Loading...
HomeMy Public PortalAboutExhibit MSD 20 - FY 2015 CIRP DocumentMetropolitan St. Louis Sewer District 2014-2015 Budget Supplement BEFORE BEFORE PROJECT CLEAR: Downspout disappears into the ground and connects to the house lateral. BEFORE BEFORE PROJECT CLEAR: Cracked sewer pipe lets in groundwater.AFTER AFTER PROJECT CLEAR: Repaired sewer pipe keeps the rain out. AFTER AFTER PROJECT CLEAR: Downspout drains onto the ground and does NOT connect to the house lateral. Exhibit MSD 20 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM BUDGET SUPPLEMENT FOR FISCAL YEAR 2015 PREFACE This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer District's intended Capital Improvement and Replacement Program during Fiscal Year 2015 (July 1, 2014 to June 30, 2015). This document is divided into the following sections: • Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix The Wastewater Construction Projects and Stormwater Construction Projects sections list projects that have scheduled construction starts during Fiscal Year 2015. The Wastewater Engineering Projects and Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal Year 2015 (which includes design, planning, and data collection/system investigation services). Due to the magnitude and complexity of these projects and the requirements for permitting and easement acquisition, their construction is scheduled in future years. The Contingency Projects sections detail projects that are currently scheduled for Fiscal Year 2016, but that may be expedited and constructed during Fiscal Year 2015, if revenue becomes available and project schedules allow. For each new project identified for funding in Fiscal Year 2015, this document provides information regarding the approximate project scope and estimated cost. For projects continued from previous fiscal years, only the estimated construction cost and reason for continuance are provided. Specific information regarding continued projects was included in previous Budget Supplement documents in the fiscal years which the projects were initially identified. Lastly, a listing of all Fiscal Year 2015 projects sorted by municipality is provided in the Appendix. On the Cover: MSD Project Clear is the Metropolitan St. Louis Sewer District’s initiative to improve water quality and alleviate many wastewater concerns in the St. Louis region. MSD Project Clear will invest billions of dollars over a generation in planning, designing, and building community rainscaping and new system improvements. This initiative includes an ambitious program of maintenance and repair, and the disconnection of some residential downspouts in parts of St. Louis County’s separate sewer area from the wastewater sewer line. This work is part of an agreement between MSD and the United States Environmental Protection Agency. Illustrations highlight the removal of inflow and infiltration from the public sewer system, through downspout disconnections and rehabilitation, vital components of the program. ") ") ") ")") ") ") ") ") ") ") ") ") ") ") ") ") ") ")") ") ") ") ") ") ") ")") ") ") ") ") ")") ") ") !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !(!(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(MS D B o u n d a r ySt. Louis County Boundary§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 169 166 183 184 165 213 212 170 181 173 172 161 171 215 175 218 214 178 167 174 217 182 219 216 162 179 180 164 163 186 185 176177 160 168 220 1 6 5 4 7 3 2 54 50 9383 73 89 44 76 24 69 11 20 4348 77 52 84 13 94 12 53 49 23 21 70 63 60 82 25 64 42 45 27 61 14 92 68 79 90 59 56 78 88 87 62 91 58 46 26 55 86 10 99 98 80 22 81 97 57 47 85 71 96 51 72 95 18 16 108 158 199 197 146 114 198 100 134 104 109 147 141 110 196 210 188 103 137 135 143 153 136 159 119 155 125 194 150 120 190 144 105 128 111 145 192 203 139 107 207 140 138 101 211191 206 151 127 112 149 204 118 193 187 154 126 201 102 189 156 195 157 202 113 148 106 208 209 115 205 142 Map produced by MSD GIS Mapping, April 2014 The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2015 Legend FISCAL YEAR 2015 !(Wastewater !(Stormwater CONTINGENCY ")Wastewater ")Stormwater Combined Sewer Area MS D DISTRICT WIDE PROJECTS 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 1 ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) 2 BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION) 3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A 4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT D 5 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 6 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 7 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) 8 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) 9 CCTV INSPECTION OF SEWERS (2014) 10 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) 11 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) 12 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C 13 CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND BLVD) 14 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 15 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 16 CONSTRUCTION MANAGEMENT SERVICES - MISSOURI WWTP SECONDARY EXPANSION & DISINFECTION 17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 18 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH 19 CRITICAL INFRASTRUCTURE ASSESSMENT 20 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161) 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 21 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION 22 DEER CREEK PUBLIC I/I REDUCTION (2016) 23 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 24 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 25 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 26 FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) 27 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) 28 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) 29 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A 30 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B 31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C 32 GENERAL SERVICES AGREEMENT - PLANNING (FY2014) 33 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A 34 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B 35 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C 36 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D 37 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E 38 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) 39 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A 40 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B 41 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C 42 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 43 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 44 LADUE ESTATES SANITARY RELIEF 45 LADUE SUBTRUNK SANITARY RELIEF (SKME-654) 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 46 LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) 47 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 48 LEMAY PUBLIC I/I REDUCTION (2016) 49 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 50 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 51 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK 52 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK 53 LEMAY WWTP SECONDARY IMPROVEMENTS 54 LEMAY WWTP SECONDARY IMPROVEMENTS 55 LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) 56 LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS 57 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 58 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS 59 LMRDP TUNNEL DEWATERING PUMP STATION 60 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 61 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 62 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 63 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST 64 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD AND S HILL ROCK HILL ROAD) 65 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 66 PUMP STATION REPLACEMENT PROJECTS (PHASE I) 67 RADAR RAINFALL DATA (FY2014) 68 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 69 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 70 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) 71 ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE 72 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON ROAD) 73 STERLING PLACE SEPARATE SEWER I/I REMOVAL 74 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) 75 STREAM FLOW WATER QUALITY SAMPLING (FY 2014) 76 SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) 77 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) 78 TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) 79 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) 80 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) 81 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) 82 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) 83 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) 84 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) 85 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR) 86 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS) 87 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) 88 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) 89 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) 90 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL 91 WEST WISE I/I REDUCTION (NW QUADRANT I-64 AND BIG BEND BLVD) 92 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION 93 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT 94 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 95 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT A 96 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT B 97 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT C 98 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D 99 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT E 100 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT F 101 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G 102 BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317) 103 BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR) 104 BLACK CREEK I/I REDUCTION 105 CAULKS CREEK PUMP STATION B FORCE MAIN 106 CEDARCREST PRIVATE I/I REDUCTION (SKME-561) 107 COLDWATER CREEK WWTF SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS 108 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C 109 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME - 240) 110 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) 111 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE 112 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION 113 DEER CREEK PUBLIC I/I REDUCTION (2015) 114 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - LAND ACQUISITION 115 DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 116 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2015) 117 EMERGENCY REPAIR FUNDS (WASTEWATER) 118 FAIRLIGHT AND BRIGHTLING SEWER SEPARATION 119 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) REHABILITATION & I/I REDUCTION 120 FORESTWOOD LATERAL SANITARY RELIEF (SKME-321) 121 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A 122 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B 123 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C 124 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D 125 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) 126 HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION 127 HARTLAND TO GOTHLAND SEWER SEPARATION 128 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI 129 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT A 130 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT B 131 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C 132 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) 133 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) 134 ISABELLE I/I REDUCTION 135 LANG ROYCE LATERAL SANITARY RELIEF (SKME-320) 136 LEMAY PUBLIC I/I REDUCTION (2015) 137 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B 138 LEMAY WWTF PLANT CONTROLS 139 LOWER MERAMEC WATERSHED I/I REMOVAL 140 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292) 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 141 NORTH BADEN CREEK I/I REDUCTION (BP-612)(CANTERBURY DR) 142 OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE AND OAKLAND AVE) 143 OLDE ENGLISH I/I REMOVAL 144 PAGE TO TRENTON SANITARY RELIEF 145 PROSPECT HILL LANDFILL VERTICAL EXPANSION 146 PROVIDENCE PUBLIC I/I REDUCTION 147 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) 148 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) 149 ROCK HILL SANITARY RELIEF (SKME -618) 150 ROXBURY I/I REDUCTION 151 ST MARIE SANITARY RELIEF I/I REDUCTION 152 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM 153 TELEGRAPH ROAD #2928 I/I REDUCTION 154 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST 155 UPPER COLDWATER SECTION D I/I REDUCTION 156 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A 157 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) 158 WEBSTER ACRES SANITARY SEWER REPLACEMENT 159 WISMER - HUNTINGTON SANITARY RELIEF (SKME -592) 187 ALGONQUIN WOOD DR. #12 STORM SEWER 188 BREEZERIDGE AND FAWNRIDGE STORM SEWER 189 BROOKHURST DRIVE STORM SEWER 190 BROOKTRAIL CT. STORM SEWER 191 CHALET COURT STREAMBANK STABILIZATION 192 CHELSEA AND IDLEWILD STORM SEWER 193 CLERMONT LANE BANK STABILIZATION 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY15 PAGE NUMBER PROJECT NAME 194 CONWAY - CLERBROOK STORM CHANNEL 195 CREEKHAVEN DRIVE STORM IMPROVEMENTS 196 DICKSON STREET #1033 STORM SEWER 197 EASEMENT ACQUISITION FOR COLDWATER CREEK OMCI PROJECTS 198 EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS 199 EASEMENT ACQUISITION FOR GRAVOIS CREEK OMCI PROJECTS 200 EMERGENCY REPAIR FUNDS (STORMWATER) 201 FORCEE LANE STORM SEWER 202 FRONTENAC FOREST STORMWATER IMPROVEMENTS 203 FRONTENAC FOREST TO PORTLAND DRIVE STORM SEWER 204 LACLEDE STATION - CHAMBERLAIN STORM SEWER 205 LAVEN - DEL LN. #1322 - 1323 STORM SEWER 206 PARK LANE #9568 - #9572 STORM SEWER 207 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER CREEK OMCI 208 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK OMCI 209 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – SEMINARY BRANCH OMCI 210 TREGARON PL. TO COUNTRY ESTATES STORM IMPROVEMENTS (FRONTENAC 4-3A) 211 VILLA COUBLAY DR. #11 AND 15 STORM IMPROVEMENTS (FRONTENAC 7-7) 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX CONTINGENCY PROJECTS - FY16 PAGE NUMBER PROJECT NAME 160 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION 161 BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II 162 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT 163 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D 164 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G 165 CHANDELLAY DR. SANITARY SEWER REPLACEMENT 166 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C 167 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C 168 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) 169 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I 170 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) 171 FF-11 FEE FEE CREEK SANITARY RELIEF 172 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III 173 FORESTWOOD SANITARY RELIEF (SKME-435) 174 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF 175 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME -521) 176 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) 177 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI 178 KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION 179 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B 180 LOWER MERAMEC WATERSHED I/I REMOVAL 181 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX CONTINGENCY PROJECTS - FY16 PAGE NUMBER PROJECT NAME 182 POWELL AVE AND ANNALEE SEWER SEPARATION 183 PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM (FY2013) 184 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM 185 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A 186 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) 212 GLEN RD #35 BANK STABILIZATION 213 HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1) 214 LAVINIA DR. #10709 STORM SEWER 215 LIGGETT TO BIG BEND CHANNEL REPAIRS 216 MADISON #708 STORM SEWER 217 MANCHESTER & MISSOURI AVENUE PHASE II STORM IMPROVEMENTS 218 MARYHILL DRIVE STORM SEWER 219 ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS. 220 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - WATKINS CREEK OMCI 14 April 2014 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY - FY15 TYPE OF PROJECT NUMBER OF PROJECTS PROJECT COST Stormwater Construction 25 $6,538,000 Wastewater Construction 68 $181,742,000 Wastewater Engineering 91 $66,548,000 TOTAL:184 $254,828,000 Stormwater Continued 1 $180,000 Wastewater Continued 8 $28,600,000 TOTAL:9 $28,780,000 GRAND TOTAL:193 $283,608,000 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 1 of 10 The identification and prioritization of projects to be included in the Capital Improvement and Replacement Program is a multi-step process, requiring monitoring and updating to ensure that the highest priority problems within the District are addressed in a timely manner, given funding limitations. These stages include: project identification, conceptual solution, preliminary study, final design, and construction. At each step in the process, the project scope is reevaluated to verify that it continues to meet regulatory requirements and customers’ needs. The project cost is updated based on available information, and the project’s priority is assessed with the goal that the highest priority projects are funded first. Project cost estimates used in the budget preparation process and shown in the Budget Supplement are usually based on the preliminary study stage of the process. At this stage there is typically a minimal amount of detailed information available regarding geotechnical conditions, utility relocation requirements, easement requirements, and other site-specific issues that have the potential to significantly affect the project’s construction cost. Preliminary study cost estimates are intended to be within thirty percent of the design engineer’s final estimates. Individual projects may vary to a greater degree than the average, due to unanticipated site- specific conditions that impact the project cost. New projects are identified on an ongoing basis to ensure that the District is in compliance with the regulatory requirements of the United States Environmental Protection Agency and Missouri Department of Natural Resources, to address customer stormwater or wastewater problems, remedy deficiencies identified through planning studies and hydraulic CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 2 of 10 analysis of the system, and implement required collection system and wastewater treatment plant maintenance and upgrades. Upon the initial identification of regulatory issues, localized problems, or system deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate, and priority ranking of the project relative to similar projects. This solution and associated cost estimate are general, based on a single site visit and a “table -top” analysis of the problem. The project may then be incorporated into the Capital Improvement and Replacement Program in a specific fiscal year, based on the availability of funds and priority of the project. Before the year in which funding of the project is anticipated, a preliminary stud y is performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual solution is still viable, given current conditions, regulatory requirements, and updated project cost estimate and priority ranking. In performing this preliminary study, the District may make multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to be constructed. Preliminary survey information may be obtained and a more detailed hydraulic analysis performed than was done at the conceptual solution level. Preliminary studies are typically performed by the Engineering Department. However, the District may use engineering consultant services to perform preliminary studies during periods of heavy workload, or for large, complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel projects, or major sewer upgrades. Upon completion of a preliminary study, the project’s priority ranking is reevaluated relative to other, similar projects. A project may be rescheduled to a later fiscal year within the CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 3 of 10 Capital Improvement and Replacement Program, should its priority ranking be reduced due to increased project cost estimate or modification of its scope. The final design of a project is performed by either the District’s Engineering Department staff or via engineering consultant services. As part of the final design process, topographic and geotechnical information is collected, utility conflicts are identified, construction plans and specifications are prepared, and easement and temporary construction license plats are drafted. In FY2015, 65 engineering budget items have been or will be procured using the Watershed Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order to increase efficiency, expedite the program and meet Consent Decree requirements and schedule. Following is a listing of the Watershed Consultant related engineering projects and associated professional service firms: Project Number Project Name Page Number Budget Watershed Program Consultant - 11151 - Construction Management Services - Tank/Treatment/Pump Station Facilities. Consultant: Kennedy Associates / Architects, Inc. 11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 17 3,600,000 Watershed Program Consultant - 11152 - Construction Management Services - Lower and Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc. 11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 14 3,000,000 Watershed Program Consultant - 11826 - Construction Management Services - Lower Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation 11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 15 1,000,000 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 4 of 10 Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls System Improvements. Consultant: Jacobs Engineering Group, Inc. 11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 43 320,000 11818 LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) 46 330,000 11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 47 580,000 11819 LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) 55 2,040,000 11959 LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS 56 290,000 11820 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 57 1,850,000 11958 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS 58 200,000 11816 LMRDP TUNNEL DEWATERING PUMP STATION 59 1,780,000 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 60 710,000 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 62 2,850,000 Watershed Program Design Consultant - 11110 - Deer Creek Sanitary System Improvements. Consultant: Parsons Water & Infrastructure, Inc. 11964 CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND BLVD) 13 270,000 10851 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I- 298)/OUTFALL (L-161) 20 750,000 10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION 21 50,000 11851 DEER CREEK PUBLIC I/I REDUCTION (2016) 22 150,000 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 23 1,800,000 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 24 630,000 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 25 6,000,000 11713 LADUE ESTATES SANITARY RELIEF 44 70,000 11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-654) 45 700,000 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 5 of 10 11716 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK 51 1,350,000 12470 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK 52 130,000 11965 WEST WISE I/I REDUCTION (NW QUADRANT I-64 AND BIG BEND BLVD) 91 800,000 Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri - Meramec Sanitary System Improvements. Consultant: AMEC Environment & Infrastructure, Inc. 12080 ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) 1 530,000 11777 BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION) 2 650,000 12060 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A 3 60,000 12434 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT D 4 100,000 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 5 1,900,000 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 6 700,000 12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) 7 110,000 12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) 10 100,000 11723 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) 11 300,000 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C 12 200,000 12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH 18 120,000 11747 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) 27 300,000 11774 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST 63 50,000 12222 SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) 76 800,000 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 6 of 10 12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) 77 60,000 12237 TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) 78 80,000 Watershed Program Design Consultant - 11145 - Lemay Sanitary System Improvements. Consultant: Burns & McDonnell Engineering Co. Inc. 11737 FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) 26 2,230,000 12061 LEMAY PUBLIC I/I REDUCTION (2016) 48 200,000 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 49 3,100,000 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 50 610,000 11989 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD AND S ROCK HILL ROAD) 64 350,000 11919 ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE 71 230,000 11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON ROAD) 72 450,000 11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL 73 380,000 11991 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) 79 1,100,000 11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) 80 1,450,000 11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) 81 350,000 11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) 82 950,000 12062 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) 83 60,000 12063 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) 84 70,000 12435 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR) 85 60,000 12436 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS) 86 70,000 12437 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) 87 90,000 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 7 of 10 12438 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) 88 50,000 11992 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) 89 1,300,000 Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek) Controls System Improvements. Consultant: to be procured in FY2015. 11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 61 3,600,000 11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 68 600,000 12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 69 300,000 12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL 90 300,000 For projects of significant scope and impact, coordination with property owners who will benefit or who will be affected by the construction of the project is achieved at neighborhood meetings hosted by the District. For smaller projects, property owners are individually contacted during the design of the project. Many projects require that new easements be acquired to enable the project to be constructed. The time required to acquire these easements is lengthy and may result in delays in the planned construction schedule. When necessary, the District may condemn for easements in order to ensure that a project is constructed. Any required condemnation proceedings are performed in full compliance with state and federal law. Some projects may additionally require specific permitting from other government agencies, such as the Missouri Department of Natural Resources, prior to bidding. CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 8 of 10 A project is advertised for public bidding a minimum of 30 days, followed by a formal bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder. Appropriation and contract ordinances are submitted to the Board of Trustees for their approval. Upon ordinance passage, contracts are executed and notices to proceed are issued. In addition to wastewater and stormwater projects, the District may construct sanitary sewer sub-district projects at the request of property owners currently served by private systems or individual septic tank systems. These sub-districts are financed by the benefiting property owners, using special benefit assessments. The affected property owners initiate the projects by submitting a petition to the District, which provides design and construction management assistance. Because of the uncertainty of the viability and/or schedule of s ub-district projects, they are not always listed in the Budget Supplement. Wastewater projects are funded via revenue from the wastewater user charge paid by ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater related work. The allocation of a given project’s costs between these two funds is an accounting function necessary to facilitate capitalization of District assets. Wastewater projects may also be funded by various Operation, Maintenance, Construction and Improvement (OMCI) funds, Construction Funds, Special Funds, or the Improvement Fund. Stormwater projects may be funded via the General Fund, Construction Funds, Special Funds, the Improvement Fund, or from various Operation, Maintenance, Construction, and CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 9 of 10 Improvement (OMCI) funds. These OMCI funds are established in certain areas of the District, are supported by property tax collection, and must be spent only within their specific areas of tax collection. The sections included in this Budget Supplement document are:  Program Summary – summary of budget, and number and type of projects. Includes general description of the capital program and budgeting process, and a glossary of terms.  Wastewater Engineering Projects – summary and details on wastewater engineering consulting services and other professional services necessary to implement the wastewater program.  Wastewater Construction Projects – summary and details on wastewater construction projects and other expenses such as property rights acquisition necessary to implement the wastewater program.  Wastewater Continued Projects – summary of wastewater projects continued from previous fiscal years, due to difficulties in easement acquisition, permitting process or coordination with other agencies, design revisions or status, or other special issues.  Wastewater Contingency Projects – summary and details on wastewater projects currently budgeted in the next fiscal year, but having the chance to be expedited into the current fiscal year, if scheduling or budget allow.  Wastewater Program – annual alphabetical listing of wastewater projects by fund, including the type of service (task) budgeted. Project costs do not include annual inflation assumptions, which are included in the annual budget.  Stormwater Engineering Projects - summary and details on stormwater engineering consulting services and other professional services necessary to implement the stormwater program.  Stormwater Construction Projects - summary and details on stormwater construction projects and other expenses such as property rights acquisition necessary to implement the stormwater program.  Stormwater Continued Projects - summary of stormwater projects continued from previous fiscal years, due to difficulties in easement acquisition, permitting process or coordination with other agencies, design revisions or status, or other special issues. CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM SUMMARY 10 of 10  Stormwater Contingency Projects - summary and details on stormwater projects currently budgeted in the next fiscal year, but having the chance to be expedited into the current fiscal year, if scheduling or budget allow.  Stormwater Program - annual alphabetical listing of stormwater projects by fund, including the type of service (task) budgeted.  Appendix – list of projects by municipality. Please note that the detail sheets for each project in this document include location maps and quantities of work to be performed. These maps and quantities are approximate estimates only, and final location and extent of work may vary depending on final design and/or field conditions during construction. GLOSSARY BIORETENTION A concave landscape feature which stores, filters, and infiltrates stormwater runoff. BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural properties of live plants to rebuild eroded streambanks and incised channels. BIOSWALE A sloped open drainage channel with landscape elements designed to store, filter, and infiltrate stormwater runoff. CD The Federal Consent Decree, entered on April 27, 2012 and all appendices and all modifications or amendments thereto, between MSD, United States of America, and the Missouri Coalition for the Environment Foundation designed to eliminate or reduce overflows from the Combined and Separate Sewer Systems in order to improve water quality and protect human health and the environment. CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe by lining it with a new pipe. This work does not require excavating the pipe and replacing it in total. CIRP Capital Improvement and Replacement Program, the ongoing system improvement efforts by MSD. CMOM Capacity, Management, Operations, and Maintenance program. COE United States Army Corps of Engineers. COMBINED SEWER The portion of MSD's sewer system designed to convey municipal sewage (i.e. domestic, commercial and industrial wastewaters) and stormwater runoff through a single-pipe system to a wastewater treatment facility and/or to a CSO outfall. CONSENT DECREE See “CD”. CSO Combined Sewer Overflow, any discharge from the combined sewer system at a point prior to the headworks of a wastewater treatment facility. GI Green Infrastructure, environmentally friendly and sustainable stormwater management practices that reduce runoff by using infiltration, such as bioretention and bioswales. I/I Inflow and Infiltration; inflow refers to direct connections of rainwater sources to the sanitary sewer system, infiltration refers to groundwater sources of flows into sewer pipes. Inflow sources can include roof downspouts, yard and area drains, foundation drains, manhole covers, cross connections from storm sewers, or inlets. Infiltration sources can include defective building laterals, sewer pipes, pipe joints, connections, or manhole walls. LATERAL A sewer connecting a building with the publicly owned sanitary sewer main. LMRDP Lower and Middle River Des Peres, generally the river from University City south to the Mississippi River. LTCP Long Term Control Plan, a long duration plan to manage/improve the combined sewer system and abate combined sewer overflows, through the identification of a capital improvement plan tailored to receiving stream water quality and the community's financial capability. GLOSSARY MAIN A smaller public sewer collecting flows from buildings via lateral connections. MGD Million Gallons per Day, a measure of flow over time. 1 MGD is equivalent to 700 gallons per minute of flow. MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote of the people, with responsibility for wastewater and stormwater services in St. Louis City and most of St. Louis County. OMCI Operation Maintenance Construction Improvement district, funds generated by tax payments in certain districts can be used for capital improvements in those districts. Funds can be used for capital projects or maintenance. OUTFALL The point of discharge to the environment from a constructed SSO or CSO. PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from private sources, such as downspout and driveway drain connections to the sanitary sewer system (inflow) or deteriorated service laterals or broken connections (infiltration). PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and broken sewer pipes or deteriorated manholes. RAINSCAPING Any combination of plantings, water features, catch basins, permeable pavement and other activities that manage stormwater as close as possible to where it falls, rather than moving it someplace else. RDP River Des Peres, a river in the central and south portions of the metropolitan area, which was enlarged in the early 1900s to provide conveyance to the Mississippi River of stormwater runoff in order to reduce surface flooding. RFP Request for Proposals. RFQ Request for Qualifications. SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and not stormwater, from residences, commercial buildings, industrial plants and institutions for treatment at a wastewater treatment facility SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system needs in the early 2000s. SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of wastewater from or caused by MSD's sanitary sewer system. This CD term shall include: (i) discharges to surface waters of the State or United States from MSD's sanitary sewer system and (ii) any release of wastewater from MSD's sanitary sewer system to public or private property that does not reach waters of the United States or the State. SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement plan which describes the results of system evaluations and the specific measures that will result in the Elimination of all Constructed SSOs Outfalls, all known SSOs, and Building Backups, and/or that are necessary to ensure that there is adequate capacity in the Sanitary Sewer System to collect, convey, and treat anticipated peak wet weather flows GLOSSARY under current and projected future conditions as defined in Paragraphs 21(e) and (g) of the CD. SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow to a trunk sewer. TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is centrally located within a watershed to which subtrunk and other sewers are tributary. USGS United States Geological Survey. WWTF Wastewater Treatment Facility, Any facility, method or process which removes, reduces or renders less obnoxious pollutants or water contaminants released from any source. WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces or renders less obnoxious pollutants or water contaminants from wastewater before releasing it to the environment. 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12080 ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) $530,000 1 11777 BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION) $650,000 2 12060 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A $60,000 3 12434 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT D $100,000 4 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $1,900,000 5 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $700,000 6 12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) $110,000 7 11811 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) $2,000,000 8 11810 CCTV INSPECTION OF SEWERS (2014)$1,000,000 9 12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) $100,000 10 11723 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) $300,000 11 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C $200,000 12 11964 CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND BLVD) $270,000 13 11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES $3,000,000 14 11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS $1,000,000 15 10324 CONSTRUCTION MANAGEMENT SERVICES - MISSOURI WWTP SECONDARY EXPANSION & DISINFECTION $500,000 16 11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES $3,600,000 17 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH $120,000 18 11125 CRITICAL INFRASTRUCTURE ASSESSMENT $1,200,000 19 10851 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161) $750,000 20 10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION $50,000 21 11851 DEER CREEK PUBLIC I/I REDUCTION (2016)$150,000 22 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $1,800,000 23 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $630,000 24 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) $6,000,000 25 11737 FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) $2,230,000 26 11747 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) $300,000 27 11751 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) $250,000 28 11753 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A $50,000 29 11754 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B $50,000 30 12064 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C $50,000 31 11755 GENERAL SERVICES AGREEMENT - PLANNING (FY2014) $500,000 32 11763 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A $50,000 33 11909 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B $50,000 34 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11910 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C $50,000 35 11911 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D $50,000 36 11912 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E $50,000 37 11759 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) $300,000 38 11779 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A $90,000 39 11780 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B $90,000 40 11781 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C $90,000 41 11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) $1,660,000 42 11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS $320,000 43 11713 LADUE ESTATES SANITARY RELIEF $70,000 44 11714 LADUE SUBTRUNK SANITARY RELIEF (SKME- 654) $700,000 45 11818 LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) $330,000 46 11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN $580,000 47 12061 LEMAY PUBLIC I/I REDUCTION (2016)$200,000 48 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $3,100,000 49 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $610,000 50 11716 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK $1,350,000 51 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12470 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK $130,000 52 11649 LEMAY WWTP SECONDARY IMPROVEMENTS $170,000 53 11649 LEMAY WWTP SECONDARY IMPROVEMENTS $600,000 54 11819 LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) $2,040,000 55 11959 LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS $290,000 56 11820 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) $1,850,000 57 11958 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS $200,000 58 11816 LMRDP TUNNEL DEWATERING PUMP STATION $1,780,000 59 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $710,000 60 11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL $3,600,000 61 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) $2,850,000 62 11774 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST $50,000 63 11989 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD AND S HILL ROCK HILL ROAD) $350,000 64 11699 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 $709,000 65 11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I) $200,000 66 11702 RADAR RAINFALL DATA (FY2014)$130,000 67 11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) $600,000 68 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL $300,000 69 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) $100,000 70 11919 ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE $230,000 71 11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON ROAD) $450,000 72 11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL $380,000 73 10766 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) $550,000 74 11916 STREAM FLOW WATER QUALITY SAMPLING (FY 2014) $799,000 75 12222 SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) $800,000 76 12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) $60,000 77 12237 TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) $80,000 78 11991 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) $1,100,000 79 11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR- 08 AND UR-09) $1,450,000 80 11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR- 10) $350,000 81 11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC- 01, WC-02, & WC-03) $950,000 82 12062 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) $60,000 83 12063 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) $70,000 84 12435 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR) $60,000 85 14 April 2014 WASTEWATER ENGINEERING PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12436 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS) $70,000 86 12437 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) $90,000 87 12438 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) $50,000 88 11992 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) $1,300,000 89 12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL $300,000 90 11965 WEST WISE I/I REDUCTION (NW QUADRANT I- 64 AND BIG BEND BLVD) $800,000 91 TOTAL:$66,548,000 §¨¦270 DUKEDUNN EARLLORDLILACTOELLECOUNTBARONROYALSCENIC B E L GROVE COBURGLAND S VISCOUNTDARRBLISS VAL L E Y SHEPLEY B E R W Y N K IL G O R E CABOTPRINCEASHBROOK BURLINGTONNORTHERNSANTAFEHOYT EWELLQUIE T VORHOFNECTAR LANIERDUCHESS DURNESSPRINCESSJERRIES RENFREWCASTLEMONARCHBARONESS DELHICOLLETT MACKIN E LBACOMET CAMBRIAAT T I C A CADIGANMURIEL RUESTADURHAMHOBKIRKBIRITZ SUR RE Y DOROTHYCRET ESUGARTRAILLEWISLANDING KELVIN COBURG PERSHALL STIMSONPRIVATEBOSW O RTH KING LARIMORE G O L D E N F O R KDIAMONDNORTHRIDGEHAVILAND HAR PERTWILL IR I S TAOS MCCARTNEYBAGNELLL O V E T T MONTICELLO BREEZYPOINTNORBRIDGEFOXPATHO D E S S A HANSOM SHELDONLYDIAMUNICIPALSPARROW MELVICHCASTLEC ASTLEPRIVATELEWISNCLARKBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12080 11TASK NO: TASK NAME: $530,000BUDGET: FUND: Bellefontaine NeighborsMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 1 ASHBROOK I/I REDUCTION (ASHBROOK DR ANDCHAMBERS RD) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SEWERS. CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER. REHABILITATE5,900 FEET OF 8-INCH TO 15-INCH SEWER, AND REMOVE PRIVATE I/ISOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. §¨¦70LUCAS N HUNTLILLIAN COLLEGEJANETHILLSPASAD E N A EDISON HELENBEGGNELSONOAKW OODMELBAEDGEW OODKENWOOD THEODORE EMMA STRATFORD JUNE RAVI N IA LAWLERLINCOLNBIRCHER HUNTER FLETCHERRAVENW OODMANOLABEULAHROLAND PEYTONSAN DIEG O SNOWFLORIAN C OUNTR Y C L UB DAWSON MARGE AVONDALECOLONIALJENNINGSSTATIONIDLEWILD HATZAPRICOTLENA SALOMEOVERBROOK FLORENCE ROXIEALBIAGREENWAY GARESCHE IRAOREON DAIBER MAT HEWHODIAMONTGROVELAND GOODFELLOWSTANWOOD ROHN OAKRIDGEWOODROW WINCHESTER FOREST HILL ROSLYN NORMANDY WILLOW WOOD SYLVANHAZ ENHAMILTONHENDERSON DONAL DWESTFARLEY KENE W A H BELAIREONEILLBOLESPINE RIDGE BRISTOL FAIRVIEWUPSHAWSANTAMONICA WAR W IC K WYMANEONABRETONFLINT SEXTON IRVINGPASADENAPASADE N A LILLIANMELBA NATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11777 11TASK NO: TASK NAME: $650,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 2 BADEN CREEK EXTENSION (BP-001) (I/IREDUCTION) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWER, ANDREMOVE CO NSTRUCTED SSO BP-001. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060. §¨¦70 §¨¦270 §¨¦170 §¨¦70 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12060 11TASK NO: TASK NAME: $60,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 3 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2016) CONTRACT A Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11777, 11687, AND11723. §¨¦270 §¨¦70§¨¦170 LINDBERGHRIVERVIEWDRLEWIS N CLARK BLVDL IN D B E R G H §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12434 11TASK NO: TASK NAME: $100,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 4 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT D Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12080, 12102,12119, AND 12237. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11144 16TASK NO: TASK NAME: $1,900,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 5 BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT) Professional Services 6660 - SanitaryReplacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THEBISSELL, CO LDWATER, MISSOURI AND MERAMEC WATERSHEDS, TOMEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11144 16TASK NO: TASK NAME: $700,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 6 BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT) Professional Services 1101 - General Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THEBISSELL, CO LDWATER, MISSOURI AND MERAMEC WATERSHEDS, TOMEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦270 §¨¦270 DUNN PRIGGE LILACCRITERIONREDMAN LAVIDACOALBANK COVE RAYMONDREALE MADRIDTRAMPE P E R S H A L L JUNE MALAGA BAYONNE QUIE T FRYBELGROVESPANISH MENDOZAVALENC IA DORIS LA R E D OFONTAINECORDOVA CADIGANROSARYBOWERSEDMAR TWILLMAN PIN T A MACKIN PRIVATE R O SADO FARMVIEW G ARDENLERIDA UPHILLP A TTERN MURIEL CROSSETT RUESTATALISMAN PETITE BRIDGEVALEMCQUAY ZAMORA HOBATHGERONASURFSIDESAEGER LARIMOREHALL HOUSEMILDRED HAR PERTAOSMONTICELLO FAIRMEADOWS RO S EVIEWBRIARB R AE M OLL ERUSSENATE JOSLYNSANR ICARDOMI MEAUXPENNINGROTH G A R D E N PRIVATEROSARYFARMVIEW PRIVATEPRIGGE PRIVATE PRIVA TE P R IV A T E PRIVATETRAM PE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12102 11TASK NO: TASK NAME: $110,000BUDGET: FUND: UnincorporatedMUNICIPALITY: BissellMAJOR SERVICE AREA: Spanish LakeWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 7 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVEAND LAKEVIEW AVE) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11811 16TASK NO: TASK NAME: $2,000,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 8 CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2014) Vendor Services 1101 - General Fund FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS ISNEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANINGAND REPAIRS/IMPROVEMENTS. PERFO RM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRISVOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BERENEWED THROUGH FY2016 BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11810 16TASK NO: TASK NAME: $1,000,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 9 CCTV INSPECTION OF SEWERS (2014) Vendor Services 1101 - General Fund FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFYPROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. PERFO RM AS NEEDED CCTV INSPECTION AND CLEANING OFSEWERS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ONPERFORMANCE. §¨¦270 §¨¦55 §¨¦270 §¨¦55 MATTIS AMBST H E I S S VONTALGEK E N N E R L Y BUTLERHILLSUNSETCAR IBEEGERALD KEMPF GREGORY RUSTYDIERSELIVALMEYERTOWNECENTRE TESCORDGATESBURYPRIVATELEEBUR GRIFFINCONCORDSCHO OL GEMINI DORSIE B R U NSTONLANGTREE FAROVERMILIO N FLORIFUCHSBA U E R STANHOPE KERTHFIJIREYNOSA L O N G VIEWTEALBYFOULKPATSYEIMESAKURAJAMIELONGSPURJOSSEMUSICYUMA C H A P ELHILL A UDJ I L L K A S SEBA U MLARKINSCHUESSLERREVEREROSSMOORWORTHINGTONFIVEOAKSROANNACAROLYNNE SUNHILL ARTHU R TIOGA CHA R WICKHURSLEY MEADO WFIELD BASLERAMBUSHLEONARDKRAMPERS T GE MME OLDE SILVER VALLE YCREST LODGEWOODHANFORD BLACKHALLCONCORD OLD TESSONASHLEYCHRISTOB L EPRIVATEKERTHFUCHSTESSON FERRY RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12119 11TASK NO: TASK NAME: $100,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 10 CHAPEL HILL I/I REDUCTION (MATTIS RD ANDVENARDE DR) Design Services 6660 - SanitaryReplacement Fund INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS IN SOMESEGMENTS O F SEWER. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. LINDSAY PAULHUMES KEEVEN CHARBONIER ESTES MULLANPHY LOEKES ASPEN FLORLAND LILAC WASHINGTON FLICKER RUE ST DENIS JENKEE MANRESAKOSTKA SWALLOW ST JEANBOULDER RUTH MADISON JEFFERSONBELLARMINE WREN FLOR ABLUEBIRD CAMPIONRYAN MANORTYSO N RADFORDLAYVEN HARRISON FLIGHTNAOMIRUE ST JEANLOVEDEWAYN E FLORDAWN ROS E TTADEL REY LAFAYETTEVERLENE MERCURYGONZAGACO RTEZSALLYFRANCISCA CLARKFLAMINGO LILALO YOLA BABLER RAVEN RUE ST CHARLESST CHARLESRONDAGERALDBORGIA VIOLETCLAVERMONTEREY MERRITHOMPSON BLANCHETTEHAMM E S MILLER DANIELBOO N ETOREROVESPERBRUCE CARMELITA MCNULTYMESCA L E R O MATERDIE MYRTLE LINKOUSLA VENTAFLOWERIDGEST FERDINANDLA SIERRAALANDALESAN MATEOJEANETTE CHERRYDALEHUNDLEY MENKE SCOTTYLIMEDALE ST PIERRESPRINGWOOD PLACEGARNIERT O R EROASPENGERALD NAOMILIN D B ERGH LINDBERGH§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11723 11TASK NO: TASK NAME: $300,000BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 11 COLDWATER CREEK WATERSHED I/I REMOVAL -SHARON STUDY AREA (N LINDBERGH BLVD ANDLINDSAY LN) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060. §¨¦270§¨¦270 DUNN FORD PERSHALL POLSONNORFOLK S O U T H ERNTAYLOR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11726 11TASK NO: TASK NAME: $200,000BUDGET: FUND: HazelwoodMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 12 COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C Engineering DuringConstruction Services 6660 - SanitaryReplacement Fund EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS. CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT. $2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION. §¨¦40 WYDOWN ETHEL PRIVATEARUNDEL HOOVER ABERDEEN ALAMO YALEBOLANDAUDUBONWISERIDGEMOORCLAYTONIAHIGHLANDDE MUNCLAYTON LILE ELLENWOOD BELLEVUEH ILLVALEC E C ILLOVELLAMOORLANDS SHEPLEY UNIVERSITYBROADVIEWASBURYCENTRALFAUQUIER RALPHMcCAUSLANDBLENDONPARKOAKKNOLL FORESTALEXA N D E R SOUTHWOODDARTFORDBRENTMOOR NORTHWOOD ST RITAWARNEREDWARD SEMINARY HARTER WELLS SAN BONITA ROSEBU R YCREST WOODOAKLAND C L A V E RACHH A W T H OR N ECONCORDIAHARCOURT SOUTHMOOR T U S C ANYFORESTRIDGE OAKLAND SAN BONITA A R U N D EL PRIVATE DEMUNPRIVATEETHEL WISE PRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11964 11TASK NO: TASK NAME: $270,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 13 CONCORDIA I/I REDUCTION (NE QUADRANTCLAYTON RD AND BIG BEND BLVD) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 435 FEET OF 8-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851. §¨¦55 §¨¦70 §¨¦44 §¨¦40 §¨¦170 §¨¦255 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11152 16TASK NO: TASK NAME: $3,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 14 CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES Professional Services 6660 - SanitaryReplacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION. PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLERDP AREAS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11826 16TASK NO: TASK NAME: $1,000,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 15 CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS Professional Services 6660 - SanitaryReplacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION. PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNELSYSTEM AND UPPER RDP TUNNEL SYSTEM. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. PRI VAT EPRI VAT EP R IV A T E P RI V AT E§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10324 14TASK NO: TASK NAME: $500,000BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Missouri River Tributary AreasWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 16 CONSTRUCTION MANAGEMENT SERVICES -MISSOURI WWTP SECONDARY EXPANSION &DISINFECTION ConstructionManagement ServicesDuring Construction 6660 - SanitaryReplacement Fund MISSOURI WASTEWATER TREATMENT PLANTS NEED TO BEUPGRADED WITH EXPANDED SECONDARY TREATMENT ANDDISINFECTION FACILITIES, PER EPA AND MDNR MANDATES. MANAGEMENT AND COORDINATION OF THE CONSTRUCTION AT THEMISSOURI TREATMENT PLANT RELATED TO EXPANDED SECONDARYTREATMENT AND DISINFECTION. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11151 16TASK NO: TASK NAME: $3,600,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 17 CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES Professional Services 6660 - SanitaryReplacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CO NSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OROTHER FACILITIES. PRO VIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTSTHROUGHOUT THE DISTRICT. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦40 §¨¦270 §¨¦40 §¨¦270 LADUE CLAYTONMASON BALLASWOODSMILLNO R T H F ORTYW EI DMANROSSS O U T H FORTY EMERSONSOUTH OUTERFORTY TEMP O FALAISES CHUL T E MOSLEYOAKAMBOIS BABLERB OPPRUHLFOR E S T C R E S T G LEN COVE STUDT TAMMANYPRIVA T E CRAIGCRAIG V I E W DRYRIDGEBRIDLEWALLIN G G RAYNIMES MASON MANOR POST OAK M AGNA C A R T A ELZEY CR O S STRAILS KR O P P K I N G S G L E N DUBON ACTIVEBOXFORD PRIORY CLIONBARNBRIDGEARAMISYVESLADU E FARM TUREEN TUCKERROYAL MAN O RKRAM RENEEHEWLETTREVEREHI BLERPRIVATE MASONPRIV ATEPRIVATEP R IV A T E OLIVEBLVD SMO141HWY§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12432 11TASK NO: TASK NAME: $120,000BUDGET: FUND: VariousMUNICIPALITY: MissouriMAJOR SERVICE AREA: Creve Coeur CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 18 CREVE COEUR CREEK PUBLIC I/I REDUCTIONSOUTH Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE PIPEMETHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12135. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11125 16TASK NO: TASK NAME: $1,200,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 19 CRITICAL INFRASTRUCTURE ASSESSMENT Vendor Services 1101 - General Fund INVESTIG ATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES. PERFO RM SERVICES SUCH AS PROJECT INSPECTION,RECO NNAISSANCE, INSPECTION PRIORITIZATION, PROJECT SET-UP,FIELD VERIFICATION, MAP UPDATES, WORK ORDER MANAGEMENT,AND POST INSPECTION REVIEW. THIS PRO JECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS. ODAYOLD WARSON MCKNIGHTLITHIA HUDSONGILBERT LITZSINGER MCKINLEYMADISONROCK HILLKORTWRIGHTELDRIDGEDESPERESE NNISROCKMANPARK ROCKFORDR ID GELINEMANI T OUBL OS S OMT AV AL ONSTANLEY LEONARDPLAINFIELDREMINGTONTHORNT O NMONIERF AI RDAL E OVERBROOK MUECK ALMENTOR BAHIASALEMHILLSNORTH B E R R Y DUNWOODYWILD D E E R W ARSONCHARLEVILLES U T T O N C O P P E R HILL RARITAN D U N KIR K BROWNBERTCHARLANEOAK LEAFB A RCIA LONE OAK S A N TAFEGREENWOODTWINBROOK C R E V E C O E U R HARDITH HILLBLUESTONEDES PERESROCK HILLMADISON ROCK HILLBER R YR A RIT A N M A N C H ESTER R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10851 11TASK NO: TASK NAME: $750,000BUDGET: FUND: Rock HillMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 20 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR(I-298)/OUTFALL (L-161) Design Services 6660 - SanitaryReplacement Fund IMPL EMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROLPLAN TO ADDRESS COMBINED SEWER OVERFLOWS IS REQUIRED. CONSTRUCT 2,300 OF 8-INCH TO 18-INCH SANITARY SEWER, ANDREMOVE INTERCEPTOR I-298 AND CSO OVERFLOW L-160. REMOVEPRIVATE INFLOW AND INFILTRATION. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851. LADUE SPOEDEGRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE ROND E L A Y F I E S T A SONAAL D E N BALHARBO URLARKINOFFIC E TU R E ENFAIRWAYSDAYKINOLD BALLASDEAVERT R I E S T E RENEELEISURE OLDOLIV E STREET ALLE GROO LDE C A B I N BENWOOD MARFORDSHERWYNTRILANE COUNTRY FAIRMOR WOODNASS AULAWREN C E SPOEDE HILLS Q U A I L W A Y S MOSLEY HILL MOSLEY ACRES SPOEDE WOODS W O O D S H I RECOLONIAL HILLSMOSLEY FOREST MIDDLEBROOK CHALET N O B L E M A N BARBEEFARON HILL G R A E S O N WEDGEWOOD C R A I G PRIVATE CRAIG OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10576 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 21 DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION Engineering DuringConstruction Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING SANITARY BYPASSES. CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH SEWERS, REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS, AND REMOVE SSOBP-627 AND SSO BP-607. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11850. THIS PROJECTINCLUDES CONSTRUCTION OF CHALET CT. STREAMBANKSTABILIZATION, 11191. §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11851 11TASK NO: TASK NAME: $150,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 22 DEER CREEK PUBLIC I/I REDUCTION (2016) Design Services 6660 - SanitaryReplacement Fund INFL OW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATE 29,600 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11964, 10851,11965, 11713 , AND 11714. §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦270 §¨¦40 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11110 16TASK NO: TASK NAME: $1,800,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 23 DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) Professional Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEKWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦270 §¨¦40 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11110 16TASK NO: TASK NAME: $630,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 24 DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) Professional Services 1101 - General Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEKWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦40 §¨¦170 DALEMETROLINK CLAYTON MCKNIGHTPINELAY ELMU NIONPACIFICFOLK NEWPORT MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEBRENTWOODKIRKHAMPERNODHANLEYDAVIS ETHEL WHITE BELLBREDELLBOLANDSUTTONLAWN OLEATHA EULALIE GLENFYLERCLAYTONIA LEE ARUNDEL EUCLID SWAN PARK LITHIA P ACIFICFOREST ABERDEEN LOUISDELNORTEPLATEAU W I L L IA M S ALAMO HIGHSCHOOLMARDEL HANCOCKMCCUTCHEONWISE ARSENALFLORA GO R E SALEMAUDUBONHICKS WRENWOOD ST CLAIRMARYBRUNO FAIRVI EW M A NHATTANPRATHERBARTOLDRUSSELL YEATMANALICIA ROCK HILLE A G E R R O S E FLORENCE MARTINIOXFO R D GODW IN BREMERTONC O M M ONWEALTHMOORLANDSY ORKBACON LYLEDESPERESANNA WAYMIRE SOUTHWALTERB RYA N MAPLEFRANCISANNALEEPR IVATECIRCLEA R L I N G T O N COLLINSGREELEY ECOFFKUHLMAN ARBOR PORTERHORNER WARNER B E R R Y RICHERTHATTONSAN BONITA OAKLAND GLENMARYELM UNIONPACIF I C OXFORDYORK EAGER FORESTWISE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11731 11TASK NO: TASK NAME: $6,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 25 DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES,PUMPING STATIONS AND SEWERS AS PART OF AN OVERALLWATERSHED PLAN FOR SANITARY RELIEF. THIS IS A SUPPLEMENTAL APPROPRIATION FOR THE PROJECTFORMERLY NAMED DC-02 DEER CREEK SANITARY RELIEF STORAGETANK. PAGE ETZEL TERMINAL VERNONPURDUE FERGUSONJULIAN PENNSYLVANIASUTTERTULANE METRO LINKCANTON BARTMER CO R N E L L ROBBIN S PARTRIDGESTA N F O R D DARTMOUTH PRIVATEHANLEYQUENDOPLYMOUTH YALEKINGSLANDWATTSBALSON DORSET SPENCER CHAMBERLAIN LY N N MEYERMILAN COLGATE MELROSE ROBERTS WALDRONRAYMOND 66THMALLARD NIXONCATES AMHERSTWILSONFARIS GREGANU R S U L ABACKER WHITNEY SUBURBAN NORTHBELRUEROTH LELANDLEROYAHERN WESTGATEGEORGETRENTON W A Y N E COLBYCORBITT JO S E P H DOVE RBRADFORDCRESTVERLDREXEL HAZELWOOD BUCKNERRUDDY PURCELLJACKSONAVALON70THSCHOFIELDIONA CABANNE ARCADIA HAYSCOLUMBIA WOODRUFFMAPLEMILFORDMIDLAND ACMES PA R TA ARDEE PRIVATE PRIVATE PRIVA TE DARTMOUTH MALLARD COLBY66THKINGSLANDPRIVATE PRIVATE PRIVATE PLYMOUTH MELROSE B E L R U E OLIVEBLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11737 11TASK NO: TASK NAME: $2,230,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 26 FERGUSON SANITARY SEWER (OLIVE TO PAGE)(DIAMOND PARK) Design Services 6660 - SanitaryReplacement Fund OVERCHARGED MAINS, SANITARY OVERFLOWS, AND BUILDINGBACKUPS. CONSTRUCT 6,500 FEET OF 30-INCH TO 42-INCH SANITARY SEWER. S C H U L T E PEM F I E S TABARDOTMOMARTETRIESTE LEISUREPAMDAYKINDEMALLEVILLAGEMONCOEUR N IE H A U SCRAIG VIEW M EADOW LAKELAUDERSUNVALLEYQU IETRIVIER A B O N JO U R OAKBA R K M O O R L A N D M ANO R B A L H A R B O U R THAMESC R I M S O N SUMMER H AVENB A R K M A N M I R A N D Y BAVARIANMONACCO §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11747 11TASK NO: TASK NAME: $300,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 27 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMESCOURT TO FIESTA CIRCLE) Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 2,160 FEET OF 12-INCH TO 15-INCH SANITARY SEWER,AND REMOVE CONSTRUCTED SSO BP-086. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11751 14TASK NO: TASK NAME: $250,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 28 GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (FY2014) General Services -Construction Inspection 6660 - SanitaryReplacement Fund CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN CO NSTRUCTION MANAGEMENT CONSULTANT FOR ASNEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11753 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 29 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT A General Services -Geotechnical 6660 - SanitaryReplacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11754 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 30 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT B General Services -Geotechnical 6660 - SanitaryReplacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12064 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 31 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT C General Services -Geotechnical 6660 - SanitaryReplacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN G EO TECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11755 11TASK NO: TASK NAME: $500,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 32 GENERAL SERVICES AGREEMENT - PLANNING(FY2014) General Services -Design CIRP Funds 1101 - General Fund WITH THE ELIMINATION OF THE WATERSHED PLANNING CONSULTANT,PLANNING NEEDS TO SUPPORT THE CAPITAL PROGRAM EXCEED THECAPACITY OF INTERNAL STAFF. RETAIN FIRM FOR AS NEEDED PLANNING SERVICES. SERVICES MAYBE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11763 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 33 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT A General Services -Survey 6660 - SanitaryReplacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11909 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 34 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT B General Services -Survey 6660 - SanitaryReplacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11910 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 35 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT C General Services -Survey 6660 - SanitaryReplacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11911 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 36 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT D General Services -Survey 6660 - SanitaryReplacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11912 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 37 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2014) CONTRACT E General Services -Survey 6660 - SanitaryReplacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11759 11TASK NO: TASK NAME: $300,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 38 GENERAL SERVICES AGREEMENT - SEWER &PROCESS DESIGN (FY2014) General Services -Design CIRP Funds 6660 - SanitaryReplacement Fund DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT THAT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2015 BASEDON PERFO RMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11779 11TASK NO: TASK NAME: $90,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 39 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A General Services -Design CIRP Funds 6660 - SanitaryReplacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11780 11TASK NO: TASK NAME: $90,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 40 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B General Services -Design CIRP Funds 6660 - SanitaryReplacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11781 11TASK NO: TASK NAME: $90,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 41 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C General Services -Design CIRP Funds 6660 - SanitaryReplacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNALSTAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESMAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦55 §¨¦255 §¨¦55 §¨¦255 UNIONPACIFICKOCHRIVERKINSWOOD GREGGREAVIS B A R R ACKSFORDER CCCGRANTLIND TELFOR D HOFFM E I S T E R ARLEE MILDS HERMANGENTRYIONE FAIN PRIVATEJOPLINCLIFFR IN G E R SHE R ID A NPAULE POTTLE ORIENT RIPA LUNAPOPLAR G A R K WILL LARKCLAGEROUTE R VICTORY MOUNT OLIVE BOUNDARYHORN JEFFERSONIAN HAL S EYFIRSTPECAN A S HROCK JACINTO SOUTHSHIRE ARRAS J E FFERSONBLUE RIDGEBANISTERALLEN LISIE U X KASKEBUNKERBIRCHP R IVATETELEGRAPHR D§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11711 11TASK NO: TASK NAME: $1,660,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 42 JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS) Design Services 6660 - SanitaryReplacement Fund EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS. CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS. §¨¦255 §¨¦55 §¨¦255 UNIONPACIFICKOCHRIVERK INSWOODUNION GREGGREAVIS B A R R ACKSFORDER CCCGRANTMILDLIND TELFOR D ARLEE S HERMANGENTR YFAIN POTTLE HOFF M EIS T E R PRIVATEJOPLINR IN G E R CLIFFIO NESHE R ID A NWACHTELRIPA WILL POPLAR G A R KLARK CLAGEROUTE R VICTORY AVENUE HBOUNDARYJEFFERSONIAN HAL S EYFIRSTPECAN A S HROCK JACINTO SOUTHSHIRE ARRAS WEISS J E FFERSON ELLEN BANISTERALLEN DUMONT LISIE U X CLEVES KASKEBUNKERBIRCHP R IVATETELEGRAPHR D§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11957 11TASK NO: TASK NAME: $320,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 43 JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS Design Services 6660 - SanitaryReplacement Fund INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THEMARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT. CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOW TO THENEW JEFFERSON BARRACKS TUNNEL. LADUE MOSLEYGRAESERELZEY EUGENIABROOKTR A ILMULLIGANST PAUL TOWNSENDLADUE ESTATESBECKERNEW SALEMRICHARDSON VILLACOUBL A YPLANTATION §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11713 11TASK NO: TASK NAME: $70,000BUDGET: FUND: Creve CoeurMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 44 LADUE ESTATES SANITARY RELIEF Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851. §¨¦40 §¨¦40 WARSONLADUE C L AY T O NDIELMANSPOEDEGRAESEROLDBO N H O M M E ENGEL BARNESDAUTELS CHUL T E G R A N DV IEWCELLAKENTHILLTOPPRIVATET E A L W O O D ME S A BEAVER STACY PRICEBRAEBU R N RIO VISTAS T A N D REWSLOG CABINC L E R M O N TGUELBRETH GRAYBRIDGESTONEYSIDERONDELAYSONA CONWAYOAKLEIGHALDE N BROOK TRAIL SPRINGWOOD ARTHUR P I CARDYDONOHO INDIAN TUREEN HIGHDOWNTUCKERL ADUEESTATESWHITEBRIDGE ANZEIGER ARBORLITTLE BELL MANSFIELD OLD OLIVE STREET LISARENEEALLEGRO LYLEWOOD H A S T IN G S SHERWYN APACHE ELBRINGDWYERVILLAMAGNET L A D E L CAPITOL C OU N T R YV IE W LOCUST D O G W O O D L Y N N B R O O K VILLA PRI VATEPRICECLAYTON OLIVE BLVD NLINDBERGHBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11714 11TASK NO: TASK NAME: $700,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 45 LADUE SUBTRUNK SANITARY RELIEF (SKME-654) Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 1,250 FEET OF STORM SEWER AND REMOVE PRIVATE I/ISOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851. UNION PACIFICHORN P RIV A T E WEISS KAYSER RUBYH O F F M EIS T E R WALLER PRIVATEUNION PACIFICPRIVA T E §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11818 11TASK NO: TASK NAME: $330,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 46 LEMAY CSO HIGH RATE CLARIFICATIONFACILITY (BROADWAY & LEMAY WWTF) Design Services 6660 - SanitaryReplacement Fund IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS. CONSTRUCT 100 MGD ENHANCED HIGH RATE CLARIFICATIONFACILITY W ITH DISINFECTION. PRIVATEUNION PACIFICHORN H O F F M EIS T E R VELMA WEISS ETTA HOLDENRUBY PERRINUNION PACIFICPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11817 11TASK NO: TASK NAME: $580,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 47 LEMAY NO. 3 PUMP STATION AND FORCE MAIN Design Services 6660 - SanitaryReplacement Fund JEFFERSO N BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMPSTATION (P-3 03), MARTIGNEY PUMP STATION (P-306), AND JEFFERSONBARRACKS PUMP STATION (P-305). §¨¦55 §¨¦44 §¨¦270 §¨¦255 §¨¦270 §¨¦55 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12061 11TASK NO: TASK NAME: $200,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 48 LEMAY PUBLIC I/I REDUCTION (2016) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 52,100 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11990, 11989, AND11667. §¨¦44 §¨¦55 §¨¦40 §¨¦270 §¨¦70§¨¦170 §¨¦255 §¨¦44 §¨¦70 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11145 16TASK NO: TASK NAME: $3,100,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 49 LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) Professional Services 6660 - SanitaryReplacement Fund SYSTEM DEFICIENCIES NEEDING CORRECTION. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAYWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦270 §¨¦70§¨¦170 §¨¦255 §¨¦44 §¨¦70 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11145 16TASK NO: TASK NAME: $610,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 50 LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) Professional Services 1101 - General Fund SYSTEM DEFICIENCIES NEEDING CORRECTION. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAYWATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦170 §¨¦40 §¨¦170 §¨¦40 HANLEYDALE DELMAR FORSYTH CLAYTON M ET R O L IN KBRENTWOOD LAYPINE FORESTP A R K MCKNIGHTWYDOWN FOLK KINGSBURYGAY MARYLAND YALEBEMISTONBELLEVUEPERSHING DAVIS ETHEL WHITE LACLEDESTATIONBOLANDLAWN EULALIE C O R NELL PURDUEBREDELLLADUE LAFON ARUNDEL WASHINGTON F RANCI S SWAN PAR K ZEPHYRSUTTON PLATEAU WISE ABERDEEN TEASDALE TOPTONDELNORTEALAMO GANNON MCCUTCHEONTHROOP ASBURYLOUWENGARNERAUDUBONB U C K HICKS WRENWOOD MARYW E L LS ST CLAIRW I L L IA M S GLADES UN IO N P A C IFICHIGH SCHOOLHOYTJEROME OXFORD POLO H U N T ERELLENWOOD ALICIA LINDELL E A G E R R O S E CATES Y ORKBARBY P R IV A T E McCAUSLANDSNOW SHEPLEY SOUTHKRAFTSONORA CAMBRIDGE FAUQUIER A R L I N G T O NRALPH HEMANWATERMAN SOUTHWOOD BLENDONDARTFORDLITZSINGER GALLERIA DONNEHORNER WARNEREDGEWOOD OAKLANDLADUEMANOR ENRIGHT EAGER MARYLAND PERSHING PRIVATE ALAMO PRIVATEMET ROL I N K KRAFTT E A S D ALE WISE YORK §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11716 11TASK NO: TASK NAME: $1,350,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 51 LEMAY WATERSHED I/I REMOVAL - NORTHHAMPTON CREEK Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12470. §¨¦40 §¨¦170 §¨¦40 §¨¦170 DALE METROLINK FORSYTH CLAY TO N WISEBRENTWOODFORESTPARKWYDOWN PINE MARYLAND BRUNO BELLEVUEPERSHING DAVIS ETHELWE N N E K E R BOLANDLADUE LAWN KINGSBURY YORK CLAYTONIAMERAMECHOOVER F R ANCI S SWAN GAYPAR K LINDENBEMISTONHANLEYYALEMCCUTCHEONASBURYLACLEDESTATIONCENTRALDE MUNAUDUBONTOPTON B U C K PRIVATE HICKSWRENWOOD OXFORD P OLO HUNTERURBAN ALICIA RUPERT LILE ELINOR LINDELL E A G E R ALAMO R O S E WILLI A M SHILLV A LEC E C IL WATERMAN UNIVERSITY MOORLANDSMORITZ PARKDALE SNOW SHEPLEY WESTMORELAND LINDBER G HSOUTH HIGHOLETAEDGEWOODLEEPLATEAUSTRASSNERBENNETTCOLLINSRALPHPOINTEROAKKNOLLDARTFORDREAR GALLERIA MITCHELLGARDEN WARNER DELTAEDWARDSANBONITA ORLANDO BRIDGEPORTSUDBURY ALABAMALYLEWALINCA SILVERTONROBINFORESTROSSIOAKLAND THRUSHWATERMAN ALICIA PRIVATE YALEMARYLAND PRIVATE UNIVERSITY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12470 11TASK NO: TASK NAME: $130,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 52 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTHHAMPTON CREEK Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS ACROSS THE SERVICE AREA. REHABILITATE 49,600 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11716. UNION PACIFICPRIVAT EH O F F M EIS T E R WEISS VELMA ETTA PERRINHOLDEN HORN RUBYP RIV A T E UNION PACIFICUNION PACIFICP R IV A T E P R I V A T E VELMA§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11649 11TASK NO: TASK NAME: $170,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Lemay CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 53 LEMAY WWTP SECONDARY IMPROVEMENTS Miscellaneous Services 6660 - SanitaryReplacement Fund INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210MGD IS REQUIRED BY CONSENT DECREE. SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY. UNION PACIFICPRIVAT EH O F F M EIS T E R WEISS VELMA ETTA PERRINHOLDEN HORN RUBYP RIV A T E UNION PACIFICUNION PACIFICP R IV A T E P R I V A T E VELMA§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11649 11TASK NO: TASK NAME: $600,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Lemay CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 54 LEMAY WWTP SECONDARY IMPROVEMENTS Engineering DuringConstruction Services 6660 - SanitaryReplacement Fund INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210MGD IS REQUIRED BY CONSENT DECREE. SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY. §¨¦44 FYLER ARSENAL U N IONPACIFIC HAMPTONPERNOD SHAW MARDEL M E TROLINK BATESSUBLETTEWEILBRANNONMORGAN FORDHANLEYWATSONDELOR ITASKAWALSH LANSDOWNE BENTCOLUMBIA RHODESMACK LINDHOLL Y HILLS NOTT I NGHAM FOLK ELLENWOOD BECK ROSANEOSHO WINONAREG ALCHRISTYYALERI VERDESP ERE S GO E T HEOAK HILLSOUTH W E S TMcCAUSLANDLACLEDESTATIONMCCAUSLANDODELL SCANLAN THOLOZAN BLOWMACKENZIEDA L E MCREE MURDOCH FINKMAN BANCROFT RAYTAFT V I S T A PARKER ALFREDTOWER GROVEDEWEYLAWNBRADLEY LLOYD MIAMI MAGNOLIAVANDEVENTER SUTTONGUSTINEBU R L IN G T O N N O R T H E R N S ANTA FE CLIFTONPOTOMAC WANDAMERAMEC JUNIATA SMILEY SCHILLER ROBERT ZEPHYR TAMMGRESHAM OLEATHA W I L L I A M S DOVERADKINSMARSHALL 3RD GARNER F L O R A DEVONSHIRE S U T HERLAND J A MIESONWIL LMORE BRUNO GLADES BINGHAM JEROME LILLYM A NHATTANIVANHOEHANCOCKBARTOLDELINOR WEST SOUTH59TH PRIVATE HEREFORDESTHERGANNETT REBERLYLE ASHBURY WALLACE ANNA KRAFTHAZELLENOX WESTWILSON CECIL DUGAN WINNEBAGO KINSEYWABASHECOFFPORTERPLATEAU HELMLENOXMAGNOLIA WALSH BECK DALE DELOR RHODES BRUNO WATSONRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11819 11TASK NO: TASK NAME: $2,040,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 55 LMRDP CSO STORAGE TUNNEL NORTH DRIVE(RDP PARK TO RDP TUBES) Design Services 6660 - SanitaryReplacement Fund IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS. CONSTRUCT NORTHERN PORTION OF THE DEEP STORAGE TUNNELSYSTEM IN THE LEMAY WATERSHED. §¨¦44 DALE FYLER ARSENAL U N I O N P A C I F I C PERNODMET R O LINK MARDELHANLEY SUBLETTEWEIL BRANNONWATSONDELOR ITASKAWALSH MORGAN FORDMACKLINDLANSDOWNE BENTCOLUMBIA RHODES WEST PARK BATESLACLEDESTATIONSHAW NOTTINGHAM FOLK ELLENWOOD BECK ROSA NEOSHO WINONAREGAL MIL E NT Z WISE YALEOAK HILLSOUTH W E S TMcCAUSLANDMCCAUSLANDODELL SCANLAN TAMMCHRI STYTOWER GROVETHOLOZAN S W A N ARCO RIV E RDESPERE SMCREE MURDOCH FINKMAN BANCROFT RAYTAFT PARKER ALFREDTUXEDO DONOVANBRADLEY MIAMI H U N T BREDELLMACKENZIESUTTONCLIFTONMAGNOLIAVANDEVENTE RPOTOMAC WANDAWILCOX SMILEY SCHILLER ZEPHYR MARSHALL GRESHAM MARQUETTE JUNIATA OLEATHA ULENAW I L L I A MS BERTHOLD LORAN GARNER FLOR AS U T HERLAND HICKS WIL LMORE BRUNO GLADES DAHLI AJEROME LILLYNAGE LMANHATTANIVANHOEHANCOCKBARTOLD WEST SOUTH SPRINGKIN G S59THPRIVATESPROULE HEREFORDBINGHAMESTHERREBERLYLE WALLACE VILLA ANNA HAZELLENOX EASTCUTTERSI GEL JONES WINNEBAGO HALFWABASHECOFFLEONAPORTERBISCHOFF DELORWALSHLENOXTAFT RAYBECK BRUNO TAMMWATS O NRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11959 11TASK NO: TASK NAME: $290,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 56 LMRDP CSO STORAGE TUNNEL NORTH DRIVECONSOLIDATION SEWERS Design Services 6660 - SanitaryReplacement Fund MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES ISREQUIRED BY CONSENT DECREE. CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THENORTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM. §¨¦55 UNIONBATES MACKENZIEDELOR GERMANIA MORGAN FORDTAFT MINNESOTAVIRGINIAPENNSYLVANIADAVIS RHODES RIVE R DES PERESHAMPTON WACHTELIDAHOBAYLESS MILENT Z ZEISSROS A H A LE SEIBERT LOUISIANAALASKAWALSH MOTT DOVER PARDELLABLOW I O NEWEBE R FINKMAN HOLLY HILLS WILMINGTON REAVISBARRAC K S FANNIEELTONKAMMERER SHARPIRON ARLEE MILITARYCHRISTYBURGEN FIELDGENTRYMATHILDAPRIVATERADIOMARCEAU BOWENHAVENQUINCY MOHEGAN STAELY OSCEOLA CLIFTON37THJOPLINAL M A ITASKA KAYSCHILLER ROBERT RIPA HEIDELBERG RADIOMKIT EUGENEGRANDEILER GRESHAM LUCIAWATERVASELFORMAN BELLERIVE UNIONPACIFICGENESTAACORNALABAMAHOFFME I S T E R REILLYJ A MIESONWIL LMORE MOUNT OLIVE ETTA CIRCLEVIEW ALTHEAPRIMM AVENUE HSPOKANECATALAN JEFFLEIGHHORNLEONAPILOT ZENITHPECANELWOOD HANNOVER REGINARAYNAVAJOEHEEGE SOUTHERN COLVIN CECIL JOELSTEINS BLUE RIDGEEIFFEL MALUS T E S S O N P A V IA HELMRUNYONAVABLOW VIRGINIAGRANDGRANDRIPA ALASKAWEBER LEMAYFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11820 11TASK NO: TASK NAME: $1,850,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 57 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE(BROADWAY TO RDP PARK) Design Services 6660 - SanitaryReplacement Fund IMPL EMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNELSYSTEM FO R THE LEMAY WATERSHED. §¨¦55 §¨¦55 UNIONBATES MORGAN FORDGERMANIA WALSH DAVIS RHODES HAMPTONRIVE R D ES PERES U NIO N P A C IFIC ROSA BAYLESS MILE NTZGOE T H E H ALEJANUARYSEIBERT VIRGINIAMINNESOTADEWEYCHRISTYDELOR BLOW IDAHOWEBER HOLLYHILLS ZEISSMACKENZIERAYFANNIEMACKLINDELTONKAMMERER SHARPIRON FIELDMATHILDARADIOMARCEAU BOWEN CARONDELETCLIFTONHAVEN Q UIN C Y MOHEGAN WILMINGTONWANDA PARDELLALANGLEY AL M A WILCOX PRIVATE KAY GUSTINESCHILLER HORN STAELY ROBERT RADIOMKIT EUGENEGRANDPAULE ULENALUCIADOVER WATEREICH E L B E R GER VASELFORMANGENESTAACORNALABAMALOUIS REILLYJ A MIESON SPRINGTIBER L E M ONA UPTON SUNSHINEWI L L MORE CIRCLEVIEW PRIMMADKINS IONEFEDERER CATALAN FRENCHLEONA PILOTKIN G S HA M BUR G ELGINS A V IO AVENUEHDANANEIERALASKAHEEGE KAYSERSTOLLEPHILOTYROLEAN HEALY COLVINJOEL STEINS HILDESHEIMRUTHWEBER TRAILTESSON ARVIN CISCORANDALL KINSEY TIFFANYBREUERMENOLAHELMFILLMORE FRIEDA NELLIEORIENTRADOMROSALOUIS WALSH GRANDLEONAREILLYDANARAYWANDAWANDAVA SEL BLOWGRAVOIS RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11958 11TASK NO: TASK NAME: $200,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 58 LMRDP CSO STORAGE TUNNEL SOUTH DRIVECONSOLIDATION SEWERS Design Services 6660 - SanitaryReplacement Fund MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES ISREQUIRED BY CONSENT DECREE. CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THESOUTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM. HORN P RIV A T E UNION PACIFICWEISS KAYSER CATALAN WALLER P R I V A T E WALLER §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11816 11TASK NO: TASK NAME: $1,780,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 59 LMRDP TUNNEL DEWATERING PUMP STATION Design Services 6660 - SanitaryReplacement Fund IMPL EMENTATION NEEDED OF CONSENT DECREE COMPONENTS. CONSTRUCT PUMP STATION TO PUMP STORED COMBINEDSEWERAGE TO LEMAY TREATMENT PLANT. §¨¦55 §¨¦70 §¨¦44 §¨¦40 §¨¦170 §¨¦255 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11109 16TASK NO: TASK NAME: $710,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 60 LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT) Professional Services 1101 - General Fund COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLERIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. DESIGN O F 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦55 §¨¦270 §¨¦55 KERTHMATTIS WELLSKELLERMERAMEC BO T T O M AMBSKENNER L Y T H EI SSEAST CONCORD AL L E N GR AV O IS ALSWELLSC H U E S SLERMENTZHILL RI N G ERB A UERB U T L E R HIL L GREENTONP O I N T E CARIBEEHAWKINSGERALD KE M PF HAGEMANNOLSENGREGORY DIERSPRIVATE RI VERCURVE VALMEYERWIL L O WBE A C H TESCORDMAN G OWAT S ON GATESBURY DANTONAIREGRIFFINA C O RNRAHNING LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYRENULSENFER N BEACHED LOUCLAYRIDGESTARLITSAKURA FERRYLARKINLITTLEROCKTIOGA COYLE TOWNE SO UTHPRIVATEB A U E R HAWKINSA M B S PRI V ATEPRIVAT E T E S S ONFERRYRDLEMAYFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11746 11TASK NO: TASK NAME: $3,600,000BUDGET: FUND: VariousMUNICIPALITY: MeramecMAJOR SERVICE AREA: Meramec Tributary AreasWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 61 LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL Design Services 6660 - SanitaryReplacement Fund FENTO N WW TF IS AN INTERIM FACILITY AND REMOVAL IS PART OFTHE REGIONAL LOWER MERAMEC FACILITY PLAN. CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THEFENTON WW TF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT ATTHE LO WER MERAMEC WWTF. HALLELIAS FONTAINE MELVINNEWBYHARLAN LEBON MARIAS JORDANWALDORFO R ANGUSTAVDONNELL LOWELLNASSAU CHAIN OF ROCKS JENNINGSSTATION RAFORD G A S T JACKSONHOPEDALETROYFILIBERTDUENKE RIV ER RUNRIVER TRAIL P O R T L A N D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11656 11TASK NO: TASK NAME: $2,850,000BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 62 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR) Design Services 6660 - SanitaryReplacement Fund CONTRO L OF COMBINED SEWER OVERFLOWS. CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATEDPUMP STATION, AND SEWERS. §¨¦270 §¨¦270 P A G E FEE FEEROSSTEMPOMASONSCHUETZS C H U L T E B O RMANWE S T P ORT MER R I C K BAS S T O N STUDT CRAIGCRAIG VIEW M A R KAIRE Q UE S TOVERL A C K L A N D HYANNISVIL L A D O R A D O TIMBERRUNMOSLEYVILL A H IL L ACTIVEC H IE F T A IN EMERSONF IESTABARDOTWHISPERINGPINESCONCOURSECRAIGSHIREFLAIRGREENWALK BALHARBO U R G RINNELLD E C O R A H NE W BALLASD E C KERPRIVATE NORTHWINDS DAYKIN NIMES KRAMCOEU R D EVI LLEWIL LOWYCKMASON MANOR M A T EUS LANDOLAKESOLDBALLASN IE H A U S MACKINACSTARSPUR K I N G C AREYPAPILLONACCENTDEVINE FERN RIDGESPRUCE H A V E N PARKCENTE R SUMMERHAVEN GAIETE L Y R IC CONGRESSIONALFAHRPARK COHASSETARDWICK LIGHTHOUSEDANTEROSS P A G E C R AIG OLIVE BLVD EMO3 6 4 H W YWMO 364HWY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11774 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: MissouriMAJOR SERVICE AREA: Creve Coeur CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 63 MISSOURI RIVER SERVICE AREA I/I REDUCTION -CREVE COEUR CREEK EAST Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE PIPEMETHOD. PARDEEROCKHILL EDGARCHESHIREARBANTULIP GRANT O L D W A TSON SELMAOAK TREE ELMVAUK HO LLYROSE WELLSSUN R AY T U R FLI N UM L O DGEPOLEDRAYTONBELTONS A NDER S SOUTHSIDE LANVALEHEATHER3R D PINETREE4T H CENTRALVOLZROCK FORESTFLAMINGOCULVERHILLRALE IG H WHITEHA V E N DOBB INWEXFORDBULL RUNGENERAL GRANTPRIVAT E BRACKENCONOVERGE N E R A L S H ERIDANBRIDLECOFFEY B R O O K VIE WR IDGEWOOD ST GEORGE G R A N B U R YGRANTPARKR E A V I SB ERRYVIO LET RONALDMISSYFIRWOOD BURNTOAKF O U R NIE RCLOVER WHITECLIFFPARK CAMELLIA WORTHING V I L L A W O O DGENERA L M E A D EHA RBORG IR A R D SHOPPERSM A D EI R A PRIVATELANVALEGRANT ROSE PINETREETULIP PRIVATEPRIVATE PRIVATEPRIVA T EGR A N T ELMPRIVATEW A T S O N R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11989 11TASK NO: TASK NAME: $350,000BUDGET: FUND: CrestwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 64 PARDEE - BLACKTHORN - HOLLY - ARBAN I/IREDUCTION (WATSON ROAD AND S HILL ROCKHILL ROAD) Design Services 6660 - SanitaryReplacement Fund WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCESREDUCE THE CAPACITY OF THE SYSTEM. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11699 16TASK NO: TASK NAME: $709,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 65 PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013 Professional Services 1101 - General Fund PRIVATE SO URCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS. PUBLIC ENGAGEMENT PROGRAM FOR OUTREACH REGARDINGREMOVAL OF PRIVATE STORMWATER SOURCES, THE CONSENTDECREE, & OTHER WET WEATHER RELATED COMMUNICATIONS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11701 11TASK NO: TASK NAME: $200,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 66 PUMP STATION REPLACEMENT PROJECTS (PHASEI) Design Services 6660 - SanitaryReplacement Fund DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION. REPLACE PUMP STATIONS P-708 (EARTH CITY UPS), AND P-702(EARTH CITY EXPRESSWAY). §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11702 16TASK NO: TASK NAME: $130,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 67 RADAR RAINFALL DATA (FY2014) Vendor Services 1101 - General Fund PIPE FLO WS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTSARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEMMODELS. INTEG RATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFL OW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2016BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦270 §¨¦70§¨¦170 §¨¦255§¨¦44 §¨¦40 §¨¦270 §¨¦70 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11153 16TASK NO: TASK NAME: $600,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 68 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS &LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) Professional Services 1101 - General Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFO RM AS NEEDED PROGRAM MANAGEMENT SERVICES,PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJORWASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREEREQUIREMENTS. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦40 §¨¦44 §¨¦170 §¨¦40 §¨¦170 M A N C H ESTER R D WATSONRDS LINDBERGH BLVDCHIPPE W A B LVD N KIRKWOOD RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12441 11TASK NO: TASK NAME: $300,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 69 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Pre-Design Services 6660 - SanitaryReplacement Fund COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON,AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTINGWATER QUALITY. CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL,DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TOPROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. CLAYTON RI DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA ALAMO BROOKLINE PRIVATECRESTWOOD RALPHOAKLAND C L A VERACHCONCORDIAHARCOURT EDWARDCLAYTONIAMOORLANDSSOUTHMOOR SEMINARY T U S CANYARUNDEL COMMODOREFORESTRIDGE PRIVATEHI LLVALEPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10390 11TASK NO: TASK NAME: $100,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 70 RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574) Design Services 6660 - SanitaryReplacement Fund DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM. CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I. IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK. C A T H EDRAL KINGS PARK ROLENS POTTLE ASHFIELDIRONDALE V O R T E X FORDER ASHROCK BURNCOATE PRIVATE V I C T R O N PEGASUSC HATFIELD F IR E L IGHTBLOOMFIELDMEAD O W F O R D R O S Y A S H FORDM A R TYRIDGE S T A L L A R D FLAME GLOWTHICKETEL PAULOWOLFGANGGRAYLANDSHADY OAKPINEDALEFIRELIGHT TELEGRAPH RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11919 11TASK NO: TASK NAME: $230,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 71 ROLENS DRIVE AND TELEGRAPH ROAD SANITARYSTORAGE Design Services 6660 - SanitaryReplacement Fund REMOVAL REQUIRED OF SSO BP-222 AND SSO BP-516. CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE,AND 220 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. §¨¦270 §¨¦270 EDDIE N PARK SAPPINGTONGARBER W A T S O N BAPTIST CHURCHDENNY GRANT LITTIE HILLTO PP R IV A TEPARDEEGEYERROXANNAMANDAVAUK CRESTOAKBUXTONLAVINIAREDOAK R O BYNEMILHADLEY HILLRUSDO N VARGAS DANDRIDGEEWERSTWILIGHTHELTA L A RKSPUR LINCOLN MAPLELAVANT LINCORDF A W N H AV E N CONCORDG OLF CREST PICKWICKCIN N A B A R KAPPBRIARSTONE CONCORD V IL LA G EMEAT HDEVESG LE N W O O D TEALRIDGE C R A I GWOO D CHARRETTE STOLZ R I C H V IE W L O WILL FO X GLEND O VERH I L L VALD A M E R E TIOGA J O A N GENELMUGANSUNSETBETHSKY CRESTGLENROSE LARKRIDGE PINE SPRAY S P I T ZRICHTER REBECCAEGGELINGCAMBROOKTRENTMORE PRIVATEPRIVATEGRAVOIS RDSLINDBERGH BL V D T E S S O NFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11990 11TASK NO: TASK NAME: $450,000BUDGET: FUND: Sunset HillsMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 72 SAPPINGTON CREEK I/I REDUCTION (GRAVOISROAD AND SAPPINGTON ROAD) Design Services 6660 - SanitaryReplacement Fund WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCESREDUCE THE CAPACITY OF THE EXISTING SYSTEM. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061. MACKENZIEWEBER I VYRADIOHALEKITLUCIAFORMANVITA VA SEL TIBERL EMONAALTHEA MOHEGAN N E M O NIL E S REAVIS BRENDAMAXWELL ERIEPORTRAMBLERMATHI LDADANACOR A L PILOTNEIERASTERE V A NDALE S T E R L IN G PHILODARLOW AVILATALBOT PAPOOSESPRINGUPLAND A L L E Y PANCHO MONTBROOKANCHORBRINKERL Y DEL L ARVIN PRIVATEL A V E R N HEIM CISCOELGINDAISY ARROW HOWERTOND A R L E N E BLACKHAWK CAYUGA BREUERATW OOD WAYNEP A V IA ELSADA M S O NALPINE BIXBY CHARLTONFRANCIS WARRIORROSEMARYWILMAPALMETTONIGER SHUFFLEKATHLEENZANEOVERTONHARMONYDEXTER PAULINE WAGER RAYWOOD HENLINLABETTELENARD S W IF T O N AMONA HALLOCK DON RON CITADEL JESSESTELLAMAC MOCCASINIRENE FLAGLERLEONA FLORESD A N A WEBER DANAARVIN FORMAN ALPINEBRENDA PI LOTS T E R L IN G G R A V O IS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11667 11TASK NO: TASK NAME: $380,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 73 STERLING PLACE SEPARATE SEWER I/I REMOVAL Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061 AND PROJECT11927. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10766 16TASK NO: TASK NAME: $550,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: UnallocatedPROJECT TYPE: EXPENSE TYPE:Asset Management Page 74 STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS) Vendor Services 1101 - General Fund DATA IS REQUIRED TO DETERMINE URBAN STORMWATERRAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FORWATER QUANTITY & QUALITY EVALUATION OF STREAMS. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM INCONJUNCTION WITH WATERSHED AND STORMWATER PLANNING ANDDESIGN EFFORTS. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11916 16TASK NO: TASK NAME: $799,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 75 STREAM FLOW WATER QUALITY SAMPLING (FY2014) Vendor Services 1101 - General Fund STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, &STORMWATER MANAGEMENT PROGRAMS. PERFO RM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN THE MSD SERVICE AREA. SERVICES MAY BE RENEWEDTHROUGH FY2016 BASED ON PERFORMANCE. §¨¦170 §¨¦70 §¨¦70HANLEY JANUARY NORFOLK SOUTHERNMABLE5TH HARVEYELIZABETHFAYS U B U R B A N BERMUDAD A R S TGARFIELD HANCOCKCARSON 4TH 3RD DAYBARATP A U LDADE1ST W IE G E LEVERGREENCLARKPOWELLWABASHGEORGIA L E E TI F F I N ZOE R O B E R T WOODSTOCK WESLEY HILLPLAZA HALEYMONROER U G G L E S OLYMPIA AMESGRAFJEFFERSON EN IDE V A N S SCUDDER THURSTONBROTHERTON C H U R C H KINGHILLSH A L P I N WARING SCOTT FORDC A S T R O HAWKESBURYMUELLER BRAN D B L A N D I N G ELKAN PACKA R DJO AVERILLHERNCLAYBEHLEA IR PO R TR O YA L PAYNELARKIN EATONSTLO UISWITTJONESMARIE HARTNETTTESTONL O U IS AGARDNERSPRING SPRING D A LEMI LLMANALINE CADILLAC HUGO BALLMANB L U E BERRY FERMOHARRISON D A R T M O O RMARGUERITEWULFFOAK MEADOWCRES TELMDAL EHENQUIN GRO V E CARDIG A N WYLINPRIVATE T H A T C H E RSMITH A D A M S EDDY ELSIE STANZA SCUDDER DADESCOTT HERNR O YA L TIFFIN ROBERT 5TH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12222 11TASK NO: TASK NAME: $800,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 76 SUBURBAN I/I REDUCTION (HARRISON DR ANDSUBURBAN AVE) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS ANDCONSTRUCT 360 FEET OF 12-INCH STORM SEWER. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12473. §¨¦170 §¨¦70 §¨¦70HANLEY JANUARY NORFOLK SOUTHERNMABLE5TH HARVEYELIZABETHFAYS U B U R B A N BERMUDAD A R S TGARFIELD HANCOCKCARSON 4TH 3RD DAYBARATP A U LDADE1ST W IE G E LEVERGREENCLARKPOWELLWABASHGEORGIA L E E TI F F I N ZOE R O B E R T WOODSTOCK WESLEY HILLPLAZA HALEYMONROER U G G L E S OLYMPIA AMESGRAFJEFFERSON EN IDE V A N S SCUDDER THURSTONBROTHERTON C H U R C H KINGHILLSH A L P I N WARING SCOTT FORDC A S T R O HAWKESBURYMUELLER BRAN D B L A N D I N G ELKAN PACKA R DJO AVERILLHERNCLAYBEHLEA IR PO R TR O YA L PAYNELARKIN EATONSTLO UISWITTJONESMARIE HARTNETTTESTONL O U IS AGARDNERSPRING SPRING D A LEMI LLMANALINE CADILLAC HUGO BALLMANB L U E BERRY FERMOHARRISON D A R T M O O RMARGUERITEWULFFOAK MEADOWCRES TELMDAL EHENQUIN GRO V E CARDIG A N WYLINPRIVATE T H A T C H E RSMITH A D A M S EDDY ELSIE STANZA SCUDDER DADESCOTT HERNR O YA L TIFFIN ROBERT 5TH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12473 11TASK NO: TASK NAME: $60,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 77 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DRAND SUBURBAN AVE) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACEMETHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12222. LAVIDACRITERIONMADRIDTRAMPE MALAGA COVE SPANISHMENDOZAJUNE MAPLE VALENCIAREALE LAREDORAYMOND CORDOV A REDMAN RIO LERIDA BURLINGTON NORTHERN SANTA FEWALKERPINTABRIDGEVALE JARDINZAMORA GERONA BARCELONANORTHDALE SAEGER FARMVIEW LAKEVIEW ARAG O N R IOGRANDEECKERTCABRILLO PR I V ATE SORIA COLUMBUS PELOTACASTILONDELREOBURGOS MURCIA MURCIA GERONA REDMAN TRAM PELAKEVIEW LAREDO COVE FARMVIEW TRAMPE REALE PRIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12237 11TASK NO: TASK NAME: $80,000BUDGET: FUND: UnincorporatedMUNICIPALITY: BissellMAJOR SERVICE AREA: Spanish LakeWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 78 TRAMPE I/I REDUCTION (CASTILON AVE ANDTRAMPE AVE) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. §¨¦170 §¨¦70 PAGEHANLEYTERMINAL ETZELMETRO LINKBROWNDELMAR C A N T O NNORTH N SOUTHLUCASNHUNTKIENLENL A C K LA N D FERGUSONPURDUEPENNSYLVANIAWALTON82NDARGYLE MYRONWEST MAPLE GROBY TULANE RIDGE SUTTERE ASTCABANNE EDISON BARTMERMCKIBBONW O ODSONMCKNIGHTHILLSCATES SHAFTESBURY81ST LOTUS LYNN MARKET CORNELL LILLIAN WELLSWHEATON KINGSLANDWINDOM RAFTGOODALEPARTRIDGEYALENELSONENDICOTTSTANFORD MELBACOLONIALWAYNE JULIAN70TH TEMPLERAVINIA DERBYQUENDO GANNON LAWLERAHERN RAMONA LAMBAUGUSTA LYNDHURSTPLYMOUTH FOREST AUDRAIN LENOX WILSONPRIVATENOLAALBIN ELMORE MADISO NBRISTOWEADS 67TH69THORLANDOVERNON MANOLAROLANDGLEN ECHO MEYERLEADALE MILAN WELLINGTON TEALGULFLINK WAGNER 66THSTELLANIXONEDMUNDVI NI TAERICKSYLVANBALSON GREGANMARILLAC FAIRVIEWMARCELLA LEROYASHLANDLULUDAVID JANE COLBYOXEYE RABEALBEYBRADFORDWOODROW HAFNERPURCELLPOLKLOYD ELCOHAYSEASTWELLSPRIVATEOLIVEBLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11991 11TASK NO: TASK NAME: $1,100,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 79 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEYHILLS AND BEL-NOR) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATIONREDUCING CAPACITY OF EXISTING SEWER SYSTEM. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12435 AND 12436. §¨¦170 §¨¦170 PAGE DELMAR HANLEYCANTON TERMINAL 82NDWOODSONRIDGE NORTH N SOUTHGROBY CORNELL MIRIAM MCKNIGHTU N I O N P A C I F I C OLD B O N H O MME81STLYNNWALTON SHAFTESBURY LAFON WARDERLE PEREPRICETEASDALE WAYNE HILLTOPMONROE GANNON AHERN LAMB78THWILSONB RADDOCK A L E R T ELMORE DREXELGRANTBROWN BERICKRICHARDBELT WAY BURNSTITUS S H E RID A N GAYMENDELLMILAN AMHERST GULFBLOOM BARBYENFIELDPICKERINGBON AIREPRIVATELINK BALSON SPOON FAIRVIEWWELLINGTON H A R N E Y LITTLE BELL CARLETON TULANE GARFIELD BON HILLS RABEFULLERTONPENNELL GEOFFRYHAFNERHOW BUCHANAN WASHINGTON MELROSEELBRING DUKEDELCRESTRYE LAUGHLINR ID D L E CRIXDALE VILLA IROQUOIS CRYSTALREAR STANFORDELKINGTONSAXONYWATSONIA LOCUST B L A N C H A PARAMOUNT ANNAERI THVILLA PRI VATEGAYWAYNEPRICEHARNEYPAGE BALSON P R I V A T E PRIVATE OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11984 11TASK NO: TASK NAME: $1,450,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 80 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08AND UR-09) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12437. §¨¦170 §¨¦170 PAGEHANLEY CANTONWOODSONTERMINAL LACKLAND BROWNNORTH N SOUTHBURNS82NDWALTONG R OBYPURDUE81STLYNN RIDGE U N I O N P A CIFIC RAFTGOODALEMONR O E ECHO WAYNE HILLTOPQUENDOAHERN LAMB78THPRICE BLOO MGAEBLERNOLAALBIN LIBERTY MALLARD B RADDOCK A L E R T WATTSELMORE GILROSEWENGLERGRANTBRISTOWEADS RICHARDBELT WAYMCKNIGHTTITUS S H E RID A N UT ICASENECA MENDELLMEYERMILAN WELLINGTONGULFMARLOWE NIXONWILSO NVINITAADDIEPICKER I NGMINERVA PRIVATECARSONMILTONLINK FARISR A C I N E ELLERTON FAIRVIEWALLEN DELPO RTH A R N E Y ASHLANDWINFIELD CARLETONOAKLANDBRASSIE MERIDIAN RABEFULLERTONPENNELL BRADFORDHAFNERHOW MELROSE TODDY SHELLBARK VILLA IROQUOISLEONDALE ACKERMANREAR MILLET TABER LOCUST PARK NOEL B L A N C H A PUTTERM O N AERITHKALENWALTON WAYNEBURNSLIBERTY PRICEMELROSE OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11983 11TASK NO: TASK NAME: $350,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 81 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12438. §¨¦70§¨¦170 PAGE TERMINALHANLEY DELMAR ETZEL GOODFELLOWUNIONMETRO LINKRIDGE WELLSBE LTNORTH N SOUTHKIENLENMINERVA C A N TON LUCASNHUNTFERGUSONPURDUEPENNSYLVANIAST LOUIS ARLINGTONLILLIAN MYRON WABADA BARTMER BURDCLARAHELENTULANELACKLAND SUTTERCATES E ASTCLEMENS EDISON SHAFTESBURY PAS A DE NALYNN MARKET HAMILTONWESTWALTONCORNELL AMHERST BEGGWHEATONKINGSLANDRAFTGREER PARTRIDGEENRIGHT NELSONHILLSOAKWOODHODIAMONTWARDERDARBYMELBAEDGEWOODCOLONIALSNOW TEASDALE WAYNE JULIAN70THDERBYQUENDO G A NNON AHERN LAMBAUGUSTA LYNDHURSTRAYMOND LOTUS AUDRAIN LENOX WILSONPRIVATENOLAALBIN MAPLE MADISONBRISTOW ROMAINE PEYTONEADS 69THVER N O NMANOLA BEULAH ROLANDELWARD TRINITYLELANDMEYERLEADALE MILAN WELLINGTON TEAL DAWSON GULFWAGNERNIXONVINITAVAL LEBALSON GREGANMARILLAC FAIRVIEWLEROYCOLBYBRADFORDA R D SLEY WOODROW ARDENPURCELLPATTONELCOWALES HAYSSALOMA BELTWESTRIDGE PRIVATECATES MAPLE CATES MAPLE VERNON HAMILTONEASTOLIVEBLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11671 11TASK NO: TASK NAME: $950,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 82 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01,WC-02, & WC-03) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦40 §¨¦170 §¨¦170 DELMAR TERMINAL METRO LINKETZEL FORSYTHDIELMANLADUEMETROLINK F O R E S TPAR K LAYWISE C A N T O NWOO D S ONVERNON PAGE FERGUSONWELLS MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE MARYLAND ECHO UNIO N P A C I F I C G R O BYO L D B O N H O M ME LAGOON TULANE SUTTERCATES EDISON GO V E R N M ENTMAPLE TRESCOTT DAVIS SHAFTESBURY ETHEL W E NNE K E R 81STMARKET YALEHANLEYYORK ST LOUIS CORNELL BARTMER PERSHING LAFON TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT MONR O E STANFORD MEEKS P R I CETEASDALE WAYNE JULIANHILLTOPENGEL70TH ALAMO DERBYQUENDO AHERN THROOP ZYKAN MCCUTCHEONBLOOM ALBIN LIBER T Y RIDGEMOORELMORE PRIVATE KINGSBURYHU NTERBRAEB U R N RIOVISTAEADS LEADALE MILAN TEA LC E C ILGULFBARBY FLORA VALLEDROM A R A INDIAN FARISBA L SON NORTH LITTLE BOLANDGARFIELD POLKTERRYVILLA PERSHING PRICEK I N G SBURY PAGE MAPLEHANLEYJULIAN ETHEL OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12062 11TASK NO: TASK NAME: $60,000BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 83 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-01) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 41,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. §¨¦40 §¨¦170 §¨¦170 DELMAR TERMINAL METRO LINKETZEL FORSYTHDIELMANLADUEMETROLINK F O R E S TPAR K LAYWISE C A N T O NWOO D S ONVERNON PAGE FERGUSONWELLS MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE MARYLAND ECHO UNIO N P A C I F I C G R O BYO L D B O N H O M ME LAGOON TULANE SUTTERCATES EDISON GO V E R N M ENTMAPLE TRESCOTT DAVIS SHAFTESBURY ETHEL W E NNE K E R 81STMARKET YALEHANLEYYORK ST LOUIS CORNELL BARTMER PERSHING LAFON TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT MONR O E STANFORD MEEKS P R I CETEASDALE WAYNE JULIANHILLTOPENGEL70TH ALAMO DERBYQUENDO AHERN THROOP ZYKAN MCCUTCHEONBLOOM ALBIN LIBER T Y RIDGEMOORELMORE PRIVATE KINGSBURYHU NTERBRAEB U R N RIOVISTAEADS LEADALE MILAN TEA LC E C ILGULFBARBY FLORA VALLEDROM A R A INDIAN FARISBA L SON NORTH LITTLE BOLANDGARFIELD POLKTERRYVILLA PERSHING PRICEK I N G SBURY PAGE MAPLEHANLEYJULIAN ETHEL OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12063 11TASK NO: TASK NAME: $70,000BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 84 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-02 AND WC-03) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 66,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. §¨¦170 §¨¦70 §¨¦170 HANLEYMETRO LINKWESTLA C K LA NDE ASTHILLSLUCASNHUNTBERMUDAMARKETNORTH N SOUTHPRIVATEWHEATONWALTONENDICOTTMONROEPAGE RAMONA ROLANDAUGUSTA LYNDHURSTAUDRAIN BLOO M LINCOLNNOLA SHIRLEYNORTH ALBIN HUME A L E R TBRISTOWANN EADSKINCAID CLER GLENEC H O GE I G E R LEADALEBELLE RIVEL I N KMALINEARDELIA MYRONEDGARCONNORLUCASSARGENTRIDGEVIEW M A YBELLEKENDALE UNDERHILL MARILLAC SANDIEGO FERGUSONMARCELLA ALLEN SALERNOEVAR T S WINFIELD PARK TR U M BELL JANE H ORATIO MONITEAUELAINE GREENDALE STILLWATERNORDICLOYD SHELLBARK M A R ILA C HARRYSST MARYSTABER WALKERRENZ CORYBERGAMOT ARCOLAG A R D E N WASHINGTON PR I V A TEPRIVATEEASTCLER WEST METRO LINKSTCHARLESROCKRD NATURALBRID GE RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12435 11TASK NO: TASK NAME: $60,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 85 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(BEL-NOR) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 44,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11991. PAGEHANLEYTERMINALNORTH N SOUTHLYNN RAFTMONROE BLOOM LAMBPENNSYLVANIALIBERTY MALLARD ALERT MADISON TITUS UTICAMILAN TEAL EADS QUENDOD U S K YVINI T AUNDERHILL R ACI N E ELLERTONFLORA PURDUEWINFIELD LEADALE TRENTON FALCONW A Y NE HAYWO OD FARISPRIVATE BALFOUR JACKSONSTILLWATERRUDDYCOLFAXJEFFERSONRAVEN BRADFORDDRIFTWAYNIXONFAIRHAM HARRISONLYNDALERABECORY BAINBRIDGEEA STMONTA L L E N GREEN LARCHPENFIELDELTORA MADISON TRENTON BLOOM MILANVINITAUNDERHILL MALLARD WAYNEHARRISON §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12436 11TASK NO: TASK NAME: $70,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 86 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(HANLEY HILLS) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 50,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11991. §¨¦40 §¨¦170 §¨¦170 DELMAR TERMINAL METRO LINKETZEL FORSYTHDIELMANLADUEMETROLINK F O R E S TPAR K LAYWISE C A N T O NWOO D S ONVERNON PAGE FERGUSONWELLS MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE MARYLAND ECHO UNIO N P A C I F I C G R O BYO L D B O N H O M ME LAGOON TULANE SUTTERCATES EDISON GO V E R N M ENTMAPLE TRESCOTT DAVIS SHAFTESBURY ETHEL W E NNE K E R 81STMARKET YALEHANLEYYORK ST LOUIS CORNELL BARTMER PERSHING LAFON TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT MONR O E STANFORD MEEKS P R I CETEASDALE WAYNE JULIANHILLTOPENGEL70TH ALAMO DERBYQUENDO AHERN THROOP ZYKAN MCCUTCHEONBLOOM ALBIN LIBER T Y RIDGEMOORELMORE PRIVATE KINGSBURYHU NTERBRAEB U R N RIOVISTAEADS LEADALE MILAN TEA LC E C ILGULFBARBY FLORA VALLEDROM A R A INDIAN FARISBA L SON NORTH LITTLE BOLANDGARFIELD POLKTERRYVILLA PERSHING PRICEK I N G SBURY PAGE MAPLEHANLEYJULIAN ETHEL OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12437 11TASK NO: TASK NAME: $90,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 87 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-08 AND UR-09) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11984. §¨¦40 §¨¦170 §¨¦170 DELMAR TERMINAL METRO LINKETZEL FORSYTHDIELMANLADUEMETROLINK F O R E S TPAR K LAYWISE C A N T O NWOO D S ONVERNON PAGE FERGUSONWELLS MCKNIGHTWYDOWNPURDU EBRENTWOODPENNSYLVANIALINDELL OAKLAND82ND KIENLENBURNSBROWNMYRONRIDGE MARYLAND ECHO UNIO N P A C I F I C G R O BYO L D B O N H O M ME LAGOON TULANE SUTTERCATES EDISON GO V E R N M ENTMAPLE TRESCOTT DAVIS SHAFTESBURY ETHEL W E NNE K E R 81STMARKET YALEHANLEYYORK ST LOUIS CORNELL BARTMER PERSHING LAFON TRINITYC L A Y T O N ARUNDELRAFTPARKPARTRIDGE ENRIGHT MONR O E STANFORD MEEKS P R I CETEASDALE WAYNE JULIANHILLTOPENGEL70TH ALAMO DERBYQUENDO AHERN THROOP ZYKAN MCCUTCHEONBLOOM ALBIN LIBER T Y RIDGEMOORELMORE PRIVATE KINGSBURYHU NTERBRAEB U R N RIOVISTAEADS LEADALE MILAN TEA LC E C ILGULFBARBY FLORA VALLEDROM A R A INDIAN FARISBA L SON NORTH LITTLE BOLANDGARFIELD POLKTERRYVILLA PERSHING PRICEK I N G SBURY PAGE MAPLEHANLEYJULIAN ETHEL OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12438 11TASK NO: TASK NAME: $50,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 88 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-10) Design Services 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11983. 82NDCANTON GRANT81STBRADDOCK WESTOVERHAFNERARCHER APPLETON ELMORE RICHARD ORCHARD GLENSIDEMENDELLVAUGHANCOOLIDGE BLA N C H ALAUGHLINLAUGHRENVARDAMAN BRIAR MALIBOU BRADDOCK MENDELLOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11992 11TASK NO: TASK NAME: $1,300,000BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 89 UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT) Pre-Design Services 6660 - SanitaryReplacement Fund SANITARY STORAGE IS NECESSARY IN UNIVERSITY CITY WATERSHEDFOR FLO W ALLOCATION TO THE LEMAY TREATMENT FACILITY DURINGWET WEATHER EVENTS. CONSTRUCT 6.5 MILLION GALLON UNDERGROUND STORAGEFACILITY. §¨¦40 §¨¦170 §¨¦170 PAGE DELMAR TERMINAL METRO LINKFORESTPARK ETZEL FORSYTHMETROLINK LAYCA N T O N LINDELL OAKLAND KIENLENGOODFELLOWWOO D S ONMCKNIGHTFERGUSONBRENTWOODWYDOWNPURDU EPENNSYLVANIA82NDMYRON MARYLAND W ELLS G R O BYBURNSG RANDBROWNLADUECLARALAGOON TULANE SUTTERCATES RIDGE EDISON GO V E R N M ENTDAVIS UNIONSHAFTESBURY ETHEL HANLEYW E NNE K E R 81STO L D B O N HOMME MARKET WATERMANYALE YORK CORNELL TERRY ROSEDALELAFON CLAYT O N KINGSLANDTRINITYARUNDELRAFT BOLANDPARK PARTRIDGEENRIGHT MONR O E STANFORD STLOUIS P R I CETEASDALE WAYNE JULIANHILLTOP70TH ALAMO DERBYQUENDO AHERN MCCUTCHEONLENOX BLOOM ALBIN LIBER T Y MAPLE RIDGEMOORELMORE THEODOSIA BELTHUNTERWABADA RIOVISTAEADS 67TH69THK I N G SBURY LEADALE MILAN TEA LC E C ILGULF 66THMOUNT BARBY EDMUNDVALLEDROM A R A HORTONHA MILTONFARISR E A R LITTLE VETTER WISE GARFIELD NINAPOLKVILLA ETHELPRICE WELLS UNIONBURNSHANLEYOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12440 11TASK NO: TASK NAME: $300,000BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 90 UPPER RDP (UNIVERSITY CITY) CSO STORAGETUNNEL Pre-Design Services 6660 - SanitaryReplacement Fund COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES ANDUNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATERQUALITY. CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL,DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TOPROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. §¨¦40§¨¦40 DALE WISE CLAYTON BOLANDYORK CLAYTONIAPA R K ETHEL HOOVER LILE LOVELLAMO ORLANDSCROMWELL ARCHBENNETTRALPHLACLEDESTATIONCENT E R SOUTHOAKKNOLLHILLSIDEARTHUR RI DGEMOORBROADVIEWWARNER GISSLERAUDUBON EDWARDHARTERSURREY HILLSHILL V ALESOMERSET HIGHLANDCRESTWOODMURPHYBROOKLINE PRIVATEOAKLAND C L A VERACHWOODLANDT U S CANYCOMMODOREARGUSWISE WARNER WOODLAND§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11965 11TASK NO: TASK NAME: $800,000BUDGET: FUND: Richmond HeightsMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 91 WEST WISE I/I REDUCTION (NW QUADRANT I-64AND BIG BEND BLVD) Design Services 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 960 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851. 14 April 2014 WASTEWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION $5,000,000 92 11920 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT $15,000,000 93 11920 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT $5,500,000 94 11853 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT A $4,680,000 95 11854 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT B $4,920,000 96 11857 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT C $3,810,000 97 11871 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D $5,000,000 98 11924 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT E $4,130,000 99 11925 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT F $4,490,000 100 11926 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G $5,000,000 101 11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317) $1,460,000 102 11686 BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR) $235,000 103 11689 BLACK CREEK I/I REDUCTION $5,700,000 104 11788 CAULKS CREEK PUMP STATION B FORCE MAIN $3,100,000 105 11884 CEDARCREST PRIVATE I/I REDUCTION (SKME- 561) $380,000 106 11809 COLDWATER CREEK WWTF SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS $2,800,000 107 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C $2,000,000 108 14 April 2014 WASTEWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 10557 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME -240) $670,000 109 11730 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) $2,500,000 110 11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE $5,000,000 111 10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION $1,500,000 112 11850 DEER CREEK PUBLIC I/I REDUCTION (2015)$5,000,000 113 11734 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - LAND ACQUISITION $6,000,000 114 11735 DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION $400,000 115 11743 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2015) $3,500,000 116 11107 EMERGENCY REPAIR FUNDS (WASTEWATER)$250,000 117 11079 FAIRLIGHT AND BRIGHTLING SEWER SEPARATION $110,000 118 10456 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) REHABILITATION & I/I REDUCTION $420,000 119 10440 FORESTWOOD LATERAL SANITARY RELIEF (SKME-321) $1,600,000 120 11758 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A $65,000 121 12379 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B $65,000 122 12380 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C $65,000 123 12381 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D $65,000 124 11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) $2,700,000 125 14 April 2014 WASTEWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 10642 HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION $3,400,000 126 10330 HARTLAND TO GOTHLAND SEWER SEPARATION $1,360,000 127 10656 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI $3,800,000 128 11708 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT A $5,000,000 129 11866 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT B $5,000,000 130 11867 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C $5,000,000 131 11773 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) $1,500,000 132 11773 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) $5,500,000 133 11710 ISABELLE I/I REDUCTION $100,000 134 11715 LANG ROYCE LATERAL SANITARY RELIEF (SKME-320) $1,400,000 135 11856 LEMAY PUBLIC I/I REDUCTION (2015)$4,800,000 136 11927 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B $5,000,000 137 12427 LEMAY WWTF PLANT CONTROLS $1,500,000 138 11650 LOWER MERAMEC WATERSHED I/I REMOVAL $5,000,000 139 11659 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292) $1,050,000 140 11694 NORTH BADEN CREEK I/I REDUCTION (BP- 612)(CANTERBURY DR) $580,000 141 12460 OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE AND OAKLAND AVE) $1,000,000 142 14 April 2014 WASTEWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11695 OLDE ENGLISH I/I REMOVAL $265,000 143 11697 PAGE TO TRENTON SANITARY RELIEF $1,000,000 144 11094 PROSPECT HILL LANDFILL VERTICAL EXPANSION $300,000 145 11933 PROVIDENCE PUBLIC I/I REDUCTION $3,000,000 146 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) $1,200,000 147 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) $800,000 148 11069 ROCK HILL SANITARY RELIEF (SKME -618)$1,350,000 149 11680 ROXBURY I/I REDUCTION $1,070,000 150 11666 ST MARIE SANITARY RELIEF I/I REDUCTION $250,000 151 11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM $600,000 152 11918 TELEGRAPH ROAD #2928 I/I REDUCTION $132,000 153 11929 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST $4,500,000 154 11681 UPPER COLDWATER SECTION D I/I REDUCTION $350,000 155 10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A $7,500,000 156 10027 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) $3,000,000 157 11086 WEBSTER ACRES SANITARY SEWER REPLACEMENT $1,120,000 158 11108 WISMER - HUNTINGTON SANITARY RELIEF (SKME -592) $1,200,000 159 TOTAL:$181,742,000 §¨¦40 §¨¦270 §¨¦40 §¨¦270 CLAYTON GEYERBALLASDESPERESSPOEDENORTH F O R T Y RUTHTHORNHILL OAKP IN G R Y WOODGATECARBERRY O A K VA L L E YTAMMANYSOUTH FORTY SQ UIRESROCLAREDRYRIDGEBRIDLEOLD C O L O N Y G RAYSELLENRICKPOST OAK PORTLAND FIRETHORNCLAYCHESTERPRIVATEBOPPROTH SIMMONSDUBON KEND ONC H IP PE R CREEKHAVEN DEVO N D A LEHICKORYDIVOTHARFLO SERENDIP ITYCLAYMARK ELAINETOPPING MALVERN PAMELA HOLIDAY TUCKERTREGARON VINETTADWYERCLAYD U R B IN REVERECHRISTINEPRINCESSNICHOLAS TINDALL FO X R I D G E HIGH OAKCLAYTON PLACEGLENMAROPOINT OAKMUELLER CACKYHICKOR Y §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11934 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 92 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/IREDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 60,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,900,000.PUBLIC I/I REDUCTION FROM 11682. §¨¦70 2 N D FERRYTERMINAL H A L L GRANDMAY1 S TPRARIEN O R F O L K S O U T H E R NDOUGLASS A N G ELIC AGANOGRANDTERMINAL §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11920 15TASK NO: TASK NAME: $15,000,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 93 BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT Construction Task 6660 - SanitaryReplacement Fund EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS. CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS. $5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16. §¨¦70 2 N D FERRYTERMINAL H A L L GRANDMAY1 S TPRARIEN O R F O L K S O U T H E R NDOUGLASS A N G ELIC AGANOGRANDTERMINAL §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11920 15TASK NO: TASK NAME: $5,500,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 94 BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT Construction, Phase II 6660 - SanitaryReplacement Fund EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS. CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS. $5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16. §¨¦270 DUKEDUNN ST CYREARLLORD LILACTOELLECOUNTBARONROYALS H EPLEY FRY BLUFFSCENIC VA L L E YCOBURGLANDS LOOKAWAYB ELGROVE VISCOUNTDARR PER S H A L L CO ZENSB E R W YNVORHOF K IL G O R E C ABOTPRINCE D UENKE ASHBROOKC A M E R O N BURLINGTONNORTHERNSANTAFEEWELLQUIE T EDGEFI ELDC E N T E R NECTAR D O RWOO D DURNESSFONTAINE SPRINGGARDENAST ORI ACASTLE HALLHUDSONDELHICOLLETT LEBON MEAD SCRANTON E LBAYORKTOWNCOMET COBURG G L E N G ARRYAT T I C A LEETONGLOUCESTER HATHAWAYHOBKIRKBIRITZ SURRE Y B ER KAYDOROTHYTRIOPRIVATEBOSWORTH F O R KFOREST HOMEHAVILAND HA R P E R TWILL JEFFREY NOLL DENNESSNORBRIDGEFOXPATHL A N A R K JAROSSHELDONEXPO PICKFORDRAFORD LANDWEHR TROY PIKESUNBEAM PERSHALL PRIVATESTC Y R §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11853 15TASK NO: TASK NAME: $4,680,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 95 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT A Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 56,400 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11684 AND 11685. §¨¦270 §¨¦170 LINDSAY PER S H ALL HUMES KEEVEN CENTRAL CHARBONIER MULLANPHY LAFAYETTEPAUL5TH UTZ GRAHAMDUNN PRIV ATE FLOR DAWN HOLIDAY KINGSFORD TAHOE JENKEE C O A C HWAY ESTES WASHINGTON BOONEFORD TESON LOEKES WRENLOVELAND COACHLIGHT ASPENKOSTKA MAPLE VILLE MARIAWIETHAUPT DOVE LILAC TAYLOR LOVESWANDEWAYNEFEEFEEB R O W N ELM GROVE WOODCREST ANGLUM STJEANQUEEN ANN RUTH LEES ST CIN RIVERWOODESTATES OLIVETO BELLARMINERIVERWOODTRAILS VILLAGESQUARE ST PATRICERYA N ALMA HAZELCRESTCHULA HARKEEFLIGHTN AOMIBARWICK HIGH SUN POLSONAIRSHIREC A M P U S LUNDY DEBORAHC H E V A L BRUCE HEATHER REGINA P R I V A T E DUNNPRIV A T E PRIVATE PRIVATE UTZ LIN D B E RGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11854 15TASK NO: TASK NAME: $4,920,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 96 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT B Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 57,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11652, 11749, AND11719. §¨¦270 §¨¦170 §¨¦170 DUNN HUMES PERSHALL N E W H A L L S F E R R Y FROST ST ANTHONY WASHINGTON DERHAKE LINDSAY LAFAYETTEMULLANPHY 5TH WAT ERFORD ST CATHERINE GRAHAMHANLEYCLARKST MARIE ESTES PAULOLDHA L L S F E R R Y KEEVEN CHARBONIER STJOSEPH E LIZ A B E T H LATTY WREN REASORLOVELANDRUE ST DENISGRANTS CLOVERWILLIAMSNE R O MAPLE AV O N BARTO MOU L E NARA STLOUIS A L L ENLILAC CANISIUSAQUEDUCTPOHLMAN P R I VAT E C A L V ER TONTROTTERSADDLEKAYW E D G W OO D STJEANCAPRIJEAN DANUBEWELLINGTONRUTH THUNDERBIRD AB E RDEEN ST CIN ZURICHH E L M K A MPF EVAJ A N A FAIRW A Y ST PATRICERYA N CORDOBADAVEYALMA HAZELCRESTHARKEEFLIGHTLARRYDAVID FOX RUN L O Y O L A ALLIANCERETFORD S T R E G I S JACKLIN WOODEN BON AIREGALLOPSTARLIGHTM O H A N SULKYDUCHESNEDEBORAHST L U K E PEBBLE CARGILL BRUCE RENA HEATHER LATTY PERS H A LLLINDBERGHLINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11857 15TASK NO: TASK NAME: $3,810,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 97 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT C Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 21,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11736, 11718, AND11666. §¨¦170 §¨¦70 §¨¦170ASHBYPAGEADIEWOODSONLACKLAND BROWNLINKMETRO L INK WRIGHTW A RSONNORTH SIMSMCKIBBONUNION P A C I F I C BALTIMORE WALTONKATHLYN BURNSEMINENCEARGYLELONG RIDGE ECHO GUTHRIE B AUR NIBLIC DIXFEEFEEJANEPOELITZ REXH A NLEY NORTHNSOUTHTRESCOTT OAK ENTITYHOODMEEKS ENG LE RKREMDYERLA JOLLA WHEATONWINDOM BRUNOGOODALECA N T ERENDICOTTTERMINALC EN TRALMIDLAND ST FRANCIS TUDORMILTON GASSTHORPE TENNYSONCYPRESSMARGOANN CHAUCERFOREST ZYKAN LIBERT YAIRWAYWISMERHAROLD WURDACK MORROW SAN JOSEBRISTOWRAYMONDTITUSTRENTON IVAN HERBERTVANCLEVEPRIVATE S TKATHERINE GULFMARVINMALINETIPTONCALVERTFLORA MCNULTY VINITAPIC K ER IN G MINERVATREADWAY TOWNLEY BOYLSTON ASHLANDMURIEL FLORENCE LINDADE PROUHETGARFIELDCHARLACKS P U R MASHIELEITHMARSHALLKINGBEE LOYD RUCKERTHOLTWICK O A K METRO LINK BROWNTHORPE PAGE HANLEYBURNSOAK §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11871 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 98 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT D Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 67,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11662, 11663, AND11712. SUPPLEMENTAL FUNDING OF $2,280,000 IN FY 16. §¨¦44 §¨¦55 §¨¦270 §¨¦55 §¨¦270 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11924 15TASK NO: TASK NAME: $4,130,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 99 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT E Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 31,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11651, 11765,11665, AND 11670. §¨¦70 §¨¦270 NATURALBRIDGERD RIVERVIEWDRLI N D B E RGHLEWISNCLARKBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11925 15TASK NO: TASK NAME: $4,490,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 100 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT F Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 47,900 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11686, 11693, AND11668. §¨¦270 §¨¦70 §¨¦170 §¨¦170 NLINDBERGHBLVDST CHARLES ROCK RD NATURALBRIDGERD E M O 370 H WY N LIN D B ERGHBLVDNATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11926 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 101 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT G Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11681, 11739,11738, AND 11710. SUPPLEMENTAL FUNDING OF $2,700,000 IN FY 16. LILACTOELLEST CYR S H EPLEY FRY BLUFF SCENIC VA L LEYCOBURGLANDS BELGROVE DARRBLISS ADRIAN K IL G O R E CABOT A SHBROOKC AMERO N HOYT EWELLNECTAR BURLINGTONNORTHERNSANTAFEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON MEAD SCRANTO NELBACOMET COBURG CAMBRIAAT T I C A LEETONGLOUCES TERDURHAMHABECKINGHOBKIRK BIRITZ SURRE Y ADLERDOROTHYPRESLEYCRET E TRION E L A N STIMSONM A RALDOBOSW O RTH T AYG O L D E N F O R KDIAMOND GRAMPIANHAVILAND ROSSTWILL JEFFREYMCCARTNEYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHO D E S S A HANSOM SIEBE RONT E L PRESTIGE LANDWEHR ZELLWEGER DUDLEYSUNBEAM GARDOLILACSHEPLEY CASTLESTCYRLEWIS N CLARK BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11685 15TASK NO: TASK NAME: $1,460,000BUDGET: FUND: Bellefontaine NeighborsMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 102 BISSELL HILLS SANITARY RELIEF/CALUMET I/IREDUCTION (BP-317) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11853. LILACTOELLELOOKAWAYS H EPLEY FRY BLUFF SCENIC VA L LE Y B ELGROVE DARRBLISSC OBURGL A NDSADRIANCABOT C AMERO N HOYT EWELLSPRINGGARDENA SHBROOKBURLINGTONNORTHERNSANTAFENECTAR STCYR DURNESSRENFREWLEBON SCRANTO NELBA COBURG G L E N GARRYLEETON A S H FORDKILGORE GLOUCESTERHABECKINGHOBKIRK BIRITZ SURRE Y DUNDEE DOROTHYPRESLEYTRION E L A N FORE S T HOME STIMSONM A RALDOBOSWORTH T AYF O R KDIAMOND GRAMPIAN ROSSJEFFREYMCCARTNEYBAGNELLTHRIFT DENNESSFOXPATHMONTEITH O D E S S A HANSOM RONT EL LANDWEHR ZELLWEGER DUDLEYGARDOLILACST CYR SHEPLEY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11686 15TASK NO: TASK NAME: $235,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: MISSISSIPPI RIVER (CITY)WATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 103 BISSELL POINT I/I REDUCTION (BP-619) (VALLEYDR) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. PRO JECT CO MPLETES A PORTON OF SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSO BP-619. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 11925. §¨¦170 §¨¦170 DELMAR PRICELADUE LAYDIELMANFORSYTH BRENTWOODMCKNIGHTCORNELL M E T R O L IN K O LD BONHO M M E MARYLANDBEMISTON DAVIS GROBY MERAMECWE N N E K E R HANLEYLAFON F RANCI S WARDERCELLASHAFTESBURY LE PEREJACKSONTOPTONAHERN GANNON CENTRALC L AY T O N LINDENP OLO H U NTERBERICKRIO VISTAYORK ST A N D REWSGRANADA81STTEASDALEGAY BRAE B U R NGRAYBRIDGE NORTH N SOUTHWYDOWN AMHERST BONHOMME BARBYENFIELD PR IV A T E CRANDONWESTWOODDROM A RABON AIREINDIAN BALSON GLEN E A G L ESOLETAWASHINGTON LITTLE LEECARONDELETBERKLEYRAISHER CARSW O L DBONHILLSGEOFFRYKINGSBURY DAYTONA R E A R BLACK CREEK DUKETERRYDELCRESTRYEVILLA MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA ORLANDO SUDBURYMCKNIGHTPRIVATEVILLA P R I V A T E HANLEYGAYB A LSON P R I V A T E GAY§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11689 15TASK NO: TASK NAME: $5,700,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 104 BLACK CREEK I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 62,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. §¨¦40 §¨¦40 C E N T R A L M ID L A N D W I LD HORSE C R E E KPRIVATEOLDCHESTERFIELD SANTAMARIAEDISON SWINGLEYRIDGE NORTHOUTERFORTY ALRICK D O R E S A YGRIMSTONE CHESTERFIEL D G R O V E WIEGANDPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11788 15TASK NO: TASK NAME: $3,100,000BUDGET: FUND: ChesterfieldMUNICIPALITY: MissouriMAJOR SERVICE AREA: Caulks CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 105 CAULKS CREEK PUMP STATION B FORCE MAIN Construction Task 6660 - SanitaryReplacement Fund EXISTING FO RCE MAIN IS UNDERSIZED AND DETERIORATING. CONSTRUCT 1,000 FEET OF 8-INCH FORCE MAIN FROM PUMPSTATION B TO 36-INCH FORCE MAIN. §¨¦170 §¨¦170 WARSONPRICELADUEDIELMANOLDBON H O M M E DELMAR GAYMCKNIGHTWE N N E K E R LAYC L AY T O N ENGEL BARNESCELLAKENTGANNON G L E N EAG L E S S T ACY B A L S ON H U NTERB RAEB U R N BERICKRIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDEGROBY P R I V A T E BARBYENFIELDHEATHER HILLDROM A RALANGTONP IC A R D Y BON AIREFO R D Y CESPOON A L A N SON HIGHDOWNARBORLITTLE MANSFIELD LISA BERKLEYMAYFAIRH A S T IN G S BON HILLS FIE L D IN G RADFORDWASHINGTON APPLE TREEBLACK CREEKTERRYDELCRESTRYEBRIAROAKRANDELAYCRIXDALE VILLA WHITE ROSELORENZOELKINGTONCHERRI W A T S O N IALYNNELOCUST VILLA P R I V A T E MCKNIGHTPR IV A T E PRIVATEOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11884 15TASK NO: TASK NAME: $380,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 106 CEDARCREST PRIVATE I/I REDUCTION (SKME-561) Construction, Phase II 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS. REMOVE PRIVATE I/I FROM PUBLIC SEWER BY CORRECTINGIMPROPER CONNECTIONS ON 300 PROPERTIES. PRO JECT WAS ORIGINALLY PART OF THE SCOPE OF 11722. PRIVATE ROBBINSGROVERICHMOND FORESTBEHLMANNMEADOWSROBBINSWAY PR IVAT E PR IV A T E PRIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11809 15TASK NO: TASK NAME: $2,800,000BUDGET: FUND: UnincorporatedMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 107 COLDWATER CREEK WWTF SCREENINGS &WASHER/COMPACTOR IMPROVEMENTS Construction Task 6660 - SanitaryReplacement Fund EXISTING WASHER/COMPACTORS DO NOT MEET NEEDED CAPACITY.EXISTING PIPING AND PUMPS REQUIRE MODIFICATION TO ALLOWFOR ADDITIONAL SLUDGE STORAGE. CONSTRUCT ADDITIONAL CAPACITY AND MAKE IMPROVEMENTS TOEXISTING FINE SCREENINGS TRANSPORT SYSTEM ANDWASHER/COMPACTOR SYSTEM, AND MINOR PIPING CHANGES TOALLOW DIGESTERS TO FUNCTION AS EMERGENCY STORAGE TANKSIF A SL UDGE FORCE MAIN FAILURE OCCURS. §¨¦270§¨¦270 DUNN FORD PERSHALL POLSONNORFOLK S O U T H ERNTAYLOR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11726 15TASK NO: TASK NAME: $2,000,000BUDGET: FUND: HazelwoodMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 108 COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS. CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT. $2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION. P RIVATE B E L C R O F T OL D H A L L S F E R R YLE SABREINVICTAC O R D I N §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10557 15TASK NO: TASK NAME: $670,000BUDGET: FUND: UnincorporatedMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 109 COLDWATER SANITARY TRUNK SEWER SECTION AREHABILITATION (SKME -240) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWER. DISCONNECT 12-INCH SANITARY SEWER FROM THE INACTIVE 72-INCHCOLDWATER TRUNK AND RECONNECT IT TO THE ACTIVE 90-INCHCOLDWATER TRUNK. CONSTRUCT 620 FEET OF 12-INCH SANITARYSEWER. §¨¦70 §¨¦70 LILLIANLUCAS N HUNTHILLSRAVI N IA SUNBURYROHN EUNICE SAN DIEGO FLORIANCOUNTRY C L U B NELSONHATZOVERBROOK ROXIEGROVELAND STANWOOD WINCHESTER FLETCHERR O L A N D B E R M U D A SHA R O N FOREST HILL B E L W O O D WILLOW WOODNORWAYHOLBORNCOLTON ESTERBROOK S U N S E T LAMMERT HUNTI NGTON NORWOODHILLSCCCOLLEGEMCLARANWARWI C K PINE RIDGE BURRWOOD STATLERUPSHAWSANTA MONICA WOODSTEADWINCHELSEA BRETONN A D IN E ROLAND §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11730 15TASK NO: TASK NAME: $2,500,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 110 CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNEL,AND 1,3 00 FEET OF 8-INCH TO 30-INCH SANITARY AND STORM SEWER.ELIMINATE CSO OUTFALL BP-059, SSO BP-255, AND SSO BP-256. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000. §¨¦70 §¨¦270 §¨¦55 §¨¦40 §¨¦44 §¨¦170 §¨¦40 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11146 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 111 CSO VOLUME REDUCTION GREENINFRASTRUCTURE Construction Task 1101 - General Fund CONTRO L AND REDUCTION OF COMBINED SEWER OVERFLOWSREQUIRED. INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. THIS PRO JECT TO BE IMPLEMENTED IN COOPERATION WITH THECITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES. LADUE SPOEDEGRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE ROND E L A Y F I E S T A SONAAL D E N BALHARBO URLARKINOFFIC E TU R E ENFAIRWAYSDAYKINOLD BALLASDEAVERT R I E S T E RENEELEISURE OLDOLIV E STREET ALLE GROO LDE C A B I N BENWOOD MARFORDSHERWYNTRILANE COUNTRY FAIRMOR WOODNASS AULAWREN C E SPOEDE HILLS Q U A I L W A Y S MOSLEY HILL MOSLEY ACRES SPOEDE WOODS W O O D S H I RECOLONIAL HILLSMOSLEY FOREST MIDDLEBROOK CHALET N O B L E M A N BARBEEFARON HILL G R A E S O N WEDGEWOOD C R A I G PRIVATE CRAIG OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10576 15TASK NO: TASK NAME: $1,500,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 112 DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING SANITARY BYPASSES. CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH SEWERS, REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS, AND REMOVE SSOBP-627 AND SSO BP-607. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11850. THIS PROJECTINCLUDES CONSTRUCTION OF CHALET CT. STREAMBANKSTABILIZATION, 11191. §¨¦270 §¨¦40 WARSONLADUE SPOEDEGRAESERMOSLEYEMERSOND AUTELS C H U L T E P E M STUDT GUELBRETHCLAYT O N G R A N D VIE W CRAIGCRAIGVIE W T E A L W O O DPRIVATE BEAVER STACY MESA RESEARCHMAGNA CAR T A ELZEY C L ER M O N T STONEYSIDELAKESHORESARAH RONDELAYFIESTASONABARDOT CONWAYALDE N BROOK TRAIL ARTHUR P I CARDYF O R D YCEDONOHO NE W B ALLASTUREEN HIGHDOWNFAIRWAYSTUCKERL ADUEESTATESDAYKIN ANZEIGER OLD OLIVE STREET LISARENEELEISURE A L L E GROLYLEWOOD H A S T IN G S SHERWYN APACHE M O R WOODRICHARDSON GAIETE PILLARCAPITOL C OU N T R YV IE W PRIVA T E C R AIG PRI VATEOL I V E B L V D NLINDBERGHBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11850 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 113 DEER CREEK PUBLIC I/I REDUCTION (2015) Construction Task 6660 - SanitaryReplacement Fund INFL OW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATE 85,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 10754 AND 10576. §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦270 §¨¦40 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11734 13TASK NO: TASK NAME: $6,000,000BUDGET: FUND: St. Louis CountyMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 114 DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - LAND ACQUISITION Land Purchase 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION CAUSING OVERCHARGEDSANITARY TRUNK SEWER AND ACTIVATING A CONSTRUCTED SSO. CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES,PUMPING STATIONS AND SEWERS AS PART OF AN OVERALLWATERSHED PLAN FOR SANITARY RELIEF. ACQUIRE PROPERTY FORVARIOUS PERMANENT STRUCTURES AND EASEMENTS ALONGTUNNEL ALIGNMENT. §¨¦170 §¨¦170 DELMAR GANNON GROBY LADUE MCKNIGHT81STOLD BONHO M ME LAFON STANFORD WARDERLE PEREBALSON MARYLANDFO R S Y THBERICKRIO VISTATE A S D ALEGAYCENTER MERAMECTOPTONCENTRALAMHERST M O N A BARBY P R IV A T E CRANDONTULANE NORTHNSOUTHSPOON AL A N S O N SHAFTESBURY LITTLE AHE R N BONHILLS C O RNELL COOLIDGE GEOF F RYKINGSBURY WASHINGTON WESTDUKEDE LCRESTRYE DONNEHOW CRIXDALE VILLA PRICE HAFNER PRICEW O ODSFAIRVIEWMULBERRYLORENZOL A D E LDOLORES EASTOVERSAXONY82ND W A T S O N IA LOCUST ALDANWILNERB L A N C H A FLEET W O ODWESTOVER PAXTON UNIVERSITYWAYFIELDCHER EL ROWLAND WILD CHERRYAVESDALEC O L O N IA L GAYGAYPRIV A T E PRIVATE CORNELLPRIVATEOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11735 15TASK NO: TASK NAME: $400,000BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 115 DELCREST SANITARY RELIEF (SKME-565) I/IREDUCTION Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS. CONSTRUCT 440 FEET OF 12-INCH STORM SEWERS AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11743 13TASK NO: TASK NAME: $3,500,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 116 EASEMENT ACQUISITION FOR COMBINED /SANITARY PROJECTS (FY 2015) Property RightsAcquisition 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSREQUIRE EXTENSIVE CONSTRUCTION WORK THROUGHOUT THEDISTRICT. EASEMENT ACQUISITION REQUIRED FOR CAPITAL IMPROVEMENTAND REPLACEMENT PROGRAM WASTEWATER SEWER PROJECTS. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11107 15TASK NO: TASK NAME: $250,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 117 EMERGENCY REPAIR FUNDS (WASTEWATER) Construction Task 4122 - WastewaterEmergency Fund AG ING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST AC T IMMEDIATELY. PRO VIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦170 §¨¦170HILLTOPALICECOLLINGWOODREAR COCHISE COMANCHE C H I S H O L M BRIGHTLINGIRVINGTONPRIVATEHILLTOP MANOR BRISCOEMARGARETARROWHEADCOMANCHE PRIVATEOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11079 15TASK NO: TASK NAME: $110,000BUDGET: FUND: OlivetteMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 118 FAIRLIGHT AND BRIGHTLING SEWERSEPARATION Construction Task 6660 - SanitaryReplacement Fund STORM INLETS CONNECTED TO SANITARY SYSTEM. CONSTRUCT 245 FEET OF 12-INCH STORM SEWER TO CORRECTIMPROPER CONNECTION TO SANITARY SYSTEM. §¨¦270 §¨¦270 PAGE ASHBYA D I E W A RSONSCHU E TZ DIELMANFEEFEELINKWOODSONSIMSBALTIMORE BURNSFLORAWRIGHT UNIONPACIF I C SPOEDERIDGEROSS S C H U L T EBA L L HIGHCENTR AL MIDLANDBAUR D AUTELTEMPO DRIVER NIBLIC DIXWELDONOL DBONHOMME BRECKENRIDGESMILEY POELITZ REXME S ATRESCOTT AMELING OAK MOSLEYB O R M A N ENGEL HOODMETRO MEEKSKREMDYER EMERSONDELORDCAN T ERMAR STAYLOR SC HA E F E R ST FRANCIS GUELBRETHGASSTHORPE STUDT P R I CELAKELANSINGRESEARCHHILLTOPSCHULTEHILLGRI SS OMCRAIGCRAIG V I E WOLD DORSETTT E A L W O O D ZYKAN PASTEURWISMERUCEYLEGLENPARK PRI VATEWURDACK MORROW SAN JOSEWARNEN IVAN OLIVAIREDUNSTONFIE S T A SONAFAIRVIEWLONGMONT H A R O L D ANDESLINDADE MCKELVEYDALEYRENEEROSLAN BULLERPLUMEASTHAMAMBRO A R CMIKEL VILLAFEEFEEADIE DIXCANTER PAGE PRICEROSSSCHULTEC R AIG OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10456 15TASK NO: TASK NAME: $420,000BUDGET: FUND: VariousMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 119 FOREST BROOK SANITARY RELIEF (SKME-003 ANDSKME-016) REHABILITATION & I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11944. HARVEYHUDSON NORFOLK SOUTHERN D A R S T FERGUSON STEIN IMPERIALDAYBARATVICKIEP A U L KEELEN GLENOWENW IE G E LCLARK K A P P E L POWELL LORNATRASKGEORGIADELLWOODL E E S U B U R B A N TI F F I N T H A T C HER CARSON R O B E R T E X U M A L ANGKIRKFORESTWOOD N A S HUA R U G G L E S GAGEAMESWESLEY ELLISONJETTRANDCLARIONKR O E G E R CHAMP LIN C H U R C H B R OTHERTON CLAIRMONTMEDFORDHEYDT DELLRIDGECA L V E RTO N NEMN IC H GLADE H I GHMONT REBAVENICEELKAN MAYFAIRHOLLINSAVERILLFROS T HERNCLAYBEHLEA IR PO R TSCOTTDALER O YA L JANUARY PAYNELARKIN PRIOR STLO UIS TANNERTESTONSCHLUETERL O U IS A C A N F I E LD T H O R O U G H M A N OLYMPIA BON OAKDUPREEC A R G I L L WEDGED A M A NMILLMANNEWTONBALLMANTULLAMOORSTIVESELK H ARTMANOR FERMOHARRISON CROWN POINT FEN W I CKEMMETT EAST DELLCHATELETDEEMBALBOAMEADOW L ARKELMDALEEMERYKNOLLCRESTSCOTTPRIVATECARDIGAN LOMOND EDDY DEANDELL BRADSHAW BRUCEELSWORTHBROMLEYTIFFIN ROBERT §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10440 15TASK NO: TASK NAME: $1,600,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 120 FORESTWOOD LATERAL SANITARY RELIEF(SKME-321) Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 7,700 FEET OF 12-INCH TO 27-INCH SANITARY RELIEFSEWER IN THE VICINITY OF FORESTWOOD, HIGHMONT ANDFERGUSON. FIVE CONSTRUCTED SSOS TO BE ELIMINATED, BP-295,BP-296, BP-281, BP-316, AND BP-322. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11758 12TASK NO: TASK NAME: $65,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: UnallocatedPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 121 GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT A Appraisal Services 1101 - General Fund APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM. PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12379 12TASK NO: TASK NAME: $65,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: UnallocatedPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 122 GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT B Appraisal Services 1101 - General Fund APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM. PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12380 12TASK NO: TASK NAME: $65,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: UnallocatedPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 123 GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT C Appraisal Services 1101 - General Fund APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM. PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12381 12TASK NO: TASK NAME: $65,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: UnallocatedPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 124 GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT D Appraisal Services 1101 - General Fund APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PRO GRAM. PERFO RM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGHFY2017 BASED ON PERFORMANCE. TE R M IN A LGREER BELTCLARALABADIEST LOUISGOODFELLOW HERBERT PALM ROOSEVELT SE L BE R BROWNHAMILTONASHLAND SEMPLETERRY SIEMERSELMBANK ROWANBLACKSTONEGREER ASHLAND TE R M IN A LASHLAND NATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11768 15TASK NO: TASK NAME: $2,700,000BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: HarlemWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 125 HARLEM - BADEN RELIEF PHASE IV (HEBERT)(DETENTION BASIN) Construction Task 6660 - SanitaryReplacement Fund STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS. CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS ANDFLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNKSEWERS. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,460,000. WEBER LANGLEY MATHILDAHEEGE PILOTVINE ELSALAKE W O ODACORN WALDO LODE HILDA ELGINPHILOA L L E Y WEBER TRAILV IR G IL SEIBERT MAXWELL VASE L HARMONYKATHLEENROSEMARYLACEYWILLARD WELMERING DANAFRANKFO RT H E E G E ELGI NLODE PILOTPHILOV I R G I L PILOTVINE KATHLEENROSEMARYG R A V O IS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10642 15TASK NO: TASK NAME: $3,400,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Mackenzie CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 126 HARMONY-ACORN SEWER SEPARATION AND I/IREDUCTION Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS INISOLATED AREA OF COMBINED SEWERS. CONSTRUCT 3,100 FEET OF 12-INCH TO 42-INCH STORM SEWER, 2,700FEET OF 8-INCH TO 12-INCH SANITARY SEWER, AND DISCONNECTPRIVATE I/I SOURCES. THIS PROJECT ELIMINATES CSO I-126. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11855. §¨¦170BROWNARGYLE OLDEN LACKLAND BURTON MILTONCHARLACKWALTONFOREST GOODALEGRACELAND MCKIBBONMARSHALLADDIEWOODSONVERONAPALMER ASHLANDHARTLANDOAKLANDSHELLEY GOTHLANDNORTHLANDSHERWOODKENOSHOMILLET APACHE ONEIDA SHAWNEESTELLADOYLE SYCAMOREBARODA SHERLAND FOREST MILTONONEIDA §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10330 15TASK NO: TASK NAME: $1,360,000BUDGET: FUND: OverlandMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 127 HARTLAND TO GOTHLAND SEWER SEPARATION Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund AREA NORTH OF MIDLAND BLVD. CONTAINS 1,600 FEET OF COMBINEDSEWERS, THAT ARE TRIBUTARY TO THE COLDWATER SANITARYSEWER NETWORK. CONSTRUCT SEPARATE STORM AND SANITARY SEWERS, ANDREMOVE I/I, TO ENABLE ELIMINATION OF THE COMBINED SEWERSYSTEM IN THIS AREA. TOTAL CONSTRUCTION BUDGET IS $4,360,000. §¨¦40 CENTRAL M IDLANDWE S TLADUE W ATERW O RKSW H ITE CH E S T E R FIELD PRIVATEDUNGATEA R R O W HEADESTA T E SUNIONPA C IFICSPUR KAYWINBRAE RIALTO W HIT E P RIVATE P R IV A T E PRIVATE OLIVE BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10656 15TASK NO: TASK NAME: $3,800,000BUDGET: FUND: VariousMUNICIPALITY: MissouriMAJOR SERVICE AREA: Caulks CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 128 INFRASTRUCTURE REPAIR #087P CAULKS CREEKA (P-750) PHASE VI Construction Task 6660 - SanitaryReplacement Fund EXISTING FO RCE MAIN IS DETERIORATED. CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,500,000. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11708 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 129 INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT A Construction Task 6660 - SanitaryReplacement Fund OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS. USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11866 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 130 INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT B Construction Task 6660 - SanitaryReplacement Fund OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS. USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11867 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 131 INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2015) CONTRACT C Construction Task 6660 - SanitaryReplacement Fund OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS,AND BUILDING BACKUPS. USE THE CURED-IN-PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11773 17TASK NO: TASK NAME: $1,500,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 132 INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2015) Work Order Repair Costs(Non-Capital) 1101 - General Fund DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLYISSUED FO R NEEDED CONSTRUCTION. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11773 17TASK NO: TASK NAME: $5,500,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 133 INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2015) Work Order Repair Costs(Capital) 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIEDTHROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLYISSUED FO R NEEDED CONSTRUCTION. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦70 §¨¦70 ASHBYJANEWRIGHTCYPRESSSIMSGERALDINEEDMUNDSONST LEOPEAR TREE LIANA MARGO ANN ST P H I L I PLAMBERTINTERNATIONAL TREADW A Y INTERNATIONAL TROPIC PRIVATE AIRFLIGHTLILLY JEAN TRAVERSE ESSELDALENORTH ALLEY ST DAMIAN DOUGLASS BOBBIE DOWNS ISABELLEST SHAWN STCLEMENT ST PIUS STKEVIN COUNTRY STEPHENS JUNE CABANA CLUB EXECUTIVE MILL PASS ST RAPHAEL ST AMBROSE MITCHELLST LINUSPRIVATE NATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11710 15TASK NO: TASK NAME: $100,000BUDGET: FUND: St. AnnMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 134 ISABELLE I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926. HUDSON STEIN DAYVICKIEDENNISBARATK A P P E L LORNAT H A TCHER D A R S T DELLWOODAMESGLENOWENJETTKR O E G E R T R AS K NASHUA CHAMPLIN CLAIRMONTMEDFORDHEYDT F ORESTWOODGAGEDELLRIDGENEMN IC H A R G E N T F A R G O HIGHMONT REBAPERCHE X U M AVENICEAVERILLCHESLEYSCOTTDALELARKIN EDGEHILLWAY SID E RANDTESTONSCHLUETERWARDROYCECOPPINGERF I R A D A M S PLA NTM O R E LA MOTTEKIRKBON OAKCARGILL WEDGEWESTDELLJANSONRENSHAWMILLMANSUPERIOR NEWTONHUTTON BALLMANS T I VESITTNERHARTNETTQUAKERFE N WICKCLAYCHATELETBEECHE R FLOR IDALE MILLBURNMA L DON ATWATERFO RES T KNOLLCRESTPRIVATEDAMESSAFFRONINAG UACHAMBERS HILLB A R B A D O S DEANDELL NEVILLEBAYVIEW PARKER DOA NEJOYCE ELLENR O YA L W E S T W O L DLEICESTER MELCHERROBERT HUDSON BON OAKTHATCHER QUAKERPRI VATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11715 15TASK NO: TASK NAME: $1,400,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 135 LANG ROYCE LATERAL SANITARY RELIEF(SKME-320) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH SANITARY SEWER,AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852. §¨¦55§¨¦270 §¨¦44 §¨¦255 §¨¦270 §¨¦255 G R A V O IS R D W ATS O N R D LEMAY FERRY RDTESSONFERRYRDTELEGRAPHRDCHIPPEWA BLVD S KIRKWOOD RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11856 15TASK NO: TASK NAME: $4,800,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 136 LEMAY PUBLIC I/I REDUCTION (2015) Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 57,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 10748, 11698, AND11750. §¨¦55 §¨¦44 §¨¦270 §¨¦255 §¨¦270 §¨¦55 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11927 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 137 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B Construction Task 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 63,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11776, 11740,11667, 11155, AND 11097. SUPPLEMENTAL FUNDING OF $3,200,000 INFY 1 6. ETTA VELMA H O F F M EIS T E R HORN MILITARYWEISS MANN UNION PACIFICP RIV A T E HOLDEN LAGRO G O E T Z CARTWRIGHT RUBYJOPLINPERRINFRANKE UNION PACIFICUNION PACIFICUNIONPACIFICUNIONPACIFICWEISS PR I V ATEPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12427 15TASK NO: TASK NAME: $1,500,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Lemay CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 138 LEMAY WWTF PLANT CONTROLS Construction Task 6660 - SanitaryReplacement Fund OBSO LETE AND UNSUPPORTED CONTROL SYSTEM NEEDSREPLACEMENT. PRO CURE NEW CONTROL MODULES AND PROCESSORS. §¨¦55 §¨¦255 §¨¦55 RINGERFORDER BAUMGARTN ER MILDYAEGER MATTIS KERTHK I NSWOOD MEHLMILBURNAMBSHEINTZOLD B A UM GARTNERBURL I NG T O N N O R T H E R N S A N TAFELIND BUTLE R HILL C A T H EDRALVIENTO OLSENTH EIS S BLACKFORESTHAWKINSFUCHSHAWKINSMANGOBERVIEW PRIVATERO SYAQUARIDGE L E M A Y W O ODSVALLEYSIDEFUCHSFIJI CANDLEGLOWL O N GVIEW IVONDALEFIRELEAFIRONDALE CHATFIELDSTARLITGWENMILLK A S S E B A U MTELESTAR DELOAK PIO N EERSIR BORSPONYEILEEN ANN H I L V I N R O Y A L HILLS MAR B U R Y LOMARNAHN FAIR WICK K A SSEBAUMKINSWOODLEMAYFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11650 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 139 LOWER MERAMEC WATERSHED I/I REMOVAL Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT. REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TOREMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,600,000. §¨¦70 §¨¦70 METRO LINKE A S THILLSWESTBERMUDASAN DIEGO RAVI N IA AUGUSTA LUCAS N HUNTPASADENAWACOCOUNTRY C L U B B ELLERIVER O S E D A L E ARLMONTLUCASOVERBROOK DELAVANEVA RT S ORE O NST ANNSROLAND WINCHESTER OXEYE NORMANDY CONTOUR CI RCLE S U N S E T HENDERSON WARWI C K HUNT INGTON M A R ILA C HUNTER SPRINGDALE BRISTOL FO R E S T V I E W NACOMIS ST MARYSSANTA MONICA PR IVATEWALKERMARKTWAINFROWOAKMOUNTSTA NDREWS CANTERBURYLA C O R N ARCOLAMETROLINKMARK TWAIN WESTEASTOAKMOUNTNATURALBRIDGE RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11659 15TASK NO: TASK NAME: $1,050,000BUDGET: FUND: NormandyMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 140 MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 700 FEET OF 12-INCH TO 30-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852. PASADENA LUCAS N HUNTO R E O N ROLAND WINCHESTE RHILLSWARWICK HU N T I N GTON A U G USTA BRISTOL NORMANDY COUNTRYCLUB ST MARYSFARLEY CR E S T L ANDST ANDREWS R A V I NIACANTERBURY ARCOLAOAKMOUNTTOWER GROVEBRETONBERMUDANORTH OAKSBRIST O L CANTERBURY NATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11694 15TASK NO: TASK NAME: $580,000BUDGET: FUND: Pasadena HillsMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 141 NORTH BADEN CREEK I/I REDUCTION(BP-612)(CANTERBURY DR) Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852. §¨¦40§¨¦40 TAMMOAKLAND CLAYTONBERTHOLD WELLS HAMPTONWEST PARK WISEVICTORIA OAKVIEWART HILLHALFCRESCENTGRAHAM HAMPTONCONCOURSEWISE VICTORIATAMMGRAHAM §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12460 15TASK NO: TASK NAME: $1,000,000BUDGET: FUND: St. Louis CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: RDP - Forest ParkWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 142 OAKLAND COMBINED SEWER DETENTION ANDSTORAGE (CLAYTON AVE AND OAKLAND AVE) Construction Task 6660 - SanitaryReplacement Fund IMPERVIOUS AREA OVERCHARGING COMBINED SEWER. DETENTIO N AND STORAGE IMPROVEMENTS TO BE MADE INCONJUNCTION WITH REDEVELOPMENT OF THE FOREST PARKHOSPITAL GROUNDS. §¨¦55MACKENZIEWEBERVALCOURHAMPTONRIVE R DE S PERES SEIBERT RHODES UNIONDANAELTONKAMMERERSETH JANUARYFLETAMATHILDAI VYSTAELY MOHEGANNEW HAMPSHIREBLOW GRAM O N D PRIVATE KITALICETON CLIFTONLUCIAVASELFORMANVITA ROBERT KAYACORNJ A MIESONLACLEDE STATIONHA L E CIRC L EVIEW ALTHEANAGEL W IL L MORE COLLEENPILOTBONNIE TIBERHILDA MAXWELLMAYLOR AFFTONEDEN TERRI LYNN HA M BUR GLANGLEY RAMBLERSAVI O CHESHIRE NEIERNAVAJOEG ERMANIA ASTERCLEVEDONHEEGEBURLINGTONNORTHERNSANTAFE PHILOTA L B O T BRENDAJOELBE R W ICK HARLANHILDESHEIMTIEM ANN WEBER TRAILDEERWOOD ARVIN V IRGILR ADIOD A R L E NEHU RSTGREEN PEARCHIVVISPROVOPINTOHELMLA BELLEBISHOP S BIXBY MACKINAWRABETHH IG H H E R I T A G E FORMAN TIEMANN VASEL WEBER P RIVATE HARLANHEEGE PILOTBRENDAGRAVOISRDWATSONRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11695 15TASK NO: TASK NAME: $265,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Mackenzie CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 143 OLDE ENGLISH I/I REMOVAL Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE EXCESSIVE INFLOW AND INFILTRATION FROM PRIVATESOURCES BY SEWER REHABILITATION AND OTHER IMPROVEMENTS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11855. PAGE OAK DYERUCEYLEKORANDOMORVENOCONNELLBACHFAIRVIEWLOTSIENORTHFIELDE A S T B R O O K LIBERTY PAGE INDUSTRIALTRENTON BRYANT§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11697 15TASK NO: TASK NAME: $1,000,000BUDGET: FUND: OverlandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 144 PAGE TO TRENTON SANITARY RELIEF Construction Task 6660 - SanitaryReplacement Fund OVERCHARGED SANITARY SEWER AND CONSTRUCTED SANITARYSEWER O VERFLOW. CONSTRUCT 36-INCH AND 48-INCH DIAMETER LINEAR STORAGETANKS. REMO VE ONE CONSTRUCTED SANITARY SEWER OVERFLOW,BP-456. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11870. LILACBLUFF SCENIC ADRIAN V A L L E YDIAMOND BURLINGTON NORTHERN SANTA FESCRANTON C A L U METLEETON ST CYR KELVIN GLOUCESTERFORK JEFFREY MID R ID G E PRIVATELOOKO UT BIRITZ FARLO WESTHADDOCK MARSHFIELD FOR K P RIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11094 15TASK NO: TASK NAME: $300,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: MISSISSIPPI RIVER (CITY)WATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 145 PROSPECT HILL LANDFILL VERTICAL EXPANSION Construction Task 6660 - SanitaryReplacement Fund LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE. CONSTRUCT NEW ENTRANCE, WATER LINE AND HYDRANTS, ANDLEACHATE FIELD IN PREPARATION FOR VERTICAL EXPANSION OFEXISTING LANDFILL. §¨¦44 §¨¦44 CLARK NEWPORT TUXEDO BOMPARTSHREWSBURYMURDOCHLACLEDESTATIONATALANTAMARSHALLSUMMITJOYGLEN SELMAFAIRVIEW LOCKWOOD YEATMANGARDEN SPRINGWEIL P A RKOXFORD EDGARDEVONSHIRE S U T HERLAND A R LIN G TO NHAWTHORNE DANBURYWILSHUSENSUFFOLKST CHARLESLAKE GREELEY MARIONO A K W OOD SUNNYSIDE DALECAROLINE DEVILLEBRUNSWICK KUHLMAN KAINLANSDOWNE LENOXGROVE EXETERHAZELAMELIA VERGUENEKENRIDGELOGCABINPLYMOUTHSWON PROVIDENCE TAMPA FAIR O A K STHEATREELBART T W I N I N G MILDREDCORNELIAKEY WEST WEIL FAIRVIEW GARDENSUMMITGREELEYGLENPARKSUMMIT §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11933 15TASK NO: TASK NAME: $3,000,000BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 146 PROVIDENCE PUBLIC I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 22,500 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11700. CLAYTON RI DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA ALAMO BROOKLINE PRIVATECRESTWOOD RALPHOAKLAND C L A VERACHCONCORDIAHARCOURT EDWARDCLAYTONIAMOORLANDSSOUTHMOOR SEMINARY T U S CANYARUNDEL COMMODOREFORESTRIDGE PRIVATEHI LLVALEPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10390 15TASK NO: TASK NAME: $1,200,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 147 RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574) Construction Task 6660 - SanitaryReplacement Fund DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM. CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I. IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK. CLAYTON RI DGEMOORHILLVALEBROADVIEWOAKKNOLLBOLANDDARTFORDST RITASAN BONITA ALAMO BROOKLINE PRIVATECRESTWOOD RALPHOAKLAND C L A VERACHCONCORDIAHARCOURT EDWARDCLAYTONIAMOORLANDSSOUTHMOOR SEMINARY T U S CANYARUNDEL COMMODOREFORESTRIDGE PRIVATEHI LLVALEPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10390 15TASK NO: TASK NAME: $800,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 148 RIDGEMOOR DRIVE I/I REDUCTION & STORMIMPROVEMENTS (SKME-574) Construction Task 5594 - Black Creek Subd#455 OMCI Fund DAMAGE TO PROPERTY DUE TO YARD FLOODING AND SANITARYSEWER SURCHARGING. I/I ENTERING SANITARY SEWER SYSTEM. CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH STORM SEWER,CONSTRUCT UNDERGROUND DETENTION SYSTEM, AND REMOVEPRIVATE I/I. IT IS ESTIMATED THAT $800,000 OF THIS PROJECT WILL BEALLOCATED TO FUND 5594, BLACK CREEK OMCI, AT TIME OFAPPROPRIATION FOR STORMWATER WORK. BERRYKIRKHAMWOODLAWN OLD WARSON LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK BROWNELLHARRISONQUAN LITZSINGER FOOTEWARSON SWONBENNETTBACON SARAH PAR HUDSON ANDREWOA KGILBERTDEACON GORE M E D I N A MCKINLEYIOLANORTH MAPLE D E N N Y ROCK HILLMARK RENDERERKORTWRIGHTWILSON OVERBROOK F L A N DER S CURRANSQUIRES DWYER WILDDEE R BOGEY H I L L A R D ROCKMANPAR KCOPP E R H I LL ELMJOANNARIDG ELINECHELSEA P RIV A T E LITHIA EUCLID JEFFERSONHIGHHAMPT O NMANI TOUJULIAN P A C I F I C VICTORIA WARWICK WATE RBURYLEONARDBARRONGLENMOOR H U N T L E I G H DUNLEIT HHULLF AI RDAL E WINGFIELD HARTJEWEL GREENVIEWBEAUFORD HOCHGASLITE MERMOD ALF RED NOLAN FUHRMANNEARLSTURGIS IOLACLAYROCKHILLOAKPRIV ATE PARPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11069 15TASK NO: TASK NAME: $1,350,000BUDGET: FUND: Rock HillMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 149 ROCK HILL SANITARY RELIEF (SKME -618) Construction Task 6660 - SanitaryReplacement Fund SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11885. §¨¦170 §¨¦170 CLAYTON HANLEYBRENTWOODME T ROL I NKDAVIS FORSYTH WENNEKERMARYLAND FO R E S T P A R K F RANCI S S H A W P A R K CENTRALLOUWENMERAMECBEMISTONPOL OHUNTERBONHOMME WESTWOODLANGTONTOP T ON G AY WATKINS DR O MA RALINDENCARONDELET P A R K T A N GL E WO OD WYDOWNCARSWOLD MCCUTCHEONDAYTONA EDGEWOODRE ARPOINTER G A LLERIA HA L I F A X YORKBRI G HTON VENETIAN C O L M A R CRES C E N T BYRONOAKLEYORLANDOBLACKCREEK ROSILINE LAKEFORESTBERKSHIRESUDBURYPRIVATE LYLEWALINCA W H I T B U R N MOHAWK BILTMORECENTRAL M E T R O L IN KLINDEN FOREST PARK §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11680 15TASK NO: TASK NAME: $1,070,000BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 150 ROXBURY I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849. BOONECLARKST MARIE HARRISON WASHINGTONLAFAYETTEJEFFERSON CASTELLORUE ST LOUIS AUBUCHONRUE ST FRANCOISRUE ST CATHERINE ST JACQUESRUE ST DENIS ST JOSEPH RUE ST JEANRUE ST ANTOINE ALPHARUESTPIERREST LOUISST JEANST FRANCOIS REGINA B E T A LILABROWNST EDITHELMDALERUE ST FERDINANDST CHRISTINAST FERDINANDS T A LBERT ST ALICE NEWFLORISSANT ST AUGUSTAST PIERREBROWNBROWN§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11666 15TASK NO: TASK NAME: $250,000BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 151 ST MARIE SANITARY RELIEF I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11857. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11898 17TASK NO: TASK NAME: $600,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 152 SUPPLEMENTAL ENVIRONMENTAL PROJECTS(SEP) PROGRAM Work Order Repair Costs(Capital) 4102 - ImprovementFund CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLIONTO DECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACEDEFECTIVE LATERALS. AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS AREIDENTIFIED AT LOW INCOME OWNER OCCUPIED PROPERTIESTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEISSUED. PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITALSERVICES. THIS PROJECT WAS UNDERTAKEN IN CONNECTION WITH THE SETTLEMENT OFAN ENFORCEMENT ACTION, UNITED STATES. STATE OF MISSOURI. AND THEMISSOURI COALITION FOR THE ENVIRONMENT FOUNDATION V. METROPOLITANST. LOUIS SEWER DISTRICT, NO. 4:07-CV-01120-CEJ, TAKEN ON BEHALF OF THEU.S. ENVIRONMENTAL PROTECTION AGENCY, THE STATE, AND THE COALITIONUNDER THE CLEAN WATER ACT CLIFFBOUNDARYSHERIDAN FRANRU SUNTIDE LIN TELC L A G E R HALSEY ESTES OLEDELSYLVIA RINGERM ILIS S A WILLETTE SYLVANSPRINGSBRILLIA NTPRIVATE S A P P I N G T ON BARRACKS MOHATTANSYLV A NWOOD BIENVENIDOOLEDEL TELEGRAPH RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11918 15TASK NO: TASK NAME: $132,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 153 TELEGRAPH ROAD #2928 I/I REDUCTION Construction Task 1101 - General Fund BUILDING AND LOT STORM DRAINS CONNECTED TO SANITARYSYSTEM ARE CAUSING CAPACITY ISSUES. REMOVE STORMWATER FROM THE SANITARY SYSTEM BYCONSTRUCTING 500 FEET OF 12-INCH STORM SEWER. SYSTEM WILLBE TURNED OVER TO THE PROPERTY OWNER AS A PRIVATE STORMSEWER. §¨¦170 §¨¦170 WARSONHANLEYASHBYLACKLAND BROWNWOODSONDIELMANDELMAR LADUE PAGE A D IELINKSIMSUNION P A C I F I C CAN T O N GRAESERO L D B O N H O M M E BALTIMORE WALTONBURNSCENTR ALMIDLAND NORTH SCHUETZ 82NDRIDGE MARYLAND ECHOBA L L MCKIBBONG R O BYDRIVER NIBLIC DIXCORNELLDAUTELPOELITZREXME S ATRESCOTT 81STOAK SHAFTESBURY ENGEL HOODMEEKS PERSHINGKREMDYERLAFONWHEATONWINDOM CAN T ERENDICOTTTERMINALSC HA E F E R GUELBRETHMILTONGASSTHORPE MONROEMARSHALLEMINENCE P R I CETEASDALE WAYNE RESEARCHAHERNLAMBHURON LYNDHURSTT E A L W O O D ZYKANLIBERTY AIRWAYALBINWISMER P R I V A T E ELMORE ARDELIA RIOVISTAANN EADS WARNEN T R E N TON OLIVAIREGAYC L E R M O N TSENECA AMHERST G ULFMALINESONAOAKLEIGHBALSONCALVERTFLORA ALDEN HEATHER HILLPALMERBOOTHBROUSTER KEMPLANDANDESTOWNLEY ASHLANDARBORLITTLE LISA GARFIELDPLUM RABEJOHN MASHIEALBEYAPACHE VILLAPRICEOAK PAGE AMHERSTADIEOAKDIXCANTER OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11929 15TASK NO: TASK NAME: $4,500,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 154 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER THAT ARE DEFECTIVE. REHABILITATE 21,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11672. §¨¦70 §¨¦170 §¨¦170 WRIGHTMETRO L I N K NORTH HANLEYKATHLYN BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAMBERTINTERNATIONAL MARGOANN DIXWISMERSCUDDER BOSWELL5TH HAROLD BROWNEDMUNDSONST LEOFAIRFIELDBENSON HERBERTPEAR TREE BATAAN MARVINCAMTIPTONG E N A I R E ISOLDASTGREGORYMCNULTYTREADWAY ROYLAGUARDIAW INNMURIEL EASTRIDGEPATRIC K LEBOURGETEDMUND LEITHMARSHALLVANCELIVINGSTON ROYALTONISAB ELLE HOLTWICKINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD NORTH METROLINK §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11681 15TASK NO: TASK NAME: $350,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 155 UPPER COLDWATER SECTION D I/I REDUCTION Construction Task 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDINGBACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926. §¨¦70 NORFOLK SOUTHERN BERMUDAMABLEHARVEYHANL E Y E V A N S S U B U R B A N WOODSTOCK D A R S T FERGUSON CARSON 5TH ELI ZABETHBARATP A U LDADE W IE G E L DENNISCLARKMETROLINK GEORGIADELLWOODL E E DAYTI F F I N K A P P E L L ANGKIRK HILLPLAZA FORESTWOODHALEYR U G G L E S GAGEELLISONGRAF EN IDAMESB L A N D I N G RANDBROTHERTON C H U R C H LURCH KINGHILLSLUCAS N HUNTHEYDT SCOTT HAWKESBURYMUELLERZOE BRAN D WESLEY H I GHMONT VENICEELKAN SUNBURYHERNBEHLEA IR PO R TR O YA L PAYNEEATONARGENTSTLO UIS AVERILLMARIESCHLUETERL O U IS ASPRINGTHOR O U G H M A N HOLBOR NLAUREL JAMESCLAYALINE HUGO FERMOMILLMANHARRISON FEN W I CKG A R V IN D A R T M O O R G E IG E RMARGUERITEWULFFOAK ELMDALEHENQUINGRO V E COOLI DGEWYLINLAMMERT PRIVATE BERNHARDT ELSIEEVERETT TILFORDDONBARSTANZA S I G N A L HILLDADEEVANS TIFFIN HERN§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10026 15TASK NO: TASK NAME: $7,500,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 156 UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ONE CONSTRUCTED SSO TO BEREMOVED, BP-305. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $12,500,000. §¨¦170 §¨¦170 PAGE HANLEYCANTON TERMINALWOODSONNORTH N SOUTHPURDUE82NDWALTONBROWNGROBY SHAFTESBURY81STLYNN MCKNIGHTRAFTPARTRIDGEMONROE WAYNE HILLTOPU N I O N PACIFIC QUENDOAHERN LAMB78THBLOO M WILSONMILTONALBIN WHEATONLIBERTY MALLARD B RADDOCK A L E R T WATTSELMORE DREXELGRANTEADS RICHARDBELT WAYTITUS S H E RID A N DORSETGAYUT I CASENECA MENDELLMEYERMILAN WELLINGTONGAEBLERGULF M O N AGOODALE NIXONVINITAPRIVATELE PERELINK B A LSON FARISGILROSEUNDERHILL R A C IN E A L A N S ON FAIRVIEWADDIEH A R N E Y CARLETON RAISHERBRA S S IE GARFIELD RABEFULLERTONPENNELL BRADFORDVERLBALFOUR HOW BUCHANAN MELROSE MOUNT OLIVELAUGHLINCRIXDALE ARCADIAELCOCRYSTALREAR MILLET CHAPININDUSTRIALTABER PARK B L A N C H A PARAMOUNT PUTTERANNABERGAMOTERI THKALEN WAYNE GAYMELROSEOLIVEBLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10027 15TASK NO: TASK NAME: $3,000,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 157 UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595) Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS. CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH SANITARY RELIEFSEWER. REMOVE CONSTRUCTED SANITARY SEWER OVERFLOWSBP-419 AND BP-435, AND COMBINED SEWER OVERFLOWS L-100 ANDL-1 01. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,020,000. ELMGLENDALE ALBANYTURF ROSEREAVISCENTRALGORER OCK HILL OAK TREE FIR W O O DDRAYTONSHORT ST GEORGEGR A Y OLACLARA D O BBINW ILSHIREWEB STERACRESBRIGH T S I DEELMGRAYELM§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11086 15TASK NO: TASK NAME: $1,120,000BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Mackenzie CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 158 WEBSTER ACRES SANITARY SEWERREPLACEMENT Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUE TOROOT INTRUSION AND STRUCTURAL DEFECTS IN THE EXISTING MAIN. CONSTRUCT 2,250 FEET OF 8-INCH SANITARY RELIEF SEWER TOREPLACE DETERIORATED 6-INCH PIPE, 900 FEET OF 12-INCH TO18-INCH STORM SEWERS, AND PUBLIC AND PRIVATE I/I REDUCTION. PAGE FLORA BURNSECHO RIDGE MIRIAM TRESCOTT WISMERSPENCERHOODTHEODOSIASIMS GAEBLERZYKAN WENGLERLACKLANDWALLISCOTE BRILLIANTE IVELAND LULLABY EASTBROOK DAWESMINERVA ROMAINEOVERLANDRHYTHMNORTHFIELDCEDARGLEN PAGEWOOD NIBLIC MEADOW VIEW HUNTINGTONDRIVER DIELMANHUNTINGTONWALLISWENGLERSPENCERCOTE BRILLIANTEDAWES MINERVA §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11108 15TASK NO: TASK NAME: $1,200,000BUDGET: FUND: OverlandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 159 WISMER - HUNTINGTON SANITARY RELIEF (SKME-592) Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND TWO CONSTRUCTED SANITARY SEWEROVERFLOWS. REPLACE 2,500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER WITH12-INCH TO 2 1-INCH SANITARY SEWER. REMOVE TWO CONSTRUCTEDSANITARY SEWER OVERFLOWS, BP-426 AND BP-626. 14 April 2014 WASTEWATER CONTINUED PROJECTS - FY15 PROJECT NUMBER PROJECT NAME REASON PROJECT CONTINUED COST ESTIMATE 10523 AYRES SANITARY RELIEF AND I/I REDUCTION PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014. $2,200,000 10014 FF-11 FEE FEE CREEK SANITARY RELIEF PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014. $4,100,000 10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2014. $6,000,000 10142 FORESTWOOD SANITARY RELIEF (SKME-435) PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN NOVEMBER, 2014. $2,100,000 10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN FEBRUARY, 2015. $3,000,000 10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME -521) PROJECT CONTINUED DUE TO COORDINATION WITH AMEREN AND UNION PACIFIC RAILROAD. ANTICIPATE BOARD INTRODUCTION IN MAY, 2015. $5,000,000 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) PROJECT CONTINUED DUE TO EASEMENT ACQUISITION (FINAL SITE FOR FACILITY IS NOT YET ESTABLISHED). ANTICIPATE BOARD INTRODUCTION IN JANUARY, 2015. $2,000,000 10716 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS PROJECT CONTINUED DUE TO EASEMENT ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN JULY, 2014. $4,200,000 TOTAL: $28,600,000 14 April 2014 WASTEWATER CONSTRUCTION CONTINGENCY PROJECTS - FY16 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION $1,900,000 160 10407 BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II $2,500,000 161 11920 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT $7,000,000 162 11871 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D $2,280,000 163 11926 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G $2,700,000 164 11009 CHANDELLAY DR. SANITARY SEWER REPLACEMENT $500,000 165 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C $1,000,000 166 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C $25,000,000 167 11730 CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) $2,500,000 168 10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I $10,000,000 169 11745 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) $270,000 170 10014 FF-11 FEE FEE CREEK SANITARY RELIEF $2,700,000 171 10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III $4,700,000 172 10142 FORESTWOOD SANITARY RELIEF (SKME-435)$1,425,000 173 10611 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF $2,000,000 174 10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME - 521) $11,300,000 175 11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) $2,760,000 176 14 April 2014 WASTEWATER CONSTRUCTION CONTINGENCY PROJECTS - FY16 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 10656 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI $2,700,000 177 11054 KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION $900,000 178 11927 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B $3,200,000 179 11650 LOWER MERAMEC WATERSHED I/I REMOVAL $1,600,000 180 10716 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS $3,100,000 181 10737 POWELL AVE AND ANNALEE SEWER SEPARATION $320,000 182 11877 PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM (FY2013) $500,000 183 11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM $500,000 184 10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A $5,000,000 185 10027 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) $2,020,000 186 TOTAL:$100,375,000 §¨¦40 §¨¦270 §¨¦40 §¨¦270 CLAYTON RD N BALLAS RDN GEYER RDDESPERESRDTOPPING RDNORTH F O R T Y DRMANCH E S TER RD BOPPRDS SPOEDE RDTHORNHILL DR RUTH DRWOODGATE DRP I N G R Y P L O A K VA L L E Y D R SOUTH FORTY DR TAMMANYLNS QUIRESLNDRYRIDGERDROCLARE LNO L D C O L O N Y L N SELLENRICK RDBRIDLE LNPORTLANDDR FIRETHORNDRG R A YDRBARNBRIDGE RDP O IN T O A K RD BOPP LN C H IP P ER R D HICKORY L N ROTH DRMALVERN DR TREGARON PL HOLIDAY LN TUCKER LNELAINE DR DIVOT DRVINETTA DRDARIEN DR CLAYTON PLACE DRGLENMARO LNBOPP RDN BALLAS RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11934 15TASK NO: TASK NAME: $1,900,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 160 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/IREDUCTION Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 60,300 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,900,000.PUBLIC I/I REDUCTION FROM 11682. BAUMGARTNER RDWINDFORD DR SKY HI LL DRFOXFIREDR MILBURN RDCHALET HILL DRBL ACKF ORESTD R FIRELEAFDRCHALETFORESTDRWESTPHALIALNOLD BAUMGAR T N ERR D WALDWICK DRNAHN DR DELI NTRYDRD E LOAKDRSEAGRAVE CTINNSBRUCK DR PIN OAK TERRACE CT S A N D E R S D R §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10407 15TASK NO: TASK NAME: $2,500,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 161 BAUMGARTNER & BLACK FOREST SANITARYREPLACEMENT PHASE II Construction Task 6660 - SanitaryReplacement Fund SANITARY BACKUPS, OVERFLOWING MANHOLES, ANDOVERCHARGED SANITARY SEWERS DURING WET WEATHER EVENTS. CONSTRUCT 3,700 FEET OF 8-INCH TO 15-INCH SANITARY SEWER,FROM 5 00 FEET SOUTH OF BLACK FOREST TO CHALET FORESTDRIVE. FE R R Y S TTERMINAL RRE GRAND AVEN O R F OL K S OU T H E R N R R N 2 N D S T H A L L S T TERMINALRRN ORFOLKSOUTHERNRR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11920 15TASK NO: TASK NAME: $7,000,000BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 162 BISSELL & LEMAY WWTP INCINERATORSCRUBBER REPLACEMENT Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund EMISSIO N CO NTROLS FOR MULTIPLE HEARTH INCINERATORS ATBISSELL & L EMAY NEED COMPLIANCE WITH NEW EMISSIONSTANDARDS FOR SEWAGE SLUDGE INCINERATORS. CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEWREGULATORY EMISSION STANDARDS. $5,50 0,000 BUDGET IS FOR EQUIPMENT PROCUREMENT, AND$15,0 00,00 0 BUDGET IS FOR INSTALLATION. SUPPLEMENTAL FUNDINGOF $7,000,0 00 IN FY 16. §¨¦170 §¨¦170ASHBY RDLACKLAND RDWOODSON RDBROWN RDPAGE AVEADIE RDST CHARLES ROCK RDMCKIBBONRDNORTH AVE KATHLYN DR WALTONRDWRIGHT AVESIMS AVEBALTIMORE AVE BURNS AVEARGYLE AVE GUTHRIE AVE ECHO LNLONG DRNIBLIC DR RIDGE AVE TRESCOTT AVEWISMER RDBRECKENRIDGE RD BURTON AVE NATURAL BRIDGE RD TERMINAL RRST FRANCIS LN POE AVEENTITY AVEDIXAVELITZ AVE CANT E R W AYM ERT AVE GOODALE AVEH O LTW O ODRDREXAVEMARGOANN LN ENDICOTTAVEM A D D O X PL ENGLERA V E KREM AVESTH E N R YLNTHORPE AVE DYER AVEOAK AVE JANEAVESANJOSELNHAROLD DR FOREST AVE WURDACK AVE FARVIEW AVE S T K ATHERINELN WISMER AVEBRISTOW AVECLARENDON AVE TRENTON AVE GEDDE AVE MCNULTY DR ZYKAN DR CALVERT AVESTELLA AVEMINERVA AVEISOLDA AVES MILTON AVELYNROS DRFLORA AVE LEITH AVE SIMSAVE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11871 15TASK NO: TASK NAME: $2,280,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 163 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT D Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 67,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11662, 11663, AND11712. SUPPLEMENTAL FUNDING OF $2,280,000 IN FY 16. §¨¦270 §¨¦70 §¨¦170 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11926 15TASK NO: TASK NAME: $2,700,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 164 BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2015) CONTRACT G Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11681, 11739,11738, AND 11710. SUPPLEMENTAL FUNDING OF $2,700,000 IN FY 16. S P R U C E HAVENDR C R AIG R D CHANDELLAY DRBARKMAN DR TIMBERWOOD LNH O L L Y SPRINGSDRSU M M E RHAVENDRSHADYSIDELNSPRUCEORCHARDDRWATERWO O D L N JEANNEHILLSDR§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11009 15TASK NO: TASK NAME: $500,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 165 CHANDELLAY DR. SANITARY SEWERREPLACEMENT Construction Task 6660 - SanitaryReplacement Fund CRACKED AND COLLAPSED SANITARY SEWER AND AN INVERTEDSIPHON L EADING TO BUILDING BACKUPS AND INCREASEDMAINTENANCE. REPLACE 1,330 FEET OF 8-INCH SANITARY SEWER, INCLUDING 200FEET OF PIPE IN TUNNEL, AND 160 FEET OF 48-INCH STORM SEWER. §¨¦270 DUNN RD PERSHALL RD FORD LN POLSON LNTAYLOR RD NORFOLK SO U T H E R N R RNORFOLKSOUTHERNRR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11726 11TASK NO: TASK NAME: $1,000,000BUDGET: FUND: HazelwoodMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 166 COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C Engineering DuringConstruction Services 6660 - SanitaryReplacement Fund EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS. CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT. $2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION. §¨¦270 DUNN RD PERSHALL RD FORD LN POLSON LNTAYLOR RD NORFOLK SO U T H E R N R RNORFOLKSOUTHERNRR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11726 15TASK NO: TASK NAME: $25,000,000BUDGET: FUND: HazelwoodMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 167 COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C Construction, Phase II 6660 - SanitaryReplacement Fund EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS. CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL SANITARY RELIEF PROJECT. $2,00 0,000 BUDGET IN FY 2015 IS FOR SITE PREPARATION. §¨¦70LUCAS N HUNT RDBERMUDADRLILLIAN AVESUNBURY AVECOLLEGE AVENHILLSDRMCLARAN AVENELSON DRKENWO O D DR CALVINAVE RAVI NIA D R ROHN AVE C O UNTR Y C L U B DR SAN DIEGO AV E AUGUSTA AVEROSEDALEDR ALBIA TERNATURALBRIDGERD BEULAH AVE FLORIAN AVE APRICOT AVEOVERBROOK D R FLETCHER STROLAND BLVDHOLBORNDR CHANDLER AVE GROVELAND DR STANWOOD DR MATHE WSTTHEODOREAVE WINCHESTER DR B E R M U D A C T FOREST HILL DR PADDIN G T O N D R CONTOURDR ROHN DRNORWAY DRESTERBROOKDR EL LI N GTO N D R WARWIC K D R BURRWOOD DR PINE RIDGE DR S R O L A N D BLVDFARLEY AVE SANTA MONICA AVE LEVERETTE AVEMELBAAVEROLANDBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11730 15TASK NO: TASK NAME: $2,500,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 168 CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059) Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNEL,AND 1,3 00 FEET OF 8-INCH TO 30-INCH SANITARY AND STORM SEWER.ELIMINATE CSO OUTFALL BP-059, SSO BP-255, AND SSO BP-256. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000. M A N C HES TER RD LITZSINGER RD CLARK AVE NEWPORT AVEUNIONPA CIFICRR N ELM AVEMARSHALL AVESMCKNIGHTRD TUXEDO BLVD ROSALIE AVE WHITE AVE EULALIE AVE S BRENTWOOD BLVDATALANTA AVE GLEN RDBELL AVEEUCLID AVE HIGHSCHOOLDRLITHIA AVE EKIRKHAMAVEMADGE AVE LOUIS AVEN FOREST AVESALEMRDEPACIFICAVE CORNELL AVEFAIRVIEW AVEMCKINLEY AVEHOLLAND AVEMADISON AVE BREMERTON RDRUSSELL AVEN ROCK HILL RDELDRIDGE AVE CECELIA AVEFLORENCE AVE MARY AVEROCKMAN PLD E S P ERESAVELAFAYETTE AVEPARK L NBACON AVE ANNALEE AVEEUNICE AVELEONARD DRSTCLAIRAVEPRIVA TERDPOCAHONTASPLGREELEY AVE BISMARK AVE ARBOR LN BRAZEAUAVEMELVIN AVEJOSEPH AVE SUMMIT AVEPORTER AVESUMMIT PLCHARLEVILLE AVECHARLANE CTB E R R Y A V E HILL AVEBOMPART AVEHILTON AVEDOUGLAS CTPATTON AVEN ROCK HILL RDMARYAVEN ROCK HILL RDFAIRVIEW AVE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10021 15TASK NO: TASK NAME: $10,000,000BUDGET: FUND: BrentwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 169 DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE I Construction Task 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATESURCHARGING AND ELIMINATE CONSTRUCTED SSOS. PRO JECT 10 021 NAME CHANGED TO INDICATE INCLUSION OF SCOPEOF PROJECT 10486, DC-03 SANITARY RELIEF. PHASE I OF A MULTIPHASE CONSTRUCTION PROJECT. C H IE F T A IN D R PEM RDCRAIGVIE W DRC R AIG R D M OM ARTE LND EC O R A H D R SCH U E T ZRD P A T T Y A N N D R BA RKMANDR MIR A N D Y D RCHANDELLAYDR D A U TEL L N GOLD LEAF DR H O LLYSPRINGSDRS P R U CEH A V E N DR SCHULTE RDT I M BE RWOODL N SUMMERHAVENDRWE A THERBYDR SHALLOW B R OO K D R C R IM S O N D R FEATHER W O O D D R WATERWOODL N MEAD O W LAKED R VILLAGE DRJEANNE HI LLS DRL IN F R E D D R LONGLEAF CIR BRO N C OLN QU IE T L N THAMES CTSI GNAL CTS C H U L T E R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11745 11TASK NO: TASK NAME: $270,000BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 170 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONGLEAF CIRCLE TO THAMES COURT) Design Services 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 2,920 FEET OF 21-INCH SANITARY SEWER. REMOVECONSTRUCTED SSO BP-078 §¨¦270 §¨¦270 R O THHILLDR PROGRESS PKYSCHULTE HILL DRMCKELVEY RDLEIGH LN GLENBUSH DR KIMLER DRWO O D H O L L O WDR BERN I E L N G LENGATEDR DA W N HILLDR MCKELVEYHILLDRGLENMEADE DRAMERICANI NDUS T RI AL DRLORICIR GLENLEADR BERNIE CIR§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10014 15TASK NO: TASK NAME: $2,700,000BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 171 FF-11 FEE FEE CREEK SANITARY RELIEF Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH SANITARY SEWER,FROM 1 876 W OODHOLLOW DRIVE TO PROGRESS PARKWAY. PART OFPROJECT TO BE BUILT BY THE CITY OF MARYLAND HEIGHTS, AS PARTOF A RO AD IMPROVEMENT PROJECT. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,800,000. FEE FEE RDA D I E R DSCHUETZ RDCHAFFEE DRMETRO BLVDNORFOLKSOUTHERNRRG R I S SOMDRMIKEL AVEMETRO CT NORTHLINE I NDUSTRI ALBLVDF AIR G R O VEINDUSTRIAL BLVD CENTERLINEINDUSTRIALDRNORTHL IN E IN D U ST R IA L D R §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10489 15TASK NO: TASK NAME: $4,700,000BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 172 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEFPHASE III Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. THE THIRD AND FINAL PHASE OF A MULTI-PHASE PROJECT. THISPHASE CONSISTS OF THE CONSTRUCTION OF 4,700 FEET OF 8-INCHTO 42-INCH SANITARY SEWER SOUTH OF SCHUETZ ROAD. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $10,700,000. HEINTZ RDERB RD TELEGRAPH RDB A U M G A R TN ER R D BLACKFOREST DR CHRISTOPHER DRC L I FFWOOD T R A IL ENGLAND T O WN RD PRIVA T E RD S U S A N R D SEA NPKYPION E E R D R GATLINGDR TEL HAVEN CTCHALETHILLDR TANZMAR DRSANDERS DR S T A E H L E C T FAITH DR NAHN DR PRIVA TERD PRIVATE RD PIONEER DR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10142 15TASK NO: TASK NAME: $1,425,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 173 FORESTWOOD SANITARY RELIEF (SKME-435) Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 7,980 FEET OF 8-INCH TO 18-INCH SANITARY RELIEFSEWER, 420 FEET OF 8-INCH FORCE MAIN, AND REPLACE THEEXISTING PUMP STATION (P-428). THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $3,525,000. G R A V O IS R D MUSICK RDBAPTIST CHURCH RDPRIV A T E R DLITTIE RD GARBER RD TESSONFERRYRD EDDIE N PARK RDP ARDEE RDS LINDBERGH BLVD DANDRIDGEDRTESSHIRE DRVARGAS DR PATRINA C T SAPPINGTONACRESDRFARADAYDR F A WNH A V E N DR ROSCO MMONDR GOLF CRESTDR MAPLE LNB RIARSTONEDRPICKWICKDRCINN A B A R D R EMIL AVEMEATH D RCHARRETTE DR MCNARY DRMUELLER RDCORDO BALNPINE FOREST DR TORIGNEY DR VALDA M E R E D R GAIL CT KAMPING LNSONATA DRBI MINIDR WILLINDA DR EDGECLIFFE DR L A S VEGASDRCORAL RIDGE DR STOLZ RD S LEVINLNGENEL DRFABICK DRCRECELIUS DRDESMON DDRTIMOTHY LN C O S M O S D R LAVINIA DRJU N IP E R C T L ARKSPURDR FITE CIR P RI V AT E RDMEATH DR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10611 15TASK NO: TASK NAME: $2,000,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 174 GC-06 GRAVOIS CREEK TO BRIARSTONE ANDGATES SANITARY RELIEF Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 7,300 FEET OF 24-INCH TO 36-INCH SANITARY SEWERS. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,000,000. §¨¦55 §¨¦55 UNION RDHOFFMEISTERAV ESPRING DR PAULE AVE MARCHI DRMOUNT OLIVE RD VIRGO LNAVENUE H STTRACY LNB I GCHI EFD R MALCOLM DR FABIAN DR DOLBIL DR DAR LN MEREDITH DRBILRON DR RIPA AVE SIOUX DRZEISS AVEREXFORDD RFRIARTUC KLNRUTHERFORDDR UNIONPACIFICRRORIENT AVEAVENUE I STPUEBLODRLABETTE DRBIRCHWOOD PL K A Y LN JESSE DRAVENUE H ST§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10496 15TASK NO: TASK NAME: $11,300,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 175 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELIEF PHASE III IV & V (SKME -521) Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNKSEWER. PROJECT INCLUDES REMOVAL AND REPLACEMENT OF AUNION PACIFIC RAILROAD TRACK SPUR. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $16,300,000. T E R M IN A L R R ST LOUIS AVE CLARA AVEGREER AVE BELT AVEGOODFELLOW BLVDLABADIE AVE NATURALBRIDGERD HERBERT ST ROOSEVELT PL TERRY AVE PALM ST SEMPLE AVEHAMILTON AVEBROWNAVESEL B E RCT ASHLAND AVESIEMERS LNROWAN AVEASHLAND AVE TE R M IN A L R R §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11768 15TASK NO: TASK NAME: $2,760,000BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: HarlemWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 176 HARLEM - BADEN RELIEF PHASE IV (HEBERT)(DETENTION BASIN) Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS. CONSTRUCT DETENTION BASIN TO RELIEVE BUILDING BACKUPS ANDFLOODING IN LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNKSEWERS. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,460,000. §¨¦40 OLIVEBLVDC E N T R A L M ID L A N D R R LADUE RD W E S T D RHOGHOLLOWRDSWINGLEYRIDGE RDPRIVATE RDA P P A LACHIANTRAIL WATERW O RKSRDWCHESTERFIEL DPKY W HITERDPETZOLD RDA R R O W HEAD ESTATE S L N DINSMO O R D R W E S T E R N M I L L D R PRI VATERDP R IV A T E R D W HITERD P RIV A T E R D PR IVATERDW H ITERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10656 15TASK NO: TASK NAME: $2,700,000BUDGET: FUND: VariousMUNICIPALITY: MissouriMAJOR SERVICE AREA: Caulks CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 177 INFRASTRUCTURE REPAIR #087P CAULKS CREEKA (P-750) PHASE VI Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund EXISTING FO RCE MAIN IS DETERIORATED. CONSTRUCT 11,400 FEET OF 30-INCH FORCE MAIN. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,500,000. GREGG RDTELEGRAPH RDGRANTRDW R I P A A V E TELFORD DRCCCRDWEMBLEY DROUTER RDRE A VIS B A R R A C K S RD BOUNDARY RDLARK AVECLYDE AVECLAGERRDJEFFERSONIAN DR LAMBETH LN NEBRASKATRAIL WALWORTHDR E RIPA AVE BROOK AVERIVER RDGAR K ST SIGSBEE AVE LINNAVEMEADOW AVELUNA AVEPRIV A T E RD G R ANDADRSADIE AVENORTH RDSOUTHAMPTONDR CYER D ELLEN AVE BELLSWO R T H D R EARLSFIELD LNTACOMA DR POPLARFORESTDRWESTAIR DR WALDENDR LAREDO AVEELLWINEDR KASKE DRBUNKERRDG ENE V ADRKEVIN DRBEATRICE AVE TEDDY AVE SOUTHWARK LN BARNSLEY DR R A INBOWDRPENTONVILLE DR HAWSON DRREES AVEKENNY DRWYCLIFFE CT CORLISS DRPRIVATE RD RAINBOW DR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11054 15TASK NO: TASK NAME: $900,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 178 KINGSTON I/I REDUCTION AND PUMP STATIONELIMINATION Construction Task 6660 - SanitaryReplacement Fund INFL OW CONTRIBUTING TO OVERCHARGED PUMP STATION ANDSEWERS. CONTRO L SURCHARGING AND ELIMINATE EXISTING PUMP STATIONP-326 THROUGH DISCONNECTION OF PRIVATE I/I SOURCES ANDSEWER IMPROVEMENTS. REDIRECT TWO STREET INLETS FROMSANITARY TO STORM SYSTEM. PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11870. §¨¦55 §¨¦44 §¨¦270 §¨¦255 §¨¦270 §¨¦55 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11927 15TASK NO: TASK NAME: $3,200,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 179 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 63,000 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD. INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11776, 11740,11667, 11155, AND 11097. SUPPLEMENTAL FUNDING OF $3,200,000 INFY 1 6. §¨¦55 §¨¦255 §¨¦55 LEMAYFERRYRDRINGERR D YAEGER RD TELEGRAPHRDFORDER RD B A UMGARTNER R D MATTISRD MILBURN RDKERTH RDMILD DRHEINTZ RDBUTLER HILL RD OLDBA UM G ARTNERRDAMBS RDMEHL AVELIND RD B L ACKFOREST DRHAWKINSFUCHSRDAQUARIDGEDRTHE IS S R D FIRELI G H T DROLSEN DRL E M A Y W O O D S DR BERVIEW LNPRIVATE RDVALLEYSIDELNIVONDALE LNL O N GVIEWDR FIRELEAF DRFUCHS RDIDECKERDRDELOAK DR EILEEN ANN DR CROSSWOOD DRTAR L T O NDRPRIVATE RDPRIVATE RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11650 15TASK NO: TASK NAME: $1,600,000BUDGET: FUND: UnincorporatedMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 180 LOWER MERAMEC WATERSHED I/I REMOVAL Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT. REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TOREMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWSTO THE LOW ER MERAMEC TREATMENT PLANT. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $6,600,000. §¨¦255§¨¦255 TELEGRAPH RDUNIONPACIFICRRKOCH R DCLIFFCA VE R D BUS S E N RDMAGOFF I N RDBURNCOATEDR FORDER RD ENGLANDTOWNRD YAEGER RD E P O TTLEAVE R O B ER TKO C H H O SPI T AL RD BLUFFRDBUSSENQUARRY RD MARTIGN E Y D R C A T H EDRALDR PRIVATERDWHITSHIRE DR CHATPORT RDMARSEILLEDRBAUMGARTNERRD ROLENS DR PIONEE R D R TEL HAVEN CT BERTRAND DR MALONE DR PRIVATERD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10716 15TASK NO: TASK NAME: $3,100,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 181 NEW ENGLAND TOWN QUARRY PUMP STATION(P-307) (SKME-544) IMPROVEMENTS Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund TWO LIFT STATIONS ARE AT THE END OF THEIR LIFE CYCLE, AND ONEIS RECEIVING ADDITIONAL FLOWS DUE TO ELIMINATION OF THEOTHER PUMP STATION. CONSTRUCT 8,900 FEET OF 8-INCH TO 18-INCH SANITARY SEWER ANDELIMINATE TWO PUMP STATIONS (P-307 AND P-323). THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL CONSTRUCTION BUDGET IS$7,30 0,000 . INCLUDES CONSTRUCTION OF 10715. MADGE AVE MANCHES TE R R D S BRENTWOOD BLVDBREMERTON RDHIGHSCHOOLDRPOWELL AVE COLLIER AVEMANDERLY DRPRIVATE RDBRAZEAU AVELAWNDELLD R ANNALEE AVEW PENDLETON AVEHILLDALE AVEMAGDALEN AVE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10737 15TASK NO: TASK NAME: $320,000BUDGET: FUND: BrentwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 182 POWELL AVE AND ANNALEE SEWER SEPARATION Construction Task 6660 - SanitaryReplacement Fund ISOLATED SECTION OF COMBINED SEWER DIRECTED TO SINKHOLEAND ADVERSE GRADES IN SANITARY SEWER LEADING TO BUILDINGBACKUPS AND INCREASED MAINTENANCE. REPLACE 700 FEET OF 8-INCH DIAMETER SANITARY SEWER ANDREDIRECT SANITARY FLOW FROM COMBINED SEWER. CONSTRUCTPUMP TO FACILITATE SEPARATION. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11877 17TASK NO: TASK NAME: $500,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 183 PRIVATE INFLOW AND INFILTRATION REDUCTIONPROGRAM (FY2013) Work Order RepairCosts (Capital) 6660 - SanitaryReplacement Fund PRIVATE SO URCES OF INFLOW AND INFILTRATION AREOVERCHARGING SANITARY SEWERS. PRO GRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCESINTO THE SANITARY SYSTEM. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11898 17TASK NO: TASK NAME: $500,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 184 SUPPLEMENTAL ENVIRONMENTAL PROJECTS(SEP) PROGRAM Work Order RepairCosts (Capital) 4102 - ImprovementFund CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLIONTO DECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACEDEFECTIVE LATERALS. AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS AREIDENTIFIED AT LOW INCOME OWNER OCCUPIED PROPERTIESTHROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BEISSUED. PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITALSERVICES. THIS PROJECT WAS UNDERTAKEN IN CONNECTION WITH THE SETTLEMENT OFAN ENFORCEMENT ACTION, UNITED STATES. STATE OF MISSOURI. AND THEMISSOURI COALITION FOR THE ENVIRONMENT FOUNDATION V. METROPOLITANST. LOUIS SEWER DISTRICT, NO. 4:07-CV-01120-CEJ, TAKEN ON BEHALF OF THEU.S. ENVIRONMENTAL PROTECTION AGENCY, THE STATE, AND THE COALITIONUNDER THE CLEAN WATER ACT. BERMUDADRHERN DRNORFOLK SOUTHERN RR WOODSTOCK RD S U B U R B A N A V E FERGUSON AVEWIEGEL D R D A R S T R D S HARVEY AVEGEORGIA AVECARSON RD E V A N S L N R U G G L E S R D FORESTWOODDRBROTHERTON LN B L A N D IN G D RPAULAVE TIFFIN AVE HAWKESBURY DR C H U R C H S T KIRK DRS DADE AVEHALEYAVESBARATAVEROYCE DRH A L P I N D R CAS TRO DR L E E A V E H I GHMONTDR HILL AVE N HILLS LNSELI ZABE T HA V E ELKAN AVES CLARK AVESTLOUIS A V E WELEBAAVERENSHAWDR BEHLE AVEPAYNEAVEGRAF AVE SHARTNETTAVESPRINGAVED A R T M O O R D R P A T R IC IA A V EHARRISONAV EEMERALDAVEFAIRVIEW LN FERMO AVE REDMOND AVE PRIVATERD WYLIN CTA D A M S S T THOMAS AVEDAMES CTWESLEY AVE GROVE A V E ANABEL AVE ELLIOTT AVEWEEKS AVEA LL E N P L TILFORD AVENI TAL CTHASTING CT TIFFIN AVE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10026 15TASK NO: TASK NAME: $5,000,000BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 185 UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ONE CONSTRUCTED SSO TO BEREMOVED, BP-305. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $12,500,000. §¨¦170 PAGE AVE OLIVE BLVD TERMINAL RR CANTON AVE NORTH N SOUTH RDWALTONRD82ND BLVDLYNN AVEWOODSON RDWAYNE AVE QUENDO AVEBLOOM D R 81ST STBELTWAYDR78TH STSHERIDANDRLIBERTY AVE ALERT D R GRANT DRMONR O E D R MENDELL DRB R A DDOCK DR TITUSRD WALDRON AVEKEMPLANDP LGROBYRDWELLINGTON AVE EADS AVE PRIVATERDHAFNER PLGULFDRMILAN AVEVINITA DRN HANLEY RDMADIS ONDRFLORA AVE ELLERTON AVE CARLETON AVE UNIONPACIFICRR TRENTONAVE MOUNTOLIVEAVEMELROSE AVE RABE DRCRYSTAL INDUSTRIAL CTA T HERTONDRHOW AVE PARAMOUNT DR LYNDALE AVENOEL CT WASHINGTON ST MELROSE AVE MILAN AVEAL E R T D R WAYNE AVE TR E N T ON AVEMILANAVE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10027 15TASK NO: TASK NAME: $2,020,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: WastewaterPROJECT TYPE: EXPENSE TYPE:Capital Page 186 UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595) Construction, Phase I(SupplementalAppropriation) 6660 - SanitaryReplacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS. CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH SANITARY RELIEFSEWER. REMOVE CONSTRUCTED SANITARY SEWER OVERFLOWSBP-419 AND BP-435, AND COMBINED SEWER OVERFLOWS L-100 ANDL-1 01. THIS PRO JECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL PROJECT BUDGET IS $5,020,000. 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 1101 - GENERAL FUND 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $700,000 11811 Vendor Services CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) Various $2,000,000 11810 Vendor Services CCTV INSPECTION OF SEWERS (2014)Various $1,000,000 11125 Vendor Services CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000 11146 Construction Task CSO VOLUME REDUCTION GREEN INFRASTRUCTURE Various $5,000,000 11110 Professional Services DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $630,000 11755 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - PLANNING (FY2014) Various $500,000 11758 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A Various $65,000 12379 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B Various $65,000 12380 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C Various $65,000 12381 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D Various $65,000 11773 Work Order Repair Costs (Non-Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) Various $1,500,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $610,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $710,000 11699 Professional Services PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 Various $709,000 11702 Vendor Services RADAR RAINFALL DATA (FY2014)Various $130,000 11153 Professional Services RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 10766 Vendor Services STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) St. Louis City And County $550,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11916 Vendor Services STREAM FLOW WATER QUALITY SAMPLING (FY 2014) Various $799,000 11918 Construction Task TELEGRAPH ROAD #2928 I/I REDUCTION Unincorporated $132,000 FUND TOTAL: $17,030,000 4102 - IMPROVEMENT FUND 11898 Work Order Repair Costs (Capital) SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM Various $600,000 FUND TOTAL: $600,000 4122 - WASTEWATER EMERGENCY FUND 11107 Construction Task EMERGENCY REPAIR FUNDS (WASTEWATER) Various $250,000 FUND TOTAL: $250,000 5594 - BLACK CREEK SUBD #455 OMCI FUND 10390 Construction Task RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) Clayton $800,000 FUND TOTAL: $800,000 6660 - SANITARY REPLACEMENT FUND 12080 Design Services ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) Bellefontaine Neighbors $530,000 10523 Construction Task AYRES SANITARY RELIEF AND I/I REDUCTION Various $2,200,000 11777 Design Services BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION) Various $650,000 11934 Construction Task BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION Various $5,000,000 11920 Construction Task BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT St. Louis City And County $15,000,000 11920 Construction, Phase II BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT St. Louis City And County $5,500,000 11853 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT A Various $4,680,000 11854 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT B Various $4,920,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11857 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT C Various $3,810,000 11871 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D Various $5,000,000 11924 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT E Various $4,130,000 11925 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT F Various $4,490,000 11926 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G Various $5,000,000 12060 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A Various $60,000 12434 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT D Various $100,000 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $1,900,000 11685 Construction Task BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317) Bellefontaine Neighbors $1,460,000 11686 Construction Task BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR) Various $235,000 11689 Construction Task BLACK CREEK I/I REDUCTION Clayton $5,700,000 12102 Design Services BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) Unincorporated $110,000 11788 Construction Task CAULKS CREEK PUMP STATION B FORCE MAIN Chesterfield $3,100,000 11884 Construction, Phase II CEDARCREST PRIVATE I/I REDUCTION (SKME-561) Various $380,000 12119 Design Services CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) Unincorporated $100,000 11723 Design Services COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) Florissant $300,000 11809 Construction Task COLDWATER CREEK WWTF SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS Unincorporated $2,800,000 11726 Engineering During Construction Services COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C Hazelwood $200,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11726 Construction Task COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C Hazelwood $2,000,000 10557 Construction Task COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME -240) Unincorporated $670,000 11964 Design Services CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND BLVD) Clayton $270,000 11152 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Various $3,000,000 11826 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Various $1,000,000 10324 Construction Management Services During Construction CONSTRUCTION MANAGEMENT SERVICES - MISSOURI WWTP SECONDARY EXPANSION & DISINFECTION Maryland Heights $500,000 11151 Professional Services CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Various $3,600,000 12432 Design Services CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH Various $120,000 11730 Construction Task CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) Various $2,500,000 10851 Design Services CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161) Rock Hill $750,000 10576 Construction Task DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION Various $1,500,000 10576 Engineering During Construction Services DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION Various $50,000 11850 Construction Task DEER CREEK PUBLIC I/I REDUCTION (2015)Various $5,000,000 11851 Design Services DEER CREEK PUBLIC I/I REDUCTION (2016)Various $150,000 11110 Professional Services DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $1,800,000 11731 Design Services DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $6,000,000 11734 Land Purchase DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - LAND ACQUISITION St. Louis County $6,000,000 11735 Construction Task DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION University City $400,000 11743 Property Rights Acquisition EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2015) St. Louis City And County $3,500,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11079 Construction Task FAIRLIGHT AND BRIGHTLING SEWER SEPARATION Olivette $110,000 11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) Various $2,230,000 11747 Design Services FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) Unincorporated $300,000 10014 Construction Task FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $4,100,000 10489 Construction Task FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III Maryland Heights $6,000,000 10456 Construction Task FOREST BROOK SANITARY RELIEF (SKME- 003 AND SKME-016) REHABILITATION & I/I REDUCTION Various $420,000 10440 Construction Task FORESTWOOD LATERAL SANITARY RELIEF (SKME-321) Ferguson $1,600,000 10142 Construction Task FORESTWOOD SANITARY RELIEF (SKME- 435) Unincorporated $2,100,000 10611 Construction Task GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF Unincorporated $3,000,000 11751 General Services - Construction Inspection GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) Various $250,000 11753 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A Various $50,000 11754 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B Various $50,000 12064 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C Various $50,000 11763 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A Various $50,000 11909 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B Various $50,000 11910 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C Various $50,000 11911 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D Various $50,000 11912 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E Various $50,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11759 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) Various $300,000 11779 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A Various $90,000 11780 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B Various $90,000 11781 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C Various $90,000 10496 Construction Task GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME - 521) Unincorporated $5,000,000 11768 Construction Task HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) St. Louis City $2,700,000 10642 Construction Task HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION Unincorporated $3,400,000 10330 Construction, Phase I (Supplemental Appropriation) HARTLAND TO GOTHLAND SEWER SEPARATION Overland $1,360,000 10656 Construction Task INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI Various $3,800,000 11708 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT A St. Louis City And County $5,000,000 11866 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT B Various $5,000,000 11867 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C Various $5,000,000 11773 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) Various $5,500,000 11710 Construction Task ISABELLE I/I REDUCTION St. Ann $100,000 11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $1,660,000 11957 Design Services JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS Various $320,000 11713 Design Services LADUE ESTATES SANITARY RELIEF Creve Coeur $70,000 11714 Design Services LADUE SUBTRUNK SANITARY RELIEF (SKME-654) Various $700,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11715 Construction Task LANG ROYCE LATERAL SANITARY RELIEF (SKME-320) Ferguson $1,400,000 11818 Design Services LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) St. Louis City $330,000 11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE MAIN Unincorporated $580,000 11856 Construction Task LEMAY PUBLIC I/I REDUCTION (2015)Various $4,800,000 11927 Construction Task LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B Various $5,000,000 12061 Design Services LEMAY PUBLIC I/I REDUCTION (2016)Various $200,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $3,100,000 11716 Design Services LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK Various $1,350,000 12470 Design Services LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK Various $130,000 12427 Construction Task LEMAY WWTF PLANT CONTROLS Unincorporated $1,500,000 11649 Miscellaneous Services LEMAY WWTP SECONDARY IMPROVEMENTS Unincorporated $170,000 11649 Engineering During Construction Services LEMAY WWTP SECONDARY IMPROVEMENTS Unincorporated $600,000 11819 Design Services LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) St. Louis City $2,040,000 11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS St. Louis City $290,000 11820 Design Services LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) Various $1,850,000 11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS St. Louis City $200,000 11816 Design Services LMRDP TUNNEL DEWATERING PUMP STATION St. Louis City $1,780,000 11746 Design Services LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL Various $3,600,000 11650 Construction Task LOWER MERAMEC WATERSHED I/I REMOVAL Unincorporated $5,000,000 11656 Land Purchase MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $2,000,000 11656 Design Services MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $2,850,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11659 Construction Task MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292) Normandy $1,050,000 11774 Design Services MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST Various $50,000 10716 Construction Task NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS Unincorporated $4,200,000 11694 Construction Task NORTH BADEN CREEK I/I REDUCTION (BP- 612)(CANTERBURY DR) Pasadena Hills $580,000 12460 Construction Task OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE AND OAKLAND AVE) St. Louis City $1,000,000 11695 Construction Task OLDE ENGLISH I/I REMOVAL Unincorporated $265,000 11697 Construction Task PAGE TO TRENTON SANITARY RELIEF Overland $1,000,000 11989 Design Services PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD AND S HILL ROCK HILL ROAD) Crestwood $350,000 11094 Construction Task PROSPECT HILL LANDFILL VERTICAL EXPANSION Various $300,000 11933 Construction Task PROVIDENCE PUBLIC I/I REDUCTION Webster Groves $3,000,000 11701 Design Services PUMP STATION REPLACEMENT PROJECTS (PHASE I) Various $200,000 12441 Pre-Design Services RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Various $300,000 10390 Design Services RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) Clayton $100,000 10390 Construction Task RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) Clayton $1,200,000 11069 Construction Task ROCK HILL SANITARY RELIEF (SKME -618)Rock Hill $1,350,000 11919 Design Services ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE Unincorporated $230,000 11680 Construction Task ROXBURY I/I REDUCTION Clayton $1,070,000 11990 Design Services SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON ROAD) Sunset Hills $450,000 11666 Construction Task ST MARIE SANITARY RELIEF I/I REDUCTION Florissant $250,000 11667 Design Services STERLING PLACE SEPARATE SEWER I/I REMOVAL Unincorporated $380,000 12222 Design Services SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) Ferguson $800,000 12473 Design Services SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) Ferguson $60,000 12237 Design Services TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) Unincorporated $80,000 14 April 2014 WASTEWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11991 Design Services UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) Various $1,100,000 11984 Design Services UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) Various $1,450,000 11983 Design Services UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) Various $350,000 11671 Design Services UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) Various $950,000 12062 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) University City $60,000 12063 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) University City $70,000 12435 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR) Various $60,000 12436 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS) Various $70,000 12437 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) Various $90,000 12438 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) Various $50,000 11929 Construction Task UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST Various $4,500,000 11992 Pre-Design Services UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) University City $1,300,000 11681 Construction Task UPPER COLDWATER SECTION D I/I REDUCTION Various $350,000 10026 Construction Task UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A Ferguson $7,500,000 12440 Pre-Design Services UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL University City $300,000 10027 Construction Task UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) Various $3,000,000 11086 Construction Task WEBSTER ACRES SANITARY SEWER REPLACEMENT Webster Groves $1,120,000 11965 Design Services WEST WISE I/I REDUCTION (NW QUADRANT I-64 AND BIG BEND BLVD) Richmond Heights $800,000 11108 Construction Task WISMER - HUNTINGTON SANITARY RELIEF (SKME -592) Overland $1,200,000 FUND TOTAL: $258,210,000 GRAND TOTAL:$276,890,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 1101 - GENERAL FUND 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $700,000 11811 Vendor Services CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) Various $2,000,000 11810 Vendor Services CCTV INSPECTION OF SEWERS (2014)Various $1,000,000 12070 Professional Services COMPREHENSIVE AMMONIA AND NUTRIENT REMOVAL MASTER PLAN Various $1,500,000 11125 Vendor Services CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000 11146 Construction Task CSO VOLUME REDUCTION GREEN INFRASTRUCTURE Various $5,000,000 11110 Professional Services DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $630,000 11755 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - PLANNING (FY2014) Various $400,000 11758 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A Various $60,000 12379 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B Various $60,000 12380 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C Various $60,000 12381 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D Various $60,000 11705 Work Order Repair Costs (Non-Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2016) Various $1,000,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $610,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $710,000 11699 Professional Services PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 Various $500,000 11702 Vendor Services RADAR RAINFALL DATA (FY2014)Various $130,000 11153 Professional Services RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 10766 Vendor Services STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) St. Louis City And County $550,000 11916 Vendor Services STREAM FLOW WATER QUALITY SAMPLING (FY 2014) Various $879,000 FUND TOTAL: $17,649,000 4102 - IMPROVEMENT FUND 11898 Work Order Repair Costs (Capital) SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM Various $500,000 FUND TOTAL: $500,000 4122 - WASTEWATER EMERGENCY FUND 11107 Construction Task EMERGENCY REPAIR FUNDS (WASTEWATER) Various $250,000 FUND TOTAL: $250,000 6660 - SANITARY REPLACEMENT FUND 11993 Design Services 82ND STREET TO I-170 SANITARY SEWER (UR-08 UR-09) University City $1,980,000 11993 Property Rights Acquisition 82ND STREET TO I-170 SANITARY SEWER (UR-08 UR-09) University City $500,000 12075 Design Services AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, HAMBURG) Unincorporated $2,010,000 11776 Construction Task ALPINE DRIVE SEPARATE SEWER I/I REMOVAL Unincorporated $525,000 12078 Design Services APPLE ORCHARD, SINGERSON, BAYLESS PLACE I/I REDUCTION (LEMAY FERRY RD AND BAYLESS AVE) Unincorporated $920,000 11682 Construction Task BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION Various $450,000 11934 Construction, Phase I (Supplemental Appropriation) BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION Various $1,900,000 10407 Construction Task BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II Unincorporated $2,500,000 11920 Construction, Phase I (Supplemental Appropriation) BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT St. Louis City And County $7,000,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11871 Construction, Phase I (Supplemental Appropriation) BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D Various $2,280,000 11926 Construction, Phase I (Supplemental Appropriation) BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G Various $2,700,000 12060 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A Various $4,800,000 12023 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT A Various $110,000 12024 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT B Various $120,000 12025 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT C Various $110,000 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $3,200,000 12425 Design Services BISSELL POINT WWTF SOUTH ASH LAGOON FLOOR REPLACEMENT St. Louis City $1,000,000 11883 Construction Task BLACK CREEK SANITARY SEWER AND I/I REDUCTION Various $2,100,000 10537 Design Services BOPP SANITARY RELIEF (SKME-611)Des Peres $190,000 11719 Construction Task BRINWOOD I/I REDUCTION Florissant $1,100,000 11790 Construction Task CAULKS CREEK FORCE MAIN (RIVER VALLEY RD TO L-52) Maryland Heights $6,600,000 11789 Design Services CAULKS CREEK FORCE MAIN REHABILITATION Chesterfield $104,000 11720 Construction Task CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I Wildwood $4,000,000 11009 Construction Task CHANDELLAY DR. SANITARY SEWER REPLACEMENT Unincorporated $500,000 11115 Construction Task CLAVERACH PARK I/I REDUCTION AND SEWER SEPARATION Clayton $2,400,000 11723 Construction Task COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) Florissant $760,000 12423 Design Services COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT Unincorporated $1,000,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11726 Engineering During Construction Services COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C Hazelwood $1,000,000 11726 Construction, Phase II COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C Hazelwood $25,000,000 12125 Design Services COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) St. Ann $3,252,000 12128 Design Services CONCORD I/I REDUCTION (TESSON FERRY RD AND E CONCORD RD) St. Louis City And County $438,000 11152 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Various $1,400,000 11826 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Various $2,600,000 11151 Professional Services CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Various $4,900,000 12137 Design Services CREVE COEUR CREEK NORTH EAST I/I REDUCTION (OLIVE BLVD AND I-270) St. Louis City And County $2,505,000 11730 Construction, Phase I (Supplemental Appropriation) CSO - GINGRAS CREEK AND I/I REDUCTION (BP-059) Various $2,500,000 11155 Construction Task DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) Unincorporated $3,000,000 10021 Construction Task DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I Brentwood $10,000,000 11997 Design Services DC-09 WEST I/I REDUCTION (S LINDBERGH AND LADUE RD) Ladue $525,000 11851 Construction Task DEER CREEK PUBLIC I/I REDUCTION (2016)Various $4,200,000 12036 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A Various $180,000 12037 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B Various $160,000 11110 Professional Services DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $1,800,000 11136 Design Services DEGIVERVILLE COMBINED SEWER RELOCATION St. Louis City $650,000 11738 Construction Task DIXIE I/I REDUCTION Various $1,800,000 11739 Construction Task DUCHESNE AND GOTT I/I REDUCTION Various $510,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11740 Construction Task E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $300,000 11744 Property Rights Acquisition EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2016) St. Louis City And County $2,000,000 11996 Design Services FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER AND GEYER RDS) Des Peres $940,000 11745 Design Services FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) Maryland Heights $270,000 10014 Construction, Phase I (Supplemental Appropriation) FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $2,700,000 10489 Construction, Phase I (Supplemental Appropriation) FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III Maryland Heights $4,700,000 10018 Design Services FF-18 VILLADORADO - LACKLAND - PAGE SANITARY RELIEF (SKME -015) Maryland Heights $920,000 11748 Construction Task FLORISSANT I/I REDUCTION Various $600,000 11749 Construction Task FLORLAND SANITARY RELIEF PHASE I - I/I REDUCTION Various $1,010,000 11750 Construction Task FORESTATE AND TEXAS SANITARY RELIEF (SKME-513) Grantwood Village $1,660,000 10142 Construction, Phase I (Supplemental Appropriation) FORESTWOOD SANITARY RELIEF (SKME- 435) Unincorporated $1,425,000 11137 Construction Task GASLIGHT SQUARE SEWER IMPROVEMENTS St. Louis City $2,700,000 10611 Construction, Phase I (Supplemental Appropriation) GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF Unincorporated $2,000,000 12394 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT B Various $50,000 11752 General Services - Construction Inspection GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2016) Various $250,000 11753 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A Various $50,000 11754 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B Various $50,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12064 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C Various $50,000 11760 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016) Various $300,000 11761 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (2016) CONTRACT A Various $135,000 11762 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (2016) CONTRACT B Various $135,000 11764 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT A Various $50,000 12395 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT C Various $50,000 12405 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT D Various $50,000 12406 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT E Various $50,000 12177 Design Services GLENDALE SECTION D SANITARY RELIEF PHASE V (SKME-624) I/I REDUCTION Glendale $100,000 11765 Construction Task GRAND GLAIZE TRUNK SANITARY RELIEF I/I REDUCTION (SKME-417) Ballwin $190,000 10496 Construction, Phase I (Supplemental Appropriation) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME - 521) Unincorporated $11,300,000 11768 Construction, Phase I (Supplemental Appropriation) HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) St. Louis City $2,760,000 11770 Construction Task HARLEM - BADEN RELIEF PHASE IV (HEBERT) (IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK) St. Louis City $3,750,000 10641 Design Services HARLEM - BADEN RELIEF PHASE IV (HEBERT) BUILDING DEMOLITION AND DESIGN St. Louis City $1,760,000 12304 Design Services HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD. AND I-270) Sunset Hills $1,755,000 11097 Construction Task HOLLY DRIVE SEWER SEPARATION Webster Groves $1,100,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11994 Design Services HUNTLEIGH MANOR OLD WARSON TIMBERWYK I/I REDUCTION (S LINDBERGH S OF LITZSINGER) Ladue $450,000 10656 Construction, Phase I (Supplemental Appropriation) INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI Various $2,700,000 11709 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2016) CONTRACT A St. Louis City And County $5,000,000 11868 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2016) CONTRACT B Various $5,000,000 11869 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2016) CONTRACT C Various $5,000,000 11705 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2016) Various $5,000,000 11142 Design Services JENNINGS STATION ROAD / NORTH BADEN BASIN St. Louis City $300,000 12314 Design Services KAPPEL I/I REDUCTION (EXUMA DR. AND GLEN OWEN DR.) Unincorporated $55,000 11054 Construction Task KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION Unincorporated $900,000 12317 Design Services KIRKWOOD I/I REDUCTION (BIG BEND BLVD. AND S. KIRKWOOD RD.) Kirkwood $1,800,000 11995 Design Services KIRKWOOD MIDDLE SCHOOL SIMMONS WILSON SARAH I/I REDUCTION (MANCHESTER AND KIRKWOOD RDS) Kirkwood $1,000,000 11712 Construction Task LACKLAND I/I REDUCTION Various $520,000 11818 Design Services LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) St. Louis City $2,370,000 11927 Construction, Phase I (Supplemental Appropriation) LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B Various $3,200,000 12061 Construction Task LEMAY PUBLIC I/I REDUCTION (2016)Various $4,000,000 12048 Design Services LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A Various $120,000 12049 Design Services LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B Various $110,000 12050 Design Services LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C Various $110,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $3,100,000 12429 Construction Task LEMAY WWTF CHILLER REHABILITATION Unincorporated $500,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11649 Miscellaneous Services LEMAY WWTP SECONDARY IMPROVEMENTS Unincorporated $2,000,000 11819 Design Services LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) St. Louis City $2,700,000 11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS St. Louis City $908,000 11820 Design Services LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) Various $3,000,000 11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS St. Louis City $605,000 11816 Design Services LMRDP TUNNEL DEWATERING PUMP STATION St. Louis City $2,400,000 11746 Design Services LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL Various $2,400,000 11650 Construction, Phase I (Supplemental Appropriation) LOWER MERAMEC WATERSHED I/I REMOVAL Unincorporated $1,600,000 11928 Construction Task LUCAS & HUNT AND I-70 SANITARY SEWER Northwoods $640,000 11651 Construction Task LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $149,000 11656 Construction Task MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $11,900,000 11656 Engineering During Construction Services MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $200,000 11662 Construction Task MCNULTY - PALLARDY I/I REDUCTION Various $4,800,000 11663 Construction Task MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I REDUCTION Overland $730,000 12310 Design Services MISSOURI RIVER BONFILS SANITARY SEWER REHABILITATION PHASE II Hazelwood $271,000 11774 Construction Task MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST Various $4,600,000 10716 Construction, Phase I (Supplemental Appropriation) NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS Unincorporated $3,100,000 11664 Construction Task NEWCASTLE I/I REDUCTION Various $70,000 11693 Construction Task NORTH BADEN CREEK I/I REDUCTION (BP- 532)(WINCHESTER DR) Various $720,000 11696 Construction Task PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $830,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11698 Construction Task PICKWICK-BERNADINE-BIMINI SANITARY RELIEF Unincorporated $1,800,000 10737 Construction Task POWELL AVE AND ANNALEE SEWER SEPARATION Brentwood $320,000 11877 Work Order Repair Costs (Capital) PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM (FY2013) Various $500,000 11094 Construction, Phase II PROSPECT HILL LANDFILL VERTICAL EXPANSION Various $1,200,000 11700 Construction Task PROVIDENCE SANITARY RELIEF (SKME - 640) Webster Groves $710,000 11701 Construction Task PUMP STATION REPLACEMENT PROJECTS (PHASE I) Various $950,000 12441 Pre-Design Services RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Various $300,000 12420 Design Services REAVSDALE I/I REDUCTION (MACKENZIE RD AND REAVIS BARRACKS RD) Unincorporated $585,000 11704 Design Services RETFORD I/I REDUCTION Unincorporated $436,000 10748 Construction Task ROSEMARY, PHILO & KATHLEEN SEWER SEPARATION Wilbur Park $1,480,000 11665 Construction Task SELVIDGE AREA I/I REDUCTION Ballwin $200,000 10754 Construction Task SHERWYN SANITARY RELIEF (SKME -651) & I/I REDUCTION Creve Coeur $1,800,000 12209 Design Services SPRINGDALE I/I REDUCTION (ROLLING DR AND SMITHFIELD PL) Bel-Ridge $234,000 11668 Construction Task SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $80,000 11669 Design Services SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) Unincorporated $457,000 12240 Design Services UNION CREEK I/I REDUCTION (I-55 BETWEEN S LINDBERGH BLVD AND BUCKLEY RD) Unincorporated $995,000 11672 Construction Task UNIVERSITY CITY I/I REDUCTION - WEST Various $500,000 12062 Construction Task UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) University City $4,000,000 12063 Construction Task UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) University City $4,000,000 11992 Design Services UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) University City $2,700,000 10026 Construction, Phase I (Supplemental Appropriation) UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A Ferguson $5,000,000 12440 Pre-Design Services UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL University City $300,000 14 April 2014 WASTEWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 10027 Construction, Phase I (Supplemental Appropriation) UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) Various $2,020,000 12253 Design Services VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) Unincorporated $2,060,000 11089 Construction Task VINITA DRIVE SANITARY RELIEF Hanley Hills $330,000 11677 Design Services WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III Webster Groves $1,500,000 11678 Construction Task WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV Webster Groves $2,300,000 FUND TOTAL: $284,054,000 GRAND TOTAL:$302,453,000 STORMWATER ENGINEERING PROJECTS 1 of 1 During Fiscal Year 2015, there are no budgeted Stormwater Engineering projects. 14 April 2014 STORMWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11228 ALGONQUIN WOOD DR. #12 STORM SEWER $124,000 187 11170 BREEZERIDGE AND FAWNRIDGE STORM SEWER $160,000 188 11206 BROOKHURST DRIVE STORM SEWER $450,000 189 11211 BROOKTRAIL CT. STORM SEWER $100,000 190 11191 CHALET COURT STREAMBANK STABILIZATION $215,000 191 11243 CHELSEA AND IDLEWILD STORM SEWER $89,000 192 11209 CLERMONT LANE BANK STABILIZATION $65,000 193 10348 CONWAY - CLERBROOK STORM CHANNEL $920,000 194 11215 CREEKHAVEN DRIVE STORM IMPROVEMENTS $45,000 195 11214 DICKSON STREET #1033 STORM SEWER $77,000 196 12402 EASEMENT ACQUISITION FOR COLDWATER CREEK OMCI PROJECTS $450,000 197 12404 EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS $650,000 198 12403 EASEMENT ACQUISITION FOR GRAVOIS CREEK OMCI PROJECTS $950,000 199 11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 200 10360 FORCEE LANE STORM SEWER $148,000 201 11220 FRONTENAC FOREST STORMWATER IMPROVEMENTS $110,000 202 11219 FRONTENAC FOREST TO PORTLAND DRIVE STORM SEWER $220,000 203 14 April 2014 STORMWATER CONSTRUCTION PROJECTS - FY15 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11076 LACLEDE STATION - CHAMBERLAIN STORM SEWER $230,000 204 10005 LAVEN - DEL LN. #1322 - 1323 STORM SEWER $230,000 205 10731 PARK LANE #9568 - #9572 STORM SEWER $30,000 206 11841 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER CREEK OMCI $400,000 207 12458 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK OMCI $350,000 208 12456 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – SEMINARY BRANCH OMCI $100,000 209 11023 TREGARON PL. TO COUNTRY ESTATES STORM IMPROVEMENTS (FRONTENAC 4-3A) $110,000 210 11237 VILLA COUBLAY DR. #11 AND 15 STORM IMPROVEMENTS (FRONTENAC 7-7) $65,000 211 TOTAL:$6,538,000 BERRYIOLAHARTH I LLARD CLIF SIDE HARPER B R O W N E L L ALGONQUINWOODSANGUINET ARTHURKINGSPONDALGONQUINESTATES GR AMERCY POCAHONTAS §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11228 15TASK NO: TASK NAME: $124,000BUDGET: FUND: GlendaleMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 187 ALGONQUIN WOOD DR. #12 STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD AND G ARAGE FLOODING. CONSTRUCT 430 FEET OF 12-INCH TO 30-INCH STORM SEWER. OAK VALLEY WOODGATESERAMA TIMBER C LAYCHESTER KENDONFAWNVALLEYHARWOODT W IN FAWNSPINE HILLFAWNRIDGEFOLKSTONE DELCHESTERBREEZERIDGELAUREL OAK PRIVA TELINDEMERE FAIRBROOKBUTTERNUTDOMINION HARGROVE FIRETHORNFOREST AIREB R I A R B ROOK FAWNVALLEYBREEZERIDGE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11170 15TASK NO: TASK NAME: $160,000BUDGET: FUND: Des PeresMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 188 BREEZERIDGE AND FAWNRIDGE STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD FLOO DING. CONSTRUCT 385 FEET OF 12-INCH TO 18-INCH STORM SEWER. FAWNRIDGE DRIVE 1700 BLOCK STORM SEWER (11195) WASCOMBINED WITH THIS PROJECT. BE RRYANDREWNORTH WILDDEER RENDERERWARSON WOODSRIDGE LINEDEARBORNGILBERTHUDSON FOREST VI EWDUNWOODYDES PERESSALEMHILLSNORTHBRIDG EHOLLISTON A L D E NEDLINBLUE BEL L MONIERR O L F E TIMBERLANE OAK HAVEN TWINBROOKBRICKENG A R L A N D H O N E YCUT BROOKHURST COTTONWOODM A N C H E S T E R R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11206 15TASK NO: TASK NAME: $450,000BUDGET: FUND: Warson WoodsMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 189 BROOKHURST DRIVE STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund OVERLAND FLOW RESULTING IN REAR YARD PONDING, EROSION ANDSTREET FLOODING. CONSTRUCT 1,850 FEET OF 12-INCH TO 24-INCH STORM SEWER, AND60 FEET O F 3 TO 4 FOOT HIGH MODULAR BLOCK WALL. TIMBERLANE DRIVE (10379) AND NORTH DRIVE (11207) WERECOMBINED IN THIS PROJECT. GRAESEROAK PARKBROOKTR A IL VILLACOUBLAY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11211 15TASK NO: TASK NAME: $100,000BUDGET: FUND: Creve CoeurMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 190 BROOKTRAIL CT. STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD ERO SION AND PONDING. CONSTRUCT 370 FEET OF 18-INCH TO 24-INCH STORM SEWER. SPOEDEMORWOODCOLONIAL HILLS GRAESER CHALET LARKINDEAVEROAKH AVEN SONACHAMBRAY RIDGECORDECREEKSIDE THE KNOLLS FARON HILL LITTLE CREEK WEDGEWOOD LANGDON W AYGREYWYCK COLONIALHILLSCHAL E T§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11191 15TASK NO: TASK NAME: $215,000BUDGET: FUND: Creve CoeurMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 191 CHALET COURT STREAMBANK STABILIZATION Construction Task 5566 - Deer CreekOMCI Fund STREAM EROSION AND INCISION. ENCLO SE 440 FEET OF CREEK WITH 42-INCH DIAMETER PIPE. THIS PRO JECT WILL BE BID AND CONSTRUCTED WITH PROJECT10576. KIRKHAM BROWNELL DWYERSAPPINGTONCHELSEA IDLEWILDCLIF SIDEHILLARD M O R E LAND LISA K AYELMWOODGLEN V I S T ACAMBRIDGEALBERT HIGHLAND WINNETKA VENNEMAN SOUTHRIDGEALEXANDRA CHELSEA §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11243 15TASK NO: TASK NAME: $89,000BUDGET: FUND: GlendaleMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 192 CHELSEA AND IDLEWILD STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD FLOO DING. CONSTRUCT 360 FEET OF 15-INCH TO 18-INCH STORM SEWER. LADUE WARSONC L E RMONT WARSON HILLS JAIM E SWOODCLIFFECHATEAUOAKS KNIGHTBRIDGE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11209 15TASK NO: TASK NAME: $65,000BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 193 CLERMONT LANE BANK STABILIZATION Construction Task 5566 - Deer CreekOMCI Fund HIGH RISK ROADWAY EROSION. CONSTRUCT 125 FEET OF 5 FOOT HIGH MODULAR BLOCK WALL, ANDHEAVY STONE REVETMENT TOE PROTECTION. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. DWYERDARYLCONWAYGERMAN ARTHUR DONOHO CABLE ANZEIGER PRIVATE GARIBALDI SAVANNAH CLERBROOK CL E R M ONTFIELDSTONEGOLD DUST LEELADOGW OO DBENNINGTONIN G L ESIDE PEBBLECREEK WARSON HILLS FORCEE MARYVIEW WARSON PRESIDENTRAMP CHAMINADE STFER R A N D W O O D S OLD FRONTENCPRIVATE S LINDBERGH BLVDS LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10348 15TASK NO: TASK NAME: $920,000BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 194 CONWAY - CLERBROOK STORM CHANNEL Construction Task 5565 - Creve CoeurFrontenac OMCI Fund CREEK EROSION. CONSTRUCT 1,500 FEET OF BANK STABILIZATION, CONSISTING OFROCK BLOCK TOE PROTECTION, GABION WALL REPAIR, ROCK BLOCKWALL, AND SEVERAL BIOSTABILIZATION TECHNIQUES. LINDBERGH-CLERBROOK STORM CHANNEL (10306) WILL BECOMBINED WITH THIS PROJECT FOR CONSTRUCTION. MAY INCLUDECAPITAL AND NON-CAPITAL SERVICES. CREEKHAVEN IRONSTONE FEDERAL CANDLEWICKDUNMORRBORCHERDING CAMBERLYTREARCY WEDGETONPOINT OAKWE NDOVERBERKLEYMANOR CLAYCHESTE R §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11215 15TASK NO: TASK NAME: $45,000BUDGET: FUND: Des PeresMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 195 CREEKHAVEN DRIVE STORM IMPROVEMENTS Construction Task 5566 - Deer CreekOMCI Fund YARD FLOO DING. CONSTRUCT 285 FEET OF 24-INCH DIAMETER STORM SEWER ANDAPPURTENANCES. CREEKHAVEN #12371 (11245) AND CREEKHAVEN #12105 (11215) WERECOMBINED IN THIS PROJECT. WOODLAWND IC K S O N GLENWAYKENMOREL E W IS T O N STURGISEA STW OOD MEADOWRIDGEW A R R E N T O N BROOKHAV E NASCOTMARIEDALE T A R R Y M O R E W A R W I C K VICTORIA M E A D O W R I D G EDICKSONMANCHESTER R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11214 15TASK NO: TASK NAME: $77,000BUDGET: FUND: KirkwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 196 DICKSON STREET #1033 STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund FREQUENT STRUCTURAL FLOODING. CONSTRUCT 145 FEET OF 36-INCH STORM SEWER. §¨¦70 §¨¦270 §¨¦170§¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12402 13TASK NO: TASK NAME: $450,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 197 EASEMENT ACQUISITION FOR COLDWATERCREEK OMCI PROJECTS Property RightsAcquisition 5564 - Coldwater CreekOMCI Fund CONSTRUCTION OF COLDWATER OMCI CAPITAL PROJECTSREQUIRES ACQUISITION OF PROPERTY RIGHTS TO ENABLECONSTRUCTION OF IMPROVEMENTS. EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE COLDWATER OMCI. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦270 §¨¦40 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12404 13TASK NO: TASK NAME: $650,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 198 EASEMENT ACQUISITION FOR DEER CREEK OMCIPROJECTS Property RightsAcquisition 5566 - Deer CreekOMCI Fund CONSTRUCTION OF DEER OMCI CAPITAL PROJECTS REQUIRESACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OFIMPROVEMENTS. EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE DEER OMCI. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦270 §¨¦55 §¨¦44 §¨¦255 §¨¦55 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12403 13TASK NO: TASK NAME: $950,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 199 EASEMENT ACQUISITION FOR GRAVOIS CREEKOMCI PROJECTS Property RightsAcquisition 5571 - Gravois CreekOMCI Fund CONSTRUCTION OF GRAVOIS OMCI CAPITAL PROJECTS REQUIRESACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OFIMPROVEMENTS. EASEMENT ACQUISITION APPROPRIATION FOR CAPITAL PROJECTSTO BE FUNDED BY THE GRAVOIS OMCI. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11120 15TASK NO: TASK NAME: $250,000BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 200 EMERGENCY REPAIR FUNDS (STORMWATER) Construction Task 4123 - StormwaterEmergency Fund AG ING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST AC T IMMEDIATELY. PRO VIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. WARSONCONWAYPICARDYFORCEE FIELDSTONEWI N WOOD PEBBLECREEK BENNINGTONI N GLESIDE STONEHENGEPICARDY§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10360 15TASK NO: TASK NAME: $148,000BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 201 FORCEE LANE STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund DRIVEWAY AND GARAGE FLOODING, AND IMPROPER CONNECTIONOF STORM LINE TO SANITARY SYSTEM. CONSTRUCT 565 FEET OF 12-INCH TO 18-INCH STORM SEWER, AND65 FEET O F 6-INCH PVC, TO REMOVE STORM DRAINS FROM THESANITARY SYSTEM. BOPPDIVOTPORTLANDCLEEKTINDALL DERBYCARBERRYBARNBRIDGE PUTTERH EATHERDAN E FORDYCE MANOR CROYDONFRO N T E N ACFORESTTODFORTH COUNTRYS IDE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11220 15TASK NO: TASK NAME: $110,000BUDGET: FUND: FrontenacMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 202 FRONTENAC FOREST STORMWATERIMPROVEMENTS Construction Task 5566 - Deer CreekOMCI Fund INFREQ UENT BASEMENT AND YARD FLOODING. CONSTRUCT 295 FEET OF 36-INCH TO 54-INCH STORM SEWER. MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM SEWERIMPROVEMENTS, PART OF WHICH WAS INCLUDED IN MSD'S CIRP. PORTLAND FRONTENACFORESTDIVOTCOUNTRYSIDECLEEKPUTTER BRIDLE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11219 15TASK NO: TASK NAME: $220,000BUDGET: FUND: FrontenacMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 203 FRONTENAC FOREST TO PORTLAND DRIVESTORM SEWER Construction Task 5566 - Deer CreekOMCI Fund FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW. CONSTRUCT 590 FEET OF 15-INCH TO 27-INCH STORM SEWER. §¨¦44 §¨¦44 MURDOCHLACLEDESTATIONSPRINGDALE A R LIN G TO N ST MICHAELSU TH ER LA N D B U R LIN G TO N N O R TH ER N S A N TA FEDEVONSHIRESUFFOLKPAGE LENOXLOG CABINLANSDOWNE CHAMBERLAIN WI L H U S E NBURLINGTONNORTHERNSANT A FE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11076 15TASK NO: TASK NAME: $230,000BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 204 LACLEDE STATION - CHAMBERLAIN STORMSEWER Construction Task 5566 - Deer CreekOMCI Fund FREQUENT ROAD AND GARAGE FLOODING. CONSTRUCT 410 FEET OF 24-INCH STORM SEWER. GEYERPAMELA BAMBURY SIMMONSEVANSLAVEN DEL SCOTTSDALE FOLGERHUN T LEIGHTRAILS LERNER BELVA MID MEADOWS CHARLENE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10005 15TASK NO: TASK NAME: $230,000BUDGET: FUND: KirkwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 205 LAVEN - DEL LN. #1322 - 1323 STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD AND STREET FLOODING, AND CREEK EROSION. CONSTRUCT 260 FEET OF 36-INCH TO 42-INCH STORM SEWER. PRIVA T E LITZSINGER PARK ROCK HILLL IT Z S INGERWOODSPRIVATE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10731 15TASK NO: TASK NAME: $30,000BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 206 PARK LANE #9568 - #9572 STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD FLOO DING. CONSTRUCT 110 FEET OF 15-INCH STORM SEWER. §¨¦70 §¨¦270 §¨¦170 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11841 17TASK NO: TASK NAME: $400,000BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 207 STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - COLDWATER CREEK OMCI Work Order Repair Costs(Capital) 5564 - Coldwater CreekOMCI Fund AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT. CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE COLDWATER CREEK OMCI AREA. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦70 §¨¦270 §¨¦170 §¨¦70 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12458 17TASK NO: TASK NAME: $350,000BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 208 STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT MALINE CREEK OMCI Work Order Repair Costs(Capital) 5576 - Maline CreekOMCI Fund AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT. CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE MALINE CREEK OMCI AREA. §¨¦44 §¨¦44 WEBER HEEGE ROCKHILLPARDEEEDGAR MACKENZIEGRANT LACLEDE STATIONVALCOURGLENDALE CHESHIRETULIP LILACI VYALICETONOLDWATSON NEW HAMPSHIRESELMAOAK TREE BAKER ELMVAUK VITAGOREHOLLYROSEWELLSSU N R A Y T U R FP RIV A T E BURLINGTONNORTHERNSANTAFEALTHEAFLORENCE REAVISBELTONCOLLEENIMSEL I N U M BONNIE ZINZER SOUTHSIDE BRENDALAVANT LANVALEEDENCLARAINNISFAIL HEATHERRAMBLERCENTRALROCKFORESTBULL RUN FERNALDD O B B I N RAVENSRIDG EFIELDSTON BE R W ICKGENERAL GRANTNAV A RREGENERAL S H ERIDAN CHESTNUT BUSCH HURSTGREEN CARMEL BIXBY LETA PALMETTONORMALMARVALEA M B E R G A T E KIRKY P I L GR I MBRIARVIEW VILLATONK E N O R A TOBEYH E R I T A G EPARD E E HU RSTGREEN GRANTGRANT ELMPRIVATE ROSE BRENDAP RIVATE W A T S O N R D G R A V O IS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12456 17TASK NO: TASK NAME: $100,000BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Seminary BranchWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 209 STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT SEMINARY BRANCH OMCI Work Order Repair Costs(Capital) 5593 - Sem Br Of RiverDes Peres OMCI Fund AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT. CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE SEMINARY BRANCH OMCI AREA. GEYERCHIPPER TREGARON CO U N T R Y E S T A T ES F RONTENAC WOODS G E O R G IA N A CRES PRIVATE LITZSI NGER §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11023 15TASK NO: TASK NAME: $110,000BUDGET: FUND: FrontenacMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 210 TREGARON PL. TO COUNTRY ESTATES STORMIMPROVEMENTS (FRONTENAC 4-3A) Construction Task 5566 - Deer CreekOMCI Fund YARD FLOO DING. CONSTRUCT 115 FEET OF 12-INCH TO 33-INCH STORM SEWER, 3 RAINGARDENS, AND 100 FEET OF BIOSWALE. MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM IMPROVEMENTS, PARTOF WHICH WAS INCLUDED IN MSD'S CIRP. SPOEDEVILLA COUBLAY OAK PARKOAK GATENOTRE DAMECHAMINADE BROOKTRAIL GLENABBEY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2015 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11237 15TASK NO: TASK NAME: $65,000BUDGET: FUND: FrontenacMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 211 VILLA COUBLAY DR. #11 AND 15 STORMIMPROVEMENTS (FRONTENAC 7-7) Construction Task 5566 - Deer CreekOMCI Fund INFREQ UENT STRUCTURAL FLOODING, AND YARD FLOODING. CONSTRUCT 155 FEET OF 12-INCH STORM SEWER, AND ONEBIORETENTION CELL. MSD W ILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF STORM SEWERIMPROVEMENTS, PART OF WHICH WAS INCLUDED IN MSD'S CIRP. 14 April 2014 STORMWATER CONTINUED PROJECTS - FY15 PROJECT NUMBER PROJECT NAME REASON PROJECT CONTINUED COST ESTIMATE 11216 FIRETHORN DRIVE #1901 STORM IMPROVEMENTS PROJECT CONTINUED DUE TO SCOPE CHANGE. ANTICIPATE BOARD INTRODUCTION IN OCTOBER, 2014. $180,000 TOTAL: $180,000 14 April 2014 STORMWATER CONSTRUCTION CONTINGENCY PROJECTS - FY16 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11223 GLEN RD #35 BANK STABILIZATION $53,000 212 11003 HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1) $315,000 213 11354 LAVINIA DR. #10709 STORM SEWER $48,000 214 10370 LIGGETT TO BIG BEND CHANNEL REPAIRS $75,000 215 10221 MADISON #708 STORM SEWER $48,000 216 11032 MANCHESTER & MISSOURI AVENUE PHASE II STORM IMPROVEMENTS $200,000 217 11203 MARYHILL DRIVE STORM SEWER $67,000 218 11262 ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS. $37,000 219 12452 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - WATKINS CREEK OMCI $360,000 220 TOTAL:$1,203,000 G L E N R D N ELM AVEE LOCKWOOD AVE ORCHARD AVESPENCER RD N MAPLE AVEU N IO N P A C IFIC R RROSEMONT AVE S MAPLE AVEPLANT AVEOAKWOOD AVE WPACIFICAVESYLVESTERAVEROSEMONT AVE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11223 15TASK NO: TASK NAME: $53,000BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 212 GLEN RD #35 BANK STABILIZATION Construction Task 5566 - Deer CreekOMCI Fund MODERATE RISK STRUCTURAL EROSION. CONSTRUCT 75 FEET OF ROCK BLOCK WALL AND HEAVY STONEREVETMENT. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. N GEYER RDHERMITAGE HILL LNPORTLA N DDRHERMITAGE HILL RD HERMITAGE HIL L P L CHIPPER RD FOXRUNLNO U T E R L A D U E D R GEYER DOWNS LN §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11003 15TASK NO: TASK NAME: $315,000BUDGET: FUND: FrontenacMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 213 HERMITAGE HILLS BANK STABILIZATION(FRONTENAC 3-1) Construction Task 5566 - Deer CreekOMCI Fund MODERATE RISK STRUCTURAL EROSION. CONSTRUCT 95 FEET OF MODULAR BLOCK WALL, 85 FEET OF ROCKBLOCK WALL , AND 80 FEET OF MODULAR BLOCK WALL WITHCOMPOSITE REVETMENT. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. MUSI CK RDFARADAY DR GAIL CT WILLINDA DRCATHY DR FABICK DRPICKWICK DRM A LLORYDRLAVINIADRLAVIER CT CORNING DR FITE CIR FLORINDA DR GEANLEE DRCRECELIUS DRTHA YER DR LAVINIA DR§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11354 15TASK NO: TASK NAME: $48,000BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 214 LAVINIA DR. #10709 STORM SEWER Construction Task 5571 - Gravois CreekOMCI Fund YARD FLOO DING. CONSTRUCT 210 FEET OF 12-INCH TO 15-INCH STORM SEWER. §¨¦44 §¨¦44 LIG G E T T A V E DIV E R S E Y D RS SAPPINGTON RDS CO T T A VE W F R IS C O A V E SCHULTZ RDB U R L IN G T O N N O R T H E R N S A N T A F E R R LOPINA BLVDR E D B U D T R E E L N MABEL AVE GILLESPIE BLVDBALTIMORE PL W IL D W O O D CIR C L E D R BANBURY CTTOWER PLAYRESDR§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10370 15TASK NO: TASK NAME: $75,000BUDGET: FUND: OaklandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Non-recurring Page 215 LIGGETT TO BIG BEND CHANNEL REPAIRS Construction Task 5571 - Gravois CreekOMCI Fund STREAMBANK EROSION. CONSTRUCT 40 FEET OF LIGHT STONE REVETMENT, 40 FEET OFLIGHT STONE REVETMENT WITH BIOSTABILIZATION, 65 FEET OFLIVE-STAKED ROCK TOE WITH BIOSTABILIZATION, AND 15 FEET OFBIOSTABILIZATION. PRO JECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. E ARGONNE DR E MONROE AVE E MADISON AVE S HOLMES AVESCOTT AVE E JEFFERSON AVE PARK AVEDICKSON STN HOLMES AVEMITCHELL PLS BRENT AVEALICE AVEMIRIAM AVEWESTWOOD PLNSAPPINGTONRDNBR E N T A V E GRAY OAKS ST S BRENT AVE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10221 15TASK NO: TASK NAME: $48,000BUDGET: FUND: OaklandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 216 MADISON #708 STORM SEWER Construction Task 5571 - Gravois CreekOMCI Fund REAR YARD FLOODING AND EROSION, BASEMENT WINDOWS HAVEFLOODED DURING HEAVY RAIN EVENTS. CONSTRUCT 220 FEET OF 12-INCH STORM SEWER. RUTH DRMEIER RDMANCHESTER RDMISSOURI AVEWOODGATE DRCHERRY ST KIRKSHIRE DRHAVERSHAM PLPINEGATE DRLOCKETT RD ROMINE DRCEDARGATEDRWOODGATE DR§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11032 15TASK NO: TASK NAME: $200,000BUDGET: FUND: KirkwoodMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Two Mile CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 217 MANCHESTER & MISSOURI AVENUE PHASE IISTORM IMPROVEMENTS Construction Task 5566 - Deer CreekOMCI Fund FIRST FLOO R, GARAGE, AND YARD FLOODING AT RESIDENCES ALONGWOODGATE DRIVE AND MANCHESTER ROAD. CONSTRUCT 620 FEET OF 12-INCH TO 24-INCH STORM SEWER. LADUE RD MARYHILL DR N LINDBERGH BLVDCOUNTRY FAIR LNSALEM ESTATES DRLADUE CTS LINDBERGH BLVDN LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11203 15TASK NO: TASK NAME: $67,000BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 218 MARYHILL DRIVE STORM SEWER Construction Task 5566 - Deer CreekOMCI Fund YARD ERO SION. CONSTRUCT 225 FEET OF 15-INCH STORM SEWER . ROBYN RDS LIN D B E R G H B L V D EDDIE N PARK RD R O O SEVELTDR S U N SETTERWESTWICK PL L IN C O L N D R TRENTMORE PL LOWILLLNMATTHEWSLN R O N N I E L N FOX CTCOURT Y A RD LA KEDR S LIN D B E R G H B L V D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11262 15TASK NO: TASK NAME: $37,000BUDGET: FUND: Sunset HillsMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Capital Page 219 ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS. Construction Task 5571 - Gravois CreekOMCI Fund YARD FLOO DING. CONSTRUCT 150 FEET OF 15-INCH STORM SEWER . §¨¦270 §¨¦270 REDMAN RD DUNN RD LUSHER RDBENHAMRDDUKE DRPRIGGE RD LORDDRCRITERIONAVETOELLELNLEWIS N CLARK BLVDLOOKAWAYDRCOALBANKRD PRIVATE RD BARON DRS H E P L EYDRLAVIDAAVECOBURGLANDSDR SCENIC DRJERRIES LNOLDJAMESTOWNRDCOVE LN LILACAVEVAL L E Y D R K A P P E L D R FRYLNVORHOFDRSPANISHPONDRDMADRID AVEASHBROOKDRLAPA D E RALNC A M E R O N R D JUNE DRMIGNONDRFONTAIN ELNNORM ALNUTHE LNCASTLE DRCOLLETT DR G LE N G A R R Y R D PETITE DR PRIVATE RDJERRIE SLNPRIVA T E R DPRIVATE RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2016 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 12452 17TASK NO: TASK NAME: $360,000BUDGET: FUND: UnincorporatedMUNICIPALITY: BissellMAJOR SERVICE AREA: Watkins CreekWATERSHED: StormwaterPROJECT TYPE: EXPENSE TYPE:Asset Management Page 220 STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - WATKINS CREEK OMCI Work Order RepairCosts (Capital) 5587 - Watkins CreekOMCI Fund AG ING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT. CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE WATKINS CREEK OMCI AREA. 14 April 2014 STORMWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 4123 - STORMWATER EMERGENCY FUND 11120 Construction Task EMERGENCY REPAIR FUNDS (STORMWATER) Various $250,000 FUND TOTAL: $250,000 5564 - COLDWATER CREEK OMCI FUND 12402 Property Rights Acquisition EASEMENT ACQUISITION FOR COLDWATER CREEK OMCI PROJECTS Various $450,000 11841 Work Order Repair Costs (Capital) STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER CREEK OMCI Various $400,000 FUND TOTAL: $850,000 5565 - CREVE COEUR FRONTENAC OMCI FUND 10348 Construction Task CONWAY - CLERBROOK STORM CHANNEL Ladue $920,000 FUND TOTAL: $920,000 5566 - DEER CREEK OMCI FUND 11228 Construction Task ALGONQUIN WOOD DR. #12 STORM SEWER Glendale $124,000 11170 Construction Task BREEZERIDGE AND FAWNRIDGE STORM SEWER Des Peres $160,000 11206 Construction Task BROOKHURST DRIVE STORM SEWER Warson Woods $450,000 11211 Construction Task BROOKTRAIL CT. STORM SEWER Creve Coeur $100,000 11191 Construction Task CHALET COURT STREAMBANK STABILIZATION Creve Coeur $215,000 11243 Construction Task CHELSEA AND IDLEWILD STORM SEWER Glendale $89,000 11209 Construction Task CLERMONT LANE BANK STABILIZATION Ladue $65,000 11215 Construction Task CREEKHAVEN DRIVE STORM IMPROVEMENTS Des Peres $45,000 11214 Construction Task DICKSON STREET #1033 STORM SEWER Kirkwood $77,000 12404 Property Rights Acquisition EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS Various $650,000 11216 Construction Task FIRETHORN DRIVE #1901 STORM IMPROVEMENTS Des Peres $180,000 14 April 2014 STORMWATER PROJECTS - FY15 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 10360 Construction Task FORCEE LANE STORM SEWER Ladue $148,000 11220 Construction Task FRONTENAC FOREST STORMWATER IMPROVEMENTS Frontenac $110,000 11219 Construction Task FRONTENAC FOREST TO PORTLAND DRIVE STORM SEWER Frontenac $220,000 11076 Construction Task LACLEDE STATION - CHAMBERLAIN STORM SEWER Webster Groves $230,000 10005 Construction Task LAVEN - DEL LN. #1322 - 1323 STORM SEWER Kirkwood $230,000 10731 Construction Task PARK LANE #9568 - #9572 STORM SEWER Ladue $30,000 11023 Construction Task TREGARON PL. TO COUNTRY ESTATES STORM IMPROVEMENTS (FRONTENAC 4-3A) Frontenac $110,000 11237 Construction Task VILLA COUBLAY DR. #11 AND 15 STORM IMPROVEMENTS (FRONTENAC 7-7) Frontenac $65,000 FUND TOTAL: $3,298,000 5571 - GRAVOIS CREEK OMCI FUND 12403 Property Rights Acquisition EASEMENT ACQUISITION FOR GRAVOIS CREEK OMCI PROJECTS Various $950,000 FUND TOTAL: $950,000 5576 - MALINE CREEK OMCI FUND 12458 Work Order Repair Costs (Capital) STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK OMCI Various $350,000 FUND TOTAL: $350,000 5593 - SEM BR OF RIVER DES PERES OMCI FUND 12456 Work Order Repair Costs (Capital) STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – SEMINARY BRANCH OMCI Various $100,000 FUND TOTAL: $100,000 GRAND TOTAL:$6,718,000 14 April 2014 STORMWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 4123 - STORMWATER EMERGENCY FUND 11120 Construction Task EMERGENCY REPAIR FUNDS (STORMWATER) Various $250,000 FUND TOTAL: $250,000 5564 - COLDWATER CREEK OMCI FUND 11182 Construction Task BERKRIDGE DRIVE AND FROST AVENUE PHASE III STORM SEWER Hazelwood $640,000 11186 Construction Task CALVERT AVE. #3342 STORM SEWER Breckenridge Hills $42,000 12462 Design Services COLDWATER CREEK OMCI STORMWATER DESIGN (PH II) (CONTRACT A) Various $400,000 10332 Construction Task DESMET INDUSTRIAL CT. LOT 8 BANK STABILIZATION Florissant $350,000 11036 Construction Task EVERMAN-TENNYSON STORM SEWER Overland $370,000 11159 Construction Task FOX RUN DRIVE #1360 STORM SEWER Florissant $28,000 11187 Construction Task GORDON AVE. TO ROY AVE. STORM IMPROVEMENTS St. John $1,300,000 11020 Construction Task HERBERT AVE. 4200-4400 BLOCK STREAMBANK STABILIZATION Woodson Terrace $320,000 11189 Construction Task MARK TWAIN #635 STORM SEWER Florissant $50,000 11158 Construction Task MERRI LANE #5 STORM SEWER Florissant $100,000 11093 Construction Task NORINE CT. #23 STORM SEWER Florissant $86,000 11085 Construction Task ROGERS LANE #925 STORM SEWER Florissant $55,000 11119 Construction Task ROGERS LANE #975 STORM SEWER Florissant $35,000 11078 Construction Task ST. EDMUND #10728 - 10732 STORM SEWER St. Ann $80,000 11039 Construction Task STANSBERRY AVE #9262 STORM SEWER Woodson Terrace $250,000 FUND TOTAL: $4,106,000 5565 - CREVE COEUR FRONTENAC OMCI FUND 10350 Construction Task STONINGTON - GEORGIAN ACRES STORM SEWER Frontenac $370,000 FUND TOTAL: $370,000 14 April 2014 STORMWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 5566 - DEER CREEK OMCI FUND 11213 Construction Task AUSTIN PLACE AND LOCKWOOD AVE. STORM SEWER Glendale $847,000 11231 Construction Task CONWAY & CHAPEL OAKS STORM IMPROVEMENTS (FRONTENAC 7-5) Frontenac $176,000 12461 Design Services DEER CREEK OMCI STORMWATER DESIGN (CONTRACT A) Various $450,000 11065 Construction Task DEER CREEK WATERSHED INITIATIVE Various $207,500 11223 Construction Task GLEN RD #35 BANK STABILIZATION Webster Groves $53,000 11003 Construction Task HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1) Frontenac $315,000 10289 Construction Task LINDEN #1064 STORM SEWER Richmond Heights $836,000 11032 Construction Task MANCHESTER & MISSOURI AVENUE PHASE II STORM IMPROVEMENTS Kirkwood $200,000 11203 Construction Task MARYHILL DRIVE STORM SEWER Ladue $67,000 11840 Construction Task MEADOWRIDGE AND EASTWOOD STORM AND SANITARY RELIEF Kirkwood $1,110,000 11196 Construction Task PICARDY LANE SUBDIVISION BANK STABILIZATION Ladue $297,000 11222 Construction Task TEALWOOD DRIVE AND BEAVER DRIVE BANK STABILIZATION Creve Coeur $357,000 11208 Construction Task WARSON RD. S. #215 BANK STABILIZATION Ladue $95,000 FUND TOTAL: $5,010,500 5571 - GRAVOIS CREEK OMCI FUND 11367 Construction Task ANCHOR DR. AND DANA AVE. STORM SEWER Unincorporated $138,000 11375 Construction Task FORMAN ROAD TO CANDACE DRIVE STORM SEWER Unincorporated $800,000 10172 Construction Task GRAND & HARRISON STORM IMPROVEMENTS Kirkwood $1,460,000 11045 Construction Task GRANT #609 BANK STABILIZATION Webster Groves $152,000 11354 Construction Task LAVINIA DR. #10709 STORM SEWER Unincorporated $48,000 10370 Construction Task LIGGETT TO BIG BEND CHANNEL REPAIRS Oakland $75,000 10221 Construction Task MADISON #708 STORM SEWER Oakland $48,000 11363 Construction Task MC ADOO CT #4325 STORM SEWER St. Louis County $155,000 14 April 2014 STORMWATER PROJECTS - FY16 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11370 Construction Task RAINRIDGE CT. #4125 BANK STABILIZATION & BUYOUTS (GCMB-370) Unincorporated $1,350,000 11360 Construction Task REDLAND DR. - TAHQUITZ DR. STORM SEWER Unincorporated $48,000 11262 Construction Task ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS. Sunset Hills $37,000 FUND TOTAL: $4,311,000 5576 - MALINE CREEK OMCI FUND 12465 Design Services MALINE CREEK AND SEMINARY BRANCH OMCI STREAMBANK STABILIZATION DESIGN (CONTRACT A) Various $450,000 12464 Design Services MALINE CREEK OMCI STORMWATER DESIGN (CONTRACT A) Various $400,000 12466 Design Services MALINE CREEK OMCI STREAMBANK STABILIZATION DESIGN (CONTRACT A) Various $400,000 12458 Work Order Repair Costs (Capital) STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK OMCI Various $300,000 FUND TOTAL: $1,550,000 5583 - SUGAR CREEK OMCI FUND 12463 Design Services SEMINARY BRANCH AND SUGAR CREEK OMCI STORMWATER DESIGN (CONTRACT A) Various $450,000 FUND TOTAL: $450,000 5587 - WATKINS CREEK OMCI FUND 12452 Work Order Repair Costs (Capital) STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - WATKINS CREEK OMCI Unincorporated $360,000 FUND TOTAL: $360,000 GRAND TOTAL:$16,407,500 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317) WASTEWATER BELLEFONTAINE NEIGHBORS 102 12080 ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) WASTEWATER BELLEFONTAINE NEIGHBORS 1 11788 CAULKS CREEK PUMP STATION B FORCE MAIN WASTEWATER CHESTERFIELD 105 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) WASTEWATER CLAYTON 70 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) WASTEWATER CLAYTON 147 10390 RIDGEMOOR DRIVE I/I REDUCTION & STORM IMPROVEMENTS (SKME-574) WASTEWATER CLAYTON 148 11680 ROXBURY I/I REDUCTION WASTEWATER CLAYTON 150 11689 BLACK CREEK I/I REDUCTION WASTEWATER CLAYTON 104 11964 CONCORDIA I/I REDUCTION (NE QUADRANT CLAYTON RD AND BIG BEND BLVD) WASTEWATER CLAYTON 13 11989 PARDEE - BLACKTHORN - HOLLY - ARBAN I/I REDUCTION (WATSON ROAD AND S HILL ROCK HILL ROAD) WASTEWATER CRESTWOOD 64 11191 CHALET COURT STREAMBANK STABILIZATION STORMWATER CREVE COEUR 191 11211 BROOKTRAIL CT. STORM SEWER STORMWATER CREVE COEUR 190 11713 LADUE ESTATES SANITARY RELIEF WASTEWATER CREVE COEUR 44 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11170 BREEZERIDGE AND FAWNRIDGE STORM SEWER STORMWATER DES PERES 188 11215 CREEKHAVEN DRIVE STORM IMPROVEMENTS STORMWATER DES PERES 195 10026 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A WASTEWATER FERGUSON 156 10440 FORESTWOOD LATERAL SANITARY RELIEF (SKME-321) WASTEWATER FERGUSON 120 11715 LANG ROYCE LATERAL SANITARY RELIEF (SKME-320) WASTEWATER FERGUSON 135 12222 SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) WASTEWATER FERGUSON 76 12473 SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) WASTEWATER FERGUSON 77 11666 ST MARIE SANITARY RELIEF I/I REDUCTION WASTEWATER FLORISSANT 151 11723 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N LINDBERGH BLVD AND LINDSAY LN) WASTEWATER FLORISSANT 11 11023 TREGARON PL. TO COUNTRY ESTATES STORM IMPROVEMENTS (FRONTENAC 4-3A) STORMWATER FRONTENAC 210 11219 FRONTENAC FOREST TO PORTLAND DRIVE STORM SEWER STORMWATER FRONTENAC 203 11220 FRONTENAC FOREST STORMWATER IMPROVEMENTS STORMWATER FRONTENAC 202 11237 VILLA COUBLAY DR. #11 AND 15 STORM IMPROVEMENTS (FRONTENAC 7-7) STORMWATER FRONTENAC 211 11228 ALGONQUIN WOOD DR. #12 STORM SEWER STORMWATER GLENDALE 187 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11243 CHELSEA AND IDLEWILD STORM SEWER STORMWATER GLENDALE 192 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C WASTEWATER HAZELWOOD 12 11726 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE FACILITY TANK C WASTEWATER HAZELWOOD 108 10005 LAVEN - DEL LN. #1322 - 1323 STORM SEWER STORMWATER KIRKWOOD 205 11214 DICKSON STREET #1033 STORM SEWER STORMWATER KIRKWOOD 196 10348 CONWAY - CLERBROOK STORM CHANNEL STORMWATER LADUE 194 10360 FORCEE LANE STORM SEWER STORMWATER LADUE 201 10731 PARK LANE #9568 - #9572 STORM SEWER STORMWATER LADUE 206 11209 CLERMONT LANE BANK STABILIZATION STORMWATER LADUE 193 10324 CONSTRUCTION MANAGEMENT SERVICES - MISSOURI WWTP SECONDARY EXPANSION & DISINFECTION WASTEWATER MARYLAND HEIGHTS 16 11659 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292) WASTEWATER NORMANDY 140 11079 FAIRLIGHT AND BRIGHTLING SEWER SEPARATION WASTEWATER OLIVETTE 118 10330 HARTLAND TO GOTHLAND SEWER SEPARATION WASTEWATER OVERLAND 127 11108 WISMER - HUNTINGTON SANITARY RELIEF (SKME -592) WASTEWATER OVERLAND 159 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11697 PAGE TO TRENTON SANITARY RELIEF WASTEWATER OVERLAND 144 11694 NORTH BADEN CREEK I/I REDUCTION (BP- 612)(CANTERBURY DR) WASTEWATER PASADENA HILLS 141 11965 WEST WISE I/I REDUCTION (NW QUADRANT I-64 AND BIG BEND BLVD) WASTEWATER RICHMOND HEIGHTS 91 10851 CSO - MCKNIGHT RD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161) WASTEWATER ROCK HILL 20 11069 ROCK HILL SANITARY RELIEF (SKME -618)WASTEWATER ROCK HILL 149 11710 ISABELLE I/I REDUCTION WASTEWATER ST. ANN 134 11768 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (DETENTION BASIN) WASTEWATER ST. LOUIS CITY 125 11816 LMRDP TUNNEL DEWATERING PUMP STATION WASTEWATER ST. LOUIS CITY 59 11818 LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) WASTEWATER ST. LOUIS CITY 46 11819 LMRDP CSO STORAGE TUNNEL NORTH DRIVE (RDP PARK TO RDP TUBES) WASTEWATER ST. LOUIS CITY 55 11958 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS WASTEWATER ST. LOUIS CITY 58 11959 LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS WASTEWATER ST. LOUIS CITY 56 12460 OAKLAND COMBINED SEWER DETENTION AND STORAGE (CLAYTON AVE AND OAKLAND AVE) WASTEWATER ST. LOUIS CITY 142 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 10766 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) UNALLOCATED ST. LOUIS CITY AND COUNTY 74 11708 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT A WASTEWATER ST. LOUIS CITY AND COUNTY 129 11743 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2015) WASTEWATER ST. LOUIS CITY AND COUNTY 116 11920 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT WASTEWATER ST. LOUIS CITY AND COUNTY 93 11920 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT WASTEWATER ST. LOUIS CITY AND COUNTY 94 11734 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - LAND ACQUISITION WASTEWATER ST. LOUIS COUNTY 114 11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS ROAD AND SAPPINGTON ROAD) WASTEWATER SUNSET HILLS 72 10557 COLDWATER SANITARY TRUNK SEWER SECTION A REHABILITATION (SKME -240) WASTEWATER UNINCORPORAT ED 109 10642 HARMONY-ACORN SEWER SEPARATION AND I/I REDUCTION WASTEWATER UNINCORPORAT ED 126 11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT ED 54 11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT ED 53 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11650 LOWER MERAMEC WATERSHED I/I REMOVAL WASTEWATER UNINCORPORAT ED 139 11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL WASTEWATER UNINCORPORAT ED 73 11695 OLDE ENGLISH I/I REMOVAL WASTEWATER UNINCORPORAT ED 143 11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) WASTEWATER UNINCORPORAT ED 42 11747 FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) WASTEWATER UNINCORPORAT ED 27 11809 COLDWATER CREEK WWTF SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS WASTEWATER UNINCORPORAT ED 107 11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT ED 47 11918 TELEGRAPH ROAD #2928 I/I REDUCTION WASTEWATER UNINCORPORAT ED 153 11919 ROLENS DRIVE AND TELEGRAPH ROAD SANITARY STORAGE WASTEWATER UNINCORPORAT ED 71 12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) WASTEWATER UNINCORPORAT ED 7 12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) WASTEWATER UNINCORPORAT ED 10 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12237 TRAMPE I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) WASTEWATER UNINCORPORAT ED 78 12427 LEMAY WWTF PLANT CONTROLS WASTEWATER UNINCORPORAT ED 138 11735 DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION WASTEWATER UNIVERSITY CITY 115 11992 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) WASTEWATER UNIVERSITY CITY 89 12062 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01) WASTEWATER UNIVERSITY CITY 83 12063 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03) WASTEWATER UNIVERSITY CITY 84 12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL WASTEWATER UNIVERSITY CITY 90 10027 UR-10 MENDELL AND WOLTER SANITARY RELIEF (SKME-595) WASTEWATER VARIOUS 157 10456 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) REHABILITATION & I/I REDUCTION WASTEWATER VARIOUS 119 10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION WASTEWATER VARIOUS 21 10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION WASTEWATER VARIOUS 112 10656 INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI WASTEWATER VARIOUS 128 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11094 PROSPECT HILL LANDFILL VERTICAL EXPANSION WASTEWATER VARIOUS 145 11107 EMERGENCY REPAIR FUNDS (WASTEWATER)WASTEWATER VARIOUS 117 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 60 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 23 11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 24 11120 EMERGENCY REPAIR FUNDS (STORMWATER)STORMWATER VARIOUS 200 11125 CRITICAL INFRASTRUCTURE ASSESSMENT WASTEWATER VARIOUS 19 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 5 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 6 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 49 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 50 11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE WASTEWATER VARIOUS 111 11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES WASTEWATER VARIOUS 17 11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES WASTEWATER VARIOUS 14 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 68 11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC- 01, WC-02, & WC-03) WASTEWATER VARIOUS 82 11681 UPPER COLDWATER SECTION D I/I REDUCTION WASTEWATER VARIOUS 155 11686 BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR) WASTEWATER VARIOUS 103 11699 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 WASTEWATER VARIOUS 65 11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I) WASTEWATER VARIOUS 66 11702 RADAR RAINFALL DATA (FY2014)WASTEWATER VARIOUS 67 11714 LADUE SUBTRUNK SANITARY RELIEF (SKME- 654) WASTEWATER VARIOUS 45 11716 LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK WASTEWATER VARIOUS 51 11730 CSO - GINGRAS CREEK AND I/I REDUCTION (BP- 059) WASTEWATER VARIOUS 110 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) WASTEWATER VARIOUS 25 11737 FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) WASTEWATER VARIOUS 26 11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL WASTEWATER VARIOUS 61 11751 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) WASTEWATER VARIOUS 28 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11753 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A WASTEWATER VARIOUS 29 11754 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B WASTEWATER VARIOUS 30 11755 GENERAL SERVICES AGREEMENT - PLANNING (FY2014) WASTEWATER VARIOUS 32 11758 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A UNALLOCATED VARIOUS 121 11759 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) WASTEWATER VARIOUS 38 11763 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A WASTEWATER VARIOUS 33 11773 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) WASTEWATER VARIOUS 133 11773 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2015) WASTEWATER VARIOUS 132 11774 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST WASTEWATER VARIOUS 63 11777 BADEN CREEK EXTENSION (BP-001) (I/I REDUCTION) WASTEWATER VARIOUS 2 11779 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A WASTEWATER VARIOUS 39 11780 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B WASTEWATER VARIOUS 40 11781 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C WASTEWATER VARIOUS 41 11810 CCTV INSPECTION OF SEWERS (2014)WASTEWATER VARIOUS 9 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11811 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) WASTEWATER VARIOUS 8 11820 LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) WASTEWATER VARIOUS 57 11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS WASTEWATER VARIOUS 15 11841 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER CREEK OMCI STORMWATER VARIOUS 207 11850 DEER CREEK PUBLIC I/I REDUCTION (2015)WASTEWATER VARIOUS 113 11851 DEER CREEK PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 22 11853 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT A WASTEWATER VARIOUS 95 11854 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT B WASTEWATER VARIOUS 96 11856 LEMAY PUBLIC I/I REDUCTION (2015)WASTEWATER VARIOUS 136 11857 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT C WASTEWATER VARIOUS 97 11866 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT B WASTEWATER VARIOUS 130 11867 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C WASTEWATER VARIOUS 131 11871 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT D WASTEWATER VARIOUS 98 11884 CEDARCREST PRIVATE I/I REDUCTION (SKME- 561) WASTEWATER VARIOUS 106 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM WASTEWATER VARIOUS 152 11909 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B WASTEWATER VARIOUS 34 11910 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C WASTEWATER VARIOUS 35 11911 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D WASTEWATER VARIOUS 36 11912 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E WASTEWATER VARIOUS 37 11916 STREAM FLOW WATER QUALITY SAMPLING (FY 2014) WASTEWATER VARIOUS 75 11924 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT E WASTEWATER VARIOUS 99 11925 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT F WASTEWATER VARIOUS 100 11926 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2015) CONTRACT G WASTEWATER VARIOUS 101 11927 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B WASTEWATER VARIOUS 137 11929 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST WASTEWATER VARIOUS 154 11934 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION WASTEWATER VARIOUS 92 11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS WASTEWATER VARIOUS 43 11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR- 10) WASTEWATER VARIOUS 81 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) WASTEWATER VARIOUS 80 11991 UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) WASTEWATER VARIOUS 79 12060 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A WASTEWATER VARIOUS 3 12061 LEMAY PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 48 12064 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C WASTEWATER VARIOUS 31 12379 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B UNALLOCATED VARIOUS 122 12380 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C UNALLOCATED VARIOUS 123 12381 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D UNALLOCATED VARIOUS 124 12402 EASEMENT ACQUISITION FOR COLDWATER CREEK OMCI PROJECTS STORMWATER VARIOUS 197 12403 EASEMENT ACQUISITION FOR GRAVOIS CREEK OMCI PROJECTS STORMWATER VARIOUS 199 12404 EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS STORMWATER VARIOUS 198 12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH WASTEWATER VARIOUS 18 12434 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT D WASTEWATER VARIOUS 4 12435 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR) WASTEWATER VARIOUS 85 14 April 2014 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY15 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12436 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS) WASTEWATER VARIOUS 86 12437 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) WASTEWATER VARIOUS 87 12438 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) WASTEWATER VARIOUS 88 12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 69 12456 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – SEMINARY BRANCH OMCI STORMWATER VARIOUS 209 12458 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT – MALINE CREEK OMCI STORMWATER VARIOUS 208 12470 LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK WASTEWATER VARIOUS 52 11206 BROOKHURST DRIVE STORM SEWER STORMWATER WARSON WOODS 189 11076 LACLEDE STATION - CHAMBERLAIN STORM SEWER STORMWATER WEBSTER GROVES 204 11086 WEBSTER ACRES SANITARY SEWER REPLACEMENT WASTEWATER WEBSTER GROVES 158 11933 PROVIDENCE PUBLIC I/I REDUCTION WASTEWATER WEBSTER GROVES 146