Loading...
HomeMy Public PortalAboutExhibit MSD 86C - Summary Schedule of Adjustments to SW CIRP Projections RevisedSummary Schedule of Adjustments to SW CIRP Projections ‐ Revised ‐ 4/8/201520172018201920202021202220232024TotalEngineering Numbers16,370,200$       10,422,000$      16,112,000$      6,999,000$        4,235,000$         3,980,000$        1,525,000$        ‐$59,643,200$      1Inflation Rates (2.5% ‐ 2016 Base Cost)102.50% 105.06% 107.69% 110.38% 113.14% 115.97% 118.87% 121.84%Inflated Values16,779,455$       10,949,614$       17,350,862$       7,725,586$         4,791,514$         4,615,580$         1,812,746$          ‐$64,025,356$       % Change from Engineering Numbers 2.5% 5.1% 7.7% 10.4% 13.1% 16.0% 18.9% N/A 7.3%2Appropriation Delay (86%/14%)16,769,801$       11,765,792$       16,454,687$       9,073,125$         5,202,284$         4,640,211$         2,205,143$         253,784$             66,364,826$       % Change from Inflated Numbers‐0.1% 7.5%‐5.2% 17.4% 8.6% 0.5% 21.6% N/A 3.7%Example:$16,779,455  x  14%  +  $10,949,614  x  84%  =  $11,765,7923Liquidation (8% ‐ 3 years delayed)16,441,451$       11,188,194$       15,219,224$       7,731,541$         4,261,021$         3,323,836$         1,479,293$         (162,398)$           59,482,161$       % Change from Appropriation Delay Numbers‐2.0%‐4.9%‐7.5%‐14.8%‐18.1%‐28.4%‐32.9%‐164.0%‐10.4%Example:$9,073,125  ‐  8%  x  $16,769,801 =  $7,731,541Infrastructure Repair2,000,000$         3,000,000$         3,000,000$         3,000,000$         ‐$‐$‐$‐$11,000,000$       Adjusted Total18,441,451$       14,188,194$       18,219,224$       10,731,541$       4,261,021$         3,323,836$         1,479,293$         (162,398)$           70,482,161$       10.0%20.6%10.7%18.3%‐18.1%‐28.4%‐32.9%‐164.0%6.2%Net Change from Original2,071,251$         3,766,194$        2,107,224$        3,732,541$        26,021$               (656,164)$          (45,707)$            (162,398)$          10,838,961$      % Change from Engineering Numbers12.7%36.1%13.1%53.3%0.6%‐16.5%‐3.0%N/A18.2%Assumption Notes:1 Inflation rates were taken from the St. Louis index published by the Engineering News‐Record.  An average rate for the 12‐months ended September 30, 2014 according to this index was 2.5%.2The key performance measure, construction budget performance, from the FY14 and FY15 budget books showed 84% and 88%, respectively.3A sample of over 250 completed projects of various types and sizes were analyzed, and the overall liquidation percentage from that sample was 8%.Exhibit MSD 86C