HomeMy Public PortalAboutExhibit MSD 99K - Revised Appendix 7.5.2Exhibit MSD 99K
Protect
Number
11693
10380
11514
11589
10358
10282
11594
11420
11511
11033
11592
11532
11591
10070
11847
11476
11837
11841
11360
11940
11018
11821
11838
11028
11182
10540
10359
11036
11159
10382
12535
Long Name
BARTER ROAD 8273 AND #301 STORM SEWER
BROGAN DALE CIRCLE STORM SEWER
CRESTWICK DRIVE 19733 AND 9741 STORM SEWER (SUNSET
HILLS 11)
HARVEST HILL CT. BANK STABILIZATION
11EMPLINE COURT STORM SEWER
MAINTENANCE YARD VEHICLE STORAGE BUILDINGS (MINTERT
AND GRAND GLAZE)
MARTYRIDGE CT. #4307 STORM SEWER (MGMB-170)
SAXONHALL DRIVE 810985 STORM SEWER
SCHUETZ ROAD AND WILLOW BROOK COVE STORM SEWERS
STONE HILL DR 4701 STORM SEWER
SUMMER LAKE DR. #15637 STORM SEWER
SUMTER RIDGE CT. #1819 STORM SEWER
VENUS LN. - BRISTORL HALL CT. STORM SEWER
HALL STREET FROM RIVERVIEW TO GRAND STORM SEWERS
HOFFMEISTER - REED - PARDELLA STORM SEWER
KENWOOD - JUNE CREEK BANK STABILIZATION
MAYWOOD-MYRON STORM SEWER
PARDELLA #835 STORM SEWER
PARDELLA AVE. #712 STORM SEWER
ROCK CREEK- GERMANIA TO LOUGiBOROUGH BANK
STABIUZATION
ROLAND BLVD STORM SEWER
SCHAEFFER PLACE 2000 BLOCK STORM SEWER
WINCHESTER DR. 873E5 STORM SEWER
WINCHESTER DRIVE 7120 BANK STABILIZATION
BERKRIDGE DRIVE AND FROST AVENUE PHASE III STORM
SEWER
BROWN ROAD TO EMINENCE BLVD. STORM IMPROVEMENTS
BUSIEK AVE. #8044 STORM SEWER
EVERMAN-TENNYSON STORM SEWER
FOX RUN DRIVE #1350 STORM SEWER
FROSTWOOD PARK STREAMBANK STABILIZATION
LAKE VALLEY DR STORM SEWER REPLACEMENT
Stormwater CIRP Project List
Desonptron
CONSTRUCT 235 FEET OF 12-INCH RCP STORM SEWERS.
DESIGN AND CONSTRUCT APPROXIMATELY 370 FEET OF 12-INCH TO 9S-INCH RCP STORM SEWER AND
APPURTENANCES.
CONSTRUCT 425 FEET OF 12-INCH TO 15-INcit RCP STORM SEWER.
CONSTRUCT 420 FEET OF BANK STABILIZATION.
DESIGN AND CONSTRUCT APPROXIMATELY 575 FEET OF 12-INCH TO 18-INCH DIAMETER STORM
SEWERS AND APPURTENANCES.
CONSTRUCT NEW VEHICLE STORAGE BUILDINGS AT THE GRAND GLAZE AND MINTERT CONSTRUCTION
YARDS.
CONSTRUCT 106 FEET OF 18-INCH RCP AND TWO STRUCTURES.
CONSTRUCT 114 FEET OF 12-INCH TO 1B-INCH STORM SEWER.
CONSTRUCT 410 FEET OF 12-INCH TO 30-INCH STORM SEWER AND 4 TRENCH DRAINS.
CONSTRUCT 170 FEET OF 15-INCH STORM SEWER.
CONSTRUCT 180 FEET OF 12-INCH STORM SEWER.
CONSTRUCT 125 FEET OF 30-INCH STORM SEWER.
CONSTRUCTA THREE WAY AREA INLET BEHIND 3190 VENUS AND PIPE TO EXISTING INLET, GRADING
AREA TO DRAIN TO INLETS.
GRADED SHOULDERS AND CURBS, CLEAN AND REGRADESWALES, AND INSTALL STORMWATER
PUMPING STATIONS AS NEEDED.
CONSTRUCT 800 FEET OF 27-INCH TO 42-INCH RCP STORM SEWER
CONSTRUCT 35 FEET OF 3E-INCH DIAMTER STORM SEWER, AND 1,316 FEET OF MODULAR BLOCK WALL
AND BANK STABILIZATION.
CONSTRUCT 70 FEET OF 24-INCH STORM SEWERS AND TRIPLE INLET.
CONSTRUCT 1,545 FEET OF 12-INCH TO 18-INCH STORM SEWER.
CONSTRUCT SOS FEET OF 16-INCH TO 21-INCH STORM SEWER.
RECONSTRUCT 485 FEET OF CHANNEL BANK WITH HEAVY STONE REVETMENT AND BIOSTABILIZATION.
CONSTRUCT 775 FEET OF 12-NCH TO 42-INCH STORM SEWER.
CONSTRUCT 290 FEET OF 12-INCH RCP.
CONSTRUCT 20 FEET OF 1S-INCH STORM SEWER AND ONE INLET.
CONSTRUCT 170 FEET OF 8-FOOT TO 9-FOOT HIGH MODULAR BLOCK WALL.
CONSTRUCT 1,225 FEET OF 12-INCH TO 24-INCH STORM SEWER AND 585 FEET OF 7 X 3 REINFORCED
CONCRETE BOX.
CONSTRUCT 1,985 FEET OF 12-INCH TO 30-INCH STORM SEWER.
CONSTRUCT APPROXIMATELY 285 FEET OF 15-INCH TO 21-INCH STORM SEWER AND APPURTENANCES,
CONSTRUCT 870 FEET OF 12-INCH TO 38-INCH STORM SEWER
CONSTRUCT 85 FEET OF 15-INCH STORM SEWER.
DESIGN AND CONSTRUCT APPROXIMATELY 85 FEET OF 7-FOOT HIGH HEAVY STONE REVETMENT ON
THE NORTH CHANNEL BANK ALONG FROSTWOOD PARK.
CONSTRUCT 55 FEET OF 15-INCH STORM SEWER AND 10 FEET OF CAP,
Budget
Amount
Financial Project Typo
'leer One
16000 FY17 Stormwater
70,000 FY17 Stormwater
25,000 FY17 Stnmmveter
90,000 FY17 Stormwoter
40,000 FY17 Stormwater
790,000 FY17 Stormwater
20,000 FY17 Rainwater
16,000 FY17 Stemmata
85,000 FY17 Starmweter
20,000 FY17 StormnmIer
10,000 FY17 Storemater
15,000 FY17 Blarrre s*a
10,000 FY17 &nmrwater
2,000,000 FY17 Slomeseter
140,000 FY17 Stormwater
240,000 FY17 Slormwnter
10,000 FY17 SWnnwster
120,000 FY17 Sh.nmdler
50,000 FY17 Shonnmoter
110,000 FY17 Stormwater
1101100 FY17 Stormwater
30,000 FY17 Stammwter
10.000 FY17 Stormwater
40.000 FY17 Stormwater
640.090 FY17 Stammeter
325.000 FY17 Stormwater
125,000 FY17 Stommeter
210,000 FY17 Stommeter
50,000 FY17 Stormweter
90,000 FY17 Stormwater
45,000 FY17 Stornwater
Problem Description
YARD FLOODING.
FLOODING OF THREE STRUCTURES AND RESTRICTION OF EMERGENCY
ACCESS
BASEMENT FLOODING
MODERATE RISK EROSION TO STRUCTURES.
POOR YARD DRAINAGE CAUSING FREQUENT FLOODING OF WALK -OUT
BASEMENT
ADDITIONAL SEWER CLEANING VEHICLES ARE BEING ORDERED TO BE
STORED AT THESE FACILITIES.
HIGH RISK EROSION TO ONE MISCELLANEOUS STRUCTURE BASEMENT
FLOODING AND YARD EROSION.
STRUCTURE FLOODING DUE TO INADEQUATE STORM SEWER.
STREET FLOODING OF SCHUETZ ROAD AND BASEMENT FLOODING OF
TWO HOMES.
Fregsent basement flooding from overland flow.
YARD AND HOME FLOODING DUE TO OVERLAND FLOW.
INFREQUENT STRUCTURAL FLOODING.
OVERLAND FLOW CAUSING YARD FLOODING.
STREET FLOODING ALONG HALL STREET FROM RIVERVIEW TO GRAND.
YARD FLOODING AND EROSION DUE TO LACK OF A STORM SEWER
SYSTEM
MODERATE RISK STRUCTURAL EROSION ALONG A TRIBUTARY TO BADEN
CREEK
FREQUENT STRUCTURAL FLOODING.
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
YARD FLOODING AND FORDING.
MODERATE BANK EROSION THREATENING TRAIL AND CEMETERY ROAD.
Frequent struatmal flooding from overland flow (non-tloodpleln)
ALLEY PONDING
BASEMENT FLOODING DUE TO INADEQUATE STREET DRAIN.
Moderate risk stnatwal erosion
MISCELLANEOUSSTRUCTURE FLOODING, YARD FLOODING, AND STREET
FLOODING
EASEMENT, STREET, AND YARD FLOODING.
YARD FORDING AND EROSION.
Overland flooding of 2 commercial buildings
REAR YARD FORDING.
EROSION IN CHANNEL ADJACENT TO FROSTWOOD PARK.
EXISTING SEWER IS DETERIORATED, CAUSING CAVE-INS.
Task Description
DeslOn Services
Design Services
Des Services
Design Services
Design Services
Construction Task
Design Services
DeslOn 8ervloss
Design Services
Design Services
Design Services
Design Services
Design Services
Design Services
Design Sarvlces
Design Services
Design Services
Design S0Maes
Design Services
Design Services
Design Services
Design SeMees
Design Services
Design Services
Censtmdlan Task
Construction Task
Co0Lucl on Teak
Caarelucion Teak
Cone inclion Tesk
ConstrooNon Task
Construction Task
Project
Number
10388
116e2
11003
11110
11076
11039
11163
10360
11882
11883
11735
91198
1108B
11222
11364
10006
10329
11336
11360
11350
11382
10241
10210
1126E
11331
1105E
11817
11302
11406
11402
11613
Long Name
MALLARD LANE & PHEASANT DRIVE STORM SEWER
MCNULTY - PALLARDY Ill REDUCTION
NORMNE CT. 4r23 STORM SEWER
ROGERS LANE 0976 STORM SEWER
ST. EDMUND 010728 - 10732 STORM SEWER
STANSBERRY AVE 1O282 STORM SEWER
Wi WARS BLVD - ANISTASIA DR. STORM SEWER
STONINGTON - GEORGIAN ACRES STORM SEWER
BALLAS ROAD SUBTRUNK SOUTH VI REDUCTION
BLACK CREEK SANITARY SEWER AND III REDUCTION
DELCREST SANITARY REUEF )SKME-S%) N REDUCTION
PICARDY LANE SUBDIVISION BANK STABILIZATION
ROCK HILL SANITARY RELIEF )SKME-618)
TEALWOOD DRIVE AND BEAVER DRIVE BANK STABIUZATION
ALTHEA - ASTER STORM SEWER
LEE AVE. #337 STORM SEWER
PARK AVENUE STORM IMPROVEMENTS
RALEIGH DRIVE *8829 STORM SEWER
REDLAND DR.-TAHQUITZ DR. STORM SEWER
WHITEHAVEN AND RALEIGH STORM SEWER
WINTERGREEN 3603 AND 3507 STORM SEWER
EMERLING - EVANS DRAINAGE IMPROVEMENTS
CORONA PARK STORM SEWER PHASE 28
DICKENS AVENUE 0470 STORM SEWER
MONROE WEST AVENUE BANK STABIUZATION
SENECA PRIVATE in REDUCTION
BARHAM DOWN DR. 700 BLOCK STORM IMPROVEMENTS
BARKMAN STORM SEWER IMPROVEMENTS
BELLINGTON LANE 0149 STORM SEWER
BOOTHBAY CT. 012301-42302 STORM SEWER
BRADBURY DR. 06468 STORM SEWER
Stormwater CIRP Project List
Descnplion
CONSTRUCT 716 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWER.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW AND INFILTRATION.
CONSTRUCT 136 FEET OF 18INCH STORM SEWER, ONE BIORETENTION FACILITY AND
APPURTENANCES.
CONSTRUCT 180 FEET OF 12-INCH TO 15-INCH STORM SEWER.
CONSTRUCT 275 FEET OF 45-INCH TO 21-INCH RCP STORM SEWER.
CONSTRUCT 545 FEET OF 12-INCH TO 42-INCH RCP STORM SEWER AND APPURTENANCES.
CONSTRUCT 1,050 FEET OF 12-INCH TO 24-INCH STORM SEWER AND APPURTENANCES.
SEWER, 295 FEET OF 8-INCH AND IS --INCH DIP SANITARY SEWER, AND APPURTENANCES, AND 12 RAIN
GARDENS.
REMOVAL OF PRIVATE VI SOURCES FROM SANITARY SEWERS.
REMOVE EXCESSIVE IA FROM THE PUBLIC SEWER BY CONSTRUCTING 1,100 FEET OF 8-INCH SANITARY
SEWER AND BY REMOVING PRIVATE DEFECTS.
CONSTRUCT 440 FEET OF 12-INCH STORM SEWERS AND REMOVE PRIVATE III SOURCES FROM
SANITARY SEWERS.
CONSTRUCT 260 FEET OF 9-FOOT HIGH ROCK BLOCK WALL, 150 FEET OF ROCK TOE PROTECTION AND
TWO GRADE CONTROL STRUCTURES.
REMOVE PRIVATE VI SOURCES FROM SANITARY SEWERS.
CONSTRUCT 290 FEET OF ROCK BLOCK WALL 170 FEET OF MODULAR BLOCK WALL, AND 65 FEET OF
HEAVY STONE REVETMENT.
CONSTRUCT 1,090 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER.
CONSTRUCT 4,110 FEET OF 12-INCH DIAMETER TO 34-INCH BY 53-INCH HORIZONTAL ELLIPTICAL PIPE,
FROM ROSE LANE TO LEE AVENUE.
CURBING AND APPURTENANCES, AND APPROXIMATELY 90 FEET OF 13 FOOT WIDE REINFORCED
CONCRETE CHANNEL
CONSTRUCT 670 FEET OF 30-INCH DIAMETER STORM SEWERS.
CONSTRUCT 416 FEET OF 15-INCh TO 15-INCH RCP STORM SEWER.
CONSTRUCT 305 FEET OF 12-INCH TO 24-INCH DIAMETER STORM SEWER AND APPURTENANCES.
CONSTRUCT 115 FEET OF 124NCH RCP STORM SEWER.
PROVIDE 800,000 IN FINANCIAL ASSISTANCE TO THE CITY OF COOL VALLEY TO COMPLETE THE DESIGN
OF THIS PROJECT IN ORDER TO BE EUGIBLE FOR POSSIBLE FUTURE STATE STORMWATER FUNDING.
CONSTRUCT 1,240 FEET CF 12-INCH TO 24-INCH DIAMETER STORM SEWERS.
CONSTRUCT 100 FEET OF 15-INCH RCP STORM SEWERS .
CONSTRUCT 176 FEET OF ROCK BLOCK TOE ALONG SOUTH STREAMBANK AND INSTALL 170 SY OF
BIOSTABIUZATION.
CONSTRUCT 6,700 FEET OF 12-INCH TO 24-INCH STORM SEWER AND REMOVE PRIVATE SOURCES OF
INFLOW AND INFILTRATION FROM 156 PROPERTIES.
CONSTRUCT 506 FEET OF 15-INCH TO 21-INCH STORM SEWERS.
CONSTRUCT 200 FEET OF 12-INCH DIAMETER STORM SEWERS .
CONSTRUCT 800 FEET OF 42-INCH RCP STORM SEWERS .
CONSTRUCT S5 FEET OF 21-INCH STORM SEWER.
REPLACE EXISTING STORM SYSTEM WITH 810 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWERS.
Budget
Amount
Remold Project Type
Year Dec
260,000 FY17 Stormwater
1,300,090 FY17 Wastewater
110.000 FY17 Stormwater
40,000 FY17 Starmxater
80,000 FY17 Stormwater
260,000 FY17 Stermwater
190,000 FY17 Sormwater
370,000 FY17 Slomrwater
415,000 FY17 Wastewater
800,000' FY17 Wastewater
600,000 FY17 Wastewater
297,O00 FY17 Stormwater
la0,Oo9 FY17 Wastewater
357,000 FY17 Stormwater
300,000 FY17 Stormwater
323,000 FY17 Stamm/War
279.000 FY17 Storrmater
230,000 FY17 Slmmwetar
48,000 FY17 5t0m6vatar
166,000 FY17 Shinnwator
50,000 FY17 Starmra1ar
625,000 FY17 Slamavater
70,000 FY17 Slormwelar
6200 FY17 Stesmwater
11,000 FY17 Stosmwalar
3,500.000 FY17 Wastewater
55,000 FY1S Stormwater
15.000 FY18 Stormnatar
35,000 FY18 Stormwatar
10,000 FY18 Storerwats
50.000 FY16 Stornwreter
Problem Description
Task Dencnpbon
YARD AND STRUCTURAL FLOODING. Construction Task
EXCESSIVE INFLOWIINFILTRATION RESULTING IN BUILDING BACKUPS AND
OVERCHARGED SANITARY SEWERS. Construction, Phase II
Yard loading.
FLOODING OF SIDE AND REAR YARD.
Yard and garage flooding.
Infrequent ahucturai flooding from overland Sow. (non-0oodplaln).
YARD FLOODING.
STREET AND YARD FLOODING ALONG GEORGIAN ACRES.
OVERCHARGING SANITARY SEWERS, AND ACTIVATING A CONSTRUCTED
SSG
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING
CONSTRUCTED SSOS.
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING
CONSTRUCTED SSOS.
CREEK EROSION.
SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS.
HIGH RISK STRUCTURAL EROSION.
STRUCTURE AND YARD FLOODING.
FLOODING DUE TO INADEQUATE STORM SEWER SYSTEM.
STREET AND YARD FLOODING ALONG PARK AVENUE
BASEMENT AND YARD FLOODING CAUSED BY OVERCHARGED STORM
LINE.
YARD FLOODING.
DAMAGE TO PROPERTY DUE TO FLOODING.
YARD FLOODING.
FLOODING OF PROPERTIES ON EVANS AVENUE AND YARD EROSION OF
PROPERTIES ON EMERUNG.
YARD AND STREET FLOODING.
YARD FLOODING.
CREEK BANK EROSION.
INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSING BUILDING
BACKUPS AND OVERCHARGED SANITARY SEWERS.
BASEMENT AND YARD FLOODING.
MINOR STREET AND YARD FLOODING AND EROSION.
EROSION ALONG DRAINAGE CHANNEL
INADEQUATE STORM SEWERS ARE CAUSING STREET FLOODING AND
EROSION.
INADEQUATE STORM SEWER SYSTEM CAUSES FREQUENT FLOODING OF
TWO HOMES.
Construction Task
Construction Task
Construction Task
Construction Task
Construction Task
CansuuWon Task
Construmon, Phase II
Construction, Phase II
ComitruGon. Phase II
CorrtruNo8 Task
Cohsbuciion, Phase II
Construction Task
Construction Task
ConstructimrTask
Consara.5ion Task
ConslrurlonTask
Construction Task
Construction Task
Construction Task
Constrution Task
Design gard ees
Design Services
Design Services
Construction Task
Design Sew{ms
Design Serviom
Design Son/loos
Design Servkm
Design Senecas
Stormwater CIRP Project List
Project Budget Financial Project Type
Number Long Name Deacnribarl Amount Year pees Problem Omanptian Tak Desnrpbon
11509 CUFF DRIVE 961 STORM SEWER CONSTRUCT 275 LF OF 15-INCH TO 18-INCH RCP STORM SEWER . 20,000 FY18 - Stommet0r GARAGE AND YARD FLOODING DUE TO OVERLAND FLOW. Design Services
11537 CRAIG ROAD91485 STORM SEWER IMPROVEMENTS CONSTRUCT 385 FEET OF 12-INCH STORM SEWER, AND 2D FEET OF DIP SANITARY SEWER, . 25,000 FY18 Stormwater GARAGE AND YARD FLOODING, AND EROSION. Design Services
11510 CRESTWICK DR. A9901-9916 STORM SEWER REMOVE 165 LP OF EXISTING STORM SEWERANDCONSTRUCT 540 LF OF 12.' TO 30" RCP STORM SEWER 40,000 FY18 Stomwater YARD, GARAGE AND BASEMENT FLOODING AND YARD EROSION. Design Services
RECONSTRUCT OUTFALL PIPE. STABILIZE STREAM BANK, AND PERFORM PREVENTATIVE CHANNEL
11447 DIPLOMAT LANE OUTFALL STABILIZATION IMPROVEMENTS. 86,000 FY18 Stormwater BANK FAIWRES/EROSION AT OUTFALL Design Services
INADEQUATE AND DETERIORATED STORM SYSTEM CAUSES FORDING ON
11541 FRONT STREET AND MARSHALL RD. STORM SEWER CONSTRUCT 890 FEET OF 15-INCH TO 30-INCH STORM SEWER. 145,000 FY18 Stormwatar MARSHALL ROAD AT FRONT STREET. Design Services
11426 GLENN DRIVE #128 STORM SEWER - CONSTRUCT 600 FEET OF 12-INCH TO 30-INCH RCP STORM SEWER. 45,000 FY18 Stemmata STRUCTURE AND YARD FLOODING. Design Services
11689 HICKORY TREE LN. STORM SEWER CONSTRUCT 330 FEET OF 12-INCH TO24-INCH RCP STORM SEWER. ABANDONING 85 FEET OF CAP. 25,000 FY18 Stormwater BASEMENT AND YARD FLOODING. AND YARD EROSION. Design Services
11608 HUNTERS GLEN CT. #3S5 STORM SEWER CONSTRUCT 260 FEET OF 12-INCH TO 16-INCH RCP STORM SEWER. gsnr81 F i i l ernrrrnycin YARD AND STRUCTURE FLOODING Design Services
11307 LADUE FARM RAOD#126 STORM SEWER CONSTRUCT 370 FEET OF 12-INCH TO I6-INCH STORM SEWER. 27.W6 F41ll dsarrierran Y,wo V-r,7O[Iryr. Alt. FRn51Ftw Design Services
11485 MAR ANN CT. #9819 STORM IMPROVEMENT 'CONSTRUCT 410 FEET OF 21-INCH STORM SEWER . mom rr le rrrimwnu YARD FLOODING AND INFREQUENT BASEMENT FLOODING, Design Servime
11489 MARMONT COURT#338 STORM SEWER CONSTRUCT 133 FEET OF 12-INCH STORM SEWER. I4896 FT I Btolmwater EROSION Design Services
11487 REMINGTCN OAKS - SAN LUIS STORM SEWER CONSTRUCT 180 FEET OF 12-INCH STORM SEWER . 14 OW 1FF11 Stormwater YARD EROSION AND RUNOFF. Design Services
11445 ROANNA LANE#10820 STORM IMPROVEMENTS CONSTRUCT 120 FEET OF 15-INCH STORM SEWER . I8,70'. " Stomwater STRUCTURAL FLOODING AT 10620 ROANNA LAN- Design Services
11424 SCOTT AVE #1213 STORM SEWER CONSTRUCT 245 FEET OF 12-INCH RCP STORM SEWER . P14th F719 Stormwater FORDING IN YARD Design Servi as
11395 SUMMERI IAVEN DRIVEX11858 STORM SEWER CONSTRUCT 440 FEET OF 12-INCH TO 113-INCH STORM SEWER. 2597.6 P i l i Stormwater YARD FLOODING. Design Services
11060 THORNHILL OR 013333 BANKSTABIUZATION ConetmrA heavy stare revelrneM and 9xte0Nfe fabric bank stabilization on south/west side of creek. Stormwater Creek bank erosion. Design Servkec
11407 TINA TERRACE DRIVE STORM SEWER CONSTRUCT 270 FEET OF 12-INCH STORM SEWER . 13.600 F r 13 StonnWeter YARD FLOODING. Design Services
11604 VILLAGE MEAD DR. A294 STORM SEWER CONSTRUCT 60 FEET OF 12-INCH STORM SEWER. loam FY19 Stormwater YARD FLOODING Design Services
11697 VON TALGE RD: I1AVERLEIGN TERRACE BANK STABILIZATION CONSTRUCT 475 FEET OF 14 FOOT HIGH MODULAR BLOCK WALL 150,000 FY18 Stormwater CREEK EROSION THREATENING FOUR STRUCTURES Design Services
11618 WHITNEY POINTE DR. 12210 CHANNEL IMPROVEMENTS CONSTRUCT 130 FEET OF 6 FOOT HIGH ROCK BLOCK WALL AND 310 CY OF HEAVY STONE REVETMENT. 50,000 FY18 Stammerer HIGH RISK STRUCTURAL EROSION DUE TO CHANNEL INCISION. Design Services
11046 WOODLAKE VILLAGE 1009 BANK STABILIZATION CONSTRUCT 300 FEET OF BANKSTABILIZATION. 30,000 FY18 Stormwater Creek bank erosion Design Services
CONSTRUCT SEPARATE STORM SYSTEM FROM GRATED INLET AT 5712 BELDON TO END OF CUL-DE- YARD FLOODING DUE TO INADEQUATE STORM SEWER/COMBINED SEWER
11501 BELDON DRIVE STORM SEWER SAC, AND DOWNSTREAM TO CONNECT TO EXISTING STORM SYSTEM. 80,000 FY18 Stormwater SYSTEM. Design Services
11606 CHAMBERS RD. TO NORTHGATE DR. STORM SEWER CONSTRUCT 1,000 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER. 70,000 FY18 Stamrwater YARD FLOODING. Design Services
11639 FAIRCHILD 96816 STORM SEWER CONSTRUCT 340 FEET OF 12-INCH T021-INCH STORM SEWER. 30,000 FY18 Stomrwoter YARD FLOODING. Design Services
CONSTRUCT APPROXIMATELY 40 FEET OF TRIPLE 6 X 3 BOX CULVERT, 90 FEET OF BB -INCH RCP STORM FLOODING OF RESIDENTIAL AND COMMERCIAL PROPERTIES AND STREET
10172 GRAND & HARRISON STORM IMPROVEMENTS SEWER, 145 FEET OF 10 FOOT WIDE ROCK LINED TRAPEZOIDAL CHANNEL AND APPUTENANCES. 420,000 FY113 Stormwater FLOODING. Cons -Imam Task
INSTALL 115-LF OF STORM SEWER AND APPURTENANCES TO ALLEVIATE GARAGE FLOODING AT 5810
11954 HANCOCK AVENUE 5600 BLOCK STORM SEWER HANCOCK AVENUE 20,000 FY18 Stormwater YARD AND GARAGE FLOODING. Design Services
11419 LAUTE96145 -6161 STORM IMPROVEMENTS CONSTRUCT 535 FEET OF 12-INCH TO 1S-INCH STORM SEWER. 50,000 FY18 Stormwater OVERLAND YARD AND STRUCTURE FLOODING. Design Services
11520 MIDRIDGE DRIVE STORM SEWER CONSTRUCT 560 FEET OF 12-INCH TO IB-INCH STORM SEWERS 50,000 FY18 Stormwater EROSION AND YARD FLOODING DUE TO SURFACE FLOWS. Design Services
OVERLAND FLOODING OF DRIVEWAY AND BASEMENT AT 7001 PAISLEY
11409 PAISLEY-ROSLYN-GAYLORD STORM SEWER CONSTRUCT 105 FEET OF 21-INCH, 875 FEET OF IS -INCH, AND 20D FEET OF 15-INCH STORM SEWER, . 60,000 FY18 Stormwater DURING MODERATE AND HEAVY RAIN EVENTS Design Services
11542 PARKWOOD DRIVE98132 STORM SEWER CONSTRUCT 240 FEET OF 15-INCH STORM SEWER. 30,000 FY18 Stormwater GARAGE AND YARD FLOODING Design Services
11560 WINCHESTER DRIVE BANK STABIUZATION CONSTRUCT 930 FEET OF BANK STABIUZAATION. 170,000 FY18 Stommvater STRUCTURAL EROSION. Design Services
Project
Number
Long Hems
11477 WISE AND WEST PARK STORM IMPROVEMENT
AVK3NON CT 8 BEAUCAIRE DR STORM SEWER (WARSON
WOODS 3 - 04 05 06)
12430
116a4
10167
10268
11680
11678
10172
11266
11024
11274
11261
10983
11160
10020
10000
11290
10347
10606
10372
10036
10302
11693
11418
10380
11600
11623
11301
11614
11579
11611
CEDARCREST PRIVATE IA REDUCTION (SKME-561)
CHARLANE 8 HILLCHESTER STORM SEWER
LINDEN #1084 STORM SEWER
ROXBURY M REDUCTION
Stormwater CIRP Project List
Desonphon
CONSTRUCT 290 FEET OF 12-INCH TO la -INCH DIAMETER STORM SEWERS.
CONSTRUCT 756 FEET OF 12-INCH TO 18-INCH STORM SEWER.
REMOVE PRIVATE M FROM PUBLIC SEWER BY CORRECTING IMPROPER CONNECTIONS ON 300
PROPERTIES.
CONSTRUCT 900 FEET OF 12-INCH TO 30-INCH DIAMETER STORM SEWER.
CONSTRUCT APPROXIMATELY 1,200 FEET OF 12-INCH TO 72-INCH STORM SEWER AND
APPURTENANCES
REMOVE PRIVATE IA SOURCES FROM SANITARY SEWERS.
WEBSTER GROVES TRUNKE SANITARY REHABILITATION AND III REMOVE EXCESSIVE IA FROM PUBLIC AND PRIVATE SOURCES THROUGH SEWER REHABILITATION AND
REDUCTION PHASE IV OTHER METHODS.
CONSTRUCT APPROXIMATELY 40 FEET CF TRIPLE 8 X3 BOX CULVERT, 90 FEET OF 96-INCH RCP STORM
SEWER 145 FEET OF 10 FOOT WIDE ROCK LINED TRAPEZOIDAL CHANNEL, AND APPUTENANCE&
GRAND & HARRISON STORM IMPROVEMENTS
HOLDEN AND LONGWOOD STORM SEWER
HOLDEN AVE TO ETA AVE STORM SEWER
ABSTON AND AIRPORT STORM SEWER
DOANE DRIVE #1719 STORM SEWER
EARL DRIVE STORM SEWER
EDGEHILL DRIVE #1021 -1029 STORM SEWER
HUDSON RD. #1401 -#1406 BANK STABILIZATION (MCDW-120)
JETT DRIVE #10129 STORM SEWER
MARKDALE DR. 88571 AND 8575 STORM SEWER
ROSEWOOD LANE & WOODARD DR. STORM SEWER
FAIRVIEW AVE. #1250 STORM SEWER
JACOBS OLD COAL ROAD & NOTTINGHAM STORM SEWER
BIG BEND TO PAWN STORM SEWER PHASE I
COTTAGE #206 STORM IMPROVEMENTS
BAXTER ROAD M273 AND #301 STORM SEWER
BOXFORD COURT BANK STABILIZATION
BROGAN DALE CIRCLE STORM SEWER
BROOKVALE TERRACE - PARKFIELD TERRACE STORM
IMPROVEMENTS
BRUNSTON DR. #4875 BANK STABIUZATION
CHANDELLAY DRIVE STORM SEWER
CRESTWICK DRIVE #8733 AND 8741 STORM SEWER (SUNSET
HILLS 11)
GEREMMA AND WHITE TREE CHANNEL IMPROVEMENTS
GRAND GLEN DR. #702 STORM IMPROVEMENTS
CONSTRUCT 490 FEET OF 12-INCH TO 21-INCH RCP STORM SEWER .
CONSTRUCT 856 FEET OF 15-INCH TO 18-INCH STORM SEWER
CONSTRUCT 1,060 FEET OF 12-INCH TO 38-INCH STORM SEWER.
CONSTRUCT 290 FEET OF DRAINAGE SWALE, 29D FEET OF CONCRETE BLOCK WALL, AND 20 FEET OF 16-
INCH STORM SEWER.
CONSTRUCT 650 FEET OF 12-INCH TO 21-INCH RCP STORM SEWER.
CONSTRUCT 40 FEET OF DRAINAGE SWALE AND 345 FEET OF 12-INCH STORM SEWER.
CONSTRUCT 280 FEET OF MODULAR BLOCK WALL, 385 FEET OF BIOSTABILIZED BANK, AND 55 FEET OF
HEAVY STONE REVETMENT.
CONSTRUCT 325 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER
CONSTRUCT 220 FEET OF 12-INCH STORM SEWER
CONSTRUCT 1,835FEET OF 12-INCH TO 33-INCH DIAMETER STORM SEWER AND APPURTENANCES.
CONSTRUCT 626 FEET OF 12-INCH TO 24-INCH RCP STORM SEWERS.
CONSTRUCT 600 FEET OF 12-INCH RCP STORM SEWER.
CONSTRUCT 1.915 FELT OF 12-INCH TO 36-INCH DIAMETER STORM SEWERS AND APPURTENANCE&
CONSTRUCT 500 FEET OF 4-FOOT WIDE TRAPEZOIDAL CHANNEL.
CONSTRUCT 235 FEET OF 12-INCH RCP STORM SEWERS.
CONSTRUCT 260 FRET OF 10-FOOT HIGH HEAVY STONE REVETMENT STABIUZATION.
DESIGN AND CONSTRUCT APPROXIMATELY 370 FEET OF 12-INCH TO 38-INCH RCP STORM SEWER AND
APPURTENANCE&
CONSTRUCT 725 FEET OF 6O-INCH TO 72-INCH STORM SEWER, AND 280 FEET OF BANK STABILIZATION
CONSTRUCT 120 FEET OF 12 FOOT MODULAR BLOCK RETAINING WALL
CONSTRUCT 260 FEET OF 12-INCH RCP STORM SEWER .
CONSTRUCT 425 FEET OF 12-INCH TO 15-INCH RCP STORM SEWER .
CONSTRUCT 1,035 FEET OF CHANNEL IMPROVEMENTS.
CONSTRUCT 370 FEET OF 12-INCH STORM SEWER.
Budget
Amount
Financial Project Type
Year Dose
35,000 FY18 Stormwater
170,000 FYIS Stormwater
850,000 FY18 Wastewater
240,000 FY18 Stemmata
836,000 FY18 Stormwater
657,000 FY18 Wastewater
1,300,000 FY18 Wastewater
1.000,000 FY18 Stomrweter
38.000 FY1S Stormerator
46,000 FY16 Stormwater
215,000 FY16 Stormwater
130,000 FY18 Stomrwatar
210,000 FY18 Stomrwatar
80,000 FY18 Stomata'
580,000 FY18 Stormwater
120,000 FY48 Stormwater
90,000 FY16 Stormwater
600,000 FY16 Stormwater
50,000 FY18 Stormwater
40,0411 Yrva 8tdmmeter
690,000 FY18 Btmmmeter
330,000 FY18 Stanweiter
45,000 FY19 Stainwater
45,000 FY19 Starnwrata
200,000 FY19 Stormwater
236,000 FY19 Stormwater
55,000 FY19 Stormwatm
20,000 FY18 Stormwater
75,000 FY19 Stormwater
76,000 FY18 Stormw star
25,000 FY18 Stormwater
Problem Description
YARD PONDING AND STREET FLOODING
Task Description
Design Services
BASEMENT AND YARD FLOODING Construction Task
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING
CONSTRUCTED SSOS. Construction Phase II
YARD FLOODING AND YARD SUBSIDENCE WE TO SINKHOLE AT 1244
CHARLANE COURT. CansOuchon Task
BASEMENT FLOODING IN THE 1000 BLOCKS OF EAST UNDER AVENUE AND
TERRACE DRIVE. Construction Task
EXCESSIVE INFLOWANFILTRATION RESULTING IN BUILDING BACKUPS AND
OVERCHARGED SANITARY SEWERS. Construction, Phase II
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED
SANITARY SEWERS. Construction, Phase II
FLOODING OF RESIDENTIAL AND COMMERCIAL PROPERTIES AND STREET
FLOODING Construction Task
BASEMENT AND STREET FLOODING DUE TO INADEQUATE ROADWAY
DRAINAGE-
Yard flooding.
YARD FLOODING.
FREQUENT BASEMENT FLOODING.
YARD FLOODING.
Design Services
Design Semces
Construction Task
Construction Task
Construction Task
YARD AND STRUCTURE FLOODING. Conahudlon Task
STREAM BANK EROSION ALONG DELLWOOOD CREEK IN THE REAR YARDS
OF RESIDENT AL PROPERTIES AT 1401 AND 1405 HUDSON ROAD. Construction Task
BASEMENT FLOODING.
Construction Task
BASEMENT FLOODING- ConahadJon Task
STREET AND YARD FLOODING AT RESIDENCES ALONG ROSEWOOD LANE
AND WOODARD DRIVE Construmon Tesk
LOCALIZED PONDING IN BACKYARD.
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW
PROPERTY DAMAGE DUE TO BASEMENT AND YARD FLOODING.
CREEK EROSION ALONG EXISTING IMPROVED CHANNEL
YARD FLOODING
CREEK EROSION THREATENING STRUCTURES.
FLOODING OF THREE STRUCTURES AND RESTRICTION OF EMERGENCY
ACCESS.
STRUCTURAL FLOODING FROM OVERLAND FLOW AND YARD FLOODING.
MODERATE RISK STRUCTURAL EROSION
YARD FLOODING.
BASEMENT FLOODING
Design Services
Design Services
Canstmctlnn Task
Goostmctlon Task
construction Task
Design Services
Construction Task
Design Services
Design Services
Design Services
Construction Task
FLOODING FROM THE 10 YEAR STORM EVENT AT 278 GEREMMA DRIVE Design Services
EASEMENT AND YARD FLOODING FROM OVERLAND FLOW.
Deign Services
Stormwater CIRP Project List
Pro900 Budget Finen0lal Project Type
Number Long Name Descriptoon Amount Year past Problem Description Task Description
11569 HARVEST HILL CT. BANK STABILIZATION CONSTRUCT 420 FEET OF BANKSTABIUZATION. 260,000 FY19 Slormweter MODERATE RISK EROSION TO STRUCTURES. Conatractan Teak
EXISTING STORM SEWER OUTFALL IS DETERIORATED. WITH FREQUENT
11428 HELTA DRIVE 11800 STORM SEWER CONSTRUCT 105 FEET OF 18•INCH STORM SEWER, AND INSTALL CIPP IN 190 FEET OF 18-INCH PIPE. 20,000 FY19 Stommeter CAVE INS ALONG SHALLOW PIPE, AND YARD EROSION. Design Services
DESIGN AND CONSTRUCT APPROXIMATELY 576 FEET OF 12-INCH TO 18-INCH DIAMETER STORM POOR YARD DRAINAGE CAUSING FREQUENT FLOODING OF WALK -OUT
10356 HEMPUNE COURT STORM SEWER SEWERS AND APPURTENANCES 120,000 FY19 Stormwater BASEMENT, Construction Task
LARKWOOP - JAYWOOD-SPARROWWOOD BANK CONSTRUCT 385 FEET OF 14 FOOT HIGH MODULAR BLOCK WALL AND 70 FEET OF 16 FOOT HIGH CREEK EROSION BETWEEN SPARROWWOOD AND JAYWOOD. AND BEHIND
11432 STABILIZATION (CRE-07) MODULAR BLOCK WALL 150,000 FY19 Stommater HYANNIS DR. BETWEEN ROSS AVE. AND HYANNIS DR. Design Services
HIGH RISK EROSION TO ONE MISCELLANEOUS STRUCTURE, BASEMENT
11594 MARTYRIDGE CT. #4307 STORM SEWER (MGMB-170) CONSTRUCT 400 FEET OF 16-INCH RCP AND TWO STRUCTURES. 50,000 FY19 Stemmata FLOODING AND YARD EROSION. Construction Task
11389 NOTTINGHAM - MAYFAIR STORM SEWER CONSTRUCT 345 FEET OF 12-INCH TO 15-INCH STORM SEWER . 20.000 FY1B Stormwater YARD FLOODING Design Services
11573 SAPPINGTON RD. AND SAPPHIRE RIDGE CT. STORM SEWER CONSTRUCT 690 FEET OF 15-INCH TO 24-INCH STORM SEWER. 70,000 FY19 Stcmlwater STRUCTURAL FLOODING FROM OVERLAND FLOW. Design Services
11420 SAXONHALL DRIVE #10966 STORM SEWER CONSTRUCT 114 FEET OF 12-INCH TO 18-INCH STORM SEWER. 35,000 FY19 Stomlwater STRUCTURE FLOODING DUE TO INADEQUATE STORM SEWER Construction Talc
STREET FLOODING OF SCHUETZ ROAD AND BASEMENT FLOODING OF
11591 SCHUETZ ROAD AND WILLOW BROOK COVE STORM SEWERS CONSTRUCT 410 FEET OF 12-INCH TO 30-INCH STORM SEWER AND 4 TRENCH DRAINS. 185,000 FY19 Stommater TWO HOMES_ Canstruc9al Task
DESIGN AND CONSTRUCT APPROXIMATELY 600 FEET OF 12-INCH TO 18-INCH STORM SEWER AND
10336 SNELSON DRIVE STORM SEWER APPURTENANCES. 35,0E0 FY19 Stanmater YARD FLOODING AND EROSION Design Services
11033 STONE HILL DR 4701 STORM SEWER CONSTRUCT 170 FEET OF 15-INCH STORM SEWER. 55,000 FY19 Ste naeater Frequent basement Hooding from overland Bow. Construction Task
11592 SUMMER LAKE DR. #15637 STORM SEWER CONSTRUCT 180 FEET OF 12-INCH STORM SEWER . 25,000 FY19 Starnexater YARD AND HOME FLOODING DUE TO OVERLAND FLOW. Construction Task
11532 SUMTER RIDGE CT. #1819 STORM SEWER CONSTRUCT 125 FEET OF 30-INCH STORM SEWER. 40,000 FY19 Stannsater INFREQUENT STRUCTURAL FLOODING. Consimcton Task
CONSTRUCT A THREE WAY AREA INLET BEHIND 3199 VENUS AND PIPE TO EXISTING INLET, GRADING
11591 VENUE LN. - BRISTORL HALL CT. STORM SEWER AREA TO DRAIN TO INLETS. 25,000 FY19 Stanmater OVERLAND FLOW CAUSING YARD FLOODING. Construction Task
10391 CARL AVE. 8 AVIS BT. STORM SEWER CONSTRUCT APPROXIMATELY 205 FEET OF 12-INCH STORM SEWER AND APPURTENANCES. 30,000 FY19 Stemmata STRUCTURE AND YARD FLOODING. Design Sinless
11318 DELMONT AVE #7628 STORM SEWER CONSTRUCT 390 FEET OF 15-INCH RCP STORM SEWER. 50,000 FY19 Stornauuter YARD FLOODING. Design Services
11418 DRURY - SWTTZER STORM SEWER CONSTRUCT 550 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER. 35,000 FY18 Stemmata YARD EROSION AND FLOODING AND OVERLAND FLOODING OF HOMES. Design Services
11474 GLEASON #656 STORM SEWER CONSTRUCT 280 FEET OF 15-INCH RCP STORM SEWER . 20,000 FY19 Stemmata YARD FLOODING, Design Servlesa
GRADED SHOULDERS MD CURBS, CLEAN AND REGRADE MALES, AND INSTALL STORMWATER
10070 HALL STREET FROM RIVERVIEW TO GRAND STORM SEWERS PUMPING STATIONS AS NEEDED. 8,00E030 FY19 Stommater STREET FLOODING ALONG HALL STREET FROM RIVERVIEW TO GRAND. Construction Task
YARD FLOODING AND EROSION DUE TO LACK OF A STORM SEWER
11647 HOFFMEISTER - REED - PARDELLA STORM SEWER CONSTRUCT 890 FEET OF 27-INCH TO 42-1NCH RCP STORM SEWER 400,000 FY19 Stemmata SYSTEM. Construction Task
CONSTRUCT 35 FEET OF 36-INCH CHANTER STORM SEWER, AND 1,315 FEET OF MODULAR BLOCK WALL MODERATE RISK STRUCTURAL EROSION ALONG A TRIBUTARY TO BADEN
11476 KENWOOO- JUNE CREEK BANK STABILIZATION AND BANK STABILIZATION. 720,000 FY19 Stemmata CREEK. Construction Task
11522 LOUISIANA AND HOLLY HILLS STORM SEWER CONSTRUCT 235 FEET OF 12-INCH STORM SEWER . 30,000 FY19 Stommater YARD FLOODING. Design SeM0es
11637 MAYWOODauTYRON STORM SEWER CONSTRUCT 70 FEET OF 24-INCH STORM SEWERS AND TRIPLE INLET. 40,000 FY19 Stammater FREQUENT STRUCTURAL FLOODING Constructibn Task
11641 PARDELLA #B35 STORM SEWER CONSTRUCT 1,545 FEET OF 12-INCH TO 1S-INCH STORM SEWER. 340,000 FY1B Stemmata FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW. ConstruWan Task
11369 PARDELLA AVE #712 STORM SEWER CONSTRUCT 590 FEET OF 15-INCH TO 21-INCH STORM SEWER. 140,000 FY1B Storm:rater YARD FLOODING AND P0380ING ConaVucSon Task
STORMWATER OVERLOADS THE 12' VCP COMBINED SEWER AND CAUSES
11506 RAFORD CT. STORM SEWER SEPARATION CONSTRUCT 370 FEET OF 18-1NCH RCP TO SEPARATE THE STORM AND SANITARY SYSTEMS. 40,000 FY19 Wastewater WBU'S IN SEVERAL DUPLEX BUILDINGS. Design Services
ROCK CREEK - GERMANIA TO LOUGHBOROUGH BANK
11940 STABILIZATION RECONSTRUCT 4E15 FEET OF CHANNEL BANK WITH HEAVY STONE REVETMENT AND BIOSTABILIZATION. 320,000 FY1B Stom water MODERATE BANK EROSION THREATENING TRAIL AND CEMETERY ROAD. Constrao50n Task
11016 ROLAND BLVD STORM SEWER CONSTRUCT 775 FEET OF 12-INCH TO 42-INCH STORM SEWER. 320,000 FY1B Stemmata Frequent squires' needing from overland Bev{nen-Boodplalnl. Construction Task
11482 SAN BERNADINO AVENUE STORM SEWER CONSTRUCT 275 FEET OF 12-INCH DIAMETER STORM SEWER , INCLUDING CURBING. 15,000 FY1B Stennwetor YARD FLOODING AND EROSION. Design Services
11821 SCHAEFFER PLACE 2000 BLOCK STORM SEWER CONSTRUCT 290 FEET OF 12-1NCH RCP. 50,000 FY113 Stommatar ALLEY POISING. ConstrunBon Task
11285 STANWOOD DR. AND BELWOOD DR. STORM SEWER CONSTRUCT 2,705 LF OF 12 INCH TO 313 INCH RCP STORM SEWER. 210,000 FY19 Stemmetar BASEMENT AND STREET FLOODING. Design Services
Pra}ct
Number
11442
11092
10386
11430
11538
11026
11820
11171
11174
11239
11224
10210
11209
11331
10209
14303
11304
11303
11450
11817
11392
11498
11492
11618
11609
11687
11610
11636
11447
11541
11658
Lang Name
STANWOOD DRIVE BANK STABILIZATION
T!EMANN AVE 4800 BLOCK STORM SEWER
UNION ROAD 100 BLOCK STORM IMPROVEMENTS
WILBORN DRIVE 65381 STORM SEWER
WINCHESTER DR. #7385 STORM SEWER
WINCHESTER DRIVE 7120 SANK STABILIZATION
WINDSOR PLACE #3540 STORM SEWER
MEAUX MART - GRAY STORM CHANNEL
ORCHARD • MASON -JOY STORM SEWER
STEEPLECHASE STORM SEWER IMPROVEMENTS (FRONTENAC 3-
TIMBER TRAIL- BRIAR RIDGE CHANNEL IMPROVEMENTS
CORONA PARK STORM SEWER PHASE 2B
DICKENS AVENUE 8470 STORM SEWER
MONROE WEST AVENUE BANK STABILIZATION
CHERRY TREE LANE STORM IMPROVEMENT
IVELAMO DR. I832 STORM SEWER
LACKLAND RD. - UCEYLE AVE. STORM SEWER
,UBERTY AVE. 10000 BLOCK STORM SEWER
MIRIAM AND BURNS STORM SEWER
BARHAM DOWN DR. 700 BLOCK STORM IMPROVEMENTS
BARKMAN STORM SEWER IMPROVEMENTS
BELUNGTON LANE 8149 STORM SEWER
BOOTHBAY CT #12301-12302 STORM SEWER
BRADBURY DR. #54813 STORM SEWER
CLIFF DRIVE 031 STORM SEWER
CRAIG ROAD 81485 STORM SEWER IMPROVEMENTS
CRESTWICK DR. 89901-B915 STORM SEWER
DEKAMAY DRIVE STORM SEWER (MGJB-130)
DIPLOMAT LANE OUTFALL STABILIZATION
FRONT STREET AND MARSHALL RD. STORM SEWER
GENTLE COURT CHANNEL IMPROVE4IENT (WILL-06)
Stormwater CIRP Project List
Description
CONSTRUCT 175 FEET OF 10 7014 FOOT HIGH MODULAR BLOCK WALL .
CONSTRUCT 770 FEET OF 12-INCH TO 18-INCH STORM SEWER
DESIGN AND CONSTRUCT APPROXIMATELY 1,600 FEET OF 12-INCH TO 18-INCH STORM SEWERS AND
APPURTENANCES, AND APPROXIMATELY 900 FEET OF CULVERTS.
CONSTRUCT 160 FEET CF 12-INCH RCP STORM SEWER .
CONSTRUCT 20 FEET OF 18-INCH STORM SEWER AND ONE INLET.
CONSTRUCT 170 FEET OF 6-FOOT TO 9-FOOT HIGH MODULAR BLOCK WALL
CONSTRUCT 240 FEET OF 15-INCH STORM SEWER.
CONSTRUCT 310 FEET OF B FOOT HIGH MODULAR BLOCK WALL, AND GRADE CONTROLS.
CONSTRUCT 2,250 FEET OF 12-INCH TO 42-INCH STORM SEWER and 50 feet of 4' x 3 RCBC.
CONSTRUCT 900 FEET OF 12-INCH TO 21-INCH STORM SEWER, ONE BIORETENTION CELL, AND
APPURTENANCES
CONSTRUCT 130 FEET OF MODULAR BLOCK WALL 100 FEET OF ROCK BLOCK WALL, AND 140 FEET OF
COMBINATION SLOPE PROTECTION.
CONSTRUCT 1,240 FEET OF 12-INCH TO 24-INCH DIAMETER STORM SEWERS
CONSTRUCT 100 FEET OF 16-14CH RCP STORM SEWERS
CONSTRUCT 175 FEET OF ROCK BLOCK TOE ALONG SOUTH STREANBANK AND INSTALL 170 SY OF
BIOSTABILIZATION.
CONSTRUCT 1,190 FEET OF 12-INCH TO 88-INCH DIAMETER STORM SEWER, 150 FEET OF 12-INCH
DIAMETER CMP CULVERT, AND 370 FEET OF 4 FOOT WIDE BY 1.5 FOOT HIGH CONCRETE BOX CULVERT.
CONSTRUCT 110 FEET OF 12-INCH STORMSEWER.
CONSTRUCT 780 FEET OF 12-INCH TO 30-INCH RCP STORM SEWER
CONSTRUCT 820 FEET OF 12-INCH TO 24-INCH STORM SEWER
CONSTRUCT 455 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER AND APPURTENANCES
CONSTRUCT 505 FEET OF 15-INCH T021-INC1H STORM SEWERS.
CONSTRUCT 200 FEET OF 12-INCH DIAMETER STORM SEWERS .
CONSTRUCT 300 FEET OF 42-INCH RCP STORM SEWERS .
CONSTRUCT 95 FEET OF 21-INCH STORM SEWER
REPLACE EXISTING STORM SYSTEM WITH 810 FEET OF 12-INCH TO 30•INCH DIAMETER STORM SEWERS,
CONSTRUCT 275 LF OF 15-INCH TO 18-INCH RCP STORM SEWER.
CONSTRUCT 385 FEET OF 12-INCH STORM SEWER, MID 20 FEET OF DIP SANITARY SEWER, .
REMOVE 185 LF OF EXISTING STORM SEWER ANDCONSTRUCT 640 LF OF 1T TO 30' RCP STORM SEWER
CONSTRUCTERS FEET OF 15-INCH TO 241NCH STORM SEWER
RECONSTRUCT OUTFALL PIPE, STABIUZE STREAM BANK AND PERFORM PREVENTATIVE CHANNEL
IMPROVEMENTS
CONSTRUCT 880 FEET OF 15-INCH TO 30-INCH STORM SEWER
CONSTRUCT 90 FEET OF 7 FOOT HIGH HEAVY STONE REVETMENT, AND GRADE CONTROL STRUCTURE
Budget
Amount
Financial Project Type Problem Desenptran
Year Desc
80,000 FY19 Stormwater CHANNEL EROSION.
70,000 FY19 Stormwater Frequent structural loading.
110,000 FY19 Stormwator YARD FLOODING AND ROAD FORDING.
15,000 FY19 Stenrmrater YARD FLOODING AT 6381 WILSON.
20,000 FY19 Stonnweter BASEMENT FLOODING DUE TO INADEQUATE STREET DRAIN.
100,000 FY19 Stormwater Modulate risk Madura! erosion
30.000 FY19 Stam wetar STREET FORDING AND STRUCTURAL FLOODING.
140,000 FY19 Stonnweter STREAMBANK EROSION.
DAMAGE TO PROPERTY DUE TO FLOODING FROM INADEQUATE STORM
980,000 FY19 Stormwater SEWER
215,000 FY19 Stormwater STRUCTURAL FLOODING.
249,000.FY19 Stamrwaler MODERATE RISK STRUCTURAL EROSION.
280,000 FY19 Slo maater YARD AND STREET FLOODING.
24,000 FY19 Stormwater YARD FLOODING
44,000 FY19 Stormwater CREEK BANK EROSION
560,000 FY19 Stomrwater INADEQUATE STORM SEWER SYSTEM
25-000 FY19 Stormwater YARD RUNOFF AND FORDING.
BASEMENT FLOODING AT 1900 KORANDO DUE TO INADEQUATE STORM
130,000 FY19 Stemmata SEWER SYSTEM
INADEQUATE ROAD DRAINAGE AND INADEQUATE PARKING LOT
220,000 FY19 Starnwater DRAINAGE
105,000 FY19 Stemmata YARD AND STRUCTURE FLOODING.
155,000 1-Y711 Stonnaeter BASEMENT AND YARD FLOODING
40,000 FY20 Sternmater MINOR STREET AND YAND FLOODING AND EROSION.
105,000. FY20 Stemmata EROSION ALONG DRAINAGE CHANNEL
INADEQUATE STORM SEWERS ARE CAUSING STREET FLOODING AND
25,000 FY20 Stormwater EROSION.
INADEQUATE STORM SEWER SYSTEM CAUSES FREQUENT FLOODING OF
140,00B FY20 Stomawter TWO HOMES.
60.000 FY20 Stomwreter GARAGE AND YARD FLOODING DUE TO OVERLAND FLOW.
66,000 FY20 Smrwrwetm GARAGE AND YARD FLOODING, AND EROSION
120,000 FY20 Stawrweter YARD, GARAGE MID BASEMENT FLOODING AND YARD EROSION.
79000 FY20 ammeter FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW
250,000 FY20 Stamweter BANK FAILURESIEROSION AT OUTFALL
INADEQUATE AND DETERIORATED STORM SYSTEM CAUSES FORDING ON
426,090 FY20 Stamwater MARSHALL ROAD AT FRONT STREET.
26,000 FY20 Stamwater CREEK EROSION NEAR 835 AND #90 GENTLE COURT.
Task Description
Design Services
Design Services
Design Services
Design Services
Construction Task
Construction on Task
Design Sentries
Construction Task
Construction Task
Construction Task
Construction Task
Construction Teak
Construction Task
Construction Task
Construction Task
construction Task
Construction Tesk
Construction Task
Conolni ton Task
Conatmcgon Task
Construction Task
Construction Task
Construction Task
Construction Task
Construction Task
Construction Task
Construction Task
Design Services
Construction Task
Construction Task
Design Services
Project
Number
11426
11020
1158E
11806
11438
11387
11644
11486
11488
11565
11461
11638
11467
11630
11446
11424
11386
11080
11407
11604
11822
11398
1181E
11048
11484
11501
11408
1180E
11839
11954
11646
Lang Name
GLENN DRIVE 6128 STORM SEWER
GUENEVERE DR - ROTHERHAM DR STORM SEWER
HICKORY TREE LN. STORM SEWER
HUNTER'S OLEN CT, 9306 STORM SEWER
KENNEY DR- BOUNDARY RD. STORM SEWER
LADUE FARM RAOD 9125 STORM SEWER
LARKIN LH NO STORM IMPROVEMENTS (ME-260)
MAR AWN CT. 99819 STORM IMPROVEMENT
MSRMONTCOURTN389 STORM SEWER
MARRGNEY CREEK -SUNRISE HEIGHTS TO TELEGRAPH PLAZA
STREAMBANK STABILIZATION
MARTIGNEY CREEK STREAMBANK STABILIZATION - FAIRWICK
AND GOLDEN VALLEY BANK STABILIZATION (MGMB-150)
NOTTINGHAM ESTATES DR. 00217 STORM SEWER
REMINGTON OAKS- SAN LUIS STORM SEWER
REYNOSIA- MELITTA STREAMBANK STABILIZATION
ROANNA LANE 910620 STORM IMPROVEMENTS
SCOTT AVE N1213 STORM SEWER
SUMMERHAVEN DRIVE 811656 STORM SEWER
THORNHILL DR 61338E BANK STABILIZATION
TINA TERRACE DRIVE STORM SEWER
VILLAGE MEAD DR. 9264 STORM SEWER
Stormwater CIRP Project List
Description
CONSTRUCT 600 FEET CF 12-111CH TO SO -INCH RCP STORM SEWER
CONSTRUCT 215 FEET OF 12-INCH STORM SEWER.
CONSTRUCT 360 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER, ABANDONING 85 FEET OF CMP.
CONSTRUCT 280 FEET OF 12-INCH TO 15-INCH RCP STORM SEWER
CONSTRUCT 436 FEET OF 12-INCH TO 18-INCH RCP STORM SEWER
CONSTRUCT 370 FEET OF 12-INCH TO 15-INCH STORM SEWER
CONSTRUCT 265 FEET OF 12-INCH TO 16-INCH STORM SEWER, AND 1 RAINGARDEN.
CONSTRUCT 410 FEET OF 21-INCH STORM SEWER .
CONSTRUCT 133 FEET Of 12-INCH STORM SEWER.
CONSTRUCT 650 FEET OF COMPOSITE REVETMENT, 150 FEET OF MODULAR BLOCK WALL, AND 10 FEET
OP GRADE CONTROL ON A20 FOOT WIDE SECTION OF THE CREEK,
CONSTRUCT 650 FEET OF STREAMBANK PROTECTION
CONSTRUCT 160 FEET OF 15-INCH STORM SEWER.
CONSTRUCT 1W FEET OF 12-INCH STORM SEWER.
CONSTRUCT 340 FEET OF 14-FOOT HIGH MODULAR BLOCK RETAINING WALL.
CONSTRUCT 120 FEET OF 15-INCH STORM SEWER -
CONSTRUCT 246 FEET OF 12-INCH RCP STORM SEWER.
CONSTRUCT 440 FEET OF 12-INCH TO TB -INCH STORM SEWER
Construct heavy stone revetment and geollodle fabrre bank stablltetlon on souBVNeet aide of meek
CONSTRUCT 270 FEET OF 12-INCH STORM SEWER.
CONSTRUCT 60 FEET OF 12-INCH STORM SEWER.
VON TALGE RD: HAVERLEIGH TERRACE BANK STABILIZATION CONSTRUCT 475 FEET CF 14 FOOT HIGH MODULAR RI rICK WALL
WEATHERBY DRIVE STORM SEWER
WHITNEY POINTE DR. 112210 CHANNEL IMPROVEMENTS
WOODLAKE VILLAGE 1008 BANK STABILIZATION
BARTOLET TO PAULE AVE STORM SEWER REPLACEMENT
BELDON DRIVE STORM SEWER
BROMDHEAD4621 STORM SEWER
CHAMBERS RD. TO NORTHGATE DR. STORM SEWER
FAIRCHILD S6818 STORM SEWER
HANCOCK AVENUE 5600 BLOCK STORM SEWER
HORN AVE. AND WACHTEL AVE. BANK STABILIZATION
CONSTRUCT 570 FEET CF 12-INCH STORM SEWERS.
CONSTRUCT 180 FEET CF 8 FOOT HIGH ROCK BLOCK WALL AND 810 CY OF HEAVY STOVE REVETMENT.
CONSTRUCT 300 FEET OF BANK STABILIZATION.
CONSTRUCT 1,000 FEET OF 36-INCH STORM SEWER, REPLACING 15- NCH TO 24-INCH SEWERS.
CONSTRUCT SEPARATE STORM SYSTEM FROM GRATED INLET AT 6712 BELDON TO END OF CULL -DE -
SAC, A142 DOWNSTREAM TO CONNECT TO EXISTING STORM SYSTEM
CONSTRUCT 235 FEET OF 30-INCH STORM SEWER.
CONSTRUCT LOOS FEET OF 12-INCH TO24-INCH RCP STORM SEWER.
CONSTRUCT 340 FEET OF 12-INCH TO 21-INCH STORM SEWER.
INSTALL 115-LF OF STORM SEWER AND APPURTENANCES TO ALLEVIATE GARAGE FLOODING AT 6610
HANCOCK AVENUE
CONSTRUCT 210 FEET OF 4 FOOT HIGH CONCRETE WALL AND BUYOUT OF ONE HOME AT 420 HORN.
Budget
Amount
F[nmbal Project Type
Year Dean
135,000.FY20 Stonrwra1ar
16,000 FY20 Stormwater
70,000 FY20 Stonnwnter
65 000 FY20 Stomwstnr
39000 FY20 Stomwreter
65.000 FY20 Stonnwatw
2E000 FY20 Stormwater
851100 FY20 Stormwater
25,000'. FY20 Stormwater
165.000 FY20 Stomlwatar
205,000 FY20 &arm eter
15,000 FY20 &a mweter
85,000 FY20 Siormaxter
105,000 FY20 Stormaeter
45,000 FY20 Stormwaler
5d,000 FY20 Slarmwvicr
75A00 FY20 Stormwater
60,000 FY20 Stormwater
45,000 FY20 Stormwater
20,000 FY20 Stormwater
445,000 FY20 Stormwater
30,000 FY20 SWnnhalar
140,000 FY20 Stormwater
88000 FY20 Stanmr/der
1301100 FY20 ammeter
170,000 FY20 Stonmvater
30.000 FY20 Stormwater
220 000 FY20 Stormwater
70,000 FY20 Stormwater
40,000 FY20 Stamnrater
60,000 FY20 Stammratee
Problem Description
STRUCTURE AND YARD FLOODING.
Yard flooding.
BASEMENT AND YARD FLOODING, AND YARD EROSION.
YARD AND STRUCTURE FLOODING.
YARD FLOODING AND EROSION
YARD FLOODING AND EROSION.
YARD FLOODING.
YARD FLOODING AND INFREQUENT BASEMENT FLOODING.
EROSION.
CREEK EROSION AND FLOODING IN YARDS AND COMMON GROUND.
HIGH RISK EROSION TO EIGHT MISCELLANEOUS STRUCTURES.
YARD FLOODING.
YARD EROSION AND RUNOFF.
MODERATE RISK STRUCTURAL EROSION AT FOUR HOMES.
STRUCTURAL FLOODING AT 10820 ROANNA LANE
PONDING IN YARD
YARD FLOODING
Creek bank erosion.
YARD FLOODING.
YARD FLOODING.
CREEK EROSION THREATENING FOUR STRUCTURES.
ROADWAY FLOODING ON CRIMSON, AND YARD FLOODINGIEROSION AT
1401,1467, AND 1415 WEATHERBY, AND 1fOT CRIMSON.
HIGH RISK STRUCTURAL EROSION DUE TO CHANNEL INCISION.
Creek bank erosion.
UNDERSIZED PIPES ARE CAUSING BASEMENT AND GARAGE FLOODING,
MID STREET FLOODING ALONG PAULE.
YARD FLOODING DUE TO INADEQUATE STORM SEWERICON,BINED SEWER
SYSTEM.
CHANNEL EROSION AT END OF 30-INCH CMP.
YARD FLOODING.
YARD FLOODING
YARD AND GARAGE FLOODING.
MODERATE RISK STRUCTURAL EROSION AND FREQUENT STRUCTURAL
FLOODING.
Task Description
CosretruGlan Task
Design Services
Construction Task
Construction Task
Design Services
Construction Task
Design Services
Construction Task
Construction Task
Design Services
Design Services
Design Swvtem
Cofakuc60n Task
Design Services
Cofehu0Saa Task
Construction Task
Cansbudlon Task
Construction Task
Combustion Task
Conetnictlon Task
Construction Task
Design Services
Construction Task
Construction Task
Design Services
C0rntruction Task
Design Services
Construction Task
C005Wctlon Task
C0rntmctlon Task
Design Services
Project
Number
11545
11410
1153D
11503
1162D
11614
11607
11431
11203
11586
11409
11542
11643
11433
11556
11477
11266
11024
10565
10372
11416
11600
11623
11391
11579
11611
11428
11432
11386
11573
10336
Long Nana
KAYSER AVE -WALLER AVE STORM SEWER
LAIJTE46146-6151 STORM IMPROVEMENTS
LARIMORE STORM SEWER
MAIN STREET 2600 BLOCK STORM SEWER
MIDRIDGE DRIVE STORM SEWER
MILITARY AND WEISS STORM SEWER
MINNIE AVE TO GREEN HAVEN STORM SEWER
MUELLER COURT STORM SEWER
OAKSHIRE LN TO GEYER RD. STORM SEWER
ORCHARD AND WINDSOR LANE STORM SEWER
PAISLEY-ROSLYN-GAYLORD STORM SEWER
PARKWOOD DRIVE 66132 STORM SEWER
TIEMAN AND KAMMERER STORM SEWER
WACHTEL AVENUE 1200 BLOCK STORM SEWER
WINCHESTER DRIVE BANK STABILIZATION
WISE AND WEST PARK STORM IMPROVEMENT
HOLDEN AND LONGWOOD STORM SEWER
HOLDEN AVE TO ETA AVE STORM SEWER
FAIRVIEW AVE. #1250 STORM SEWER
JACOBS OLD COAL ROAD 8 NOTTINGHAM STORM SEWER
BOXFORD COURT BANK
BROOKVALE TERRACE- PARKFIELD TERRACE STORM
IMPROVEMENTS
BRUNSTON DR #4875 BANK STABILIZATION
CHANDELLAY DRIVE STORM SEWER
GEREMMA AND WHITE TREE CHANNEL IMPROVEMENTS
GRAND GLEN DR. #702 STORM IMPROVEMENTS
HELTA DRIVE 11800 STORM SEWER
LARKWOOD -JAYWOOD-SPARROWWOOD BANK
STABILIZATION (CRE-07),
NOTTINGHAM- MAYFAIR STORM SEWER
SAPPINGTON RD. AND SAPPHIRE RIDGE CT STORM SEWER
SNELSON DRIVE STORM SEWER
Stormwater CIRP Project List
Description
CONSTRUCT 816 FEET OF 12-INCH TO 21-INCH RCP STORM SEWER
CONSTRUCT 565 FEET OF 12-I19CH TO 15-INCH STORM SEWER.
CONSTRUCT 4,860 FEET OF 12-INCH TO 54-INCH STORM SEWER AND CULVERTS,
CONSTRUCT 286 FEET OF 15-INCH TO 21-INCH RCP STORM SEWER .
CONSTRUCT 660 FEET OF 12-INCH TO IS -INCH STORM SEWERS.
CONSTRUCT 500 FEET OF 12-INCH TO 15-INCH DIAMETER STORM SEWER.
CONSTRUCT 890 FEET OF 12 INCH TO W INCH DIAMETER STORM SEWER FROM MINNIE AVE TO GREEN
HAVEN DR.
CONSTRUCT 550 FEET OF 12-INCH TO 18-INCH RCP STORM SEWER
CONSTRUCT 1,040 FEET OF 12-INCH TO 27-INCH STORM SEWER
CONSTRUCT W0 FEET OF 16-INCH TO 88-INCH STORM SEWER, 20 FEET OF 8-INCH DIP,
CONSTRUCT 105 FEET OF 21-INCH, 875 FEET OF 18-INCH, AND 200 FEET OF 15-INCH STORM SEWER, .
CONSTRUCT 240 FEET OF 15-INCH STORM SEWER
CONSTRUCT 460 FEET OF 12-INCH TO 18-INCH STORM SEWER.
CONSTRUCT 390 FEET OF 12-1NCH TO 24-INCH STORM SEWER .
CONSTRUCT 920 FEET OF BANK STABILIZATION.
CONSTRUCT 290 FEET OF 12-INCH TO 18-INCH DIAMETER STORM SEWERS.
CONSTRUCT 490 FEET OF 12-INCH TO 21-INCH RCP STORM SEWER
CONSTRUCT 956 FEET OF 15-INCH YO la -INCH STORM SEWER.
CONSTRUCT 825 FEET OF 12-INCH TO 24-INCH RCP STORM SEWERS
CONSTRUCT 600 FEET OF 12-INCH RCP STORM SEWER
CONSTRUCT 260 FEET OF 10-FOOT HIGH HEAVY STONE REVETMENT STABILIZATION.
CONSTRUCT 726 FEET OF 60-1NCH TO 72a81C11 STORM SEWER . AND 280 FEET OF BANK STABILIZATION
CONSTRUCT 120 FEET OF 12 FOOT MODULAR BLOCK RETAINING WALL.
CONSTRUCT 260 FEET OF 12-INCH RCP STORM SEWER
CONSTRUCT 1,035 FEET OF CHANNEL IMPROVEMENTS
CONSTRUCT 370 FEET OF 12-INCH STORM SEWER.
CONSTRUCT 106 FEET OF 18-INCH STORM SEWER , AND INSTALLCIPP IN 180 FEET OF 16-INCH PIPE,
CONSTRUCT 8135 FEET OF 19 FOOT HIGH MODULAR BLOCK WALL AND 70 FEET OF 18 FOOT HIGH
MODULAR BLOCK WALL
CONSTRUCT 346 FEET OF 12-INCH TO 15-INCH STORM SEWER
CONSTRUCT 690 FEET OF 15-INCH TO 24-INCH STORM SEWER.
DESIGN AND CONSTRUCT APPROXIMATELY 506 FEET OF 12-INCH TO 16-INCH STORM SEWER AND
APPURTENANCES
Budget
Amount
Financial Project Type
Year Dar
60.000 FY20 Stcmmater
130,060 FY20 Stormwater
480 000 FY20 Stomrwater
20,080 FY20 Stonnwater
140,000. FY20 Stormwater
40,000 FY20 Stormwater
40,000 FY20 Stormwater
35,000 FY20 Storrnwater
160,000 FY20 Stormwater
70,000 FY20 Stormwater
180.000 FY20 Ddn„x,etor
80,000 FY20 Stonoweter
50,000 FY20 StmrrnvMer
85,000. FY20 Stormeater
404000 FY20 Stmrrnvater
180,000 FY20 Storrowaler
132 MO FY20 Stormwaler
192.000 FY20 SM,,,rr hr
200,000 PY20 Sto<mwe[er
195.060 FY20 Stormvwter
130.000 FY21 Stornwvaler
700.000 FY21 Staroweter
150,000 FY21 Syommater
50,000 FY21 Stormwater
220.000 FY21 SLormwater
70000 FY21 5101 eMster
50.000 FY21 Stormwater
450.000 FY21 Stormiess
66000 FY21 Sto mwater
200,000. FY21 Stormwwtar
100,000 FY21 Stormwater
Problem Description
YARD AND STREET FLOODING.
OVERLAND YARD AND STRUCTURE FLOODING
FREQUENT ROADWAY, STRUCTURAL. AND YARD FLOODING.
YARD FLOODING.
EROSION AND YARD FLOODING DUE TO SURFACE FLOWS.
FLOODING FROM INADEQUATE ROAD DRAINAGE.
STREET PONDING IN FROM OF 7033 MINNIE AVENUE.
YARD FLOODING AND EROSION.
YARD FLOODING
YARD AND GARAGE FLOODING
OVERLAND FLOODING OF DRIVEWAY AND BASEMENT AT 7001 PAISLEY
DURING MODERATE AND HEAVY RAIN EVENTS.
GARAGE AND YARD FLOODING
YARD AND ALLEY FLOODING
YARD FLOODING DUE TO INADEQUATE ROADWAY DRAINAGE.
STRUCTURAL EROSION
YARD PONDING AND STREET FLOODING
BASEMENT AND STREET FLOODING DUE TO INADEQUATE ROADWAY
DRAINAGE.
Yard Boodlrg.
LOCALIZED PONDING IN BACKYARD.
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW
CREEK EROSION THREATENING STRUCTURES.
STRUCTURAL FLOODING FROM OVERLAND FLOW AND YARD FLOODING
MODERATE RISK STRUCTURAL EROSION.
YARD FLOODING
FLOODING FROM THE 10 YEAR STORM EVENT AT 276 GEREMMA DRIVE
BASEMENT AND YARD FLOODING FROM OVERLAND FLOW.
EXISTING STORM SEWER OUTFALL IS DETERIORATED, WITH FREQUENT
CAVE INS ALONG SHALLOW PIPE, AND YARD EROSION.
CREEK EROSION BETWEEN SPARROW WOOD AND JAYWOOD. AND BEHIND
HYANNIS DR. BETWEEN ROSS AVE AND HYANNIS DR - Construction Task
YARD FLOODING.
STRUCTURAL FLOODING FROM OVERLAND FLOW.
YARD FLOODING AND EROSION
Teak Descnptroa
Design Services
Construction Task
Design Servicesrvi Design Services
Construction Task
Design Services
Design Services
Design SwlmServicesDesign Services
Deakin Swims
ConConstruction Task
Construction Task
Design Services
Design Services
Construction Task
Construction Ted
Conskution Task
Conduction Task
Conskuthn Task
Construction Tad
Construction Teak
Construction Teak
Construction Teakdss Consikn Teak
Construction Task
Construction Teak
Conduction Teak
Construction Task
Construction Task
Construction Task
Stormwater CIRP Project List
Prolog Budget FinancW Project Type
Number LonO Mama Oesmptian Amount Year Dsac Problem Demonptran Task Descriptor
10331 CARL AVE SAVIS ST STORM SEWER CONSTRUCT APPROXIMATELY 285 FEET OF 12-INCH STORM SEWER AND APPURTENANCES. P0,000 FY21 Stormwater STRUCTURE AND YARD FLOODING. Construction Task
11318 DELMONT AVE 117028 STORM SEWER CONSTRUCT 390 FEET OF 15-INCH RCP STORM SEWER 140,000 FY21 Stalemates YARD FLOODING Construction Task
11415 DRURY- SWITZER STORM SEWER CONSTRUCT 550 FEET OF 12-INCH TO 10-INCH DIAMETER STORM SEWER. 100,000 FY21 Stomrwater YARD EROSION AND FLOODING, AND OVERLAND FLOODING OF HOMES. Construction Task
11474 GLEASON 093 STORM SEWER CONSTRUCT 250 FEET OF 154NCH RCP STORM SEWER 60,000 FY21 Blnnrnrater YARD FLOODING. Construction Task
11622 LOUISIANA AND HOLLY HILLS STORM SEWER CONSTRUCT 235 FEET OF 12-INCH STORM SEWER. 80.000 FY21 Stormwater YARD FLOODING Con* !elan Task
STORMWATER OVERLOADS TEE 17 VCP COMBINED SEWER AND CAUSES
11505 RAFORD CT. STORM SEWER SEPARATION CONSTRUCT 370 FEET OF 18-INCH RCP TO SEPARATE THE STORM AND SANITARY SYSTEMS 110,000 FY21 Wastewater WBVS IN SEVERAL DUPLEX BUILDINGS. Conatnm6on Task
11482 SAN BERNADINO AVENUE STORM SEWER CONSTRUCT 276 FEET OF 12•INCH DIAMETER STORM SEWER , INCLUDING CURBING. 45,000 FY21 Glomerate YARD FLOODING AND EROSION. Constriction Task
11285 STANWOOD DR. AND BELWOOD DR STORM SEWER CONSTRUCT 2 765 LF OF 12 INCH TO 30 INCH RCP STORM SEWER. 829,090 FY21 St rmwetar BASEMENT AND STREET FLOODING, Construction Task
11442 STANWOOD DRIVE BAN( STABILIZATION CONSTRUCT 175 FEET OF 10 TO 14 FOOT HIGH MODULAR BLOCK WALL. 180,090 FY21 Stormenter CHANNEL EROSION. Construction Task
11042 T1EMANN AVE 4000 BLOCK STORM SEWER CONSTRUCT 770 FEET OF 12-IRON TO 18-INCH STORM SEWER 190,000 FY21 Stormwater Frequent structural flooding, Construction Task
DESIGN AND CONSTRUCT APPROXIMATELY 1,500 FEET OF 12-INCH TO 18-INCH STORM SEWERS AND
MSS UNION ROAD 100 BLOCK STORM IMPROVEMENTS APPURTENANCES, AND APPROXIMATELY 900 FEET OF CULVERTS. 320,000 FY22 Stormwater YARD FLOODING AND ROAD FORDING, Construction Task
11420 WILBORN DRIVE 416381 STORM SEWER CONSTRUCT 180 FEET OF 12-INCH RCP STORM SEWER . 40,000 FY21 Stommster YARD FLOODING AT 5351 WILSON. Construction Task
11620 WINDSOR PLACE 03840 STORM SEWER CONSTRUCT 240 FEET OF 154NCH STORM SEWER. 90,030 FY21 Stormwater STREET PONDING AND -STRUCTURAL FLOODING Construction Task
11535 DEKAMAY DRIVE STORM SEWER (MGJB-130) CONSTRUCT 985 FEET OF 15-INCH TO 24-1NCH STORM SEWER. 210,000 FY22 Stormwater FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW. Construction Tog
11030 GUENNEVERE DR - ROTHERHAM DR STORM SEWER CONSTRUCT 215 FEET OF 12-INCH STORM SEWER. 40,000 FY22 Stormwater Yard Modarg. Consbucton Task
11438 KENNEY DR -BOUNDARY RD. STORM SEWER CONSTRUCT 435 FEET OF 12-INCH TO 1&INCH RCP STORM SEWER 80 000 FY22 Stommster YARD FLOODING AND EROSION Constuction Task
11635 NOTTINGHAM ESTATES DR 95217 STORM SEWER CONSTRUCT 160 FEET OF 154NCH STORM SEWER. 35,000 FY22 Stormwater YARD FLOODING Construction Task
ROADWAY FLOODING ON CRIMSON, AND YARD FLOODINWEROSION AT
11206 WEATHERBY DRIVE STORM SEWER CONSTRUCT 670 FEET OF 124NCH STORM SEWERS. 65,000 FY22 Stormwater 1401.1407, AND 1415 WEATHERBY, AND 1101 CRIMSON ColMmdlon Task
UNDERSIZED PIPES ARE CAUSING BASEMENT AND GARAGE FLOODING,
11494 BARTOLET TO PAULE AVE. STORM SEWER REPLACEMENT CONSTRUCT 1,000 FEET OF 38-INCH STORM SEWER, REPLACING 16-INCH TO 241NCH SEWERS. 950.000 FY22 Stormwater AND STREET FLOODING ALONG PAULE. Construction Task
11408 BROADHEAD9321 STORM SEWER CONSTRUCT 236 FEET OF 304NCH STORM SEWER. 90.000 FY22 Stormwater CHANNEL EROSION AT END OF 304NCH CARP. Construction Task
MODERATE RISK STRUCTURAL EROSION AND FREQUENT STRUCTURAL
11848 HORN AVE AND WACHTEL AVE BANK STABILIZATION CONSTRUCT 210 FEET OF 4 FOOT HIGH CONCRETE WALL AND BUYOUT OF ONE HOME AT 42a HORN, 140,000 FY22 Stormwater FLOODING. Construction Task
11645 KAYSER AVE. - WALLER AVE STORM SEWER CONSTRUCTSIO FEET OF 12-INCH TO 21-INCH RCP STORM SEWER. 220,000 FY22 Swlllllater YARD AND STREET FLOODING. Construction Trek
11630 LARIMORE STORM SEWER CONSTRUCT 4.880 FEET OF 12-INCH TO 54-1NCH STORM SEWER AND CULVERT& 1,400,000 FY22 Stannwater FREQUENT ROADWAY, STRUCTURAL, AND YARD FLOODING. Congruence Task
11603 MAIN STREET 2500 BLOCK STORM SEWER CONSTRUCT 280 FEET OF 15-INCH TO 21-INCH RCP STORM SEWER . 60,000 FY22 Stormwater YARD FLOODING. Construction Teak
11814 MILITARY AND WEISS STORM SEWER CONSTRUCT 500 FEET OF 12-INCH TO 164NCH DIAMETER STORM SEWER. 110,000 FY22 Stormwater FLOODING FROM INADEQUATE ROAD DRAINAGE Construction Task
CONSTRUCT 320 FEET OF 12 INCH TO 18 INCH DIAMETER STORM SEWER FROM MINNIE AVE TO GREEN
11507 MINNIE AVE TO GREEN HAVEN STORM SEWER HAVEN DR 110,000 FY22 Stormwater STREET FORDING IN FRONT OF 7033 MINNEE AVENUE Construction Task
11431 MUELLER COURT STORM SEWER CONSTRUCT 650 FEET OF 12-INCH TO 16-INCH RCP STORM SEWER 100,000 FY22 r' sss tr TARO FLOODING AND EROSION. Construction Task
11253 OAKSHIRE W. TO GEYER RD. STORM SEWER CONSTRUCT 1,340 FEET OF 12-INCH TO 37-INCH STORM SEWER. 4E10,000 FY22 Storrmwater TARO FLOODING. Construction Teak
11538 ORCHARD AND WINDSOR LANE STORM SEWER CONSTRUCT S30 FEET OF IS -INCH TO 98-NCH STORM SEWER 20 PEET OF 0-INCH DIP. 200,000 FY22 Stomsweter YARD AND GARAGE FLOODING. Construction Teak
11843 TTEMAN AND KAMMERER STORM SEWER CONSTRUCT 460 FEET OF 12-INCH TO la -INCH STORM SEWER 140,000 FY22 Stommator YARD AND ALLEY FLOODING Construcion Task
11433 WACHTEL AVENUE 1200 BLOCK STORM SEWER CONSTRUCT 330 FEET OF 12-INCH TO 241NCH STORM SEWER. 100,000 FY22 Sto mvater YARD FLOODING DUE TO INADEQUATE ROADWAY DRAINAGE. Cosatmctron Task
Project
Number
11558
Long Name
GENTLE COURT CHANNEL IMPROVEMENT (W ILL-0S)
11544 LARKIN LN. 98 STORM IMPROVEMENTS (ME-260)
MARTIGNEY CREEK -SUNRISE HEIGHTS TO TELEGRAPH PLAZA
11555 STREAMBANK STABILIZATION
MARTIGNEY CREEK STREAMBANK STABILIZATION - FAIRW1CK
11451 AND GOLDEN VALLEY BANK STABILIZATION (MGMB-160)
11630 REYNOBIA- MELITTA STREAMBANK STABIUZATION
Stormwater CIRP Project List
Desaripton
CONSTRUCT 90 FEET OF 7 FOOT HIGH HEAVY STONE REVETMENT, AND GRADE CONTROL STRUCTURE
CONSTRUCT 265 FEET OF 12-INCH TO 16-INCH STORM SEWER AND 1 RAINGARDEN.
CONSTRUCT 650 FEET OF COMPOSITE REVETMENT, 160 FEET OF MODULAR BLOCK WALL, AND 10 FEET
OF GRADE CONTROL ON A 20 FOOT WIDE SECTION OF THE CREEK
CONSTRUCT 650 FEET OF STREAMBANK PROTECTION
CONSTRUCT 340 FEET OF 14-FOOT HIGH MODULAR BLOCK RETAINING WALL
Budget Financial Project Type
Amount Year Dean
65,000 FY23 Stamrmater
76,000 FY23 Stormwater
460,000 FY29 Stonmeater
810.000 FY23 Btnnuwoter
315.000 FY23 Stormwater
Problem Description
CREEK EROSION NEAR Y39 AND N40 GENTLE COURT.
YARD FLOODING
CREEK EROSION AND FLOODING IN YARDS AM) COMMON GROUND.
HIGH RISK EROSION TO EIGHT MISCELLANEOUS STRUCTURES.
MODERATE RISK STRUCTURAL EROSION AT FOUR HOMES.
Task Description
Construction Task
Conantbon Task
Construction Task
Construction Task
Canalrudkm Teak