HomeMy Public PortalAboutExhibit MSD 16 - FY 2013 CIRP Budget DocumentExhibit MSD 16
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2012-2013
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis
Sewer District's intended Capital Improvement and Replacement Program during Fiscal Year 2013
(July 1, 2012 to June 30, 2013). This document is divided into the following sections:
• Program Summary • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list
projects for which the District intends to award construction contracts during Fiscal Year 2013. The
Wastewater Engineering Projects and Stormwater Engineering Projects sections lists projects for
which the District intends to award engineering contracts during Fiscal Year 2013 (for design,
planning, and data collection/system investigation services). Due to the magnitude and complexity
of these projects and the requirements for permitting and easement acquisition, their construction is
planned for future years. The Contingency Projects sections detail projects that are currently
scheduled for Fiscal Year 2014, but that may be expedited and constructed during Fiscal Year 2013,
if revenue should become available and project schedules allow.
For each new project identified for funding in Fiscal Year 2013, this document provides
information regarding the project scope and estimated cost. For projects continued from previous
fiscal years, only the estimated construction cost and reason for continuance are provided. Specific
information regarding continued projects was included in previous Budget Supplement documents
for the fiscal year in which the projects were initially identified. Lastly, a listing of all Fiscal Year
2013 projects sorted by municipality is provided in the Appendix.
On the Cover: The Metropolitan St. Louis Sewer District is responsible for the interception, collection,
and treatment of wastewater for approximately 1.4 million residents of St. Louis City and County. We
also provide stormwater management to this vibrant and diverse customer base.
")
")
")
")
")
")")
")
")
")
")
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(MS
D
B
o
u
n
d
a
r
ySt. Louis County Boundary144
147
143
145
142 139
146
141
140
138
1376
1
8
3
4
2
5
7
20
80
50
66
63
91
79
24
21
89
56
77
14
19
22
58
85
13
42
25
59
52
65
55
87
47
82
9011
15
96
95
94
67
53
43
18
76
75
54
71
68
57
88
48
86
49
51
46
17
81
64
27
78
98
26
12
61
84
72
45
83
23
44
97
41
165
164
163
158107
160
131
127
116
151
123132
134
159
136
129
166
126135
150
115
121
161
162
149
133117
148
124
130
157
104
120153
154
155
167
114
118
105
152
122
119
106
108
103
128§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255
§¨¦70
§¨¦44
§¨¦40
§¨¦70§¨¦270
Map produced by MSD GIS Mapping, April 2012
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2012 - 2013
Legend
FISCAL YEAR 2013
!(STORMWATER - PAGE #
!(WASTEWATER - PAGE #
CONTINGENCY
")WASTEWATER - PAGE #
Combined Sewer Area
MSD DISTRICT WIDE PROJECTS
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
1 BELLEFONTAINE #2 LATERAL SANITARY RELIEF (BP-287)(COBURG LANDS DR)
2 BISSEL HILLS SANITARY RELIEF/CALUMENT I/I REDUCTION (BP-317)
3 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
4 BLACK CREEK - HADDINGTON COURT STORAGE TANK
5 BLACK CREEK I/I REDUCTION
6 BRIGHTWELL I/I REDUCTION
7 BRINWOOD I/I REDUCTION
8 CAULKS CREEK FORCE MAIN (RIVER VALLEY RD. TO L-52)
9 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - NORTH
10 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS - SOUTH
11 CEDARCREST SANITARY RELIEF (SKME-561) I/I REDUCTION
12 CLAVERACH PARK I/I REDUCTION AND SEWER SEPARATION
13 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
14 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME -
240)
15 COMBINED SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (FY2008)
16 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
17 CREVE COEUR CREEK (L-52) FORCE MAIN IMPROVEMENTS PHASE II
18 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059)
19 DACEY BRANCH I/I REDUCTION (BP-313)
20 DC-02 DEER CREEK SANITARY RELIEF
21 DC-02 DEER CREEK SANITARY RELIEF STORAGE TANK
22 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
23 DELCREST SANITARY RELIEF (SKME -565) I/I REDUCTION
24 DERHAKE I/I REDUCTION & CAPRI TO S.WATERFORD SANITARY RELIEF
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
25 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF
26 FLORLAND SANITARY RELIEF PHASE I - I/I REDUCTION
27 FORESTATE AND TEXAS SANITARY RELIEF (SKME-513)
28 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2012)
29 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT A
30 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT B
31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT C
32 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2011)
33 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011) CONTRACT A
34 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011) CONTRACT B
35 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011) CONTRACT C
36 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011) CONTRACT D
37 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2011) CONTRACT E
38 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A
39 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B
40 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C
41 GLENDALE SECTION D SANITARY RELIEF PHASE IV (SKME-624) I/I
REDUCTION
42 HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION
43 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
44 LACKLAND I/I REDUCTION
45 LANG ROYCE LATERAL SANITARY RELIEF (SKME-320)
46 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
47 LEMAY WWTP SECONDARY IMPROVEMENTS
48 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
49 LYNN HAVEN I/I REDUCTION
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
50 MALINE CREEK CSO 051 TREATMENT FACILITY
51 MALINE CREEK CSO 052 STORAGE FACILITY
52 MALINE I/I REDUCTION & SEWER REHABILITATION (BP-289)(COLONY DR)
53 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292)
54 MCNULTY - PALLARDY I/I REDUCTION
55 MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I REDUCTION
56 NORTH BADEN CREEK I/I REDUCTION (BP-612)(CANTERBURY DR)
57 OLDE ENGLISH I/I REMOVAL
58 PAGE TO TRENTON SANITARY RELIEF
59 PICKWICK-BERNADINE-BIMINI SANITARY RELIEF
60 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013
61 PROSPECT HILL LANDFILL VERTICAL EXPANSION
62 RADAR RAINFALL DATA (FY2011)
63 ROCK HILL SANITARY RELIEF (SKME -618)
64 ROSEMARY, PHILO & KATHLEEN SEWER SEPARATION
65 ROXBURY I/I REDUCTION
66 SEPARATE SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (FY2008)
67 SHERWYN SANITARY RELIEF (SKME -651) & I/I REDUCTION
68 ST MARIE SANITARY RELIEF I/I REDUCTION
69 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
70 STREAM FLOW WATER QUALITY SAMPLING (FY 2011)
71 TUCKAWAY SANITARY REHABILITATION
72 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595)
73 WATERSHED FACILITY PLANNING PHASE II
74 WATERSHED FACILITY PLANNING PHASE II
75 WEBSTER ACRES SANITARY SEWER REPLACEMENT
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
76 WEBSTER GROVES TRUNK "E" SANITARY REHABILITATION AND I/I
REDUCTION PHASE IV
77 WISMER - HUNTINGTON SANITARY RELIEF (SKME -592)
78 BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II
79 BISSELL SERVICE AREA PUMP STATION POWER SUPPLY IMPROVEMENTS
80 BLANCHA DR. TO OLIVE BLVD. SEWER SEPARATION
81 BROOKTON WAY TO MERAMEC BOTTOM ROAD SANITARY RELIEF PHASE II
82 CALVARY CEMETERY STORAGE BASIN (PROPERTY ACQUISITION)
83 CELLA - ROLLING ROCK - GLEN CREEK I/I REDUCTION (SKME -658, 659, & 657)
84 COLDWATER CREEK WWTP DIGESTER CLEAN-OUT
85 COLDWATER TREATMENT PLANT IMPROVEMENTS (SLUDGE PUMP STATION)
86 CREVE COEUR CREEK PUBLIC I/I REDUCTION
87 CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE III (SKME-021)
88 CREVE COEUR CREEK WATERSHED SANITARY SEWER REHABILITATION
89 CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72 INTERCEPTOR (I-122)
SEPARATION
90 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
91 DEER CREEK/MALINE CREEK PUBLIC I/I REDUCTION
92 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2013)
93 EMERGENCY REPAIR FUND APPROPRIATION
94 FEE FEE CREEK PUBLIC I/I REDUCTION
95 FEE FEE TRUNK SEWER (SKME-002) REHABILITATION AND I/I REDUCTION
96 FREDERICK STREET COMBINED SEWER (PROPERTY ACQUISITION)
97 GALAXY (BP-491) SANITARY SEWER REHABILITATION AND I/I REDUCTION
98 GC-11 GRAVOIS CREEK SANITARY RELIEF
99 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT A
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
100 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT B
101 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT C
102 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT D
103 GLENDALE SECTION D SANITARY RELIEF PHASE III (SKME-624) I/I REDUCTION
104 GLENDALE SECTION D SANITARY RELIEF PHASE IV (SKME-624) I/I
REDUCTION
105 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III (SKME -
521)
106 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III (SKME -
521)
107 HERMITAGE I/I REDUCTION (SKME-615)
108 HIGH SCHOOL DR. & MADGE AVE. SEWER SEPARATION
109 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2013) CONTRACT A
110 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2013) CONTRACT B
111 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2013) CONTRACT C
112 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2013)
113 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2013)
114 LEMAY WWTP ASH LAGOON ACCESS ROAD
115 LEMAY WWTP DISINFECTION FACILITIES
116 LOWER MERAMEC RIVER WWTP EDUCATIONAL/RECREATIONAL FACILITY
117 MAPLEWOOD - BLENDON COMBINED SEWER RELIEF PHASE I
118 MCKELVEY PROJECT "A" AND "B" SANITARY RELIEF (SKME-005)
119 MISSOURI RIVER WWTP SECONDARY TREATMENT EXPANSION AND
DISINFECTION FACILITIES
120 OLD MILL CREEK SEWER REHABILITATION PHASE III - 14TH TO 2ND STREET
121 PAGE AVE. & LINDBERGH SANITARY SEWER
122 PALM SEWER REPAIR/REPLACEMENT
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
123 PORTIS #3242 COMBINED SEWER IMPROVEMENTS
124 PROVIDENCE PLACE SANITARY RELIEF
125 PUBLIC I/I REDUCTION REHABILITATION
126 RDP FOULWATER INTERCEPTOR REHABILITATION (PHASE I)
127 RIVERSIDE AND YARNELL SANITARY RELIEF (SKME-400)
128 RIVERSIDE AND YARNELL SANITARY RELIEF (SKME-400)
129 STONINGTON SANITARY RELIEF (SKME -652)
130 TAYLOR - FILLMORE - HARRISON SANITARY RELIEF (SKME-502 & 503)
131 TIEMANN & NONIE AVE. SANITARY SEWER REPLACEMENT
132 TOPPING SANITARY RELIEF (SKME -421)
133 TOWER GROVE- MANCHESTER COMBINED SEWER SYSTEM PHASE II (TOWER
GROVE PLACE STORM RELIEF SEWERS)
134 UPPER MALINE TRUNK SANITARY RELIEF PHASE III SECTION C
135 VALLEY PARK/GRAND GLAIZE DIVERSION & PUMP STATION
136 WEBSTER GROVES TRUNK "E" SANITARY REHABILITATION AND I/I
REDUCTION PHASE II
148 CHALET COURT STREAMBANK STABILIZATION
149 GENERAL SERVICES AGREEMENT - STORMWATER PLANNING (FY2011)
150 OMCI STORMWATER DESIGN (CONTRACT A)
151 OMCI STORMWATER DESIGN (CONTRACT B)
152 OMCI STORMWATER DESIGN (CONTRACT C)
153 OMCI STORMWATER DESIGN (CONTRACT D)
154 ASHBY ROAD 3000 BLOCK STORM SEWER
155 CLAYTON CENTRAL STORM IMPROVEMENTS
156 EMERGENCY REPAIR FUNDS (STORMWATER)
157 HARRISON - ST MARIE STORM SEWER
158 HIGH MEADOW ROAD STORM SEWER (FRONTENAC 2-2)
27 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY13
PAGE NUMBER PROJECT NAME
159 PAGE AVE. #9441-9445 STORM SEWER
160 PARKWOODS - DICKSON STORM SEWER
161 PLANT AVE. & E. SWON STORM SEWER
162 ROMAINE AVE. #9449 STORM SEWER
163 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER
CREEK OMCI
164 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DEER CREEK
OMCI
165 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - GRAVOIS CREEK
OMCI
166 TULANE - SHANDEL STORM SEWER
167 WABASH AVE #8555 STORM SEWER
24 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY14
PAGE NUMBER PROJECT NAME
137 COLDWATER CREEK WWTP DIGESTER PIPING
138 CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71 INTERCEPTOR (I-161)
SEPARATION
139 ESSEX PLACE COMBINED SEWER RELIEF
140 FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY RELIEF PHASE V
141 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN)
142 INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE VI
143 LEMAY PUMP STATION NO. 1 REDUNDANT FORCE MAIN
144 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574)
145 SUN VALLEY I/I REDUCTION
146 TILLIE BADEN NEWBY SEWER IMPROVEMENTS (PROPERTY ACQUISITION)
147 UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-314)
24 April 2012
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY13
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Stormwater Construction 14 $2,637,000
Stormwater Engineering 6 $2,366,000
Wastewater Construction 59 $152,480,000
Wastewater Engineering 77 $65,896,000
TOTAL:156 $223,379,000
Stormwater Continued 2 $319,000
Wastewater Continued 3 $10,138,000
TOTAL:5 $10,457,000
GRAND TOTAL:161 $233,836,000
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
1 of 6
The identification and prioritization of projects to be included in the Capital
Improvement and Replacement Program is a multi-step process, requiring monitoring and
updating to ensure that the highest priority problems within the District are addressed in a
timely manner, given funding limitations. These stages include: project identification,
conceptual solution, preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it
continues to meet regulatory requirements and customers’ needs. The project cost is
updated based on available information, and the project’s priority is assessed with the
goal that the highest priority projects are funded first.
Project cost estimates used in the budget preparation process and shown in the
Budget Supplement are usually based on the preliminary study stage of the process. At
this stage there is typically a minimal amount of detailed information available regarding
geotechnical conditions, utility relocation requirements, easement requirements, and
other site-specific issues that have the potential to significantly affect the project’s
construction cost. Preliminary study cost estimates are intended to be within thirty
percent of the design engineer’s final estimates. Individual projects may vary to a greater
degree than the average, due to unanticipated site-specific conditions that impact the
project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
2 of 6
Protection Agency and Missouri Department of Natural Resources, to address customer
stormwater or wastewater problems, remedy deficiencies identified through planning
studies and hydraulic analysis of the system, and implement required collection system
and wastewater treatment plant maintenance and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost
estimate, and priority ranking of the project relative to similar projects. This solution and
associated cost estimate are general, based on a single site visit and a “table-top” analysis
of the problem. The project may then be incorporated into the Capital Improvement and
Replacement Program in a specific fiscal year, based on the availability of funds and
priority of the project.
Before the year in which funding of the project is anticipated, a preliminary stud y
is performed. In this study, scope is reevaluated in greater detail to ensure that the
conceptual solution is still viable, given current conditions, regulatory requirements, and
updated project cost estimate and priority ranking. In performing this preliminary study,
the District may make multiple site visits to inspect the problem area and estimate
alignment of the sewer or channel to be constructed. Preliminary survey information may
be obtained and a more detailed hydraulic analysis performed than was done at the
conceptual solution level. Preliminary studies are typically performed by the Engineering
Department. However, the District may use engineering consultant services to perform
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
3 of 6
preliminary studies during periods of heavy workload, or for large, complex projects such
as new treatment plants, upgrades to existing treatment plants, tunnel projects, or major
sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is
reevaluated relative to other, similar projects. A project may be rescheduled to a later
fiscal year within the Capital Improvement and Replacement Program, should its priority
ranking be reduced due to increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering
Department staff or via engineering consultant services. As part of the final design
process, topographic and geotechnical information is collected, utility conflicts are
identified, construction plans and specifications are prepared, and easement and
temporary construction license plats are drafted.
For projects of significant scope and impact, coordination with property owners
who will benefit or who will be affected by the construction of the project is achieved at
"open-line" meetings hosted by the District. For smaller projects, property owners are
individually contacted during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in
delays in the planned construction schedule. When necessary, the District may condemn
for easements in order to ensure that a project is constructed. Any required
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
4 of 6
condemnation proceedings are performed in full compliance with state and federal law.
Some projects may additionally require specific permitting from other government
agencies, such as the Missouri Department of Natural Resources, prior to bidding.
A project is advertised for public bidding a minimum of three weeks, followed by
a formal bid opening. Bids are evaluated to determine the lowest responsive, responsible
bidder. Appropriation and contract ordinances are submitted to the Board of Trustees for
their approval. Upon ordinance passage, contracts are executed and notices to proceed
are issued.
In addition to wastewater and stormwater projects, the District may construct
sanitary sewer sub-district projects at the request of property owners currently served by
private systems or individual septic tank systems. These sub-districts are financed by the
benefiting property owners, using special benefit assessments. The affected property
owners initiate the projects by submitting a petition to the District, which provides design
and construction management assistance. Because of the uncertainty of the viability
and/or schedule of sub-district projects, they are not always listed in the Budget
Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid
by ratepayers. The user charge also supports the sale of revenue bonds to fund the
wastewater program. Fund 6660, the Sanitary Replacement Fund, is used to pay for
capital wastewater work, while Fund 1101, the General Fund, is used to pay for non-
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
5 of 6
capital wastewater related work. The allocation of a given project’s costs between these
two funds is an accounting function necessary to facilitate capitalization of District
assets. Wastewater projects may also be funded by various Operation, Maintenance,
Construction and Improvement (OMCI) funds, Construction Funds, Special Funds, or the
Improvement Fund.
Stormwater projects may be funded via Fund 1101, the General Fund,
Construction Funds, Special Funds, the Improvement Fund, or from various Operation,
Maintenance, Construction, and Improvement (OMCI) funds. These OMCI funds are
established in certain areas of the District, are supported by property tax collection, and
must be spent only within their specific areas of tax collection.
The sections included in this Budget Supplement document are:
Program Summary – summary of budget, and number and type of projects.
Includes general description of the capital program and budgeting process.
Wastewater Engineering Projects – summary and details on wastewater
engineering consulting services and other vendor services necessary to
implement the wastewater program.
Wastewater Construction Projects – summary and details on wastewater
construction projects and other expenses such as property rights acquisition
necessary to implement the wastewater program.
Wastewater Continued Projects – summary of wastewater projects continued
from previous fiscal years, due to difficulties in easement acquisition, permitting
process or coordination with other agencies, design revisio ns or status, or other
special issues.
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
6 of 6
Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited
into the current fiscal year, if scheduling or budget allow.
Wastewater Program – annual alphabetical listing of wastewater projects by
fund, including the type of service (task) budgeted. Project costs do not include
annual inflation assumptions, which are included in the annual budget.
Stormwater Engineering Projects - summary and details on stormwater
engineering consulting services and other vendor services necessary to
implement the stormwater program.
Stormwater Construction Projects - summary and details on stormwater
construction projects and other expenses such as property rights acquisition
necessary to implement the stormwater program.
Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting
process or coordination with other agencies, design revisions or status, or other
special issues.
Stormwater Contingency Projects - summary and details on stormwater projects
currently budgeted in the next fiscal year, but having the chance to be expedited
into the current fiscal year, if scheduling or budget allow.
Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include location
maps and quantities of work to be performed. These maps and quantities are estimates
only, and final location and extent of work may vary depending on final design and/or
field conditions during construction.
24 April 2012
WASTEWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11684 BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
$220,000 1
11685 BISSEL HILLS SANITARY RELIEF/CALUMENT
I/I REDUCTION (BP-317)
$490,000 2
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 3
11688 BLACK CREEK - HADDINGTON COURT
STORAGE TANK
$625,000 4
11689 BLACK CREEK I/I REDUCTION $1,800,000 5
11718 BRIGHTWELL I/I REDUCTION $375,000 6
11719 BRINWOOD I/I REDUCTION $700,000 7
11790 CAULKS CREEK FORCE MAIN (RIVER VALLEY
RD. TO L-52)
$950,000 8
10376 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH
$1,500,000 9
10377 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH
$1,500,000 10
11722 CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
$1,650,000 11
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
$300,000 12
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$2,745,000 13
10557 COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
$1,300,000 14
10232 COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2008)
$3,200,000 15
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$450,000 16
11825 CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
$300,000 17
24 April 2012
WASTEWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11730 CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
$2,250,000 18
11116 DACEY BRANCH I/I REDUCTION (BP-313)$150,000 19
10021 DC-02 DEER CREEK SANITARY RELIEF $1,750,000 20
11731 DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
$1,250,000 21
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 22
11735 DELCREST SANITARY RELIEF (SKME -565) I/I
REDUCTION
$250,000 23
11736 DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
$875,000 24
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
$875,000 25
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
$198,000 26
11750 FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
$425,000 27
10612 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2012)
$100,000 28
10613 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
$50,000 29
10614 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
$50,000 30
10615 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
$50,000 31
10623 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2011)
$300,000 32
10626 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT A
$50,000 33
10627 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT B
$50,000 34
24 April 2012
WASTEWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10628 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT C
$50,000 35
10629 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT D
$50,000 36
10630 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT E
$50,000 37
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
$90,000 38
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
$90,000 39
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
$90,000 40
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
$110,000 41
10642 HARMONY-ACORN SEWER SEPARATION AND
I/I REDUCTION
$760,000 42
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$2,700,000 43
11712 LACKLAND I/I REDUCTION $600,000 44
11715 LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
$600,000 45
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$600,000 46
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $1,500,000 47
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$11,000,000 48
11652 LYNN HAVEN I/I REDUCTION $200,000 49
11655 MALINE CREEK CSO 051 TREATMENT
FACILITY
$2,400,000 50
11656 MALINE CREEK CSO 052 STORAGE FACILITY $1,000,000 51
24 April 2012
WASTEWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11658 MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
$200,000 52
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
$435,000 53
11662 MCNULTY - PALLARDY I/I REDUCTION $1,000,000 54
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
$525,000 55
11694 NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
$250,000 56
11695 OLDE ENGLISH I/I REMOVAL $500,000 57
11697 PAGE TO TRENTON SANITARY RELIEF $180,000 58
11698 PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
$400,000 59
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
$500,000 60
11094 PROSPECT HILL LANDFILL VERTICAL
EXPANSION
$350,000 61
10743 RADAR RAINFALL DATA (FY2011)$120,000 62
11069 ROCK HILL SANITARY RELIEF (SKME -618)$600,000 63
10748 ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
$440,000 64
11680 ROXBURY I/I REDUCTION $500,000 65
10231 SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2008)
$1,200,000 66
10754 SHERWYN SANITARY RELIEF (SKME -651) & I/I
REDUCTION
$420,000 67
11666 ST MARIE SANITARY RELIEF I/I REDUCTION $258,000 68
24 April 2012
WASTEWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$550,000 69
10768 STREAM FLOW WATER QUALITY SAMPLING
(FY 2011)
$660,000 70
11670 TUCKAWAY SANITARY REHABILITATION $120,000 71
10027 UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
$800,000 72
10230 WATERSHED FACILITY PLANNING PHASE II $4,500,000 73
10230 WATERSHED FACILITY PLANNING PHASE II $500,000 74
11086 WEBSTER ACRES SANITARY SEWER
REPLACEMENT
$320,000 75
11678 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE
IV
$400,000 76
11108 WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
$300,000 77
TOTAL:$65,896,000
CHAMBERS TOELLECOBURG LANDSDARR
BLISS
BELLEFONTAINEK IL G O R E C
A
B
O
TASHBROOKHOYT
SHEPLEYEWELLNECTAR
ROXTON
SEATONAVANT
ELBABAKEWELLADDISON
BURLINGTON NORTHERN SANTA FEA S H F ORD
DELHIATTICA
AKRON
TAPPANL A I R E
LILACESQUIRE
C O M ET
DOROTHYCRETETRIOB A L LARD
MARALDOBOSWORTH
FONTANSON
JEPSONG O L D E N
MCCARTNEYNEWB
O
L
DBELLA
FONDAC O R INTH
SURREYBYFIELDODESSAHAVILANDDRUIDENSLEYREPOSELANCESURF TOPAZCOSIE
NORTHAMPTONSCIENCE HILLNORWICHU
NI
CORN
FA T H O M
ALCOVE
L O CHIELBELGR OVEGLOROSEFARRINGTON
LA ROUXLILAC§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11684
11
TASK NO:
TASK NAME:
$220,000.00
BUDGET:
FUND:
Bellefontaine Neighbors
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 1
BELLEFONTAINE #2 LATERAL SANITARY RELIEF(BP-287)(COBURG LANDS DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITION OF PUBLIC SEWERS (3,750 FEET OF 8 INCH TO 12 INCHSANITARY SEWER AND 2,900 FEET OF 12 INCH TO 24 INCH STORMSEWER) AND REMOVAL OF PRIVATE I/I SOURCES FROM SANITARYSEWERS. REMOVE CONSTRUCTED SSO BP-287
Design Services
6660 - SanitaryReplacement Fund
CHAMBERSBELLEFONTAINE
RIVERVIEWLILACTOELLEST CYR
S H EPLEY
FRY
BLUFF
SCENIC VA
L
LEYCOBURG LAND S
BELGROVE
DARRBLISS
ADRIAN
K IL G O R E CABOT
A SHBROOKC AMERO N
HOYT
EWELLNECTAR
BURLINGTON NORTHERN SANTA FEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON
MEAD
SCRANTO
NELBACOMET
COBURG
CAMBRIAAT T I C A
LEETONGLOUCES TERDURHAMHABECKINGHOBKIRK
BIRITZ
ADLERPRESLEYTRION
E
L
A
N STIMSONM ARALDOBOSWORTH
T AYG O L D E N
F O R K
GRAMPIANHAVILAND
ROSSTWILL
JEFFREYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHTOPAZODESSA
HANSOM
SIEBE
RONT E L
PRESTIGE
COSIE
LANDWEHR
ZELLWEGER DUDLEYSUNBEAM GARDOLILACCASTLESHEPLEY
ST CYRLEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11685
11
TASK NO:
TASK NAME:
$490,000.00
BUDGET:
FUND:
Bellefontaine Neighbors
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 2
BISSEL HILLS SANITARY RELIEF/CALUMENT I/IREDUCTION (BP-317)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATE PUBLIC SEWERS (45,000 FEET OF 8 INCH TO 21 INCHSANITARY SEWER) AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-317
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11144
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 3
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS AND DESIGN SERVICESTHROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMECWATERSHEDS.
Professional Services
1101 - General Fund
CLAYTONLOUWEN H A L I F A X
BE
RKSHIRE SUDBURYMCCUTCHEONR O X B U R G H
HA
D
D
I
N
G
T
ONWHITBURNST LOUIS GA LLERIA
W
ENNEKER
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11688
11
TASK NO:
TASK NAME:
$625,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 4
BLACK CREEK - HADDINGTON COURT STORAGETANK
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
M E T R O L IN K
O LD BONHO
M
M
E
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
F
RANCI
S WARDERCELLASHAFTESBURY
LE PEREJACKSONTOPTONAHERN
GANNON
CENTRALC L AY T O N LINDENP
OLO
H
U
NTERBERICKRIO VISTAYORK
ST A N D REWSGRANADA81STTEASDALEGAY
BRAE
B
U
R
NGRAYBRIDGE NORTH N SOUTHWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
PR IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEYRAISHER
CARSW O L DBON HILLS
GEOFFRYKINGSBURY
DAYTONA
R E A R
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA
ORLANDO
SUDBURYMCKNIGHTPRIVATEVILLA
P
R
I
V
A
T
E
HANLEYGAYB A LSON
P R I V A T E GAY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11689
11
TASK NO:
TASK NAME:
$1,800,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 5
BLACK CREEK I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 62,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
CLARKBOONEPARKER
PADDOCKST JOSEPH
HUMES
NEW FLORISSANTHARRISON
WASHINGTONLAFAYETTEJEFFERSONRUE ST DENIS
ST CATHERINE
ST MARIE ST LOUISCASTELLOAUBUCHONKAYST JEANRUE ST LOUIS
C ARLA
WATERFORD
ST DENISTHUNDERBIRDLILAC
RUE ST FRANCOIS
RYAN
WREN
S T IRRUPQUEENS
FOX RUN
RAVEN
TROTTERPIMLIC
O
GRAHAMMULLANPHY
FLORVALORIOLE
PEPPERHILLHIALEAHJAMAICAFALCON
BROWN
RISSANTMARK TWAIN
ST JACQUESMARQUETTEST MICHAELBEVERLY ARLINGTONSALLY FARNHAMDEBORAHGLENOROPREAKNESSKAEL
REDWOOD
S O R RELLD E R B Y
MYRTLE
NASHUAMARTINST FERDINANDSPRING VALLEYE
L
MDALEPATTERSONLAVIN
K E L LY
CHERRYDALE
ST STEPHENLOUISEMENKEST PIERREWINNERSSALLY
ST FERDINANDBROWNST JEANLINDBERGHLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11718
11
TASK NO:
TASK NAME:
$375,000.00
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 6
BRIGHTWELL I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
LINDSAY
PAULKEEVEN
MULLANPHY SHACKELFORDJ
ENKEE ESTES
FLORDAWN
FLAMINGO
K IN GS FO R D
ASPEN
DOVE
LAYVEN
SUNSET PARK
LOEKES LOVELANDSW ANSWALLOWDEWAYNE
FLICKERCENTRALHUMES
HOWDERSHELLBOULDER
BLU E HERON
PRATTMANORALBERTHARKEEMOSELLERADFORDNAOMIDAVID
TEAKWOOD MANOR
DEL REY
RIVERWOOD TRAILS MERCURYRIVERWOOD ESTATES THRUSHFR A N CISCA
CROFTDALE
P RIVATE NIGHTMOCKINGBIRD
HIGH SUN
DOWNINGRONDABLUFF PARKSGERALDRAYMONDBLUFFBLACK PINEMONTEREYCHARBONIER
GLYNNHAMME S
MILLER
NORINECRANETOREROS U C A SA
ELWOODCLOVERMERE
LINKOUSCARDINALLA VENTASHIRL EYALANDALEJEANETTE
CHARBONIER
NAOMIPRIVATE
ALBERTPRIVATEPRIVATE NIGHTPRIVATEGERAL D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11719
11
TASK NO:
TASK NAME:
$700,000.00
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 7
BRINWOOD I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
CENTRAL MIDLANDRIVER VALLEYHOG HOLLOWW A T E R W O R K SJOHN PELLETPRIVATE
W ATER W ORKSG L E N COVERIDGE CRESTR IDGE T R A I LLAKERIVER B E N D
RIDGEME A D O W
R ID G E C RESTCOLIS EUMOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11790
11
TASK NO:
TASK NAME:
$950,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Caulks Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 8
CAULKS CREEK FORCE MAIN (RIVER VALLEY RD.TO L-52)
EXISTING FORCE MAIN IS UNDERSIZED AND 30 YEARS OLD.
CONSTRUCT 11,500 FEET OF 30-INCH FORCEMAIN.
THIS BUDGET ITEM INCLUDES $150,000 FOR FORCE MAIN DESIGN ATTHE CAULKS 'B' PUMP STATION, PROJECT 11788.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10376
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 9
$1,500,000.00
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - NORTH
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS.
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
Vendor Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10377
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 10
$1,500,000.00
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - SOUTH
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS.
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
Vendor Services
1101 - General Fund
§¨¦170
§¨¦170
LADUEPRICEDIELMAN O LD BONH OMME
DELMAR
MCKNIGHTLE PEREBAR N ES
G L EN EAG L E S
W
E
N
NE
K
E
RBRAEB
U
R
N BERICKCELLARIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDESTACY
BARBYENFIELDHEATHER HILLDRO
M
A
RAPR
IV
A
T
EBON AIREFOR
D
Y
C
EKENTSPOON
AL
A
N
SON
ARBORGANNON
MANSFIELD
BERKLEYLAYKINGS BURYBON HILLS
WASHINGTON
APPLE TREETERRYDELCRESTRYE
SHERATON
BRIAR OAK
RANDELAYVILLA
EDGEW O O D
LADU E HILLSWHITE ROSEWILLOW HILLPRICEWO O DSLINDLEY
BRAZILLIANL A D E L
B R IA R CLIFF
W A T S O N IA
GLENMARYLYNNEBEAUWOODCHERRY HILL
PAXTON
LARKDALEVILLA PLACEPRIVATEP R I V A T E MCKNIGHTMCKNIGHTVILLA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11722
11
TASK NO:
TASK NAME:
$1,650,000.00
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 11
CEDARCREST SANITARY RELIEF (SKME-561) I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 55,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
WYDOWN
BIG BENDCLAYTON
YORK
AUDUBONP A R K RI
DGEMOORBYRON
H ILLVALEGLENRIDGEOXFORD
CROMWELL
PARKDALE
BROADVIEWBOLANDWELLINGTON
OAK KNOLLBUCKINGHAM
HILLSIDECENTERASBURYBRENTMOOR
SOMERSET
RALPHSURREY HILLSBROOKLINECRESTWOOD
OAKLAND
EDWARDC L A VERACHCLAYTONIAPRIVATECONCORDIAHARCOURT
CARRSWOLD
SOUTHMOOR
T U S CANYCOMMODOREFOREST RIDGE
HI
LLVALE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11115
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 12
CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION
EXCESSIVE I/I IN THE SANITARY SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 6000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. ALSO SEPARATE 500 FEET OFCOMBINED SEWER
Design Services
6660 - SanitaryReplacement Fund
BYASSEE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
11
TASK NO:
TASK NAME:
$2,745,000.00
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 13
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
THE DESIGN OF SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL PROJECT SANITARY RELIEFPROJECT.
Design Services
6660 - SanitaryReplacement Fund
VAILESI
N
KS
OLD HA
L
L
S
F
E
RRY
N
E
W
H
A
L
L
S
F
E
R
R
Y94TH M
O
ND
O
U
B
L
E
A
U PRIVATEAQUEDUCT95THAV ON
WATERFORD
90TH
MONSOLS
VIE MBRATROTTERS A N T I A G O
W E D G W OOD
C
HURCHILL
WELLI
NGTONHIRONDELLETHUNDERBI
RDLISAAB
ERDEEN
D E L LAGORUE DE RENARDFAIRW A Y
LOGIS
9 1STINVICTADAVEYE S T ATE SARBRE
HUMES ROB B I N S MILL
TREMONT SUNLANDB
R
UNS
WI
CKANGEPYRENEESS ORRELLSEVILLE
STIR RUP
FOX RUN
A V D E PARISJ
OS
T
MAI
NG
R
A
V
E
LL
E
S
USSEXRETFORD
GREENWAY CHASE
S OM E RSETJOST ESTATESM O H A N
D E E PROUVRE
RIVER OAKS
DIE
C
K
M
A
N
N
DEER VALLEYVALENCIAE S P A C E
C H E L S E A
B AVILLELAVIN
P R IV AT EPRIVATE
PRIVA TEP R I VAT E
LINDBERGHLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10557
11
TASK NO:
TASK NAME:
$1,300,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 14
COLDWATER SANITARY TRUNK SEWER SECTION AREHABILITATION (SKME -240)
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWER.
REHABILITATION OF SECTION A, TO REDUCE INFILTRATION IN THECOLDWATER TRUNK SEWER BETWEEN NEW HALLS FERRY ROADAND THE COLDWATER TREATMENT PLANT. BYPASSES TO BEREMOVED.
Design Services
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦70
§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10232
16
TASK NO:
TASK NAME:
$3,200,000.00
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 15
COMBINED SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008)
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY AND COMBINED SEWER SYSTEM CAUSES BUILDINGBACKUPS AND OVERCHARGING OF THE SYSTEM
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS CONSTRUCTION OR REHABILITATION PROJECTS.
THIS BUDGET INCLUDES $500,000 FOR INSPECTIONS OF CRITICALSEWER INFRASTRUCTURE IN THE CITY OF ST. LOUIS
Professional Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11152
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 16
$450,000.00
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR TUNNELCONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS.
Professional Services
6660 - SanitaryReplacement Fund
MARI
NE
C E N TR A L M ID LA N D
C I T Y O F M A R Y LA ND HEIGHTSCREVE COEUR MI
L
L PRIVATE
SPORT P
O
RT RUL
EH O O K S R IV E R PRI
VAT
E
P R IV A T E PRI
VAT
EPRI
VAT
ECITY OF MARYLAND HEIGHTSP
RI
VAT
E§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11825
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 17
CREVE COEUR CREEK (L-52) FORCE MAINIMPROVEMENTS PHASE II
GROWTH AND WET WEATHER INFILTRATION REQUIRES NEW FORCEMAIN.
CONSTRUCTION OF 3,500 FEET OF 42-INCH FORCE MAIN ANDAPPURTENANCES.
Design Services
6660 - SanitaryReplacement Fund
§¨¦70
§¨¦70
LILLIANLUCAS N HUNTHILLSCOLLEGEMCLARANCALVIN
SUNBURYRAVI N IA
NELSONJEN
W
OOD
FLETCHERBERMUDAALBIABEULAHROLANDAPRIC OTSAN DIEG
O
FLORIANCOUNTR
Y
C
L
UB
HATZSAPPHIREOVERBROOK
DAWSON
ROXIEHOLBORNTHEODORE
GROVELAND
CHANDLER
STANWOOD
ROHN
HARNEY
F
L
O
R
I
S
S
A
N
T
WINCHESTER
S
H
ARO
N
FOREST HILL
B
E
L
W
O
O
D
BEGGWILLOW WOODNORWAY GARESCHE
SEATTLEFARLEY
EL LI N GTO N
HUNTINGTON
S U NSET
EMMA
PINE RIDGE
BURRWOOD
BRISTOL CURRYUPSHAWONEILLWOODSTEAD
OAKRIDGEBLUE SPRUCE
N A D IN E
WOODDALE
FLETCHER§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11730
11
TASK NO:
TASK NAME:
$2,250,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 18
CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNELAND 1,300 FEET OF 8 - 30-INCH SANITARY AND STORM SEWER.ELIMINATE CONSTRUCTED CSO OUTFALL BP-059.
Design Services
6660 - SanitaryReplacement Fund
TRASKKEELEN
HUDSON
ELKIN
S
HALLS FERRYIMPERIALVORHOFATMORE
NASHUA
JETTCAPI
TOLCROWN POINT
L
A
NDSEERLINNELLREBACHAMPLIN
MAYFAIRDOWD
PRIOR
WINKLERFOLEY
CLAIRMONTGREEN VALLEYTANNERMURATCHESLEY OLNEYDELLRIDGETATEALLIANCEVENTURACARGILL
JANSONHALLWOODST IVES
N
E
W H
ALLS FE
R
RY
ITTNERQUAKERPANNELLGADBURY
BON OAKOL D MANO R
VARNUMDEEMBEECHER
CLOVERDALEGREE N S L O P E LANGFORDMA LDON
AINSWORTH
EMERY
D
A
CEYCROWLEY
MOWBRYSAFFRON OLD HALLS FERRYHALLSTEADC
A
N
FIE
L
D
H A R NE YW O LD
EM PIR E
DO
ANEO R B ITTIBISKIPPOTTKAMPCAPITOL
H
I
L
L
MINNE FORDPEARSONF O S S
CAVALIERSIBLEYQUAKERBEECHER
H U D S O N
BON OAKCARGILL
H U D S O N
BON OAK§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11116
11
TASK NO:
TASK NAME:
$150,000.00
BUDGET:
FUND:
Dellwood
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 19
DACEY BRANCH I/I REDUCTION (BP-313)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATE PUBLIC SEWERS (16,500 FEET OF 8" TO 12" SANITARYSEWER AND 2,600 FEET OF 12" TO 21" STORM SEWER). REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS AND REMOVECONSTRUCTED SSO BP-313.
Design Services
6660 - SanitaryReplacement Fund
§¨¦40CLAYTON
WARSONT R EN TSOUTH FORTY
DANIELLITZSINGER KENTROANOVERHILL
S PRICECELLAD EN N Y BARNESMAGNOLIAS
PRINGWOOD
MIDPARKWIN D IN G RID G E
INDIANLOG CABINOVERBROOKHIGHDOWNT W IN S P RINGSR
OLLING ROCKMAYFAIRWARRIDGE
PRIVATETHORNWOOD RAUSCHER
DUNLEIT
HOAK BENDLEAGRAMW O OD ACRELADUE R I D G EWINDING BROOKP I C AR
D
Y
D E E R CREEK
W O O D C R E S TLEELALYLEWOODPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10021
11
TASK NO:
TASK NAME:
$1,750,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 20
DC-02 DEER CREEK SANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 2.4 MILES (12,500 FEET) OF 48-INCH TO 72-INCHDIAMETER SANITARY SEWER, FROM LITZSINGER AND OVERBROOKNORTHWEST TO WARSON ROAD.
Design Services
6660 - SanitaryReplacement Fund
MCKNIGHTOLD WARSON
LITZSINGER
PARK
PRIV A T E
MCKINLEYODAYROCKMANROCK HILLOVERBROOK
KORTWRIGHTWARSONCHARLANEOAK LEAFGRAYSTONE
CHARLEVILLELITZSIN GER WOODSSHERRELL
PRIVATE
ROCK HILL§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11731
11
TASK NO:
TASK NAME:
$1,250,000.00
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 21
DC-02 DEER CREEK SANITARY RELIEF STORAGETANK
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOs.
CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦170
OLIVE BLVD
W A T SO N RDS LINDBERGH BLVDS KIRKWOOD RDM A N C H E S T E R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11110
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 22
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO'S.
DESIGN NECESSARY SYSTEM IMPROVEMENTS IN THE DEER CREEKWATERSHED.
Professional Services
1101 - General Fund
§¨¦170
§¨¦170
DELMAR
GANNON
GROBY
MCKNIGHT81STOLD BONHOMME
LE PERELAFON
BALSON
STANFORDBERICK
TEASDALEGAYCENTERAMHERST
BARBY
P R IV A T ETULANE
FORS
Y
T
H
SPOON
A
LA
N
S
O
N
CANTERBURYLITTLE
O
A
KBR
O
O
K
CRANDONC O R NELL GLENSI
DEWASHINGTON DE
LCREST BLACKBERRYKI
NGDELMULBERRYSWARTHMOREPRICEWO ODSM
A
PL
E
VIE
W SAXONYLOR E NZO
VILLA
BENLOUW A T S O N IA
WILNERB
R
O
OKSHIRE UNI
VERSITY
LOREN WOODS
B I R N AWOODSROWLAND
AVESDALEGREENSHIREGAYM
C
K
NI
GHT
GAYMCKNIGHTCORNELL
P
R
IV
A
T
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11735
11
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
University City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 23
DELCREST SANITARY RELIEF (SKME -565) I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦270
DUNN
ST ANTHONY
ST CATHERINE
WATERFORDW
A
S
HIN
G
T
O
N
PERSHALLALLENKINGSLEYCAPRIST LOUIS
JEAN ST EDWARDBARTO ST EUGENERIDGED E R HAKE
CARMONACHEYENNETANEY
ROGERS
N
E
W
F
L
O
R
IS
S
A
N
T LARRYP RIVA T E COTEAUDURWOOD
GRANDVIEWPUEBLOBROOK
WOODENGRENOBLE BON AIRELYNN MEADOWSWILSHIREDAUPHIN
ST M
A
R
KCOUNTRYS I D E
ST FRANCO IS
NE
WGA TELILA
DUCHE SNER O B I N WOODA
CRE DALE SADDLEDUQUETTEH O L I D A Y HILLCLEARVIEWWYCOMBS T L U K E
E
LIZ
A
B
E
T
H
PEBBLE
SHAWNEEPADDOCKOZME NT PADDLEWHEELBIRCHLAWNST DA N IE L
O R C HARDBROADMEREST GREGORYCLEMENSHOLLY
BRIGHTMOORELDER
ST STEPHEN
S T J A M E SVALERIE
PRIVAT E
DERHAKE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11736
11
TASK NO:
TASK NAME:
$875,000.00
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 24
DERHAKE I/I REDUCTION & CAPRI TOS.WATERFORD SANITARY RELIEF
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
A D I E
PAGE BALLS
C
H
U
E
T
Z
LA C K LA N D
A R C
PAGE SERVICEPRIVATEWESTLINE I N D U S T R I A LCENTERLINE INDUSTRIALC
E
N
T
R
A
L MID
L
A
N
DVERN
AL
A
KESIDE CR O S S IN GNORFOLK SOUTHERNHAMME
RADMI
NISTRAT IO N
WESTPORT CENTERPAGE
A D M IN IS TRATION
PRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10601
11
TASK NO:
TASK NAME:
$875,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 25
FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,940 FEET OF 27 INCH TO 36 INCH DIAMETER SANITARYRELIEF SEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVENORTHWEST TO ADIE ROAD. CONSTRUCTED SSO TO BE REMOVED.
Design Services
6660 - SanitaryReplacement Fund
KEEVENPAUL LINDSAYCHARBONIERFLORDAWN
HOLIDAYHOWDERSHELL TAHOECOACHWAY
YAQUI
LYNN HAVEN
TESON
LOEKES
COACH LIGHT
KOSTKA
LAYVEN
FLORLAND
CANISIUSL
A
MP
LIGHT
ESTES
MANRESA
QUEEN ANNLILA
ST CHARLESCAMPIONPRATTBELLARMINE
FLOR AHAZELVALLEY
BROWERMANORJENKEEALBERTRADFORDPALMTRINITY
AVION NAOMICANDLE LIGHT
IMPERIALALMA
RUTH
TAMMA ROS E TTANAPLESOLIANRIVERWOOD TRAILSCAL
L
E VISTA MERCURYBORGIA
GONZAGA
CROFTDALE
CARRI
A
GEFLAMINGO
ELM GROVE
RIDERWOOD TANNOIAASP ENFOXT R AIL
BARWICK DOWNINGRONDAHAVENTREE GERAL DRAYMOND MONTEREY
GERARD PARK
ACORN TRAIL MERRIA V ANT
THOMPSON
LA CUESTA
BLANCHETTEPRIVATEBELLFLO
WER HAMM E S
LANDIHOLLY RIVERBRUCE
FOXFIELDGEORGETOWNMESCA
L
E
R
O
CAIONELA VENTAFLOWERIDGEINDUSTRIAL
SLUSSERALANDALE
SIR LORDSJEANETTE
SEMINARYSCOTTYPRATTNAOMIALBERTLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11749
11
TASK NO:
TASK NAME:
$198,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 26
FLORLAND SANITARY RELIEF PHASE I - I/IREDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
ZINZERGRANT
GRANTVIEWGRANTWOOD
P
RI
V
AT
E LACLEDE STATIONMCNARY
BRIARVIEW
FORESTATE
WHITEH AVENVI
CKSBURGGRAVOIS VIEWP RIVATEPRIVA
T
E
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11750
11
TASK NO:
TASK NAME:
$425,000.00
BUDGET:
FUND:
Grantwood Village
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 27
FORESTATE AND TEXAS SANITARY RELIEF(SKME-513)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO.
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER.REHABILITATE 12,500 FEET OF 8-INCH TO 24-INCH SANITARY ANDSTORM SEWERS. I/I CONTROL MEASURES FOR VARIOUS PRIVATEAND PUBLIC SOURCES. ELIMINATION OF CONSTRUCTED SSO.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10612
14
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 28
$100,000.00
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (FY2012)
CAPITAL PROJECT CONSTRUCTION MANAGMENTAND PROJECT ANDPRIVATE DEVELOPEMENT INSPECTION NEEDS EXCEEDS INTERNALSTAFF CAPACITY.
RETAIN CONSTRUCTION MANAGEMENT FIRM. SERVICES WILL BE FORFY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10613
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 29
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT A
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10614
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 30
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT B
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10615
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 31
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT C
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10623
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 32
$300,000.00
GENERAL SERVICES AGREEMENT - SEWER &PROCESS DESIGN (FY2011)
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN.SERVICES WILL BE FOR FY 2011 TO FY 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10626
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 33
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT A
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10627
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 34
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT B
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10628
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 35
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT C
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10629
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 36
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT D
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10630
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 37
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT E
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11779
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 38
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A
SEWER DESIGN NEEDS EXCEED CAPACITY OF EXISTINGRESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 2013, 2014, & 2015.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11780
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 39
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B
DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11781
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 40
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C
DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
KIRKHAM
GRAYDICKSONSWONGOREOLD WARSON
LOCKWOOD
LEE
ELMESSEX UNION PACIF IC
JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK
BROWNELL
QUAN
FOOTE
EDWINEUCLID
JEFFERSONLITHIABENNETT
BACON
GILL
PAR
HUDSON
ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON
AUSTINM E D I N A MCKINLEYPARKLANDADAMS
MADISON
IOLANORTH
BIG BENDLONGVIE
W ROCK HILLMARK
RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPA C I F I C
DWYER
WILD DEE R
BOGEY
D E S PERESH I L L A R D ROCKMANCOPP E R H I LL
JOANNARIDG E LINED
E
VONBREMERTONCHELSEA
P RIV A T E
HIGH HAMPT O NMANI
TOUJULIAN
VICTORIA
WARWICK
WATE RBURYMOODYLEONARD
OAKSFOX
BARRONFREDERICKGLENMOOR
HULLF
AI
RDAL
E
PARKWOODSMCDONALDHARTGREENVIEWCOL L
E
G
E
ALGONQUIN
CEDAR
B E R R Y
HI
LLSI
DEWOODLAWNBELLEVIEW
BEAUFORD
HOCHBERRY WOOD
RARITAN
GASLITE
ALF RED
NOLAN
FUHRMANN
RUSSELLSTURGISELM
LOCKWOODELM BERRYCHELSEA
ALGONQUIN ROCK HILLPAR IOLACEDAR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11122
11
TASK NO:
TASK NAME:
$110,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 41
GLENDALE SECTION D SANITARY RELIEF PHASEIV (SKME-624) I/I REDUCTION
EXCESSIVE I/I IN SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING80,000 FEET OF PIPE SEWERS AND MANHOLES.
CONSTRUCTION OF THIS PROJECT RECEIVES PARTIAL FUNDING /SUPPLEMENTAL APPROPRIATION IN FY 14. TOTAL CONSTRUCTIONBUDGET IS $9,600,000.
Design Services
6660 - SanitaryReplacement Fund
LANGLEY
PHILOWALDO
A L L E YPILOT
V IR G ILKATHLEENHARMONY LACEYROSEMARYACORNLAKE
W
O
OD
V I R G I LPILOT
PHILOPILOTKATHLEENR O S E M A R Y
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10642
11
TASK NO:
TASK NAME:
$760,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Seminary Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 42
HARMONY-ACORN SEWER SEPARATION AND I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS INISOLATED AREA OF COMBINED SEWERS.
CONSTRUCT 3,100 FEET OF 12-42 INCH STORM SEWER, 2,700 FEETOF 8-12 INCH SANITARY SEWER, DISCONNECT PRIVATE I/I SOURCES,AND REHABILITATE 8,800 FEET OF PUBLIC SEWERS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦255
§¨¦55
§¨¦255
UNION PACIFICRIVERKOCHKINSWOOD GREGGUNIONBROADWAYCCCKINGSTONRE
A
VIS B
A
RRACKSGRANTLIND TELFORD
FORDER
ARLEE
SHERMANGENTR YFAIN PRIV ATEJOPLINCLIFFSHER ID A NHOFF
M
EIS
T
E
RWACHTELRIPA
LUNAG A R KLARK
CLAGERRAINBOW
W EMBLEYRO SYAQUA RIDGE BOUNDARYJEFFERSONIAN
FIRSTPECANSOUTHSHIRELAURABUCKLEYDACE
SIGSBEE
J
E
FFERSON
ELLEN
BANISTERDUMONT
LISIE
U
X
CLEVES
M ERRITTTACOMAKASKE
BUNKERBIRCHP
R
IVATETELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11711
11
TASK NO:
TASK NAME:
$2,700,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 43
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
EXISTING SYSYEM IS NOT ADEQUATE FOR CURRENT CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, TOELIMINATE BOTH THE MARTIGNEY AND JB PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PRE-DESIGN BUDGET IS $4,500,000.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦170
§¨¦170BROWNMIDLAND
LACKLAND WOODSONNORTH
SIMSWALTONMCKIBBONARGYLEDIXOLDENREXBALTIMORE
BURTON
TRESCOTT EMINENCEHOODCOLESWINDOM HUMEBOSWELLTUDOR
MILTONGORDONGASSTENNYSON
BURNSGOODALEH O L T W O ODCHAUCER ST LOUISROY
FORESTPASTEURAIRWAY
WISMERGILROSERIDGEWAYORLANDOBENSON
GAEBLERWENGLERARLINE
SENECA
ANN
EVERMAN GRACELAND HILLEMANMARVINMARLOWE STELLAQUIETCALVERTMCNULTY
ADDIEBRISTOL
ARDELIA
MORAN
WALLISDAWESVERONAEDMUNDSONENGLER
EZRA
SPENCERHAGNER
ASHLANDSUNCRESTROYALTONDAVID
SHERWOODOAKLANDMAVIS
SHELLEY CHARLACKMARSHALLDENNISON
BELHAV ENGOTHLANDE A STRIDGEJOELCROCUS
HUNTINGTONAPACHE
BURDELLA
MECCA
ONEIDA
LATROBE
SHAWNEE
DOYLE PATRICEBRECKENRIDGE
NORTH
WALLISDAVID
WISMERMILTONMILTONMIDLAND
BRISTOLTENNYSON
CALVERTREXAIRWAYCHARLACKMILTON ROYSIMSDIXMARVINTENNYSONCALVERTWISMERDAWESHOODMARSHALLST CHARLES ROCK RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11712
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 44
LACKLAND I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
K A P P E L
L A N GKIRKGAGEDELLWOOD VICKIERANDROYCEDENNISWARDLORNAWEST FLORISSANTF A R G O
VENICEPERCHFORESTWOODF I R
NEWTONCANFIEL D
CLARIONNESBITELLISONNEMNICHSCHLUETERFERGUSON NORTHWINDS ESTATESHIGHMONT
RENSHAW
EDGEHIL
L INAGUACADDIEFIELDFLORWOODNORLA KESH I G H M O N T §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11715
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Ferguson
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 45
LANG ROYCE LATERAL SANITARY RELIEF(SKME-320)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH SANITARY SEWER,REHABILITATE PUBLIC SEWERS, AND REMOVE PRIVATE I/I SOURCESFROM SANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-291.
Design Services
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦44
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦270 §¨¦70
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11145
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 46
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
SYSTEM DEFICIENCIES NEEDING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS, AND DESIGN SERVICESIN THE LEMAY WATERSHED.
Professional Services
1101 - General Fund
P
RIV
A
T
E
UNION PACIFICUNION PACIFICPRIVATEUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFIC§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
11
TASK NO:
TASK NAME:
$1,500,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 47
LEMAY WWTP SECONDARY IMPROVEMENTS
REQUIRED TO INCREASE SECONDARY CAPACITY TO 210MGD
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
Design Services
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦40
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11109
16
TASK NO:
TASK NAME:
$11,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 48
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
COMBINED SEWAGE OVERFLOWS INTO THE LOWER AND MIDDLERIVER DES PERES THAT POTENTIALLY IMPACT WATER QUALITY.
CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL,CONSOLIDATION SEWERS, AND DEWATERING PUMP STATION. THISPROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELDINVESTIGATIONS AND PRELIMINARY STUDIES.
PROJECT WILL INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
Professional Services
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦170
§¨¦270
§¨¦170
DUNN
KEEVEN
HOWDERSHELLUTZ
PERSHALL
HOLIDAY
TAHOE
C
O
A
C
H
W
AY
YAQUI PAULLYNN HAVEN
FLORDAWN
FORD
TESON
CHARBONIER
LOEKES
PRIVATE
COACH LIGHT
KOSTKA
LAYVEN
FLO
RLAND
TAYLOR
LA
MPLI
G
HT
LINDSAY
ELM GROVEIMPERIALWOODCREST
MANRESA
QUEEN ANN
UNDERCLIFF
B R O W N
FEE FEE HILLS
ST CINCAMPIONPRATTOLIVETO
BELLARMINE
SUNSETRIVERW O OD TRAILS
ALMARADFORDCHULA
PALM
AVION
BARWICK
CANDLE LIGHT
J
A
M
ES S MCDONNELL
TAMMA ROSETTAMARY JOBEAM LOY OLACALLE VISTA
B E LLFLOWER
B
R
OOKESAIRSHIRE
A V ANT
THOMPSON
LA CUESTA
LANDIFEE FEEALBERTFOX CR ESTL E H N EBRUCE
CAPOSELLE
HEATHER
G
R
O
T
T
O
ROBINWINGJANRIASERENITY
P
RIVATE
TESON
RIVERWOOD TRAILS
DUNN
UTZ
P
R
IVATE
PR IV A T E
PRIV A T EPRIVATEP R I V ATEN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11652
11
TASK NO:
TASK NAME:
$200,000.00
BUDGET:
FUND:
Hazelwood
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 49
LYNN HAVEN I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
R IV E R V IE W HALLFONTAINE
CHAIN OF ROCKS
RAFORDBEL
LEFONTAINEBROADWAYRIVER RUN
RIVER TRAIL
M A K A LU
LOWELLR IV E R V IE W
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11655
11
TASK NO:
TASK NAME:
$2,400,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 50
MALINE CREEK CSO 051 TREATMENT FACILITY
CONTROL OF COMBINED SEWER OVERFLOWS.
CONSTRUCT CSO TREATMENT FACILITY. PROJECT POTENTIALLY TOINCLUDE STORAGE.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL DESIGN BUDGET IS $4,000,000.
Design Services
6660 - SanitaryReplacement Fund
RIVERVIEWHALLLEBON
MARIAS
N
E
L
A
N
BURLINGTON NORTHERN SANTA FEFONTAINE
CHAIN OF ROCKS
P R IV ATETEURVILLELARAMIE
R IVER RUN
RIVER TRAIL BURLINGTON NORTHERN SANTA FERIVERVIEW§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11656
11
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 51
MALINE CREEK CSO 052 STORAGE FACILITY
CONTROL OF COMBINED SEWER OVERFLOWS
CONSTRUCT 1 MG STORAGE FACILITY.
Design Services
6660 - SanitaryReplacement Fund
CHAMBERS
BELLEFONTAINEK IL G O R E
C
A
BOTCOLONYDELHICASTLEMEAD ELBAC O M E T
CAMBRIABURLINGTON NORTHERN SANTA FEA S H FORDTAPPAN
DURHAML A I R E
BIRITZ
SUR
REYDWIGHTCRETE
BALLARD
COBUR G LA NDSMARALDOBOSWORTH
DUL
UTHG O L D E N
FOREST HOME JEPSONTWILL
C O R IN TH
BERWYN FONDANORBRIDGEADMIRAL ODE S SA
HANSOM
ENSLEY
PRESTIGE LANCENORTHAMPTONFA T H O M
NORWICHLANDWEHR
DANVILLE
ZELLWEGER
U
N
ICORN TRIOSUNBEAM
G R E E N ACRES
K
ELVIN
L O CHIELMOLINE FARRINGTONLA ROUXCASTLELEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11658
11
TASK NO:
TASK NAME:
$200,000.00
BUDGET:
FUND:
Bellefontaine Neighbors
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 52
MALINE I/I REDUCTION & SEWERREHABILITATION (BP-289)(COLONY DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITE PUBLIC SEWERS (9,500 FEET OF 8 INCH TO 10 INCHSANITARY SEWER AND 1,500 FEET OF 12 INCH TO 24 INCH STORMSEWER), REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS,AND REMOVE CONSTRUCTED SSO BP-289.
Design Services
6660 - SanitaryReplacement Fund
HILLSMETRO LINKEASTROLANDAUGUSTAWACO BERMUDAFLORISSANT
R OS E D A L E
LUCASMARI
ETTACOUNTRY CLU
B RAVINIAST ANNSPASADENACIRCLE
S U N S E T
WAR W I C K
HUN T I NGTON
M A R IL A C
FO R E S T V I E W
WINCHESTER
ST MARYSOXEYE S P R I N G D A L E
FROWCARDWELLOAKMOUNTCANTERBU R Y
ARCOLASAN D IE GOTOWER GROVEBELLER IV E
PARKDALEMARK TWAIN
METRO LINKEASTF
L
O
R
I
S
S
A
N
TOAKMOUNTNATURAL BRIDGE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11659
11
TASK NO:
TASK NAME:
$435,000.00
BUDGET:
FUND:
Normandy
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 53
MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 700 FEET OF 12"-30" STORM SEWER, REHABILITATEPUBLIC SEWERS AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-292.
Design Services
6660 - SanitaryReplacement Fund
NORTH
BOBB
HAROLD
KATHLYN
EMINENCEWOODSONCALVERTBROWNGORDONBOSWELLST LOUISROY GEDDE
MARVINBATAAN
GUTHRIE
MCNULTY
TUTWILER
PATRICK
MARSHALLCORREGIDOR
PALLARDY
CHARLACKROSEMORE
LEENORA
PATRICELINDSCOTTJANET HERBERTMARYKNOLLJONELLFRANNLYNNHAROLD
MARVINMCNULTY
TUTWILER
KATHLYN
GORDONLEENORA GORDONMARSHALLROYBATA AN
BROWNPALLA RDY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11662
11
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 54
MCNULTY - PALLARDY I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
ASHBYM ID LA N D
LACKLAND
PAGE WOODSONSIMSBALTIMORE
FLORA
RIDGE
ECHO BURNSDRIVER
NIBLIC POEMIRIAM
TRESCOTT
HOODDIXKREMDYERGOODALECANTER CHAUCERBROWNGASSTENNYSON
THEODOSIA
H O L T W O OD
O A K REXZYKAN PASTEURM A D D O X GAEBLERWISMERHOBDAY
UCEYLEWENGLERLIBERTY
FARVIEW
CARLYLE
DECKERTHORPE
EASTBROOK
EVERMAN
KORANDOM I L TON
BRYANTMARLOWE STELLAQUIETSENECAWABADAY
OCONNELLWURDACK
ADDIEMARVINWALLISCOLESDAWESVERONAIVELANDLAKE ARGYLEOHARECLARENDON
SPENCERBOYLS TON ST JOACHIMFOWLERCOTE BRILLIANTEPEBBLE BEAC H CALVERTPROUHETAIRWAYMORVENGOCKELULLABY
P IN EHURSTSCOTLAND ANGELOHIGHLANDTUDOR
B ACHWESTWISE
OSGOODRHYTH M
BRISTOL
C I N N A M O N
HUNTINGTONL O C U S T SHERMANB RUNORONALDLATROBE
GILWOODBRISTONDENNISON
BRECKENRIDGE
SIMSSIMSAIRWAYTHORPE
MIDLAND
SPENCERCOLESDAWESWALLISWISMERMILTONHUNTINGTONHOODM I R I A M MILTONCHAUCERREXBURNSMILTONCALVERTPOE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11663
11
TASK NO:
TASK NAME:
$525,000.00
BUDGET:
FUND:
Overland
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 55
MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS AND REDUCTION OF PRIVATE SOURCESTO REMOVE EXCESSIVE INFLOW AND INFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
PASADENA
F
L
O
R
I
S
S
A
N
T
LUCAS N HUNTR
O
L
AND
OREONHU N T I N GTON
WINCHESTER
BRISTOLHILLSA
U
GUSTA
ST MARYSWARW I C K
CANTERBURYARCOLATOWER GROVENORMANDY BRETONCOUNT
R
Y
C
L
UBCRESTLA N DROLANDBRISTOLRO
LAND
CANTERBURY
NATURAL BRIDGE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11694
11
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
Pasadena Hills
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 56
NORTH BADEN CREEK I/I REDUCTION(BP-612)(CANTERBURY DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, REHABILITATEPUBLIC SEWERS (2,000 FEET OF 8 INCH SANITARY SEWER), ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. REMOVECONSTRUCTED SSO BP-612
Design Services
6660 - SanitaryReplacement Fund
MACKENZIEWEBERVALCOUR
DANAELTONSETH
FLETAMATHILDAI
VYSTAELY
NEW HAMPSHIREGR A MONDSEIBERT
KITRADIORIVE
R DES P
E
RES
HEEGE
MOHEGANLUCIAALICETONVASELFORMANVITA
FABER
GENESTA3RD
ACORNJ
A
MIESON
ALT
HEACOLLEENPILOTBONNIE
HALEBRENDA HILDA
NAGEL
MAXWELLMAYLORELSA
EDENELGINLANGLEY
DELMA SAVIO
WALDO
NEIERNAVAJOELODE
ASTERKIDDERSOUTHERN
PHILODARLOWCRAIGHILL
T ALBO TLAWNSIDE
CHESHIRE JOELBE R W I CK
A L L E YHARLAN TIEMANN
WEBER TRAILDEERWOOD
ARVIN IVANHOED
A
RL
E
NE
HU RSTGREENC
R
OY
DONCHIVVISMENOLAWAYNEP A V IA HARMONYPINTOALPINE WOLZWILMA
D E M A R A
RANCHWOOD
OAKDALEFELICIARABETHC AYUGACONSULTOBEY CANDACE TOMOREVA
SELJOEL FLETAWEBERBRENDAHARLANHEEGE
LANGLEY
PILOTHEEGEHARLANWATSON RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11695
11
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 57
OLDE ENGLISH I/I REMOVAL
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE INFLOW AND INFILTRATION FROM PUBLIC ANDPRIVATE SOURCES BY SEWER REHABILITATION AND OTHERIMPROVEMENTS.
Design Services
6660 - SanitaryReplacement Fund
PAGE ASHBYWARSONLACKLAND
DRIVER
NIBLIC
UNION PACIFIC WISMERBAUR
FLORA
DIELMANMEEKS
MESA DYERLA JOLLA
OAK
ECHO
RIDGEENTITYMADDOX
CANTER
TRESCOTT
HURON
ZYKANLIBERTY
MIRIAMUCEYLE
G R A NDVIEWRESEARCHTRENTON SIMSEASTBROOK
KORANDOBRYANTFAIRVIEWOCONNELLNORTHFIELDCR O C K ETT WALLISLOTSIEDAWESIVELANDLAKE THEODOSIA
SCOTLAND
SPENCERMORVENLULLA B YHIGHLANDLACKLINK
CENTRAL MIDLAND
MIDWEST INDU STRIAL
B ACHBOOTH
PAGE INDUSTRIALRHYTHM
K AHLMEYER
RIT TERRIDDLE
CEDAR GLENHUNTINGTONLOCUST
DIELMAN ROCK ISLAND INDUSTRIAL
MOHAVEWIBRACHTKINARKWERREMEYERCHAUCER
ZIMMERMANHENNEPINL O C U S T
CANTER
WALLISTRENTON SPENCEROAK
SIMSO A K DAWES§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11697
11
TASK NO:
TASK NAME:
$180,000.00
BUDGET:
FUND:
Overland
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 58
PAGE TO TRENTON SANITARY RELIEF
OVERCHARGED SANITARY SEWER AND CONSTRUCTED SSO
CONSTRUCT 36-INCH AND 48-INCH DIAMETER LINEAR STORAGETANKS. REMOVE ONE CONSTRUCTED SANITARY SEWER OVERFLOW.
Design Services
6660 - SanitaryReplacement Fund
LAVINIAVARGAS
DANDRIDGEFARADAYBAPTIST CHURCHSHEA
MUSI
CKPICKWICKGAIL
OASIS
MALLORY
WILLINDAMUGANCATHY
EDGECLIFFE
CORAL RIDGE
KINGSMERE
THREE COURT
BIMINIFITETHAYER
LAVIER
CORNING
LAWNBROOK
BERNADINE
C O N C ORD CIRCLEEDGEMOOR
PALMYRAMARTINIQUE
WALCHSHAUSER
M U S IC K M A N O R
LAVINIA§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11698
11
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 59
PICKWICK-BERNADINE-BIMINI SANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOs.
CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH SANITARY SEWERS.REHABILITATE 40,000 FEET OF 8-INCH TO 27-INCH SANITARY ANDSTORM SEWERS. VARIOUS I/I REDUCTION MEASURES FOR PUBLICAND PRIVATE SOURCES.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11699
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 60
$500,000.00
PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013
PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS.
PUBLIC ENGAGEMENT PROGRAM REGARDING REMOVAL OF PRIVATESTORMWATER SOURCES, CONSENT DECREE & OTHER WETWEATHER COMMUNICATIONS.
Professional Services
1101 - General Fund
LILACBLUFF
SCENIC
ADRIAN
RIVERVIEWBURLINGTON NORTHERN SANTA FEV
A
L
L
E
YDIAMOND
SCRANTON
LEETON
C
A
L
UMETKELVIN FORKGLOUCESTERST C YRMID R ID G E
PRIVATERIVERMONTLOOKOUT
WESTHADDOCK
MARSHFIELD
P RIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11094
11
TASK NO:
TASK NAME:
$350,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
MISSISSIPPI RIVER (CITY)
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 61
PROSPECT HILL LANDFILL VERTICAL EXPANSION
LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE.
VERTICALLY EXPAND EXISTING DISPOSAL SITE.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10743
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 62
$120,000.00
RADAR RAINFALL DATA (FY2011)
ACTUAL FLOWS FROM INFLOW AND INFILTRATION DUE TO RAINEVENTS IS NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEMMODELS.
INTERGRATION OF EXISTING RAIN GAUGE NETWORK WITH RADARIMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING ANDINFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS.
Vendor Services
1101 - General Fund
BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSINGER
FOOTEWARSON
SWONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GORE
M E D I N A MCKINLEYIOLANORTH
MAPLE
D E N N Y
ROCK HILLMARK
RENDERERKORTWRIGHTWILSON
OVERBROOK
F L A N DER S
CURRANSQUIRES
DWYER
WILD DEE R
BOGEY
H I L L A R D ROCKMANPAR KCOPP E R H I LL
ELMJOANNARIDG E LINECHELSEA
P RIV A T E
LITHIA
EUCLID
JEFFERSONHIGH HAMPT O NMANI
TOUJULIAN P A C I F I C
VICTORIA
WARWICK
WATE RBURYLEONARDBARRONFREDERICKGLENMOOR
H U N T L E I G H
DUNLEIT
HHULLF
AI
RDAL
E
HARTJEWEL GREENVIEWBEAUFORD
HOCHGASLITE
MERMOD
ALF RED
NOLAN
FUHRMANNEARLSTURGIS B E R R Y R O A D
IOLACLAYROCK HILLOAKPRIV ATE
PARPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11069
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Rock Hill
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 63
ROCK HILL SANITARY RELIEF (SKME -618)
SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 48,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
WEBERPILOTPHILO
DANAWAYNEROSEMARYV IR G IL
KATHLEENOVERTONA L L E Y
FORMANAUTUMN
CANDACE
V I R G I L PHI
LO§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10748
11
TASK NO:
TASK NAME:
$440,000.00
BUDGET:
FUND:
Wilbur Park
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 64
ROSEMARY, PHILO & KATHLEEN SEWERSEPARATION
APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS ANDDRIVEWAY DRAINS CONNECTED TO THE SANITARY SEWER.
DISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS. CONSTRUCTAPPROXIMATELY 350 FEET OF 10-INCH SANITARY SEWER AND 2000FEET OF 12-INCH TO 18-INCH INCH STORM SEWER ANDAPPURTENANCES, PUBLIC AND PRIVATE I/I REDUCTION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦170 HANLEYCLAYTON
DAVISBRENTWOOD
ME
T
ROL
I
NKF
RANCI
S
FOREST PARK
FORSYTH
SHAW PARK
WEN NEKERCENTRALLOUWENPOL
OMERAMECBEMISTONLANGTONWATKINSHUNTERT
A
N
GL
E
WO
OD
CARONDELET
DAYTONA RE AR
HA L I F A X TOP
T
ON
VENETIAN
C O L M A R SH IR LEY
CRESC
E
NTORLANDO
ROSILINE
MCCUTCHEONSUDBURYBERKSHIREPRI
VATEPARKSID E
WALINCA
W H I T B U R NDROMARA MOHAWK
R O X B U R G H FORESTBILTMORE
COUNTRY CLUB
MERAMECCENTRALMET
ROL
I
NKCENT
RALF O R E S T P A R K
WALINCA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11680
11
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 65
ROXBURY I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10231
16
TASK NO:
TASK NAME:
$1,200,000.00
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 66
SEPARATE SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008)
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY SEWERS CAUSES BUILDING BACKUPS ANDOVERCHARGING OF THE SYSTEM.
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS FUTURE CONSTRUCTION AND REHABILITATIONPROJECTS.
Professional Services
1101 - General Fund
SPOEDEWARSONLADUEGRAESERMOSLEY PRIVATECRAIGT E A L W O OD
BE AVE R
S T ACY
DWYERDAUTELELZEY C L ER M O N TRUNNYMEDE
OAK PARKSCHULTESTONEYSIDERONDELAY
F
IESTA
SONAALD EN
B
R
OOKTRAIL HEATHER HILLVOUGACONWAYBAL HARBO
U
R
LARKINDONOHO
ST PAUL
TUREENFAIRWAYS
LADUE ESTATESOLD OLIVE STREET
LISA
TRIESTE
RENEEDAYKIN
A L L E G ROBENWOOD
MARFORDPICARD
YNEW SALEMSHERWYNTRI L A N E
FIE L D IN GC
OUNTRY FAIRM A R Y HILL
CLERBROOK APPLE TREEOLIVE LAKEQ U A IL W A Y S
MOSLEY HILL
OAK GATE PILLARCHERRI
C O U N T R Y V IE W
NOTRE DAMEWOODFIELD
D O G W O O D
FORCEE
Q U E E N S B R O O K
CHALET
SUNDOWNOLD OLIVE S T REET
OLIVE BLVD
N LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10754
11
TASK NO:
TASK NAME:
$420,000.00
BUDGET:
FUND:
Creve Coeur
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 67
SHERWYN SANITARY RELIEF (SKME -651) & I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
CONSTRUCT APPROXIMATELY 1200 FEET OF 12-INCH SANITARYSEWERS; REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATESOURCES BY REHABILITATING 35,000 FEET OF PIPE SEWERS ANDMANHOLES AND REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
BOONEST MARIE CLARKHARRISON
WASHINGTON LAFAYETTEJEFFERSONBROWNCASTELLORUE ST CATHERINE
ST JACQUESRUE ST LOUIS
NEW FLORISSANTRUE ST FRANCOIS
RUE ST DENIS
AUBUCHONRUE ST JEANST JEANREGINARUE ST PIERREST CATHERINE
ST BAPTISTA
ST AUGUSTA
ST ALBERT BROWN§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11666
11
TASK NO:
TASK NAME:
$258,000.00
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 68
ST MARIE SANITARY RELIEF I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10766
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 69
$550,000.00
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
DATA IS REQUIRED TO DETERMINE URBAN STORMWATERRAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FORWATER QUANTITY & QUALITY EVALUATION OF STREAMS
CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM INCONJUNCTION WITH WATERSHED AND STORMWATER PLANNING ANDDESIGN EFFORTS.
Vendor Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10768
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 70
$660,000.00
STREAM FLOW WATER QUALITY SAMPLING (FY2011)
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYFROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION &STORMWATER MANAGEMENT PROGRAMS
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITH MSD'S SERVICE AREA.
Vendor Services
1101 - General Fund
§¨¦55
§¨¦55KERTH BUTLER HILL
RINGERAMBS
DANTONAIREVALLE YSIDEC LAYRIDGESTARLITRE G A L WAY
GWENMILLOWENSLITTLE ROCKSIR BORSCHE R RYVIEWTUCKAWAY
STARVIEW
B
RITCA
STL
E
OLD LEMAY FERRYBARBAGALLO
EILEEN ANN
VENTURA PLACE
OZARKGLENM IDAMERICAF UCHSIR O N S ID E
PROVIDENCE PLACECAMELOT ESTATESBROOKTOP
G
R
A
N
D
C
A
S
TLE
ABERDOURROUND TABLE
DAI Q UIRIB R A U N GATE
ZAM ORACRESTSI D EMORN I N G D ALEH E R IT A G E W O O D SBUTLER H ILL ESTA T E S
HAWKINS GLEN
GARONPRIVATE KERTH CI R C L E
SUNDESERTPRI V A TE LEMAY FERRY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11670
11
TASK NO:
TASK NAME:
$120,000.00
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 71
TUCKAWAY SANITARY REHABILITATION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE INFLOW AND INFILTRATION THROUGH SEWERREHABILITATION AND OTHER METHODS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦170
PAGE HANLEYCANTON
MID
L
A
N
D
TERMINAL
82NDNORTH N SOUTHLYNNWALTONWAYNE LAMB78THLIBERTY
B
R
A
D
D
O
C
K
APPLETON
GRANTMILAN
MENDELLBELT WAYGULFMADISON VI
NI
T
APRIVATEELMORE
RICHARD
MONROE
FAIRVIEWTRENTON
ORCHARD
CARLETON79TH
EASTOVERCOOLIDGE
81STWESTOVERKOREA
RABEALERT
HAFNERARCHER
FULLERTON
BUCHANAN
MELROSEMOUNT OLIVEPOLKJEFFERSON
STILLWATERWELLINGTON
DAJOBYLAUGHLIN BLOOM
CRYSTALCHAPIN INDUSTR IAL
A T H E RTONMON TREAL
FAIRHAM
HARRISONLYNDALEVAUGHANPARAMOUNT
LAUGHRENMOOREANNAANNANDALEHAWTHORNER
USHMOREERI
THWASHINGTON
ERMESCARLETON
ALERT
L Y N N
MILAN
TERMINAL
LAUGHLINWAYNE
MELROSE
MILAN
MENDELLW A Y N E
BLOOM
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10027
11
TASK NO:
TASK NAME:
$800,000.00
BUDGET:
FUND:
University City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 72
UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS.
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARYRELIEF SEWERS AND APPURTENANCES. CONSTRUCTED SANITARYSEWER OVERFLOWS TO BE REMOVED.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10230
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 73
$4,500,000.00
WATERSHED FACILITY PLANNING PHASE II
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF.
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS.
Professional Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMA NC HESTER
MO370
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10230
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 74
$500,000.00
WATERSHED FACILITY PLANNING PHASE II
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF.
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS.
Professional Services
1101 - General Fund
ELMCENTRALSHORT
FIR W O O D
GLENDALE
G
O
R
EREAVIS
OLA
OAK TREE
ST GEORGE
W ILSH IR ETU R F
W
E
B
S
T
E
R A
C
R
E
S
WEBSTE R OAKS ELM§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11086
11
TASK NO:
TASK NAME:
$320,000.00
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 75
WEBSTER ACRES SANITARY SEWERREPLACEMENT
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUE TOROOT INTRUSION AND STRUCTURAL DEFECTS IN THE EXISTINGMAIN.
CONSTRUCT 2,500 FEET OF 8-INCH SANITARY RELIEF SEWER TOREPLACE DETERIORATED 6-INCH PIPE, 850 FEET OF 12-INCH TO18-INCH STORM SEWERS, AND PUBLIC AND PRIVATE I/I REDUCTION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦44 BIG BENDBERRYUNION PACIF I C
EDGARLOCKWOOD
KIRKHAM
GRAYDICKSONGORENEWPORT
GLENDALE
LEE
ELMCLARK
B U R L IN G T O N N O R T H E R N S A N T A F E BOMPARTSAPPINGTONTUXEDO
MAPLEODAYLACLEDE STATIONESSEX
LILACBELLSELMABAKER
HOLMESBISMARK
JACKSON
BROWNELL
ATALANTAGLEN
OAK TREE
EUCLID
LITHIABENNETT P ACIFIC
PLANTBACON
SUMMITJOYARGONNE BRENTWOODMADGE
ANDREWJEFFERSONSYLVESTEROAKGILBERTCORNELLMADISONO A K L A N DPARK MARYLOUISAUSTINFAIRVIEWMCKINLEY
R ID G EIOLA
REAVISNORTH
YEATMANG A R D E NROCK HILLADAMS SALEMPAPIN
IMSEKORTWRIGHTSPRINGWEIL
FO RESTDWYER
F R IS C O
CLARAHOLLYWOOD OAKWOODDES PERESFLORE NCECOP P E R HILL
LANVALEJOANNA
EUNICE
ALICEG
R
A
N
T
FIELDSTON
VICTORIA
WARWICK GREELEY
SWON
HIGH HA M PTONMOODY
FOX
BARRONFREDERICKARBOR
HULLRUTHMCDONALD
M E R R IT T
MANDERLYTYLERPORTERCOLLEGE COLLIERALGONQUIN
CEDAR
LOCUST
GASLITE
ELLIOTT
ALLISON
GLENELMJACKSON
CLARKELMELMSUMMITMANCHESTER R D §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11678
11
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 76
WEBSTER GROVES TRUNK "E" SANITARYREHABILITATION AND I/I REDUCTION PHASE IV
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCESTHROUGH SEWER REHABILITATION AND OTHER METHODS.
Design Services
6660 - SanitaryReplacement Fund
FLORA
ECHO
MIRIAM
RIDGE SPENCERWISMERTHEODOSIA
HUNTINGTONHOODWALLISCOTE BRILLIANTEDAWESHUNTINGTONCOTE BRILLIANTE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11108
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Overland
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 77
WISMER - HUNTINGTON SANITARY RELIEF (SKME-592)
BUILDING BACKUPS AND TWO CONSTRUCTED SANITARY SEWEROVERFLOWS.
REPLACE 2500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER WITH12-INCH TO 21-INCH SANITARY SEWER. REMOVE TWO CONSTRUCTEDSANITARY SEWER OVERFLOWS.
Design Services
6660 - SanitaryReplacement Fund
27 April 2012
WASTEWATER CONSTRUCTION PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10407 BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
$2,100,000 78
11815 BISSELL SERVICE AREA PUMP STATION
POWER SUPPLY IMPROVEMENTS
$800,000 79
10393 BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
$136,000 80
11792 BROOKTON WAY TO MERAMEC BOTTOM
ROAD SANITARY RELIEF PHASE II
$3,180,000 81
11121 CALVARY CEMETERY STORAGE BASIN
(PROPERTY ACQUISITION)
$500,000 82
10382 CELLA - ROLLING ROCK - GLEN CREEK I/I
REDUCTION (SKME -658, 659, & 657)
$410,000 83
11117 COLDWATER CREEK WWTP DIGESTER CLEAN-
OUT
$1,500,000 84
10518 COLDWATER TREATMENT PLANT
IMPROVEMENTS (SLUDGE PUMP STATION)
$350,000 85
11831 CREVE COEUR CREEK PUBLIC I/I REDUCTION $6,200,000 86
10428 CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE III (SKME-021)
$1,500,000 87
10568 CREVE COEUR CREEK WATERSHED SANITARY
SEWER REHABILITATION
$500,000 88
10429 CSO - JEFFERSON BARRACKS SUBSYSTEM NO.
72 INTERCEPTOR (I-122) SEPARATION
$2,100,000 89
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 90
11829 DEER CREEK/MALINE CREEK PUBLIC I/I
REDUCTION
$5,360,000 91
11741 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2013)
$2,000,000 92
11107 EMERGENCY REPAIR FUND APPROPRIATION $250,000 93
11830 FEE FEE CREEK PUBLIC I/I REDUCTION $5,890,000 94
27 April 2012
WASTEWATER CONSTRUCTION PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10597 FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION
$250,000 95
11138 FREDERICK STREET COMBINED SEWER
(PROPERTY ACQUISITION)
$2,000,000 96
10610 GALAXY (BP-491) SANITARY SEWER
REHABILITATION AND I/I REDUCTION
$1,000,000 97
10015 GC-11 GRAVOIS CREEK SANITARY RELIEF $400,000 98
11782 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
$60,000 99
11783 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
$60,000 100
11784 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
$60,000 101
11785 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
$60,000 102
10458 GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
$2,000,000 103
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
$4,700,000 104
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
$2,000,000 105
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
$8,220,000 106
10645 HERMITAGE I/I REDUCTION (SKME-615)$400,000 107
10646 HIGH SCHOOL DR. & MADGE AVE. SEWER
SEPARATION
$260,000 108
11706 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY 2013) CONTRACT A
$5,000,000 109
11845 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT B
$5,000,000 110
11846 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT C
$5,000,000 111
27 April 2012
WASTEWATER CONSTRUCTION PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11771 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
$3,200,000 112
11771 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
$800,000 113
11794 LEMAY WWTP ASH LAGOON ACCESS ROAD $50,000 114
10681 LEMAY WWTP DISINFECTION FACILITIES $11,512,000 115
11106 LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
$500,000 116
10030 MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
$1,000,000 117
10163 MCKELVEY PROJECT "A" AND "B" SANITARY
RELIEF (SKME-005)
$3,420,000 118
10710 MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION AND DISINFECTION
FACILITIES
$17,000,000 119
10722 OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET
$2,800,000 120
10725 PAGE AVE. & LINDBERGH SANITARY SEWER $350,000 121
10727 PALM SEWER REPAIR/REPLACEMENT $3,780,000 122
10145 PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
$293,000 123
10184 PROVIDENCE PLACE SANITARY RELIEF $800,000 124
11114 PUBLIC I/I REDUCTION REHABILITATION $3,000,000 125
10198 RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
$5,000,000 126
10146 RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
$4,500,000 127
10146 RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
$4,600,000 128
27 April 2012
WASTEWATER CONSTRUCTION PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10185 STONINGTON SANITARY RELIEF (SKME -652)$1,830,000 129
10121 TAYLOR - FILLMORE - HARRISON SANITARY
RELIEF (SKME-502 & 503)
$3,900,000 130
10775 TIEMANN & NONIE AVE. SANITARY SEWER
REPLACEMENT
$359,000 131
10199 TOPPING SANITARY RELIEF (SKME -421)$1,200,000 132
10777 TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (TOWER GROVE
PLACE STORM RELIEF SEWERS)
$2,100,000 133
10782 UPPER MALINE TRUNK SANITARY RELIEF
PHASE III SECTION C
$2,940,000 134
10787 VALLEY PARK/GRAND GLAIZE DIVERSION &
PUMP STATION
$800,000 135
10793 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE
II
$2,500,000 136
TOTAL:$152,480,000
BAUMGAR T N ER
HEINTZBLACKFORESTMILBURNFIRELEAF DELO A K
WINDFORD
FOXFIRE
OLD B A U M G ARTNER
FORDHAMMILD
BIRCH HOLLOWSKY H
ILL
CHALET HILL
G
EBHARDT
WESTPHALIASA N D E R S
PIO N EER
NAHN SOUTHFIELDDANFORTHBRANDENBE R GENGLAND TOWN
S T ONEHURSTDELI
NTRYSEAGRAVECHATFIELDW EST CLIFFE
INNS
B
R
U
C
K
PRIVATE
PIN OAK TERRACE
WALDWICK
FLAMING LEAFHEINTZSAND E R S
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10407
15
TASK NO:
TASK NAME:
$2,100,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 78
BAUMGARTNER & BLACK FOREST SANITARYREPLACEMENT PHASE II
SANITARY BACKUPS, OVERFLOWING MANHOLES, ANDOVERCHARGED SANITARY SEWERS DURING WET WEATHER EVENTS.
CONSTRUCTION OF 3,700 FEET OF 8-INCH TO 15-INCH PIPE ANDAPPURTENANCES FROM APPROXIAMTELY 500 FEET SOUTH OFBLACK FOREST TO CHALET FOREST DRIVE.
THIS PHASE WILL BE CONSTRUCTED BY ST LOUIS COUNTY AS PARTOF THEIR BAUMGARTNER RD PROJECT AND REIMBURSED BY MSD.
Construction
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦44
§¨¦70
§¨¦40
§¨¦55
§¨¦170
§¨¦70
§¨¦270
§¨¦40 §¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11815
15
TASK NO:
TASK NAME:
$800,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Bissell
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 79
BISSELL SERVICE AREA PUMP STATION POWERSUPPLY IMPROVEMENTS
BATTERY BACKUP AT PUMP STATIONS HAS LIMITED DURATION.
INSTALL BACKUP GENERATORS AT FLOODWALL STRUCTURES.
Construction
6660 - SanitaryReplacement Fund
BLANCHA HAFNER82NDSWARTHMORE
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10393
15
TASK NO:
TASK NAME:
$136,000.00
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 80
BLANCHA DR. TO OLIVE BLVD. SEWERSEPARATION
18-INCH STORM SEWER IS DIRECTLY CONNECTED TO 27-INCHSANITARY SEWER ALONG OLIVE BLVD.
CONSTRUCT 240 FEET OF 18-INCH TO 24-INCH STORM SEWER FROMNEW MANHOLE ON EXISTING 18-INCH LINE TO EXISTING STORMSEWER ALONG OLIVE BLVD.
Construction
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦55KERTH
WELLSGREENTONDANTONAIREBROOK T O N
SUS O N H ILLS
K ARAMA R
VALLE YSIDEPRIVAT EED LOUHAWKINSWIELANDD UESSEL
LILA C R I D G EOWENSMELISSA JO EASTGR O V ETONMEDALTONLIMERICK
COYLE
WINDLEIGH
BRI ARMISTIR O N S I D E
LAKET ONGREEN TRACE
EVER
G
R
E
E
N
SUSO
N WAY
ROYAL
K
I
N
G
B A N EZ
SIE
N
N
A HILLS
MARKTON
AMBERWAY
TRAI
L
S
I
D
E JADOSUPRAIRIE
V
I
E
W
BALM
Y
B
A
Y
SUNNYMEADOWPRIV
A
T
E
PRIVATE
PRIVATE
PRIVAT
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11792
15
TASK NO:
TASK NAME:
$3,180,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Meramec Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 81
BROOKTON WAY TO MERAMEC BOTTOM ROADSANITARY RELIEF PHASE II
BUILDING BACKUPS DUE TO OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,600 FEET OF 8-INCH TO 30-INCH SANITARY SEWERS,AND ELIMINATE ONE CONSTRUCTED SSO (BP-220.)
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $5,300,000.
Construction
6660 - SanitaryReplacement Fund
SW
I
T
Z
E
R BROADWAYNORFOLK SOUTHERN CHURCHF
R
E
D
E
RIC
K
BURLIN
GTO
N N
O
RT
H
E
R
N S
A
N
T
A F
ECHRISTIANBLASEPONCE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11121
13
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 82
CALVARY CEMETERY STORAGE BASIN (PROPERTYACQUISITION)
OVERCHAGED TRUNK SEWER.
PURCHASE OF MAINTENANCE FACILITY FOR EVENTUALCONSTRUCTION OF STORAGE BASIN.
Land Purchase
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦40 LADUELAYWARSONCLAYTON PRICEBARNESCONWAY
SOUTH FORTY CELLAKENTROANOVERHILLS
G LEN EAGLES
BRAE
B
U
R
N
MCKNIGHTS T A N D REWSGODWINMAGNOLIALADUE CRES T
P IC A RDY
LINDW O R T HMIDPARKINDIAN
LOG C ABINHIGHDOWNTWIN S P RINGSR
OLLING ROCKPRIVATEFOREWAYRAUS
C
H
E
R
SUSSEXDWYERSHERATON
EDGEW O O D
EXMOORYORK
LADUE R I D GEWINDING BROOKD E E R CREEK
JAIMES
BURROUGHS
LAYTON
WARSONPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10382
15
TASK NO:
TASK NAME:
$410,000.00
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 83
CELLA - ROLLING ROCK - GLEN CREEK I/IREDUCTION (SKME -658, 659, & 657)
BUILDING BACKUPS AND OVERFLOW FROM MANHOLES DUE TOSURCHARGING OF SEWERS.
PERFORM PUBLIC AND PRIVATE I/I REDUCTION BASED ON I/I ANDCCTV DATA FOR AREA TRIBUTARY TO PROJECT SEWERS IN ORDERTO MINIMIZE THE FLOW IN THE SANITARY SEWER SYSTEM.
Construction
6660 - SanitaryReplacement Fund
PRIVATER O B B I N S GROVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11117
15
TASK NO:
TASK NAME:
$1,500,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 84
COLDWATER CREEK WWTP DIGESTERCLEAN-OUT
SLUDGE REMAINS IN SIX DECOMMISSIONED DIGESTERS.
REMOVE AND PROPERLY DISPOSE OF SLUDGE.
Construction
1101 - General Fund
PRIVATERICHM
OND FOREST
B
E
H
L
MANN ME A DO W SROBBINS GROVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10518
15
TASK NO:
TASK NAME:
$350,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 85
COLDWATER TREATMENT PLANTIMPROVEMENTS (SLUDGE PUMP STATION)
EXISTING TREATMENT FACILITIES DO NOT ADEQUATELY CONVEYSEPARATED SLUDGE TO THE GRAVITY THICKENER.
REPLACE THE GRAVITY DRAIN SYSTEM WITH A PUMP STATION THATWILL TURN THE EXISTING GRAVITY LINE INTO A FORCE MAIN.
Construction
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦270
§¨¦40
§¨¦270
O LIVE B L V D
S MO141 HWYCLARKSON RDE MO364 HWY
E M O 100 H W Y MANCHESTER RD MA N C H E S T E R R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11831
15
TASK NO:
TASK NAME:
$6,200,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 86
CREVE COEUR CREEK PUBLIC I/I REDUCTION
I/I CAUSING SEWER SURCHARGING, BUILDING BACKUPS, ANDOVERFLOWS.
REHABILITATION OF APPROXIMATELY 48,000 FEET OF SEWER MAIN,750 MANHOLES, AND APPURTENANCES.
COMBINES PUBLIC I/I REDUCTION FOR CREVE COEUR CREEK SANREHAB (10568) & CREVE COEUR CREEK SAN RELIEF PHASE III (10428)PROJECTS.
Construction
6660 - SanitaryReplacement Fund
LAD
U
E
WOODS MILLBOX
F
O
R
D
LADUE FARMSAYLESVILLEC
R
OSS TRAILSAGU STA
C E D AR BRIDGE
P
ARLIAMENT
TRAILT
O
PSEABROOK PRIVATENEW BED
FORD
FINGER
LAKEWOODS MILLS MO141 HWY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10428
15
TASK NO:
TASK NAME:
$1,500,000.00
BUDGET:
FUND:
Chesterfield
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 87
CREVE COEUR CREEK SANITARY TRUNK SEWERRELIEF PHASE III (SKME-021)
GROWTH AND WET WEATHER INFILTRATION AND INFLOW OCCURINGWITHIN THE WATERSHED HAS RESULTED IN OVERCHARGING OF THETRUNK SEWER.
CONSTRUCTION OF THE THIRD PHASE OF A MULTI-PHASE PROJECT,TO INCLUDE 1,070 FEET OF 30-INCH TO 36-INCH DIAMETER SANITARYTRUNK SEWER AND APPURTENANCES.
Construction
6660 - SanitaryReplacement Fund
§¨¦40§¨¦40
CLAYT O N
CONWAY MASONLADUE
WILSONKEH
RS MI
LLHENR
YCENTRAL MIDLAND
WEI
DMANTHF
S
C
H
O
E
T
T
L
E
R
W
E
S
T WOODS MILLCO U N TR Y RIDGECLAYM O NTDUT C H MILLISLEVIEWNORTH OUT
E
R
F
O
R
T
Y
A
PPALACHIAN
CED A RMILLHIGHCROFTPRIVATEWILD HOR S E C R E EK
S T R AUB
THO R N H ILL
FIELD
CHE S T E R FIELDWESTMEADE
AMBOIS
BUR G U NDY RUHLG L E N C O VE
TAMMANYHOLLOWAYW
HITE
B
A
XT
E
ROLD CLARKS O N
PIN R U N
SOUTH OUTER FORTY
NIMES
NARDIN CHASSELLEPETZOLDARAMISYVESMA
Y
F
A
I
R LADU E FARMPRIVATEP
R
I
V
A
T
E
PRIVATE
PRIVATE
PRIVATEW HITE
PRIVATEMASONPRIVATE
O L I V E BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10568
15
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 88
CREVE COEUR CREEK WATERSHED SANITARYSEWER REHABILITATION
DETERIORATED VCP PIPES ALLOW ROOT INTRUSION ANDINFILTRATION/INFLOW LEADING TO EXCESSIVE WET-WEATHERFLOWS, SEWER BACKUPS AND OVERFLOWS.
REHABILITATE APPROXIMATELY 10 LATERALS, DISCONNECT 2 ROOFDRAINS, AND DISCONNECT 41 AREA DRAINS.
Construction
6660 - SanitaryReplacement Fund
RIVERUNION PACIFICGREGGCCCSHERMAN
SHERIDA N
GRANTKOCHK I N G STONCLAGERBOUNDARYHALS E Y LEE
FIRST
NE
B
R
A
S
K
A
LONGSTREET RIDGEJEF
F
E
R
S
O
N
I
A
N
COOKEHANCOC K
SIG
S
B
E
E
FLAGSTAFF
SOUTHGR
O
V
E
R
PRI
V
A
T
E
GRAV ESJ
EF
F
ERSON
DAVISWORTHGRANDA
EAST CIRCLEKEAR
N
E
Y
RAI
N
B
O
W
FRA
N
R
U
LAR
E
D
O
TACOMA
WE
S
T
A
I
R
ELLWINE
POPLAR FOREST
SMITHBUNKER
N ORTH GATEMIRAVALLE
MOSESAPPIANMUELL
E
R
BRIL L IA N T
CAMERONHAWSON SCENIC
CORLISSJEFFERSON GRANTKEARNE
YTELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10429
15
TASK NO:
TASK NAME:
$2,100,000.00
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 89
CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72INTERCEPTOR (I-122) SEPARATION
REDUCE STORMWATER FLOW TO 54-INCH COMBINED SEWERINTERCEPTOR, TO ENABLE THE REMOVAL FUTURE OF CSOL-152/I-122.
CONSTRUCT APPROXIMATELY 6,600 FEET OF 6-INCH TO 27-INCHSANITARY SEWERS AND 550 FEET OF 12-INCH TO 24-INCH STORMSEWERS AND APPURTENANCES, REHAB APPROXIMATELY 7,200 FEETOF EXISTING SEWERS, AND REDUCE PRIVATE PROPERTY I/I.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $3,500,000.
Construction
6660 - SanitaryReplacement Fund
§¨¦70
§¨¦270
§¨¦55
§¨¦40
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11146
15
TASK NO:
TASK NAME:
$5,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 90
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
CONTROL OF COMBINED SEWER OVERFLOWS.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES TO THE COMBINED SEWER SYSTEMS
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THECITY OF ST. LOUIS AND OTHER AGENCIES.
Construction
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦170
§¨¦55
§¨¦270
§¨¦170
§¨¦70
§¨¦70
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11829
15
TASK NO:
TASK NAME:
$5,360,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 91
DEER CREEK/MALINE CREEK PUBLIC I/IREDUCTION
I/I CAUSING SEWER SURCHARGING, BUILDING BACKUPS, ANDOVERFLOWS.
SEWER LINING AND REHABILITATION TO REDUCE PUBLIC I/I.
PROJECT COMBINES PUBLIC I/I REDUCTION FOR UPPER JESKE PARK(10781), CELLA-ROLLING ROCK-GLEN CREEK (10382), ANDSTONINGTON (10185) PROJECTS
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11741
13
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 92
$2,000,000.00
EASEMENT ACQUISITION FOR COMBINED /SANITARY PROJECTS (FY 2013)
BUILDING BACKUPS AND OVERCHARGED SANITARY AND COMBINEDSEWERS.
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM COMBINED AND SANITARY RELIEF SEWERPROJECTS.
Property RightsAcquisition
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11107
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 93
$250,000.00
EMERGENCY REPAIR FUND APPROPRIATION
AGING AND DETERIORATED SEWER STRUCTURES CAN FAILWITHOUT NOTICE, CREATING EMERGENCY SITUATIONS IN WHICHTHE DISTRICT MUST ACT IMMEDIATELY.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
Construction
4122 - WastewaterEmergency Fund
§¨¦70
§¨¦270
§¨¦270 PAGE
DORSETT
ADIE
W
ARSONSCHU
ETZMCKELVEYMARINE LINKDIELMANFEE FEE
R
U
L
EWRIGHTASHBYSIMSAVERY
SMILEYOLD ST CHARLES
AMIOTCENTRAL MIDLANDLONGROSS
SCHUL
TEBA
L
LBALTIMORE
D
AUTELTEMPO
FLORA
DRIVER
UNION PACIFI C
SPOEDEA M ELING
POEPR
I
VA
TE
CYPRESSLITZ
ECHO
TERRY
MES
ARIDGE
BRECKENRIDGE
OAK
GERALDINEENTITYB O R M A N HOODMEEKSPHEASANT RUN
AMBOIS
TRESCOTT
ORCHARD LAKES DYERG ARDENB
A
SST O N
B
E
NEDETTA
DELORDVILLA
CAN T E R
M
A
R
S
SC
H
A
E
F
E
R
ST FRANCIS
GUELBRETHBANKSGASSSTUDT LANSINGDECKER
GRINNELLGRI
S
S
O
M
CRAIGOLDFARMMARKAIRE
T E A L W O O D
NIMES
DE RUNTZ
MASON MANOR
BENSON
WARNEN
IVAN
WELUDLOWLEIGH
NULL
SONABELA
IRE
LONGMONT
ARAMISANDESGRAPE
KRAMRENEEVINSONRUCKERTRO
S
E
A
C
R
E
S LONGFEE FEECENTR A L M ID LA N D
ADIEROSSFEE FEEOAK
OLIVE BLV DN LINDBERGH BLVDE MO364 H
W
Y
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11830
15
TASK NO:
TASK NAME:
$5,890,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 94
FEE FEE CREEK PUBLIC I/I REDUCTION
PUBLIC I/I CAUSING SEWER SURCHARGING, BUILDING BACKUPS, ANDOVERFLOWS.
SEWER LINING AND REHABILITATION TO REDUCE PUBLIC I/I.
PROJECT COMBINES PUBLIC I/I REDUCTION FOR FEE FEE TRUNKSEWER REHAB (10597) & MCKELVEY PROJECT A&B SANRELIEF(10163) PROJECTS
Construction
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦270 PAGE
DORSETT
ADIE
C
R
A
I
G SCHUETZMARINEF E E F E E LINKROSSS
C
H
U
L
T
E
B
A
L
L
DA
UTELWELDONTEMPOC
E
N
T
R
AL MIDLAND
MASONB O RMA N
SPOEDE
WESTP O R T
ROTH H
IL
LGARDENRULE
BASST O NBENNINGTON
PEM
MERRI C K
S
C
HAEFE
R
GUELBRETHPRI V ATESCHULTE HILLC H IE F T A INGRISSOM
GRAELER
MARKAIRE
L A C K L A N D
MILLPARK
HYANNISVILLA D O R A D O
WARNEN
PORT DIANECHAFFEEGLENMEADEHARDING
WARSON
ACTIVEFIES T A
SONAM O M A R T E BROUSTERGREENWALK DECORAH
MEADOWSIDENE W B ALLASGRAPE
NORTHWINDS
DAYKINMCKELVEYKRAMWILLOWYCK
RENEEVINSONLEI S U R E
NORFOLK SOUT H ER N
ACCENTARCMIKEL
GAIET
EFEE FEEROSSPRIVATEOLI V E B L VD
N LINDBERGH BLVDE MO364 HWY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10597
15
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 95
FEE FEE TRUNK SEWER (SKME-002)REHABILITATION AND I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I IN THE FEE FEE AREA.
Construction
6660 - SanitaryReplacement Fund
BITTNER
SW
I
T
Z
E
R CHURCHBROADWAYBADEN
FREDERICK
NORFOLK SOUTHERN
CHRISTIANBLASETHRUSHPONCE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11138
13
TASK NO:
TASK NAME:
$2,000,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 96
FREDERICK STREET COMBINED SEWER(PROPERTY ACQUISITION)
OVERCHARGED MAINS, BUILDING BACKUPS, AND FLOODING.
ACQUISITION OF 40 PROPERTIES.
FUTURE ENGINEERED DETENTION FACILITIES TO BE CONSIDEREDAFTER BUY-OUT.
Land Purchase
6660 - SanitaryReplacement Fund
ADIE FEE FEELINKDORSETTSMILEY LONGHIGHDIXIETAYLORSCHUETZLITZ
T ER R Y HAASMERTFALCONOLD S
T C
HARLES
BALLASHBYDELORDMARS
ST FRANCIS
MIDLAND
THORPELAKELANSINGDECKER
HOBDAYREADINGPRIVATE
RIDGEEDGEWORTHGILLST X A V IE R
S
C
HAEFER
ST H E N RYFARVIEW
WURDACK
MORRO
W
DE RUNTZ
BRUNO
WARNEN
IVANDONNYCAVE
VAN CLEVEWELUDLOWWELLAND
CLARENDON
HARDING CYPRESSCUMBERLANDSATURN
BURGES S
W IL W O OD
MACK
GRAPE TOWNLEY
OHAREBOYLSTON
ST ANN
INVER
N
E
S
SNORA FLORE
N
C
E
EA S Y
O L D DORSE
T
T
LINDADE
S
A
X
O
N
H
A
L
LDALEY
RIDGECREST
KIN
G
B
E
E
G R A N D CIRCLE
ARC
ESSEX
SC H E N K VENUSCINNAMON
DO
W
N
I
N
G
PAS T UREBLA
K
E
MERCER
WYLWOOD
ROCK ISLAND
GILWOODGRABEN
HARLEYP
RIVATE
ESSEX
F E E FEEDELORDADIEMI D L A N D
PRI
V
A
T
E
PRIVATEN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10610
15
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 97
GALAXY (BP-491) SANITARY SEWERREHABILITATION AND I/I REDUCTION
DETERIORATED VITRIFIED CLAY PIPE ALLOWS INFLOW/INFILTRATIONAND ROOT BLOCKAGES LEADING TO WET WEATHER BACKUPS ANDOVERFLOWS.
REHABILITATE APPROXIMATELY 7,000 FEET OF SEWER, 100MANHOLES, AND CONNECTIONS, TO ENABLE REMOVAL OF BP-491.
Construction
6660 - SanitaryReplacement Fund
KA
R
L
S
R
U
H
E BLUE RIDGECU
M
B
E
R
L
A
N
D
DU
M
O
N
T
A
R
L
E
E
TELFORDBERKSHIREHERAULTALL
E
G
H
A
N
Y
BASILMAYENNE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10015
15
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 98
GC-11 GRAVOIS CREEK SANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 640 FEET OF 12-INCH DIAMETER STORM SEWERS , 141FEET OF GRASS-LINED CHANNEL, AND DISCONNECT DOWNSPOUTSAND AREA DRAINS TO SEPARATE STORM FLOW FROM SANITARYSEWER.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11782
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 99
$60,000.00
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (FY2013) CONTRACT A
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SPROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM.
Appraisal Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11783
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 100
$60,000.00
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (FY2013) CONTRACT B
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SPROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM.
Appraisal Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11784
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 101
$60,000.00
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (FY2013) CONTRACT C
PROPERTY APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THEDISTRICT'S PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM.
Appraisal Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11785
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 102
$60,000.00
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (FY2013) CONTRACT D
APPRAISAL SERVICES ARE NEEDED TO SUPPORT THE DISTRICT'SPROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM.
Appraisal Services
1101 - General Fund
KIRKHAM
GRAYDICKSONSWONGOREOLD WARSON
LOCKWOOD
LEE
ELMESSEX UNION PACIF IC
JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK
BROWNELL
QUAN
FOOTE
EDWINEUCLID
JEFFERSONLITHIABENNETT
BACON
GILL
PAR
HUDSON
ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON
AUSTINM E D I N A MCKINLEYPARKLANDADAMS
MADISON
IOLANORTH
BIG BENDLONGVIE
W ROCK HILLMARK
RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPACIFIC
DWYER
WILD DEE R
BOGEY
D E S PERESHILLARD ROCKMANCOPP E R H I LL
JOANNARIDG E LINED
E
VONBREMERTONCHELSEA
P RIV A T E
HIGH HAMPT O NMANITOU
JULIAN
VICTORIA
WARWICK
WATE RBURYMOODYLEONARD
OAKSFOX
BARRONFREDERICKGLENMOOR
HULLFA
IRDA
L
E
PARKWOODSMCDONALDHARTGREENVIEWCOL L
E
G
E
ALG
O
N
Q
U
I
N
CEDAR
BERRY
HILLS
IDEWOODLAWN
BELLEVIEW
BEAUFORD
HOCHBERRY WOOD
RARIT
A
N
GASLITE
ALFRED
NOLAN
FUHRMANN
RUSSELLSTURGISELM
LOCKWOODELM BERRYCHELSEA
ALGONQUIN ROCK HILLPAR IOLACEDAR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10458
15
TASK NO:
TASK NAME:
$2,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 103
GLENDALE SECTION D SANITARY RELIEF PHASEIII (SKME-624) I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTION OF PHASE III OF SEWER IMPROVEMENTS, TOINCLUDE REHABILITATION OF APPROXIMATELY 100 PRIVATELATERALS, DISCONNECTION OF APPROXIMATELY 738 ROOF DRAINS,AND DISCONNNECTION OF APPROXIMATELY 552 AREA DRAINS.
Construction
6660 - SanitaryReplacement Fund
KIRKHAM
GRAYDICKSONSWONGOREOLD WARSON
LOCKWOOD
LEE
ELMESSEX UNION PACIF IC
JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK
BROWNELL
QUAN
FOOTE
EDWINEUCLID
JEFFERSONLITHIABENNETT
BACON
GILL
PAR
HUDSON
ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON
AUSTINM E D I N A MCKINLEYPARKLANDADAMS
MADISON
IOLANORTH
BIG BENDLONGVIE
W ROCK HILLMARK
RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPACIFIC
DWYER
WILD DEE R
BOGEY
D E S PERESHILLARD ROCKMANCOPP E R H I LL
JOANNARIDG E LINED
E
VONBREMERTONCHELSEA
P RIV A T E
HIGH HAMPT O NMANITOU
JULIAN
VICTORIA
WARWICK
WATE RBURYMOODYLEONARD
OAKSFOX
BARRONFREDERICKGLENMOOR
HULLFA
IRDA
L
E
PARKWOODSMCDONALDHARTGREENVIEWCOL L
E
G
E
ALG
O
N
Q
U
I
N
CEDAR
BERRY
HILLS
IDEWOODLAWN
BELLEVIEW
BEAUFORD
HOCHBERRY WOOD
RARIT
A
N
GASLITE
ALFRED
NOLAN
FUHRMANN
RUSSELLSTURGISELM
LOCKWOODELM BERRYCHELSEA
ALGONQUIN ROCK HILLPAR IOLACEDAR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11122
15
TASK NO:
TASK NAME:
$4,700,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 104
GLENDALE SECTION D SANITARY RELIEF PHASEIV (SKME-624) I/I REDUCTION
EXCESSIVE I/I IN SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING80,000 FEET OF PIPE SEWERS AND MANHOLES.
CONSTRUCTION OF THIS PROJECT RECEIVES PARTIAL FUNDING /SUPPLEMENTAL APPROPRIATION IN FY 14. TOTAL CONSTRUCTIONBUDGET IS $9,600,000.
Construction
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦55
FAN
N
I
E AVENUE HUNIONU N IO N P A C I F I CTIFFANY
BAY
L
E
S
S RUNYOND
E
B
R
A
MAJESTY
SEI B E RT
G
R
A
S
S
O CLEARPOINTMARILYN ESTATESH U M M INGBIRD
SAN GABRIELHERNANWHIPPOORWILL
AVEN UE FBOENECKE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10496
15
TASK NO:
TASK NAME:
$2,000,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 105
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELIEF PHASE III (SKME -521)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNKSEWER. INCLUDES REMOVAL AND REPLACEMENT OF A UPRR TRACKSPUR.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $15,700,000.
Construction, Phase II
6660 - SanitaryReplacement Fund
§¨¦55
BAY
L
E
S
S
UNION PACIFICFAN
N
I
E
SAN
T
E
N
AVENUE HDALLASCO
L
V
I
N
MAJESTY
BELLAVILLAWEI
S
S SANDRASAN GABRIELRUPRECHTRAIN RID GEFA
W
N
ZEISSBOENECKEAVENUE HDA
L
L
A
S
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10496
15
TASK NO:
TASK NAME:
$8,220,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 106
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELIEF PHASE III (SKME -521)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNKSEWER. INCLUDES REMOVAL AND REPLACEMENT OF A UPRR TRACKSPUR.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $15,700,000.
Construction
6660 - SanitaryReplacement Fund
GEYER
OAKBRIDLEPORTLAND
EASTCHIPPE R
DIVOTHOLIDAY
CLEEKTREGARON F R O N T ENAC WOODSCOUNTRYSID E
FIRETHORNHIC K ORYPUTTERDEVON D A L EFOX R U NFOX RIDGE
WILLOW LEAFINDIAN CREEKLAKEVIEWCRICKLEWOODOUTER LADUE
COACH N FOUR
GRAYCOUNT R Y E STATES
PRIVATEHUNTLEIGH WOODSHERMITAGE HILL
LITZSINGERPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10645
15
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
Frontenac
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 107
HERMITAGE I/I REDUCTION (SKME-615)
SANITARY SEWER SURCHARGING, SANITARY SEWER OVERFLOWSDURING WET WEATHER, AND FOUR CONSTRUCTED SSOS.
REPLACE 1,200 FEET OF 8-INCH SANITARY SEWERS.
Construction, Phase II
6660 - SanitaryReplacement Fund
MADGEBREMERTONHIGH SCHOOLANNALEEPOWELL§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10646
15
TASK NO:
TASK NAME:
$260,000.00
BUDGET:
FUND:
Brentwood
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 108
HIGH SCHOOL DR. & MADGE AVE. SEWERSEPARATION
WATER BACKUPS AT 2444, 2445, AND 2508 HIGH SCHOOL DR. AND8925 & 8929 POWELL AVE.
CONSTRUCT APPROXIMATELY 750 FEET OF 12-INCH DIA. RCP ANDAPPURTENANCES.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11706
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 109
$5,000,000.00
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY 2013) CONTRACT A
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULTS IN STORMWATER I/IAND SSO'S DUE TO BLOCKED LINES.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO RENEW THEDETERIORATED PIPES.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11845
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 110
$5,000,000.00
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2013) CONTRACT B
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I ANDOVERFLOWS DUE TO BLOCKED LINES.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO RENEWDETERIORATED PIPES.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11846
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 111
$5,000,000.00
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2013) CONTRACT C
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I ANDOVERFLOWS DUE TO BLOCKED LINES.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO RENEWDETERIORATED PIPES.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11771
17
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 112
$3,200,000.00
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2013)
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN IN NEED OF REPAIR OR REPLACEMENT.
AS THE REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEPROMPTLY ISSUED.
PROJECT WILL INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11771
17
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 113
$800,000.00
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2013)
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN IN NEED OF REPAIR OR REPLACEMENT.
AS THE REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEPROMPTLY ISSUED.
PROJECT WILL INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
Work Order Repair Costs(Non-Capital)
1101 - General Fund
LINNJOPLINRIPA
UNION PACIFICARLEE
PERRINFELTON
PRIVATEH
O
FFMEISTER
ELLEN ADAIRARLEE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11794
15
TASK NO:
TASK NAME:
$50,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 114
LEMAY WWTP ASH LAGOON ACCESS ROAD
IMPROVEMENTS IN AREA HAVE RESTRICTED ACCESS TO THE SITE.
CONSTRUCT NEW ROADWAY FOR ACCESS AND TRUCKING OF ASHMATERIAL.
Construction
6660 - SanitaryReplacement Fund
BROADWAYETTA
H
O
F
F
M
E
I
S
T
E
R
VELMA
MANN
P
R
I
V
A
T
E
JOPLINUNION PACIFICPERRINHOLDEN
LORETTA
G
O
E
T
Z
MILIT
A
R
Y
CARTWRIGHTGENTRY
RUBYUNION PACIFICPRIVATEHOLDEN VELMAP
R
I
V
A
T
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10681
15
TASK NO:
TASK NAME:
$11,512,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 115
LEMAY WWTP DISINFECTION FACILITIES
EPA AND MDNR HAVE MANDATED THAT DISINFECTION FACILITIES BECONSTRUCTED AT THE LEMAY WWTP.
CONSTRUCT IMPROVEMENTS AT THE LEMAY WWTP TO MEETREGULATORY DISINFECTION MANDATES.
Construction(Supplemental
6660 - SanitaryReplacement Fund
FINEPRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11106
15
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Meramec Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 116
LOWER MERAMEC RIVER WWTPEDUCATIONAL/RECREATIONAL FACILITY
EXISTING TREATMENT FACILITIES NEED TO BE EXPANDED ANDUPGRADED TO MEET DEPARTMENT OF NATURAL RESOURCESREQUIREMENTS AND POPULATION NEEDS.
DESIGN AND CONSTRUCTION OF PUBLIC EDUCATIONALFACILITIES/FEATURES AT THE LOWER MERAMEC WWTP.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦44BIG BENDYALEUNION PACIFICSUTTONMcCAUSLANDSOUTHWEST
ZEPHYR FORESTPLATEAU
FLORA
GAYOLABREDELL
ARS
E
N
A
L
WILLIAMS
FOLK
BELLEVUEGARNER
BRUNO
GLADES
DEL NORTELYNDOVER PRATHERRICHMOND
IVANHOEALICIA
R U PERT
MARTINIKRAFTELMLYLE MITCHELL
WEAVER
ANNA
SARAH
ELLIS PRINCETONHIGH
EMILIEALAMEDAGOFF
WALDEMAR
FLORENTMAPLE MARSHALLHIAWATHA
ELLENDALELIMITLOHMEYER
HAZEL
JEROME
RANNELLS
LA VETA
LANHAM ECOFFBLENDONVINE
ARBORMCCREADYMAGNOLIA
MA R IE T T ABONETA RICHERTCOMFORTLINDBERGH
CA NTERBURYGRAYBEULAH QUEENWOODLAND HERMITAGEODELL
STANLEY
HOPEMARGARETTEHUDLERMITCHELL
BRUNO
H AZ
E
L McCAUSLANDECOFFBRUNOYALE
ELM
MAPLE ARSENALSUTTON GLADES
UNION PACIFICFLORA
MANCHEST
E
R
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10030
15
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 117
MAPLEWOOD - BLENDON COMBINED SEWERRELIEF PHASE I
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCTION OF 18,000 FEET OF 12-INCH TO 96-INCH DIAMETERSEWER IN THE AREA AT RIVER DES PERES AND ARSENAL STREETNORTH TO BELLEVUE AVE. AT BRUNO AVE.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $12,500,000.
Construction
6660 - SanitaryReplacement Fund
LINKADIE
D
O
RSE
TT
MIDL
A
N
D
SCHAEFER
BRUNOVA
N
C
L
E
V
EBROUSTERMONIMA
B
A
L
L
T O WNLEY
INVER
N
E
S
S
C
E
N
T
R
A
L
MI
D
L
A
N
D
WARNEN
OLD DORSETTPLUM
PINEVIEW CROSSING
FRANCISG
RA
N
D
CIR
C
L
E
SCH ENKBRAD YMID CIRCLEBONANZA
PAST URESA LL Y
PRIVA
TEFRANCESO
L
D
M
ID
LAND
C
LEAR SKIES
BIR
C
H
W
O
O
D CROSS
HARLEYMIDLANDADIEMI
D
L
A
N
D
N LINDBERGH BLVDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10163
15
TASK NO:
TASK NAME:
$3,420,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 118
MCKELVEY PROJECT "A" AND "B" SANITARYRELIEF (SKME-005)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,500 FEET OF 18-INCH TO 21-INCH DIAMETER SANITARYRELIEF SEWERS, REHAB 31 LATERALS, DISCONNECT 8 ROOFDRAINS, 43 AREAS DRAINS, & 9 SUMP PUMPS. ELIMINATE THREECONSTRUCTED SSO'S (BP-068, BP-080, BP-537).
Construction
6660 - SanitaryReplacement Fund
PR
I
VA
T
E
PR
I
VA
T
E
PRIVATE
PR
I
VA
T
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10710
15
TASK NO:
TASK NAME:
$17,000,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Missouri River Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 119
MISSOURI RIVER WWTP SECONDARY TREATMENTEXPANSION AND DISINFECTION FACILITIES
MISSOURI RIVER WWTP IS CURRENTLY APPROACHING ITS DESIGNCAPACITY FOR PEAK FLOW WET WEATHER OPERATION AND FORMEETING MDNR DISCHARGE REQUIREMENTS
CONSTRUCTION OF SECONDARY TREATMENT AND DISINFECTIONFACILITIES AT THE MISSOURI RIVER WWTP TO ACCOMMODATE PEAKFLOWS AND TO MEET MDNR DISCHARGE REQUIREMENTS.
Construction(Supplemental
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦70
§¨¦40
7TH14TH4THTUCKERCHOTEAU
PARK 2NDBROADWAYUNION PACIFIC
CLARK
6TH9TH3RD8THMETRO LINK
11THGRATIOTSPRUCE
LEBANON
RAMP I7013THCERRE
ST ANGEPAPIN
HICKORY
LOM
B
A
R
D15THLASALLE
10THRUTGER
MORRISON
LA SALLE P
A
R
K
CON
V
E
N
T
CONV
E
N
T8TH
11TH11TH13THMORRISON 6TH13THHICKORY9THGRATIOT
HICKORY
GRATIOT
GRATI
O
T7TH
9TH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10722
15
TASK NO:
TASK NAME:
$2,800,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Mill Creek (City)
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 120
OLD MILL CREEK SEWER REHABILITATIONPHASE III - 14TH TO 2ND STREET
DETERIORATED 20 FEET x 15 FEET BRICK AND STONE SEWER.
REHABILITATE 5604 FEET OF THE 15 FOOT BY 20 FOOT ARCH OLDMILL CREEK SEWER BETWEEN 14TH AND 2ND.
Construction
6660 - SanitaryReplacement Fund
CE
N
T
R
A
L
M
I
D
L
A
N
D
OAK SPUROAK FOR
E
S
T
SPURN LINDBERGH BLVDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10725
15
TASK NO:
TASK NAME:
$350,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 121
PAGE AVE. & LINDBERGH SANITARY SEWER
CHRONIC MAINTENANCE ISSUES WITH 8-INCH SANITARY SEWER.
Construct 454 lineal feet of 12 inch pipe in tunnel and 286 lineal feet of 8 inchto 12 inch pipe sewers and appertenances to replace existing 8 inch sewer.
Construction
6660 - SanitaryReplacement Fund
TERMINALBRANCH BURLINGTON
NORTHERN
SANTA
FE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10727
15
TASK NO:
TASK NAME:
$3,780,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Rocky Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 122
PALM SEWER REPAIR/REPLACEMENT
MULTIPLE STRUCTURAL FAILURES OF A REINFORCED CONCRETEHORSESHOE SEWER DOWNSTREAM OF THE FLOOD PROTECTIONEMERGENCY CLOSURE STRUCTURE.
REPLACE THE PALM SEWER OUTFALL STRUCTURE AND 120 FEET OF18 FOOT WIDE BY 14 FOOT HIGH REINFORCED CONCRETE ARCHSEWER FROM THE FLOOD PROTECTION EMERGENCY CLOSURESTRUCTURE TO THE OUTFALL.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $6,300,000.
Construction
6660 - SanitaryReplacement Fund
ALFREDPORTISMORGAN FORDCONNECTICUT
JUNIATA
UNI
O
N
P
A
C
I
F
I
C
FYLER
WYOMING
HUMPHREY
FYLER
UNION PACIFIC
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10145
15
TASK NO:
TASK NAME:
$293,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 123
PORTIS #3242 COMBINED SEWER IMPROVEMENTS
LOCALIZED PROPERTY AND STREET FLOODING IN THE 3200 BLOCKOF PORTIS AVENUE.
CONSTRUCT SWALE, INLETS, & 720 FEET OF 8-INCH TO 24-INCHSEWER.
Construction
6660 - SanitaryReplacement Fund
PRIVATEBAUM
G
A
R
T
N
E
R
OLSENJEDM EDSOUTHCREST
OLD BAUMGAR
T
N
E
R
PENNBR OOKELEMAY FERRY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10184
15
TASK NO:
TASK NAME:
$800,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 124
PROVIDENCE PLACE SANITARY RELIEF
SANITARY BACKUPS AND OVERCHARGED SANITARY SEWERSDURING WET WEATHER EVENTS.
CONSTRUCT 2,015 FEET OF 15-INCH DIAMETER SANITARY SEWERSAND APPURTENANCES.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11114
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 125
$3,000,000.00
PUBLIC I/I REDUCTION REHABILITATION
EXCESSIVE I/I IN THE SANITARY SYSTEM.
REHABILITATE EXISTING SEWERS, MANHOLES, AND SERVICECONNNECTIONS TO REDUCE INFLOW AND INFILTRATION INTO THESANITARY SYSTEM.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $5,000,000.
Construction
6660 - SanitaryReplacement Fund
§¨¦55§¨¦55 UNIONGERMANIA
BLO
W
BAY
L
E
S
S
ROB
E
R
T
SEI
B
E
R
T
MORGAN FORDWEBER
IVORY
FAN
N
I
EKAMMERER SHARPFIELDCARONDELET
WEI
S
S
PR
I
V
A
T
E
DA
V
I
S
KAY
HU
R
C
K
HEIDELBERG
RIVER DES PERES
EUGENEGRANDU N IO N PACIF IC
MA
R
C
E
A
U
LOUIS
PARDELLAUPT
O
N
PRI
M
M
QUI
N
C
Y
REEDALASKAHOFFMEISTERBI
G
C
HI
E
F
FRE
N
C
HLEONAHA
M
B
U
R
G
WACHTELHA
N
N
O
V
E
R
AVENUE HWANDAHE
E
G
E STOLLEALABAMAHEA
L
Y
CA
T
A
L
A
N
FATIMA
H
OLLY HIL
L
S
CO
L
V
I
N
STE
I
N
S
LOUGHB
O
R
O
U
GH
JULIAHILDESHEIM KO
E
L
N
LANDORTIE
M
A
N
N
KRAMER
T
E
S
S
O
NCARLSBAD RAYTIFFANYPEARCROSBYYATESHU
M
M
E
L
S
H
E
I
M
RUNYONNEL
L
I
E
SU
N
S
H
I
N
E
ES
P
E
N
S
C
H
I
E
D
ORI
E
N
T IDAHOMAJE S TY
SC
H
I
R
M
E
R
CO
M
S
T
O
C
K
PO
E
P
P
I
N
GRADOM
AVENUE IOLD COU
NT
YSTEFFEN RIO TINTOLA
S
A
T
A
TO
M
O
R
E
TENNESSEEGARLYNWEBER
LOU
G
H
B
O
R
O
U
G
H
SEIBERT
ALASKAKO
E
L
N
HAN
N
O
V
E
R
TES
S
O
N
DAVIS
STE
I
N
SLEONA
FAN
N
I
EYATES GRANDLEONALO
U
I
S
AVENUE HHE
E
G
E
P
R
I
M
M
TIE
M
A
N
NGRAVOIS RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10198
15
TASK NO:
TASK NAME:
$5,000,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 126
RDP FOULWATER INTERCEPTOR REHABILITATION(PHASE I)
STRUCTURAL REHABILITATION OF THE FOULWATER INTERCEPTORSYSTEM NEEDED TO REDUCE I/I DURING WET WEATHER AND HIGHRIVER STAGES.
STRUCTURAL REHABILITATION OF FOULWATER INTERCEPTOR TOREDUCE I/I INTO THE SYSTEM.
THIS PROJECT WILL BE BID IN THREE SEPARATE PACKAGES.
Construction
6660 - SanitaryReplacement Fund
GRAVOISL
A
R
KIN WILLIAM S
WATSONNEW SMIZER MILL
MAI
N
GREEN ACRES RIVERSIDEYARNELLOLD SMIZER MILL
PRIVATE
DART
WA
T
E
R
G R A V O I S B L U F FS
FABICK
FURY
SO U T H ROCK ALVAPEFFER
GARY PL A Y E R
OP
P
S
WOLFNER
IMPERIAL
S U M M ER TOP
MONTEVALE
FOREST KNOLLOAKWOODFERRYVILL
A GRAN
COUNTRY HOMESENNAWOODS W E A N EYR I V E R HILLS
W O O DW A YOLD GRAVOIS
H A Y S HILLRAINTREEWEST
F
R
E
D
E
GRAVEFALL C R O WNFLEE T W O O D
S
K
I
N
K
E
RSTEMWOODHILLSIDE GOODEPRIVATE WA
T
S
O
N
PRIVATEPRIVATEWOLFNER
E MO30 HWY W MO30 HWY
S MO141 HWY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10146
15
TASK NO:
TASK NAME:
$4,500,000.00
BUDGET:
FUND:
Fenton
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Fenton Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 127
RIVERSIDE AND YARNELL SANITARY RELIEF(SKME-400)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTION OF 13,200 FEET OF 8-INCH TO 48-INCH SANITARYRELIEF SEWERS AND APPURTENANCES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $10,600,000.
Construction
5591 - Meramec RiverBasin Subd #449 OMCI
GRAVOISL
A
R
KIN WILLIAM S
WATSONNEW SMIZER MILL
MAI
N
GREEN ACRES RIVERSIDEYARNELLOLD SMIZER MILL
PRIVATE
DART
WA
T
E
R
G R A V O I S B L U F FS
FABICK
FURY
SO U T H ROCK ALVAPEFFER
GARY PL A Y E R
OP
P
S
WOLFNER
IMPERIAL
S U M M ER TOP
MONTEVALE
FOREST KNOLLOAKWOODFERRYVILL
A GRAN
COUNTRY HOMESENNAWOODS W E A N EYR I V E R HILLS
W O O DW A YOLD GRAVOIS
H A Y S HILLRAINTREEWEST
F
R
E
D
E
GRAVEFALL C R O WNFLEE T W O O D
S
K
I
N
K
E
RSTEMWOODHILLSIDE GOODEPRIVATE WA
T
S
O
N
PRIVATEPRIVATEWOLFNER
E MO30 HWY W MO30 HWY
S MO141 HWY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10146
15
TASK NO:
TASK NAME:
$4,600,000.00
BUDGET:
FUND:
Fenton
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Fenton Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 128
RIVERSIDE AND YARNELL SANITARY RELIEF(SKME-400)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTION OF 13,200 FEET OF 8-INCH TO 48-INCH SANITARYRELIEF SEWERS AND APPURTENANCES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $10,600,000.
Construction
6660 - SanitaryReplacement Fund
§¨¦40§¨¦40
CLAYTON
CONWAY
SPOEDELYLEWOOD THORNWO
O
D
R IDGELYNNLYNNBROOK
BLAYTONNSTONINGTONCREEKWOODSOUTH FORTY
N O R T H F OR T Y
BRYNNWOODEVERSDALECLAYT O NS LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10185
15
TASK NO:
TASK NAME:
$1,830,000.00
BUDGET:
FUND:
Frontenac
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 129
STONINGTON SANITARY RELIEF (SKME -652)
SANITARY SEWER SURCHARING, OVERFLOWS, WET WEATHERSANITARY BACK-UPS, AND ONE CONSTRUCTED SSO (BP-166.)
CONSTRUCTION OF 3,310 FEET OF 8-INCH TO 15-INCH SANITARYSEWER, ONE CONSTRUCTED SSO (BP-166) IS TO BE ELIMINATED.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦44GEYERBIG BEND CLAYROSE HILL
WOODBINE
LEE HARRISONFILLMORELEFFINGWELL
BURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
ORLEANSSCOTT
ELLIOTTTAYLOR
ROSE
UNION PACIFIC
MILWAUKEEATTUCKS
MEACHAM
MARYHURSTNEW YORK CLARKNIRK
VAN BURENPRIVATE NORTONSPELLMANCLINTON
MIDWAY
MONROE
MIRIAMHEEGE
ACORN
FOREST GLEN
OAKSHIRE
MCLAIN
GEY E R FORE S T
PINELLAS
PROSPECT OHLMANIDLEWILD
MEMPHIS
CHICAGOHEMANASHWOODARTANGENETTE TOLSTOIREARDON
KIRKWOOD
SANTE
CLAYBINEWHITSONSILVER
CLARKTAYLORSCO
T
T
TAYLORCLINTON
MIDWAY
S KIRKWOOD RDS KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10121
15
TASK NO:
TASK NAME:
$3,900,000.00
BUDGET:
FUND:
Kirkwood
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 130
TAYLOR - FILLMORE - HARRISON SANITARYRELIEF (SKME-502 & 503)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,115 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARYSEWER FROM NEAR LEFFINGWELL AND SHORT AVENUE, SOUTH ANDWEST OF HARRISON. THREE CONSTRUCTED SSO'S (BP-400, BP-385,BP-407) ARE TO BE REMOVED.
Construction
6660 - SanitaryReplacement Fund
SE
I
B
E
R
T
TI
E
M
A
N
N
PR
I
V
A
T
E
NONIEHE
I
D
E
L
B
E
R
G
HU
M
M
E
L
S
H
E
I
M
STEFFENOL
D
E
N
B
U
R
G
HILDESHEIMTIE
M
A
N
N
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10775
15
TASK NO:
TASK NAME:
$359,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 131
TIEMANN & NONIE AVE. SANITARY SEWERREPLACEMENT
SANITARY SEWER DISCHARGING TO SINKHOLE.
DESIGN AND CONSTRUCT APPROXIMATELY 425 FEET OF 8-INCHSANITARY SEWER AND APPURTENANCES.
Construction
6660 - SanitaryReplacement Fund
PINGRYBARRETT STATIONSAMSKARLINBONROYALP
O
I
N
T
E
LAU R E L L A KE
RO
M
AN
Y WAY
GRECIAN WAYMANCHESTER RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10199
15
TASK NO:
TASK NAME:
$1,200,000.00
BUDGET:
FUND:
Town and Country
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Grand Glaize Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 132
TOPPING SANITARY RELIEF (SKME -421)
SANITARY SEWER SURCHARGING, MANHOLE OVERFLOWS, ANDBUILDING BACKUPS DURING WET WEATHER EVENTS.
CONSTRUCT 2,205 FEET OF 12-INCH TO 15-INCH DIAMETER SANITARYSEWERS AND APPURTENANCES.
Construction
6660 - SanitaryReplacement Fund
ALFREDKINGSHIGHWAYFLAD
TOWER GROVE MAURYSHENANDOAH PORTISBISCHOFF
CLEVELANDVANDEVENTER
SOUTHWES
T
BOTANICAL
COLUMBIA
HEGERMAGNOLIA GURNEYMAURYMAGNOLIA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10777
15
TASK NO:
TASK NAME:
$2,100,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 133
TOWER GROVE- MANCHESTER COMBINED SEWERSYSTEM PHASE II (TOWER GROVE PLACE STORMRELIEF SEWERS)
OVERLAND FLOODING CAUSED BY INSUFFICIENT INLET ANDCOLLECTOR SEWER CAPACITY AT THE TOWER GROVE LOCATION.
CONSTRUCT 2,200 FEET OF 12-INCH TO 72-INCH DIAMETER STORMRELIEF SEWERS AND APPURTENANCES, AND REMOVAL OF PRIVATEI&I TO MINIMIZE THE POTENTIAL FOR BUILDING BACKUPS ANDSURFACE FLOODING DUE TO OVERCHARGED COMBINED SEWERS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $3,500,000.
Construction
6660 - SanitaryReplacement Fund
LANGKIRKRAND
FERG
U
S
O
N ROYCEGAGEWARDWEST FLORISSANTVENICEDELLWOODFORESTWOODEDG
E
H
I
L
L
NORF
O
L
K
S
O
U
T
H
E
R
N
HIGH
M
O
N
T
CLE
A
R
F
I
E
L
D
DASHWOO
D
NESBIT
S H A R O
N
D
A
L
E
C A N F I E L D
HIGHMONT
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10782
15
TASK NO:
TASK NAME:
$2,940,000.00
BUDGET:
FUND:
Ferguson
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 134
UPPER MALINE TRUNK SANITARY RELIEF PHASEIII SECTION C
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,200 FEET OF 24-INCH TO 54-INCH DIAMETER RELIEFSEWER FROM WEST FLORISSANT ROAD WESTWARDLY TOFERGUSON ROAD AT MALINE CREEK, IN UNINCORPORATED ST. LOUISCOUNTY AND THE CITY OF FERGUSON. ONE CONSTRUCTED SSO(BP-303) TO BE REMOVED.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $4,900,000.
Construction
6660 - SanitaryReplacement Fund
8THPRIVATE
9THBURLINGTON NORTHERN SANTA FE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10787
15
TASK NO:
TASK NAME:
$800,000.00
BUDGET:
FUND:
Valley Park
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Grand Glaize Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 135
VALLEY PARK/GRAND GLAIZE DIVERSION & PUMPSTATION
DURING HEAVY RAINS THE TREATMENT PLANT CANNOT HANDLE THEFLOW AND SEWAGE BACKUPS OCCUR INTO BUILDINGS IN VALLEYPARK.
CONSTRUCT PUMP STATION AND ASSOCIATED PIPING TO DIVERTFLOWS INTO THE STORAGE LAGOONS AT THE GRAND GLAIZETREATMENT PLANT.
Construction
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦44 BERRYROCK HILLBIG BEND
UNION PA
CI
FI
C
KIRKHAM
GRAYDICKSONGLENLOCKWOOD
GORELEE
GLENDALEELMJACKSON
ESSEX
SAPPINGTONMAPLEMONROE
LILACB U R L IN G T O N N O R T H E R N S A N T A F E SELMABAKER
BISMARK
BROWNELL BELLARGONNE
HOLMESFOOTE
EDWINEUCLID
MADISON
LITHIA
OAK TREEPLANTBACON
ADAMS JEFFERSONSYLVESTERSCOTT OA K CORNELLHILL
AUSTINPARKLANDIOLAREAVISNEWPORT
PAPINBENNETTFLANDERS
PACIFIC
DWYER ORCHARDFRISCO
CLARA
SOUTHSIDE
INNISFAILHOLLYWOODANDREWLAFAYETTE
CENTRALHILLARD MASONJOANNA
PARKD
E
VONBRENTCHELSEA MANITOU
SIMMONS
VICTORIA
BONITA
WARWICK
MOODY
OAKSFOX
BARRONFREDERICKGLENMOOR
CHESTNUT
ALMENTOR
OAKWAY
OLIVEHULLFA
IRD
A
L
E
HARTSWON
ELLIOTT
C O L L
E
G
E
ALGONQUIN
CEDAR
STARKHILLS
IDE
WOODLAWNBELLEVIEW
CARM
E
L
A
R
M
I
N
BERRY WOOD
GASLITE
NOLAN
MINTURNFUHRMANN
YORKSHIRERUSSELLSTURGIS
FORESTON SELMAMADISON
CEDARIOLAELMCHELSEA
LOCKWOODELM U N I O N P A CIFICELMHOLMESSCOTT
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10793
15
TASK NO:
TASK NAME:
$2,500,000.00
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 136
WEBSTER GROVES TRUNK "E" SANITARYREHABILITATION AND I/I REDUCTION PHASE II
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
REHABILITATION OF EXISTING SANITARY SEWERS AND REMOVAL OFPUBLIC I/I .
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PROJECT BUDGET IS $7,500,000.
Construction
6660 - SanitaryReplacement Fund
25 April 2012
WASTEWATER CONTINUED PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10665 INFRASTRUCTURE
REPAIRS(REHABILITATION
)(FY 2012) CONTRACT A
PROJECT CONTINUED DUE TO COORDINATION WITH
OPERATIONS ON SCOPE OF WORK. ANTICIPATE BOARD
ADOPTION IN JULY, 2012.
$5,400,000
11132 LEMAY WWTP OUTFALL
002 ELIMINATION
PROJECT WAS INCLUDED IN SCOPE OF $20,000,000 BUDGET
FOR PROJECT 10681, WHICH RECEIVED A PARTIAL
APPROPRIATION OF $15,000,000 IN FY12.
$238,000
11132 LEMAY WWTP OUTFALL
002 ELIMINATION
PROJECT WAS INCLUDED IN SCOPE OF $20,000,000 BUDGET
FOR PROJECT 10681, WHICH RECEIVED A PARTIAL
APPROPRIATION OF $15,000,000 IN FY12.
$4,500,000
TOTAL: $10,138,000
24 April 2012
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11808 COLDWATER CREEK WWTP DIGESTER PIPING $300,000 137
10430 CSO - SOUTH COUNTY PARK SUBSYSTEM NO.
71 INTERCEPTOR (I-161) SEPARATION
$1,680,000 138
11786 ESSEX PLACE COMBINED SEWER RELIEF $2,000,000 139
10600 FF-02 FEE FEE - ALAN SHEPARD I-270
SANITARY RELIEF PHASE V
$1,700,000 140
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
$2,700,000 141
10656 INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI
$5,500,000 142
11123 LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
$9,000,000 143
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
$2,000,000 144
10770 SUN VALLEY I/I REDUCTION $1,226,000 145
11139 TILLIE BADEN NEWBY SEWER
IMPROVEMENTS (PROPERTY ACQUISITION)
$2,400,000 146
10781 UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314)
$1,000,000 147
TOTAL:$29,506,000
P RIVATE RDTREES EDGE LN
OBERO N LNBEHLMANN FARMS BLVDBE
HLMANN MEA D O W S W A Y
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11808
15
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 137
COLDWATER CREEK WWTP DIGESTER PIPING
DECOMMISSIONED DIGESTERS CAN FUNCTION AS EMERGENCYSTORAGE TANKS.
CONSTRUCT NEEDED PIPING CHANGES TO ALLOW DIGESTERS TOFUNCTION AS EMERGENCY STORAGE TANKS.
Construction
6660 - SanitaryReplacement Fund
RIVER RDTELEGRAPH RDUNION PACIFIC RRGREGG RDCCC RDSHERMAN AVEKINGSTON DRSHERIDAN R DGRANT RDBOUNDARY RDHALSE Y S T RIDGE RDFIRST DR
NEBRASKA TRAIL
HANCOCK DR
FLAGSTAFF DR
R
E
A
VIS B
A
RRACKS RD
COOKE RDJEFFERSONIAN DR
GRO
V
E
R R
D
SIGSBEE AVE PRIVATE RDKEARNEY ST
GRA NDA DRDAVIS ST
BELLSWOR T H D R
POPLAR FOREST DRTACOMA DR
LAREDO AVE
G
ENE
V
A DRBEATRICE AVE
SYLVIA DR
BRILLIA N T L N
CAMERON RDCORLISS DRBOUNDARY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10430
15
TASK NO:
TASK NAME:
$1,680,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 138
CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71INTERCEPTOR (I-161) SEPARATION
SEWER SURCHARGING AND BUILDING BACKUPS.
CONSTRUCT 900 FEET OF 8-INCH DIAMETER SANITARY SEWERS ANDAPPURTENANCES, REHABILITATE 19 MANHOLES AND 10,000 FEET OFEXISTING 6-INCH TO 8-INCH SEWERS, INCLUDING THREE POINTREPAIRS AND REDUCE PRIVATE PROPERTY I/I.
IT IS ANTICIPATED THAT THIS PROJECT WILL FACILITATE THEEVENTUAL REMOVAL OF ONE CSO (L-151) AND ASSOCIATEDINTERCEPTOR (I-161).
Construction
6660 - SanitaryReplacement Fund
MARCUS AVENATURAL BRIDGE RDSHREVE AVEPALM ST CORA AVEMARGARETTA AVE
LEXINGTON AVE
ESSEX PL
FARLIN AVE
SACRAMENTO AVE
SAN FRANCISCO AVE
PALM ST
LEXINGTON AVE
SACRAMENTO AVE
CORA AVECORA AVESAN FRANCISCO AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11786
13
TASK NO:
TASK NAME:
$2,000,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Harlem
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 139
ESSEX PLACE COMBINED SEWER RELIEF
REOCCURRING OVERCHARGED MAINS AND BUILDING BACKUPS.
BUYOUT OF 14 PROPERTIES ON ESSEX PLACE.
FUTURE DETENTION FACILITIES TO BE CONSIDERED AFTER BUY-OUT.
Land Purchase
6660 - SanitaryReplacement Fund
MIDLAND AVE FEE FEE RDDE RUNTZ AVE
SMILEY RDREADING AVEMACK AVE
DOWNING PL
SHUMATE AVELANSING AVELANSING DRFRANKE AVE
W Y L W O O D D R
MARS LNCARLSON AVE LENNOX TERMIDLAND CROSSING CTMIDLAND AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10600
15
TASK NO:
TASK NAME:
$1,700,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 140
FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARYRELIEF PHASE V
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTION OF 2,360 FEET OF 8-INCH TO 36-INCH DIAMETERSEWERS, FROM FEE FEE ROAD AND MIDLAND BOULEVARDNORTHWEST TO NEAR I-270. TWO CONSTRUCTED SSO'S AND A WETWEATHER PUMP STATION ARE TO BE REMOVED.
PROJECT CANNOT START CONSTRUCTION UNTIL PHASE IV ISCONSTRUCTED.
Construction
6660 - SanitaryReplacement Fund
GREER AVE CLARA AVEHERBERT STTERMINAL R R
LABADIE AVE
ASHLAND AVE
PALM STGOODFELLOW BLVDNATURAL BRIDGE RD
BLACKSTONE AVEASHLAND AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11768
15
TASK NO:
TASK NAME:
$2,700,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Harlem
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 141
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(DETENTION BASIN)
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS &FLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNKSEWERS.
Construction
6660 - SanitaryReplacement Fund
CENTRAL M IDLAND RRW H ITE RDOLIVE BLVDW ATER W O RKS RDPRIVATE RDH
O
W
A
R
D B
E
N
D
STATI
ON
R
DUNION PA CIFIC SPUR RR
KENDALL BLUFF CTW ATERW ORKS RD
KENDALL RIDGE DREAST DRPRI V A T E R D W H IT E RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10656
15
TASK NO:
TASK NAME:
$5,500,000.00
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Caulks Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 142
INFRASTRUCTURE REPAIR #087P CAULKS CREEK"A" (P-750) PHASE VI
EXISTING FORCE MAIN IS DETERIORATED.
RECONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN.
Construction
6660 - SanitaryReplacement Fund
MARCEAU ST
W CATALAN STMINNESOTA AVEADELIA AVE
W ESPENSCHIED ST
NELLIE AVE
FANNIE AVE VIRGINIA AVES BROADWAY STMICHIGAN AVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11123
15
TASK NO:
TASK NAME:
$9,000,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 143
LEMAY PUMP STATION NO. 1 REDUNDANT FORCEMAIN
NEED TO INCREASE INFLUENT PUMPING CAPACITY FROM 290 TO 340MGD.
CONSTRUCT 3,600 FEET OF REDUNDANT 96-INCH FORCE MAIN FROMLEMAY PUMP STATION 1 TO LEMAY HEADWORKS.
Construction
6660 - SanitaryReplacement Fund
BIG BEND BLVDRI
DGEMOOR DRSOUTHMOOR DR
O A K KNOLL DRBROADVI
EW DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10390
15
TASK NO:
TASK NAME:
$2,000,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 144
RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574)
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING, I/I ENTERING SANITARY SEWER SYSTEM.
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH DIAMETER STORMSEWER, REMOVAL AND REPLACEMENT OF 700 FEET OF UNDERSIZEDSANITARY SEWER, DETENTION BASIN, AND APPURTENANCES, ANDADDRESS PRIVATE I/I.
Construction
6660 - SanitaryReplacement Fund
H
A
L
L
S
F
E
R
R
Y
R
D
ST CYR RD
S
H
A
N
N
O
N
A
V
E
C O ZENS AVELEWIS N CLARK BLVDJENNIN G S STA TIO N RDDORWOOD DRDUENKE DRST CYR DRC
E
N
T
E
R
A
V
E
B O YCE PLHORD AVE YORKTOWN DREDNA STDARNELL PLASTORIA D
RLEAMONT DRS U M TER D RG LEN G A R D EN D RLUCAS N HUNT RDB ERKAY AVEMA
R
Y
A
V
E
A
D
A WOR
T
L
E
Y
AV
ESUN VALLEY DRWI
E
C
K
D
R
W ILBERT DRJA N NETTE D
R
MI
D
D
L
E
R
I
V
E
R
R
D
LONGRIDGE DRJ
E
N
D
A
L
E
C
T SHADYDALE DRCATALINA DRAMESB U RY DR
MAY AVEOS
A
G
E
R
I
V
E
R
R
DRANCH M EADO W S DRMAY A LNPICKFORD PLC
U
R
R
E
N
T
R
I
V
E
R
R
D
MAYF IE L D C T
FAIRHAVEN DR EDG EW ATER DRB LU EG RASS D R
CAVERHILL DR
W ESTCHESTER D R
T R U D Y A V E
NETHERWOOD DR
AETNA DRHAZELTON LN
BOYCE PL§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10770
15
TASK NO:
TASK NAME:
$1,226,000.00
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 145
SUN VALLEY I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
I/I REDUCTION IN THE AREA OF HALLS FERRY ROAD SOUTH OF ST.CYR ROAD, NORTH TO MALINE CREEK TRUNK SEWER SECTION B.BYPASSES TO BE REMOVED IF ENCOUNTERED.
Construction
6660 - SanitaryReplacement Fund
GIMBLIN ST
CHURCH RDBADEN AVE
SWITZER AVE NEWBY STB IT T N E R S T
PEGGY CT
NORFOLK SOUTHERN RR
GARTH AVE
T IL L IE A V E
ROBIN AVEHALLS FERRY RD
FREDERI
CK STLYNFIELD PLLYNHAVEN PL
FREDERI
CK ST§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11139
13
TASK NO:
TASK NAME:
$2,400,000.00
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 146
TILLIE BADEN NEWBY SEWER IMPROVEMENTS(PROPERTY ACQUISITION)
OVERCHARGED MAINS AND BUILDING BACKUPS IN A DEPRESSIONOVER THE BADEN TRUNK SEWER.
ACQUISITION OF 50 PROPERTIES.
FUTURE DETENTION FACILITIES TO BE CONSIDERED AFTER BUY-OUT.
Land Purchase
6660 - SanitaryReplacement Fund
N FLORISSANT RDN ELIZABETH AVED A R S T R D
POWELL AVE
R O B E R T A V E
AMES PLH E R E F O R D A V E
A IR P ORT RD
OLYMPIA DR
FROST AVE
T H O R O U G H M A N AV E
R O YA L AV E
JANUARY AVE
NORFOLK SOUTHERN RR
LARKIN R
D
MILLMAN DRSUPERIOR DRTHATCHER AVECARDIGAN DR
MARIE AVECHAMBERS RD
PLANT
M
O
R
E DR
BALLMAN AVEN CLAY AVELAKE P E M B R O K E D R
MOUNDALE DRN HARVEY AVEGERALD PLNANCY PLR ISDON DRSCOTT AVE
F OR EST AV E
BLACKBURN AVE
PALACE CT
WOOSTER DR COLCH E S T E R D R
CHANSLOR AVEMARY AVEB A N G E R T AV EESTATES CTSHIREFORD
L
NHIGH P L
EASTLEIGH DR
K I N G S C T ROBERT AVE
R O YA L AV E
N CLAY AVER O YA L AV ENANCY PL§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10781
15
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
Ferguson
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 147
UPPER JESKE PARK LATERAL SANITARY RELIEF(SKME-314)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER.
CONSTRUCT 2,300 FEET OF 12-INCH TO 18-INCH DIAMETER SANITARYSEWER AND REMOVAL OF PRIVATE I/I.
Construction
6660 - SanitaryReplacement Fund
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10376 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - NORTH
Various $1,500,000
10377 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS - SOUTH
Various $1,500,000
11117 Construction COLDWATER CREEK WWTP DIGESTER
CLEAN-OUT
Unincorporated $1,500,000
10232 Professional
Services
COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2008)
St. Louis City And
County
$3,200,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10613 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
Various $50,000
10626 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2011) CONTRACT A
Various $50,000
10627 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2011) CONTRACT B
Various $50,000
10628 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2011) CONTRACT C
Various $50,000
10629 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2011) CONTRACT D
Various $50,000
11782 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
A
Various $60,000
11783 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
B
Various $60,000
11784 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
C
Various $60,000
11785 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
D
Various $60,000
11771 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
Various $800,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
10743 Vendor
Services
RADAR RAINFALL DATA (FY2011)Various $120,000
10231 Professional
Services
SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT
(FY2008)
St. Louis County $1,200,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
10768 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2011)
Various $660,000
10230 Professional
Services
WATERSHED FACILITY PLANNING PHASE II St. Louis City And
County
$500,000
FUND TOTAL: $14,320,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUND
APPROPRIATION
Various $250,000
FUND TOTAL: $250,000
5591 - MERAMEC RIVER BASIN SUBD #449 OMCI FUND
10146 Construction RIVERSIDE AND YARNELL SANITARY
RELIEF (SKME-400)
Fenton $4,500,000
FUND TOTAL: $4,500,000
6660 - SANITARY REPLACEMENT FUND
10407 Construction BAUMGARTNER & BLACK FOREST
SANITARY REPLACEMENT PHASE II
Unincorporated $2,100,000
11684 Design Services BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
Bellefontaine
Neighbors
$220,000
11685 Design Services BISSEL HILLS SANITARY
RELIEF/CALUMENT I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$490,000
11815 Construction BISSELL SERVICE AREA PUMP STATION
POWER SUPPLY IMPROVEMENTS
St. Louis City $800,000
11688 Pre-Design
Services
BLACK CREEK - HADDINGTON COURT
STORAGE TANK
Clayton $625,000
11689 Design Services BLACK CREEK I/I REDUCTION Clayton $1,800,000
10393 Construction BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
St. Louis County $136,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11718 Design Services BRIGHTWELL I/I REDUCTION Florissant $375,000
11719 Design Services BRINWOOD I/I REDUCTION Florissant $700,000
11792 Construction BROOKTON WAY TO MERAMEC BOTTOM
ROAD SANITARY RELIEF PHASE II
Unincorporated $3,180,000
11121 Land Purchase CALVARY CEMETERY STORAGE BASIN
(PROPERTY ACQUISITION)
St. Louis City $500,000
11790 Design Services CAULKS CREEK FORCE MAIN (RIVER
VALLEY RD. TO L-52)
Maryland Heights $950,000
11722 Design Services CEDARCREST SANITARY RELIEF (SKME-
561) I/I REDUCTION
Ladue $1,650,000
10382 Construction CELLA - ROLLING ROCK - GLEN CREEK I/I
REDUCTION (SKME -658, 659, & 657)
Ladue $410,000
11115 Design Services CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $300,000
11726 Design Services COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
St. Louis County $2,745,000
10557 Design Services COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
Unincorporated $1,300,000
10518 Construction COLDWATER TREATMENT PLANT
IMPROVEMENTS (SLUDGE PUMP STATION)
Unincorporated $350,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $450,000
11825 Design Services CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
Maryland Heights $300,000
11831 Construction CREVE COEUR CREEK PUBLIC I/I
REDUCTION
Various $6,200,000
10428 Construction CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE III (SKME-021)
Chesterfield $1,500,000
10568 Construction CREVE COEUR CREEK WATERSHED
SANITARY SEWER REHABILITATION
Various $500,000
11730 Design Services CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $2,250,000
10429 Construction CSO - JEFFERSON BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-122) SEPARATION
St. Louis County $2,100,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11116 Design Services DACEY BRANCH I/I REDUCTION (BP-313)Dellwood $150,000
10021 Design Services DC-02 DEER CREEK SANITARY RELIEF Various $1,750,000
11731 Pre-Design
Services
DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
Ladue $1,250,000
11829 Construction DEER CREEK/MALINE CREEK PUBLIC I/I
REDUCTION
Various $5,360,000
11735 Design Services DELCREST SANITARY RELIEF (SKME -565)
I/I REDUCTION
University City $250,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11736 Design Services DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
Florissant $875,000
11741 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2013)
St. Louis City And
County
$2,000,000
11830 Construction FEE FEE CREEK PUBLIC I/I REDUCTION Various $5,890,000
10597 Construction FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION
Various $250,000
10601 Design Services FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $875,000
11749 Design Services FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $198,000
11750 Design Services FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
Grantwood Village $425,000
11138 Land Purchase FREDERICK STREET COMBINED SEWER
(PROPERTY ACQUISITION)
St. Louis City $2,000,000
10610 Construction GALAXY (BP-491) SANITARY SEWER
REHABILITATION AND I/I REDUCTION
Various $1,000,000
10015 Construction GC-11 GRAVOIS CREEK SANITARY RELIEF Unincorporated $400,000
10612 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2012)
Various $100,000
10614 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
Various $50,000
10615 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
Various $50,000
10623 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2011)
Various $300,000
10630 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2011) CONTRACT E
Various $50,000
11779 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
10458 Construction GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
Various $2,000,000
11122 Design Services GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
Various $110,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11122 Construction GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
Various $4,700,000
10496 Construction,
Phase II
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $2,000,000
10496 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $8,220,000
10642 Design Services HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION
Unincorporated $760,000
10645 Construction,
Phase II
HERMITAGE I/I REDUCTION (SKME-615)Frontenac $400,000
10646 Construction HIGH SCHOOL DR. & MADGE AVE. SEWER
SEPARATION
Brentwood $260,000
11706 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY 2013) CONTRACT A
St. Louis City And
County
$5,000,000
11845 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT B
Various $5,000,000
11846 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT C
Various $5,000,000
11771 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
Various $3,200,000
10665 Construction INFRASTRUCTURE
REPAIRS(REHABILITATION)(FY 2012)
CONTRACT A
St. Louis City And
County
$5,400,000
11711 Pre-Design
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,700,000
11712 Design Services LACKLAND I/I REDUCTION Various $600,000
11715 Design Services LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
Ferguson $600,000
11794 Construction LEMAY WWTP ASH LAGOON ACCESS ROAD Unincorporated $50,000
10681 Construction
(Supplemental
Appropriation)
LEMAY WWTP DISINFECTION FACILITIES Unincorporated $11,512,000
11132 Engineering
During
Construction
Services
LEMAY WWTP OUTFALL 002 ELIMINATION Unincorporated $238,000
11132 Construction LEMAY WWTP OUTFALL 002 ELIMINATION Unincorporated $4,500,000
11649 Design Services LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $1,500,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $11,000,000
11106 Construction LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
Unincorporated $500,000
11652 Design Services LYNN HAVEN I/I REDUCTION Hazelwood $200,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11655 Design Services MALINE CREEK CSO 051 TREATMENT
FACILITY
St. Louis City $2,400,000
11656 Design Services MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $1,000,000
11658 Design Services MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
Bellefontaine
Neighbors
$200,000
10030 Construction MAPLEWOOD - BLENDON COMBINED
SEWER RELIEF PHASE I
Various $1,000,000
11659 Design Services MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $435,000
10163 Construction MCKELVEY PROJECT "A" AND "B"
SANITARY RELIEF (SKME-005)
Maryland Heights $3,420,000
11662 Design Services MCNULTY - PALLARDY I/I REDUCTION Various $1,000,000
11663 Design Services MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $525,000
10710 Construction
(Supplemental
Appropriation)
MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION AND
DISINFECTION FACILITIES
Maryland Heights $17,000,000
11694 Design Services NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
Pasadena Hills $250,000
10722 Construction OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET
St. Louis City $2,800,000
11695 Design Services OLDE ENGLISH I/I REMOVAL Unincorporated $500,000
10725 Construction PAGE AVE. & LINDBERGH SANITARY
SEWER
Unincorporated $350,000
11697 Design Services PAGE TO TRENTON SANITARY RELIEF Overland $180,000
10727 Construction PALM SEWER REPAIR/REPLACEMENT St. Louis City $3,780,000
11698 Design Services PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
Unincorporated $400,000
10145 Construction PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
St. Louis City $293,000
11094 Design Services PROSPECT HILL LANDFILL VERTICAL
EXPANSION
St. Louis City $350,000
10184 Construction PROVIDENCE PLACE SANITARY RELIEF Unincorporated $800,000
11114 Construction PUBLIC I/I REDUCTION REHABILITATION Various $3,000,000
10198 Construction RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
St. Louis City $5,000,000
10146 Construction RIVERSIDE AND YARNELL SANITARY
RELIEF (SKME-400)
Fenton $4,600,000
11069 Design Services ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $600,000
10748 Design Services ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
Wilbur Park $440,000
27 April 2012
WASTEWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11680 Design Services ROXBURY I/I REDUCTION Clayton $500,000
10754 Design Services SHERWYN SANITARY RELIEF (SKME -651) &
I/I REDUCTION
Creve Coeur $420,000
11666 Design Services ST MARIE SANITARY RELIEF I/I REDUCTION Florissant $258,000
10185 Construction STONINGTON SANITARY RELIEF (SKME -
652)
Frontenac $1,830,000
10121 Construction TAYLOR - FILLMORE - HARRISON
SANITARY RELIEF (SKME-502 & 503)
Kirkwood $3,900,000
10775 Construction TIEMANN & NONIE AVE. SANITARY SEWER
REPLACEMENT
Unincorporated $359,000
10199 Construction TOPPING SANITARY RELIEF (SKME -421)Town And Country $1,200,000
10777 Construction TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (TOWER GROVE
PLACE STORM RELIEF SEWERS)
St. Louis City $2,100,000
11670 Design Services TUCKAWAY SANITARY REHABILITATION St. Louis County $120,000
10782 Construction UPPER MALINE TRUNK SANITARY RELIEF
PHASE III SECTION C
Ferguson $2,940,000
10027 Design Services UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
University City $800,000
10787 Construction VALLEY PARK/GRAND GLAIZE DIVERSION
& PUMP STATION
Valley Park $800,000
10230 Professional
Services
WATERSHED FACILITY PLANNING PHASE II St. Louis City And
County
$4,500,000
11086 Design Services WEBSTER ACRES SANITARY SEWER
REPLACEMENT
Webster Groves $320,000
10793 Construction WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE II
Webster Groves $2,500,000
11678 Design Services WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $400,000
11108 Design Services WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
Overland $300,000
FUND TOTAL: $209,444,000
GRAND TOTAL:$228,514,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - NORTH (2014)
Various $1,500,000
11810 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - SOUTH (2014)
Various $1,500,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11755 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $400,000
11782 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
A
Various $70,000
11783 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
B
Various $70,000
11784 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
C
Various $70,000
11785 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
D
Various $70,000
11772 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Various $800,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
10743 Vendor
Services
RADAR RAINFALL DATA (FY2011)Various $130,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
10768 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2011)
Various $726,000
FUND TOTAL: $9,386,000
4122 - WASTEWATER EMERGENCY FUND
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11107 Construction EMERGENCY REPAIR FUND
APPROPRIATION
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
11776 Design Services ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $180,000
10523 Construction AYRES SANITARY RELIEF AND I/I
REDUCTION
Crestwood $2,040,000
11682 Design Services BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $300,000
11683 Design Services BEAVER DAM STUDY AREA I/I REDUCTION Des Peres $150,000
11686 Design Services BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR)
Various $325,000
11688 Pre-Design
Services
BLACK CREEK - HADDINGTON COURT
STORAGE TANK
Clayton $625,000
10537 Design Services BOPP SANITARY RELIEF (SKME -611)Des Peres $130,000
11792 Construction
(Supplemental
Appropriation)
BROOKTON WAY TO MERAMEC BOTTOM
ROAD SANITARY RELIEF PHASE II
Unincorporated $2,120,000
11720 Design Services CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $1,000,000
10547 Design Services CAULKS CREEK TRUNK SEWER LINE A
SANITARY REPLACEMENT (WILDWOOD
ANNEXATION)
Chesterfield $300,000
11793 Construction CC-14 CREVE COEUR CREEK SANITARY
RELIEF (SKME-026) PHASE II
Creve Coeur $2,280,000
10549 Construction CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II
Chesterfield $2,100,000
11808 Construction COLDWATER CREEK WWTP DIGESTER
PIPING
Unincorporated $300,000
11809 Construction COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Unincorporated $750,000
10557 Construction COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
Unincorporated $8,000,000
11727 Design Services COLLINGWOOD DRIVE SEWER SEPARATION Olivette $180,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,160,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $650,000
11825 Construction CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
Maryland Heights $2,500,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10449 Construction CSO - CLAYTONIA TERRACE AND DALE
AVE CSO INTERCEPTOR (I-101A, 101B/L-126,
127) SEPARATION
Richmond Heights $700,000
10429 Construction
(Supplemental
Appropriation)
CSO - JEFFERSON BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-122) SEPARATION
St. Louis County $1,400,000
10430 Construction CSO - SOUTH COUNTY PARK SUBSYSTEM
NO. 71 INTERCEPTOR (I-161) SEPARATION
Unincorporated $1,680,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11116 Construction DACEY BRANCH I/I REDUCTION (BP-313)Dellwood $2,250,000
11155 Design Services DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $1,000,000
11731 Pre-Design
Services
DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
Ladue $1,000,000
11732 Land Purchase DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK - LAND ACQUISITION
St. Louis County $4,500,000
11733 Pre-Design
Services
DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK
St. Louis County $1,250,000
11734 Land Purchase DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK - LAND ACQUISITION
St. Louis County $6,000,000
11738 Design Services DIXIE I/I REDUCTION Various $1,200,000
11739 Design Services DUCHESNE AND GOTT I/I REDUCTION Various $900,000
10335 Construction DUCHESNE PARK NO. 1 PUMP STATION
ELIMINATION (P-407)
Unincorporated $531,000
11742 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
St. Louis City And
County
$3,000,000
11786 Land Purchase ESSEX PLACE COMBINED SEWER RELIEF St. Louis City $2,000,000
10600 Construction FF-02 FEE FEE - ALAN SHEPARD I-270
SANITARY RELIEF PHASE V
Maryland Heights $1,700,000
10014 Construction FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $5,400,000
10489 Construction FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $6,000,000
11748 Design Services FLORISSANT I/I REDUCTION Various $662,500
10456 Design Services FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION & I/I
REDUCTION
Unincorporated $1,000,000
10142 Construction FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $2,100,000
10611 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $3,000,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11751 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2014)
Various $150,000
11759 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2014)
Various $300,000
11763 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014)
Various $250,000
11779 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
11122 Construction
(Supplemental
Appropriation)
GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
Various $4,900,000
11765 Design Services GRAND GLAIZE TRUNK SANITARY RELIEF
I/I REDUCTION (SKME-417)
Ballwin $375,000
10496 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $5,480,000
11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521)
Unincorporated $2,200,000
11768 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $2,700,000
10641 Design Services HARLEM - BADEN RELIEF PHASE IV
(HEBERT) BUILDING DEMOLITION AND
DESIGN
St. Louis City $1,000,000
10642 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION
Unincorporated $4,000,000
10330 Construction HARTLAND TO GOTHLAND SEWER
SEPARATION
Overland $3,000,000
11097 Design Services HOLLY DRIVE SEWER SEPARATION Webster Groves $300,000
10656 Construction INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI
Maryland Heights $5,500,000
11772 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Various $3,200,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11707 Construction INFRASTRUCTURE
REPAIRS(REHABILITATION)(FY 2014)
St. Louis City And
County
$15,000,000
11710 Design Services ISABELLE I/I REDUCTION St. Ann $165,000
11711 Pre-Design
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $1,800,000
11714 Design Services LADUE SUBTRUNK SANITARY RELIEF
(SKME-654)
Ladue $600,000
11123 Construction LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
St. Louis City $9,000,000
11649 Construction LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $3,600,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $11,000,000
10696 Construction LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING
IMPROVEMENTS (PHASE II)
Unincorporated $250,000
11651 Design Services LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $100,000
11653 Design Services MACKENZIE I/I REDUCTION Various $1,420,000
11654 Construction MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
St. Louis City $260,000
11655 Design Services MALINE CREEK CSO 051 TREATMENT
FACILITY
St. Louis City $1,600,000
11657 Design Services MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-288)(COLLETT DR)
Ferguson $400,000
11658 Construction MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
Bellefontaine
Neighbors
$2,100,000
10030 Construction
(Supplemental
Appropriation)
MAPLEWOOD - BLENDON COMBINED
SEWER RELIEF PHASE I
Various $11,500,000
11661 Design Services MARTIGNEY I/I REDUCTION Various $1,650,000
10024 Construction MC-02 WATSON TO EDGAR RD SANITARY
RELIEF SKME-580A
Various $3,780,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $2,000,000
10716 Construction NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,138,000
11664 Design Services NEWCASTLE I/I REDUCTION Various $481,500
11693 Design Services NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
Various $275,000
11696 Design Services PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $156,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10727 Construction
(Supplemental
Appropriation)
PALM SEWER REPAIR/REPLACEMENT St. Louis City $2,520,000
11700 Design Services PROVIDENCE SANITARY RELIEF (SKME -
640)
Webster Groves $250,000
11114 Construction
(Supplemental
Appropriation)
PUBLIC I/I REDUCTION REHABILITATION Various $2,000,000
11822 Vendor
Services
PUMP STATIONS SCADA IMPROVEMENTS Various $350,000
10390 Construction RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $2,000,000
10146 Construction
(Supplemental
Appropriation)
RIVERSIDE AND YARNELL SANITARY
RELIEF (SKME-400)
Fenton $1,500,000
11665 Design Services SELVIDGE AREA I/I REDUCTION Ballwin $250,000
11667 Design Services STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $180,000
11668 Design Services SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $150,000
10770 Construction SUN VALLEY I/I REDUCTION Unincorporated $1,226,000
11139 Land Purchase TILLIE BADEN NEWBY SEWER
IMPROVEMENTS (PROPERTY ACQUISITION)
St. Louis City $2,400,000
10777 Construction
(Supplemental
Appropriation)
TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (TOWER GROVE
PLACE STORM RELIEF SEWERS)
St. Louis City $1,400,000
11672 Design Services UNIVERSITY CITY I/I REDUCTION - WEST Various $500,000
11681 Design Services UPPER COLDWATER SECTION D I/I
REDUCTION
Various $500,000
11673 Pre-Design
Services
UPPER DEER CREEK TANK FACILITY Ladue $500,000
11674 Land Purchase UPPER DEER CREEK TANK FACILITY - LAND
ACQUISITION
Various $1,500,000
10781 Construction UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314)
Ferguson $1,000,000
10782 Construction
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE III SECTION C
Ferguson $1,960,000
11675 Design Services VANCE ROAD WET WEATHER STORAGE Valley Park $3,000,000
11086 Construction WEBSTER ACRES SANITARY SEWER
REPLACEMENT
Webster Groves $1,300,000
10793 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE II
Webster Groves $5,000,000
24 April 2012
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11677 Design Services WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $600,000
10029 Construction WISE AND MABEL SEWER SEPARATION Richmond Heights $3,000,000
11692 Design Services WOODLAWN SANITARY RELIEF Kirkwood $475,000
10237 Construction WOODSMILL SANITARY RELIEF (SKME-020)Town And Country $2,600,000
FUND TOTAL: $217,675,000
GRAND TOTAL:$227,311,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - NORTH (2014)
Various $1,500,000
11810 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - SOUTH (2014)
Various $1,500,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11755 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $350,000
11782 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
A
Various $65,000
11783 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
B
Various $65,000
11784 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
C
Various $65,000
11785 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
D
Various $65,000
11773 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $1,000,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2015)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
10768 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2011)
Various $799,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $10,189,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUND
APPROPRIATION
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
10523 Construction
(Supplemental
Appropriation)
AYRES SANITARY RELIEF AND I/I
REDUCTION
Crestwood $1,360,000
11777 Design Services BADEN CREEK EXTENSION (BP-001)Various $875,000
11684 Construction BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
Bellefontaine
Neighbors
$1,900,000
11685 Construction BISSEL HILLS SANITARY
RELIEF/CALUMENT I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$3,960,000
11687 Design Services BISSELL POINT SERVICE AREA I/I REMOVAL Various $625,000
11847 Design Services BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Clayton $1,400,000
11689 Construction BLACK CREEK I/I REDUCTION Clayton $6,600,000
11790 Construction CAULKS CREEK FORCE MAIN (RIVER
VALLEY RD. TO L-52)
Maryland Heights $5,600,000
11788 Construction CAULKS CREEK PUMP STATION "B" FORCE
MAIN
Chesterfield $1,200,000
10547 Construction CAULKS CREEK TRUNK SEWER LINE A
SANITARY REPLACEMENT (WILDWOOD
ANNEXATION)
Chesterfield $800,000
11793 Construction
(Supplemental
Appropriation)
CC-14 CREVE COEUR CREEK SANITARY
RELIEF (SKME-026) PHASE II
Creve Coeur $1,520,000
11722 Construction CEDARCREST SANITARY RELIEF (SKME-
561) I/I REDUCTION
Ladue $5,610,000
11115 Construction CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $3,200,000
11723 Design Services COLDWATER CREEK WATERSHED I/I
REMOVAL
Various $375,000
11724 Design Services COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $2,025,000
11726 Construction COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
St. Louis County $9,333,000
10557 Construction
(Supplemental
Appropriation)
COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
Unincorporated $5,700,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11727 Construction COLLINGWOOD DRIVE SEWER SEPARATION Olivette $1,000,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,170,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $2,150,000
11730 Construction CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $12,000,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11731 Design Services DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
Ladue $2,200,000
11733 Pre-Design
Services
DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK
St. Louis County $1,000,000
10576 Construction DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $2,760,000
10576 Design Services DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $50,000
11690 Pre-Design
Services
DEER CREEK - BP-198 INTERIM STORAGE
FACILITY
Rock Hill $250,000
11735 Construction DELCREST SANITARY RELIEF (SKME -565)
I/I REDUCTION
University City $1,875,000
11737 Design Services DIAMOND PARK STORAGE FACILITY Various $2,100,000
11743 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
St. Louis City And
County
$3,500,000
11746 Pre-Design
Services
FENTON WWTP ELIMINATION TUNNEL Various $3,600,000
10489 Construction FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $4,700,000
11750 Construction FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
Grantwood Village $3,100,000
10440 Construction FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
Ferguson $1,600,000
10142 Construction
(Supplemental
Appropriation)
FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $1,425,000
10611 Construction
(Supplemental
Appropriation)
GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $2,000,000
11751 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2014)
Various $150,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11759 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2014)
Various $300,000
11763 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014)
Various $250,000
11779 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
10497 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE IV & V (SKME -
521)
Unincorporated $4,000,000
11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521)
Unincorporated $1,000,000
11767 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VII (SKME -521)
Unincorporated $1,700,000
11768 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $1,800,000
11770 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $3,750,000
10330 Construction
(Supplemental
Appropriation)
HARTLAND TO GOTHLAND SEWER
SEPARATION
Overland $1,700,000
10863 Design Services HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $625,000
11773 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $4,000,000
11708 Construction INFRASTRUCTURE
REPAIRS(REHABILITATION)(FY 2015)
St. Louis City And
County
$15,000,000
11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,700,000
11140 Land Purchase JENNINGS STATION ROAD / NORTH BADEN
BASIN (PROPERTY ACQUISITION)
St. Louis City $2,000,000
11054 Construction KINGSTON I/I REDUCTION AND PUMP
STATION ELIMINATION
Unincorporated $450,000
11715 Construction LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
Ferguson $1,800,000
11123 Construction
(Supplemental
Appropriation)
LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
St. Louis City $6,000,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11716 Design Services LEMAY WATERSHED I/I REMOVAL Various $1,000,000
11649 Construction
(Supplemental
Appropriation)
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $2,400,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $5,700,000
11650 Design Services LOWER MERAMEC WATERSHED I/I
REMOVAL
Various $750,000
11655 Construction MALINE CREEK CSO 051 TREATMENT
FACILITY
St. Louis City $12,600,000
11656 Construction MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $3,000,000
11657 Construction MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-288)(COLLETT DR)
Ferguson $5,000,000
11659 Construction MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $3,100,000
10024 Construction
(Supplemental
Appropriation)
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF SKME-580A
Various $2,520,000
11774 Design Services MISSOURI RIVER SERVICE AREA I/I
REDUCTION
Various $250,000
10716 Construction
(Supplemental
Appropriation)
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $2,092,000
11694 Construction NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
Pasadena Hills $750,000
11695 Construction OLDE ENGLISH I/I REMOVAL Unincorporated $1,500,000
11697 Construction PAGE TO TRENTON SANITARY RELIEF Overland $1,700,000
11094 Construction PROSPECT HILL LANDFILL VERTICAL
EXPANSION
St. Louis City $1,500,000
11701 Construction PUMP STATION REPLACEMENT PROJECTS
(FY 2015)
Various $500,000
11703 Design Services RDP FOULWATER INTERCEPTOR
REHABILITATION PHASE II
St. Louis City $650,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $3,900,000
11069 Construction ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $4,800,000
11680 Construction ROXBURY I/I REDUCTION Clayton $1,900,000
11059 Design Services SENECA PRIVATE I/I REDUCTION University City $375,000
10754 Construction SHERWYN SANITARY RELIEF (SKME -651) &
I/I REDUCTION
Creve Coeur $2,300,000
24 April 2012
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11139 Land Purchase TILLIE BADEN NEWBY SEWER
IMPROVEMENTS (PROPERTY ACQUISITION)
St. Louis City $1,600,000
11671 Design Services UNIVERSITY CITY I/I REDUCTION - EAST Various $2,500,000
11673 Design Services UPPER DEER CREEK TANK FACILITY Ladue $1,000,000
10026 Construction UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $12,500,000
10027 Construction UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
University City $2,400,000
11678 Construction WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $3,000,000
11679 Design Services WEST LOCKWOOD SANITARY RELIEF Webster Groves $250,000
10029 Construction
(Supplemental
Appropriation)
WISE AND MABEL SEWER SEPARATION Richmond Heights $2,000,000
11108 Construction WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
Overland $1,200,000
FUND TOTAL: $236,045,000
GRAND TOTAL:$246,484,000
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - NORTH (2014)
Various $1,500,000
11810 Vendor
Services
CCTV INSPECTION & PHYSICAL
INSPECTION OF SEWERS - SOUTH (2014)
Various $1,500,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11756 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2016)
Various $300,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2016)
Various $240,000
11705 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $1,000,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2015)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
10768 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2011)
Various $879,000
FUND TOTAL: $10,199,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUND
APPROPRIATION
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11776 Construction ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $420,000
11682 Construction BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $2,400,000
11683 Construction BEAVER DAM STUDY AREA I/I REDUCTION Des Peres $1,725,000
11685 Construction
(Supplemental
Appropriation)
BISSEL HILLS SANITARY
RELIEF/CALUMENT I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$2,640,000
11686 Construction BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR)
Various $3,000,000
11687 Construction BISSELL POINT SERVICE AREA I/I REMOVAL Various $2,500,000
11687 Design Services BISSELL POINT SERVICE AREA I/I REMOVAL Various $625,000
11688 Design Services BLACK CREEK - HADDINGTON COURT
STORAGE TANK
Clayton $1,250,000
11689 Construction
(Supplemental
Appropriation)
BLACK CREEK I/I REDUCTION Clayton $2,100,000
10537 Construction BOPP SANITARY RELIEF (SKME -611)Des Peres $750,000
11718 Construction BRIGHTWELL I/I REDUCTION Florissant $1,125,000
11719 Construction BRINWOOD I/I REDUCTION Florissant $2,800,000
11789 Design Services CAULKS CREEK FORCE MAIN
REHABILITATION
Chesterfield $200,000
11720 Construction CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $2,400,000
11722 Construction
(Supplemental
Appropriation)
CEDARCREST SANITARY RELIEF (SKME-
561) I/I REDUCTION
Ladue $300,000
11723 Construction COLDWATER CREEK WATERSHED I/I
REMOVAL
Various $1,500,000
11723 Design Services COLDWATER CREEK WATERSHED I/I
REMOVAL
Various $375,000
11726 Construction
(Supplemental
Appropriation)
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
St. Louis County $6,222,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,200,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $2,250,000
11730 Construction
(Supplemental
Appropriation)
CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $8,000,000
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10851 Design Services CSO - MCKNIGHT RD #2737 CSO
INTERCEPTOR (I-298)/OUTFALL (L-161)
Rock Hill $300,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11155 Construction DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $3,120,000
11731 Construction DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
Ladue $2,000,000
11733 Design Services DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK
St. Louis County $2,500,000
10576 Construction
(Supplemental
Appropriation)
DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $1,840,000
11690 Pre-Design
Services
DEER CREEK - BP-198 INTERIM STORAGE
FACILITY
Rock Hill $250,000
11833 Design Services DELCREST SANITARY RELIEF Various $500,000
11736 Construction DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
Florissant $2,625,000
11737 Design Services DIAMOND PARK STORAGE FACILITY Various $1,400,000
11738 Construction DIXIE I/I REDUCTION Various $2,160,000
11739 Construction DUCHESNE AND GOTT I/I REDUCTION Various $2,700,000
11740 Design Services E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $150,000
11744 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
St. Louis City And
County
$2,000,000
11079 Construction FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
Olivette $100,000
11745 Design Services FEE FEE TRUNK SEWER RELIEF (SKME-002)Maryland Heights $270,000
11746 Pre-Design
Services
FENTON WWTP ELIMINATION TUNNEL Various $2,400,000
11747 Design Services FF-04 QUIET VILLAGE SANITARY RELIEF Unincorporated $150,000
10601 Construction FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $3,000,000
11748 Construction FLORISSANT I/I REDUCTION Various $1,988,000
11749 Construction FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $462,000
10456 Construction FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION & I/I
REDUCTION
Unincorporated $3,000,000
11752 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2016)
Various $250,000
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11754 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2016)
Various $150,000
11760 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2016)
Various $300,000
11762 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2016)
Various $270,000
11764 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2016)
Various $250,000
11765 Construction GRAND GLAIZE TRUNK SANITARY RELIEF
I/I REDUCTION (SKME-417)
Ballwin $1,125,000
10497 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE IV & V (SKME -
521)
Unincorporated $2,500,000
11769 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $3,000,000
11770 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $2,500,000
11097 Construction HOLLY DRIVE SEWER SEPARATION Webster Groves $1,300,000
11705 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $4,000,000
11709 Construction INFRASTRUCTURE
REPAIRS(REHABILITATION)(FY 2016)
St. Louis City And
County
$15,000,000
11710 Construction ISABELLE I/I REDUCTION St. Ann $385,000
11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $1,800,000
11142 Design Services JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $300,000
11712 Construction LACKLAND I/I REDUCTION Various $2,400,000
11713 Construction LADUE ESTATES SANITARY RELIEF Creve Coeur $150,000
11714 Construction LADUE SUBTRUNK SANITARY RELIEF
(SKME-654)
Ladue $2,760,000
11716 Design Services LEMAY WATERSHED I/I REMOVAL Various $1,000,000
11716 Construction LEMAY WATERSHED I/I REMOVAL Various $2,400,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $9,500,000
11650 Construction LOWER MERAMEC WATERSHED I/I
REMOVAL
Various $3,000,000
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11650 Design Services LOWER MERAMEC WATERSHED I/I
REMOVAL
Various $750,000
11651 Construction LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $1,125,000
11652 Construction LYNN HAVEN I/I REDUCTION Hazelwood $1,770,000
11655 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO 051 TREATMENT
FACILITY
St. Louis City $8,400,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $2,000,000
11660 Design Services MARTIGNEY AND FORDER SANITARY
RELIEF (SKME -538)
Unincorporated $1,950,000
11662 Construction MCNULTY - PALLARDY I/I REDUCTION Various $3,900,000
11663 Construction MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $3,600,000
11774 Construction MISSOURI RIVER SERVICE AREA I/I
REDUCTION
Various $1,000,000
11774 Design Services MISSOURI RIVER SERVICE AREA I/I
REDUCTION
Various $250,000
11664 Construction NEWCASTLE I/I REDUCTION Various $1,444,000
11693 Construction NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
Various $1,125,000
11696 Construction PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $364,000
11828 Land Purchase PARTRIDGE AVENUE 8500 BLOCK
COMBINED SEWER RELIEF (PROPERTY
ACQUISITION)
St. Louis City $1,000,000
11698 Construction PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
Unincorporated $3,400,000
11700 Construction PROVIDENCE SANITARY RELIEF (SKME -
640)
Webster Groves $2,000,000
11701 Construction PUMP STATION REPLACEMENT PROJECTS
(FY 2015)
Various $500,000
11703 Construction RDP FOULWATER INTERCEPTOR
REHABILITATION PHASE II
St. Louis City $3,900,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $3,900,000
11704 Design Services RETFORD I/I REDUCTION Unincorporated $436,000
11775 Design Services RIDGEWOOD DRIVE SEPARATE SEWER I/I
REMOVAL
Crestwood $275,000
11069 Construction
(Supplemental
Appropriation)
ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $3,200,000
24 April 2012
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10748 Construction ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
Wilbur Park $2,138,000
11665 Construction SELVIDGE AREA I/I REDUCTION Ballwin $1,125,000
11091 Design Services SENECA PUBLIC I/I REDUCTION Overland $200,000
10754 Construction
(Supplemental
Appropriation)
SHERWYN SANITARY RELIEF (SKME -651) &
I/I REDUCTION
Creve Coeur $1,400,000
11666 Construction ST MARIE SANITARY RELIEF I/I REDUCTION Florissant $750,000
11667 Construction STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $420,000
11668 Construction SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $1,000,000
11669 Design Services SUB-TRUNK #3 LATERAL SANITARY RELIEF
(SKME -302)
Unincorporated $278,000
11670 Construction TUCKAWAY SANITARY REHABILITATION St. Louis County $1,125,000
11681 Construction UPPER COLDWATER SECTION D I/I
REDUCTION
Various $1,500,000
11673 Construction UPPER DEER CREEK TANK FACILITY Ladue $600,000
10027 Construction
(Supplemental
Appropriation)
UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
University City $1,600,000
11676 Construction VILLA COUBLAY SANITARY RELIEF Creve Coeur $250,000
11677 Construction WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $3,000,000
11678 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $2,000,000
11692 Construction WOODLAWN SANITARY RELIEF Kirkwood $1,425,000
FUND TOTAL: $202,137,000
GRAND TOTAL:$212,586,000
24 April 2012
STORMWATER ENGINEERING PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11191 CHALET COURT STREAMBANK
STABILIZATION
$66,000 148
10624 GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
$300,000 149
11129 OMCI STORMWATER DESIGN (CONTRACT A)$500,000 150
11147 OMCI STORMWATER DESIGN (CONTRACT B)$500,000 151
11148 OMCI STORMWATER DESIGN (CONTRACT C)$500,000 152
11149 OMCI STORMWATER DESIGN (CONTRACT D)$500,000 153
TOTAL:$2,366,000
GRAESERCHALET
COLONIAL HILLSLITTLE CREEK
LANGDON WAY
COLONIAL HILLS
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11191
11
TASK NO:
TASK NAME:
$66,000.00
BUDGET:
FUND:
Creve Coeur
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 148
CHALET COURT STREAMBANK STABILIZATION
STREAM EROSION AND INCISION.
CONSTRUCT 400 FEET OF BANK STABILIZATION ON BOTH BANKS ANDFOUR GRADE CONTROL STRUCTURES.
Design Services
5566 - Deer CreekOMCI Fund
§¨¦270
§¨¦55
§¨¦44
§¨¦255
§¨¦55
G R A V O IS R DWATSON R D
LEMAY FERRY RDS
LIN
D
BERGH BLVD
TESSON FERRY RDTELEGRAPH RDM A N C H E S T E R R D
C H IP P E WA BLVD
E M O 30 H W Y S KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10624
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 149
GENERAL SERVICES AGREEMENT - STORMWATERPLANNING (FY2011)
PLANNING NEEDS TO SUPPORT CAPITAL PROJECTS IN THE GRAVOISCREEK WATERSHED EXCEED THE CAPACITY OF INTERNAL STAFF.
PERFORM AS NEEDED STORMWATER PLANNING SERVICES.SERVICES WILL BE FOR FY 2013 AND 2014.
General Services-Planning
5571 - Gravois CreekOMCI Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
OLIVE BLVD
W A T S O N RDS LINDBERGH BLVDCHIPPEW A B L V D
S KIRKWOOD RDM A N C H E S TE R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11129
16
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 150
OMCI STORMWATER DESIGN (CONTRACT A)
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING ISAVAILABLE.
DESIGN IMPROVEMENTS IN THE DEER CREEK WATERSHED.
Professional Services
5566 - Deer CreekOMCI Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
OLIVE BLVD
W A T S O N RDS LINDBERGH BLVDCHIPPEW A B L V D
S KIRKWOOD RDM A N C H E S TE R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11147
16
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 151
OMCI STORMWATER DESIGN (CONTRACT B)
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING ISAVAILABLE.
DESIGN IMPROVEMENTS IN THE DEER CREEK WATERSHED.
Professional Services
5566 - Deer CreekOMCI Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
OLIVE BLVD
W A T S O N RDS LINDBERGH BLVDCHIPPEW A B L V D
S KIRKWOOD RDM A N C H E S TE R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11148
16
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 152
OMCI STORMWATER DESIGN (CONTRACT C)
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING ISAVAILABLE.
DESIGN IMPROVEMENTS IN THE DEER CREEK WATERSHED.
Professional Services
5566 - Deer CreekOMCI Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
OLIVE BLVD
W A T S O N RDS LINDBERGH BLVDCHIPPEW A B L V D
S KIRKWOOD RDM A N C H E S TE R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11149
16
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 153
OMCI STORMWATER DESIGN (CONTRACT D)
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING ISAVAILABLE.
DESIGN IMPROVEMENTS IN THE DEER CREEK WATERSHED.
PROJECT MAY INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
Professional Services
5566 - Deer CreekOMCI Fund
24 April 2012
STORMWATER CONSTRUCTION PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10371 ASHBY ROAD 3000 BLOCK STORM SEWER $340,000 154
11103 CLAYTON CENTRAL STORM IMPROVEMENTS $285,000 155
11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 156
10331 HARRISON - ST MARIE STORM SEWER $271,000 157
11217 HIGH MEADOW ROAD STORM SEWER
(FRONTENAC 2-2)
$82,000 158
10295 PAGE AVE. #9441-9445 STORM SEWER $150,000 159
11130 PARKWOODS - DICKSON STORM SEWER $100,000 160
10736 PLANT AVE. & E. SWON STORM SEWER $42,000 161
10747 ROMAINE AVE. #9449 STORM SEWER $125,000 162
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
$250,000 163
11842 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
$300,000 164
11843 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
$250,000 165
10344 TULANE - SHANDEL STORM SEWER $81,000 166
10357 WABASH AVE #8555 STORM SEWER $111,000 167
TOTAL:$2,637,000
ASHBYBOYLSTON
WURDACK
CLARENDON GEORGETOWN FARMBOYLSTON HILLCLARENDON
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10371
15
TASK NO:
TASK NAME:
$340,000.00
BUDGET:
FUND:
St. Ann
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 154
ASHBY ROAD 3000 BLOCK STORM SEWER
YARD FLOODING AND YARD EROSION.
DESIGN AND CONSTRUCT 775FEET OF 21-INCH STORM SEWER, 20FEET OF 8-INCH DIP, AND APPURTENANCES.
Construction
5564 - Coldwater CreekOMCI Fund
FORSYTH
CENTRALMERAMECBEMISTONBONHOMMEBRENTWOODCARONDELET
CARONDELET
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11103
15
TASK NO:
TASK NAME:
$285,000.00
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 155
CLAYTON CENTRAL STORM IMPROVEMENTS
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 650 FEET OF 12-INCH STORM SEWER AND INLETS.
Construction
5563 - Clayton CentralOMCI Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109 GRAVOISLINDBERGHMO364
MO10 0
MO370
TELEGRAPHM O 3 0
MO141
W AT S O N
ST CHARLES ROCK
LEMAY FERRYHIGHW A Y 67TESSON FERRYCLARKSONC HIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHEST E R MO3
6
4
M A N C H E S T E R
NATURAL BRID
GE
LINDBERGHMANCHESTER
MO
3
7
0
M O 3 0
CHIPPEWA
H IG H W A Y 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11120
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 156
$250,000.00
EMERGENCY REPAIR FUNDS (STORMWATER)
FAILING INFRASTRUCTURE.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
Construction
4123 - StormwaterEmergency Fund
CLARKST M
A
R
I
E
HAR
R
I
S
O
N
BOONELAFAYETTEJEFFERSONWAS
H
I
N
G
T
O
N
RUE
S
T
C
A
T
H
E
R
I
N
E
ST JACQUES§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10331
15
TASK NO:
TASK NAME:
$271,000.00
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 157
HARRISON - ST MARIE STORM SEWER
YARD FLOODING AND PONDING AT 280 AND 290 NORTH LAFAYETTESTREET.
DESIGN AND CONSTRUCT 750 FEET OF 15-INCH TO 42-INCH RCPSTORM SEWERS AND APPURTENANCES.
Construction
5569 - Fountain CreekOMCI Fund
GEYERHIGH MEADOW
HICKORY PRIVATEGEYER WOOD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11217
15
TASK NO:
TASK NAME:
$82,000.00
BUDGET:
FUND:
Frontenac
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 158
HIGH MEADOW ROAD STORM SEWER(FRONTENAC 2-2)
YARD FLOODING.
CONSTRUCT 175 FEET OF 12-INCH STORM SEWER, BERM ANDBIORETENTION CELL.
Construction
5566 - Deer CreekOMCI Fund
PAGE
MINERVA
ROMAINE
BURNSPRICELIBERTY
MINE
R
V
A
PAGE BURNS§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10295
15
TASK NO:
TASK NAME:
$150,000.00
BUDGET:
FUND:
Overland
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 159
PAGE AVE. #9441-9445 STORM SEWER
BASEMENT AND YARD FLOODING AT RESIDENCES IN THE IMMEDIATEAREA OF PAGE AVENUE.
DESIGN AND CONSTRUCT 440 FEET OF 15-INCH TO 24-INCH STORMSEWER.
Construction
5584 - University CityOMCI Fund
ADAMSDICKSON PARKWOODSHAWBROOK
LUTHERHOLMESHAWBROOKHA
W
B
R
O
O
K
LUTHER§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11130
15
TASK NO:
TASK NAME:
$100,000.00
BUDGET:
FUND:
Kirkwood
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 160
PARKWOODS - DICKSON STORM SEWER
YARD FLOODING.
DESIGN & CONSTRUCT 375 FEET OF 15-INCH TO 21-INCH STORMSEWER.
Construction
5571 - Gravois CreekOMCI Fund
MAPLEPLANTPORTLAND
SWONVALLEY KERRUISH
PLANTSWON
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10736
15
TASK NO:
TASK NAME:
$42,000.00
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 161
PLANT AVE. & E. SWON STORM SEWER
YARD FLOODING AND PONDING ALLOWS STORMWATER TO ENTERHOUSE LATERAL VENT AND SANITARY SEWERS.
DESIGN AND CONSTRUCT APPROXIMATELY 110 FEET OF 15-INCHSTORM SEWER AND APPURTENANCES.
Construction
5566 - Deer CreekOMCI Fund
RIDGE
MIRIAM
BURNSMINERVA
ROMAINE
PAGEWENGLERP
A
GEWOODMINE
R
V
A
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10747
15
TASK NO:
TASK NAME:
$125,000.00
BUDGET:
FUND:
Overland
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 162
ROMAINE AVE. #9449 STORM SEWER
PONDING IN REAR YARDS OF 9447 AND 9449 ROMAINE AVE.
DESIGN AND CONSTRUCT APPROXIMATELY 390 FEET OF 12-INCH TO21-INCH DIAMETER REINFORCED CONCRETE PIPE STORM SEWERAND APPURTENANCES.
Construction
5584 - University CityOMCI Fund
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11841
17
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 163
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - COLDWATER CREEK OMCI
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE COLDWATER CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEMWORK CLASSIFIED AS NON-CAPITAL.
Work Order Repair Costs(Non-Capital)
5564 - Coldwater CreekOMCI Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦170 OLIVE BLVD
M A N C H E S TER R D
W A TSON RDS LINDBERGH BLVDN KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11842
17
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 164
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - DEER CREEK OMCI
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE DEER CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEMWORK CLASSIFIED AS NON-CAPITAL.
Work Order Repair Costs(Non-Capital)
5566 - Deer CreekOMCI Fund
§¨¦270
§¨¦55
§¨¦44
§¨¦255
§¨¦44
§¨¦255
G R A V O IS R D
WA TS O N R D
LEMAY FERRY RDTESSON FERRY RDM A N C H E S T E R R D
TELEGRAPH RDC H I P P EWA BLVD
E M O 30 HW Y S KIRKWOOD RDS LINDBERGH BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11843
17
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 165
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - GRAVOIS CREEK OMCI
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE GRAVOIS CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEMWORK CLASSIFIED AS NON-CAPITAL.
Work Order Repair Costs(Non-Capital)
5571 - Gravois CreekOMCI Fund
BALSON
TULAN
ESHANDEL SWARTHMOREOLD BONHOMME
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10344
15
TASK NO:
TASK NAME:
$81,000.00
BUDGET:
FUND:
University City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 166
TULANE - SHANDEL STORM SEWER
STREET PONDING.
DESIGN AND CONSTRUCT APPROXIMATELY 350 FEET OF 12-INCH TO21-INCH RCP STORM SEWER AND APPUTENANCES.
Construction
5584 - University CityOMCI Fund
WABASH
HANLEYJO EVERGREENAL
D
E
R
GARFIELDHANCOCKNORFOLK
S
O
U
T
H
E
R
N
JACKSONMADISONGRAHAM
HALTONIA
B
U
CKTHORN
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10357
15
TASK NO:
TASK NAME:
$111,000.00
BUDGET:
FUND:
Berkeley
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 167
WABASH AVE #8555 STORM SEWER
FLOODING AT 8555 WABASH AVENUE.
DESIGN AND CONSTRUCT APPROXIMATELY 350 FEET OF 15-INCH TO24-INCH DIAMETER REINFORCED CONCRETE PIPE STORM SEWERAND APPURTENANCES.
Construction
5564 - Coldwater CreekOMCI Fund
24 April 2012
STORMWATER CONTINUED PROJECTS - FY13
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10588 EAST WATSON AND
KATHY CT. STORM
IMPROVEMENT
PROJECT CONTINUED DUE TO DESIGN CONCERNS.
ANTICIPATE BOARD INTRODUCTION IN FEBRUARY, 2013.
$65,000
10229 WINDOM #8721 SEWER
REHABILITATION
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2012.
$254,000
TOTAL: $319,000
STORMWATER CONTINGENCY PROJECTS
1 of 1
During Fiscal Year 2013, there are no budgeted Stormwater Contingency
projects.
24 April 2012
STORMWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5563 - CLAYTON CENTRAL OMCI FUND
11103 Construction CLAYTON CENTRAL STORM
IMPROVEMENTS
Clayton $285,000
FUND TOTAL: $285,000
5564 - COLDWATER CREEK OMCI FUND
10371 Construction ASHBY ROAD 3000 BLOCK STORM SEWER St. Ann $340,000
11841 Work Order
Repair Costs
(Non-Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
Various $250,000
10357 Construction WABASH AVE #8555 STORM SEWER Berkeley $111,000
10229 Construction WINDOM #8721 SEWER REHABILITATION Charlack $254,000
FUND TOTAL: $955,000
5566 - DEER CREEK OMCI FUND
11191 Design Services CHALET COURT STREAMBANK
STABILIZATION
Creve Coeur $66,000
11217 Construction HIGH MEADOW ROAD STORM SEWER
(FRONTENAC 2-2)
Frontenac $82,000
11129 Professional
Services
OMCI STORMWATER DESIGN (CONTRACT
A)
Various $500,000
11147 Professional
Services
OMCI STORMWATER DESIGN (CONTRACT
B)
Various $500,000
11148 Professional
Services
OMCI STORMWATER DESIGN (CONTRACT
C)
Various $500,000
11149 Professional
Services
OMCI STORMWATER DESIGN (CONTRACT
D)
Various $500,000
10736 Construction PLANT AVE. & E. SWON STORM SEWER Webster Groves $42,000
11842 Work Order
Repair Costs
(Non-Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
Various $300,000
FUND TOTAL: $2,490,000
24 April 2012
STORMWATER PROJECTS - FY13
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5569 - FOUNTAIN CREEK OMCI FUND
10331 Construction HARRISON - ST MARIE STORM SEWER Florissant $271,000
FUND TOTAL: $271,000
5571 - GRAVOIS CREEK OMCI FUND
10588 Construction EAST WATSON AND KATHY CT. STORM
IMPROVEMENT
Sunset Hills $65,000
10624 General
Services-
Planning
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
Various $300,000
11130 Construction PARKWOODS - DICKSON STORM SEWER Kirkwood $100,000
11843 Work Order
Repair Costs
(Non-Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
Various $250,000
FUND TOTAL: $715,000
5584 - UNIVERSITY CITY OMCI FUND
10295 Construction PAGE AVE. #9441-9445 STORM SEWER Overland $150,000
10747 Construction ROMAINE AVE. #9449 STORM SEWER Overland $125,000
10344 Construction TULANE - SHANDEL STORM SEWER University City $81,000
FUND TOTAL: $356,000
GRAND TOTAL:$5,322,000
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11658 MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
WASTEWATER BELLEFONTAINE
NEIGHBORS
52
11684 BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
WASTEWATER BELLEFONTAINE
NEIGHBORS
1
11685 BISSEL HILLS SANITARY RELIEF/CALUMENT I/I
REDUCTION (BP-317)
WASTEWATER BELLEFONTAINE
NEIGHBORS
2
10357 WABASH AVE #8555 STORM SEWER STORMWATER BERKELEY 167
10646 HIGH SCHOOL DR. & MADGE AVE. SEWER
SEPARATION
WASTEWATER BRENTWOOD 108
10428 CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE III (SKME-021)
WASTEWATER CHESTERFIELD 87
11103 CLAYTON CENTRAL STORM IMPROVEMENTS STORMWATER CLAYTON 155
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
WASTEWATER CLAYTON 12
11680 ROXBURY I/I REDUCTION WASTEWATER CLAYTON 65
11688 BLACK CREEK - HADDINGTON COURT
STORAGE TANK
WASTEWATER CLAYTON 4
11689 BLACK CREEK I/I REDUCTION WASTEWATER CLAYTON 5
10754 SHERWYN SANITARY RELIEF (SKME -651) & I/I
REDUCTION
WASTEWATER CREVE COEUR 67
11191 CHALET COURT STREAMBANK STABILIZATION STORMWATER CREVE COEUR 148
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11116 DACEY BRANCH I/I REDUCTION (BP-313)WASTEWATER DELLWOOD 19
10146 RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
WASTEWATER FENTON 127
10146 RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
WASTEWATER FENTON 128
10782 UPPER MALINE TRUNK SANITARY RELIEF
PHASE III SECTION C
WASTEWATER FERGUSON 134
11715 LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
WASTEWATER FERGUSON 45
10331 HARRISON - ST MARIE STORM SEWER STORMWATER FLORISSANT 157
11666 ST MARIE SANITARY RELIEF I/I REDUCTION WASTEWATER FLORISSANT 68
11718 BRIGHTWELL I/I REDUCTION WASTEWATER FLORISSANT 6
11719 BRINWOOD I/I REDUCTION WASTEWATER FLORISSANT 7
11736 DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
WASTEWATER FLORISSANT 24
10185 STONINGTON SANITARY RELIEF (SKME -652)WASTEWATER FRONTENAC 129
10645 HERMITAGE I/I REDUCTION (SKME-615)WASTEWATER FRONTENAC 107
11217 HIGH MEADOW ROAD STORM SEWER
(FRONTENAC 2-2)
STORMWATER FRONTENAC 158
11750 FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
WASTEWATER GRANTWOOD
VILLAGE
27
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11652 LYNN HAVEN I/I REDUCTION WASTEWATER HAZELWOOD 49
10121 TAYLOR - FILLMORE - HARRISON SANITARY
RELIEF (SKME-502 & 503)
WASTEWATER KIRKWOOD 130
11130 PARKWOODS - DICKSON STORM SEWER STORMWATER KIRKWOOD 160
10382 CELLA - ROLLING ROCK - GLEN CREEK I/I
REDUCTION (SKME -658, 659, & 657)
WASTEWATER LADUE 83
11722 CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
WASTEWATER LADUE 11
11731 DC-02 DEER CREEK SANITARY RELIEF
STORAGE TANK
WASTEWATER LADUE 21
10163 MCKELVEY PROJECT "A" AND "B" SANITARY
RELIEF (SKME-005)
WASTEWATER MARYLAND
HEIGHTS
118
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
WASTEWATER MARYLAND
HEIGHTS
25
10710 MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION AND DISINFECTION
FACILITIES
WASTEWATER MARYLAND
HEIGHTS
119
11790 CAULKS CREEK FORCE MAIN (RIVER VALLEY
RD. TO L-52)
WASTEWATER MARYLAND
HEIGHTS
8
11825 CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
WASTEWATER MARYLAND
HEIGHTS
17
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
WASTEWATER NORMANDY 53
10295 PAGE AVE. #9441-9445 STORM SEWER STORMWATER OVERLAND 159
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10747 ROMAINE AVE. #9449 STORM SEWER STORMWATER OVERLAND 162
11108 WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
WASTEWATER OVERLAND 77
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
WASTEWATER OVERLAND 55
11697 PAGE TO TRENTON SANITARY RELIEF WASTEWATER OVERLAND 58
11694 NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
WASTEWATER PASADENA
HILLS
56
11069 ROCK HILL SANITARY RELIEF (SKME -618)WASTEWATER ROCK HILL 63
10371 ASHBY ROAD 3000 BLOCK STORM SEWER STORMWATER ST. ANN 154
10145 PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 123
10198 RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
WASTEWATER ST. LOUIS CITY 126
10722 OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET
WASTEWATER ST. LOUIS CITY 120
10727 PALM SEWER REPAIR/REPLACEMENT WASTEWATER ST. LOUIS CITY 122
10777 TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (TOWER GROVE
PLACE STORM RELIEF SEWERS)
WASTEWATER ST. LOUIS CITY 133
11094 PROSPECT HILL LANDFILL VERTICAL
EXPANSION
WASTEWATER ST. LOUIS CITY 61
11121 CALVARY CEMETERY STORAGE BASIN
(PROPERTY ACQUISITION)
WASTEWATER ST. LOUIS CITY 82
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11138 FREDERICK STREET COMBINED SEWER
(PROPERTY ACQUISITION)
WASTEWATER ST. LOUIS CITY 96
11655 MALINE CREEK CSO 051 TREATMENT FACILITY WASTEWATER ST. LOUIS CITY 50
11656 MALINE CREEK CSO 052 STORAGE FACILITY WASTEWATER ST. LOUIS CITY 51
11815 BISSELL SERVICE AREA PUMP STATION POWER
SUPPLY IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 79
10230 WATERSHED FACILITY PLANNING PHASE II WASTEWATER ST. LOUIS CITY
AND COUNTY
73
10230 WATERSHED FACILITY PLANNING PHASE II WASTEWATER ST. LOUIS CITY
AND COUNTY
74
10232 COMBINED SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2008)
WASTEWATER ST. LOUIS CITY
AND COUNTY
15
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
69
11706 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY 2013) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
109
11741 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2013)
WASTEWATER ST. LOUIS CITY
AND COUNTY
92
10231 SEPARATE SEWER AREA -
INFLOW/INFILTRATION ASSESSMENT (FY2008)
WASTEWATER ST. LOUIS
COUNTY
66
10393 BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
WASTEWATER ST. LOUIS
COUNTY
80
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10429 CSO - JEFFERSON BARRACKS SUBSYSTEM NO.
72 INTERCEPTOR (I-122) SEPARATION
WASTEWATER ST. LOUIS
COUNTY
89
11670 TUCKAWAY SANITARY REHABILITATION WASTEWATER ST. LOUIS
COUNTY
71
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
WASTEWATER ST. LOUIS
COUNTY
13
10199 TOPPING SANITARY RELIEF (SKME -421)WASTEWATER TOWN AND
COUNTRY
132
10015 GC-11 GRAVOIS CREEK SANITARY RELIEF WASTEWATER UNINCORPORAT
ED
98
10184 PROVIDENCE PLACE SANITARY RELIEF WASTEWATER UNINCORPORAT
ED
124
10407 BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
WASTEWATER UNINCORPORAT
ED
78
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
WASTEWATER UNINCORPORAT
ED
106
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
WASTEWATER UNINCORPORAT
ED
105
10518 COLDWATER TREATMENT PLANT
IMPROVEMENTS (SLUDGE PUMP STATION)
WASTEWATER UNINCORPORAT
ED
85
10557 COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
WASTEWATER UNINCORPORAT
ED
14
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10642 HARMONY-ACORN SEWER SEPARATION AND I/I
REDUCTION
WASTEWATER UNINCORPORAT
ED
42
10681 LEMAY WWTP DISINFECTION FACILITIES WASTEWATER UNINCORPORAT
ED
115
10725 PAGE AVE. & LINDBERGH SANITARY SEWER WASTEWATER UNINCORPORAT
ED
121
10775 TIEMANN & NONIE AVE. SANITARY SEWER
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
131
11106 LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
WASTEWATER UNINCORPORAT
ED
116
11117 COLDWATER CREEK WWTP DIGESTER CLEAN-
OUT
WASTEWATER UNINCORPORAT
ED
84
11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT
ED
47
11695 OLDE ENGLISH I/I REMOVAL WASTEWATER UNINCORPORAT
ED
57
11698 PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
WASTEWATER UNINCORPORAT
ED
59
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
43
11792 BROOKTON WAY TO MERAMEC BOTTOM ROAD
SANITARY RELIEF PHASE II
WASTEWATER UNINCORPORAT
ED
81
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11794 LEMAY WWTP ASH LAGOON ACCESS ROAD WASTEWATER UNINCORPORAT
ED
114
10027 UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
WASTEWATER UNIVERSITY
CITY
72
10344 TULANE - SHANDEL STORM SEWER STORMWATER UNIVERSITY
CITY
166
11735 DELCREST SANITARY RELIEF (SKME -565) I/I
REDUCTION
WASTEWATER UNIVERSITY
CITY
23
10787 VALLEY PARK/GRAND GLAIZE DIVERSION &
PUMP STATION
WASTEWATER VALLEY PARK 135
10021 DC-02 DEER CREEK SANITARY RELIEF WASTEWATER VARIOUS 20
10030 MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
WASTEWATER VARIOUS 117
10376 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - NORTH
WASTEWATER VARIOUS 9
10377 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - SOUTH
WASTEWATER VARIOUS 10
10458 GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
WASTEWATER VARIOUS 103
10568 CREVE COEUR CREEK WATERSHED SANITARY
SEWER REHABILITATION
WASTEWATER VARIOUS 88
10597 FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION
WASTEWATER VARIOUS 95
10610 GALAXY (BP-491) SANITARY SEWER
REHABILITATION AND I/I REDUCTION
WASTEWATER VARIOUS 97
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10612 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2012)
UNALLOCATED VARIOUS 28
10613 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
UNALLOCATED VARIOUS 29
10614 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
UNALLOCATED VARIOUS 30
10615 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
UNALLOCATED VARIOUS 31
10623 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2011)
UNALLOCATED VARIOUS 32
10624 GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
STORMWATER VARIOUS 149
10626 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT A
UNALLOCATED VARIOUS 33
10627 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT B
UNALLOCATED VARIOUS 34
10628 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT C
UNALLOCATED VARIOUS 35
10629 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT D
UNALLOCATED VARIOUS 36
10630 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT E
UNALLOCATED VARIOUS 37
10743 RADAR RAINFALL DATA (FY2011)WASTEWATER VARIOUS 62
10768 STREAM FLOW WATER QUALITY SAMPLING
(FY 2011)
UNALLOCATED VARIOUS 70
11107 EMERGENCY REPAIR FUND APPROPRIATION UNALLOCATED VARIOUS 93
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 48
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 22
11114 PUBLIC I/I REDUCTION REHABILITATION WASTEWATER VARIOUS 125
11120 EMERGENCY REPAIR FUNDS (STORMWATER)STORMWATER VARIOUS 156
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
WASTEWATER VARIOUS 41
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
WASTEWATER VARIOUS 104
11129 OMCI STORMWATER DESIGN (CONTRACT A)STORMWATER VARIOUS 150
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 3
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 46
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 90
11147 OMCI STORMWATER DESIGN (CONTRACT B)STORMWATER VARIOUS 151
11148 OMCI STORMWATER DESIGN (CONTRACT C)STORMWATER VARIOUS 152
11149 OMCI STORMWATER DESIGN (CONTRACT D)STORMWATER VARIOUS 153
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 16
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11662 MCNULTY - PALLARDY I/I REDUCTION WASTEWATER VARIOUS 54
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
WASTEWATER VARIOUS 60
11712 LACKLAND I/I REDUCTION WASTEWATER VARIOUS 44
11730 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-
059)
WASTEWATER VARIOUS 18
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
WASTEWATER VARIOUS 26
11771 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
WASTEWATER VARIOUS 112
11771 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
WASTEWATER VARIOUS 113
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
UNALLOCATED VARIOUS 38
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
UNALLOCATED VARIOUS 39
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
UNALLOCATED VARIOUS 40
11782 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
UNALLOCATED VARIOUS 99
11783 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
UNALLOCATED VARIOUS 100
11784 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
UNALLOCATED VARIOUS 101
11785 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
UNALLOCATED VARIOUS 102
27 April 2012
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY13
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11829 DEER CREEK/MALINE CREEK PUBLIC I/I
REDUCTION
WASTEWATER VARIOUS 91
11830 FEE FEE CREEK PUBLIC I/I REDUCTION WASTEWATER VARIOUS 94
11831 CREVE COEUR CREEK PUBLIC I/I REDUCTION WASTEWATER VARIOUS 86
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
STORMWATER VARIOUS 163
11842 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
STORMWATER VARIOUS 164
11843 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
STORMWATER VARIOUS 165
11845 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2013) CONTRACT B
WASTEWATER VARIOUS 110
11846 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2013) CONTRACT C
WASTEWATER VARIOUS 111
10736 PLANT AVE. & E. SWON STORM SEWER STORMWATER WEBSTER
GROVES
161
10793 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE II
WASTEWATER WEBSTER
GROVES
136
11086 WEBSTER ACRES SANITARY SEWER
REPLACEMENT
WASTEWATER WEBSTER
GROVES
75
11678 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
WASTEWATER WEBSTER
GROVES
76
10748 ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
WASTEWATER WILBUR PARK 64