLEM
PROJECT SOLUTION
CONTINUE CURRENT DATA COLLECTION PROGRAM IN CONJUNCTION WITH THE U.S. DEPARTMENT OF GEOLOGICAL SURVEY.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2010. CONTRACT IS RENEWED ANNUALLY BASED ON PERFORMANCE AND DATA
NEEDS. THIS IS A SOLE SOURCE CONTRACT DUE TO THE SPECIAL NATURE OF THE WORK.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $550,000
SCHEDULE
STREAM FLOW GAUGE OPERATION (USGS) (FY 2011)
STORMWATER DISTRICTWIDE
700
2011 8716117ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10766
TASK #
016.2 $550,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010172
2011
Various
Various
Various
STORMWATER FACILITIES FUND
CONSULTANT
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND THE WATER QUALITY
OF AREA STREAMS FOR USE IN HYDROLOGIC AND HYDRAULIC SYSTEM MODELS, PHASE II STORMWATER PROGRAM, AND SANITARY
SEWER OVERFLOW & TOTAL MAXIMUM DAILY LOAD RULES.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM DATA COLLECTION PROGRAM.
REMARKS
VENDOR WILL BE SELECTED FOR SERVICES UNDER A MULTI-YEAR CONTRACT. ANTICIPATE BOARD INTRODUCTION IN NOVEMBER,
2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
STREAM FLOW WATER QUALITY SAMPLING (FY 2011)
STORMWATER DISTRICTWIDE
700
2011 8719118ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10768
TASK #
016.2 $400,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010222
2011
St. Louis City and County
Various
Various
STORMWATER FACILITIES FUND
CONSULTANT
$700,000
St. Louis Metropolitan Sewer District - Fiscal Year
VARIOUS STREAMBANK EROSION PROBLEMS/NEEDS THROUGHOUT THE DISTRICT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN STREAMBANK STABILIZATION IMPROVEMENTS FOR SIX PROJECTS WITHIN THE DISTRICT: CONWAY, HUDSON, WC33,
LINDBERGH, OLIVE, & RECO.
REMARKS
CONSTRUCTION OF THESE PROJECTS IS TENTATIVELY PROGRAMMED IN FISCAL YEARS 2012 AND 2013.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $700,000
SCHEDULE
STREAMBANK STABILIZATION IMPROVEMENTS (DESIGN)
(2011)
STORMWATER DISTRICTWIDE
700
2011 9222119ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2011 2/1/2012
2/1/2012 2/1/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10769
TASK #
011.2 $700,000.00
AMOUNT
r -
L J
STORMWATER CONSTRUCTION PROJECTS
121
The projects described in this section are related to constructing storm
sewers, channels, and creek bank stabilization, which will help alleviate flooding
and erosion problems. There are forty-six (46) projects planned at a total
estimated cost of $18,029,000.
The District's revenue sources to plan and construct these projects are from
the District's General Fund, Improvement Fund or from the collection of property
taxes that are placed in various Operation, Maintenance, Construction and
Improvement (OMCI) Funds currently established in certain areas of the District.
The property taxes collected within the boundaries of OMCI Taxing Districts must
be spent for improvements within their specific areas of collection.
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
ALPINE & RAMBLER STORM SEWER 126$100,0002010215
ARLEE & HOFFMEISTER STORM SEWER 127$400,0002009233
BOPP AND CLAYCHESTER STORM SEWER 128$65,0002008176
BRANFORD DRIVE #30 STORM SEWER 129$98,0002008118
BURNING TREE AND FOX RUN DRIVE
STORM SEWER
130$100,0002009050
CHALET COURT STORM SEWER 131$75,0002007262
CONWAY ROAD #11632 STORM SEWER 132$150,0002008083
CORNELL AVE. #8360 STORM SEWER (RAIN
GARDENS)
133$82,0002007181A
COUNT DRIVE #10556 STORM SEWER 134$31,0002009192
EASEMENT ACQUISITION FOR
STORMWATER PROJECTS (FY 2011)
135$400,0002010230
EAST WATSON AND KATHY CT. STORM
IMPROVEMENT
136$65,0002001037A
FIELDCREST AND FOURNIER CHANNEL
IMPROVEMENTS (GCMB-130)
137$600,0002007144
FIELDING ROAD #10 CHANNEL
IMPROVEMENTS
138$62,0002009075
GALLANT FOX DRIVE STORM SEWER 139$163,0002008195
GRAHAM ROAD #630 STORM SEWER 140$80,0002008196
122
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING TO CLOSE
OUT 576)
141$4,136,0002002035
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING)
142$486,0002002035
HOWDERSHELL PARK STORM
IMPROVEMENTS
143$82,0002010100
INNISFAIL #217 STORM CHANNEL 144$54,0002008188
IRENE & BOPP STORM SEWER 145$54,0002008182
IRIS LANE BANK STABILIZATION 146$75,0002008075
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING TO
CLOSE FUND 592)
147$117,0002009144
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING)
148$51,0002009144
LANETT CT. #11390 STORM IMPROVEMENT 149$156,0002009053
LATTY TO LAUPHER LANE STORM SEWER 150$100,0002008154
LINDSCOTT STORM SEWER 151$308,0002008093
LINWOOD & LANYARD STORM SEWER 152$73,0002008161
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING TO CLOSE 580)
153$42,0002008214
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING)
154$164,0002008214
123
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
MALUS & GREEN PARK STORM SEWER 155$472,0002007189
MARY AVENUE FLOOD MITIGATION 156$500,0002009156
MINERVA - WENGLER - BURNS STORM
SEWER
157$126,0002001083
MONTOUR 12000 BLOCK STORM SEWER 158$120,0002008158
NORMTON DRIVE BANK STABILIZATION 159$580,0002007075
PAXTON LANE TO RICARDO LANE STORM
IMPROVEMENTS
160$235,0002007193
RISSANT DRIVE #39 STORM SEWER 161$118,0002008191
RUTH-HELEN-CECELIA OUTFALL SEWER 162$1,300,0002005121A
SELMA & LANVALE STORM SEWER 163$58,0002008098
SHIREFORD LANE STORM IMPROVEMENT 164$123,00099140
STORMWATER INFRASTRUCTURE REPAIR
PROJECTS
165$4,000,0002009067
TEALBROOK ESTATES STORM SEWER 166$680,0002007128
THUNDERBIRD AND CARDINAL DRIVE
STORM SEWER
167$70,0002008190
TREADWAY LANE #4315 STORM SEWER 168$143,0002008104
WENNEKER - TREEBROOK LANE STORM
CHANNEL
169$580,0002007135
124
PAGEPROJECT NAME COST ESTIMATEPROJECT
NUMBER
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
WHITE BIRCH WAY - QUEEN ANN DRIVE
STORM SEWER
170$120,0002008186
WOODLEAF COURT STORM SEWER
IMPROVEMENTS
171$435,0002006069
$18,029,000TOTAL:
125
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010215
2011
Unincorporated
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$100,000
St. Louis Metropolitan Sewer District - Fiscal Year
STORM WATER SYSTEM CONNECTED TO SANITARY SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 340 FEET OF 12-INCH STORM SEWER AND APPURTENANCES.
REMARKS
THIS PROJECT WILL REMOVE STORMWATER FLOWS FROM BP-507.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $100,000
SCHEDULE
ALPINE & RAMBLER STORM SEWER
STORMWATER
571
2011 9179126ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2009 11/1/2010 1/1/2011 5/1/2011
10/1/2010 12/1/2010 4/1/2011 5/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10522
TASK #
015.1.1 $100,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009233
2011
Unincorporated
Lemay/RDP
Mississippi River Tributary Areas
STORMWATER FACILITIES FUND
BLACK AND VEATCH CORPORATION
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING STORM SEWER CONFLICTS WITH LEMAY TREATMENT PLANT OUTFALL.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT NEW STORM SEWER AND APPURTENANCES, TO CREATE AN ADEQUATE DISCHARGE POINT FOR EXISTING
STORM SEWER.
REMARKS
THIS PROJECT WAS DESIGNED AS PART OF THE LEMAY TREATMENT PLANT WET WEATHER EXPANSION PROJECT.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
ARLEE & HOFFMEISTER STORM SEWER
STORMWATER
700
2011 8578127ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/2009 9/1/2010 2/1/2011 6/1/2011
9/1/2010 2/1/2011 6/1/2011 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10389
TASK #
015.1.1 $400,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008176
2011
Des Peres
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
MSD
$65,000
St. Louis Metropolitan Sewer District - Fiscal Year
PONDING IN TWO YARDS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 365 FEET OF 12-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $65,000
SCHEDULE
BOPP AND CLAYCHESTER STORM SEWER
STORMWATER
566
2011 8336128ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 10/1/2010 1/1/2011 5/1/2011
9/1/2010 12/1/2010 4/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10536
TASK #
015.1.1 $65,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008118
2011
Olivette
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$98,000
St. Louis Metropolitan Sewer District - Fiscal Year
STORMWATER FLOODING AND DITCH EROSION IN AN AREA OF DISCONTINUOUS STORM SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 225 FEET OF 21-INCH TO 30-INCH STORM SEWERS AND APPURTENANCES, CONNECTING
TWO EXISTING STORM LINES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $98,000
SCHEDULE
BRANFORD DRIVE #30 STORM SEWER
STORMWATER
584
2011 7885129ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 5/1/2010 8/1/2010 12/1/2010
4/1/2010 7/1/2010 11/1/2010 1/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10538
TASK #
015.1.1 $98,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009050
2011
Florissant
Coldwater
Paddock Creek
PADDOCK CREEK OMCI
MSD
$100,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 485 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $100,000
SCHEDULE
BURNING TREE AND FOX RUN DRIVE STORM SEWER
STORMWATER
581
2011 8392130ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 9/1/2010 12/1/2010 4/1/2011
8/1/2010 11/1/2010 3/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10543
TASK #
015.1.1 $100,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007262
2011
Creve Coeur
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC
OMCI
MSD
$75,000
St. Louis Metropolitan Sewer District - Fiscal Year
EROSION IN BACKYARD.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 70 FEET OF 15-INCH STORM SEWER AND APPURTENANCES, POTENTIALLY INCLUDING
RAIN GARDENS.
REMARKS
MSD HAS COMMITTED TO IMPLEMENTING RAIN GARDEN OR RELATED PLANT-BASED GREEN INFRASTRUCTURE PROJECTS AS PART
OF A DEER CREEK WATERSHED INITIATIVE IN PARTNERSHIP WITH MISSOURI BOTANICAL GARDEN AND IN CONJUNCTION WITH THE
MISSOURI DEPARTMENT OF CONSERVATION AND WASHINGTON UNIVERSITY, CONTINGENT UPON VOLUNTARY LANDOWNER
PARTICIPATION.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $75,000
SCHEDULE
CHALET COURT STORM SEWER
STORMWATER
565
2011 8079131ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2008 5/1/2010 7/1/2010 11/1/2010
4/1/2010 6/1/2010 10/1/2010 4/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10280
TASK #
015.1.1 $75,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008083
2011
Westwood
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC
OMCI
MSD
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 635 FEET OF 12-INCH TO 18-INCH DIAMETER STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
CONWAY ROAD #11632 STORM SEWER
STORMWATER
565
2011 8136132ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 9/1/2010 11/1/2010 3/1/2011
8/1/2010 10/1/2010 2/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10405
TASK #
015.1.1 $150,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007181A
2011
University City
Lemay/RDP
Black Creek
BLACK CREEK OMCI
MSD
$82,000
St. Louis Metropolitan Sewer District - Fiscal Year
STORMWATER FLOODING AND PONDING.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT RAIN GARDENS AS A PART OF THIS PROJECT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $82,000
SCHEDULE
CORNELL AVE. #8360 STORM SEWER (RAIN GARDENS)
STORMWATER
594
2011 8702133ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 5/1/2010 6/1/2010 10/1/2010
4/1/2010 5/1/2010 9/1/2010 12/1/2010
EXPENSE TYPE = C
ORACLE PROJECT #
10559
TASK #
015.1.1 $82,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009192
2011
Unincorporated
Bissell
Blackjack Creek
BLACKJACK- DELLWOOD OMCI
MSD
$31,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 110 FEET OF 12-INCH DIAMETER STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $31,000
SCHEDULE
COUNT DRIVE #10556 STORM SEWER
STORMWATER
567
2011 4050134ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 7/1/2010 10/1/2010 2/1/2011
6/1/2010 9/1/2010 1/1/2011 4/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10560
TASK #
015.1.1 $31,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010230
2011
St. Louis City and County
Various
Various
STORMWATER FACILITIES FUND
MSD
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
VARIOUS STORMWATER PROBLEMS THROUGHOUT THE DISTRICT.
PROJECT PROBLEM
PROJECT SOLUTION
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM STORMWATER PROJECTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION JUNE, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
EASEMENT ACQUISITION FOR STORMWATER PROJECTS
(FY 2011)
STORMWATER DISTRICTWIDE
700
2011 9207135ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10586
TASK #
013.0 $400,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001037A
2011
Sunset Hills
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$65,000
St. Louis Metropolitan Sewer District - Fiscal Year
OVERLAND FLOODING OF 3 HOMES ALONG EAST WATSON ROAD NEAR KATHY COURT.
PROJECT PROBLEM
PROJECT SOLUTION
WITH COOPERATION FROM THE HOMEOWNERS, FLOODPROOF #10209, #10215, AND #10221 EAST WATSON ROAD.
REMARKS
PROJECT IS ALSO PARTIALLY IN CRESTWOOD.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $65,000
SCHEDULE
EAST WATSON AND KATHY CT. STORM IMPROVEMENT
STORMWATER
571
2011 8641136ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2009 9/1/2010 11/1/2010 3/1/2011
8/1/2010 10/1/2010 2/1/2011 3/1/2011
EXPENSE TYPE = N
ORACLE PROJECT #
10588
TASK #
015.1.1 $65,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007144
2011
Crestwood
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$600,000
St. Louis Metropolitan Sewer District - Fiscal Year
15 YEAR FLOODING OF 10 YARDS ON FIELD CREST CT., PADDOCK CT., AND FOURNIER DR. 100 YEAR FLOODING OF SIX YARDS AND
FOUR HABITABLE STRUCTURES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 80 FEET OF 9-FEET WIDE BY 6-FEET HIGH REINFORCED CONCRETE BOX CULVERT UNDER
FOURNIER DRIVE, AND STREAM BANK STABILIZATION USING VEGETATED GABIONS UPSTREAM AND DOWNSTREAM OF THE BOX
CULVERT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $600,000
SCHEDULE
FIELDCREST AND FOURNIER CHANNEL IMPROVEMENTS
(GCMB-130)
STORMWATER
571
2011 7967137ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 5/1/2010 8/1/2010 12/1/2010
4/1/2010 6/1/2010 11/1/2010 6/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10234
TASK #
015.1.1 $600,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009075
2011
Ladue
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$62,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD EROSION
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 215 FEET OF TRAPEZOIDAL ROCK LINED CHANNEL.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $62,000
SCHEDULE
FIELDING ROAD #10 CHANNEL IMPROVEMENTS
STORMWATER
566
2011 4737138ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/2009 6/1/2010 9//2010 1/1/2011
5/1/2010 8/1/2010 12/1/2010 3/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10602
TASK #
015.1.1 $62,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008195
2011
Florissant
Coldwater
Paddock Creek
PADDOCK CREEK OMCI
MSD
$163,000
St. Louis Metropolitan Sewer District - Fiscal Year
REAR YARD FLOODING AT FIVE PROPERTIES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 730 FEET OF 12-INCH TO 24-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $163,000
SCHEDULE
GALLANT FOX DRIVE STORM SEWER
STORMWATER
581
2011 8356139ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 9/1/2010 3/1/2011 7/1/2011
8/1/2009 2/1/2011 6/1/2011 9/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10343
TASK #
015.1.1 $163,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008196
2011
Florissant
Coldwater
Fountain Creek
FOUNTAIN CREEK OMCI
MSD
$80,000
St. Louis Metropolitan Sewer District - Fiscal Year
DRIVEWAY AND YARD FLOODING AT THREE PROPERTIES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 230 FEET OF 12-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $80,000
SCHEDULE
GRAHAM ROAD #630 STORM SEWER
STORMWATER
569
2011 8358140ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 10/1/2010 1/1/2011 5/1/2011
9/1/2010 12/1/2012 4/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10633
TASK #
015.1.1 $80,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2002035
2011
Unincorporated
Bissell
Maline Creek
STORMWATER FACILITIES FUND
REITZ & JENS, INC.
$4,136,000
St. Louis Metropolitan Sewer District - Fiscal Year
DAMAGE TO PROPERTY DUE TO EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 1,220 FEET OF 45 FEET WIDE BY 12 FEET HIGH VERTICAL WALL CHANNEL, FROM VORHOFF DRIVE
SOUTH TO HUDSON DRIVE.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005, FOR $451,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $4,136,000
SCHEDULE
HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
(PARTIAL FUNDING TO CLOSE OUT 576)
STORMWATER
700
2011 8204141ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2004 8/1/2006 6/1/2010 10/1/2010
8/1/2006 7/1/2007 10/1/2010 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10067
TASK #
015.1.1 $4,136,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2002035
2011
Unincorporated
Bissell
Maline Creek
MALINE CREEK OMCI
REITZ & JENS, INC.
$486,000
St. Louis Metropolitan Sewer District - Fiscal Year
DAMAGE TO PROPERTY DUE TO EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 1,220 FEET OF 45 FEET WIDE BY 12 FEET HIGH VERTICAL WALL CHANNEL, FROM VORHOFF DRIVE
SOUTH TO HUDSON DRIVE.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005, FOR $451,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $486,000
SCHEDULE
HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
(PARTIAL FUNDING)
STORMWATER
576
2011 6215142ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2004 8/1/2006 5/1/2010 9/1/2010
8/1/2006 7/1/2007 9/1/2010 6/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10067
TASK #
015.1.1 $486,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010100
2011
Hazelwood
Coldwater
Coldwater Creek
LYNN HAVEN OMCI
MSD
$82,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD EROSION NEAR EXISTING AREA INLET.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT A JUNCTION CHAMBER ON AN EXISTING 60-INCH PIPE, WITH 3 AREA INLETS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $82,000
SCHEDULE
HOWDERSHELL PARK STORM IMPROVEMENTS
STORMWATER
575
2011 8650143ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 6/1/2010 10/1/2010
5/1/2010 9/1/2012 11/1/2010
EXPENSE TYPE = C
ORACLE PROJECT #
10647
TASK #
015.1.1 $82,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008188
2011
Webster Groves
Lemay/RDP
Seminary Branch
SEMINARY OMCI
MSD
$54,000
St. Louis Metropolitan Sewer District - Fiscal Year
POTENTIAL FAILURE OF VERTICAL WALL ON EAST SIDE OF CREEK BANK.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVE EXISTING CONCRETE WALL AND REPLACE WITH BIOSTABILIZATION AND ROCK TOE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $54,000
SCHEDULE
INNISFAIL #217 STORM CHANNEL
STORMWATER
593
2011 8352144ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/2009 6/1/2010 9/1/2010 1/1/2011
5/1/2010 8/1/2010 12/1/2010 3/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10666
TASK #
015.1.1 $54,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008182
2011
Des Peres
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
MSD
$54,000
St. Louis Metropolitan Sewer District - Fiscal Year
RUNOFF FROM BOPP ROAD CAUSING YARD EROSION AT #2 IRENE COURT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 163 FEET OF 12-INCH DIAMETER STORM SEWER AND 28 FEET OF 15-INCH STORM SEWER,
AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $54,000
SCHEDULE
IRENE & BOPP STORM SEWER
STORMWATER
566
2011 4695145ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 9/1/2010 12/1/2010 4/1/2011
8/1/2010 11/1/2010 3/1/2011 6/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10667
TASK #
015.1.1 $54,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008075
2011
Kirkwood
Meramec
Sugar Creek
SUGAR CREEK OMCI
MSD
$75,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
RESHAPE AND PROTECT 220 FEET OF EARTHEN SWALE WITH VEGETATED REINFORCEMENT MAT AND EIGHT GRADE CONTROL
STRUCTURES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $75,000
SCHEDULE
IRIS LANE BANK STABILIZATION
STORMWATER
583
2011 3975146ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2008 5/1/2010 8/1/2010 12/1/2010
4/1/2010 7/1/2010 11/1/2010 1/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10668
TASK #
015.1.1 $75,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009144
2011
Shrewsbury
Lemay/RDP
Mackenzie Creek
STORMWATER FACILITIES FUND
MSD
$117,000
St. Louis Metropolitan Sewer District - Fiscal Year
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 600 FEET OF 12-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $117,000
SCHEDULE
JACOBS OLD COAL ROAD & NOTTINGHAM STORM SEWER
(PARTIAL FUNDING TO CLOSE FUND 592)
STORMWATER
700
2011 8477147ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 11/1/2010 1/1/2011 6/1/2011
10/1/2010 12/1/2010 5/1/2011 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10372
TASK #
015.1.1 $117,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009144
2011
Shrewsbury
Lemay/RDP
Mackenzie Creek
SHREWSBURY OMCI
MSD
$51,000
St. Louis Metropolitan Sewer District - Fiscal Year
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 600 FEET OF 12-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $51,000
SCHEDULE
JACOBS OLD COAL ROAD & NOTTINGHAM STORM SEWER
(PARTIAL FUNDING)
STORMWATER
592
2011 8476148ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 11/1/2010 1/1/2011 6/1/2011
10/1/2010 12/1/2010 5/1/2011 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10372
TASK #
015.1.1 $51,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009053
2011
Unincorporated
Bissell
Watkins Creek
WATKINS CREEK OMCI
MSD
$156,000
St. Louis Metropolitan Sewer District - Fiscal Year
CHANNEL BANK EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 180 FEET OF CHANNEL BANK STABILIZATION AND 30 FEET OF 12-INCH DIAMETER STORM
SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $156,000
SCHEDULE
LANETT CT. #11390 STORM IMPROVEMENT
STORMWATER
587
2011 4564149ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2009 1/1/2011 3/1/2011 12/11/2011
12/1/2010 2/1/2011 6/1/2011 1/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10349
TASK #
015.1.1 $156,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008154
2011
Hazelwood
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$100,000
St. Louis Metropolitan Sewer District - Fiscal Year
FLOODING
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 250 FEET OF 36-INCH STORM SEWERS AND APPURTENANCES
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $100,000
SCHEDULE
LATTY TO LAUPHER LANE STORM SEWER
STORMWATER
564
2011 7848150ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 10/1/2010 1/1/2011 5/1/2011
9/1/2010 12/1/2010 4/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10673
TASK #
015.1.1 $100,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008093
2011
St. John
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$308,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD, STRUCTURE AND BASEMENT FLOODING AT 3443 LINDSCOTT AVENUE AND NEIGHBORING PROPERTIES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,225 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $308,000
SCHEDULE
LINDSCOTT STORM SEWER
STORMWATER
564
2011 8132151ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2009 12/1/2010 1/1/2011 5/1/2011
12/1/2010 12/1/2010 4/1/2011 12/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10307
TASK #
015.1.1 $308,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008161
2011
Kirkwood
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
MSD
$73,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD RUNOFF.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 280 FEET OF 15-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $73,000
SCHEDULE
LINWOOD & LANYARD STORM SEWER
STORMWATER
566
2011 4620152ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2009 9/1/2010 1/1/2011 6/1/2011
8/1/2010 12/1/2010 5/1/2011 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10685
TASK #
015.1.1 $73,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008214
2011
Ferguson
Bissell
Maline Creek
STORMWATER FACILITIES FUND
MSD
$42,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE STORM SEWER CAUSING STREET FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 540 FEET OF 12-INCH TO 30-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $42,000
SCHEDULE
MABLE AVE. AND CARSON ROAD STORM SEWER (PARTIAL
FUNDING TO CLOSE 580)
STORMWATER
700
2011 8393153ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 4/1/2010 7/1/2010 11/1/2010
3/1/2010 6/1/2010 10/1/2010 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10698
TASK #
015.1.1 $42,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008214
2011
Ferguson
Bissell
Maline Creek
NORTH KINLOCH OMCI
MSD
$164,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE STORM SEWER CAUSING STREET FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 540 FEET OF 12-INCH TO 30-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $164,000
SCHEDULE
MABLE AVE. AND CARSON ROAD STORM SEWER (PARTIAL
FUNDING)
STORMWATER
580
2011 8379154ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 4/1/2010 7/1/2010 11/1/2010
3/1/2010 6/1/2010 10/1/2010 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10698
TASK #
015.1.1 $164,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007189
2011
Unincorporated
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$472,000
St. Louis Metropolitan Sewer District - Fiscal Year
EROSION ALONG CREEK BANK BEHIND HOMES ON MALUS DRIVE, GREEN PARK ROAD, AND DOLPH LANE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 765 FEET OF 12-INCH TO 36-INCH DIAMETER STORM SEWER, AND APPROXIMATELY 295
FEET OF 7.5-FOOT BY 4-FOOT REINFORCED CONCRETE CHANNEL.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $472,000
SCHEDULE
MALUS & GREEN PARK STORM SEWER
STORMWATER
571
2011 4722155ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2008 6/1/2010 9/1/2010 1/1/2011
5/1/2010 8/1/2010 12/1/2010 11/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10252
TASK #
015.1.1 $472,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009156
2011
Brentwood
Lemay/RDP
Deer Creek
DEER CREEK OMCI
CITY OF BRENTWOOD
$500,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL FLOODING OF RESIDENTIAL BUILDINGS.
PROJECT PROBLEM
PROJECT SOLUTION
BUYOUT FLOOD PRONE PROPERTIES, AND REMOVE STRUCTURES.
REMARKS
THIS PROJECT IS TO BE CARRIED OUT BY THE CITY OF BRENTWOOD, WITH MSD PROVIDING A 25% MATCH TO AN ANTICIPATED
STATE FLOOD MITIGATION GRANT. ANTICIPATE BOARD INTRODUCTION JUNE, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $500,000
SCHEDULE
MARY AVENUE FLOOD MITIGATION
STORMWATER
566
2011 8487156ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10701
TASK #
015.1.1 $500,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001083
2011
Overland
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$126,000
St. Louis Metropolitan Sewer District - Fiscal Year
FREQUENT STRUCTURAL, STREET, AND YARD FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 505 FEET OF 12-INCH TO 18-INCH DIAMETER STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $126,000
SCHEDULE
MINERVA - WENGLER - BURNS STORM SEWER
STORMWATER
584
2011 3703157ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 9/1/2010 12/1/2010 4/1/2011
8/1/2010 11/1/2010 3/1/2011 7/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10060
TASK #
015.1.1 $126,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008158
2011
Des Peres
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
MSD
$120,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING FROM SHEET FLOW.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 537 FEET OF 12-INCH RCP STORM SEWER, 5 INLETS, AND 1 MANHOLE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $120,000
SCHEDULE
MONTOUR 12000 BLOCK STORM SEWER
STORMWATER
566
2011 4094158ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2009 9/1/2010 1/1/2011 6/1/2011
8/1/2010 12/1/2010 5/1/2011 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10713
TASK #
015.1.1 $120,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007075
2011
Ladue
Lemay/RDP
Black Creek
BLACK CREEK OMCI
STANTEC CONSULTING SERVICES,
INC.
$580,000
St. Louis Metropolitan Sewer District - Fiscal Year
CREEK EROSION ALONG BLACK CREEK NEAR THE EAST END OF NORMTON DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 715 FEET OF STREAM BANK STABILIZATION USING VARIOUS METHODS.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2009 BY DEER CREEK WATERSHED STORM CHANNEL IMPROVEMENTS (DESIGN) 2008138.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $580,000
SCHEDULE
NORMTON DRIVE BANK STABILIZATION
STORMWATER
594
2011 7865159ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 3/1/2010 2/1/2011 6/1/2011
3/1/2010 2/1/2011 6/1/2011 10/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10200
TASK #
015.1.1 $580,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007193
2011
Ladue
Lemay/RDP
Black Creek
BLACK CREEK OMCI
MSD
$235,000
St. Louis Metropolitan Sewer District - Fiscal Year
CREEK EROSION BEHIND HOMES ON THE EAST SIDE OF RIO VISTA DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 540 FEET OF BANK STABILIZATION AND 125 FEET OF 15-INCH TO 24-INCH DIAMETER
STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $235,000
SCHEDULE
PAXTON LANE TO RICARDO LANE STORM IMPROVEMENTS
STORMWATER
594
2011 4689160ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 5/1/2010 8/1/2010 12/1/2010
4/1/2010 7/1/2010 11/1/2010 4/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10255
TASK #
015.1.1 $235,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008191
2011
Florissant
Coldwater
Paddock Creek
PADDOCK CREEK OMCI
MSD
$118,000
St. Louis Metropolitan Sewer District - Fiscal Year
BACKYARD FLOODING AT SEVEN PROPERTIES AND STRUCTURE FLOODING AT ONE RESIDENCE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 735 FEET OF 12-INCH TO 15-INCH STORM SEWER, BERM, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $118,000
SCHEDULE
RISSANT DRIVE #39 STORM SEWER
STORMWATER
581
2011 8355161ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 7/1/2010 3/1/2011 7/1/2011
6/1/2010 2/1/2011 6/1/2011 9/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10341
TASK #
015.1.1 $118,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005121A
2011
Brentwood
Lemay/RDP
Deer Creek
DEER CREEK OMCI
REITZ & JENS, INC.
$1,300,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING STORM SEWER SYSTEM FROM MANCHESTER ROAD UPSTREAM TO CECELIA AVENUE HAS DETERIORATED AND HAS
INADEQUATE CAPACITY, CAUSING LOCALIZED FLOODING OF YARDS AND STREETS AND REQUIRING MULTIPLE REPAIRS ON THE
SYSTEM. OUTFALL DOWNSTREAM IS INADEQUATE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN OUTFALL SEWER SYSTEM FOR PROJECT 2005121, AND PROVIDE CONSTRUCTION PHASE SERVICES FOR TOTAL PROJECT.
DESIGN INCLUDES 1,327 FEET OF 12-INCH TO 60-INCH DIAMETER STORM SEWERS AND APPURTENANCES.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2009, FOR $284,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,300,000
SCHEDULE
RUTH-HELEN-CECELIA OUTFALL SEWER
STORMWATER
566
2011 8673162ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 1/1/2010 7/1/2010 11/1/2010
1/1/2010 6/1/2010 11/1/2010 2/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10451
TASK #
015.1.1 $1,300,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008098
2011
Webster Groves
Lemay/RDP
Seminary Branch
SEMINARY OMCI
MSD
$58,000
St. Louis Metropolitan Sewer District - Fiscal Year
REAR YARD AND BASEMENT FLOODING, AND YARD EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 290 FEET OF 12-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $58,000
SCHEDULE
SELMA & LANVALE STORM SEWER
STORMWATER
593
2011 4644163ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2009 7/1/2010 3/1/2011 7/1/2011
6/1/2010 2/1/2011 6/1/2011 9/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10312
TASK #
015.1.1 $58,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
99140
2011
Ferguson
Bissell
Maline Creek
MALINE CREEK OMCI
MSD
$123,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD EROSION BEHIND THREE HOMES ALONG SHIREFORD LANE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 440 FEET OF CREEK BANK STABILIZATION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $123,000
SCHEDULE
SHIREFORD LANE STORM IMPROVEMENT
STORMWATER
576
2011 4541164ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2009 11/1/2010 1/1/2011 11/1/2011
10/1/2010 12/1/2010 5/1/2011 1/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10044
TASK #
015.1.1 $123,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009067
2011
St. Louis City and County
Various
Various
STORMWATER FACILITIES FUND
MSD
$4,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING STORMWATER INFRASTRUCTURE IS DETERIORATING, AND IS IN NEED OF REPAIR AND REPLACEMENT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT REPLACEMENT STORMWATER INFRASTRUCTURE IN AREAS OF DETERIORATED FACILITIES.
REMARKS
ANTICIPATE BOARD INTRODUCTION SEPTEMBER, 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $4,000,000
SCHEDULE
STORMWATER INFRASTRUCTURE REPAIR PROJECTS
STORMWATER DISTRICTWIDE
700
2011 7412165ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = I
ORACLE PROJECT #
10763
TASK #
017.1
10763 017.2 $2,000,000.00
$2,000,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007128
2011
Ladue
Lemay/RDP
Deer Creek
DEER CREEK OMCI
KOWELMAN ENGINEERING, INC.
$680,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING INADEQUATE OR NON-EXISTENT STORM SYSTEM CAUSING YARD FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,968 FEET OF 12-INCH TO 27-INCH DIAMETER RCP STORM SEWERS, 180 FEET OF ROCK BLANKET, AND
APPURTENANCES.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2008 BY DEER CREEK WATERSHED STORM SEWER IMPROVEMENTS (DESIGN) 2007242.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $680,000
SCHEDULE
TEALBROOK ESTATES STORM SEWER
STORMWATER
566
2011 4017166ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2007 6/1/2009 6/1/2010 10/1/2010
6/1/2009 6/1/2010 10/1/2010 12/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10226
TASK #
015.1.1 $680,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008190
2011
Florissant
Coldwater
Paddock Creek
PADDOCK CREEK OMCI
MSD
$70,000
St. Louis Metropolitan Sewer District - Fiscal Year
BACKYARD FLOODING AT TWO PROPERTIES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 270 FEET OF 12-INCH TO 18-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $70,000
SCHEDULE
THUNDERBIRD AND CARDINAL DRIVE STORM SEWER
STORMWATER
581
2011 8354167ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 8/1/2010 10/1/2010 2/1/2011
7/1/2010 9/1/2010 1/1/2011 4/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10774
TASK #
015.1.1 $70,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008104
2011
Edmundson
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$143,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING ALONG WEST SIDE OF TREADWAY LANE FROM MILL PASS LANE NORTH TOWARD CHARM COURT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 840 FEET OF 15-INCH TO 21-INCH RCP AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $143,000
SCHEDULE
TREADWAY LANE #4315 STORM SEWER
STORMWATER
564
2011 8131168ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 4/1/2010 7/1/2010 11/1/2010
3/1/2010 6/1/2010 10/1/2010 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10314
TASK #
015.1.1 $143,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007135
2011
Ladue
Lemay/RDP
Deer Creek
BLACK CREEK OMCI
STANTEC CONSULTING SERVICES,
INC.
$580,000
St. Louis Metropolitan Sewer District - Fiscal Year
EROSION OF CREEK BANK APPROACHING STRUCTURES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT BANK STABILIZATION ALONG BLACK CREEK, TO PROTECT ADJACENT STRUCTURES, TO INCLUDE
APPROXIMATELY 485 FEET OF BANK STABILIZATION, 110 FEET OF REINFORCED CONCRETE CHANNEL WALLS, 255 FEET OF
CONCRETE CHANNEL BOTTOM, 10 FEET OF 12-INCH STORM SEWER AND APPURTENANCES.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2009 BY DEER CREEK WATERSHED STORM CHANNEL IMPROVEMENTS (DESIGN) 2008138.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $580,000
SCHEDULE
WENNEKER - TREEBROOK LANE STORM CHANNEL
STORMWATER
594
2011 7899169ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 3/1/2010 3/1/2011 6/1/2011
3/1/2010 2/1/2011 6/1/2011 10/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10228
TASK #
015.1.1 $580,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008186
2011
Hazelwood
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$120,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AT TEN RESIDENCES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 565 FEET OF 12-INCH TO 15-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $120,000
SCHEDULE
WHITE BIRCH WAY - QUEEN ANN DRIVE STORM SEWER
STORMWATER
564
2011 8350170ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2009 9/1/2010 3/1/2011 7/1/2011
8/1/2010 2/1/2011 6/1/2011 8/1/2011
EXPENSE TYPE = C
ORACLE PROJECT #
10797
TASK #
015.1.1 $120,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006069
2011
Kirkwood
Lemay/RDP
Deer Creek
DEER CREEK OMCI
KOWELMAN ENGINEERING, INC.
$435,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE STORM SEWER SYSTEM CAUSING YARD, STREET AND HOUSE FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 991 FEET OF 18-INCH TO 48-INCH STORM SEWERS AND APPURTENANCES
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2008 BY DEER CREEK WATERSHED STORM SEWER IMPROVEMENTS (DESIGN) 2007242.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $435,000
SCHEDULE
WOODLEAF COURT STORM SEWER IMPROVEMENTS
STORMWATER
566
2011 4530171ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2005 12/1/2007 7/1/2008 1/1/2011 5/1/2011
1/1/2006 6/1/2009 1/1/2011 5/1/2011 5/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10151
TASK #
015.1.1 $435,000.00
AMOUNT
r -
L J
STORMWATER CONTINUED PROJECTS
Some of the District's Stormwater projects are continued from previous
fiscal years due to difficulties in easement acquisition, the permit process from
other agencies, design revisions or status, or other special requirements or issues.
There are sixteen (16) projects that were identified in previous budget
supplements that are still in the design, permitting, and/or easement acquisition
process. These projects have a total estimated cost of $6,656,000.
The fiscal year indicated in parentheses at the end of each project title
indicates the budget year that the project was originally planned. The revenue to
construct these projects comes from the appropriate Operation, Maintenance,
Construction, and Improvement (OMCI) Fund.
173
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN FEBRUARY,
2011.
CHARLACKBRISTOW AND ANN STORM SEWER (FY10)1 $375,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2010.
UNINCORPORATEDBROOKINGS #10931 CHANNEL IMPROVEMENTS
(GCMB-260) (FY10)
2 $250,000
CONTINUED FOR COORDINATION WITH OTHERS.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER,
2010.
UNINCORPORATEDCC-013 STORM SYSTEM REPLACEMENT (FY10)3 $132,000
PROJECT DELAYED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN APRIL, 2011.
UNINCORPORATEDDIEBOLD - CELTIC CHANNEL IMPROVEMENT
(GCMB-340) (FY04)
4 $205,000
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN AUGUST,
2010.
FERGUSONFERGUSON BRANCH BANK STABILIZATION
(FY10)
5 $140,000
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER,
2010.
KIRKWOODFILLMORE - ELLIOT BANK STABILIZATION
(GCKC-130) (FY08)
6 $150,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER,
2010.
WEBSTER GROVESFLORENCE #503 STORM SEWER IMPROVEMENTS
(FY10)
7 $340,000
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN NOVEMBER,
2010.
UNINCORPORATEDHARDWICK COURT CHANNEL IMPROVEMENTS
AND SANITARY SEWER PROTECTION
(MCMB-510) (FY10)
8 $1,400,000
174
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER,
2010.
UNINCORPORATEDLADA AVENUE STORM SEWER (FY10)9 $440,000
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2010.
UNINCORPORATEDLIBERTY AVENUE STORM SEWER
IMPROVEMENTS (FY10)
10 $425,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST,
2010.
FLORISSANTLINDBERGH AND PATTERSON STORM SEWER
(FY09)
11 $94,000
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN MAY, 2011.
ST. LOUIS COUNTYMAINTENANCE YARD VEHICLE STORAGE
BUILDINGS (MINTERT AND GRAND GLAIZE)
(FY10)
12 $1,500,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST,
2010.
CRESTWOODSKY CREST - MAPLE GROVE CHANNEL
IMPROVEMENT(GCMC-120) (FY10)
13 $425,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER,
2010.
LAKESHIRESTONELL - ELISE DRIVE STORM PROJECT
(GCMB-220) (FY10)
14 $454,000
PROJECT CONTINUED FOR EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN NOVEMBER,
2010.
CREVE COEURTEMPLE ISRAEL CREEK BANK STABILIZATION
(FY08)
15 $140,000
175
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN NOVEMBER,
2010.
FLORISSANTTHUNDERBIRD DRIVE BANK STABILIZATION
(FY09)
16 $186,000
$6,656,000TOTAL:
176
CONTINGENCY STORMWATER PROJECTS
177
During the fiscal year, construction projects, when bid, may come in under budget.
As well, projects may be delayed due to permitting or easement acquisition issues.
When this occurs, there is unused funding in the Capital Program. This unused
funding can be reallocated to allow additional construction projects to proceed during the
fiscal year, if other projects planned in future fiscal years are ready to be bid.
The projects described in this section are not programmed in the 2010-2011
Capital Improvement and Replacement Program, but there is the possibility that their
schedules may proceed in such a manner as to enable them to be constructed in Fiscal
Year 2011, if unused funding becomes available.
These 4 projects, totaling $ 1,376,000, are being presented in the Budget
Supplement to fulfill the requirements for public hearings for projects in the Capital
Program. If unused funding becomes available, and scheduling allows, the District may
seek Board approval to add these projects to the 2010-2011 Capital Improvement and
Replacement Program.
CONTENTS OF STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
DIELMAN ROAD TO APPLESEED STORM SEWER 179$84,0002008110
FAWNVALLEY STORM CHANNEL IMPROVEMENTS 180$996,0002006192
PLANT AVE. & E. SWON STORM SEWER 181$42,0002009160
WINDOM #8721 SEWER REHABILITATION 182$254,0002007136
$1,376,000TOTAL:
178
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008110
2012
Olivette
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$84,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 220 FEET OF ROCK-LINED TRAPEZOIDAL CHANNEL, AND 10 FEET OF 48-INCH DIAMETER
STORM SEWERS, AND APPURTENANCES, FROM DIELMAN ROAD TO APPLESEED.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $84,000
SCHEDULE
DIELMAN ROAD TO APPLESEED STORM SEWER
STORMWATER
584
2012 5764179ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10317
TASK #
015.1.1 $84,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006192
2012
Des Peres
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
STANTEC CONSULTING SERVICES,
INC.
$996,000
St. Louis Metropolitan Sewer District - Fiscal Year
STREAM BANK EROSION IN DEVELOPED AND UNMAINTAINED AREAS ALONG TWO MILE CREEK.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,740 FEET OF CHANNEL STABILIZATION IN AREAS OF CREEK EROSION USING VARIOUS
METHODS.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2009 BY DEER CREEK WATERSHED STORM CHANNEL IMPROVEMENTS (DESIGN) 2008138.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $996,000
SCHEDULE
FAWNVALLEY STORM CHANNEL IMPROVEMENTS
STORMWATER
566
2012 8056180ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2009 3/1/2010 3/1/2011 7/1/2011
3/1/2010 3/1/2011 7/1/2011 10/1/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10192
TASK #
015.1.1 $996,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009160
2012
Webster Groves
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$42,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND PONDING ALLOWS STORMWATER TO ENTER HOUSE LATERAL VENT AND SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 110 FEET OF 15-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $42,000
SCHEDULE
PLANT AVE. & E. SWON STORM SEWER
STORMWATER
566
2012 8499181ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10736
TASK #
015.1.1 $42,000.00
AMOUNT
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007136
2012
Charlack
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$254,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND CAVE INS ON EXISTING NON-STANDARD STORM SYSTEM; SYSTEM IS UNABLE TO BE MAINTAINED.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,015 FEET OF 12-INCH TO 21-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $254,000
SCHEDULE
WINDOM #8721 SEWER REHABILITATION
STORMWATER
564
2012 7893182ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10229
TASK #
015.1.1 $254,000.00
AMOUNT
PROJECTED MULTI-YEAR CAPITAL IMPROVEMENT
AND REPLACEMENT PROGRAM
FOR STORMWATER PROJECTS
183
This section sorts by Fiscal Year and by Fund Name the projected list of
Stormwater projects to be implemented by the District in the near future, beginning with
Fiscal Year 2011. As funding, priorities, and regulatory requirements change over time,
the projected capital program will also change.
The revenue to be utilized to fund these projects is from the District's Impervious
Rate, General Fund, the Improvement Fund, or from property taxes that are placed in
various Operation, Maintenance, Construction and Improvement (OMCI) Funds currently
established throughout parts of St. Louis County. The property taxes collected within the
boundaries of OMCI Taxing Districts must be spent only for improvements within their
respective areas of collection.
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
BLACK CREEK OMCI
CORNELL AVE. #8360 STORM SEWER (RAIN
GARDENS)
$82,000UNIVERSITY CITY
LINDEN #1064 STORM SEWER (DESIGN)$140,000RICHMOND HEIGHTS
NORMTON DRIVE BANK STABILIZATION $580,000LADUE
PAXTON LANE TO RICARDO LANE STORM
IMPROVEMENTS
$235,000LADUE
RIDGEMOOR DRIVE STORM IMPROVEMENTS
AND I/I REDUCTION (SKME-574) (DESIGN)
$360,000CLAYTON
WENNEKER - TREEBROOK LANE STORM
CHANNEL
$580,000LADUE
6 $1,977,000SUBTOTALNUMBER OF PROJECTS =
BLACKJACK- DELLWOOD OMCI
COUNT DRIVE #10556 STORM SEWER $31,000UNINCORPORATED
1 $31,000SUBTOTALNUMBER OF PROJECTS =
COLDWATER CREEK OMCI
CC-013 STORM SYSTEM REPLACEMENT $132,000UNINCORPORATED
LATTY TO LAUPHER LANE STORM SEWER $100,000HAZELWOOD
LINDBERGH AND PATTERSON STORM SEWER $94,000FLORISSANT
LINDSCOTT STORM SEWER $308,000ST. JOHN
TREADWAY LANE #4315 STORM SEWER $143,000EDMUNDSON
WHITE BIRCH WAY - QUEEN ANN DRIVE STORM
SEWER
$120,000HAZELWOOD
6 $897,000SUBTOTALNUMBER OF PROJECTS =
CREVE COEUR FRONTENAC OMCI
CHALET COURT STORM SEWER $75,000CREVE COEUR
CONWAY ROAD #11632 STORM SEWER $150,000WESTWOOD
TEMPLE ISRAEL CREEK BANK STABILIZATION $140,000CREVE COEUR
184
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
3 $365,000SUBTOTALNUMBER OF PROJECTS =
DEER CREEK OMCI
BOPP AND CLAYCHESTER STORM SEWER $65,000DES PERES
FIELDING ROAD #10 CHANNEL IMPROVEMENTS $62,000LADUE
IRENE & BOPP STORM SEWER $54,000DES PERES
LINWOOD & LANYARD STORM SEWER $73,000KIRKWOOD
MARY AVENUE FLOOD MITIGATION $500,000BRENTWOOD
MONTOUR 12000 BLOCK STORM SEWER $120,000DES PERES
RUTH-HELEN-CECELIA OUTFALL SEWER $1,300,000BRENTWOOD
TEALBROOK ESTATES STORM SEWER $680,000LADUE
WOODLEAF COURT STORM SEWER
IMPROVEMENTS
$435,000KIRKWOOD
9 $3,289,000SUBTOTALNUMBER OF PROJECTS =
FOUNTAIN CREEK OMCI
GRAHAM ROAD #630 STORM SEWER $80,000FLORISSANT
1 $80,000SUBTOTALNUMBER OF PROJECTS =
GRAVOIS CREEK OMCI
ALPINE & RAMBLER STORM SEWER $100,000UNINCORPORATED
BROOKINGS #10931 CHANNEL IMPROVEMENTS
(GCMB-260)
$250,000UNINCORPORATED
DIEBOLD - CELTIC CHANNEL IMPROVEMENT
(GCMB-340)
$205,000UNINCORPORATED
EAST WATSON AND KATHY CT. STORM
IMPROVEMENT
$65,000SUNSET HILLS
FIELDCREST AND FOURNIER CHANNEL
IMPROVEMENTS (GCMB-130)
$600,000CRESTWOOD
FILLMORE - ELLIOT BANK STABILIZATION
(GCKC-130)
$150,000KIRKWOOD
MALUS & GREEN PARK STORM SEWER $472,000UNINCORPORATED
185
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
SKY CREST - MAPLE GROVE CHANNEL
IMPROVEMENT(GCMC-120)
$425,000CRESTWOOD
STONELL - ELISE DRIVE STORM PROJECT
(GCMB-220)
$454,000LAKESHIRE
9 $2,721,000SUBTOTALNUMBER OF PROJECTS =
IMPROVEMENT FUND
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2011)
$300,000VARIOUS
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
$250,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
$200,000VARIOUS
10 $2,150,000SUBTOTALNUMBER OF PROJECTS =
LYNN HAVEN OMCI
HOWDERSHELL PARK STORM IMPROVEMENTS $82,000HAZELWOOD
1 $82,000SUBTOTALNUMBER OF PROJECTS =
MALINE CREEK OMCI
186
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
BRISTOW AND ANN STORM SEWER $375,000CHARLACK
FERGUSON BRANCH BANK STABILIZATION $140,000FERGUSON
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING)
$486,000UNINCORPORATED
HARDWICK COURT CHANNEL IMPROVEMENTS
AND SANITARY SEWER PROTECTION
(MCMB-510)
$1,400,000UNINCORPORATED
LADA AVENUE STORM SEWER $440,000UNINCORPORATED
SHIREFORD LANE STORM IMPROVEMENT $123,000FERGUSON
6 $2,964,000SUBTOTALNUMBER OF PROJECTS =
NORTH KINLOCH OMCI
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING)
$164,000FERGUSON
1 $164,000SUBTOTALNUMBER OF PROJECTS =
PADDOCK CREEK OMCI
BURNING TREE AND FOX RUN DRIVE STORM
SEWER
$100,000FLORISSANT
GALLANT FOX DRIVE STORM SEWER $163,000FLORISSANT
RISSANT DRIVE #39 STORM SEWER $118,000FLORISSANT
THUNDERBIRD AND CARDINAL DRIVE STORM
SEWER
$70,000FLORISSANT
THUNDERBIRD DRIVE BANK STABILIZATION $186,000FLORISSANT
5 $637,000SUBTOTALNUMBER OF PROJECTS =
SEMINARY OMCI
FLORENCE #503 STORM SEWER
IMPROVEMENTS
$340,000WEBSTER GROVES
INNISFAIL #217 STORM CHANNEL $54,000WEBSTER GROVES
SELMA & LANVALE STORM SEWER $58,000WEBSTER GROVES
3 $452,000SUBTOTALNUMBER OF PROJECTS =
187
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
SHREWSBURY OMCI
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING)
$51,000SHREWSBURY
1 $51,000SUBTOTALNUMBER OF PROJECTS =
STORMWATER FACILITIES FUND
ARLEE & HOFFMEISTER STORM SEWER $400,000UNINCORPORATED
EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (FY 2011)
$400,000ST. LOUIS CITY AND
COUNTY
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING TO CLOSE OUT
576)
$4,136,000UNINCORPORATED
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING TO CLOSE
FUND 592)
$117,000SHREWSBURY
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING TO CLOSE 580)
$42,000FERGUSON
MAINTENANCE YARD VEHICLE STORAGE
BUILDINGS (MINTERT AND GRAND GLAIZE)
$1,500,000ST. LOUIS COUNTY
STORMWATER INFRASTRUCTURE
IMPROVEMENTS (DESIGN) (2011)
$600,000ST. LOUIS CITY AND
COUNTY
STORMWATER INFRASTRUCTURE REPAIR
PROJECTS
$4,000,000ST. LOUIS CITY AND
COUNTY
STREAM FLOW GAUGE OPERATION (USGS) (FY
2011)
$550,000VARIOUS
STREAM FLOW WATER QUALITY SAMPLING (FY
2011)
$400,000VARIOUS
STREAMBANK STABILIZATION IMPROVEMENTS
(DESIGN) (2011)
$700,000ST. LOUIS CITY AND
COUNTY
11 $12,845,000SUBTOTALNUMBER OF PROJECTS =
SUGAR CREEK OMCI
IRIS LANE BANK STABILIZATION $75,000KIRKWOOD
ROSEWOOD LANE & WOODARD DR. STORM
SEWER (DESIGN)
$160,000KIRKWOOD
188
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2011
COST
ESTIMATE
2 $235,000SUBTOTALNUMBER OF PROJECTS =
UNIVERSITY CITY OMCI
BRANFORD DRIVE #30 STORM SEWER $98,000OLIVETTE
CHERRY TREE LANE STORM IMPROVEMENT
(DESIGN)
$150,000OLIVETTE
LIBERTY AVENUE STORM SEWER
IMPROVEMENTS
$425,000UNINCORPORATED
MINERVA - WENGLER - BURNS STORM SEWER $126,000OVERLAND
4 $799,000SUBTOTALNUMBER OF PROJECTS =
WATKINS CREEK OMCI
LANETT CT. #11390 STORM IMPROVEMENT $156,000UNINCORPORATED
1 $156,000SUBTOTALNUMBER OF PROJECTS =
NUMBER OF PROJECTS = 80GRAND TOTALS:$29,895,000
189
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
COLDWATER CREEK OMCI
ARGYLE #8800 STORM SEWER $530,000OVERLAND
ASHBY ROAD 3000 BLOCK STORM SEWER $186,000ST. ANN
COLDWATER CREEK AT LYNN TOWN BANK
STABILIZATION
$486,000BRECKENRIDGE
HILLS
LYNN TOWN APARTMENTS CHANNEL
IMPROVEMENTS (CLD-19)
$360,000BRECKENRIDGE
HILLS
WABASH AVE #8555 STORM SEWER $113,000BERKELEY
WINDOM #8721 SEWER REHABILITATION $254,000CHARLACK
6 $1,929,000SUBTOTALNUMBER OF PROJECTS =
DEER CREEK OMCI
EAST ESSEX AVE. #802 - #804 STORM SEWER $35,000GLENDALE
FAWNVALLEY STORM CHANNEL
IMPROVEMENTS
$996,000DES PERES
PARK LANE #9568 - #9572 STORM SEWER $35,000LADUE
PLANT AVE. & E. SWON STORM SEWER $42,000WEBSTER GROVES
RUTH-HELEN-CECELIA STORM SEWER
REPLACEMENT (PARTIAL FUNDING)
$550,000BRENTWOOD
5 $1,658,000SUBTOTALNUMBER OF PROJECTS =
FOUNTAIN CREEK OMCI
HARRISON- ST MARIE STORM SEWER $181,000FLORISSANT
1 $181,000SUBTOTALNUMBER OF PROJECTS =
GRAVOIS CREEK OMCI
DIAMOND HEAD DR. STORM SEWER (GCUC-110)$960,000UNINCORPORATED
GRAND & HARRISON STORM IMPROVEMENTS $770,000KIRKWOOD
2 $1,730,000SUBTOTALNUMBER OF PROJECTS =
IMPROVEMENT FUND
190
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2012)
$100,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2012)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2012)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2012)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2012)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2012) (SUPPLEMENTAL)
$300,000VARIOUS
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2012)
(SUPPLEMENTAL)
$250,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2012) (SUPPLEMENTAL)
$200,000VARIOUS
18 $2,640,000SUBTOTALNUMBER OF PROJECTS =
191
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
SEMINARY OMCI
BIG BEND TO PAPIN STORM SEWER PHASE I
(DESIGN) (PARTIAL FUNDING)
$95,000WEBSTER GROVES
1 $95,000SUBTOTALNUMBER OF PROJECTS =
STORMWATER FACILITIES FUND
BIG BEND TO PAPIN STORM SEWER PHASE I
(DESIGN) (PARTIAL FUNDING TO CLOSE FUND
593)
$50,000WEBSTER GROVES
BROWN ROAD TO EMINENCE BLVD. STORM
IMPROVEMENTS (DESIGN)
$140,000ST. JOHN
EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (FY 2012)
$500,000ST. LOUIS CITY AND
COUNTY
EMERLING - EVANS DRAINAGE IMPROVEMENTS $700,000COOL VALLEY
LORETTA - GENTRY STORM SEWER PHASE I
(DESIGN)
$260,000UNINCORPORATED
MCNULTY - PALLARDY STORM IMPROVEMENT
(DESIGN)
$570,000ST. JOHN
RUTH-HELEN-CECELIA STORM SEWER
REPLACEMENT (PARTIAL FUNDING TO CLOSE
566)
$100,000BRENTWOOD
STORMWATER INFRASTRUCTURE REPAIR
PROJECTS
$5,000,000ST. LOUIS CITY AND
COUNTY
STREAM FLOW GAUGE OPERATION (USGS) (FY
2012)
$550,000VARIOUS
STREAM FLOW WATER QUALITY SAMPLING (FY
2012)
$400,000VARIOUS
10 $8,270,000SUBTOTALNUMBER OF PROJECTS =
UNIVERSITY CITY OMCI
DIELMAN ROAD TO APPLESEED STORM SEWER $84,000OLIVETTE
FAIRVIEW AVE. #1250 STORM SEWER $63,000UNIVERSITY CITY
FULLERTON & TAMERTON STORM SEWER $134,000UNIVERSITY CITY
MAGNET DRIVE STORM SEWER.$50,000OLIVETTE
PAGE #8227 STORM SEWER $68,000VINITA PARK
192
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2012
COST
ESTIMATE
PAGE AVE. #9441-9445 STORM SEWER $130,000OVERLAND
ROMAINE AVE. #9449 STORM SEWER $67,000OVERLAND
TULANE - SHANDEL STORM SEWER $81,000UNIVERSITY CITY
8 $677,000SUBTOTALNUMBER OF PROJECTS =
NUMBER OF PROJECTS = 51GRAND TOTALS:$17,180,000
193
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2013
COST
ESTIMATE
BLACK CREEK OMCI
LINDEN #1064 STORM SEWER $520,000RICHMOND HEIGHTS
RIDGEMOOR DRIVE STORM IMPROVEMENTS
AND I/I REDUCTION (SKME-574) (PARTIAL
FUNDING)
$10,000CLAYTON
2 $530,000SUBTOTALNUMBER OF PROJECTS =
BLACKJACK- DELLWOOD OMCI
HUDSON RD. #1401 - #1405 BANK
STABILIZATION (MCDW-120) (PARTIAL
FUNDING)
$68,000FERGUSON
1 $68,000SUBTOTALNUMBER OF PROJECTS =
CLAYTON CENTRAL OMCI
CLAYTON CENTRAL STORM IMPROVEMENTS $285,000CLAYTON
1 $285,000SUBTOTALNUMBER OF PROJECTS =
COLDWATER CREEK OMCI
DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION (PARTIAL FUNDING)
$200,000FLORISSANT
EVERMAN - TENNYSON STORM SEWER $300,000OVERLAND
2 $500,000SUBTOTALNUMBER OF PROJECTS =
CREVE COEUR FRONTENAC OMCI
CONWAY - CLERBROOK STORM CHANNEL $515,000LADUE
LINDBERGH - CLERBROOK STORM CHANNEL $230,000LADUE
194
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2013
COST
ESTIMATE
STONINGTON - GEORGIAN ACRES STORM
SEWER
$370,000FRONTENAC
3 $1,115,000SUBTOTALNUMBER OF PROJECTS =
DEER CREEK OMCI
BRIDGEPORT AVE. & BRENTWOOD BLVD.
SEWER SEPARATION
$90,000BRENTWOOD
1 $90,000SUBTOTALNUMBER OF PROJECTS =
GRAVOIS CREEK OMCI
GRANDA - HAWSON - CLAGER STORM SEWER
IMPROVEMENTS (PARTIAL FUNDING)
$350,000UNINCORPORATED
GRANT CT. #609 BANK STABILIZATION $34,000WEBSTER GROVES
RECO AVENUE BANK STABILIZATION $287,000CRESTWOOD
ROBYN RD. 9100 BLOCK STORM
IMPROVEMENTS.
$43,000SUNSET HILLS
4 $714,000SUBTOTALNUMBER OF PROJECTS =
IMPROVEMENT FUND
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2013)
(SUPPLEMENTAL)
$100,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2013) (SUPPLEMENTAL)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2013) (SUPPLEMENTAL)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2013) (SUPPLEMENTAL)
$50,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) (SUPPLEMENTAL)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) (SUPPLEMENTAL)
$60,000VARIOUS
195
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2013
COST
ESTIMATE
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) (SUPPLEMENTAL)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) (SUPPLEMENTAL)
$60,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2013)
$300,000VARIOUS
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2013)
$250,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2013)
$200,000VARIOUS
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2013)
$200,000VARIOUS
18 $2,640,000SUBTOTALNUMBER OF PROJECTS =
SEMINARY OMCI
COTTAGE #206 STORM IMPROVEMENTS $303,000WEBSTER GROVES
1 $303,000SUBTOTALNUMBER OF PROJECTS =
STORMWATER FACILITIES FUND
CORONA PARK STORM SEWER PHASE 2B
(PARTIAL FUNDING TO CLOSE FUND 583)
$145,000KIRKWOOD
196
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2013
COST
ESTIMATE
DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION (PARTIAL FUNDING TO CLOSE
564)
$102,000FLORISSANT
EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (FY 2013)
$500,000ST. LOUIS CITY AND
COUNTY
GRANDA - HAWSON - CLAGER STORM SEWER
IMPROVEMENTS (PARTIAL FUNDING TO CLOSE
571)
$10,000UNINCORPORATED
HUDSON RD. #1401 - #1405 BANK
STABILIZATION (MCDW-120) (PARTIAL
FUNDING TO CLOSE FUND 567)
$165,000FERGUSON
KINGSLAND AVENUE #1400 STORM SEWER
IMPROVEMENT (PARTIAL FUNDING TO CLOSE
FUND 589)
$323,000PAGEDALE
LAVEN - DEL LN. #1322 - 1323 STORM SEWER $533,000KIRKWOOD
RIDGEMOOR DRIVE STORM IMPROVEMENTS
AND I/I REDUCTION (SKME-574) (PARTIAL
FUNDING TO CLOSE FUND 594)
$1,860,000CLAYTON
ROSEWOOD LANE & WOODARD DR. STORM
SEWER
$560,000KIRKWOOD
STORMWATER IMPROVEMENT PROJECTS (2013)$11,000,000ST. LOUIS CITY AND
COUNTY
STORMWATER INFRASTRUCTURE REPAIR
PROJECTS
$5,000,000ST. LOUIS CITY AND
COUNTY
STREAM FLOW GAUGE OPERATION (USGS) (FY
2013)
$550,000VARIOUS
STREAM FLOW WATER QUALITY SAMPLING (FY
2013)
$400,000VARIOUS
13 $21,148,000SUBTOTALNUMBER OF PROJECTS =
SUGAR CREEK OMCI
CORONA PARK STORM SEWER PHASE 2B
(PARTIAL FUNDING)
$125,000KIRKWOOD
1 $125,000SUBTOTALNUMBER OF PROJECTS =
UNIVERSITY CITY OMCI
197
PROJECT NAME MUNICIPALITY
PROJECT LISTING
STORMWATER PROJECTS
FISCAL YEAR 2013
COST
ESTIMATE
CHERRY TREE LANE STORM IMPROVEMENT $573,000OLIVETTE
OLIVE 8200 BLOCK BANK STABILIZATION
(UCSW-110)
$580,000UNIVERSITY CITY
2 $1,153,000SUBTOTALNUMBER OF PROJECTS =
WATKINS CREEK OMCI
WC-33 STORM IMPROVEMENT $273,000UNINCORPORATED
1 $273,000SUBTOTALNUMBER OF PROJECTS =
WELLSTON OMCI
KINGSLAND AVENUE #1400 STORM SEWER
IMPROVEMENT (PARTIAL FUNDING)
$90,000PAGEDALE
1 $90,000SUBTOTALNUMBER OF PROJECTS =
NUMBER OF PROJECTS = 51GRAND TOTALS:$29,034,000
198
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
MARY AVENUE FLOOD MITIGATION 156BRENTWOODSTORMWATER
RUTH-HELEN-CECELIA OUTFALL SEWER 162BRENTWOODSTORMWATER
CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II (DESIGN)
19CHESTERFIELDINFRASTRUCTURE
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE V
57CHESTERFIELDINFRASTRUCTURE
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI CASING PIPE
58CHESTERFIELDINFRASTRUCTURE
VALLEY SANITARY RELIEF (SKME-014)
PHASE II
71CLARKSON VALLEY INFRASTRUCTURE
RIDGEMOOR DRIVE STORM IMPROVEMENTS
AND I/I REDUCTION (SKME-574) (DESIGN)
114CLAYTONSTORMWATER
FIELDCREST AND FOURNIER CHANNEL
IMPROVEMENTS (GCMB-130)
137CRESTWOODSTORMWATER
CHALET COURT STORM SEWER 131CREVE COEUR STORMWATER
BOPP AND CLAYCHESTER STORM SEWER 128DES PERES STORMWATER
BOPP SANITARY RELIEF I/I REDUCTION
(SKME -611)
42DES PERES INFRASTRUCTURE
IRENE & BOPP STORM SEWER 145DES PERES STORMWATER
MONTOUR 12000 BLOCK STORM SEWER 158DES PERES STORMWATER
UPPER SUGAR CREEK SANITARY RELIEF SEC.
C PHASE II
69DES PERES INFRASTRUCTURE
199
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
TREADWAY LANE #4315 STORM SEWER 168EDMUNDSONSTORMWATER
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING TO CLOSE 580)
153FERGUSONSTORMWATER
MABLE AVE. AND CARSON ROAD STORM
SEWER (PARTIAL FUNDING)
154FERGUSONSTORMWATER
SHIREFORD LANE STORM IMPROVEMENT 164FERGUSONSTORMWATER
UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314) (DESIGN)
36FERGUSONINFRASTRUCTURE
BRIGHTWELL SANITARY RELIEF (SKME-213)43FLORISSANTINFRASTRUCTURE
BURNING TREE AND FOX RUN DRIVE STORM
SEWER
130FLORISSANTSTORMWATER
FOUNTAIN/ANTHONY LATERAL SANITARY
RELIEF (SKME 236)
52FLORISSANTINFRASTRUCTURE
GALLANT FOX DRIVE STORM SEWER 139FLORISSANTSTORMWATER
GRAHAM ROAD #630 STORM SEWER 140FLORISSANTSTORMWATER
RISSANT DRIVE #39 STORM SEWER 161FLORISSANTSTORMWATER
THUNDERBIRD AND CARDINAL DRIVE
STORM SEWER
167FLORISSANTSTORMWATER
HERMITAGE I/I REDUCTION (SKME-615)
(DESIGN)
29FRONTENACINFRASTRUCTURE
STONINGTON SANITARY RELIEF (SKME -652)
(I/I REDUCTION)
67FRONTENACINFRASTRUCTURE
200
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
GLENDALE SECTION D SANITARY RELIEF
(SKME-624)
53GLENDALEINFRASTRUCTURE
GLENDALE SECTION D SANITARY RELIEF
PHASE II (SKME-624) (I/I REDUCTION)
54GLENDALEINFRASTRUCTURE
GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION (DESIGN)
28GLENDALEINFRASTRUCTURE
CAPILIA SANITARY RELIEF (SKME-511)
(REHABILITATION)
44GRANTWOOD
VILLAGE
INFRASTRUCTURE
HOWDERSHELL PARK STORM
IMPROVEMENTS
143HAZELWOODSTORMWATER
LATTY TO LAUPHER LANE STORM SEWER 150HAZELWOODSTORMWATER
WHITE BIRCH WAY - QUEEN ANN DRIVE
STORM SEWER
170HAZELWOODSTORMWATER
IRIS LANE BANK STABILIZATION 146KIRKWOODSTORMWATER
LINWOOD & LANYARD STORM SEWER 152KIRKWOODSTORMWATER
ROSEWOOD LANE & WOODARD DR. STORM
SEWER (DESIGN)
115KIRKWOODSTORMWATER
WOODLEAF COURT STORM SEWER
IMPROVEMENTS
171KIRKWOODSTORMWATER
FIELDING ROAD #10 CHANNEL
IMPROVEMENTS
138LADUESTORMWATER
NORMTON DRIVE BANK STABILIZATION 159LADUESTORMWATER
201
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
PAXTON LANE TO RICARDO LANE STORM
IMPROVEMENTS
160LADUESTORMWATER
TEALBROOK ESTATES STORM SEWER 166LADUESTORMWATER
WENNEKER - TREEBROOK LANE STORM
CHANNEL
169LADUESTORMWATER
BRANFORD DRIVE #30 STORM SEWER 129OLIVETTESTORMWATER
CHERRY TREE LANE STORM IMPROVEMENT
(DESIGN)
102OLIVETTESTORMWATER
UR-07 BON HILLS SANITARY RELIEF PHASE II
(REHABILITATION)
70OLIVETTEINFRASTRUCTURE
MINERVA - WENGLER - BURNS STORM
SEWER
157OVERLANDSTORMWATER
LINDEN #1064 STORM SEWER (DESIGN)113RICHMOND
HEIGHTS
STORMWATER
WISE AND MABEL SEWER SEPARATION
(DESIGN)
38RICHMOND
HEIGHTS
INFRASTRUCTURE
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING TO CLOSE
FUND 592)
147SHREWSBURYSTORMWATER
JACOBS OLD COAL ROAD & NOTTINGHAM
STORM SEWER (PARTIAL FUNDING)
148SHREWSBURYSTORMWATER
COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY
TANK A
46ST. ANN INFRASTRUCTURE
LINDSCOTT STORM SEWER 151ST. JOHN STORMWATER
202
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
CSO - INTERCEPTOR & OUTFALL
MODIFICATIONS PHASE III
47ST. LOUIS CITY INFRASTRUCTURE
CSO VOLUME REDUCTION - GREEN
INFRASTRUCTURE (PILOT PROGRAM)
48ST. LOUIS CITY INFRASTRUCTURE
MANCHESTER AVENUE COMBINED SEWER
RELIEF - PHASE II
63ST. LOUIS CITY INFRASTRUCTURE
OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET (DESIGN)
32ST. LOUIS CITY INFRASTRUCTURE
PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
64ST. LOUIS CITY INFRASTRUCTURE
TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (UTAH &
HUMPHREY STORM RELIEF SEWERS)
68ST. LOUIS CITY INFRASTRUCTURE
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2011)
49ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (FY 2011)
135ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY 2011)
59ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
POWER SUPPLY IMPROVEMENTS AT
VARIOUS SANITARY PUMP STATIONS PHASE
III
65ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
PROGRAM TO ELIMINATE BASEMENT
BACKUPS PHASE VI
66ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
STORMWATER INFRASTRUCTURE
IMPROVEMENTS (DESIGN) (2011)
116ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
203
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
STORMWATER INFRASTRUCTURE REPAIR
PROJECTS
165ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
STREAMBANK STABILIZATION
IMPROVEMENTS (DESIGN) (2011)
119ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
WATERSHED FACILITY PLANNING (FY2011
SUPPLEMENTAL APPROPRIATION)
37ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
AYRES SANITARY RELIEF AND I/I REDUCTION
(DESIGN)
18ST. LOUIS COUNTY INFRASTRUCTURE
COLDWATER WET WEATHER STORAGE
FACILITY TANK A (ENGINEERING
CONSTRUCTION SERVICES)
22ST. LOUIS COUNTY INFRASTRUCTURE
CREVE COEUR CREEK WATERSHED
SANITARY SEWER REHABILITATION
(DESIGN)
24ST. LOUIS COUNTY INFRASTRUCTURE
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2011) (SUPPLEMENTAL APPROPRIATION
35ST. LOUIS COUNTY INFRASTRUCTURE
EAST WATSON AND KATHY CT. STORM
IMPROVEMENT
136SUNSET HILLS STORMWATER
ALPINE & RAMBLER STORM SEWER 126UNINCORPORATEDSTORMWATER
ARLEE & HOFFMEISTER STORM SEWER 127UNINCORPORATEDSTORMWATER
CC-15 SEVEN PINES TO BENNINGTON PLACE
SANITARY RELIEF PHASE II (SKME-033)
45UNINCORPORATEDINFRASTRUCTURE
COUNT DRIVE #10556 STORM SEWER 134UNINCORPORATEDSTORMWATER
204
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407) (DESIGN)
25UNINCORPORATEDINFRASTRUCTURE
FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION
(DESIGN)
26UNINCORPORATEDINFRASTRUCTURE
GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF (DESIGN)
27UNINCORPORATEDINFRASTRUCTURE
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING TO CLOSE
OUT 576)
141UNINCORPORATEDSTORMWATER
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230) (PARTIAL FUNDING)
142UNINCORPORATEDSTORMWATER
INFRASTRUCTURE REPAIR #015P BURNCOATE
(P-321)
56UNINCORPORATEDINFRASTRUCTURE
LANETT CT. #11390 STORM IMPROVEMENT 149UNINCORPORATEDSTORMWATER
LEMAY WWTP WET WEATHER EXPANSION
OUTFALL SEWER
61UNINCORPORATEDINFRASTRUCTURE
LOWER MERAMEC RIVER WWTP PHASE II
(DISINFECTION)
62UNINCORPORATEDINFRASTRUCTURE
MALUS & GREEN PARK STORM SEWER 155UNINCORPORATEDSTORMWATER
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS (DESIGN)
30UNINCORPORATEDINFRASTRUCTURE
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
(DESIGN)
31UNINCORPORATEDINFRASTRUCTURE
205
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
CORNELL AVE. #8360 STORM SEWER (RAIN
GARDENS)
133UNIVERSITY CITY STORMWATER
GRAND GLAIZE WWTP IMPROVEMENTS -
MEDIUM VOLTAGE SWITCHGEAR
(INSTALLATION)
55VALLEY PARK INFRASTRUCTURE
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH (FY2011)
(SUPPLEMENTAL APPROPRIATION)
20VARIOUSINFRASTRUCTURE
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH (FY2011)
(SUPPLEMENTAL APPROPRIATION)
21VARIOUSINFRASTRUCTURE
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2011) (SUPPLEMENTAL APPROPRIATION)
23VARIOUSINFRASTRUCTURE
EMERGENCY REPAIR FUND APPROPRIATION
(FY2011)
50VARIOUSINFRASTRUCTURE
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
103VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
105VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SEWER &
CHANNEL DESIGN (FY2011)
104VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2011)
106VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
107VARIOUSSTORMWATER
DISTRICTWIDE
206
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
110VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
109VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
112VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
111VARIOUSSTORMWATER
DISTRICTWIDE
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011)
108VARIOUSSTORMWATER
DISTRICTWIDE
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2011)
60VARIOUSINFRASTRUCTURE
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM
33VARIOUSINFRASTRUCTURE
RADAR RAINFALL DATA (FY2011)34VARIOUSINFRASTRUCTURE
STREAM FLOW GAUGE OPERATION (USGS)
(FY 2011)
117VARIOUSSTORMWATER
DISTRICTWIDE
STREAM FLOW WATER QUALITY SAMPLING
(FY 2011)
118VARIOUSSTORMWATER
DISTRICTWIDE
INNISFAIL #217 STORM CHANNEL 144WEBSTER GROVES STORMWATER
SELMA & LANVALE STORM SEWER 163WEBSTER GROVES STORMWATER
CONWAY ROAD #11632 STORM SEWER 132WESTWOODSTORMWATER
207
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2011 PROJECT INDEX BY MUNICIPALITY
FALLBROOK - DEVONDALE I/I REDUCTION
(SKME -644 & 645)
51WESTWOODINFRASTRUCTURE
208