HomeMy Public PortalAboutExhibit MSD 84D - Wastewater Not Required for ComplianceWastewater CIRP Project List Appendix Section 7.2
Projects not required for compliance with Consent Decree or other regulatory requirements
Project
Number Long Name Description Budget
Amount
Financial
Year
Project Type
Desc Problem Description
12498
LEMAY WWTF RETURN ACTIVATED SLUDGE
PUMP DRIVE MODIFICATIONS
REBUILD PUMPS AND INSTALL VARIABLE
FREQUENCY DRIVES.50,000 FY19 Wastewater
AGING PUMPS NEARING THE END OF THEIR
USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING
EXCESSIVE UTILITY COSTS.
12498
LEMAY WWTF RETURN ACTIVATED SLUDGE
PUMP DRIVE MODIFICATIONS
REBUILD PUMPS AND INSTALL VARIABLE
FREQUENCY DRIVES.350,000 FY20 Wastewater
AGING PUMPS NEARING THE END OF THEIR
USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING
EXCESSIVE UTILITY COSTS.
12512
CORPS OF ENGINEERS LOWER RIVER DES
PERES FEASIBILITY STUDY
PROVIDE THE REQUIRED LOCAL MATCH FOR A
FEDERAL FEASIBILITY STUDY TO DEFINE A
FEDERAL PROJECT FOR WATER QUALITY AND
OTHER IMPROVEMENTS IN THE LOWER RIVER
DES PERES AREA.500,000 FY17 Unallocated
THE CORPS OF ENGINEERS REQUIRES A LOCAL
MATCH FOR A FEASIBLITY STUDY TO DEFINE A
FEDERAL ENVIRONMENTAL PROJECT IN THE
LOWER RIVER DES PERES AREA.
12545 LEMAY WWTF ROADWAY REPAIRS PHASE I
REPLACE 30,000 SQUARE FEET OF
DETERIORATED PAVEMENT.480,000 FY18 Wastewater DETERIORATING CONCRETE PAVEMENT.
Exhibit MSD 84D