Loading...
HomeMy Public PortalAboutExhibit MSD 94B - CIP Variance FY11-FY14RTF Template 2011 2012 2013 2014 21135000 0 7582000 21513500 50230500 10900000 14900000 39900000 65700000 15310000 15697500 6698144 37705644 0 0 500000 500000 21135000 26210000 38179500 68611644 154136144 6100000 0 14770000 13350000 34220000 13603000 2560000 36383000 40037000 92583000 63252000 11265000 65376718 81442200 221335918 58866000 82742300 29742000 9094000 180444300 162956000 122777300 184451218 212534844 682719362 2011 2012 2013 2014 15697000 23234000 46685000 51636000 137252000 0 0 3111000 4473000 7584000 15697000 23234000 49796000 56109000 144836000 6283000 16241000 12044000 34568000 13415000 7490000 26756000 59508000 107169000 67341000 18821000 98218000 114020000 298400000 55487000 81558000 25538000 287000 162870000 158223000 131103000 216549000 241968000 747843000 2011 2012 2013 2014 5438000 -23234000 -39103000 -30122500 -87021500 0 10900000 14900000 39900000 65700000 0 15310000 15697500 6698144 37705644 0 0 -3111000 -3973000 -7084000 5438000 2976000 -11616500 12502644 9300144 6.4211549614736671E-2 -183000 0 -1471000 1306000 -348000 -1.0067114093959731E-2 188000 -4930000 9627000 -19471000 -14586000 -0.13610279091901575 -4089000 -7556000 -32841282 -32577800 -77064082 -0.25825764745308311 3379000 1184300 4204000 8807000 17574300 0.10790384969607662 4733000 -8325700 -32097782 -29433156 -65123638 -8.7081965064859865E-2 Wastewater Capital Improvement and Replacement Program Fiscal Years Ending June 30, Total Asset Management - Capacity Asset Management - Renewal Cityshed Combined Sewer Overflow Districtwide Other Sanitary Sewer Overflow Treatment Plants Notes: Other: miscellaneous projects that are not included in other categories Variance (Appropriation Basis) Note: this category was not in use when the 2011 budget was established Note: this category included Capacity,Renewal, Distritwide, and Other in 2011. 2011-2014 Wastewater Capital Program Budget from 2011 Rate Change Proposal (Appropriation Basis) Other (B & C System) Actual Capital Expenditures (Appropriation Basis) 11 to 14 Asset Management Subtotal: Notes: CIRP Expenses Summary - FY11 to FY14 Districtwide: general projects that provide support services for the wastewater capital program throughout the District Sanitary Sewer Overflow: projects in the separate sewer area that enable or facilitate removal of constructed and known sanitary sewer overflows Treatment Plants: regulatory and asset related projects at MSD wastewater treatment plants needed to comply with treatment plant permits Combined Sewer Overflow: projects in the combined sewer area that reduce or control combined sewer overflows Cityshed: projects that address capacity issues within the combined sewer system to address surface flooding and building backups. Asset Management – Renewal: projects that renew ageing and deteriorated collection system, force mains and pumping station infrastructure Asset Management – Capacity: projects that increase collection system capacity, remove inflow and infiltration to reduce building backups, mitigate sewer overflows, and reduce wet weather flows to the combined sewer system and wastewater treatment plants. EXHIBIT MSD 94B