HomeMy Public PortalAboutExhibit MSD 16A4 SRF Loan Application MO River Secondary Expansion 10 12 2009pdf4
MISSOURI DEPARTMENT OF NATURAL RESOURCES
WATER PROTECTION PROGRAM, FINANCIAL ASSISTANCE CENTER
CLEAN WATER STATE REVOLVING FUND LOAN APPLICATION
Submit to: P.O. Box 176, Jefferson City, MO 65102-0176
ATTN: Financial Assistance Center
This application is for a Clean Water State Revolving Fund Loan described in 10 CSR 20-4.040
FOR OFFICE USE ONLY
DATE RECEIVED
LOAN NUMBER
PRIORITY POINTS
APPLICANT INFORMATION
1. NAME OF APPLICANT
Metropolitan St. Louis Sewer District
❑ Incorporated Municipality
® Public Water/Sewer District ❑ Other:
APPLICANT TELEPHONE NUMBER WITH AREA CODE _ APPLICANT FAX NUMBER WITH AREA CODE
314 - 768 - 6200 Ext. 314 - 768 - 6341
APPLICANT MAILING ADDRESS
2350 Market Street
CITY
St. Louis
STATE
MO
ZIP CODE + FOUR
63103-2555
COUNTY
St. Louis City and County
AUTHORIZED REPRESENTATIVE NAME
Jeffrey Theerman
AUTHORIZED REPRESENTATIVE TITLE
Executive Director
2 NAME OF PERSON TO CONTACT ABOUT THIS APPLICATION
Bart Hager
TELEPHONE NUMBER WITH AREA CODE
314 - 768 - 6208
Ext.
3 CONSULTING ENGINEER
Black and Veatch
CONSULTANT MAILING ADDRESS
15450 South Outer Forty Drive, Suite 200
CITY
Chesterfield
STATE
MO
ZIP CODE + FOUR
63017-2062
CONSULTANT TELEPHONE NUMBER WITH AREA CODE
636 - 532 - 7940 Ext.
CONSULTANT FAX NUMBER WITH AREA CODE
636 - 532 - 1465
4 POPULATION (CURRENT CENSUS)
1,354,628
POPULATION OF AREA TO BE SERVED
197,000
5 STATE SENATE DISTRICT NUMBER(S)
7, 24, 26
STATE REPRESENTATIVE DISTRICT NUMBER(S)
78 - 82, 85, 86, 88
6. PROPOSED PROJECT INFORMATION
® Point Source Project
❑ Non -Point Source Project
Decentralized/Cluster Wastewater System
On -Site System Rehabilitation/Replacement
Other Non -Point Source Project
Project Description (Attach Engineering Report as submitted to Missouri Water and Wastewater Review Committee;
if applicable):
MISSOURI RIVER VWVTP SECONDARY TREATMENT EXPANSION AND DISINFECTION FACILITIES - Project No. 2006168
Design and construction of secondary treatment expansion, new solids handling facilitities and disinfection facilities at the Missouri River Treatment
Plant. Engineering Report is attached.
PERMIT INFORMATION Factor A at 10 CSR 20-4.010 (1)(A)1
7. List National Pollutant Discharge Elimination System, or NPDES, Permit Number(s) of Water or Wastewater facilities affected
by this project:
MO -0004391
8. List Non -Permitted facilities to be eliminated by this project (attach list if necessa
Name
Population Served
Type and Condition of Facility
MO 780-1951 (09/08)
PROJECT COST INFORMATION
9. Cost Estimate Dated: 10/8/2007
10. Cost Breakdown for Designated Categories
Engineering Planning and Design
$4,700,000 j I. Secondary Treatment
$128,000,000
Engineering (Construction Phase)
$2,600,000
I I . Advanced Treatment
$6,500,000
Engineering Inspection
$5,200,000 I IIA. Inflow/Infiltration Correction
Land and Easements*
IIIB. Sewer Rehabilitation
Construction
$114,000,000 IVA. Collection Sewers
Equipment
IVB. Interceptor Sewers
SRF Closing Costs (estimate 3 percent)
$2,300,000 V. Combined Sewer Overflow Correction
Other Costs (specify)
$
VI. Storm Water
Contingencies
$5,700,000
VII. Non -Point Source
Total Project Costs $134,500,000
Total Project Costs $134,500,000
Funding From Other Sources
$0
Funding Request (this application only) $134,500,000
These costs are generally not eligible for CWSRF funding.
t 1. DEBT INSTRUMENT
A. Bonds
B. Capital Improvements Sales Tax
Date of Bond Election
8/5/2008
Date of Election
/ /
Type of Bond
Revenue
Dedicated? ❑ Yes ❑ No
Amount of Bond
$275,000,000
Sunset Provision? ❑ Yes ❑ No
C. Other (specify):
12. APPLICANT FINANCIAL INFORMATION Factor C at 10 CSR 20-4.010(1)(A)3
A. Median Household Income (from census) $46,800.00
B Current monthly sewer use rate (for 5,000 gallons) $23.86
Proposed sewer rate (for 5,000 gallons) $24.34
C Sewer revenues for most recent year ended $209,326,070.00
Most recent year's date of data used 6/30/2008
D. Sewer operating expenditures for most recent year $206,993,603.00
13. BOARD TRAINING Factor C at 10 CSR 20-4.010(1)(A)3
List any board training(s) related to wastewater utility management that current board members have attended in the last
three years:
Wastewater utility management training is included as part of each new Board member's orientation training. As well, ongoing training occurs
during monthly Committee meetings and Board meetings.
MO 780-1951 (09/08)
2
14. WATERSHED INFORMATION Factors A at 10 CSR 20-4.010;(1)(A)1` and Factor E at 10 CSR 20-4.010 (1)(A)5
WATER BODY AFFECTED BY PROPOSED PROJECT
Missouri River
® Check if this is the
receiving water body
is classified
body is not classified, provide the nearest
body
I1 Check if the body
❑ If affected water
downstream water
Is proposed project identified in a multi -jurisdictional area watershed plan? ❑ Yes ® No If yes, provide a copy of the plan.
Does the proposed project serve more than
❑ No If yes, identify communities:
one community? ►1 Yes
Chesterfield
Maryland Heights
Unincorporated St. Louis County
Does the proposed project eliminate the need for multiple wastewater treatment facilities?
❑ Yes /1 No
Does the proposed project address groundwater pollution? ® Yes ❑ No
GROUNDWATER IS USED FOR:
Limited irrigation and drinking water wells.
OTHER PROBLEMS ADDRESSED:
This project will enable the elimination of SSOs, which will reduce groundwater and surface water pollution.
15. PROJECT TYPE (CHECK ALL THAT APPLY) Factor B at 10iCSR 20-4.0101(1)(A)2
❑ Combined sewer overflow/sanitary
® Wastewater Treatment Facility
❑ New facility
® Increase capacity/increase
sewer overflow Number of overflows
(specify) Has antidegradation report
level of treatment
improvement
disposal system Percentage of systems
wastewater system
primarily to address inflow/infiltration
collection system
Practice
side slope seepage prevention and control
by: Factors E at 10 CSR 20-4.010 (1)(A)5
petroleum storage tanks
a hazardous waste site participating in the department's
caused by inadequate landfill leachate collection
by: Factor F at 10 CSR 20-4.010(1)(A)6
habitat and/or to prevent aquatic/riparian
per year:
been submitted? ® Yes ❑ No ❑ N/A
failing: 0/0
► Rehabilitation/process
❑ Failing or failed on -site wastewater
❑ On -site system replacement/rehabilitation
❑ Construction of a decentralized
❑ New collection system
❑ Collection system rehabilitation
❑ New collection system
system, and monitoring wells
Voluntary Cleanup Program
systems
degradation
■ Upgrade or expansion of existing
❑ Storm water detention
❑ Agricultural Best Management
❑ Landfill capping, leachate collection,
The project addresses groundwater pollution
❑ Addressing problems caused by
❑ Addressing problems caused by
❑ Addressing water quality problems
The project considers aquatic/riparian habitat
❑ Including measures to restore aquatic/riparian
3
16. PROJECT SCHEDULE (READINESS TO PROCEED) Factor C at 10 CSR 20-4.010(1)(A)3
Milestone
Anticipated Date
A. Antidegradation report submitted (for any new, expanded or upgraded wastewater
treatment plant)
3/25/2008
B. Engineering Report and Facility Plan complete
4/10/2008
C. All other funding is secured (if necessary, bonds are voted)
8/5/2008
D. Engineering Plans and Specifications complete
10/1/2010
E. Construction start date
7/8/2011
F. Mandatory completion date (attach copy of compliance schedule)
/ /
17. THE FOLLOWING INFORMATION IS REQUIRED BY:10 CSR 20-4.040(8) AND MUST BE INCLUDED WITH THIS
APPLICATION FORM:
® A project summary that includes the need for the project
:
showing the project location
notice to proceed
►1 The project components including maps or drawings
® A cost estimate including a cost breakdown
® The most recent financial statement
® Proposed project schedule including:
® Construction start date defined as the date of
►1 Construction completion
® Initiation of operation
® Project completion
18. SUPPLEMENTAL INFORMATION — DOCUMENTATION MUST BE ATTACHED Factor C at 10 CSR 20-4.010(1)(A)3
® User charge system budgets showing revenues and expenses for the past five years.
® Documentation showing that an inflow/infiltration reduction program has been in place for the fast five years.
❑ Water or Energy Conservation Plan
❑ Proposed project is specifically identified in the applicant's master wastewater or capital improvement plan. (Master
wastewater or capital improvement plan should be for a period of five or more years).
❑ Documentation indicating the percentage of failed on -site wastewater disposal systems to be replaced
or rehabilitated.
CERTIFICATION:
The undersigned representative certifies that the information submitted in this application is true and correct to the best of his/her
knowledge and that he/she is authorized to sign and submit this application. The applicant agrees, if a loan is awarded on the basis
of this application, to comply with all applicable terms, conditions and procedures of the Department of Natural Resources, the
applicable rules and regulations of the Missouri Clean Water Commission and the terms and conditions of the loan agreement.
Incomplete applications will be returned.
TURE OF AUTHORIZES REP ESENTATIVE
DATE
10/15/2009
N E A D FFICIAL ITLE (TYPE OR PRINT)
Jeffrey Theerman, Executive Director
TELEPHONE NUMBER WITH AREA CODE
314 - 768 - 6245 Ext.
PREPARER'S NAME AND SIGNATURE (IF APPLICABLE)
SIGNATURE OF PREPARER
DATE
10/15/2009
NAME AND TITLE (P NT OR TYPE)
Bart Hager, Senior Civil Engineer, Planning
TELEPHONE NUMBER WITH AREA CODE
314 - 768 - 6208 Ext.
4