HomeMy Public PortalAboutExhibit MSD 18 - FY 2014 CIRP Budget DocumentMetropolitan St. Louis Sewer District
2013-2014 Budget Supplement
Exhibit MSD 18
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2014
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2014 (July 1,
2013 to June 30, 2014). This document is divided into the following sections:
Program Summary Wastewater Engineering Projects Wastewater Construction Projects Wastewater Continued Projects Wastewater Contingency Projects Wastewater Program Stormwater Engineering Projects Stormwater Construction Projects Stormwater Continued Projects Stormwater Contingency Projects Stormwater Program Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list
projects that have scheduled construction starts during Fiscal Year 2014. The Wastewater
Engineering Projects and Stormwater Engineering Projects sections list projects that have scheduled
engineering starts during Fiscal Year 2014 (which includes design, planning, and data
collection/system investigation services). Due to the magnitude and complexity of these projects and
the requirements for permitting and easement acquisition, their construction is planned for future
years. The Contingency Projects sections detail projects that are currently scheduled for Fiscal Year
2015, but that may be expedited and constructed during Fiscal Year 2014, if revenue becomes
available and project schedules allow.
For each new project identified for funding in Fiscal Year 2014, this document provides
information regarding the approximate project scope and estimated cost. For projects continued
from previous fiscal years, only the estimated construction cost and reason for continuance are
provided. Specific information regarding continued projects was included in previous Budget
Supplement documents for the fiscal year in which the projects were initially identified. Lastly, a
listing of all Fiscal Year 2014 projects sorted by municipality is provided in the Appendix.
On the Cover: Project Clear is a long-term communications effort by MSD. Our goal is to provide
clear, current information to the public about the planning, design and construction of the 23-year, $4.7
billion initiative to improve water quality in the St. Louis region. Primary efforts will focus on reducing
sewer overflows and basement backups and solutions will include a mixture of new sewer lines, new
tunnels and a program to remove individual stormwater connections to the sanitary sewer system.
Construction photos highlight the construction of the Coldwater Creek Wet Weather Storage Facility.
")
")
")")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(
!(
!(
!(!(
!(
!(MS
D
B
o
u
n
d
a
r
ySt. Louis County Boundary§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦70
§¨¦40 §¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
138
153
189
150
137
151
135
157
155
148
140158
156
149
145
144
142
186
143
187
160
183
134
146
181
188184
182
147
152
139
159
154 141
136
1859
4
1
6
8
5
2
7
3
59
54
92
27
80
19
20
90
65
72
23
82
78
91
49
57
10
22
51
67
85
46
97
63
86
56
73
60
61
14
83
48
98
84
11
99
47
26
52
45
58
81
55
68
71
44
64
21
28
79
53
87
88
96
76
77
50
15
62
95
89
25
24
29
119
112
176
163162
123
131
113
125
120
122
173
118
169
178
116
132
133
164
126
177
121
105
167
165
179
174
106
130
129
172
171
170 114
127
117
166
168
115
161
180
104
Map produced by MSD GIS M apping, May 2013
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2014
Legend
FIS CAL YEAR 2014
!(Wastewater
!(Stormwater
CONTI NGENCY
")Wastewater
")Stormwater
Combined Sewer Area
MSD DISTRICT WIDE PROJECTS
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
1 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
2 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
3 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION
4 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
5 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
6 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT B
7 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT C
8 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
9 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
10 BISSELL POINT I/I REDUCTION (BP-619)(VALLEY DR)
11 CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I
12 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014)
13 CCTV INSPECTION OF SEWERS (2014)
14 COLDWATER CREEK WWTP SCREENINGS & WASHER/COMPACTOR
IMPROVEMENTS
15 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
16 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
18 CRITICAL INFRASTRUCTURE ASSESSMENT
19 DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551)
20 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
21 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
22 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
23 DIXIE I/I REDUCTION
24 DUCHESNE AND GOTT I/I REDUCTION
25 E. WATSON SEPARATE SEWER I/I REMOVAL
26 FLORISSANT I/I REDUCTION
27 FLORISSANT PUBLIC I/I REDUCTION
28 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016)
REHABILITATION & I/I REDUCTION
29 GASLIGHT SQUARE SEWER IMPROVEMENTS
30 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014)
31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT A
32 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT B
33 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT C
34 GENERAL SERVICES AGREEMENT - PLANNING (FY2014)
35 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014)
36 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A
37 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B
38 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C
39 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D
40 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E
41 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A
42 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B
43 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C
44 GRAND GLAIZE TRUNK SANITARY RELIEF I/I REDUCTION (SKME-417)
45 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME -
521)
46 HOLLY DRIVE SEWER SEPARATION
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
47 ISABELLE I/I REDUCTION
48 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
49 KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION
50 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
51 LEMAY PUBLIC I/I REDUCTION (2016)
52 LEMAY PUMP STATION NO. 1 REDUNDANT FORCE MAIN
53 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
54 LMRDP STORAGE TUNNEL SOUTH END
55 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
56 LOWER MERAMEC WATERSHED I/I REMOVAL
57 LYNKIRK STUDY AREA I/I REDUCTION
58 MACKENZIE I/I REDUCTION
59 MACKENZIE PUBLIC I/I REDUCTION
60 MALINE CREEK CSO 052 STORAGE FACILITY
61 MARTIGNEY I/I REDUCTION
62 MARTIGNEY PUBLIC I/I REDUCTION
63 NEWCASTLE I/I REDUCTION
64 NORTH BADEN CREEK I/I REDUCTION (BP-532)(WINCHESTER DR)
65 PADDOCK CREEK I/I REDUCTION (PRIVATE)
66 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013
67 PROVIDENCE PUBLIC I/I REDUCTION
68 PROVIDENCE SANITARY RELIEF (SKME -640)
69 PUMP STATIONS SCADA IMPROVEMENTS
70 RADAR RAINFALL DATA (FY2014)
71 SELVIDGE AREA I/I REDUCTION
72 SENECA PRIVATE I/I REDUCTION
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
73 STERLING PLACE SEPARATE SEWER I/I REMOVAL
74 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
75 STREAM FLOW WATER QUALITY SAMPLING (FY 2014)
76 SUB-TRUNK #2 LATERAL SANITARY RELIEF
77 UNIVERSITY CITY I/I REDUCTION - WEST
78 UNIVERSITY CITY PUBLIC I/I REDUCTION WEST
79 UPPER COLDWATER SECTION D I/I REDUCTION
80 VINITA DRIVE SANITARY RELIEF
81 AYRES SANITARY RELIEF AND I/I REDUCTION
82 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2014)
83 CC-14 CREVE COEUR CREEK SANITARY RELIEF (SKME-026) PHASE II
84 CC-17 FOUR SEASONS BRANCH SANITARY RELIEF PHASE II
85 CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
86 CEDARCREST SANITARY RELIEF (SKME-561) I/I REDUCTION
87 CREVE COEUR CREEK (L-52) FORCE MAIN IMPROVEMENTS PHASE II
88 CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71 INTERCEPTOR (I-161)
SEPARATION
89 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
90 DACEY BRANCH I/I REDUCTION (BP-313)
91 DEER CREEK PUBLIC I/I REDUCTION (2014)
92 DUCHESNE PARQUE NO. 1 PUMP STATION ELIMINATION (P-407)
93 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2014)
94 EMERGENCY REPAIR FUNDS (WASTEWATER)
95 FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY RELIEF PHASE V
96 FF-11 FEE FEE CREEK SANITARY RELIEF
97 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III
98 FORESTWOOD SANITARY RELIEF (SKME-435)
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
99 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF
100 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT A
101 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT B
102 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT C
103 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013)
CONTRACT D
104 GLENDALE SECTION D SANITARY RELIEF PHASE III (SKME-624) I/I REDUCTION
105 GLENDALE SECTION D SANITARY RELIEF PHASE IV (SKME-624) I/I
REDUCTION
106 HARTLAND TO GOTHLAND SEWER SEPARATION
107 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT A
108 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT B
109 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT C
110 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2014)
111 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2014)
112 LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT A
113 LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT B
114 LEMAY WWTP SECONDARY IMPROVEMENTS
115 LOWER MERAMEC RIVER WWTP SCREEN SHAFT LINING
116 LOWER MERAMEC RIVER WWTP SITE RESTORATION/LANDSCAPING
IMPROVEMENTS (PHASE II)
117 MACKENZIE PLACE PUMP STATION (P-325) SECONDARY POWER SUPPLY
118 MACKENZIE PUBLIC I/I REDUCTION
119 MALINE CREEK CSO 052 STORAGE FACILITY
120 MALINE I/I REDUCTION & SEWER REHABILITATION (BP-289)(COLONY DR)
121 MAPLEWOOD - BLENDON COMBINED SEWER RELIEF PHASE I
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
122 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
123 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544)
IMPROVEMENTS
124 PUBLIC I/I REDUCTION REHABILITATION
125 RDP FOULWATER INTERCEPTOR REHABILITATION (PHASE I)
126 ROCK HILL PUBLIC I/I REDUCTION (SKME-618)
127 SUN VALLEY I/I REDUCTION
128 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM
129 TILLIE BADEN NEWBY SEWER IMPROVEMENTS (PROPERTY ACQUISITION)
130 UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-314)
131 WEBSTER GROVES TRUNK "E" SANITARY REHABILITATION AND I/I
REDUCTION PHASE II
132 WISE AND MABEL SEWER SEPARATION
133 WOODSMILL SANITARY RELIEF (SKME-020)
161 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT A)
162 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT B)
163 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT C)
164 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT D)
165 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT E)
166 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT F)
167 COLDWATER CREEK OMCI STORMWATER DESIGN (CONTRACT G)
168 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT A)
169 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT B)
170 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT C)
171 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT D)
172 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT E)
173 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT F)
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY14
PAGE NUMBER PROJECT NAME
174 CONWAY RD 11700 STORM SEWER
175 EMERGENCY REPAIR FUNDS (STORMWATER)
176 FIRETHORN DRIVE #1901 STORM IMPROVEMENTS
177 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER
CREEK OMCI
178 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DEER CREEK
OMCI
179 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - GRAVOIS CREEK
OMCI
180 SUNSWEPT DRIVE #8 BANK STABILIZATION
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY15
PAGE NUMBER PROJECT NAME
134 BELLEFONTAINE #2 LATERAL SANITARY RELIEF (BP-287)(COBURG LANDS DR)
135 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
136 BRIGHTWELL I/I REDUCTION
137 COLDWATER CREEK WWTP SCREENINGS & WASHER/COMPACTOR
IMPROVEMENTS
138 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
139 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
140 DC-03 DEER CREEK SANITARY RELIEF STORAGE TANK - LAND ACQUISITION
141 DERHAKE I/I REDUCTION & CAPRI TO S.WATERFORD SANITARY RELIEF
142 FAIRLIGHT AND BRIGHTLING SEWER SEPARATION
143 FF-11 FEE FEE CREEK SANITARY RELIEF
144 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III
145 FORESTWOOD SANITARY RELIEF (SKME-435)
146 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF
147 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III (SKME -
521)
148 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN)
149 HARTLAND TO GOTHLAND SEWER SEPARATION
150 INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE VI
151 LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
152 LEMAY WWTP SECONDARY IMPROVEMENTS
153 LEMAY WWTP SECONDARY IMPROVEMENTS
154 LYNN HAVEN I/I REDUCTION
155 MAPLEWOOD - BLENDON COMBINED SEWER RELIEF PHASE I
156 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544)
IMPROVEMENTS
157 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574)
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY15
PAGE NUMBER PROJECT NAME
158 ROCK HILL SANITARY RELIEF (SKME -618)
159 TUCKAWAY SANITARY REHABILITATION
160 WISE AND MABEL SEWER SEPARATION
181 CHELSEA AND IDLEWILD STORM SEWER
182 CREEKHAVEN #12371 STORM SEWER
183 CREEKHAVEN DRIVE #12105 STORM IMPROVEMENTS
184 FRONTENAC FOREST #120 STORM IMPROVEMENT
185 GLEN RD #35 BANK STABILIZATION
186 LACLEDE STATION - CHAMBERLAIN STORM SEWER
187 MARYHILL DRIVE STORM SEWER
188 PARK LANE #9568 - #9572 STORM SEWER
189 TIMBERLANE DR. STORM SEWER
7 June 2013
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY14
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Stormwater Construction 7 $2,676,000
Stormwater Engineering 13 $2,550,000
Wastewater Construction 53 $152,974,000
Wastewater Engineering 80 $48,165,000
TOTAL:153 $206,365,000
Wastewater Continued 12 $40,000,000
TOTAL:12 $40,000,000
GRAND TOTAL:165 $246,365,000
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
1 of 9
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
2 of 9
analysis of the system, and implement required collection system and wastewater treatment plant
maintenance and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table -top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary stud y is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultant services to perform preliminary studies during periods of heavy workload, or for
large, complex projects such as new treatment plants, upgrades to existing treatment plants,
tunnel projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
3 of 9
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, and easement and temporary construction license plats are drafted.
In FY2014, 55 budget items have been or will be procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated vendors:
Project
Number Project Name Page
Number Budget
Watershed Program Consultant - 11151 -
Construction Management Services -
Tank/Treatment/Pump Station Facilities -
VENDOR: To Be Procured in FY2014
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES 17 1,050,000
Watershed Program Consultant - 11152 -
Construction Management Services - Lower and
Middle RDP Tunnel Facilities - VENDOR:
Shannon & Wilson, Inc.
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES 15 1,500,000
Watershed Program Design Consultant - 11109 -
Lower & Middle RDP CSO Controls System
Improvements - VENDOR:
Jacobs Engineering Group Inc.
11711
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS) 48 2,050,000
11817
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN 50 850,000
11123
LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN 52 150,000
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
4 of 9
11820 LMRDP STORAGE TUNNEL SOUTH END 54 7,450,000
11109
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT) 55 550,000
11656 MALINE CREEK CSO 052 STORAGE FACILITY 60 1,600,000
Watershed Program Design Consultant - 11110 -
Deer Creek Sanitary System Improvements -
VENDOR: Parsons Water and Infrastructure Inc.
11682
BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION 2 300,000
11934
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION 3 140,000
10021
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) 20 1,700,000
11110
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 21 600,000
11731
DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) 22 3,200,000
11933 PROVIDENCE PUBLIC I/I REDUCTION 67 40,000
11700 PROVIDENCE SANITARY RELIEF (SKME -640) 68 260,000
Watershed Program Design Consultant - 11144 -
Bissell - Coldwater - Missouri - Meramec Sanitary
System Improvements - VENDOR:
AMEC Environment & Infrastructure, Inc.
11923
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A 5 60,000
11924
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT B 6 110,000
11925
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT C 7 80,000
11926
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D 8 80,000
11144
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 9 600,000
11686
BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR) 10 180,000
11720
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I 11 1,120,000
11738 DIXIE I/I REDUCTION 23 750,000
11739 DUCHESNE AND GOTT I/I REDUCTION 24 180,000
11748 FLORISSANT I/I REDUCTION 26 350,000
11932 FLORISSANT PUBLIC I/I REDUCTION 27 40,000
10456
FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION & I/I
REDUCTION 28 260,000
11765
GRAND GLAIZE TRUNK SANITARY RELIEF I/I
REDUCTION (SKME-417) 44 90,000
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
5 of 9
11710 ISABELLE I/I REDUCTION 47 30,000
11650 LOWER MERAMEC WATERSHED I/I REMOVAL 56 200,000
11651 LYNKIRK STUDY AREA I/I REDUCTION 57 60,000
11664 NEWCASTLE I/I REDUCTION 63 80,000
11693
NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR) 64 230,000
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE) 65 210,000
11665 SELVIDGE AREA I/I REDUCTION 71 60,000
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF 76 85,000
11681
UPPER COLDWATER SECTION D I/I
REDUCTION 79 190,000
Watershed Program Design Consultant - 11145 -
Lemay Sanitary System Improvements - VENDOR:
Burns & McDonnell Engineering Co Inc.
11776
ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL 1 190,000
11155
DAMMERT AND BROADWAY SANITARY RELIEF
(SKME-551) 19 1,100,000
11740 E. WATSON SEPARATE SEWER I/I REMOVAL 25 120,000
11766
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521) 45 3,200,000
11097 HOLLY DRIVE SEWER SEPARATION 46 240,000
11054
KINGSTON I/I REDUCTION AND PUMP
STATION ELIMINATION 49 25,000
11927 LEMAY PUBLIC I/I REDUCTION (2016) 51 220,000
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 53 600,000
11653 MACKENZIE I/I REDUCTION 58 250,000
11931 MACKENZIE PUBLIC I/I REDUCTION 59 90,000
11661 MARTIGNEY I/I REDUCTION 61 310,000
11930 MARTIGNEY PUBLIC I/I REDUCTION 62 190,000
11059 SENECA PRIVATE I/I REDUCTION 72 900,000
11667
STERLING PLACE SEPARATE SEWER I/I
REMOVAL 73 140,000
11672 UNIVERSITY CITY I/I REDUCTION - WEST 77 100,000
11929
UNIVERSITY CITY PUBLIC I/I REDUCTION
WEST 78 60,000
11089 VINITA DRIVE SANITARY RELIEF 80 70,000
Watershed Program Consultant - 11826 -
Construction Management Services - Lower
Meramec and Deer Creek Tunnels - VENDOR:
To Be Procured in FY2014
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS 16 300,000
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
6 of 9
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at "open-line"
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may condemn for easements in
order to ensure that a project is constructed. Any required condemnation proceedings are
performed in full compliance with state and federal law. Some projects may additionally require
specific permitting from other government agencies, such as the Missouri Department of Natural
Resources, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon ordinance passage, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by pri vate systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
7 of 9
assistance. Because of the uncertainty of the viability and/or schedule of sub -district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Fund 6660, the Sanitary Replacement Fund, is used to pay for capital wastewater
work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater related
work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets. Wastewater projects may also be
funded by various Operation, Maintenance, Construction and Improvement (OMCI) funds,
Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via Fund 1101, the General Fund, Construction
Funds, Special Funds, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process.
Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other vendor services necessary to implement the wastewater
program.
Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
8 of 9
Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted. Project costs do not include annual
inflation assumptions, which are included in the annual budget.
Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other vendor services necessary to implement the stormwater
program.
Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include location maps
and quantities of work to be performed. These maps and quantities are approximate estimates
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM SUMMARY
9 of 9
only, and final location and extent of work may vary depending on final design and/or field
conditions during construction.
7 June 2013
WASTEWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL $190,000 1
11682 BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
$300,000 2
11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
$140,000 3
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
$4,500,000 4
11923 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
$60,000 5
11924 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT B
$110,000 6
11925 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT C
$80,000 7
11926 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
$80,000 8
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 9
11686 BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR)
$180,000 10
11720 CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
$1,120,000 11
11811 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
$2,000,000 12
11810 CCTV INSPECTION OF SEWERS (2014)$1,000,000 13
11809 COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
$360,000 14
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$1,500,000 15
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$300,000 16
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$1,050,000 17
7 June 2013
WASTEWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11125 CRITICAL INFRASTRUCTURE ASSESSMENT $1,200,000 18
11155 DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
$1,100,000 19
10021 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
$1,700,000 20
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 21
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$3,200,000 22
11738 DIXIE I/I REDUCTION $750,000 23
11739 DUCHESNE AND GOTT I/I REDUCTION $180,000 24
11740 E. WATSON SEPARATE SEWER I/I REMOVAL $120,000 25
11748 FLORISSANT I/I REDUCTION $350,000 26
11932 FLORISSANT PUBLIC I/I REDUCTION $40,000 27
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION & I/I
REDUCTION
$260,000 28
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS $500,000 29
11751 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
$100,000 30
10613 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
$50,000 31
10614 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
$50,000 32
10615 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
$50,000 33
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
$400,000 34
7 June 2013
WASTEWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11759 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
$300,000 35
11763 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
$50,000 36
11909 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
$50,000 37
11910 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
$50,000 38
11911 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
$50,000 39
11912 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
$50,000 40
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
$90,000 41
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
$90,000 42
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
$90,000 43
11765 GRAND GLAIZE TRUNK SANITARY RELIEF I/I
REDUCTION (SKME-417)
$90,000 44
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521)
$3,200,000 45
11097 HOLLY DRIVE SEWER SEPARATION $240,000 46
11710 ISABELLE I/I REDUCTION $30,000 47
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$2,050,000 48
11054 KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
$25,000 49
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$850,000 50
11927 LEMAY PUBLIC I/I REDUCTION (2016)$220,000 51
7 June 2013
WASTEWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11123 LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
$150,000 52
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$600,000 53
11820 LMRDP STORAGE TUNNEL SOUTH END $7,450,000 54
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$550,000 55
11650 LOWER MERAMEC WATERSHED I/I REMOVAL $200,000 56
11651 LYNKIRK STUDY AREA I/I REDUCTION $60,000 57
11653 MACKENZIE I/I REDUCTION $250,000 58
11931 MACKENZIE PUBLIC I/I REDUCTION $90,000 59
11656 MALINE CREEK CSO 052 STORAGE FACILITY $1,600,000 60
11661 MARTIGNEY I/I REDUCTION $310,000 61
11930 MARTIGNEY PUBLIC I/I REDUCTION $190,000 62
11664 NEWCASTLE I/I REDUCTION $80,000 63
11693 NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
$230,000 64
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)$210,000 65
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
$789,000 66
11933 PROVIDENCE PUBLIC I/I REDUCTION $40,000 67
11700 PROVIDENCE SANITARY RELIEF (SKME -640)$260,000 68
7 June 2013
WASTEWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11822 PUMP STATIONS SCADA IMPROVEMENTS $350,000 69
11702 RADAR RAINFALL DATA (FY2014)$130,000 70
11665 SELVIDGE AREA I/I REDUCTION $60,000 71
11059 SENECA PRIVATE I/I REDUCTION $900,000 72
11667 STERLING PLACE SEPARATE SEWER I/I
REMOVAL
$140,000 73
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$550,000 74
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
$726,000 75
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF $85,000 76
11672 UNIVERSITY CITY I/I REDUCTION - WEST $100,000 77
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION
WEST
$60,000 78
11681 UPPER COLDWATER SECTION D I/I REDUCTION $190,000 79
11089 VINITA DRIVE SANITARY RELIEF $70,000 80
TOTAL:$48,165,000
HALEWEBER
MACKENZIEIVY
REAVIS RADIOLUCIAALICETON
EL
I
S
E ALTHEAR
O
C
K
HI
L
LVAS EL
LENOR VALCOURBONNIE
NEMONI
L
E
SBRENDABURLINGTON NORTHERN SANTA FEAFFTONEDEN
ERIERAMBLERCORA L
LA
K
E
S
ID
E ASTERE
VAN
D
A
L
E
R A D IOMKIDDERSTERLIN
G
LEMONAAVILATALBOTANTONIAUPLAND
BERWICK
LAKEFORD KOERBER
PANCHO
DORISANN
L
Y
D
E
L
LARV ELLEN PRIVATELAVERN
ARVIN
CISCODAISY
ARROWNEW HAMPSHIREDARLENEATW
O
O
D
PAVIA
SOUTHVIEW
DA M S O NL A K ESHIRE
MARLENE
BONT
O
N
RIDGELY
ALPINENEIER NIGER
SHUFFLEPAULINE
WAGER
C A N T E R LE I G HCONSUL RAYWOOD
LENARDTOBEY
C O V E N T RYHALLOCK
CITADEL
TOCAN IRENEGRA
S
S
O
HERITAGECASSELBER
R
Y
LEONA
H E R I T A G EAFFTON
STE RLI NG
ALPINE
P R IV A T EBRENDA VASEL
GR AVOIS R
D
TESSONFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11776
11
TASK NO:
TASK NAME:
$190,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 1
ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦270
§¨¦40
§¨¦270
§¨¦40
CLAYTON
GEYERDESPERESBALLASOAKNORTH F O R T Y
CA
R
B
ERRY
OA K V ALLE Y SPOEDETOPPINGBRIDLEG RAYCEDAR VALLEYSELLENRICKPOST OAK PORTL AN D
FIRETHORNCLAY C H E STER
BOPP
TWIN FAWN SROTHDUBON
WOODGATEK END
ONC H IPP E R
DUNMOR R
CREEKHAVEN
DEVON D ALEHIC KORYDIVOTHARFLOCLAYMARKRANCH
MALVERN
T HORNHILL
PAMELA
SPRINGDALE
HOLIDAY
TREGAR O N
SERAMA
IRON S TONEFALLBROOK
OAKSPRINGSDU R B I N
C
O
U
NTRYSI D E
BAMBURYREVEREPUTTERDELVIN
NICHO L A S
T O P P I N G ACRES
TINDALL
B A L WYCK
BORCHERDINGGLENMARO
RIDGEFIELDMUELLER CROYDONBICKFORD
PRIVATEF R O N T E N A C F O R ES T
HICKO R Y
BOPP§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11682
11
TASK NO:
TASK NAME:
$300,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 2
BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,
OVERCHARGING SANITARY SEWERS, AND ACTIVATING A
CONSTRUCTED SSO.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦270
§¨¦270
CLAYTON
DES PERESCAR
B
ERR
YBALLAS
D RYRIDGEROCLARECEDAR VALLEYPOSTOAKSELLENRICK
ROTHDUBON BARNBRIDGEOLD COLONY
CREEKHAVEN
HARFLO
SERENDIPITYCLAYMARK RANCH
SPRINGDALE
IRONSTONE
TOPPINGOAK SPRINGSWESTMOORPOIN T OA K
F E D E RAL
DELVIN
MUNICIPAL CENTERT O P P I N G A CRESTOWN N COUNTRYWO OD L A R K
COPPERSMITH
HORTON
BA LWYCK
B O PP
TUN D RATRICORNBORCHERDINGCLAYTON PLACEGLENMAROVANDIVERCOUNTRYLIFEACRESSPRUCEPOND
MUELLERHAWTHORNE
CRYSTAL VIEW
TOPPING PLACE
TIMMOR
TOPPINGES TATE S
TREARCY
TAU NTON
DREXEL HILLKENT MANOR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11934
11
TASK NO:
TASK NAME:
$140,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 3
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 60,300 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
FERRY
GRA
N
D
TERMIN
A
L
2ND HAL
L
NORFOLK SOUTHERNDOU
GL
A
S
S
TERMINALTERMIN A LN
O
R
F
O
LK
S
OUTHERN
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11920
11
TASK NO:
TASK NAME:
$4,500,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Bissell
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 4
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
Design Services
6660 - Sanitary
Replacement Fund
EMISSION CONTROLS FOR MULTIPLE HEARTH INCINERATORS AT
BISSELL & LEMAY NEED COMPLIANCE WITH NEW EMISSION
STANDARDS FOR SEWAGE SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEW
REGULATORY EMISSION STANDARDS.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦70 §¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11923
11
TASK NO:
TASK NAME:
$60,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 5
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
Design Services
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 47,300 FEET OF PUBLIC SEWERS USING THE
CURED-IN-PLACE METHOD.
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦170§¨¦40
§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11924
11
TASK NO:
TASK NAME:
$110,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Missouri River Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 6
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT B
Design Services
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 31,300 FEET OF PUBLIC SEWERS USING THE
CURED-IN-PLACE METHOD.
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11925
11
TASK NO:
TASK NAME:
$80,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Bissell
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 7
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT C
Design Services
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 47,980 FEET OF PUBLIC SEWERS USING THE
CURED-IN-PLACE METHOD.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11926
11
TASK NO:
TASK NAME:
$80,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 8
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT D
Design Services
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THE
CURED-IN-PLACE METHOD.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11144
16
TASK NO:
TASK NAME:
$600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 9
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS AND DESIGN SERVICES
THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
LILACTOELLES HEPLEY
BLUFF
SCENIC VAL
L
E
YADRIAN LOOKAWAYC A MER O N
SPRINGGARDENDURNESSCALUMETRENFREWELBABURLINGTON NORTHERN SANTA FECOBURG
LEETON
M I D LOTHIAN
GLOUCESTERHABECKINGHOBKIRK
S
U
R
R
E
YDOROTHYPR E SLEYGLEN G ARRYTRIOSTIMSONM ARALDOTAY
FORKDIAMONDNORTHRIDGE
G
R
A
MPIAN
ROSSCA I THNE S S
RIVER
M
O
N
T
J
E
F
F
R
E
YMCCARTNEYBAGNELLTHRIFT
BELLA
BIRITZ DENNESSTOPAZ
MIDRIDGE
L A N A R K
M C ALPINE
HAYWARDSHELDONCOSIE
LOOK OUT CHAMB
E
RS DUDLEYKIRKWALLGARDOMELVICH MACDOUG
A
L
L
HADDOCK
MARSHFIELD
MOIDA
R
T
LILACFORK
DIAMONDSHEPLEY
V
A
L
L
EY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11686
11
TASK NO:
TASK NAME:
$180,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
MISSISSIPPI RIVER (CITY)
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 10
BISSELL POINT I/I REDUCTION (BP-619)(VALLEY
DR)
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PROJECT COMPLETES A PORTON OF SYSTEM IMPROVEMENTS
NECESSARY TO REMOVE CONSTRUCTED SSO BP-619.
STRECKER
VALLEYS H E P A RDCLAYTON
O R R V I L L E JO ESIN D IAN T R EE
CHU
R
CHF I ELDMCBRIDEPOINTEWIL
D
RIDGE
BEN T R IDGE WI
LS
ON
F
A
R
M
SUNMEADOWPAN ORAMA HE
R
WO R T H
WILDH O R S E P A RKWAYHORSE SHO
E
R
I
D
G
E
KEHR S G R O V E
WOLFFGARDENVALLEYPRI V A T E
G A R D E N R IDGE
K EH R
S
RI
DGEV I N T A G E O A K
S A D D L E CREEK
ANNASL ONE CA B I N
C
HIPP E N H A M
T U R N B E R R Y P L A C E
W IL L S T R A CELA
SIA
N
D
R
A
PEPP ER MILLWHITING
THIEL ANDRAESRIDGLEY WOOD
S
P
I
SAJOSH
PRIVATE
PRIVA
T
E
M
O
1
0
9
S
T
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11720
11
TASK NO:
TASK NAME:
$1,120,000
BUDGET:
FUND:
Wildwood
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Caulks Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 11
CAULKS CREEK TRUNK SEWER (SKME-011) PHASE
I
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 13,580 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARY
RELIEF SEWERS.
SCOPE OF PROJECT 10547 CAULKS TRUNK LINE A WILDWOOD
ANNEXATION, NOW INCLUDED WITH THIS DESIGN.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11811
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 12
$2,000,000
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS
NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING
AND REPAIRS/IMPROVEMENTS.
PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS
VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11810
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 13
$1,000,000
CCTV INSPECTION OF SEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY
PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS.
PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF
SEWERS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON
PERFORMANCE.
PRIVATE ROBBINSGROVERI
C
H
MOND FORESTBEHLMANNMEADOWSROBBINS
WAY
PRIVATE
P R IV A T E PRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11809
11
TASK NO:
TASK NAME:
$360,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 14
COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Design Services
6660 - Sanitary
Replacement Fund
EXISTING WASHER/COMPACTORS DO NOT MEET NEEDED CAPACITY.
CONSTRUCT ADDITIONAL CAPACITY AND MAKE IMPROVEMENTS TO
EXISTING FINE SCREENINGS TRANSPORT SYSTEM AND
WASHER/COMPACTOR SYSTEM, AND MINOR PIPING CHANGES TO
ALLOW DIGESTERS TO FUNCTION AS EMERGENCY STORAGE TANKS
IF A SLUDGE FORCE MAIN FAILURE OCCURS.
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦170
§¨¦255
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11152
16
TASK NO:
TASK NAME:
$1,500,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 15
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
TUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE
RDP AREAS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11826
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 16
$300,000
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
TUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL
SYSTEM AND UPPER RDP TUNNEL SYSTEM.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11151
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 17
$1,050,000
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR
OTHER FACILITIES.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
FOR TANK, TREATMENT, AND PUMP STATION PROJECTS
THROUGHOUT THE DISTRICT.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11125
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 18
$1,200,000
CRITICAL INFRASTRUCTURE ASSESSMENT
Pre-Design Services
1101 - General Fund
LARGE DIAMETER BRICK SEWER SYSTEMS LOCATED IN CRITICAL
LOCATIONS NEED ASSESSMENT FOR CONDITION AND RISK OF
FAILURE.
PERFORM INVESTIGATIONS OF SEWER SYSTEMS IN HIGH RISK
AREAS WHERE FAILURES WOULD HAVE THE POTENTIAL TO CAUSE
SUBSTANTIAL PUBLIC DISRUPTION OR DAMAGE TO PROPERTY.
IDENTIFY AND PRIORITIZE REHABILITATION NEEDS.
THIS PROJECT IS TARGETED TO CRITICAL LOCATIONS THAT HAVE
NOT BEEN PREVIOUSLY EVALUATED BY OTHER EFFORTS.
§¨¦55
§¨¦55
WACHTELB
A
Y
L
E
S
S
ZEISSH
O
F
F
M
E
I
S
T
E
RPARDELLAREED D
A
V
I
S
FA
N
N
I
E
ARLEE MILITARYGEN
T
R
Y
P R I V A TEAVENUE HP
A
U
L
E
M
A
R
C
E
A
U
O
R
I
E
N
T
H
U
R
C
KGRAND
UNION PACIFICCLYDEWEBERERSKINEMINNESOTAETTA
C
A
T
A
L
A
N
H
O
R
N
M
O
U
N
T
O
L
I
V
E
FELTON
N
A
E
R
TVIRGO MICHIGANDALLASG
O
ETZ
JOPLINVEGASUNIONPERRINLORETTAREGINA LA
G
R
O
K
A
Y
S
E
R
W
E
I
S
S
PL
A
C
I
D
MANNCORMAR
VELMARUPRECHTLANDOR
BLUE RIDGES
A
N
T E N
D
U
M
O
N
T
HOLDEN
C
L
E
V
E
S
B
O
B
RIN
G
C
ATSKILL
W
A
L
L
E
R
E
S
P
E
N
S
C
H
I
E
DIDAHOMAJESTY
POINT
RIS
C
H
CARTWRIGHT
P
O
E
P
P
I
N
G
A
D
E
L
I
A
JE
F
F
O
R
D
SAVENUE IS
U
S
A
N BAUMANNP
R
I
M
M
OLD C
O
UNT Y
DAMMERTB
A
R
T
O
L
ET
EL
I
A
S
FA
W
N
B
A
Y
L
E
SS
DAMMERTVELMA
W
A
L
L
E
R
FA
N
N
I
E
W
E
IS
S
PA
U
L
E
UNIONPACIFICFELTON
H
O
R
N
KA
Y
S
E
R
O
R
I
E
N
T
UNIONPA
CIFIC
ARLEE
PRI
VATEREGINAW
A
L
L
E
R
ETTA
W
E
I
S
S
LEMAY FERRY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11155
11
TASK NO:
TASK NAME:
$1,100,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 19
DAMMERT AND BROADWAY SANITARY RELIEF
(SKME-551)
Design Services
6660 - Sanitary
Replacement Fund
TWO SSOS AND A PUMP STATION REQUIRE ELIMINATION.
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER,
AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦40
§¨¦40
CLAYTON
LAYOLD WARSON MCKNIGHTT R E N TWARSONPRICELITZSINGER
S
O
U
T
H
FORTY BARNESDANIELCELLAKENTROANOVERHI
L
L
S
D E N N Y GODW INCONWAYMAGNOLIASP
RINGWOOD
ARTHUR
P I C A R DY
WIND I N G R I D GE
INDIAN
ELLSWORTHLOG CABINPAR K
OVERBROOKHIGHDOWNANZEIGER
P R IV A T E
TWIN SPRINGS
R
O
L
LINGROCKMAYFAIRWARRIDGE
WILD ROSE
W
AT E R B U R Y
LY LEWOOD
RA
U
S
C
H
E
R
DUN
L
E
I
T
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R C REEK
LITZSINGER
PR IVA
TE
W ARSONPRIVA
T
E
PRIVATE
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10021
11
TASK NO:
TASK NAME:
$1,700,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 20
DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD)
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE
SURCHARGING AND ELIMINATE CONSTRUCTED SSOS.
SUPPLEMENTAL APPROPRIATION. 10021 NAME CHANGED TO
INDICATE INCLUSION OF SCOPE OF PROJECT 10486, DC-03 SANITARY
RELIEF.
§¨¦270
§¨¦40
§¨¦44
§¨¦170
§¨¦40
§¨¦270
§¨¦170
OLIVE BLVD
M A N C H E S T E R R DS LINDBERGH BLVDWATSO N R D
N KIRKWOOD RDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11110
16
TASK NO:
TASK NAME:
$600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 21
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
ACTIVATING CONSTRUCTED SSOS.
DESIGN NECESSARY SYSTEM IMPROVEMENTS IN THE DEER CREEK
WATERSHED TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦40
§¨¦44
§¨¦170
§¨¦40
DALEMETROLI
N
K
ELMLAYPINE
U N IONPACIFICFORSYTH
WYDOWN
PERNOD
FYLER
LOCKWOOD
FOLK
LANSDOWNEMCKNIGHTNEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONBRENTWOODSOUTHWESTHANLEY
G
OR
EPRICEW E LLS
M URDOCHODAYDAVIS
LINDENW OOD
ETHEL
FORE S T P A R K
BANCROFT
BRADLEY
WHITE
ODELL
BELLBREDELLBISMARK BOLANDSUTTONSCANLAN
EULALIE
GLE N
ARUNDEL
EUCLID FRANCISS
WAN
PAR K
WEST PARK
LITHIA
OAKLAND
WABASHDANIELP ACIFIC
SUMMITZEPHYR
OLD WARSONCELLA FORESTLOUISMARQUETTE
W I L L I A MS
ALAM
O
L
A
GOO N
MARDEL
MADGEMCCUTCHEONROAN
OAK LOUWENFL ORA ASBURYW
R
ENWOO
D
MARYS U T H E R LAND
BRUNO
GLADES
JEROME
M ANHA
T
T
A
N PRATHERIOLAYEATMANWISE
CECELIAEA G E R
ROS E
C E C ILOXFO R DGODWIN
Y ORKPARKDALE
LYLED E S P ERESARLIN
G
T
O NLANGTON VILLA
CROMW ELL
LAFAYETTETAMMKRAFTINDIAN
FAUQUIER
WILD ROSE
DOLAN
JAMIESONPORTERCEDAR
B ERRY
BANCROFTYALEMARYTAMMUNIONPACIFICWHITE
M A N C H E S T E R R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11731
11
TASK NO:
TASK NAME:
$3,200,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 22
DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
Pre-Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN
EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGE TUNNEL
AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS
AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF.
THIS IS A SUPPLEMENTAL APPROPRIATION FOR THE PROJECT
FORMERLY NAMED DC-02 DEER CREEK SANITARY RELIEF STORAGE
TANK.
WOODSONWISMERWRIGHTNORTH EMINENCEBALTIMORE DIXSIMSGUTHRIE
REXSTJOACHIMBOBB
COLESGORDONBOSWELLPOEMILTONMARGOANN
BROWNCHAUCERROYGERALDINETUDORAIRWAYHAROLD
BENSON
CARLYLE HERBERTBATAANJANE
WESTRIDGEORLANDOMARVINT I P TONST LOUIS
QUIETCALVERTPASTEURISOLDASTGREGORYBRISTOLEDMUNDSON
DELPHINE
W IN NCORREGIDOR
LILLY JEAN
SUNCRESTMURIEL
ROYALTONEASTRIDGETUTWILER
PATRIC
K
ROSLAN
STANSBERRY
CHARLACKEDMUND
TENNYSONMACON
LYNNTOWNDELTA
KATHLYN
CHESTER
GEDDE
AMBRO
EDMIL DEHARTLIVINGS
TON
JOELWESTWISE
ANGELOS T KATHERINE
H
O
L
T
W
I
C
K
OSGOODELSAMARM ARY
SHERMANINDUSTRIALBURDELLA
LINDSCOTTMECCA
LATROBELYNROSTREFORE
LEENORA
BRECKE
N
R
I
D
G
ENACECALVERTROSLAN
HAROLDSIMSBOSWELL
BRECKENRIDG
E
SIMSMURIEL
CALVERTCORREGIDOR
DIXBRISTOLREX GORDONKATHLYN
SIMSEDMUND
TUDORAIRWAYHAROLDMARVINST
C
H
A
RL
E
S
R
O
C
K
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11738
11
TASK NO:
TASK NAME:
$750,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 23
DIXIE I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT 1,500 FEET OF 8-INCH TO 12-INCH STORM SEWER.
§¨¦270
DUNN
PERSHALL
CLOVERF
L
ORABARTO
W ILLIAM
S
LATTY GOTTBECKER
JEAN
ANIS
T
A
SI
AMORAN
ELBRI
N
G
CONNOLLY
BUDDIEDE
S
METARGOSADONIA
BAS
C
O
M
GLADYSBRACKLEIGH
YOU
N
GDUBOURGGAHANSTMAURICEBOELLNERDUCHESNEM
A
R
E
C
H
AL
S
T
M
ARKLAFAYETTEMARLACW A D S WORTH
S
P
RIN G
LAUPHERP R I V A TEWASHINGTON
RICHWO OD CHATEAUMANNI
N
GTALLY HO
ST JAMESLOCUST
RYAN
SANTA
C
R
U
Z
LA HAVRES T C O R N E L I U S
S T GE NEVIEV E
SAGEWOOD ST MICHAELWILLOW
SU
S
I
E
BUDDIE
GLADYS
BUDDIE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11739
11
TASK NO:
TASK NAME:
$180,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 24
DUCHESNE AND GOTT I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT 1,220 FEET OF 12-INCH SANITARY SEWER.
§¨¦44
§¨¦44
GEYERROTT
RAYBURN
WATSON
EDDIE N P A R KROBYNDEANEMANDA CRESTOAKMONICA
APEX
RUSDONM A E B E R N TAHITIS
AMO
A
RICHVIEW
HA R W IC H
R
E
D
O
A
K
FLORALEA
M
A
RE T
CINEM A STURDYFOXPARKS U N S E T H IL LSGAYLELODG E BALI
L O WILLKATHYLYNN
M ATT
H
EWS
PRIVATE
G L E NFIELD
D
E
L
V
I
S
T
A
S U N SETRECOB
E
T
H
SKY CRESTOAKSHIREASPEN
C O URT STARLINGCRESTWOOD
FOX CR EEKJOSHUA
SADDLEBROOKWOODFOXS U N S E T O F F IC E
RICHTERMILWAUKEEWOODPA
RKMAPLE GROVEEGGELINGWESTWICKFERN GLENMORESIMEMPHISC
O
U
R
T
Y
A
RDLAKE
TRENTMORE
F O X B RIDGEMEADOWGLENMIDDLEW
OOD RYEGATEW A T S O N P L A Z A
P R IVATEWATSON
PRIVA
T
ESTURDYWATSON RD
SLINDBERGHBLVDS KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11740
11
TASK NO:
TASK NAME:
$120,000
BUDGET:
FUND:
Sunset Hills
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 25
E. WATSON SEPARATE SEWER I/I REMOVAL
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦270
§¨¦170
§¨¦170
FROST
ST ANTHONY
DUNN
HANLEYWA
S
H
I
N
G
T
O
N
PERSHALLGRAHAM WATERFORDST CATHERINE
LATTYLAFAYETTE EL
I
ZAB
E
TH
ST
M
A
R
I
E
REASOR
HA
R
R
I
S
O
N
MID WOO
D BOONECLOVERW ILLIAM
S
FLORA
MAPLE
BARTO
STLOUIS
ALLENAUBUCHON
ELBRI
N
G
C A L VE R T O N
NYFLOT
YOU
N
GJEFFERSON KINGSLEY
BECKER
MORANSADDLECAPRIJEAN
JONASELM
D E R H AKESTCHARLES
HAZELWOODZU RICH
BUCKEY
E
M IL B A N K
STDENI S
H U D SON
S T E DWARDCAD
YGAHAN
ROMISSTRINITY
FORDRIDGEHOLLINSSTJACQUESALDERCARMONATANEYBROWNROGERS
SIELO
F
F LARRYARGOBROWERP R IV ATE GRANDVIEWPIMLICOPUEBLOST M A U RICE
ST REG ISST EDITHJACKLIN
B O ELLNERM
A
N
O
R BON AIRELYNNMEADOWSWILSHIREST
MA
RKKNOLLLILA
DUCHESNE
R O B INWOODMOONLIGHTCASTELLOST NICHO L A S
KNOLLWAYST JEANLOMOND
RE
G
I
N
A
SLUSSER
CARMEL
BAR
A
T
HOLLYREEBSUFFOLKKELLY
CHARTIERST STEPHEN
ERMANDADERHAKE
P E RSHALL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11748
11
TASK NO:
TASK NAME:
$350,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 26
FLORISSANT I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦270
§¨¦170
§¨¦170
FROST
ST ANTHONY
DUNN
HANLEYWA
S
H
I
N
G
T
O
N
PERSHALLGRAHAM WATERFORDST CATHERINE
LATTYLAFAYETTE EL
I
ZAB
E
TH
ST
M
A
R
I
E
REASOR
HA
R
R
I
S
O
N
MID WOO
D BOONECLOVERW ILLIAM
S
FLORA
MAPLE
BARTO
STLOUIS
ALLENAUBUCHON
ELBRI
N
G
C A L VE R T O N
NYFLOT
YOU
N
GJEFFERSON KINGSLEY
BECKER
MORANSADDLECAPRIJEAN
JONASELM
D E R H AKESTCHARLES
HAZELWOODZU RICH
BUCKEY
E
M IL B A N K
STDENI S
H U D SON
S T E DWARDCAD
YGAHAN
ROMISSTRINITY
FORDRIDGEHOLLINSSTJACQUESALDERCARMONATANEYBROWNROGERS
SIELO
F
F LARRYARGOBROWERP R IV ATE GRANDVIEWPIMLICOPUEBLOST M A U RICE
ST REG ISST EDITHJACKLIN
B O ELLNERM
A
N
O
R BON AIRELYNNMEADOWSWILSHIREST
MA
RKKNOLLLILA
DUCHESNE
R O B INWOODMOONLIGHTCASTELLOST NICHO L A S
KNOLLWAYST JEANLOMOND
RE
G
I
N
A
SLUSSER
CARMEL
BAR
A
T
HOLLYREEBSUFFOLKKELLY
CHARTIERST STEPHEN
ERMANDADERHAKE
P E RSHALL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11932
11
TASK NO:
TASK NAME:
$40,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 27
FLORISSANT PUBLIC I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE PUBLIC I/I ENTERING SECTIONS OF THE PUBLIC
SANITARY SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 44,800 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
§¨¦270
§¨¦270
PAGE ASHBYADIE
CRAIG SCHUETZWARSONLINKSIMSFEEFE E
DIELMANSCHULTEBALLCENT
R
A
L
MID
L
A
N
D
B AUR
DAUTELDRIVER
NIBLICWELDON BALTIMORE
POEUNION PACIFIC
LITZ
FLORA
ME
S
AOAK
SPOEDE WRIGHTB O R M A N
ENGELMETRO
MEEKS
BRECKENRIDG
E
KREMDYERBRUNODELORD
ECHO
CA N T E RMAR
S
SCH
A
E
F
E
RST FRANCIS
GUELBRETHMIDLAND
GASSRIDGE
THORPELANSING
RESEARCHM A D D OX
TRESCOTT
C H I E F T A INGRISS
O
M
HURONOLDDORSETTZYKANLIBERTY
LACKLAND WISMERUCEYLEWURDACK
MILLPARK
MOR
R
O
W
BENSON
WARNEN
OLIVAIREVILL A
V
A
NCLEVE
PORTDIANES
T
K
ATHERINE
F IE S T A
SONAISOLDABOOTH
W I L W O OD
DECOR AH
MACK
ANDESNEWBAL L A S
GRAPE
TOWNLEY
BOYLSTON
INV
E
R
N
E
S
S
DAYK IN
LINDADE
MILTONRENEEWALTERSPAM
M E DIALIMETREEARC
ELBRINGMIKELLINDLEY
LOC UST POEFEEFEECANTER
OLIVE BLVD
NLINDBERGHBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10456
11
TASK NO:
TASK NAME:
$260,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 28
FOREST BROOK SANITARY RELIEF (SKME-003 AND
SKME-016) REHABILITATION & I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF 149 PRIVATE I/I SOURCES FROM SANITARY SEWERS.
BOYLEOLI
V
E
LINDEL
L WHITTIERSARAHWE
S
T
M
I
N
S
T
E
R
MC
P
H
E
R
S
ON
MARYL
A
N
D
WA
S
H
I
N
G
T
O
N
WE
S
T
M
I
N
ST
E
R
MC
P
H
E
R
S
O
N
MARYLAND
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11137
11
TASK NO:
TASK NAME:
$500,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Western Mill Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 29
GASLIGHT SQUARE SEWER IMPROVEMENTS
Design Services
1101 - General Fund
OVERCHARGED COMBINED SEWERS CAUSING WET WEATHER
BUILDING BACKUPS.
IMPROVEMENTS IN GASLIGHT SQUARE AREA TO REDUCE BUILDING
BACKUPS, TO INCLUDE STRAPPED PLUMBING RETROFITS FOR 95
BUILDINGS, OR PRIVATE PUMP STATION.
PROJECT TO BE DESIGNED VIA AMENDMENT TO EXISTING URS
CONTRACT. THE SCOPE OF THIS WORK CANNOT BE CAPITALIZED.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11751
14
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 30
$100,000
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
General Services -
Construction Inspection
6660 - Sanitary
Replacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS
NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016
BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 10613
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 31
$50,000
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
General Services -
Geotechnical
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 10614
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 32
$50,000
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
General Services -
Geotechnical
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 10615
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 33
$50,000
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
General Services -
Geotechnical
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11755
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 34
$400,000
GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
General Services -
Design
1101 - General Fund
WITH THE ELIMINATION OF THE WATERSHED PLANNING CONSULTANT,
PLANNING NEEDS TO SUPPORT THE CAPITAL PROGRAM EXCEED THE
CAPACITY OF INTERNAL STAFF.
RETAIN FIRM FOR AS NEEDED PLANNING SERVICES. SERVICES MAY
BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11759
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 35
$300,000
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
General Services -
Design
6660 - Sanitary
Replacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN
SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED
ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11763
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 36
$50,000
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
General Services -
Survey
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11909
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 37
$50,000
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
General Services -
Survey
1101 - General Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11910
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 38
$50,000
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
General Services -
Survey
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11911
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 39
$50,000
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
General Services -
Survey
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11912
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 40
$50,000
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
General Services -
Survey
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11779
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 41
$90,000
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
General Services -
Design
6660 - Sanitary
Replacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11780
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 42
$90,000
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
General Services -
Design
6660 - Sanitary
Replacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11781
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 43
$90,000
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
General Services -
Design
6660 - Sanitary
Replacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
CLAYTON
CLAYMONT
HOLLOWAYHIGHVIEWVLASISHILLSDALECREST L A N D
IVYSKYLINESUNSETCORALMIMOSAA
L
G
O
N
Q
U
I
NPA
R
KPROVIDENCESHIRLEYB R IA RW YC K
W E S T W OOD
SEVENTRAILS
K E N IL W O R TH
ELMCRESTGREENBRI
ARSTR
E
I
F
FCLAYHEATH C
O
R
O
NADO
WHITETREEPACKFORDNORTHMOOR
BIRCHWOODM
O
N
T
I
C
E
L
L
O
NANTUCKE
T PRI
VATEMEADOWB
ROOK
LO G H ILLAPPLEGATERAUSCHER
LINDELL
MONRO E M IL L
SMITH
GA
N
A
H
L
S P R A G U E SMILLBOLTONCHURCHILL
ORCHARDGLENNKEHR SMILLHATTERASANTIOCH
WELLSHIRE
HAPPYR O M IN E LAKEWOODWATFORDDALE
ELMMIMOSAPRIVATEMANCHESTER RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11765
11
TASK NO:
TASK NAME:
$90,000
BUDGET:
FUND:
Ballwin
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Grand Glaize Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 44
GRAND GLAIZE TRUNK SANITARY RELIEF I/I
REDUCTION (SKME-417)
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55
§¨¦55 UNIONREAVIS
BARRACK
S
WI
L
L IONEFAIN
RI
P
A
MACKENZIEAVENUE HSPOKANEJEFFLEIGHCAMINOMARCHIDARDING TELFORDRAINBOWMULLALLYZ E N ITHT I M M PECANJA
C
I
N
T
O
BUCKLEYSHAPFIELDVIA M I R A L E STAMCCORRY
EI
F
F
E
L
BANISTERC
O
A
C
H
E
L
L
A
M
A
L
U
S
M
O
U
N
T
O
L
I
V
E
F
A
B
I
A
N
VILLARIDGE
M
A
L
C
O
L
MM A N G R OVE
C
O
R
N
U
S
D
O
L
BIL
C
A
L
E
F
P
A
R
K
C
R
E
S
T
SEQUOIA
B
A
R
T
H
B L A C K P O O L
BONTONH UNTINGDONJUDITH
M
E
L
O
N
W E M B LEYGREEN PARK
ROSEGARDENR O D APAMARYVALE VIAVEN ETO
N
A
V
A
J
OGENE
CAUSEWAYEUCALYPTUS
P A R K L
A
WND O RANR
U
T
H
E
R
F
O
R
D
HIGHAIRE
V
E
S
C
O
V
OBOXR
E
D
L
A
N
D
BUNKER H IL L
REAVIS GARDENSBUCKLEYRAINBOWZENITH
LEMAY FER
RY R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11766
11
TASK NO:
TASK NAME:
$3,200,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 45
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE VI (SKME -521)
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF
THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH
DIAMETER SEWER.
ELMROSE
TULI P
HOLLY
BELTONOLD WATSONROCK HILLWEXFORDDRAKE
PEARL
TURF
JONQUILGARDENIAWEBSTER KNO
LLS
ROSEELM
TUL
I
P
DRAKETURF §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11097
11
TASK NO:
TASK NAME:
$240,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 46
HOLLY DRIVE SEWER SEPARATION
Design Services
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS AND BYPASS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS,
CONSTRUCT 2,000 FEET OF 8-INCH SANITARY SEWER, AND 280 FEET
OF 12-INCH TO 18-INCH STORM SEWER.
§¨¦70
§¨¦70
ASHBYJANEWRIGHTST LEOPEAR TREE
GERALDINESIMSTREA D W A Y
L A M BE
R
TIN
T
E
R
N
A
T
IO
N
A
L
ESSELDALEAIRFLIGHTLIANACYPRESS DOUGLASS
INTERNATIONAL TR A V E R S E
ST D
A
M
I
A
N
ISABELLE
TA N B A R K
CRILLYST PI
U
S
NORTH ALLEY
S
T
KEVIN
COUNTR
YSTEPHENS
BOBBIE DOWNS
STPHI
L
IP DABNEYJUNE
C A M S H I RE
FAIRWAYSTCLEMENT
CABANA CLUB EXE C U TIVE
MILL PASS
S
T
R
APHAEL
SOUTH LAMBERT PARK
TROP I C
ST AMB
R
O
S
E
ST LINUSJEREMIAH KODIAK
NATURAL BRIDGE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11710
11
TASK NO:
TASK NAME:
$30,000
BUDGET:
FUND:
St. Ann
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 47
ISABELLE I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55
§¨¦255
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERK
INSWOOD GREGGREA
V
I
S
B
A
R
RACKSF
O
R
D
E
R CCCGRANTLI
N
D TELFO R D
H
O
FF
M
EI
STE
RARLEE
MILDS
H
ERMAN
GENT
R
Y
IONE
FAIN PRIVATEJOPLINCLIFFRING ER
SHE R ID A N
P
A
U
L
E
P
O
T
T
L
E
O
R
I
E
N
T
RIP
A
LUNAP
O
P
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTO
R
Y
M
O
U
N
T
O
L
I
V
E
BOUNDARY
H
O
R
N
JEFFE
R
S
O
NIAN
HAL S EYFIRSTPECAN
ASH
ROCK
JA
C
I
N
T
O
SOUTHSHI
R
E
AR
R
A
S JEF
F
E
R
S
O
NBLUE RIDGEBANISTERAL
L
E
N
LI
SIEUX KASKEBUNKERBIRCHP
RI
VATETELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11711
11
TASK NO:
TASK NAME:
$2,050,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 48
JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
Design Services
6660 - Sanitary
Replacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT
CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO
DAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,
ELIMINATING THE MARTIGNEY AND JEFFERSON BARRACKS PUMP
STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 14. TOTAL DESIGN BUDGET IS $4,500,000.
RIPA
GREGGGRANTCCCTELFORDLARKOUTERWEMBLEYCLYDEBOUNDARYLUNABROOKLINNREAV
I
S
B
A
RRACK
S
CLAGERN
E
B
R
A
S
K
A
RIVERLA
M
B
E
T
H
GARK
CY E
SI
G
S
B
E
E
JE
F
F
E
R
S
O
N
I
A
N SADIEWALWO
RTH MEADOWELLEN JOPLINNORTH
PR
I
V
A
T
E
A
L
L
E
N
GR A NDASEDANL
A
R
E
D
O
TA
C
O
M
A
S
O
U
T
H
A
M
PT
O
N
W
E
ST
A
I
R
W
A
L
D
E
N KASKEBELLSW O R T H
EA
R
LS
F
I
EL
D
RUTHL A NDE L L WINE
TEDDYKEVIN
BUNKERPOPLARFORESTOH A R A
BE
A
T
R
I
C
E ERIEREESR OSEGARDENOLEDELR A INBOWB
A
R
N
SL
E
Y
SHERMANB
E
T
T
Y
J
EANS
O
U
T
H
W
A
R
K
D O RANCHAPEL
PE
N
T
O
N
VI
L
L
E
E L E ANORKAYM
I
D
D
L
E
B
O
R
O WO
O
L
WIC
H
SCE N IC
DE
M
E
RV
I
L
L
E
KENNYA
T
L
ASSHETLA
N
DREAV TELWINDINGW
Y
C
L
I
F
F
E
CORLISSB
U
R
M
A CCCPRI
V
ATER
A
I
N
B
O
W TELEGRAPHRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11054
11
TASK NO:
TASK NAME:
$25,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 49
KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
Design Services
6660 - Sanitary
Replacement Fund
INFLOW CONTRIBUTING TO OVERCHARGED SEWERS AND PUMP
STATION.
CONTROL SURCHARGING & BACKUPS AND ELIMINATE EXISTING
PUMP STATION P-326 THROUGH I/I REDUCTION AND SEWER
IMPROVEMENTS. REDIRECT TWO STREET INLETS FROM SANITARY TO
STORM SYSTEM.
§¨¦55 UNIONUNIONPACIFICGRANTK
O
E
L
N
MINNESOTAD
A
V
I
S
GREGGVIRGINIABUCKLEYS
EI
B
E
R
T
WACHTELB
A
Y
L
E
S
S PENNSYLVANIAG
ERMAN
I
AZEISSCCCM
O
T
T
PARDELLAWE
B
E
RTELFO R D IDAHOR
E
A
V
I
S
B
ARRACKSFA
N
N
I
EKAMMERER
ARLEE MILITARYS
H
ERMAN
N
A
G
E
L
GENT
R
Y
FAIN PRIVATEJOPLINM
A
R
C
E
A
U
CLIFFMOHEGAN
R
O
B
E
R
T
BL
O
W
RI
P
A
LUNAGRANDGARKMORGAN FORDLARKWATERCLAGEROUTE RHOFFMEISTER REILLYS
P
R
I
N
G
M
O
U
N
T
O
L
IV
E
ETTA
P
R
I
M
M
AVENUE HBOUNDARY
C
A
T
A
L
A
N
H
O
R
N
JEFFE
R
S
O
NIAN
HAL S EYPECANREGINAP E A LDANA H
E
E
G
E
PHILOC
O
L
V
I
N
BLUE RIDGEEI
F
F
E
L
TIE
M
A
N
N
BANISTERAL
L
E
N
TE
S
S
O
N
KASKEBUNKERRUNYONPR
I
V
A
TE
WEBER
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11817
11
TASK NO:
TASK NAME:
$850,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 50
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Design Services
6660 - Sanitary
Replacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP
STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP
STATION AND FORCE MAIN.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦255
§¨¦70
§¨¦270
§¨¦255
§¨¦55 §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11927
11
TASK NO:
TASK NAME:
$220,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 51
LEMAY PUBLIC I/I REDUCTION (2016)
Design Services
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE SEWERS USING THE CURED-IN-PLACE METHOD.
D
A
V
I
S
MILITARYM
A
R
C
E
A
UWACHTELFA
N
N
I
EGRAND H
U
R
C
K
WATERVULCANC
A
T
A
L
A
N
H
O
R
N
UNION PACIFICH
O
F
F
M
E
I
S
T
E
R REILLYMINNESOTAG
O
E
T
Z
GEN
T
R
Y PENNSYLVANIAO
R
I
E
N
T
LA
G
R
O
T
E
S
S
O
N
K
A
Y
S
E
R
W
E
I
S
S
P
O
E
P
P
I
N
G
PARDELLAMANN VIRGINIAB
A
Y
L
E
S
S
P
R
I
M
M
PRIVAT
EERSKINE
PL
A
C
I
D
E
S
P
E
N
S
C
H
I
E
DPOL KW
A
L
L
E
R
N
E
L
L
I
EIDAHOA
D
E
L
I
ABAUMANN
OLD C
O
U
N
T
Y
DAMMERTMICHIGANW
A
L
L
E
R
H
O
R
N
W
E
I
S
S
B
A
Y
L
E
SS
P
RIV
ATEKA
Y
S
E
R
UNIONPACIFIC
LA
G
R
O
W
A
L
LE
R
KAYSER
PR IVATE
L E M A Y F E R R Y R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11123
11
TASK NO:
TASK NAME:
$150,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 52
LEMAY PUMP STATION NO. 1 REDUNDANT FORCE
MAIN
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
NEED TO INCREASE INFLUENT PUMPING CAPACITY FROM 290 TO 340
MGD.
CONSTRUCT 3,600 FEET OF REDUNDANT 96-INCH FORCE MAIN FROM
LEMAY PUMP STATION 1 TO LEMAY HEADWORKS.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11145
16
TASK NO:
TASK NAME:
$600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 53
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES NEEDING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS, AND DESIGN SERVICES
IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE
REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55 UNIONB
A
T
E
S
MACKENZIEDE
LO
R
GE
R
M
A
NIA
MORGAN FORDTA
F
T
MINNESOTAVIRGINIAPENNSYLVANIAD
A
V
I
S
RHODES
R
IV
E
R
D
E
S
P
E
R
E
SHAMPTO
NWACHTELIDAHOB
AY
L
E
S
S ROSAMILENT
ZZEISSH
ALELOUISIANAS
EIB
E
R
T ALASKAW
A
L
S
H
M
O
T
T
D
O
VER
PARDELLABL
O
W
I O NEWE
B
E
RFINKMAN
H
O
L
L
Y
H
ILL
S
WI
L
M
I
N
G
T
O
N
RE
A
VIS
BARRA
C
K
S
FA
N
N
I
EELTONKAMMERER SHARPIR
O
N
ARLEE MILITARYCHRISTYBU
R
G
E
N
FIELDGEN TRYMATHILDA
PRIVATERADIOM
A
R
C
E
A
U
B
O
W
E
N
UNIONPACIFICOS
C
E
O
L
A
H
A
V
E
N
Q
UIN
CY
MOHEGAN
STAELY CLIFTON37THJOPLINA
L
M
A
IT
A
S
K
A
KAYSC
H
I
L
L
E
R
R
O
B
E
R
T
RI
P
A
H
EI
D
E
LBERG
RADIOMKIT EUGENEGRANDEI
L
E
R
GRESHAM
LUCIAWATERVASELFORMAN
BELLE
RIVEGENESTA
ACORNALABAMAHOFFM E I S T E R REILLYJAM
IES
O
NWILL
MORE
M
O
U
N
T
O
L
I
V
E
ETTA
CIRCLEVIEW
ALTHEAP
R
IM
M
AVENUE HSPOKANEC
A
T
A
L
A
N
JEFFLEIGHH
O
R
NLEONAPILOT
ZENITHPECANE
L
W
O
O
D
H
A
N
N
O
V
E
R
REGINARAYNAVAJOEH
E
E
G
E
SOUTHERN
C
O
L
V
I
N
C
EC
I
L
JOELST
E
I
N
S
BLUE RIDGEEI
FFE
L
M
AL
U
S
T
E
S
SON
PAVIA HELMRUNYONAVABL
O
W
VIRGINIAGRANDGRANDRIPA ALASKAWEBER
LEM A YFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11820
11
TASK NO:
TASK NAME:
$7,450,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 54
LMRDP STORAGE TUNNEL SOUTH END
Pre-Design Services
6660 - Sanitary
Replacement Fund
IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED.
CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL
SYSTEM FOR THE LEMAY WATERSHED.
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦170
§¨¦255
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11109
16
TASK NO:
TASK NAME:
$550,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 55
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE
RIVER DES PERES POTENTIALLY IMPACT WATER QUALITY.
CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL,
CONSOLIDATION SEWERS, AND DEWATERING PUMP STATION. THIS
PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦255
§¨¦255
KERTHRING E R
ERB
F
O
R
D
E
R
M
A
T
T
I
S
HEINTZB A U MGA R T N E R
KINSWOOD
MILDAMBSY A E G E RMEHL MILBURNTHEISS
OLDB A U M G ARTNERP
O
T
T
LELI
N
D
BUTLE R HILL CLIFFSUSANCARIBEEHAWKINSBUR
N
C
O
A
TE
E
A
S
T VIENTOOLSENBL
A
CKFOREST
P
O
P
L
A
R
ELIENGLAND TOWNVALMEYERT
O
W
N
E
C
E
N
T
R
E
M AN G O
P
RI
VATE
DANTONAIREBERVIEWC L I F F CAVE
AQUARID
G
E
L E M A Y W O ODS
MARTIGNE Y
VALLEYSIDEFUCHSFIJIL
O
N
GVIE
W
IVONDALEFIRELEAFWHITSHIRESTARLITSAGEASH
ROCK
PE A L
DELOAKLITTLEROCKSIR BORSEILEEN ANN
SUNHILL
ADWORTHDOHACK
LIS
IEUX
CO
Y
L
E
FAUS
T
CROSSWOODPRIVATEHAWKINSAMBS
PRIVATEPRIVATEPRIVATEPRIVAT
ETELEGRAPHRDLEMAYFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11650
11
TASK NO:
TASK NAME:
$200,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 56
LOWER MERAMEC WATERSHED I/I REMOVAL
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWS
TO THE LOWER MERAMEC TREATMENT PLANT.
REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TO
REMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWS
TO THE LOWER MERAMEC TREATMENT PLANT.
LINDEMANLINDGATE
LILLIAN
TWIN PINECHOPINFRANCES LOCKETTNANADOU
G
HE
RTY FE
R
R
Y
GRANT TALLIEMOZ
A
RT
LY NKIRK
AMHERST
WHITECLIFFBEN DAVIS
GREENING
SHERILINNORTHLIN
DOVERGATE
MONTOUR
WINESAP LINDEMANNHAVERSHAMCORNHILL OAKB LUFF
BEETHOVENARMA T
JI
LL
SOUT H LINBLAC K TWIG
BRI
AR
F
ARMLIN MANOR
ST CROIX
CAMEO
LORIEN
TRINKET
GREENING
L Y NKIRK
ST CROIX
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11651
11
TASK NO:
TASK NAME:
$60,000
BUDGET:
FUND:
Kirkwood
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Grand Glaize Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 57
LYNKIRK STUDY AREA I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL.
§¨¦44
§¨¦44 ELMBERRYLOCKWOOD
GRAYEDGARGORELACLEDE STATIONGLENDALEUNIONPACIFIC
CHESHIREHEEGEMAPLEBURLIN
G
T
ON N ORTHE
R
N
S
A
N
T
A
F
E
TULIP LILACBAKER
JACKSON
ROCKHILLOAKOLDWATSONSELMAOAK TREEPLANT
GR
A
N
T VALCOURH O L L Y
R O S EJEFFERSON SYLVESTERWELLST U R FSAND
E
R
S
LI N U M JOYFLORENCE
RIDGE
REAVI
S
MURDOCH
BELTONPARKIOLA GARD E NPAPIN
IMSEC A N N ONBURYALBANY WEIL
SOUTHSIDE
F O R E S T
LANVALECLARA
INNISFAIL
H O LLYWOODCOFF
E
Y
3
R
D
CENT
R
A
L
P R IVATEALMACHAPELFORDYALE
DOB BIN
RAVENSRID
G
E
PARDE
E
FIELDSTON
IDAMOR
L A K E
BONITA
GENERAL S H E RIDAN
SWON
OAKSHAZEL
LARKHILL
OLIVE BUSCH
MCDONALD
R
I
D
G
EWOODHART GROVE
LOCKSLEYALGONQUIN
YORKSHIRE
CATALI
N
A
CEDAR
FOURNIERHAWKIN
S
CA
R
M
E
L PLYMOUTHSPENCER
CATALPA
NORMALMARVALEAMBERGAT
E
KIRKY
RABETHBLACKMERF ORESTO
N
KENORA
ASHBURY
GRANTJACKSON
SWON
PARDEECEDAR
ROSE
GRA
NTELMSELMAGARDEN
WEILSELMA
PRIVATEP LANTWATSON RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11653
11
TASK NO:
TASK NAME:
$250,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 58
MACKENZIE I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS AND
CONSTRUCT 1,100 FEET OF 12-INCH TO 18-INCH SEWER.
§¨¦44
§¨¦44 ELMROCK HILLEDGARGLENDALE GRAYGORETULIP LILACBAKER
JACKSON
SELMAOAK TREE
LACLEDE STATIONCHESHIREO L D WATSON
BURLIN
G
T
ON NO
R
T
H
E
R
N
S
A
N
T
A
F
E
H O LLY
R O S E
WELLST U R FLI N UM DRAYTONFLORENCE OLD ORCHARDMAPLERIDGE
RE AVIS
BELTONS H E R W O O D
PARK
PAPIN
IMSEC A N NONBURYALBANYSOUTHSIDE
ECKRIC
H
FORES T
LANVALECLARA
INNISFAIL
HAMPSHIRE
CEN TRA L
PINETREEVIRGINI
A
ALMASYLVESTERCOLEBROOKBRISTOL
OAK
DOBB IN
WEXFORDFIELDSTON
SIMMONS
R O SEA CRE
GRANTBRIDLELOCKWOODPLANTCHESTNUT
L A R K H ILL HAZELP A S A D ENAPRIVATE
BUSCH
VIO LET
ALGON
Q
UIN
LACLEDE G R O V E S
R O N ALDHEEGEFIRWO
O
D LA N D S CAPE
SHORT
AMBERGAT
E
CAMELLIA
WORTHINGYORKSHIRE DE E RHURSTIVANHOEV I L L A W O ODTOFT
OLAWINDSOR ASHBURYREGENTSELMAGRAYJACKSONELMSELMAPINETREEELMREAVISGORE
LANVALEROSE
PINETREETUL
I
P
WATSON RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11931
11
TASK NO:
TASK NAME:
$90,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 59
MACKENZIE PUBLIC I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 31,500 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
HALLBURLINGTON NORTHERN SANTA FEMARIAS
CHAIN OF ROCK
S
RIV
ER
TRA
I
L
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11656
11
TASK NO:
TASK NAME:
$1,600,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 60
MALINE CREEK CSO 052 STORAGE FACILITY
Design Services
6660 - Sanitary
Replacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS.
CONSTRUCT COMBINED SEWAGE STORAGE TANK, ASSOCIATED
PUMP STATION, AND SEWERS.
§¨¦55
§¨¦270
§¨¦255
§¨¦255 LEMAY F
E
R
RY
R
D
TE LEGRAPHRDGRAVO IS RD
TE S SONFE R RYRDS
LIN
D
B
E
R
G
H
BLV
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11661
11
TASK NO:
TASK NAME:
$310,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 61
MARTIGNEY I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55
§¨¦270
§¨¦255
§¨¦255 LEMAY FERRY
R
D
T ELEGRAPHRDGRAVOI
S
R
D
TES S O NFER R YRDS
LIND
B
E
R
G
H
BLV
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11930
11
TASK NO:
TASK NAME:
$190,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 62
MARTIGNEY PUBLIC I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 27,000 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE METHOD.
NEW HALLS
FERRY
M
O
N
D
OUBLEAUCHURCHILL
WELLINGTONA
B
E
RDEEN
M O NSOLSLOG
I
S
WI
N
T
ERGREEN
W EDGWOODBRUNSWICK HIRO
N
DELL ED R E SDEN
DOVERINDIANCUPS
E
VILLEWE
S
T
MINSTER
MESERTAGR
A
V
E
L
L
E
SUNCRESTROSANTAQUEDUCTWINDSORBROOKSHIRE AR
P
E
N
T
BRA D W EL L
FARNHAMC R OSS KEYS
COUGAR
ES PACEBARCELONAR U E D ER ENARDWOODSAG ECH ESH I
REC HADWICKC HELSEA
S
P
R
INGTIME
CONCORD
S O M E R S E TB A V IL L EGREENBRIAR
A V O NJOSTESTATESDOMENIQUECA N T E R B U R Y
E
D
I
N
B
U
R
G
SEAVIEWLIND
B
E
R
G
H
LIND B ERG
H
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11664
11
TASK NO:
TASK NAME:
$80,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 63
NEWCASTLE I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦70
PASADE N ALUCAS N HUNTNELSONMELBALILLIAN
H
U
N
T
E
R
RA V INIA
HILLSROL
A
N
D
FL
O
R
I
A
N
LAWLERCOLONIALLINCOLNIRA
OREON
GR
O
V
E
L
A
N
D
OAKRIDGEWINCHESTER
EDI
S
ON
FO
R
E
S
T
H
I
L
L
NO
R
M
A
N
D
Y
A
U
GUS
TA
WI
L
L
O
W
WO
O
D
AVONDALESUNSET
HE
N
DE
R
S
O
NCOU
NTRYCL
U
B
WESTFA
RL
E
Y
WAR W I C KBERMUDA
D
O
N
A
LD
MANOLAHUN T I NGTON
ONEILLB
RISTOL CRESTLANDROH
N
ST MARYSFA
I
R
CH
I
L
D
RE
D
E
R
EASTMATH
E
W
MU
R
R
A
Y
S T ANDRE
W
S CANTERB U R Y
ARCOLANEONABRETONCENTRALNAD INE
DU
C
K
W
O
R
T
H
CANTERBURY
COLONIALONEILLNELSONPASADENAROLANDBRISTOL
MELB A
N
A
T
U
R
A
L
B
RID
G
E
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11693
11
TASK NO:
TASK NAME:
$230,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 64
NORTH BADEN CREEK I/I REDUCTION
(BP-532)(WINCHESTER DR)
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. REPLACE
500 FEET OF 12-INCH SANITARY SEWER, AND CONSTRUCT 400 FEET
OF 12-INCH STORM SEWER.
PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTS
NECESSARY TO REMOVE CONSTRUCTED SSO BP-532.
DERHAKENEW HALLS FERRY
ST ANTHONY
ST CATHERINEWATERFORDPADD
O
C
K
WASHINGTON NEROAVON
NARA
STLOUIS
CATOALLEN
PRIVATE
AQUEDUCTAUBUCHONOL
D
H
A
L
L
SFERRYHUMES
POHLMANTROTTERMARIETTASADDLEKINGSLEYLISACASTELLO DANUBETHUNDERBI
R
D
STDEN I SH E L MKA MPF
FAIRW A Y
PAPALSTE
U
G
E
N
E TINAS
E
V
E
N
HILL
SRIDGE MILETUS
E S T ATE S
ROGERSLARRY TREMONT
VAN D A L S
CAPRIPYRENEESS O R R E L L
SEVILLE
S T IR RUP
BAYMEADOWSCARLA
FOX RUN
GREENGRASS
RHINEI N DIA
N
C
UPBELCROFT
PIMLICOFLORVALRENEEFAIRMOUNTBON AIRESH O REHAM
BROWN
GALLOPS T EED
WILSHIREMOHAN
DENISEWINDSOR
LIL A
R O B IN WOODNARR
A
G
A
N
S
E
T
ST LUK
E
PENHURST
KAEL
COUGAR
VALENCIAEADSTONEDANABROADMEREHOLLY
BELAIRKELLY
ST STEPHEN
PRIVATE
PRIVA TEBROWNPRIV A T ELINDBER
G
H
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11696
11
TASK NO:
TASK NAME:
$210,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 65
PADDOCK CREEK I/I REDUCTION (PRIVATE)
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11699
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 66
$789,000
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Professional Services
1101 - General Fund
PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWER
SYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS.
PUBLIC ENGAGEMENT PROGRAM FOR OUTREACH REGARDING
REMOVAL OF PRIVATE STORMWATER SOURCES, THE CONSENT
DECREE, & OTHER WET WEATHER RELATED COMMUNICATIONS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES.
TU XED O
MARSHA
L
L
YEATMANOXFORD
LACLEDESTATI
ONGREELEY
KUHLMAN
SUFFOLKNEWPORT
PROVIDENCE
CLARK
EXETERTAMPABROOKSIDE
ATALANTA
T W INING
KE
Y
W
E
S
T
ROBINSONL
E
N
O
XBARBARA JEANCLY D
E
H
U
R
S
T
PROVIDENCE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11933
11
TASK NO:
TASK NAME:
$40,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 67
PROVIDENCE PUBLIC I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 22,500 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
§¨¦44
§¨¦44
WEIL
MARSHALL
NEWPORT
CLARK
BOMPARTTUXEDO
MURDOCHLACLEDESTATIONSHREWSBURY
SELMAMETR
O
LI
NKATALANTA
UNION PACIFICEDGARLOCKWOOD SUMMITJOYFOREST
B U R L IN G T O N N O R T H E R N S A N T A F E
PLANTSYLVESTERDEVONSHIRE
SUTHERLAND
FAIRVIEW
RIDGE YEATMANGARDEN
NOTTINGHAM
LANSDOWNEGLENSPRINGPARKKIRKHAMOXFORDORCHARDARLINGTO
N SUSSEXWILSHUSENBRUNSWICKLAFAYETTE
DEVILLEMASONHAWT H O R N E
LENOXEUNICE
SUFFOLKST CHARLESKAINEXETERL A K E
GREELEY
MARIONSWON
SUNNYSIDE
HAZELDA
L
E
ST VINCENTCAROLINEMICHAELP A S A D ENAGREEN
W
O
O
D
O
A
KWOOD
ARBOR
KUHLMAN
CALVERTGLENNONSTARK
KENRIDGE ST MICHAELLO G C ABINFAIRLAWNCATALPA
PROVIDENCE
SANDAUTAMPA
P R I V A T E
THEATREELBART
BAR
T
O
L
O
MILDREDQUTTONSTANDISH
GARDEN
GREELEY
OAK W OODHAZELPARK
ATALANTA
PAR
K
G LENO
A
K
WOOD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11700
11
TASK NO:
TASK NAME:
$260,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 68
PROVIDENCE SANITARY RELIEF (SKME -640)
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN
EXISTING SEWERS AND ACTIVATING A CONSTRUCTED SSO.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND
CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11822
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 69
$350,000
PUMP STATIONS SCADA IMPROVEMENTS
Vendor Services
6660 - Sanitary
Replacement Fund
EXISTING SCADA SOFTWARE IS INCOMPATIBLE WITH THE NEW
DISTRICT STANDARD WINDOWS 7 OPERATING SYSTEM.
UPGRADE EXISTING SCADA HARDWARE AND SOFTWARE.
OPERATIONS TO COORDINATE PROCUREMENT THROUGH
PURCHASING.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11702
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 70
$130,000
RADAR RAINFALL DATA (FY2014)
Vendor Services
1101 - General Fund
ACTUAL PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN
EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM
MODELS.
INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR
IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING AND
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL
CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2016
BASED ON PERFORMANCE.
RAMSEYPARKE
R CORALOLD BALLWINIVYSHIRLEYNANCY
B A R TO N STEAMBOATBIRCHWOODD EBULA
NEWTONROJEAN
SEAWINDAPPLEGATE
ST MARYSVICTORREDSTART
LESLIESOLONSWEETCREEKSMI
THS
UN NYSIDEVAIL
MANCHESTER RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11665
11
TASK NO:
TASK NAME:
$60,000
BUDGET:
FUND:
Ballwin
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Fishpot Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 71
SELVIDGE AREA I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT NEW SANITARY SEWER TO ELIMINATE INFLOW AND
INFILTRATION SOURCES.
§¨¦170BROWNLACKLANDBURNS
RIDGE WOODSONECHO
FLORA
MIRIAMHOOD GOODALETRESCOTT MILTONGASSTENNYSON
THEODOSIA GAEBLERWENGLERFOREST
SENECA CHARLACKEVERMAN
SHERWOODLESLI
EMARLOWE
WABADAY
PALMER
ADDIEWALLISDAWESKENOSHOVERONASPENCERCOTE BRILLIANTE HARTLANDS
H
ELLEY
GOTHLANDBRASSIE
MINERVA
MEADOWBRO
O
K
APACHE
OSAGE
ONEIDA
SHAWNEE
KALEN
BARODA
SIEVERS
WALLISHOODSPENCERGOODALESPENCERMILTONWALLISWABAD
A
Y
MI RIAM
MILTON
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11059
11
TASK NO:
TASK NAME:
$900,000
BUDGET:
FUND:
Overland
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 72
SENECA PRIVATE I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSING
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER AND
REMOVE PRIVATE SOURCES OF INFLOW AND INFILTRATION FROM 156
PROPERTIES.
WEBER MACKENZIEVALCOURIVY
GRAMOND
STAELY
NEW HAMPSHIRERADIOLUCIAVASELVITA
ALICETON ALTHEAR
O
C
K
HI
L
LBONNIE
NI
L
E
SBRENDAMAYLORELSAEDENELGINLANGLEY
DELMA
RAMBLERCOR A LNEIER
ASTERKIDDERS TER L I NG TALMAARDALE JOELDARLOWCRAIGHILL
ARVIN
MAXWELL
LAWNSIDE
G R A C E
BRINKERLAVERN
DAISY
CHESHIRE
DARLENEBRITTINLONKARPAVIAAVA
ALPINE
BIXBY
CHARLTONPALMETTODE MARAMARVALE
NIGERLARRY DELDEXTER
PAULINECONSULRAYWOOD
V A L B ROOKSWI
F
TON
H A M PSTEADSECURITYGR A
S
S
O
HERITAGECASSELBER
R
Y
LA JARA
PRIVATE
LANGLEY
H E R I T A G ELANGLEY
ELGINSTERLI
N
G VASEL
ALPINE
GRAVOI
S
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11667
11
TASK NO:
TASK NAME:
$140,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 73
STERLING PLACE SEPARATE SEWER I/I REMOVAL
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
ACTIVATING CONSTRUCTED SSO.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 10766
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 74
$550,000
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER
RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR
WATER QUANTITY & QUALITY EVALUATION OF STREAMS.
CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN
CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND
DESIGN EFFORTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11916
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 75
$726,000
STREAM FLOW WATER QUALITY SAMPLING (FY
2014)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY
CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, &
STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY
WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE.
§¨¦270
§¨¦270 DUNNLUSHER REDMAN
BENHAMCRITERIONLILACLAVIDACOVE
PRIGGERAYMONDREALE
COAL BAN
KMADRIDTRAMPE
JUNE
MALAGA
BAYONNE SPANISHMENDOZAS P A NISHPON D
V
ALEN C IAFONTAINE
DORIS
CORDO
V
A
CADIGANROSARYBOWERSP E R S HAL L
EDMAR
TWILLMAN PIN T A
MACKIN ROSADO
FARMVIEW
G ARDENSHARDELL
LERIDA
UPHILLP
AT
TERN
MURIEL
CROSSETT
RUESTATALISM
A
N
PETITE BRIDGEVALENOB HILL
MCQUAY
ZAMORA
SHEFFIELD GERONASURF S IDEPRIVATESAEGER
LARIMO
R
E
CLAUDINE HALL HOUSEHAR PERTAOS
MONTICELLO
L A K E M O N T
FAIRMEADOWS
RO S EVIEWBRIARB R AE
M
O
L
L
ERUSSENATE
R IO G RANDESANR ICARDOCORLYNSCENIC LAKEMIMEAUXMUNICIPALSPARROW
FARMVIEW
PERSHALL
TRAMPE
G A R D E NLEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11668
11
TASK NO:
TASK NAME:
$85,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Watkins Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 76
SUB-TRUNK #2 LATERAL SANITARY RELIEF
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTS
NECESSARY TO REMOVE CONSTRUCTED SSOS BP-210, BP-211, AND
BP-213.
§¨¦170
§¨¦170
PAGE
WARSONASHBYWOODSONDIELMANBROWNDELMARLINKSIMSUNIONPACIFIC NORTH N SOUTHO L D B O N H O M M E
BALTIMORE
WALTONBURNS82NDARGYLE
GANNON
RIDGE
SPOEDEECHO
B AUR
GROBY
DRIVERADIE
NIBLIC
CANTONTERMINALPOE
MCKNIGHTC
E
N
T
R
A
L
MID
L
A
N
D
ME
S
ATRESCOTT
STANFORD81STOAK
SCHUETZ MCKIBBONENGEL HOODMEEKSKREM
PRIVATEDYER LAFON
WINDOM
G R A N D V I E WBRUNO GOODALECA N T E RENDICOTTSCH
A
E
F
ERLE PEREGUELBRETHTUDOR
GASSTHORPE
PRI
CEWAYNE
RESEARCHB A L SONHILLTOPMADDOX
HURON
T EALWOOD
FOREST
ZYKAN
BEAVER
ALBINWISMER
S T ACY
ELMORE
AHERN
MILLPARK
BRISTOWEADS
TRENTON
V
A
NCLEVE
ORCHARD GULFBARBY
FLORA
ALD E N
BOOTH
PI C K E R IN G
KEMPL
A
N
D
MINERVA
ANDESASHLANDARBORLITTLE
BELL
CODY
HASTING
S
DREXEL
DOWNEYHAFNERHOWELBRINGLACKLAND
VILLA
LOCU S T
THORPE
OAK
PAGEBURNS P RIVATECANTER
OLIVE BLVD
NLINDBERGHBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11672
11
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 77
UNIVERSITY CITY I/I REDUCTION - WEST
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦170
§¨¦170
PAGE
WARSONLACKLAND
ASHBYWOODSONDIELMANBROWNUNION PACIFIC
OLD B O N H O M M ELINKBURNSFLORA 82NDWALTONARGYLE
RIDGE
ECHOSIMS
BAUR
DRIVER
NIBLIC
ME
S
AMCKNIGHTTRESCOTT
GROBY 81STOAK ENTITYENGEL HOODMEEKSDYER
LAJOLLA
C H AUCERG R A ND V IE WBRUNO GOODALETER M IN
A
L
CANTER
M I LT
O
N
GASSTHORPE
P
RICECHARLACKRESEARCHB A LSONHILLTOPHOLTWOOD
M A D D OX
LE PERECENT
R
A
L
MIDLAND
PRIVATET E A L W O O D
FOREST
ZYKAN
LIBERTY
CANTON
BEAVER WISMERSTACY UCEYLEELMORE GILROSESTANFORD
TRENTON
GAYSENECA
ORCHARD
STONEYSIDEIN D IA N M E A D O WSKORANDOLINPAGEBRYANTLACKLINK
BOOTH
PICKE R IN G
MINERVAPOE
ANDESH AR N E Y
ARBORBELLFOWLER
MANSFIELD HARTLANDOLD
O
L
I
V
E
S
T
R
E
E
T 79THLISA
TU X FO R DBULLER
HASTING
S MASHIEELBRINGLAUGHLINSEVILLE
CRIXDALE
VILLA
CINNAMON
FAYVIEWIROQUOIS
MAGNETCRYSTALLOCUSTBURNS
PRICEWALTONPAGE
VILLAWISMEROAKOAK
MEEKS BURNSSIMSOLIVE BLVD
NLINDBERGHBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11929
11
TASK NO:
TASK NAME:
$60,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 78
UNIVERSITY CITY PUBLIC I/I REDUCTION WEST
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER THAT ARE DEFECTIVE.
REHABILITATE 21,000 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
§¨¦70
§¨¦170
§¨¦170
WRIGHTMETRO L I N K
NORTH HANLEYKATHLYN
BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAM
B
E
RTINTERNATIONAL
MARGO ANN
DIXWISMERSCUDDER
BOSWELL5TH
HAROLD BROWNEDMUNDSONST LEOFAIRFIELDBENSON HERBERTPEAR TREE
BATAAN
MARVINCAMTIPTONGENA IRE
ISOLDASTGREGOR YMCNULTYTREADWAY
ROYLAGUARDIAW INNMURIEL
E ASTRIDGEPATRIC
KLEBOURGETEDMUND
L
E
I
T
HMARSHALLVANCELIVINGSTO
N
ROYALTONISAB ELLE
H
O
L
T
W
I
C
KINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD
NORTH
METROLINK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11681
11
TASK NO:
TASK NAME:
$190,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 79
UPPER COLDWATER SECTION D I/I REDUCTION
Design Services
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
HANLEYMONROEVIN
ITA
TITUS
MADISON
AL
E
R
TSTILLWATERBL
O
O
M
DRIFTWAYUN
D
ER
H
I
L
L
BLUEMONT
GARFIELD
JACKSON
BUCHANAN
ALERTVINITAMONROE
MADISON
BLOOM
UNDERHILL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11089
11
TASK NO:
TASK NAME:
$70,000
BUDGET:
FUND:
Hanley Hills
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 80
VINITA DRIVE SANITARY RELIEF
Design Services
6660 - Sanitary
Replacement Fund
ELIMINATION OF SSO REQUIRED.
CONSTRUCT 650 FEET OF 12-INCH SANITARY SEWER AND REMOVE
SSO.
7 June 2013
WASTEWATER CONSTRUCTION PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10523 AYRES SANITARY RELIEF AND I/I REDUCTION $2,200,000 81
11852 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2014)
$5,200,000 82
11793 CC-14 CREVE COEUR CREEK SANITARY RELIEF
(SKME-026) PHASE II
$1,800,000 83
10549 CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II
$2,100,000 84
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-
561)
$860,000 85
11722 CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
$5,200,000 86
11825 CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
$2,500,000 87
10430 CSO - SOUTH COUNTY PARK SUBSYSTEM NO.
71 INTERCEPTOR (I-161) SEPARATION
$1,680,000 88
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 89
11116 DACEY BRANCH I/I REDUCTION (BP-313)$50,000 90
11849 DEER CREEK PUBLIC I/I REDUCTION (2014)$5,700,000 91
10335 DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407)
$600,000 92
11742 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
$3,000,000 93
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)$250,000 94
10600 FF-02 FEE FEE - ALAN SHEPARD I-270
SANITARY RELIEF PHASE V
$1,700,000 95
10014 FF-11 FEE FEE CREEK SANITARY RELIEF $4,100,000 96
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
$6,000,000 97
7 June 2013
WASTEWATER CONSTRUCTION PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10142 FORESTWOOD SANITARY RELIEF (SKME-435)$2,100,000 98
10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
$3,000,000 99
11782 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
$85,000 100
11783 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
$85,000 101
11784 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
$55,000 102
11785 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
$55,000 103
10458 GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
$630,000 104
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
$9,600,000 105
10330 HARTLAND TO GOTHLAND SEWER
SEPARATION
$3,000,000 106
11707 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT A
$5,000,000 107
11864 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT B
$5,000,000 108
11865 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT C
$5,000,000 109
11772 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
$3,200,000 110
11772 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
$800,000 111
11855 LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT A
$6,000,000 112
11870 LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT B
$3,300,000 113
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $6,300,000 114
7 June 2013
WASTEWATER CONSTRUCTION PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11807 LOWER MERAMEC RIVER WWTP SCREEN
SHAFT LINING
$1,000,000 115
10696 LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING
IMPROVEMENTS (PHASE II)
$250,000 116
11654 MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
$260,000 117
11931 MACKENZIE PUBLIC I/I REDUCTION $5,200,000 118
11656 MALINE CREEK CSO 052 STORAGE FACILITY $2,000,000 119
11658 MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
$50,000 120
10030 MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
$7,500,000 121
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$2,000,000 122
10716 NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
$3,138,000 123
11114 PUBLIC I/I REDUCTION REHABILITATION $5,000,000 124
10198 RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
$2,400,000 125
11885 ROCK HILL PUBLIC I/I REDUCTION (SKME-618)$6,600,000 126
10770 SUN VALLEY I/I REDUCTION $1,226,000 127
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
$500,000 128
11139 TILLIE BADEN NEWBY SEWER
IMPROVEMENTS (PROPERTY ACQUISITION)
$1,600,000 129
10781 UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314)
$1,000,000 130
10793 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE
II
$6,500,000 131
7 June 2013
WASTEWATER CONSTRUCTION PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10029 WISE AND MABEL SEWER SEPARATION $3,000,000 132
10237 WOODSMILL SANITARY RELIEF (SKME-020)$2,600,000 133
TOTAL:$152,974,000
§¨¦44
§¨¦44
L
IGG
E
T
T BERRYO AK L A N D
S
A
N
D
E
R
S
D
I
V
ER
S
E
Y
UNION
P
A
CI
FI
C
FRISCO
G
R
A
N
T
BUR LINGT ON NOR
T
HERN S
A
N
T
A
F
E
S C O T T
ELMONT
3RD
CON
OVE
RJO AN
N
BRIA
RT
O
NSCHULTZSAP
P
I
NGT
ONGLENDALE
HAWKIN
S GLENOAKLOPIN
A
C LO VERTRELLIS
LEAWO
O
D ARM
IN
FERN
D
AL
E
MONROE
LEXINGTO N
MABEL
GROVE
AYRESC
U
R
WOODF IE L D C R E S T
GILL
ESPI
E
RED B U D T R E E
W
E
BSTERFOREST
C H A TW O O D
BALTIMORE
M ARSAN
DEN T O N
WOODL
EI
G
H
TOW ER WEB
STER
WO O D S
DIA
NEBANBURYWOODHAVENWI
LDWO
OD C
IRC
L
E
OAKLAND
SAPPINGTONUNION
P
A
CI
FI
C
CLO VER
F R I S C O
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10523
15
TASK NO:
TASK NAME:
$2,200,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 81
AYRES SANITARY RELIEF AND I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND TWO SEPARATE SEWER OVERFLOWS.
CONSTRUCT 3,750 FEET OF 8-INCH TO 12-INCH SEWER, PERFORM
PRIVATE I/I REDUCTION ON 24 PROPERTIES, AND REMOVE TWO
SSOS.
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11852
15
TASK NO:
TASK NAME:
$5,200,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Bissell
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 82
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2014)
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF 48,670 FEET OF THE PUBLIC SEWER SYSTEM TO
REDUCE PUBLIC I/I.
NORTH FORTY CO LLEGEPARKCONWAYGARDENSLADUEMONTDELASALLECONWAY PINECONWAY HOLMES
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11793
15
TASK NO:
TASK NAME:
$1,800,000
BUDGET:
FUND:
Creve Coeur
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 83
CC-14 CREVE COEUR CREEK SANITARY RELIEF
(SKME-026) PHASE II
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,200 OF 18-INCH SANITARY SEWER FROM HAMMERMILL
DR. TO BALCON ESTATES ROAD.
WOODS MILLPOST
FOREST C R E S T
PRIVATE
LA GORCE
FORESTVALE
BEAGLE
G
L
E
N
C
OVEBURNINGTREEOAKLAND HILLSDELTONA
FORESTLAC
ORANGEHILLSWALFIELDB
EA
U
LAC
CALCUTTA
GREYMO R ELAND O WOODS
TEMPESTKING S CROSSBR
O
A
DMOOR
G LENVA L L E Y MANO RLAC
DELMO N T E
LONDON§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10549
15
TASK NO:
TASK NAME:
$2,100,000
BUDGET:
FUND:
Chesterfield
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 84
CC-17 FOUR SEASONS BRANCH SANITARY RELIEF
PHASE II
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PHASE II OF PROJECT TO CONSTRUCT 3,300 FEET OF 8-INCH TO
15-INCH DIAMETER SEWER AND APPURTENANCES AND REMOVE ONE
SSO.
§¨¦170
§¨¦170
WARSONPRICELADUEDIELMANOLDBON H O M M E
DELMAR
GAYMCKNIGHTWENNEKERLAYCLAYTON
ENGEL
BARNESCELLAKENTGANNON
G L E N EA G L E S
S T ACY
B A L SON
HUNTERB RA
E
B
U
R
NBERICKRIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDEGROBY
PRIVATEBARBYENFIELDHEATHER HILLDR
O
M
ARALANGTONP I C A R D Y BON AIREF
O
RDYCESPOON
ALANS
O
N
HIGHDOWNARBORLITTLE
MANSFIELD
LISA
BERKLEYMAYFAIRHASTING
S
BO N HILLS
FIE L D I N G RADFORDWASHINGTON
APPLE TREEBLACK CR
E
E
KTERRYDEL
C
R
E
S
TRYEBRIAROAK
RANDELAYCRIXDALE
VILLA
WHITE ROSELORENZOELKINGTONCHERRI WATSONI
A
LYNNELOCUST
VILLA
PRIVATE MCKNIGHTP R IV A T E
PRIVATEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11884
15
TASK NO:
TASK NAME:
$860,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 85
CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
ACTIVATING CONSTRUCTED SSOS.
REMOVE PRIVATE I/I FROM PUBLIC SEWER BY CORRECTING
IMPROPER CONNECTIONS ON 300 PROPERTIES.
PROJECT WAS ORIGINALLY PART OF THE SCOPE OF 11722.
§¨¦170
§¨¦170
WARSONPRICELADUEDIELMANOLDBON H O M M E
DELMAR
GAYMCKNIGHTWENNEKERLAYCLAYTON
ENGEL
BARNESCELLAKENTGANNON
G L E N EA G L E S
S T ACY
B A L SON
HUNTERB RA
E
B
U
R
NBERICKRIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDEGROBY
PRIVATEBARBYENFIELDHEATHER HILLDR
O
M
ARALANGTONP I C A R D Y BON AIREF
O
RDYCESPOON
ALANS
O
N
HIGHDOWNARBORLITTLE
MANSFIELD
LISA
BERKLEYMAYFAIRHASTING
S
BO N HILLS
FIE L D I N G RADFORDWASHINGTON
APPLE TREEBLACK CR
E
E
KTERRYDEL
C
R
E
S
TRYEBRIAROAK
RANDELAYCRIXDALE
VILLA
WHITE ROSELORENZOELKINGTONCHERRI WATSONI
A
LYNNELOCUST
VILLA
PRIVATE MCKNIGHTP R IV A T E
PRIVATEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11722
15
TASK NO:
TASK NAME:
$5,200,000
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 86
CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
ACTIVATING CONSTRUCTED SSOS.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING
55,000 FEET OF PIPE SEWERS AND MANHOLES.
CENTR
A
L
MI
D
L
A
N
D
C I T Y O F M A R Y L A N D H EIGHTSSPORT PORTPRI
VATECREVE COEUR
M
ILL RULEH O O K S R IV E R PRIVATE PRI
VATEPRI VATE PRIVATE
P R IVA
T
EPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11825
15
TASK NO:
TASK NAME:
$2,500,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 87
CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
Construction
6660 - Sanitary
Replacement Fund
GROWTH AND WET WEATHER INFILTRATION REQUIRES NEW FORCE
MAIN.
CONSTRUCT 3,500 FEET OF 42-INCH FORCE MAIN AND
APPURTENANCES.
RIVERGRANTGREGGUNION PACIFICCC CSHERMAN
SHERIDA NCLAGER OUTERR
AIN
B
O
W
NOR T H
RIDGEBOUNDARYHALS E Y LEE
FIRSTWEMBLEY N
E
B
R
A
S
K
A
JE
F
F
E
R
S
O
N
I
A
N
LONGSTREET
LA
M
B
E
T
H
COOKERE
A
V
I
S
BAR
R
A
C
K
S
HANCO C K
CY E
SIG
S
B
E
E
FLAGSTAFF
SOUTHGROV
E
RGRAV E SOLEDELFR
A
N
R
U TELFORDPRI
V
A
T
E
DAVISWORTHAL
L
E
N
G RANDAKEA
R
N
E
Y
L
A
R
E
D
O
TA
C
O
M
A
S
O
U
T
H
A
M
PT
O
N
BRAND
W
E
S
T
A
I
R
EA
RL
S
F
I
E
L
D
E L L WINEROXBURY
POPLAR FORESTC
L
A
Y
P
O
O
L
SMITHBUNKERBE
A
T
R
I
C
E
SY
L
V
I
A
MIRAVALLE
MOSE
S
MUE
L
L
E
R
WI
L
L
E
T
T
E
BRIL L I A N T
PE
NT
O
N
V
I
L
L
E
CAMERONHAWSON SCENIC
CORLISSKEAR
N
E
Y
G R ANTBOUNDARYCCCP R IVATEPRI
V
A
T
E
TELEGRAPHRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10430
15
TASK NO:
TASK NAME:
$1,680,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 88
CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71
INTERCEPTOR (I-161) SEPARATION
Construction
6660 - Sanitary
Replacement Fund
SEWER SURCHARGING AND BUILDING BACKUPS.
CONSTRUCT 900 FEET OF 8-INCH DIAMETER SANITARY SEWERS AND
APPURTENANCES, REHABILITATE 19 MANHOLES AND 10,000 FEET OF
EXISTING 6-INCH TO 8-INCH SEWERS, INCLUDING THREE POINT
REPAIRS AND REDUCE PRIVATE PROPERTY I/I.
IT IS ANTICIPATED THAT THIS PROJECT WILL FACILITATE THE
EVENTUAL REMOVAL OF ONE CSO (L-151) AND ASSOCIATED
INTERCEPTOR (I-161).
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11146
15
TASK NO:
TASK NAME:
$5,000,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 89
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS
REQUIRED.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES.
§¨¦270
BARONTRASKHUDSON
PERSHALL
DUNN
VORHOFVISCOUNTIMPERIALKEELEN
E LK I NS
HALLWOODEDGEFIELDATMORE
NASHUALINNELLLANDSEERJETTCHAMPLIN CAPITOLCLAIRMONTDELLRIDGECROWN POINT
GREEN VALLEYN
EW
H
A
L
L
S
F
E
R
R
Y
REBAMAYFAIRCHESLEY
MONARCHPRIOR
WINKLERFOLEY
MURATOLNEYTATEALLIANCE
BON OAKVENTURACARGILL OLD HALLS FERRYJANSONDISCOVER Y
KING
S T I VESITTNERSTEIN QUAKERPANNELLOLD MANOR
EMPRESSVARNUMHALLSTEADDEEM
PEPPERBEECHER
BALBOACLOVERDALEGRAFTON
FLORIDALEGREEN S L O P E LA N GFORDM A L DON
HERITAGE
KNOLLCRESTHARN E Y WOLD
EMPIRESAFFRONCHAMBERS HILLCAN
F
I
E
L
D
O R B ITT
NEVILLES O M ERSET TERRACE
K R O E G E R
BRADSHAW
IBI S
KIPP CH
I
C
K
E
R
I
NGOTTKAMP
C A P ITOL
HI
LLWHEELINGFOSS
CAVALIERPADUCAH
Q UE EN
CROWN POINTEM P I R EBON OAKHUDSON
MONARCHPERSHALL
WINKLERPERSHALL
HUD S O N
BON OAKQUAKER§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11116
15
TASK NO:
TASK NAME:
$50,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 90
DACEY BRANCH I/I REDUCTION (BP-313)
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦40
§¨¦44
§¨¦170
DELMAR
DALEWARSONTERMINAL
M E T ROLINK
PAGE
METRO LINKETZEL
FORSYTHDIELMANFORESTPARK
MCKNIGHTBRENTWOODLADUE
LAYPINE
C A N T O N KIENLENFERGUSONWELLS
C L A Y T O N
WYDOWN
LINDELLPURDUE
OAKLAND
O L D B O N H OMME
PENNSYLVANIAUNIO N P A C I F I C
OLD WARSON WOOD
SONFOLK
WEST PARK
LITZSINGER 82NDRIDGE
MARYLAND
MY
R
O
N
NORTH N SOUTHG R O B YHAMILTONASHBYMAPLE
LAGOON
TULANE
CA
TE
S
SOU T H WESTTRENTG O V E R N M E N TME
S
AHANLEYWALTONDAVIS
LACLEDESTATIONETHELWENNEKER
WHITE
MARKET
BREDELLENGEL
MEEKS
YALESUTTONST
L
O
U
I
S
CORNELL
PERSHING
S
O
UTHFORTY
MARYLAFON TRINITYARUNDELRAFTPA
R
K
PARTRIDGEENRIGHT
MON
R
O
E
STANFORD
CELLACLARALOUISPRI
CETEASDALE
JULIAN70TH DERBYQUENDO
ELIZABETHMADGE
AHERN
MCCUTCHEONHU RON
GARNER
ZYKAN B
L
O
O
M
WILSONBUCKWISE
STACY
ST CLAIRBRUNO
ELMORE
HOYTOXFORD
KINGSBURYHU
NTERWADEROSEMENDELLBARBYOAKLEIGH
PRIVATE VALLEDROMA
RAVILLA
INDIAN FARISR
O
M
A
I
N
E
ARBORLITTLE
RALPHPLATEAU
SAN BONITA
PA
G
E
VILLA
PERSHING
PRICEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11849
15
TASK NO:
TASK NAME:
$5,700,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 91
DEER CREEK PUBLIC I/I REDUCTION (2014)
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE SANITARY SEWER SYSTEM TO REDUCE
PUBLIC I/I.
PIERRED
U
C
HE
S
NEPARQUELACONTE
HEAT
H
E
R
BLUFFHILL
C
A
M
P
WALDENRIDGE
M IN N E T T ELARIVERA§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10335
15
TASK NO:
TASK NAME:
$600,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Meramec Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 92
DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407)
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION AND FORCE MAIN CAN BE ELIMINATED BY
CONNECTING GRAVITY SYSTEM TO EXISTING 8-INCH SANITARY
SEWER ON HEATHER BLUFF COURT.
CONSTRUCT 765 FEET OF 8-INCH SANITARY SEWER AND
APPURTENANCES, AND MAKE ALTERATIONS AS NECESSARY TO
ELIMINATE PUMP STATION.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11742
13
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 93
$3,000,000
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
Property Rights
Acquisition
6660 - Sanitary
Replacement Fund
IMPLEMENTATION OF THE CAPITAL PROGRAM REQUIRES
ACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OF
IMPROVEMENTS.
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM COMBINED AND SANITARY SEWER SYSTEM
PROJECTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11107
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 94
$250,000
EMERGENCY REPAIR FUNDS (WASTEWATER)
Construction
4122 - Wastewater
Emergency Fund
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUT
NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICT
MUST ACT IMMEDIATELY.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCY
FUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
MID
L
A
N
D
DE RUNTZ
SMILEYLANSINGMACK
READINGFEE FEECUMBERLANDSHUMATECARLSON
FRANKE
W YL W O O D
DOW
NING
LENNOXBROADVIEWMIDLANDCROSSINGMID
L
A
ND
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10600
15
TASK NO:
TASK NAME:
$1,700,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 95
FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY
RELIEF PHASE V
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,390 FEET OF 8-INCH TO 36-INCH DIAMETER SEWERS,
AND ELIMINATION OF TWO CONSTRUCTED SSOS (BP-083 AND BP-511)
AND A WET WEATHER PUMP STATION.
§¨¦270
§¨¦270
R
OTHHILL
PROGRESSLEIGHSCHULTE HILLGLENBU
S
HMARSHALO
R
I WOO
D
H
OLLO
W
AMERICANINDUST R IA L
KIMLER
G LE N G A T EBERN I E MCKELVEYHILLGLENMEADE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10014
15
TASK NO:
TASK NAME:
$4,100,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 96
FF-11 FEE FEE CREEK SANITARY RELIEF
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH DIAMETER SEWER
AND APPURTENANCES, FROM 1876 WOODHOLLOW DRIVE TO
PROGRESS PARKWAY.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $6,800,000.
A DIEFEE FEESCHUETZCHAFFEEMETROGRISSOMMIKELNORFOLKS O U T H E R N
ROCK ISLANDNORTH
L
I
NEINDUSTRIALCENTERLINE INDUSTRIALF
AI
RGROVE INDUSTRIAL
NORTHLINE INDUSTRIAL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10489
15
TASK NO:
TASK NAME:
$6,000,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 97
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF
PHASE III
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
THE THIRD AND FINAL PHASE OF A MULTI-PHASE PROJECT. THIS
PHASE CONSISTS OF THE CONSTRUCTION OF 4,700 FEET OF 8-INCH
TO 42-INCH DIAMETER SEWER SOUTH OF SCHUETZ ROAD.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $10,700,000.
ERBHEINTZBLACKFORESTBAUM
G
A
R
T
N
E
R
SE A NP
RI
VATECLIFFWOO D
T
R
E
E
R
I
D
G
E
S U S A N
PI O N E E R
GATLI
N
G
CHRISTOPHERENGLAND T O W N
RABBITRUNTANZMARSANDERS
TEL H A VEN
W H I T E W O O D
FA ITH
P A THFINDERCLAYMONT
MARY CREST
NAHN
B
R
ANDENB E R GWESTPHALIA
ROYAL COUNTRY
OAKMONT TERRACE
OAKVILLE TERRACEGLENNAIREB
R
E
N
N
A
PEACHW OOD
J ANEL
MISTY
PRIVATE
PRIV A TEPRIVATE
SAN D E R S
PIONEER
TELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10142
15
TASK NO:
TASK NAME:
$2,100,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 98
FORESTWOOD SANITARY RELIEF (SKME-435)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,980 FEET OF 8-INCH TO 18-INCH DIAMETER SANITARY
RELIEF SEWERS, 420 FEET OF 8-INCH FORCE MAIN, AND
REPLACEMENT OF THE EXISTING PUMP STATION.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $3,525,000.
MUSICKGRANT
SAPPINGTONGARBER
P R IV A T E
BAPTIST CHURCHEDDIE N PARK
LITTIEPARDEE EL
I
S
E
GR
E
E
N
P
A
R
K
ROXANNATESSHIRE
MUELLERKOHRSVAUK
ALICETON
BUXTONA
N
TIGOLENOREMILVARGASDANDRIDGEEWERS
TWILIGHTST
O
N
E
L
L
AL
I
XMAYOZINZER
FLORIFARA
D
A
Y
MAPLELAVAN T
BU
F
F
T
O
N
LINCORDJA
N
FAWNHAVEN
MEA T H
CONCORDG OLF CREST
DENNY W O LFFPICKWICKGA
I
L
KAPPBRIARSTONE
CON C O R D V I L L A G E MCNARYTEALRIDGE
BI
MINI
CR A I GWOO D
BEHRFERNALDCHARRETTE
ANTONIASTOL
Z
SONATAW
HITEHA V E N
S
L
E
V
I
N
VALD A M E R E
TI O GA
WI
L
L
I
N
D
AGENELMUGAN
S
O
LARLASVEGASFABICKPINE SPRAY
WI
L
L
D
A
N
SPITZ
REBECCALETA
LAVINIACAMBROOKPEBBLE OAK
FI
T
EALEPPOLARKSPUR PRI
VATEPRIVATE
PRIVATEMEA T H
GRAVOI
S
R
D
T E S S O N F E RRYRDSLINDBERGHBLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10611
15
TASK NO:
TASK NAME:
$3,000,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 99
GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 24-INCH TO 36-INCH SANITARY SEWERS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,000,000.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11782
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 100
$85,000
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11783
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 101
$85,000
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11784
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 102
$55,000
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11785
12
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 103
$55,000
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE.
§¨¦44BERRYUNIONPACIFICGLE NKIRKHAM
CLAYGRAYLOCKWOODDICKSON
GOREOLD WARSON
TAYLORWHITE
LEE
ELMARGONNE
JEFFE R S ON
ESSEX
SAPPINGTONMADISON
MONROE BRENTWOODMCKNIGHTWOODMAPLET R E N TODAYBELLSELMAEDGARBAKERHARRISONBISMARK
BROWNELL
GLENDALE LILACBODLEY
LITHIABENNETT
PLANTBACON
JOYSARAH
GILL
PARPEEKE WARSONWAY
MADGE
ANDREWSYLVESTEROA KDEACON
AUSTINM E D INA
HOLLANDMCKINLEYSQUIRES
IOLANORTH
LONGVI
E
WD E N N Y
ROCK HILLMARK
HOLMESPAPINKORTWRIGHTO
VERBROOK
BREMERTONBERNICECLARA
MORITZ
H O LLYWOODD E S P ERESLAFAYETTEALMAPA R KC O P P E R HILL
JOANNA
BRENTHIGHHAMP T O N
MANITOU
JULIAN
JACKSON
VICTORIA
WARWICK
PRIVATEFREDERICKSWANREMINGTONMARS
H
ALL
HUNTLEIGH
HULLFAIRDALE
JEWEL TYLERSWON
COLLEGE HILLDALECEDARWOODLAWN
LYMAN
SUMMIT
GASLITE GLENHARRISONSELMAMONROE
LOCKWOODCLAY ELMELMOAKCEDARCLAY
ESSEX
P R I V ATE
MAPLEMADISON
PARK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10458
15
TASK NO:
TASK NAME:
$630,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 104
GLENDALE SECTION D SANITARY RELIEF PHASE
III (SKME-624) I/I REDUCTION
Construction, Phase II
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTION OF PHASE III OF SEWER IMPROVEMENTS, TO
INCLUDE REHABILITATION OF APPROXIMATELY 20 PRIVATE LATERALS,
DISCONNECTION OF APPROXIMATELY 510 ROOF DRAINS, AND
DISCONNNECTION OF APPROXIMATELY 120 AREA DRAINS.
KIRKHAM
GRAYDICKSONSWONGOREOLD WARSON
LOCKWOOD
LEE
ELMESSEX UNIONPAC IF I C
JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK
BROWNELL
QUAN
FOOTE
EDWINEUCLID
JEFFERSONLITHIABENNETT
BACON
GILL
PA R
HUDSON
ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON
AUSTINM E D I N A MCKINLEYPARKLANDADAMS
MADISON
IOLANORTH
LONGVI
E
WROCK HILLMARK
RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPACIFIC
DWYER
WILD DEE R
BOGEY
D E S PERESHILLARD ROCKMANC O P P E R H I LL
JOANNA
R ID G E LINED
EVONBREMERTONCHELSEA
P R IV A T E
HIGHHAMPT O N
MANI
TOUJULIAN
VICTORIA
WARWICK
W
AT E R B U R Y
MOODYLEONARD
OAKSFOX
BARRONFREDERICKGLENMOOR
HULLFAIRDALE
PARKWOODSMCDONALDHARTGREENVIEWCOL L
EGEAL
G
O
NQ
U
I
N
CEDAR
B ERRY
HILL
SIDEWOODLAWN
BELLEVIEW
BEAUFORD
HOCHBERRYWOOD
RA
R
I
T
AN
GASLITE
ALFRED
NOLAN
FUHRMANN
RUSSELLSTURGISELM
LOCKWOODELM BERRYMAPLECHELSEA
ALGONQUIN ROCK HILLPAR IOLACEDAR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11122
15
TASK NO:
TASK NAME:
$9,600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 105
GLENDALE SECTION D SANITARY RELIEF PHASE
IV (SKME-624) I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I IN SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING
80,000 FEET OF PIPE SEWERS AND MANHOLES.
PROJECT WAS TO BEGIN IN FY13 WITH PARTIAL FUNDING OF
$4,700,000. IT WAS CONTINUED INTO FY14, WITH FULL FUNDING NOW
BUDGETED IN FY14.
§¨¦170BROWNARGYLE
OLDEN
LACKLAND
BURTON
MILTONCHARLACKWALTONFOREST
GOODALEGRACELAND MCKIBBONMARSHALLADDIEWOODSONVERONAPALMER ASHLANDHARTLANDOAKLANDS
H
ELLEY
GOTHLANDNORTHLANDSHERWOODKENOSHOMILLET
APACHE
ONEIDA
SHAWNEESTELLADOYLE
SYCAMOREBARODA
SHERLAND
FOREST
MILTONONEIDA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10330
15
TASK NO:
TASK NAME:
$3,000,000
BUDGET:
FUND:
Overland
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 106
HARTLAND TO GOTHLAND SEWER SEPARATION
Construction
6660 - Sanitary
Replacement Fund
AREA NORTH OF MIDLAND BLVD. CONTAINS APPROXIMATELY 1,600
FEET OF COMBINED SEWERS, THAT ARE TRIBUTARY TO THE
COLDWATER SANITARY SEWER NETWORK.
CONSTRUCT SEPARATE STORM AND SANITARY SEWERS, AND
REMOVE I/I, TO ENABLE ELIMINATION OF COMBINED SEWER SYSTEM.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $4,700,000.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11707
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and County
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 107
$5,000,000
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT A
Construction
6660 - Sanitary
Replacement Fund
OLDER DETERIORATED AND DAMAGED SEWER LINES (6-INCH TO
36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED
MAINS, AND BUILDING BACKUPS.
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA
REHABILITATION CONTRACTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11864
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 108
$5,000,000
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT B
Construction
6660 - Sanitary
Replacement Fund
OLDER DETERIORATED AND DAMAGED SEWER LINES (6-INCH TO
36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED
MAINS, AND BUILDING BACKUPS.
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA
REHABILITATION CONTRACTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11865
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 109
$5,000,000
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT C
Construction
6660 - Sanitary
Replacement Fund
OLDER DETERIORATED AND DAMAGED SEWER LINES (6-INCH TO
36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED
MAINS, AND BUILDING BACKUPS.
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA
REHABILITATION CONTRACTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11772
17
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 110
$3,200,000
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Work Order Repair Costs
(Capital)
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS, AND
OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR
REPLACEMENT.
AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT
THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND
AWARDED.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11772
17
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 111
$800,000
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Work Order Repair Costs
(Non-Capital)
1101 - General Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS, AND
OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR
REPLACEMENT.
AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT
THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND
AWARDED.
§¨¦55
§¨¦270
§¨¦44
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11855
15
TASK NO:
TASK NAME:
$6,000,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 112
LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT A
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF SEWERS AND MANHOLES USING TRENCHLESS
TECHNOLOGIES.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11870
15
TASK NO:
TASK NAME:
$3,300,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 113
LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT B
Construction
6660 - Sanitary
Replacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,
BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATION OF SEWERS AND MANHOLES USING TRENCHLESS
TECHNOLOGIES.
P
R
I
V
A
T
E
UNION PACIFICHOF
FM
E
I
S
T
ER
PERRINUNION PACIFICPRIVATEUNION PACIFICUNION PACIFICUNION PACIFICPRIVA T E
UNIONPACIFICPRIVATE
UNION PACIFICUNION PACIFIC§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
15
TASK NO:
TASK NAME:
$6,300,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Lemay Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 114
LEMAY WWTP SECONDARY IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210
MGD IS REQUIRED BY CONSENT DECREE.
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $10,500,000.
FINEPRIVATEWILLIAMS
O
N
PINETOPAPPEL
K
I
NGSRI
DGEMANOROLD TELE
G
R
A
P
H
TELEGR
A
P
H
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11807
15
TASK NO:
TASK NAME:
$1,000,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Meramec Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 115
LOWER MERAMEC RIVER WWTP SCREEN SHAFT
LINING
Construction
6660 - Sanitary
Replacement Fund
EXISTING SCREEN SHAFT COATING IS DETERIORATING.
DUE TO THE SCREEN SHAFT COATING PEELING OFF, A REMOVAL AND
POSSIBLE REPLACEMENT OF THE COATING IS NEEDED. ANALYSIS OF
COATING OPTIONS WILL BE ACCOMPLISHED WITH THIS PROJECT.
FINEPR
I
VA
T
E
PINE T O PKINGSRIDGEMANOR PINETOP
T E L E G R A P H R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10696
15
TASK NO:
TASK NAME:
$250,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Meramec Tributary Areas
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 116
LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING IMPROVEMENTS
(PHASE II)
Construction
6660 - Sanitary
Replacement Fund
EXISTING TREATMENT FACILITIES NEED TO BE EXPANDED AND
UPGRADED TO MEET DEPARTMENT OF NATURAL RESOURCES
REQUIREMENTS AND POPULATION NEEDS.
FINAL SITE RESTORATION REQUIRED AFTER COMPLETION OF ALL
TREATMENT PLANT CONSTRUCTION, PER ST. LOUIS COUNTY
RECORDED CONDITIONAL USE PERMIT.
RIVER DES PERESC
I
R
C
L
E
V
I
EW
RHODES
P
O
I
N
T
V
I
E
W
HOLLYHILLS
GREE
N
H
O
L
L
Y
A
R
C
HWOO
DMENOLAVILLANOVA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11654
15
TASK NO:
TASK NAME:
$260,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 117
MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION NEEDS EMERGENCY POWER OR 24 HOUR STORAGE.
INSTALL EMERGENCY GENERATOR, AUTOMATIC TRANSFER SWITCH,
AND CONTROL PANEL ON ELEVATED PLATFORM.
§¨¦44
§¨¦44 ELMROCK HILLEDGARGLENDALE GRAYGORETULIP LILACBAKER
JACKSON
SELMAOAK TREE
LACLEDE STATIONCHESHIREO L D WATSON
BURLIN
G
T
ON NO
R
T
H
E
R
N
S
A
N
T
A
F
E
H O LLY
R O S E
WELLST U R FLI N UM DRAYTONFLORENCE OLD ORCHARDMAPLERIDGE
RE AVIS
BELTONS H E R W O O D
PARK
PAPIN
IMSEC A N NONBURYALBANYSOUTHSIDE
ECKRIC
H
FORES T
LANVALECLARA
INNISFAIL
HAMPSHIRE
CEN TRA L
PINETREEVIRGINI
A
ALMASYLVESTERCOLEBROOKBRISTOL
OAK
DOBB IN
WEXFORDFIELDSTON
SIMMONS
R O SEA CRE
GRANTBRIDLELOCKWOODPLANTCHESTNUT
L A R K H ILL HAZELP A S A D ENAPRIVATE
BUSCH
VIO LET
ALGON
Q
UIN
LACLEDE G R O V E S
R O N ALDHEEGEFIRWO
O
D LA N D S CAPE
SHORT
AMBERGAT
E
CAMELLIA
WORTHINGYORKSHIRE DE E RHURSTIVANHOEV I L L A W O ODTOFT
OLAWINDSOR ASHBURYREGENTSELMAGRAYJACKSONELMSELMAPINETREEELMREAVISGORE
LANVALEROSE
PINETREETUL
I
P
WATSON RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11931
15
TASK NO:
TASK NAME:
$5,200,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Mackenzie Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 118
MACKENZIE PUBLIC I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY
SEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 31,500 FEET OF PUBLIC SEWERS WITH
CURED-IN-PLACE PIPE.
HALLBURLINGTON NORTHERN SANTA FEMARIAS
CHAIN OF ROCK
S
RIV
ER
TRA
I
L
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11656
13
TASK NO:
TASK NAME:
$2,000,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 119
MALINE CREEK CSO 052 STORAGE FACILITY
Land Purchase
6660 - Sanitary
Replacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS.
CONSTRUCT COMBINED SEWAGE STORAGE TANK, ASSOCIATED
PUMP STATION, AND SEWERS.
DUKELILACEARLTOELLEROYALK IL G O R E CABOTST CYR
SHEPLEY
COLONYAVAN
T
CALUMETB ERWYNCASTLE C O B U R G LANDSDELHIMEADPRINCE ELBAB
A
K
EWELL
C O M E T
DWIGHTCAMBRIAATTICA
LEETON
A S HFORD
AKRON
GLOUCESTERA S H B ROOKDURHAML A I R E
BIRITZ
SU
R
R
E
Y
SCRANTON
COLLET
T
BLISS
DOROTHYCRET E
GARDNER TRIOBALLARD
M ARALDOBOSWORTH
GOLDE N
H A V IL A N D
DUCHESS
JEP
S
O
N
GABRIEL
TWILL MCCARTNEYB A G N E LLBELLA
FONDANORBRIDGEADMIRAL HANSOM
JAROSAME S BURY HAYWARDBLODGETT
YORKTOWNPRESTIGE SURFCOSIE
NORTHAMPTONFATHOM
NORWICHLANDWEHR
ZELLWEGER
SUNBEAM
CAVERHILL WESTL O CHIELNETHERWOOD
HADDOCK
HAZELTONCASTLEPRINCE LEWISNCLARKBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11658
15
TASK NO:
TASK NAME:
$50,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 120
MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
YALESUTTONBELLEVUEMcCAUSLANDZEPHYR
UNION PACIFICGAYOLA
SOUTHWEST
FLORA FORESTBRUNO
W I L L I A M S
LYNDOVER
RICHMOND PRATHERR U PERT
MARTINIDEL NORTELYLEGARNER
OAKVI
EWANNA
FOLK
AR
S
E
N
ALROSELANDSARAH
HIGH
EMILIEALAMEDAGOFFFLORENT
MAPLE MARSHALLALICIA PRINCETONELLENDALELIMITWALDEMAR
LOHMEYER
HAZEL
LANHAM ECOFFIVANHOEBLENDONVINE
MITCHELL
MAGNOLI A
WEAVER
MA R IE T T A RICHERTMOLLERGRAYMYRTLE
GLADES
QUEENELLIS HERMITAGEHIAWATHAMCCREADYODELLNOONA NSTANLEY
HOPEBEULAHMARGARETTELOWERYGLADES
MAPLE
BRUNO
MAPLE
BRUNO BLENDONMcCAUSLANDARSENALSUTTON U N IO N P A C IF IC
ECOFFGLADES
M A N C H E S T E R R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10030
15
TASK NO:
TASK NAME:
$7,500,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 121
MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT 18,000 FEET OF 12-INCH TO 96-INCH DIAMETER SEWER
IN THE AREA NEAR RIVER DES PERES AND ARSENAL STREET NORTH
TO BELLEVUE AVE. AT BRUNO AVE.
PROJECT WAS TO BEGIN IN FY13 WITH PARTIAL FUNDING OF
$1,000,000. IT WAS CONTINUED INTO FY14, WITH $12.5 M FUNDING
NOW BUDGETED IN FY14 & FY15.
BUSSEN
BLUFF UNION PACIFICC
L
I
F
F
C
A
V
E
CHATPORTDOBER B U SS E N Q U A R R Y
HUNTSPORTAI
L
E
S
W
I
C
K
GLENRICH
HEMPLINE
WHITSHIRE
W I N C A N TON
PIERPORTSTEELERIDGEAI
L
E
S
W
O
O
D
PIERWOODASHTON CIRCLEP R I V A T EHALYARD
PRIVA
T
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10715
15
TASK NO:
TASK NAME:
$2,000,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 122
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION
(P-323) IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE.
CONSTRUCT 5,250 FEET OF 8-INCH TO 12-INCH GRAVITY SEWER TO
ELIMINATE THE PUMP STATION.
KOCHUNION PACIFICBLUFFPRIVATEM A G O F FI
NBUSSENROBE R T K O C HHOSPITALBUSSEN Q U A R RYOAKVILLEELKSPRIVATE
PRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10716
15
TASK NO:
TASK NAME:
$3,138,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 123
NEW ENGLAND TOWN QUARRY PUMP STATION
(P-307) (SKME-544) IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
LIFT STATION IS AT THE END OF ITS LIFE CYCLE, AND RECEIVING
ADDITIONAL FLOWS DUE TO ELIMINATION OF ANOTHER PUMP
STATION.
CONSTRUCT 3,650 FEET OF 8-INCH TO 18-INCH SANITARY SEWER AND
ELIMINATE PUMP STATION.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,228,000.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11114
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 124
$5,000,000
PUBLIC I/I REDUCTION REHABILITATION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I IN THE SANITARY SYSTEM.
REHABILITATION OF 40,000 FEET OF 6-30 INCH SEWERS AND
MANHOLES, AND REPAIR 1,100 SERVICE CONNECTIONS.
PROJECT WAS TO BEGIN IN FY13 WITH PARTIAL FUNDING OF
$3,000,000. IT WAS CONTINUED INTO FY14, WITH FULL FUNDING NOW
BUDGETED IN FY14.
§¨¦55
§¨¦55
UNIO
N
G
E
R
M
A
N
I
A
D
A
V
IS
B
A
Y
L
E
S
SMORGAN FORDZEISSS
E
I
B
E
R
T
REEDWEB
E
RFA
N
N
I
EKAMMERERUNIONPA C I F IC SHARPR
IV
E
R
D
E
S
PERES
PARDELLAFIELDH
O
L
L
Y
H
IL
L
S
MINNESOTAM
A
R
C
E
A
U
C
A
RONDE LET
B
O
W
E
N
WACHTELHA
V
E
N
PA
U
L
E
ALM
A
VIRGINIAP
R
I
V
A
T
E
K
A
Y
MILITARYH
U
R
C
K
H
EIDELBERG EUGENEGRANDARENDESMOHEGAN IDAHODEWEYWATERFORMANPENNSYLVANIAALABAMALOUIS
REILLYS
P
R
I
N
G HAMPTONU
P
T
O
N
VERMONTSETH
POLKP
R
I
M
M
R
O
B
E
R
T
Q
U
I
N
C
Y
ALASKALEONA
S
U
N
S
H
I
N
E
N
A
G
E
L
FE
D
E
R
E
R
C
A
T
A
L
A
N
FR
E
N
C
H
3RD
ERSKINEVIRGOMICHIGANMARCHIDALLASH
O
R
N
H
A
M
B
U
R
G
H
IL
D
A
LOUG
H
B
O
R
OU
G
H
H
A
N
N
O
V
E
R
AVENUEHH
E
E
G
E
KA
Y
SE
R
STOLL
E
TO
E
N
G
E
S
W
E
I
S
S
HE
A
L
Y
PAPOOSEFIL
L
M
O
RE
FA
T
I
M
A
C
O
L
V
I
N
ST
E
I
N
S
K
O
E
L
N
TI
E
M
A
N
N
WEBER TRAILPARKWOODT
E
S
SO
N
S
T
O
N
E
REGINAOLDE ENGLISHRAYTIFFANYWANDAYATESPINTOLACEYO
R
I
E
N
T
CLYMER
MIDWAYP
O
E
P
P
I
N
G
A
D
E
L
I
A
VI
K
I
N
GAVENUE IRIO TINTOHIL LERY
TI
E
M
A
N
N
TE
S
S
O
N
P
R
I
M
MGRAN DH
E
E
G
E QU
IN
C
Y
AVENUE HR
O
BERT RAYTE
S
S
O
N
WEBER
L
O
UI
S
P
RIMM
R
O
B
E
R
T
GRA VOIS R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10198
15
TASK NO:
TASK NAME:
$2,400,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 125
RDP FOULWATER INTERCEPTOR REHABILITATION
(PHASE I)
Construction, Phase II
6660 - Sanitary
Replacement Fund
STRUCTURAL REHABILITATION OF THE FOULWATER INTERCEPTOR
SYSTEM NEEDED TO REDUCE I/I DURING WET WEATHER AND HIGH
RIVER STAGES.
STRUCTURAL REHABILITATION OF 240 FEET OF 108-INCH
HORSESHOE BRICK FOULWATER INTERCEPTOR, TO REDUCE I/I INTO
THE SYSTEM.
TWO BID PACKAGES FOR PORTIONS OF THIS PROJECT WERE LET IN
FY13. FY14 BUDGET REPRESENTS THE THIRD AND FINAL BID
PACKAGE FOR THIS PROJECT.
BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R E N TDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSIN
G
E
R
FOOTEWARSON
SWONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GO
R
E
M E D I N A MCKINLEYIOLANORTH
MAPLE
D E N N Y
ROCK HILLMARK
RENDERERKORTWRIGHTWILSON
O
V
E
RBROOK
F L A N D E R S
CURRANSQ
U
I
R
E
S
DWYER
WILD DEER
BOGEY
HIL L ARD ROCKMANPAR K
C O P P E R H I LL
ELMJOANNA
R ID G E LINECHELSEA
P R IV A T E
LITHIA
EUCLID
JEFFERSONHIGHHAMPT O N
MANITOU
JULIAN P A C I F I C
VICTORIA
WARWICK
W
AT E R B U R Y
LEONARDBARRONFREDERICKGLENMOOR
HUNTLEIGH
DUN
L
E
I
T
HHULLFAIRDALE
HARTJEWEL
G R E E N VIEWBEAUFORD
HOCHGASLITE
MERMOD
ALFRED
NOLAN
FUHRMANNEARLSTURGIS B E R R Y R O A D
IOLACLAYROCKHILLOAKPRIV ATE
PAR
P R I V ATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11885
15
TASK NO:
TASK NAME:
$6,600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 126
ROCK HILL PUBLIC I/I REDUCTION (SKME-618)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
ACTIVATING CONSTRUCTED SSOS.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING
47,500 FEET OF SEWERS AND MANHOLES.
ST CYR
HO
R
D
COZE
N
SSHANNON
MARYJENNI
N
G
S
S
T
A
TI
O
N
DUENKE
LUC
A
S N HUNT
NEWBYP
ARKCLIFTONCENTERTYRELL
NEMNICH
WALDORF
M
C
L
A
R
A
N DORWO O D
COLLEGEORAN
M E L V INBOYC
E
EDNAAST
O
R
I
A
MAY
L
E
X
A
COLLET
T
MEAD
YORKTOWNSW
I
T
Z
E
R
DAR NELLSUMTER
BERK
A
YWINKLERLEAM
O
N
T
DONNELLADLER
COLERI
D
G
EEMILIEWIECK
S
H
I
R
L
E
Y
G L E N G A R D E N
ADA WORTLEYBLEWETTL O NGRIDGESUN
V
A
L
L
E
Y
WI LBER
T
TWILL
WENTW
O
R
T
HNOLTEJANNET
T
E
HARLAN
H O W E L LMIDDLE RIVER DURHAMJENDALEMA Y A
CATA
LI
N
A
SHAD
Y
D
A
L
E JAROSAME S BURY
YUKON
HIL
D
R
E
D
B R AVO
PRESTIGE
OSAGE R
IV
ERPICKFORDNASSAUSUNDOWN
RANC
H
MEAD
O
W
SVENTURAE
L
TA
RO
S
E
B
AGLEYCURRENT R
IVER
FAI
R
H
A
V
E
N
TR UDY
BLUE
G
R
A
S
S
SUNBEAM
CAVERHILL
NEWA
R
K
JUDYLORDANEIC HLER
W E S TCHE
S
T
E
R
NETHERWOOD
HAZELTON
BO Y CE
H
ILDRED
S T CYR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10770
15
TASK NO:
TASK NAME:
$1,226,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 127
SUN VALLEY I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
I/I REDUCTION IN THE AREA OF HALLS FERRY ROAD SOUTH OF ST.
CYR ROAD, NORTH TO MALINE CREEK TRUNK SEWER SECTION B.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11898
17
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 128
$500,000
SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
Work Order Repair Costs
(Non-Capital)
1101 - General Fund
CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLION
TO DECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACE
DEFECTIVE LATERALS.
AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS ARE
IDENTIFIED AT LOW INCOME OWNER OCCUPIED PROPERTIES
THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE
ISSUED.
ANY WORK PERFORMED OR EXPENDITURES INCURRED IN
PERFORMING THE SEP CANNOT BE CAPITALIZED, PER CONSENT
DECREE REQUIREMENTS.
BADENCHURCH
SW
I
T
Z
E
R
GIMBLIN
NEWBYBITTNER
GARTH
TILLIE
PE
G
G
Y
FREDERICKNORFOLKSOUTHERN
LY
N
F
I
E
L
D
LYNH
AVEN
D IC K MANPARKFREDERICK§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11139
13
TASK NO:
TASK NAME:
$1,600,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Baden
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 129
TILLIE BADEN NEWBY SEWER IMPROVEMENTS
(PROPERTY ACQUISITION)
Land Purchase
6660 - Sanitary
Replacement Fund
OVERCHARGED MAINS AND BUILDING BACKUPS IN A DEPRESSION
OVER THE BADEN TRUNK SEWER.
ACQUISITION OF 50 PROPERTIES.
FUTURE DETENTION FACILITIES TO BE CONSIDERED AFTER BUY-OUT.
TOTAL BUDGET IS $4 MILLION, $2.4 MILLION WAS APPROPRIATED IN
FY2013.
DARST
ELIZABETHPOWELL
ROBERT
AMESCHURC HHARVEYC
L
A
R
K
JANU
A
RY
CLAYA IR P O R T
ROYAL
L
A
R
K
I
N
N
O
R
F
O
L
K
S
O
U
T
H
E
R
NMARIE TESTONOLYMPIA
BARATTHOROUGHMAN
LAUREL
MARGUERITECHANSLORMILLMANSUPERIORPL
A
N
T
M
O
R
E
BALLMANSPRINGMAPLENANCYGERALDM OUNDALEFOREST
ADELLESCOTT R ISDONJEHLINGEDDY
WARFORDC
A
R
DIG A N
MARYWARFIELDUPLYNNPALACE
BEACONCUNNINGHAMBANGERT
ALMEDAMELCHERSANDRINGHAM
HIGH
LAKE V IE W
ROBERT
MILLMANCLAYCLAYROYA LNANCYROYALNANCY §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10781
15
TASK NO:
TASK NAME:
$1,000,000
BUDGET:
FUND:
Ferguson
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 130
UPPER JESKE PARK LATERAL SANITARY RELIEF
(SKME-314)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER.
CONSTRUCT 2,300 FEET OF 12-INCH TO 18-INCH DIAMETER SANITARY
SEWER AND REMOVAL OF PRIVATE I/I.
BP-315 TO BE ELIMINATED UPON COMPLETION OF THIS PROJECT AND
PROJECT 11829.
§¨¦44BERRYUNIONPACIFICLOCKWOOD
KIRKHAM
GRAYDICKSONTAYLOREDGARGOREGLENDALE
LEE
BURLIN
G
T
O
N
N
O
R
T
H
E
R
N
SA NTA FEELM BOMPARTARGONNE
ESSEX
MADISON
MONROE
HOLMESWOODNEWPORT
MAPLEODAYTULIP LILACBELLBAKER
BISMARK
BROWNELL
JEFF E R SON
LI
GGE
T
T
CLARKGLEN
EDWINSELMAOAK TREE
BODLEY
LITHIA
JACKSONBENNETTPLANTBACONSUMMIT JOYFILLMOREGILL
PAR ANDREWROSE SYLVESTERSCOTTOAKDEACON
SANDE
R
S
L I N U MPARK MARYAUSTINM E D INA
WELLSBRENTWOODDI
V
E
R
S
E
Y
FAIRVI EWHOLLAND
R ID G EIOLA
REAVI
S
NORTH
LONG
VI
E
WMARK
SARAH
PAPIN
IMSEC A N N O N BURY
BELTONGA R D E N
P ACIFIC
LANVALECLARAMCKINLEYHOLLYWOODDESPERE SGRANTJOANNA
BRENTFLORENCEROCK HILLDOBBINMANITOU
JULIAN
VICTORIA
L A K E
WARWICK LEONARDFREDERICKCHESTNUT
MARSHALL
HULLFAIRDALE
TYLERSWON
EAST
COLLEGE HILLDALELOCKSLEYALGONQUIN
CEDARWOODLAWN
LYMAN
CL
A
Y HOCHGASLITE GILBERTOAKHOLMESCEDAR GLENSELMATAYLORCLARK
ELMELM§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10793
15
TASK NO:
TASK NAME:
$6,500,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 131
WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE II
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED
SANITARY SEWERS.
REHABILITATION OF 79,700 FEET OF 8-36 INCH SEWER, 570
MANHOLES, AND REPAIR 1,100 SERVICE CONNECTIONS.
PROJECT WAS TO BEGIN IN FY13 WITH PARTIAL FUNDING OF
$2,500,000. IT WAS CONTINUED INTO FY14, WITH FULL FUNDING NOW
BUDGETED IN FY14.
§¨¦40
WISE
ETHEL
HOOVER HIGHLANDBELLEVUECLAYTON
CLAYTONIASAN BONITA
MABELST RITAWARNER SEMINARYHARTERMOORLANDS ALAMO
MURPHYPRIVATEH A W THO R N ECONCORDIAWOODLAND
SUNSETOAKKNOLLPARKCOMMODORETUSCANYRIDGEMOORBROAD
VIEW
OAKLAND
WARNER
PRIVATE
OAKLAND
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10029
15
TASK NO:
TASK NAME:
$3,000,000
BUDGET:
FUND:
Richmond Heights
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 132
WISE AND MABEL SEWER SEPARATION
Construction
6660 - Sanitary
Replacement Fund
STREET AND YARD FLOODING, AND BUILDING BACKUPS DUE TO
UNDERSIZED SEWERS.
CONSTRUCT 440 FEET OF 6X5 BOX CULVERT, 8,780 FEET OF 12-INCH
TO 72-INCH STORM SEWER, 154 FEET OF 15-INCH CIPP LINING, AND
REMOVE INFLOW SOURCES FROM 53 PRIVATE PROPERTIES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,300,000.
§¨¦40
LA
D
U
E
PRIVATEBABLERWOODSMILLBRYNWYCKBOXFO
R
D
SUNWAYDOULTONLADU E FARMSAYLESVILLE
CONWAYHILLCRO
S
S
T
R
AIL
S
LOVINSKILLEARNMARY V I L L E CENTREWOODSMILLCOVE
C E D A R BRIDGE
PEBBLEV
A
L
L
E
Y
MCNALLYM ARYVILLEUNIVERSITYB A Y W O OD
VIL
L
A
G
E
S BON CHATEAUWOODSMILLP R I V ATE
PRIVATEPR IV A TE
PRIVATEPRIVATES MO141 HWYNMO141HWY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10237
15
TASK NO:
TASK NAME:
$2,600,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Creve Coeur Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 133
WOODSMILL SANITARY RELIEF (SKME-020)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DURING
WET WEATHER EVENTS.
CONSTRUCT 5,950 FEET OF 8-INCH TO 24-INCH DIAMETER SANITARY
RELIEF SEWERS AND APPURTENANCES.
7 June 2013
WASTEWATER CONTINUED PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10407 BAUMGARTNER & BLACK
FOREST SANITARY
REPLACEMENT PHASE II
PROJECT CONTINUED DUE TO COORDINATION WITH ST.
LOUIS COUNTY DEPT. OF HIGHWAYS AND TRAFFIC.
ANTICIPATE BOARD INTRODUCTION IN JUNE, 2014.
$2,500,000
10429 CSO - JEFFERSON
BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-
122) SEPARATION
PROJECT CONTINUED DUE TO COORDINATION WITH
OTHERS (STATE HISTORIC PRESERVATION OFFICE).
ANTICIPATE BOARD INTRODUCTION IN JULY, 2013.
$2,100,000
10496 GRAVOIS TRUNK
(WHITECLIFF TO RDP)
SANITARY RELIEF PHASE
III (SKME -521)
PROJECT CONTINUED DUE TO COORDINATION WITH
AMEREN AND UNION PACIFIC RAILROAD. ANTICIPATE
BOARD INTRODUCTION IN MAY, 2014.
$1,000,000
10496 GRAVOIS TRUNK
(WHITECLIFF TO RDP)
SANITARY RELIEF PHASE
III (SKME -521)
PROJECT CONTINUED DUE TO COORDINATION WITH
AMEREN AND UNION PACIFIC RAILROAD. ANTICIPATE
BOARD INTRODUCTION IN MAY, 2014.
$8,200,000
11706 INFRASTRUCTURE
REPAIRS
(REHABILITATION) (FY
2013) CONTRACT A
PROJECT CONTINUED DUE TO MWBE UTILIZATION
CONCERNS. ANTICIPATE BOARD INTRODUCTION IN JULY,
2013.
$5,000,000
11845 INFRASTRUCTURE
REPAIRS
(REHABILITATION)
(FY2013) CONTRACT B
PROJECT CONTINUED DUE TO MWBE UTILIZATION
CONCERNS. ANTICIPATE BOARD INTRODUCTION IN JULY,
2013.
$5,000,000
11846 INFRASTRUCTURE
REPAIRS
(REHABILITATION)
(FY2013) CONTRACT C
PROJECT CONTINUED DUE TO MWBE UTILIZATION
CONCERNS. ANTICIPATE BOARD INTRODUCTION IN
AUGUST, 2013.
$5,000,000
11794 LEMAY WWTP ASH
LAGOON ACCESS ROAD
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2013.
$50,000
11132 LEMAY WWTP OUTFALL
002 ELIMINATION
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2013.
$4,500,000
11655 MALINE CREEK CSO 051
TREATMENT FACILITY
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2013.
$2,400,000
10722 OLD MILL CREEK SEWER
REHABILITATION PHASE
III - 14TH TO 2ND STREET
PROJECT CONTINUED DUE TO COORDINATION WITH
CORPS OF ENGINEERS. ANTICIPATE BOARD
INTRODUCTION IN JUNE, 2014.
$2,800,000
7 June 2013
WASTEWATER CONTINUED PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10199 TOPPING SANITARY
RELIEF (SKME -421)
PROJECT CONTINUED DUE TO EASEMENT
ACQUISITION/CONDEMNATION. ANTICIPATE BOARD
INTRODUCTION IN AUGUST, 2013.
$1,450,000
TOTAL: $40,000,000
7 June 2013
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11684 BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
$125,000 134
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
$10,000,000 135
11718 BRIGHTWELL I/I REDUCTION $800,000 136
11809 COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
$1,900,000 137
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$10,000,000 138
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 139
11734 DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK - LAND ACQUISITION
$6,000,000 140
11736 DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
$50,000 141
11079 FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
$100,000 142
10014 FF-11 FEE FEE CREEK SANITARY RELIEF $2,700,000 143
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
$4,700,000 144
10142 FORESTWOOD SANITARY RELIEF (SKME-435)$1,425,000 145
10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
$2,000,000 146
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
$8,100,000 147
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
$2,700,000 148
10330 HARTLAND TO GOTHLAND SEWER
SEPARATION
$1,700,000 149
10656 INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI
$5,500,000 150
7 June 2013
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11921 LEMAY WWTP INCINERATOR SCRUBBER
REPLACEMENT
$10,000,000 151
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $1,650,000 152
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $4,200,000 153
11652 LYNN HAVEN I/I REDUCTION $150,000 154
10030 MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
$5,000,000 155
10716 NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
$2,090,000 156
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
$2,000,000 157
11069 ROCK HILL SANITARY RELIEF (SKME -618)$2,400,000 158
11670 TUCKAWAY SANITARY REHABILITATION $110,000 159
10029 WISE AND MABEL SEWER SEPARATION $2,300,000 160
TOTAL:$92,700,000
TOELLE LNLEWISNCLARKBLVDC OBURGLANDSDRLILAC AVEBEL G R O V E DR
SHEPLEY DR
DARR DR
K IL G O R E D R
BLISS
D
R
A S HBROOKDRBURLINGTONNORTHERNSANTAFERRCABOTDREWELL DRNECTAR DR
HOYTDR
LILAC DRFOREST HO
ME DR
QUI E T D R
DELHI DRDWIGHT DRC O M E T DR
E LBALNATTICA DR
HOBKIRK DRAKRON DR
SURR
E
Y
L
NES
QUIRE
D
R
BIRITZ DR
BOSWORTH DR M A R ALDOPLDOROTHY AVESTIMSON DRDIAMOND DRH A VILA N D D R
G O LD EN DR
MCCARTNEY LNB A G N E L LDRNORBRIDGE LNADMIRAL D
RFONDA DRBYFIELD DRHANSOM DR SHELDONDROD E SSA DR
BLODGETT DR
GLEA
S
O
N
D
RIRISLN
FOR K D R
HUNTSM A N D R
MELVICH DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11684
15
TASK NO:
TASK NAME:
$125,000
BUDGET:
FUND:
Bellefontaine Neighbors
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Maline Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 134
BELLEFONTAINE #2 LATERAL SANITARY RELIEF
(BP-287)(COBURG LANDS DR)
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF 114 PRIVATE I/I SOURCES FROM SANITARY SEWERS.
REMOVE CONSTRUCTED SSO BP-287.
TERMINAL RR
FER R Y STN
2ND
STHAL
L
S
T
E G RAN
D
A
V
E
NORFOLK SOUTHERN
RR
MAY
S
T
DOU
GL
A
S
S
ST TERMINALR R
E GR
A
N
D
A
V
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11920
15
TASK NO:
TASK NAME:
$10,000,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Bissell
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 135
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
EMISSION CONTROLS FOR MULTIPLE HEARTH INCINERATORS AT
BISSELL & LEMAY NEED COMPLIANCE WITH NEW EMISSION
STANDARDS FOR SEWAGE SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEW
REGULATORY EMISSION STANDARDS.
LIND
B
E
R
G
H
CLARK STBOONE STW
A
S
H
I
N
G
T
O
N
S
T
ST
J
O
S
E
P
H
S
T
HA
R
R
I
S
O
N
S
T PA
D
D
O
C
K
D
R
H
U
M
E
S
L
N
ST CATHERINE ST
RU
E
S
T
D
EN
I
S
S
T
ST
M
A
R
I
E
S
T AUBUCHON STST LOUIS STN LAFAYETTE STRU
E
S
T
L
O
U
I
S
S
TST JEAN STRU
E
S
T
FR
A
N
C
O
I
S
S
T THUNDERBIRDAVETROTTERWAYLI
L
A
C
D
R
N WATERFORDDR
RU
E
S
T
C
A
T
H
E
RIN
E
ST
ST DENIS S T
W
R
E
N
D
R
CARLA DR
KAY DRM
U
L
L
A
N
P
H
Y
R
D
R
Y
A
N
D
R
N CASTELLO STF
A
L
C
O
N
D
R
I N DIA NC
U
P
DRS T IR R UP LN
FOX RUN DRQUEENS DRE HUMES LN
PIMLICODRR
A
V
E
N
L
N
FLORVAL DRORIOLE DR
S
A
LLY
D
R
SO R R E L L D R
BLUEFIELD DRCANTERDRDEBORAH DRREDWOOD DR
BROWN STKAEL LN
SPRING VALLEY DRM
Y
R
T
L
E
D
R
ST STEPHEN DRLOUISE CTM
E
N
K
E
P
L
WESCOTT DR LINDB
ERG
H
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11718
15
TASK NO:
TASK NAME:
$800,000
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 136
BRIGHTWELL I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF 134 PRIVATE I/I SOURCES FROM PUBLIC SEWERS.
PRIVATE RD
RIC
H
M
OND FORESTDRROB
BINSWA Y D R
P R I VA T E R D
P RI V A TE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11809
15
TASK NO:
TASK NAME:
$1,900,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 137
COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
EXISTING WASHER/COMPACTORS DO NOT MEET NEEDED CAPACITY.
CONSTRUCT ADDITIONAL CAPACITY AND MAKE IMPROVEMENTS TO
EXISTING FINE SCREENINGS TRANSPORT SYSTEM AND
WASHER/COMPACTOR SYSTEM, AND MINOR PIPING CHANGES TO
ALLOW DIGESTERS TO FUNCTION AS EMERGENCY STORAGE TANKS
IF A SLUDGE FORCE MAIN FAILURE OCCURS.
§¨¦270
§¨¦270
DUNN RD
PERSHALL RD
F
O
R
D
L
N
N
O
R
F
O
L
K
S
O
U
T
H
ERNRR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
15
TASK NO:
TASK NAME:
$10,000,000
BUDGET:
FUND:
Hazelwood
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 138
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARY
SEWERS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGE
FACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT.
§¨¦70
§¨¦270
§¨¦55
§¨¦40
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11146
15
TASK NO:
TASK NAME:
$5,000,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 139
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS
REQUIRED.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES.
METROLINK
RRSUSSEX AVECAM BRIDGE
A
VE
BI
G
B
E
N
D
I
ND
U
S
T
R
I
A
L
C
T
OXFORD
B
L
V
D
SUFFOLK AVES
H
R
E
WS
BURYAVECO MMONW
E
A
LTH AV
EKENSINGTON AVE
MANHAT
T
A
N
A
V
E
TUXEDO BLVD
KEYWESTA
V
E
M
A
R
S
H
ALLAVEME
T
R
O
L
I
N
K
R
R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11734
13
TASK NO:
TASK NAME:
$6,000,000
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 140
DC-03 DEER CREEK SANITARY RELIEF STORAGE
TANK - LAND ACQUISITION
Land Purchase
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION CAUSING OVERCHARGED
SANITARY TRUNK SEWER AND ACTIVATING A CONSTRUCTED SSO.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGE TANK AND
ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS
PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF.
§¨¦270
§¨¦270
ST ANTHONY LN
DERHAKE RD
ST CATHERINE ST
WASH
I
NGTON
ST
ST LOUIS ST
DUNN RD ALLEN DRBARTO DR
KINGSLEY DRAUBUCHON STSTEDWARDLNST DENIS S T
STEUGE
NELN
BECKER DR CAPRIDRSWATERFORDDRCONNOLLY DR CARMONA DRMIL BANK
D
R
ROGERS LNRIDGE DRSADDLE DRPERSHALL RDGRANDVIEWDRTANEY DRCOTEAU LNLARRY DRP R IV A TE R DLYNN MEADOWS LNPADDOCK DRPUEBLODRS T R EGIS LN
NE
L
I
Z
ABET
HAVEBON AIRE DRWILSHIRE DRR O B I N W OODDRST MA
R
KDRW A D S W O RTHDR NEWG
ATE DR
DUQUETTE LNEDU
C
HESNEDRC H ARLOTTEDRCLEARVIEW DRST NICHOL A S L N
STMAT
T
H
E
W
D
RALPHA DRAPACHE DR
BIRCHLAWN DRBROADMERE DRCLEMENS DRHOLLY LN
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11736
15
TASK NO:
TASK NAME:
$50,000
BUDGET:
FUND:
Florissant
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 141
DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER CONNECTIONS ON
21 PROPERTIES.
§¨¦170
§¨¦170
OLIVE BLVDCOLLINGWOOD DRHILLTOP RDHILLTOP DRREAR DR
COCHISE DR
CHISHO LM C T
BRIGHTLING DRALICE PL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11079
15
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Olivette
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
University City Branch
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 142
FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
Construction
6660 - Sanitary
Replacement Fund
STORM INLETS CONNECTED TO SANITARY SYSTEM.
CONSTRUCT 245 FEET OF 12-INCH STORM SEWER TO CORRECT
IMPROPER CONNECTION TO SANITARY SYSTEM.
§¨¦270
§¨¦270ROT
H
HILLDR PROGRESS PKYSCHULTE HILL DRMCKELVEY RDLEIGH L
N
GLENBU
S
H DR
KIMLER DRWOODHOLL
O
W
DR
BERN I E L N
G LEN G A TED R
D A W N HILL DR MCKELVEYHILLDRGLENMEADE DRAMERICANI
NDUSTRI
ALDRLORICIR
GLENLEA
D
R
BERNI
E
CI
R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10014
15
TASK NO:
TASK NAME:
$2,700,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 143
FF-11 FEE FEE CREEK SANITARY RELIEF
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH DIAMETER SEWER
AND APPURTENANCES, FROM 1876 WOODHOLLOW DRIVE TO
PROGRESS PARKWAY.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $6,800,000.
FEE FEE RD
A DIE RDSCHUETZ RDCHAFFEE DRGRISSOM DRNORFOLKSOUT H E R N R RMETRO BLVDMETRO CT MIKELAVECENTERLINE INDUSTRIAL DRNORTHLIN
E
I
NDUSTRIALBLVDF
AI
RGROV
EINDUSTRIAL BLVD
NORTHL INE INDUSTRIAL D R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10489
15
TASK NO:
TASK NAME:
$4,700,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Fee Fee Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 144
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF
PHASE III
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
THE THIRD AND FINAL PHASE OF A MULTI-PHASE PROJECT. THIS
PHASE CONSISTS OF THE CONSTRUCTION OF 4,700 FEET OF 8-INCH
TO 42-INCH DIAMETER SEWER SOUTH OF SCHUETZ ROAD.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $10,700,000.
HEINTZ RDERB RD
TELEGRAPH RDB A U M G A R T N E R R D
B
LACKFOREST DR
CHRISTOPHER DRC L I FFWOOD T R A IL
ENGLAND T O WN RD
PRIVA
TERDS U S A N R D
SE A N PK YPION E E R D R
G
ATLINGDR
TEL HAVEN CTCHALETHILLDR
TANZMAR DRSANDERS DR
STAE HLE CT
FA ITH DR
NAHN DR
PRIVA TER D
PRIVATE RD
PIONEER DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10142
15
TASK NO:
TASK NAME:
$1,425,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 145
FORESTWOOD SANITARY RELIEF (SKME-435)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,980 FEET OF 8-INCH TO 18-INCH DIAMETER SANITARY
RELIEF SEWERS, 420 FEET OF 8-INCH FORCE MAIN, AND
REPLACEMENT OF THE EXISTING PUMP STATION.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $3,525,000.
G RAVOI
S
R
D
MUSICK RDBAPTIST CHURCH RDP R IV A T E R D
LITTIE RD
GARBER RD
TESSONFERR Y R D
EDDIE N PARK R
D PARDEE RDS LIND
B
E
R
G
H
BLVD DANDRIDGEDRTESSHIRE DRVARGAS D R
PATRINA C T
SAPPINGTONACRESDRFARA
D
AY
DR
F A WNH A V EN DR
ROSCO MMON
D
R
GOLF CREST
DR
MAPLE LNB R IA R S T O N E DRPICKWICKDRCINN A B A R D R
EMIL AVEMEATH D R
CHARRETTE DR MCNARY DRMUELLER RDCORDO BALNPINE FOREST DR
TORIGNEY DR
VALDA M E R E D R
GA
IL
C
T KAMPING LNSONATA DRBI
MINIDR
WI
L
L
I
N
D
A
D
R
EDGECLIFFE DRLASVEGASDRCORAL RIDGE DR
STOLZ
R
D
S
L
E
VINLNGENEL DRFABICK DRCRECELIUS DRDESMON DD R
TI
M
O
T
H
Y
L
N
COSMOS D R
LAVINIA DRJ U N IP E R C T
L ARKSPUR DR
FI
T
E
C
I
R PRIVATE
RD
MEATH DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10611
15
TASK NO:
TASK NAME:
$2,000,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 146
GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 24-INCH TO 36-INCH SANITARY SEWERS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,000,000.
§¨¦55
B
A
Y
L
E
S
S
A
V
E
UNION PACIFIC RRFA
N
N
I
E
A
V
E
AVENUE H STS
A
N
T
E
N
D
R
DALLAS DRC
O
L
V
IN
D
R
MAJEST Y C T
BELLAVILLA DRRAI N R IDGEDRSAN GABRIEL PLE AVENUE H STW
E
I
S
S
A
V
E SANDRA CTE
D
A
L
L
A
S
CT
RUPRECHTAVEBOENECKE CT§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10496
15
TASK NO:
TASK NAME:
$8,100,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 147
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE III (SKME -521)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNK
SEWER. INCLUDES REMOVAL AND REPLACEMENT OF A UPRR TRACK
SPUR.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $16,300,000.
GR
E
E
R
A
V
E
TERMI
N
A
L
R
R
CLARA AVEHE
R
B
E
R
T
S
T
LABA
D
I
E
A
V
EGOODFELLOW BLVDN
AT
U
R
A
L
B
R
ID
G
E
R
D
A
S
H
L
A
N
D
A
V
E
PA
L
M
S
T
ST L
O
U
I
S
A
V
ESELBE
R
CT
BLACKSTONEA V E
AS
H
L
A
N
D
A
VE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11768
15
TASK NO:
TASK NAME:
$2,700,000
BUDGET:
FUND:
St. Louis City
MUNICIPALITY:
Bissell
MAJOR SERVICE AREA:
Harlem
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 148
HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
Construction
6660 - Sanitary
Replacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS &
FLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNK
SEWERS.
§¨¦170BROWN RDARGYLE AVE
LACKLAND
R
D
OLDEN AVE
BURTON AVE
CHARLACK AVEWALTON RDGOODALE AVEFOREST AVE
E MILTON AVEMCKIBBON RDGRACELAND AVEWOODSON RDMARSHALL AVEVERONA AVEADDIE AVES MILTON AVEASHLAND AVEHARTLAND AVEOAKLAND AVES
H
E
LLEYAVE
GOTHLAND AVENORTHLAND AVEW SHERWOOD DRKENOSHOAVEAPACHE LN
MILLET DRONEIDA
L
N
SHAWNEE
L
N
DOYLE
A
VE
BARODA A
V
E
SHERLAND AVE
FOREST AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10330
15
TASK NO:
TASK NAME:
$1,700,000
BUDGET:
FUND:
Overland
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 149
HARTLAND TO GOTHLAND SEWER SEPARATION
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
AREA NORTH OF MIDLAND BLVD. CONTAINS APPROXIMATELY 1,600
FEET OF COMBINED SEWERS, THAT ARE TRIBUTARY TO THE
COLDWATER SANITARY SEWER NETWORK.
CONSTRUCT SEPARATE STORM AND SANITARY SEWERS, AND
REMOVE I/I, TO ENABLE ELIMINATION OF COMBINED SEWER SYSTEM.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $4,700,000.
§¨¦40 OLIVE BLVDCE N TRAL
MI
D
L
A
N
D
R
R
WE
S
TDRLA
D
U
E
R
D
W H ITE R
D
WCH E S T E R F IELD
P
K
Y ARROWH
E
A
D
E
S
T
A
T
E
S
L
N
P
R
IV ATERDUN IO N P A C IF ICSPURRR
WHITE
RDPRI
VATERD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10656
15
TASK NO:
TASK NAME:
$5,500,000
BUDGET:
FUND:
Maryland Heights
MUNICIPALITY:
Missouri
MAJOR SERVICE AREA:
Caulks Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 150
INFRASTRUCTURE REPAIR #087P CAULKS CREEK
"A" (P-750) PHASE VI
Construction
6660 - Sanitary
Replacement Fund
EXISTING FORCE MAIN IS DETERIORATED.
CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN.
UNION PACIFIC RRH
O
R
N
A
V
E
PRI
V
AT
E
R
D
W
E
I
S
S
A
V
E
E
HO
F
FM
E
I
S
T
ER
A
V
ERUBYAVE W
A
L
LE
R
A
V
E
UNION PACIFIC RRUNION PACIFIC RRUNION PACIFIC RRPRIVATE
RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11921
15
TASK NO:
TASK NAME:
$10,000,000
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Lemay Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 151
LEMAY WWTP INCINERATOR SCRUBBER
REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
EMISSION CONTROLS FOR FOUR MULTIPLE HEARTH INCINERATORS
AT LEMAY NEED TO MEET NEW EMISSION STANDARDS FOR SEWAGE
SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEW
REGULATORY EMISSION STANDARDS.
UNION PACIFIC RRPRIVATE R D
E
HOF
F
ME
I
S
T
E
R
AV
E
PERRIN AVEE VELMA AVE
W
EIS
S
A
V
E
UNION PACIFIC RRPRIVATE
RDUNION PACIFIC RRUNIONPACIFICRRP
R
I
V
A
T
E
R
D
UNIONPACIFICRRPRI V
A
T
E
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
11
TASK NO:
TASK NAME:
$1,650,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Lemay Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 152
LEMAY WWTP SECONDARY IMPROVEMENTS
Miscellaneous Services
6660 - Sanitary
Replacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210
MGD IS REQUIRED BY CONSENT DECREE.
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $10,500,000.
UNION PACIFIC RRPRIVATE R D
E
HOF
F
ME
I
S
T
E
R
AV
E
PERRIN AVEE VELMA AVE
W
EIS
S
A
V
E
UNION PACIFIC RRPRIVATE
RDUNION PACIFIC RRUNIONPACIFICRRP
R
I
V
A
T
E
R
D
UNIONPACIFICRRPRI V
A
T
E
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
15
TASK NO:
TASK NAME:
$4,200,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Lemay Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 153
LEMAY WWTP SECONDARY IMPROVEMENTS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210
MGD IS REQUIRED BY CONSENT DECREE.
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $10,500,000.
§¨¦270
§¨¦170
§¨¦170
DUNN
R
D
NLINDBERGHBLVDK
E
E
V
E
N
L
N
PERSHALLRD
LI
N
D
S
A
Y
L
N
C
H
A
R
B
O
N
I
E
R
R
D
GRAHAM RDFLO
R
D
AW
N
D
R
FEE FEE RDC
O
A
C
H
WA
Y
L
N
UTZ
L
N
H
O
L
I
D
A
Y
A
V
E
TA
H
O
E
D
R LINDBE R G H
E
S
T
E
S
D
R
C
O
A
C
HLIG
H
T
L
N
M
U
L
L
A
N
P
H
Y
R
D
F
O
R
D
L
N
PHANTOM DRK
O
S
T
K
A
L
N
VILLEROSALNLATTY AVE
TA
Y
L
O
R
R
D
P
R
I
V
A
T
E
R
D
L
A
Y
V
E
N
A
VE
Q
U
E
E
N
A
N
N
D
R
FE
E
F
E
E
H
I
L
L
S
D
R
B ROW N RD
B
O
B
BIN
R
AY
AV
E
TE
S
O
N
R
D
R IVE R W O O D TRAILS DR
NYFLOT AVE
VILLAGE SQ
U
A
R
E
D
R
B
E
L
L
A
R
MI
N
E
L
N
ST PATRICE LNS
T
C
I
N
L
N
BERKRIDGE DRCAMPUSPARKW A Y D R
RU
T
H
DRMOSELLE CTB
A
R
W
I
C
K
L
N
C
H
U
L
A
D
R
J
E
N
K
E
E
A
V
E
A
L
M
A D
R
AV
I
O
N
W
A
Y
L
U
N
D
Y
D
R
TE
S
O
N
R
D
P
R
I
V
ATE
R
D
DUNN RD
U
T
Z
L
N
P
R
I
V
A
T
E
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11652
15
TASK NO:
TASK NAME:
$150,000
BUDGET:
FUND:
Hazelwood
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 154
LYNN HAVEN I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER CONNECTIONS ON
56 PROPERTIES.
§¨¦44
§¨¦44
MANCH
E
S
TER RD
UNION PACIFIC RRYALE AVEMcCAUSLANDAVESO U T H W E S T A V E
ZEPHYR PL
GAYOLA PL
PLATEAU AVE
SUTTON BLVDFOREST AVEW I L L IA M S A V E
ARSENAL AVE
FLORA AVE
LYNDOVER PL
BELLEVUEAVERICHMOND PL
GARNER AVEPRATHER AVEGLADES AVE
FOLK AVE BRUNO AVE
MARTINI DRR U P E RT AVE
MITCHELL AVE
ALICIA AVE
PRINCETON PLW BRUNO AVE
SARAH ST
WEAVER AVE
EMILIE S TALAMEDAAVEMARSHALL AVEHIGH ST
LOHMEYER AVE
HIAWATHA AVE
LYLE AVEANNA AVE
ELM AVE
RANNELLS AVE
ELLIS AVE
MAPLE AVE
BURLINGTONNORTHERNSANTAFER RBLENDON PLJEROME AVE
GOFF AVE
LA VETA AVE
HAZE L A V E
LANHAM AVE MAGN O LIA AVEECOFF AVEARBORAVERICHERT AVEBLANDPLBLENDON PLFLORA A VEMITCHELL AVE
ELM AVE
GLADES AVE
HAZEL
AVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10030
15
TASK NO:
TASK NAME:
$5,000,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
River Des Peres
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 155
MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT 18,000 FEET OF 12-INCH TO 96-INCH DIAMETER SEWER
IN THE AREA NEAR RIVER DES PERES AND ARSENAL STREET NORTH
TO BELLEVUE AVE. AT BRUNO AVE.
PROJECT WAS TO BEGIN IN FY13 WITH PARTIAL FUNDING OF
$1,000,000. IT WAS CONTINUED INTO FY14, WITH $12.5 M FUNDING
NOW BUDGETED IN FY14 & FY15.
UNIONPACIFICRRKOCHRDM A G O F F I N R
DBLUFF RDPRIVATERDR O B E R T K O C H H O SPITA LRD
BUSSENRDBUSSENQUA R R Y RDOAKVILLEELKSLNHENLEY DRHICKORYHILLDRMAGOFFINTR
A
I
L
S
C
T
PRIVATE
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10716
15
TASK NO:
TASK NAME:
$2,090,000
BUDGET:
FUND:
Unincorporated
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Martigney Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 156
NEW ENGLAND TOWN QUARRY PUMP STATION
(P-307) (SKME-544) IMPROVEMENTS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
LIFT STATION IS AT THE END OF ITS LIFE CYCLE, AND RECEIVING
ADDITIONAL FLOWS DUE TO ELIMINATION OF ANOTHER PUMP
STATION.
CONSTRUCT 3,650 FEET OF 8-INCH TO 18-INCH SANITARY SEWER AND
ELIMINATE PUMP STATION.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,228,000.
H ILLVALEDRBROADVIEWDRRIDGEMOORDROA K KNOLLDRHARCOURT DR
SOUTHMOOR DR
C L A V E R A CHDRPRIVATE RD
SAN BONITA AVE
FOREST RIDGEPL
TUSCANY
P
A
R
KHILLVALE DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10390
15
TASK NO:
TASK NAME:
$2,000,000
BUDGET:
FUND:
Clayton
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 157
RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
Construction
6660 - Sanitary
Replacement Fund
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARY
SEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM.
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH DIAMETER STORM
SEWER, UPGRADE EXISTING DETENTION BASIN, AND ADDRESS
PRIVATE I/I.
IT IS ESTIMATED THAT $850,000 OF THIS PROJECT WILL BE
ALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OF
APPROPRIATION FOR STORMWATER WORK.
M A N C H E S T E R R D
N BERRY RDOLD WARSON RD
N WOODLAWN AVES LINDBERGH BLVDDICKSON STS MCKNIGHT RDN KIRKWOOD RDT R E N TDRW KIRKHAM A V E
LEE AVE
BROWNELL AVE
LITZSINGER
R
D
WOOD AVEBISMARK AVE
KIRKHAM AVE ODAY AVEN TAYLOR AVEBENNETT AVEFOOTE AVE
BACON AVE
N CLAY AVEDEACON DRUNIONPA C IF I C R RGILBERT AVEPAR LN
M E D I N A DR MCKINLEY AVEKORTWRIGHT AVEO
V
E
RBROOK DR
NORTH DR N ROCK HILL RDWILD DEER R D
SQUIRESLN
MARK DR ROCKMANPLBERNICE AVEBOGEY LN
C O P P E R H I LL RD
HIL L ARD RD
HIGHHAMPTO N R D
P R IV A T E R D
PAR K LNCHELSEA AVE
WARWICK LN
JULIAN PL
HUNTLEIGH DR
VICTORIA AVE
GLENMOOR AVE
TYLER PLN CLAY AVENROCKHILLRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11069
15
TASK NO:
TASK NAME:
$2,400,000
BUDGET:
FUND:
Rock Hill
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 158
ROCK HILL SANITARY RELIEF (SKME -618)
Construction
6660 - Sanitary
Replacement Fund
SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS.
REMOVE EXCESSIVE I/I FROM PRIVATE SOURCES BY REMOVING
PRIVATE DEFECTS.
§¨¦55
§¨¦55KERTH RDBUTLER HILL RD
LEMAYFERRYRDRINGE R R DAMBS RDYAEGER RDDANTONAIREPLHAW K IN S F U C H S R D
W IELANDDRC L A Y R ID G E D R
F U C HSRDGWEN M ILLD R
R E G A L W AY D R
LILAC R I D G E L N LITTLE ROCK RDEILEEN ANN DR
CHER R Y VIEWLNO W ENSDRC A M E LOT ESTATESDRBRO O KT O P LN
S
T
A
R
V
I
E
W
D
R
GUMTREE LNBUTLERBENDDR
VENTURAPLACEDR
PROVIDENCEPLACEDRM E D A L TONW AYCROW
N
O
V
E
R
D
R
A M B S C T
IRON S I DE LN ROUND T ABLE C T
ABERDOUR LNCHRISTOBL
EDRPRIV
ATE RD
TARLT O N D RPRIVATE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11670
15
TASK NO:
TASK NAME:
$110,000
BUDGET:
FUND:
St. Louis County
MUNICIPALITY:
Meramec
MAJOR SERVICE AREA:
Mattese Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 159
TUCKAWAY SANITARY REHABILITATION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS
AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER CONNECTIONS ON 8
PROPERTIES.
§¨¦40
WISE AVE
DALE AVE
ETHEL AVE
HOOVER AVE
CLAYTONIA TERHIGHLAND TERCLAYTON
R
D
BELLEVUE AVEMOORLANDS DRSAN BONITA AVE
LOVELLA AVERALPH TERMABEL AVEWARNER AVE ST RITA AVEBROADVIEWD
R
HARTER AVE
PRIVATE RD
ALAMO AVE
W PARK AVE
C L A V E R A C HDRCONCORDIA LNYALE AVESUNSET AVEBROOKLINE TER
T U S C A N Y P A R K
OAKLAND AVE
WOODLAND DRH A W T HOR N E P L
PRIVATE RD
WARNER AVE PRIVATE RDOAKLAND AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10029
15
TASK NO:
TASK NAME:
$2,300,000
BUDGET:
FUND:
Richmond Heights
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Black Creek
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 160
WISE AND MABEL SEWER SEPARATION
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
STREET AND YARD FLOODING, AND BUILDING BACKUPS DUE TO
UNDERSIZED SEWERS.
CONSTRUCT 440 FEET OF 6X5 BOX CULVERT, 8,780 FEET OF 12-INCH
TO 72-INCH STORM SEWER, 154 FEET OF 15-INCH CIPP LINING, AND
REMOVE INFLOW SOURCES FROM 53 PRIVATE PROPERTIES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 15. TOTAL PROJECT BUDGET IS $5,300,000.
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $2,000,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014)Various $1,000,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11137 Design Services GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $500,000
11755 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $400,000
11909 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT B
Various $50,000
11782 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
A
Various $85,000
11783 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
B
Various $85,000
11784 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
C
Various $55,000
11785 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
D
Various $55,000
11772 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Various $800,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $550,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $789,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $726,000
11898 Work Order
Repair Costs
(Non-Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $500,000
FUND TOTAL: $16,275,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
11776 Design Services ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $190,000
10523 Construction AYRES SANITARY RELIEF AND I/I
REDUCTION
Various $2,200,000
11682 Design Services BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $300,000
11934 Design Services BALLAS ROAD SUBTRUNK SOUTH PUBLIC
I/I REDUCTION
Various $140,000
10407 Construction BAUMGARTNER & BLACK FOREST
SANITARY REPLACEMENT PHASE II
Unincorporated $2,500,000
11920 Design Services BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City $4,500,000
11852 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2014)
Various $5,200,000
11923 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
Various $60,000
11924 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT B
Various $110,000
11925 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT C
Various $80,000
11926 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
Various $80,000
11686 Design Services BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR)
Various $180,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11720 Design Services CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $1,120,000
11793 Construction CC-14 CREVE COEUR CREEK SANITARY
RELIEF (SKME-026) PHASE II
Creve Coeur $1,800,000
10549 Construction CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II
Chesterfield $2,100,000
11884 Construction CEDARCREST PRIVATE I/I REDUCTION
(SKME-561)
Various $860,000
11722 Construction CEDARCREST SANITARY RELIEF (SKME-
561) I/I REDUCTION
Ladue $5,200,000
11809 Design Services COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Unincorporated $360,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $300,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $1,050,000
11825 Construction CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
Maryland Heights $2,500,000
10429 Construction CSO - JEFFERSON BARRACKS SUBSYSTEM
NO. 72 INTERCEPTOR (I-122) SEPARATION
St. Louis County $2,100,000
10430 Construction CSO - SOUTH COUNTY PARK SUBSYSTEM
NO. 71 INTERCEPTOR (I-161) SEPARATION
Unincorporated $1,680,000
11116 Construction DACEY BRANCH I/I REDUCTION (BP-313)Various $50,000
11155 Design Services DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $1,100,000
10021 Design Services DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
Various $1,700,000
11849 Construction DEER CREEK PUBLIC I/I REDUCTION (2014)Various $5,700,000
11731 Pre-Design
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $3,200,000
11738 Design Services DIXIE I/I REDUCTION Various $750,000
11739 Design Services DUCHESNE AND GOTT I/I REDUCTION Various $180,000
10335 Construction DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407)
Unincorporated $600,000
11740 Design Services E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $120,000
11742 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
St. Louis City And
County
$3,000,000
10600 Construction FF-02 FEE FEE - ALAN SHEPARD I-270
SANITARY RELIEF PHASE V
Maryland Heights $1,700,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10014 Construction FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $4,100,000
10489 Construction FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $6,000,000
11748 Design Services FLORISSANT I/I REDUCTION Various $350,000
11932 Design Services FLORISSANT PUBLIC I/I REDUCTION Various $40,000
10456 Design Services FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION & I/I
REDUCTION
Various $260,000
10142 Construction FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $2,100,000
10611 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $3,000,000
11751 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
Various $100,000
10613 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
Various $50,000
10614 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
Various $50,000
10615 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
Various $50,000
11759 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2014)
Various $300,000
11763 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT A
Various $50,000
11910 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT C
Various $50,000
11911 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT D
Various $50,000
11912 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT E
Various $50,000
11779 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11781 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
10458 Construction,
Phase II
GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
Various $630,000
11122 Construction GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
Various $9,600,000
11765 Design Services GRAND GLAIZE TRUNK SANITARY RELIEF
I/I REDUCTION (SKME-417)
Ballwin $90,000
10496 Construction,
Phase II
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $1,000,000
10496 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $8,200,000
11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521)
Unincorporated $3,200,000
10330 Construction HARTLAND TO GOTHLAND SEWER
SEPARATION
Overland $3,000,000
11097 Design Services HOLLY DRIVE SEWER SEPARATION Webster Groves $240,000
11706 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY 2013) CONTRACT A
St. Louis City And
County
$5,000,000
11845 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT B
Various $5,000,000
11846 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2013) CONTRACT C
Various $5,000,000
11707 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT A
St. Louis City And
County
$5,000,000
11864 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT B
Various $5,000,000
11865 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2014) CONTRACT C
Various $5,000,000
11772 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
Various $3,200,000
11710 Design Services ISABELLE I/I REDUCTION St. Ann $30,000
11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,050,000
11054 Design Services KINGSTON I/I REDUCTION AND PUMP
STATION ELIMINATION
Unincorporated $25,000
11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $850,000
11855 Construction LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT A
Various $6,000,000
11870 Construction LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT B
Various $3,300,000
11927 Design Services LEMAY PUBLIC I/I REDUCTION (2016)Various $220,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11123 Engineering
During
Construction
Services
LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
St. Louis City $150,000
11794 Construction LEMAY WWTP ASH LAGOON ACCESS ROAD Unincorporated $50,000
11132 Construction LEMAY WWTP OUTFALL 002 ELIMINATION Unincorporated $4,500,000
11649 Construction LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $6,300,000
11820 Pre-Design
Services
LMRDP STORAGE TUNNEL SOUTH END Various $7,450,000
11807 Construction LOWER MERAMEC RIVER WWTP SCREEN
SHAFT LINING
Unincorporated $1,000,000
10696 Construction LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING
IMPROVEMENTS (PHASE II)
Unincorporated $250,000
11650 Design Services LOWER MERAMEC WATERSHED I/I
REMOVAL
Unincorporated $200,000
11651 Design Services LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $60,000
11653 Design Services MACKENZIE I/I REDUCTION Various $250,000
11654 Construction MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
St. Louis City $260,000
11931 Construction MACKENZIE PUBLIC I/I REDUCTION Webster Groves $5,200,000
11931 Design Services MACKENZIE PUBLIC I/I REDUCTION Webster Groves $90,000
11655 Design Services MALINE CREEK CSO 051 TREATMENT
FACILITY
St. Louis City $2,400,000
11656 Design Services MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $1,600,000
11656 Land Purchase MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $2,000,000
11658 Construction MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
Various $50,000
10030 Construction MAPLEWOOD - BLENDON COMBINED
SEWER RELIEF PHASE I
Various $7,500,000
11661 Design Services MARTIGNEY I/I REDUCTION Various $310,000
11930 Design Services MARTIGNEY PUBLIC I/I REDUCTION Various $190,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $2,000,000
10716 Construction NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,138,000
11664 Design Services NEWCASTLE I/I REDUCTION Various $80,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11693 Design Services NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
Various $230,000
10722 Construction OLD MILL CREEK SEWER REHABILITATION
PHASE III - 14TH TO 2ND STREET
St. Louis City $2,800,000
11696 Design Services PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $210,000
11933 Design Services PROVIDENCE PUBLIC I/I REDUCTION Webster Groves $40,000
11700 Design Services PROVIDENCE SANITARY RELIEF (SKME -
640)
Webster Groves $260,000
11114 Construction PUBLIC I/I REDUCTION REHABILITATION Various $5,000,000
11822 Vendor
Services
PUMP STATIONS SCADA IMPROVEMENTS Various $350,000
10198 Construction,
Phase II
RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
St. Louis City $2,400,000
11885 Construction ROCK HILL PUBLIC I/I REDUCTION (SKME-
618)
Various $6,600,000
11665 Design Services SELVIDGE AREA I/I REDUCTION Ballwin $60,000
11059 Design Services SENECA PRIVATE I/I REDUCTION Overland $900,000
11667 Design Services STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $140,000
11668 Design Services SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $85,000
10770 Construction SUN VALLEY I/I REDUCTION Unincorporated $1,226,000
11139 Land Purchase TILLIE BADEN NEWBY SEWER
IMPROVEMENTS (PROPERTY ACQUISITION)
St. Louis City $1,600,000
10199 Construction TOPPING SANITARY RELIEF (SKME -421)Town And Country $1,450,000
11672 Design Services UNIVERSITY CITY I/I REDUCTION - WEST Various $100,000
11929 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION
WEST
Various $60,000
11681 Design Services UPPER COLDWATER SECTION D I/I
REDUCTION
Various $190,000
10781 Construction UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314)
Ferguson $1,000,000
11089 Design Services VINITA DRIVE SANITARY RELIEF Hanley Hills $70,000
10793 Construction WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE II
Webster Groves $6,500,000
10029 Construction WISE AND MABEL SEWER SEPARATION Richmond Heights $3,000,000
10237 Construction WOODSMILL SANITARY RELIEF (SKME-020)Various $2,600,000
7 June 2013
WASTEWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $224,614,000
GRAND TOTAL:$241,139,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $1,500,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014)Various $1,500,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11755 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $350,000
11909 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT B
Various $50,000
11782 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
A
Various $80,000
11783 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
B
Various $80,000
11784 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
C
Various $50,000
11785 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2013) CONTRACT
D
Various $50,000
11773 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $1,000,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $550,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $709,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $799,000
11898 Work Order
Repair Costs
(Non-Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $600,000
FUND TOTAL: $16,598,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
11684 Construction BELLEFONTAINE #2 LATERAL SANITARY
RELIEF (BP-287)(COBURG LANDS DR)
Bellefontaine
Neighbors
$125,000
11685 Construction BISSEL HILLS SANITARY
RELIEF/CALUMENT I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$1,700,000
11920 Construction BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City $10,000,000
11853 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT A
Various $5,800,000
11854 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT B
Various $6,600,000
11857 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT C
Various $5,200,000
11871 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
Various $7,600,000
11687 Design Services BISSELL POINT SERVICE AREA I/I
REMOVAL-SUBTRUNK #3 LATERAL
Various $625,000
11847 Design Services BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Clayton $1,600,000
11689 Construction BLACK CREEK I/I REDUCTION Clayton $5,300,000
11883 Construction BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
Various $1,600,000
11718 Construction BRIGHTWELL I/I REDUCTION Florissant $800,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11790 Construction CAULKS CREEK FORCE MAIN (RIVER
VALLEY RD. TO L-52)
Maryland Heights $5,600,000
11788 Construction CAULKS CREEK PUMP STATION "B" FORCE
MAIN
Chesterfield $1,200,000
11009 Construction CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
Unincorporated $350,000
11115 Construction CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $2,200,000
11723 Design Services COLDWATER CREEK WATERSHED I/I
REMOVAL
Various $375,000
11809 Construction COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Unincorporated $1,900,000
11724 Design Services COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $2,025,000
11726 Construction COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $10,000,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $5,500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $5,050,000
11730 Construction CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $3,000,000
11734 Land Purchase DC-03 DEER CREEK SANITARY RELIEF
STORAGE TANK - LAND ACQUISITION
St. Louis County $6,000,000
10576 Construction DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $1,200,000
10576 Design Services DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $50,000
11850 Construction DEER CREEK PUBLIC I/I REDUCTION (2015)Various $7,100,000
11731 Design Services DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $6,000,000
11735 Construction DELCREST SANITARY RELIEF (SKME -565)
I/I REDUCTION
University City $200,000
11736 Construction DERHAKE I/I REDUCTION & CAPRI TO
S.WATERFORD SANITARY RELIEF
Florissant $50,000
11743 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
St. Louis City And
County
$3,500,000
11079 Construction FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
Olivette $100,000
11746 Pre-Design
Services
FENTON WWTP ELIMINATION TUNNEL Various $3,600,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO
PAGE)(DIAMOND PARK)
Various $2,100,000
10014 Construction
(Supplemental
Appropriation)
FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $2,700,000
10489 Construction
(Supplemental
Appropriation)
FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $4,700,000
11750 Construction FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
Grantwood Village $1,990,000
10440 Construction FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
Ferguson $1,600,000
10142 Construction
(Supplemental
Appropriation)
FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $1,425,000
10611 Construction
(Supplemental
Appropriation)
GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $2,000,000
11751 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015)
Various $150,000
11759 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2014)
Various $300,000
11763 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT A
Various $50,000
11910 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT C
Various $50,000
11911 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT D
Various $50,000
11912 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT E
Various $50,000
11779 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10496 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III (SKME -521)
Unincorporated $8,100,000
10497 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE IV & V (SKME -
521)
Unincorporated $2,700,000
11767 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VII (SKME -521)
Unincorporated $1,700,000
11768 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $2,700,000
11770 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $3,750,000
10641 Design Services HARLEM - BADEN RELIEF PHASE IV
(HEBERT) BUILDING DEMOLITION AND
DESIGN
St. Louis City $1,760,000
10642 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION
Unincorporated $4,000,000
10330 Construction
(Supplemental
Appropriation)
HARTLAND TO GOTHLAND SEWER
SEPARATION
Overland $1,700,000
10656 Construction INFRASTRUCTURE REPAIR #087P CAULKS
CREEK "A" (P-750) PHASE VI
Maryland Heights $5,500,000
11708 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT A
St. Louis City And
County
$5,000,000
11866 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT B
Various $5,000,000
11867 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT C
Various $5,000,000
11773 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $4,000,000
11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $1,350,000
11054 Construction KINGSTON I/I REDUCTION AND PUMP
STATION ELIMINATION
Unincorporated $800,000
11713 Design Services LADUE ESTATES SANITARY RELIEF Creve Coeur $40,000
11714 Design Services LADUE SUBTRUNK SANITARY RELIEF
(SKME-654)
Ladue $600,000
11715 Construction LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
Ferguson $1,200,000
11818 Design Services LEMAY CSO OUTFALL 063 HIGH RATE
CLARIFICATION FACILITY
St. Louis City $1,100,000
11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $700,000
11856 Construction LEMAY PUBLIC I/I REDUCTION (2015)Various $6,100,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11123 Engineering
During
Construction
Services
LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
St. Louis City $300,000
11716 Design Services LEMAY WATERSHED I/I REMOVAL Various $1,000,000
11921 Construction LEMAY WWTP INCINERATOR SCRUBBER
REPLACEMENT
St. Louis County $10,000,000
11649 Miscellaneous
Services
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $1,650,000
11649 Construction
(Supplemental
Appropriation)
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $4,200,000
11819 Design Services LMRDP STORAGE TUNNEL NORTH END St. Louis City $2,200,000
11820 Design Services LMRDP STORAGE TUNNEL SOUTH END Various $2,200,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
St. Louis City $2,200,000
11652 Construction LYNN HAVEN I/I REDUCTION Hazelwood $150,000
11656 Design Services MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $1,650,000
10030 Construction
(Supplemental
Appropriation)
MAPLEWOOD - BLENDON COMBINED
SEWER RELIEF PHASE I
Various $5,000,000
11659 Construction MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $1,600,000
11774 Design Services MISSOURI RIVER SERVICE AREA I/I
REDUCTION
Various $250,000
10716 Construction
(Supplemental
Appropriation)
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $2,090,000
11694 Construction NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
Pasadena Hills $550,000
11695 Construction OLDE ENGLISH I/I REMOVAL Unincorporated $320,000
11697 Construction PAGE TO TRENTON SANITARY RELIEF Overland $970,000
11094 Construction PROSPECT HILL LANDFILL VERTICAL
EXPANSION
St. Louis City $1,500,000
11701 Construction PUMP STATION REPLACEMENT PROJECTS
(FY 2015)
Various $500,000
11703 Design Services RDP FOULWATER INTERCEPTOR
REHABILITATION PHASE II
St. Louis City $650,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $3,900,000
10390 Construction RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $2,000,000
7 June 2013
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11069 Construction ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $2,400,000
11919 Design Services ROLENS DRIVE AND TELEGRAPH ROAD
SANITARY STORAGE
Unincorporated $100,000
11680 Construction ROXBURY I/I REDUCTION Clayton $250,000
10754 Construction SHERWYN SANITARY RELIEF (SKME -651) &
I/I REDUCTION
Creve Coeur $1,100,000
11670 Construction TUCKAWAY SANITARY REHABILITATION St. Louis County $110,000
11671 Design Services UNIVERSITY CITY I/I REDUCTION - EAST Various $2,500,000
10026 Construction UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $7,500,000
10027 Construction UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
University City $4,100,000
11675 Design Services VANCE ROAD WET WEATHER STORAGE Valley Park $250,000
11086 Construction WEBSTER ACRES SANITARY SEWER
REPLACEMENT
Webster Groves $1,300,000
11678 Construction WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $2,300,000
10029 Construction
(Supplemental
Appropriation)
WISE AND MABEL SEWER SEPARATION Richmond Heights $2,300,000
11108 Construction WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
Overland $1,200,000
FUND TOTAL: $263,525,000
GRAND TOTAL:$280,373,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $1,500,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014)Various $1,500,000
11125 Pre-Design
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11137 Construction GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $2,700,000
11755 General
Services -
Design
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $300,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (FY2016)
Various $240,000
11705 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $1,000,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $879,000
11898 Work Order
Repair Costs
(Non-Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $500,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $18,999,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
11776 Construction ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $310,000
11682 Construction BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $450,000
11934 Construction BALLAS ROAD SUBTRUNK SOUTH PUBLIC
I/I REDUCTION
Various $6,850,000
11920 Construction
(Supplemental
Appropriation)
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City $7,500,000
11923 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
Various $4,528,000
11924 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT B
Various $4,750,000
11925 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT C
Various $4,980,000
11926 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
Various $5,050,000
11686 Construction BISSELL POINT I/I REDUCTION (BP-
619)(VALLEY DR)
Various $210,000
11687 Construction BISSELL POINT SERVICE AREA I/I
REMOVAL-SUBTRUNK #3 LATERAL
Various $2,500,000
11689 Construction
(Supplemental
Appropriation)
BLACK CREEK I/I REDUCTION Clayton $2,100,000
10537 Design Services BOPP SANITARY RELIEF (SKME -611)Des Peres $160,000
11719 Construction BRINWOOD I/I REDUCTION Florissant $750,000
11789 Design Services CAULKS CREEK FORCE MAIN
REHABILITATION
Chesterfield $200,000
11720 Construction CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $6,270,000
11723 Construction COLDWATER CREEK WATERSHED I/I
REMOVAL
Various $1,500,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11726 Construction
(Supplemental
Appropriation)
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $6,300,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $6,500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $2,100,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $2,800,000
11730 Construction
(Supplemental
Appropriation)
CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $3,000,000
10851 Design Services CSO - MCKNIGHT RD #2737 CSO
INTERCEPTOR (I-298)/OUTFALL (L-161)
Rock Hill $700,000
11155 Construction DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $5,000,000
11833 Design Services DELCREST SANITARY RELIEF Various $500,000
11738 Construction DIXIE I/I REDUCTION Various $1,800,000
11739 Construction DUCHESNE AND GOTT I/I REDUCTION Various $460,000
11740 Construction E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $60,000
11744 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
St. Louis City And
County
$2,000,000
11745 Design Services FEE FEE TRUNK SEWER RELIEF (SKME-002)Maryland Heights $270,000
11746 Pre-Design
Services
FENTON WWTP ELIMINATION TUNNEL Various $2,400,000
11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO
PAGE)(DIAMOND PARK)
Various $1,400,000
11747 Design Services FF-04 QUIET VILLAGE SANITARY RELIEF Unincorporated $150,000
10601 Construction FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $5,000,000
11748 Construction FLORISSANT I/I REDUCTION Various $500,000
11932 Construction FLORISSANT PUBLIC I/I REDUCTION Various $4,700,000
11749 Construction FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $730,000
10456 Construction FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION & I/I
REDUCTION
Various $420,000
11944 Construction FOREST BROOK SANITARY RELIEF PUBLIC
I/I REDUCTION
Various $4,030,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11752 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2016)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015)
Various $150,000
11760 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2016)
Various $300,000
11762 General
Services -
Design
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2016)
Various $270,000
11764 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2016)
Various $250,000
11765 Construction GRAND GLAIZE TRUNK SANITARY RELIEF
I/I REDUCTION (SKME-417)
Ballwin $120,000
10497 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE IV & V (SKME -
521)
Unincorporated $1,900,000
11768 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $2,200,000
11770 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $2,750,000
10863 Design Services HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $625,000
11097 Construction HOLLY DRIVE SEWER SEPARATION Webster Groves $1,100,000
11709 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT A
St. Louis City And
County
$5,000,000
11868 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT B
Various $5,000,000
11869 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT C
Various $5,000,000
11705 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $4,000,000
11710 Construction ISABELLE I/I REDUCTION St. Ann $40,000
11142 Design Services JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $300,000
11712 Construction LACKLAND I/I REDUCTION Various $520,000
11713 Construction LADUE ESTATES SANITARY RELIEF Creve Coeur $150,000
11818 Design Services LEMAY CSO OUTFALL 063 HIGH RATE
CLARIFICATION FACILITY
St. Louis City $2,300,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11927 Construction LEMAY PUBLIC I/I REDUCTION (2016)Various $7,976,000
11716 Construction LEMAY WATERSHED I/I REMOVAL Various $4,000,000
11921 Construction
(Supplemental
Appropriation)
LEMAY WWTP INCINERATOR SCRUBBER
REPLACEMENT
St. Louis County $4,000,000
11819 Design Services LMRDP STORAGE TUNNEL NORTH END St. Louis City $3,400,000
11820 Design Services LMRDP STORAGE TUNNEL SOUTH END Various $3,400,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
St. Louis City $2,300,000
11650 Construction LOWER MERAMEC WATERSHED I/I
REMOVAL
Unincorporated $6,530,000
11928 Construction LUCAS & HUNT AND I-70 SANITARY SEWER Northwoods $800,000
11651 Construction LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $120,000
11653 Construction MACKENZIE I/I REDUCTION Various $500,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $200,000
11656 Construction MALINE CREEK CSO 052 STORAGE
FACILITY
St. Louis City $5,650,000
11661 Construction MARTIGNEY I/I REDUCTION Various $318,000
11662 Construction MCNULTY - PALLARDY I/I REDUCTION Various $5,200,000
11663 Construction MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $730,000
11774 Construction MISSOURI RIVER SERVICE AREA I/I
REDUCTION
Various $1,000,000
11664 Construction NEWCASTLE I/I REDUCTION Various $60,000
11693 Construction NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
Various $590,000
11696 Construction PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $250,000
11698 Construction PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
Unincorporated $1,730,000
11933 Construction PROVIDENCE PUBLIC I/I REDUCTION Webster Groves $3,050,000
11700 Construction PROVIDENCE SANITARY RELIEF (SKME -
640)
Webster Groves $710,000
11701 Construction PUMP STATION REPLACEMENT PROJECTS
(FY 2015)
Various $500,000
7 June 2013
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11703 Construction RDP FOULWATER INTERCEPTOR
REHABILITATION PHASE II
St. Louis City $6,500,000
11153 Professional
Services
RDP TRIBUTARIES (DEER CREEK)
CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
Various $3,900,000
11704 Design Services RETFORD I/I REDUCTION Unincorporated $436,000
11775 Design Services RIDGEWOOD DRIVE SEPARATE SEWER I/I
REMOVAL
Crestwood $275,000
10748 Construction ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
Wilbur Park $1,510,000
11665 Construction SELVIDGE AREA I/I REDUCTION Ballwin $200,000
11059 Construction SENECA PRIVATE I/I REDUCTION Overland $5,450,000
11666 Construction ST MARIE SANITARY RELIEF I/I REDUCTION Florissant $230,000
11667 Construction STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $160,000
11668 Construction SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $59,000
11669 Design Services SUB-TRUNK #3 LATERAL SANITARY RELIEF
(SKME -302)
Unincorporated $278,000
11918 Construction TELEGRAPH ROAD #2928 I/I REDUCTION Unincorporated $132,000
11672 Construction UNIVERSITY CITY I/I REDUCTION - WEST Various $220,000
11681 Construction UPPER COLDWATER SECTION D I/I
REDUCTION
Various $140,000
10026 Construction
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $5,000,000
10027 Construction
(Supplemental
Appropriation)
UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
University City $3,080,000
11089 Construction VINITA DRIVE SANITARY RELIEF Hanley Hills $330,000
11677 Design Services WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $600,000
11678 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,300,000
FUND TOTAL: $213,967,000
GRAND TOTAL:$233,216,000
7 June 2013
STORMWATER ENGINEERING PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11903 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
$300,000 161
11904 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT B)
$100,000 162
11905 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT C)
$300,000 163
11906 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT D)
$100,000 164
11907 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT E)
$300,000 165
11908 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
$100,000 166
11938 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT G)
$250,000 167
11899 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
$200,000 168
11900 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT B)
$100,000 169
11901 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT C)
$200,000 170
11902 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT D)
$100,000 171
11936 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT E)
$250,000 172
11937 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
$250,000 173
TOTAL:$2,550,000
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11903
16
TASK NO:
TASK NAME:
$300,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 161
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11904
16
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 162
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT B)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11905
16
TASK NO:
TASK NAME:
$300,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 163
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT C)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11906
16
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 164
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT D)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11907
16
TASK NO:
TASK NAME:
$300,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 165
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT E)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11908
16
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 166
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE COLDWATER CREEK WATERSHED.
§¨¦70
§¨¦270 §¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11938
16
TASK NO:
TASK NAME:
$250,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 167
COLDWATER CREEK OMCI STORMWATER DESIGN
(CONTRACT G)
Professional Services
5564 - Coldwater Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN STREAMBANK STABILIZATION IMPROVEMENTS IN THE
COLDWATER CREEK WATERSHED.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11899
16
TASK NO:
TASK NAME:
$200,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 168
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK WATERSHED.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11900
16
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 169
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT B)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK WATERSHED.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11901
16
TASK NO:
TASK NAME:
$200,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 170
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT C)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK WATERSHED.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11902
16
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 171
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT D)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK WATERSHED.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11936
16
TASK NO:
TASK NAME:
$250,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 172
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT E)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN STREAMBANK STABILIZATION IMPROVEMENTS IN THE
GRAVOIS CREEK WATERSHED.
§¨¦55
§¨¦44
§¨¦270
§¨¦255
§¨¦270
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11937
16
TASK NO:
TASK NAME:
$250,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 173
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
Professional Services
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS
AVAILABLE.
DESIGN STREAMBANK STABILIZATION IMPROVEMENTS IN THE
GRAVOIS CREEK WATERSHED.
7 June 2013
STORMWATER CONSTRUCTION PROJECTS - FY14
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11832 CONWAY RD 11700 STORM SEWER $75,000 174
11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 175
11216 FIRETHORN DRIVE #1901 STORM
IMPROVEMENTS
$48,000 176
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
$750,000 177
11842 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
$725,000 178
11843 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
$700,000 179
10378 SUNSWEPT DRIVE #8 BANK STABILIZATION $128,000 180
TOTAL:$2,676,000
§¨¦40 §¨¦40CONWOOD WESTWOODPRIVATEWESTWOODCOUNTRYCL
U
B
WESTWOOD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11832
15
TASK NO:
TASK NAME:
$75,000
BUDGET:
FUND:
Westwood
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 174
CONWAY RD 11700 STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
FREQUENT STRUCTURAL FLOODING.
CONSTRUCT 220 FEET OF 21-INCH STORM SEWER AND TRENCH
DRAIN.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦55
§¨¦170
§¨¦255
OLIVE
M
O
1
0
9
G R A V O ISLINDBERGHM
O
364
MO10 0
MO370
TELEGRAPHM O3 0
MO141
W A T S O N
ST
C
H
A
RLES
ROCK
LEM A Y FE R RYH IG H W A Y 6 7
TESSONFER R YCLARKSON C HIPPEWA
KIRKWOODRIVERVIEWNATURALBRIDGE
M A NCHESTE R
M A N C H E S T E R
NATURAL
B
RI
D
G
ELINDBERGHMO36
4MANCHESTER
M O 3 0
M
O
370
H I G H WAY67
CHIPPEWA
LIN
D
BERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2014
PROJECT NO: 11120
15
TASK NO:
TASK NAME:
BUDGET:
FUND:
Various
MUNICIPALITY:
Various
MAJOR SERVICE AREA:
Various
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 175
$250,000
EMERGENCY REPAIR FUNDS (STORMWATER)
Construction
4123 - Stormwater
Emergency Fund
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUT
NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICT
MUST ACT IMMEDIATELY.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCY
FUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
GRAYFIRETHORNOAK
POINT OAK
OAK VALLEY PINE HILLFAWNVALLE
Y
FOLKSTONEBRIARBR O O K
WI
L
L
O
W
L
E
AF
ANDREMORRISPL ACE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11216
15
TASK NO:
TASK NAME:
$48,000
BUDGET:
FUND:
Des Peres
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Two Mile Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 176
FIRETHORN DRIVE #1901 STORM IMPROVEMENTS
Construction
5566 - Deer Creek
OMCI Fund
FLOODING AND YARD EROSION.
CONSTRUCT 90 FEET OF 18-INCH RCP STORM SEWER, 300 FEET OF
EARTH BERM, 800 CUBIC FEET OF BIORETENTION, AND
APPURTENANCES.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11841
17
TASK NO:
TASK NAME:
$750,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Coldwater
MAJOR SERVICE AREA:
Coldwater Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 177
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
Work Order Repair Costs
(Capital)
5564 - Coldwater Creek
OMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS IN
NEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATER
INFRASTRUCTURE IN THE COLDWATER CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEM
WORK CLASSIFIED AS NON-CAPITAL.
§¨¦270
§¨¦40
§¨¦44
§¨¦170
§¨¦40
§¨¦270
§¨¦170
OLIVE BLVD
M A N C H E S T E R R DS LINDBERGH BLVDWATSO N R DN KIRKWOOD RDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11842
17
TASK NO:
TASK NAME:
$725,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 178
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
Work Order Repair Costs
(Capital)
5566 - Deer Creek
OMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS IN
NEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATER
INFRASTRUCTURE IN THE DEER CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEM
WORK CLASSIFIED AS NON-CAPITAL.
§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11843
17
TASK NO:
TASK NAME:
$700,000
BUDGET:
FUND:
Various
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Gravois Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Asset Management
Page 179
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
Work Order Repair Costs
(Capital)
5571 - Gravois Creek
OMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS IN
NEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATER
INFRASTRUCTURE IN THE GRAVOIS CREEK OMCI AREA.
IT IS ANTICIPATED THAT 40% OF THIS BUDGET MAY BE FOR SYSTEM
WORK CLASSIFIED AS NON-CAPITAL.
SUNSWEPT
PRIV A T E
A LLEG R O
FOXBROOK
COUNTR Y V IEWSHADYBROOK
Q U A I L W A Y S
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦255
FISCAL YEAR: 2014
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10378
15
TASK NO:
TASK NAME:
$128,000
BUDGET:
FUND:
Creve Coeur
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 180
SUNSWEPT DRIVE #8 BANK STABILIZATION
Construction
5566 - Deer Creek
OMCI Fund
EXISTING GABION WALL IS FAILING, CAUSING EROSION.
CONSTRUCT 90 FEET OF ROCK BLOCK WALL.
STORMWATER CONTINUED PROJECTS
1 of 1
During Fiscal Year 2014, there are no budgeted Stormwater Continued
projects.
7 June 2013
STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11243 CHELSEA AND IDLEWILD STORM SEWER $89,000 181
11245 CREEKHAVEN #12371 STORM SEWER $115,000 182
11215 CREEKHAVEN DRIVE #12105 STORM
IMPROVEMENTS
$61,000 183
11218 FRONTENAC FOREST #120 STORM
IMPROVEMENT
$26,000 184
11223 GLEN RD #35 BANK STABILIZATION $53,000 185
11076 LACLEDE STATION - CHAMBERLAIN STORM
SEWER
$195,000 186
11203 MARYHILL DRIVE STORM SEWER $64,000 187
10731 PARK LANE #9568 - #9572 STORM SEWER $30,000 188
10379 TIMBERLANE DR. STORM SEWER $100,000 189
TOTAL:$733,000
KIRKHAM AVE
BROWNELL AVE
DWYER AVE IDLEWILD LNCHELSEA AVE
N SAPPINGTON RDCLIF SIDE DRH I L L ARD RDCAMBRIDGE CTGLENVISTAP LLISAKAY DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11243
15
TASK NO:
TASK NAME:
$89,000
BUDGET:
FUND:
Glendale
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 181
CHELSEA AND IDLEWILD STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 470 FEET OF 15-INCH TO 18-INCH STORM SEWER AND
APPURTENANCES.
N BALLAS RDIRONSTONE RD
FEDERAL DR
CREEKHAVEN DR
BORCHERDING LN
DUNMORR DRSPRINGDALE LN
PRIVATERD POINTOAKRDN BALLAS RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11245
15
TASK NO:
TASK NAME:
$115,000
BUDGET:
FUND:
Des Peres
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Two Mile Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 182
CREEKHAVEN #12371 STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING BEHIND 12371 CREEKHAVEN DR.
CONSTRUCT 545 FEET OF 12-INCH TO 15-INCH STORM SEWER, 2
BIORETENTION CELLS AND APPURTENANCES.
CREEKHAVEN DRCANDLEWICKDR
DUNMORRDRCAMBERLY RDBERKLEYMANOR DR
IRONSTONE RD
BORCHERDING LN
FEDERAL DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11215
15
TASK NO:
TASK NAME:
$61,000
BUDGET:
FUND:
Des Peres
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Two Mile Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 183
CREEKHAVEN DRIVE #12105 STORM
IMPROVEMENTS
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 285 FEET OF 24-INCH DIAMETER STORM SEWER AND
APPURTENANCES.
BOPP RDDIVOT DRCLEEK CTPUTTER LNPORTLAND DR
DERBYWAYCOUNTRYSIDE LNCROYDONWALKFRONTENACFORESTST§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11218
15
TASK NO:
TASK NAME:
$26,000
BUDGET:
FUND:
Frontenac
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Two Mile Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 184
FRONTENAC FOREST #120 STORM IMPROVEMENT
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
REGRADE SWALE AREA AND LINE WITH 235 SY OF ROCK BLANKET.
GLEN
RDN ELM AVEE LOCKWOOD AVE ORCHARD AVESPENCER RD
S ELM AVEU N IO N P A C IF IC R R
N MAPLE AVEROSEMONT
A
V
E
S MAPLE AVEPLANT AVEOAKWOOD
A
V
E
W PACIFICAVESYLVESTERAVEROSEMONT AVE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11223
15
TASK NO:
TASK NAME:
$53,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Non-recurring
Page 185
GLEN RD #35 BANK STABILIZATION
Construction
5566 - Deer Creek
OMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 75 FEET OF ROCK BLOCK WALL AND HEAVY STONE
REVETMENT.
§¨¦44
D
A
L
E
A
V
E
B U R LIN G T O N N O R T H E R N S A N T A F E R R
ST MICHAEL AVEARLIN
G
T
O
N
A
V
E
N LACLEDE STATION RDSUTHE
R
L
A
N
D
A
V
E
DEVONSHIRE
A
V
ESUFFOLK AVEPAGE AVESPRINGAVESLACLEDESTATIONRDCH
A
MB
E
R
LAI
N
P
L
LANSDOWNE A
V
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11076
15
TASK NO:
TASK NAME:
$195,000
BUDGET:
FUND:
Webster Groves
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 186
LACLEDE STATION - CHAMBERLAIN STORM
SEWER
Construction
5566 - Deer Creek
OMCI Fund
FREQUENT ROAD AND GARAGE FLOODING.
CONSTRUCT APPROXIMATELY 410 FEET OF 24-INCH RCP STORM
SEWER AND APPURTENANCES.
LADUE RD
MARYHILL DR
N LINDBERGH BLVDCOUNTRY FAIR LNSALEM ESTATES DRLADUE CTS LINDBERGH BLVDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11203
15
TASK NO:
TASK NAME:
$64,000
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 187
MARYHILL DRIVE STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD EROSION.
CONSTRUCT 225 FEET OF 15-INCH STORM SEWER .
LITZSINGER RD
PARK LN
PRIVATE RD
NROCKHILLRDLITZSINGERLN§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10731
15
TASK NO:
TASK NAME:
$30,000
BUDGET:
FUND:
Ladue
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 188
PARK LANE #9568 - #9572 STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 110 FEET OF 15-INCH STORM SEWER AND
APPURTENANCES.
NORTH DR
WILD DEERRD
ANDREW DRW ARSONWOODSDRDEARBORN DRRIDGE LINE DRSAL
E
MHI
LLSDRFOREST VIEW DRDUNW OODYDRNBERRY
R
D
NORTHBRIDGE RD
DES PERES AVEHUDSON AVE
BLUE BELL
LN
A L D E N L N
TIMBERLANE DR TWINBROOK DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10379
15
TASK NO:
TASK NAME:
$100,000
BUDGET:
FUND:
Warson Woods
MUNICIPALITY:
Lemay/RDP
MAJOR SERVICE AREA:
Deer Creek
WATERSHED:
Stormwater
PROJECT TYPE:
EXPENSE TYPE:
Capital
Page 189
TIMBERLANE DR. STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
OVERLAND FLOW RESULTING IN YARD PONDING AND EROSION, AND
BASEMENT FLOODING.
CONSTRUCT 465 FEET OF 12-INCH TO 18-INCH RCP STORM SEWER
AND APPURTENANCES.
7 June 2013
STORMWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
11903 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
Various $300,000
11904 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT B)
Various $100,000
11905 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT C)
Various $300,000
11906 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT D)
Various $100,000
11907 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT E)
Various $300,000
11908 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
Various $100,000
11938 Professional
Services
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT G)
Various $250,000
11841 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
Various $750,000
FUND TOTAL: $2,200,000
5566 - DEER CREEK OMCI FUND
11832 Construction CONWAY RD 11700 STORM SEWER Westwood $75,000
11216 Construction FIRETHORN DRIVE #1901 STORM
IMPROVEMENTS
Des Peres $48,000
11842 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
Various $725,000
10378 Construction SUNSWEPT DRIVE #8 BANK STABILIZATION Creve Coeur $128,000
FUND TOTAL: $976,000
5571 - GRAVOIS CREEK OMCI FUND
11899 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
Various $200,000
11900 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT B)
Various $100,000
7 June 2013
STORMWATER PROJECTS - FY14
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11901 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT C)
Various $200,000
11902 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT D)
Various $100,000
11936 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT E)
Various $250,000
11937 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
Various $250,000
11843 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
Various $700,000
FUND TOTAL: $1,800,000
GRAND TOTAL:$5,226,000
7 June 2013
STORMWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
10348 Construction CONWAY - CLERBROOK STORM CHANNEL Ladue $606,000
10306 Construction LINDBERGH - CLERBROOK STORM
CHANNEL
Ladue $245,000
FUND TOTAL: $851,000
5566 - DEER CREEK OMCI FUND
11211 Construction BROOKTRAIL CT. STORM SEWER Creve Coeur $70,000
11191 Construction CHALET COURT STREAMBANK
STABILIZATION
Creve Coeur $215,000
11243 Construction CHELSEA AND IDLEWILD STORM SEWER Glendale $89,000
11245 Construction CREEKHAVEN #12371 STORM SEWER Des Peres $115,000
11215 Construction CREEKHAVEN DRIVE #12105 STORM
IMPROVEMENTS
Des Peres $61,000
10360 Construction FORCEE LANE STORM SEWER Ladue $138,000
11218 Construction FRONTENAC FOREST #120 STORM
IMPROVEMENT
Frontenac $26,000
11223 Construction GLEN RD #35 BANK STABILIZATION Webster Groves $53,000
11076 Construction LACLEDE STATION - CHAMBERLAIN STORM
SEWER
Webster Groves $195,000
10005 Construction LAVEN - DEL LN. #1322 - 1323 STORM SEWER Kirkwood $533,000
10289 Construction LINDEN #1064 STORM SEWER Richmond Heights $536,000
11203 Construction MARYHILL DRIVE STORM SEWER Ladue $64,000
11207 Construction NORTH DRIVE STORM SEWER (WW CIP #1-
10)
Warson Woods $325,000
10731 Construction PARK LANE #9568 - #9572 STORM SEWER Ladue $30,000
10379 Construction TIMBERLANE DR. STORM SEWER Warson Woods $100,000
7 June 2013
STORMWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $2,550,000
5571 - GRAVOIS CREEK OMCI FUND
10172 Construction GRAND & HARRISON STORM
IMPROVEMENTS
Kirkwood $1,460,000
FUND TOTAL: $1,460,000
GRAND TOTAL:$5,111,000
7 June 2013
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
11182 Construction BERKRIDGE DRIVE AND FROST AVENUE
PHASE III STORM SEWER
Hazelwood $640,000
10540 Construction BROWN ROAD TO EMINENCE BLVD. STORM
IMPROVEMENTS
St. John $605,000
10359 Construction BUSIEK AVE. #8044 STORM SEWER Berkeley $125,000
11186 Construction CALVERT AVE. #3342 STORM SEWER Breckenridge Hills $42,000
10332 Construction DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
Florissant $350,000
11036 Construction EVERMAN-TENNYSON STORM SEWER Overland $370,000
11159 Construction FOX RUN DRIVE #1360 STORM SEWER Florissant $25,000
10362 Construction FROSTWOOD PARK STREAMBANK
STABILIZATION
Berkeley $41,000
11187 Construction GORDON AVE. TO ROY AVE. STORM
IMPROVEMENTS
St. John $1,300,000
11020 Construction HERBERT AVE. 4200-4400 BLOCK
STREAMBANK STABILIZATION
Woodson Terrace $320,000
10388 Construction MALLARD LANE & PHEASANT DRIVE
STORM SEWER
Florissant $191,000
11189 Construction MARK TWAIN #635 STORM SEWER Florissant $50,000
11158 Construction MERRI LANE #5 STORM SEWER Florissant $100,000
11093 Construction NORINE CT. #23 STORM SEWER Florissant $86,000
11127 Construction ROANOKE AND LOEKES STORM SEWER Florissant $115,000
11085 Construction ROGERS LANE #925 STORM SEWER Florissant $55,000
11119 Construction ROGERS LANE #975 STORM SEWER Florissant $35,000
11078 Construction ST. EDMUND #10728 - 10732 STORM SEWER St. Ann $80,000
11039 Construction STANSBERRY AVE #9262 STORM SEWER Woodson Terrace $250,000
11183 Construction WILLIAMS BLVD - ANISTASIA DR. STORM
SEWER
Hazelwood $190,000
7 June 2013
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $4,970,000
5566 - DEER CREEK OMCI FUND
11228 Construction ALGONQUIN WOOD DR. #12 STORM SEWER Glendale $124,000
11213 Construction AUSTIN PLACE AND LOCKWOOD AVE.
STORM SEWER
Glendale $847,000
11170 Construction BREEZERIDGE DRIVE #1532 STORM SEWER Des Peres $54,000
11206 Construction BROOKHURST DR. STORM SEWER (WW CIP
#1-05, 1-09, & 1-16)
Warson Woods $294,000
11230 Construction CURRAN AVE. - BERNICE AVE. STORM
SEWER
Kirkwood $93,000
11214 Construction DICKSON STREET #1033 STORM SEWER Kirkwood $170,000
11195 Construction FAWNRIDGE DR. 11700 BLOCK STORM
SEWER
Des Peres $108,000
11219 Construction FRONTENAC FOREST TO PORTLAND DRIVE
STORM SEWER
Frontenac $220,000
11003 Construction HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
Frontenac $215,000
11840 Construction MEADOWRIDGE AND EASTWOOD STORM
AND SANITARY RELIEF
Kirkwood $1,059,000
11032 Construction MANCHESTER & MISSOURI AVENUE PHASE
II
Kirkwood $175,000
11196 Construction PICARDY LANE SUBDIVISION BANK
STABILIZATION
Ladue $297,000
11222 Construction TEALWOOD DRIVE AND BEAVER DRIVE
BANK STABILIZATION
Creve Coeur $251,000
FUND TOTAL: $3,907,000
5571 - GRAVOIS CREEK OMCI FUND
11364 Construction ALTHEA - ASTER STORM SEWER Unincorporated $380,000
11367 Construction ANCHOR DR. AND DANA AVE. STORM
SEWER
Unincorporated $135,000
11035 Construction BARBERTON DRIVE #10069 STORM
IMPROVEMENTS (MC-14)
Crestwood $107,000
11375 Construction FORMAN ROAD TO CANDACE DRIVE
STORM SEWER
Unincorporated $590,000
11045 Construction GRANT #609 BANK STABILIZATION Webster Groves $145,000
10006 Construction LEE AVE. #337 STORM SEWER Kirkwood $323,000
10370 Construction LIGGETT TO BIG BEND CHANNEL REPAIRS Oakland $67,000
7 June 2013
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11105 Construction MANDA LANE #8901 STORM SEWER Crestwood $35,000
11363 Construction MC ADOO CT #4325 STORM SEWER St. Louis County $155,000
10329 Construction PARK AVENUE STORM IMPROVEMENTS Oakland $279,000
11018 Construction PATRINA COURT BANK STABILIZATION Unincorporated $510,000
11370 Construction RAINRIDGE CT. #4125 BANK STABILIZATION
& BUYOUTS (GCMB-370)
Unincorporated $1,350,000
11338 Construction RALEIGH DRIVE #8829 STORM SEWER Grantwood Village $200,000
11350 Construction WHITEHAVEN AND RALEIGH STORM
SEWER
Grantwood Village $169,000
FUND TOTAL: $4,445,000
GRAND TOTAL:$13,572,000
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11665 SELVIDGE AREA I/I REDUCTION WASTEWATER BALLWIN 71
11765 GRAND GLAIZE TRUNK SANITARY RELIEF I/I
REDUCTION (SKME-417)
WASTEWATER BALLWIN 44
10549 CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II
WASTEWATER CHESTERFIELD 84
10378 SUNSWEPT DRIVE #8 BANK STABILIZATION STORMWATER CREVE COEUR 180
11793 CC-14 CREVE COEUR CREEK SANITARY RELIEF
(SKME-026) PHASE II
WASTEWATER CREVE COEUR 83
11216 FIRETHORN DRIVE #1901 STORM
IMPROVEMENTS
STORMWATER DES PERES 176
10781 UPPER JESKE PARK LATERAL SANITARY
RELIEF (SKME-314)
WASTEWATER FERGUSON 130
11089 VINITA DRIVE SANITARY RELIEF WASTEWATER HANLEY HILLS 80
11651 LYNKIRK STUDY AREA I/I REDUCTION WASTEWATER KIRKWOOD 57
11722 CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
WASTEWATER LADUE 86
10014 FF-11 FEE FEE CREEK SANITARY RELIEF WASTEWATER MARYLAND
HEIGHTS
96
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
WASTEWATER MARYLAND
HEIGHTS
97
10600 FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY
RELIEF PHASE V
WASTEWATER MARYLAND
HEIGHTS
95
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11825 CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
WASTEWATER MARYLAND
HEIGHTS
87
10330 HARTLAND TO GOTHLAND SEWER
SEPARATION
WASTEWATER OVERLAND 106
11059 SENECA PRIVATE I/I REDUCTION WASTEWATER OVERLAND 72
10029 WISE AND MABEL SEWER SEPARATION WASTEWATER RICHMOND
HEIGHTS
132
11710 ISABELLE I/I REDUCTION WASTEWATER ST. ANN 47
10198 RDP FOULWATER INTERCEPTOR
REHABILITATION (PHASE I)
WASTEWATER ST. LOUIS CITY 125
11123 LEMAY PUMP STATION NO. 1 REDUNDANT
FORCE MAIN
WASTEWATER ST. LOUIS CITY 52
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS WASTEWATER ST. LOUIS CITY 29
11139 TILLIE BADEN NEWBY SEWER IMPROVEMENTS
(PROPERTY ACQUISITION)
WASTEWATER ST. LOUIS CITY 129
11654 MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
WASTEWATER ST. LOUIS CITY 117
11656 MALINE CREEK CSO 052 STORAGE FACILITY WASTEWATER ST. LOUIS CITY 60
11656 MALINE CREEK CSO 052 STORAGE FACILITY WASTEWATER ST. LOUIS CITY 119
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
WASTEWATER ST. LOUIS CITY 4
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
74
11707 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
107
11742 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
WASTEWATER ST. LOUIS CITY
AND COUNTY
93
11740 E. WATSON SEPARATE SEWER I/I REMOVAL WASTEWATER SUNSET HILLS 25
10142 FORESTWOOD SANITARY RELIEF (SKME-435)WASTEWATER UNINCORPORAT
ED
98
10335 DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407)
WASTEWATER UNINCORPORAT
ED
92
10430 CSO - SOUTH COUNTY PARK SUBSYSTEM NO.
71 INTERCEPTOR (I-161) SEPARATION
WASTEWATER UNINCORPORAT
ED
88
10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
WASTEWATER UNINCORPORAT
ED
99
10696 LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING IMPROVEMENTS
(PHASE II)
WASTEWATER UNINCORPORAT
ED
116
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
122
10716 NEW ENGLAND TOWN QUARRY PUMP STATION
(P-307) (SKME-544) IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
123
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10770 SUN VALLEY I/I REDUCTION WASTEWATER UNINCORPORAT
ED
127
11054 KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
WASTEWATER UNINCORPORAT
ED
49
11155 DAMMERT AND BROADWAY SANITARY RELIEF
(SKME-551)
WASTEWATER UNINCORPORAT
ED
19
11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT
ED
114
11650 LOWER MERAMEC WATERSHED I/I REMOVAL WASTEWATER UNINCORPORAT
ED
56
11667 STERLING PLACE SEPARATE SEWER I/I
REMOVAL
WASTEWATER UNINCORPORAT
ED
73
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF WASTEWATER UNINCORPORAT
ED
76
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
48
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE VI (SKME -521)
WASTEWATER UNINCORPORAT
ED
45
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL WASTEWATER UNINCORPORAT
ED
1
11807 LOWER MERAMEC RIVER WWTP SCREEN
SHAFT LINING
WASTEWATER UNINCORPORAT
ED
115
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11809 COLDWATER CREEK WWTP SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
14
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
50
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD)
WASTEWATER VARIOUS 20
10030 MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
WASTEWATER VARIOUS 121
10237 WOODSMILL SANITARY RELIEF (SKME-020)WASTEWATER VARIOUS 133
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION & I/I
REDUCTION
WASTEWATER VARIOUS 28
10458 GLENDALE SECTION D SANITARY RELIEF
PHASE III (SKME-624) I/I REDUCTION
WASTEWATER VARIOUS 104
10523 AYRES SANITARY RELIEF AND I/I REDUCTION WASTEWATER VARIOUS 81
10613 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
WASTEWATER VARIOUS 31
10614 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
WASTEWATER VARIOUS 32
10615 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
WASTEWATER VARIOUS 33
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)UNALLOCATED VARIOUS 94
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 55
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 21
11114 PUBLIC I/I REDUCTION REHABILITATION WASTEWATER VARIOUS 124
11116 DACEY BRANCH I/I REDUCTION (BP-313)WASTEWATER VARIOUS 90
11120 EMERGENCY REPAIR FUNDS (STORMWATER)STORMWATER VARIOUS 175
11122 GLENDALE SECTION D SANITARY RELIEF
PHASE IV (SKME-624) I/I REDUCTION
WASTEWATER VARIOUS 105
11125 CRITICAL INFRASTRUCTURE ASSESSMENT WASTEWATER VARIOUS 18
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 9
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 53
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 89
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 17
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 15
11653 MACKENZIE I/I REDUCTION WASTEWATER VARIOUS 58
11658 MALINE I/I REDUCTION & SEWER
REHABILITATION (BP-289)(COLONY DR)
WASTEWATER VARIOUS 120
11661 MARTIGNEY I/I REDUCTION WASTEWATER VARIOUS 61
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11664 NEWCASTLE I/I REDUCTION WASTEWATER VARIOUS 63
11672 UNIVERSITY CITY I/I REDUCTION - WEST WASTEWATER VARIOUS 77
11681 UPPER COLDWATER SECTION D I/I REDUCTION WASTEWATER VARIOUS 79
11682 BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
WASTEWATER VARIOUS 2
11686 BISSELL POINT I/I REDUCTION (BP-619)(VALLEY
DR)
WASTEWATER VARIOUS 10
11693 NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
WASTEWATER VARIOUS 64
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)WASTEWATER VARIOUS 65
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
WASTEWATER VARIOUS 66
11702 RADAR RAINFALL DATA (FY2014)WASTEWATER VARIOUS 70
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 22
11738 DIXIE I/I REDUCTION WASTEWATER VARIOUS 23
11739 DUCHESNE AND GOTT I/I REDUCTION WASTEWATER VARIOUS 24
11748 FLORISSANT I/I REDUCTION WASTEWATER VARIOUS 26
11751 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
WASTEWATER VARIOUS 30
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
WASTEWATER VARIOUS 34
11759 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
WASTEWATER VARIOUS 35
11763 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
WASTEWATER VARIOUS 36
11772 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
WASTEWATER VARIOUS 110
11772 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
WASTEWATER VARIOUS 111
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
WASTEWATER VARIOUS 41
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
WASTEWATER VARIOUS 42
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
WASTEWATER VARIOUS 43
11782 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
UNALLOCATED VARIOUS 100
11783 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
UNALLOCATED VARIOUS 101
11784 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
UNALLOCATED VARIOUS 102
11785 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
UNALLOCATED VARIOUS 103
11810 CCTV INSPECTION OF SEWERS (2014)WASTEWATER VARIOUS 13
11811 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
WASTEWATER VARIOUS 12
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11820 LMRDP STORAGE TUNNEL SOUTH END WASTEWATER VARIOUS 54
11822 PUMP STATIONS SCADA IMPROVEMENTS WASTEWATER VARIOUS 69
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 16
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
STORMWATER VARIOUS 177
11842 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
STORMWATER VARIOUS 178
11843 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
STORMWATER VARIOUS 179
11849 DEER CREEK PUBLIC I/I REDUCTION (2014)WASTEWATER VARIOUS 91
11852 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2014)
WASTEWATER VARIOUS 82
11855 LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT A
WASTEWATER VARIOUS 112
11864 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT B
WASTEWATER VARIOUS 108
11865 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT C
WASTEWATER VARIOUS 109
11870 LEMAY PUBLIC I/I REDUCTION (2014)
CONTRACT B
WASTEWATER VARIOUS 113
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-
561)
WASTEWATER VARIOUS 85
11885 ROCK HILL PUBLIC I/I REDUCTION (SKME-618)WASTEWATER VARIOUS 126
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
WASTEWATER VARIOUS 128
11899 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
STORMWATER VARIOUS 168
11900 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT B)
STORMWATER VARIOUS 169
11901 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT C)
STORMWATER VARIOUS 170
11902 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT D)
STORMWATER VARIOUS 171
11903 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
STORMWATER VARIOUS 161
11904 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT B)
STORMWATER VARIOUS 162
11905 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT C)
STORMWATER VARIOUS 163
11906 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT D)
STORMWATER VARIOUS 164
11907 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT E)
STORMWATER VARIOUS 165
11908 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
STORMWATER VARIOUS 166
11909 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
WASTEWATER VARIOUS 37
11910 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
WASTEWATER VARIOUS 38
11911 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
WASTEWATER VARIOUS 39
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11912 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
WASTEWATER VARIOUS 40
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
WASTEWATER VARIOUS 75
11923 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
WASTEWATER VARIOUS 5
11924 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT B
WASTEWATER VARIOUS 6
11925 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT C
WASTEWATER VARIOUS 7
11926 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT D
WASTEWATER VARIOUS 8
11927 LEMAY PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 51
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION WEST WASTEWATER VARIOUS 78
11930 MARTIGNEY PUBLIC I/I REDUCTION WASTEWATER VARIOUS 62
11932 FLORISSANT PUBLIC I/I REDUCTION WASTEWATER VARIOUS 27
11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
WASTEWATER VARIOUS 3
11936 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT E)
STORMWATER VARIOUS 172
11937 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
STORMWATER VARIOUS 173
11938 COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT G)
STORMWATER VARIOUS 167
7 June 2013
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY14
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10793 WEBSTER GROVES TRUNK "E" SANITARY
REHABILITATION AND I/I REDUCTION PHASE II
WASTEWATER WEBSTER
GROVES
131
11097 HOLLY DRIVE SEWER SEPARATION WASTEWATER WEBSTER
GROVES
46
11700 PROVIDENCE SANITARY RELIEF (SKME -640)WASTEWATER WEBSTER
GROVES
68
11931 MACKENZIE PUBLIC I/I REDUCTION WASTEWATER WEBSTER
GROVES
59
11931 MACKENZIE PUBLIC I/I REDUCTION WASTEWATER WEBSTER
GROVES
118
11933 PROVIDENCE PUBLIC I/I REDUCTION WASTEWATER WEBSTER
GROVES
67
11832 CONWAY RD 11700 STORM SEWER STORMWATER WESTWOOD 174
11720 CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
WASTEWATER WILDWOOD 11