Loading...
HomeMy Public PortalAboutExhibit MSD 84D - Wastewater Not Required for ComplianceWastewater CIRP Project List Appendix Section 7.2 Projects not required for compliance with Consent Decree or other regulatory requirements Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description 12498 LEMAY WWTF RETURN ACTIVATED SLUDGE PUMP DRIVE MODIFICATIONS REBUILD PUMPS AND INSTALL VARIABLE FREQUENCY DRIVES.50,000 FY19 Wastewater AGING PUMPS NEARING THE END OF THEIR USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING EXCESSIVE UTILITY COSTS. 12498 LEMAY WWTF RETURN ACTIVATED SLUDGE PUMP DRIVE MODIFICATIONS REBUILD PUMPS AND INSTALL VARIABLE FREQUENCY DRIVES.350,000 FY20 Wastewater AGING PUMPS NEARING THE END OF THEIR USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING EXCESSIVE UTILITY COSTS. 12512 CORPS OF ENGINEERS LOWER RIVER DES PERES FEASIBILITY STUDY PROVIDE THE REQUIRED LOCAL MATCH FOR A FEDERAL FEASIBILITY STUDY TO DEFINE A FEDERAL PROJECT FOR WATER QUALITY AND OTHER IMPROVEMENTS IN THE LOWER RIVER DES PERES AREA.500,000 FY17 Unallocated THE CORPS OF ENGINEERS REQUIRES A LOCAL MATCH FOR A FEASIBLITY STUDY TO DEFINE A FEDERAL ENVIRONMENTAL PROJECT IN THE LOWER RIVER DES PERES AREA. 12545 LEMAY WWTF ROADWAY REPAIRS PHASE I REPLACE 30,000 SQUARE FEET OF DETERIORATED PAVEMENT.480,000 FY18 Wastewater DETERIORATING CONCRETE PAVEMENT. Exhibit MSD 84D