HomeMy Public PortalAboutExhibit MSD 61 - CIRP Project Listing FY2013-FY2016CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.1 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11103 CLAYTON CENTRAL STORM IMPROVEMENTS
CONSTRUCT 650 FEET OF 12-INCH STORM
SEWER AND INLETS. 240,000 5563 FY13 Stormwater Construction Task
10371 ASHBY ROAD 3000 BLOCK STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 630
FEET OF 18-INCH RCP STORM SEWER, 20 FEET
OF 8-INCH DIP, AND APPURTENANCES. 330,000 5564 FY13 Stormwater Construction Task
10357 WABASH AVE #8555 STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 350
FEET OF 15-INCH TO 24-INCH DIAMETER
REINFORCED CONCRETE PIPE STORM SEWER
AND APPURTENANCES. 115,000 5564 FY13 Stormwater Construction Task
10229 WINDOM #8721 SEWER REHABILITATION
DESIGN AND CONSTRUCT 1,015 FEET OF 12-INCH
TO 21-INCH DIAMETER STORM SEWER AND
APPURTENANCES. 240,000 5564 FY13 Stormwater Construction Task
10624
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
PERFORM AS NEEDED STORMWATER PLANNING
SERVICES. SERVICES WILL BE FOR FY 2013 AND
2014. 100,000 5564 FY13 Stormwater General Services - Geotechnical
11841
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
COLDWATER CREEK OMCI AREA. 250,000 5564 FY13 Stormwater Work Order Repair Costs (Non-Capital)
11241
CAROLE LANE STORM IMPROVEMENTS
(FRONTENAC 6-1)
CONSTRUCT 395 FEET OF 12-INCH TO 15-INCH
STORM SEWER, ONE BIORETENTION CELL, AND
APPURTENANCES. 85,000 5566 FY13 Stormwater Construction Task
10624
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
PERFORM AS NEEDED STORMWATER PLANNING
SERVICES. SERVICES WILL BE FOR FY 2013 AND
2014. 85,000 5566 FY13 Stormwater Construction Task
11217
HIGH MEADOW ROAD STORM SEWER
(FRONTENAC 2-2)
CONSTRUCT 175 FEET OF 12-INCH STORM
SEWER, BERM AND BIORETENTION CELL. 82,000 5566 FY13 Stormwater Construction Task
10736 PLANT AVE. & E. SWON STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 110
FEET OF 15-INCH STORM SEWER AND
APPURTENANCES. 45,000 5566 FY13 Stormwater Construction Task
11191 CHALET COURT STREAMBANK STABILIZATION
ENCLOSE 440 FEET OF CREEK WITH 42-INCH
DIAMETER PIPE. 66,000 5566 FY13 Stormwater Design Services
10327
DEER CREEK WATERSHED STORM CHANNEL
IMPROVEMENTS (DESIGN)
PREPARE PLANS AND SPECIFICATIONS FOR THE
CONSTRUCTION OF THREE PROJECTS IN THE
DEER CREEK WATERSHED: NORMTON DRIVE
BANK STABILIZATION; WENNEKER - TREEBROOK
LANE STORM CHANNEL; AND FAWNVALLEY
STORM CHANNEL IMPROVEMENTS. 13,000 5566 FY13 Stormwater Design Services
11129 OMCI STORMWATER DESIGN (CONTRACT A)
DESIGN IMPROVEMENTS IN THE DEER CREEK
WATERSHED. 581,000 5566 FY13 Stormwater Professional Services
11147 OMCI STORMWATER DESIGN (CONTRACT B)
DESIGN IMPROVEMENTS IN THE DEER CREEK
WATERSHED. 594,000 5566 FY13 Stormwater Professional Services
11148 OMCI STORMWATER DESIGN (CONTRACT C)
DESIGN IMPROVEMENTS IN THE DEER CREEK
WATERSHED. 546,000 5566 FY13 Stormwater Professional Services
11149 OMCI STORMWATER DESIGN (CONTRACT D)
DESIGN IMPROVEMENTS IN THE DEER CREEK
WATERSHED. 449,000 5566 FY13 Stormwater Professional Services
11842
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE DEER
CREEK OMCI AREA. 300,000 5566 FY13 Stormwater Work Order Repair Costs (Non-Capital)
10331 HARRISON - ST MARIE STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 590
FEET OF 15-INCH TO 42-INCH RCP STORM
SEWERS AND APPURTENANCES. 355,000 5569 FY13 Stormwater Construction Task
10588
EAST WATSON AND KATHY CT. STORM
IMPROVEMENT
WITH COOPERATION FROM THE HOMEOWNERS,
FLOODPROOF #10209, #10215, AND #10221 EAST
WATSON ROAD. 65,000 5571 FY13 Stormwater Construction Task
Exhibit MSD 61
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.2 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11130 PARKWOODS - DICKSON STORM SEWER
DESIGN & CONSTRUCT 375 FEET OF 15-INCH TO
21-INCH STORM SEWER. 98,000 5571 FY13 Stormwater Construction Task
10624
GENERAL SERVICES AGREEMENT -
STORMWATER PLANNING (FY2011)
PERFORM AS NEEDED STORMWATER PLANNING
SERVICES. SERVICES WILL BE FOR FY 2013 AND
2014. 200,000 5571 FY13 Stormwater General Services- Planning
11843
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
GRAVOIS CREEK OMCI AREA. 250,000 5571 FY13 Stormwater Work Order Repair Costs (Non-Capital)
10295 PAGE AVE. #9441-9445 STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 440
FEET OF 15-INCH TO 21-INCH STORM SEWER AND
APPURTENANCES. 115,000 5584 FY13 Stormwater Construction Task
10747 ROMAINE AVE. #9449 STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 390
FEET OF 12-INCH TO 21-INCH DIAMETER
REINFORCED CONCRETE PIPE STORM SEWER
AND APPURTENANCES. 97,000 5584 FY13 Stormwater Construction Task
11903
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT A)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 367,000 5564 FY14 Stormwater Professional Services
11904
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT B)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 111,000 5564 FY14 Stormwater Professional Services
11905
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT C)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 367,000 5564 FY14 Stormwater Professional Services
11906
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT D)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 150,000 5564 FY14 Stormwater Professional Services
11907
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT E)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 300,000 5564 FY14 Stormwater Professional Services
11908
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
DESIGN IMPROVEMENTS IN THE COLDWATER
CREEK WATERSHED. 115,000 5564 FY14 Stormwater Professional Services
11938
COLDWATER CREEK OMCI STORMWATER
DESIGN (CONTRACT G)
DESIGN STREAMBANK STABILIZATION
IMPROVEMENTS IN THE COLDWATER CREEK
WATERSHED. 210,000 5564 FY14 Stormwater Professional Services
11841
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
COLDWATER CREEK OMCI AREA. 750,000 5564 FY14 Stormwater Work Order Repair Costs (Capital)
11832 CONWAY RD 11700 STORM SEWER
CONSTRUCT 220 FEET OF 21-INCH STORM
SEWER AND TRENCH DRAIN. 57,600 5566 FY14 Stormwater Construction Task
10378 SUNSWEPT DRIVE #8 BANK STABILIZATION CONSTRUCT 90 FEET OF ROCK BLOCK WALL. 110,000 5566 FY14 Stormwater Construction Task
11842
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DEER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE DEER
CREEK OMCI AREA. 725,000 5566 FY14 Stormwater Work Order Repair Costs (Capital)
11899
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 203,000 5571 FY14 Stormwater Professional Services
11900
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT B)
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 136,000 5571 FY14 Stormwater Professional Services
11901
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT C)
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 245,000 5571 FY14 Stormwater Professional Services
11902
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT D)
DESIGN IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 139,000 5571 FY14 Stormwater Professional Services
11936
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT E)
DESIGN STREAMBANK STABILIZATION
IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 249,000 5571 FY14 Stormwater Professional Services
11937
GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
DESIGN STREAMBANK STABILIZATION
IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED. 250,000 5571 FY14 Stormwater Professional Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.3 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11843
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - GRAVOIS CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
GRAVOIS CREEK OMCI AREA. 700,000 5571 FY14 Stormwater Work Order Repair Costs (Capital)
10288 LAKE VILLAGE STORM IMPROVEMENTS
DESIGN AND CONSTRUCT APPROXIMATELY 910
FEET OF ARTICULATED CONCRETE BLOCK LINED
SWALE. 40,000 5587 FY14 Stormwater Construction, Phase II
12402
EASEMENT ACQUISITION FOR COLDWATER
CREEK OMCI PROJECTS
EASEMENT ACQUISITION APPROPRIATION FOR
CAPITAL PROJECTS TO BE FUNDED BY THE
COLDWATER OMCI. 450,000 5564 FY15 Stormwater Property Rights Acquisition
11841
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
COLDWATER CREEK OMCI AREA. 400,000 5564 FY15 Stormwater Work Order Repair Costs (Capital)
10348 CONWAY - CLERBROOK STORM CHANNEL
CONSTRUCT 1,500 FEET OF BANK STABILIZATION,
CONSISTING OF ROCK BLOCK TOE PROTECTION,
GABION WALL REPAIR, ROCK BLOCK WALL, AND
SEVERAL BIOSTABILIZATION TECHNIQUES. 1,040,000 5565 FY15 Stormwater Construction Task
11228 ALGONQUIN WOOD DR. #12 STORM SEWER
CONSTRUCT 430 FEET OF 12-INCH TO 30-INCH
STORM SEWER. 108,000 5566 FY15 Stormwater Construction Task
11170 BREEZERIDGE AND FAWNRIDGE STORM SEWER
CONSTRUCT 185 FEET OF 15-INCH STORM
SEWER. 145,000 5566 FY15 Stormwater Construction Task
11206 BROOKHURST DRIVE STORM SEWER
CONSTRUCT 1,850 FEET OF 12-INCH TO 24-INCH
STORM SEWER, AND 60 FEET OF 3 TO 4 FOOT
HIGH MODULAR BLOCK WALL. 450,000 5566 FY15 Stormwater Construction Task
11211 BROOKTRAIL CT. STORM SEWER
CONSTRUCT 370 FEET OF 18-INCH TO 24-INCH
STORM SEWER. 100,000 5566 FY15 Stormwater Construction Task
11191 CHALET COURT STREAMBANK STABILIZATION
ENCLOSE 440 FEET OF CREEK WITH 42-INCH
DIAMETER PIPE. 215,000 5566 FY15 Stormwater Construction Task
11243 CHELSEA AND IDLEWILD STORM SEWER
CONSTRUCT 360 FEET OF 15-INCH TO 18-INCH
STORM SEWER. 89,000 5566 FY15 Stormwater Construction Task
11215 CREEKHAVEN DRIVE STORM IMPROVEMENTS
CONSTRUCT 285 FEET OF 24-INCH DIAMETER
STORM SEWER AND APPURTENANCES. 50,000 5566 FY15 Stormwater Construction Task
11214 DICKSON STREET #1033 STORM SEWER
CONSTRUCT 145 FEET OF 36-INCH STORM
SEWER. 104,000 5566 FY15 Stormwater Construction Task
11220
FRONTENAC FOREST STORMWATER
IMPROVEMENTS
CONSTRUCT 295 FEET OF 36-INCH TO 54-INCH
STORM SEWER. 110,000 5566 FY15 Stormwater Construction Task
11219
FRONTENAC FOREST TO PORTLAND DRIVE
STORM SEWER
CONSTRUCT 590 FEET OF 15-INCH TO 27-INCH
STORM SEWER. 220,000 5566 FY15 Stormwater Construction Task
10005 LAVEN - DEL LN. #1322-1323 STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 271
FEET OF 36-INCH TO 42-INCH STORM SEWER,
AND APPURTENANCES. 190,000 5566 FY15 Stormwater Construction Task
11023
TREGARON PL. TO COUNTRY ESTATES STORM
IMPROVEMENTS (FRONTENAC 4-3A)
CONSTRUCT 115 FEET OF 12-INCH TO 33-INCH
STORM SEWER, 3 RAIN GARDENS, AND 100 FEET
OF BIOSWALE. 110,000 5566 FY15 Stormwater Construction Task
11237
VILLA COUBLAY DR. #11 AND 15 STORM
IMPROVEMENTS (FRONTENAC 7-7)
CONSTRUCT 155 FEET OF 12-INCH STORM
SEWER, AND ONE BIORETENTION CELL. 65,000 5566 FY15 Stormwater Construction Task
12404
EASEMENT ACQUISITION FOR DEER CREEK OMCI
PROJECTS
EASEMENT ACQUISITION APPROPRIATION FOR
CAPITAL PROJECTS TO BE FUNDED BY THE DEER
OMCI. 650,000 5566 FY15 Stormwater Property Rights Acquisition
12403
EASEMENT ACQUISITION FOR GRAVOIS CREEK
OMCI PROJECTS
EASEMENT ACQUISITION APPROPRIATION FOR
CAPITAL PROJECTS TO BE FUNDED BY THE
GRAVOIS OMCI. 950,000 5571 FY15 Stormwater Property Rights Acquisition
12458
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - MALINE CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE MALINE
CREEK OMCI AREA. 350,000 5576 FY15 Stormwater Work Order Repair Costs (Capital)
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.4 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12452
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - WATKINS CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
WATKINS CREEK OMCI AREA. 360,000 5587 FY15 Stormwater Work Order Repair Costs (Capital)
12456
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT – SEMINARY BRANCH OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
SEMINARY BRANCH OMCI AREA. 100,000 5593 FY15 Stormwater Work Order Repair Costs (Capital)
11120 EMERGENCY REPAIR FUNDS (STORMWATER)
PROVIDE A PLACEHOLDER APPROPRIATION FOR
THE EMERGENCY FUND, TO FACILITATE
EMERGENCY RESPONSE AS NEEDED.250,000 4123 FY16 Stormwater Construction Task
11186 CALVERT AVE. #3342 STORM SEWER CONSTRUCT 99 FEET OF 18-INCH STORM SEWER.42,000 5564 FY16 Stormwater Construction Task
10332
DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
CONSTRUCT 84 FEET OF 12-INCH TO 24-INCH
STORM SEWER, 150 SQUARE YARDS OF BANK
PROTECTION, AND 298 SQUARE YARDS OF ROCK
TOE PROTECTION.545,000 5564 FY16 Stormwater Construction Task
11020
HERBERT AVE. 4200-4400 BLOCK STREAMBANK
STABILIZATION
CONSTRUCT 441 FEET OF BIO-SWALE, 572 CUBIC
YARDS OF GRADE CONTROL CHANNEL, AND 94
FEET OF 24-INCH DIAMETER STORM SEWER.250,000 5564 FY16 Stormwater Construction Task
11127 ROANOKE AND LOEKES STORM SEWER
CONSTRUCT 787 FEET OF 15-INCH TO 24-INCH
STORM SEWER.250,000 5564 FY16 Stormwater Construction Task
11841
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
COLDWATER CREEK OMCI AREA.400,000 5564 FY16 Stormwater Work Order Repair Costs (Capital)
11213
AUSTIN PLACE AND LOCKWOOD AVE. STORM
SEWER
CONSTRUCT 2,510 FEET OF 12-INCH TO 36-INCH
STORM SEWER .847,000 5566 FY16 Stormwater Construction Task
11231
CONWAY & CHAPEL OAKS STORM
IMPROVEMENTS (FRONTENAC 7-5)
CONSTRUCT 410 FEET OF 12-INCH TO 18-INCH
STORM SEWER, TWO EARTHEN BERMS AND TWO
BIORETENTION CELLS.176,000 5566 FY16 Stormwater Construction Task
11065 DEER CREEK WATERSHED INITIATIVE
COST SHARING OF GREEN INFRASTRUCTURE
CONSTRUCTION.207,500 5566 FY16 Stormwater Construction Task
11216 FIRETHORN DRIVE #1901 STORM IMPROVEMENTS
CONSTRUCT 411 FEET OF 12-INCH STORM
SEWER, AND 245 FEET OF EARTH BERM.180,000 5566 FY16 Stormwater Construction Task
10360 FORCEE LANE STORM SEWER
CONSTRUCT 400 FEET OF 15-INCH TO 18-INCH
STORM SEWER.148,000 5566 FY16 Stormwater Construction Task
11234
GLEN ABBEY DR. STORM IMPROVEMENTS
(FRONTENAC 7-3)
CONSTRUCT 755 FEET OF 12-INCH TO 21-INCH
STORM SEWER, AND FOUR BIORETENTION
CELLS.325,000 5566 FY16 Stormwater Construction Task
11223 GLEN RD #35 BANK STABILIZATION
CONSTRUCT 75 FEET OF ROCK BLOCK WALL AND
HEAVY STONE REVETMENT.53,000 5566 FY16 Stormwater Construction Task
11003
HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
CONSTRUCT 80 FEET OF 8-INCH TO 12-INCH
STORM SEWER, AND 685 FEET OF NATURAL
CHANNEL STABILIZATION, INCLUDING ROCK
LINED CHANNEL AND BIOSTABILIZED SLOPES.315,000 5566 FY16 Stormwater Construction Task
11076
LACLEDE STATION - CHAMBERLAIN STORM
SEWER
CONSTRUCT 420 FEET OF 12-INCH TO 24-INCH
STORM SEWER.230,000 5566 FY16 Stormwater Construction Task
11203 MARYHILL DRIVE STORM SEWER
CONSTRUCT 225 FEET OF 15-INCH STORM
SEWER.67,000 5566 FY16 Stormwater Construction Task
11005
OAK VALLEY EAST STORM SEWER (FRONTENAC 1-
2)
CONSTRUCT 700 FEET OF 12-INCH TO 18-INCH
STORM SEWER AND RAINGARDENS.185,000 5566 FY16 Stormwater Construction Task
10731 PARK LANE #9568 - #9572 STORM SEWER
CONSTRUCT 110 FEET OF 15-INCH STORM
SEWER.30,000 5566 FY16 Stormwater Construction Task
11000 WEST OAK DRIVE STORM IMPROVEMENTS
CONSTRUCT 180 FEET OF 12-INCH TO 15-INCH
STORM SEWER, AND 80 FEET OF CURBING.35,000 5566 FY16 Stormwater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.5 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12461
DEER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
DESIGN IMPROVEMENTS IN THE DEER CREEK
WATERSHED.350,000 5566 FY16 Stormwater Design Services
12610
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - FOUNTAIN CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
FOUNTAIN CREEK OMCI AREA.77,000 5569 FY16 Stormwater Work Order Repair Costs (Capital)
11367 ANCHOR DR. AND DANA AVE. STORM SEWER
CONSTRUCT 460 FEET OF 12-INCH TO 27-INCH
STORM SEWER.138,000 5571 FY16 Stormwater Construction Task
11045 GRANT #609 BANK STABILIZATION
CONSTRUCT 210 FEET OF FOUR FEET HIGH ROCK
BLOCK TOE WITH BIOSTABILIZATION ABOVE IT.152,000 5571 FY16 Stormwater Construction Task
11354 LAVINIA DR. #10709 STORM SEWER
CONSTRUCT 210 FEET OF 12-INCH TO 15-INCH
STORM SEWER.48,000 5571 FY16 Stormwater Construction Task
10370 LIGGETT TO BIG BEND CHANNEL REPAIRS
CONSTRUCT 40 FEET OF LIGHT STONE
REVETMENT, 40 FEET OF LIGHT STONE
REVETMENT WITH BIOSTABILIZATION, 65 FEET OF
LIVE-STAKED ROCK TOE WITH BIOSTABILIZATION,
AND 15 FEET OF BIOSTABILIZATION.75,000 5571 FY16 Stormwater Construction Task
10221 MADISON #708 STORM SEWER
CONSTRUCT 220 FEET OF 12-INCH STORM
SEWER.48,000 5571 FY16 Stormwater Construction Task
11105 MANDA LANE #8901 STORM SEWER CONSTRUCT 95 FEET OF 18-INCH STORM SEWER.55,000 5571 FY16 Stormwater Construction Task
11363 MC ADOO CT #4325 STORM SEWER
CONSTRUCT 245 FEET OF 18-INCH TO 36-INCH
STORM SEWER.155,000 5571 FY16 Stormwater Construction Task
11262 ROBYN RD. 9100 BLOCK STORM IMPROVEMENTS.
CONSTRUCT 150 FEET OF 15-INCH STORM
SEWER.37,000 5571 FY16 Stormwater Construction Task
11370
RAINRIDGE CT. #4125 BANK STABILIZATION &
BUYOUTS (GCMB-370)
CONSTRUCT 205 FEET OF 15 FOOT HIGH
REINFORCED CONCRETE RETAINING WALL, 905
CUBIC YARDS OF HEAVY STONE REVETMENT, 325
FEET OF 8-INCH DIAMETER SANITARY SEWER,
AND THE BUYOUT OF THREE RESIDENTIAL
PROPERTIES.605,000 5571 FY16 Stormwater Land Purchase
10020
HUDSON RD. #1401 - #1405 BANK STABILIZATION
(MCDW-120)
CONSTRUCT 280 FEET OF MODULAR BLOCK
WALL, 365 FEET OF BIOSTABILIZED BANK, AND 55
FEET OF HEAVY STONE REVETMENT.250,000 5576 FY16 Stormwater Design Services
12458
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - MALINE CREEK OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE MALINE
CREEK OMCI AREA.400,000 5576 FY16 Stormwater Work Order Repair Costs (Capital)
12609
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - NORTH AFFTON OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE NORTH
AFFTON OMCI AREA.30,000 5579 FY16 Stormwater Work Order Repair Costs (Capital)
10347
ROSEWOOD LANE & WOODARD DR. STORM
SEWER
CONSTRUCT 1,835 FEET OF 12-INCH TO 33-INCH
DIAMETER STORM SEWER.210,000 5583 FY16 Stormwater Design Services
10780
UNIVERSITY CITY BRANCH OF RIVER DES PERES -
CORPS OF ENGINEERS STUDY
CORPS OF ENGINEERS TO UPDATE PAST
FEASIBILITY STUDY FOR PROJECT THAT WOULD
REDUCE FLOOD DAMAGE TO EXISTING
STRUCTURES AND REDUCE STREAM BANK
EROSION.300,000 5584 FY16 Stormwater Pre-Design Services
12608
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - UNIVERSITY CITY OMCI
CONSTRUCT REPAIR AND REPLACEMENT OF
STORMWATER INFRASTRUCTURE IN THE
UNIVERSITY CITY OMCI AREA.205,000 5584 FY16 Stormwater Work Order Repair Costs (Capital)
10035 BIG BEND TO PAPIN STORM SEWER PHASE I
CONSTRUCT 1,915 FEET OF 12-INCH TO 36-INCH
DIAMETER STORM SEWERS AND
APPURTENANCES.190,000 5593 FY16 Stormwater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.6 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10302 COTTAGE #206 STORM IMPROVEMENTS
CONSTRUCT 600 FEET OF 4-F00T WIDE
TRAPEZOIDAL CHANNEL.120,000 5593 FY16 Stormwater Design Services
11782
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 75,000 1101 FY13 Unallocated Appraisal Services
11783
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 75,000 1101 FY13 Unallocated Appraisal Services
11784
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 45,000 1101 FY13 Unallocated Appraisal Services
11785
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 45,000 1101 FY13 Unallocated Appraisal Services
10626
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT A
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY
SERVICES. SERVICES WILL BE FOR FY 2011, 2012,
AND 2013. 50,000 1101 FY13 Unallocated General Services - Survey
10627
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT B
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY
SERVICES. SERVICES WILL BE FOR FY 2011, 2012,
AND 2013. 50,000 1101 FY13 Unallocated General Services - Survey
10628
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT C
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY
SERVICES. SERVICES WILL BE FOR FY 2011, 2012,
AND 2013. 50,000 1101 FY13 Unallocated General Services - Survey
10629
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT D
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY
SERVICES. SERVICES WILL BE FOR FY 2011, 2012,
AND 2013. 50,000 1101 FY13 Unallocated General Services - Survey
10766
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE STREAM GAUGING DATA COLLECTION
PROGRAM IN CONJUNCTION WITH WATERSHED
AND STORMWATER PLANNING AND DESIGN
EFFORTS, AND REPORTING PURSUANT TO THE
EPA/MSD CONSENT DECREE. 550,000 1101 FY13 Unallocated Vendor Services
10768
STREAM FLOW WATER QUALITY SAMPLING (FY
2011)
PERFORM SAMPLING AND ANALYSIS OF STREAM
WATER QUALITY WITH MSD'S SERVICE AREA. 427,500 1101 FY13 Unallocated Vendor Services
10623
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2011)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER &
PROCESS DESIGN. SERVICES WILL BE FOR FY
2011 TO FY 2013. 300,000 6660 FY13 Unallocated General Services - Design CIRP Funds
10630
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2011) CONTRACT E
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY
SERVICES. SERVICES WILL BE FOR FY 2011, 2012,
AND 2013. 50,000 6660 FY13 Unallocated General Services - Survey
11782
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 85,000 1101 FY14 Unallocated Appraisal Services
11783
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 85,000 1101 FY14 Unallocated Appraisal Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.7 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11784
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 55,000 1101 FY14 Unallocated Appraisal Services
11785
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (FY2013) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 55,000 1101 FY14 Unallocated Appraisal Services
10766
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE STREAM GAUGING DATA COLLECTION
PROGRAM IN CONJUNCTION WITH WATERSHED
AND STORMWATER PLANNING AND DESIGN
EFFORTS, AND REPORTING PURSUANT TO THE
EPA/MSD CONSENT DECREE. 540,000 1101 FY14 Unallocated Vendor Services
11916
STREAM FLOW WATER QUALITY SAMPLING (FY
2014)
PERFORM SAMPLING AND ANALYSIS OF STREAM
WATER QUALITY WITHIN THE MSD SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH
FY2016 BASED ON PERFORMANCE. 569,144 1101 FY14 Unallocated Vendor Services
10612
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2012)
RETAIN CONSTRUCTION MANAGEMENT FIRM.
SERVICES WILL BE FOR FY 2012 TO 2014. 100,000 6660 FY14 Unallocated
Construction Management Services During
Construction
11758
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE. 65,000 1101 FY15 Unallocated Appraisal Services
12379
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE. 65,000 1101 FY15 Unallocated Appraisal Services
12380
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE. 65,000 1101 FY15 Unallocated Appraisal Services
12381
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE. 65,000 1101 FY15 Unallocated Appraisal Services
10766
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE STREAM GAUGING DATA COLLECTION
PROGRAM IN CONJUNCTION WITH WATERSHED
AND STORMWATER PLANNING AND DESIGN
EFFORTS, AND REPORTING PURSUANT TO THE
EPA/MSD CONSENT DECREE. 550,000 1101 FY15 Unallocated Vendor Services
11916
STREAM FLOW WATER QUALITY SAMPLING (FY
2014)
PERFORM SAMPLING AND ANALYSIS OF STREAM
WATER QUALITY WITHIN THE MSD SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH
FY2016 BASED ON PERFORMANCE. 748,975 1101 FY15 Unallocated Vendor Services
11758
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE.70,000 1101 FY16 Unallocated Appraisal Services
12379
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE.70,000 1101 FY16 Unallocated Appraisal Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.8 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12380
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE.70,000 1101 FY16 Unallocated Appraisal Services
12381
GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2017 BASED ON
PERFORMANCE.70,000 1101 FY16 Unallocated Appraisal Services
10766
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE STREAM GAUGING DATA COLLECTION
PROGRAM IN CONJUNCTION WITH WATERSHED
AND STORMWATER PLANNING AND DESIGN
EFFORTS, AND REPORTING PURSUANT TO THE
EPA/MSD CONSENT DECREE.560,000 1101 FY16 Unallocated Vendor Services
11916
STREAM FLOW WATER QUALITY SAMPLING (FY
2014)
PERFORM SAMPLING AND ANALYSIS OF STREAM
WATER QUALITY WITHIN THE MSD SERVICE
AREA. SERVICES MAY BE RENEWED THROUGH
FY2016 BASED ON PERFORMANCE.625,000 1101 FY16 Unallocated Vendor Services
10613
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 1101 FY13 Wastewater General Services - Geotechnical
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS. 600,000 1101 FY13 Wastewater Professional Services
10232
COMBINED SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2008)
PERFORM SYSTEM-WIDE INVESTIGATIONS TO
IDENTIFY INFLOW AND INFILTRATION SOURCES.
REDUCTION TO BE ACCOMPLISHED THROUGH
VARIOUS CONSTRUCTION OR REHABILITATION
PROJECTS. 3,200,000 1101 FY13 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS. 600,000 1101 FY13 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS. 600,000 1101 FY13 Wastewater Professional Services
11699
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
PUBLIC ENGAGEMENT PROGRAM FOR
OUTREACH REGARDING REMOVAL OF PRIVATE
STORMWATER SOURCES, THE CONSENT
DECREE, & OTHER WET WEATHER RELATED
COMMUNICATIONS. 500,000 1101 FY13 Wastewater Professional Services
10231
SEPARATE SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2008)
PERFORM SYSTEM-WIDE INVESTIGATIONS TO
IDENTIFY INFLOW AND INFILTRATION SOURCES.
REDUCTION TO BE ACCOMPLISHED THROUGH
VARIOUS FUTURE CONSTRUCTION AND
REHABILITATION PROJECTS. 1,200,000 1101 FY13 Wastewater Professional Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.9 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10230 WATERSHED FACILITY PLANNING PHASE II
UTILIZE PROFESSIONAL ENGINEERING SERVICES
TO AUGMENT, ASSIST, AND FACILITATE VARIOUS
PLANNING TASKS AND ACTIVITIES, INCLUDING
ADMINISTRATION AND COORDINATION BETWEEN
THE DISTRICT, INFLOW/INFILTRATION SERVICES,
AND SPECIALTY VENDORS. 500,000 1101 FY13 Wastewater Professional Services
10376
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - NORTH
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY
SOURCES OF INFLOW AND INFILTRATION AND/OR
PHYSICAL DEFECTS. 1,500,000 1101 FY13 Wastewater Vendor Services
10377
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS - SOUTH
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY
SOURCES OF INFLOW AND INFILTRATION AND/OR
PHYSICAL DEFECTS. 1,500,000 1101 FY13 Wastewater Vendor Services
10743 RADAR RAINFALL DATA (FY2011)
INTERGRATION OF EXISTING RAIN GAUGE
NETWORK WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING AND
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. 110,000 1101 FY13 Wastewater Vendor Services
11771
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
AS THE REPAIR OR REPLACEMENT PROBLEMS
ARE IDENTIFIED THROUGHOUT THE DISTRICT,
CONSTRUCTION CONTRACTS WILL BE PROMPTLY
ISSUED. 800,000 1101 FY13 Wastewater Work Order Repair Costs (Non-Capital)
10146
RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
CONSTRUCTION OF 13,200 FEET OF 8-INCH TO 48-
INCH SANITARY RELIEF SEWERS AND
APPURTENANCES. 5,100,000 5591 FY13 Wastewater Construction Task
10393
BLANCHA DR. TO OLIVE BLVD. SEWER
SEPARATION
DESIGN AND CONSTRUCT APPROXIMATELY 240
FEET OF 18-INCH TO 24-INCH STORM SEWER
FROM NEW MANHOLE ON EXISTING 18-INCH LINE
TO EXISTING STORM SEWER ALONG OLIVE BLVD. 146,000 6660 FY13 Wastewater Construction Task
11792
BROOKTON WAY TO MERAMEC BOTTOM ROAD
SANITARY RELIEF PHASE II
CONSTRUCT 5,600 FEET OF 8-INCH TO 30-INCH
SANITARY SEWERS, AND ELIMINATE ONE
CONSTRUCTED SSO (BP-220.) 2,650,000 6660 FY13 Wastewater Construction Task
10382
CELLA - ROLLING ROCK - GLEN CREEK I/I
REDUCTION (SKME -658, 659, & 657)
PERFORM PRIVATE I/I REDUCTION BASED ON I/I
AND CCTV DATA FOR AREA TRIBUTARY TO THE
PROJECT SEWERS IN ORDER TO MINIMIZE THE
FLOW IN THE SANITARY SEWERS. 550,000 6660 FY13 Wastewater Construction Task
10518
COLDWATER TREATMENT PLANT
IMPROVEMENTS (SLUDGE PUMP STATION)
REPLACE THE GRAVITY DRAIN SYSTEM WITH A
PUMP STATION THAT WILL TURN THE EXISTING
GRAVITY LINE INTO A FORCE MAIN. 325,000 6660 FY13 Wastewater Construction Task
11831 CREVE COEUR CREEK PUBLIC I/I REDUCTION
REHABILITATION OF APPROXIMATELY 48,000
FEET OF SEWER MAIN, 750 MANHOLES, AND
APPURTENANCES. 2,800,000 6660 FY13 Wastewater Construction Task
10428
CREVE COEUR CREEK SANITARY TRUNK SEWER
RELIEF PHASE III (SKME-021)
CONSTRUCTION OF THE THIRD PHASE OF A
MULTI-PHASE PROJECTOF APPROXIMATELY 1070
FEET OF 30-INCH TO 36-INCH DIAMETER
SANITARY TRUNK SEWER AND APPURTENANCES. 1,500,000 6660 FY13 Wastewater Construction Task
10568
CREVE COEUR CREEK WATERSHED SANITARY
SEWER REHABILITATION
REHABILITATE 10 LATERALS, DISCONNECT 2
ROOF DRAINS, AND DISCONNECT 41 AREA
DRAINS. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-039. 190,000 6660 FY13 Wastewater Construction Task
11829
DEER CREEK/MALINE CREEK PUBLIC I/I
REDUCTION
SEWER LINING AND REHABILITATION TO REDUCE
PUBLIC I/I. 3,350,000 6660 FY13 Wastewater Construction Task
11786 ESSEX PLACE COMBINED SEWER RELIEF BUYOUT OF 14 PROPERTIES ON ESSEX PLACE. 2,000,000 6660 FY13 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.10 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11830 FEE FEE CREEK PUBLIC I/I REDUCTION
SEWER LINING AND REHABILITATION TO REDUCE
PUBLIC I/I. 5,200,000 6660 FY13 Wastewater Construction Task
10597
FEE FEE TRUNK SEWER (SKME-002)
REHABILITATION AND I/I REDUCTION REMOVAL OF PRIVATE I/I IN THE FEE FEE AREA. 150,000 6660 FY13 Wastewater Construction Task
10480
FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY
RELIEF PHASE IV (WATER RELOCATION)
WATER LINE RELOCATION IS NECESSARY TO
ENABLE THE PROJECT TO PROCEED. 378,718 6660 FY13 Wastewater Construction Task
10479
FF-02 FEE FEE - ALAN SHEPARD I-
27javascript:_submitNav('DefaultFormName','http%3A/
/ebsapp01.stlmsd.com%3A8000/OA_HTML/OA.jsp%3
Fpage%3D/oracle/apps/pa/structure/webui/StructWpV
ersionPG%26workplanTab%3DY%26_ti%3D82018027
1%26oapc%3D40%26menu%3
CONSTRUCT APPROXIMATELY 3,494 FEET OF 8-
INCH TO 36-INCH DIAMETER SEWERS FROM
LONGMONT ROAD NORTHEAST TO SMILEY ROAD.
TWO BYPASSES ARE TO BE REMOVED. 100,000 6660 FY13 Wastewater Construction Task
10610 GALAXY I/I REDUCTION
REHABILITATE 7,000 FEET OF SEWER, 100
MANHOLES, AND CONNECTIONS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-491. 800,000 6660 FY13 Wastewater Construction Task
10015 GC-11 GRAVOIS CREEK SANITARY RELIEF
CONSTRUCT 640 FEET OF 12-INCH DIAMETER
STORM SEWERS , 141 FEET OF GRASS-LINED
CHANNEL, AND DISCONNECT DOWNSPOUTS AND
AREA DRAINS TO SEPARATE STORM FLOW FROM
SANITARY SEWER. 350,000 6660 FY13 Wastewater Construction Task
10458
GLENDALE SECTION D SANITARY RELIEF PHASE
III (SKME-624) I/I REDUCTION
CONSTRUCTION OF PHASE III OF SEWER
IMPROVEMENTS, TO INCLUDE REHABILITATION
OF APPROXIMATELY 20 PRIVATE LATERALS,
DISCONNECTION OF APPROXIMATELY 510 ROOF
DRAINS, AND DISCONNNECTION OF
APPROXIMATELY 120 AREA DRAINS. 2,300,000 6660 FY13 Wastewater Construction Task
10646
HIGH SCHOOL DR. & MADGE AVE. SEWER
SEPARATION
CONSTRUCT APPROXIMATELY 750 FEET OF 12-
INCH DIA. RCP AND APPURTENANCES. 240,000 6660 FY13 Wastewater Construction Task
11836
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2012) CONTRACT C
REHABILITATION OF 150,000 FEET OF SEWERS
USING CURED-IN-PLACE PIPE METHODS. 5,800,000 6660 FY13 Wastewater Construction Task
11123
LEMAY PUMP STATION NO. 1 REDUNDANT FORCE
MAIN
CONSTRUCT 3,600 FEET OF REDUNDANT 96-INCH
FORCE MAIN FROM LEMAY PUMP STATION 1 TO
LEMAY HEADWORKS. 21,600,000 6660 FY13 Wastewater Construction Task
11132 LEMAY WWTP OUTFALL 002 ELIMINATION
CONSTRUCT AN ASH SLURRY TRANSFER,
DEWATERING BIN SYSTEM AND TRUCK LOADING
FACILITY ADJACENT TO PLANT INCINERATOR
BUILDING TO ELIMINATE OUTFALL 002. 1,730,000 6660 FY13 Wastewater Construction Task
11106
LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
DESIGN AND CONSTRUCTION OF PUBLIC
EDUCATIONAL FACILITIES / FEATURES AT THE
LOWER MERAMEC TREATMENT PLANT. 440,000 6660 FY13 Wastewater Construction Task
10163 MCKELVEY PROJECT A AND B SANITARY RELIEF
CONSTRUCT 7,500 FEET OF 18-INCH TO 21-INCH
DIAMETER SANITARY RELIEF SEWERS, REHAB 31
LATERALS, DISCONNECT 8 ROOF DRAINS, 43
AREAS DRAINS, & 9 SUMP PUMPS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-068, BP-080,
AND BP-537. 3,300,000 6660 FY13 Wastewater Construction Task
10725 PAGE AVE. & LINDBERGH SANITARY SEWER
Construct 454 lineal feet of 12 inch pipe in tunnel and
286 lineal feet of 8 inch to 12 inch pipe sewers and
appertenances to replace existing 8 inch sewer. 370,000 6660 FY13 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.11 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10727 PALM SEWER REPAIR/REPLACEMENT
REPLACE THE PALM SEWER OUTFALL
STRUCTURE AND 120 FEET OF 18 FOOT WIDE BY
14 FOOT HIGH REINFORCED CONCRETE ARCH
SEWER FROM THE FLOOD PROTECTION
EMERGENCY CLOSURE STRUCTURE TO THE
OUTFALL. 2,700,000 6660 FY13 Wastewater Construction Task
10145
PORTIS #3242 COMBINED SEWER
IMPROVEMENTS
CONSTRUCT SWALE, INLETS, & 720 FEET OF 8-
INCH TO 24-INCH SEWER. 280,000 6660 FY13 Wastewater Construction Task
11877
PRIVATE INFLOW AND INFILTRATION REDUCTION
PROGRAM
CONTINUE PROGRAM TO REDUCE PRIVATE
INFLOW AND INFILTRATION SOURCES OF FLOW
INTO THE SANITARY SYSTEM. 1,000,000 6660 FY13 Wastewater Construction Task
10184 PROVIDENCE PLACE SANITARY RELIEF
CONSTRUCT 2,015 FEET OF 15-INCH DIAMETER
SANITARY SEWERS AND APPURTENANCES. 1,250,000 6660 FY13 Wastewater Construction Task
10198
RDP FOULWATER INTERCEPTOR REHABILITATION
(PHASE I)
STRUCTURAL REHABILITATION OF 240 FEET OF
108-INCH HORSESHOE BRICK FOULWATER
INTERCEPTOR, TO REDUCE I/I INTO THE SYSTEM. 2,400,000 6660 FY13 Wastewater Construction Task
10146
RIVERSIDE AND YARNELL SANITARY RELIEF
(SKME-400)
CONSTRUCTION OF 13,200 FEET OF 8-INCH TO 48-
INCH SANITARY RELIEF SEWERS AND
APPURTENANCES. 2,800,000 6660 FY13 Wastewater Construction Task
10185 STONINGTON SANITARY RELIEF (SKME-652)
CONSTRUCTION OF 3,310 FEET OF 8-INCH TO 15-
INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-166. 2,050,000 6660 FY13 Wastewater Construction Task
10121
TAYLOR - FILLMORE - HARRISON SANITARY
RELIEF
CONSTRUCT 6,115 FEET OF 8-INCH TO 30-INCH
DIAMETER SANITARY SEWER FROM NEAR
LEFFINGWELL AND SHORT AVENUE, SOUTH AND
WEST OF HARRISON. ELIMINATE CONSTRUCTED
SSO OUTFALLS BP-400, BP-385, AND BP-407. 3,400,000 6660 FY13 Wastewater Construction Task
10777
TOWER GROVE- MANCHESTER COMBINED
SEWER SYSTEM PHASE II (TOWER GROVE PLACE
STORM RELIEF SEWERS)
CONSTRUCT 2,200 FEET OF 12-INCH TO 72-INCH
DIAMETER STORM RELIEF SEWERS AND
APPURTENANCES, AND REMOVAL OF PRIVATE I&I
TO MINIMIZE THE POTENTIAL FOR BUILDING
BACKUPS AND SURFACE FLOODING DUE TO
OVERCHARGED COMBINED SEWERS. 1,870,000 6660 FY13 Wastewater Construction Task
10782
UPPER MALINE TRUNK SANITARY RELIEF PHASE
III SECTION C
CONSTRUCT 4,200 FEET OF 24-INCH TO 54-INCH
DIAMETER RELIEF SEWER FROM WEST
FLORISSANT ROAD WESTWARDLY TO FERGUSON
ROAD AT MALINE CREEK, IN UNINCORPORATED
ST. LOUIS COUNTY AND THE CITY OF FERGUSON.
ONE CONSTRUCTED SSO (BP-303) TO BE
REMOVED. 3,800,000 6660 FY13 Wastewater Construction Task
10787
VALLEY PARK/GRAND GLAIZE DIVERSION & PUMP
STATION
CONSTRUCT PUMP STATION AND ASSOCIATED
PIPING TO DIVERT FLOWS INTO THE STORAGE
LAGOONS AT THE GRAND GLAIZE TREATMENT
PLANT. 810,000 6660 FY13 Wastewater Construction Task
10681 LEMAY WWTP DISINFECTION FACILITIES
CONSTRUCT IMPROVEMENTS AT THE LEMAY
WWTP TO MEET REGULATORY DISINFECTION
MANDATES. 7,700,000 6660 FY13 Wastewater Construction, Phase I (Supplemental Appropriation)
10710
MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION AND DISINFECTION
FACILITIES
CONSTRUCTION OF SECONDARY TREATMENT
AND DISINFECTION FACILITIES AT THE MISSOURI
RIVER WWTP TO ACCOMMODATE PEAK FLOWS
AND TO MEET MDNR DISCHARGE
REQUIREMENTS. 17,380,000 6660 FY13 Wastewater Construction, Phase I (Supplemental Appropriation)
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.12 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11684
BELLEFONTAINE #2 LATERAL SANITARY RELIEF
(BP-287) (COBURG LANDS DR)
REMOVAL OF 114 PRIVATE I/I SOURCES FROM
SANITARY SEWERS. REMOVE CONSTRUCTED
SSO BP-287. 234,000 6660 FY13 Wastewater Design Services
11685
BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
CONSTRUCT 355 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 406,000 6660 FY13 Wastewater Design Services
11689 BLACK CREEK I/I REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC AND
PRIVATE SOURCES BY REHABILITATING 62,000
FEET OF PIPE SEWERS AND MANHOLES AND BY
REMOVING PRIVATE DEFECTS. 1,215,000 6660 FY13 Wastewater Design Services
11718 BRIGHTWELL I/I REDUCTION
REMOVAL OF 134 PRIVATE I/I SOURCES FROM
PUBLIC SEWERS. 320,000 6660 FY13 Wastewater Design Services
11719 BRINWOOD I/I REDUCTION
CONSTRUCT 1,000 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, 900 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 330,000 6660 FY13 Wastewater Design Services
11790
CAULKS CREEK FORCEMAIN (RIVER VALLEY RD
TO L-52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN
AND 1,000 FEET OF 36-INCH SANITARY SEWER. 940,000 6660 FY13 Wastewater Design Services
11722
CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES
BY REHABILITATING 55,000 FEET OF PIPE
SEWERS AND MANHOLES. 768,000 6660 FY13 Wastewater Design Services
11115
CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
REHABILITATE 6,000 FEET OF PIPE SEWERS AND
MANHOLES, REMOVE PRIVATE I/I SOURCES FROM
SANITARY SEWERS, AND SEPARATE 500 FEET OF
COMBINED SEWER. 445,000 6660 FY13 Wastewater Design Services
11726
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C
CONSTRUCT SANITARY SEWAGE WET WEATHER
STORAGE FACILITIES AS PART OF THE OVERALL
SANITARY RELIEF PROJECT. 2,400,000 6660 FY13 Wastewater Design Services
10557
COLDWATER SANITARY TRUNK SEWER SECTION
A REHABILITATION (SKME -240)
DISCONNECT 12-INCH SANITARY SEWER FROM
THE INACTIVE 72-INCH COLDWATER TRUNK AND
RECONNECT IT TO THE ACTIVE 90-INCH
COLDWATER TRUNK. CONSTRUCT 620 FEET OF
12-INCH SANITARY SEWER. 46,000 6660 FY13 Wastewater Design Services
11825
CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
CONSTRUCT 3,500 FEET OF 42-INCH FORCE MAIN
AND APPURTENANCES. 210,000 6660 FY13 Wastewater Design Services
11730
CSO - GINGRAS CREEK AND I/I REDUCTION (BP-
059)
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED
SEWER IN TUNNEL, AND 1,300 FEET OF 8-INCH TO
30-INCH SANITARY AND STORM SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
255 AND BP-256, AND CSO OUTFALL BP-059. 655,000 6660 FY13 Wastewater Design Services
11116 DACEY BRANCH I/I REDUCTION (BP-313)
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 92,000 6660 FY13 Wastewater Design Services
10021
DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE I
CONSTRUCT 5,000 FEET OF 6-INCH TO 78-INCH
SANITARY SEWER TO ALLEVIATE SURCHARGING.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
155, BP-170, BP-198, BP-348, BP-349, BP-545, AND
BP-591. 1,465,000 6660 FY13 Wastewater Design Services
11735
DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
CONSTRUCT 440 FEET OF 12-INCH STORM
SEWERS AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 275,000 6660 FY13 Wastewater Design Services
11736
DERHAKE I/I REDUCTION & CAPRI TO S
WATERFORD SANITARY RELIEF
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER
CONNECTIONS ON 21 PROPERTIES. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-101 AND BP-
102. 97,000 6660 FY13 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.13 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10601
FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
CONSTRUCT 9,940 FEET OF 27-INCH TO 36-INCH
SANITARY RELIEF SEWERS FROM SCHUETZ
ROAD NEAR MEADOWSIDE DRIVE NORTHWEST
TO ADIE ROAD. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-076. 767,000 6660 FY13 Wastewater Design Services
11749
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
CONSTRUCT 2,600 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 273,000 6660 FY13 Wastewater Design Services
11750
FORESTATE AND TEXAS SANITARY RELIEF (SKME-
513)
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY
SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-389. 420,000 6660 FY13 Wastewater Design Services
11122
GLENDALE SECTION D SANITARY RELIEF PHASE
IV (SKME-624) I/I REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES
BY REHABILITATING 80,000 FEET OF PIPE
SEWERS AND MANHOLES. 176,000 6660 FY13 Wastewater Design Services
10642
HARMONY-ACORN SEWER SEPARATION AND I/I
REDUCTION
CONSTRUCT 3,100 FEET OF 12-INCH TO 42-INCH
STORM SEWER, 2,700 FEET OF 8-INCH TO 12-INCH
SANITARY SEWER, AND DISCONNECT PRIVATE I/I
SOURCES. THIS PROJECT ELIMINATES CSO I-126. 773,000 6660 FY13 Wastewater Design Services
11054
KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
CONTROL SURCHARGING AND ELIMINATE
EXISTING PUMP STATION P-326 THROUGH
DISCONNECTION OF PRIVATE I/I SOURCES AND
CONSTRUCTION OF 900 FEET OF 8-INCH TO 18-
INCH SEWERS. 350,000 6660 FY13 Wastewater Design Services
11712 LACKLAND I/I REDUCTION
CONSTRUCT 600 FEET OF 8-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 447,000 6660 FY13 Wastewater Design Services
11715
LANG ROYCE LATERAL SANITARY RELIEF (SKME-
320)
CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 316,000 6660 FY13 Wastewater Design Services
11649 LEMAY WWTP SECONDARY IMPROVEMENTS
PERFORM STRESS TESTING OF SECONDARY
IMPROVEMENTS TO CONFIRM EXPANSION OF
TREATMENT CAPACITY. 1,580,000 6660 FY13 Wastewater Design Services
11652 LYNN HAVEN I/I REDUCTION
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER
CONNECTIONS ON 56 PROPERTIES. 176,000 6660 FY13 Wastewater Design Services
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS. 940,000 6660 FY13 Wastewater Design Services
11658
MALINE I/I REDUCTION & SEWER REHABILITATION
(BP-289) (COLONY DR)
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 68,000 6660 FY13 Wastewater Design Services
11659
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
CONSTRUCT 2,300 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 282,000 6660 FY13 Wastewater Design Services
11662 MCNULTY - PALLARDY I/I REDUCTION
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 816,000 6660 FY13 Wastewater Design Services
11663
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
CONSTRUCT 800 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 622,000 6660 FY13 Wastewater Design Services
11694
NORTH BADEN CREEK I/I REDUCTION (BP-612)
(CANTERBURY DR)
CONSTRUCT 450 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 125,000 6660 FY13 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.14 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11695 OLDE ENGLISH I/I REMOVAL
REMOVE EXCESSIVE INFLOW AND INFILTRATION
FROM PRIVATE SOURCES BY SEWER
REHABILITATION AND OTHER IMPROVEMENTS.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-480. 275,000 6660 FY13 Wastewater Design Services
11697 PAGE TO TRENTON SANITARY RELIEF
CONSTRUCT 36-INCH AND 48-INCH DIAMETER
LINEAR STORAGE TANKS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-456. 284,000 6660 FY13 Wastewater Design Services
11698 PICKWICK - BERNADINE - BIMINI SANITARY RELIEF
CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH
SANITARY SEWERS. REDUCE PRIVATE I/I
SOURCES. ELIMINATE CONSTRUCTED SSO
OUTFALLS BP-401, BP-522, AND BP-629. 578,000 6660 FY13 Wastewater Design Services
11094 PROSPECT HILL LANDFILL VERTICAL EXPANSION
CONSTRUCTION OF NEW LEACHATE FIELD AND
INTERMEDIATE LINER, RETROFIT OF EXISTING
LEACHATE FIELD, AND GRADING. 587,000 6660 FY13 Wastewater Design Services
11069 ROCK HILL SANITARY RELIEF (SKME-618)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 695,000 6660 FY13 Wastewater Design Services
10748
ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
CONSTRUCT 3,610 FEET OF 12-INCH TO 48-INCH
INCH STORM SEWERS AND DISCONNECT
DRIVEWAY DRAINS AND DOWNSPOUTS. 450,000 6660 FY13 Wastewater Design Services
11680 ROXBURY I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 360,000 6660 FY13 Wastewater Design Services
10754
SHERWYN SANITARY RELIEF (SKME-651) AND I/I
REDUCTION
CONSTRUCT 1,675 FEET OF 6-INCH TO 16-INCH
SANITARY SEWERS AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-199 & BP-203. 545,000 6660 FY13 Wastewater Design Services
11666 ST. MARIE SANITARY RELIEF I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 168,000 6660 FY13 Wastewater Design Services
11670 TUCKAWAY SANITARY REHABILITATION
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER
CONNECTIONS ON 8 PROPERTIES. 41,000 6660 FY13 Wastewater Design Services
10027
UR-10 MENDELL AND WOLTER SANITARY RELIEF
(SKME-595)
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH
SANITARY RELIEF SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-419 AND BP-
435, AND COMBINED SEWER OVERFLOWS L-100
AND L-101. 1,055,000 6660 FY13 Wastewater Design Services
11086
WEBSTER ACRES SANITARY SEWER
REPLACEMENT
CONSTRUCT 2,250 FEET OF 8-INCH SANITARY
RELIEF SEWER TO REPLACE DETERIORATED 6-
INCH PIPE, 900 FEET OF 12-INCH TO 18-INCH
STORM SEWERS, AND PUBLIC AND PRIVATE I/I
REDUCTION. 352,000 6660 FY13 Wastewater Design Services
11678
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
REMOVE EXCESSIVE I/I FROM PUBLIC AND
PRIVATE SOURCES THROUGH SEWER
REHABILITATION AND OTHER METHODS. 1,600,000 6660 FY13 Wastewater Design Services
11108
WISMER - HUNTINGTON SANITARY RELIEF (SKME-
592)
REPLACE 2,500 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER WITH 12-INCH TO 21-INCH
SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALLS BP-426 AND BP-626. 220,000 6660 FY13 Wastewater Design Services
11779
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE. 90,000 6660 FY13 Wastewater General Services - Design CIRP Funds
11780
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2017 BASED ON PERFORMANCE. 90,000 6660 FY13 Wastewater General Services - Design CIRP Funds
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.15 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11781
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2017 BASED ON PERFORMANCE. 90,000 6660 FY13 Wastewater General Services - Design CIRP Funds
10614
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 6660 FY13 Wastewater General Services - Geotechnical
10615
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 6660 FY13 Wastewater General Services - Geotechnical
11121
CALVARY CEMETERY STORAGE BASIN
(PROPERTY ACQUISITION)
PURCHASE OF MAINTENANCE FACILITY FOR
EVENTUAL CONSTRUCTION OF STORAGE BASIN. 500,000 6660 FY13 Wastewater Land Purchase
11138
FREDERICK STREET COMBINED SEWER
(PROPERTY ACQUISITION)ACQUISITION OF 40 PROPERTIES. 2,000,000 6660 FY13 Wastewater Land Purchase
11688
BLACK CREEK - HADDINGTON COURT STORAGE
TANK
CONSTRUCTION OF SANITARY SEWAGE WET
WEATHER STORAGE TANK AND ASSOCIATED
STRUCTURES, PUMPING STATIONS AND SEWERS
AS PART OF AN OVERALL WATERSHED PLAN FOR
SANITARY RELIEF. 625,000 6660 FY13 Wastewater Pre-Design Services
11731
DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
CONSTRUCT SANITARY TUNNEL AND
ASSOCIATED STRUCTURES, PUMPING STATIONS
AND SEWERS AS PART OF AN OVERALL
WATERSHED PLAN FOR SANITARY RELIEF. 1,250,000 6660 FY13 Wastewater Pre-Design Services
10496
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE III IV & V (SKME -521)
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH
SANITARY TRUNK SEWER. PROJECT INCLUDES
REMOVAL AND REPLACEMENT OF A UNION
PACIFIC RAILROAD TRACK SPUR. 80,000 6660 FY13 Wastewater Pre-Design Services
11711
JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS. 3,600,000 6660 FY13 Wastewater Pre-Design Services
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TUNNEL
CONSTRUCTION PROJECTS IN THE LOWER AND
MIDDLE RDP AREAS. 1,800,000 6660 FY13 Wastewater Professional Services
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES. 10,750,000 6660 FY13 Wastewater Professional Services
10230 WATERSHED FACILITY PLANNING PHASE II
UTILIZE PROFESSIONAL ENGINEERING SERVICES
TO AUGMENT, ASSIST, AND FACILITATE VARIOUS
PLANNING TASKS AND ACTIVITIES, INCLUDING
ADMINISTRATION AND COORDINATION BETWEEN
THE DISTRICT, INFLOW/INFILTRATION SERVICES,
AND SPECIALTY VENDORS. 4,500,000 6660 FY13 Wastewater Professional Services
11862
ASHLAND AVENUE - CLARA TO BELT COMBINED
SEWER RELIEF
BUYOUT OF 31 PROPERTIES IN THE 5500 BLOCK
OF ASHLAND, WHICH ARE ADJACENT TO THE
SOUTH HARLEM TRUNK SEWER, SOFT
SEPARATION AND CONSTRUCTION OF
STORMWATER DETENTION BASIN. 1,000,000 6660 FY13 Wastewater Property Rights Acquisition
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.16 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11863
ASHLAND AVENUE - SEMPLE TO UNION
COMBINED SEWER RELIEF
BUYOUT OF 55 PROPERTIES ALONG THE SOUTH
HARLEM TRUNK SEWER, SOFT SEPARATION AND
CONSTRUCTION OF STORMWATER DETENTION
BASIN. 2,000,000 6660 FY13 Wastewater Property Rights Acquisition
11876
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C -
PROPERTY ACQUISITION
ACQUIRE PROPERTY NECESSARY FOR THE
CONSTRUCTION OF COLDWATER TANK C. 3,000,000 6660 FY13 Wastewater Property Rights Acquisition
11741
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2013)
EASEMENT ACQUISITION COSTS FOR CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
COMBINED AND SANITARY RELIEF SEWER
PROJECTS. 2,000,000 6660 FY13 Wastewater Property Rights Acquisition
11140
JENNINGS STATION ROAD / NORTH BADEN BASIN
(PROPERTY ACQUISITION)
ACQUISITION OF 25 PROPERTIES FOR
CONSTRUCTION OF STORAGE BASIN. 2,000,000 6660 FY13 Wastewater Property Rights Acquisition
11828
PARTRIDGE AVENUE 8500 BLOCK COMBINED
SEWER RELIEF
BUYOUT 10 PROPERTIES IN THE 8500 BLOCK OF
PARTRIDGE, SOFT SEPARATION AND
CONSTRUCTION OF STORMWATER DETENTION
BASIN. 1,000,000 6660 FY13 Wastewater Property Rights Acquisition
11139
TILLIE BADEN NEWBY SEWER IMPROVEMENTS
(PROPERTY ACQUISITION)ACQUISITION OF 50 PROPERTIES. 2,400,000 6660 FY13 Wastewater Property Rights Acquisition
10470
FLOW METERING AND MONITORING EQUIPMENT
ACQUISITION (FY2008 CONTRACT B)
CONTINUATION OF THE COLLECTION OF DATA ON
SYSTEM FLOWS DURING VARIOUS WET
WEATHER EVENTS. THIS INFORMATION WILL BE
USED TO CALIBRATE HYDRAULIC MODELS AND
IDENTIFY IMPROVEMENT PROJECTS. 500,000 6660 FY13 Wastewater Vendor Services
11771
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2013)
AS THE REPAIR OR REPLACEMENT PROBLEMS
ARE IDENTIFIED THROUGHOUT THE DISTRICT,
CONSTRUCTION CONTRACTS WILL BE PROMPTLY
ISSUED. 3,200,000 6660 FY13 Wastewater Work Order Repair Costs (Capital)
11117
COLDWATER CREEK WWTP DIGESTER CLEAN-
OUT REMOVE AND PROPERLY DISPOSE OF SLUDGE. 1,600,000 1101 FY14 Wastewater Construction Task
11146
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
TO THE COMBINED SEWER SYSTEM. 6,825,339 1101 FY14 Wastewater Construction Task
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS
CONSTRUCT 6,300 FEET OF 8-INCH TO 24-INCH
SANITARY SEWER AND ONE PUBLIC PUMP
STATION. 800,000 1101 FY14 Wastewater Design Services
11755
GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
RETAIN FIRM FOR AS NEEDED PLANNING
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE. 400,000 1101 FY14 Wastewater General Services - Design CIRP Funds
11125 CRITICAL INFRASTRUCTURE ASSESSMENT
PERFORM SERVICES SUCH AS PROJECT
INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD
VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND POST INSPECTION REVIEW.
SERVICES MAY BE RENEWED THROUGH FY2017
BASED ON PERFORMANCE. 1,200,000 1101 FY14 Wastewater Pre-Design Services
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS. 590,000 1101 FY14 Wastewater Professional Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.17 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR PROJECTS
ASSOCIATED WITH THE LOWER MERAMEC
TUNNEL SYSTEM AND UPPER RDP TUNNEL
SYSTEM. 100,000 1101 FY14 Wastewater Professional Services
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT. 100,000 1101 FY14 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS. 562,047 1101 FY14 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS. 475,000 1101 FY14 Wastewater Professional Services
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES. 630,000 1101 FY14 Wastewater Professional Services
11699
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
PUBLIC ENGAGEMENT PROGRAM FOR
OUTREACH REGARDING REMOVAL OF PRIVATE
STORMWATER SOURCES, THE CONSENT
DECREE, & OTHER WET WEATHER RELATED
COMMUNICATIONS. 789,000 1101 FY14 Wastewater Professional Services
11811
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
PERFORM CLEANING, CCTV, PHYSICAL
INSPECTION, AND DEBRIS VOLUME ESTIMATION
OF SELECTED SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 2,000,000 1101 FY14 Wastewater Vendor Services
11810 CCTV INSPECTION OF SEWERS (2014)
PERFORM AS NEEDED CCTV INSPECTION AND
CLEANING OF SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 1,000,000 1101 FY14 Wastewater Vendor Services
11702 RADAR RAINFALL DATA (FY2014)
INTEGRATE EXISTING RAIN GAUGE NETWORK
WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING,
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 130,000 1101 FY14 Wastewater Vendor Services
11772
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
AS REPAIR OR REPLACEMENT NEEDS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONSTRUCTION CONTRACTS WILL BE BID AND
AWARDED. 1,300,000 1101 FY14 Wastewater Work Order Repair Costs (Non-Capital)
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.18 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11898
SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
AS DEFECTIVE SEPTIC TANKS AND PRIVATE
SEWER LATERALS ARE IDENTIFIED AT OWNER
OCCUPIED PROPERTIES IN 2010 LOW TO MEDIAN
INCOME CENSUS TRACTS THROUGHOUT THE
DISTRICT, CONSTRUCTION CONTRACTS WILL BE
ISSUED. 500,000 1101 FY14 Wastewater Work Order Repair Costs (Non-Capital)
11684
BELLEFONTAINE #2 LATERAL SANITARY RELIEF
(BP-287) (COBURG LANDS DR)
REMOVAL OF 114 PRIVATE I/I SOURCES FROM
SANITARY SEWERS. REMOVE CONSTRUCTED
SSO BP-287. 50,000 6660 FY14 Wastewater Construction Task
11852
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2014)
REHABILITATION OF 48,670 FEET OF THE PUBLIC
SEWER SYSTEM TO REDUCE PUBLIC I/I. 2,800,000 6660 FY14 Wastewater Construction Task
11815
BISSELL SERVICE AREA PUMP STATION POWER
SUPPLY IMPROVEMENTS
INSTALL BACKUP GENERATORS AT FLOODWALL
STRUCTURES. 2,000,000 6660 FY14 Wastewater Construction Task
10325 BISSELL WWTP DISINFECTION FACILITIES
DESIGN THE CONSTRUCTION OF PHYSICAL
IMPROVEMENTS AT THE PLANTS TO MEET
REGULATORY DISINFECTION REQUIREMENTS. 400,000 6660 FY14 Wastewater Construction Task
11718 BRIGHTWELL I/I REDUCTION
REMOVAL OF 134 PRIVATE I/I SOURCES FROM
PUBLIC SEWERS. 77,500 6660 FY14 Wastewater Construction Task
11793
CC-14 CREVE COEUR CREEK SANITARY RELIEF
(SKME-026) PHASE II
CONSTRUCT 1,200 OF 18-INCH SANITARY SEWER
FROM HAMMERMILL DR. TO BALCON ESTATES
ROAD. 217,000 6660 FY14 Wastewater Construction Task
10549
CC-17 FOUR SEASONS BRANCH SANITARY
RELIEF PHASE II
PHASE II OF PROJECT TO CONSTRUCT 3,300
FEET OF 8-INCH TO 15-INCH DIAMETER SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-033. 2,900,000 6660 FY14 Wastewater Construction Task
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
REMOVE PRIVATE I/I FROM PUBLIC SEWER BY
CORRECTING IMPROPER CONNECTIONS ON 300
PROPERTIES. 553,000 6660 FY14 Wastewater Construction Task
11722
CEDARCREST SANITARY RELIEF (SKME-561) I/I
REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES
BY REHABILITATING 55,000 FEET OF PIPE
SEWERS AND MANHOLES. 3,100,000 6660 FY14 Wastewater Construction Task
11825
CREVE COEUR CREEK (L-52) FORCE MAIN
IMPROVEMENTS PHASE II
CONSTRUCT 3,500 FEET OF 42-INCH FORCE MAIN
AND APPURTENANCES. 5,150,000 6660 FY14 Wastewater Construction Task
10429
CSO - JEFFERSON BARRACKS SUBSYSTEM NO.
72 INTERCEPTOR (I-122) SEPARATION
CONSTRUCT APPROXIMATELY 6,600 FEET OF 6-
INCH TO 27-INCH SANITARY SEWERS AND 550
FEET OF 12-INCH TO 24-INCH STORM SEWERS
AND APPURTENANCES, REHAB APPROXIMATELY
7,200 FEET OF EXISTING SEWERS, AND REDUCE
PRIVATE PROPERTY I/I. 2,500,000 6660 FY14 Wastewater Construction Task
10430
CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71
INTERCEPTOR (I-161) SEPARATION
CONSTRUCT 900 FEET OF 8-INCH DIAMETER
SANITARY SEWERS AND APPURTENANCES,
REHABILITATE 19 MANHOLES AND 10,000 FEET
OF EXISTING 6-INCH TO 8-INCH SEWERS,
INCLUDING THREE POINT REPAIRS AND REDUCE
PRIVATE PROPERTY I/I. 750,000 6660 FY14 Wastewater Construction Task
11146
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
TO THE COMBINED SEWER SYSTEM. 1,874,661 6660 FY14 Wastewater Construction Task
11116 DACEY BRANCH I/I REDUCTION (BP-313)
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 42,000 6660 FY14 Wastewater Construction Task
11849 DEER CREEK PUBLIC I/I REDUCTION (2014)
REHABILITATION OF THE SANITARY SEWER
SYSTEM TO REDUCE PUBLIC I/I. 4,150,000 6660 FY14 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.19 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11736
DERHAKE I/I REDUCTION & CAPRI TO S
WATERFORD SANITARY RELIEF
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER
CONNECTIONS ON 21 PROPERTIES. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-101 AND BP-
102. 19,200 6660 FY14 Wastewater Construction Task
10335
DUCHESNE PARQUE NO. 1 PUMP STATION
ELIMINATION (P-407)
CONSTRUCT 765 FEET OF 8-INCH SANITARY
SEWER AND APPURTENANCES, AND MAKE
ALTERATIONS AS NECESSARY TO ELIMINATE
PUMP STATION. 580,000 6660 FY14 Wastewater Construction Task
10600
FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY
RELIEF PHASE V
CONSTRUCT 2,390 FEET OF 8-INCH TO 36-INCH
DIAMETER SEWERS, AND ELIMINATION OF TWO
CONSTRUCTED SSOS (BP-083 AND BP-511) AND A
WET WEATHER PUMP STATION. 1,125,000 6660 FY14 Wastewater Construction Task
11122
GLENDALE SECTION D SANITARY RELIEF PHASE
IV (SKME-624) I/I REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES
BY REHABILITATING 80,000 FEET OF PIPE
SEWERS AND MANHOLES. 5,000,000 6660 FY14 Wastewater Construction Task
10330 HARTLAND TO GOTHLAND SEWER SEPARATION
CONSTRUCT SEPARATE STORM AND SANITARY
SEWERS, AND REMOVE I/I, TO ENABLE
ELIMINATION OF THE COMBINED SEWER SYSTEM
IN THIS AREA. 3,000,000 6660 FY14 Wastewater Construction Task
11706
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY 2013) CONTRACT A
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO RENEW THE DETERIORATED PIPES. 5,000,000 6660 FY14 Wastewater Construction Task
11845
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2013) CONTRACT B
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO RENEW DETERIORATED PIPES. 7,000,000 6660 FY14 Wastewater Construction Task
11846
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2013) CONTRACT C
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO RENEW DETERIORATED PIPES. 2,100,000 6660 FY14 Wastewater Construction Task
11707
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT A
AS REPAIR OR REHABILITATION NEEDS ARE
IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE INSTALLATION WILL
OCCUR VIA REHABILITATION CONTRACTS. 5,500,000 6660 FY14 Wastewater Construction Task
11864
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2014) CONTRACT B
AS REPAIR OR REHABILITATION NEEDS ARE
IDENTIFIED BY SEWER CLEANING AND
INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE INSTALLATION WILL
OCCUR VIA REHABILITATION CONTRACTS. 4,900,000 6660 FY14 Wastewater Construction Task
11855 LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT A
REHABILITATION OF SEWERS AND MANHOLES
USING TRENCHLESS TECHNOLOGIES. 3,550,000 6660 FY14 Wastewater Construction Task
11870 LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT B
REHABILITATION OF SEWERS AND MANHOLES
USING TRENCHLESS TECHNOLOGIES. 1,750,000 6660 FY14 Wastewater Construction Task
11132 LEMAY WWTP OUTFALL 002 ELIMINATION
CONSTRUCT AN ASH SLURRY TRANSFER,
DEWATERING BIN SYSTEM AND TRUCK LOADING
FACILITY ADJACENT TO PLANT INCINERATOR
BUILDING TO ELIMINATE OUTFALL 002. 1,600,000 6660 FY14 Wastewater Construction Task
11649 LEMAY WWTP SECONDARY IMPROVEMENTS
PERFORM STRESS TESTING OF SECONDARY
IMPROVEMENTS TO CONFIRM EXPANSION OF
TREATMENT CAPACITY. 14,000,000 6660 FY14 Wastewater Construction Task
11807
LOWER MERAMEC RIVER WWTP SCREEN SHAFT
LINING
DUE TO THE SCREEN SHAFT COATING PEELING
OFF, A REMOVAL AND POSSIBLE REPLACEMENT
OF THE COATING IS NEEDED. ANALYSIS OF
COATING OPTIONS WILL BE ACCOMPLISHED
WITH THIS PROJECT. 565,000 6660 FY14 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.20 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10696
LOWER MERAMEC RIVER WWTP SITE
RESTORATION/LANDSCAPING IMPROVEMENTS
(PHASE II)
FINAL SITE RESTORATION REQUIRED AFTER
COMPLETION OF ALL TREATMENT PLANT
CONSTRUCTION, PER ST. LOUIS COUNTY
RECORDED CONDITIONAL USE PERMIT. 44,000 6660 FY14 Wastewater Construction Task
11652 LYNN HAVEN I/I REDUCTION
REMOVE PRIVATE I/I BY ADDRESSING IMPROPER
CONNECTIONS ON 56 PROPERTIES. 50,000 6660 FY14 Wastewater Construction Task
11654
MACKENZIE PLACE PUMP STATION (P-325)
SECONDARY POWER SUPPLY
INSTALL EMERGENCY GENERATOR, AUTOMATIC
TRANSFER SWITCH, AND CONTROL PANEL ON
ELEVATED PLATFORM. 280,000 6660 FY14 Wastewater Construction Task
11931 MACKENZIE PUBLIC I/I REDUCTION
REHABILITATE 31,500 FEET OF PUBLIC SEWERS
WITH CURED-IN-PLACE PIPE. 3,100,000 6660 FY14 Wastewater Construction Task
11658
MALINE I/I REDUCTION & SEWER REHABILITATION
(BP-289) (COLONY DR)
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 52,000 6660 FY14 Wastewater Construction Task
10030
MAPLEWOOD - BLENDON COMBINED SEWER
RELIEF PHASE I
CONSTRUCT 18,000 FEET OF 12-INCH TO 96-INCH
DIAMETER SEWER IN THE AREA NEAR RIVER DES
PERES AND ARSENAL STREET NORTH TO
BELLEVUE AVE. AT BRUNO AVE. 10,950,000 6660 FY14 Wastewater Construction Task
10722
OLD MILL CREEK SEWER REHABILITATION PHASE
III - 14TH TO 2ND STREET
REHABILITATE 5,600 FEET OF THE 15 FOOT BY 20
FOOT BRICK AND STONE ARCH OLD MILL CREEK
SEWER BETWEEN 14TH AND 2ND STREETS. 2,800,000 6660 FY14 Wastewater Construction Task
10725 PAGE AVE. & LINDBERGH SANITARY SEWER
Construct 454 lineal feet of 12 inch pipe in tunnel and
286 lineal feet of 8 inch to 12 inch pipe sewers and
appertenances to replace existing 8 inch sewer. 160,000 6660 FY14 Wastewater Construction Task
11114 PUBLIC I/I REDUCTION REHABILITATION
REHABILITATION OF 40,000 FEET OF 6-30 INCH
SEWERS AND MANHOLES, AND REPAIR 1,100
SERVICE CONNECTIONS. 4,500,000 6660 FY14 Wastewater Construction Task
11885 ROCK HILL PUBLIC I/I REDUCTION (SKME-618)
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES
BY REHABILITATING 47,500 FEET OF SEWERS
AND MANHOLES. 4,100,000 6660 FY14 Wastewater Construction Task
10770 SUN VALLEY I/I REDUCTION
I/I REDUCTION IN THE AREA OF HALLS FERRY
ROAD SOUTH OF ST. CYR ROAD, NORTH TO
MALINE CREEK TRUNK SEWER SECTION B. 760,000 6660 FY14 Wastewater Construction Task
10775
TIEMANN & NONIE AVE. SANITARY SEWER
REPLACEMENT
DESIGN AND CONSTRUCT APPROXIMATELY 425
FEET OF 8-INCH SANITARY SEWER AND
APPURTENANCES. 410,000 6660 FY14 Wastewater Construction Task
10199 TOPPING SANITARY RELIEF (SKME -421)
CONSTRUCT 2,205 FEET OF 12-INCH TO 15-INCH
DIAMETER SANITARY SEWERS AND
APPURTENANCES. 1,100,000 6660 FY14 Wastewater Construction Task
10781
UPPER JESKE PARK LATERAL SANITARY RELIEF
(SKME-314)
CONSTRUCT 2,300 FEET OF 12-INCH TO 18-INCH
DIAMETER SANITARY SEWER AND REMOVAL OF
PRIVATE I/I. 930,000 6660 FY14 Wastewater Construction Task
10793
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE II
REHABILITATION OF 79,700 FEET OF 8-36 INCH
SEWER, 570 MANHOLES, AND REPAIR 1,100
SERVICE CONNECTIONS. 4,900,000 6660 FY14 Wastewater Construction Task
10029 WISE AND MABEL SEWER SEPARATION
CONSTRUCT 440 FEET OF 6X5 BOX CULVERT,
8,780 FEET OF 12-INCH TO 72-INCH STORM
SEWER, 154 FEET OF 15-INCH CIPP LINING, AND
REMOVE INFLOW SOURCES FROM 53 PRIVATE
PROPERTIES. 4,300,000 6660 FY14 Wastewater Construction Task
10237 WOODS MILL SANITARY RELIEF (SKME-020)
CONSTRUCT 5,950 FEET OF 8-INCH TO 24-INCH
DIAMETER SANITARY RELIEF SEWERS AND
APPURTENANCES. 3,950,000 6660 FY14 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.21 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10458
GLENDALE SECTION D SANITARY RELIEF PHASE
III (SKME-624) I/I REDUCTION
CONSTRUCTION OF PHASE III OF SEWER
IMPROVEMENTS, TO INCLUDE REHABILITATION
OF APPROXIMATELY 20 PRIVATE LATERALS,
DISCONNECTION OF APPROXIMATELY 510 ROOF
DRAINS, AND DISCONNNECTION OF
APPROXIMATELY 120 AREA DRAINS. 1,270,000 6660 FY14 Wastewater Construction, Phase II
10496
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE III IV & V (SKME -521)
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH
SANITARY TRUNK SEWER. PROJECT INCLUDES
REMOVAL AND REPLACEMENT OF A UNION
PACIFIC RAILROAD TRACK SPUR. 110,000 6660 FY14 Wastewater Construction, Phase II
10029 WISE AND MABEL SEWER SEPARATION
CONSTRUCT 440 FEET OF 6X5 BOX CULVERT,
8,780 FEET OF 12-INCH TO 72-INCH STORM
SEWER, 154 FEET OF 15-INCH CIPP LINING, AND
REMOVE INFLOW SOURCES FROM 53 PRIVATE
PROPERTIES. 400,000 6660 FY14 Wastewater Construction, Phase II
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 444,000 6660 FY14 Wastewater Design Services
11682 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 654,000 6660 FY14 Wastewater Design Services
11934
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
REHABILITATE 60,300 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 144,000 6660 FY14 Wastewater Design Services
10066
BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE I
CONSTRUCTION OF APPROXIMATELY 3200 FEET
OF 8-INCH TO 21-INCH PIPE AND
APPURTENANCES FROM MATTESSE CREEK
WEST OF HEINTZ ROAD TO APPROXIAMTELY 500
FEET SOUTH OF BLACK FOREST. 190,000 6660 FY14 Wastewater Design Services
11924
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT E
REHABILITATE 31,300 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 47,000 6660 FY14 Wastewater Design Services
11925
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT F
REHABILITATE 47,900 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 46,000 6660 FY14 Wastewater Design Services
11926
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT G
REHABILITATE 50,200 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 85,000 6660 FY14 Wastewater Design Services
11923
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT E
REHABILITATE 42,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD. 38,000 6660 FY14 Wastewater Design Services
11920
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
CONSTRUCT INCINERATOR SCRUBBER
REPLACEMENT TO MEET NEW REGULATORY
EMISSION STANDARDS. 4,400,000 6660 FY14 Wastewater Design Services
11686
BISSELL POINT I/I REDUCTION (BP-619) (VALLEY
DR)
CONSTRUCT 1,360 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-619. 403,000 6660 FY14 Wastewater Design Services
11720
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
CONSTRUCT 15,900 FEET OF 8-INCH TO 36-INCH
DIAMETER SANITARY SEWER. 1,051,000 6660 FY14 Wastewater Design Services
11809
COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
CONSTRUCT ADDITIONAL CAPACITY AND MAKE
IMPROVEMENTS TO EXISTING FINE SCREENINGS
TRANSPORT SYSTEM AND WASHER/COMPACTOR
SYSTEM, AND MINOR PIPING CHANGES TO
ALLOW DIGESTERS TO FUNCTION AS
EMERGENCY STORAGE TANKS IF A SLUDGE
FORCE MAIN FAILURE OCCURS. 485,000 6660 FY14 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.22 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11155
DAMMERT AND BROADWAY SANITARY RELIEF
(SKME-551)
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-515 AND BP-
624. 1,307,000 6660 FY14 Wastewater Design Services
10021
DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE I
CONSTRUCT 5,000 FEET OF 6-INCH TO 78-INCH
SANITARY SEWER TO ALLEVIATE SURCHARGING.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
155, BP-170, BP-198, BP-348, BP-349, BP-545, AND
BP-591. 1,500,000 6660 FY14 Wastewater Design Services
11738 DIXIE I/I REDUCTION
CONSTRUCT 1,500 FEET OF 8-INCH TO 12-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 1,030,000 6660 FY14 Wastewater Design Services
11739 DUCHESNE AND GOTT I/I REDUCTION
CONSTRUCT 1,220 FEET OF 12-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-129. 351,000 6660 FY14 Wastewater Design Services
11740 E WATSON SEPARATE SEWER I/I REMOVAL
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 329,000 6660 FY14 Wastewater Design Services
11748 FLORISSANT I/I REDUCTION
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 962,000 6660 FY14 Wastewater Design Services
11932 FLORISSANT PUBLIC I/I REDUCTION
REHABILITATE 44,800 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD. 30,000 6660 FY14 Wastewater Design Services
10456
FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION AND I/I
REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 358,000 6660 FY14 Wastewater Design Services
11765
GRAND GLAIZE TRUNK SANITARY RELIEF AND I/I
REDUCTION (SKME-417)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-062. 127,000 6660 FY14 Wastewater Design Services
11766
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE VI (SKME-521)
SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS
PHASE CONSISTS OF THE CONSTRUCTION OF
11,000 FEET OF 8-INCH TO 72-INCH DIAMETER
SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-588. 1,810,000 6660 FY14 Wastewater Design Services
11097 HOLLY DRIVE SEWER SEPARATION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS, CONSTRUCT 2,200 FEET OF 8-INCH TO
24-INCH SEWERS. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-617. 226,000 6660 FY14 Wastewater Design Services
11710 ISABELLE I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 180,000 6660 FY14 Wastewater Design Services
11711
JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS. 2,150,000 6660 FY14 Wastewater Design Services
11054
KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
CONTROL SURCHARGING AND ELIMINATE
EXISTING PUMP STATION P-326 THROUGH
DISCONNECTION OF PRIVATE I/I SOURCES AND
CONSTRUCTION OF 900 FEET OF 8-INCH TO 18-
INCH SEWERS. 29,000 6660 FY14 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.23 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
CONSTRUCT REPLACEMENT FOR THE EXISTING
LEMAY NO. 3 PUMP STATION AND FORCE MAIN.
DEMOLISH EXISTING LEMAY PUMP STATION (P-
303), MARTIGNEY PUMP STATION (P-306), AND
JEFFERSON BARRACKS PUMP STATION (P-305). 842,000 6660 FY14 Wastewater Design Services
11927 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
REHABILITATE 63,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 110,000 6660 FY14 Wastewater Design Services
11650
LOWER MERAMEC WATERSHED I/I REMOVAL -
MATTESE TRUNK SEWER
REHABILITATE THE LOWER MATTESE CREEK
TRUNK SEWER TO REMOVE EXCESSIVE INFLOW
AND INFILTRATION, REDUCING FLOWS TO THE
LOWER MERAMEC TREATMENT PLANT. 24,000 6660 FY14 Wastewater Design Services
11651 LYNKIRK STUDY AREA I/I REDUCTION
CONSTRUCT 110 FEET OF 8-INCH SANITARY
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-216. 74,000 6660 FY14 Wastewater Design Services
11653 MACKENZIE I/I REDUCTION
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS AND CONSTRUCT 1,100 FEET
OF 12-INCH TO 18-INCH SEWER. 800,000 6660 FY14 Wastewater Design Services
11931 MACKENZIE PUBLIC I/I REDUCTION
REHABILITATE 31,500 FEET OF PUBLIC SEWERS
WITH CURED-IN-PLACE PIPE. 60,000 6660 FY14 Wastewater Design Services
11661 MARTIGNEY I/I REDUCTION
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 1,844,000 6660 FY14 Wastewater Design Services
11930 MARTIGNEY PUBLIC I/I REDUCTION
REHABILITATE 27,000 FEET OF PUBLIC SEWERS
WITH CURED-IN-PLACE PIPE METHOD. 142,000 6660 FY14 Wastewater Design Services
11664 NEWCASTLE I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 180,000 6660 FY14 Wastewater Design Services
11693
NORTH BADEN CREEK I/I REDUCTION (BP-532)
(WINCHESTER DR)
CONSTRUCT 380 FEET OF 12-INCH STORM
SEWER, REPLACE 510 FEET OF 12-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 382,000 6660 FY14 Wastewater Design Services
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)
CONSTRUCT 610 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 1,424,000 6660 FY14 Wastewater Design Services
11933 PROVIDENCE PUBLIC I/I REDUCTION
REHABILITATE 22,500 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 42,000 6660 FY14 Wastewater Design Services
11700 PROVIDENCE SANITARY RELIEF (SKME-640)
CONSTRUCT 780 FEET OF 8-INCH SEWER, 215
FEET OF 12-INCH SEWER, AND REMOVE PRIVATE
I/I SOURCES FROM SANITARY SEWERS. 450,000 6660 FY14 Wastewater Design Services
11665 SELVIDGE AREA I/I REDUCTION
CONSTRUCT 590 FEET OF 6-INCH TO 12-INCH
SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-056. 59,000 6660 FY14 Wastewater Design Services
11059 SENECA PRIVATE I/I REDUCTION
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 1,023,000 6660 FY14 Wastewater Design Services
11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 293,000 6660 FY14 Wastewater Design Services
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 337,000 6660 FY14 Wastewater Design Services
11672 UNIVERSITY CITY I/I REDUCTION - WEST
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS. 1,397,000 6660 FY14 Wastewater Design Services
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST
REHABILITATE 21,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 116,000 6660 FY14 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.24 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11681 UPPER COLDWATER SECTION D I/I REDUCTION
CONSTRUCT 3,200 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 447,000 6660 FY14 Wastewater Design Services
11089 VINITA DRIVE SANITARY RELIEF
CONSTRUCT 650 FEET OF 12-INCH SANITARY
SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-412. 115,000 6660 FY14 Wastewater Design Services
11751
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
RETAIN CONSTRUCTION MANAGEMENT
CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2016
BASED ON PERFORMANCE. 100,000 6660 FY14 Wastewater General Services - Construction Inspection
11759
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER &
PROCESS DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 300,000 6660 FY14 Wastewater General Services - Design CIRP Funds
11779
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2015 BASED ON PERFORMANCE. 90,000 6660 FY14 Wastewater General Services - Design CIRP Funds
10613
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT A
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Geotechnical
10614
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT B
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Geotechnical
10615
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2012) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2014 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Geotechnical
11763
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Survey
11909
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Survey
11910
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Survey
11911
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Survey
11912
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY14 Wastewater General Services - Survey
11139
TILLIE BADEN NEWBY SEWER IMPROVEMENTS
(PROPERTY ACQUISITION)ACQUISITION OF 50 PROPERTIES. 1,600,000 6660 FY14 Wastewater Land Purchase
11731
DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
CONSTRUCT SANITARY TUNNEL AND
ASSOCIATED STRUCTURES, PUMPING STATIONS
AND SEWERS AS PART OF AN OVERALL
WATERSHED PLAN FOR SANITARY RELIEF. 7,600,000 6660 FY14 Wastewater Pre-Design Services
11820
LMRDP CSO STORAGE TUNNEL (BROADWAY TO
RDP TUBES)
CONSTRUCT DEEP STORAGE TUNNEL SYSTEM
FOR THE LEMAY WATERSHED. 6,000,000 6660 FY14 Wastewater Pre-Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.25 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS. 415,000 6660 FY14 Wastewater Pre-Design Services
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS. 2,510,000 6660 FY14 Wastewater Professional Services
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TUNNEL
CONSTRUCTION PROJECTS IN THE LOWER AND
MIDDLE RDP AREAS. 1,500,000 6660 FY14 Wastewater Professional Services
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR PROJECTS
ASSOCIATED WITH THE LOWER MERAMEC
TUNNEL SYSTEM AND UPPER RDP TUNNEL
SYSTEM. 290,000 6660 FY14 Wastewater Professional Services
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT. 950,000 6660 FY14 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS. 2,437,953 6660 FY14 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS. 1,795,000 6660 FY14 Wastewater Professional Services
11742
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2014)
EASEMENT ACQUISITION COSTS FOR CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
COMBINED AND SANITARY SEWER SYSTEM
PROJECTS. 3,000,000 6660 FY14 Wastewater Property Rights Acquisition
11822 PUMP STATIONS SCADA IMPROVEMENTS
UPGRADE EXISTING SCADA HARDWARE AND
SOFTWARE. 400,000 6660 FY14 Wastewater Vendor Services
11772
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2014)
AS REPAIR OR REPLACEMENT NEEDS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONSTRUCTION CONTRACTS WILL BE BID AND
AWARDED. 7,700,000 6660 FY14 Wastewater Work Order Repair Costs (Capital)
11146
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
TO THE COMBINED SEWER SYSTEM. 5,000,000 1101 FY15 Wastewater Construction Task
11755
GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
RETAIN FIRM FOR AS NEEDED PLANNING
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE. 500,000 1101 FY15 Wastewater General Services - Design CIRP Funds
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS. 723,000 1101 FY15 Wastewater Professional Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.26 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT. 250,000 1101 FY15 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS. 630,000 1101 FY15 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS. 660,000 1101 FY15 Wastewater Professional Services
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES. 709,000 1101 FY15 Wastewater Professional Services
11699
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
PUBLIC ENGAGEMENT PROGRAM FOR
OUTREACH REGARDING REMOVAL OF PRIVATE
STORMWATER SOURCES, THE CONSENT
DECREE, & OTHER WET WEATHER RELATED
COMMUNICATIONS. 709,000 1101 FY15 Wastewater Professional Services
11153
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS
& LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM
CONTROLS, TO MEET CONSENT DECREE
REQUIREMENTS. 600,000 1101 FY15 Wastewater Professional Services
11811
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
PERFORM CLEANING, CCTV, PHYSICAL
INSPECTION, AND DEBRIS VOLUME ESTIMATION
OF SELECTED SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 2,000,000 1101 FY15 Wastewater Vendor Services
11810 CCTV INSPECTION OF SEWERS (2014)
PERFORM AS NEEDED CCTV INSPECTION AND
CLEANING OF SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 1,000,000 1101 FY15 Wastewater Vendor Services
11125 CRITICAL INFRASTRUCTURE ASSESSMENT
PERFORM SERVICES SUCH AS PROJECT
INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD
VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND POST INSPECTION REVIEW.
SERVICES MAY BE RENEWED THROUGH FY2017
BASED ON PERFORMANCE. 1,200,000 1101 FY15 Wastewater Vendor Services
11702 RADAR RAINFALL DATA (FY2014)
INTEGRATE EXISTING RAIN GAUGE NETWORK
WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING,
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE. 130,000 1101 FY15 Wastewater Vendor Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.27 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11773
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
AS REPAIR OR REPLACEMENT PROBLEMS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONTRACTS WILL BE PROMPTLY ISSUED FOR
NEEDED CONSTRUCTION. 1,500,000 1101 FY15 Wastewater Work Order Repair Costs (Non-Capital)
11898
SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
AS DEFECTIVE SEPTIC TANKS AND PRIVATE
SEWER LATERALS ARE IDENTIFIED AT OWNER
OCCUPIED PROPERTIES IN 2010 LOW TO MEDIAN
INCOME CENSUS TRACTS THROUGHOUT THE
DISTRICT, CONSTRUCTION CONTRACTS WILL BE
ISSUED. 600,000 4102 FY15 Wastewater Work Order Repair Costs (Capital)
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)
PROVIDE A PLACEHOLDER APPROPRIATION FOR
THE EMERGENCY FUND, TO FACILITATE
EMERGENCY RESPONSE AS NEEDED. 600,000 4122 FY15 Wastewater Construction Task
12613
EMERGENCY REPAIR #048 (MALINE CREEK W OF
BELLEFONTAINE RD)
CONSTRUCT 300 FEET OF 60-INCH SANITARY
SEWER. 300,000 4122 FY15 Wastewater Design Services
10324
CONSTRUCTION MANAGEMENT SERVICES -
MISSOURI WWTP SECONDARY EXPANSION &
DISINFECTION
MANAGEMENT AND COORDINATION OF THE
CONSTRUCTION AT THE MISSOURI TREATMENT
PLANT RELATED TO EXPANDED SECONDARY
TREATMENT AND DISINFECTION. 500,000 6660 FY15 Wastewater
Construction Management Services During
Construction
10523 AYRES SANITARY RELIEF AND I/I REDUCTION
CONSTRUCT 3,510 FEET OF 8-INCH TO 12-INCH
SANITARY SEWER, REHABILITATE 12,970 FEET OF
SEWER, AND PERFORM PRIVATE I/I REDUCTION
ON 63 PROPERTIES. 2,000,000 6660 FY15 Wastewater Construction Task
11934
BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I
REDUCTION
REHABILITATE 60,300 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 5,000,000 6660 FY15 Wastewater Construction Task
11853
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT A
REHABILITATE 56,400 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 3,350,000 6660 FY15 Wastewater Construction Task
11854
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT B
REHABILITATE 57,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 4,400,000 6660 FY15 Wastewater Construction Task
11857
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT C
REHABILITATE 21,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 2,950,000 6660 FY15 Wastewater Construction Task
11871
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT D
REHABILITATE 67,200 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 4,950,000 6660 FY15 Wastewater Construction Task
11924
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT E
REHABILITATE 31,300 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 2,450,000 6660 FY15 Wastewater Construction Task
11925
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT F
REHABILITATE 47,900 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 2,900,000 6660 FY15 Wastewater Construction Task
11926
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2015) CONTRACT G
REHABILITATE 50,200 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 5,000,000 6660 FY15 Wastewater Construction Task
11920
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
CONSTRUCT INCINERATOR SCRUBBER
REPLACEMENT TO MEET NEW REGULATORY
EMISSION STANDARDS. 15,000,000 6660 FY15 Wastewater Construction Task
11685
BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
CONSTRUCT 355 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 1,460,000 6660 FY15 Wastewater Construction Task
11686
BISSELL POINT I/I REDUCTION (BP-619) (VALLEY
DR)
CONSTRUCT 1,360 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-619. 235,000 6660 FY15 Wastewater Construction Task
11689 BLACK CREEK I/I REDUCTION
REMOVE EXCESSIVE I/I FROM PUBLIC AND
PRIVATE SOURCES BY REHABILITATING 62,000
FEET OF PIPE SEWERS AND MANHOLES AND BY
REMOVING PRIVATE DEFECTS. 5,600,000 6660 FY15 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.28 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11809
COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
CONSTRUCT ADDITIONAL CAPACITY AND MAKE
IMPROVEMENTS TO EXISTING FINE SCREENINGS
TRANSPORT SYSTEM AND WASHER/COMPACTOR
SYSTEM, AND MINOR PIPING CHANGES TO
ALLOW DIGESTERS TO FUNCTION AS
EMERGENCY STORAGE TANKS IF A SLUDGE
FORCE MAIN FAILURE OCCURS. 2,800,000 6660 FY15 Wastewater Construction Task
10557
COLDWATER SANITARY TRUNK SEWER SECTION
A REHABILITATION (SKME -240)
DISCONNECT 12-INCH SANITARY SEWER FROM
THE INACTIVE 72-INCH COLDWATER TRUNK AND
RECONNECT IT TO THE ACTIVE 90-INCH
COLDWATER TRUNK. CONSTRUCT 620 FEET OF
12-INCH SANITARY SEWER. 670,000 6660 FY15 Wastewater Construction Task
11730
CSO - GINGRAS CREEK AND I/I REDUCTION (BP-
059)
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED
SEWER IN TUNNEL, AND 1,300 FEET OF 8-INCH TO
30-INCH SANITARY AND STORM SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
255 AND BP-256, AND CSO OUTFALL BP-059. 2,500,000 6660 FY15 Wastewater Construction Task
10576
DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH
SEWERS, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-627, BP-471,
AND BP-607. 1,500,000 6660 FY15 Wastewater Construction Task
11850 DEER CREEK PUBLIC I/I REDUCTION (2015)
REHABILITATE 85,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 4,750,000 6660 FY15 Wastewater Construction Task
11735
DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
CONSTRUCT 440 FEET OF 12-INCH STORM
SEWERS AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 435,000 6660 FY15 Wastewater Construction Task
11079
FAIRLIGHT AND BRIGHTLING SEWER
SEPARATION
CONSTRUCT 245 FEET OF 12-INCH STORM
SEWER TO CORRECT IMPROPER CONNECTION
TO SANITARY SYSTEM. 86,000 6660 FY15 Wastewater Construction Task
10014 FF-11 FEE FEE CREEK SANITARY RELIEF
CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, FROM 1876 WOODHOLLOW
DRIVE TO PROGRESS PARKWAY. PART OF
PROJECT TO BE BUILT BY THE CITY OF
MARYLAND HEIGHTS, AS PART OF A ROAD
IMPROVEMENT PROJECT. 4,100,000 6660 FY15 Wastewater Construction Task
10489
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF
PHASE III
THE THIRD AND FINAL PHASE OF A MULTI-PHASE
PROJECT. THIS PHASE CONSISTS OF THE
CONSTRUCTION OF 4,700 FEET OF 8-INCH TO 42-
INCH SANITARY SEWER SOUTH OF SCHUETZ
ROAD. 6,000,000 6660 FY15 Wastewater Construction Task
10456
FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION AND I/I
REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 285,000 6660 FY15 Wastewater Construction Task
10142 FORESTWOOD SANITARY RELIEF (SKME-435)
CONSTRUCT 7,980 FEET OF 8-INCH TO 18-INCH
SANITARY RELIEF SEWER, 420 FEET OF 8-INCH
FORCE MAIN, AND REPLACE THE EXISTING PUMP
STATION (P-428). 2,100,000 6660 FY15 Wastewater Construction Task
10611
GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF
CONSTRUCT 7,300 FEET OF 24-INCH TO 36-INCH
SANITARY SEWERS. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-610. 3,000,000 6660 FY15 Wastewater Construction Task
10496
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
RELIEF PHASE III IV & V (SKME -521)
CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH
SANITARY TRUNK SEWER. PROJECT INCLUDES
REMOVAL AND REPLACEMENT OF A UNION
PACIFIC RAILROAD TRACK SPUR. 5,000,000 6660 FY15 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.29 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10642
HARMONY-ACORN SEWER SEPARATION AND I/I
REDUCTION
CONSTRUCT 3,100 FEET OF 12-INCH TO 42-INCH
STORM SEWER, 2,700 FEET OF 8-INCH TO 12-INCH
SANITARY SEWER, AND DISCONNECT PRIVATE I/I
SOURCES. THIS PROJECT ELIMINATES CSO I-126. 3,400,000 6660 FY15 Wastewater Construction Task
10656
INFRASTRUCTURE REPAIR #087P CAULKS CREEK
A (P-750) PHASE VI
CONSTRUCT 11,400 FEET OF 30-INCH FORCE
MAIN. 3,800,000 6660 FY15 Wastewater Construction Task
11708
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT A
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO REHABILITATE DETERIORATED SEWER LINES. 5,000,000 6660 FY15 Wastewater Construction Task
11866
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT B
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO REHABILITATE DETERIORATED SEWER LINES. 5,000,000 6660 FY15 Wastewater Construction Task
11867
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2015) CONTRACT C
USE THE CURED-IN-PLACE PIPE LINING PROCESS
TO REHABILITATE DETERIORATED SEWER LINES. 5,000,000 6660 FY15 Wastewater Construction Task
11710 ISABELLE I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 35,500 6660 FY15 Wastewater Construction Task
11715
LANG ROYCE LATERAL SANITARY RELIEF (SKME-
320)
CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 1,350,000 6660 FY15 Wastewater Construction Task
11856 LEMAY PUBLIC I/I REDUCTION (2015)
REHABILITATE 57,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 3,550,000 6660 FY15 Wastewater Construction Task
11927 LEMAY PUBLIC I/I REDUCTION (2015) CONTRACT B
REHABILITATE 63,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 4,000,000 6660 FY15 Wastewater Construction Task
12427 LEMAY WWTF PLANT CONTROLS
PROCURE NEW CONTROL MODULES AND
PROCESSORS. 1,300,000 6660 FY15 Wastewater Construction Task
11650
LOWER MERAMEC WATERSHED I/I REMOVAL -
MATTESE TRUNK SEWER
REHABILITATE THE LOWER MATTESE CREEK
TRUNK SEWER TO REMOVE EXCESSIVE INFLOW
AND INFILTRATION, REDUCING FLOWS TO THE
LOWER MERAMEC TREATMENT PLANT. 5,000,000 6660 FY15 Wastewater Construction Task
11659
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
CONSTRUCT 2,300 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 1,050,000 6660 FY15 Wastewater Construction Task
11694
NORTH BADEN CREEK I/I REDUCTION (BP-612)
(CANTERBURY DR)
CONSTRUCT 450 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 580,000 6660 FY15 Wastewater Construction Task
11695 OLDE ENGLISH I/I REMOVAL
REMOVE EXCESSIVE INFLOW AND INFILTRATION
FROM PRIVATE SOURCES BY SEWER
REHABILITATION AND OTHER IMPROVEMENTS.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-480. 220,000 6660 FY15 Wastewater Construction Task
11697 PAGE TO TRENTON SANITARY RELIEF
CONSTRUCT 36-INCH AND 48-INCH DIAMETER
LINEAR STORAGE TANKS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-456. 1,000,000 6660 FY15 Wastewater Construction Task
11094 PROSPECT HILL LANDFILL VERTICAL EXPANSION
CONSTRUCTION OF NEW LEACHATE FIELD AND
INTERMEDIATE LINER, RETROFIT OF EXISTING
LEACHATE FIELD, AND GRADING. 300,000 6660 FY15 Wastewater Construction Task
11933 PROVIDENCE PUBLIC I/I REDUCTION
REHABILITATE 22,500 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 1,900,000 6660 FY15 Wastewater Construction Task
11680 ROXBURY I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 1,070,000 6660 FY15 Wastewater Construction Task
11666 ST. MARIE SANITARY RELIEF I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 195,000 6660 FY15 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.30 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11929 UNIVERSITY CITY PUBLIC I/I REDUCTION - WEST
REHABILITATE 21,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 4,500,000 6660 FY15 Wastewater Construction Task
11681 UPPER COLDWATER SECTION D I/I REDUCTION
CONSTRUCT 3,200 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 55,000 6660 FY15 Wastewater Construction Task
10027
UR-10 MENDELL AND WOLTER SANITARY RELIEF
(SKME-595)
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH
SANITARY RELIEF SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-419 AND BP-
435, AND COMBINED SEWER OVERFLOWS L-100
AND L-101. 3,000,000 6660 FY15 Wastewater Construction Task
11108
WISMER - HUNTINGTON SANITARY RELIEF (SKME-
592)
REPLACE 2,500 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER WITH 12-INCH TO 21-INCH
SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALLS BP-426 AND BP-626. 1,100,000 6660 FY15 Wastewater Construction Task
10330 HARTLAND TO GOTHLAND SEWER SEPARATION
CONSTRUCT SEPARATE STORM AND SANITARY
SEWERS, AND REMOVE I/I, TO ENABLE
ELIMINATION OF THE COMBINED SEWER SYSTEM
IN THIS AREA. 1,360,000 6660 FY15 Wastewater Construction, Phase I (Supplemental Appropriation)
11920
BISSELL & LEMAY WWTP INCINERATOR
SCRUBBER REPLACEMENT
CONSTRUCT INCINERATOR SCRUBBER
REPLACEMENT TO MEET NEW REGULATORY
EMISSION STANDARDS. 3,650,000 6660 FY15 Wastewater Construction, Phase II
11884 CEDARCREST PRIVATE I/I REDUCTION (SKME-561)
REMOVE PRIVATE I/I FROM PUBLIC SEWER BY
CORRECTING IMPROPER CONNECTIONS ON 300
PROPERTIES. 380,000 6660 FY15 Wastewater Construction, Phase II
12080
ASHBROOK I/I REDUCTION (ASHBROOK DR AND
CHAMBERS RD)
CONSTRUCT 400 FEET OF 10-INCH SANITARY
SEWER. REHABILITATE 5,900 FEET OF 8-INCH TO
15-INCH SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. 125,000 6660 FY15 Wastewater Design Services
11777
BADEN CREEK EXTENSION (BP-001) - I/I
REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWER, AND REMOVE CONSTRUCTED SSO BP-
001. 612,000 6660 FY15 Wastewater Design Services
12060
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
REHABILITATE 55,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD. 55,000 6660 FY15 Wastewater Design Services
12434
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT D
REHABILITATE 28,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD. 57,000 6660 FY15 Wastewater Design Services
12102
BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE
AND LAKEVIEW AVE)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 108,000 6660 FY15 Wastewater Design Services
12119
CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 76,000 6660 FY15 Wastewater Design Services
11723
COLDWATER CREEK WATERSHED I/I REMOVAL -
SHARON STUDY AREA (N LINDBERGH BLVD AND
LINDSAY LN)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 246,000 6660 FY15 Wastewater Design Services
11964
CONCORDIA I/I REDUCTION (NE QUAD CLAYTON
RD AND BIG BEND BLVD)
CONSTRUCT 435 FEET OF 8-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 209,000 6660 FY15 Wastewater Design Services
12432
CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD. 55,000 6660 FY15 Wastewater Design Services
10851
CSO - MCKNIGHT ROAD #2737 CSO INTERCEPTOR
(I-298)/OUTFALL (L-161)
CONSTRUCT 2,300 OF 8-INCH TO 18-INCH
SANITARY SEWER, AND REMOVE INTERCEPTOR I-
298 AND CSO OVERFLOW L-160. REMOVE
PRIVATE INFLOW AND INFILTRATION. 650,000 6660 FY15 Wastewater Design Services
11851 DEER CREEK PUBLIC I/I REDUCTION (2016)
REHABILITATE 29,600 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 90,000 6660 FY15 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.31 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11731
DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
CONSTRUCT SANITARY TUNNEL AND
ASSOCIATED STRUCTURES, PUMPING STATIONS
AND SEWERS AS PART OF AN OVERALL
WATERSHED PLAN FOR SANITARY RELIEF. 6,000,000 6660 FY15 Wastewater Design Services
11737
FERGUSON SANITARY SEWER (OLIVE TO PAGE)
(DIAMOND PARK)
CONSTRUCT 6,500 FEET OF 30-INCH TO 42-INCH
SANITARY SEWER. 2,129,000 6660 FY15 Wastewater Design Services
11747
FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES
COURT TO FIESTA CIRCLE)
CONSTRUCT 2,160 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-086. 210,000 6660 FY15 Wastewater Design Services
10458
GLENDALE SECTION D SANITARY RELIEF PHASE
III (SKME-624) I/I REDUCTION
CONSTRUCTION OF PHASE III OF SEWER
IMPROVEMENTS, TO INCLUDE REHABILITATION
OF APPROXIMATELY 20 PRIVATE LATERALS,
DISCONNECTION OF APPROXIMATELY 510 ROOF
DRAINS, AND DISCONNNECTION OF
APPROXIMATELY 120 AREA DRAINS. 400,000 6660 FY15 Wastewater Design Services
11711
JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS. 1,652,000 6660 FY15 Wastewater Design Services
11957
JEFFERSON BARRACKS TUNNEL CONSOLIDATION
SEWERS
CONSTRUCT CONSOLIDATION SEWERS TO
DELIVER FLOW TO THE NEW JEFFERSON
BARRACKS TUNNEL. 311,000 6660 FY15 Wastewater Design Services
11713 LADUE ESTATES SANITARY RELIEF
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 41,000 6660 FY15 Wastewater Design Services
11714 LADUE SUBTRUNK SANITARY RELIEF (SKME-654)
CONSTRUCT 1,250 FEET OF STORM SEWER AND
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 555,000 6660 FY15 Wastewater Design Services
11818
LEMAY CSO HIGH RATE CLARIFICATION FACILITY
(BROADWAY & LEMAY WWTF)
CONSTRUCT 100 MGD ENHANCED HIGH RATE
CLARIFICATION FACILITY WITH DISINFECTION. 323,000 6660 FY15 Wastewater Design Services
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
CONSTRUCT REPLACEMENT FOR THE EXISTING
LEMAY NO. 3 PUMP STATION AND FORCE MAIN.
DEMOLISH EXISTING LEMAY PUMP STATION (P-
303), MARTIGNEY PUMP STATION (P-306), AND
JEFFERSON BARRACKS PUMP STATION (P-305). 573,000 6660 FY15 Wastewater Design Services
12061 LEMAY PUBLIC I/I REDUCTION (2016)
REHABILITATE 75,900 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 196,000 6660 FY15 Wastewater Design Services
11716
LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 1,510,000 6660 FY15 Wastewater Design Services
12470
LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK
REHABILITATE 49,600 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 50,000 6660 FY15 Wastewater Design Services
11820
LMRDP CSO STORAGE TUNNEL (BROADWAY TO
RDP TUBES)
CONSTRUCT DEEP STORAGE TUNNEL SYSTEM
FOR THE LEMAY WATERSHED. 1,845,000 6660 FY15 Wastewater Design Services
11819
LMRDP CSO STORAGE TUNNEL NORTH DRIVE
(RDP PARK TO RDP TUBES)
CONSTRUCT NORTHERN PORTION OF THE DEEP
STORAGE TUNNEL SYSTEM IN THE LEMAY
WATERSHED. 1/7/15-The storage tunnel is now
planned to be constructed under one contract (11820);
this will be confirmed after the rate commission
process has been completed. 2,031,000 6660 FY15 Wastewater Design Services
11959
LMRDP CSO STORAGE TUNNEL NORTH DRIVE
CONSOLIDATION SEWERS
CONSTRUCT CONSOLIDATION SEWERS TO
DELIVER FLOWS TO THE NORTHERN PORTION OF
THE DEEP STORAGE TUNNEL SYSTEM. 284,000 6660 FY15 Wastewater Design Services
11958
LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
CONSOLIDATION SEWERS
CONSTRUCT CONSOLIDATION SEWERS TO
DELIVER FLOWS TO THE SOUTHERN PORTION OF
THE DEEP STORAGE TUNNEL SYSTEM. 199,000 6660 FY15 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.32 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11816 LMRDP TUNNEL DEWATERING PUMP STATION
CONSTRUCT PUMP STATION TO PUMP STORED
COMBINED SEWERAGE TO LEMAY TREATMENT
PLANT. 1,774,000 6660 FY15 Wastewater Design Services
11746
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
CONSTRUCT DEEP TUNNEL TO CONVEY
WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, FOR TREATMENT AT
THE LOWER MERAMEC WWTF. 3,600,000 6660 FY15 Wastewater Design Services
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS. 2,772,000 6660 FY15 Wastewater Design Services
11774
MISSOURI RIVER SERVICE AREA I/I REDUCTION -
CREVE COEUR CREEK EAST
REHABILITATE 43,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD. 31,000 6660 FY15 Wastewater Design Services
11989
PARDEE - BLACKTHORN - HOLLY I/I REDUCTION
(WATSON RD AND S ROCK HILL RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-631. 316,000 6660 FY15 Wastewater Design Services
11701
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
REPLACE PUMP STATIONS P-708 (EARTH CITY
UPS), AND P-702 (EARTH CITY EXPRESSWAY). 222,000 6660 FY15 Wastewater Design Services
11919 ROLENS AND TELEGRAPH SANITARY STORAGE
CONSTRUCT 420 FEET OF 60-INCH SANITARY
SEWER FOR STORAGE, AND 220 FEET OF 8-INCH
TO 10-INCH SANITARY SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-222 AND BP-
516. 210,000 6660 FY15 Wastewater Design Services
11990
SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RD
AND SAPPINGTON RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 380,000 6660 FY15 Wastewater Design Services
11667 STERLING PLACE SEPARATE SEWER I/I REMOVAL
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 340,000 6660 FY15 Wastewater Design Services
12222
SUBURBAN I/I REDUCTION (HARRISON DR AND
SUBURBAN AVE)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS AND CONSTRUCT 360 FEET OF 12-INCH
STORM SEWER. 615,000 6660 FY15 Wastewater Design Services
12473
SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE METHOD. 22,000 6660 FY15 Wastewater Design Services
12237
TRAMPE (PARTIAL) I/I REDUCTION (CASTILON AVE
AND TRAMPE AVE)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 70,000 6660 FY15 Wastewater Design Services
11991
UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY
HILLS AND BEL-NOR)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 1,030,000 6660 FY15 Wastewater Design Services
11984
UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 1,382,000 6660 FY15 Wastewater Design Services
11983 UNIVERSITY CITY I/I REDUCTION - EAST (UR-10)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 319,000 6660 FY15 Wastewater Design Services
11671
UNIVERSITY CITY I/I REDUCTION - EAST (WC-01,
WC-02, & WC-03)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. 898,000 6660 FY15 Wastewater Design Services
12435
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(BEL-NOR)
REHABILITATE 44,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 44,000 6660 FY15 Wastewater Design Services
12436
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(HANLEY HILLS)
REHABILITATE 50,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE METHOD. 63,000 6660 FY15 Wastewater Design Services
12437
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(UR-08 AND UR-09)
REHABILITATE 70,800 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 80,000 6660 FY15 Wastewater Design Services
12438
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(UR-10)
REHABILITATE 32,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 46,000 6660 FY15 Wastewater Design Services
12062
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-01)
REHABILITATE 31,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 51,000 6660 FY15 Wastewater Design Services
12063
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-02 AND WC-03)
REHABILITATE 66,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD. 79,000 6660 FY15 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.33 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11965
WEST WISE I/I REDUCTION (NW QUAD I-64 AND
BIG BEND BLVD)
CONSTRUCT 960 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. 607,000 6660 FY15 Wastewater Design Services
11726
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C
CONSTRUCT SANITARY SEWAGE WET WEATHER
STORAGE FACILITIES AS PART OF THE OVERALL
SANITARY RELIEF PROJECT. 452,000 6660 FY15 Wastewater Engineering During Construction Services
11649 LEMAY WWTP SECONDARY IMPROVEMENTS
PERFORM STRESS TESTING OF SECONDARY
IMPROVEMENTS TO CONFIRM EXPANSION OF
TREATMENT CAPACITY. 600,000 6660 FY15 Wastewater Engineering During Construction Services
11751
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (FY2014)
RETAIN CONSTRUCTION MANAGEMENT
CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2016
BASED ON PERFORMANCE. 250,000 6660 FY15 Wastewater General Services - Construction Inspection
11759
GENERAL SERVICES AGREEMENT - SEWER &
PROCESS DESIGN (FY2014)
RETAIN DESIGN FIRM FOR AS NEEDED SEWER &
PROCESS DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2015 BASED ON
PERFORMANCE. 300,000 6660 FY15 Wastewater General Services - Design CIRP Funds
11781
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2017 BASED ON PERFORMANCE. 90,000 6660 FY15 Wastewater General Services - Design CIRP Funds
11753
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Geotechnical
11754
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Geotechnical
12064
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Geotechnical
11763
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Survey
11909
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Survey
11910
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Survey
11911
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Survey
11912
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (FY2014) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2015 BASED ON PERFORMANCE. 50,000 6660 FY15 Wastewater General Services - Survey
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.34 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11734
DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - LAND ACQUISITION
CONSTRUCT SANITARY TUNNEL AND
ASSOCIATED STRUCTURES, PUMPING STATIONS
AND SEWERS AS PART OF AN OVERALL
WATERSHED PLAN FOR SANITARY RELIEF.
ACQUIRE PROPERTY FOR VARIOUS PERMANENT
STRUCTURES AND EASEMENTS ALONG TUNNEL
ALIGNMENT. 6,000,000 6660 FY15 Wastewater Land Purchase
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS. 2,000,000 6660 FY15 Wastewater Land Purchase
11649 LEMAY WWTP SECONDARY IMPROVEMENTS
PERFORM STRESS TESTING OF SECONDARY
IMPROVEMENTS TO CONFIRM EXPANSION OF
TREATMENT CAPACITY. 170,000 6660 FY15 Wastewater Miscellaneous Services
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER
TUNNEL, DEWATERING PUMP STATION, AND
CONSOLIDATION PIPING, TO PROVIDE A
STORAGE VOLUME OF 28 MILLION GALLONS. 600,000 6660 FY15 Wastewater Pre-Design Services
11992
UNIVERSITY CITY SANITARY STORAGE FACILITY
(HAFNER CT)
CONSTRUCT 6.5 MILLION GALLON
UNDERGROUND STORAGE FACILITY. 1,166,000 6660 FY15 Wastewater Pre-Design Services
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS. 2,720,000 6660 FY15 Wastewater Professional Services
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TUNNEL
CONSTRUCTION PROJECTS IN THE LOWER AND
MIDDLE RDP AREAS. 1,800,000 6660 FY15 Wastewater Professional Services
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR PROJECTS
ASSOCIATED WITH THE LOWER MERAMEC
TUNNEL SYSTEM AND UPPER RDP TUNNEL
SYSTEM. 1,400,000 6660 FY15 Wastewater Professional Services
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT. 3,750,000 6660 FY15 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS. 4,113,000 6660 FY15 Wastewater Professional Services
11743
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2015)
EASEMENT ACQUISITION REQUIRED FOR CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
WASTEWATER SEWER PROJECTS. 3,500,000 6660 FY15 Wastewater Property Rights Acquisition
11773
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2015)
AS REPAIR OR REPLACEMENT PROBLEMS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONTRACTS WILL BE PROMPTLY ISSUED FOR
NEEDED CONSTRUCTION. 5,500,000 6660 FY15 Wastewater Work Order Repair Costs (Capital)
11146
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
TO THE COMBINED SEWER SYSTEM.5,000,000 1101 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.35 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11918 TELEGRAPH ROAD #2928 I/I REDUCTION
REMOVE STORMWATER FROM THE SANITARY
SYSTEM BY CONSTRUCTING 500 FEET OF 12-
INCH STORM SEWER. SYSTEM WILL BE TURNED
OVER TO THE PROPERTY OWNER AS A PRIVATE
STORM SEWER.132,000 1101 FY16 Wastewater Construction Task
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS.800,000 1101 FY16 Wastewater Professional Services
12070
COMPREHENSIVE AMMONIA AND NUTRIENT
REMOVAL MASTER PLAN
PREPARE A COMPREHENSIVE MASTER PLAN TO
INFORM AND GUIDE THE DISTRICT'S AMMONIA
AND NUTRIENT REMOVAL STRATEGY AT
WASTEWATER TREATMENT FACILITIES OVER THE
NEXT 15 YEARS.1,500,000 1101 FY16 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS.700,000 1101 FY16 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS.670,000 1101 FY16 Wastewater Professional Services
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES.527,000 1101 FY16 Wastewater Professional Services
11699
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
PUBLIC ENGAGEMENT PROGRAM FOR
OUTREACH REGARDING REMOVAL OF PRIVATE
STORMWATER SOURCES, THE CONSENT
DECREE, & OTHER WET WEATHER RELATED
COMMUNICATIONS.500,000 1101 FY16 Wastewater Professional Services
11153
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS
& LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES FOR MAJOR WASTEWATER SYSTEM
CONTROLS, TO MEET CONSENT DECREE
REQUIREMENTS.600,000 1101 FY16 Wastewater Professional Services
11811
CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
PERFORM CLEANING, CCTV, PHYSICAL
INSPECTION, AND DEBRIS VOLUME ESTIMATION
OF SELECTED SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE.2,000,000 1101 FY16 Wastewater Vendor Services
11810 CCTV INSPECTION OF SEWERS (2014)
PERFORM AS NEEDED CCTV INSPECTION AND
CLEANING OF SEWERS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE.1,000,000 1101 FY16 Wastewater Vendor Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.36 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11125 CRITICAL INFRASTRUCTURE ASSESSMENT
PERFORM SERVICES SUCH AS PROJECT
INSPECTION, RECONNAISSANCE, INSPECTION
PRIORITIZATION, PROJECT SET-UP, FIELD
VERIFICATION, MAP UPDATES, WORK ORDER
MANAGEMENT, AND POST INSPECTION REVIEW.
SERVICES MAY BE RENEWED THROUGH FY2017
BASED ON PERFORMANCE.1,200,000 1101 FY16 Wastewater Vendor Services
11702 RADAR RAINFALL DATA (FY2014)
INTEGRATE EXISTING RAIN GAUGE NETWORK
WITH RADAR IMAGING, FOR USE IN
CONJUNCTION WITH FLOW METERING,
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC
MODEL CALIBRATIONS. SERVICES MAY BE
RENEWED THROUGH FY2016 BASED ON
PERFORMANCE.130,000 1101 FY16 Wastewater Vendor Services
11705
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
AS REPAIR OR REPLACEMENT PROBLEMS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONTRACTS WILL BE PROMPTLY ISSUED FOR
NEEDED CONSTRUCTION.1,500,000 1101 FY16 Wastewater Work Order Repair Costs (Non-Capital)
11898
SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
AS DEFECTIVE SEPTIC TANKS AND PRIVATE
SEWER LATERALS ARE IDENTIFIED AT OWNER
OCCUPIED PROPERTIES IN 2010 LOW TO MEDIAN
INCOME CENSUS TRACTS THROUGHOUT THE
DISTRICT, CONSTRUCTION CONTRACTS WILL BE
ISSUED.1,100,000 4102 FY16 Wastewater Work Order Repair Costs (Capital)
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)
PROVIDE A PLACEHOLDER APPROPRIATION FOR
THE EMERGENCY FUND, TO FACILITATE
EMERGENCY RESPONSE AS NEEDED.500,000 4122 FY16 Wastewater Construction Task
11719 BRINWOOD I/I REDUCTION
CONSTRUCT 1,000 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, 900 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.280,000 5564 FY16 Wastewater Construction Task
11749
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
CONSTRUCT 2,600 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.600,000 5564 FY16 Wastewater Construction Task
11662 MCNULTY - PALLARDY I/I REDUCTION
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.1,400,000 5564 FY16 Wastewater Construction Task
11663
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
CONSTRUCT 800 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.190,000 5564 FY16 Wastewater Construction Task
11681 UPPER COLDWATER SECTION D I/I REDUCTION
CONSTRUCT 3,200 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.970,000 5564 FY16 Wastewater Construction, Phase II
11883
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
REMOVE EXCESSIVE I/I FROM THE PUBLIC
SEWER BY CONSTRUCTING 1,100 FEET OF 8-INCH
SANITARY SEWER AND BY REMOVING PRIVATE I/I
SOURCES FROM SANITARY SEWERS.380,000 5566 FY16 Wastewater Construction Task
11115
CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
REHABILITATE 6,000 FEET OF PIPE SEWERS AND
MANHOLES, REMOVE PRIVATE I/I SOURCES FROM
SANITARY SEWERS, AND SEPARATE 500 FEET OF
COMBINED SEWER.280,000 5566 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.37 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11840
MEADOWRIDGE AND EASTWOOD STORM AND
SANITARY RELIEF
CONSTRUCT 645 FEET OF 6-FOOT BY 3-FOOT
AND 6-FOOT BY 4-FOOT REINFORCED CONCRETE
BOX CULVERT, AND CONSTRUCT 740 FEET OF 15-
INCH SANITARY SEWER.1,110,000 5566 FY16 Wastewater Construction Task
11700 PROVIDENCE SANITARY RELIEF (SKME-640)
CONSTRUCT 780 FEET OF 8-INCH SEWER, 215
FEET OF 12-INCH SEWER, AND REMOVE PRIVATE
I/I SOURCES FROM SANITARY SEWERS.450,000 5566 FY16 Wastewater Construction Task
10576
DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH
SEWERS, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-627, BP-471,
AND BP-607.75,000 5566 FY16 Wastewater Construction, Phase II
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.110,000 5571 FY16 Wastewater Construction Task
10748
ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
CONSTRUCT 3,610 FEET OF 12-INCH TO 48-INCH
INCH STORM SEWERS AND DISCONNECT
DRIVEWAY DRAINS AND DOWNSPOUTS.1,700,000 5571 FY16 Wastewater Construction Task
11659
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
CONSTRUCT 2,300 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.300,000 5576 FY16 Wastewater Construction, Phase II
11672 UNIVERSITY CITY I/I REDUCTION - WEST
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.90,000 5584 FY16 Wastewater Construction Task
10027
UR-10 MENDELL AND WOLTER SANITARY RELIEF
(SKME-595)
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH
SANITARY RELIEF SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-419 AND BP-
435, AND COMBINED SEWER OVERFLOWS L-100
AND L-101.120,000 5584 FY16 Wastewater Construction Task
12310
MISSOURI RIVER BONFILS SANITARY SEWER
REHABILITATION PHASE II
REHABILITATE 22,000 FEET OF 10-INCH TO 18-
INCH SEWER, 182 MANHOLES, AND 16 SERVICE
LATERAL CONNECTIONS.2,000,000 5590 FY16 Wastewater Construction Task
11097 HOLLY DRIVE SEWER SEPARATION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS, CONSTRUCT 2,200 FEET OF 8-INCH TO
24-INCH SEWERS. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-617.370,000 5593 FY16 Wastewater Construction Task
10390
RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH
STORM SEWER, CONSTRUCT UNDERGROUND
DETENTION SYSTEM, AND REMOVE PRIVATE I/I.800,000 5594 FY16 Wastewater Construction Task
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.680,000 6660 FY16 Wastewater Construction Task
11682 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.550,000 6660 FY16 Wastewater Construction Task
10407
BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
CONSTRUCT 3,700 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER, FROM 500 FEET SOUTH OF
BLACK FOREST TO CHALET FOREST DRIVE.2,100,000 6660 FY16 Wastewater Construction Task
12060
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
REHABILITATE 55,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.4,880,000 6660 FY16 Wastewater Construction Task
12434
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT D
REHABILITATE 28,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.4,532,000 6660 FY16 Wastewater Construction Task
11923
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT E
REHABILITATE 42,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.4,550,000 6660 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.38 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11883
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
REMOVE EXCESSIVE I/I FROM THE PUBLIC
SEWER BY CONSTRUCTING 1,100 FEET OF 8-INCH
SANITARY SEWER AND BY REMOVING PRIVATE I/I
SOURCES FROM SANITARY SEWERS.1,810,000 6660 FY16 Wastewater Construction Task
11719 BRINWOOD I/I REDUCTION
CONSTRUCT 1,000 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, 900 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.1,385,000 6660 FY16 Wastewater Construction Task
11790
CAULKS CREEK FORCEMAIN (RIVER VALLEY RD
TO L-52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN
AND 1,000 FEET OF 36-INCH SANITARY SEWER.6,600,000 6660 FY16 Wastewater Construction Task
11788 CAULKS CREEK PUMP STATION B FORCEMAIN
CONSTRUCT 1,000 FEET OF 8-INCH FORCE MAIN
FROM PUMP STATION B TO 36-INCH FORCE MAIN.3,100,000 6660 FY16 Wastewater Construction Task
11720
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
CONSTRUCT 15,900 FEET OF 8-INCH TO 36-INCH
DIAMETER SANITARY SEWER.4,000,000 6660 FY16 Wastewater Construction Task
11009
CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
CONSTRUCT 1,180 FEET OF 8-INCH SANITARY
SEWER AND 155 FEET OF 8-INCH PIPE IN TUNNEL.550,000 6660 FY16 Wastewater Construction Task
11115
CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
REHABILITATE 6,000 FEET OF PIPE SEWERS AND
MANHOLES, REMOVE PRIVATE I/I SOURCES FROM
SANITARY SEWERS, AND SEPARATE 500 FEET OF
COMBINED SEWER.1,700,000 6660 FY16 Wastewater Construction Task
11723
COLDWATER CREEK WATERSHED I/I REMOVAL -
SHARON STUDY AREA (N LINDBERGH BLVD AND
LINDSAY LN)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.770,000 6660 FY16 Wastewater Construction Task
10021
DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE I
CONSTRUCT 5,000 FEET OF 6-INCH TO 78-INCH
SANITARY SEWER TO ALLEVIATE SURCHARGING.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
155, BP-170, BP-198, BP-348, BP-349, BP-545, AND
BP-591.6,000,000 6660 FY16 Wastewater Construction Task
11851 DEER CREEK PUBLIC I/I REDUCTION (2016)
REHABILITATE 29,600 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD.3,360,000 6660 FY16 Wastewater Construction Task
11738 DIXIE I/I REDUCTION
CONSTRUCT 1,500 FEET OF 8-INCH TO 12-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.2,000,000 6660 FY16 Wastewater Construction Task
11739 DUCHESNE AND GOTT I/I REDUCTION
CONSTRUCT 1,220 FEET OF 12-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-129.510,000 6660 FY16 Wastewater Construction Task
11740 E WATSON SEPARATE SEWER I/I REMOVAL
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.300,000 6660 FY16 Wastewater Construction Task
11748 FLORISSANT I/I REDUCTION
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.600,000 6660 FY16 Wastewater Construction Task
11932 FLORISSANT PUBLIC I/I REDUCTION
REHABILITATE 44,800 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.3,700,000 6660 FY16 Wastewater Construction Task
11749
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
CONSTRUCT 2,600 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.640,000 6660 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.39 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11944
FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) PUBLIC REHABILITATION AND I/I
REDUCTION
REHABILITATE 47,700 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER, 3,000 FEET OF 12-INCH TO 48-
INCH STORM SEWER, AND 277 MANHOLES, TO
REDUCE I/I INTO THE SANITARY SYSTEM.3,840,000 6660 FY16 Wastewater Construction Task
11750
FORESTATE AND TEXAS SANITARY RELIEF (SKME-
513)
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY
SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-389.1,660,000 6660 FY16 Wastewater Construction Task
10440
FORESTWOOD LATERAL SANITARY RELIEF (SKME-
321)
CONSTRUCT 6,700 FEET OF 12-INCH TO 24-INCH
SANITARY RELIEF SEWER IN THE VICINITY OF
FORESTWOOD, HIGHMONT AND FERGUSON.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-
295, BP-296, BP-281, BP-316, AND BP-322.1,600,000 6660 FY16 Wastewater Construction Task
11765
GRAND GLAIZE TRUNK SANITARY RELIEF AND I/I
REDUCTION (SKME-417)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-062.50,000 6660 FY16 Wastewater Construction Task
11768
HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(DETENTION BASIN)
CONSTRUCT DETENTION BASIN TO RELIEVE
BUILDING BACKUPS AND FLOODING IN LOW
ELEVATION AREA CONTAINING TWO MAJOR
TRUNK SEWERS.5,460,000 6660 FY16 Wastewater Construction Task
11770
HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(IMPROVEMENTS FROM BASIN TO HAMILTON
TRUNK)
CONSTRUCT 5,850 FEET OF 12-INCH TO 108-INCH
SEWERS, 500 FEET OF PIPE IN TUNNEL, AND
3,330 FEET OF SEWER LINING IN THE CITY OF ST.
LOUIS.3,900,000 6660 FY16 Wastewater Construction Task
11097 HOLLY DRIVE SEWER SEPARATION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS, CONSTRUCT 2,200 FEET OF 8-INCH TO
24-INCH SEWERS. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-617.1,120,000 6660 FY16 Wastewater Construction Task
11709
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2016) CONTRACT A
USE THE CURED IN PLACE PIPE LINING PROCESS
TO REHABILITATE DETERIORATED SEWER LINES.5,000,000 6660 FY16 Wastewater Construction Task
11868
INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2016) CONTRACT B
USE THE CURED IN PLACE PIPE LINING PROCESS
TO REHABILITATE DETERIORATED SEWER LINES.5,000,000 6660 FY16 Wastewater Construction Task
11054
KINGSTON I/I REDUCTION AND PUMP STATION
ELIMINATION
CONTROL SURCHARGING AND ELIMINATE
EXISTING PUMP STATION P-326 THROUGH
DISCONNECTION OF PRIVATE I/I SOURCES AND
CONSTRUCTION OF 900 FEET OF 8-INCH TO 18-
INCH SEWERS.900,000 6660 FY16 Wastewater Construction Task
11712 LACKLAND I/I REDUCTION
CONSTRUCT 600 FEET OF 8-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.520,000 6660 FY16 Wastewater Construction Task
12061 LEMAY PUBLIC I/I REDUCTION (2016)
REHABILITATE 75,900 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD.4,000,000 6660 FY16 Wastewater Construction Task
12488 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
CONSTRUCT UPGRADE OF ELECTRICAL
SYSTEMS AND SWITCH GEAR, MECHANICAL GATE
REPLACEMENT, AND PUMP UPGRADES.1,750,000 6660 FY16 Wastewater Construction Task
12496 LEMAY WWTF CHANNEL AERATION BLOWERS
INSTALL CHANNEL AIR BLOWERS, CONSTRUCT
NEW AUXILIARY BLOWER BUILDING, AND
REPLACE CHANNEL AIR DIFFUSERS.1,000,000 6660 FY16 Wastewater Construction Task
12429 LEMAY WWTF CHILLER REHABILITATION REPLACE TUBE BUNDLES IN CHILLERS.500,000 6660 FY16 Wastewater Construction Task
12501
LOWER MERAMEC WWTF SCREEN CHANNEL
COATING IMPROVEMENTS
INSTALL SCREEN CHANNEL COATING SYSTEM TO
REPAIR AND PROTECT THE STRUCTURE FROM
CHEMICAL DAMAGE.300,000 6660 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.40 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11928 LUCAS & HUNT AND I-70 SANITARY SEWER
RELOCATE 935 FEET OF 10-INCH SANITARY
SEWER FROM BENEATH INTERSTATE HIGHWAY.640,000 6660 FY16 Wastewater Construction Task
11651 LYNKIRK STUDY AREA I/I REDUCTION
CONSTRUCT 110 FEET OF 8-INCH SANITARY
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-216.160,000 6660 FY16 Wastewater Construction Task
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS.1,050,000 6660 FY16 Wastewater Construction Task
11661 MARTIGNEY I/I REDUCTION
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.318,000 6660 FY16 Wastewater Construction Task
11662 MCNULTY - PALLARDY I/I REDUCTION
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH
STORM SEWER AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.3,200,000 6660 FY16 Wastewater Construction Task
11663
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
CONSTRUCT 800 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.810,000 6660 FY16 Wastewater Construction Task
11774
MISSOURI RIVER SERVICE AREA I/I REDUCTION -
CREVE COEUR CREEK EAST
REHABILITATE 43,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.3,680,000 6660 FY16 Wastewater Construction Task
12616
MISSOURI RIVER WWTF FLOOD PROTECTION
BERM
CONSTRUCT EARTH BERM TO PROTECT THE
SOLIDS HANDLING BUILDING FROM THE 100 YEAR
STORM EVENT.250,000 6660 FY16 Wastewater Construction Task
12503
MISSOURI RIVER WWTF POTABLE WATER FEED
UPGRADE
PROVIDE ADDITIONAL POTABLE WATER SUPPLY
FROM PUBLIC WATER FACILITY TO THE MISSOURI
RIVER WWTF.300,000 6660 FY16 Wastewater Construction Task
10716
NEW ENGLAND TOWN QUARRY PUMP STATION (P-
307) (SKME-544) IMPROVEMENTS
CONSTRUCT 8,900 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER AND ELIMINATE TWO PUMP
STATIONS (P-307 AND P-323).4,200,000 6660 FY16 Wastewater Construction Task
11664 NEWCASTLE I/I REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.70,000 6660 FY16 Wastewater Construction Task
11693
NORTH BADEN CREEK I/I REDUCTION (BP-532)
(WINCHESTER DR)
CONSTRUCT 380 FEET OF 12-INCH STORM
SEWER, REPLACE 510 FEET OF 12-INCH
SANITARY SEWER, AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS.740,000 6660 FY16 Wastewater Construction Task
12460
OAKLAND COMBINED SEWER DETENTION AND
STORAGE (CLAYTON AVE AND OAKLAND AVE)
DETENTION AND STORAGE IMPROVEMENTS TO
BE MADE IN CONJUNCTION WITH
REDEVELOPMENT OF THE FOREST PARK
HOSPITAL GROUNDS.1,000,000 6660 FY16 Wastewater Construction Task
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)
CONSTRUCT 610 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.1,080,000 6660 FY16 Wastewater Construction Task
11698 PICKWICK - BERNADINE - BIMINI SANITARY RELIEF
CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH
SANITARY SEWERS. REDUCE PRIVATE I/I
SOURCES. ELIMINATE CONSTRUCTED SSO
OUTFALLS BP-401, BP-522, AND BP-629.1,880,000 6660 FY16 Wastewater Construction Task
10737 POWELL AVE AND ANNALEE SEWER SEPARATION
REPLACE 700 FEET OF 8-INCH DIAMETER
SANITARY SEWER AND REDIRECT SANITARY
FLOW FROM COMBINED SEWER. CONSTRUCT
PUMP TO FACILITATE SEPARATION.320,000 6660 FY16 Wastewater Construction Task
11700 PROVIDENCE SANITARY RELIEF (SKME-640)
CONSTRUCT 780 FEET OF 8-INCH SEWER, 215
FEET OF 12-INCH SEWER, AND REMOVE PRIVATE
I/I SOURCES FROM SANITARY SEWERS.350,000 6660 FY16 Wastewater Construction Task
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.41 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11701
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
REPLACE PUMP STATIONS P-708 (EARTH CITY
UPS), AND P-702 (EARTH CITY EXPRESSWAY).950,000 6660 FY16 Wastewater Construction Task
10390
RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH
STORM SEWER, CONSTRUCT UNDERGROUND
DETENTION SYSTEM, AND REMOVE PRIVATE I/I.1,200,000 6660 FY16 Wastewater Construction Task
11069 ROCK HILL SANITARY RELIEF (SKME-618)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.1,350,000 6660 FY16 Wastewater Construction Task
10748
ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
CONSTRUCT 3,610 FEET OF 12-INCH TO 48-INCH
INCH STORM SEWERS AND DISCONNECT
DRIVEWAY DRAINS AND DOWNSPOUTS.900,000 6660 FY16 Wastewater Construction Task
11665 SELVIDGE AREA I/I REDUCTION
CONSTRUCT 590 FEET OF 6-INCH TO 12-INCH
SANITARY SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-056.200,000 6660 FY16 Wastewater Construction Task
10754
SHERWYN SANITARY RELIEF (SKME-651) AND I/I
REDUCTION
CONSTRUCT 1,675 FEET OF 6-INCH TO 16-INCH
SANITARY SEWERS AND REMOVE PRIVATE I/I
SOURCES FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-199 & BP-203.1,200,000 6660 FY16 Wastewater Construction Task
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.60,000 6660 FY16 Wastewater Construction Task
11672 UNIVERSITY CITY I/I REDUCTION - WEST
REMOVAL OF PRIVATE I/I SOURCES FROM
SANITARY SEWERS.500,000 6660 FY16 Wastewater Construction Task
12435
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(BEL-NOR)
REHABILITATE 44,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD.4,530,000 6660 FY16 Wastewater Construction Task
12436
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(HANLEY HILLS)
REHABILITATE 50,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE METHOD.4,530,000 6660 FY16 Wastewater Construction Task
12062
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-01)
REHABILITATE 31,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD.4,080,000 6660 FY16 Wastewater Construction Task
12063
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST
(WC-02 AND WC-03)
REHABILITATE 66,000 FEET OF PUBLIC SEWERS
USING THE CURED-IN-PLACE PIPE METHOD.5,120,000 6660 FY16 Wastewater Construction Task
10026
UPPER MALINE TRUNK SANITARY RELIEF PHASE
IV SECTION A
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH
SANITARY SEWER, INCLUDING PIPE IN TUNNEL.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-305.7,500,000 6660 FY16 Wastewater Construction Task
11089 VINITA DRIVE SANITARY RELIEF
CONSTRUCT 650 FEET OF 12-INCH SANITARY
SEWER. ELIMINATE CONSTRUCTED SSO
OUTFALL BP-412.250,000 6660 FY16 Wastewater Construction Task
11086
WEBSTER ACRES SANITARY SEWER
REPLACEMENT
CONSTRUCT 2,250 FEET OF 8-INCH SANITARY
RELIEF SEWER TO REPLACE DETERIORATED 6-
INCH PIPE, 900 FEET OF 12-INCH TO 18-INCH
STORM SEWERS, AND PUBLIC AND PRIVATE I/I
REDUCTION.1,120,000 6660 FY16 Wastewater Construction Task
11678
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
REMOVE EXCESSIVE I/I FROM PUBLIC AND
PRIVATE SOURCES THROUGH SEWER
REHABILITATION AND OTHER METHODS.3,800,000 6660 FY16 Wastewater Construction Task
11726
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C
CONSTRUCT SANITARY SEWAGE WET WEATHER
STORAGE FACILITIES AS PART OF THE OVERALL
SANITARY RELIEF PROJECT.16,000,000 6660 FY16 Wastewater Construction, Phase I (Supplemental Appropriation)
10014 FF-11 FEE FEE CREEK SANITARY RELIEF
CONSTRUCT 4,150 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, FROM 1876 WOODHOLLOW
DRIVE TO PROGRESS PARKWAY. PART OF
PROJECT TO BE BUILT BY THE CITY OF
MARYLAND HEIGHTS, AS PART OF A ROAD
IMPROVEMENT PROJECT.4,900,000 6660 FY16 Wastewater Construction, Phase I (Supplemental Appropriation)
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.42 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
10489
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF
PHASE III
THE THIRD AND FINAL PHASE OF A MULTI-PHASE
PROJECT. THIS PHASE CONSISTS OF THE
CONSTRUCTION OF 4,700 FEET OF 8-INCH TO 42-
INCH SANITARY SEWER SOUTH OF SCHUETZ
ROAD.5,900,000 6660 FY16 Wastewater Construction, Phase I (Supplemental Appropriation)
11685
BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
CONSTRUCT 355 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.290,000 6660 FY16 Wastewater Construction, Phase II
11686
BISSELL POINT I/I REDUCTION (BP-619) (VALLEY
DR)
CONSTRUCT 1,360 FEET OF 12-INCH STORM
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALL BP-619.610,000 6660 FY16 Wastewater Construction, Phase II
10576
DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
CONSTRUCT 3,000 FEET OF 8-INCH TO 15-INCH
SEWERS, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-627, BP-471,
AND BP-607.65,000 6660 FY16 Wastewater Construction, Phase II
10456
FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION AND I/I
REDUCTION
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.150,000 6660 FY16 Wastewater Construction, Phase II
11659
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
CONSTRUCT 2,300 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.950,000 6660 FY16 Wastewater Construction, Phase II
12503
MISSOURI RIVER WWTF POTABLE WATER FEED
UPGRADE
PROVIDE ADDITIONAL POTABLE WATER SUPPLY
FROM PUBLIC WATER FACILITY TO THE MISSOURI
RIVER WWTF.150,000 6660 FY16 Wastewater Construction, Phase II
11681 UPPER COLDWATER SECTION D I/I REDUCTION
CONSTRUCT 3,200 FEET OF 12-INCH STORM
SEWER, AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.450,000 6660 FY16 Wastewater Construction, Phase II
11993
82ND STREET TO I-170 SANITARY RELIEF (UR-08,
UR-09)
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH
DIAMETER SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-421, AND FACILITATE FUTURE
ELIMINATION OF MULTIPLE UPSTREAM
CONSTRUCTED SSO OUTFALLS (BP-416, BP-417,
BP-433, AND BP476).855,000 6660 FY16 Wastewater Design Services
12075
AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-
WEBER RD, SEIBERT, AND HAMBURG)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.565,000 6660 FY16 Wastewater Design Services
12078
APPLE ORCHARD - SINGERSON - BAYLESS PLACE
I/I REDUCTION (LEMAY FERRY RD AND BAYLESS
AVE)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.610,000 6660 FY16 Wastewater Design Services
12023
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT A
REHABILITATE 43,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.110,000 6660 FY16 Wastewater Design Services
12024
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT B
REHABILITATE 56,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.140,000 6660 FY16 Wastewater Design Services
12025
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT C
REHABILITATE 54,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.130,000 6660 FY16 Wastewater Design Services
12617
BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT F
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.120,000 6660 FY16 Wastewater Design Services
11789 CAULKS CREEK FORCEMAIN REHABILITATION
LINE 35,000 FEET OF 20-INCH TO 24-INCH
FORCEMAIN FROM PUMP STATION A TO THE 36-
INCH FORCEMAIN AT THE MISSOURI AMERICAN
WATER PLANT.150,000 6660 FY16 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.43 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12504
COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
DEMOLISH EXISTING FOUR SQUARE CLARIFIERS
AND CONSTRUCT NEW FOURTH CIRCULAR
CLARIFIER. ENLARGE FEED CHANNEL AND PIPING
TO THE EXISTING THREE CIRCULAR CLARIFIERS.1,500,000 6660 FY16 Wastewater Design Services
12125
COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND ASHBY
RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.3,100,000 6660 FY16 Wastewater Design Services
12128
CONCORD I/I REDUCTION (TESSON FERRY RD
AND E CONCORD RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.280,000 6660 FY16 Wastewater Design Services
11997
DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD
AND LADUE RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.400,000 6660 FY16 Wastewater Design Services
12036
DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.200,000 6660 FY16 Wastewater Design Services
12037
DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.150,000 6660 FY16 Wastewater Design Services
11136 DEGIVERVILLE COMBINED SEWER RELOCATION
RELOCATE 3,800 FEET OF COMBINED SEWER IN
METROLINK ROW WITH 12-INCH TO 42-INCH
COMBINED SEWER.650,000 6660 FY16 Wastewater Design Services
11996
FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I
REDUCTION (MANCHESTER RD W OF N GEYER
RD)
CONSTRUCT CIPP PUBLIC SEWER
REHABILITATION OF 8,000 FEET OF 8-INCH TO 12-
INCH SANITARY SEWER, 90 MANHOLES, AND
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.505,000 6660 FY16 Wastewater Design Services
10018
FF-18 VILLA DORADO - LACKLAND - PAGE
SANITARY RELIEF (ADIE RD TO VILLA DORADO
DR)
CONSTRUCT 5,230 FEET OF 30-INCH SANITARY
RELIEF SEWER WEST OF SCHUETZ ROAD FROM
ADIE ROAD SOUTH TO VILLA DORADO DRIVE.
ELIMINATE CONSTRUCTED SSO OUTFALL BP-087.475,000 6660 FY16 Wastewater Design Services
12569
GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT SANITARY STORAGE FACILITY TO
STORE WET WEATHER SANITARY FLOW, TO
MITIGATE SURCHARGING AND ELIMINATE TWO
CONSTRUCTED SSOS.3,125,000 6660 FY16 Wastewater Design Services
12619
HAMBURG AVE TO AL CLAIRE DR TO WEBMORE
DR CSO L-181 (I-032) ELIMINATION
PERFORM PIR REMOVAL AT 139 PROPERTIES,
REHABILITATE 6,500 FEET OF SANITARY AND
STORM SEWERS, AND REMOVE CSO L-181.245,000 6660 FY16 Wastewater Design Services
12304
HELTA, SAPPINGTON, AND GREGORY COURT I/I
REDUCTION (SAPPINGTON RD AND I-270)
CONSTRUCT 7,900 FEET OF 8-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.560,000 6660 FY16 Wastewater Design Services
11994
HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK
I/I REDUCTION (S LINDBERGH BLVD SOUTH OF
LITZSINGER RD)
CONSTRUCT CIPP PUBLIC SEWER
REHABILITATION OF 10,500 FEET OF 8-INCH TO 21-
INCH SANITARY SEWER, 100 MANHOLES, AND
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.290,000 6660 FY16 Wastewater Design Services
12314
KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND
GLEN OWEN DR)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.475,000 6660 FY16 Wastewater Design Services
12317
KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S
KIRKWOOD RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.765,000 6660 FY16 Wastewater Design Services
11995
KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON,
W SARAH I/I REDUCTION (MANCHESTER RD AND
KIRKWOOD RD)
CONSTRUCT CIPP PUBLIC SEWER
REHABILITATION OF 16,000 FEET OF 8-INCH TO 12-
INCH SANITARY SEWER, 140 MANHOLES, AND
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.555,000 6660 FY16 Wastewater Design Services
12048 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.110,000 6660 FY16 Wastewater Design Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.44 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12049 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.100,000 6660 FY16 Wastewater Design Services
12050 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.100,000 6660 FY16 Wastewater Design Services
12038 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.130,000 6660 FY16 Wastewater Design Services
12488 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
CONSTRUCT UPGRADE OF ELECTRICAL
SYSTEMS AND SWITCH GEAR, MECHANICAL GATE
REPLACEMENT, AND PUMP UPGRADES.400,000 6660 FY16 Wastewater Design Services
11820
LMRDP CSO STORAGE TUNNEL (BROADWAY TO
RDP TUBES)
CONSTRUCT DEEP STORAGE TUNNEL SYSTEM
FOR THE LEMAY WATERSHED.8,075,000 6660 FY16 Wastewater Design Services
11959
LMRDP CSO STORAGE TUNNEL NORTH DRIVE
CONSOLIDATION SEWERS
CONSTRUCT CONSOLIDATION SEWERS TO
DELIVER FLOWS TO THE NORTHERN PORTION OF
THE DEEP STORAGE TUNNEL SYSTEM.81,000 6660 FY16 Wastewater Design Services
11958
LMRDP CSO STORAGE TUNNEL SOUTH DRIVE
CONSOLIDATION SEWERS
CONSTRUCT CONSOLIDATION SEWERS TO
DELIVER FLOWS TO THE SOUTHERN PORTION OF
THE DEEP STORAGE TUNNEL SYSTEM.223,000 6660 FY16 Wastewater Design Services
11816 LMRDP TUNNEL DEWATERING PUMP STATION
CONSTRUCT PUMP STATION TO PUMP STORED
COMBINED SEWERAGE TO LEMAY TREATMENT
PLANT.2,050,000 6660 FY16 Wastewater Design Services
11746
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
CONSTRUCT DEEP TUNNEL TO CONVEY
WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, FOR TREATMENT AT
THE LOWER MERAMEC WWTF.2,400,000 6660 FY16 Wastewater Design Services
12536
NATURAL BRIDGE RD - DARBY TO CHEVROLET
COMBINED SEWER RELIEF
REPLACE 1,100 FEET OF 36-INCH TO 42-INCH
COMBINED SEWER WITH 54-INCH COMBINED
SEWER, AND REPLACE 10 SINGLE INLETS WITH
DOUBLE INLETS.200,000 6660 FY16 Wastewater Design Services
12420
REAVSDALE I/I REDUCTION (MACKENZIE RD AND
REAVIS BARRACKS RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.485,000 6660 FY16 Wastewater Design Services
10390
RIDGEMOOR DRIVE I/I REDUCTION & STORM
IMPROVEMENTS (SKME-574)
CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH
STORM SEWER, CONSTRUCT UNDERGROUND
DETENTION SYSTEM, AND REMOVE PRIVATE I/I.100,000 6660 FY16 Wastewater Design Services
12209
SPRINGDALE I/I REDUCTION (ROLLING DR AND
SMITHFIELD PL)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.130,000 6660 FY16 Wastewater Design Services
12240
UNION CREEK I/I REDUCTION (I-55 BETWEEN S
LINDBERGH BLVD AND BUCKLEY RD)
REMOVE PRIVATE I/I SOURCES FROM SANITARY
SEWERS.565,000 6660 FY16 Wastewater Design Services
11992
UNIVERSITY CITY SANITARY STORAGE FACILITY
(HAFNER CT)
CONSTRUCT 6.5 MILLION GALLON
UNDERGROUND STORAGE FACILITY.3,100,000 6660 FY16 Wastewater Design Services
12253
VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD AND
WATSON RD)
CONSTRUCT 1,800 FEET OF 12-INCH SANITARY
SEWER AND REMOVE PRIVATE I/I SOURCES
FROM SANITARY SEWERS.994,000 6660 FY16 Wastewater Design Services
11677
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE III
REHABILITATE PUBLIC SEWERS USING THE
CURED-IN-PLACE PIPE METHOD.270,000 6660 FY16 Wastewater Design Services
11726
COLDWATER SANITARY RELIEF SECTION B, C & D
WET WEATHER STORAGE FACILITY TANK C
CONSTRUCT SANITARY SEWAGE WET WEATHER
STORAGE FACILITIES AS PART OF THE OVERALL
SANITARY RELIEF PROJECT.1,200,000 6660 FY16 Wastewater Engineering During Construction Services
11656
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT COMBINED SEWAGE STORAGE
TUNNEL, ASSOCIATED PUMP STATION, AND
SEWERS.211,000 6660 FY16 Wastewater Engineering During Construction Services
11752
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
RETAIN CONSTRUCTION MANAGEMENT
CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2017
BASED ON PERFORMANCE.250,000 6660 FY16 Wastewater General Services - Construction Inspection
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.45 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11760
GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY &
SEWER DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2017 BASED ON
PERFORMANCE.300,000 6660 FY16 Wastewater General Services - Design CIRP Funds
11780
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2017 BASED ON PERFORMANCE.90,000 6660 FY16 Wastewater General Services - Design CIRP Funds
11781
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
DESIGN. SERVICES MAY BE RENEWED THROUGH
FY2017 BASED ON PERFORMANCE.90,000 6660 FY16 Wastewater General Services - Design CIRP Funds
11753
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater General Services - Geotechnical
11754
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater General Services - Geotechnical
12064
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater General Services - Geotechnical
11764
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater General Services - Survey
11755
GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
RETAIN FIRM FOR AS NEEDED PLANNING
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2016 BASED ON PERFORMANCE.400,000 6660 FY16 Wastewater General Services- Planning
12394
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater GSA - (Survey) CIRP Funds
12395
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater GSA - (Survey) CIRP Funds
12405
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2017 BASED ON PERFORMANCE.50,000 6660 FY16 Wastewater GSA - (Survey) CIRP Funds
12406
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E 50,000 6660 FY16 Wastewater GSA - (Survey) CIRP Funds
12569
GRAVOIS TRUNK SANITARY STORAGE FACILITY
(PARDEE LN AND PARDEE RD)
CONSTRUCT SANITARY STORAGE FACILITY TO
STORE WET WEATHER SANITARY FLOW, TO
MITIGATE SURCHARGING AND ELIMINATE TWO
CONSTRUCTED SSOS.8,000,000 6660 FY16 Wastewater Land Purchase
11711
JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS.2,500,000 6660 FY16 Wastewater Land Purchase
11992
UNIVERSITY CITY SANITARY STORAGE FACILITY
(HAFNER CT)
CONSTRUCT 6.5 MILLION GALLON
UNDERGROUND STORAGE FACILITY.4,000,000 6660 FY16 Wastewater Land Purchase
11649 LEMAY WWTP SECONDARY IMPROVEMENTS
PERFORM STRESS TESTING OF SECONDARY
IMPROVEMENTS TO CONFIRM EXPANSION OF
TREATMENT CAPACITY.510,000 6660 FY16 Wastewater Miscellaneous Services
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.46 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER
TUNNEL, DEWATERING PUMP STATION, AND
CONSOLIDATION PIPING, TO PROVIDE A
STORAGE VOLUME OF 28 MILLION GALLONS.700,000 6660 FY16 Wastewater Pre-Design Services
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS AND DESIGN
SERVICES THROUGHOUT THE BISSELL,
COLDWATER, MISSOURI AND MERAMEC
WATERSHEDS, TO MEET CONSENT DECREE
REQUIREMENTS.3,200,000 6660 FY16 Wastewater Professional Services
11152
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TUNNEL
CONSTRUCTION PROJECTS IN THE LOWER AND
MIDDLE RDP AREAS.1,400,000 6660 FY16 Wastewater Professional Services
11826
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR PROJECTS
ASSOCIATED WITH THE LOWER MERAMEC
TUNNEL SYSTEM AND UPPER RDP TUNNEL
SYSTEM.2,600,000 6660 FY16 Wastewater Professional Services
11151
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT.4,900,000 6660 FY16 Wastewater Professional Services
11110
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE DEER CREEK WATERSHED, TO
MEET CONSENT DECREE REQUIREMENTS.3,000,000 6660 FY16 Wastewater Professional Services
11145
LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT
SERVICES, PLANNING, ANALYSIS, AND DESIGN
SERVICES IN THE LEMAY WATERSHED, TO MEET
CONSENT DECREE REQUIREMENTS.2,900,000 6660 FY16 Wastewater Professional Services
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES.620,000 6660 FY16 Wastewater Professional Services
11993
82ND STREET TO I-170 SANITARY RELIEF (UR-08,
UR-09)
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH
DIAMETER SEWER. ELIMINATE CONSTRUCTED
SSO OUTFALL BP-421, AND FACILITATE FUTURE
ELIMINATION OF MULTIPLE UPSTREAM
CONSTRUCTED SSO OUTFALLS (BP-416, BP-417,
BP-433, AND BP476).500,000 6660 FY16 Wastewater Property Rights Acquisition
11744
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
EASEMENT ACQUISITION COSTS FOR CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
COMBINED AND SANITARY RELIEF SEWER
PROJECTS.3,000,000 6660 FY16 Wastewater Property Rights Acquisition
12626
FLOW METERING MANHOLE IMPROVEMENTS
(2016)
REPLACE EXISTING AND/OR INSTALL NEW
MANHOLES DESIGNED SPECIFICALLY TO
IMPROVE HYDRAULICS AND FACILITATE FLOW
METERING.400,000 6660 FY16 Wastewater Work Order Repair Costs (Capital)
CIRP Projects Listing
FY 2013 to FY 2016
The Budget column includes appropriations for past
projects and future anticipated budget amounts.47 2/5/2015
Project Number Project Name Description Budget Fund Number Fiscal Year Project Type Task Description
11705
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
AS REPAIR OR REPLACEMENT PROBLEMS ARE
IDENTIFIED THROUGHOUT THE DISTRICT,
CONTRACTS WILL BE PROMPTLY ISSUED FOR
NEEDED CONSTRUCTION.5,500,000 6660 FY16 Wastewater Work Order Repair Costs (Capital)
11877
PRIVATE INFLOW AND INFILTRATION REDUCTION
PROGRAM
CONTINUE PROGRAM TO REDUCE PRIVATE
INFLOW AND INFILTRATION SOURCES OF FLOW
INTO THE SANITARY SYSTEM.500,000 6660 FY16 Wastewater Work Order Repair Costs (Capital)