HomeMy Public PortalAboutExhibit MSD 16I 2008 CIRP Supplemental BudgetCAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2007-2008
PREFACE
1
This annual Budget Supplement is designed to provide the public with concise and readable
information about the Metropolitan St. Louis Sewer District's intended Capital Improvement and
Replacement Program during its Fiscal Year 2008 (July 1, 2007 to June 30, 2008). For ease of use,
this document is divided into the following sections:
• Program Summary • Infrastructure Engineering Projects • Infrastructure Construction Projects • Infrastructure Continued Projects • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • State Stormwater Grant Projects • Appendix
Listed in the Infrastructure Construction and Stormwater Construction Projects sections are
projects that the District intends to award construction contracts for during its Fiscal Year 2008.
Listed in the Infrastructure Engineering and Stormwater Engineering sections are projects that the
District intends to award engineering contracts for during its Fiscal Year 2008 (for design, planning,
and data collection/system investigation services). Due to the magnitude, complexity, permitting,
and easement requirements of design projects, their construction is planned for future years.
For each new project identified for funding in Fiscal Year 2008, this document provides
information regarding the project scope, estimated cost, and projected schedule. For projects
continued from previous fiscal years, only the estimated construction cost and reason for
continuance are provided. Specific information regarding the continued projects was included in
previous Budget Supplement documents for the fiscal year in which the projects were initially
identified. This fiscal year is indicated in parentheses following the project name.
Projects participating in the State Stormwater grant program are also listed, along with
information about the program.
Lastly, a listing of all Fiscal Year 2008 projects sorted by municipality is provided in the
Appendix.
n The Metropolitan St. Louis Sewer District
-"�EJ CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2007 - 2008
ST CHARLES COUNTY
MADISON COUNTY
ILLINOIS
ST. CLAIR COUNTY
ILLINOIS
ST. LOUIS COUNTY
JEFFERSON COUNTY
21
32
Infrastructure Projects
Storm Projects
Combined Projects
Legend
5a Area —wide Infrastructure Projects
65 Area —wide Storm Projects
75 Area —wide Combined Projects
\t/
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2007-2008
MAP
NO.PROJECT NAME
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - NORTH (FY2008)15
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - SOUTH (FY2008)16
COMBINED SEWER AREA - INFLOW/INFILTRATION ASSESSMENT17
CREVE COEUR CREEK (L-52) PUMP STATION IMPROVEMENTS (ENGINEERING CONSTRUCTION
SERVICES)
18
CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72 INTERCEPTOR (I-122) SEPARATION (DESIGN)19
CSO LONG TERM CONTROL PLAN PUBLIC PARTICIPATION PROGRAM20
FLOW METERING AND MONITORING EQUIPMENT ACQUISITION (FY2008)21
SEPARATE SEWER AREA - INFLOW/INFILTRATION ASSESSMENT22
SEWER IMPROVEMENTS IN ST. LOUIS CITY PARKS PHASE IV (DESIGN)23
WATERSHED FACILITY PLANNING24
BARRETT STATION SANITARY RELIEF29
BLACK CREEK SANITARY RELIEF (HIGHWAY 40 TO WENLOU DRIVE)30
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - SUPPORT SERVICES
(SUPPLEMENTAL APPROPRIATION)
31
COLDWATER SANITARY RELIEF SECTION B, C & D (LAND ACQUISITION)32
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE II (BP-012,BP-032,BP-038,BP-049)33
CSO - INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE II (NEW MILL SEWER)34
CSO - INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE II (PEVELY PUMP
STATION)
35
CSO - MACKLIND OUTFALL L-062 SEPARATION36
CSO - MIDDLESEX AND YORK DRIVE (L-110) SEWER SEPARATION37
CSO - SOUTHWEST INDUSTRIAL CENTER OUTFALLS L-046, L-049, L-177 SEPARATION38
EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2007-2010)39
EMERGENCY REPAIR FUND APPRORIATION40
3
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2007-2008
MAP
NO.PROJECT NAME
I-64/40 RECONSTRUCTION BETTERMENTS ALLOWANCE41
I-70 AND BERMUDA SANITARY SEWER RELOCATION42
INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2008)43
INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2008)44
KEHRS MILL TRAILS SUBDIVISION SANITARY SEWERS (S.D. #2003144)45
LC-01 FELTON, ARLEE & VIDA TO CLYDE SANITARY RELIEF PHASE III46
LEMAY GARDENS SEPARATE SEWER AREA I/I REDUCTION47
LEMAY WWTP AERATION BLOWER MODIFICATIONS PHASE I48
LEMAY WWTP SECONDARY CHILLER PIPING REPLACEMENT49
LEMAY WWTP WET WEATHER EXPANSION50
LOWER MERAMEC RIVER WWTP SITE RESTORATION/LANDSCAPING IMPROVEMENTS51
MISSOURI RIVER BONFILS INFILTRATION AND INFLOW CORRECTION PHASE VI (LATERAL
SEWER REHABILITATION)
52
OXFORD AND BIG BEND COMBINED SEWER REPLACEMENT53
POTTLE AVE. PUMP STATION ELIMINATION54
POWER SUPPLY IMPROVEMENTS AT VARIOUS SANITARY PUMP STATIONS55
PROGRAM TO ELIMINATE BASEMENT BACKUPS PHASE III56
SANITARY SEWER CLEANING57
SEPARATE SEWER OVERFLOW MODIFICATION AND MONITORING PROGRAM (FY 2008)58
TOWER GROVE-MANCHESTER COMBINED SEWER SYSTEM PHASE I (PARK - THURMAN
DIVERSION STRUCTURE)
59
VALDAMERE DRIVE #11125 SANITARY SEWER REPLACEMENT60
COLDWATER CREEK WATERSHED STORM SEWER IMPROVEMENTS (DESIGN)69
DEER CREEK WATERSHED STORM SEWER IMPROVEMENTS (DESIGN)70
4
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2007-2008
MAP
NO.PROJECT NAME
SAPPINGTON CREEK MEATH TO GRAVOIS (GCXR-110) (PRELIMINARY DESIGN)
(SUPPLEMENTAL APPROPRIATION)
71
STORMWATER FACILITY PLANNING (SUPPLEMENTAL APPROPRIATION)72
STREAM FLOW GAUGE OPERATION AND MAINTENANCE (FY 2008)73
130 ST. EDWARD LANE STORM SEWER79
61 CONWAY CLOSE STORM SEWER80
AVIGNON CT. #1685 STORM SEWER81
BALSON AVE. 7800 BLOCK STORM SEWER82
BRIAR CT. #8011 STORM SEWER83
BURCH LANE STORM SEWER84
BURTON TO ARGYLE STORM SEWER85
CLAYTON TERRACE #3 BANK STABILIZATION86
COLONIAL LN. #8556 STORM IMPROVEMENTS87
CONWAY & CONWOOD STORM CHANNEL PHASE III88
CORONATION DRIVE #1241 STORM SEWER89
EDNA & THURSBY STORM SEWER90
EDWIN AVE. #767 STORM SEWER IMPROVEMENTS91
ELTORA AVENUE STORM CHANNEL PHASE I (UCNE-140)92
FILLMORE - ELLIOT BANK STABILIZATION (GCKC-130)93
FOOTE - BERRY PARK STORM SEWER94
HARRISON AVE. #1375 STORM SEWER IMPROVEMENTS95
JEFFERSON #360 STORM SEWER IMPROVEMENT96
KORTWRIGHT- NORTH OF SHERRELL AND O'DAY STORM IMPROVEMENT97
5
METROPOLITAN SEWER DISTRICT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
FISCAL YEAR 2007-2008
MAP
NO.PROJECT NAME
KORTWRIGHT- OAK HAVEN AND O`DAY STORM IMPROVEMENT98
MANCHESTER & MISSOURI AVENUE STORM SEWER PHASE I99
MCCUTCHEON TO MCKNIGHT CHANNEL REPLACEMENT100
MUNDY #1480 STORM SEWER101
NORTH FOREST STORM RELIEF102
OAK AVENUE #10051 STORM IMPROVEMENTS (UCSC-115)103
OLD BONHOMME GROBY STORM SEWER IMPROVEMENT104
PRENTICE - GRANGER STORM CHANNEL (MCBJ-110) PHASE II105
PRICEWOODS - BIRNAWOODS STORM SEWER106
PURDUE AND CANTON STORM SEWER107
RIDGECORDE LANE STORM SEWER108
RUTH-HELEN-CECELIA STORM SEWER REPLACEMENT109
SELMA AND OAK TREE DR. CULVERT EXTENSION110
SPENCER AVENUE STORM SEWER111
STORMWATER INFRASTRUCTURE REPAIR/REPLACEMENT (OPERATIONS - FY2008)112
TEMPLE ISRAEL CREEK BANK STABILIZATION113
WC-21 BANK PROTECTION114
WILDWOOD LN. #75 STORM SEWER115
WILLOUGHBY PLACE #533 STORM SEWER116
WISMER-LESLIE STORM SEWER117
6
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
7
The identification and prioritization of projects to be included in the Capital
Improvement and Replacement Program is a multi-step process, requiring continuous
monitoring and updating to ensure that the highest priority problems within the District
are addressed in a timely manner, given funding limitations. These stages include:
project identification, conceptual solution, preliminary study, final design and
construction.
At each step in the process the project scope is reevaluated to verify that it
continues to meet regulatory requirements and customers’ needs. The project cost is
updated based on available information, and the project’s priority is assessed to ensure
that the highest priority projects are funded first.
Project cost estimates used in the budget preparation process and shown in the
Budget Supplement are usually based on the preliminary study stage of the process. At
this stage there is typically a minimal amount of detailed information regarding
geotechnical conditions, utility relocation requirements, easement requirements and other
site-specific issues that may affect the project’s construction cost. Historically,
preliminary study cost estimates have been found to be within thirty percent of the final
design engineer’s estimates. Individual projects may vary to a greater degree than the
average, due to unanticipated site-specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
8
Protection Agency and Missouri Department of Natural Resources, to address customer
storm or sanitary problems, remedy deficiencies identified through planning studies and
hydraulic analysis of the system, and implement required collection system and
wastewater treatment plant upgrades.
Upon the initial identification of regulatory issues, localized problems or system
deficiencies, a conceptual solution is developed which includes a project scope, cost
estimate and priority ranking of the project relative to similar projects. This solution and
associated cost estimate are general, based on a single site visit and a “table-top” analysis
of the problem. The project may then be incorporated into the Capital Improvement and
Replacement Program in a specific fiscal year, based on the availability of funds and
priority of the project.
Prior to the year that funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the
conceptual solution is still viable, given current conditions, regulatory requirements,
updated project cost estimate, and priority ranking computed. In performing this
preliminary study, the District may make multiple site visits to inspect the problem area
and estimate alignment of the sewer or channel to be constructed. Preliminary survey
information may be obtained and a more detailed hydraulic analysis performed than was
done at the conceptual solution level. Preliminary studies are typically performed by the
Engineering Department. However, on occasion, the District may use engineering
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
9
consultant services to perform preliminary studies during periods of heavy workload, or
for large, complex projects such as new treatment plants, upgrades to existing treatment
plants, or major outfall sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is
reevaluated relative to other, similar projects. A project may be rescheduled to a later
fiscal year within the Capital Improvement and Replacement Program, should its priority
ranking be reduced due to increased project costs or modification of its scope.
The final design of a project is performed by either the District’s Engineering
Department staff or via engineering consultant design services. As part of the final
design process, topographic and geotechnical information is collected, utility conflicts
identified, construction plans and specifications are prepared, and easement and
temporary construction license plats are drafted.
For projects of significant scope and impact, coordination with property owners
who will benefit or will be affected by the construction of the project is achieved at
"open-line" meetings hosted by the District. For smaller projects, property owners are
individually contacted during the design of the project.
Many projects require that new easements be acquired in order for the project to
be constructed. The time required to acquire these easements is lengthy, and may result
in delays in the planned construction schedule. When necessary, the District may
condemn for easements in order to ensure that a project is constructed – any required
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
10
condemnation proceedings are performed in full compliance with state and federal law.
Some projects may additionally require specific permitting from other government
agencies, such as the Missouri Department of Natural Resources, prior to bidding.
A project is advertised for public bidding a minimum of three weeks, followed by
a formal bid opening. Bids are evaluated to determine the lowest responsive responsible
bidder. Appropriation and contract ordinances are submitted to the Board of Trustees for
their approval. Upon ordinance passage, contracts are executed and notices to proceed
are issued.
In addition to infrastructure and stormwater projects, the District may construct
sanitary sewer subdistrict projects at the request of property owners currently served by
individual septic tank systems. These subdistricts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the
projects by submitting a petition to the District, which provides design and construction
management assistance. Because of the uncertainty of the viability and/or schedule of
subdistrict projects, they are not always listed in the Budget Supplement.
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
11
Number of
Type of Project Individual Projects Project Cost
Infrastructure Construction 32 $103,345,000
Stormwater Construction 39 $ 9,764,000
Infrastructure Engineering 10 $ 22,920,000
Stormwater Engineering 5 $ 3,500,000
Proposed Projects Subtotal: 86 $139,529,000
Continued Infrastructure Projects 35 $137,145,000
Continued Stormwater Projects 16 $ 6,445,000
Continued Projects Subtotal: 51 $143,590,000
FISCAL YEAR 2008 PROJECT TOTALS 137 $283,119,000
INFRASTRUCTURE ENGINEERING PROJECTS
13
The projects described in this section relate to the preliminary or final design of
new or rehabilitated sanitary and combined sewer systems. Also included in this section
are projects relating to combined sewer overflow elimination and separation projects
identified in the District’s Combined Sewer Overflow Long Term Control Plan,
additional appropriations for combined and separate sewer area inflow/infiltration
assessments, combined and separate sewer area flow metering and monitoring and CCTV
inspections and physical inspection of sewers, and continued funding of the District’s
Watershed Facilities Planning efforts. The construction phase of preliminary and final
design projects are planned in later fiscal years due to the complexity of the design, the
size of the project, and the time required to obtain needed easements.
Ten (10) infrastructure engineering projects are planned at a total estimated cost of
$22,920,000. The cost estimates indicated are only for the required engineering work;
however, the project scopes are fully described.
PAGEPROJECT NAME
CONTENTS OF INFRASTRUCTURE ENGINEERING PROJECTS
COST ESTIMATEPROJECT
NUMBER
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH (FY2008)
15$1,000,0002007236A
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH (FY2008)
16$1,000,0002007236B
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
17$4,500,0002007141
CREVE COEUR CREEK (L-52) PUMP STATION
IMPROVEMENTS (ENGINEERING
CONSTRUCTION SERVICES)
18$480,0002003062
CSO - JEFFERSON BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-122) SEPARATION
(DESIGN)
19$150,0002003076D
CSO LONG TERM CONTROL PLAN PUBLIC
PARTICIPATION PROGRAM
20$935,0002007238
FLOW METERING AND MONITORING
EQUIPMENT ACQUISITION (FY2008)
21$4,500,0002007235
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
22$3,500,0002007140
SEWER IMPROVEMENTS IN ST. LOUIS CITY
PARKS PHASE IV (DESIGN)
23$255,0002007169
WATERSHED FACILITY PLANNING 24$6,600,0002007139
$22,920,000TOTAL:
14
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007236A
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
ADS Environmental Services
$1,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL HAVE ANNUAL APPROPRIATIONS AS REQUIRED. INITIAL FUNDING OF $2,000,000 WAS
APPROPRIATED IN FISCAL YEAR 2004, WITH SUPPLEMENTAL APPROPRIATIONS OF $2,000,000 IN FISCAL YEAR 2005, $2,000,000 IN
FISCAL YEAR 2006, AND $1,000,000 IN FISCAL YEAR 2007. ANTICIPATE ORDINANCE INTRODUCTION FOR THIS APPROPRIATION IN
DECEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,000,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - NORTH (FY2008)
INFRASTRUCTURE
660
2008 790215ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007236B
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
Ace Pipe Cleaning
$1,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL HAVE ANNUAL APPROPRIATIONS AS REQUIRED. INITIAL FUNDING OF $2,000,000 WAS
APPROPRIATED IN FISCAL YEAR 2004, WITH SUPPLEMENTAL APPROPRIATIONS OF $2,000,000 IN FISCAL YEAR 2005, $2,000,000 IN
FISCAL YEAR 2006, AND $1,000,000 IN FISCAL YEAR 2007. ANTICIPATE ORDINANCE INTRODUCTION FOR THIS APPROPRIATION IN
DECEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,000,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - SOUTH (FY2008)
INFRASTRUCTURE
660
2008 790316ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007141
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
CONSULTANT
$4,500,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO COMBINED SEWER SYSTEM CAUSES BASEMENT BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION TECHNIQUES.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL HAVE ANNUAL APPROPRIATIONS AS REQUIRED. THE INITAL FUNDING OF $1,000,000 WAS
APPROPRIATED IN FISCAL YEAR 2003 WITH SUPPLEMENTAL APPROPRIATIONS OF $500,000 IN FISCAL YEAR 2004, $2,000,000 IN FISCAL
YEAR 2005, $4,500,000 IN FISCAL YEAR 2006. AND $4,500,000 IN FISCAL YEAR 2007. ANTICIPATE BOARD INTRODUCTION IN JULY, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $4,500,000
SCHEDULE
COMBINED SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT
INFRASTRUCTURE
660
2008 720017ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003062
2008
Maryland Heights
Missouri
Creve Coeur Creek
SANITARY REPLACEMENT
CAMP DRESSER AND MCKEE, INC.
$480,000
St. Louis Metropolitian Sewer District - Fiscal Year
GROWTH AND WET WEATHER INFILTRATION AND INFLOW OCCURING IN SEVERAL OF THE SUBWATERSHEDS TRIBUTARY TO PUMP
STATION L-52. THE STATION IS APPROACHING ITS DESIGN CAPACITY FOR PEAK WET WEATHER FLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE DESIGN CONSULTANT ENGINEERING SUPPORT SERVICES DURING THE CONSTRUCTION OF A NEW PUMP STATION AND
APPROXIMATELY 18,000 FEET OF 48-INCH DIAMETER SANITARY FORCE MAIN.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $480,000
SCHEDULE
CREVE COEUR CREEK (L-52) PUMP STATION
IMPROVEMENTS (ENGINEERING CONSTRUCTION SERVICES)
INFRASTRUCTURE
660
2008 803418ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS 7/1/2007
7/1/2007 7/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003076D
2008
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
CONSULTANT
$150,000
St. Louis Metropolitian Sewer District - Fiscal Year
REDUCE STORMWATER FLOW TO 18-INCH COMBINED SEWER INTERCEPTOR BY SEPARATING STORMWATER FROM THE COMBINED
SYSTEM WHERE POSSIBLE.
PROJECT PROBLEM
PROJECT SOLUTION
SEPARATE SEWERS AS REQUIRED TO ENABLE ELIMINATION OF ONE CSO OUTFALL (L-152).
REMARKS
CONSTRUCTION IS TENTATIVELY PROGRAMMED IN FISCAL YEAR 2010, FOR $593,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $150,000
SCHEDULE
CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72
INTERCEPTOR (I-122) SEPARATION (DESIGN)
INFRASTRUCTURE
660
2008 763319ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2007 12/1/2008 12/1/2009 4/1/2010
12/1/2008 12/1/2009 4/1/2010 2/1/2011
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007238
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
CONSULTANT
$935,000
St. Louis Metropolitian Sewer District - Fiscal Year
DEVELOPMENT OF THE LONG TERM CONTROL PLAN FOR COMBINED SEWER OVERFLOWS HAS A PUBLIC PARTICIPATION
REQUIREMENT THAT INCLUDES COMMUNITY-WIDE ENGAGEMENT ON THE PLAN'S SOLUTIONS/COSTS.
PROJECT PROBLEM
PROJECT SOLUTION
COMPLETE DEVELOPMENT AND IMPLEMENTATION OF A COMMUNITY-WIDE PUBLIC PARTICIPATION PROGRAM.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $935,000
SCHEDULE
CSO LONG TERM CONTROL PLAN PUBLIC PARTICIPATION
PROGRAM
INFRASTRUCTURE
660
2008 803020ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007235
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD/CONSULTANT
$4,500,000
St. Louis Metropolitian Sewer District - Fiscal Year
COMPLIANCE WITH ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS FOR THE ELIMINATION AND CONTROL OF SANITARY AND
COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONTINUATION OF THE COLLECTION OF DATA ON SYSTEM FLOWS DURING VARIOUS WET WEATHER EVENTS. THIS INFORMATION
WILL BE USED TO CALIBRATE HYDRAULIC MODELS AND IDENTIFY IMPROVEMENT PROJECTS. THIS APPROPRIATION WILL PROVIDE
FUNDS FOR THE PURCHASE OF FLOW METERING EQUIPMENT FOR THIS PROGRAM TO BE PERFORMED WITH MSD OPERATIONS
STAFF. ADDITIONALLY, IT WILL PROVIDE FUNDS FOR DATA ANALYSIS BY CONTRACT CONSULTANT.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT HAS ANNUAL APPROPRIATIONS AS REQUIRED. A TOTAL OF $4,000,000 WAS PREVIOUSLY
APPROPRIATED IN FISCAL YEARS 2004 AND 2005, $4,000,000 WAS APPROPRIATED IN FISCAL YEAR 2006, AND $4,000,000 WAS
APPROPRIATED IN FISCAL YEAR 2007. ANTICIPATE BOARD INTRODUCTION IN NOVEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $4,500,000
SCHEDULE
FLOW METERING AND MONITORING EQUIPMENT
ACQUISITION (FY2008)
INFRASTRUCTURE
660
2008 790521ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007140
2008
St. Louis County
Various
Various
SANITARY REPLACEMENT
CONSULTANT
$3,500,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO SANITARY SEWER SYSTEM CAUSES BASEMENT BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION TECHNIQUES.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT HAS ANNUAL APPROPRIATIONS AS REQUIRED. INITIAL FUNDING OF $1,000,000 WAS
APPROPRIATED IN FISCAL YEAR 2003 WITH SUPPLEMENTAL APPROPRIATIONS OF $500,000 IN FISCAL YEAR 2004, $1,500,000 IN FISCAL
YEAR 2005, $3,500,000 IN FISCAL YEAR 2006, AND $3,500,000 IN FISCAL YEAR 2007. BOARD INTODUCTION ANTICIPATED IN JULY, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $3,500,000
SCHEDULE
SEPARATE SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT
INFRASTRUCTURE
660
2008 719622ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007169
2008
St. Louis City
Lemay/RDP
RDP - Forest Park
SANITARY REPLACEMENT
CONSULTANT
$255,000
St. Louis Metropolitian Sewer District - Fiscal Year
VARIOUS PARKS WITHIN THE CITY OF ST. LOUIS REQUIRE IMPROVEMENTS TO COLLECTION SYSTEMS. THE DISTRICT RECEIVED AN
EPA GRANT TO FUND NEEDED PARK SEWER IMPROVEMENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM CONDITION ASSESSMENT OF MAJOR COMBINED SEWER TUNNELS FLOWING UNDER FOREST PARK, AND PERFORM NEEDED
SPOT REPAIRS AS NECESSARY, TO FULLY UTILIZE REMAINING FEDERAL GRANT FUNDING.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$140,000 $0 $0 $115,000
SCHEDULE
SEWER IMPROVEMENTS IN ST. LOUIS CITY PARKS PHASE
IV (DESIGN)
INFRASTRUCTURE
660
2008 799623ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2007 2/1/2009 6/1/2009
12/1/2008 6/1/2009 6/1/2010
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007139
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
JACOBS CIVIL, INC.
$6,600,000
St. Louis Metropolitian Sewer District - Fiscal Year
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITAL IMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTING
DISTRICT STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
UTILIZE PROFESSIONAL ENGIEERING SERVICES TO AUGMENT, ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,
INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THE DISTRICT, INFLOW/INFILTRATION PROFESSIONAL SERVICES, AND
SPECIALTY VENDORS.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL RECEIVE ANNUAL APPROPRIATIONS AS REQUIRED. $1,500,000 WAS APPROPRIATED IN
FISCAL YEAR 2004, $2,500,000 IN FISCAL YEAR 2005, $6,300,000 IN FISCAL YEAR 2006, AND $7,200,000 IN FISCAL YEAR 2007. BOARD
INTRODUCTION OF THIS APPROPRIATION IS ANTICIPATED IN JULY 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $6,600,000
SCHEDULE
WATERSHED FACILITY PLANNING
INFRASTRUCTURE
660
2008 722624ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
INFRASTRUCTURE CONSTRUCTION PROJECTS
25
The projects described in this section are related to constructing, rehabilitating or
maintenance repair of sanitary or combined sewers, improvements to existing treatment
plants, and the reduction of inflow and infiltration in the separate sewer area. These
types of projects help alleviate basement backups, address regulatory issues and rebuild
part of our aging infrastructure system. Approximately one half of the projected funding
is for improvements and expansion at the Lemay Wastewater Treatment Plant. Thirty-
two (32) projects are to be funded at a total estimated cost of $103,345,000.
The District's revenue source for constructing the majority of these projects is the
Sanitary Replacement Fund, which receives money from wastewater user charges and
from the sale of revenue bonds. The remaining projects will be funded with revenues
from various Operation, Maintenance, Construction, and Improvement (OMCI) Funds,
Construction Funds, Special Funds, or the Improvement Fund. The property taxes
collected within the boundaries of OMCI Taxing Districts must be spent for
improvements within their specific areas of collection. The Construction Fund and
Improvement Fund receive revenues from various connection fees.
CONTENTS OF INFRASTRUCTURE CONSTRUCTION PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
BARRETT STATION SANITARY RELIEF 29$935,00096026
BLACK CREEK SANITARY RELIEF (HIGHWAY 40
TO WENLOU DRIVE)
30$3,500,0002002103
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - SUPPORT SERVICES
(SUPPLEMENTAL APPROPRIATION)
31$250,0002006166
COLDWATER SANITARY RELIEF SECTION B, C & D
(LAND ACQUISITION)
32$3,000,0002003083
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS
PHASE II (BP-012,BP-032,BP-038,BP-049)
33$500,0002003053B6
CSO - INTERCEPTOR ACCESS AND MONITORING
IMPROVEMENTS PHASE II (NEW MILL SEWER)
34$1,300,0002003054C
CSO - INTERCEPTOR ACCESS AND MONITORING
IMPROVEMENTS PHASE II (PEVELY PUMP
STATION)
35$1,000,0002003054E
CSO - MACKLIND OUTFALL L-062 SEPARATION 36$320,0002006114
CSO - MIDDLESEX AND YORK DRIVE (L-110)
SEWER SEPARATION
37$990,0002000060
CSO - SOUTHWEST INDUSTRIAL CENTER
OUTFALLS L-046, L-049, L-177 SEPARATION
38$140,0002006115
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2007-2010)
39$1,200,0002005115
EMERGENCY REPAIR FUND APPRORIATION 40$250,0002007249
I-64/40 RECONSTRUCTION BETTERMENTS
ALLOWANCE
41$10,000,0002007170
I-70 AND BERMUDA SANITARY SEWER
RELOCATION
42$450,0002007048
26
CONTENTS OF INFRASTRUCTURE CONSTRUCTION PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY 2008)
43$7,000,0002007172
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2008)
44$2,000,0002007173
KEHRS MILL TRAILS SUBDIVISION SANITARY
SEWERS (S.D. #2003144)
45$2,000,0002003144
LC-01 FELTON, ARLEE & VIDA TO CLYDE
SANITARY RELIEF PHASE III
46$410,00090056B
LEMAY GARDENS SEPARATE SEWER AREA I/I
REDUCTION
47$970,0002004063
LEMAY WWTP AERATION BLOWER
MODIFICATIONS PHASE I
48$600,0002007239
LEMAY WWTP SECONDARY CHILLER PIPING
REPLACEMENT
49$220,0002007154
LEMAY WWTP WET WEATHER EXPANSION 50$45,000,0002003067
LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING IMPROVEMENTS
51$210,00095066H
MISSOURI RIVER BONFILS INFILTRATION AND
INFLOW CORRECTION PHASE VI (LATERAL SEWER
REHABILITATION)
52$3,000,00097040D
OXFORD AND BIG BEND COMBINED SEWER
REPLACEMENT
53$150,0002006083
POTTLE AVE. PUMP STATION ELIMINATION 54$150,0002007157
POWER SUPPLY IMPROVEMENTS AT VARIOUS
SANITARY PUMP STATIONS
55$500,0002007240
PROGRAM TO ELIMINATE BASEMENT BACKUPS
PHASE III
56$500,00099135
27
CONTENTS OF INFRASTRUCTURE CONSTRUCTION PROJECTS
PROJECT
NUMBER
COST ESTIMATEPROJECT NAME PAGE
SANITARY SEWER CLEANING 57$15,000,0002007167
SEPARATE SEWER OVERFLOW MODIFICATION
AND MONITORING PROGRAM (FY 2008)
58$500,0002006174
TOWER GROVE-MANCHESTER COMBINED SEWER
SYSTEM PHASE I (PARK - THURMAN DIVERSION
STRUCTURE)
59$1,000,0002003088A
VALDAMERE DRIVE #11125 SANITARY SEWER
REPLACEMENT
60$300,0002007160
$103,345,000TOTAL:
28
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
96026
2008
Unincorporated
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
ST. LOUIS COUNTY DEPARTMENT OF
HIGHWAYS
$935,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 2,480 FEET OF 18 INCH DIAMETER SANITARY SEWER AND APPURTENANCES FROM NEAR BARRETT
WOODS DRIVE SOUTHERLY TO THE SOUTH END OF BARRETT SPRINGS DRIVE. BYPASS DEACTIVATED.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2007, FOR $215,000. THIS PROJECT WILL BE BUILT BY ST. LOUIS COUNTY AS
PART OF THEIR BARRETT STATION ROADWAY PROJECT. ANTICIPATE BOARD INTRODUCTION IN JUNE 2008.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $935,000
SCHEDULE
BARRETT STATION SANITARY RELIEF
INFRASTRUCTURE
660
2008 680129ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2002103
2008
Clayton
Lemay/RDP
Black Creek
SANITARY REPLACEMENT
HORNER & SHIFRIN
$3,500,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
MULTI-PHASE PROJECT CONSISTING OF THE CONSTRUCTION OF APPROXIMATELY 3,600 FEET OF 8-INCH TO 18-INCH DIAMETER
SANITARY SEWER FROM U.S. HIGHWAY 40 TO WENLOU DRIVE. INTERCEPTOR TO BE REMOVED.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2004, FOR $1,360,000 AND INCLUDED A STUDY OF THE BLACK CREEK
WATERSHED. DESIGN AND EASEMENT ACQUISITION WERE DELAYED IN ORDER TO COORDINATE WITH TWO COMMERCIAL
DEVELOPMENTS. PART OF THIS PROJECT LOCATED WITHIN THE COMMERCIAL DEVELOPMENTS MAY BE CONSTRUCTED BY THE
DEVELOPERS.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $3,500,000
SCHEDULE
BLACK CREEK SANITARY RELIEF (HIGHWAY 40 TO
WENLOU DRIVE)
INFRASTRUCTURE
660
2008 677630ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2002 5/1/2006 1/1/2008 6/1/2008
1/1/2003 5/1/2006 1/1/2008 6/1/2008 6/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006166
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
ADS & Ace Pipe Cleaning
$250,000
St. Louis Metropolitian Sewer District - Fiscal Year
OCCASIONALLY DURING THE PHYSICAL INSPECTION OF SEWERS BY MSD CONTRACTED VENDORS AND CONSULTANTS THERE IS AN
IMMEDIATE NEED FOR ASSISTANCE IN THE LOCATING AND RAISING OF MANHOLES, AND THE CLEANING OF HEAVY DEBRIS FROM THE
SEWERS WHEN MSD OPERATIONS PERSONNEL ARE UNAVAILABLE.
PROJECT PROBLEM
PROJECT SOLUTION
OBTAIN CONTRACTUAL SERVICES FOR PHYSICAL SEWER INSPECTION SUPPORT SERVICES AS NEEDED.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN DECEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $250,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - SUPPORT SERVICES (SUPPLEMENTAL
APPROPRIATION)
INFRASTRUCTURE
660
2008 790131ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003083
2008
St. Louis County
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
MSD
$3,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXCESSIVE INFILTRATION CAUSING OVERLOADED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
THE ACQUISITION OF REAL PROPERTY TO ACCOMODATE SANITARY SEWAGE WET WEATHER STORAGE FACILITIES AS PART OF THE
OVERALL PROJECT.
REMARKS
THE ACQUISITION WILL OCCUR DURING THE FISCAL YEAR WITH ANTICIPATED INTRODUCTION AND APPROPRIATION OF FUNDS IN MAY
2008.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $3,000,000
SCHEDULE
COLDWATER SANITARY RELIEF SECTION B, C & D (LAND
ACQUISITION)
INFRASTRUCTURE
660
2008 729532ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003053B6
2008
St. Louis City
Various
Various
SANITARY REPLACEMENT
HORNER & SHIFRIN
$500,000
St. Louis Metropolitian Sewer District - Fiscal Year
COMPLIANCE WITH ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS FOR CONTOL OF COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF MODIFICATIONS TO VARIOUS INTERCEPTORS AND THEIR OUTFALLS THROUGHOUT THE COMBINED SEWER AREAS
IN THE CITY OF ST. LOUIS AND ADJACENT COUNTY ALONG THE MISSISSIPPI, RIVER DES PERES, DEER CREEK, AND BLACK CREEK.
THIS PROJECT PROVIDES FOR THE DESIGN AND CONSTRUCTION OF MODIFICATIONS TO REMOVE DIRECT SANITARY CONNECTION TO
COMBINED SEWER OUTFALL.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $483,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $500,000
SCHEDULE
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS PHASE II
(BP-012,BP-032,BP-038,BP-049)
INFRASTRUCTURE
660
2008 806133ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2006 3/1/2007 10/1/2007 2/1/2008
10/1/2007 10/1/2007 2/1/2008 2/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003054C
2008
St. Louis City
Various
Various
SANITARY REPLACEMENT
BLACK & VEATCH CORPORATION
$1,300,000
St. Louis Metropolitian Sewer District - Fiscal Year
COMPLIANCE WITH ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS FOR CONTOL OF COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF STRUCTURE AND SYSTEM MODIFICATIONS TO IMPROVE INTERCEPTOR INSPECTION ACCESS AND MONITORING AT
VARIOUS LOCATIONS IN BOTH THE CITY OF ST. LOUIS AND ST. LOUIS COUNTY, ALONG THE MISSISSIPPI RIVER, RIVER DES PERES,
DEER CREEK, AND BLACK CREEK. THIS PROJECT INCLUDES THE ELIMINATION OF MISCELLANEOUS UN-PERMITTED CONNECTIONS TO
THE MILL CREEK SEWER THAT WILL REQUIRE THE DESIGN AND CONSTRUCTION OF MISCELLANEOUS SEWER ACCESS
IMPROVEMENTS.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $932,000 (INCLUDED PEVELY PUMP STATION).
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,300,000
SCHEDULE
CSO - INTERCEPTOR ACCESS AND MONITORING
IMPROVEMENTS PHASE II (NEW MILL SEWER)
INFRASTRUCTURE
660
2008 775634ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/2007 10/1/2007
5/1/2005 9/1/2006 10/1/2007 12/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003054E
2008
St. Louis City
Various
Various
SANITARY REPLACEMENT
BLACK & VEATCH CORPORATION
$1,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
COMPLIANCE WITH ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS FOR CONTROL OF COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF STRUCTURE AND SYSTEM MODIFICATIONS TO IMPROVE INTERCEPTOR INSPECTION ACCESS AND MONITORING AT
VARIOUS LOCATIONS IN BOTH THE CITY OF ST. LOUIS AND ST. LOUIS COUNTY, ALONG THE MISSISSIPPI RIVER, RIVER DES PERES,
DEER CREEK, AND BLACK CREEK. THIS PROJECT INCLUDES THE ELIMINATION OF MISCELLANEOUS UN-PERMITTED CONNECTIONS TO
THE MILL CREEK SEWER THAT WILL REQUIRE THE DESIGN AND CONSTRUCTION MISCELLANEOUS SEWER ACCESS IMPROVEMENTS.
REMARKS
PROJECT WAS INCLUDED IN THE DESIGN FOR CSO- INTERCEPTOR ACCESS AND MONITORING PHASE II (NEW MILL SEWER),
PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $932,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,000,000
SCHEDULE
CSO - INTERCEPTOR ACCESS AND MONITORING
IMPROVEMENTS PHASE II (PEVELY PUMP STATION)
INFRASTRUCTURE
660
2008 798035ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/2007 9/1/2007 3/1/2008 7/1/2008
5/1/2005 9/1/2007 3/1/2008 7/1/2008 7/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006114
2008
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
MSD
$320,000
St. Louis Metropolitian Sewer District - Fiscal Year
IMPLEMENTATION OF THE CSO LONG TERM CONTROL PLAN.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCTION OF APPROXIMATELY 780 FEET OF 21-INCH DIAMETER STORM SEWERS, 315 FEET OF C.I.P.P. LINING, AND
APPURTENANCES, TO ENABLE REMOVAL OF ONE CSO.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $320,000
SCHEDULE
CSO - MACKLIND OUTFALL L-062 SEPARATION
INFRASTRUCTURE
660
2008 726936ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2007 9/1/2007 3/1/2008 7/1/2008
5/1/2006 9/1/2007 3/1/2008 6/1/2008 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2000060
2008
Brentwood
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
HNTB CORPORATION
$990,000
St. Louis Metropolitian Sewer District - Fiscal Year
IMPLEMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROL PLAN TO ADDRESS COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
INSTALLATION OF APPROXIMATELY 1,675 FEET OF 10-INCH SANITARY MAIN. CONVERT EXISTING COMBINED SEWER TO A SEPARATE
STORM SEWER. CONNECT LATERALS TO NEW SANITARY SEWER. DISCONNECT DOWNSPOUTS AND OTHER SOURCES OF PRIVATE
INFLOW. REMOVE INTERCEPTOR.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $200,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $990,000
SCHEDULE
CSO - MIDDLESEX AND YORK DRIVE (L-110) SEWER
SEPARATION
INFRASTRUCTURE
660
2008 573437ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/04 5/1/2006 1/1/2007 4/1/2007 8/1/2007
9/1/2005 1/1/2007 3/1/2007 8/1/2007 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006115
2008
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
MSD
$140,000
St. Louis Metropolitian Sewer District - Fiscal Year
CSO LONG TERM CONTROL PLAN IMPLEMENTATION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 220 FEET OF 15-INCH DIAMETER SEWERS, AND INSTALL 400 FEET OF C.I.P.P. LINING, IN ORDER TO
ELIMINATE OUTFALLS L-046 AND L-177, AND CONVERT OUTFALL L-049 TO A STORMWATER ONLY OUTFALL .
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $140,000
SCHEDULE
CSO - SOUTHWEST INDUSTRIAL CENTER OUTFALLS L-046,
L-049, L-177 SEPARATION
INFRASTRUCTURE
660
2008 726738ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2007 9/1/2007 12/1/2007 3/1/2008
11/1/2006 9/1/2007 12/1/2007 3/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005115
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$1,200,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGED SANITARY AND COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM COMBINED AND SANITARY RELIEF
SEWER PROJECTS.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT HAS ANNUAL APPROPRIATIONS AS REQUIRED. $1,200,000 WAS APPROPRIATED IN FISCAL YEAR
2006 AND ANOTHER $1,200,000 WAS APPROPRIATED IN FISCAL YEAR 2007. ANTICIPATE BOARD INTRODUCTION FOR FISCAL YEAR 2008
IN SEPTEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,200,000
SCHEDULE
EASEMENT ACQUISITION FOR COMBINED / SANITARY
PROJECTS (FY 2007-2010)
INFRASTRUCTURE
660
2008 722039ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007249
2008
Various
Various
Various
EMERGENCY FUND
MSD
$250,000
St. Louis Metropolitian Sewer District - Fiscal Year
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUT NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE
DISTRICT MUST ACT IMMEDIATELY, PURSUANT TO ITS CHARTER, TO EFFECT SEWER REPAIRS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE AN APPROPRIATION INTO THE EMERGENCY FUND TO ENABLE EMERGENCY REPONSE WHEN NEEDED.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $250,000
SCHEDULE
EMERGENCY REPAIR FUND APPRORIATION
INFRASTRUCTURE
122
2008 806540ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007170
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MoDOT
$10,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
THE MISSOURI DEPARTMENT OF TRANSPORTATION IS PLANNING TO REBUILD I-64/40 IN ST. LOUIS CITY AND COUNTY. THE DISTRICT
CAN INCORPORATE NEEDED SEWER IMPROVEMENTS IN THE PROJECT AREA INTO THAT EFFORT, AS A BETTERMENT ALLOWANCE TO
THE HIGHWAY RECONSTRUCTION CONTRACT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND BUILD VARIOUS IMPROVEMENTS TO SEWERS ALONG THE I-64/40 PROJECT. THESE MAY INCLUDE PORTIONS OF THE
FOLLOWING COMBINED OR SANITARY RELIEF PROJECTS: BLACK CREEK; LACLEDE STATION; DALE; CELLA; GLEN CREEK; DC-02 DEER
CREEK; NORTH OUTER FORTY; STONINGTON; AND LINDEN.
REMARKS
THIS EFFORT WILL ADDRESS PORTIONS OF THE FOLLOWING IDENTIFIED SKME PROJECTS: 567, 576, 575, 658, 657, 660, 652, AND 653.
BOARD INTRODUCTION ANTICIPATED JULY 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $10,000,000
SCHEDULE
I-64/40 RECONSTRUCTION BETTERMENTS ALLOWANCE
INFRASTRUCTURE
660
2008 799541ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007048
2008
Normandy
Bissell
Bissell
SANITARY REPLACEMENT
MSD
$450,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING 8 INCH SANITARY CROSSING OF INTERSTATE HIGHWAY 70 IS COLLAPSED.
PROJECT PROBLEM
PROJECT SOLUTION
RELOCATE APPROXIMATELY 900 LINEAL FEET OF 8 INCH SANITARY SEWER AND APPURTENANCES AND ABANDON EXISTING
COLLAPSED CROSSING.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $450,000
SCHEDULE
I-70 AND BERMUDA SANITARY SEWER RELOCATION
INFRASTRUCTURE
660
2008 792142ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 10/1/2007 1/1/2008 5/1/2008
10/1/2007 12/1/2007 4/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007172
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$7,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
OLDER, DAMAGED, AND DETERIORATED SEWER SYSTEMS IN THE CITY OF ST. LOUIS AND PARTS OF ST. LOUIS COUNTY (6-36 INCH
DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND LEAKING PIPES RESULTING IN STREET COLLAPSES, WATER BACK-
UPS, COMBINED AND SANITARY SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
AS REPAIR OR REHABILITATION PROBLEMS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE WILL TAKE PLACE PROMTLY, UTILIZING BLANKET REHABILITATION CONTRACTS. IT IS ANTICIPATED THAT
REHABILITATION WILL CONTINUE THROUGHOUT THE CITY OF ST. LOUIS AND VARIOUS PARTS OF ST. LOUIS COUNTY FOR A 10 YEAR
PERIOD OR UNTIL ALL SEWERS HAVE BEEN CLEANED, INSPECTED, AND REHABILITATED AS NECESSARY.
REMARKS
REHABILITATION PROJECTS WILL BE DESIGNED AND CONSTRUCTED THROUGHOUT THE FISCAL YEAR AS THEY ARE IDENTIFIED.
BOARD INTRODUCTION OF FUNDING APPROPRIATION IS ANTICIPATED IN JULY, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $7,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2008)
INFRASTRUCTURE
660
2008 728343ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007173
2008
Various
Various
Various
SANITARY REPLACEMENT
MSD
$2,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
DAMAGED AND DETERIORATED MANHOLES & SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.
PROJECT PROBLEM
PROJECT SOLUTION
AS THE REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE
PROMPTLY ISSUED.
REMARKS
REPAIR AND/OR REPLACEMENT PROJECTS THROUGHOUT THE ENTIRE DISTRICT WILL BE PLANNED AND CONSTRUCTED AS THEY ARE
IDENTIFIED. BOARD INTRODUCTION ANTICIPATED IN JULY 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $2,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS (SANITARY/COMBINED -
FY2008)
INFRASTRUCTURE
660
2008 801744ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003144
2008
Clarkson Valley
Missouri
Caulks Creek
IMPROVEMENT FUND
KUHLMANN DESIGN GROUP, INC.
$2,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
ONE HUNDRED LOT KEHRS MILL TRAIL SUBDIVISION IS CURRENTLY SERVED BY INDIVIDUAL SEPTIC TANKS.
PROJECT PROBLEM
PROJECT SOLUTION
EXTEND PUBLIC SANITARY SEWER SYSTEM TO SERVE KEHRS MILL TRAILS SUBDIVISION BY CONSTRUCTING APPROXIMATELY 17,800
FEET OF 2-INCH TO 4-INCH LOW PRESSURE FORCE MAINS, 730 FEET OF 8-INCH GRAVITY SEWERS, CHEMICAL DOSING STATIONS,
BOOSTER PUMP STATION, AND UPGRADES TO EXISTING LIFT STATIONS WHERE NECESSARY. WORK TO BE PAID FOR VIA SPECIAL
BENEFIT ASSESSMENT SUBDISTRICT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $2,000,000 $0 $0
SCHEDULE
KEHRS MILL TRAILS SUBDIVISION SANITARY SEWERS (S.D.
#2003144)
INFRASTRUCTURE
102
2008 808945ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/2003 9/1/2006 10/1/2007 5/1/2008 10/1/2008
4/1/2006 10/1/2007 4/1/2008 8/1/2008 7/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
90056B
2008
Unincorporated
Lemay/RDP
Lemay Creek
SANITARY REPLACEMENT
TECH SERVICES, INC.
$410,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERLOADED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHASE III OF A MULTI-PHASE PROJECT. ENTIRE LC-01 PROJECT CONSISTS OF THE CONSTRUCTION OF APPROXIMATELY 8,740 FEET
OF 8 INCH TO 48 INCH DIAMETER SEWERS FROM AN AREA ALONG CLYDE AVE. EASTWARDLY TO ADAIR. STREETS AFFECTED BY
PROPOSED SEWER ARE CLYDE AVE., ARLEE AVE., RIPA AVE., AND ADAIR.
REMARKS
DESIGN FOR ALL PHASES WAS COMPLETED IN 2001. SOME REDESIGN IS IN PROGRESS AND EXPECTED TO BE COMPLETED BY JULY
2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $410,000
SCHEDULE
LC-01 FELTON, ARLEE & VIDA TO CLYDE SANITARY RELIEF
PHASE III
INFRASTRUCTURE
660
2008 806046ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 12/1/2007
12/1/2007 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2004063
2008
Unincorporated
Lemay/RDP
Gravois Creek
SANITARY REPLACEMENT
CRM ENGINEERING, INC.
$970,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND OVERCHARGING SANITARY SEWERS DUE TO EXCESSIVE STORMWATER INFLOW INTO SANITARY SEWER
SYSTEM FROM PRIVATE SOURCE CONNECTIONS (ROOF DRAINS, AREA DRAINS AND DRIVEWAY DRAINS).
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 2,500 FEET OF STORM SEWER, DISCONNECTION OF PRIVATE STORM CONNECTIONS FROM THE
SANITARY SYSTEM, AND RECONNECTION OF PRIVATE STORM CONNECTIONS TO THE NEW STORM SYSTEM.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $970,000
SCHEDULE
LEMAY GARDENS SEPARATE SEWER AREA I/I REDUCTION
INFRASTRUCTURE
660
2008 707747ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2007 2/1/2008 6/1/2008
2/1/2008 6/1/2008 8/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007239
2008
Unincorporated
Lemay/RDP
Lemay Creek
SANITARY REPLACEMENT
MSD
$600,000
St. Louis Metropolitian Sewer District - Fiscal Year
THE LEMAY WWTP OPERATES FOUR 4160 VOLT AERATION BLOWERS TO PROVIDE OXYGEN TO THE MICROORGANISMS IN THE
SECONDARY TREATMENT TANKS. ALL FOUR UNITS HAVE 3000 HORSEPOWER CONSTANT SPEED MOTORS. THE DEMAND FOR AIR IS
VARIABLE DEPENDING UPON ORGANIC LOAD ON THE PLANT AND TEMPERATURE OF THE AIR AND WATER. AIR FLOW IS CURRENTLY
ADJUSTED BY MEANS OF INLET DAMPERS. A MORE EFFICIENT METHOD IS TO VARY THE SPEED OF THE BLOWER.
PROJECT PROBLEM
PROJECT SOLUTION
PURCHASE AND INSTALL A VARIABLE SPEED DRIVE FOR ONE UNIT.
REMARKS
BOARD INTRODUCTION ANTICIAPTED IN MAY, 2008. PURCHASE AND INSTALLATION OF DRIVES FOR THE REMAINING THREE UNITS IS
ANTICIPATED IN FY 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $600,000
SCHEDULE
LEMAY WWTP AERATION BLOWER MODIFICATIONS PHASE I
INFRASTRUCTURE
660
2008 802848ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007154
2008
St. Louis City
Lemay/RDP
Mississippi River Tributary Areas
SANITARY REPLACEMENT
CONSULTANT
$220,000
St. Louis Metropolitian Sewer District - Fiscal Year
THE PIPING SYSTEM IN THE BLOWER BUILDING OF THE LEMAY WWTP HAS SIGNIFICANT COROSION ISSUES AND NEEDS TO BE
REPLACED PRIOR TO FAILURE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND INSTALL REPLACEMENT PIPING INCLUDING VALVES, REGULATORS, AND EXPANSION DEVICES.
REMARKS
DESIGN BY GSA CONTRACT FOR SEWER AND PROCESS WORK.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $220,000
SCHEDULE
LEMAY WWTP SECONDARY CHILLER PIPING
REPLACEMENT
INFRASTRUCTURE
660
2008 798149ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2007 2/1/2008 6/1/2008
2/1/2008 6/1/2008 12/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003067
2008
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
BLACK AND VEATCH
$45,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
PROVIDE FOR ADDITIONAL TREATMENT CAPACITY OF WET WEATHER FLOWS FROM COMBINED AND SEPARATE SEWER AREAS TO
REDUCE COMBINED SEWER OVERFLOWS AND TO ELIMINATE SANITARY SEWER OVERFLOWS DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF ADDITIONAL TREATMENT PROCESSES AND PUMP STATION TO TREAT PEAK WET WEATHER FLOWS, INCLUDING
CONSTRUCTION OF A NEW 132-INCH DIAMETER OUTFALL SEWER TO THE MISSISSIPPI RIVER.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005, FOR $3,100,000. THE TOTAL CONSTRUCTION COST IS ESTIMATED AT
$97.000,000. THE REMAINING FUNDING WILL BE PROVIDED IN FY 2009.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $45,000,000
SCHEDULE
LEMAY WWTP WET WEATHER EXPANSION
INFRASTRUCTURE
660
2008 604850ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2005 4/1/2006 11/1/2007
11/1/2005 3/1/2006 11/1/2007 11/1/2010
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
95066H
2008
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
CH2M HILL, INC
$210,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING TREATMENT FACILITIES NEED TO BE EXPANDED AND UPGRADED TO MEET DEPARTMENT OF NATURAL RESOURCES
REQUIREMENTS AND POPULATION NEEDS.
PROJECT PROBLEM
PROJECT SOLUTION
FINAL SITE RESTORATION REQUIRED AFTER COMPLETION OF ALL TREATMENT PLANT CONSTRUCTION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $210,000
SCHEDULE
LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING IMPROVEMENTS
INFRASTRUCTURE
660
2008 379251ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 5/1/2007 9/1/2007
5/1/2007 9/1/2007 12/1/2007
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
97040D
2008
Bridgeton
Missouri
Cowmire Creek
MO RIVER BONFIL SUBD #448
GEORGE BUTLER ASSOCIATES, INC.
$3,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING SANITARY SEWERS ARE OVERCHARGED DUE TO EXCESSIVE INFILTRATION AND INFLOW.
PROJECT PROBLEM
PROJECT SOLUTION
SIXTH PHASE OF A MULTI- PHASED PROJECT TO CLEAN, TELEVISE, AND MONITOR EXISTING SANITARY SEWERS IN ORDER TO
REHABILITATE THE PROBLEMATIC REACHES. PHASE VI IS A PILOT PROGRAM TO DETERMINE THE EFFECTIVENESS OF
REHABILITATING SERVICE LATERALS AND CONNECTIONS IN ORDER TO ELIMINATING INFILTRATION. PHASE VI CONSIST OF THE
REHABILITATION OF SERVICE LATERALS AND POST CONSTRUCTION FLOW MONITORING AND ANALYSIS.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $350,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $3,000,000
SCHEDULE
MISSOURI RIVER BONFILS INFILTRATION AND INFLOW
CORRECTION PHASE VI (LATERAL SEWER
REHABILITATION)
INFRASTRUCTURE
590
2008 731152ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/2006 4/1/2007 7/1/2007 9/1/2007
7/1/2007 7/1/2007 9/1/2007 3/1/2008
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006083
2008
Maplewood
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
MSD
$150,000
St. Louis Metropolitian Sewer District - Fiscal Year
GRIT BUILD UP IN COMBINATION SEWER CAUSING BLOCKAGES IN SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVE AND REPLACE APPROXIMATELY 488 LINEAL FEET OF EXISTING 12 INCH COMBINED WITH 18 INCH COMBINED SEWER AND
CONSTRUCT GRIT CHAMBER NEAR STRUCTURE 22J1-128C .
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $150,000
SCHEDULE
OXFORD AND BIG BEND COMBINED SEWER REPLACEMENT
INFRASTRUCTURE
660
2008 737053ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2007 8/1/2007 10/1/2007 2/1/2008
8/1/2007 10/1/2007 1/1/2008 4/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007157
2008
Unincorporated
Lemay/RDP
Martigney Creek
SANITARY REPLACEMENT
MSD
$150,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING PUMP STATION IS IN NEED OF REPLACEMENT OR ELIMINATION. NEARBY DEVELOPMENT OFFERS OPPURTUNITY FOR
ELIMINATION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 850 LINEAL FEET OF 8 INCH DIAMETER SANITARY SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $150,000
SCHEDULE
POTTLE AVE. PUMP STATION ELIMINATION
INFRASTRUCTURE
660
2008 798554ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/2007 8/1/2007 11/1/2007 3/1/2008
8/1/2007 11/1/2007 2/1/2008 5/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007240
2008
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$500,000
St. Louis Metropolitian Sewer District - Fiscal Year
POWER FAILURES AT PUMP STATIONS MAY CAUSE SANITARY AND COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
INSTALL POWER SUPPLY IMPROVEMENTS, INCLUDING BACKUP GENERATORS AND NATURAL GAS SUPPLY, TO REDUCE THE
POSSIBILITY OF PUMP STATION OVERFLOWS IN THE EVENT OF POWER FAILURES. IMPROVEMENTS ARE PLANNED FOR 25 PUMP
STATIONS OVER THE NEXT TWO FISCAL YEARS, FOR A TOTAL COST OF $1.0 MILLION.
REMARKS
BOARD INTRODUCTION ANTICIPATED IN AUGUST, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $500,000
SCHEDULE
POWER SUPPLY IMPROVEMENTS AT VARIOUS SANITARY
PUMP STATIONS
INFRASTRUCTURE
660
2008 803155ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
99135
2008
St. Louis City and County
Various
Various
IMPROVEMENT FUND
MSD
$500,000
St. Louis Metropolitian Sewer District - Fiscal Year
OVERCHARGED SANITARY SEWERS CAUSE BASEMENT BACKUPS DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
MODIFICATION OF EXISTING BUILDING PLUMBING FACILITIES TO ELIMINATE BASEMENT BACKUPS.
REMARKS
THIS IS AN ONGOING PROGRAM THAT WILL RECEIVE ANNUAL APPROPRIATIONS AS REQUIRED. PHASE I WAS FUNDED IN FISCAL YEAR
2000 FOR $2,500,000 AND PHASE II WAS FUNDED IN FISCAL YEAR 2005 FOR $500,000. ANTICIPATE BOARD INTRODUCTION IN
SEPTEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $500,000
SCHEDULE
PROGRAM TO ELIMINATE BASEMENT BACKUPS PHASE III
INFRASTRUCTURE
102
2008 289356ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007167
2008
St. Louis County
Various
Various
SANITARY REPLACEMENT
OPERATIONS DEPARTMENT
$15,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
DEBRIS IN SEWERS IS REDUCING CAPACITY AND CAUSING SANITARY SEWER OVERFLOWS AND BASEMENT BACKUPS IN THE
SANITARY SEWER SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
IMPLEMENT A COMPREHENSIVE CLEANING PROGRAM OF SEWERS IN THE SEPARATE SEWER AREA, UTILIZING VENDORS TO CARRY
OUT SEWER CLEANING. THIS PROJECT WILL CONSIST OF THE CLEANING OF APPROXIMATELY 22,000,000 FEET OF 8-INCH TO 12-INCH
SANITARY SEWERS.
REMARKS
BOARD INTRODUCTION ANTICIPATED IN NOVEMBER 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $15,000,000
SCHEDULE
SANITARY SEWER CLEANING
INFRASTRUCTURE
660
2008 802557ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006174
2008
St. Louis County
Various
Various
SANITARY REPLACEMENT
MSD
$500,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING SSO'S WITHIN THE SEPARATE SEWER SYSTEM HAVE DETERIORATED AND ARE ALLOWING EXCESSIVE I/I INTO THE SYSTEM
AND REGULATORY REQUIREMENTS REQUIRE MONITORING AND REPORTING OF ALL SSO'S UNTIL REMOVAL.
PROJECT PROBLEM
PROJECT SOLUTION
IN COORDINATION WITH ON-GOING INSPECTION PROGRAM, REMOVE, REHABILITATE, OR MODIFY EXISTING SSO'S TO ELIMINATE
EXCESSIVE I/I AND EQUIP WITH ELECTRONIC MONITORING DEVICES FOR FUTURE REPORTING PURPOSES.
REMARKS
PROJECTS WILL BE CONSTRUCTED AS IDENTIFIED IN COORDINATION WITH THE ON-GOING INSPECTION PROGRAM. ANTICIPATE
BOARD INTRODUCTION IN JULY 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $500,000
SCHEDULE
SEPARATE SEWER OVERFLOW MODIFICATION AND
MONITORING PROGRAM (FY 2008)
INFRASTRUCTURE
660
2008 800758ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003088A
2008
St. Louis City
Lemay/RDP
Tower Grove-Manchester
SANITARY REPLACEMENT
PARSONS BRINKERHOFF QUADE &
DOUGLAS, INC
$1,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
BASEMENT BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF RECOMMENDED IMPROVEMENTS TO THE COMBINED SEWER SYSTEM TO MINIMIZE THE POTENTIAL FOR
BASEMENT BACKUPS AND FLOODING. PROJECT AREA GENERALLY IS BOUNDED BY MANCHESTER AND PARK AVENUE ON THE NORTH,
GRAND BOULEVARD ON THE EAST, McDONALD AVENUE ON THE SOUTH AND SUBLETTE AND MARCONI STREET ON THE WEST, IN THE
CITY OF ST. LOUIS. PHASE I CONSISTS OF IMPROVEMENTS TO THE DIVERSION STRUCTURE AT PARK AVENUE NEAR THURMAN
AVENUE.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005 FOR $2,000,000. PHASE II CONSTRUCTION IS FUNDED IN FISCAL YEAR
2009 FOR $5,000,000..
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,000,000
SCHEDULE
TOWER GROVE-MANCHESTER COMBINED SEWER SYSTEM
PHASE I (PARK - THURMAN DIVERSION STRUCTURE)
INFRASTRUCTURE
660
2008 341559ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 1/1/2008 5/1/2008
6/1/2003 12/1/2007 5/1/2008 7/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007160
2008
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
MSD
$300,000
St. Louis Metropolitian Sewer District - Fiscal Year
BROKEN 8-INCH VCP CAUSING BASEMENT BACKUPS.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVE AND REPLACE APPROXIMATLY 400 FEET OF 8-INCH DIAMETER SANITARY SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $300,000
SCHEDULE
VALDAMERE DRIVE #11125 SANITARY SEWER
REPLACEMENT
INFRASTRUCTURE
660
2008 798860ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 10/1/2007 12/1/2007 4/1/2008
10/1/2007 11/1/2007 3/1/2008 6/1/2008
EXPENSE TYPE = C
INFRASTRUCTURE CONTINUED PROJECTS
Some of the District's Infrastructure projects are continued from previous
fiscal years due to difficulties in easement acquisition, the permit process from
other agencies, design revisions or status, or other special requirements or issues.
There are thirty-five (35) projects that were identified in previous budget
supplements that are still in the design, permitting, and/or easement acquisition
process. These projects have a total estimated cost of $137,145,000.
The fiscal year indicated in parentheses at the end of each project title
indicates the budget year that the project was originally planned. The revenue to
construct these projects comes from the Sanitary Replacement Fund, the
appropriate Operation, Maintenance, Construction, and Improvement (OMCI)
Fund, or Special Funds.
61
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED INFRASTRUCTURE PROJECTS
$1,470,0001BELLEFONTAINE #1 LATERAL SANITARY
RELIEF (SKME-315) (FY07)
BELLEFONTAINE
NEIGHBORS
FINALIZING AGREEMENT WITH MISSOURI
DEPARTMENT OF CONSERVATION. BOARD
INTRODUCTION ANTICIPATED IN NOVEMBER 2007.
$1,230,0002BISSELL POINT WWTP BELT FILTER PRESS
IMPROVEMENTS (FY06)
ST. LOUIS CITY PROJECT WILL BE RE-BID DUE TO LACK OF
MBE/WBE PARTICIPATION. ADDITIONALLY, 2002044
A AND B HAVE BEEN COMBINED INTO ONE PROJECT
UNDER THIS PROJECT NUMBER. ANTICIPATE
BOARD INTRODUCTION SEPTEMBER 2007.
$150,0003BISSELL POINT- SEWER SOLID WASTE
TRANSFER STATION (FY07)
ST. LOUIS CITY PROJECT DESIGN NOT COMPLETE (CONSULTANT).
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER
2007.
$1,300,0004CC-11 AND CC-20 CREVE COEUR CREEK
SANITARY RELIEF PHASE II (SKME -025) (FY07)
VARIOUS PROJECT PENDING EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN FEBRUARY
2008.
$11,000,0005CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS (SKME -030) (FY07)
UNINCORPORATED DESIGN WAS DELAYED UNTIL FLOWS WERE
DETERMINED BY THE PLANNING CONSULTANT.
ANTICIPATE BOARD INTRODUCTION IN MAY 2008.
$21,500,0006CREVE COEUR CREEK (L-52) PUMP STATION
IMPROVEMENTS (SKME -030) (FY06)
UNINCORPORATED PROJECT DESIGN NOT COMPLETE (CONSULTANT)
DUE TO DELAY IN ESTIMATING POTENTIAL FLOWS
DURING PRELIMINARY DESIGN. ANTICIPATE
BOARD INTRODUCTION IN SEPTEMBER 2007.
$525,0007CSO - DROMARA DRIVE SEWER SEPARATION
(FY07)
LADUE PROJECT PENDING EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
62
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED INFRASTRUCTURE PROJECTS
$360,0008CSO - GREENBRIAR COMBINED SEWER
SEPARATION (FY06)
LADUE PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
$100,0009CSO - INTERCEPTOR & OUTFALL
MODIFICATIONS (JEFFERSON BARRACKS
OUTFALL L-152 REPLACEMENT) (FY07)
UNINCORPORATED PROJECT DELAYED FOR PERMITTING BY ARMY
CORPS OF ENGINEERS. ANTICIPATE BOARD
INTRODUCTION IN FEBRUARY 2008.
$5,600,00010CSO - INTERCEPTOR & OUTFALL
MODIFICATIONS
(LM-143,BP-003,BP-006,BP-019,BP-030,BP-037,BP-
043) (FY06)
ST. LOUIS CITY AND
COUNTY
PROJECT DELAYED PENDING US ARMY CORPS OF
ENGINEERS PERMITTING. ANTICIPATE BOARD
INTRODUCTION IN NOVEMBER 2007.
$200,00011CSO - INTERCEPTOR ACCESS AND
MONITORING IMPROVEMENTS PHASE II (BP
INTERCEPTOR LEVEL SENSORS) (FY07)
ST. LOUIS CITY ANTICIPATE BOARD INTRODUCTION IN AUGUST
2007.
$200,00012CSO - RIVERVIEW NORTH SEWER
SEPARATION/ELIMINATION (I-278 AND I-317)
(FY07)
ST. LOUIS CITY DESIGN COMPLETE. ANTICIPATE BOARD
INTRODUCTION IN JUNE 2007.
$2,150,00013DC-09 SANITARY RELIEF (SKME -655)
SEPARATE SEWER AREA I/I REDUCTION (FY07)
LADUE PROJECT DELAYED FOR ADDITIONAL CCTV. BOARD
INTRODUCTION ANTICIPATED IN OCTOBER 2007.
$3,045,00014EVA-WABASH SANITARY RELIEF PHASE I
(SKME -217) (FY06)
BERKELEY PROJECT PENDING EASEMENT CONDEMNATION.
BOARD INTRODUCTION ANTICIPATED IN DECEMBER
2007.
$600,00015FENTON WASTEWATER TREATMENT PLANT
ODOR IMPROVEMENTS (FY07)
FENTON ANTICIPATE BOARD INTRODUCTION IN AUGUST
2007.
63
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED INFRASTRUCTURE PROJECTS
$1,800,00016FF-02 FEE FEE - ALAN SHEPARD I-270
SANITARY RELIEF PHASE IV (FY06)
MARYLAND HEIGHTS PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION OCTOBER 2007.
$4,450,00017FF-08 FEE FEE CREEK SANITARY RELIEF (FY06)MARYLAND HEIGHTS PROJECT IN EASEMENT ACQUISITION. BOARD
INTRODUCTION ANTICIPATED IN OCTOBER 2007.
$400,00018FF-13 WALTZ RD./MCKELVEY SANITARY
RELIEF PHASE II (FY06)
MARYLAND HEIGHTS PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION DECEMBER 2007.
$8,400,00019FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF - PHASE I & II (FY04)
MARYLAND HEIGHTS PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN JANUARY 2008.
$1,500,00020FISHPOT WEST SANITARY RELIEF PHASE II
(FY07)
UNINCORPORATED PROJECT IN EASEMENT ACQUISITION. PROJECT
DELAYED UNTIL OAK VALLEY DEVELOPMENT
COMPLETED. ANTICIPATE BOARD INTRODUCTION
IN MAY 2008.
$3,400,00021INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE IV, SECTION B (FY06)
CHESTERFIELD PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
$23,000,00022LEMAY PUMP STATION NO. 3 AND FORCE
MAIN IMPROVEMENTS (FY06)
UNINCORPORATED PROJECT DELAYED TO COORDINATE DESIGN AND
CONSTRUCTION WITH JEFFERSON BARRACKS PUMP
STATION ELIMINATION (2005116) AND ADDITIONAL
CSO REMOVAL SOUTH OF THE LEMAY WWTP.
ANTICIPATE BOARD INTRODUCTION SEPTEMBER
2007.
$235,00023LINDBERGH/WARSON PUMP STATION
ELIMINATION (P-706) (FY07)
OLIVETTE PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN OCTOBER 2007.
64
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED INFRASTRUCTURE PROJECTS
$295,00024LORENZO LANE SANITARY SEWER
RELOCATION (FY07)
LADUE PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
$3,000,00025LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - FINE ROAD LAGOON
CLOSURE (FY07)
UNINCORPORATED PROJECT DELAYED UNTIL THE CITY OF ARNOLD IS
DISCONNECTED FROM THE LAGOON. ANTICIPATE
BOARD INTRODUCTION IN AUGUST 2007.
$13,650,00026MANCHESTER AVENUE COMBINED SEWER
RELIEF (FY07)
ST. LOUIS CITY PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER
2007.
$3,500,00027MARBENDALE - LEMP SANITARY FACILITIES
CONSOLIDATION (FY05)
KIRKWOOD PROJECT IN EASEMENT CONDEMNATION
ANTICIPATE BOARD INTRODUCTION IN OCTOBER
2007.
$7,450,00028MC-01 WEBSTER AND MARLBOROUGH TRUNK
SANITARY RELIEF (FY06)
UNINCORPORATED PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN AUGUST 2007.
$300,00029OAK VALLEY SANITARY SEWER - FISHPOT
WEST SANITARY RELIEF PHASE 1A (FY06)
UNINCORPORATED PROJECT DELAYED FOR COORDINATION WITH
DEVELOPER. ANTICIPATE BOARD INTRODUCTION
IN MAY 2008.
$6,400,00030SEPARATE SEWER AREA -
INFLOW/INFILTRATION REDUCTION PROJECTS
(EVA WABASH REHABILITATION) (FY06)
ST. LOUIS CITY AND
COUNTY
PROJECT DESIGN DELAYED DUE TO REQUIRED
INCREASE IN SCOPE. ANTICIPATE BOARD
INTRODUCTION IN OCTOBER 2007.
$1,500,00031SPRING GARDEN - BANFF TO RIVERVIEW
SANITARY RELIEF (FY06)
UNINCORPORATED PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN JANUARY
2008.
65
PROJECT NAME COST ESTIMATEMUNICIPALITYREASON PROJECT CONTINUED
CONTINUED INFRASTRUCTURE PROJECTS
$220,00032SPRINGDALE LATERAL SANITARY RELIEF
(SKME-305) (FY07)
BEL-RIDGE DELAYED AT REQUEST OF MAYOR TO COORDINATE
WITH POSSIBLE DEVELOPMENT. ANTICIPATE
BOARD INTRODUCTION IN MARCH 2008.
$5,600,00033UPPER MALINE TRUNK SANITARY RELIEF
PHASE III SECTION A (FY06)
FERGUSON PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER
2007.
$2,415,00034UR-06 UPPER RIVER DES PERES SANITARY
RELIEF PHASE II (FY05)
VARIOUS PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
$200,00035WEST WATSON ROAD.- NANELL LANE PHASE
II (FY07)
SUNSET HILLS PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
$137,145,000TOTAL:
66
STORMWATER ENGINEERING PROJECTS
67
There are five (5) projects included in this section. The total estimated cost
of these four projects is $3,500,000. The FY 2008 program provides supplemental
funding to continue several programs including the program for stream flow gauge
monitoring of local streams for water quantity and water quality. Additionally this
year’s program will provide supplemental funding for Stormwater Facility Planning
started in Fiscal Year 2006 that will coordinate with Watershed Facility Planning
(Infrastructure Engineering Projects) efforts, as well as plan and prioritize
stormwater replacement and renewal projects funded through existing and proposed
stormwater rates. The District is positioning itself to manage the majority of future
Stormwater Capital Programs with in-house engineering staff. Two (2) design
contracts to assist with design of select stormwater projects during Fiscal Year
2008, while the District is in the process of adding and training in-house design
staff, are also included.
PAGEPROJECT NAME
CONTENTS OF STORMWATER ENGINEERING PROJECTS
COST ESTIMATEPROJECT
NUMBER
COLDWATER CREEK WATERSHED STORM
SEWER IMPROVEMENTS (DESIGN)
69$285,0002007241
DEER CREEK WATERSHED STORM SEWER
IMPROVEMENTS (DESIGN)
70$235,0002007242
SAPPINGTON CREEK MEATH TO GRAVOIS
(GCXR-110) (PRELIMINARY DESIGN)
(SUPPLEMENTAL APPROPRIATION)
71$80,0002005043
STORMWATER FACILITY PLANNING
(SUPPLEMENTAL APPROPRIATION)
72$2,000,0002005122
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (FY 2008)
73$900,0002007266
$3,500,000TOTAL:
68
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007241
2008
Various
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
CONSULTANT
$285,000
St. Louis Metropolitian Sewer District - Fiscal Year
STORMWATER PROJECT DESIGN NEEDS EXCEED THE CAPACITY OF CURRENT STAFF. IN THE INTERIM WHILE ADDITIONAL DESIGN
STAFF ARE BEING HIRED, CONSULTANT SERVICES ARE NEEDED TO DESIGN SOME STORMWATER PROJECTS, TO ENABLE THE
DISTRICT TO MEET PROJECTED CONSTRUCTION SCHEDULES.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF THREE PROJECTS IN THE COLDWATER CREEK WATERSHED:
GOODALE AND VERONA STORM SEWER, MIDLAND & ANGELO STORM SEWER, AND RIDGELAWN COURT STORM SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $285,000
SCHEDULE
COLDWATER CREEK WATERSHED STORM SEWER
IMPROVEMENTS (DESIGN)
STORMWATER
564
2008 804269ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2007 12/1/2008 12/1/2009 4/1/2010
10/1/2006 12/1/2008 12/1/2009 4/1/2010 4/1/2011
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007242
2008
Various
Lemay/RDP
Deer Creek
DEER CREEK OMCI
CONSULTANT
$235,000
St. Louis Metropolitian Sewer District - Fiscal Year
STORMWATER PROJECT DESIGN NEEDS EXCEED THE CAPACITY OF CURRENT STAFF. IN THE INTERIM WHILE ADDITIONAL DESIGN
STAFF ARE BEING HIRED, CONSULTANT SERVICES ARE NEEDED TO DESIGN SOME STORMWATER PROJECTS, TO ENABLE THE
DISTRICT TO MEET PROJECTED CONSTRUCTION SCHEDULES.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF TWO PROJECTS IN THE DEER CREEK WATERSHED: TEALBROOK
ESTATES STORM SEWER, AND WOODLEAF COURT STORM SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $235,000
SCHEDULE
DEER CREEK WATERSHED STORM SEWER
IMPROVEMENTS (DESIGN)
STORMWATER
566
2008 804370ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2007 12/1/2008 12/1/2009 4/1/2010
11/1/2006 12/1/2008 12/1/2009 4/1/2010 4/1/2011
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005043
2008
St. Louis County
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
CONSULTANT
$80,000
St. Louis Metropolitian Sewer District - Fiscal Year
FLOODING AND SEVERE EROSION ALONG SAPPINGTON CREEK IN UNINCORPORATED ST. LOUIS COUNTY AT REAR OF HOMES ON
KAMPING LANE.
PROJECT PROBLEM
PROJECT SOLUTION
PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 650 FEET OF HEAVY STONE
REVETMENT AND 220 FEET OF ROCK WEDGE SLOPE PROTECTION AND BIOSTABILIZATION.
REMARKS
SUPPLEMENTAL APPROPRIATION TO THIS CONTRACT WILL ALLOW DESIGN OF NEEDED IMPROVEMENTS IN THE AREA OF KAMPING
LANE TO PROCEED MORE QUICKLY AND AT LESS COST THAN A SEPARATE PROCUREMENT OF DESIGN SERVICES.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $80,000
SCHEDULE
SAPPINGTON CREEK MEATH TO GRAVOIS (GCXR-110)
(PRELIMINARY DESIGN) (SUPPLEMENTAL APPROPRIATION)
STORMWATER
571
2008 809271ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2007 5/1/2008 9/1/2008 1/1/2009
5/1/2008 9/1/2008 1/1/2009 11/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005122
2008
St. Louis City and County
Various
Various
IMPROVEMENT FUND
PARSONS WATER &
INFRASTRUCTURE INC.
$2,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
SCOPE OF PLANNING WORK ASSOCIATED WITH AN EXPANDED STORMWATER CAPITAL IMPROVEMENT PROGRAM EXCEEDS THE
AVAILABLE RESOURCES OF EXISTING DISTRICT STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT, ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES
FOR AN EXPANDED STORMWATER CAPITAL PROGRAM. PRIMARY SERVICES FOR THIS SUPPLEMENTAL FUNDING WILL INCLUDE:
DETENTION BASIN RESEARCH AND INVENTORY FOR APPROXIMATELY 400 BASINS TO COMPLETE THIS WORK TASK; PERFORM
RESEARCH AND FIELD INVESTIGATION FOR APPROXIMATELY 500 IDENTIFIED STORMWATER PROJECTS; PREPARATION OF
APPROXIMATELY 50 PRELIMINARY STUDIES.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL RECEIVE ANNUAL APPROPRIATIONS AS REQUIRED. $2,000,000 WAS APPROPRIATED IN
FISCAL YEAR 2006 AND $2,000,000 IS PLANNED FOR FISCAL YEAR 2007. BOARD INTRODUCTION FOR FISCAL YEAR 2008 IS
ANTICIPATED IN DECEMBER, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $2,000,000
SCHEDULE
STORMWATER FACILITY PLANNING (SUPPLEMENTAL
APPROPRIATION)
STORMWATER DISTRICTWIDE
102
2008 739172ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007266
2008
St. Louis City and County
Various
Various
GENERAL FUND
VENDOR
$900,000
St. Louis Metropolitian Sewer District - Fiscal Year
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND THE WATER
QUANTITY AND WATER QUALITY OF AREA STREAMS FOR USE IN HYDROLOGIC AND HYDRAULIC SYSTEM MODELS, PHASE II
STORMWATER PROGRAM, AND SANITARY SEWER OVERFLOW & TOTAL MAXIMUM DAILY LOAD RULES.
PROJECT PROBLEM
PROJECT SOLUTION
CONTINUE CURRENT DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING EFFORTS.
REMARKS
THIS IS A MULTI-YEAR PROJECT THAT WILL HAVE ANNUAL APPROPRIATION AS REQUIRED. THE INITIAL FUNDING OF $700,000 WAS
APPROPRIATED IN FISCAL YEAR 2004 WITH SUPPLEMENTAL APPROPRIATIONS OF $735,000 IN FISCAL YEAR 2005, $800,000 IN FISCAL
YEAR 2006 AND $850,000 IN FISCAL YEAR 2007. ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER, 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $900,000
SCHEDULE
STREAM FLOW GAUGE OPERATION AND MAINTENANCE
(FY 2008)
STORMWATER DISTRICTWIDE
101
2008 739873ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
STORMWATER CONSTRUCTION PROJECTS
75
The projects described in this section are related to constructing storm
sewers, channels, and creek bank stabilization, which will help alleviate flooding
and erosion problems. There are thirty-nine (39) projects planned at a total
estimated cost of $9,764,000.
The District's revenue sources to plan and construct these projects are from
the District's General Fund, Improvement Fund or from the collection of property
taxes that are placed in various Operation, Maintenance, Construction and
Improvement (OMCI) Funds currently established in certain areas of the District.
The property taxes collected within the boundaries of OMCI Taxing Districts must
be spent for improvements within their specific areas of collection.
PAGEPROJECT NAME
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
COST ESTIMATEPROJECT
NUMBER
130 ST. EDWARD LANE STORM SEWER 79$40,0002006194
61 CONWAY CLOSE STORM SEWER 80$68,0002006193
AVIGNON CT. #1685 STORM SEWER 81$81,0002006130
BALSON AVE. 7800 BLOCK STORM SEWER 82$120,0002006131
BRIAR CT. #8011 STORM SEWER 83$60,0002006132
BURCH LANE STORM SEWER 84$287,0002007086
BURTON TO ARGYLE STORM SEWER 85$495,0002006103
CLAYTON TERRACE #3 BANK
STABILIZATION
86$58,0002006135
COLONIAL LN. #8556 STORM
IMPROVEMENTS
87$325,00086141
CONWAY & CONWOOD STORM CHANNEL
PHASE III
88$250,0002001115B
CORONATION DRIVE #1241 STORM SEWER 89$90,0002006136
EDNA & THURSBY STORM SEWER 90$320,0002004058
EDWIN AVE. #767 STORM SEWER
IMPROVEMENTS
91$187,0002006137
ELTORA AVENUE STORM CHANNEL PHASE
I (UCNE-140)
92$62,0002006138
FILLMORE - ELLIOT BANK STABILIZATION
(GCKC-130)
93$115,00085036
FOOTE - BERRY PARK STORM SEWER 94$102,0002006139
HARRISON AVE. #1375 STORM SEWER
IMPROVEMENTS
95$75,0002006142
76
PAGEPROJECT NAME
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
COST ESTIMATEPROJECT
NUMBER
JEFFERSON #360 STORM SEWER
IMPROVEMENT
96$100,0002006144
KORTWRIGHT- NORTH OF SHERRELL AND
O'DAY STORM IMPROVEMENT
97$560,0002005050
KORTWRIGHT- OAK HAVEN AND O`DAY
STORM IMPROVEMENT
98$290,0002004059
MANCHESTER & MISSOURI AVENUE
STORM SEWER PHASE I
99$125,00085071A
MCCUTCHEON TO MCKNIGHT CHANNEL
REPLACEMENT
100$130,00085069
MUNDY #1480 STORM SEWER 101$140,0002007045
NORTH FOREST STORM RELIEF 102$485,0002006148
OAK AVENUE #10051 STORM
IMPROVEMENTS (UCSC-115)
103$150,0002003129
OLD BONHOMME GROBY STORM SEWER
IMPROVEMENT
104$60,0002006150
PRENTICE - GRANGER STORM CHANNEL
(MCBJ-110) PHASE II
105$360,0002000110A
PRICEWOODS - BIRNAWOODS STORM
SEWER
106$42,0002007145
PURDUE AND CANTON STORM SEWER 107$270,0002005073
RIDGECORDE LANE STORM SEWER 108$95,0002006151
RUTH-HELEN-CECELIA STORM SEWER
REPLACEMENT
109$1,300,0002005121
SELMA AND OAK TREE DR. CULVERT
EXTENSION
110$160,0002006154
SPENCER AVENUE STORM SEWER 111$138,0002006195
77
PAGEPROJECT NAME
CONTENTS OF STORMWATER CONSTRUCTION PROJECTS
COST ESTIMATEPROJECT
NUMBER
STORMWATER INFRASTRUCTURE
REPAIR/REPLACEMENT (OPERATIONS -
FY2008)
112$2,000,0002007171
TEMPLE ISRAEL CREEK BANK
STABILIZATION
113$64,0002006156
WC-21 BANK PROTECTION 114$75,0002006160
WILDWOOD LN. #75 STORM SEWER 115$100,00089100
WILLOUGHBY PLACE #533 STORM SEWER 116$35,0002006161
WISMER-LESLIE STORM SEWER 117$350,0002006162
$9,764,000TOTAL:
78
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006194
2008
Florissant
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$40,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD FLOODING AND PONDING AT HOMES ON THE SOUTH SIDE OF ST. EDWARD LANE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 160 FEET OF 18-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $40,000
SCHEDULE
130 ST. EDWARD LANE STORM SEWER
STORMWATER
564
2008 788279ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/1/2007 2/1/2008 3/1/2008 5/1/2008
7/18/2006 2/1/2008 3/1/2008 5/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006193
2008
Ladue
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$68,000
St. Louis Metropolitian Sewer District - Fiscal Year
STORM SEWER SYSTEM NEAR 61 CONWAY CLOSE ROAD FLOODING DUE TO A RESTRICTION IN SIZE OF THE STORM SEWER LINE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 230 FEET OF 18-INCH STORM SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $68,000
SCHEDULE
61 CONWAY CLOSE STORM SEWER
STORMWATER
566
2008 788380ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/06 1/1/2007 6/1/2007 7/1/2007 11/1/2007
7/1/2006 5/1/2007 6/1/2007 10/1/2007 1/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006130
2008
Warson Woods
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$81,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING AT #1685 AND #1693 AVIGNON. PRIVATE DRAIN SYSTEM DOES NOT HANDLE EXISTING FLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 270 FEET OF 18-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $81,000
SCHEDULE
AVIGNON CT. #1685 STORM SEWER
STORMWATER
566
2008 715781ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2006 7/1/2007 9/1/2007 2/1/2008
4/1/2006 6/1/2007 8/1/2007 12/1/2007 3/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006131
2008
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$120,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING PRIVATE STORM SYSTEM BETWEEN 7835 & 7831 BALSON DOES NOT FUNCTION PROPERLY. REAR YARDS FLOOD, WATER
PONDS AND FLOODS BASEMENT ENTRIES INTO HOMES. 7823 BALSON HAS BASEMENT GARAGE FLOODING FROM RUNOFF ON DUKE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 270 FEET OF 15-INCH DIAMETER STORM SEWERS AND APPURTENANCES (INCLUDING UP
TO 100 FEET OF PIPE IN TUNNEL).
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $120,000
SCHEDULE
BALSON AVE. 7800 BLOCK STORM SEWER
STORMWATER
584
2008 715882ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 5/1/2007 7/1/2007 11/1/2007
4/1/2006 4/1/2007 6/1/2007 10/1/2007 2/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006132
2008
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$60,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD FLOODING, OCCASIONALLY ENTERING BASEMENT THROUGH REAR WINDOWS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 200 FEET OF 12-INCH STORM SEWER AND APPURTENANCES (2 STRUCTURES).
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $60,000
SCHEDULE
BRIAR CT. #8011 STORM SEWER
STORMWATER
584
2008 716283ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2007 1/1/2008 2/1/2008 4/1/2008
4/1/2006 1/1/2008 2/1/2008 4/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007086
2008
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$287,000
St. Louis Metropolitian Sewer District - Fiscal Year
FLOODING OF THREE BASEMENTS THAT HAVE REAR ENTRY GARAGES, AT #1123, 1127, 1131 BURCH LANE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 710 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWER, 445 FEET OF SWALES AND
BERMS, AND APPURTENANCES TO REDUCE THE FLOW TRIBUTARY TO THE BASEMENT GARAGES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $287,000
SCHEDULE
BURCH LANE STORM SEWER
STORMWATER
584
2008 789584ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 7/7/2007 12/7/2007 4/1/2008
2/7/2007 8/1/2007 11/7/2007 3/1/2008 7/8/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006103
2008
Overland
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$495,000
St. Louis Metropolitian Sewer District - Fiscal Year
INADEQUATE AND DETERIORATED STORM SEWER SYSTEM IS CAUSING STREET, BASEMENT, AND YARD FLOODING AT SEVERAL
RESIDENCES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1930 FEET OF 12-INCH TO 36-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $495,000
SCHEDULE
BURTON TO ARGYLE STORM SEWER
STORMWATER
564
2008 710285ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 1/1/2008 4/1/2008 7/1/2008
10/1/2006 1/1/2008 4/1/2008 7/1/2008 10/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006135
2008
Frontenac
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC OMCI
MSD
$58,000
St. Louis Metropolitian Sewer District - Fiscal Year
CREEK BANK EROSION IN AREAS ALONG A TRIBUTARY TO DEER CREEK.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT CREEK BANK STABILIZATION UTILIZING COMPOSITE REVETMENT, GRADE CONTROL STRUCTURES, AND
BIOSTABILIZATION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $58,000
SCHEDULE
CLAYTON TERRACE #3 BANK STABILIZATION
STORMWATER
565
2008 448286ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2007 1/1/2008 3/1/2008 5/1/2008
9/1/2006 1/1/2008 3/1/2008 5/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
86141
2008
Ladue
Lemay/RDP
Black Creek
BLACK CREEK SUBD #455
MSD
$325,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD AND STRUCTURE FLOODING, AND EROSION AT SEVERAL RESIDENCES.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,350 FEET OF 12-INCH TO 36-INCH DIAMETER STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $325,000
SCHEDULE
COLONIAL LN. #8556 STORM IMPROVEMENTS
STORMWATER
594
2008 393687ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 8/1/2007 1/1/2008 5/1/2008
9/1/2006 7/1/2007 10/1/2007 4/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001115B
2008
Westwood
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC OMCI
MSD
$250,000
St. Louis Metropolitian Sewer District - Fiscal Year
CREEK EROSION AND YARD FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
THIRD PHASE OF PROJECT. THIS PHASE CONSISTS OF CONSTRUCTING APPROXIMATELY 1000 FEET OF 8-INCH SANITARY SEWERS
AND 400 FEET OF CREEK BANK STABILIZATION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $250,000
SCHEDULE
CONWAY & CONWOOD STORM CHANNEL PHASE III
STORMWATER
565
2008 791388ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
5/1/2007 9/1/2007 1/1/2008 5/1/2008
1/1/2007 9/1/2007 11/1/2007 4/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006136
2008
Unincorporated
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$90,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD AND STORAGE SHED FLOODING IN THE 1200 BLOCK OF CORONATION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 515 FEET OF 12-INCH TO 18-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $90,000
SCHEDULE
CORONATION DRIVE #1241 STORM SEWER
STORMWATER
571
2008 702389ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2007 9/1/2007 11/1/2007 2/1/2008
3/1/2006 9/1/2007 11/1/2007 2/1/2008 4/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2004058
2008
Kirkwood
Meramec
Sugar Creek
SUGAR CREEK OMCI
MSD
$320,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD AND BASEMENT FLOODING AND OPEN CHANNEL EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 315 FEET OF 27-INCH TO 42-INCH DIAMETER STORM SEWER, AND 445 FEET OF 8-INCH TO
10-INCH SANITARY SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $320,000
SCHEDULE
EDNA & THURSBY STORM SEWER
STORMWATER
583
2008 704590ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/06 1/1/2007 8/1/2007 11/1/2007 3/1/2008
6/1/2006 7/1/2007 10/1/2007 2/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006137
2008
Glendale
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$187,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING AT 767 EDWIN AVENUE, JUST WEST OF SOUTH MORELAND AVENUE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 420 FEET OF 12-INCH TO 48-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $187,000
SCHEDULE
EDWIN AVE. #767 STORM SEWER IMPROVEMENTS
STORMWATER
566
2008 396891ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2006 11/1/2007 3/1/2008 6/1/2008
4/1/2006 10/1/2007 2/1/2008 6/1/2008 10/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006138
2008
Pagedale
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$62,000
St. Louis Metropolitian Sewer District - Fiscal Year
FLOODING OF HOMES ALONG ELTORA DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT FLOODPROOFING FOR NINE HOMES ALONG ELTORA AVENUE AND PENNSYLVANIA AVENUE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $62,000
SCHEDULE
ELTORA AVENUE STORM CHANNEL PHASE I (UCNE-140)
STORMWATER
584
2008 431892ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2007 12/1/2007 4/1/2008 7/1/2008
5/1/2006 12/1/2007 3/1/2008 6/1/2008 9/1/2008
EXPENSE TYPE = N
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
85036
2008
Kirkwood
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$115,000
St. Louis Metropolitian Sewer District - Fiscal Year
CREEK EROSION THREATENS FIVE HOMES ON CLINTON PLACE AND WHITSON STREET AND FOUR COMMERCIAL BUILDINGS ON
FILLMORE AND LEFFINGWELL.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 450 FEET OF BIOSTABILIZATION ALONG KIRKWOOD CREEK BETWEEN FILLMORE AND
CLINTON.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $115,000
SCHEDULE
FILLMORE - ELLIOT BANK STABILIZATION (GCKC-130)
STORMWATER
571
2008 386893ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2006 7/1/2007 9/1/2007 2/1/2008
1/1/2006 6/1/2007 8/1/2007 12/1/2007 3/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006139
2008
Glendale
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$102,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD EROSION AND FLOODING AT #22 AND #26 BERRY ROAD PARK, AND #655 FOOTE AVENUE..
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 440 FEET OF 12-INCH TO 24-INCH DIAMETER STORM SEWER AND APPURTENANCES, FROM
FOOTE AVENUE TO BERRY PARK DRIVE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $102,000
SCHEDULE
FOOTE - BERRY PARK STORM SEWER
STORMWATER
566
2008 466694ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2007 3/1/2008 5/1/2008 7/1/2008
5/1/2006 3/1/2008 5/1/2008 7/1/2008 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006142
2008
Florissant
Coldwater
Fountain Creek
FOUNTAIN CREEK OMCI
MSD
$75,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD PONDING OF WATER ON HOMES ON THE NORTH SIDE OF HARRISON AVENUE, EAST OF AUBUCHON STREET.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 360 FEET OF 15-INCH TO 18-INCH STORM SEWER AND APPURTENANCES
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $75,000
SCHEDULE
HARRISON AVE. #1375 STORM SEWER IMPROVEMENTS
STORMWATER
569
2008 446595ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/06 1/1/2007 4/1/2007 8/1/2007 12/1/2007
3/1/2006 3/1/2007 7/1/2007 11/1/2007 2/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006144
2008
Florissant
Coldwater
Fountain Creek
FOUNTAIN CREEK OMCI
MSD
$100,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD FLOODING AT 360 TO 500 JEFFERSON. EXISTING SWALE CANNOT ADEQUATELY HANDLE RUNOFF.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 505 FEET OF 12-INCH TO 21-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $100,000
SCHEDULE
JEFFERSON #360 STORM SEWER IMPROVEMENT
STORMWATER
569
2008 734496ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
1/1/2008 5/1/2007 10/1/2007 2/1/2008
3/22/2006 4/1/2008 9/1/2007 1/1/2008 4/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005050
2008
Rock Hill
Lemay/RDP
Deer Creek
DEER CREEK OMCI
ACCESS ENGINEERING, LLC.
$560,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING AT 1225 O'DAY, AND 9779 & 9783 SHERRELL COURT, DUE TO INADEQUATE SINKHOLES.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 785 FEET OF 18-INCH TO 30-INCH DIAMETER STORM SEWERS, 550 FEET OF 12-INCH DIAMETER
SANITARY SEWERS, AND APPURTENANCES, PROVIDING OVERFLOW RELIEF TO TWO SINKHOLES.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $170,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $560,000
SCHEDULE
KORTWRIGHT- NORTH OF SHERRELL AND O'DAY STORM
IMPROVEMENT
STORMWATER
566
2008 705597ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2006 1/8/2008 6/1/2008
10/1/2004 7/1/2006 1/8/2008 6/1/2008 6/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2004059
2008
Rock Hill
Lemay/RDP
Deer Creek
DEER CREEK OMCI
ACCESS ENGINEERING, LLC.
$290,000
St. Louis Metropolitian Sewer District - Fiscal Year
HOUSES ARE FLOODING DUE TO INADEQUATE SINKHOLES.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 1,293 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWER AND APPURTENANCES, FROM
KORTWRIGHT TO OAK HAVEN AND O'DAY AVENUES.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2006, FOR $52,000 - THE PROJECT WAS DESIGNED IN CONJUNCTION WITH
PROJECT 2005050.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $290,000
SCHEDULE
KORTWRIGHT- OAK HAVEN AND O`DAY STORM
IMPROVEMENT
STORMWATER
566
2008 705398ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
7/1/2006 1/8/2008 6/1/2008
9/1/2004 7/1/2006 1/8/2008 6/1/2008 3/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
85071A
2008
Kirkwood
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
MSD
$125,000
St. Louis Metropolitian Sewer District - Fiscal Year
HOUSE FLOODING AND YARD FLOODING ALONG MISSOURI AVENUE NORTH OF MANCHESTER.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 150 FEET OF 54-INCH STORM SEWER AND APPURTENANCES, AND ALTERATIONS TO
EXISTING INLETS TO ENHANCE STORMWATER COLLECTION.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $125,000
SCHEDULE
MANCHESTER & MISSOURI AVENUE STORM SEWER PHASE
I
STORMWATER
566
2008 790099ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/2007 9/1/2007 11/1/2007 3/1/2008
7/1/2006 8/1/2007 10/1/2007 2/1/2008 5/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
85069
2008
Richmond Heights
Lemay/RDP
Black Creek
BLACK CREEK SUBD #455
MSD
$130,000
St. Louis Metropolitian Sewer District - Fiscal Year
CREEK FLOODING & EROSION ALONG A TRIBUTARY OF BLACK CREEK BETWEEN MCCUTCHEON AND MCKNIGHT.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 500 FEET OF 8-INCH REINFORCED CONCRETE CHANNEL BOTTOM.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $130,000
SCHEDULE
MCCUTCHEON TO MCKNIGHT CHANNEL REPLACEMENT
STORMWATER
594
2008 4231100ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2007 12/1/2007 3/1/2008 7/1/2008
7/1/2006 12/1/2007 2/1/2008 6/1/2008 10/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007045
2008
Florissant
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$140,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD FLOODING AT 1480 MUNDY.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 660 FEET OF 15-INCH TO 24-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $140,000
SCHEDULE
MUNDY #1480 STORM SEWER
STORMWATER
564
2008 7866101ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 3/1/2008 5/1/2008 7/1/2008
7/1/2006 3/1/2008 5/1/2008 7/1/2008 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006148
2008
Webster Groves
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$485,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING DUE TO INADEQUATE STORM SEWER SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,310 FEET OF 12-INCH TO 27-INCH RELIEF STORM SEWER AND APPURTENANCES (11
STRUCTURES).
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $485,000
SCHEDULE
NORTH FOREST STORM RELIEF
STORMWATER
566
2008 7159102ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2006 7/1/2007 10/1/2007 3/1/2008
6/1/2006 6/1/2007 9/1/2007 1/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2003129
2008
Overland
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$150,000
St. Louis Metropolitian Sewer District - Fiscal Year
FLOODING OF HOMES NEAR ELEMENTARY SCHOOL.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 700 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER AND APPURTENANCES FROM
IVELAND SCHOOL SOUTH ALONG NORTHFIELD AVENUE TO PAGE AVE AND APPROXIMATELY 420 FEET OF 2-FOOT HIGH EARTHEN
BERM ALONG THE SOUTH PROPERTY LINE OF IVELAND SCHOOL.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $150,000
SCHEDULE
OAK AVENUE #10051 STORM IMPROVEMENTS (UCSC-115)
STORMWATER
584
2008 4035103ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2007 9/1/2007 12/1/2007 1/1/2009
11/1/2005 9/1/2007 11/1/2007 4/1/2008 4/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006150
2008
University City
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$60,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING INLET 17K4-178D HAS NO OUTFALL.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 325 FEET OF 12-INCH RCP STORM SEWER, TO PROVIDE OUTFALL FOR EXISTING INLETS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $60,000
SCHEDULE
OLD BONHOMME GROBY STORM SEWER IMPROVEMENT
STORMWATER
566
2008 7352104ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/05 4/1/2007 6/1/2007 7/1/2007 11/1/2007
2/1/2006 5/1/2007 6/1/2007 10/1/2007 12/1/2007
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2000110A
2008
Unincorporated
Bissell
Blackjack Creek
BLACKJACK- DELLWOOD OMCI
EFK MOEN, LLC
$360,000
St. Louis Metropolitian Sewer District - Fiscal Year
MODERATE RISK EROSION TO 10 HOMES (11279 THROUGH 11369 PRENTICE DRIVE).
PROJECT PROBLEM
PROJECT SOLUTION
PHASE II OF THE CONSTRUCTION OF ENERGY DISSIPATING AND GRADE CONTROL STRUCTURES AND THE BIOSTABLIZATION OF THE
CHANNEL BETWEEN PRENTICE DRIVE AND GRANGER TRAIL.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2003, FOR $210,000. PHASE I WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2005,
FOR $594,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $360,000
SCHEDULE
PRENTICE - GRANGER STORM CHANNEL (MCBJ-110)
PHASE II
STORMWATER
567
2008 7021105ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2003 5/1/2007 9/1/2007
10/1/2003 2/1/2004 9/1/2007 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007145
2008
Olivette
Lemay/RDP
Black Creek
BLACK CREEK SUBD #455
MSD
$42,000
St. Louis Metropolitian Sewer District - Fiscal Year
OVERLAND FLOW CAUSING BASEMENT FLOODING AND EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 170 FEET OF 12-INCH RCP STORM SEWER AND TWO INLETS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $42,000
SCHEDULE
PRICEWOODS - BIRNAWOODS STORM SEWER
STORMWATER
594
2008 7968106ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/06 10/1/2007 1/1/2008 2/1/2008 4/1/2008
1/1/2008 2/1/2008 4/1/2008 5/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005073
2008
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$270,000
St. Louis Metropolitian Sewer District - Fiscal Year
STREET AND YARD FLOODING NEAR 1500 PURDUE AVENUE AND YARD AND BASEMENT FLOODING AT 1502 BRADFORD AVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 780 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWERS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $270,000
SCHEDULE
PURDUE AND CANTON STORM SEWER
STORMWATER
584
2008 5539107ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2007 5/1/2007 11/1/2007 3/1/2008
4/1/2005 4/1/2007 11/1/2007 2/1/2008 5/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006151
2008
Creve Coeur
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC OMCI
MSD
$95,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING AND STRUCTURE FLOODING AT RESIDENCES ON RIDGECORDE PLACE AND RIDGECORDE LANE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 445 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER, 200 FEET OF AN EARTHEN
BERM, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $95,000
SCHEDULE
RIDGECORDE LANE STORM SEWER
STORMWATER
565
2008 4668108ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 8/1/2007 3/1/2008 7/1/2008
8/1/2006 7/1/2007 10/1/2007 6/1/2008 9/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005121
2008
Brentwood
Lemay/RDP
Deer Creek
DEER CREEK OMCI
EFK MOEN, LLC
$1,300,000
St. Louis Metropolitian Sewer District - Fiscal Year
EXISTING STORM SEWER SYSTEM FROM MANCHESTER ROAD UPSTREAM TO CECELIA AVENUE HAS DETERIORATED AND HAS
INADEQUATE CAPACITY, CAUSING LOCALIZED FLOODING OF YARDS AND STREETS AND REQUIRING MULTIPLE REPAIRS ON THE
SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVAL AND REPLACEMENT OF APPROXIMATELY 1,200 FEET OF 6-INCH TO 24-INCH STORM AND SANITARY SEWERS WITH
APPROXIMATELY 610 FEET OF 7' WIDE BY 3' HIGH TO 9' WIDE BY 8' HIGH BOX CULVERT, 470 FEET OF 45-INCH BY 29-INCH ELLIPTICAL
PIPE TO 12-INCH DIAMETER STORM SEWERS, 136 FEET OF 8-INCH SANIATRY SEWERS AND APPURTENANCES.
REMARKS
THE DESIGN OF THIS PROJECT WAS FUNDED IN FISCAL YEAR 2006, FOR $175,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $1,300,000
SCHEDULE
RUTH-HELEN-CECELIA STORM SEWER REPLACEMENT
STORMWATER
566
2008 7271109ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2006 1/1/2008 6/1/2008
4/1/2005 8/1/2006 1/1/2008 6/1/2008 6/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006154
2008
Webster Groves
Lemay/RDP
Seminary Branch
SEMINARY BRANCH OF RIVER
DES PERES
MSD
$160,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD FLOODING OF 313 AND 319 OAK TREE DRIVE; PREVIOUS PROJECT BY CITY OF WEBSTER GROVES ENDED AT SELMA.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 30 FEET OF DOUBLE 5 FOOT WIDE BY 3 FOOT HIGH BOX CULVERT, WITH BANK
STABILIZATION DOWNSTREAM.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $160,000
SCHEDULE
SELMA AND OAK TREE DR. CULVERT EXTENSION
STORMWATER
593
2008 7155110ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
2/1/2007 9/1/2007 12/7/2007 1/1/2009
4/1/2006 9/1/2007 11/1/2007 4/1/2008 4/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006195
2008
Overland
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$138,000
St. Louis Metropolitian Sewer District - Fiscal Year
LOW POINT FLOODING OF STREET OVERFLOWS DOWN DRIVEWAY AT 2411 SPENCER, AND OVERLOADS THE PRIVATE DRIVEWAY
DRAIN, CAUSING FLOODING OF THE BASEMENT GARAGE.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVE INADEQUATE STORM SEWER SYSTEM AND REPLACE WITH LARGER DIAMETER SEWER AND ADDITIONAL INLETS TO COLLECT
TRIBUTARY FLOW. DESIGN AND CONSTRUCT APPROXIMATELY 665 FEET OF 12-INCH TO 24-INCH DIAMETER STORM SEWERS AND
APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $138,000
SCHEDULE
SPENCER AVENUE STORM SEWER
STORMWATER
564
2008 7896111ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
4/1/2007 9/1/2007 12/1/2007 4/1/2008
1/1/2007 8/1/2007 10/1/2007 3/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007171
2008
St. Louis City and County
Various
Various
IMPROVEMENT FUND
MSD
$2,000,000
St. Louis Metropolitian Sewer District - Fiscal Year
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR
REPLACEMENT.
PROJECT PROBLEM
PROJECT SOLUTION
AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE
PROMPTLY ISSUED.
REMARKS
REPAIR AND/OR REPLACEMENT PROJECTS THROUGHOUT THE ENTIRE DISTRICT WILL BE PLANNED AND CONSTRUCTED AS THEY ARE
IDENTIFIED. BOARD INTRODUCTION ANTICIPATED IN JULY 2007.
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $2,000,000
SCHEDULE
STORMWATER INFRASTRUCTURE REPAIR/REPLACEMENT
(OPERATIONS - FY2008)
STORMWATER DISTRICTWIDE
102
2008 7279112ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = M
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006156
2008
Creve Coeur
Lemay/RDP
Deer Creek
CREVE COEUR FRONTENAC OMCI
MSD
$64,000
St. Louis Metropolitian Sewer District - Fiscal Year
CREEK BANK EROSION NEAR CHILTON LANE
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT HEAVY STONE REVETMENT AND GABION WALLS TO STABILIZE CREEK BANK.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $64,000
SCHEDULE
TEMPLE ISRAEL CREEK BANK STABILIZATION
STORMWATER
565
2008 4305113ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/1/2006 11/1/2007 3/1/2008 1/1/2009
8/1/2006 10/1/2007 2/1/2008 6/1/2008 4/1/2009
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006160
2008
Unincorporated
Bissell
Watkins Creek
WATKINS CREEK OMCI
MSD
$75,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD & STREET FLOODING ON CLAUDINE DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 50 FEET OF BANK PROTECTION AND OTHER MINOR STORMWATER IMPROVEMENTS ON
CLAUDINE DRIVE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $75,000
SCHEDULE
WC-21 BANK PROTECTION
STORMWATER
587
2008 4277114ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
8/1/2007 10/1/2007 12/1/2007 4/1/2008
4/1/2006 9/1/2007 11/1/2007 3/1/2008 6/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
89100
2008
Kirkwood
Meramec
Sugar Creek
SUGAR CREEK OMCI
MSD
$100,000
St. Louis Metropolitian Sewer District - Fiscal Year
FIRST FLOOR FLOODING OF TWO HOMES AND YARD EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 75 FEET OF 15-INCH PIPE, 310 FEET OF 12-INCH PIPE, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $100,000
SCHEDULE
WILDWOOD LN. #75 STORM SEWER
STORMWATER
583
2008 7947115ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
6/1/06 1/1/2007 7/1/2007 8/1/2007 12/1/2007
8/1/2006 7/1/2007 8/1/2007 11/1/2007 2/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006161
2008
Webster Groves
Lemay/RDP
Seminary Branch
SEMINARY BRANCH OF RIVER
DES PERES
MSD
$35,000
St. Louis Metropolitian Sewer District - Fiscal Year
REAR YARD FLOODING
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 100 FEET OF 12-INCH DIAMETER STORM SEWER AND APPURTENANCES (1 STRUCTURE).
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $35,000
SCHEDULE
WILLOUGHBY PLACE #533 STORM SEWER
STORMWATER
593
2008 7366116ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
9/1/2007 12/1/2007 1/1/2008 5/1/2008
5/1/2006 11/1/2007 1/1/2008 4/1/2008 7/1/2008
EXPENSE TYPE = C
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006162
2008
Overland
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$350,000
St. Louis Metropolitian Sewer District - Fiscal Year
YARD AND STRUCTURE FLOODING IN THE 2400 BLOCKS OF WISMER AND LESLIE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 1,480 FEET OF 12-INCH TO 30-INCH STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD
$0 $0 $0 $350,000
SCHEDULE
WISMER-LESLIE STORM SEWER
STORMWATER
564
2008 7145117ID =
START
END
PRELIMINARY DESIGN DESIGN EASMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
3/1/2007 8/1/2007 2/1/2008 6/1/2008
4/1/2006 7/1/2007 10/1/2007 5/1/2008 8/1/2008
EXPENSE TYPE = C
STORMWATER CONTINUED PROJECTS
Some of the District's Stormwater projects are continued from previous
fiscal years due to difficulties in easement acquisition, the permit process from
other agencies, design revisions or status, or other special requirements or issues.
There are sixteen (16) projects that were identified in previous budget
supplements that are still in the design, permitting, and/or easement acquisition
process. These projects have a total estimated cost of $6,445,000.
The fiscal year indicated in parentheses at the end of each project title
indicates the budget year that the project was originally planned. The revenue to
construct these projects comes from the appropriate Operation, Maintenance,
Construction, and Improvement (OMCI) Fund.
119
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN AUGUST 2007.
UNINCORPORATEDALBIN AVE. - BRENNER AVE. STORM SEWER
(FY07)
1 $468,000
PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
KIRKWOODBALLAS RD. N. #103 & 107 (GRG-38) CHANNEL
IMPROVEMENTS (FY07)
2 $680,000
PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
FRONTENACCLAYTON DOWNS - CLAYTON RD. BANK
STABILIZATION (FY07)
3 $50,000
PROJECT DELAYED FOR RE-DESIGN AND PERMITTING
BY U.S. ARMY CORPS OF ENGINEERS. BOARD
INTRODUCTION ANTICIPATED IN JANUARY 2008.
UNINCORPORATEDDIEBOLD - CELTIC CHANNEL IMPROVEMENT
(GCMB-340) (FY04)
4 $205,000
DESIGN DELAYED DUE TO EXPANDED SCOPE.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER
2007.
GLENDALEFREDERICK LN. STORM SEWER IMPROVEMENTS
(FY07)
5 $265,000
PROJECT PENDING EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
OVERLANDGAEBLER - TRESCOTT STORM SEWER (UCTC-120)
(FY07)
6 $1,625,000
PROJECT DESIGN DELAYED TO COORDINATE DESIGN
AND CONSTRUCTION WITH GIRARD PLACE #149
STORM SEWER . ANTICIPATE BOARD INTRODUCTION
IN DECEMBER 2007.
KIRKWOODGARDEN LANE STORM SEWER PHASE II (FY06)7 $450,000
120
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
PROJECT IN EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
KIRKWOODGIRARD PL. #149 STORM SEWER IMPROVEMENTS
(FY07)
8 $325,000
PROJECT DELAYED FOR MORE SURVEYS AND
RE-DESIGN. ANTICIPATE BOARD INTRODUCTION IN
DECEMBER 2007.
WEBSTER GROVESGREELEY TO PROVIDENCE STORM SEWER (FY06)9 $85,000
PROJECT PENDING EASEMENT CONDEMNATION.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER
2007.
KIRKWOODKIRKWOOD ROAD - COMMERCE - REARDON
(GCKC-140) PHASE II (FY07)
10 $1,180,000
COORDINATING WITH CITY OF FRONTENAC IN
EASEMENT ACQUISITION. ANTICIPATE BOARD
INTRODUCTION IN DECEMBER 2007.
FRONTENACLYNNBROOK STORM SEWER (FY07)11 $253,000
PROJECT DELAYED FOR RE-DESIGN AND PERMITTING
BY U.S. ARMY CORPS OF ENGINEERS. ANTICIPATE
BOARD INTRODUCTION IN OCTOBER 2007.
LADUEMAGNOLIA AND WAVERTON STORM CHANNEL
(DCT5-110) PHASE II (FY06)
12 $143,000
DESIGN COMPLETE. ANTICIPATE BOARD
INTRODUCTION IN JUNE 2007.
ROCK HILLPLAINFIELD #9512 BANK STABILIZATION (FY07)13 $230,000
PROJECT IN EASEMENT ACQUISITION. ANTICIPATE
BOARD INTRODUCTION IN DECEMBER 2007.
RICHMOND
HEIGHTS
RIDGETOP DRIVE STORM SEWER (FY07)14 $250,000
PROJECT PENDING EASEMENT ACQUISITIONS.
ANTICIPATE BOARD INTRODUCTION IN DECEMBER
2007.
LADUETWIN SPRINGS LANE STORM SEWER (FY07)15 $146,000
121
REASON PROJECT CONTINUEDMUNICIPALITY COST ESTIMATEPROJECT NAME
CONTINUED STORMWATER PROJECTS
DESIGN COMPLETE. ANTICIPATE BOARD
INTRODUCTION IN JUNE 2007.
FLORISSANTWILLOWBROOK #1420 STORM SEWER (FY07)16 $90,000
$6,445,000TOTAL:
122
STATE STORMWATER GRANT PROJECTS
123
The projects described in this section are related to constructing, reconstructing, or
rehabilitating existing stormwater or combined sewer systems in order to alleviate
flooding, erosion, or water backups throughout the District. Twenty-five projects are
expected to be partially funded by $1,154,113 in stormwater grants from the State of
Missouri. The total estimated cost of these projects is $7,032,159.
Also included in this section is a list of 17 projects submitted by local
municipalities or by MSD for which stormwater grant funding was not available. These
projects were submitted to the State of Missouri as “contingency” projects, which could
receive funding, should money become available.
The District was appointed as the agent for the Department of Natural Resources
for the dispersal and award of special grant money for use in various stormwater
programs. The District’s role includes convening a Stormwater Coordinating Committee
(SCC) for our area, ensuring that all municipalities, St. Louis County, and the City of St.
Louis are made aware of proposed grant money, helping to provide answers regarding
requirements and guidelines, recommending awards to the State, administering payment
requests, and generally ensuring that State regulations are followed. Placing the proposed
projects in the District’s Budget Supplement helps to fulfill the State’s requirement that
all stormwater projects are consistent with a comprehensive stormwater plan.
STATE STORMWATER GRANT PROJECTS
MUNICIPALITY PROJECT NAME STATE LOCAL TOTAL
1 BALLWIN HOLLOWAY ROAD CULVERT
REPAIRS
$34,687 $79,313 $114,000
2 BLACKJACK DETENTION POND AND STORM
SEWER IMPROVEMENTS
$31,262 $260,113 $291,375
3 BRIDGETON HARMANN ESTATES DETENTION
BASIN CONVERSION
$32,487 $169,425 $201,912
4 CALVERTON PARK ELBRING/FLORA PROJECT $30,497 $161,743 $192,240
5 CHESTERFIELD CHESTERFIELD HILLS STORMWATER
RETENTION LAKES REHAB
$36,857 $63,143 $100,000
6 CLAYTON CLAYTON CITYWIDE STORMWATER
MASTER PLAN
$32,106 $47,894 $80,000
7 CRESTWOOD FOURNIER DRIVE BOX CULVERT $31,971 $231,029 $263,000
8 FRONTENAC LYNNBROOK SUBDIVISION
STORMWATER
$30,800 $607,460 $638,260
9 GREEN PARK GREEN PARK ROAD IMPROVEMENTS $30,685 $206,983 $237,668
10 HAZELWOOD ELM GROVE STORM SEWER
EXTENSION
$33,977 $194,503 $228,480
11 MANCHESTER 913 SHERWICK TERRACE STORM
SEWER IMPROVEMENTS
$32,992 $77,008 $110,000
12 NORTHWOODS COLONIAL ST- CREEK BANK
EROSION AND STORMWATER
$28,287 $40,992 $69,279
13 ST. JOHN HILLEMON/WALTON STORMWATER
DITCH
$22,500 $22,500 $45,000
14 ST. LOUIS COUNTY GREEN PARK ROAD CULVERT $45,000 $45,000 $90,000
15 ST. LOUIS COUNTY TRAMPE ROAD CULVERT
REPLACEMENT
$135,000 $135,000 $270,000
16 ST. LOUIS COUNTY VALLEY CREST STORMWATER
PROJECT
$25,000 $25,000 $50,000
17 ST. LOUIS COUNTY REGENCY DRIVE STORM SEWER $62,502 $62,498 $125,000
18 SUNSET HILLS LINCOLN STORM SEWER $31,469 $46,830 $78,299
19 TOWN & COUNTRY MASON RIDGE ROAD STORMWATER
IMPROVEMENTS
$31,836 $84,164 $116,000
20 UNIVERSITY CITY CONCRETE CURBS & GUTTERS FORM
OLD BONHOMME RD
$20,000 $20,000 $40,000
21 VALLEY PARK VALLEY PARK ROAD
IMPROVEMENTS
$31,224 $231,442 $262,666
22 WEBSTER GROVES 1239 GRANT ROAD STORMWATER
PROJECT
$33,561 $45,419 $78,980
23 WILDWOOD CAULKS CREEK CUTBANK REPAIR
AT STRECKER RD
$34,911 $315,089 $350,000
TOTALS:$859,611 $3,172,548 $4,032,159
125
1
2
STATE STORMWATER GRANT PROJECTS
MUNICIPALITY PROJECT NAME STATE LOCAL MSD TOTAL
CITY OF ST. LOUIS SOUTHERN FIRST STREET
DRAINAGE
$200,000 $200,000 $0 $400,000
CITY OF ST. LOUIS
(MSD)
HARLEM BADEN PHASE III
(HIGHLAND)
$94,502 $0 $2,505,498 $2,600,000
TOTALS:$294,502 $200,000 $2,505,498 $3,000,000
126
STATE STORMWATER GRANT CONTINGENCY PROJECTS
MUNICIPALITY PROJECT NAME TOTAL COST
CHESTERFIELD OLD RIVERWOODS LANE STORMWATER
IMPROVEMENT $40,000.00
CLAYTON DAVIS PLACE STORMWATER INLET PROJECT
$51,000.00
MANCHESTER LA MARITE STORM SEWER UPGRADE
IMPROVEMENTS $100,000.00
MANCHESTER 736 WOODRIDGE HEIGHTS STORM
SEWER/INLET & SWALE/BERM $55,000.00
MANCHESTER 12 CLOVERLEAF/HEDGEWOOD AREA
$70,000.00
MARLBOROUGH (MSD)OAK KNOLL MANOR STORM SEWER
$50,000.00
SHREWSBURY (MSD)LENOX AVE. STORM SEWER
$82,500.00
ST LOUIS COUNTY (MSD)DIEBOLD- CELTIC CHANNEL IMPROVEMENT
$205,000.00
ST LOUIS COUNTY (MSD)GRAVOIS GARDENS STORM IMPROVEMENTS
PHASE II $792,000.00
ST LOUIS COUNTY (MSD)HALLSTEAD STORM CHANNEL PHASE IV
$2,250,000.00
ST LOUIS COUNTY (MSD)JOEL- IVANHOE STORM SEWER
$159,000.00
ST LOUIS COUNTY (MSD)VALCOUR & WEBSTER STORM SEWER
$280,000.00
SUNSET HILLS RICHVIEW STORM SEWER CONNECTER
$527,900.00
VALLEY PARK LEONARD AVENUE STORMWATER
IMPROVEMENTS PHASE II $330,132.00
CITY OF ST LOUIS (MSD)HARLEM-BADEN PHASE IV (ROSALIE)
$2,100,000.00
CITY OF ST LOUIS (MSD)MANCHESTER AVENUE COMBINED SEWER
RELIEF $13,650,000.00
CITY OF ST LOUIS (MSD)SEWER IMPROVEMENTS IN ST. LOUIS CITY
PARKS PH III $503,000.00
127
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
CSO - MIDDLESEX AND YORK DRIVE (L-110)
SEWER SEPARATION
37BRENTWOODINFRASTRUCTURE
RUTH-HELEN-CECELIA STORM SEWER
REPLACEMENT
109BRENTWOODSTORMWATER
MISSOURI RIVER BONFILS INFILTRATION
AND INFLOW CORRECTION PHASE VI
(LATERAL SEWER REHABILITATION)
52BRIDGETONINFRASTRUCTURE
KEHRS MILL TRAILS SUBDIVISION SANITARY
SEWERS (S.D. #2003144)
45CLARKSON VALLEY INFRASTRUCTURE
BLACK CREEK SANITARY RELIEF (HIGHWAY
40 TO WENLOU DRIVE)
30CLAYTONINFRASTRUCTURE
RIDGECORDE LANE STORM SEWER 108CREVE COEUR STORMWATER
TEMPLE ISRAEL CREEK BANK
STABILIZATION
113CREVE COEUR STORMWATER
130 ST. EDWARD LANE STORM SEWER 79FLORISSANTSTORMWATER
HARRISON AVE. #1375 STORM SEWER
IMPROVEMENTS
95FLORISSANTSTORMWATER
JEFFERSON #360 STORM SEWER
IMPROVEMENT
96FLORISSANTSTORMWATER
MUNDY #1480 STORM SEWER 101FLORISSANTSTORMWATER
CLAYTON TERRACE #3 BANK STABILIZATION 86FRONTENACSTORMWATER
EDWIN AVE. #767 STORM SEWER
IMPROVEMENTS
91GLENDALESTORMWATER
129
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
FOOTE - BERRY PARK STORM SEWER 94GLENDALESTORMWATER
EDNA & THURSBY STORM SEWER 90KIRKWOODSTORMWATER
FILLMORE - ELLIOT BANK STABILIZATION
(GCKC-130)
93KIRKWOODSTORMWATER
MANCHESTER & MISSOURI AVENUE STORM
SEWER PHASE I
99KIRKWOODSTORMWATER
WILDWOOD LN. #75 STORM SEWER 115KIRKWOODSTORMWATER
61 CONWAY CLOSE STORM SEWER 80LADUESTORMWATER
COLONIAL LN. #8556 STORM IMPROVEMENTS 87LADUESTORMWATER
OXFORD AND BIG BEND COMBINED SEWER
REPLACEMENT
53MAPLEWOODINFRASTRUCTURE
CREVE COEUR CREEK (L-52) PUMP STATION
IMPROVEMENTS (ENGINEERING
CONSTRUCTION SERVICES)
18MARYLAND HEIGHTS INFRASTRUCTURE
I-70 AND BERMUDA SANITARY SEWER
RELOCATION
42NORMANDYINFRASTRUCTURE
PRICEWOODS - BIRNAWOODS STORM SEWER 106OLIVETTESTORMWATER
BURTON TO ARGYLE STORM SEWER 85OVERLANDSTORMWATER
OAK AVENUE #10051 STORM IMPROVEMENTS
(UCSC-115)
103OVERLANDSTORMWATER
SPENCER AVENUE STORM SEWER 111OVERLANDSTORMWATER
130
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
WISMER-LESLIE STORM SEWER 117OVERLANDSTORMWATER
ELTORA AVENUE STORM CHANNEL PHASE I
(UCNE-140)
92PAGEDALESTORMWATER
MCCUTCHEON TO MCKNIGHT CHANNEL
REPLACEMENT
100RICHMOND
HEIGHTS
STORMWATER
KORTWRIGHT- NORTH OF SHERRELL AND
O'DAY STORM IMPROVEMENT
97ROCK HILL STORMWATER
KORTWRIGHT- OAK HAVEN AND O`DAY
STORM IMPROVEMENT
98ROCK HILL STORMWATER
CSO - INTERCEPTOR & OUTFALL
MODIFICATIONS PHASE II
(BP-012,BP-032,BP-038,BP-049)
33ST. LOUIS CITY INFRASTRUCTURE
CSO - INTERCEPTOR ACCESS AND
MONITORING IMPROVEMENTS PHASE II (NEW
MILL SEWER)
34ST. LOUIS CITY INFRASTRUCTURE
CSO - INTERCEPTOR ACCESS AND
MONITORING IMPROVEMENTS PHASE II
(PEVELY PUMP STATION)
35ST. LOUIS CITY INFRASTRUCTURE
CSO - MACKLIND OUTFALL L-062
SEPARATION
36ST. LOUIS CITY INFRASTRUCTURE
CSO - SOUTHWEST INDUSTRIAL CENTER
OUTFALLS L-046, L-049, L-177 SEPARATION
38ST. LOUIS CITY INFRASTRUCTURE
LEMAY WWTP SECONDARY CHILLER PIPING
REPLACEMENT
49ST. LOUIS CITY INFRASTRUCTURE
SEWER IMPROVEMENTS IN ST. LOUIS CITY
PARKS PHASE IV (DESIGN)
23ST. LOUIS CITY INFRASTRUCTURE
131
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
TOWER GROVE-MANCHESTER COMBINED
SEWER SYSTEM PHASE I (PARK - THURMAN
DIVERSION STRUCTURE)
59ST. LOUIS CITY INFRASTRUCTURE
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SUPPORT SERVICES
(SUPPLEMENTAL APPROPRIATION)
31ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH (FY2008)
15ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH (FY2008)
16ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
17ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
CSO LONG TERM CONTROL PLAN PUBLIC
PARTICIPATION PROGRAM
20ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2007-2010)
39ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
FLOW METERING AND MONITORING
EQUIPMENT ACQUISITION (FY2008)
21ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
I-64/40 RECONSTRUCTION BETTERMENTS
ALLOWANCE
41ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY 2008)
43ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
POWER SUPPLY IMPROVEMENTS AT
VARIOUS SANITARY PUMP STATIONS
55ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
PROGRAM TO ELIMINATE BASEMENT
BACKUPS PHASE III
56ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
132
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
STORMWATER FACILITY PLANNING
(SUPPLEMENTAL APPROPRIATION)
72ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
STORMWATER INFRASTRUCTURE
REPAIR/REPLACEMENT (OPERATIONS -
FY2008)
112ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (FY 2008)
73ST. LOUIS CITY AND
COUNTY
STORMWATER
DISTRICTWIDE
WATERSHED FACILITY PLANNING 24ST. LOUIS CITY AND
COUNTY
INFRASTRUCTURE
COLDWATER SANITARY RELIEF SECTION B, C
& D (LAND ACQUISITION)
32ST. LOUIS COUNTY INFRASTRUCTURE
SANITARY SEWER CLEANING 57ST. LOUIS COUNTY INFRASTRUCTURE
SAPPINGTON CREEK MEATH TO GRAVOIS
(GCXR-110) (PRELIMINARY DESIGN)
(SUPPLEMENTAL APPROPRIATION)
71ST. LOUIS COUNTY STORMWATER
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
22ST. LOUIS COUNTY INFRASTRUCTURE
SEPARATE SEWER OVERFLOW
MODIFICATION AND MONITORING PROGRAM
(FY 2008)
58ST. LOUIS COUNTY INFRASTRUCTURE
BARRETT STATION SANITARY RELIEF 29UNINCORPORATEDINFRASTRUCTURE
CORONATION DRIVE #1241 STORM SEWER 89UNINCORPORATEDSTORMWATER
CSO - JEFFERSON BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-122) SEPARATION
(DESIGN)
19UNINCORPORATEDINFRASTRUCTURE
133
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
LC-01 FELTON, ARLEE & VIDA TO CLYDE
SANITARY RELIEF PHASE III
46UNINCORPORATEDINFRASTRUCTURE
LEMAY GARDENS SEPARATE SEWER AREA I/I
REDUCTION
47UNINCORPORATEDINFRASTRUCTURE
LEMAY WWTP AERATION BLOWER
MODIFICATIONS PHASE I
48UNINCORPORATEDINFRASTRUCTURE
LEMAY WWTP WET WEATHER EXPANSION 50UNINCORPORATEDINFRASTRUCTURE
LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING
IMPROVEMENTS
51UNINCORPORATEDINFRASTRUCTURE
POTTLE AVE. PUMP STATION ELIMINATION 54UNINCORPORATEDINFRASTRUCTURE
PRENTICE - GRANGER STORM CHANNEL
(MCBJ-110) PHASE II
105UNINCORPORATEDSTORMWATER
VALDAMERE DRIVE #11125 SANITARY SEWER
REPLACEMENT
60UNINCORPORATEDINFRASTRUCTURE
WC-21 BANK PROTECTION 114UNINCORPORATEDSTORMWATER
BALSON AVE. 7800 BLOCK STORM SEWER 82UNIVERSITY CITY STORMWATER
BRIAR CT. #8011 STORM SEWER 83UNIVERSITY CITY STORMWATER
BURCH LANE STORM SEWER 84UNIVERSITY CITY STORMWATER
OLD BONHOMME GROBY STORM SEWER
IMPROVEMENT
104UNIVERSITY CITY STORMWATER
PURDUE AND CANTON STORM SEWER 107UNIVERSITY CITY STORMWATER
134
PAGEPROJECT NAME MUNICIPALITY PROJECT
TYPE
FISCAL YEAR 2008 PROJECT INDEX BY MUNICIPALITY
COLDWATER CREEK WATERSHED STORM
SEWER IMPROVEMENTS (DESIGN)
69VARIOUSSTORMWATER
DEER CREEK WATERSHED STORM SEWER
IMPROVEMENTS (DESIGN)
70VARIOUSSTORMWATER
EMERGENCY REPAIR FUND APPRORIATION 40VARIOUSINFRASTRUCTURE
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2008)
44VARIOUSINFRASTRUCTURE
AVIGNON CT. #1685 STORM SEWER 81WARSON WOODS STORMWATER
NORTH FOREST STORM RELIEF 102WEBSTER GROVES STORMWATER
SELMA AND OAK TREE DR. CULVERT
EXTENSION
110WEBSTER GROVES STORMWATER
WILLOUGHBY PLACE #533 STORM SEWER 116WEBSTER GROVES STORMWATER
CONWAY & CONWOOD STORM CHANNEL
PHASE III
88WESTWOODSTORMWATER
135
n The Metropolitan St. Louis Sewer District
STATE STORMWATER GRANT PROJECTS
FISCAL YEAR 2007 - 2008
ST. CHARLES COUNTY
MADISON COUNTY
ILLINOIS
ST. CLAIR COUNTY
ILLINOIS
ST. LOUIS COUNTY
JEFFERSON COUNTY
32
Legend
State Stormwater Grant - County
State Stormwater Grant - City