HomeMy Public PortalAboutExhibit MSD 20 - FY 2015 CIRP DocumentMetropolitan St. Louis Sewer District
2014-2015 Budget Supplement
BEFORE
BEFORE PROJECT CLEAR:
Downspout disappears into
the ground and connects
to the house lateral.
BEFORE
BEFORE PROJECT CLEAR:
Cracked sewer pipe lets in groundwater.AFTER
AFTER PROJECT CLEAR:
Repaired sewer pipe keeps the rain out.
AFTER
AFTER PROJECT CLEAR:
Downspout drains onto the
ground and does NOT
connect to the
house lateral.
Exhibit MSD 20
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2015
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer District's
intended Capital Improvement and Replacement Program during Fiscal Year 2015 (July 1, 2014 to June 30, 2015).
This document is divided into the following sections:
• Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects that have
scheduled construction starts during Fiscal Year 2015. The Wastewater Engineering Projects and Stormwater
Engineering Projects sections list projects that have scheduled engineering starts during Fiscal Year 2015 (which
includes design, planning, and data collection/system investigation services). Due to the magnitude and complexity
of these projects and the requirements for permitting and easement acquisition, their construction is scheduled in
future years. The Contingency Projects sections detail projects that are currently scheduled for Fiscal Year 2016, but
that may be expedited and constructed during Fiscal Year 2015, if revenue becomes available and project schedules
allow.
For each new project identified for funding in Fiscal Year 2015, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal years, only
the estimated construction cost and reason for continuance are provided. Specific information regarding continued
projects was included in previous Budget Supplement documents in the fiscal years which the projects were initially
identified. Lastly, a listing of all Fiscal Year 2015 projects sorted by municipality is provided in the Appendix.
On the Cover: MSD Project Clear is the Metropolitan St. Louis Sewer District’s initiative to improve water quality and
alleviate many wastewater concerns in the St. Louis region. MSD Project Clear will invest billions of dollars over a
generation in planning, designing, and building community rainscaping and new system improvements. This initiative
includes an ambitious program of maintenance and repair, and the disconnection of some residential downspouts in parts of
St. Louis County’s separate sewer area from the wastewater sewer line. This work is part of an agreement between MSD
and the United States Environmental Protection Agency. Illustrations highlight the removal of inflow and infiltration from
the public sewer system, through downspout disconnections and rehabilitation, vital components of the program.
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")")
")
")
")
")
")")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(MS
D
B
o
u
n
d
a
r
ySt. Louis County Boundary§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦44
§¨¦70
§¨¦40 §¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
169
166
183
184
165
213
212
170
181
173
172
161
171
215
175
218
214
178
167
174
217
182
219
216
162
179
180
164
163
186
185
176177
160
168
220
1
6
5
4
7
3
2
54
50
9383
73
89
44
76
24 69
11
20
4348
77
52
84
13
94
12
53
49
23
21
70
63
60
82
25
64
42
45
27
61
14
92
68
79
90
59
56
78
88 87
62
91
58
46
26
55
86
10
99
98
80
22
81
97
57
47
85
71
96
51
72
95
18
16
108
158
199
197
146
114 198
100
134
104
109
147
141
110
196
210
188
103
137
135
143
153
136
159
119
155
125
194 150
120
190
144
105
128
111
145
192
203
139
107
207
140
138
101
211191
206
151
127
112
149
204
118
193
187
154
126
201
102
189
156
195
157
202
113
148
106
208
209
115
205
142
Map produced by MSD GIS Mapping, April 2014
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2015
Legend
FISCAL YEAR 2015
!(Wastewater
!(Stormwater
CONTINGENCY
")Wastewater
")Stormwater
Combined Sewer Area
MS D DISTRICT WIDE PROJECTS
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
1 ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD)
2 BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION)
3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT D
5 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
6 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
7 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE)
8 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014)
9 CCTV INSPECTION OF SEWERS (2014)
10 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR)
11 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
12 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
13 CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND
BLVD)
14 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
15 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
16 CONSTRUCTION MANAGEMENT SERVICES - MISSOURI WWTP SECONDARY
EXPANSION & DISINFECTION
17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
18 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH
19 CRITICAL INFRASTRUCTURE ASSESSMENT
20 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161)
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
21 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION
22 DEER CREEK PUBLIC I/I REDUCTION (2016)
23 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
24 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
25 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
26 FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK)
27 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE)
28 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014)
29 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A
30 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B
31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C
32 GENERAL SERVICES AGREEMENT - PLANNING (FY2014)
33 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A
34 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B
35 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C
36 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D
37 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E
38 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014)
39 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A
40 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B
41 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C
42 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
43 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
44 LADUE ESTATES SANITARY RELIEF
45 LADUE SUBTRUNK SANITARY RELIEF (SKME-654)
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
46 LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY
WWTF)
47 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
48 LEMAY PUBLIC I/I REDUCTION (2016)
49 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
50 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
51 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK
52 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK
53 LEMAY WWTP SECONDARY IMPROVEMENTS
54 LEMAY WWTP SECONDARY IMPROVEMENTS
55 LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES)
56 LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS
57 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK)
58 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS
59 LMRDP TUNNEL DEWATERING PUMP STATION
60 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
61 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
62 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
63 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST
64 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD
AND S HILL ROCK HILL ROAD)
65 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013
66 PUMP STATION REPLACEMENT PROJECTS (PHASE I)
67 RADAR RAINFALL DATA (FY2014)
68 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
69 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
70 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574)
71 ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE
72 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON
ROAD)
73 STERLING PLACE SEPARATE SEWER I/I REMOVAL
74 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
75 STREAM FLOW WATER QUALITY SAMPLING (FY 2014)
76 SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE)
77 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE)
78 TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE)
79 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR)
80 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09)
81 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10)
82 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03)
83 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01)
84 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03)
85 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR)
86 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS)
87 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09)
88 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10)
89 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT)
90 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL
91 WEST WISE I/I REDUCTION (NW QUADRANT I-64 AND BIG BEND BLVD)
92 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION
93 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
94 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
95 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT A
96 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT B
97 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT C
98 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
99 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT E
100 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT F
101 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
102 BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317)
103 BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR)
104 BLACK CREEK I/I REDUCTION
105 CAULKS CREEK PUMP STATION B FORCE MAIN
106 CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
107 COLDWATER CREEK WWTF SCREENINGS & WASHER/COMPACTOR
IMPROVEMENTS
108 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
109 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME -
240)
110 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059)
111 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
112 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION
113 DEER CREEK PUBLIC I/I REDUCTION (2015)
114 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - LAND ACQUISITION
115 DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
116 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2015)
117 EMERGENCY REPAIR FUNDS (WASTEWATER)
118 FAIRLIGHT AND BRIGHTLING SEWER SEPARATION
119 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016)
REHABILITATION & I/I REDUCTION
120 FORESTWOOD LATERAL SANITARY RELIEF (SKME-321)
121 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT
A
122 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B
123 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C
124 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT
D
125 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN)
126 HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION
127 HARTLAND TO GOTHLAND SEWER SEPARATION
128 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI
129 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT A
130 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT B
131 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C
132 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015)
133 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015)
134 ISABELLE I/I REDUCTION
135 LANG ROYCE LATERAL SANITARY RELIEF (SKME-320)
136 LEMAY PUBLIC I/I REDUCTION (2015)
137 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
138 LEMAY WWTF PLANT CONTROLS
139 LOWER MERAMEC WATERSHED I/I REMOVAL
140 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292)
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
141 NORTH BADEN CREEK I/I REDUCTION (BP-612)(CANTERBURY DR)
142 OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE
AND OAKLAND AVE)
143 OLDE ENGLISH I/I REMOVAL
144 PAGE TO TRENTON SANITARY RELIEF
145 PROSPECT HILL LANDFILL VERTICAL EXPANSION
146 PROVIDENCE PUBLIC I/I REDUCTION
147 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574)
148 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574)
149 ROCK HILL SANITARY RELIEF (SKME -618)
150 ROXBURY I/I REDUCTION
151 ST MARIE SANITARY RELIEF I/I REDUCTION
152 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM
153 TELEGRAPH ROAD #2928 I/I REDUCTION
154 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST
155 UPPER COLDWATER SECTION D I/I REDUCTION
156 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A
157 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595)
158 WEBSTER ACRES SANITARY SEWER REPLACEMENT
159 WISMER - HUNTINGTON SANITARY RELIEF (SKME -592)
187 ALGONQUIN WOOD DR. #12 STORM SEWER
188 BREEZERIDGE AND FAWNRIDGE STORM SEWER
189 BROOKHURST DRIVE STORM SEWER
190 BROOKTRAIL CT. STORM SEWER
191 CHALET COURT STREAMBANK STABILIZATION
192 CHELSEA AND IDLEWILD STORM SEWER
193 CLERMONT LANE BANK STABILIZATION
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY15
PAGE NUMBER PROJECT NAME
194 CONWAY - CLERBROOK STORM CHANNEL
195 CREEKHAVEN DRIVE STORM IMPROVEMENTS
196 DICKSON STREET #1033 STORM SEWER
197 EASEMENT ACQUISITION FOR COLDWATER CREEK OMCI PROJECTS
198 EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS
199 EASEMENT ACQUISITION FOR GRAVOIS CREEK OMCI PROJECTS
200 EMERGENCY REPAIR FUNDS (STORMWATER)
201 FORCEE LANE STORM SEWER
202 FRONTENAC FOREST STORMWATER IMPROVEMENTS
203 FRONTENAC FOREST TO PORTLAND DRIVE STORM SEWER
204 LACLEDE STATION - CHAMBERLAIN STORM SEWER
205 LAVEN - DEL LN. #1322 - 1323 STORM SEWER
206 PARK LANE #9568 - #9572 STORM SEWER
207 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER
CREEK OMCI
208 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK
OMCI
209 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – SEMINARY
BRANCH OMCI
210 TREGARON PL. TO COUNTRY ESTATES STORM IMPROVEMENTS (FRONTENAC
4-3A)
211 VILLA COUBLAY DR. #11 AND 15 STORM IMPROVEMENTS (FRONTENAC 7-7)
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY16
PAGE NUMBER PROJECT NAME
160 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION
161 BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II
162 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT
163 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
164 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
165 CHANDELLAY DR. SANITARY SEWER REPLACEMENT
166 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
167 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
168 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059)
169 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE I
170 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES
COURT)
171 FF-11 FEE FEE CREEK SANITARY RELIEF
172 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III
173 FORESTWOOD SANITARY RELIEF (SKME-435)
174 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF
175 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V
(SKME -521)
176 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN)
177 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI
178 KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION
179 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
180 LOWER MERAMEC WATERSHED I/I REMOVAL
181 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544)
IMPROVEMENTS
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY16
PAGE NUMBER PROJECT NAME
182 POWELL AVE AND ANNALEE SEWER SEPARATION
183 PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM (FY2013)
184 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM
185 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A
186 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595)
212 GLEN RD #35 BANK STABILIZATION
213 HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1)
214 LAVINIA DR. #10709 STORM SEWER
215 LIGGETT TO BIG BEND CHANNEL REPAIRS
216 MADISON #708 STORM SEWER
217 MANCHESTER & MISSOURI AVENUE PHASE II STORM IMPROVEMENTS
218 MARYHILL DRIVE STORM SEWER
219 ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS.
220 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - WATKINS CREEK
OMCI
14 April 2014
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY15
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Stormwater Construction 25 $6,538,000
Wastewater Construction 68 $181,742,000
Wastewater Engineering 91 $66,548,000
TOTAL:184 $254,828,000
Stormwater Continued 1 $180,000
Wastewater Continued 8 $28,600,000
TOTAL:9 $28,780,000
GRAND TOTAL:193 $283,608,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 10
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 10
analysis of the system, and implement required collection system and wastewater treatment plant
maintenance and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table -top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary stud y is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultant services to perform preliminary studies during periods of heavy workload, or for
large, complex projects such as new treatment plants, upgrades to existing treatment plants,
tunnel projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 10
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, and easement and temporary construction license plats are drafted.
In FY2015, 65 engineering budget items have been or will be procured using the
Watershed Consultant approach, retaining firms for multi-year efforts on a related suite of
projects, in order to increase efficiency, expedite the program and meet Consent Decree
requirements and schedule. Following is a listing of the Watershed Consultant related
engineering projects and associated professional service firms:
Project
Number Project Name Page
Number Budget
Watershed Program Consultant - 11151 - Construction
Management Services - Tank/Treatment/Pump Station
Facilities. Consultant: Kennedy Associates / Architects,
Inc.
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES 17 3,600,000
Watershed Program Consultant - 11152 - Construction
Management Services - Lower and Middle RDP Tunnel
Facilities. Consultant: Shannon & Wilson, Inc.
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES 14 3,000,000
Watershed Program Consultant - 11826 - Construction
Management Services - Lower Meramec and Deer Creek
Tunnels. Consultant: Black & Veatch Corporation
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS 15 1,000,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 10
Watershed Program Design Consultant - 11109 - Lower &
Middle RDP CSO Controls System Improvements.
Consultant: Jacobs Engineering Group, Inc.
11957
JEFFERSON BARRACKS TUNNEL CONSOLIDATION
SEWERS 43 320,000
11818
LEMAY CSO HIGH RATE CLARIFICATION
FACILITY (BROADWAY & LEMAY WWTF) 46 330,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 47 580,000
11819
LMRDP CSO STORAGE TUNNEL NORTH DRIVE
(RDP PARK TO RDP TUBES) 55 2,040,000
11959
LMRDP CSO STORAGE TUNNEL NORTH DRIVE
CONSOLIDATION SEWERS 56 290,000
11820
LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
(BROADWAY TO RDP PARK) 57 1,850,000
11958
LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
CONSOLIDATION SEWERS 58 200,000
11816 LMRDP TUNNEL DEWATERING PUMP STATION 59 1,780,000
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 60 710,000
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR) 62 2,850,000
Watershed Program Design Consultant - 11110 - Deer
Creek Sanitary System Improvements. Consultant: Parsons
Water & Infrastructure, Inc.
11964
CONCORDIA I/I REDUCTION (NE QUADRANT
CLAYTON RD AND BIG BEND BLVD) 13 270,000
10851
CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-
298)/OUTFALL (L-161) 20 750,000
10576
DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION 21 50,000
11851 DEER CREEK PUBLIC I/I REDUCTION (2016) 22 150,000
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 23 1,800,000
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 24 630,000
11731
DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) 25 6,000,000
11713 LADUE ESTATES SANITARY RELIEF 44 70,000
11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-654) 45 700,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 10
11716
LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK 51 1,350,000
12470
LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK 52 130,000
11965
WEST WISE I/I REDUCTION (NW QUADRANT I-64
AND BIG BEND BLVD) 91 800,000
Watershed Program Design Consultant - 11144 - Bissell -
Coldwater - Missouri - Meramec Sanitary System
Improvements. Consultant: AMEC Environment &
Infrastructure, Inc.
12080
ASHBROOK I/I REDUCTION (ASHBROOK DR AND
CHAMBERS RD) 1 530,000
11777
BADEN CREEK EXTENSION (BP-001) (I/I
REDUCTION) 2 650,000
12060
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A 3 60,000
12434
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT D 4 100,000
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 5 1,900,000
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 6 700,000
12102
BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE
AND LAKEVIEW AVE) 7 110,000
12119
CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR) 10 100,000
11723
COLDWATER CREEK WATERSHED I/I REMOVAL -
SHARON STUDY AREA (N LINDBERGH BLVD AND
LINDSAY LN) 11 300,000
11726
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C 12 200,000
12432
CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH 18 120,000
11747
FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES
COURT TO FIESTA CIRCLE) 27 300,000
11774
MISSOURI RIVER SERVICE AREA I/I REDUCTION -
CREVE COEUR CREEK EAST 63 50,000
12222
SUBURBAN I/I REDUCTION (HARRISON DR AND
SUBURBAN AVE) 76 800,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 10
12473
SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE) 77 60,000
12237
TRAMPE I/I REDUCTION (CASTILON AVE AND
TRAMPE AVE) 78 80,000
Watershed Program Design Consultant - 11145 - Lemay
Sanitary System Improvements. Consultant: Burns &
McDonnell Engineering Co. Inc.
11737
FERGUSON SANITARY SEWER (OLIVE TO PAGE)
(DIAMOND PARK) 26 2,230,000
12061 LEMAY PUBLIC I/I REDUCTION (2016) 48 200,000
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 49 3,100,000
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 50 610,000
11989
PARDEE - BLACKTHORN - HOLLY - ARBAN I/I
REDUCTION (WATSON ROAD AND S ROCK HILL
ROAD) 64 350,000
11919
ROLENS DRIVE AND TELEGRAPH ROAD
SANITARY STORAGE 71 230,000
11990
SAPPINGTON CREEK I/I REDUCTION (GRAVOIS
ROAD AND SAPPINGTON ROAD) 72 450,000
11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL 73 380,000
11991
UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY
HILLS AND BEL-NOR) 79 1,100,000
11984
UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09) 80 1,450,000
11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) 81 350,000
11671
UNIVERSITY CITY I/I REDUCTION - EAST (WC-01,
WC-02, & WC-03) 82 950,000
12062
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-01) 83 60,000
12063
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-02 AND WC-03) 84 70,000
12435
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(BEL-NOR) 85 60,000
12436
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(HANLEY HILLS) 86 70,000
12437
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(UR-08 AND UR-09) 87 90,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 10
12438
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(UR-10) 88 50,000
11992
UNIVERSITY CITY SANITARY STORAGE FACILITY
(HAFNER CT) 89 1,300,000
Watershed Program Design Consultant - 11153 - RDP
Tributaries (Deer Creek) Controls System Improvements.
Consultant: to be procured in FY2015.
11746
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL 61 3,600,000
11153
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &
LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT) 68 600,000
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 69 300,000
12440
UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL 90 300,000
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may condemn for easements in
order to ensure that a project is constructed. Any required condemnation proceedings are
performed in full compliance with state and federal law. Some projects may additionally require
specific permitting from other government agencies, such as the Missouri Department of Natural
Resources, prior to bidding.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
8 of 10
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon ordinance passage, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of s ub-district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets. Wastewater projects may also be
funded by various Operation, Maintenance, Construction and Improvement (OMCI) funds,
Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the General Fund, Construction Funds, Special
Funds, the Improvement Fund, or from various Operation, Maintenance, Construction, and
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
9 of 10
Improvement (OMCI) funds. These OMCI funds are established in certain areas of the District,
are supported by property tax collection, and must be spent only within their specific areas of tax
collection.
The sections included in this Budget Supplement document are:
Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of terms.
Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted. Project costs do not include annual
inflation assumptions, which are included in the annual budget.
Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
10 of 10
Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include location maps
and quantities of work to be performed. These maps and quantities are approximate estimates
only, and final location and extent of work may vary depending on final design and/or field
conditions during construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural
properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD
The Federal Consent Decree, entered on April 27, 2012 and all
appendices and all modifications or amendments thereto, between MSD,
United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows from
the Combined and Separate Sewer Systems in order to improve water
quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe by
lining it with a new pipe. This work does not require excavating the pipe
and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system
improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater treatment
facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer
system at a point prior to the headworks of a wastewater treatment
facility.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using infiltration,
such as bioretention and bioswales.
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system, infiltration refers to groundwater
sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can
include defective building laterals, sewer pipes, pipe joints, connections,
or manhole walls.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LMRDP Lower and Middle River Des Peres, generally the river from University
City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the
combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving
stream water quality and the community's financial capability.
GLOSSARY
MAIN A smaller public sewer collecting flows from buildings via lateral
connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote of
the people, with responsibility for wastewater and stormwater services in
St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects or
maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or
CSO.
PRIVATE I/I
REDUCTION
Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to the
sanitary sewer system (inflow) or deteriorated service laterals or broken
connections (infiltration).
PUBLIC I/I
REDUCTION
Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as possible
to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the
metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to
reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER
SYSTEM
The portion of the sewer system designed to convey only sewage, and not
stormwater, from residences, commercial buildings, industrial plants and
institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system
needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of
wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or United
States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement
plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are
necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows
GLOSSARY
under current and projected future conditions as defined in Paragraphs
21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow to
a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is
centrally located within a watershed to which subtrunk and other sewers
are tributary.
USGS United States Geological Survey.
WWTF Wastewater Treatment Facility, Any facility, method or process which
removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces
or renders less obnoxious pollutants or water contaminants from
wastewater before releasing it to the environment.
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12080 ASHBROOK I/I REDUCTION (ASHBROOK DR
AND CHAMBERS RD)
$530,000 1
11777 BADEN CREEK EXTENSION (BP-001) (I/I
REDUCTION)
$650,000 2
12060 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
$60,000 3
12434 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT D
$100,000 4
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$1,900,000 5
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$700,000 6
12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE
AVE AND LAKEVIEW AVE)
$110,000 7
11811 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
$2,000,000 8
11810 CCTV INSPECTION OF SEWERS (2014)$1,000,000 9
12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR)
$100,000 10
11723 COLDWATER CREEK WATERSHED I/I
REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
$300,000 11
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$200,000 12
11964 CONCORDIA I/I REDUCTION (NE QUADRANT
CLAYTON RD AND BIG BEND BLVD)
$270,000 13
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$3,000,000 14
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$1,000,000 15
10324 CONSTRUCTION MANAGEMENT SERVICES -
MISSOURI WWTP SECONDARY EXPANSION &
DISINFECTION
$500,000 16
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$3,600,000 17
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
$120,000 18
11125 CRITICAL INFRASTRUCTURE ASSESSMENT $1,200,000 19
10851 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR
(I-298)/OUTFALL (L-161)
$750,000 20
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE
III AND I/I REDUCTION
$50,000 21
11851 DEER CREEK PUBLIC I/I REDUCTION (2016)$150,000 22
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$1,800,000 23
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$630,000 24
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$6,000,000 25
11737 FERGUSON SANITARY SEWER (OLIVE TO
PAGE) (DIAMOND PARK)
$2,230,000 26
11747 FF-04 QUIET VILLAGE SANITARY RELIEF
(THAMES COURT TO FIESTA CIRCLE)
$300,000 27
11751 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
$250,000 28
11753 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
$50,000 29
11754 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
$50,000 30
12064 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
$50,000 31
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
$500,000 32
11763 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
$50,000 33
11909 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
$50,000 34
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11910 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
$50,000 35
11911 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
$50,000 36
11912 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
$50,000 37
11759 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
$300,000 38
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
$90,000 39
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
$90,000 40
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
$90,000 41
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$1,660,000 42
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$320,000 43
11713 LADUE ESTATES SANITARY RELIEF $70,000 44
11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-
654)
$700,000 45
11818 LEMAY CSO HIGH RATE CLARIFICATION
FACILITY (BROADWAY & LEMAY WWTF)
$330,000 46
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$580,000 47
12061 LEMAY PUBLIC I/I REDUCTION (2016)$200,000 48
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$3,100,000 49
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$610,000 50
11716 LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
$1,350,000 51
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12470 LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK
$130,000 52
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $170,000 53
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $600,000 54
11819 LMRDP CSO STORAGE TUNNEL NORTH DRIVE
(RDP PARK TO RDP TUBES)
$2,040,000 55
11959 LMRDP CSO STORAGE TUNNEL NORTH DRIVE
CONSOLIDATION SEWERS
$290,000 56
11820 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
(BROADWAY TO RDP PARK)
$1,850,000 57
11958 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
CONSOLIDATION SEWERS
$200,000 58
11816 LMRDP TUNNEL DEWATERING PUMP STATION $1,780,000 59
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$710,000 60
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$3,600,000 61
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$2,850,000 62
11774 MISSOURI RIVER SERVICE AREA I/I
REDUCTION - CREVE COEUR CREEK EAST
$50,000 63
11989 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I
REDUCTION (WATSON ROAD AND S HILL
ROCK HILL ROAD)
$350,000 64
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
$709,000 65
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
$200,000 66
11702 RADAR RAINFALL DATA (FY2014)$130,000 67
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 68
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL $300,000 69
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
$100,000 70
11919 ROLENS DRIVE AND TELEGRAPH ROAD
SANITARY STORAGE
$230,000 71
11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS
ROAD AND SAPPINGTON ROAD)
$450,000 72
11667 STERLING PLACE SEPARATE SEWER I/I
REMOVAL
$380,000 73
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$550,000 74
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
$799,000 75
12222 SUBURBAN I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
$800,000 76
12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON
DR AND SUBURBAN AVE)
$60,000 77
12237 TRAMPE I/I REDUCTION (CASTILON AVE AND
TRAMPE AVE)
$80,000 78
11991 UNIVERSITY CITY I/I REDUCTION - EAST
(HANLEY HILLS AND BEL-NOR)
$1,100,000 79
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-
08 AND UR-09)
$1,450,000 80
11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-
10)
$350,000 81
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-
01, WC-02, & WC-03)
$950,000 82
12062 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
$60,000 83
12063 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
$70,000 84
12435 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
$60,000 85
14 April 2014
WASTEWATER ENGINEERING PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12436 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
$70,000 86
12437 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-08 AND UR-09)
$90,000 87
12438 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-10)
$50,000 88
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
$1,300,000 89
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
$300,000 90
11965 WEST WISE I/I REDUCTION (NW QUADRANT I-
64 AND BIG BEND BLVD)
$800,000 91
TOTAL:$66,548,000
§¨¦270
DUKEDUNN
EARLLORDLILACTOELLECOUNTBARONROYALSCENIC
B E L GROVE
COBURGLAND S
VISCOUNTDARRBLISS
VAL
L
E
Y
SHEPLEY
B E R W Y N
K IL G O R E CABOTPRINCEASHBROOK
BURLINGTONNORTHERNSANTAFEHOYT
EWELLQUIE T
VORHOFNECTAR
LANIERDUCHESS
DURNESSPRINCESSJERRIES
RENFREWCASTLEMONARCHBARONESS
DELHICOLLETT
MACKIN
E LBACOMET
CAMBRIAAT T I C A CADIGANMURIEL
RUESTADURHAMHOBKIRKBIRITZ
SUR
RE
Y DOROTHYCRET ESUGARTRAILLEWISLANDING
KELVIN
COBURG
PERSHALL
STIMSONPRIVATEBOSW O RTH
KING
LARIMORE
G O L D E N
F O R KDIAMONDNORTHRIDGEHAVILAND
HAR PERTWILL
IR I S
TAOS
MCCARTNEYBAGNELLL O V E T T
MONTICELLO
BREEZYPOINTNORBRIDGEFOXPATHO D E S S A
HANSOM SHELDONLYDIAMUNICIPALSPARROW
MELVICHCASTLEC ASTLEPRIVATELEWISNCLARKBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12080
11TASK NO:
TASK NAME:
$530,000BUDGET:
FUND:
Bellefontaine NeighborsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 1
ASHBROOK I/I REDUCTION (ASHBROOK DR ANDCHAMBERS RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SEWERS.
CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER. REHABILITATE5,900 FEET OF 8-INCH TO 15-INCH SEWER, AND REMOVE PRIVATE I/ISOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
§¨¦70LUCAS N HUNTLILLIAN COLLEGEJANETHILLSPASAD E N A
EDISON HELENBEGGNELSONOAKW OODMELBAEDGEW OODKENWOOD
THEODORE
EMMA
STRATFORD
JUNE
RAVI N IA
LAWLERLINCOLNBIRCHER
HUNTER FLETCHERRAVENW OODMANOLABEULAHROLAND
PEYTONSAN
DIEG
O
SNOWFLORIAN
C
OUNTR
Y
C
L
UB DAWSON
MARGE
AVONDALECOLONIALJENNINGSSTATIONIDLEWILD
HATZAPRICOTLENA
SALOMEOVERBROOK
FLORENCE
ROXIEALBIAGREENWAY
GARESCHE
IRAOREON
DAIBER
MAT HEWHODIAMONTGROVELAND
GOODFELLOWSTANWOOD
ROHN
OAKRIDGEWOODROW
WINCHESTER
FOREST HILL
ROSLYN
NORMANDY
WILLOW WOOD
SYLVANHAZ
ENHAMILTONHENDERSON DONAL
DWESTFARLEY
KENE
W
A
H
BELAIREONEILLBOLESPINE RIDGE
BRISTOL FAIRVIEWUPSHAWSANTAMONICA
WAR W IC K
WYMANEONABRETONFLINT
SEXTON IRVINGPASADENAPASADE
N
A
LILLIANMELBA
NATURALBRIDGERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11777
11TASK NO:
TASK NAME:
$650,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 2
BADEN CREEK EXTENSION (BP-001) (I/IREDUCTION)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWER, ANDREMOVE CO NSTRUCTED SSO BP-001.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12060
11TASK NO:
TASK NAME:
$60,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 3
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2016) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11777, 11687, AND11723.
§¨¦270
§¨¦70§¨¦170 LINDBERGHRIVERVIEWDRLEWIS N CLARK BLVDL IN D B E R G H
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12434
11TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 4
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT D
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12080, 12102,12119, AND 12237.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11144
16TASK NO:
TASK NAME:
$1,900,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 5
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THEBISSELL, CO LDWATER, MISSOURI AND MERAMEC WATERSHEDS, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11144
16TASK NO:
TASK NAME:
$700,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 6
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THEBISSELL, CO LDWATER, MISSOURI AND MERAMEC WATERSHEDS, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦270
§¨¦270
DUNN
PRIGGE
LILACCRITERIONREDMAN
LAVIDACOALBANK
COVE
RAYMONDREALE MADRIDTRAMPE
P E R S H A L L
JUNE
MALAGA
BAYONNE
QUIE T
FRYBELGROVESPANISH MENDOZAVALENC IA
DORIS LA R E D OFONTAINECORDOVA
CADIGANROSARYBOWERSEDMAR
TWILLMAN PIN T A
MACKIN
PRIVATE
R
O
SADO
FARMVIEW
G ARDENLERIDA
UPHILLP
A
TTERN
MURIEL
CROSSETT
RUESTATALISMAN
PETITE BRIDGEVALEMCQUAY
ZAMORA
HOBATHGERONASURFSIDESAEGER
LARIMOREHALL HOUSEMILDRED
HAR PERTAOSMONTICELLO
FAIRMEADOWS
RO S EVIEWBRIARB R AE
M
OLL
ERUSSENATE
JOSLYNSANR ICARDOMI
MEAUXPENNINGROTH
G A R D E N
PRIVATEROSARYFARMVIEW
PRIVATEPRIGGE
PRIVATE
PRIVA TE
P R IV A T E
PRIVATETRAM PE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12102
11TASK NO:
TASK NAME:
$110,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Spanish LakeWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 7
BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVEAND LAKEVIEW AVE)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11811
16TASK NO:
TASK NAME:
$2,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 8
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS ISNEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANINGAND REPAIRS/IMPROVEMENTS.
PERFO RM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRISVOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BERENEWED THROUGH FY2016 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11810
16TASK NO:
TASK NAME:
$1,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 9
CCTV INSPECTION OF SEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFYPROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS.
PERFO RM AS NEEDED CCTV INSPECTION AND CLEANING OFSEWERS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ONPERFORMANCE.
§¨¦270
§¨¦55
§¨¦270
§¨¦55
MATTIS
AMBST
H
E
I
S
S VONTALGEK
E
N
N
E
R
L
Y
BUTLERHILLSUNSETCAR IBEEGERALD
KEMPF
GREGORY
RUSTYDIERSELIVALMEYERTOWNECENTRE TESCORDGATESBURYPRIVATELEEBUR
GRIFFINCONCORDSCHO
OL
GEMINI
DORSIE
B R U NSTONLANGTREE
FAROVERMILIO N FLORIFUCHSBA U E R
STANHOPE
KERTHFIJIREYNOSA
L
O
N
G
VIEWTEALBYFOULKPATSYEIMESAKURAJAMIELONGSPURJOSSEMUSICYUMA
C
H
A
P
ELHILL
A UDJ I L L
K
A
S
SEBA
U
MLARKINSCHUESSLERREVEREROSSMOORWORTHINGTONFIVEOAKSROANNACAROLYNNE
SUNHILL
ARTHU R
TIOGA
CHA R WICKHURSLEY
MEADO
WFIELD
BASLERAMBUSHLEONARDKRAMPERS
T
GE
MME
OLDE
SILVER
VALLE
YCREST
LODGEWOODHANFORD
BLACKHALLCONCORD
OLD TESSONASHLEYCHRISTOB
L
EPRIVATEKERTHFUCHSTESSON FERRY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12119
11TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 10
CHAPEL HILL I/I REDUCTION (MATTIS RD ANDVENARDE DR)
Design Services
6660 - SanitaryReplacement Fund
INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS IN SOMESEGMENTS O F SEWER.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
LINDSAY
PAULHUMES
KEEVEN
CHARBONIER
ESTES
MULLANPHY
LOEKES
ASPEN
FLORLAND
LILAC
WASHINGTON
FLICKER
RUE ST DENIS
JENKEE
MANRESAKOSTKA
SWALLOW
ST JEANBOULDER
RUTH
MADISON
JEFFERSONBELLARMINE
WREN
FLOR ABLUEBIRD
CAMPIONRYAN
MANORTYSO N
RADFORDLAYVEN
HARRISON FLIGHTNAOMIRUE ST JEANLOVEDEWAYN E
FLORDAWN
ROS E TTADEL REY
LAFAYETTEVERLENE
MERCURYGONZAGACO RTEZSALLYFRANCISCA
CLARKFLAMINGO
LILALO YOLA
BABLER
RAVEN
RUE ST CHARLESST CHARLESRONDAGERALDBORGIA VIOLETCLAVERMONTEREY
MERRITHOMPSON
BLANCHETTEHAMM E S
MILLER
DANIELBOO
N
ETOREROVESPERBRUCE
CARMELITA MCNULTYMESCA
L
E
R
O
MATERDIE
MYRTLE
LINKOUSLA VENTAFLOWERIDGEST FERDINANDLA SIERRAALANDALESAN MATEOJEANETTE
CHERRYDALEHUNDLEY
MENKE
SCOTTYLIMEDALE
ST PIERRESPRINGWOOD PLACEGARNIERT O R EROASPENGERALD
NAOMILIN D B ERGH
LINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11723
11TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 11
COLDWATER CREEK WATERSHED I/I REMOVAL -SHARON STUDY AREA (N LINDBERGH BLVD ANDLINDSAY LN)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060.
§¨¦270§¨¦270
DUNN
FORD
PERSHALL
POLSONNORFOLK
S
O
U
T
H
ERNTAYLOR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
11TASK NO:
TASK NAME:
$200,000BUDGET:
FUND:
HazelwoodMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 12
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT.
$2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION.
§¨¦40
WYDOWN
ETHEL
PRIVATEARUNDEL
HOOVER
ABERDEEN
ALAMO
YALEBOLANDAUDUBONWISERIDGEMOORCLAYTONIAHIGHLANDDE MUNCLAYTON
LILE
ELLENWOOD
BELLEVUEH ILLVALEC E C ILLOVELLAMOORLANDS SHEPLEY
UNIVERSITYBROADVIEWASBURYCENTRALFAUQUIER
RALPHMcCAUSLANDBLENDONPARKOAKKNOLL FORESTALEXA N D E R
SOUTHWOODDARTFORDBRENTMOOR
NORTHWOOD
ST RITAWARNEREDWARD SEMINARY
HARTER
WELLS
SAN BONITA
ROSEBU R YCREST
WOODOAKLAND
C L A V E RACHH A W T H OR N ECONCORDIAHARCOURT
SOUTHMOOR
T U S C ANYFORESTRIDGE
OAKLAND
SAN BONITA
A R U N D EL
PRIVATE DEMUNPRIVATEETHEL
WISE
PRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11964
11TASK NO:
TASK NAME:
$270,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 13
CONCORDIA I/I REDUCTION (NE QUADRANTCLAYTON RD AND BIG BEND BLVD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 435 FEET OF 8-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
§¨¦55
§¨¦70
§¨¦44
§¨¦40
§¨¦170
§¨¦255
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11152
16TASK NO:
TASK NAME:
$3,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 14
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLERDP AREAS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11826
16TASK NO:
TASK NAME:
$1,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 15
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNELSYSTEM AND UPPER RDP TUNNEL SYSTEM.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
PRI
VAT
EPRI
VAT
EP R IV A T E
P
RI
V
AT
E§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10324
14TASK NO:
TASK NAME:
$500,000BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Missouri River Tributary AreasWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 16
CONSTRUCTION MANAGEMENT SERVICES -MISSOURI WWTP SECONDARY EXPANSION &DISINFECTION
ConstructionManagement ServicesDuring Construction
6660 - SanitaryReplacement Fund
MISSOURI WASTEWATER TREATMENT PLANTS NEED TO BEUPGRADED WITH EXPANDED SECONDARY TREATMENT ANDDISINFECTION FACILITIES, PER EPA AND MDNR MANDATES.
MANAGEMENT AND COORDINATION OF THE CONSTRUCTION AT THEMISSOURI TREATMENT PLANT RELATED TO EXPANDED SECONDARYTREATMENT AND DISINFECTION.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11151
16TASK NO:
TASK NAME:
$3,600,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 17
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CO NSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OROTHER FACILITIES.
PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTSTHROUGHOUT THE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦40
§¨¦270
§¨¦40
§¨¦270
LADUE
CLAYTONMASON
BALLASWOODSMILLNO R T H F ORTYW
EI
DMANROSSS O U T H FORTY EMERSONSOUTH OUTERFORTY TEMP
O
FALAISES
CHUL
T
E
MOSLEYOAKAMBOIS
BABLERB OPPRUHLFOR E S T C R E S T
G LEN COVE
STUDT
TAMMANYPRIVA T E CRAIGCRAIG V I E W
DRYRIDGEBRIDLEWALLIN G
G RAYNIMES
MASON MANOR
POST OAK
M
AGNA
C
A
R
T
A
ELZEY
CR
O
S
STRAILS
KR
O
P
P
K I N G S G L E N
DUBON ACTIVEBOXFORD
PRIORY CLIONBARNBRIDGEARAMISYVESLADU E FARM
TUREEN
TUCKERROYAL MAN O RKRAM RENEEHEWLETTREVEREHI
BLERPRIVATE MASONPRIV
ATEPRIVATEP R IV A T E
OLIVEBLVD
SMO141HWY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12432
11TASK NO:
TASK NAME:
$120,000BUDGET:
FUND:
VariousMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Creve Coeur CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 18
CREVE COEUR CREEK PUBLIC I/I REDUCTIONSOUTH
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12135.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11125
16TASK NO:
TASK NAME:
$1,200,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 19
CRITICAL INFRASTRUCTURE ASSESSMENT
Vendor Services
1101 - General Fund
INVESTIG ATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFO RM SERVICES SUCH AS PROJECT INSPECTION,RECO NNAISSANCE, INSPECTION PRIORITIZATION, PROJECT SET-UP,FIELD VERIFICATION, MAP UPDATES, WORK ORDER MANAGEMENT,AND POST INSPECTION REVIEW.
THIS PRO JECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
ODAYOLD WARSON MCKNIGHTLITHIA
HUDSONGILBERT LITZSINGER
MCKINLEYMADISONROCK HILLKORTWRIGHTELDRIDGEDESPERESE NNISROCKMANPARK
ROCKFORDR ID GELINEMANI
T
OUBL
OS
S
OMT
AV
AL
ONSTANLEY
LEONARDPLAINFIELDREMINGTONTHORNT O NMONIERF
AI
RDAL
E
OVERBROOK
MUECK ALMENTOR
BAHIASALEMHILLSNORTH
B E R R Y
DUNWOODYWILD D E E R
W ARSONCHARLEVILLES U T T O N
C O P P E R HILL
RARITAN
D
U
N
KIR
K
BROWNBERTCHARLANEOAK LEAFB A RCIA
LONE OAK
S A N TAFEGREENWOODTWINBROOK C
R
E
V
E C
O
E
U
R
HARDITH HILLBLUESTONEDES PERESROCK HILLMADISON ROCK HILLBER
R
YR
A
RIT
A
N
M A N C H ESTER R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10851
11TASK NO:
TASK NAME:
$750,000BUDGET:
FUND:
Rock HillMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 20
CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR(I-298)/OUTFALL (L-161)
Design Services
6660 - SanitaryReplacement Fund
IMPL EMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROLPLAN TO ADDRESS COMBINED SEWER OVERFLOWS IS REQUIRED.
CONSTRUCT 2,300 OF 8-INCH TO 18-INCH SANITARY SEWER, ANDREMOVE INTERCEPTOR I-298 AND CSO OVERFLOW L-160. REMOVEPRIVATE INFLOW AND INFILTRATION.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
LADUE SPOEDEGRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE
ROND E L A Y
F I E S T A
SONAAL D E N
BALHARBO
URLARKINOFFIC
E
TU R E ENFAIRWAYSDAYKINOLD BALLASDEAVERT R I E S T E
RENEELEISURE
OLDOLIV E STREET
ALLE GROO LDE C A B I N
BENWOOD
MARFORDSHERWYNTRILANE
COUNTRY FAIRMOR WOODNASS AULAWREN C E
SPOEDE HILLS
Q U A I L W A Y S
MOSLEY HILL
MOSLEY ACRES
SPOEDE WOODS
W
O
O
D
S
H
I
RECOLONIAL HILLSMOSLEY FOREST MIDDLEBROOK
CHALET
N
O
B
L
E
M
A
N
BARBEEFARON HILL
G R A E S O N
WEDGEWOOD
C
R
A
I
G
PRIVATE
CRAIG OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10576
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 21
DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING SANITARY BYPASSES.
CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH SEWERS, REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS, AND REMOVE SSOBP-627 AND SSO BP-607.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11850. THIS PROJECTINCLUDES CONSTRUCTION OF CHALET CT. STREAMBANKSTABILIZATION, 11191.
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270 §¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11851
11TASK NO:
TASK NAME:
$150,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 22
DEER CREEK PUBLIC I/I REDUCTION (2016)
Design Services
6660 - SanitaryReplacement Fund
INFL OW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 29,600 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11964, 10851,11965, 11713 , AND 11714.
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11110
16TASK NO:
TASK NAME:
$1,800,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 23
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEKWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11110
16TASK NO:
TASK NAME:
$630,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 24
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEKWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦40
§¨¦170
DALEMETROLINK
CLAYTON
MCKNIGHTPINELAY
ELMU NIONPACIFICFOLK
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEBRENTWOODKIRKHAMPERNODHANLEYDAVIS
ETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHA
EULALIE
GLENFYLERCLAYTONIA
LEE
ARUNDEL
EUCLID
SWAN
PARK
LITHIA
P ACIFICFOREST
ABERDEEN
LOUISDELNORTEPLATEAU
W I L L IA M S
ALAMO
HIGHSCHOOLMARDEL
HANCOCKMCCUTCHEONWISE
ARSENALFLORA
GO
R
E SALEMAUDUBONHICKS
WRENWOOD
ST CLAIRMARYBRUNO
FAIRVI EW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANALICIA
ROCK HILLE A G E R
R O S E
FLORENCE
MARTINIOXFO R D
GODW IN
BREMERTONC O M M ONWEALTHMOORLANDSY ORKBACON LYLEDESPERESANNA
WAYMIRE SOUTHWALTERB RYA N
MAPLEFRANCISANNALEEPR IVATECIRCLEA R L I N G T O N
COLLINSGREELEY ECOFFKUHLMAN
ARBOR PORTERHORNER
WARNER
B E R R Y RICHERTHATTONSAN BONITA
OAKLAND
GLENMARYELM
UNIONPACIF I C
OXFORDYORK
EAGER
FORESTWISE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11731
11TASK NO:
TASK NAME:
$6,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 25
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES,PUMPING STATIONS AND SEWERS AS PART OF AN OVERALLWATERSHED PLAN FOR SANITARY RELIEF.
THIS IS A SUPPLEMENTAL APPROPRIATION FOR THE PROJECTFORMERLY NAMED DC-02 DEER CREEK SANITARY RELIEF STORAGETANK.
PAGE
ETZEL
TERMINAL
VERNONPURDUE FERGUSONJULIAN
PENNSYLVANIASUTTERTULANE METRO LINKCANTON
BARTMER
CO R N E L L
ROBBIN S
PARTRIDGESTA N F O R D
DARTMOUTH
PRIVATEHANLEYQUENDOPLYMOUTH
YALEKINGSLANDWATTSBALSON
DORSET
SPENCER
CHAMBERLAIN
LY N N
MEYERMILAN
COLGATE
MELROSE ROBERTS
WALDRONRAYMOND
66THMALLARD
NIXONCATES
AMHERSTWILSONFARIS GREGANU
R
S
U
L
ABACKER WHITNEY
SUBURBAN
NORTHBELRUEROTH
LELANDLEROYAHERN
WESTGATEGEORGETRENTON
W A Y N E
COLBYCORBITT JO S E P H
DOVE RBRADFORDCRESTVERLDREXEL
HAZELWOOD
BUCKNERRUDDY
PURCELLJACKSONAVALON70THSCHOFIELDIONA
CABANNE
ARCADIA
HAYSCOLUMBIA WOODRUFFMAPLEMILFORDMIDLAND ACMES PA R TA
ARDEE
PRIVATE
PRIVATE PRIVA TE
DARTMOUTH
MALLARD
COLBY66THKINGSLANDPRIVATE
PRIVATE
PRIVATE
PLYMOUTH
MELROSE
B
E
L
R
U
E
OLIVEBLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11737
11TASK NO:
TASK NAME:
$2,230,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 26
FERGUSON SANITARY SEWER (OLIVE TO PAGE)(DIAMOND PARK)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED MAINS, SANITARY OVERFLOWS, AND BUILDINGBACKUPS.
CONSTRUCT 6,500 FEET OF 30-INCH TO 42-INCH SANITARY SEWER.
S
C
H
U
L
T
E PEM
F I E S TABARDOTMOMARTETRIESTE
LEISUREPAMDAYKINDEMALLEVILLAGEMONCOEUR
N IE H A U SCRAIG VIEW
M EADOW LAKELAUDERSUNVALLEYQU IETRIVIER A
B O N JO U R
OAKBA R K
M O O R L A N D M ANO
R
B
A
L
H
A
R
B
O
U
R THAMESC
R
I
M
S
O
N
SUMMER H AVENB
A
R
K
M
A
N
M
I
R
A
N
D
Y
BAVARIANMONACCO
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11747
11TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 27
FF-04 QUIET VILLAGE SANITARY RELIEF (THAMESCOURT TO FIESTA CIRCLE)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,160 FEET OF 12-INCH TO 15-INCH SANITARY SEWER,AND REMOVE CONSTRUCTED SSO BP-086.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11751
14TASK NO:
TASK NAME:
$250,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 28
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (FY2014)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN CO NSTRUCTION MANAGEMENT CONSULTANT FOR ASNEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11753
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 29
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT A
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11754
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 30
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT B
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12064
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 31
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT C
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11755
11TASK NO:
TASK NAME:
$500,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 32
GENERAL SERVICES AGREEMENT - PLANNING(FY2014)
General Services -Design CIRP Funds
1101 - General Fund
WITH THE ELIMINATION OF THE WATERSHED PLANNING CONSULTANT,PLANNING NEEDS TO SUPPORT THE CAPITAL PROGRAM EXCEED THECAPACITY OF INTERNAL STAFF.
RETAIN FIRM FOR AS NEEDED PLANNING SERVICES. SERVICES MAYBE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11763
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 33
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT A
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11909
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 34
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT B
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11910
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 35
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT C
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11911
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 36
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT D
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11912
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 37
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT E
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11759
11TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 38
GENERAL SERVICES AGREEMENT - SEWER &PROCESS DESIGN (FY2014)
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT THAT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2015 BASEDON PERFO RMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11779
11TASK NO:
TASK NAME:
$90,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 39
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11780
11TASK NO:
TASK NAME:
$90,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 40
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11781
11TASK NO:
TASK NAME:
$90,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 41
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦255
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERKINSWOOD GREGGREAVIS
B
A
R
R
ACKSFORDER CCCGRANTLIND TELFOR D
HOFFM
E
I
S
T
E
R
ARLEE
MILDS
HERMANGENTRYIONE
FAIN PRIVATEJOPLINCLIFFR IN G E R
SHE R ID A NPAULE
POTTLE
ORIENT
RIPA
LUNAPOPLAR
G A R K
WILL LARKCLAGEROUTE R
VICTORY
MOUNT OLIVE
BOUNDARYHORN
JEFFERSONIAN
HAL S EYFIRSTPECAN
A
S
HROCK
JACINTO
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALLEN
LISIE
U
X KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR D§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11711
11TASK NO:
TASK NAME:
$1,660,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 42
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Design Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
§¨¦255
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERK
INSWOODUNION GREGGREAVIS
B
A
R
R
ACKSFORDER CCCGRANTMILDLIND TELFOR D
ARLEE
S
HERMANGENTR YFAIN
POTTLE
HOFF
M
EIS
T
E
R PRIVATEJOPLINR IN G E R CLIFFIO NESHE R ID A NWACHTELRIPA
WILL
POPLAR
G A R KLARK
CLAGEROUTE R
VICTORY AVENUE HBOUNDARYJEFFERSONIAN
HAL S EYFIRSTPECAN
A
S
HROCK
JACINTO
SOUTHSHIRE
ARRAS
WEISS
J
E
FFERSON
ELLEN
BANISTERALLEN
DUMONT
LISIE
U
X
CLEVES
KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR D§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11957
11TASK NO:
TASK NAME:
$320,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 43
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Design Services
6660 - SanitaryReplacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THEMARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOW TO THENEW JEFFERSON BARRACKS TUNNEL.
LADUE
MOSLEYGRAESERELZEY
EUGENIABROOKTR A ILMULLIGANST PAUL
TOWNSENDLADUE ESTATESBECKERNEW SALEMRICHARDSON VILLACOUBL A YPLANTATION §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11713
11TASK NO:
TASK NAME:
$70,000BUDGET:
FUND:
Creve CoeurMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 44
LADUE ESTATES SANITARY RELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
§¨¦40 §¨¦40 WARSONLADUE
C L AY T O NDIELMANSPOEDEGRAESEROLDBO N H O M M E
ENGEL
BARNESDAUTELS
CHUL
T
E
G R A N DV IEWCELLAKENTHILLTOPPRIVATET E A L W O O D ME
S
A
BEAVER
STACY PRICEBRAEBU
R
N RIO VISTAS T A N D REWSLOG CABINC L E R M O N TGUELBRETH GRAYBRIDGESTONEYSIDERONDELAYSONA
CONWAYOAKLEIGHALDE N
BROOK
TRAIL
SPRINGWOOD
ARTHUR P I CARDYDONOHO
INDIAN
TUREEN
HIGHDOWNTUCKERL ADUEESTATESWHITEBRIDGE
ANZEIGER ARBORLITTLE
BELL
MANSFIELD
OLD OLIVE STREET
LISARENEEALLEGRO
LYLEWOOD
H A S T IN G S
SHERWYN
APACHE
ELBRINGDWYERVILLAMAGNET
L A D E L
CAPITOL
C OU N T R YV IE W
LOCUST
D O G W O O D
L Y N N B R O O K
VILLA
PRI
VATEPRICECLAYTON
OLIVE BLVD
NLINDBERGHBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11714
11TASK NO:
TASK NAME:
$700,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 45
LADUE SUBTRUNK SANITARY RELIEF (SKME-654)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,250 FEET OF STORM SEWER AND REMOVE PRIVATE I/ISOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
UNION PACIFICHORN
P
RIV
A
T
E
WEISS
KAYSER
RUBYH
O
F
F
M
EIS
T
E
R
WALLER
PRIVATEUNION PACIFICPRIVA T E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11818
11TASK NO:
TASK NAME:
$330,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 46
LEMAY CSO HIGH RATE CLARIFICATIONFACILITY (BROADWAY & LEMAY WWTF)
Design Services
6660 - SanitaryReplacement Fund
IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS.
CONSTRUCT 100 MGD ENHANCED HIGH RATE CLARIFICATIONFACILITY W ITH DISINFECTION.
PRIVATEUNION PACIFICHORN
H
O
F
F
M
EIS
T
E
R
VELMA
WEISS
ETTA
HOLDENRUBY PERRINUNION PACIFICPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11817
11TASK NO:
TASK NAME:
$580,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 47
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Design Services
6660 - SanitaryReplacement Fund
JEFFERSO N BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMPSTATION (P-3 03), MARTIGNEY PUMP STATION (P-306), AND JEFFERSONBARRACKS PUMP STATION (P-305).
§¨¦55
§¨¦44
§¨¦270
§¨¦255
§¨¦270
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12061
11TASK NO:
TASK NAME:
$200,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 48
LEMAY PUBLIC I/I REDUCTION (2016)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 52,100 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11990, 11989, AND11667.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11145
16TASK NO:
TASK NAME:
$3,100,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 49
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES NEEDING CORRECTION.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAYWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11145
16TASK NO:
TASK NAME:
$610,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 50
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES NEEDING CORRECTION.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAYWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦170
§¨¦40
§¨¦170
§¨¦40 HANLEYDALE
DELMAR
FORSYTH
CLAYTON
M ET R O L IN KBRENTWOOD
LAYPINE FORESTP A R K
MCKNIGHTWYDOWN
FOLK
KINGSBURYGAY
MARYLAND
YALEBEMISTONBELLEVUEPERSHING
DAVIS
ETHEL
WHITE LACLEDESTATIONBOLANDLAWN
EULALIE
C O R NELL
PURDUEBREDELLLADUE
LAFON
ARUNDEL
WASHINGTON
F
RANCI
S
SWAN
PAR K
ZEPHYRSUTTON
PLATEAU
WISE
ABERDEEN
TEASDALE
TOPTONDELNORTEALAMO
GANNON
MCCUTCHEONTHROOP
ASBURYLOUWENGARNERAUDUBONB
U
C
K
HICKS
WRENWOOD
MARYW E L LS
ST CLAIRW I L L IA M S GLADES
UN IO N P A C IFICHIGH SCHOOLHOYTJEROME
OXFORD
POLO
H
U
N
T
ERELLENWOOD
ALICIA
LINDELL
E A G E R
R O S E
CATES
Y ORKBARBY
P R IV A T E
McCAUSLANDSNOW
SHEPLEY
SOUTHKRAFTSONORA
CAMBRIDGE
FAUQUIER
A R L I N G T O NRALPH HEMANWATERMAN
SOUTHWOOD
BLENDONDARTFORDLITZSINGER
GALLERIA DONNEHORNER
WARNEREDGEWOOD OAKLANDLADUEMANOR
ENRIGHT
EAGER
MARYLAND
PERSHING
PRIVATE
ALAMO
PRIVATEMET
ROL
I
N
K
KRAFTT E A S D ALE
WISE
YORK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11716
11TASK NO:
TASK NAME:
$1,350,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 51
LEMAY WATERSHED I/I REMOVAL - NORTHHAMPTON CREEK
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12470.
§¨¦40
§¨¦170
§¨¦40 §¨¦170
DALE
METROLINK
FORSYTH
CLAY TO N
WISEBRENTWOODFORESTPARKWYDOWN
PINE
MARYLAND
BRUNO BELLEVUEPERSHING
DAVIS
ETHELWE
N
N
E
K
E
R
BOLANDLADUE
LAWN
KINGSBURY
YORK
CLAYTONIAMERAMECHOOVER
F
R
ANCI
S
SWAN GAYPAR K
LINDENBEMISTONHANLEYYALEMCCUTCHEONASBURYLACLEDESTATIONCENTRALDE MUNAUDUBONTOPTON
B
U
C
K
PRIVATE
HICKSWRENWOOD
OXFORD
P
OLO
HUNTERURBAN
ALICIA RUPERT
LILE
ELINOR
LINDELL
E A G E R
ALAMO
R O S E
WILLI A M SHILLV
A
LEC E C IL
WATERMAN
UNIVERSITY
MOORLANDSMORITZ
PARKDALE
SNOW
SHEPLEY
WESTMORELAND
LINDBER G HSOUTH
HIGHOLETAEDGEWOODLEEPLATEAUSTRASSNERBENNETTCOLLINSRALPHPOINTEROAKKNOLLDARTFORDREAR
GALLERIA
MITCHELLGARDEN
WARNER
DELTAEDWARDSANBONITA
ORLANDO
BRIDGEPORTSUDBURY ALABAMALYLEWALINCA SILVERTONROBINFORESTROSSIOAKLAND
THRUSHWATERMAN
ALICIA
PRIVATE
YALEMARYLAND
PRIVATE
UNIVERSITY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12470
11TASK NO:
TASK NAME:
$130,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 52
LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTHHAMPTON CREEK
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS ACROSS THE SERVICE AREA.
REHABILITATE 49,600 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11716.
UNION PACIFICPRIVAT EH
O
F
F
M
EIS
T
E
R
WEISS
VELMA
ETTA
PERRINHOLDEN
HORN
RUBYP
RIV
A
T
E UNION PACIFICUNION PACIFICP
R
IV
A
T
E
P
R
I
V
A
T
E
VELMA§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
11TASK NO:
TASK NAME:
$170,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Lemay CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 53
LEMAY WWTP SECONDARY IMPROVEMENTS
Miscellaneous Services
6660 - SanitaryReplacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210MGD IS REQUIRED BY CONSENT DECREE.
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
UNION PACIFICPRIVAT EH
O
F
F
M
EIS
T
E
R
WEISS
VELMA
ETTA
PERRINHOLDEN
HORN
RUBYP
RIV
A
T
E UNION PACIFICUNION PACIFICP
R
IV
A
T
E
P
R
I
V
A
T
E
VELMA§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
11TASK NO:
TASK NAME:
$600,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Lemay CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 54
LEMAY WWTP SECONDARY IMPROVEMENTS
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210MGD IS REQUIRED BY CONSENT DECREE.
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
§¨¦44 FYLER
ARSENAL
U N IONPACIFIC
HAMPTONPERNOD
SHAW
MARDEL
M
E
TROLINK
BATESSUBLETTEWEILBRANNONMORGAN FORDHANLEYWATSONDELOR
ITASKAWALSH
LANSDOWNE BENTCOLUMBIA
RHODESMACK LINDHOLL
Y
HILLS
NOTT I NGHAM
FOLK
ELLENWOOD
BECK
ROSANEOSHO
WINONAREG ALCHRISTYYALERI
VERDESP
ERE
S
GO
E
T
HEOAK HILLSOUTH W E S TMcCAUSLANDLACLEDESTATIONMCCAUSLANDODELL
SCANLAN
THOLOZAN
BLOWMACKENZIEDA
L
E
MCREE
MURDOCH
FINKMAN
BANCROFT
RAYTAFT
V I S T A
PARKER ALFREDTOWER GROVEDEWEYLAWNBRADLEY
LLOYD
MIAMI
MAGNOLIAVANDEVENTER
SUTTONGUSTINEBU R L IN G T O N N O R T H E R N S ANTA FE
CLIFTONPOTOMAC
WANDAMERAMEC
JUNIATA
SMILEY
SCHILLER
ROBERT
ZEPHYR
TAMMGRESHAM
OLEATHA
W I L L I A M S
DOVERADKINSMARSHALL
3RD
GARNER
F L O R A
DEVONSHIRE
S U T HERLAND
J
A
MIESONWIL
LMORE
BRUNO
GLADES
BINGHAM
JEROME
LILLYM A NHATTANIVANHOEHANCOCKBARTOLDELINOR
WEST SOUTH59TH
PRIVATE HEREFORDESTHERGANNETT
REBERLYLE
ASHBURY
WALLACE
ANNA KRAFTHAZELLENOX
WESTWILSON
CECIL
DUGAN
WINNEBAGO
KINSEYWABASHECOFFPORTERPLATEAU
HELMLENOXMAGNOLIA
WALSH
BECK
DALE
DELOR
RHODES
BRUNO
WATSONRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11819
11TASK NO:
TASK NAME:
$2,040,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 55
LMRDP CSO STORAGE TUNNEL NORTH DRIVE(RDP PARK TO RDP TUBES)
Design Services
6660 - SanitaryReplacement Fund
IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS.
CONSTRUCT NORTHERN PORTION OF THE DEEP STORAGE TUNNELSYSTEM IN THE LEMAY WATERSHED.
§¨¦44
DALE
FYLER
ARSENAL
U N I O N P A C I F I C
PERNODMET
R
O
LINK
MARDELHANLEY SUBLETTEWEIL
BRANNONWATSONDELOR ITASKAWALSH MORGAN FORDMACKLINDLANSDOWNE BENTCOLUMBIA
RHODES
WEST PARK
BATESLACLEDESTATIONSHAW
NOTTINGHAM
FOLK
ELLENWOOD
BECK
ROSA
NEOSHO
WINONAREGAL
MIL
E
NT
Z
WISE
YALEOAK HILLSOUTH W E S TMcCAUSLANDMCCAUSLANDODELL
SCANLAN TAMMCHRI
STYTOWER GROVETHOLOZAN
S W A N
ARCO
RIV
E
RDESPERE
SMCREE
MURDOCH
FINKMAN
BANCROFT
RAYTAFT
PARKER ALFREDTUXEDO
DONOVANBRADLEY
MIAMI
H U N T
BREDELLMACKENZIESUTTONCLIFTONMAGNOLIAVANDEVENTE RPOTOMAC
WANDAWILCOX
SMILEY
SCHILLER
ZEPHYR
MARSHALL
GRESHAM
MARQUETTE
JUNIATA
OLEATHA
ULENAW I L L I A MS
BERTHOLD
LORAN
GARNER
FLOR AS U T HERLAND
HICKS
WIL
LMORE
BRUNO
GLADES
DAHLI
AJEROME
LILLYNAGE LMANHATTANIVANHOEHANCOCKBARTOLD WEST SOUTH
SPRINGKIN
G
S59THPRIVATESPROULE HEREFORDBINGHAMESTHERREBERLYLE
WALLACE
VILLA
ANNA
HAZELLENOX EASTCUTTERSI
GEL
JONES
WINNEBAGO HALFWABASHECOFFLEONAPORTERBISCHOFF
DELORWALSHLENOXTAFT RAYBECK
BRUNO
TAMMWATS O NRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11959
11TASK NO:
TASK NAME:
$290,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 56
LMRDP CSO STORAGE TUNNEL NORTH DRIVECONSOLIDATION SEWERS
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES ISREQUIRED BY CONSENT DECREE.
CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THENORTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM.
§¨¦55 UNIONBATES
MACKENZIEDELOR
GERMANIA
MORGAN FORDTAFT
MINNESOTAVIRGINIAPENNSYLVANIADAVIS
RHODES
RIVE
R
DES
PERESHAMPTON
WACHTELIDAHOBAYLESS
MILENT
Z
ZEISSROS
A
H
A
LE
SEIBERT LOUISIANAALASKAWALSH
MOTT
DOVER
PARDELLABLOW
I O NEWEBE
R
FINKMAN
HOLLY HILLS
WILMINGTON
REAVISBARRAC
K
S
FANNIEELTONKAMMERER SHARPIRON
ARLEE MILITARYCHRISTYBURGEN
FIELDGENTRYMATHILDAPRIVATERADIOMARCEAU
BOWENHAVENQUINCY
MOHEGAN
STAELY
OSCEOLA
CLIFTON37THJOPLINAL
M
A
ITASKA
KAYSCHILLER
ROBERT
RIPA
HEIDELBERG
RADIOMKIT EUGENEGRANDEILER
GRESHAM
LUCIAWATERVASELFORMAN
BELLERIVE
UNIONPACIFICGENESTAACORNALABAMAHOFFME I S T E R REILLYJ
A
MIESONWIL
LMORE
MOUNT OLIVE
ETTA
CIRCLEVIEW
ALTHEAPRIMM
AVENUE HSPOKANECATALAN
JEFFLEIGHHORNLEONAPILOT
ZENITHPECANELWOOD
HANNOVER
REGINARAYNAVAJOEHEEGE
SOUTHERN
COLVIN
CECIL
JOELSTEINS
BLUE RIDGEEIFFEL
MALUS
T
E
S
S
O
N
P A V IA HELMRUNYONAVABLOW
VIRGINIAGRANDGRANDRIPA ALASKAWEBER
LEMAYFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11820
11TASK NO:
TASK NAME:
$1,850,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 57
LMRDP CSO STORAGE TUNNEL SOUTH DRIVE(BROADWAY TO RDP PARK)
Design Services
6660 - SanitaryReplacement Fund
IMPL EMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED.
CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNELSYSTEM FO R THE LEMAY WATERSHED.
§¨¦55
§¨¦55 UNIONBATES
MORGAN FORDGERMANIA
WALSH
DAVIS
RHODES
HAMPTONRIVE
R
D
ES
PERES
U NIO N P A C IFIC
ROSA
BAYLESS
MILE
NTZGOE
T
H
E
H
ALEJANUARYSEIBERT
VIRGINIAMINNESOTADEWEYCHRISTYDELOR
BLOW
IDAHOWEBER
HOLLYHILLS
ZEISSMACKENZIERAYFANNIEMACKLINDELTONKAMMERER SHARPIRON
FIELDMATHILDARADIOMARCEAU
BOWEN
CARONDELETCLIFTONHAVEN
Q
UIN
C
Y
MOHEGAN
WILMINGTONWANDA
PARDELLALANGLEY
AL
M
A
WILCOX
PRIVATE
KAY GUSTINESCHILLER
HORN
STAELY
ROBERT
RADIOMKIT EUGENEGRANDPAULE ULENALUCIADOVER
WATEREICH E L B E R GER
VASELFORMANGENESTAACORNALABAMALOUIS
REILLYJ
A
MIESON
SPRINGTIBER
L E M ONA
UPTON
SUNSHINEWI
L
L
MORE
CIRCLEVIEW
PRIMMADKINS
IONEFEDERER
CATALAN
FRENCHLEONA
PILOTKIN
G
S
HA
M
BUR
G
ELGINS A V IO
AVENUEHDANANEIERALASKAHEEGE
KAYSERSTOLLEPHILOTYROLEAN
HEALY
COLVINJOEL STEINS
HILDESHEIMRUTHWEBER TRAILTESSON
ARVIN
CISCORANDALL
KINSEY
TIFFANYBREUERMENOLAHELMFILLMORE
FRIEDA
NELLIEORIENTRADOMROSALOUIS
WALSH
GRANDLEONAREILLYDANARAYWANDAWANDAVA
SEL BLOWGRAVOIS RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11958
11TASK NO:
TASK NAME:
$200,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 58
LMRDP CSO STORAGE TUNNEL SOUTH DRIVECONSOLIDATION SEWERS
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES ISREQUIRED BY CONSENT DECREE.
CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THESOUTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM.
HORN
P
RIV
A
T
E
UNION PACIFICWEISS
KAYSER
CATALAN
WALLER
P
R
I
V
A
T
E
WALLER
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11816
11TASK NO:
TASK NAME:
$1,780,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 59
LMRDP TUNNEL DEWATERING PUMP STATION
Design Services
6660 - SanitaryReplacement Fund
IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS.
CONSTRUCT PUMP STATION TO PUMP STORED COMBINEDSEWERAGE TO LEMAY TREATMENT PLANT.
§¨¦55
§¨¦70
§¨¦44
§¨¦40
§¨¦170
§¨¦255
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11109
16TASK NO:
TASK NAME:
$710,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 60
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLERIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY.
DESIGN O F 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦55 KERTHMATTIS
WELLSKELLERMERAMEC BO T T O M AMBSKENNER
L
Y
T
H
EI
SSEAST
CONCORD
AL
L
E
N
GR AV O IS
ALSWELLSC H U E S SLERMENTZHILL
RI N G ERB A UERB U T L E R HIL L
GREENTONP O I N T E
CARIBEEHAWKINSGERALD
KE
M
PF
HAGEMANNOLSENGREGORY
DIERSPRIVATE
RI VERCURVE VALMEYERWIL
L
O
WBE A C H TESCORDMAN G OWAT
S
ON
GATESBURY
DANTONAIREGRIFFINA C O RNRAHNING LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYRENULSENFER N BEACHED LOUCLAYRIDGESTARLITSAKURA
FERRYLARKINLITTLEROCKTIOGA
COYLE
TOWNE SO UTHPRIVATEB A U E R
HAWKINSA M B S
PRI V ATEPRIVAT E
T E S S ONFERRYRDLEMAYFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11746
11TASK NO:
TASK NAME:
$3,600,000BUDGET:
FUND:
VariousMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Meramec Tributary AreasWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 61
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Design Services
6660 - SanitaryReplacement Fund
FENTO N WW TF IS AN INTERIM FACILITY AND REMOVAL IS PART OFTHE REGIONAL LOWER MERAMEC FACILITY PLAN.
CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THEFENTON WW TF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT ATTHE LO WER MERAMEC WWTF.
HALLELIAS
FONTAINE
MELVINNEWBYHARLAN
LEBON
MARIAS
JORDANWALDORFO R ANGUSTAVDONNELL
LOWELLNASSAU
CHAIN OF ROCKS
JENNINGSSTATION
RAFORD
G
A
S
T JACKSONHOPEDALETROYFILIBERTDUENKE RIV ER RUNRIVER TRAIL
P O R T L A N D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11656
11TASK NO:
TASK NAME:
$2,850,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 62
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Design Services
6660 - SanitaryReplacement Fund
CONTRO L OF COMBINED SEWER OVERFLOWS.
CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATEDPUMP STATION, AND SEWERS.
§¨¦270
§¨¦270
P A G E
FEE FEEROSSTEMPOMASONSCHUETZS
C
H
U
L
T
E
B O RMANWE S T P ORT
MER R I C K
BAS S T O N
STUDT CRAIGCRAIG VIEW
M
A
R
KAIRE
Q
UE
S
TOVERL A C K L A N D
HYANNISVIL L A D O R A D O
TIMBERRUNMOSLEYVILL A H IL L ACTIVEC H IE F T A IN
EMERSONF
IESTABARDOTWHISPERINGPINESCONCOURSECRAIGSHIREFLAIRGREENWALK
BALHARBO
U
R
G RINNELLD E C O R A H
NE W BALLASD
E
C
KERPRIVATE
NORTHWINDS
DAYKIN
NIMES KRAMCOEU
R
D
EVI
LLEWIL LOWYCKMASON MANOR
M A T EUS
LANDOLAKESOLDBALLASN IE H A U S
MACKINACSTARSPUR
K
I
N
G
C
AREYPAPILLONACCENTDEVINE
FERN RIDGESPRUCE H A V E N
PARKCENTE R
SUMMERHAVEN
GAIETE
L Y R IC CONGRESSIONALFAHRPARK
COHASSETARDWICK
LIGHTHOUSEDANTEROSS P A G E
C
R
AIG
OLIVE BLVD
EMO3 6 4 H W YWMO
364HWY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11774
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Creve Coeur CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 63
MISSOURI RIVER SERVICE AREA I/I REDUCTION -CREVE COEUR CREEK EAST
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE PIPEMETHOD.
PARDEEROCKHILL EDGARCHESHIREARBANTULIP
GRANT
O L D W A TSON SELMAOAK TREE
ELMVAUK HO LLYROSE
WELLSSUN
R
AY
T U R FLI N UM
L O DGEPOLEDRAYTONBELTONS
A
NDER
S
SOUTHSIDE
LANVALEHEATHER3R
D PINETREE4T
H CENTRALVOLZROCK FORESTFLAMINGOCULVERHILLRALE IG H
WHITEHA V E N
DOBB INWEXFORDBULL RUNGENERAL GRANTPRIVAT E
BRACKENCONOVERGE N E R A L S H ERIDANBRIDLECOFFEY
B
R
O
O
K
VIE
WR
IDGEWOOD
ST GEORGE
G R A N B U R YGRANTPARKR E A V I SB
ERRYVIO LET
RONALDMISSYFIRWOOD BURNTOAKF
O
U
R
NIE
RCLOVER
WHITECLIFFPARK
CAMELLIA
WORTHING
V I L L A W O O DGENERA L M E A D EHA
RBORG
IR
A
R
D
SHOPPERSM
A
D
EI
R
A PRIVATELANVALEGRANT
ROSE
PINETREETULIP
PRIVATEPRIVATE
PRIVATEPRIVA T EGR
A
N
T ELMPRIVATEW A T S O N R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11989
11TASK NO:
TASK NAME:
$350,000BUDGET:
FUND:
CrestwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 64
PARDEE - BLACKTHORN - HOLLY - ARBAN I/IREDUCTION (WATSON ROAD AND S HILL ROCKHILL ROAD)
Design Services
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCESREDUCE THE CAPACITY OF THE SYSTEM.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11699
16TASK NO:
TASK NAME:
$709,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 65
PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013
Professional Services
1101 - General Fund
PRIVATE SO URCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS.
PUBLIC ENGAGEMENT PROGRAM FOR OUTREACH REGARDINGREMOVAL OF PRIVATE STORMWATER SOURCES, THE CONSENTDECREE, & OTHER WET WEATHER RELATED COMMUNICATIONS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11701
11TASK NO:
TASK NAME:
$200,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 66
PUMP STATION REPLACEMENT PROJECTS (PHASEI)
Design Services
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION.
REPLACE PUMP STATIONS P-708 (EARTH CITY UPS), AND P-702(EARTH CITY EXPRESSWAY).
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11702
16TASK NO:
TASK NAME:
$130,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 67
RADAR RAINFALL DATA (FY2014)
Vendor Services
1101 - General Fund
PIPE FLO WS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTSARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEMMODELS.
INTEG RATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFL OW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2016BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255§¨¦44
§¨¦40 §¨¦270
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11153
16TASK NO:
TASK NAME:
$600,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 68
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJORWASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREEREQUIREMENTS.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦40
§¨¦44
§¨¦170
§¨¦40 §¨¦170
M A N C H ESTER R D
WATSONRDS LINDBERGH BLVDCHIPPE W A B LVD
N KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12441
11TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 69
RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON,AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTINGWATER QUALITY.
CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL,DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TOPROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS.
CLAYTON RI
DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA
ALAMO
BROOKLINE
PRIVATECRESTWOOD
RALPHOAKLAND
C L A VERACHCONCORDIAHARCOURT
EDWARDCLAYTONIAMOORLANDSSOUTHMOOR
SEMINARY
T U S CANYARUNDEL
COMMODOREFORESTRIDGE
PRIVATEHI
LLVALEPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10390
11TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 70
RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574)
Design Services
6660 - SanitaryReplacement Fund
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM.
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I.
IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK.
C A T H EDRAL
KINGS PARK
ROLENS
POTTLE
ASHFIELDIRONDALE
V O R T E X
FORDER
ASHROCK
BURNCOATE
PRIVATE
V I C T R O N PEGASUSC HATFIELD
F IR E L IGHTBLOOMFIELDMEAD O W F O R D
R O S Y
A S H FORDM
A
R
TYRIDGE
S T A L L A R D
FLAME GLOWTHICKETEL PAULOWOLFGANGGRAYLANDSHADY OAKPINEDALEFIRELIGHT
TELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11919
11TASK NO:
TASK NAME:
$230,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 71
ROLENS DRIVE AND TELEGRAPH ROAD SANITARYSTORAGE
Design Services
6660 - SanitaryReplacement Fund
REMOVAL REQUIRED OF SSO BP-222 AND SSO BP-516.
CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE,AND 220 FEET OF 8-INCH TO 10-INCH SANITARY SEWER.
§¨¦270
§¨¦270
EDDIE N PARK
SAPPINGTONGARBER
W A T S O N
BAPTIST CHURCHDENNY
GRANT
LITTIE
HILLTO
PP R IV A TEPARDEEGEYERROXANNAMANDAVAUK
CRESTOAKBUXTONLAVINIAREDOAK
R O BYNEMILHADLEY HILLRUSDO
N
VARGAS
DANDRIDGEEWERSTWILIGHTHELTA
L A RKSPUR
LINCOLN
MAPLELAVANT
LINCORDF A W N H AV E N
CONCORDG OLF CREST
PICKWICKCIN N A B A R
KAPPBRIARSTONE
CONCORD V IL LA G EMEAT HDEVESG
LE
N
W
O
O
D
TEALRIDGE
C R A I GWOO D
CHARRETTE
STOLZ
R I C H V IE W
L O WILL
FO
X
GLEND O VERH I L L
VALD A M E R E
TIOGA
J
O
A
N GENELMUGANSUNSETBETHSKY CRESTGLENROSE
LARKRIDGE
PINE SPRAY
S P I T ZRICHTER
REBECCAEGGELINGCAMBROOKTRENTMORE
PRIVATEPRIVATEGRAVOIS RDSLINDBERGH
BL
V
D
T E S S O NFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11990
11TASK NO:
TASK NAME:
$450,000BUDGET:
FUND:
Sunset HillsMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 72
SAPPINGTON CREEK I/I REDUCTION (GRAVOISROAD AND SAPPINGTON ROAD)
Design Services
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCESREDUCE THE CAPACITY OF THE EXISTING SYSTEM.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061.
MACKENZIEWEBER
I
VYRADIOHALEKITLUCIAFORMANVITA
VA
SEL
TIBERL EMONAALTHEA MOHEGAN
N E M O
NIL
E
S
REAVIS BRENDAMAXWELL
ERIEPORTRAMBLERMATHI
LDADANACOR A L PILOTNEIERASTERE
V
A
NDALE
S T E R L IN G PHILODARLOW
AVILATALBOT PAPOOSESPRINGUPLAND
A L L E Y
PANCHO MONTBROOKANCHORBRINKERL
Y
DEL
L
ARVIN
PRIVATEL A V E R N
HEIM
CISCOELGINDAISY
ARROW
HOWERTOND
A
R
L
E
N
E
BLACKHAWK
CAYUGA
BREUERATW
OOD WAYNEP A V IA ELSADA M S O NALPINE
BIXBY
CHARLTONFRANCIS
WARRIORROSEMARYWILMAPALMETTONIGER
SHUFFLEKATHLEENZANEOVERTONHARMONYDEXTER
PAULINE
WAGER
RAYWOOD
HENLINLABETTELENARD
S
W
IF
T
O
N
AMONA
HALLOCK
DON RON
CITADEL
JESSESTELLAMAC
MOCCASINIRENE
FLAGLERLEONA FLORESD A N A
WEBER
DANAARVIN
FORMAN
ALPINEBRENDA PI
LOTS T E R L IN G
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11667
11TASK NO:
TASK NAME:
$380,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 73
STERLING PLACE SEPARATE SEWER I/I REMOVAL
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061 AND PROJECT11927.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10766
16TASK NO:
TASK NAME:
$550,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
UnallocatedPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 74
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN STORMWATERRAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FORWATER QUANTITY & QUALITY EVALUATION OF STREAMS.
CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM INCONJUNCTION WITH WATERSHED AND STORMWATER PLANNING ANDDESIGN EFFORTS.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11916
16TASK NO:
TASK NAME:
$799,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 75
STREAM FLOW WATER QUALITY SAMPLING (FY2014)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, &STORMWATER MANAGEMENT PROGRAMS.
PERFO RM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN THE MSD SERVICE AREA. SERVICES MAY BE RENEWEDTHROUGH FY2016 BASED ON PERFORMANCE.
§¨¦170
§¨¦70
§¨¦70HANLEY JANUARY
NORFOLK SOUTHERNMABLE5TH
HARVEYELIZABETHFAYS U B U R B A N
BERMUDAD A R S TGARFIELD
HANCOCKCARSON
4TH
3RD DAYBARATP A U LDADE1ST
W IE G E LEVERGREENCLARKPOWELLWABASHGEORGIA L E E
TI F F I N
ZOE
R O B E R T
WOODSTOCK
WESLEY
HILLPLAZA
HALEYMONROER U G G L E S
OLYMPIA
AMESGRAFJEFFERSON
EN IDE V A N S
SCUDDER THURSTONBROTHERTON
C H U R C H
KINGHILLSH A L P I N
WARING
SCOTT FORDC A S T R O
HAWKESBURYMUELLER
BRAN D B L A N D I N G
ELKAN
PACKA R DJO
AVERILLHERNCLAYBEHLEA IR PO R TR O YA L
PAYNELARKIN
EATONSTLO
UISWITTJONESMARIE HARTNETTTESTONL O U IS AGARDNERSPRING
SPRING D A LEMI
LLMANALINE
CADILLAC
HUGO BALLMANB L U E BERRY
FERMOHARRISON
D A R T M O O RMARGUERITEWULFFOAK MEADOWCRES
TELMDAL
EHENQUIN
GRO
V
E
CARDIG A N
WYLINPRIVATE
T H A T C H E RSMITH
A D A M S
EDDY
ELSIE
STANZA
SCUDDER DADESCOTT
HERNR O YA L
TIFFIN
ROBERT
5TH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12222
11TASK NO:
TASK NAME:
$800,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 76
SUBURBAN I/I REDUCTION (HARRISON DR ANDSUBURBAN AVE)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS ANDCONSTRUCT 360 FEET OF 12-INCH STORM SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12473.
§¨¦170
§¨¦70
§¨¦70HANLEY JANUARY
NORFOLK SOUTHERNMABLE5TH
HARVEYELIZABETHFAYS U B U R B A N
BERMUDAD A R S TGARFIELD
HANCOCKCARSON
4TH
3RD DAYBARATP A U LDADE1ST
W IE G E LEVERGREENCLARKPOWELLWABASHGEORGIA L E E
TI F F I N
ZOE
R O B E R T
WOODSTOCK
WESLEY
HILLPLAZA
HALEYMONROER U G G L E S
OLYMPIA
AMESGRAFJEFFERSON
EN IDE V A N S
SCUDDER THURSTONBROTHERTON
C H U R C H
KINGHILLSH A L P I N
WARING
SCOTT FORDC A S T R O
HAWKESBURYMUELLER
BRAN D B L A N D I N G
ELKAN
PACKA R DJO
AVERILLHERNCLAYBEHLEA IR PO R TR O YA L
PAYNELARKIN
EATONSTLO
UISWITTJONESMARIE HARTNETTTESTONL O U IS AGARDNERSPRING
SPRING D A LEMI
LLMANALINE
CADILLAC
HUGO BALLMANB L U E BERRY
FERMOHARRISON
D A R T M O O RMARGUERITEWULFFOAK MEADOWCRES
TELMDAL
EHENQUIN
GRO
V
E
CARDIG A N
WYLINPRIVATE
T H A T C H E RSMITH
A D A M S
EDDY
ELSIE
STANZA
SCUDDER DADESCOTT
HERNR O YA L
TIFFIN
ROBERT
5TH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12473
11TASK NO:
TASK NAME:
$60,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 77
SUBURBAN PUBLIC I/I REDUCTION (HARRISON DRAND SUBURBAN AVE)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12222.
LAVIDACRITERIONMADRIDTRAMPE
MALAGA
COVE SPANISHMENDOZAJUNE
MAPLE VALENCIAREALE
LAREDORAYMOND CORDOV
A
REDMAN
RIO
LERIDA
BURLINGTON NORTHERN SANTA FEWALKERPINTABRIDGEVALE JARDINZAMORA
GERONA
BARCELONANORTHDALE
SAEGER
FARMVIEW
LAKEVIEW ARAG O N
R IOGRANDEECKERTCABRILLO
PR I V ATE
SORIA
COLUMBUS
PELOTACASTILONDELREOBURGOS MURCIA
MURCIA
GERONA
REDMAN
TRAM PELAKEVIEW
LAREDO
COVE
FARMVIEW
TRAMPE
REALE PRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12237
11TASK NO:
TASK NAME:
$80,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Spanish LakeWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 78
TRAMPE I/I REDUCTION (CASTILON AVE ANDTRAMPE AVE)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
§¨¦170
§¨¦70
PAGEHANLEYTERMINAL
ETZELMETRO LINKBROWNDELMAR
C A N T O NNORTH N SOUTHLUCASNHUNTKIENLENL A C K LA N D
FERGUSONPURDUEPENNSYLVANIAWALTON82NDARGYLE
MYRONWEST
MAPLE
GROBY
TULANE
RIDGE
SUTTERE
ASTCABANNE
EDISON
BARTMERMCKIBBONW
O
ODSONMCKNIGHTHILLSCATES
SHAFTESBURY81ST LOTUS
LYNN
MARKET
CORNELL
LILLIAN
WELLSWHEATON
KINGSLANDWINDOM
RAFTGOODALEPARTRIDGEYALENELSONENDICOTTSTANFORD MELBACOLONIALWAYNE
JULIAN70TH
TEMPLERAVINIA
DERBYQUENDO
GANNON LAWLERAHERN
RAMONA
LAMBAUGUSTA
LYNDHURSTPLYMOUTH
FOREST AUDRAIN
LENOX
WILSONPRIVATENOLAALBIN
ELMORE
MADISO
NBRISTOWEADS 67TH69THORLANDOVERNON MANOLAROLANDGLEN ECHO
MEYERLEADALE
MILAN
WELLINGTON TEALGULFLINK
WAGNER
66THSTELLANIXONEDMUNDVI
NI
TAERICKSYLVANBALSON GREGANMARILLAC
FAIRVIEWMARCELLA
LEROYASHLANDLULUDAVID JANE
COLBYOXEYE
RABEALBEYBRADFORDWOODROW
HAFNERPURCELLPOLKLOYD
ELCOHAYSEASTWELLSPRIVATEOLIVEBLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11991
11TASK NO:
TASK NAME:
$1,100,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 79
UNIVERSITY CITY I/I REDUCTION - EAST (HANLEYHILLS AND BEL-NOR)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATIONREDUCING CAPACITY OF EXISTING SEWER SYSTEM.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12435 AND 12436.
§¨¦170
§¨¦170
PAGE
DELMAR HANLEYCANTON
TERMINAL
82NDWOODSONRIDGE
NORTH N SOUTHGROBY
CORNELL
MIRIAM
MCKNIGHTU N I O N P A C I F I C
OLD B
O
N
H
O
MME81STLYNNWALTON
SHAFTESBURY
LAFON WARDERLE PEREPRICETEASDALE
WAYNE
HILLTOPMONROE
GANNON
AHERN LAMB78THWILSONB
RADDOCK
A
L
E
R
T
ELMORE
DREXELGRANTBROWN
BERICKRICHARDBELT WAY
BURNSTITUS
S
H
E
RID
A
N
GAYMENDELLMILAN
AMHERST GULFBLOOM
BARBYENFIELDPICKERINGBON AIREPRIVATELINK
BALSON
SPOON FAIRVIEWWELLINGTON
H A R N E Y
LITTLE
BELL
CARLETON
TULANE
GARFIELD
BON HILLS RABEFULLERTONPENNELL
GEOFFRYHAFNERHOW
BUCHANAN
WASHINGTON
MELROSEELBRING
DUKEDELCRESTRYE LAUGHLINR ID D L E
CRIXDALE
VILLA
IROQUOIS CRYSTALREAR
STANFORDELKINGTONSAXONYWATSONIA
LOCUST B L A N C H A
PARAMOUNT
ANNAERI
THVILLA
PRI
VATEGAYWAYNEPRICEHARNEYPAGE
BALSON
P
R
I
V
A
T
E
PRIVATE
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11984
11TASK NO:
TASK NAME:
$1,450,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 80
UNIVERSITY CITY I/I REDUCTION - EAST (UR-08AND UR-09)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12437.
§¨¦170
§¨¦170
PAGEHANLEY
CANTONWOODSONTERMINAL
LACKLAND
BROWNNORTH N SOUTHBURNS82NDWALTONG R OBYPURDUE81STLYNN
RIDGE
U N I O N P A CIFIC RAFTGOODALEMONR
O
E
ECHO
WAYNE
HILLTOPQUENDOAHERN LAMB78THPRICE
BLOO
MGAEBLERNOLAALBIN
LIBERTY MALLARD
B
RADDOCK
A
L
E
R
T
WATTSELMORE GILROSEWENGLERGRANTBRISTOWEADS
RICHARDBELT WAYMCKNIGHTTITUS
S
H
E
RID
A
N
UT
ICASENECA
MENDELLMEYERMILAN
WELLINGTONGULFMARLOWE NIXONWILSO NVINITAADDIEPICKER I NGMINERVA
PRIVATECARSONMILTONLINK
FARISR A C I N E
ELLERTON
FAIRVIEWALLEN
DELPO RTH A R N E Y ASHLANDWINFIELD
CARLETONOAKLANDBRASSIE
MERIDIAN
RABEFULLERTONPENNELL
BRADFORDHAFNERHOW
MELROSE
TODDY
SHELLBARK
VILLA
IROQUOISLEONDALE ACKERMANREAR
MILLET
TABER
LOCUST
PARK
NOEL
B L A N C H A
PUTTERM
O
N
AERITHKALENWALTON WAYNEBURNSLIBERTY
PRICEMELROSE
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11983
11TASK NO:
TASK NAME:
$350,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 81
UNIVERSITY CITY I/I REDUCTION - EAST (UR-10)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12438.
§¨¦70§¨¦170
PAGE
TERMINALHANLEY
DELMAR
ETZEL GOODFELLOWUNIONMETRO LINKRIDGE WELLSBE LTNORTH N SOUTHKIENLENMINERVA
C A N TON LUCASNHUNTFERGUSONPURDUEPENNSYLVANIAST LOUIS
ARLINGTONLILLIAN
MYRON
WABADA
BARTMER BURDCLARAHELENTULANELACKLAND SUTTERCATES
E
ASTCLEMENS
EDISON
SHAFTESBURY
PAS
A
DE
NALYNN
MARKET HAMILTONWESTWALTONCORNELL
AMHERST BEGGWHEATONKINGSLANDRAFTGREER
PARTRIDGEENRIGHT NELSONHILLSOAKWOODHODIAMONTWARDERDARBYMELBAEDGEWOODCOLONIALSNOW
TEASDALE
WAYNE
JULIAN70THDERBYQUENDO
G A NNON
AHERN LAMBAUGUSTA
LYNDHURSTRAYMOND
LOTUS
AUDRAIN
LENOX
WILSONPRIVATENOLAALBIN
MAPLE
MADISONBRISTOW
ROMAINE PEYTONEADS
69THVER N O NMANOLA BEULAH
ROLANDELWARD
TRINITYLELANDMEYERLEADALE
MILAN
WELLINGTON TEAL
DAWSON
GULFWAGNERNIXONVINITAVAL LEBALSON GREGANMARILLAC
FAIRVIEWLEROYCOLBYBRADFORDA
R
D
SLEY
WOODROW
ARDENPURCELLPATTONELCOWALES
HAYSSALOMA
BELTWESTRIDGE
PRIVATECATES MAPLE
CATES
MAPLE
VERNON HAMILTONEASTOLIVEBLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11671
11TASK NO:
TASK NAME:
$950,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 82
UNIVERSITY CITY I/I REDUCTION - EAST (WC-01,WC-02, & WC-03)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦40
§¨¦170
§¨¦170
DELMAR
TERMINAL METRO LINKETZEL
FORSYTHDIELMANLADUEMETROLINK
F O R E S TPAR K
LAYWISE
C A N T O NWOO
D
S
ONVERNON
PAGE
FERGUSONWELLS
MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL
OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE
MARYLAND
ECHO
UNIO N P A C I F I C
G R O BYO L D B O N H O M ME
LAGOON
TULANE SUTTERCATES
EDISON
GO V E R N M ENTMAPLE
TRESCOTT
DAVIS
SHAFTESBURY
ETHEL
W
E
NNE
K
E
R 81STMARKET
YALEHANLEYYORK
ST LOUIS
CORNELL
BARTMER
PERSHING
LAFON
TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT
MONR
O
E
STANFORD
MEEKS
P
R
I
CETEASDALE
WAYNE
JULIANHILLTOPENGEL70TH
ALAMO
DERBYQUENDO
AHERN
THROOP
ZYKAN
MCCUTCHEONBLOOM
ALBIN
LIBER T Y
RIDGEMOORELMORE
PRIVATE
KINGSBURYHU
NTERBRAEB
U
R
N RIOVISTAEADS LEADALE
MILAN TEA LC E C ILGULFBARBY
FLORA
VALLEDROM
A
R
A
INDIAN FARISBA L SON
NORTH
LITTLE
BOLANDGARFIELD
POLKTERRYVILLA
PERSHING
PRICEK I N G SBURY
PAGE
MAPLEHANLEYJULIAN
ETHEL
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12062
11TASK NO:
TASK NAME:
$60,000BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 83
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-01)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 41,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
§¨¦40
§¨¦170
§¨¦170
DELMAR
TERMINAL METRO LINKETZEL
FORSYTHDIELMANLADUEMETROLINK
F O R E S TPAR K
LAYWISE
C A N T O NWOO
D
S
ONVERNON
PAGE
FERGUSONWELLS
MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL
OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE
MARYLAND
ECHO
UNIO N P A C I F I C
G R O BYO L D B O N H O M ME
LAGOON
TULANE SUTTERCATES
EDISON
GO V E R N M ENTMAPLE
TRESCOTT
DAVIS
SHAFTESBURY
ETHEL
W
E
NNE
K
E
R 81STMARKET
YALEHANLEYYORK
ST LOUIS
CORNELL
BARTMER
PERSHING
LAFON
TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT
MONR
O
E
STANFORD
MEEKS
P
R
I
CETEASDALE
WAYNE
JULIANHILLTOPENGEL70TH
ALAMO
DERBYQUENDO
AHERN
THROOP
ZYKAN
MCCUTCHEONBLOOM
ALBIN
LIBER T Y
RIDGEMOORELMORE
PRIVATE
KINGSBURYHU
NTERBRAEB
U
R
N RIOVISTAEADS LEADALE
MILAN TEA LC E C ILGULFBARBY
FLORA
VALLEDROM
A
R
A
INDIAN FARISBA L SON
NORTH
LITTLE
BOLANDGARFIELD
POLKTERRYVILLA
PERSHING
PRICEK I N G SBURY
PAGE
MAPLEHANLEYJULIAN
ETHEL
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12063
11TASK NO:
TASK NAME:
$70,000BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 84
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-02 AND WC-03)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 66,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
§¨¦170
§¨¦70
§¨¦170
HANLEYMETRO LINKWESTLA C K LA NDE
ASTHILLSLUCASNHUNTBERMUDAMARKETNORTH N SOUTHPRIVATEWHEATONWALTONENDICOTTMONROEPAGE
RAMONA
ROLANDAUGUSTA
LYNDHURSTAUDRAIN
BLOO
M LINCOLNNOLA SHIRLEYNORTH
ALBIN
HUME
A
L
E
R
TBRISTOWANN
EADSKINCAID CLER
GLENEC H O
GE I G E R
LEADALEBELLE RIVEL I N KMALINEARDELIA
MYRONEDGARCONNORLUCASSARGENTRIDGEVIEW
M
A
YBELLEKENDALE
UNDERHILL
MARILLAC
SANDIEGO
FERGUSONMARCELLA
ALLEN
SALERNOEVAR
T
S
WINFIELD
PARK
TR
U
M
BELL
JANE
H ORATIO MONITEAUELAINE
GREENDALE
STILLWATERNORDICLOYD
SHELLBARK
M A R ILA C
HARRYSST MARYSTABER WALKERRENZ
CORYBERGAMOT ARCOLAG A R D E N
WASHINGTON
PR I V A TEPRIVATEEASTCLER WEST
METRO LINKSTCHARLESROCKRD
NATURALBRID
GE
RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12435
11TASK NO:
TASK NAME:
$60,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 85
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(BEL-NOR)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 44,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11991.
PAGEHANLEYTERMINALNORTH N SOUTHLYNN RAFTMONROE
BLOOM
LAMBPENNSYLVANIALIBERTY MALLARD
ALERT
MADISON
TITUS
UTICAMILAN
TEAL
EADS
QUENDOD U S K YVINI
T
AUNDERHILL
R ACI N E
ELLERTONFLORA
PURDUEWINFIELD LEADALE
TRENTON FALCONW A Y NE HAYWO
OD
FARISPRIVATE
BALFOUR
JACKSONSTILLWATERRUDDYCOLFAXJEFFERSONRAVEN
BRADFORDDRIFTWAYNIXONFAIRHAM HARRISONLYNDALERABECORY
BAINBRIDGEEA
STMONTA
L
L
E
N
GREEN LARCHPENFIELDELTORA
MADISON
TRENTON
BLOOM
MILANVINITAUNDERHILL
MALLARD
WAYNEHARRISON §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12436
11TASK NO:
TASK NAME:
$70,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 86
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(HANLEY HILLS)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 50,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11991.
§¨¦40
§¨¦170
§¨¦170
DELMAR
TERMINAL METRO LINKETZEL
FORSYTHDIELMANLADUEMETROLINK
F O R E S TPAR K
LAYWISE
C A N T O NWOO
D
S
ONVERNON
PAGE
FERGUSONWELLS
MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL
OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE
MARYLAND
ECHO
UNIO N P A C I F I C
G R O BYO L D B O N H O M ME
LAGOON
TULANE SUTTERCATES
EDISON
GO V E R N M ENTMAPLE
TRESCOTT
DAVIS
SHAFTESBURY
ETHEL
W
E
NNE
K
E
R 81STMARKET
YALEHANLEYYORK
ST LOUIS
CORNELL
BARTMER
PERSHING
LAFON
TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT
MONR
O
E
STANFORD
MEEKS
P
R
I
CETEASDALE
WAYNE
JULIANHILLTOPENGEL70TH
ALAMO
DERBYQUENDO
AHERN
THROOP
ZYKAN
MCCUTCHEONBLOOM
ALBIN
LIBER T Y
RIDGEMOORELMORE
PRIVATE
KINGSBURYHU
NTERBRAEB
U
R
N RIOVISTAEADS LEADALE
MILAN TEA LC E C ILGULFBARBY
FLORA
VALLEDROM
A
R
A
INDIAN FARISBA L SON
NORTH
LITTLE
BOLANDGARFIELD
POLKTERRYVILLA
PERSHING
PRICEK I N G SBURY
PAGE
MAPLEHANLEYJULIAN
ETHEL
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12437
11TASK NO:
TASK NAME:
$90,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 87
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-08 AND UR-09)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11984.
§¨¦40
§¨¦170
§¨¦170
DELMAR
TERMINAL METRO LINKETZEL
FORSYTHDIELMANLADUEMETROLINK
F O R E S TPAR K
LAYWISE
C A N T O NWOO
D
S
ONVERNON
PAGE
FERGUSONWELLS
MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL
OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE
MARYLAND
ECHO
UNIO N P A C I F I C
G R O BYO L D B O N H O M ME
LAGOON
TULANE SUTTERCATES
EDISON
GO V E R N M ENTMAPLE
TRESCOTT
DAVIS
SHAFTESBURY
ETHEL
W
E
NNE
K
E
R 81STMARKET
YALEHANLEYYORK
ST LOUIS
CORNELL
BARTMER
PERSHING
LAFON
TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT
MONR
O
E
STANFORD
MEEKS
P
R
I
CETEASDALE
WAYNE
JULIANHILLTOPENGEL70TH
ALAMO
DERBYQUENDO
AHERN
THROOP
ZYKAN
MCCUTCHEONBLOOM
ALBIN
LIBER T Y
RIDGEMOORELMORE
PRIVATE
KINGSBURYHU
NTERBRAEB
U
R
N RIOVISTAEADS LEADALE
MILAN TEA LC E C ILGULFBARBY
FLORA
VALLEDROM
A
R
A
INDIAN FARISBA L SON
NORTH
LITTLE
BOLANDGARFIELD
POLKTERRYVILLA
PERSHING
PRICEK I N G SBURY
PAGE
MAPLEHANLEYJULIAN
ETHEL
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12438
11TASK NO:
TASK NAME:
$50,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 88
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-10)
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11983.
82NDCANTON
GRANT81STBRADDOCK
WESTOVERHAFNERARCHER
APPLETON
ELMORE
RICHARD
ORCHARD
GLENSIDEMENDELLVAUGHANCOOLIDGE
BLA N C H ALAUGHLINLAUGHRENVARDAMAN BRIAR
MALIBOU
BRADDOCK
MENDELLOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11992
11TASK NO:
TASK NAME:
$1,300,000BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 89
UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT)
Pre-Design Services
6660 - SanitaryReplacement Fund
SANITARY STORAGE IS NECESSARY IN UNIVERSITY CITY WATERSHEDFOR FLO W ALLOCATION TO THE LEMAY TREATMENT FACILITY DURINGWET WEATHER EVENTS.
CONSTRUCT 6.5 MILLION GALLON UNDERGROUND STORAGEFACILITY.
§¨¦40
§¨¦170
§¨¦170
PAGE
DELMAR
TERMINAL METRO LINKFORESTPARK
ETZEL
FORSYTHMETROLINK
LAYCA N T O N
LINDELL
OAKLAND KIENLENGOODFELLOWWOO
D
S
ONMCKNIGHTFERGUSONBRENTWOODWYDOWNPURDU EPENNSYLVANIA82NDMYRON
MARYLAND
W ELLS
G R O BYBURNSG RANDBROWNLADUECLARALAGOON
TULANE SUTTERCATES
RIDGE
EDISON
GO V E R N M ENTDAVIS
UNIONSHAFTESBURY
ETHEL
HANLEYW
E
NNE
K
E
R 81STO L D B O N HOMME
MARKET
WATERMANYALE
YORK
CORNELL
TERRY
ROSEDALELAFON
CLAYT O N KINGSLANDTRINITYARUNDELRAFT
BOLANDPARK
PARTRIDGEENRIGHT
MONR
O
E
STANFORD
STLOUIS
P
R
I
CETEASDALE
WAYNE
JULIANHILLTOP70TH
ALAMO
DERBYQUENDO
AHERN
MCCUTCHEONLENOX
BLOOM
ALBIN
LIBER T Y
MAPLE
RIDGEMOORELMORE THEODOSIA
BELTHUNTERWABADA
RIOVISTAEADS
67TH69THK I N G SBURY
LEADALE
MILAN TEA LC E C ILGULF 66THMOUNT
BARBY EDMUNDVALLEDROM
A
R
A
HORTONHA MILTONFARISR E A R
LITTLE
VETTER
WISE
GARFIELD
NINAPOLKVILLA
ETHELPRICE WELLS UNIONBURNSHANLEYOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12440
11TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 90
UPPER RDP (UNIVERSITY CITY) CSO STORAGETUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES ANDUNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATERQUALITY.
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL,DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TOPROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS.
§¨¦40§¨¦40
DALE
WISE
CLAYTON
BOLANDYORK
CLAYTONIAPA R K
ETHEL
HOOVER
LILE
LOVELLAMO ORLANDSCROMWELL
ARCHBENNETTRALPHLACLEDESTATIONCENT
E
R
SOUTHOAKKNOLLHILLSIDEARTHUR RI
DGEMOORBROADVIEWWARNER
GISSLERAUDUBON EDWARDHARTERSURREY HILLSHILL V ALESOMERSET
HIGHLANDCRESTWOODMURPHYBROOKLINE
PRIVATEOAKLAND
C L A VERACHWOODLANDT U S CANYCOMMODOREARGUSWISE
WARNER
WOODLAND§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11965
11TASK NO:
TASK NAME:
$800,000BUDGET:
FUND:
Richmond HeightsMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 91
WEST WISE I/I REDUCTION (NW QUADRANT I-64AND BIG BEND BLVD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 960 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
14 April 2014
WASTEWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
$5,000,000 92
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
$15,000,000 93
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
$5,500,000 94
11853 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT A
$4,680,000 95
11854 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT B
$4,920,000 96
11857 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT C
$3,810,000 97
11871 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
$5,000,000 98
11924 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT E
$4,130,000 99
11925 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT F
$4,490,000 100
11926 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
$5,000,000 101
11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
$1,460,000 102
11686 BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
$235,000 103
11689 BLACK CREEK I/I REDUCTION $5,700,000 104
11788 CAULKS CREEK PUMP STATION B FORCE
MAIN
$3,100,000 105
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-
561)
$380,000 106
11809 COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
$2,800,000 107
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$2,000,000 108
14 April 2014
WASTEWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10557 COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
$670,000 109
11730 CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
$2,500,000 110
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 111
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE
III AND I/I REDUCTION
$1,500,000 112
11850 DEER CREEK PUBLIC I/I REDUCTION (2015)$5,000,000 113
11734 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - LAND ACQUISITION
$6,000,000 114
11735 DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
$400,000 115
11743 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
$3,500,000 116
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)$250,000 117
11079 FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
$110,000 118
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION & I/I
REDUCTION
$420,000 119
10440 FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
$1,600,000 120
11758 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
$65,000 121
12379 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
$65,000 122
12380 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
$65,000 123
12381 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
$65,000 124
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
$2,700,000 125
14 April 2014
WASTEWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10642 HARMONY-ACORN SEWER SEPARATION AND
I/I REDUCTION
$3,400,000 126
10330 HARTLAND TO GOTHLAND SEWER
SEPARATION
$1,360,000 127
10656 INFRASTRUCTURE REPAIR #087P CAULKS
CREEK A (P-750) PHASE VI
$3,800,000 128
11708 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT A
$5,000,000 129
11866 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT B
$5,000,000 130
11867 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT C
$5,000,000 131
11773 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
$1,500,000 132
11773 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
$5,500,000 133
11710 ISABELLE I/I REDUCTION $100,000 134
11715 LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
$1,400,000 135
11856 LEMAY PUBLIC I/I REDUCTION (2015)$4,800,000 136
11927 LEMAY PUBLIC I/I REDUCTION (2015)
CONTRACT B
$5,000,000 137
12427 LEMAY WWTF PLANT CONTROLS $1,500,000 138
11650 LOWER MERAMEC WATERSHED I/I REMOVAL $5,000,000 139
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
$1,050,000 140
11694 NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
$580,000 141
12460 OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND OAKLAND
AVE)
$1,000,000 142
14 April 2014
WASTEWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11695 OLDE ENGLISH I/I REMOVAL $265,000 143
11697 PAGE TO TRENTON SANITARY RELIEF $1,000,000 144
11094 PROSPECT HILL LANDFILL VERTICAL
EXPANSION
$300,000 145
11933 PROVIDENCE PUBLIC I/I REDUCTION $3,000,000 146
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
$1,200,000 147
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
$800,000 148
11069 ROCK HILL SANITARY RELIEF (SKME -618)$1,350,000 149
11680 ROXBURY I/I REDUCTION $1,070,000 150
11666 ST MARIE SANITARY RELIEF I/I REDUCTION $250,000 151
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
$600,000 152
11918 TELEGRAPH ROAD #2928 I/I REDUCTION $132,000 153
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION -
WEST
$4,500,000 154
11681 UPPER COLDWATER SECTION D I/I REDUCTION $350,000 155
10026 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
$7,500,000 156
10027 UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
$3,000,000 157
11086 WEBSTER ACRES SANITARY SEWER
REPLACEMENT
$1,120,000 158
11108 WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
$1,200,000 159
TOTAL:$181,742,000
§¨¦40
§¨¦270
§¨¦40
§¨¦270
CLAYTON
GEYERBALLASDESPERESSPOEDENORTH F O R T Y
RUTHTHORNHILL OAKP IN G R Y
WOODGATECARBERRY
O A K VA L L E YTAMMANYSOUTH FORTY
SQ
UIRESROCLAREDRYRIDGEBRIDLEOLD C O L O N Y
G RAYSELLENRICKPOST OAK
PORTLAND
FIRETHORNCLAYCHESTERPRIVATEBOPPROTH
SIMMONSDUBON
KEND
ONC H IP PE R
CREEKHAVEN
DEVO N D A LEHICKORYDIVOTHARFLO
SERENDIP ITYCLAYMARK
ELAINETOPPING MALVERN
PAMELA
HOLIDAY TUCKERTREGARON
VINETTADWYERCLAYD U R B IN REVERECHRISTINEPRINCESSNICHOLAS
TINDALL
FO X R I D G E
HIGH OAKCLAYTON PLACEGLENMAROPOINT OAKMUELLER
CACKYHICKOR Y
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11934
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 92
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 60,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,900,000.PUBLIC I/I REDUCTION FROM 11682.
§¨¦70
2
N
D FERRYTERMINAL
H
A
L
L
GRANDMAY1
S
TPRARIEN
O
R
F
O
L
K
S
O
U
T
H
E
R
NDOUGLASS
A N G ELIC AGANOGRANDTERMINAL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11920
15TASK NO:
TASK NAME:
$15,000,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 93
BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT
Construction Task
6660 - SanitaryReplacement Fund
EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS.
$5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16.
§¨¦70
2
N
D FERRYTERMINAL
H
A
L
L
GRANDMAY1
S
TPRARIEN
O
R
F
O
L
K
S
O
U
T
H
E
R
NDOUGLASS
A N G ELIC AGANOGRANDTERMINAL
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11920
15TASK NO:
TASK NAME:
$5,500,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 94
BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT
Construction, Phase II
6660 - SanitaryReplacement Fund
EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS.
$5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16.
§¨¦270
DUKEDUNN
ST CYREARLLORD LILACTOELLECOUNTBARONROYALS H EPLEY
FRY
BLUFFSCENIC VA
L
L
E
YCOBURGLANDS LOOKAWAYB ELGROVE
VISCOUNTDARR
PER S H A L L
CO ZENSB E R W YNVORHOF K IL G O R E
C
ABOTPRINCE
D
UENKE ASHBROOKC A M E R O N
BURLINGTONNORTHERNSANTAFEEWELLQUIE T
EDGEFI
ELDC
E
N
T
E
R
NECTAR
D
O
RWOO
D DURNESSFONTAINE SPRINGGARDENAST
ORI
ACASTLE
HALLHUDSONDELHICOLLETT
LEBON
MEAD
SCRANTON
E LBAYORKTOWNCOMET
COBURG
G L E N G ARRYAT T I C A
LEETONGLOUCESTER
HATHAWAYHOBKIRKBIRITZ
SURRE
Y
B ER KAYDOROTHYTRIOPRIVATEBOSWORTH
F O R KFOREST HOMEHAVILAND
HA R P E R
TWILL
JEFFREY
NOLL
DENNESSNORBRIDGEFOXPATHL A N A R K
JAROSSHELDONEXPO
PICKFORDRAFORD
LANDWEHR
TROY PIKESUNBEAM
PERSHALL
PRIVATESTC Y R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11853
15TASK NO:
TASK NAME:
$4,680,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 95
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT A
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 56,400 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11684 AND 11685.
§¨¦270
§¨¦170
LINDSAY
PER S H ALL
HUMES
KEEVEN
CENTRAL
CHARBONIER
MULLANPHY
LAFAYETTEPAUL5TH
UTZ
GRAHAMDUNN
PRIV
ATE
FLOR
DAWN
HOLIDAY
KINGSFORD
TAHOE
JENKEE
C
O
A
C
HWAY
ESTES
WASHINGTON
BOONEFORD
TESON
LOEKES
WRENLOVELAND
COACHLIGHT ASPENKOSTKA
MAPLE
VILLE MARIAWIETHAUPT
DOVE
LILAC
TAYLOR LOVESWANDEWAYNEFEEFEEB R O W N
ELM GROVE
WOODCREST
ANGLUM STJEANQUEEN ANN
RUTH
LEES
ST CIN
RIVERWOODESTATES
OLIVETO
BELLARMINERIVERWOODTRAILS
VILLAGESQUARE
ST PATRICERYA
N
ALMA
HAZELCRESTCHULA HARKEEFLIGHTN AOMIBARWICK
HIGH SUN
POLSONAIRSHIREC
A
M
P
U
S
LUNDY DEBORAHC
H
E
V
A
L
BRUCE
HEATHER
REGINA
P R I V A T E
DUNNPRIV
A
T
E
PRIVATE
PRIVATE
UTZ LIN D B E RGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11854
15TASK NO:
TASK NAME:
$4,920,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 96
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT B
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 57,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11652, 11749, AND11719.
§¨¦270
§¨¦170
§¨¦170 DUNN
HUMES
PERSHALL
N
E
W
H
A
L
L
S
F
E
R
R
Y
FROST
ST ANTHONY
WASHINGTON
DERHAKE
LINDSAY
LAFAYETTEMULLANPHY
5TH
WAT ERFORD
ST CATHERINE
GRAHAMHANLEYCLARKST MARIE
ESTES
PAULOLDHA
L
L
S
F
E
R
R
Y
KEEVEN
CHARBONIER
STJOSEPH
E
LIZ
A
B
E
T
H
LATTY
WREN
REASORLOVELANDRUE ST DENISGRANTS
CLOVERWILLIAMSNE
R
O
MAPLE
AV O N
BARTO
MOU
L
E
NARA
STLOUIS
A L L ENLILAC
CANISIUSAQUEDUCTPOHLMAN
P R I VAT E
C A L V ER TONTROTTERSADDLEKAYW E D G W OO D
STJEANCAPRIJEAN DANUBEWELLINGTONRUTH THUNDERBIRD AB
E
RDEEN
ST CIN
ZURICHH E L M K A MPF
EVAJ
A
N
A
FAIRW A Y
ST PATRICERYA
N
CORDOBADAVEYALMA
HAZELCRESTHARKEEFLIGHTLARRYDAVID
FOX RUN
L O Y O L A
ALLIANCERETFORD
S T R E G I S
JACKLIN
WOODEN BON AIREGALLOPSTARLIGHTM O H A N
SULKYDUCHESNEDEBORAHST L U K E PEBBLE
CARGILL
BRUCE
RENA
HEATHER
LATTY
PERS H A LLLINDBERGHLINDBERGH §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11857
15TASK NO:
TASK NAME:
$3,810,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 97
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT C
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 21,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11736, 11718, AND11666.
§¨¦170
§¨¦70
§¨¦170ASHBYPAGEADIEWOODSONLACKLAND BROWNLINKMETRO L INK
WRIGHTW
A
RSONNORTH
SIMSMCKIBBONUNION P A C I F I C
BALTIMORE
WALTONKATHLYN
BURNSEMINENCEARGYLELONG
RIDGE
ECHO
GUTHRIE
B AUR
NIBLIC DIXFEEFEEJANEPOELITZ
REXH
A
NLEY
NORTHNSOUTHTRESCOTT
OAK ENTITYHOODMEEKS
ENG LE RKREMDYERLA JOLLA WHEATONWINDOM
BRUNOGOODALECA N T ERENDICOTTTERMINALC
EN
TRALMIDLAND
ST FRANCIS
TUDORMILTON
GASSTHORPE TENNYSONCYPRESSMARGOANN
CHAUCERFOREST
ZYKAN
LIBERT YAIRWAYWISMERHAROLD
WURDACK
MORROW
SAN JOSEBRISTOWRAYMONDTITUSTRENTON
IVAN
HERBERTVANCLEVEPRIVATE S
TKATHERINE
GULFMARVINMALINETIPTONCALVERTFLORA
MCNULTY
VINITAPIC K ER IN G
MINERVATREADWAY
TOWNLEY
BOYLSTON
ASHLANDMURIEL
FLORENCE
LINDADE
PROUHETGARFIELDCHARLACKS P U R
MASHIELEITHMARSHALLKINGBEE
LOYD
RUCKERTHOLTWICK
O A K
METRO
LINK
BROWNTHORPE
PAGE HANLEYBURNSOAK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11871
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 98
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT D
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 67,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11662, 11663, AND11712. SUPPLEMENTAL FUNDING OF $2,280,000 IN FY 16.
§¨¦44
§¨¦55
§¨¦270
§¨¦55
§¨¦270
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11924
15TASK NO:
TASK NAME:
$4,130,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 99
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT E
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 31,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11651, 11765,11665, AND 11670.
§¨¦70
§¨¦270
NATURALBRIDGERD RIVERVIEWDRLI N D B E RGHLEWISNCLARKBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11925
15TASK NO:
TASK NAME:
$4,490,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 100
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT F
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 47,900 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11686, 11693, AND11668.
§¨¦270
§¨¦70
§¨¦170
§¨¦170
NLINDBERGHBLVDST CHARLES ROCK RD
NATURALBRIDGERD
E
M
O
370
H
WY
N LIN D B ERGHBLVDNATURALBRIDGERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11926
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 101
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT G
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11681, 11739,11738, AND 11710. SUPPLEMENTAL FUNDING OF $2,700,000 IN FY 16.
LILACTOELLEST CYR
S H EPLEY
FRY
BLUFF
SCENIC VA
L
LEYCOBURGLANDS
BELGROVE
DARRBLISS
ADRIAN
K IL G O R E CABOT
A SHBROOKC AMERO N
HOYT
EWELLNECTAR
BURLINGTONNORTHERNSANTAFEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON
MEAD
SCRANTO
NELBACOMET
COBURG
CAMBRIAAT T I C A
LEETONGLOUCES TERDURHAMHABECKINGHOBKIRK
BIRITZ
SURRE
Y
ADLERDOROTHYPRESLEYCRET E TRION
E
L
A
N STIMSONM A RALDOBOSW O RTH
T AYG O L D E N
F O R KDIAMOND GRAMPIANHAVILAND
ROSSTWILL
JEFFREYMCCARTNEYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHO D E S S A
HANSOM
SIEBE
RONT E L
PRESTIGE LANDWEHR
ZELLWEGER DUDLEYSUNBEAM GARDOLILACSHEPLEY
CASTLESTCYRLEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11685
15TASK NO:
TASK NAME:
$1,460,000BUDGET:
FUND:
Bellefontaine NeighborsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 102
BISSELL HILLS SANITARY RELIEF/CALUMET I/IREDUCTION (BP-317)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11853.
LILACTOELLELOOKAWAYS H EPLEY
FRY
BLUFF
SCENIC VA
L
LE
Y
B ELGROVE
DARRBLISSC OBURGL A NDSADRIANCABOT
C AMERO N
HOYT
EWELLSPRINGGARDENA SHBROOKBURLINGTONNORTHERNSANTAFENECTAR
STCYR DURNESSRENFREWLEBON
SCRANTO
NELBA COBURG
G L E N GARRYLEETON
A S H FORDKILGORE
GLOUCESTERHABECKINGHOBKIRK
BIRITZ
SURRE
Y
DUNDEE
DOROTHYPRESLEYTRION
E
L
A
N
FORE S T HOME STIMSONM A RALDOBOSWORTH
T AYF O R KDIAMOND GRAMPIAN
ROSSJEFFREYMCCARTNEYBAGNELLTHRIFT DENNESSFOXPATHMONTEITH
O D E S S A
HANSOM
RONT EL
LANDWEHR
ZELLWEGER DUDLEYGARDOLILACST CYR
SHEPLEY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11686
15TASK NO:
TASK NAME:
$235,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
MISSISSIPPI RIVER (CITY)WATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 103
BISSELL POINT I/I REDUCTION (BP-619) (VALLEYDR)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PRO JECT CO MPLETES A PORTON OF SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSO BP-619. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 11925.
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
M E T R O L IN K
O LD BONHO
M
M
E
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
F
RANCI
S WARDERCELLASHAFTESBURY
LE PEREJACKSONTOPTONAHERN
GANNON
CENTRALC L AY T O N LINDENP
OLO
H
U
NTERBERICKRIO VISTAYORK
ST A N D REWSGRANADA81STTEASDALEGAY
BRAE
B
U
R
NGRAYBRIDGE NORTH N SOUTHWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
PR IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEYRAISHER
CARSW O L DBONHILLSGEOFFRYKINGSBURY
DAYTONA
R E A R
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA
ORLANDO
SUDBURYMCKNIGHTPRIVATEVILLA
P
R
I
V
A
T
E
HANLEYGAYB A LSON
P R I V A T E GAY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11689
15TASK NO:
TASK NAME:
$5,700,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 104
BLACK CREEK I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 62,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
§¨¦40
§¨¦40
C E N T R A L M ID L A N D
W I LD HORSE C R E E KPRIVATEOLDCHESTERFIELD
SANTAMARIAEDISON
SWINGLEYRIDGE
NORTHOUTERFORTY
ALRICK
D O R E S A YGRIMSTONE
CHESTERFIEL
D
G
R
O
V
E
WIEGANDPRIVATE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11788
15TASK NO:
TASK NAME:
$3,100,000BUDGET:
FUND:
ChesterfieldMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Caulks CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 105
CAULKS CREEK PUMP STATION B FORCE MAIN
Construction Task
6660 - SanitaryReplacement Fund
EXISTING FO RCE MAIN IS UNDERSIZED AND DETERIORATING.
CONSTRUCT 1,000 FEET OF 8-INCH FORCE MAIN FROM PUMPSTATION B TO 36-INCH FORCE MAIN.
§¨¦170
§¨¦170
WARSONPRICELADUEDIELMANOLDBON H O M M E
DELMAR
GAYMCKNIGHTWE
N
N
E
K
E
R
LAYC L AY T O N
ENGEL
BARNESCELLAKENTGANNON
G L E N EAG L E S
S T ACY
B A L S ON
H
U
NTERB RAEB
U
R
N BERICKRIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDEGROBY
P
R
I
V
A
T
E
BARBYENFIELDHEATHER HILLDROM
A
RALANGTONP IC A R D Y BON AIREFO
R
D
Y
CESPOON
A
L
A
N
SON
HIGHDOWNARBORLITTLE
MANSFIELD
LISA
BERKLEYMAYFAIRH A S T IN G S
BON HILLS
FIE L D IN G RADFORDWASHINGTON
APPLE TREEBLACK CREEKTERRYDELCRESTRYEBRIAROAKRANDELAYCRIXDALE
VILLA
WHITE ROSELORENZOELKINGTONCHERRI W A T S O N IALYNNELOCUST
VILLA
P R I V A T E MCKNIGHTPR IV A T E
PRIVATEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11884
15TASK NO:
TASK NAME:
$380,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 106
CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
Construction, Phase II
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
REMOVE PRIVATE I/I FROM PUBLIC SEWER BY CORRECTINGIMPROPER CONNECTIONS ON 300 PROPERTIES.
PRO JECT WAS ORIGINALLY PART OF THE SCOPE OF 11722.
PRIVATE ROBBINSGROVERICHMOND FORESTBEHLMANNMEADOWSROBBINSWAY
PR IVAT E
PR IV A T E PRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11809
15TASK NO:
TASK NAME:
$2,800,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 107
COLDWATER CREEK WWTF SCREENINGS &WASHER/COMPACTOR IMPROVEMENTS
Construction Task
6660 - SanitaryReplacement Fund
EXISTING WASHER/COMPACTORS DO NOT MEET NEEDED CAPACITY.EXISTING PIPING AND PUMPS REQUIRE MODIFICATION TO ALLOWFOR ADDITIONAL SLUDGE STORAGE.
CONSTRUCT ADDITIONAL CAPACITY AND MAKE IMPROVEMENTS TOEXISTING FINE SCREENINGS TRANSPORT SYSTEM ANDWASHER/COMPACTOR SYSTEM, AND MINOR PIPING CHANGES TOALLOW DIGESTERS TO FUNCTION AS EMERGENCY STORAGE TANKSIF A SL UDGE FORCE MAIN FAILURE OCCURS.
§¨¦270§¨¦270
DUNN
FORD
PERSHALL
POLSONNORFOLK
S
O
U
T
H
ERNTAYLOR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
15TASK NO:
TASK NAME:
$2,000,000BUDGET:
FUND:
HazelwoodMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 108
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT.
$2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION.
P RIVATE
B E L C R O F T
OL
D
H
A
L
L
S
F
E
R
R
YLE SABREINVICTAC O R D I N
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10557
15TASK NO:
TASK NAME:
$670,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 109
COLDWATER SANITARY TRUNK SEWER SECTION AREHABILITATION (SKME -240)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWER.
DISCONNECT 12-INCH SANITARY SEWER FROM THE INACTIVE 72-INCHCOLDWATER TRUNK AND RECONNECT IT TO THE ACTIVE 90-INCHCOLDWATER TRUNK. CONSTRUCT 620 FEET OF 12-INCH SANITARYSEWER.
§¨¦70
§¨¦70
LILLIANLUCAS N HUNTHILLSRAVI N IA SUNBURYROHN
EUNICE
SAN
DIEGO
FLORIANCOUNTRY
C
L
U
B
NELSONHATZOVERBROOK
ROXIEGROVELAND
STANWOOD
WINCHESTER FLETCHERR
O
L
A
N
D
B
E
R
M
U
D
A SHA
R
O
N
FOREST HILL
B
E
L
W
O
O
D
WILLOW WOODNORWAYHOLBORNCOLTON ESTERBROOK
S U N S E T
LAMMERT
HUNTI NGTON NORWOODHILLSCCCOLLEGEMCLARANWARWI C K
PINE RIDGE
BURRWOOD STATLERUPSHAWSANTA MONICA
WOODSTEADWINCHELSEA
BRETONN A D IN E
ROLAND
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11730
15TASK NO:
TASK NAME:
$2,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 110
CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNEL,AND 1,3 00 FEET OF 8-INCH TO 30-INCH SANITARY AND STORM SEWER.ELIMINATE CSO OUTFALL BP-059, SSO BP-255, AND SSO BP-256.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000.
§¨¦70
§¨¦270
§¨¦55
§¨¦40
§¨¦44
§¨¦170
§¨¦40 §¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11146
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 111
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction Task
1101 - General Fund
CONTRO L AND REDUCTION OF COMBINED SEWER OVERFLOWSREQUIRED.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM.
THIS PRO JECT TO BE IMPLEMENTED IN COOPERATION WITH THECITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
LADUE SPOEDEGRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE
ROND E L A Y
F I E S T A
SONAAL D E N
BALHARBO
URLARKINOFFIC
E
TU R E ENFAIRWAYSDAYKINOLD BALLASDEAVERT R I E S T E
RENEELEISURE
OLDOLIV E STREET
ALLE GROO LDE C A B I N
BENWOOD
MARFORDSHERWYNTRILANE
COUNTRY FAIRMOR WOODNASS AULAWREN C E
SPOEDE HILLS
Q U A I L W A Y S
MOSLEY HILL
MOSLEY ACRES
SPOEDE WOODS
W
O
O
D
S
H
I
RECOLONIAL HILLSMOSLEY FOREST MIDDLEBROOK
CHALET
N
O
B
L
E
M
A
N
BARBEEFARON HILL
G R A E S O N
WEDGEWOOD
C
R
A
I
G
PRIVATE
CRAIG OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10576
15TASK NO:
TASK NAME:
$1,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 112
DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING SANITARY BYPASSES.
CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH SEWERS, REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS, AND REMOVE SSOBP-627 AND SSO BP-607.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11850. THIS PROJECTINCLUDES CONSTRUCTION OF CHALET CT. STREAMBANKSTABILIZATION, 11191.
§¨¦270
§¨¦40 WARSONLADUE
SPOEDEGRAESERMOSLEYEMERSOND
AUTELS
C
H
U
L
T
E
P E M
STUDT GUELBRETHCLAYT O N
G R A N D VIE W
CRAIGCRAIGVIE W
T E A L W O O DPRIVATE
BEAVER
STACY
MESA
RESEARCHMAGNA
CAR
T
A
ELZEY C L ER M O N T STONEYSIDELAKESHORESARAH RONDELAYFIESTASONABARDOT
CONWAYALDE N
BROOK
TRAIL
ARTHUR P I CARDYF
O
R
D
YCEDONOHO
NE W B ALLASTUREEN
HIGHDOWNFAIRWAYSTUCKERL ADUEESTATESDAYKIN
ANZEIGER
OLD OLIVE STREET
LISARENEELEISURE
A L L E GROLYLEWOOD
H A S T IN G S
SHERWYN
APACHE
M O R WOODRICHARDSON
GAIETE
PILLARCAPITOL
C OU N T R YV IE W
PRIVA T E
C
R
AIG
PRI
VATEOL I V E B L V D
NLINDBERGHBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11850
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 113
DEER CREEK PUBLIC I/I REDUCTION (2015)
Construction Task
6660 - SanitaryReplacement Fund
INFL OW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 85,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 10754 AND 10576.
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11734
13TASK NO:
TASK NAME:
$6,000,000BUDGET:
FUND:
St. Louis CountyMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 114
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - LAND ACQUISITION
Land Purchase
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION CAUSING OVERCHARGEDSANITARY TRUNK SEWER AND ACTIVATING A CONSTRUCTED SSO.
CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES,PUMPING STATIONS AND SEWERS AS PART OF AN OVERALLWATERSHED PLAN FOR SANITARY RELIEF. ACQUIRE PROPERTY FORVARIOUS PERMANENT STRUCTURES AND EASEMENTS ALONGTUNNEL ALIGNMENT.
§¨¦170
§¨¦170
DELMAR
GANNON
GROBY
LADUE MCKNIGHT81STOLD BONHO
M
ME
LAFON
STANFORD
WARDERLE PEREBALSON
MARYLANDFO
R
S
Y
THBERICKRIO VISTATE A S D ALEGAYCENTER
MERAMECTOPTONCENTRALAMHERST
M
O
N
A
BARBY
P R IV A T E
CRANDONTULANE
NORTHNSOUTHSPOON
AL
A
N
S
O
N
SHAFTESBURY
LITTLE
AHE
R
N
BONHILLS
C O RNELL
COOLIDGE
GEOF
F
RYKINGSBURY
WASHINGTON
WESTDUKEDE
LCRESTRYE
DONNEHOW
CRIXDALE
VILLA
PRICE
HAFNER
PRICEW O ODSFAIRVIEWMULBERRYLORENZOL A D E LDOLORES EASTOVERSAXONY82ND
W A T S O N IA
LOCUST
ALDANWILNERB L A N C H A
FLEET
W
O
ODWESTOVER
PAXTON
UNIVERSITYWAYFIELDCHER EL
ROWLAND
WILD CHERRYAVESDALEC O L O N IA L GAYGAYPRIV
A
T
E
PRIVATE
CORNELLPRIVATEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11735
15TASK NO:
TASK NAME:
$400,000BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 115
DELCREST SANITARY RELIEF (SKME-565) I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 440 FEET OF 12-INCH STORM SEWERS AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11743
13TASK NO:
TASK NAME:
$3,500,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 116
EASEMENT ACQUISITION FOR COMBINED /SANITARY PROJECTS (FY 2015)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSREQUIRE EXTENSIVE CONSTRUCTION WORK THROUGHOUT THEDISTRICT.
EASEMENT ACQUISITION REQUIRED FOR CAPITAL IMPROVEMENTAND REPLACEMENT PROGRAM WASTEWATER SEWER PROJECTS.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11107
15TASK NO:
TASK NAME:
$250,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 117
EMERGENCY REPAIR FUNDS (WASTEWATER)
Construction Task
4122 - WastewaterEmergency Fund
AG ING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST AC T IMMEDIATELY.
PRO VIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦170
§¨¦170HILLTOPALICECOLLINGWOODREAR
COCHISE
COMANCHE
C H I S H O L M
BRIGHTLINGIRVINGTONPRIVATEHILLTOP MANOR
BRISCOEMARGARETARROWHEADCOMANCHE
PRIVATEOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11079
15TASK NO:
TASK NAME:
$110,000BUDGET:
FUND:
OlivetteMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 118
FAIRLIGHT AND BRIGHTLING SEWERSEPARATION
Construction Task
6660 - SanitaryReplacement Fund
STORM INLETS CONNECTED TO SANITARY SYSTEM.
CONSTRUCT 245 FEET OF 12-INCH STORM SEWER TO CORRECTIMPROPER CONNECTION TO SANITARY SYSTEM.
§¨¦270
§¨¦270 PAGE ASHBYA D I E
W
A
RSONSCHU
E
TZ
DIELMANFEEFEELINKWOODSONSIMSBALTIMORE
BURNSFLORAWRIGHT
UNIONPACIF I C
SPOEDERIDGEROSS
S
C
H
U
L
T
EBA
L
L HIGHCENTR
AL
MIDLANDBAUR
D
AUTELTEMPO
DRIVER
NIBLIC DIXWELDONOL
DBONHOMME
BRECKENRIDGESMILEY
POELITZ
REXME
S
ATRESCOTT
AMELING
OAK
MOSLEYB O R M A N
ENGEL HOODMETRO
MEEKSKREMDYER
EMERSONDELORDCAN T ERMAR
STAYLOR
SC
HA
E
F
E
R
ST FRANCIS
GUELBRETHGASSTHORPE
STUDT
P
R
I
CELAKELANSINGRESEARCHHILLTOPSCHULTEHILLGRI
SS
OMCRAIGCRAIG V I E WOLD DORSETTT E A L W O O D
ZYKAN PASTEURWISMERUCEYLEGLENPARK
PRI
VATEWURDACK
MORROW
SAN JOSEWARNEN
IVAN
OLIVAIREDUNSTONFIE S T A
SONAFAIRVIEWLONGMONT H A R O L D
ANDESLINDADE
MCKELVEYDALEYRENEEROSLAN
BULLERPLUMEASTHAMAMBRO
A R CMIKEL
VILLAFEEFEEADIE DIXCANTER
PAGE
PRICEROSSSCHULTEC
R
AIG
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10456
15TASK NO:
TASK NAME:
$420,000BUDGET:
FUND:
VariousMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 119
FOREST BROOK SANITARY RELIEF (SKME-003 ANDSKME-016) REHABILITATION & I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11944.
HARVEYHUDSON
NORFOLK SOUTHERN
D A R S T
FERGUSON
STEIN
IMPERIALDAYBARATVICKIEP A U L
KEELEN
GLENOWENW IE G E LCLARK K A P P E L
POWELL
LORNATRASKGEORGIADELLWOODL E E
S U B U R B A N
TI F F I N
T H A T C HER
CARSON
R O B E R T
E X U M A
L ANGKIRKFORESTWOOD N A S HUA
R U G G L E S GAGEAMESWESLEY
ELLISONJETTRANDCLARIONKR O E G E R
CHAMP LIN
C H U R C H
B R OTHERTON CLAIRMONTMEDFORDHEYDT
DELLRIDGECA L V E RTO N
NEMN IC H
GLADE
H I GHMONT REBAVENICEELKAN MAYFAIRHOLLINSAVERILLFROS T
HERNCLAYBEHLEA IR PO R TSCOTTDALER O YA L
JANUARY
PAYNELARKIN
PRIOR
STLO
UIS TANNERTESTONSCHLUETERL O U IS A C A N F I E LD
T H O R O U G H M A N
OLYMPIA
BON OAKDUPREEC A R G I L L
WEDGED A M A NMILLMANNEWTONBALLMANTULLAMOORSTIVESELK
H
ARTMANOR
FERMOHARRISON CROWN POINT
FEN
W
I
CKEMMETT
EAST
DELLCHATELETDEEMBALBOAMEADOW L ARKELMDALEEMERYKNOLLCRESTSCOTTPRIVATECARDIGAN
LOMOND
EDDY
DEANDELL
BRADSHAW
BRUCEELSWORTHBROMLEYTIFFIN
ROBERT
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10440
15TASK NO:
TASK NAME:
$1,600,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 120
FORESTWOOD LATERAL SANITARY RELIEF(SKME-321)
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,700 FEET OF 12-INCH TO 27-INCH SANITARY RELIEFSEWER IN THE VICINITY OF FORESTWOOD, HIGHMONT ANDFERGUSON. FIVE CONSTRUCTED SSOS TO BE ELIMINATED, BP-295,BP-296, BP-281, BP-316, AND BP-322.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11758
12TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
UnallocatedPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 121
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM.
PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12379
12TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
UnallocatedPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 122
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM.
PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12380
12TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
UnallocatedPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 123
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM.
PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12381
12TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
UnallocatedPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 124
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM.
PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE.
TE R M IN A LGREER BELTCLARALABADIEST LOUISGOODFELLOW HERBERT
PALM
ROOSEVELT
SE
L
BE
R
BROWNHAMILTONASHLAND
SEMPLETERRY SIEMERSELMBANK
ROWANBLACKSTONEGREER
ASHLAND TE R M IN A LASHLAND
NATURALBRIDGERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11768
15TASK NO:
TASK NAME:
$2,700,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
HarlemWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 125
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(DETENTION BASIN)
Construction Task
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS ANDFLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNKSEWERS.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,460,000.
WEBER
LANGLEY
MATHILDAHEEGE
PILOTVINE
ELSALAKE
W
O
ODACORN
WALDO
LODE
HILDA
ELGINPHILOA L L E Y
WEBER TRAILV IR G IL
SEIBERT
MAXWELL
VASE
L HARMONYKATHLEENROSEMARYLACEYWILLARD
WELMERING
DANAFRANKFO
RT
H
E
E
G
E
ELGI
NLODE
PILOTPHILOV I R G I L
PILOTVINE
KATHLEENROSEMARYG R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10642
15TASK NO:
TASK NAME:
$3,400,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Mackenzie CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 126
HARMONY-ACORN SEWER SEPARATION AND I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS INISOLATED AREA OF COMBINED SEWERS.
CONSTRUCT 3,100 FEET OF 12-INCH TO 42-INCH STORM SEWER, 2,700FEET OF 8-INCH TO 12-INCH SANITARY SEWER, AND DISCONNECTPRIVATE I/I SOURCES. THIS PROJECT ELIMINATES CSO I-126.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11855.
§¨¦170BROWNARGYLE
OLDEN
LACKLAND
BURTON
MILTONCHARLACKWALTONFOREST
GOODALEGRACELAND MCKIBBONMARSHALLADDIEWOODSONVERONAPALMER ASHLANDHARTLANDOAKLANDSHELLEY
GOTHLANDNORTHLANDSHERWOODKENOSHOMILLET
APACHE
ONEIDA
SHAWNEESTELLADOYLE
SYCAMOREBARODA
SHERLAND
FOREST
MILTONONEIDA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10330
15TASK NO:
TASK NAME:
$1,360,000BUDGET:
FUND:
OverlandMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 127
HARTLAND TO GOTHLAND SEWER SEPARATION
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AREA NORTH OF MIDLAND BLVD. CONTAINS 1,600 FEET OF COMBINEDSEWERS, THAT ARE TRIBUTARY TO THE COLDWATER SANITARYSEWER NETWORK.
CONSTRUCT SEPARATE STORM AND SANITARY SEWERS, ANDREMOVE I/I, TO ENABLE ELIMINATION OF THE COMBINED SEWERSYSTEM IN THIS AREA.
TOTAL CONSTRUCTION BUDGET IS $4,360,000.
§¨¦40 CENTRAL M IDLANDWE
S
TLADUE
W ATERW O RKSW H ITE
CH E S T E R FIELD PRIVATEDUNGATEA R R O W HEADESTA
T
E
SUNIONPA C IFICSPUR
KAYWINBRAE
RIALTO
W
HIT
E
P
RIVATE
P
R
IV
A
T
E
PRIVATE
OLIVE BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10656
15TASK NO:
TASK NAME:
$3,800,000BUDGET:
FUND:
VariousMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Caulks CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 128
INFRASTRUCTURE REPAIR #087P CAULKS CREEKA (P-750) PHASE VI
Construction Task
6660 - SanitaryReplacement Fund
EXISTING FO RCE MAIN IS DETERIORATED.
CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,500,000.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11708
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 129
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT A
Construction Task
6660 - SanitaryReplacement Fund
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11866
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 130
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT B
Construction Task
6660 - SanitaryReplacement Fund
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11867
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 131
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT C
Construction Task
6660 - SanitaryReplacement Fund
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS.
USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11773
17TASK NO:
TASK NAME:
$1,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 132
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2015)
Work Order Repair Costs(Non-Capital)
1101 - General Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.
AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLYISSUED FO R NEEDED CONSTRUCTION.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11773
17TASK NO:
TASK NAME:
$5,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 133
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2015)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.
AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLYISSUED FO R NEEDED CONSTRUCTION.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦70
ASHBYJANEWRIGHTCYPRESSSIMSGERALDINEEDMUNDSONST LEOPEAR TREE
LIANA
MARGO ANN
ST
P
H
I
L
I
PLAMBERTINTERNATIONAL
TREADW A Y
INTERNATIONAL
TROPIC
PRIVATE AIRFLIGHTLILLY JEAN
TRAVERSE
ESSELDALENORTH ALLEY
ST DAMIAN
DOUGLASS
BOBBIE DOWNS
ISABELLEST SHAWN
STCLEMENT
ST PIUS
STKEVIN
COUNTRY
STEPHENS
JUNE
CABANA CLUB
EXECUTIVE
MILL PASS
ST RAPHAEL
ST AMBROSE
MITCHELLST LINUSPRIVATE
NATURALBRIDGERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11710
15TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
St. AnnMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 134
ISABELLE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
HUDSON
STEIN
DAYVICKIEDENNISBARATK A P P E L LORNAT H A TCHER
D A R S T DELLWOODAMESGLENOWENJETTKR O E G E R
T
R
AS
K
NASHUA
CHAMPLIN
CLAIRMONTMEDFORDHEYDT
F
ORESTWOODGAGEDELLRIDGENEMN IC H
A
R
G
E
N
T
F A R G O
HIGHMONT REBAPERCHE X U M AVENICEAVERILLCHESLEYSCOTTDALELARKIN
EDGEHILLWAY
SID
E
RANDTESTONSCHLUETERWARDROYCECOPPINGERF I R
A D A M S
PLA
NTM
O
R
E
LA MOTTEKIRKBON OAKCARGILL
WEDGEWESTDELLJANSONRENSHAWMILLMANSUPERIOR NEWTONHUTTON
BALLMANS T I VESITTNERHARTNETTQUAKERFE
N
WICKCLAYCHATELETBEECHE R
FLOR
IDALE MILLBURNMA L DON
ATWATERFO RES T KNOLLCRESTPRIVATEDAMESSAFFRONINAG
UACHAMBERS HILLB A R B A D O S
DEANDELL
NEVILLEBAYVIEW
PARKER
DOA
NEJOYCE ELLENR O YA L
W E S T W O L DLEICESTER
MELCHERROBERT
HUDSON
BON OAKTHATCHER QUAKERPRI
VATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11715
15TASK NO:
TASK NAME:
$1,400,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 135
LANG ROYCE LATERAL SANITARY RELIEF(SKME-320)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH SANITARY SEWER,AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852.
§¨¦55§¨¦270
§¨¦44
§¨¦255
§¨¦270
§¨¦255
G R A V O IS R D
W ATS O N R D
LEMAY FERRY RDTESSONFERRYRDTELEGRAPHRDCHIPPEWA BLVD
S KIRKWOOD RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11856
15TASK NO:
TASK NAME:
$4,800,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 136
LEMAY PUBLIC I/I REDUCTION (2015)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 57,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 10748, 11698, AND11750.
§¨¦55
§¨¦44
§¨¦270
§¨¦255
§¨¦270
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11927
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 137
LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 63,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11776, 11740,11667, 11155, AND 11097. SUPPLEMENTAL FUNDING OF $3,200,000 INFY 1 6.
ETTA
VELMA
H
O
F
F
M
EIS
T
E
R
HORN
MILITARYWEISS
MANN
UNION PACIFICP
RIV
A
T
E
HOLDEN
LAGRO
G
O
E
T
Z
CARTWRIGHT
RUBYJOPLINPERRINFRANKE
UNION PACIFICUNION PACIFICUNIONPACIFICUNIONPACIFICWEISS
PR I V ATEPRIVATE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12427
15TASK NO:
TASK NAME:
$1,500,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Lemay CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 138
LEMAY WWTF PLANT CONTROLS
Construction Task
6660 - SanitaryReplacement Fund
OBSO LETE AND UNSUPPORTED CONTROL SYSTEM NEEDSREPLACEMENT.
PRO CURE NEW CONTROL MODULES AND PROCESSORS.
§¨¦55
§¨¦255
§¨¦55 RINGERFORDER
BAUMGARTN ER MILDYAEGER
MATTIS
KERTHK I NSWOOD
MEHLMILBURNAMBSHEINTZOLD B A UM GARTNERBURL
I
NG
T
O
N
N
O
R
T
H
E
R
N
S
A
N
TAFELIND
BUTLE R HILL
C A T H EDRALVIENTO
OLSENTH
EIS
S
BLACKFORESTHAWKINSFUCHSHAWKINSMANGOBERVIEW
PRIVATERO SYAQUARIDGE
L E M A Y W O ODSVALLEYSIDEFUCHSFIJI CANDLEGLOWL
O
N
GVIEW
IVONDALEFIRELEAFIRONDALE
CHATFIELDSTARLITGWENMILLK
A
S
S
E
B
A
U
MTELESTAR
DELOAK
PIO N EERSIR BORSPONYEILEEN ANN
H I L V I N
R O Y A L HILLS
MAR B U R Y LOMARNAHN
FAIR
WICK
K A SSEBAUMKINSWOODLEMAYFERRYRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11650
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 139
LOWER MERAMEC WATERSHED I/I REMOVAL
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT.
REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TOREMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,600,000.
§¨¦70
§¨¦70
METRO LINKE
A
S
THILLSWESTBERMUDASAN DIEGO
RAVI N IA
AUGUSTA
LUCAS N HUNTPASADENAWACOCOUNTRY
C
L
U
B
B
ELLERIVER O S E D A L E
ARLMONTLUCASOVERBROOK
DELAVANEVA
RT
S
ORE O NST ANNSROLAND
WINCHESTER
OXEYE
NORMANDY
CONTOUR
CI
RCLE
S U N S E T
HENDERSON
WARWI C K HUNT INGTON
M A R ILA C
HUNTER
SPRINGDALE
BRISTOL
FO R E S T V I E W
NACOMIS
ST MARYSSANTA MONICA
PR IVATEWALKERMARKTWAINFROWOAKMOUNTSTA NDREWS CANTERBURYLA
C
O
R
N
ARCOLAMETROLINKMARK TWAIN
WESTEASTOAKMOUNTNATURALBRIDGE
RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11659
15TASK NO:
TASK NAME:
$1,050,000BUDGET:
FUND:
NormandyMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 140
MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 700 FEET OF 12-INCH TO 30-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852.
PASADENA LUCAS N HUNTO R E O N
ROLAND
WINCHESTE RHILLSWARWICK
HU N T I N GTON
A
U
G
USTA
BRISTOL
NORMANDY
COUNTRYCLUB
ST MARYSFARLEY
CR E S T L ANDST ANDREWS
R
A
V
I
NIACANTERBURY
ARCOLAOAKMOUNTTOWER GROVEBRETONBERMUDANORTH OAKSBRIST O L
CANTERBURY
NATURALBRIDGERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11694
15TASK NO:
TASK NAME:
$580,000BUDGET:
FUND:
Pasadena HillsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 141
NORTH BADEN CREEK I/I REDUCTION(BP-612)(CANTERBURY DR)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852.
§¨¦40§¨¦40
TAMMOAKLAND
CLAYTONBERTHOLD
WELLS
HAMPTONWEST PARK
WISEVICTORIA OAKVIEWART HILLHALFCRESCENTGRAHAM HAMPTONCONCOURSEWISE
VICTORIATAMMGRAHAM §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12460
15TASK NO:
TASK NAME:
$1,000,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
RDP - Forest ParkWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 142
OAKLAND COMBINED SEWER DETENTION ANDSTORAGE (CLAYTON AVE AND OAKLAND AVE)
Construction Task
6660 - SanitaryReplacement Fund
IMPERVIOUS AREA OVERCHARGING COMBINED SEWER.
DETENTIO N AND STORAGE IMPROVEMENTS TO BE MADE INCONJUNCTION WITH REDEVELOPMENT OF THE FOREST PARKHOSPITAL GROUNDS.
§¨¦55MACKENZIEWEBERVALCOURHAMPTONRIVE
R
DE
S
PERES
SEIBERT
RHODES
UNIONDANAELTONKAMMERERSETH JANUARYFLETAMATHILDAI
VYSTAELY
MOHEGANNEW HAMPSHIREBLOW
GRAM O N D
PRIVATE
KITALICETON CLIFTONLUCIAVASELFORMANVITA
ROBERT
KAYACORNJ
A
MIESONLACLEDE STATIONHA
L
E
CIRC
L
EVIEW
ALTHEANAGEL
W
IL
L
MORE
COLLEENPILOTBONNIE
TIBERHILDA
MAXWELLMAYLOR
AFFTONEDEN TERRI LYNN
HA
M
BUR
GLANGLEY
RAMBLERSAVI O
CHESHIRE
NEIERNAVAJOEG
ERMANIA
ASTERCLEVEDONHEEGEBURLINGTONNORTHERNSANTAFE
PHILOTA L B O T
BRENDAJOELBE R W ICK HARLANHILDESHEIMTIEM
ANN
WEBER TRAILDEERWOOD
ARVIN
V IRGILR
ADIOD
A
R
L
E
NEHU RSTGREEN
PEARCHIVVISPROVOPINTOHELMLA BELLEBISHOP S
BIXBY
MACKINAWRABETHH IG H
H E R I T A G E
FORMAN
TIEMANN
VASEL WEBER
P RIVATE
HARLANHEEGE
PILOTBRENDAGRAVOISRDWATSONRD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11695
15TASK NO:
TASK NAME:
$265,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Mackenzie CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 143
OLDE ENGLISH I/I REMOVAL
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE INFLOW AND INFILTRATION FROM PRIVATESOURCES BY SEWER REHABILITATION AND OTHER IMPROVEMENTS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11855.
PAGE
OAK
DYERUCEYLEKORANDOMORVENOCONNELLBACHFAIRVIEWLOTSIENORTHFIELDE A S T B R O O K
LIBERTY
PAGE INDUSTRIALTRENTON BRYANT§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11697
15TASK NO:
TASK NAME:
$1,000,000BUDGET:
FUND:
OverlandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 144
PAGE TO TRENTON SANITARY RELIEF
Construction Task
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWER AND CONSTRUCTED SANITARYSEWER O VERFLOW.
CONSTRUCT 36-INCH AND 48-INCH DIAMETER LINEAR STORAGETANKS. REMO VE ONE CONSTRUCTED SANITARY SEWER OVERFLOW,BP-456.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11870.
LILACBLUFF
SCENIC
ADRIAN
V
A
L
L
E
YDIAMOND
BURLINGTON NORTHERN SANTA FESCRANTON
C
A
L
U
METLEETON
ST CYR KELVIN
GLOUCESTERFORK JEFFREY
MID R ID G E
PRIVATELOOKO UT
BIRITZ
FARLO
WESTHADDOCK
MARSHFIELD FOR K
P RIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11094
15TASK NO:
TASK NAME:
$300,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
MISSISSIPPI RIVER (CITY)WATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 145
PROSPECT HILL LANDFILL VERTICAL EXPANSION
Construction Task
6660 - SanitaryReplacement Fund
LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE.
CONSTRUCT NEW ENTRANCE, WATER LINE AND HYDRANTS, ANDLEACHATE FIELD IN PREPARATION FOR VERTICAL EXPANSION OFEXISTING LANDFILL.
§¨¦44
§¨¦44
CLARK
NEWPORT
TUXEDO
BOMPARTSHREWSBURYMURDOCHLACLEDESTATIONATALANTAMARSHALLSUMMITJOYGLEN
SELMAFAIRVIEW
LOCKWOOD YEATMANGARDEN SPRINGWEIL
P
A
RKOXFORD
EDGARDEVONSHIRE
S U T HERLAND
A R LIN G TO NHAWTHORNE
DANBURYWILSHUSENSUFFOLKST CHARLESLAKE
GREELEY
MARIONO A K W OOD
SUNNYSIDE
DALECAROLINE
DEVILLEBRUNSWICK
KUHLMAN
KAINLANSDOWNE
LENOXGROVE
EXETERHAZELAMELIA
VERGUENEKENRIDGELOGCABINPLYMOUTHSWON
PROVIDENCE
TAMPA
FAIR
O
A
K
STHEATREELBART
T W I N I N G
MILDREDCORNELIAKEY WEST
WEIL
FAIRVIEW
GARDENSUMMITGREELEYGLENPARKSUMMIT §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11933
15TASK NO:
TASK NAME:
$3,000,000BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 146
PROVIDENCE PUBLIC I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 22,500 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11700.
CLAYTON RI
DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA
ALAMO
BROOKLINE
PRIVATECRESTWOOD
RALPHOAKLAND
C L A VERACHCONCORDIAHARCOURT
EDWARDCLAYTONIAMOORLANDSSOUTHMOOR
SEMINARY
T U S CANYARUNDEL
COMMODOREFORESTRIDGE
PRIVATEHI
LLVALEPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10390
15TASK NO:
TASK NAME:
$1,200,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 147
RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM.
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I.
IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK.
CLAYTON RI
DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA
ALAMO
BROOKLINE
PRIVATECRESTWOOD
RALPHOAKLAND
C L A VERACHCONCORDIAHARCOURT
EDWARDCLAYTONIAMOORLANDSSOUTHMOOR
SEMINARY
T U S CANYARUNDEL
COMMODOREFORESTRIDGE
PRIVATEHI
LLVALEPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10390
15TASK NO:
TASK NAME:
$800,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 148
RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574)
Construction Task
5594 - Black Creek Subd#455 OMCI Fund
DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM.
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I.
IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK.
BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSINGER
FOOTEWARSON
SWONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GORE
M E D I N A MCKINLEYIOLANORTH
MAPLE
D E N N Y
ROCK HILLMARK
RENDERERKORTWRIGHTWILSON
OVERBROOK
F L A N DER S
CURRANSQUIRES
DWYER
WILDDEE R
BOGEY
H I L L A R D ROCKMANPAR KCOPP E R H I LL
ELMJOANNARIDG ELINECHELSEA
P RIV A T E
LITHIA
EUCLID
JEFFERSONHIGHHAMPT O NMANI
TOUJULIAN P A C I F I C
VICTORIA
WARWICK
WATE RBURYLEONARDBARRONGLENMOOR
H U N T L E I G H
DUNLEIT
HHULLF
AI
RDAL
E
WINGFIELD
HARTJEWEL GREENVIEWBEAUFORD
HOCHGASLITE
MERMOD
ALF RED
NOLAN
FUHRMANNEARLSTURGIS IOLACLAYROCKHILLOAKPRIV ATE
PARPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11069
15TASK NO:
TASK NAME:
$1,350,000BUDGET:
FUND:
Rock HillMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 149
ROCK HILL SANITARY RELIEF (SKME -618)
Construction Task
6660 - SanitaryReplacement Fund
SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11885.
§¨¦170
§¨¦170
CLAYTON HANLEYBRENTWOODME
T
ROL
I
NKDAVIS
FORSYTH
WENNEKERMARYLAND
FO R E S T P A R K
F
RANCI
S
S H A W P A R K
CENTRALLOUWENMERAMECBEMISTONPOL
OHUNTERBONHOMME
WESTWOODLANGTONTOP
T
ON
G
AY
WATKINS
DR
O
MA
RALINDENCARONDELET
P A R K
T
A
N
GL
E
WO
OD
WYDOWNCARSWOLD
MCCUTCHEONDAYTONA EDGEWOODRE ARPOINTER
G A LLERIA
HA L I F A X
YORKBRI
G
HTON
VENETIAN
C O L M A R
CRES
C
E
N
T
BYRONOAKLEYORLANDOBLACKCREEK
ROSILINE
LAKEFORESTBERKSHIRESUDBURYPRIVATE LYLEWALINCA
W H I T B U R N MOHAWK
BILTMORECENTRAL M E T R O L IN KLINDEN
FOREST PARK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11680
15TASK NO:
TASK NAME:
$1,070,000BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 150
ROXBURY I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849.
BOONECLARKST MARIE HARRISON
WASHINGTONLAFAYETTEJEFFERSON
CASTELLORUE ST LOUIS
AUBUCHONRUE ST FRANCOISRUE ST CATHERINE
ST JACQUESRUE ST DENIS
ST JOSEPH
RUE ST JEANRUE ST ANTOINE
ALPHARUESTPIERREST LOUISST JEANST FRANCOIS
REGINA
B E T A LILABROWNST EDITHELMDALERUE ST FERDINANDST CHRISTINAST FERDINANDS
T
A
LBERT
ST ALICE
NEWFLORISSANT
ST AUGUSTAST PIERREBROWNBROWN§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11666
15TASK NO:
TASK NAME:
$250,000BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 151
ST MARIE SANITARY RELIEF I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11857.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11898
17TASK NO:
TASK NAME:
$600,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 152
SUPPLEMENTAL ENVIRONMENTAL PROJECTS(SEP) PROGRAM
Work Order Repair Costs(Capital)
4102 - ImprovementFund
CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLIONTO DECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACEDEFECTIVE LATERALS.
AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS AREIDENTIFIED AT LOW INCOME OWNER OCCUPIED PROPERTIESTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEISSUED. PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITALSERVICES.
THIS PROJECT WAS UNDERTAKEN IN CONNECTION WITH THE SETTLEMENT OFAN ENFORCEMENT ACTION, UNITED STATES. STATE OF MISSOURI. AND THEMISSOURI COALITION FOR THE ENVIRONMENT FOUNDATION V. METROPOLITANST. LOUIS SEWER DISTRICT, NO. 4:07-CV-01120-CEJ, TAKEN ON BEHALF OF THEU.S. ENVIRONMENTAL PROTECTION AGENCY, THE STATE, AND THE COALITIONUNDER THE CLEAN WATER ACT
CLIFFBOUNDARYSHERIDAN
FRANRU
SUNTIDE
LIN TELC
L
A
G
E
R
HALSEY
ESTES OLEDELSYLVIA
RINGERM
ILIS
S
A
WILLETTE
SYLVANSPRINGSBRILLIA NTPRIVATE
S A P P I N G T ON BARRACKS MOHATTANSYLV
A
NWOOD
BIENVENIDOOLEDEL TELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11918
15TASK NO:
TASK NAME:
$132,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 153
TELEGRAPH ROAD #2928 I/I REDUCTION
Construction Task
1101 - General Fund
BUILDING AND LOT STORM DRAINS CONNECTED TO SANITARYSYSTEM ARE CAUSING CAPACITY ISSUES.
REMOVE STORMWATER FROM THE SANITARY SYSTEM BYCONSTRUCTING 500 FEET OF 12-INCH STORM SEWER. SYSTEM WILLBE TURNED OVER TO THE PROPERTY OWNER AS A PRIVATE STORMSEWER.
§¨¦170
§¨¦170
WARSONHANLEYASHBYLACKLAND BROWNWOODSONDIELMANDELMAR
LADUE
PAGE
A D IELINKSIMSUNION P A C I F I C
CAN T O N
GRAESERO L D B O N H O M M E
BALTIMORE
WALTONBURNSCENTR
ALMIDLAND
NORTH
SCHUETZ
82NDRIDGE
MARYLAND
ECHOBA
L
L MCKIBBONG R O BYDRIVER
NIBLIC DIXCORNELLDAUTELPOELITZREXME
S
ATRESCOTT
81STOAK
SHAFTESBURY
ENGEL HOODMEEKS
PERSHINGKREMDYERLAFONWHEATONWINDOM
CAN T ERENDICOTTTERMINALSC
HA
E
F
E
R
GUELBRETHMILTONGASSTHORPE
MONROEMARSHALLEMINENCE
P
R
I
CETEASDALE
WAYNE
RESEARCHAHERNLAMBHURON LYNDHURSTT E A L W O O D
ZYKANLIBERTY AIRWAYALBINWISMER
P
R
I
V
A
T
E
ELMORE
ARDELIA
RIOVISTAANN
EADS
WARNEN
T R E N TON
OLIVAIREGAYC L E R M O N TSENECA
AMHERST
G ULFMALINESONAOAKLEIGHBALSONCALVERTFLORA
ALDEN HEATHER HILLPALMERBOOTHBROUSTER
KEMPLANDANDESTOWNLEY
ASHLANDARBORLITTLE
LISA
GARFIELDPLUM
RABEJOHN
MASHIEALBEYAPACHE
VILLAPRICEOAK
PAGE
AMHERSTADIEOAKDIXCANTER
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11929
15TASK NO:
TASK NAME:
$4,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 154
UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER THAT ARE DEFECTIVE.
REHABILITATE 21,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11672.
§¨¦70
§¨¦170
§¨¦170
WRIGHTMETRO L I N K
NORTH HANLEYKATHLYN BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAMBERTINTERNATIONAL
MARGOANN
DIXWISMERSCUDDER
BOSWELL5TH
HAROLD BROWNEDMUNDSONST LEOFAIRFIELDBENSON HERBERTPEAR TREE
BATAAN
MARVINCAMTIPTONG E N A I R E
ISOLDASTGREGORYMCNULTYTREADWAY
ROYLAGUARDIAW INNMURIEL
EASTRIDGEPATRIC
K LEBOURGETEDMUND
LEITHMARSHALLVANCELIVINGSTON
ROYALTONISAB ELLE
HOLTWICKINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD
NORTH
METROLINK
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11681
15TASK NO:
TASK NAME:
$350,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 155
UPPER COLDWATER SECTION D I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
§¨¦70
NORFOLK SOUTHERN
BERMUDAMABLEHARVEYHANL
E
Y
E V A N S
S U B U R B A N
WOODSTOCK
D A R S T
FERGUSON
CARSON
5TH ELI
ZABETHBARATP A U LDADE
W IE G E L DENNISCLARKMETROLINK GEORGIADELLWOODL E E DAYTI F F I N
K A P P E L
L ANGKIRK
HILLPLAZA FORESTWOODHALEYR U G G L E S GAGEELLISONGRAF
EN IDAMESB L A N D I N G RANDBROTHERTON
C H U R C H
LURCH
KINGHILLSLUCAS N HUNTHEYDT
SCOTT
HAWKESBURYMUELLERZOE
BRAN D
WESLEY H I GHMONT VENICEELKAN
SUNBURYHERNBEHLEA IR PO R TR O YA L
PAYNEEATONARGENTSTLO
UIS AVERILLMARIESCHLUETERL O U IS ASPRINGTHOR O U G H M A N
HOLBOR
NLAUREL
JAMESCLAYALINE
HUGO FERMOMILLMANHARRISON FEN
W
I
CKG A R V IN
D A R T M O O R
G E IG E RMARGUERITEWULFFOAK ELMDALEHENQUINGRO
V
E
COOLI
DGEWYLINLAMMERT
PRIVATE
BERNHARDT
ELSIEEVERETT
TILFORDDONBARSTANZA
S I G N A L HILLDADEEVANS
TIFFIN
HERN§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10026
15TASK NO:
TASK NAME:
$7,500,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 156
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ONE CONSTRUCTED SSO TO BEREMOVED, BP-305.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $12,500,000.
§¨¦170
§¨¦170
PAGE HANLEYCANTON
TERMINALWOODSONNORTH N SOUTHPURDUE82NDWALTONBROWNGROBY SHAFTESBURY81STLYNN
MCKNIGHTRAFTPARTRIDGEMONROE
WAYNE
HILLTOPU N I O N PACIFIC
QUENDOAHERN LAMB78THBLOO
M
WILSONMILTONALBIN
WHEATONLIBERTY
MALLARD
B
RADDOCK
A
L
E
R
T
WATTSELMORE
DREXELGRANTEADS
RICHARDBELT WAYTITUS
S
H
E
RID
A
N
DORSETGAYUT
I
CASENECA
MENDELLMEYERMILAN
WELLINGTONGAEBLERGULF
M
O
N
AGOODALE NIXONVINITAPRIVATELE PERELINK
B A LSON FARISGILROSEUNDERHILL
R A C IN E
A
L
A
N
S
ON FAIRVIEWADDIEH A R N E Y
CARLETON
RAISHERBRA S S IE
GARFIELD
RABEFULLERTONPENNELL
BRADFORDVERLBALFOUR
HOW
BUCHANAN
MELROSE
MOUNT OLIVELAUGHLINCRIXDALE
ARCADIAELCOCRYSTALREAR
MILLET
CHAPININDUSTRIALTABER
PARK
B L A N C H A
PARAMOUNT
PUTTERANNABERGAMOTERI
THKALEN
WAYNE
GAYMELROSEOLIVEBLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10027
15TASK NO:
TASK NAME:
$3,000,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 157
UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595)
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS.
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH SANITARY RELIEFSEWER. REMOVE CONSTRUCTED SANITARY SEWER OVERFLOWSBP-419 AND BP-435, AND COMBINED SEWER OVERFLOWS L-100 ANDL-1 01.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,020,000.
ELMGLENDALE
ALBANYTURF ROSEREAVISCENTRALGORER
OCK HILL
OAK TREE
FIR W O O DDRAYTONSHORT
ST GEORGEGR
A
Y
OLACLARA
D O BBINW ILSHIREWEB STERACRESBRIGH
T
S
I
DEELMGRAYELM§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11086
15TASK NO:
TASK NAME:
$1,120,000BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Mackenzie CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 158
WEBSTER ACRES SANITARY SEWERREPLACEMENT
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUE TOROOT INTRUSION AND STRUCTURAL DEFECTS IN THE EXISTING MAIN.
CONSTRUCT 2,250 FEET OF 8-INCH SANITARY RELIEF SEWER TOREPLACE DETERIORATED 6-INCH PIPE, 900 FEET OF 12-INCH TO18-INCH STORM SEWERS, AND PUBLIC AND PRIVATE I/I REDUCTION.
PAGE
FLORA BURNSECHO
RIDGE
MIRIAM
TRESCOTT
WISMERSPENCERHOODTHEODOSIASIMS GAEBLERZYKAN WENGLERLACKLANDWALLISCOTE BRILLIANTE
IVELAND
LULLABY
EASTBROOK DAWESMINERVA
ROMAINEOVERLANDRHYTHMNORTHFIELDCEDARGLEN
PAGEWOOD
NIBLIC
MEADOW VIEW HUNTINGTONDRIVER
DIELMANHUNTINGTONWALLISWENGLERSPENCERCOTE BRILLIANTEDAWES
MINERVA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11108
15TASK NO:
TASK NAME:
$1,200,000BUDGET:
FUND:
OverlandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 159
WISMER - HUNTINGTON SANITARY RELIEF (SKME-592)
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND TWO CONSTRUCTED SANITARY SEWEROVERFLOWS.
REPLACE 2,500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER WITH12-INCH TO 2 1-INCH SANITARY SEWER. REMOVE TWO CONSTRUCTEDSANITARY SEWER OVERFLOWS, BP-426 AND BP-626.
14 April 2014
WASTEWATER CONTINUED PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10523 AYRES SANITARY RELIEF
AND I/I REDUCTION
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014.
$2,200,000
10014 FF-11 FEE FEE CREEK
SANITARY RELIEF
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014.
$4,100,000
10489 FF-15 MCKELVEY/R.R. TO
ADIE SANITARY RELIEF
PHASE III
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014.
$6,000,000
10142 FORESTWOOD SANITARY
RELIEF (SKME-435)
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN NOVEMBER, 2014.
$2,100,000
10611 GC-06 GRAVOIS CREEK TO
BRIARSTONE AND GATES
SANITARY RELIEF
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN FEBRUARY, 2015.
$3,000,000
10496 GRAVOIS TRUNK
(WHITECLIFF TO RDP)
SANITARY RELIEF PHASE
III IV & V (SKME -521)
PROJECT CONTINUED DUE TO COORDINATION WITH
AMEREN AND UNION PACIFIC RAILROAD. ANTICIPATE
BOARD INTRODUCTION IN MAY, 2015.
$5,000,000
11656 MALINE CREEK CSO BP 051
& 052 LOCAL STORAGE
FACILITY (CHAIN OF
ROCKS DR TO CHURCH
DR)
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION
(FINAL SITE FOR FACILITY IS NOT YET ESTABLISHED).
ANTICIPATE BOARD INTRODUCTION IN JANUARY, 2015.
$2,000,000
10716 NEW ENGLAND TOWN
QUARRY PUMP STATION
(P-307) (SKME-544)
IMPROVEMENTS
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JULY, 2014.
$4,200,000
TOTAL: $28,600,000
14 April 2014
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
$1,900,000 160
10407 BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
$2,500,000 161
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
$7,000,000 162
11871 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
$2,280,000 163
11926 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
$2,700,000 164
11009 CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
$500,000 165
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$1,000,000 166
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$25,000,000 167
11730 CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
$2,500,000 168
10021 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE I
$10,000,000 169
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
$270,000 170
10014 FF-11 FEE FEE CREEK SANITARY RELIEF $2,700,000 171
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
$4,700,000 172
10142 FORESTWOOD SANITARY RELIEF (SKME-435)$1,425,000 173
10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
$2,000,000 174
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III IV & V (SKME -
521)
$11,300,000 175
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
$2,760,000 176
14 April 2014
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10656 INFRASTRUCTURE REPAIR #087P CAULKS
CREEK A (P-750) PHASE VI
$2,700,000 177
11054 KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
$900,000 178
11927 LEMAY PUBLIC I/I REDUCTION (2015)
CONTRACT B
$3,200,000 179
11650 LOWER MERAMEC WATERSHED I/I REMOVAL $1,600,000 180
10716 NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
$3,100,000 181
10737 POWELL AVE AND ANNALEE SEWER
SEPARATION
$320,000 182
11877 PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM (FY2013)
$500,000 183
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
$500,000 184
10026 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
$5,000,000 185
10027 UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
$2,020,000 186
TOTAL:$100,375,000
§¨¦40
§¨¦270
§¨¦40
§¨¦270
CLAYTON RD
N BALLAS RDN GEYER RDDESPERESRDTOPPING RDNORTH F O R T Y DRMANCH E S TER RD BOPPRDS SPOEDE RDTHORNHILL DR
RUTH DRWOODGATE DRP I N G R Y P L
O A K VA L L E Y D R
SOUTH FORTY DR
TAMMANYLNS
QUIRESLNDRYRIDGERDROCLARE LNO L D C O L O N Y L N SELLENRICK RDBRIDLE LNPORTLANDDR
FIRETHORNDRG R A YDRBARNBRIDGE RDP O IN T O A K RD
BOPP LN
C H IP P ER R D
HICKORY L N
ROTH DRMALVERN DR
TREGARON PL
HOLIDAY LN TUCKER LNELAINE DR DIVOT DRVINETTA DRDARIEN DR
CLAYTON PLACE DRGLENMARO LNBOPP RDN BALLAS RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11934
15TASK NO:
TASK NAME:
$1,900,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 160
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/IREDUCTION
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 60,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,900,000.PUBLIC I/I REDUCTION FROM 11682.
BAUMGARTNER RDWINDFORD DR
SKY HI
LL DRFOXFIREDR
MILBURN RDCHALET HILL DRBL
ACKF
ORESTD
R FIRELEAFDRCHALETFORESTDRWESTPHALIALNOLD BAUMGAR T N ERR D WALDWICK DRNAHN DR DELI
NTRYDRD E LOAKDRSEAGRAVE CTINNSBRUCK DR
PIN OAK TERRACE CT
S A N D E R S D R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10407
15TASK NO:
TASK NAME:
$2,500,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 161
BAUMGARTNER & BLACK FOREST SANITARYREPLACEMENT PHASE II
Construction Task
6660 - SanitaryReplacement Fund
SANITARY BACKUPS, OVERFLOWING MANHOLES, ANDOVERCHARGED SANITARY SEWERS DURING WET WEATHER EVENTS.
CONSTRUCT 3,700 FEET OF 8-INCH TO 15-INCH SANITARY SEWER,FROM 5 00 FEET SOUTH OF BLACK FOREST TO CHALET FORESTDRIVE.
FE R R Y S TTERMINAL RRE GRAND AVEN
O
R
F
OL
K
S
OU
T
H
E
R
N
R
R
N 2
N
D S
T
H
A
L
L S
T
TERMINALRRN
ORFOLKSOUTHERNRR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11920
15TASK NO:
TASK NAME:
$7,000,000BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 162
BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS.
CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS.
$5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16.
§¨¦170
§¨¦170ASHBY RDLACKLAND RDWOODSON RDBROWN RDPAGE AVEADIE RDST CHARLES ROCK RDMCKIBBONRDNORTH AVE
KATHLYN DR
WALTONRDWRIGHT AVESIMS AVEBALTIMORE AVE
BURNS AVEARGYLE AVE
GUTHRIE AVE
ECHO LNLONG DRNIBLIC DR
RIDGE AVE
TRESCOTT AVEWISMER RDBRECKENRIDGE RD
BURTON AVE
NATURAL BRIDGE RD
TERMINAL RRST FRANCIS LN
POE AVEENTITY AVEDIXAVELITZ AVE
CANT E R W AYM ERT AVE
GOODALE AVEH O LTW O ODRDREXAVEMARGOANN LN
ENDICOTTAVEM A D D O X PL
ENGLERA V E
KREM AVESTH E N R YLNTHORPE AVE
DYER AVEOAK AVE JANEAVESANJOSELNHAROLD DR
FOREST AVE
WURDACK AVE
FARVIEW AVE
S
T
K
ATHERINELN
WISMER AVEBRISTOW AVECLARENDON AVE
TRENTON AVE
GEDDE AVE
MCNULTY DR
ZYKAN DR CALVERT AVESTELLA AVEMINERVA AVEISOLDA AVES MILTON AVELYNROS DRFLORA AVE
LEITH AVE
SIMSAVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11871
15TASK NO:
TASK NAME:
$2,280,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 163
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT D
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 67,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11662, 11663, AND11712. SUPPLEMENTAL FUNDING OF $2,280,000 IN FY 16.
§¨¦270
§¨¦70
§¨¦170
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11926
15TASK NO:
TASK NAME:
$2,700,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 164
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT G
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11681, 11739,11738, AND 11710. SUPPLEMENTAL FUNDING OF $2,700,000 IN FY 16.
S P R U C E HAVENDR
C
R
AIG R
D CHANDELLAY DRBARKMAN DR TIMBERWOOD LNH O L L Y SPRINGSDRSU M M E RHAVENDRSHADYSIDELNSPRUCEORCHARDDRWATERWO
O
D
L
N
JEANNEHILLSDR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11009
15TASK NO:
TASK NAME:
$500,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 165
CHANDELLAY DR. SANITARY SEWERREPLACEMENT
Construction Task
6660 - SanitaryReplacement Fund
CRACKED AND COLLAPSED SANITARY SEWER AND AN INVERTEDSIPHON L EADING TO BUILDING BACKUPS AND INCREASEDMAINTENANCE.
REPLACE 1,330 FEET OF 8-INCH SANITARY SEWER, INCLUDING 200FEET OF PIPE IN TUNNEL, AND 160 FEET OF 48-INCH STORM SEWER.
§¨¦270 DUNN RD
PERSHALL RD
FORD LN POLSON LNTAYLOR RD
NORFOLK
SO
U
T
H
E
R
N
R
RNORFOLKSOUTHERNRR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
11TASK NO:
TASK NAME:
$1,000,000BUDGET:
FUND:
HazelwoodMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 166
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT.
$2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION.
§¨¦270 DUNN RD
PERSHALL RD
FORD LN POLSON LNTAYLOR RD
NORFOLK
SO
U
T
H
E
R
N
R
RNORFOLKSOUTHERNRR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
15TASK NO:
TASK NAME:
$25,000,000BUDGET:
FUND:
HazelwoodMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 167
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Construction, Phase II
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT.
$2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION.
§¨¦70LUCAS N HUNT RDBERMUDADRLILLIAN AVESUNBURY AVECOLLEGE AVENHILLSDRMCLARAN AVENELSON DRKENWO O D DR
CALVINAVE
RAVI NIA D
R
ROHN AVE
C
O
UNTR
Y
C
L
U
B
DR
SAN
DIEGO
AV
E
AUGUSTA
AVEROSEDALEDR ALBIA TERNATURALBRIDGERD
BEULAH AVE
FLORIAN AVE APRICOT AVEOVERBROOK
D
R
FLETCHER STROLAND BLVDHOLBORNDR CHANDLER AVE
GROVELAND DR
STANWOOD DR
MATHE WSTTHEODOREAVE
WINCHESTER
DR
B
E
R
M
U
D
A
C
T
FOREST HILL DR
PADDIN G T O N D R
CONTOURDR
ROHN DRNORWAY DRESTERBROOKDR
EL LI N GTO N D R
WARWIC K D R
BURRWOOD DR
PINE RIDGE DR
S
R
O
L
A
N
D
BLVDFARLEY AVE
SANTA MONICA AVE LEVERETTE AVEMELBAAVEROLANDBLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11730
15TASK NO:
TASK NAME:
$2,500,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 168
CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059)
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNEL,AND 1,3 00 FEET OF 8-INCH TO 30-INCH SANITARY AND STORM SEWER.ELIMINATE CSO OUTFALL BP-059, SSO BP-255, AND SSO BP-256.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000.
M A N C HES TER RD
LITZSINGER RD
CLARK AVE
NEWPORT AVEUNIONPA CIFICRR
N ELM AVEMARSHALL AVESMCKNIGHTRD
TUXEDO BLVD
ROSALIE AVE
WHITE AVE
EULALIE AVE
S BRENTWOOD BLVDATALANTA AVE
GLEN RDBELL AVEEUCLID AVE HIGHSCHOOLDRLITHIA AVE
EKIRKHAMAVEMADGE AVE
LOUIS AVEN FOREST AVESALEMRDEPACIFICAVE
CORNELL AVEFAIRVIEW AVEMCKINLEY AVEHOLLAND AVEMADISON AVE BREMERTON RDRUSSELL AVEN ROCK HILL RDELDRIDGE AVE CECELIA AVEFLORENCE AVE
MARY AVEROCKMAN PLD E S P ERESAVELAFAYETTE AVEPARK L NBACON AVE ANNALEE AVEEUNICE AVELEONARD DRSTCLAIRAVEPRIVA TERDPOCAHONTASPLGREELEY AVE
BISMARK AVE
ARBOR LN BRAZEAUAVEMELVIN AVEJOSEPH AVE
SUMMIT AVEPORTER AVESUMMIT PLCHARLEVILLE AVECHARLANE CTB E R R Y A V E HILL AVEBOMPART AVEHILTON AVEDOUGLAS CTPATTON AVEN ROCK HILL RDMARYAVEN ROCK HILL RDFAIRVIEW AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10021
15TASK NO:
TASK NAME:
$10,000,000BUDGET:
FUND:
BrentwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 169
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE I
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATESURCHARGING AND ELIMINATE CONSTRUCTED SSOS.
PRO JECT 10 021 NAME CHANGED TO INDICATE INCLUSION OF SCOPEOF PROJECT 10486, DC-03 SANITARY RELIEF. PHASE I OF A MULTIPHASE CONSTRUCTION PROJECT.
C H IE F T A IN D R
PEM RDCRAIGVIE W DRC
R
AIG R
D
M OM ARTE LND EC O R A H D R SCH
U
E
T
ZRD
P A T T Y A N N D R
BA RKMANDR
MIR
A
N
D
Y
D
RCHANDELLAYDR D
A
U
TEL
L
N
GOLD LEAF DR
H O LLYSPRINGSDRS P R U CEH A V E N DR SCHULTE RDT
I
M
BE
RWOODL N SUMMERHAVENDRWE
A
THERBYDR
SHALLOW B R OO K D R
C R IM S
O
N
D
R
FEATHER W O O D D R
WATERWOODL
N
MEAD O W LAKED R
VILLAGE DRJEANNE HI
LLS DRL IN F R E D D R
LONGLEAF CIR BRO
N
C
OLN
QU IE T L N
THAMES CTSI
GNAL CTS
C
H
U
L
T
E
R
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11745
11TASK NO:
TASK NAME:
$270,000BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 170
FEE FEE TRUNK SEWER RELIEF (SKME-002, LONGLEAF CIRCLE TO THAMES COURT)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,920 FEET OF 21-INCH SANITARY SEWER. REMOVECONSTRUCTED SSO BP-078
§¨¦270
§¨¦270
R
O
THHILLDR PROGRESS PKYSCHULTE HILL DRMCKELVEY RDLEIGH LN
GLENBUSH DR
KIMLER DRWO
O
D
H
O
L
L
O
WDR
BERN I E L N
G LENGATEDR
DA W N HILLDR MCKELVEYHILLDRGLENMEADE DRAMERICANI
NDUS
T
RI
AL
DRLORICIR
GLENLEADR BERNIE CIR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10014
15TASK NO:
TASK NAME:
$2,700,000BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 171
FF-11 FEE FEE CREEK SANITARY RELIEF
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH SANITARY SEWER,FROM 1 876 W OODHOLLOW DRIVE TO PROGRESS PARKWAY. PART OFPROJECT TO BE BUILT BY THE CITY OF MARYLAND HEIGHTS, AS PARTOF A RO AD IMPROVEMENT PROJECT.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,800,000.
FEE FEE RDA D I E R DSCHUETZ RDCHAFFEE DRMETRO BLVDNORFOLKSOUTHERNRRG
R
I
S
SOMDRMIKEL AVEMETRO CT
NORTHLINE
I
NDUSTRI
ALBLVDF
AIR
G
R
O
VEINDUSTRIAL BLVD
CENTERLINEINDUSTRIALDRNORTHL IN E IN D U ST R IA L D R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10489
15TASK NO:
TASK NAME:
$4,700,000BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 172
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEFPHASE III
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
THE THIRD AND FINAL PHASE OF A MULTI-PHASE PROJECT. THISPHASE CONSISTS OF THE CONSTRUCTION OF 4,700 FEET OF 8-INCHTO 42-INCH SANITARY SEWER SOUTH OF SCHUETZ ROAD.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $10,700,000.
HEINTZ RDERB RD
TELEGRAPH RDB A U M G A R TN ER R D BLACKFOREST DR
CHRISTOPHER DRC L I FFWOOD T R A IL
ENGLAND T O WN RD
PRIVA
T
E
RD
S U S A N R D
SEA NPKYPION E E R D R
GATLINGDR
TEL HAVEN CTCHALETHILLDR
TANZMAR DRSANDERS DR
S T A E H L E C T
FAITH DR
NAHN DR
PRIVA TERD
PRIVATE RD
PIONEER DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10142
15TASK NO:
TASK NAME:
$1,425,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 173
FORESTWOOD SANITARY RELIEF (SKME-435)
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,980 FEET OF 8-INCH TO 18-INCH SANITARY RELIEFSEWER, 420 FEET OF 8-INCH FORCE MAIN, AND REPLACE THEEXISTING PUMP STATION (P-428).
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $3,525,000.
G R A V O IS R D
MUSICK RDBAPTIST CHURCH RDPRIV A T E R DLITTIE RD
GARBER RD
TESSONFERRYRD
EDDIE N PARK RDP ARDEE RDS LINDBERGH BLVD DANDRIDGEDRTESSHIRE DRVARGAS DR
PATRINA C T
SAPPINGTONACRESDRFARADAYDR
F A WNH A V E N DR
ROSCO MMONDR
GOLF CRESTDR
MAPLE LNB RIARSTONEDRPICKWICKDRCINN A B A R D R
EMIL AVEMEATH D RCHARRETTE DR MCNARY DRMUELLER RDCORDO BALNPINE FOREST DR
TORIGNEY DR
VALDA M E R E D R
GAIL CT KAMPING LNSONATA DRBI
MINIDR
WILLINDA DR
EDGECLIFFE DR
L
A
S
VEGASDRCORAL RIDGE DR
STOLZ RD
S
LEVINLNGENEL DRFABICK DRCRECELIUS DRDESMON DDRTIMOTHY LN
C O S M O S D R
LAVINIA DRJU N IP E R C T
L ARKSPURDR
FITE CIR
P
RI
V
AT
E
RDMEATH DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10611
15TASK NO:
TASK NAME:
$2,000,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 174
GC-06 GRAVOIS CREEK TO BRIARSTONE ANDGATES SANITARY RELIEF
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 24-INCH TO 36-INCH SANITARY SEWERS.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000.
§¨¦55
§¨¦55
UNION RDHOFFMEISTERAV ESPRING DR
PAULE AVE
MARCHI DRMOUNT OLIVE RD VIRGO LNAVENUE H STTRACY LNB
I
GCHI
EFD
R
MALCOLM DR
FABIAN DR
DOLBIL DR
DAR LN
MEREDITH DRBILRON DR
RIPA AVE SIOUX DRZEISS AVEREXFORDD RFRIARTUC KLNRUTHERFORDDR UNIONPACIFICRRORIENT AVEAVENUE I STPUEBLODRLABETTE DRBIRCHWOOD PL
K A Y LN
JESSE DRAVENUE H ST§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10496
15TASK NO:
TASK NAME:
$11,300,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 175
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELIEF PHASE III IV & V (SKME -521)
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNKSEWER. PROJECT INCLUDES REMOVAL AND REPLACEMENT OF AUNION PACIFIC RAILROAD TRACK SPUR.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $16,300,000.
T E R M IN A L R R
ST LOUIS AVE
CLARA AVEGREER AVE BELT AVEGOODFELLOW BLVDLABADIE AVE
NATURALBRIDGERD
HERBERT ST
ROOSEVELT PL
TERRY AVE
PALM ST
SEMPLE AVEHAMILTON AVEBROWNAVESEL
B
E
RCT
ASHLAND AVESIEMERS LNROWAN AVEASHLAND AVE TE R M IN A L R R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11768
15TASK NO:
TASK NAME:
$2,760,000BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
HarlemWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 176
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(DETENTION BASIN)
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS ANDFLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNKSEWERS.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,460,000.
§¨¦40 OLIVEBLVDC E N T R A L M ID L A N D R R
LADUE RD
W
E
S
T
D
RHOGHOLLOWRDSWINGLEYRIDGE RDPRIVATE RDA
P
P
A
LACHIANTRAIL
WATERW O RKSRDWCHESTERFIEL DPKY
W HITERDPETZOLD RDA
R
R
O
W
HEAD
ESTATE
S
L
N DINSMO
O
R
D
R
W E S T E R N M I L L D R
PRI VATERDP R IV A T E R D
W
HITERD
P
RIV
A
T
E R
D
PR IVATERDW H ITERD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10656
15TASK NO:
TASK NAME:
$2,700,000BUDGET:
FUND:
VariousMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Caulks CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 177
INFRASTRUCTURE REPAIR #087P CAULKS CREEKA (P-750) PHASE VI
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FO RCE MAIN IS DETERIORATED.
CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,500,000.
GREGG RDTELEGRAPH RDGRANTRDW R I P A A V E
TELFORD DRCCCRDWEMBLEY DROUTER RDRE
A
VIS
B
A
R
R
A
C
K
S
RD
BOUNDARY RDLARK AVECLYDE AVECLAGERRDJEFFERSONIAN DR
LAMBETH LN
NEBRASKATRAIL
WALWORTHDR
E RIPA AVE
BROOK AVERIVER RDGAR K ST
SIGSBEE AVE LINNAVEMEADOW AVELUNA AVEPRIV
A
T
E
RD
G R ANDADRSADIE AVENORTH RDSOUTHAMPTONDR
CYER D
ELLEN AVE
BELLSWO R T H D R
EARLSFIELD LNTACOMA DR
POPLARFORESTDRWESTAIR DR
WALDENDR
LAREDO AVEELLWINEDR KASKE DRBUNKERRDG
ENE
V
ADRKEVIN DRBEATRICE AVE
TEDDY AVE
SOUTHWARK LN
BARNSLEY DR
R A INBOWDRPENTONVILLE DR
HAWSON DRREES AVEKENNY DRWYCLIFFE CT
CORLISS DRPRIVATE RD
RAINBOW DR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11054
15TASK NO:
TASK NAME:
$900,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 178
KINGSTON I/I REDUCTION AND PUMP STATIONELIMINATION
Construction Task
6660 - SanitaryReplacement Fund
INFL OW CONTRIBUTING TO OVERCHARGED PUMP STATION ANDSEWERS.
CONTRO L SURCHARGING AND ELIMINATE EXISTING PUMP STATIONP-326 THROUGH DISCONNECTION OF PRIVATE I/I SOURCES ANDSEWER IMPROVEMENTS. REDIRECT TWO STREET INLETS FROMSANITARY TO STORM SYSTEM.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11870.
§¨¦55
§¨¦44
§¨¦270
§¨¦255
§¨¦270
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11927
15TASK NO:
TASK NAME:
$3,200,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 179
LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 63,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11776, 11740,11667, 11155, AND 11097. SUPPLEMENTAL FUNDING OF $3,200,000 INFY 1 6.
§¨¦55
§¨¦255
§¨¦55
LEMAYFERRYRDRINGERR D
YAEGER RD
TELEGRAPHRDFORDER RD
B A UMGARTNER R D
MATTISRD
MILBURN RDKERTH RDMILD DRHEINTZ RDBUTLER HILL RD
OLDBA UM G ARTNERRDAMBS RDMEHL AVELIND RD
B
L
ACKFOREST DRHAWKINSFUCHSRDAQUARIDGEDRTHE
IS
S
R
D
FIRELI G H T DROLSEN DRL E M A Y W O O D S DR BERVIEW LNPRIVATE RDVALLEYSIDELNIVONDALE LNL
O
N
GVIEWDR
FIRELEAF DRFUCHS RDIDECKERDRDELOAK DR
EILEEN ANN DR
CROSSWOOD DRTAR L T O NDRPRIVATE RDPRIVATE RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11650
15TASK NO:
TASK NAME:
$1,600,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 180
LOWER MERAMEC WATERSHED I/I REMOVAL
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT.
REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TOREMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,600,000.
§¨¦255§¨¦255
TELEGRAPH RDUNIONPACIFICRRKOCH
R
DCLIFFCA
VE
R
D BUS S E N RDMAGOFF I N RDBURNCOATEDR
FORDER RD
ENGLANDTOWNRD
YAEGER RD
E
P
O
TTLEAVE
R O B ER TKO C H H O SPI T AL RD
BLUFFRDBUSSENQUARRY RD
MARTIGN E Y D R
C A T H EDRALDR
PRIVATERDWHITSHIRE DR
CHATPORT RDMARSEILLEDRBAUMGARTNERRD
ROLENS DR
PIONEE R D R
TEL HAVEN CT
BERTRAND DR
MALONE DR
PRIVATERD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10716
15TASK NO:
TASK NAME:
$3,100,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 181
NEW ENGLAND TOWN QUARRY PUMP STATION(P-307) (SKME-544) IMPROVEMENTS
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
TWO LIFT STATIONS ARE AT THE END OF THEIR LIFE CYCLE, AND ONEIS RECEIVING ADDITIONAL FLOWS DUE TO ELIMINATION OF THEOTHER PUMP STATION.
CONSTRUCT 8,900 FEET OF 8-INCH TO 18-INCH SANITARY SEWER ANDELIMINATE TWO PUMP STATIONS (P-307 AND P-323).
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL CONSTRUCTION BUDGET IS$7,30 0,000 . INCLUDES CONSTRUCTION OF 10715.
MADGE AVE
MANCHES TE R R D
S BRENTWOOD BLVDBREMERTON RDHIGHSCHOOLDRPOWELL AVE
COLLIER AVEMANDERLY DRPRIVATE RDBRAZEAU AVELAWNDELLD R ANNALEE AVEW PENDLETON AVEHILLDALE AVEMAGDALEN AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10737
15TASK NO:
TASK NAME:
$320,000BUDGET:
FUND:
BrentwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 182
POWELL AVE AND ANNALEE SEWER SEPARATION
Construction Task
6660 - SanitaryReplacement Fund
ISOLATED SECTION OF COMBINED SEWER DIRECTED TO SINKHOLEAND ADVERSE GRADES IN SANITARY SEWER LEADING TO BUILDINGBACKUPS AND INCREASED MAINTENANCE.
REPLACE 700 FEET OF 8-INCH DIAMETER SANITARY SEWER ANDREDIRECT SANITARY FLOW FROM COMBINED SEWER. CONSTRUCTPUMP TO FACILITATE SEPARATION.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11877
17TASK NO:
TASK NAME:
$500,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 183
PRIVATE INFLOW AND INFILTRATION REDUCTIONPROGRAM (FY2013)
Work Order RepairCosts (Capital)
6660 - SanitaryReplacement Fund
PRIVATE SO URCES OF INFLOW AND INFILTRATION AREOVERCHARGING SANITARY SEWERS.
PRO GRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCESINTO THE SANITARY SYSTEM.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11898
17TASK NO:
TASK NAME:
$500,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 184
SUPPLEMENTAL ENVIRONMENTAL PROJECTS(SEP) PROGRAM
Work Order RepairCosts (Capital)
4102 - ImprovementFund
CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLIONTO DECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACEDEFECTIVE LATERALS.
AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS AREIDENTIFIED AT LOW INCOME OWNER OCCUPIED PROPERTIESTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEISSUED. PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITALSERVICES.
THIS PROJECT WAS UNDERTAKEN IN CONNECTION WITH THE SETTLEMENT OFAN ENFORCEMENT ACTION, UNITED STATES. STATE OF MISSOURI. AND THEMISSOURI COALITION FOR THE ENVIRONMENT FOUNDATION V. METROPOLITANST. LOUIS SEWER DISTRICT, NO. 4:07-CV-01120-CEJ, TAKEN ON BEHALF OF THEU.S. ENVIRONMENTAL PROTECTION AGENCY, THE STATE, AND THE COALITIONUNDER THE CLEAN WATER ACT.
BERMUDADRHERN DRNORFOLK SOUTHERN RR
WOODSTOCK RD
S U B U R B A N A V E
FERGUSON AVEWIEGEL D R
D A R S T R D
S HARVEY AVEGEORGIA AVECARSON RD
E V A N S L N
R U G G L E S R D FORESTWOODDRBROTHERTON LN
B L A N D IN G D RPAULAVE
TIFFIN AVE
HAWKESBURY DR
C H U R C H S T
KIRK DRS DADE AVEHALEYAVESBARATAVEROYCE DRH A L P I N D R
CAS TRO DR
L E E A V E
H I GHMONTDR
HILL AVE
N HILLS LNSELI
ZABE
T
HA
V
E
ELKAN AVES CLARK AVESTLOUIS
A
V
E
WELEBAAVERENSHAWDR
BEHLE AVEPAYNEAVEGRAF AVE SHARTNETTAVESPRINGAVED A R T M O O R D R
P A T R IC IA A V EHARRISONAV
EEMERALDAVEFAIRVIEW LN
FERMO AVE
REDMOND AVE
PRIVATERD WYLIN CTA D A M S S T
THOMAS AVEDAMES CTWESLEY AVE
GROVE
A
V
E
ANABEL AVE
ELLIOTT AVEWEEKS AVEA LL E N P L
TILFORD AVENI
TAL CTHASTING CT
TIFFIN AVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10026
15TASK NO:
TASK NAME:
$5,000,000BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 185
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ONE CONSTRUCTED SSO TO BEREMOVED, BP-305.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $12,500,000.
§¨¦170
PAGE AVE
OLIVE BLVD
TERMINAL RR
CANTON AVE NORTH N SOUTH RDWALTONRD82ND BLVDLYNN AVEWOODSON
RDWAYNE AVE
QUENDO AVEBLOOM
D
R
81ST STBELTWAYDR78TH STSHERIDANDRLIBERTY AVE
ALERT
D
R
GRANT DRMONR
O
E
D
R
MENDELL DRB
R
A
DDOCK DR
TITUSRD
WALDRON AVEKEMPLANDP LGROBYRDWELLINGTON AVE
EADS AVE
PRIVATERDHAFNER PLGULFDRMILAN AVEVINITA DRN HANLEY RDMADIS
ONDRFLORA AVE
ELLERTON AVE
CARLETON AVE
UNIONPACIFICRR
TRENTONAVE
MOUNTOLIVEAVEMELROSE AVE RABE DRCRYSTAL INDUSTRIAL CTA T HERTONDRHOW AVE
PARAMOUNT DR
LYNDALE AVENOEL CT
WASHINGTON ST
MELROSE AVE
MILAN AVEAL
E
R
T
D
R
WAYNE AVE
TR E N T ON AVEMILANAVE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10027
15TASK NO:
TASK NAME:
$2,020,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
WastewaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 186
UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595)
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS.
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH SANITARY RELIEFSEWER. REMOVE CONSTRUCTED SANITARY SEWER OVERFLOWSBP-419 AND BP-435, AND COMBINED SEWER OVERFLOWS L-100 ANDL-1 01.
THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,020,000.
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $700,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $2,000,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014)Various $1,000,000
11125 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction
Task
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $630,000
11755 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $500,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT A
Various $65,000
12379 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT B
Various $65,000
12380 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT C
Various $65,000
12381 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT D
Various $65,000
11773 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $1,500,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $610,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $710,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $709,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $799,000
11918 Construction
Task
TELEGRAPH ROAD #2928 I/I REDUCTION Unincorporated $132,000
FUND TOTAL: $17,030,000
4102 - IMPROVEMENT FUND
11898 Work Order
Repair Costs
(Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $600,000
FUND TOTAL: $600,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction
Task
EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $250,000
FUND TOTAL: $250,000
5594 - BLACK CREEK SUBD #455 OMCI FUND
10390 Construction
Task
RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $800,000
FUND TOTAL: $800,000
6660 - SANITARY REPLACEMENT FUND
12080 Design Services ASHBROOK I/I REDUCTION (ASHBROOK DR
AND CHAMBERS RD)
Bellefontaine
Neighbors
$530,000
10523 Construction
Task
AYRES SANITARY RELIEF AND I/I
REDUCTION
Various $2,200,000
11777 Design Services BADEN CREEK EXTENSION (BP-001) (I/I
REDUCTION)
Various $650,000
11934 Construction
Task
BALLAS ROAD SUBTRUNK SOUTH PUBLIC
I/I REDUCTION
Various $5,000,000
11920 Construction
Task
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City And
County
$15,000,000
11920 Construction,
Phase II
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City And
County
$5,500,000
11853 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT A
Various $4,680,000
11854 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT B
Various $4,920,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11857 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT C
Various $3,810,000
11871 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
Various $5,000,000
11924 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT E
Various $4,130,000
11925 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT F
Various $4,490,000
11926 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
Various $5,000,000
12060 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
Various $60,000
12434 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT D
Various $100,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $1,900,000
11685 Construction
Task
BISSELL HILLS SANITARY
RELIEF/CALUMET I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$1,460,000
11686 Construction
Task
BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
Various $235,000
11689 Construction
Task
BLACK CREEK I/I REDUCTION Clayton $5,700,000
12102 Design Services BRIDGEVALE I/I REDUCTION (BRIDGEVALE
AVE AND LAKEVIEW AVE)
Unincorporated $110,000
11788 Construction
Task
CAULKS CREEK PUMP STATION B FORCE
MAIN
Chesterfield $3,100,000
11884 Construction,
Phase II
CEDARCREST PRIVATE I/I REDUCTION
(SKME-561)
Various $380,000
12119 Design Services CHAPEL HILL I/I REDUCTION (MATTIS RD
AND VENARDE DR)
Unincorporated $100,000
11723 Design Services COLDWATER CREEK WATERSHED I/I
REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
Florissant $300,000
11809 Construction
Task
COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Unincorporated $2,800,000
11726 Engineering
During
Construction
Services
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $200,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11726 Construction
Task
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $2,000,000
10557 Construction
Task
COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
Unincorporated $670,000
11964 Design Services CONCORDIA I/I REDUCTION (NE QUADRANT
CLAYTON RD AND BIG BEND BLVD)
Clayton $270,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $3,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $1,000,000
10324 Construction
Management
Services During
Construction
CONSTRUCTION MANAGEMENT SERVICES -
MISSOURI WWTP SECONDARY EXPANSION
& DISINFECTION
Maryland Heights $500,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $3,600,000
12432 Design Services CREVE COEUR CREEK PUBLIC I/I
REDUCTION SOUTH
Various $120,000
11730 Construction
Task
CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $2,500,000
10851 Design Services CSO - MCKNIGHT RD #2737 CSO
INTERCEPTOR (I-298)/OUTFALL (L-161)
Rock Hill $750,000
10576 Construction
Task
DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $1,500,000
10576 Engineering
During
Construction
Services
DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $50,000
11850 Construction
Task
DEER CREEK PUBLIC I/I REDUCTION (2015)Various $5,000,000
11851 Design Services DEER CREEK PUBLIC I/I REDUCTION (2016)Various $150,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $1,800,000
11731 Design Services DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $6,000,000
11734 Land Purchase DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - LAND
ACQUISITION
St. Louis County $6,000,000
11735 Construction
Task
DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
University City $400,000
11743 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
St. Louis City And
County
$3,500,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11079 Construction
Task
FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
Olivette $110,000
11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO
PAGE) (DIAMOND PARK)
Various $2,230,000
11747 Design Services FF-04 QUIET VILLAGE SANITARY RELIEF
(THAMES COURT TO FIESTA CIRCLE)
Unincorporated $300,000
10014 Construction
Task
FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $4,100,000
10489 Construction
Task
FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $6,000,000
10456 Construction
Task
FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION & I/I
REDUCTION
Various $420,000
10440 Construction
Task
FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
Ferguson $1,600,000
10142 Construction
Task
FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $2,100,000
10611 Construction
Task
GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $3,000,000
11751 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
Various $50,000
11754 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
Various $50,000
12064 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
Various $50,000
11763 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT A
Various $50,000
11909 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT B
Various $50,000
11910 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT C
Various $50,000
11911 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT D
Various $50,000
11912 General
Services -
Survey
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (FY2014) CONTRACT E
Various $50,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11759 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
& PROCESS DESIGN (FY2014)
Various $300,000
11779 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
10496 Construction
Task
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III IV & V (SKME -
521)
Unincorporated $5,000,000
11768 Construction
Task
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $2,700,000
10642 Construction
Task
HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION
Unincorporated $3,400,000
10330 Construction,
Phase I
(Supplemental
Appropriation)
HARTLAND TO GOTHLAND SEWER
SEPARATION
Overland $1,360,000
10656 Construction
Task
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK A (P-750) PHASE VI
Various $3,800,000
11708 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT A
St. Louis City And
County
$5,000,000
11866 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT B
Various $5,000,000
11867 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2015) CONTRACT C
Various $5,000,000
11773 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
Various $5,500,000
11710 Construction
Task
ISABELLE I/I REDUCTION St. Ann $100,000
11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $1,660,000
11957 Design Services JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Various $320,000
11713 Design Services LADUE ESTATES SANITARY RELIEF Creve Coeur $70,000
11714 Design Services LADUE SUBTRUNK SANITARY RELIEF
(SKME-654)
Various $700,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11715 Construction
Task
LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
Ferguson $1,400,000
11818 Design Services LEMAY CSO HIGH RATE CLARIFICATION
FACILITY (BROADWAY & LEMAY WWTF)
St. Louis City $330,000
11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $580,000
11856 Construction
Task
LEMAY PUBLIC I/I REDUCTION (2015)Various $4,800,000
11927 Construction
Task
LEMAY PUBLIC I/I REDUCTION (2015)
CONTRACT B
Various $5,000,000
12061 Design Services LEMAY PUBLIC I/I REDUCTION (2016)Various $200,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $3,100,000
11716 Design Services LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
Various $1,350,000
12470 Design Services LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK
Various $130,000
12427 Construction
Task
LEMAY WWTF PLANT CONTROLS Unincorporated $1,500,000
11649 Miscellaneous
Services
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $170,000
11649 Engineering
During
Construction
Services
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $600,000
11819 Design Services LMRDP CSO STORAGE TUNNEL NORTH
DRIVE (RDP PARK TO RDP TUBES)
St. Louis City $2,040,000
11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH
DRIVE CONSOLIDATION SEWERS
St. Louis City $290,000
11820 Design Services LMRDP CSO STORAGE TUNNEL SOUTH
DRIVE (BROADWAY TO RDP PARK)
Various $1,850,000
11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH
DRIVE CONSOLIDATION SEWERS
St. Louis City $200,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
St. Louis City $1,780,000
11746 Design Services LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $3,600,000
11650 Construction
Task
LOWER MERAMEC WATERSHED I/I
REMOVAL
Unincorporated $5,000,000
11656 Land Purchase MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $2,000,000
11656 Design Services MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $2,850,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11659 Construction
Task
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $1,050,000
11774 Design Services MISSOURI RIVER SERVICE AREA I/I
REDUCTION - CREVE COEUR CREEK EAST
Various $50,000
10716 Construction
Task
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $4,200,000
11694 Construction
Task
NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
Pasadena Hills $580,000
12460 Construction
Task
OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
11695 Construction
Task
OLDE ENGLISH I/I REMOVAL Unincorporated $265,000
11697 Construction
Task
PAGE TO TRENTON SANITARY RELIEF Overland $1,000,000
11989 Design Services PARDEE - BLACKTHORN - HOLLY - ARBAN
I/I REDUCTION (WATSON ROAD AND S HILL
ROCK HILL ROAD)
Crestwood $350,000
11094 Construction
Task
PROSPECT HILL LANDFILL VERTICAL
EXPANSION
Various $300,000
11933 Construction
Task
PROVIDENCE PUBLIC I/I REDUCTION Webster Groves $3,000,000
11701 Design Services PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $200,000
12441 Pre-Design
Services
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $300,000
10390 Design Services RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $100,000
10390 Construction
Task
RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $1,200,000
11069 Construction
Task
ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $1,350,000
11919 Design Services ROLENS DRIVE AND TELEGRAPH ROAD
SANITARY STORAGE
Unincorporated $230,000
11680 Construction
Task
ROXBURY I/I REDUCTION Clayton $1,070,000
11990 Design Services SAPPINGTON CREEK I/I REDUCTION
(GRAVOIS ROAD AND SAPPINGTON ROAD)
Sunset Hills $450,000
11666 Construction
Task
ST MARIE SANITARY RELIEF I/I REDUCTION Florissant $250,000
11667 Design Services STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $380,000
12222 Design Services SUBURBAN I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
Ferguson $800,000
12473 Design Services SUBURBAN PUBLIC I/I REDUCTION
(HARRISON DR AND SUBURBAN AVE)
Ferguson $60,000
12237 Design Services TRAMPE I/I REDUCTION (CASTILON AVE
AND TRAMPE AVE)
Unincorporated $80,000
14 April 2014
WASTEWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11991 Design Services UNIVERSITY CITY I/I REDUCTION - EAST
(HANLEY HILLS AND BEL-NOR)
Various $1,100,000
11984 Design Services UNIVERSITY CITY I/I REDUCTION - EAST
(UR-08 AND UR-09)
Various $1,450,000
11983 Design Services UNIVERSITY CITY I/I REDUCTION - EAST
(UR-10)
Various $350,000
11671 Design Services UNIVERSITY CITY I/I REDUCTION - EAST
(WC-01, WC-02, & WC-03)
Various $950,000
12062 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
University City $60,000
12063 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
University City $70,000
12435 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
Various $60,000
12436 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
Various $70,000
12437 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-08 AND UR-09)
Various $90,000
12438 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-10)
Various $50,000
11929 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
WEST
Various $4,500,000
11992 Pre-Design
Services
UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
University City $1,300,000
11681 Construction
Task
UPPER COLDWATER SECTION D I/I
REDUCTION
Various $350,000
10026 Construction
Task
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $7,500,000
12440 Pre-Design
Services
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $300,000
10027 Construction
Task
UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
Various $3,000,000
11086 Construction
Task
WEBSTER ACRES SANITARY SEWER
REPLACEMENT
Webster Groves $1,120,000
11965 Design Services WEST WISE I/I REDUCTION (NW QUADRANT
I-64 AND BIG BEND BLVD)
Richmond Heights $800,000
11108 Construction
Task
WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
Overland $1,200,000
FUND TOTAL: $258,210,000
GRAND TOTAL:$276,890,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $700,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $2,000,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014)Various $1,000,000
12070 Professional
Services
COMPREHENSIVE AMMONIA AND
NUTRIENT REMOVAL MASTER PLAN
Various $1,500,000
11125 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction
Task
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $630,000
11755 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $400,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT A
Various $60,000
12379 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT B
Various $60,000
12380 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT C
Various $60,000
12381 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT D
Various $60,000
11705 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $1,000,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $610,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $710,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $500,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$550,000
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $879,000
FUND TOTAL: $17,649,000
4102 - IMPROVEMENT FUND
11898 Work Order
Repair Costs
(Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $500,000
FUND TOTAL: $500,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction
Task
EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $250,000
FUND TOTAL: $250,000
6660 - SANITARY REPLACEMENT FUND
11993 Design Services 82ND STREET TO I-170 SANITARY SEWER
(UR-08 UR-09)
University City $1,980,000
11993 Property Rights
Acquisition
82ND STREET TO I-170 SANITARY SEWER
(UR-08 UR-09)
University City $500,000
12075 Design Services AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT,
HAMBURG)
Unincorporated $2,010,000
11776 Construction
Task
ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $525,000
12078 Design Services APPLE ORCHARD, SINGERSON, BAYLESS
PLACE I/I REDUCTION (LEMAY FERRY RD
AND BAYLESS AVE)
Unincorporated $920,000
11682 Construction
Task
BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $450,000
11934 Construction,
Phase I
(Supplemental
Appropriation)
BALLAS ROAD SUBTRUNK SOUTH PUBLIC
I/I REDUCTION
Various $1,900,000
10407 Construction
Task
BAUMGARTNER & BLACK FOREST
SANITARY REPLACEMENT PHASE II
Unincorporated $2,500,000
11920 Construction,
Phase I
(Supplemental
Appropriation)
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
St. Louis City And
County
$7,000,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11871 Construction,
Phase I
(Supplemental
Appropriation)
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT D
Various $2,280,000
11926 Construction,
Phase I
(Supplemental
Appropriation)
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2015)
CONTRACT G
Various $2,700,000
12060 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
Various $4,800,000
12023 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $110,000
12024 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $120,000
12025 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $110,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $3,200,000
12425 Design Services BISSELL POINT WWTF SOUTH ASH LAGOON
FLOOR REPLACEMENT
St. Louis City $1,000,000
11883 Construction
Task
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
Various $2,100,000
10537 Design Services BOPP SANITARY RELIEF (SKME-611)Des Peres $190,000
11719 Construction
Task
BRINWOOD I/I REDUCTION Florissant $1,100,000
11790 Construction
Task
CAULKS CREEK FORCE MAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $6,600,000
11789 Design Services CAULKS CREEK FORCE MAIN
REHABILITATION
Chesterfield $104,000
11720 Construction
Task
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $4,000,000
11009 Construction
Task
CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
Unincorporated $500,000
11115 Construction
Task
CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $2,400,000
11723 Construction
Task
COLDWATER CREEK WATERSHED I/I
REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
Florissant $760,000
12423 Design Services COLDWATER CREEK WWTF FINAL
CLARIFIERS REPLACEMENT
Unincorporated $1,000,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11726 Engineering
During
Construction
Services
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $1,000,000
11726 Construction,
Phase II
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $25,000,000
12125 Design Services COLDWATER SOUTHWEST SUBWATERSHED
I/I REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
St. Ann $3,252,000
12128 Design Services CONCORD I/I REDUCTION (TESSON FERRY
RD AND E CONCORD RD)
St. Louis City And
County
$438,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,400,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $2,600,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,900,000
12137 Design Services CREVE COEUR CREEK NORTH EAST I/I
REDUCTION (OLIVE BLVD AND I-270)
St. Louis City And
County
$2,505,000
11730 Construction,
Phase I
(Supplemental
Appropriation)
CSO - GINGRAS CREEK AND I/I REDUCTION
(BP-059)
Various $2,500,000
11155 Construction
Task
DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $3,000,000
10021 Construction
Task
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE I
Brentwood $10,000,000
11997 Design Services DC-09 WEST I/I REDUCTION (S LINDBERGH
AND LADUE RD)
Ladue $525,000
11851 Construction
Task
DEER CREEK PUBLIC I/I REDUCTION (2016)Various $4,200,000
12036 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $180,000
12037 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $160,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $1,800,000
11136 Design Services DEGIVERVILLE COMBINED SEWER
RELOCATION
St. Louis City $650,000
11738 Construction
Task
DIXIE I/I REDUCTION Various $1,800,000
11739 Construction
Task
DUCHESNE AND GOTT I/I REDUCTION Various $510,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11740 Construction
Task
E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $300,000
11744 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
St. Louis City And
County
$2,000,000
11996 Design Services FAWN VALLEY, PIONEER PARK,
WESTCHESTER I/I REDUCTION
(MANCHESTER AND GEYER RDS)
Des Peres $940,000
11745 Design Services FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
Maryland Heights $270,000
10014 Construction,
Phase I
(Supplemental
Appropriation)
FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $2,700,000
10489 Construction,
Phase I
(Supplemental
Appropriation)
FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $4,700,000
10018 Design Services FF-18 VILLADORADO - LACKLAND - PAGE
SANITARY RELIEF (SKME -015)
Maryland Heights $920,000
11748 Construction
Task
FLORISSANT I/I REDUCTION Various $600,000
11749 Construction
Task
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $1,010,000
11750 Construction
Task
FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
Grantwood Village $1,660,000
10142 Construction,
Phase I
(Supplemental
Appropriation)
FORESTWOOD SANITARY RELIEF (SKME-
435)
Unincorporated $1,425,000
11137 Construction
Task
GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $2,700,000
10611 Construction,
Phase I
(Supplemental
Appropriation)
GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF
Unincorporated $2,000,000
12394 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT -
SURVEY SERVICES (2016) CONTRACT B
Various $50,000
11752 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
Various $50,000
11754 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
Various $50,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12064 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
Various $50,000
11760 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2016)
Various $300,000
11761 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (2016) CONTRACT A
Various $135,000
11762 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (2016) CONTRACT B
Various $135,000
11764 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
Various $50,000
12395 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
Various $50,000
12405 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
Various $50,000
12406 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
Various $50,000
12177 Design Services GLENDALE SECTION D SANITARY RELIEF
PHASE V (SKME-624) I/I REDUCTION
Glendale $100,000
11765 Construction
Task
GRAND GLAIZE TRUNK SANITARY RELIEF
I/I REDUCTION (SKME-417)
Ballwin $190,000
10496 Construction,
Phase I
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELIEF PHASE III IV & V (SKME -
521)
Unincorporated $11,300,000
11768 Construction,
Phase I
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (DETENTION BASIN)
St. Louis City $2,760,000
11770 Construction
Task
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $3,750,000
10641 Design Services HARLEM - BADEN RELIEF PHASE IV
(HEBERT) BUILDING DEMOLITION AND
DESIGN
St. Louis City $1,760,000
12304 Design Services HELTA, SAPPINGTON, AND GREGORY
COURT I/I REDUCTION (SAPPINGTON RD.
AND I-270)
Sunset Hills $1,755,000
11097 Construction
Task
HOLLY DRIVE SEWER SEPARATION Webster Groves $1,100,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11994 Design Services HUNTLEIGH MANOR OLD WARSON
TIMBERWYK I/I REDUCTION (S LINDBERGH
S OF LITZSINGER)
Ladue $450,000
10656 Construction,
Phase I
(Supplemental
Appropriation)
INFRASTRUCTURE REPAIR #087P CAULKS
CREEK A (P-750) PHASE VI
Various $2,700,000
11709 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT A
St. Louis City And
County
$5,000,000
11868 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT B
Various $5,000,000
11869 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT C
Various $5,000,000
11705 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $5,000,000
11142 Design Services JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $300,000
12314 Design Services KAPPEL I/I REDUCTION (EXUMA DR. AND
GLEN OWEN DR.)
Unincorporated $55,000
11054 Construction
Task
KINGSTON I/I REDUCTION AND PUMP
STATION ELIMINATION
Unincorporated $900,000
12317 Design Services KIRKWOOD I/I REDUCTION (BIG BEND
BLVD. AND S. KIRKWOOD RD.)
Kirkwood $1,800,000
11995 Design Services KIRKWOOD MIDDLE SCHOOL SIMMONS
WILSON SARAH I/I REDUCTION
(MANCHESTER AND KIRKWOOD RDS)
Kirkwood $1,000,000
11712 Construction
Task
LACKLAND I/I REDUCTION Various $520,000
11818 Design Services LEMAY CSO HIGH RATE CLARIFICATION
FACILITY (BROADWAY & LEMAY WWTF)
St. Louis City $2,370,000
11927 Construction,
Phase I
(Supplemental
Appropriation)
LEMAY PUBLIC I/I REDUCTION (2015)
CONTRACT B
Various $3,200,000
12061 Construction
Task
LEMAY PUBLIC I/I REDUCTION (2016)Various $4,000,000
12048 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $120,000
12049 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $110,000
12050 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $110,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $3,100,000
12429 Construction
Task
LEMAY WWTF CHILLER REHABILITATION Unincorporated $500,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11649 Miscellaneous
Services
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $2,000,000
11819 Design Services LMRDP CSO STORAGE TUNNEL NORTH
DRIVE (RDP PARK TO RDP TUBES)
St. Louis City $2,700,000
11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH
DRIVE CONSOLIDATION SEWERS
St. Louis City $908,000
11820 Design Services LMRDP CSO STORAGE TUNNEL SOUTH
DRIVE (BROADWAY TO RDP PARK)
Various $3,000,000
11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH
DRIVE CONSOLIDATION SEWERS
St. Louis City $605,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
St. Louis City $2,400,000
11746 Design Services LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $2,400,000
11650 Construction,
Phase I
(Supplemental
Appropriation)
LOWER MERAMEC WATERSHED I/I
REMOVAL
Unincorporated $1,600,000
11928 Construction
Task
LUCAS & HUNT AND I-70 SANITARY SEWER Northwoods $640,000
11651 Construction
Task
LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $149,000
11656 Construction
Task
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $11,900,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $200,000
11662 Construction
Task
MCNULTY - PALLARDY I/I REDUCTION Various $4,800,000
11663 Construction
Task
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $730,000
12310 Design Services MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE II
Hazelwood $271,000
11774 Construction
Task
MISSOURI RIVER SERVICE AREA I/I
REDUCTION - CREVE COEUR CREEK EAST
Various $4,600,000
10716 Construction,
Phase I
(Supplemental
Appropriation)
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,100,000
11664 Construction
Task
NEWCASTLE I/I REDUCTION Various $70,000
11693 Construction
Task
NORTH BADEN CREEK I/I REDUCTION (BP-
532)(WINCHESTER DR)
Various $720,000
11696 Construction
Task
PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $830,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11698 Construction
Task
PICKWICK-BERNADINE-BIMINI SANITARY
RELIEF
Unincorporated $1,800,000
10737 Construction
Task
POWELL AVE AND ANNALEE SEWER
SEPARATION
Brentwood $320,000
11877 Work Order
Repair Costs
(Capital)
PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM (FY2013)
Various $500,000
11094 Construction,
Phase II
PROSPECT HILL LANDFILL VERTICAL
EXPANSION
Various $1,200,000
11700 Construction
Task
PROVIDENCE SANITARY RELIEF (SKME -
640)
Webster Groves $710,000
11701 Construction
Task
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $950,000
12441 Pre-Design
Services
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $300,000
12420 Design Services REAVSDALE I/I REDUCTION (MACKENZIE
RD AND REAVIS BARRACKS RD)
Unincorporated $585,000
11704 Design Services RETFORD I/I REDUCTION Unincorporated $436,000
10748 Construction
Task
ROSEMARY, PHILO & KATHLEEN SEWER
SEPARATION
Wilbur Park $1,480,000
11665 Construction
Task
SELVIDGE AREA I/I REDUCTION Ballwin $200,000
10754 Construction
Task
SHERWYN SANITARY RELIEF (SKME -651) &
I/I REDUCTION
Creve Coeur $1,800,000
12209 Design Services SPRINGDALE I/I REDUCTION (ROLLING DR
AND SMITHFIELD PL)
Bel-Ridge $234,000
11668 Construction
Task
SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $80,000
11669 Design Services SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $457,000
12240 Design Services UNION CREEK I/I REDUCTION (I-55
BETWEEN S LINDBERGH BLVD AND
BUCKLEY RD)
Unincorporated $995,000
11672 Construction
Task
UNIVERSITY CITY I/I REDUCTION - WEST Various $500,000
12062 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
University City $4,000,000
12063 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
University City $4,000,000
11992 Design Services UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
University City $2,700,000
10026 Construction,
Phase I
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $5,000,000
12440 Pre-Design
Services
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $300,000
14 April 2014
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10027 Construction,
Phase I
(Supplemental
Appropriation)
UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
Various $2,020,000
12253 Design Services VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
Unincorporated $2,060,000
11089 Construction
Task
VINITA DRIVE SANITARY RELIEF Hanley Hills $330,000
11677 Design Services WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $1,500,000
11678 Construction
Task
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $2,300,000
FUND TOTAL: $284,054,000
GRAND TOTAL:$302,453,000
STORMWATER ENGINEERING PROJECTS
1 of 1
During Fiscal Year 2015, there are no budgeted Stormwater Engineering
projects.
14 April 2014
STORMWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11228 ALGONQUIN WOOD DR. #12 STORM SEWER $124,000 187
11170 BREEZERIDGE AND FAWNRIDGE STORM
SEWER
$160,000 188
11206 BROOKHURST DRIVE STORM SEWER $450,000 189
11211 BROOKTRAIL CT. STORM SEWER $100,000 190
11191 CHALET COURT STREAMBANK
STABILIZATION
$215,000 191
11243 CHELSEA AND IDLEWILD STORM SEWER $89,000 192
11209 CLERMONT LANE BANK STABILIZATION $65,000 193
10348 CONWAY - CLERBROOK STORM CHANNEL $920,000 194
11215 CREEKHAVEN DRIVE STORM IMPROVEMENTS $45,000 195
11214 DICKSON STREET #1033 STORM SEWER $77,000 196
12402 EASEMENT ACQUISITION FOR COLDWATER
CREEK OMCI PROJECTS
$450,000 197
12404 EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS
$650,000 198
12403 EASEMENT ACQUISITION FOR GRAVOIS
CREEK OMCI PROJECTS
$950,000 199
11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 200
10360 FORCEE LANE STORM SEWER $148,000 201
11220 FRONTENAC FOREST STORMWATER
IMPROVEMENTS
$110,000 202
11219 FRONTENAC FOREST TO PORTLAND DRIVE
STORM SEWER
$220,000 203
14 April 2014
STORMWATER CONSTRUCTION PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11076 LACLEDE STATION - CHAMBERLAIN STORM
SEWER
$230,000 204
10005 LAVEN - DEL LN. #1322 - 1323 STORM SEWER $230,000 205
10731 PARK LANE #9568 - #9572 STORM SEWER $30,000 206
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
$400,000 207
12458 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – MALINE CREEK OMCI
$350,000 208
12456 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – SEMINARY BRANCH OMCI
$100,000 209
11023 TREGARON PL. TO COUNTRY ESTATES STORM
IMPROVEMENTS (FRONTENAC 4-3A)
$110,000 210
11237 VILLA COUBLAY DR. #11 AND 15 STORM
IMPROVEMENTS (FRONTENAC 7-7)
$65,000 211
TOTAL:$6,538,000
BERRYIOLAHARTH I LLARD
CLIF SIDE
HARPER
B R O W N E L L
ALGONQUINWOODSANGUINET
ARTHURKINGSPONDALGONQUINESTATES
GR AMERCY
POCAHONTAS
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11228
15TASK NO:
TASK NAME:
$124,000BUDGET:
FUND:
GlendaleMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 187
ALGONQUIN WOOD DR. #12 STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD AND G ARAGE FLOODING.
CONSTRUCT 430 FEET OF 12-INCH TO 30-INCH STORM SEWER.
OAK VALLEY
WOODGATESERAMA
TIMBER
C LAYCHESTER
KENDONFAWNVALLEYHARWOODT W IN FAWNSPINE HILLFAWNRIDGEFOLKSTONE
DELCHESTERBREEZERIDGELAUREL OAK
PRIVA TELINDEMERE
FAIRBROOKBUTTERNUTDOMINION
HARGROVE FIRETHORNFOREST AIREB R I A R B ROOK
FAWNVALLEYBREEZERIDGE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11170
15TASK NO:
TASK NAME:
$160,000BUDGET:
FUND:
Des PeresMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 188
BREEZERIDGE AND FAWNRIDGE STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 385 FEET OF 12-INCH TO 18-INCH STORM SEWER.
FAWNRIDGE DRIVE 1700 BLOCK STORM SEWER (11195) WASCOMBINED WITH THIS PROJECT.
BE
RRYANDREWNORTH
WILDDEER
RENDERERWARSON WOODSRIDGE LINEDEARBORNGILBERTHUDSON
FOREST VI
EWDUNWOODYDES PERESSALEMHILLSNORTHBRIDG EHOLLISTON
A L D E NEDLINBLUE BEL
L
MONIERR O L F E
TIMBERLANE
OAK HAVEN
TWINBROOKBRICKENG A R L A N D
H O N E YCUT
BROOKHURST COTTONWOODM A N C H E S T E R R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11206
15TASK NO:
TASK NAME:
$450,000BUDGET:
FUND:
Warson WoodsMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 189
BROOKHURST DRIVE STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
OVERLAND FLOW RESULTING IN REAR YARD PONDING, EROSION ANDSTREET FLOODING.
CONSTRUCT 1,850 FEET OF 12-INCH TO 24-INCH STORM SEWER, AND60 FEET O F 3 TO 4 FOOT HIGH MODULAR BLOCK WALL.
TIMBERLANE DRIVE (10379) AND NORTH DRIVE (11207) WERECOMBINED IN THIS PROJECT.
GRAESEROAK PARKBROOKTR A IL
VILLACOUBLAY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11211
15TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
Creve CoeurMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 190
BROOKTRAIL CT. STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD ERO SION AND PONDING.
CONSTRUCT 370 FEET OF 18-INCH TO 24-INCH STORM SEWER.
SPOEDEMORWOODCOLONIAL HILLS
GRAESER
CHALET LARKINDEAVEROAKH AVEN SONACHAMBRAY
RIDGECORDECREEKSIDE
THE KNOLLS
FARON HILL
LITTLE CREEK
WEDGEWOOD
LANGDON W AYGREYWYCK
COLONIALHILLSCHAL E T§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11191
15TASK NO:
TASK NAME:
$215,000BUDGET:
FUND:
Creve CoeurMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 191
CHALET COURT STREAMBANK STABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
STREAM EROSION AND INCISION.
ENCLO SE 440 FEET OF CREEK WITH 42-INCH DIAMETER PIPE.
THIS PRO JECT WILL BE BID AND CONSTRUCTED WITH PROJECT10576.
KIRKHAM
BROWNELL
DWYERSAPPINGTONCHELSEA IDLEWILDCLIF SIDEHILLARD
M O R E LAND LISA
K
AYELMWOODGLEN V I S T ACAMBRIDGEALBERT
HIGHLAND
WINNETKA
VENNEMAN SOUTHRIDGEALEXANDRA
CHELSEA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11243
15TASK NO:
TASK NAME:
$89,000BUDGET:
FUND:
GlendaleMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 192
CHELSEA AND IDLEWILD STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 360 FEET OF 15-INCH TO 18-INCH STORM SEWER.
LADUE
WARSONC L E RMONT
WARSON HILLS JAIM E SWOODCLIFFECHATEAUOAKS
KNIGHTBRIDGE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11209
15TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 193
CLERMONT LANE BANK STABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
HIGH RISK ROADWAY EROSION.
CONSTRUCT 125 FEET OF 5 FOOT HIGH MODULAR BLOCK WALL, ANDHEAVY STONE REVETMENT TOE PROTECTION.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
DWYERDARYLCONWAYGERMAN
ARTHUR
DONOHO
CABLE
ANZEIGER
PRIVATE
GARIBALDI
SAVANNAH
CLERBROOK
CL E R M ONTFIELDSTONEGOLD DUST LEELADOGW OO DBENNINGTONIN
G
L
ESIDE
PEBBLECREEK
WARSON HILLS
FORCEE
MARYVIEW
WARSON
PRESIDENTRAMP CHAMINADE STFER R A N D W O O D S
OLD FRONTENCPRIVATE S LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10348
15TASK NO:
TASK NAME:
$920,000BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 194
CONWAY - CLERBROOK STORM CHANNEL
Construction Task
5565 - Creve CoeurFrontenac OMCI Fund
CREEK EROSION.
CONSTRUCT 1,500 FEET OF BANK STABILIZATION, CONSISTING OFROCK BLOCK TOE PROTECTION, GABION WALL REPAIR, ROCK BLOCKWALL, AND SEVERAL BIOSTABILIZATION TECHNIQUES.
LINDBERGH-CLERBROOK STORM CHANNEL (10306) WILL BECOMBINED WITH THIS PROJECT FOR CONSTRUCTION. MAY INCLUDECAPITAL AND NON-CAPITAL SERVICES.
CREEKHAVEN
IRONSTONE
FEDERAL CANDLEWICKDUNMORRBORCHERDING CAMBERLYTREARCY
WEDGETONPOINT OAKWE
NDOVERBERKLEYMANOR
CLAYCHESTE
R
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11215
15TASK NO:
TASK NAME:
$45,000BUDGET:
FUND:
Des PeresMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 195
CREEKHAVEN DRIVE STORM IMPROVEMENTS
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 285 FEET OF 24-INCH DIAMETER STORM SEWER ANDAPPURTENANCES.
CREEKHAVEN #12371 (11245) AND CREEKHAVEN #12105 (11215) WERECOMBINED IN THIS PROJECT.
WOODLAWND IC K S O N
GLENWAYKENMOREL E W IS T O N STURGISEA STW OOD
MEADOWRIDGEW A R R E N T O N
BROOKHAV E NASCOTMARIEDALE T A R R Y M O R E
W A R W I C K
VICTORIA
M E A D O W R I D G EDICKSONMANCHESTER R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11214
15TASK NO:
TASK NAME:
$77,000BUDGET:
FUND:
KirkwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 196
DICKSON STREET #1033 STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
FREQUENT STRUCTURAL FLOODING.
CONSTRUCT 145 FEET OF 36-INCH STORM SEWER.
§¨¦70
§¨¦270
§¨¦170§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12402
13TASK NO:
TASK NAME:
$450,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 197
EASEMENT ACQUISITION FOR COLDWATERCREEK OMCI PROJECTS
Property RightsAcquisition
5564 - Coldwater CreekOMCI Fund
CONSTRUCTION OF COLDWATER OMCI CAPITAL PROJECTSREQUIRES ACQUISITION OF PROPERTY RIGHTS TO ENABLECONSTRUCTION OF IMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE COLDWATER OMCI.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦40
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12404
13TASK NO:
TASK NAME:
$650,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 198
EASEMENT ACQUISITION FOR DEER CREEK OMCIPROJECTS
Property RightsAcquisition
5566 - Deer CreekOMCI Fund
CONSTRUCTION OF DEER OMCI CAPITAL PROJECTS REQUIRESACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OFIMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE DEER OMCI.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦270
§¨¦55
§¨¦44
§¨¦255
§¨¦55
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12403
13TASK NO:
TASK NAME:
$950,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 199
EASEMENT ACQUISITION FOR GRAVOIS CREEKOMCI PROJECTS
Property RightsAcquisition
5571 - Gravois CreekOMCI Fund
CONSTRUCTION OF GRAVOIS OMCI CAPITAL PROJECTS REQUIRESACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OFIMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE GRAVOIS OMCI.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11120
15TASK NO:
TASK NAME:
$250,000BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 200
EMERGENCY REPAIR FUNDS (STORMWATER)
Construction Task
4123 - StormwaterEmergency Fund
AG ING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST AC T IMMEDIATELY.
PRO VIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
WARSONCONWAYPICARDYFORCEE
FIELDSTONEWI
N
WOOD
PEBBLECREEK
BENNINGTONI
N
GLESIDE
STONEHENGEPICARDY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10360
15TASK NO:
TASK NAME:
$148,000BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 201
FORCEE LANE STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
DRIVEWAY AND GARAGE FLOODING, AND IMPROPER CONNECTIONOF STORM LINE TO SANITARY SYSTEM.
CONSTRUCT 565 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND65 FEET O F 6-INCH PVC, TO REMOVE STORM DRAINS FROM THESANITARY SYSTEM.
BOPPDIVOTPORTLANDCLEEKTINDALL
DERBYCARBERRYBARNBRIDGE
PUTTERH EATHERDAN E
FORDYCE MANOR
CROYDONFRO N T E N ACFORESTTODFORTH
COUNTRYS IDE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11220
15TASK NO:
TASK NAME:
$110,000BUDGET:
FUND:
FrontenacMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 202
FRONTENAC FOREST STORMWATERIMPROVEMENTS
Construction Task
5566 - Deer CreekOMCI Fund
INFREQ UENT BASEMENT AND YARD FLOODING.
CONSTRUCT 295 FEET OF 36-INCH TO 54-INCH STORM SEWER.
MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM SEWERIMPROVEMENTS, PART OF WHICH WAS INCLUDED IN MSD'S CIRP.
PORTLAND
FRONTENACFORESTDIVOTCOUNTRYSIDECLEEKPUTTER BRIDLE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11219
15TASK NO:
TASK NAME:
$220,000BUDGET:
FUND:
FrontenacMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 203
FRONTENAC FOREST TO PORTLAND DRIVESTORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 590 FEET OF 15-INCH TO 27-INCH STORM SEWER.
§¨¦44
§¨¦44 MURDOCHLACLEDESTATIONSPRINGDALE
A R LIN G TO N
ST MICHAELSU TH ER LA N D
B U R LIN G TO N N O R TH ER N S A N TA FEDEVONSHIRESUFFOLKPAGE LENOXLOG CABINLANSDOWNE
CHAMBERLAIN
WI
L
H
U
S
E
NBURLINGTONNORTHERNSANT A FE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11076
15TASK NO:
TASK NAME:
$230,000BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 204
LACLEDE STATION - CHAMBERLAIN STORMSEWER
Construction Task
5566 - Deer CreekOMCI Fund
FREQUENT ROAD AND GARAGE FLOODING.
CONSTRUCT 410 FEET OF 24-INCH STORM SEWER.
GEYERPAMELA
BAMBURY
SIMMONSEVANSLAVEN DEL
SCOTTSDALE
FOLGERHUN
T
LEIGHTRAILS
LERNER
BELVA
MID MEADOWS CHARLENE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10005
15TASK NO:
TASK NAME:
$230,000BUDGET:
FUND:
KirkwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 205
LAVEN - DEL LN. #1322 - 1323 STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD AND STREET FLOODING, AND CREEK EROSION.
CONSTRUCT 260 FEET OF 36-INCH TO 42-INCH STORM SEWER.
PRIVA T E
LITZSINGER
PARK
ROCK HILLL IT Z S INGERWOODSPRIVATE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10731
15TASK NO:
TASK NAME:
$30,000BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 206
PARK LANE #9568 - #9572 STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 110 FEET OF 15-INCH STORM SEWER.
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11841
17TASK NO:
TASK NAME:
$400,000BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 207
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - COLDWATER CREEK OMCI
Work Order Repair Costs(Capital)
5564 - Coldwater CreekOMCI Fund
AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE COLDWATER CREEK OMCI AREA.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦170 §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12458
17TASK NO:
TASK NAME:
$350,000BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 208
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT MALINE CREEK OMCI
Work Order Repair Costs(Capital)
5576 - Maline CreekOMCI Fund
AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE MALINE CREEK OMCI AREA.
§¨¦44
§¨¦44
WEBER
HEEGE
ROCKHILLPARDEEEDGAR MACKENZIEGRANT LACLEDE STATIONVALCOURGLENDALE
CHESHIRETULIP LILACI
VYALICETONOLDWATSON NEW HAMPSHIRESELMAOAK TREE
BAKER
ELMVAUK
VITAGOREHOLLYROSEWELLSSU
N
R
A
Y
T U R FP RIV A T E BURLINGTONNORTHERNSANTAFEALTHEAFLORENCE
REAVISBELTONCOLLEENIMSEL I N U M
BONNIE
ZINZER
SOUTHSIDE
BRENDALAVANT LANVALEEDENCLARAINNISFAIL
HEATHERRAMBLERCENTRALROCKFORESTBULL RUN
FERNALDD O B B I N
RAVENSRIDG
EFIELDSTON
BE R W ICKGENERAL GRANTNAV A RREGENERAL S H ERIDAN
CHESTNUT BUSCH
HURSTGREEN
CARMEL
BIXBY
LETA PALMETTONORMALMARVALEA M B E R G A T E
KIRKY
P
I
L
GR
I
MBRIARVIEW VILLATONK E N O R A
TOBEYH E R I T A G EPARD
E
E
HU RSTGREEN
GRANTGRANT ELMPRIVATE
ROSE
BRENDAP RIVATE
W A T S O N R D
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12456
17TASK NO:
TASK NAME:
$100,000BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Seminary BranchWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 209
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT SEMINARY BRANCH OMCI
Work Order Repair Costs(Capital)
5593 - Sem Br Of RiverDes Peres OMCI Fund
AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE SEMINARY BRANCH OMCI AREA.
GEYERCHIPPER
TREGARON
CO U N T R Y E S T A T ES
F RONTENAC WOODS
G E O R G IA N A CRES
PRIVATE LITZSI NGER
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11023
15TASK NO:
TASK NAME:
$110,000BUDGET:
FUND:
FrontenacMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 210
TREGARON PL. TO COUNTRY ESTATES STORMIMPROVEMENTS (FRONTENAC 4-3A)
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 115 FEET OF 12-INCH TO 33-INCH STORM SEWER, 3 RAINGARDENS, AND 100 FEET OF BIOSWALE.
MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM IMPROVEMENTS, PARTOF WHICH WAS INCLUDED IN MSD'S CIRP.
SPOEDEVILLA COUBLAY OAK PARKOAK GATENOTRE DAMECHAMINADE
BROOKTRAIL
GLENABBEY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2015
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11237
15TASK NO:
TASK NAME:
$65,000BUDGET:
FUND:
FrontenacMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 211
VILLA COUBLAY DR. #11 AND 15 STORMIMPROVEMENTS (FRONTENAC 7-7)
Construction Task
5566 - Deer CreekOMCI Fund
INFREQ UENT STRUCTURAL FLOODING, AND YARD FLOODING.
CONSTRUCT 155 FEET OF 12-INCH STORM SEWER, AND ONEBIORETENTION CELL.
MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM SEWERIMPROVEMENTS, PART OF WHICH WAS INCLUDED IN MSD'S CIRP.
14 April 2014
STORMWATER CONTINUED PROJECTS - FY15
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11216 FIRETHORN DRIVE #1901
STORM IMPROVEMENTS
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER, 2014.
$180,000
TOTAL: $180,000
14 April 2014
STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11223 GLEN RD #35 BANK STABILIZATION $53,000 212
11003 HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
$315,000 213
11354 LAVINIA DR. #10709 STORM SEWER $48,000 214
10370 LIGGETT TO BIG BEND CHANNEL REPAIRS $75,000 215
10221 MADISON #708 STORM SEWER $48,000 216
11032 MANCHESTER & MISSOURI AVENUE PHASE II
STORM IMPROVEMENTS
$200,000 217
11203 MARYHILL DRIVE STORM SEWER $67,000 218
11262 ROBYN RD. 9100 BLOCK STORM
IMPROVEMENTS.
$37,000 219
12452 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - WATKINS CREEK OMCI
$360,000 220
TOTAL:$1,203,000
G
L
E
N R
D
N ELM AVEE LOCKWOOD AVE ORCHARD AVESPENCER RD
N MAPLE AVEU N IO N P A C IFIC R RROSEMONT AVE
S MAPLE AVEPLANT AVEOAKWOOD AVE
WPACIFICAVESYLVESTERAVEROSEMONT AVE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11223
15TASK NO:
TASK NAME:
$53,000BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 212
GLEN RD #35 BANK STABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 75 FEET OF ROCK BLOCK WALL AND HEAVY STONEREVETMENT.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
N GEYER RDHERMITAGE HILL LNPORTLA N DDRHERMITAGE HILL RD
HERMITAGE HIL L P L
CHIPPER RD
FOXRUNLNO U T E R L A D U E D R
GEYER DOWNS LN
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11003
15TASK NO:
TASK NAME:
$315,000BUDGET:
FUND:
FrontenacMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 213
HERMITAGE HILLS BANK STABILIZATION(FRONTENAC 3-1)
Construction Task
5566 - Deer CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 95 FEET OF MODULAR BLOCK WALL, 85 FEET OF ROCKBLOCK WALL , AND 80 FEET OF MODULAR BLOCK WALL WITHCOMPOSITE REVETMENT.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
MUSI
CK RDFARADAY DR
GAIL CT
WILLINDA DRCATHY DR FABICK DRPICKWICK DRM A LLORYDRLAVINIADRLAVIER CT
CORNING DR
FITE CIR
FLORINDA DR
GEANLEE DRCRECELIUS DRTHA YER DR
LAVINIA DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11354
15TASK NO:
TASK NAME:
$48,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 214
LAVINIA DR. #10709 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 210 FEET OF 12-INCH TO 15-INCH STORM SEWER.
§¨¦44
§¨¦44
LIG
G
E
T
T A
V
E
DIV
E
R
S
E
Y D
RS SAPPINGTON RDS CO T T A VE
W F R IS C O A V E
SCHULTZ RDB U R L IN G T O N N O R T H E R N S A N T A F E R R
LOPINA BLVDR E D B U D T R E E L N
MABEL AVE
GILLESPIE BLVDBALTIMORE PL
W
IL
D
W
O
O
D CIR
C
L
E D
R BANBURY CTTOWER PLAYRESDR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10370
15TASK NO:
TASK NAME:
$75,000BUDGET:
FUND:
OaklandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 215
LIGGETT TO BIG BEND CHANNEL REPAIRS
Construction Task
5571 - Gravois CreekOMCI Fund
STREAMBANK EROSION.
CONSTRUCT 40 FEET OF LIGHT STONE REVETMENT, 40 FEET OFLIGHT STONE REVETMENT WITH BIOSTABILIZATION, 65 FEET OFLIVE-STAKED ROCK TOE WITH BIOSTABILIZATION, AND 15 FEET OFBIOSTABILIZATION.
PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
E ARGONNE DR
E MONROE AVE
E MADISON AVE
S HOLMES AVESCOTT AVE
E JEFFERSON AVE
PARK AVEDICKSON STN HOLMES AVEMITCHELL PLS BRENT AVEALICE AVEMIRIAM AVEWESTWOOD PLNSAPPINGTONRDNBR
E
N
T
A
V
E
GRAY OAKS ST S BRENT AVE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10221
15TASK NO:
TASK NAME:
$48,000BUDGET:
FUND:
OaklandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 216
MADISON #708 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
REAR YARD FLOODING AND EROSION, BASEMENT WINDOWS HAVEFLOODED DURING HEAVY RAIN EVENTS.
CONSTRUCT 220 FEET OF 12-INCH STORM SEWER.
RUTH DRMEIER RDMANCHESTER RDMISSOURI AVEWOODGATE DRCHERRY ST
KIRKSHIRE DRHAVERSHAM PLPINEGATE DRLOCKETT RD
ROMINE DRCEDARGATEDRWOODGATE DR§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11032
15TASK NO:
TASK NAME:
$200,000BUDGET:
FUND:
KirkwoodMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Two Mile CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 217
MANCHESTER & MISSOURI AVENUE PHASE IISTORM IMPROVEMENTS
Construction Task
5566 - Deer CreekOMCI Fund
FIRST FLOO R, GARAGE, AND YARD FLOODING AT RESIDENCES ALONGWOODGATE DRIVE AND MANCHESTER ROAD.
CONSTRUCT 620 FEET OF 12-INCH TO 24-INCH STORM SEWER.
LADUE RD
MARYHILL DR
N LINDBERGH BLVDCOUNTRY FAIR LNSALEM ESTATES DRLADUE CTS LINDBERGH BLVDN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11203
15TASK NO:
TASK NAME:
$67,000BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 218
MARYHILL DRIVE STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD ERO SION.
CONSTRUCT 225 FEET OF 15-INCH STORM SEWER .
ROBYN RDS LIN
D
B
E
R
G
H B
L
V
D
EDDIE N PARK RD
R O O SEVELTDR
S U N SETTERWESTWICK PL
L IN C O L N D R
TRENTMORE PL LOWILLLNMATTHEWSLN
R O N N I E L N
FOX CTCOURT Y A RD LA KEDR
S LIN
D
B
E
R
G
H B
L
V
D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11262
15TASK NO:
TASK NAME:
$37,000BUDGET:
FUND:
Sunset HillsMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Capital
Page 219
ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS.
Construction Task
5571 - Gravois CreekOMCI Fund
YARD FLOO DING.
CONSTRUCT 150 FEET OF 15-INCH STORM SEWER .
§¨¦270
§¨¦270
REDMAN RD
DUNN RD LUSHER RDBENHAMRDDUKE DRPRIGGE RD
LORDDRCRITERIONAVETOELLELNLEWIS N CLARK BLVDLOOKAWAYDRCOALBANKRD
PRIVATE RD
BARON DRS H E P L EYDRLAVIDAAVECOBURGLANDSDR
SCENIC DRJERRIES LNOLDJAMESTOWNRDCOVE LN
LILACAVEVAL
L
E
Y
D
R
K A P P E L D R
FRYLNVORHOFDRSPANISHPONDRDMADRID AVEASHBROOKDRLAPA
D
E
RALNC A M E R O N R D
JUNE DRMIGNONDRFONTAIN ELNNORM
ALNUTHE LNCASTLE DRCOLLETT DR
G LE N G A R R Y R D
PETITE DR
PRIVATE RDJERRIE
SLNPRIVA T E R DPRIVATE RD §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 12452
17TASK NO:
TASK NAME:
$360,000BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Watkins CreekWATERSHED:
StormwaterPROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 220
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - WATKINS CREEK OMCI
Work Order RepairCosts (Capital)
5587 - Watkins CreekOMCI Fund
AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE WATKINS CREEK OMCI AREA.
14 April 2014
STORMWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction
Task
EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
12402 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COLDWATER
CREEK OMCI PROJECTS
Various $450,000
11841 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
Various $400,000
FUND TOTAL: $850,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
10348 Construction
Task
CONWAY - CLERBROOK STORM CHANNEL Ladue $920,000
FUND TOTAL: $920,000
5566 - DEER CREEK OMCI FUND
11228 Construction
Task
ALGONQUIN WOOD DR. #12 STORM SEWER Glendale $124,000
11170 Construction
Task
BREEZERIDGE AND FAWNRIDGE STORM
SEWER
Des Peres $160,000
11206 Construction
Task
BROOKHURST DRIVE STORM SEWER Warson Woods $450,000
11211 Construction
Task
BROOKTRAIL CT. STORM SEWER Creve Coeur $100,000
11191 Construction
Task
CHALET COURT STREAMBANK
STABILIZATION
Creve Coeur $215,000
11243 Construction
Task
CHELSEA AND IDLEWILD STORM SEWER Glendale $89,000
11209 Construction
Task
CLERMONT LANE BANK STABILIZATION Ladue $65,000
11215 Construction
Task
CREEKHAVEN DRIVE STORM
IMPROVEMENTS
Des Peres $45,000
11214 Construction
Task
DICKSON STREET #1033 STORM SEWER Kirkwood $77,000
12404 Property Rights
Acquisition
EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS
Various $650,000
11216 Construction
Task
FIRETHORN DRIVE #1901 STORM
IMPROVEMENTS
Des Peres $180,000
14 April 2014
STORMWATER PROJECTS - FY15
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10360 Construction
Task
FORCEE LANE STORM SEWER Ladue $148,000
11220 Construction
Task
FRONTENAC FOREST STORMWATER
IMPROVEMENTS
Frontenac $110,000
11219 Construction
Task
FRONTENAC FOREST TO PORTLAND DRIVE
STORM SEWER
Frontenac $220,000
11076 Construction
Task
LACLEDE STATION - CHAMBERLAIN STORM
SEWER
Webster Groves $230,000
10005 Construction
Task
LAVEN - DEL LN. #1322 - 1323 STORM SEWER Kirkwood $230,000
10731 Construction
Task
PARK LANE #9568 - #9572 STORM SEWER Ladue $30,000
11023 Construction
Task
TREGARON PL. TO COUNTRY ESTATES
STORM IMPROVEMENTS (FRONTENAC 4-3A)
Frontenac $110,000
11237 Construction
Task
VILLA COUBLAY DR. #11 AND 15 STORM
IMPROVEMENTS (FRONTENAC 7-7)
Frontenac $65,000
FUND TOTAL: $3,298,000
5571 - GRAVOIS CREEK OMCI FUND
12403 Property Rights
Acquisition
EASEMENT ACQUISITION FOR GRAVOIS
CREEK OMCI PROJECTS
Various $950,000
FUND TOTAL: $950,000
5576 - MALINE CREEK OMCI FUND
12458 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – MALINE CREEK OMCI
Various $350,000
FUND TOTAL: $350,000
5593 - SEM BR OF RIVER DES PERES OMCI FUND
12456 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – SEMINARY BRANCH OMCI
Various $100,000
FUND TOTAL: $100,000
GRAND TOTAL:$6,718,000
14 April 2014
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction
Task
EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
11182 Construction
Task
BERKRIDGE DRIVE AND FROST AVENUE
PHASE III STORM SEWER
Hazelwood $640,000
11186 Construction
Task
CALVERT AVE. #3342 STORM SEWER Breckenridge Hills $42,000
12462 Design Services COLDWATER CREEK OMCI STORMWATER
DESIGN (PH II) (CONTRACT A)
Various $400,000
10332 Construction
Task
DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
Florissant $350,000
11036 Construction
Task
EVERMAN-TENNYSON STORM SEWER Overland $370,000
11159 Construction
Task
FOX RUN DRIVE #1360 STORM SEWER Florissant $28,000
11187 Construction
Task
GORDON AVE. TO ROY AVE. STORM
IMPROVEMENTS
St. John $1,300,000
11020 Construction
Task
HERBERT AVE. 4200-4400 BLOCK
STREAMBANK STABILIZATION
Woodson Terrace $320,000
11189 Construction
Task
MARK TWAIN #635 STORM SEWER Florissant $50,000
11158 Construction
Task
MERRI LANE #5 STORM SEWER Florissant $100,000
11093 Construction
Task
NORINE CT. #23 STORM SEWER Florissant $86,000
11085 Construction
Task
ROGERS LANE #925 STORM SEWER Florissant $55,000
11119 Construction
Task
ROGERS LANE #975 STORM SEWER Florissant $35,000
11078 Construction
Task
ST. EDMUND #10728 - 10732 STORM SEWER St. Ann $80,000
11039 Construction
Task
STANSBERRY AVE #9262 STORM SEWER Woodson Terrace $250,000
FUND TOTAL: $4,106,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
10350 Construction
Task
STONINGTON - GEORGIAN ACRES STORM
SEWER
Frontenac $370,000
FUND TOTAL: $370,000
14 April 2014
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5566 - DEER CREEK OMCI FUND
11213 Construction
Task
AUSTIN PLACE AND LOCKWOOD AVE.
STORM SEWER
Glendale $847,000
11231 Construction
Task
CONWAY & CHAPEL OAKS STORM
IMPROVEMENTS (FRONTENAC 7-5)
Frontenac $176,000
12461 Design Services DEER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
Various $450,000
11065 Construction
Task
DEER CREEK WATERSHED INITIATIVE Various $207,500
11223 Construction
Task
GLEN RD #35 BANK STABILIZATION Webster Groves $53,000
11003 Construction
Task
HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
Frontenac $315,000
10289 Construction
Task
LINDEN #1064 STORM SEWER Richmond Heights $836,000
11032 Construction
Task
MANCHESTER & MISSOURI AVENUE PHASE
II STORM IMPROVEMENTS
Kirkwood $200,000
11203 Construction
Task
MARYHILL DRIVE STORM SEWER Ladue $67,000
11840 Construction
Task
MEADOWRIDGE AND EASTWOOD STORM
AND SANITARY RELIEF
Kirkwood $1,110,000
11196 Construction
Task
PICARDY LANE SUBDIVISION BANK
STABILIZATION
Ladue $297,000
11222 Construction
Task
TEALWOOD DRIVE AND BEAVER DRIVE
BANK STABILIZATION
Creve Coeur $357,000
11208 Construction
Task
WARSON RD. S. #215 BANK STABILIZATION Ladue $95,000
FUND TOTAL: $5,010,500
5571 - GRAVOIS CREEK OMCI FUND
11367 Construction
Task
ANCHOR DR. AND DANA AVE. STORM
SEWER
Unincorporated $138,000
11375 Construction
Task
FORMAN ROAD TO CANDACE DRIVE
STORM SEWER
Unincorporated $800,000
10172 Construction
Task
GRAND & HARRISON STORM
IMPROVEMENTS
Kirkwood $1,460,000
11045 Construction
Task
GRANT #609 BANK STABILIZATION Webster Groves $152,000
11354 Construction
Task
LAVINIA DR. #10709 STORM SEWER Unincorporated $48,000
10370 Construction
Task
LIGGETT TO BIG BEND CHANNEL REPAIRS Oakland $75,000
10221 Construction
Task
MADISON #708 STORM SEWER Oakland $48,000
11363 Construction
Task
MC ADOO CT #4325 STORM SEWER St. Louis County $155,000
14 April 2014
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11370 Construction
Task
RAINRIDGE CT. #4125 BANK STABILIZATION
& BUYOUTS (GCMB-370)
Unincorporated $1,350,000
11360 Construction
Task
REDLAND DR. - TAHQUITZ DR. STORM
SEWER
Unincorporated $48,000
11262 Construction
Task
ROBYN RD. 9100 BLOCK STORM
IMPROVEMENTS.
Sunset Hills $37,000
FUND TOTAL: $4,311,000
5576 - MALINE CREEK OMCI FUND
12465 Design Services MALINE CREEK AND SEMINARY BRANCH
OMCI STREAMBANK STABILIZATION
DESIGN (CONTRACT A)
Various $450,000
12464 Design Services MALINE CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
Various $400,000
12466 Design Services MALINE CREEK OMCI STREAMBANK
STABILIZATION DESIGN (CONTRACT A)
Various $400,000
12458 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – MALINE CREEK OMCI
Various $300,000
FUND TOTAL: $1,550,000
5583 - SUGAR CREEK OMCI FUND
12463 Design Services SEMINARY BRANCH AND SUGAR CREEK
OMCI STORMWATER DESIGN (CONTRACT
A)
Various $450,000
FUND TOTAL: $450,000
5587 - WATKINS CREEK OMCI FUND
12452 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - WATKINS CREEK OMCI
Unincorporated $360,000
FUND TOTAL: $360,000
GRAND TOTAL:$16,407,500
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
WASTEWATER BELLEFONTAINE
NEIGHBORS
102
12080 ASHBROOK I/I REDUCTION (ASHBROOK DR
AND CHAMBERS RD)
WASTEWATER BELLEFONTAINE
NEIGHBORS
1
11788 CAULKS CREEK PUMP STATION B FORCE MAIN WASTEWATER CHESTERFIELD 105
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
WASTEWATER CLAYTON 70
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
WASTEWATER CLAYTON 147
10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
WASTEWATER CLAYTON 148
11680 ROXBURY I/I REDUCTION WASTEWATER CLAYTON 150
11689 BLACK CREEK I/I REDUCTION WASTEWATER CLAYTON 104
11964 CONCORDIA I/I REDUCTION (NE QUADRANT
CLAYTON RD AND BIG BEND BLVD)
WASTEWATER CLAYTON 13
11989 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I
REDUCTION (WATSON ROAD AND S HILL ROCK
HILL ROAD)
WASTEWATER CRESTWOOD 64
11191 CHALET COURT STREAMBANK STABILIZATION STORMWATER CREVE COEUR 191
11211 BROOKTRAIL CT. STORM SEWER STORMWATER CREVE COEUR 190
11713 LADUE ESTATES SANITARY RELIEF WASTEWATER CREVE COEUR 44
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11170 BREEZERIDGE AND FAWNRIDGE STORM
SEWER
STORMWATER DES PERES 188
11215 CREEKHAVEN DRIVE STORM IMPROVEMENTS STORMWATER DES PERES 195
10026 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
WASTEWATER FERGUSON 156
10440 FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
WASTEWATER FERGUSON 120
11715 LANG ROYCE LATERAL SANITARY RELIEF
(SKME-320)
WASTEWATER FERGUSON 135
12222 SUBURBAN I/I REDUCTION (HARRISON DR AND
SUBURBAN AVE)
WASTEWATER FERGUSON 76
12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON
DR AND SUBURBAN AVE)
WASTEWATER FERGUSON 77
11666 ST MARIE SANITARY RELIEF I/I REDUCTION WASTEWATER FLORISSANT 151
11723 COLDWATER CREEK WATERSHED I/I REMOVAL
- SHARON STUDY AREA (N LINDBERGH BLVD
AND LINDSAY LN)
WASTEWATER FLORISSANT 11
11023 TREGARON PL. TO COUNTRY ESTATES STORM
IMPROVEMENTS (FRONTENAC 4-3A)
STORMWATER FRONTENAC 210
11219 FRONTENAC FOREST TO PORTLAND DRIVE
STORM SEWER
STORMWATER FRONTENAC 203
11220 FRONTENAC FOREST STORMWATER
IMPROVEMENTS
STORMWATER FRONTENAC 202
11237 VILLA COUBLAY DR. #11 AND 15 STORM
IMPROVEMENTS (FRONTENAC 7-7)
STORMWATER FRONTENAC 211
11228 ALGONQUIN WOOD DR. #12 STORM SEWER STORMWATER GLENDALE 187
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11243 CHELSEA AND IDLEWILD STORM SEWER STORMWATER GLENDALE 192
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
WASTEWATER HAZELWOOD 12
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
WASTEWATER HAZELWOOD 108
10005 LAVEN - DEL LN. #1322 - 1323 STORM SEWER STORMWATER KIRKWOOD 205
11214 DICKSON STREET #1033 STORM SEWER STORMWATER KIRKWOOD 196
10348 CONWAY - CLERBROOK STORM CHANNEL STORMWATER LADUE 194
10360 FORCEE LANE STORM SEWER STORMWATER LADUE 201
10731 PARK LANE #9568 - #9572 STORM SEWER STORMWATER LADUE 206
11209 CLERMONT LANE BANK STABILIZATION STORMWATER LADUE 193
10324 CONSTRUCTION MANAGEMENT SERVICES -
MISSOURI WWTP SECONDARY EXPANSION &
DISINFECTION
WASTEWATER MARYLAND
HEIGHTS
16
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
WASTEWATER NORMANDY 140
11079 FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
WASTEWATER OLIVETTE 118
10330 HARTLAND TO GOTHLAND SEWER
SEPARATION
WASTEWATER OVERLAND 127
11108 WISMER - HUNTINGTON SANITARY RELIEF
(SKME -592)
WASTEWATER OVERLAND 159
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11697 PAGE TO TRENTON SANITARY RELIEF WASTEWATER OVERLAND 144
11694 NORTH BADEN CREEK I/I REDUCTION (BP-
612)(CANTERBURY DR)
WASTEWATER PASADENA
HILLS
141
11965 WEST WISE I/I REDUCTION (NW QUADRANT I-64
AND BIG BEND BLVD)
WASTEWATER RICHMOND
HEIGHTS
91
10851 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR
(I-298)/OUTFALL (L-161)
WASTEWATER ROCK HILL 20
11069 ROCK HILL SANITARY RELIEF (SKME -618)WASTEWATER ROCK HILL 149
11710 ISABELLE I/I REDUCTION WASTEWATER ST. ANN 134
11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
WASTEWATER ST. LOUIS CITY 125
11816 LMRDP TUNNEL DEWATERING PUMP STATION WASTEWATER ST. LOUIS CITY 59
11818 LEMAY CSO HIGH RATE CLARIFICATION
FACILITY (BROADWAY & LEMAY WWTF)
WASTEWATER ST. LOUIS CITY 46
11819 LMRDP CSO STORAGE TUNNEL NORTH DRIVE
(RDP PARK TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 55
11958 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
CONSOLIDATION SEWERS
WASTEWATER ST. LOUIS CITY 58
11959 LMRDP CSO STORAGE TUNNEL NORTH DRIVE
CONSOLIDATION SEWERS
WASTEWATER ST. LOUIS CITY 56
12460 OAKLAND COMBINED SEWER DETENTION AND
STORAGE (CLAYTON AVE AND OAKLAND AVE)
WASTEWATER ST. LOUIS CITY 142
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
74
11708 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
129
11743 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
WASTEWATER ST. LOUIS CITY
AND COUNTY
116
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
WASTEWATER ST. LOUIS CITY
AND COUNTY
93
11920 BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
WASTEWATER ST. LOUIS CITY
AND COUNTY
94
11734 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - LAND ACQUISITION
WASTEWATER ST. LOUIS
COUNTY
114
11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS
ROAD AND SAPPINGTON ROAD)
WASTEWATER SUNSET HILLS 72
10557 COLDWATER SANITARY TRUNK SEWER
SECTION A REHABILITATION (SKME -240)
WASTEWATER UNINCORPORAT
ED
109
10642 HARMONY-ACORN SEWER SEPARATION AND I/I
REDUCTION
WASTEWATER UNINCORPORAT
ED
126
11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT
ED
54
11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT
ED
53
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11650 LOWER MERAMEC WATERSHED I/I REMOVAL WASTEWATER UNINCORPORAT
ED
139
11667 STERLING PLACE SEPARATE SEWER I/I
REMOVAL
WASTEWATER UNINCORPORAT
ED
73
11695 OLDE ENGLISH I/I REMOVAL WASTEWATER UNINCORPORAT
ED
143
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
42
11747 FF-04 QUIET VILLAGE SANITARY RELIEF
(THAMES COURT TO FIESTA CIRCLE)
WASTEWATER UNINCORPORAT
ED
27
11809 COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
107
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
47
11918 TELEGRAPH ROAD #2928 I/I REDUCTION WASTEWATER UNINCORPORAT
ED
153
11919 ROLENS DRIVE AND TELEGRAPH ROAD
SANITARY STORAGE
WASTEWATER UNINCORPORAT
ED
71
12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE
AVE AND LAKEVIEW AVE)
WASTEWATER UNINCORPORAT
ED
7
12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR)
WASTEWATER UNINCORPORAT
ED
10
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12237 TRAMPE I/I REDUCTION (CASTILON AVE AND
TRAMPE AVE)
WASTEWATER UNINCORPORAT
ED
78
12427 LEMAY WWTF PLANT CONTROLS WASTEWATER UNINCORPORAT
ED
138
11735 DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
WASTEWATER UNIVERSITY
CITY
115
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
WASTEWATER UNIVERSITY
CITY
89
12062 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
WASTEWATER UNIVERSITY
CITY
83
12063 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
WASTEWATER UNIVERSITY
CITY
84
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
WASTEWATER UNIVERSITY
CITY
90
10027 UR-10 MENDELL AND WOLTER SANITARY
RELIEF (SKME-595)
WASTEWATER VARIOUS 157
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION & I/I
REDUCTION
WASTEWATER VARIOUS 119
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
WASTEWATER VARIOUS 21
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
WASTEWATER VARIOUS 112
10656 INFRASTRUCTURE REPAIR #087P CAULKS
CREEK A (P-750) PHASE VI
WASTEWATER VARIOUS 128
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11094 PROSPECT HILL LANDFILL VERTICAL
EXPANSION
WASTEWATER VARIOUS 145
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)WASTEWATER VARIOUS 117
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 60
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 23
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 24
11120 EMERGENCY REPAIR FUNDS (STORMWATER)STORMWATER VARIOUS 200
11125 CRITICAL INFRASTRUCTURE ASSESSMENT WASTEWATER VARIOUS 19
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 5
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 6
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 49
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 50
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 111
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 17
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 14
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 68
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-
01, WC-02, & WC-03)
WASTEWATER VARIOUS 82
11681 UPPER COLDWATER SECTION D I/I REDUCTION WASTEWATER VARIOUS 155
11686 BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
WASTEWATER VARIOUS 103
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
WASTEWATER VARIOUS 65
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
WASTEWATER VARIOUS 66
11702 RADAR RAINFALL DATA (FY2014)WASTEWATER VARIOUS 67
11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-
654)
WASTEWATER VARIOUS 45
11716 LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
WASTEWATER VARIOUS 51
11730 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-
059)
WASTEWATER VARIOUS 110
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 25
11737 FERGUSON SANITARY SEWER (OLIVE TO PAGE)
(DIAMOND PARK)
WASTEWATER VARIOUS 26
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 61
11751 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
WASTEWATER VARIOUS 28
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11753 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
WASTEWATER VARIOUS 29
11754 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
WASTEWATER VARIOUS 30
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
WASTEWATER VARIOUS 32
11758 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
UNALLOCATED VARIOUS 121
11759 GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
WASTEWATER VARIOUS 38
11763 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
WASTEWATER VARIOUS 33
11773 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
WASTEWATER VARIOUS 133
11773 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
WASTEWATER VARIOUS 132
11774 MISSOURI RIVER SERVICE AREA I/I REDUCTION
- CREVE COEUR CREEK EAST
WASTEWATER VARIOUS 63
11777 BADEN CREEK EXTENSION (BP-001) (I/I
REDUCTION)
WASTEWATER VARIOUS 2
11779 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
WASTEWATER VARIOUS 39
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
WASTEWATER VARIOUS 40
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
WASTEWATER VARIOUS 41
11810 CCTV INSPECTION OF SEWERS (2014)WASTEWATER VARIOUS 9
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11811 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
WASTEWATER VARIOUS 8
11820 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
(BROADWAY TO RDP PARK)
WASTEWATER VARIOUS 57
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 15
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
STORMWATER VARIOUS 207
11850 DEER CREEK PUBLIC I/I REDUCTION (2015)WASTEWATER VARIOUS 113
11851 DEER CREEK PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 22
11853 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT A
WASTEWATER VARIOUS 95
11854 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT B
WASTEWATER VARIOUS 96
11856 LEMAY PUBLIC I/I REDUCTION (2015)WASTEWATER VARIOUS 136
11857 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT C
WASTEWATER VARIOUS 97
11866 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT B
WASTEWATER VARIOUS 130
11867 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT C
WASTEWATER VARIOUS 131
11871 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT D
WASTEWATER VARIOUS 98
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-
561)
WASTEWATER VARIOUS 106
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
WASTEWATER VARIOUS 152
11909 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
WASTEWATER VARIOUS 34
11910 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
WASTEWATER VARIOUS 35
11911 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
WASTEWATER VARIOUS 36
11912 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
WASTEWATER VARIOUS 37
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
WASTEWATER VARIOUS 75
11924 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT E
WASTEWATER VARIOUS 99
11925 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT F
WASTEWATER VARIOUS 100
11926 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT G
WASTEWATER VARIOUS 101
11927 LEMAY PUBLIC I/I REDUCTION (2015)
CONTRACT B
WASTEWATER VARIOUS 137
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION -
WEST
WASTEWATER VARIOUS 154
11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
WASTEWATER VARIOUS 92
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
WASTEWATER VARIOUS 43
11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-
10)
WASTEWATER VARIOUS 81
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09)
WASTEWATER VARIOUS 80
11991 UNIVERSITY CITY I/I REDUCTION - EAST
(HANLEY HILLS AND BEL-NOR)
WASTEWATER VARIOUS 79
12060 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
WASTEWATER VARIOUS 3
12061 LEMAY PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 48
12064 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
WASTEWATER VARIOUS 31
12379 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
UNALLOCATED VARIOUS 122
12380 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
UNALLOCATED VARIOUS 123
12381 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
UNALLOCATED VARIOUS 124
12402 EASEMENT ACQUISITION FOR COLDWATER
CREEK OMCI PROJECTS
STORMWATER VARIOUS 197
12403 EASEMENT ACQUISITION FOR GRAVOIS CREEK
OMCI PROJECTS
STORMWATER VARIOUS 199
12404 EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS
STORMWATER VARIOUS 198
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
WASTEWATER VARIOUS 18
12434 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT D
WASTEWATER VARIOUS 4
12435 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
WASTEWATER VARIOUS 85
14 April 2014
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12436 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
WASTEWATER VARIOUS 86
12437 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-08 AND UR-09)
WASTEWATER VARIOUS 87
12438 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-10)
WASTEWATER VARIOUS 88
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 69
12456 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – SEMINARY BRANCH OMCI
STORMWATER VARIOUS 209
12458 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – MALINE CREEK OMCI
STORMWATER VARIOUS 208
12470 LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK
WASTEWATER VARIOUS 52
11206 BROOKHURST DRIVE STORM SEWER STORMWATER WARSON WOODS 189
11076 LACLEDE STATION - CHAMBERLAIN STORM
SEWER
STORMWATER WEBSTER
GROVES
204
11086 WEBSTER ACRES SANITARY SEWER
REPLACEMENT
WASTEWATER WEBSTER
GROVES
158
11933 PROVIDENCE PUBLIC I/I REDUCTION WASTEWATER WEBSTER
GROVES
146