HomeMy Public PortalAboutFY21 and FY22 Project List Legislative SummaryMetropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 1
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
CONSTRUCT 3,700 FEET OF 8-INCH TO 24-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-069.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 &
FY22
Construction 5,985,000
10024 MC-02 WATSON TO EDGAR RD SANITARY RELIEF
(SKME-580A)
CONSTRUCT 5,700 FEET OF 27-INCH TO 36-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-557.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Construction 4,000,000
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
CONSTRUCT 1,010 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Construction 780,000
10209 CHERRY TREE LANE STORM IMPROVEMENT CONSTRUCT 1,150 FEET OF 12-INCH TO 36-INCH
STORM SEWER, AND 165 FEET OF 4 FOOT WIDE
BY 1.5 FOOT HIGH CONCRETE BOX CULVERT.
INADEQUATE STORM SEWER SYSTEM.Stormwater FY21 Construction 730,000
10266 ST. SIMON CT. #10023 STORM CHANNEL (GCMB-
250)
CONSTRUCT 40 FEET OF 42-INCH STORM SEWER
AND BANK STABILIZATION.
YARD EROSION AFFECTS #10023 ST. SIMON CT.
LOCATED OFF TESSON FERRY RD.
Stormwater FY22 Construction 60,000
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
CONSTRUCT A NEW TRUCK STORAGE BUILDING
AND MODIFICATIONS TO AN EXISTING BUILDING
AT THE MINTERT CONSTRUCTION YARD.
ADDITIONAL STORM SEWER CLEANING VEHICLES
ARE BEING ORDERED TO BE STORED AT THIS
FACILITY.
Stormwater FY21 Construction 2,000,000
10293 RECO AVENUE BANK STABILIZATION DESIGN AND CONSTRUCT APPROXIMATELY 595
FEET OF ROCK BLOCK TOE WALL, COMPOSITE
REVETMENT, AND HEAVY STONE REVETMENT
BANK STABILIZATION.
EROSION ALONG PARKING LOTS AND DRIVEWAYS.Stormwater FY22 Construction 175,000
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
CONSTRUCT 1,160 LINEAR FEET OF ROCK LINING
AND BIOSTABILIZATION.
CREEK BANK EROSION ALONG PROPERTIES
BETWEEN LA PADERA LANE AND EL CAMARA
DRIVE.
Stormwater FY22 Construction 900,000
10366 UNION ROAD 100 BLOCK STORM IMPROVEMENTS CONSTRUCT 1,500 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
YARD FLOODING AND ROAD PONDING.Stormwater FY21 Construction 600,000
10391 CARL AVE., AVIS ST., AND MAIN ST. STORM SEWER CONSTRUCT 595 FEET OF 12-INCH TO 21-INCH
STORM SEWER, 40 FEET OF 12-INCH COMBINED
SEWER, AND 50 FEET OF BIOSWALE.
STRUCTURE AND YARD FLOODING.Stormwater FY21 Construction 310,000
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY
REHABILITATION (FANNIE AVE TO PARDEE LANE)
REHABILITATE 39,560 FEET OF 36-INCH TO 72-INCH
SANITARY TRUNK SEWER AND REHABILITATE 103
MANHOLES.
INFLOW AND INFILTRATION CAUSING BUILDING
BACKUPS AND OVERCHARGED SEWERS.
Wastewater FY21 Construction (Supplemental
Appropriation)
6,800,000
CAPITAL PROJECTS
[Green denotes design, professional services, and easement acquisition projects]
[Blue denotes construction projects]
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 2
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
10716 NEW ENGLAND TOWN QUARRY PUMP STATION (P-
307) (SKME-544) IMPROVEMENTS
CONSTRUCT 2,500 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, 1,200 FEET OF 10-INCH
SANITARY FORCEMAIN, AND REPLACE SANITARY
PUMP STATION P-307.
PUMP STATION IS AT THE END OF ITS LIFE CYCLE,
AND IS RECEIVING ADDITIONAL FLOW DUE TO
ELIMINATION OF A PUMP STATION.
Wastewater FY21 Construction 3,500,000
10756 SOUTH BROADWAY AT MERAMEC COMBINED
SEWER REPLACEMENT
CONSTRUCT 1,700 FEET OF 12-INCH TO 30-INCH
COMBINED SEWER.
EXISTING 15-INCH COMBINED SEWER IS
DETERIORATED WITH NUMEROUS GRADE
CHANGES. LINE HOLDS DEBRIS AND BLOCKS
EASILY CAUSING STREET FLOODING.
Wastewater FY22 Construction 1,780,000
11136 DEGIVERVILLE COMBINED SEWER
IMPROVEMENTS
PERFORM POINT REPAIRS AND REHABILITATION
OF LATERAL CONNECTIONS, AND IMPROVE
ACCESS TO MANHOLES WITHIN METRO RIGHT-OF-
WAY FOR MAINTENANCE.
EXISTING COMBINED SEWER HAS CHRONIC ROOT
INTRUSION AND INFLOW CAUSING BUILDING
BACKUPS.
Wastewater FY21 Construction 2,200,000
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
ENTERING THE COMBINED SEWER SYSTEM IN
THE MISSISSIPPI WATERSHED.
CONTROL AND REDUCTION OF COMBINED SEWER
OVERFLOWS AS REQUIRED BY THE CONSENT
DECREE.
Wastewater FY21 &
FY22
Construction 13,000,000
11212 WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
CONSTRUCT 1,900 FEET OF 12-INCH TO 30-INCH
STORM SEWER, 1,400 FEET OF 12-INCH TO 15-
INCH SANITARY SEWER, AND PERFORM PRIVATE
I/I REDUCTION AT 7 PROPERTIES.
STREET FLOODING AND BUILDING BACKUPS DUE
TO INADEQUATE COMBINED SEWERS.
Wastewater FY21 Construction 4,000,000
11224 TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
CONSTRUCT 130 FEET OF MODULAR BLOCK WALL,
100 FEET OF ROCK BLOCK WALL, AND 140 FEET
OF COMBINATION SLOPE PROTECTION.
MODERATE RISK STRUCTURAL EROSION.Stormwater FY21 Construction 249,000
11396 WEATHERBY DRIVE STORM SEWER CONSTRUCT 485 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
ROADWAY FLOODING ON CRIMSON, AND YARD
FLOODING/EROSION AT 1401,1407, AND 1415
WEATHERBY, AND 1101 CRIMSON.
Stormwater FY21 Construction 180,000
11408 BROADHEAD #921 STORM SEWER CONSTRUCT 235 FEET OF 30-INCH STORM SEWER.CHANNEL EROSION AT END OF 30-INCH CMP.Stormwater FY22 Construction 225,000
11416 BOXFORD COURT BANK STABILIZATION CONSTRUCT 280 LINEAR FEET OF 8 TO 12 FEET
HIGH HEAVY STONE REVETMENT BANK
STABILIZATION.
CREEK EROSION THREATENING STRUCTURES.Stormwater FY22 Construction 267,000
11418 DRURY - SWITZER STORM SEWER CONSTRUCT 550 FEET OF 12-INCH TO 15-INCH
STORM SEWER.
YARD EROSION AND FLOODING, AND OVERLAND
FLOODING OF HOMES.
Stormwater FY21 Construction 135,000
11430 WILBORN DRIVE #5361 STORM SEWER CONSTRUCT 250 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
BASEMENT AND YARD FLOODING.Stormwater FY21 Construction 120,000
11432 LARKWOOD - JAYWOOD - SPARROWWOOD BANK
STABILIZATION (CRE-07)
CONSTRUCT 360 FEET OF 12 FOOT HIGH
MODULAR BLOCK RETAINING WALL.
CREEK EROSION NEAR LARKWOOD DR. AND
JAYWOOD DR.
Stormwater FY21 Construction 800,000
11442 STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
CONSTRUCT 190 FEET OF 12-INCH TO 30-INCH
STORM SEWER, AND 139 SQUARE YARDS OF
HEAVY STONE REVETMENT.
CHANNEL EROSION.Stormwater FY21 Construction 390,000
11474 GLEASON #656 STORM SEWER CONSTRUCT 260 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
YARD FLOODING.Stormwater FY21 Construction 95,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 3
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
11481 MARTIGNEY CREEK STREAMBANK STABILIZATION -
FAIRWICK AND GOLDEN VALLEY BANK
STABILIZATION (MGMB-150)
CONSTRUCT 850 FEET OF 6 FOOT TO 12 FOOT
HIGH MODULAR BLOCK WALL BANK
STABILIZATION, AND 916 FEET OF 12-INCH TO 18-
INCH SANITARY SEWER.
HIGH RISK EROSION TO EIGHT MISCELLANEOUS
STRUCTURES.
Stormwater FY21 Construction 2,180,000
11506 RAFORD CT. STORM SEWER SEPARATION CONSTRUCT 360 FEET OF 15-INCH STORM
SEWER, TO SEPARATE THE STORM AND
SANITARY SYSTEMS.
OVERLAND FLOODING, AND STORMWATER
OVERCHARGES THE 12-INCH VCP COMBINED
SEWER CAUSING BUILDING BACKUPS IN SEVERAL
DUPLEX BUILDINGS.
Stormwater FY21 Construction 175,000
11507 MINNIE AVE. TO GREENHAVEN STORM SEWER
SEPARATION
CONSTRUCT 448 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
STREET AND YARD FLOODING, AND NEED TO
SEPARATE STORM FLOWS FROM THE COMBINED
SEWER SYSTEM.
Wastewater FY21 Construction 245,000
11522 LOUISIANA AND HOLLY HILLS STORM SEWER CONSTRUCT 260 FEET OF 12-INCH TO 15-INCH
STORM SEWER.
YARD FLOODING.Stormwater FY21 Construction 200,000
11535 DEKAMAY DRIVE STORM SEWER (MGJB-130)CONSTRUCT 1,050 FEET OF 12-INCH TO 24-INCH
STORM SEWER.
FREQUENT STRUCTURAL FLOODING FROM
OVERLAND FLOW.
Stormwater FY22 Construction 615,000
11536 NOTTINGHAM ESTATES DR. #5217 STORM SEWER CONSTRUCT 243 FEET OF 15-INCH TO 16-INCH
STORM SEWER.
YARD FLOODING.Stormwater FY21 Construction 125,000
11545 KAYSER AVE. - WALLER AVE. STORM SEWER CONSTRUCT 414 FEET OF 12-INCH TO 18-INCH
STORM SEWER.
YARD AND STREET FLOODING.Stormwater FY21 Construction 180,000
11558 GENTLE COURT CHANNEL IMPROVEMENT (WILL-
06)
CONSTRUCT 90 FEET OF 6 FEET HIGH HEAVY
STONE REVETMENT BANK STABILIZATION AND
ONE GRADE CONTROL STRUCTURE.
CREEK EROSION NEAR #39 GENTLE COURT.Stormwater FY22 Construction 180,000
11598 ORCHARD AND WINDSOR LANE STORM SEWER CONSTRUCT 765 FEET OF 18-INCH TO 36-INCH
STORM SEWER AND 1 RAIN GARDEN.
YARD AND GARAGE FLOODING.Stormwater FY22 Construction 400,000
11630 REYNOSA - MELITTA STREAMBANK STABILIZATION CONSTRUCT 340 FEET OF 4 TO 12 FEET HIGH
MODULAR BLOCK RETAINING WALL, 800 FEET OF
4 TO 12 FEET HIGH HEAVY STONE REVETMENT,
AND BIOSTABILIZATION.
MODERATE RISK STRUCTURAL EROSION AT FOUR
HOMES.
Stormwater FY21 Construction 1,150,000
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO
JENNER LN)
CONSTRUCT 4,300 FEET OF 8-INCH TO 27-INCH
SANITARY SEWER. CONTINGENCY PROJECT TO
ELIMINATE CONSTRUCTED SSO OUTFALL BP-214.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL BP-214 REQUIRES REMOVAL.
Wastewater FY22 Construction 1,905,000
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
CONSTRUCT 3,200 FEET OF 12-INCH TO 21-INCH
STORM SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 40 PROPERTIES.
INFLOW AND INFILTRATION CAUSING BUILDING
BACKUPS, OVERCHARGED SEWERS, AND
ACTIVATING CONSTRUCTED SSOS.
Wastewater FY21 Construction, Phase III 1,300,000
11679 WEST LOCKWOOD SANITARY RELIEF CONSTRUCT 3,324 FEET OF 8-INCH TO 30-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-187 AND BP-
587.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS ACTIVATING CONSTRUCTED
SSOS.
Wastewater FY21 Construction 2,950,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 4
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS.
EXISTING COLLECTION SYSTEM IS UNDERSIZED
FOR CURRENT CONDITIONS. PORTIONS OF THE
SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH
RIVER CONDITIONS.
Wastewater FY21 &
FY22
Construction (Supplemental
Appropriation)
90,000,000
11724 COLDWATER SANITARY RELIEF SECTION B, C & D -
SECTION B REHABILITATION
CONSTRUCT REHABILITATION OF SECTION B OF
THE COLDWATER TRUNK SEWER. ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-091, BP-115, BP-
119, BP-141, BP-144, BP-473, BP-526, AND BP-527.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Construction 1,600,000
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP)
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER
STORAGE TUNNEL AND DIVERSION STRUCTURES.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS AND ACTIVATING
CONSTRUCTED SSOS.
Wastewater FY21 Construction (Supplemental
Appropriation)
15,000,000
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER
DEEP TUNNEL TO CONVEY WASTEWATER FROM
THE FENTON WWTF TO THE BAUMGARTNER
TUNNEL, TO ENABLE TREATMENT OF FLOWS AT
THE LOWER MERAMEC WWTF.
THE FENTON WWTF IS AN INTERIM FACILITY AND
IT'S ELIMINATION IS PART OF THE EAST WEST
GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
Wastewater FY21 &
FY22
Construction 80,000,000
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH
SEWER, AND 3,000 FEET OF SEWER LINING.
STREET FLOODING AND BUILDING BACKUPS DUE
TO OVERCHARGED COMBINED SEWERS.
Wastewater FY21 Construction (Supplemental
Appropriation)
600,000
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD
TO L-52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN
AND 1,000 FEET OF 36-INCH SANITARY SEWER.
EXISTING FORCEMAIN IS UNDERSIZED AND OVER
THIRTY YEARS OLD.
Wastewater FY21 &
FY22
Construction 30,000,000
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
CONSTRUCT 2,050 FEET OF 12-INCH TO 102-INCH
STORM AND COMBINED SEWERS, 900 FEET OF
PIPE IN TUNNEL, AND 325 FEET OF SEWER LINING,
IN THE CITY OF ST. LOUIS.
BUILDING BACKUPS AND FLOODING DUE TO
OVERCHARGED COMBINED SEWERS.
Wastewater FY21 &
FY22
Construction 9,300,000
11797 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
DARVER TO 69TH STREET TRUNK SEWER
CONSTRUCT 8,550 OF 8-INCH TO 48-INCH TRUNK
SEWER, 70 FEET OF PIPE IN TUNNEL, AND 3,000
FEET OF SEWER LINING.
BUILDING BACKUPS AND FLOODING DUE TO
OVERCHARGED COMBINED SEWERS.
Wastewater FY22 Construction 4,000,000
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
CONSTRUCT 109,900 SQUARE FEET OF
SHOTCRETE LINER, 1,240 FEET OF CIPP LINING,
AND 6,400 SQUARE FEET OF SPOT REPAIRS,
ALONG 7,000 FEET OF 8 TO 12 FOOT DIAMETER
SEWER.
BUILDING BACKUPS AND FLOODING DUE TO
OVERCHARGED COMBINED SEWERS.
Wastewater FY21 Construction (Supplemental
Appropriation)
843,000
11888 FABICK PUMP STATION (P-444) IMPROVEMENTS
(SKME-404E)
MODIFICATIONS TO PUMP STATION TO MEET
CURRENT STANDARDS.
NO PUMP OR POWER REDUNDANCY AT PUMP
STATION.
Wastewater FY22 Construction 750,000
12059 LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A REHABILITATE 100,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Construction 7,938,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 5
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12110 CANTERBURY AND ROLAND SANITARY RELIEF
(NELSON DR TO ROLAND BLVD)
CONSTRUCT 2,670 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-612 AND BP-
532. CONSTRUCT 610 FEET OF ROCK LINED
CHANNEL, INCLUDING 185 FEET OF RETAINING
WALL.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL BP-612 REQUIRES REMOVAL.
Wastewater FY22 Construction 1,730,000
12142 DACEY BRANCH SANITARY RELIEF (BELLA CLARE
DR TO PRIOR DR)
CONSTRUCT 279 FEET OF 12-INCH SANITARY
SEWER AND GRADE CONTROL STRUCTURES.
OVERCHARGED SANITARY SEWERS, AND A
MANHOLE LOCATED WITHIN A BRANCH OF
DELLWOOD CREEK.
Wastewater FY21 Construction 605,000
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
CONSTRUCT 4,450 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-409.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Construction 2,820,000
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-708)
REPLACEMENT
REPLACE PUMP STATION P-708.PUMP STATION P-708 NEEDS REPLACEMENT TO
MEET CURRENT SERVICE LEVEL DEMANDS.
Wastewater FY22 Construction 2,100,000
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO PUMP STATION
P-425 AND CONSTRUCT 1,585 FEET OF
ASSOCIATED FORCE MAIN.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Construction 722,000
12171 FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
REHABILITATE 2,000 FEET OF 30-INCH SEWER.
REHABILITATE 10 MANHOLES.
SEWER IN POOR STRUCTURE CONDITION
REQIRES REHABILITATION.
Wastewater FY22 Construction 500,000
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I
REDUCTION (SMITH DR AND VLASIS DR)
REPLACE 343 FEET OF 8-INCH SANITARY SEWER,
AND PERFORM PRIVATE I/I REDUCTION AT 14
PROPERTIES.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS, AND EXCESSIVE I/I FLOWS AT
THE VANCE ROAD PUMP STATION AND GRAND
GLAIZE WWTF.
Wastewater FY22 Construction 230,000
12175 GEYER SANITARY RELIEF AND WINDSOR SPRINGS
P-521 STORAGE (BIG BEND BLVD TO WINDSOR
SPRINGS DR)
CONSTRUCT 6,460 FEET OF 10-INCH FORCEMAIN,
UPGRADE WINDSOR SPRINGS PUMP STATION,
AND PERFORM PRIVATE I/I REDUCTION AT 7
PROPERTIES.
BUILDING BACKUPS AND OVERCHARGED SEWERS.Wastewater FY22 Construction 4,000,000
12188 RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
REHABILITATE PUMP STATION P-781.PUMP STATION P-781 NEEDS REHABILITATION TO
MEET CURRENT SERVICE LEVEL DEMANDS.
Wastewater FY21 Construction 1,000,000
12201 SHREWSBURY SANITARY RELIEF SEWER AND I/I
REDUCTION (WEIL AVE AND I-44)
CONSTRUCT 600 FEET OF 12-INCH STORM
SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 196 PROPERTIES.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Construction 1,312,000
12207 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)
REPLACEMENT
CONSTRUCT REPLACEMENT OF DETERIORATED
PUMP STATION.
DETERIORATED PUMP STATION REQUIRES
REPLACEMENT.
Wastewater FY21 Construction 1,240,000
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO
DALE AVE)
CONSTRUCT 2,460 FEET OF 15-INCH TO 48-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-440.
OVERCHARGED SANITARY SEWERS.
CONSTRUCTED SSO OUTFALL BP-440 REQUIRES
REMOVAL.
Wastewater FY21 Construction 1,400,000
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES ST
TO N LAFAYETTE ST)
CONSTRUCT 195 FEET OF 8-INCH SANITARY
SEWER, REPLACE 154 FEET OF 12-INCH SEWER
WITH 15-INCH SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-110.
OVERCHARGED SANITARY SEWERS.
CONSTRUCTED SSO OUTFALL BP-110 REQUIRES
REMOVAL.
Wastewater FY22 Construction 564,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 6
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12221 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM
CT TO COVE LN)
CONSTRUCT 4,400 FEET OF 18-INCH TO 21-INCH
SANITARY SEWER. CONTINGENCY PROJECT TO
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-210,
BP-211 AND BP-213.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALLS BP-210, BP-211 AND BP-213 REQUIRE
REMOVAL.
Wastewater FY22 Construction 2,515,000
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
CONSTRUCT 4,630 FEET OF 8-INCH TO 21-INCH
SANITARY SEWER, 762 FEET OF 12-INCH TO 21-
INCH STORM SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-618.
OVERCHARGED SANITARY SEWERS. YARD AND
STRUCTURE FLOODING. CONSTRUCTED SSO
OUTFALL BP-618 REQUIRES REMOVAL.
Wastewater FY22 Construction 2,732,000
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO PUMP STATION
P-750.
EXISTING PUMP STATION IS DETERIORATING AND
REQUIRES IMPROVEMENT.
Wastewater FY22 Construction 6,000,000
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE
CAPACITY FOR ADDITIONAL FLOW, AND UPGRADE
THE FACILITY TO ENABLE ACCOMMODATION OF
POTENTIAL NUTRIENT REMOVAL REQUIREMENTS.
ADDITIONAL FLOW TO THE LOWER MERAMEC
WWTF DUE TO ELIMINATION OF THE FENTON
WWTF, AND POTENTIAL FUTURE NUTRIENT
REMOVAL PERMIT REQUIREMENTS.
Wastewater FY22 Construction 30,000,000
12272 GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT COVE CT)
CONSTRUCT 1,600 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS IN THE
GRAND GLAIZE TRUNK SEWER.
Wastewater FY22 Construction 1,100,000
12296 WOODS MILL SANITARY RELIEF (I-64 TO BROOK
MILL LN)
CONSTRUCT 2,100 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER.
OVERCHARGED SEWERS.Wastewater FY21 Construction 1,445,000
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO
FLORIDALE CT)
CONSTRUCT 1,520 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-291.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL BP-291 REQUIRES REMOVAL.
Wastewater FY21 Construction 1,050,000
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
CONSTRUCT 5,770 FEET OF 8-INCH TO 21-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-
433, AND BP-476. ELIMINATE WET WEATHER PUMP
STATION P-790.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALLS BP-416, BP-417, BP-433, AND BP-476
REQUIRE REMOVAL.
Wastewater FY21 &
FY22
Construction 5,800,000
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO
SIMS AVE)
CONSTRUCT 2,530 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-095 AND BP-
145.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALLS BP-095 AND BP-145 REQUIRE REMOVAL.
Wastewater FY21 Construction 1,460,000
12364 OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
CONSTRUCT 920 FEET OF 8-INCH SANITARY
SEWER. DECOMMISSION AND ABANDON EXISTING
PUMP STATION P-470 AND ASSOCIATED
FORCEMAIN.
PUMP STATION P-470 NEEDS TO BE REPLACED OR
ELIMINATED.
Wastewater FY22 Construction 400,000
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION REHABILITATE PUBLIC SEWERS, MANHOLES, AND
LATERAL SERVICE CONNECTIONS.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Construction 4,750,000
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE IV
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH
SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING. ELIMINATE CONSTRUCTED SSO
OUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198,
BP-545, AND BP-591.
BUILDING BACKUPS AND OVERCHARGED
SANITARY TRUNK SEWER ACTIVATING
CONSTRUCTED SSOS.
Wastewater FY21 &
FY22
Construction (Supplemental
Appropriation)
32,500,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 7
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
REHABILITATE FLOODWALL PUMP STATIONS,
GATES, AND STRUCTURES AT THE BADEN (P-143)
AND RIVERVIEW (P-141) PUMP STATIONS.
FLOODWALL ORS PUMP STATIONS, GATES, AND
STRUCTURES ARE OVER 50 YEARS OLD, AND ARE
IN NEED OF REHABILITATION.
Wastewater FY21 Construction, Design-Build
(Supplemental Appropriation)
3,000,000
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
CONSTRUCT UPGRADE OF MECHANICAL VALVE
AND PIPING SYSTEMS.
MECHANICAL SYSTEMS ARE AGING AND IN NEED
OF REPLACEMENT.
Wastewater FY21 Construction 3,300,000
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
CONSTRUCT NEW SUBMERSIBLE PUMP STATION
AT AN ALTERNATE LOCATION OUTSIDE OF THE
FLOODPLAIN.
AGING MECHANICAL AND ELECTRICAL SYSTEMS,
SECONDARY CONTAINMENT IS NEEDED FOR ON-
SITE CHEMICALS, AND CURRENT LOCATION IS
SUBJECT TO FREQUENT FLOODING.
Wastewater FY21 &
FY22
Construction 9,000,000
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
CONSTRUCT REPLACEMENT OF MAIN
SUBSTATION SWITCHGEAR AND PRELIMINARY
AND PRIMARY TREATMENT MOTOR CONTROL
CENTER UNITS.
EXISTING SWITCHGEAR IS OBSOLETE AND
REPLACEMENT IS REQUIRED TO MINIMIZE POWER
SERVICE INTERRUPTIONS.
Wastewater FY21 Construction (Supplemental
Appropriation)
4,400,000
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD
AND KEHRS MILL RD)
REHABILITATE 38,000 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
EXCESSIVE PUBLIC I/I CAUSING BUILDING
BACKUPS AND OVERCHARGED SANITARY
SEWERS.
Wastewater FY21 Construction 1,850,000
12508 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT A
REHABILITATE 65,630 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Construction 4,643,000
12509 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT B
REHABILITATE 60,160 FEET OF THE PUBLIC
SEWER SYSTEM USING THE CURED IN PLACE
PIPE METHOD.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Construction 3,674,000
12548 BISSELL POINT WWTF FINE SCREEN, CONCRETE
AND GATE IMPROVEMENTS
INSTALL FINE SCREENS TO REPLACE FAILING
COMMINUTORS, REPAIR SLUICE GATES AND
COMPONENTS, AND CONCRETE.
COMMINUTOR, CONCRETE AND SLUICE GATE
DETERIORATION DUE TO AGING
INFRASTRUCTURE.
Wastewater FY22 Construction 18,000,000
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
REPLACE AERATION CONTROL PIPING AND
INSTRUMENTATION, AND INSTALL A PARALLEL
BOSKER SWITCH TRACK SYSTEM AND ONE NEW
BOSKER UNIT.
AERATION PIPING NEEDS TO BE REPLACED, AND
BOSKERS SWITCH TRACK NEEDS TO BE
IMPROVED.
Wastewater FY22 Construction 5,714,000
12566 BISSELL POINT WWTF TRICKLING FILTER MEDIA
REPLACEMENT
REPLACE TRICKLING FILTER MEDIA ON SIX
FILTERS AT THE BISSELL PLANT.
AGING TRICKLING FILTER MEDIA NEARING END OF
USEFUL LIFE.
Wastewater FY21 &
FY22
Construction 24,000,000
12583 WHITE BIRCH PUMP STATION (P-725) ELIMINATION CONSTRUCT 2,800 FEET OF 8-INCH SANITARY
SEWER. DECOMMISSION AND ABANDON EXISTING
PUMP STATION P-725 AND ASSOCIATED
FORCEMAIN.
DETERIORATED PUMP STATION REQUIRES
REPLACEMENT OR ELIMINATION.
Wastewater FY21 Construction 1,200,000
12584 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Construction 3,380,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 8
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I AND TO RENEW THE SYSTEM.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Construction 2,932,000
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP) - PUMP STATION
CONSTRUCT A 21 MGD PUMP STATION FACILITY,
FOR THE DEER CREEK TUNNEL PROJECT.
EXCESSIVE INFLOW AND INFILTRATION CAUSING
SURCHARGING IN EXISTING SEWERS AND
ACTIVATING CONSTRUCTED SSOS.
Wastewater FY21 &
FY22
Construction (Supplemental
Appropriation)
18,200,000
12740 DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
CONSTRUCT 675 FEET OF 12-INCH TO 21-INCH
COMBINED SEWER, AND 620 FEET OF
REINFORCED CONCRETE BOX CULVERT 9 FOOT
WIDE BY SIX FOOT HIGH.
BUILDING BACKUPS AND OVERCHARGED MAINS.Wastewater FY22 Construction 3,200,000
12741 LOUISVILLE AVENUE AND OAKLAND AVENUE
COMBINED SEWER RELIEF
CONSTRUCT 950 FEET OF 12-INCH TO 36-INCH
RELIEF SEWER, AND 800 FEET OF 96-INCH
COMBINED SEWER FOR WET WEATHER STORAGE.
BUILDING BACKUPS AND OVERCHARGED MAINS.Wastewater FY22 Construction 2,100,000
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
CONSTRUCT 668 FEET OF 8-INCH SANITARY
SEWER, 585 FEET OF 30-INCH TO 42-INCH STORM
SEWER TO REPLACE ERODING CHANNEL, AND 30
FEET OF 15-INCH STORM SEWER.
SLOPE FAILURES CAUSING DAMAGE TO EXISTING
SANITARY SEWER.
Wastewater FY22 Construction 1,200,000
12762 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (RAIN GARDEN)
CONSTRUCT RAIN GARDENS AND LANDSCAPING
ADJACENT TO THE NEW MALINE CSO PUMP
STATION.
IMPLEMENTATION OF THE CSO LONG TERM
CONTROL PLAN IS REQUIRED.
Wastewater FY21 Construction 200,000
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
REPLACE APPROXIMATELY 5,700 FEET OF 36-INCH
TO 42-INCH SANITARY SEWER, AND MAKE POINT
REPAIRS AT 4 LOCATIONS ON 36-INCH PIPE AND 1
POINT REPAIR ON 48-INCH PIPE.
PIPE WITH LEAKING JOINTS AND GROUND
SURFACE SUBSIDENCE.
Wastewater FY21 Construction (Supplemental
Appropriation)
1,063,000
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD TO
SPRING GARDEN DR)
CONSTRUCT 10,100 FEET OF 20-INCH FORCEMAIN.EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE
CAUSED BY HYDROGEN SULFIDE AND AIR
POCKETS.
Wastewater FY21 &
FY22
Construction 7,500,000
12938 WILLOW HILL STORM SEWER (LADUE 1614A)CONSTRUCT 2,435 FEET OF 12-INCH TO 42-INCH
STORM SEWER.
STRUCTURE FLOODING AND YARD FLOODING
FROM OVERLAND FLOW.
Stormwater FY21 Construction 500,000
13014 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2021) CONTRACT A
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
DETERIORATED AND DAMAGED SEWER LINES
CAUSE PIPE COLLAPSES, BLOCKED MAINS, AND
BUILDING BACKUPS.
Wastewater FY21 Construction 2,500,000
13015 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2021) CONTRACT B
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
DETERIORATED AND DAMAGED SEWER LINES
CAUSE PIPE COLLAPSES, BLOCKED MAINS, AND
BUILDING BACKUPS.
Wastewater FY21 Construction 2,500,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 9
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13016 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2022) CONTRACT A
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
DETERIORATED AND DAMAGED SEWER LINES
CAUSE PIPE COLLAPSES, BLOCKED MAINS, AND
BUILDING BACKUPS.
Wastewater FY22 Construction 2,500,000
13017 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2022) CONTRACT B
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR SYSTEM REHABILITATION AND
REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
DETERIORATED AND DAMAGED SEWER LINES
CAUSE PIPE COLLAPSES, BLOCKED MAINS, AND
BUILDING BACKUPS.
Wastewater FY22 Construction 2,500,000
13031 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT B
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Construction 2,141,000
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
ENTERING THE COMBINED SEWER SYSTEM IN
THE RIVER DES PERES WATERSHED.
CONTROL AND REDUCTION OF COMBINED SEWER
OVERFLOWS AS REQUIRED BY THE CONSENT
DECREE.
Wastewater FY21 Construction 3,000,000
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
INSTALLATION OF GREEN SOURCE CONTROL
DEVICES TO REDUCE STORMWATER VOLUMES
ENTERING THE COMBINED SEWER SYSTEM IN
THE RIVER DES PERES WATERSHED.
CONTROL AND REDUCTION OF COMBINED SEWER
OVERFLOWS AS REQUIRED BY THE CONSENT
DECREE.
Wastewater FY22 Construction 3,000,000
13082 LOWER MERAMEC WWTF FITTING REPLACEMENT REPLACE 60-INCH AND 48-INCH FITTINGS AND
ISOLATION VALVES ON PRIMARY INFLUENT AND
EFFLUENT LINES.
FITTINGS AND VALVES ARE DETERIORATING AND
LEAKING DUE TO SETTLING.
Wastewater FY22 Construction 1,775,000
13126 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021)
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR STORMWATER SYSTEM
REHABILITATION AND REPAIR, AS NEEDS ARE
IDENTIFIED BY SEWER CLEANING AND
INSPECTION EFFORTS.
DETERIORATED AND DAMAGED STORMWATER
SEWER LINES CAUSE PIPE COLLAPSES, BLOCKED
SEWERS, AND STREET AND YARD FLOODING.
Stormwater FY21 Construction 3,000,000
13127 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022)
CONSTRUCT CURED-IN-PLACE PIPE
INSTALLATION FOR STORMWATER SYSTEM
REHABILITATION AND REPAIR, AS NEEDS ARE
IDENTIFIED BY SEWER CLEANING AND
INSPECTION EFFORTS.
DETERIORATED AND DAMAGED STORMWATER
SEWER LINES CAUSE PIPE COLLAPSES, BLOCKED
SEWERS, AND STREET AND YARD FLOODING.
Stormwater FY22 Construction 4,000,000
13164 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION REHABILITATE 2,150 FEET OF 60-INCH DIAMETER
SANITARY SEWER, AND REHABILITATE 4,000 FEET
OF 8-INCH TO 24-INCH SANITARY SEWER AND 120
STRUCTURES.
DURING FLOOD INUNDATION AND HIGH
GROUNDWATER, INFLOW AND INFILTRATION
OCCURS INTO THE LOWER MERAMEC TUNNEL.
Wastewater FY21 Construction 1,820,000
13222 MISSOURI RIVER WWTF DIGESTER GAS STORAGE
COVER REPLACEMENT
REPLACE TWO MEMBRANE GAS STORAGE
COVERS FOR THE ANAEROBIC DIGESTERS.
FLEXIBLE MEMBRANE MATERIAL DEGRADING AND
NEARING END OF USEFUL LIFE.
Wastewater FY22 Construction 1,100,000
13223 MISSOURI RIVER WWTF TUNNEL SERVICE WATER
PIPING REPLACEMENT
REPLACE THE SERVICE WATER PIPING IN THE
DIGESTER AND SECONDARY TUNNELS.
CORRODED WATER PIPING AT END OF USEFUL
LIFE.
Wastewater FY21 Construction 550,000
13231 HARLEM CITYSHED MITIGATION BASINS (ASHLAND
AND ESSEX)
CONSTRUCT 4 STORMWATER DETENTION BASINS,
AND 4 RAIN GARDENS.
BUILDING BACKUPS AND STREET FLOODING.Wastewater FY22 Construction 9,000,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 10
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13232 BADEN CITYSHED MITIGATION BASINS (CALVARY,
FREDERICK, PARTRIDGE AND TILLIE)
CONSTRUCT 4 STORMWATER DETENTION BASINS,
AND 3 RAIN GARDENS.
BUILDING BACKUPS, STRUCTURE AND STREET
FLOODING.
Wastewater FY21 Construction (Supplemental
Appropriation)
3,520,000
13285 CLAYTON CITY HALL STORM SEWER CONSTRUCT 360 FEET OF 12-INCH TO 36-INCH
STORM SEWER.
STORM SEWER SURCHARGING AND FLOODING OF
A CITY OF CLAYTON PARKING GARAGE
UNDERGROUND LEVEL.
Stormwater FY22 Construction 1,590,000
13296 MARKET ST 2350 GREEN INFRASTRUCTURE -
ENTRANCE AND LANDSCAPING IMPROVEMENTS
REPLACE SIDEWALKS AND LANDSCAPING,
PAVEMENT, HANDICAP RAMP, AND INSTALL
RAINGARDEN.
IMPLEMENTATION OF THE CSO VOLUME
REDUCTION GREEN INFRASTRUCTURE PROGRAM
AND STORMWATER WATER QUALITY EDUCATION
AND OUTREACH.
Unallocated FY21 Construction 1,600,000
13303 LEMAY WWTF AERATION BASIN GATES CONSTRUCT GATES ON AERATION BASINS.EXISTING VALVES ARE DETERIORATED AND
INOPERABLE.
Wastewater FY21 Construction 1,000,000
13336 LANGLEY AND PHILO SANITARY STORAGE CONSTRUCT 115,000 GALLONS OF SANITARY
STORAGE, INCLUDING 400 FEET OF 84-INCH
SANITARY STORAGE PIPE, AND 510 FEET OF 8-
INCH TO 18-INCH SANITARY SEWER.
WET WEATHER FLOWS EXCEED THE CAPACITY
OF THE SANITARY SEWER.
Wastewater FY21 Construction 1,500,000
13342 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2022) CONTRACT C
PERFORM POINT REPAIRS AT APPROXIMATELY 50
PRIVATE LATERAL LOCATIONS.
DEFECTIVE PRIVATE LATERALS AND
CONNECTIONS CAUSING OPERATIONS AND
MAINTENANCE CONCERNS.
Wastewater FY22 Construction 500,000
13344 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09) PHASE II
CONSTRUCT 1,560 FEET OF 12-INCH TO 36-INCH
STORM SEWER, PERFORM PRIVATE I/I
REDUCTION AT 12 PROPERTIES, AND CONSTRUCT
DRAINAGE SWALE.
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND
INFILTRATION.
Wastewater FY21 Construction 1,100,000
13375 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE) PHASE II
CONSTRUCT 2,300 FEET OF 10-INCH TO 18-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-451.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL SSO BP-451 REQUIRES REMOVAL.
Wastewater FY22 Construction 802,000
13385 WATER QUALITY STORMWATER BMP PARK
ALONG DEER CREEK (HANLEY RD TO SOUTH
BRENTWOOD BLVD)
CONSTRUCT STORMWATER QUALITY BMPS SUCH
AS BIORETENTION, PERMEABLE PAVERS, AND
EDUCATIONAL SIGNAGE, FOR PUBLIC
DEMONSTRATION AND EDUCATION.
REGULAR STORMWATER FLOODING ALONG DEER
CREEK. FLOOD MITIGATION PROJECT PROVIDES
OPPORTUNITY FOR PUBLIC OUTREACH AND
EDUCATION.
Stormwater FY21 Construction 800,000
13386 NORTH POINTE DETENTION BASIN OPTI RETROFIT MODIFY EXISTING BASIN OUTFALL STRUCTURE,
INSTALL OPTI PLATFORM, AND OPTIMIZE BASIN
TO MITIGATE STORMWATER DISCHARGE TO THE
COMBINED SEWER.
BUILDING BACKUPS, STREET FLOODING, AND
STRUCTURE FLOODING ALONG BADEN TRUNK
SEWER, AND COMBINED SEWER OVERFLOWS TO
THE MISSISSIPPI RIVER.
Wastewater FY21 Construction 350,000
13404 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE I
CONSTRUCT 2,300 FEET OF 12-INCH TO 36-INCH
SANITARY SEWER.
AREA EXPERIENCES EXCESSIVE INFLOW
THROUGH COMBINED SEWERS. REMOVAL OF I-
132 AND L-106 REQUIRED BY THE LONG TERM
CONTROL PLAN.
Wastewater FY21 Construction 3,500,000
13405 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE IA
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH
SANITARY SEWER.
OVERCHARGED SEWERS. ELIMINATION OF
CONSTRUCTED SSO OUTFALL REQUIRED.
Wastewater FY21 Construction 2,800,000
13407 LOWER MERAMEC WWTF - SOLIDS HANDLING
EQUIPMENT REPLACEMENT
REPLACE EXISTING FINE SCREENS, WASHER
COMPACTORS, AND ODOR CONTROL UNIT AT
SCREEN SHAFT.
EXISTING EQUIPMENT APPROACHING END OF
LIFE AND IN NEED OF REPLACEMENT.
Wastewater FY22 Construction 5,600,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 11
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13408 LOWER MERAMEC WWTF - INFLUENT PUMP
STATION IMPROVEMENTS
INSTALL NEW LOW FLOW JOCKEY PUMP AND
ASSOCIATED PIPING AND CONTROLS, REPLACE 2
800 HP PUMPS AND IMPROVE DISCHARGE PIPING
SUPPORTS, AND IMPROVE VIBRATION ISSUES
ASSOCIATED WITH THE EXISTING 3 2,000 HP
PUMPS.
PUMPS OPERATING OUT OF PUMP DESIGN CURVE
DURING LOW FLOW CONDITIONS, EXCESSIVE
WEAR AND TEAR TO PUMPS, VIBRATION ISSUES
AND OVERHEATED BEARINGS.
Wastewater FY22 Construction 5,500,000
13409 LOWER MERAMEC WWTF - ADMINISTRATION
BUILDING FACILITY IMPROVEMENTS
EXPAND ADMINISTRATION BUILDING TO
ACCOMMODATE STAFF OFFICES, EXPANDED
LOCKER ROOMS, AND CONFERENCE ROOM.
PLANT EXPANSION REQUIRES ADDITIONAL STAFF
AND WORKSPACE.
Wastewater FY22 Construction 1,500,000
13472 SOUTH COUNTY RELIEF FORCE MAIN
REPLACEMENT (P-419 TO BECKER RD)
CONSTRUCT 4,215 FEET OF 12-INCH
REPLACEMENT FORCE MAIN.
FORCE MAIN BREAKS AND FAILURES.Wastewater FY22 Construction 1,841,000
13480 DEER CREEK TRUNK SEWER RELOCATION
(BRECKENRIDGE INDUSTRIAL CT TO MARY AVE)
RELOCATE 3,000 FEET OF THE 6.5 FOOT DEER
CREEK TRUNK SEWER.
CITY OF BRENTWOOD DEVELOPMENT REQUIRES
RELOCATION OF THE DEER CREEK TRUNK SEWER
OUT OF A NEW FLOOD PLAIN AREA.
Wastewater FY21 Construction 3,000,000
13481 CAULKS CREEK FORCEMAIN IMPROVEMENTS
(CAULKS PUMP STATION A TO HOG HOLLOW RD)
REHABILITATE OR REPLACE 30,000 FEET OF 20-
INCH TO 24-INCH FORCEMAIN FROM PUMP
STATION A TO THE 36-INCH FORCEMAIN.
FORCEMAIN CONVERSION TO REDUNDANT
FORCEMAIN REQUIRES REHABILITATION DUE TO
AGE AND CONDITION.
Wastewater FY22 Construction 9,000,000
13510 LINDWORTH STORM SEWER SEPARATION CONSTRUCT 1,070 FEET OF 21-INCH TO 48-INCH
STORM SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT TWO PROPERTIES.
OVERCHARGED SANITARY SEWERS. STREET AND
STRUCTURE FLOODING FOR MUNICIPALITY'S
PORTION OF PROJECT.
Wastewater FY22 Construction 2,000,000
13517 CAULKS CREEK FORCEMAIN - WETLAND BYPASS CONSTRUCT 1,000 FEET OF 30-INCH FORCEMAIN.EXISTING FORCEMAIN IN AN ENVIRONMENTALLY
SENSITIVE AREA DETERIORATING DUE TO
ADVANCED AGE.
Wastewater FY21 Construction 3,000,000
13518 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS PHASE II
APPLY WATERPROOF MEMBRANE ON SHAFT
WALLS FROM ELEVATION 318 TO 358, INCLUDING
WALL PREPARATION AND NECESSARY JOINT
REPAIRS, AND REPLACE CORRODED PIPES AND
APPLY PIPE COATINGS.
EXCESSIVE HUMIDITY IN SOME AREAS CAUSING
CORRODED COMPONENTS.
Wastewater FY22 Construction 4,500,000
10070 HALL STREET STORM SEWERS CONSTRUCT 10,350 FEET OF 12-INCH TO 36-INCH
STORM SEWER, 2 MILES OF CURB AND GUTTER,
AND 130 FEET OF 60-INCH TUNNEL, ALONG HALL
STREET.
STREET FLOODING ALONG HALL STREET FROM
RIVERVIEW TO GRAND.
Stormwater FY22 Design Services 50,000
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
CONSTRUCT A NEW TRUCK STORAGE BUILDING
AND MODIFICATIONS TO AN EXISTING BUILDING
AT THE MINTERT CONSTRUCTION YARD.
ADDITIONAL STORM SEWER CLEANING VEHICLES
ARE BEING ORDERED TO BE STORED AT THIS
FACILITY.
Stormwater FY21 Engineering During Construction
Services
200,000
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION
(P-323) IMPROVEMENTS
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH
SANITARY SEWER, 1,600 FEET OF 6-INCH
FORCEMAIN, AND REPLACE SANITARY PUMP
STATION P-323.
PUMP STATION IS AT THE END OF ITS LIFE CYCLE.
DETERIORATED SANITARY AND STORM SEWERS.
Wastewater FY21 Design Services 250,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 12
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
CONSTRUCT A 28-FOOT DIAMETER
UNDERGROUND COMBINED SEWER STORAGE
FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP
STATION, AND ASSOCIATED COLLECTION
SEWERS.
CONTROL OF COMBINED SEWER OVERFLOWS IS
REQUIRED BY THE CONSENT DECREE.
Wastewater FY21 Design Services 150,000
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER
DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-
306) AND JEFFERSON BARRACKS (P-305) PUMP
STATIONS.
EXISTING COLLECTION SYSTEM IS UNDERSIZED
FOR CURRENT CONDITIONS. PORTIONS OF THE
SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH
RIVER CONDITIONS.
Wastewater FY21 &
FY22
Engineering During Construction
Services
900,000
11737 ELTORA WET WEATHER STORAGE FACILITY CONSTRUCT A 2 MILLION GALLON SANITARY
STORAGE FACILITY, PUMP STATION, AND
COLLECTION SEWERS.
BUILDING BACKUPS AND OVERCHARGED
SEWERS. CONSTRUCTED SSO OUTFALLS
REQUIRE REMOVAL.
Wastewater FY21 Design Services 800,000
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER
DEEP TUNNEL TO CONVEY WASTEWATER FROM
THE FENTON WWTF TO THE BAUMGARTNER
TUNNEL, TO ENABLE TREATMENT OF FLOWS AT
THE LOWER MERAMEC WWTF.
THE FENTON WWTF IS AN INTERIM FACILITY AND
IT'S ELIMINATION IS PART OF THE EAST WEST
GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
Wastewater FY21 &
FY22
Engineering During Construction
Services
1,500,000
11789 CAULKS CREEK FORCEMAIN REHABILITATION REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH
FORCEMAIN FROM PUMP STATION A TO THE 36-
INCH FORCEMAIN AT THE MISSOURI AMERICAN
WATER PLANT.
FORCEMAIN CONVERSION TO REDUNDANT
FORCEMAIN REQUIRES REHABILITATION DUE TO
AGE AND CONDITION.
Wastewater FY21 Design Services 100,000
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD
TO L-52)
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN
AND 1,000 FEET OF 36-INCH SANITARY SEWER.
EXISTING FORCEMAIN IS UNDERSIZED AND OVER
THIRTY YEARS OLD.
Wastewater FY21 Engineering During Construction
Services
800,000
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
CONSTRUCT 109,900 SQUARE FEET OF
SHOTCRETE LINER, 1,240 FEET OF CIPP LINING,
AND 6,400 SQUARE FEET OF SPOT REPAIRS,
ALONG 7,000 FEET OF 8 TO 12 FOOT DIAMETER
SEWER.
BUILDING BACKUPS AND FLOODING DUE TO
OVERCHARGED COMBINED SEWERS.
Wastewater FY21 Engineering During Construction
Services
50,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
AND AMEREN CUSTOMER SUBSTATION.
DEMOLISH EXISTING LEMAY PUMP STATION (P-
303), MARTIGNEY PUMP STATION (P-306), AND
JEFFERSON BARRACKS PUMP STATION (P-305).
JEFFERSON BARRACKS TUNNEL PROJECT
REQUIRES A NEW PUMP STATION TO CONVEY
FLOWS TO THE LEMAY TREATMENT PLANT.
Wastewater FY21 Design Services 250,000
11833 DELCREST SANITARY RELIEF CONSTRUCT 4,080 FEET OF 8-INCH TO 18-INCH
SANITARY SEWERS, AND ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-015 AND BP-
094.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS ACTIVATING CONSTRUCTED
SSOS.
Wastewater FY22 Design Services 432,000
11937 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
DESIGN STREAMBANK STABILIZATION
IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED.
STORMWATER ISSUES EXIST IN AREAS WHERE
FUNDING IS AVAILABLE.
Stormwater FY22 Engineering During Construction
Services
30,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 13
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
11943 LINDBERGH SANITARY RELIEF (MEADOWSIDE DR
TO N LINDBERGH BLVD)
REPLACE 3,150 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER WITH 12-INCH TO 18-INCH
SANITARY SEWER.
SANITARY SEWER IS EXPOSED AT CREEK
CROSSINGS, INADEQUATE CAPACITY, AND
SEWER BACKUPS.
Wastewater FY22 Design Services 241,000
12077 AMBLEWOOD SANITARY RELIEF (WATERFORD DR
TO BIRCHBARK DR)
CONSTRUCT 2,400 FEET OF 10-INCH TO 24-INCH
SANITARY SEWER.
BUILDING BACKUPS ALONG THE PADDOCK CREEK
LATERAL IN THE VICINITY OF AMBLEWOOD DRIVE.
Wastewater FY21 Design Services 307,000
12079 ARV ELLEN SANITARY RELIEF (TESSON CREEK
ESTATES DR TO MADAFORD LN)
CONSTRUCT 730 FEET OF 12-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 95,000
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO
LANARK RD)
CONSTRUCT 275 FEET OF 12-INCH SANITARY
SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 57,000
12088 BAXTER - MERAMEC BOTTOMS - VALLEY PARK
PRIVATE I/I REDUCTION
CONSTRUCT 290 FEET OF 12-INCH TO 24-INCH
STORM SEWER AND PERFORM PRIVATE I/I
REDUCTION AT 14 PROPERTIES.
OVERCHARGED SANITARY SEWERS IN THE
BAXTER STUDY AREA.
Wastewater FY21 Design Services 147,000
12107 BUCKLEY SANITARY RELIEF (DACE LN TO POPLAR
DR)
CONSTRUCT 1,900 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 143,000
12108 BURNING TREE INFRASTRUCTURE REPAIR (N.
WATERFORD DR TO FOX RUN DR)
CONSTRUCT 230 FEET OF 15-INCH SANITARY
SEWER AND REHABILITATE 180 FEET OF 15-INCH
SANITARY SEWER.
DEFICIENT SEWER CAUSING OVERCHARGING.Wastewater FY22 Design Services 103,000
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
RECONSTRUCT PUMP STATION AT NEW
LOCATION.
PUMP STATION AT MAXIMUM CAPACITY, ACCESS
IMPACTED BY FLOODING, UTILITY
COMPLICATIONS, AND NO ROOM ON SITE FOR
NEEDED EMERGENCY STORAGE.
Wastewater FY21 Design Services 300,000
12122 CLARK AVE SANITARY RELIEF (LACLEDE STA RD
TO YEATMAN AVE)
CONSTRUCT 1,200 FEET OF 18-INCH SANITARY
SEWER.
EXCESSIVE I/I BUILDING BACKUP AND
STRUCTURAL PROBLEMS.
Wastewater FY22 Design Services 117,000
12130 CONWAY ROAD SANITARY RELIEF (CONWAY LN
TO DWYER AVE)
CONSTRUCT 3,300 FEET OF 12-INCH TO 18-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 352,000
12134 COWMIRE CREEK SANITARY REPLACEMENT I-70
CROSSING (ST. CHARLES ROCK RD TO MARK
TWAIN LN)
CONSTRUCT 620 FEET OF 10-INCH SANITARY
SEWER.
DETERIORATED SANITARY SEWER Wastewater FY22 Design Services 115,000
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
CONSTRUCT 5,000 FEET OF 15-INCH TO 30-INCH
SANITARY SEWER, AND 4,100 FEET OF 15-INCH TO
27-INCH STORM SEWER. PERFORM PUBLIC AND
PRIVATE I/I REDUCTION TO FACILITATE COMBINED
SEWER SEPARATION. REMOVE INTERCEPTOR I-
132 AND CSO OUTFALL L-106.
REMOVAL OF I-132 AND L-106 REQUIRED BY THE
LONG TERM CONTROL PLAN.
Wastewater FY21 Design Services 150,000
12141 CSO - SHREWSBURY AVE CSO INTERCEPTOR (I-
293)/OUTFALL (L-166) SEWER SEPARATION
CONSTRUCT 1,130 FEET OF 8-INCH TO 21-INCH
SANITARY AND 290 FEET OF 12-INCH STORM
SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 37 PROPERTIES.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 370,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 14
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12143 DANIEL BOONE I/I REDUCTION (SHACKELFORD RD
AND MULLANPHY LN)
CONSTRUCT 40 FEET OF 8-INCH TO 18-INCH
SANITARY SEWER. REHABILITATE 9,100 FEET OF 8-
INCH TO 21-INCH SEWER. PERFORM PRIVATE I/I
REDUCTION AT 2 PROPERTIES.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 100,000
12145 DC-04 DEER CREEK SANITARY RELIEF PHASE III
(LAKESHORE DR TO NEW BALLAS RD)
CONSTRUCT 2,400 FEET OF 12-INCH TO 18-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 182,000
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-708)
REPLACEMENT
REPLACE PUMP STATION P-708.PUMP STATION P-708 NEEDS REPLACEMENT TO
MEET CURRENT SERVICE LEVEL DEMANDS.
Wastewater FY22 Engineering During Construction
Services
75,000
12157 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF PHASE II
CONSTRUCT 4,800 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-382.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL BP-382 REQUIRES REMOVAL.
Wastewater FY21 Design Services 520,000
12159 EDMUNDSON SANITARY RELIEF (EDMUND AVE TO
BATAAN DR)
CONSTRUCT 3,200 FEET OF 15-INCH TO 18-INCH
SANITARY SEWER.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 387,000
12167 FENTON CREEK EAST I/I REDUCTION (OLD TOWN
FENTON)
REHABILITATE 9 MANHOLES AND ASSOCIATED
SEWERS, PERFORM PRIVATE I/I REDUCTION AT 13
PROPERTIES.
OVERCHARGED SANITARY SEWERS, AND
EXCESSIVE I/I FLOWS.
Wastewater FY22 Design Services 68,000
12170 FENTON WASTEWATER TREATMENT FACILITY
ELIMINATION
DECOMMISSION AND ABANDON EXISTING FENTON
WWTF.
COMPLETION OF THE LOWER MERAMEC WWTF
EXPANSION PH III AND EXT OF THE CONVEYENCE
TUNNEL, FLOWS FROM THE FENTON WWTF WILL
BE DIVERTED TO L MERAMEC WWTF.
Wastewater FY22 Design Services 2,324,000
12178 FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
CONSTRUCT 6,085 FEET OF 10-INCH TO 24-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 730,000
12185 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF
ROCKS DR AND FONTAINE PL)
CONSTRUCT 2,120 FEET OF 15-INCH TO 18-INCH
STORM SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 35 PROPERTIES.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 388,000
12195 S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
CONSTRUCT 2,800 FEET OF 8-INCH TO 24-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-623.
OVERCHARGED SANITARY SEWERS.
CONSTRUCTED SSO OUTFALL BP-623 REQUIRES
REMOVAL.
Wastewater FY21 Design Services 517,000
12202 SMITH CREEK LADUE ROAD SANITARY RELIEF
(ROYAL MANOR DR TO HEWLETT CT)
CONSTRUCT 5,200 FEET OF 15-INCH SANITARY
SEWER.
BUILDING BACKUPS AND OVERCHARGED SEWERS.Wastewater FY22 Design Services 360,000
12214 ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE
LN TO LYNROS DR)
CONSTRUCT 3,600 FEET OF 15-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 295,000
12217 ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LN
TO STONEHARD DR)
CONSTRUCT 2,100 FEET OF 30-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 211,000
12231 TM-01 TWO MILE CREEK OUTFALL SANITARY
RELIEF
CONSTRUCT 11,400 FEET OF 8-INCH TO 48-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY21 Design Services 1,805,000
12241 UPPER BADEN SANITARY RELIEF (JENNINGS
STATION RD TO OAKRIDGE BLVD)
CONSTRUCT 4,100 FEET OF 15-INCH TO 27-INCH
SANITARY SEWER, AND ELIMINATE
CONSTRUCTED SSO OUTFALL BP-001.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALL BP-001 REQUIRES REMOVAL.
Wastewater FY21 Design Services 483,000
12242 UPPER FISHPOT EAST SANITARY RELIEF (FIELD
AVE TO WOLFF LN)
CONSTRUCT 3,400 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS
Wastewater FY22 Design Services 303,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 15
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12245 UPPER LAWNVIEW CREEK SANITARY RELIEF
(RHAPSODY LN TO MILLVALLEY DR)
CONSTRUCT 4,200 FEET OF 12-INCH SANITARY
SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 418,000
12249 UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
CONSTRUCT 13,335 FEET OF 8-INCH TO 36-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY21 Design Services 1,460,000
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE
CAPACITY FOR ADDITIONAL FLOW, AND UPGRADE
THE FACILITY TO ENABLE ACCOMMODATION OF
POTENTIAL NUTRIENT REMOVAL REQUIREMENTS.
ADDITIONAL FLOW TO THE LOWER MERAMEC
WWTF DUE TO ELIMINATION OF THE FENTON
WWTF, AND POTENTIAL FUTURE NUTRIENT
REMOVAL PERMIT REQUIREMENTS.
Wastewater FY21 Design Services 2,200,000
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE
CAPACITY FOR ADDITIONAL FLOW, AND UPGRADE
THE FACILITY TO ENABLE ACCOMMODATION OF
POTENTIAL NUTRIENT REMOVAL REQUIREMENTS.
ADDITIONAL FLOW TO THE LOWER MERAMEC
WWTF DUE TO ELIMINATION OF THE FENTON
WWTF, AND POTENTIAL FUTURE NUTRIENT
REMOVAL PERMIT REQUIREMENTS.
Wastewater FY22 Construction Management Services
During Construction
1,800,000
12255 LOWER MERAMEC WWTF EXPANSION PHASE II EXPAND THE EXISTING WWTF TO INCREASE
CAPACITY FOR ADDITIONAL FLOW, AND UPGRADE
THE FACILITY TO ENABLE ACCOMMODATION OF
POTENTIAL NUTRIENT REMOVAL REQUIREMENTS.
ADDITIONAL FLOW TO THE LOWER MERAMEC
WWTF DUE TO ELIMINATION OF THE FENTON
WWTF, AND POTENTIAL FUTURE NUTRIENT
REMOVAL PERMIT REQUIREMENTS.
Wastewater FY22 Engineering During Construction
Services
1,500,000
12264 GLENFIELD SANITARY RELIEF (WATSON WOODS
CT TO S LINDBERGH BLVD)
CONSTRUCT 2,600 FEET OF 15-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY21 Design Services 374,000
12271 WATKINS-SPANISH SANITARY RELIEF (MALAGA ST
TO TRAMPE AVE)
CONSTRUCT 2,500 FEET OF 24-INCH TO 27-INCH
SANITARY SEWER.
OVERCHARGE SANITARY SEWERS.Wastewater FY22 Design Services 290,000
12277 WEIDMAN I/I REDUCTION (HWY 141 AND DUTCH
MILL DR)
PERFORM PUBLIC AND PRIVATE I/I REDUCTION.OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 59,000
12280 WHITE PLAINS SANITARY RELIEF (SALTBOX DR TO
CEDAR CREEK RD)
CONSTRUCT 2,785 FEET OF 8-INCH TO 15-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 400,000
12287 WILSON SANITARY RELIEF (WILD HORSE CREEK
RD TO CLARKSON RD)
CONSTRUCT 9,200 FEET OF 12-INCH TO 15-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS Wastewater FY22 Design Services 751,000
12299 HAWTHORNE ESTATES SANITARY RELIEF (RANCH
LN TO CLAYTON HILLS LN)
CONSTRUCT 1,300 FEET OF 12-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 87,000
12300 WOODSON SANITARY RELIEF (FLORA AVE TO
LACKLAND RD)
CONSTRUCT 3,800 FEET OF 15-INCH TO 24-INCH
SANITARY SEWER. CONTINGENCY PROJECT TO
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-024,
BP-533, AND BP-534.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALLS BP-024, BP-533 AND BP-534 REQUIRE
REMOVAL.
Wastewater FY22 Design Services 420,000
12330 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION CONSTRUCT 870 FEET OF 8-INCH TO 12-INCH
SANITARY SEWER, AND PERFORM PRIVATE I/I
REDUCTION AT 27 PROPERTIES.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 227,000
12332 LITTLETON CT. SANITARY RELIEF (OLD SMIZER
MILL RD AND 141 TO LA PALMA DR)
CONSTRUCT 2,600 FEET OF 12-INCH SANITARY
SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 193,000
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE I
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH
SANITARY SEWER.
OVERCHARGED SEWERS. ELIMINATION OF
CONSTRUCTED SSO OUTFALL REQUIRED.
Wastewater FY21 Design Services 50,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 16
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12337 MAIN SANITARY RELIEF (VANCE RD TO INEZ AVE)CONSTRUCT 2,200 FEET OF 15-INCH SANITARY
SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 208,000
12344 MARTIGNEY SANITARY RELIEF (KOCH RD TO
WOOD HILL DR)
CONSTRUCT 10,000 FEET OF 15-INCH TO 36-INCH
SANITARY SEWER.
OVERCHARGED SANITARY SEWERS.Wastewater FY22 Design Services 1,550,000
12355 MULBERRY CREEK SANITARY RELIEF (HARWICH
DR TO S LINDBERGH BLVD)
CONSTRUCT 4,300 FEET OF 15-INCH TO 18-INCH
SANITARY SEWER.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS.
Wastewater FY22 Design Services 326,000
12357 NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
CONSTRUCT 1,555 FEET OF 8-INCH SANITARY
SEWER. DECOMMISSION AND ABANDON EXISTING
PUMP STATION P-480 AND ASSOCIATED
FORCEMAIN.
PUMP STATION P-480 NEEDS TO BE REPLACED OR
ELIMINATED.
Wastewater FY21 Design Services 214,000
12360 NORMANDIE SANITARY RELIEF (PAGE AVE TO
SAINT CHARLES ROCK ROAD)
CONSTRUCT 8,600 FEET OF 24-INCH SANITARY
SEWER. CONTINGENCY PROJECT TO ELIMINATE
CONSTRUCTED SSO OUTFALLS BP-454, BP-457,
AND BP-458.
BUILDING BACKUPS AND OVERCHARGED
SANITARY SEWERS. CONSTRUCTED SSO
OUTFALLS BP-454, BP-457, AND BP-458 REQUIRE
REMOVAL.
Wastewater FY22 Design Services 735,000
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION REHABILITATE PUBLIC SEWERS, MANHOLES, AND
LATERAL SERVICE CONNECTIONS.
EXCESSIVE I/I CAUSING OVERCHARGED
SANITARY SEWERS.
Wastewater FY21 Design Services 61,000
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE IV
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH
SANITARY SEWER, TO ALLEVIATE SYSTEM
SURCHARGING. ELIMINATE CONSTRUCTED SSO
OUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198,
BP-545, AND BP-591.
BUILDING BACKUPS AND OVERCHARGED
SANITARY TRUNK SEWER ACTIVATING
CONSTRUCTED SSOS.
Wastewater FY22 Engineering During Construction
Services
500,000
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
REHABILITATE FLOODWALL PUMP STATIONS,
GATES, AND STRUCTURES. PROJECT INCLUDES
MULTIPLE PHASES. CONSTRUCTION UNDER THIS
PROJECT NUMBER INCLUDES WORK AT THE MILL
CREEK (P-161) AND BADEN (P-143) PUMP
STATIONS, AND HARLEM EMERGENCY CLOSURE
STRUCTURE.
FLOODWALL ORS PUMP STATIONS, GATES, AND
STRUCTURES ARE OVER 50 YEARS OLD, AND ARE
IN NEED OF REHABILITATION.
Wastewater FY22 Design Services 1,200,000
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
CONSTRUCT UPGRADE OF MECHANICAL VALVE
AND PIPING SYSTEMS.
MECHANICAL SYSTEMS ARE AGING AND IN NEED
OF REPLACEMENT.
Wastewater FY21 Engineering During Construction
Services
300,000
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO REDUCE
HUMIDITY, AND REPLACE CORRODED ELEMENTS.
INEFFICIENT HVAC SYSTEMS, EXCESSIVE
HUMIDITY IN SOME AREAS, AND CORRODED
COMPONENTS.
Wastewater FY21 Design Services 100,000
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
CONSTRUCT IMPROVEMENTS TO REDUCE
HUMIDITY, AND REPLACE CORRODED ELEMENTS.
INEFFICIENT HVAC SYSTEMS, EXCESSIVE
HUMIDITY IN SOME AREAS, AND CORRODED
COMPONENTS.
Wastewater FY22 Engineering During Construction
Services
100,000
12548 BISSELL POINT WWTF FINE SCREEN, CONCRETE
AND GATE IMPROVEMENTS
INSTALL FINE SCREENS TO REPLACE FAILING
COMMINUTORS, REPAIR SLUICE GATES AND
COMPONENTS, AND CONCRETE.
COMMINUTOR, CONCRETE AND SLUICE GATE
DETERIORATION DUE TO AGING
INFRASTRUCTURE.
Wastewater FY21 Design Services 3,424,000
12548 BISSELL POINT WWTF FINE SCREEN, CONCRETE
AND GATE IMPROVEMENTS
INSTALL FINE SCREENS TO REPLACE FAILING
COMMINUTORS, REPAIR SLUICE GATES AND
COMPONENTS, AND CONCRETE.
COMMINUTOR, CONCRETE AND SLUICE GATE
DETERIORATION DUE TO AGING
INFRASTRUCTURE.
Wastewater FY22 Engineering During Construction
Services
1,000,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 17
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
REPLACE AERATION CONTROL PIPING AND
INSTRUMENTATION, AND INSTALL A PARALLEL
BOSKER SWITCH TRACK SYSTEM AND ONE NEW
BOSKER UNIT.
AERATION PIPING NEEDS TO BE REPLACED, AND
BOSKERS SWITCH TRACK NEEDS TO BE
IMPROVED.
Wastewater FY21 Design Services 951,000
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
CONSTRUCT FLUIDIZED BED INCINERATORS AT
THE BISSELL AND LEMAY WASTEWATER
TREATMENT FACILITIES, TO INCLUDE REDUNDANT
SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS
HANDLING SYSTEM IMPROVEMENTS.
LONG TERM SOLUTION FOR SOLIDS HANDLING AT
TREATMENT FACILITIES IS NEEDED.
Wastewater FY21 &
FY22
Design Services 5,050,000
12584 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Design Services 57,000
12585 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 55,000
12586 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT D
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 102,000
12587 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT E
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 60,000
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I AND TO RENEW THE SYSTEM.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Design Services 48,000
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO
RDP) - PUMP STATION
CONSTRUCT A 21 MGD PUMP STATION FACILITY,
FOR THE DEER CREEK TUNNEL PROJECT.
EXCESSIVE INFLOW AND INFILTRATION CAUSING
SURCHARGING IN EXISTING SEWERS AND
ACTIVATING CONSTRUCTED SSOS.
Wastewater FY21 Engineering During Construction
Services
1,000,000
12628 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TO P-
750)
CONSTRUCT 15,600 FEET OF 2-INCH TO 16-INCH
FORCEMAIN.
LACK OF CAPACITY FOR EXISTING FORCEMAIN.Wastewater FY21 Design Services 2,988,000
12815 GRAVIOS CREEK SANITARY TRUNK RELOCATION
AND STREAM STABILIZATION (AFFTON ATHLETIC
COMPLEX TO GREEN PK IND DR)
CONSTRUCT 1,780 FEET OF 42-INCH SANITARY
SEWER, AND 110 FEET OF 8-INCH SANITARY
SEWER.
TRUNK SEWER RELOCATION OUT OF GRAVIOS
CREEK REQUIRED. EROSION THREATENING
SANITARY SEWER.
Wastewater FY21 Design Services 437,000
13031 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT B
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY21 Design Services 44,000
13032 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT B
REHABILITATE THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 84,000
13033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT C
REHABILITATE THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 130,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 18
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13046 FILLMORE PUMP STATION (P-308) REHABILITATION REHABILITATE THE MECHANICAL AND
ELECTRICAL SYSTEMS, AND THE BUILDING
ENVELOPE.
AGING PUMP STATION IN NEED OF ASSET
RENEWAL.
Wastewater FY22 Design Services 500,000
13124 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT F
REHABILITATION OF THE PUBLIC SEWER SYSTEM
USING THE CURED IN PLACE PIPE METHOD, TO
REDUCE PUBLIC I/I.
INFLOW AND INFILTRATION CAUSING
OVERCHARGED SEWERS.
Wastewater FY22 Design Services 110,000
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023)
CONSTRUCT CONCRETE REPAIRS, REPLACE
SECONDARY CLARIFIER DUCT BANK, AND RENEW
4 GRIT TANKS.
AGING AND DETERIORATED FACILITIES AND
MECHANICAL EQUIPMENT REQUIRE REPAIR AND
REPLACEMENT.
Wastewater FY21 Design Services 900,000
13227 L51 PUMP STATION FORCEMAIN IMPROVEMENTS CONSTRUCT 8,800 FEET OF 36-INCH
REPLACEMENT FORCEMAIN.
EXISTING FORCEMAIN FROM THE L51 PUMP
STATION TO THE MISSOURI RIVER WWTF IS
NEARING THE END OF ITS USEFUL LIFE.
Wastewater FY22 Design Services 900,000
13432 HATHAWAY DRIVE SANITARY RELIEF CONSTRUCT 1,042 FEET OF 10-INCH SANITARY
SEWER, AND PERFORM PRIVATE I/I REDUCTION
AT 6 PROPERTIES.
OVERCHARGED MAIN.Wastewater FY21 Design Services 215,000
13516 GASLIGHT SQUARE SEWER IMPROVEMENTS
PHASE II
CONSTRUCT COMBINED SEWER IMPROVEMENTS
IN THE GASLIGHT SQUARE AREA.
OVERCHARGED COMBINED SEWERS CAUSING
WET WEATHER BUILDING BACKUPS.
Wastewater FY21 Pre-Design Services 750,000
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
CONTINUE THE STREAM GAUGE DATA
COLLECTION PROGRAM IN CONJUNCTION WITH
WASTEWATER AND STORMWATER PLANNING AND
DESIGN EFFORTS, AND TO SUPPORT REPORTING
WHICH IS REQUIRED PURSUANT TO THE
CONSENT DECREE.
DATA IS REQUIRED TO DETERMINE URBAN
RAINFALL/RUNOFF RESPONSE OF WATERSHEDS
AND IS UTILIZED FOR WATER QUANTITY AND
QUALITY EVALUATION OF STREAMS.
Unallocated FY21 &
FY22
Vendor Services 1,205,000
10880 SIMS AVE STORM BUYOUT BUYOUT AND DEMOLISH STRUCTURE TO
REESTABLISH THE OVERLAND FLOW PATH.
STRUCTURE CONSTRUCTED WITHIN OVERLAND
FLOW PATH, AND EXISTING SEWER UNDER
STRUCTURE IS DETERIORATING.
Stormwater FY21 Land Purchase 200,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
DESIGN OF 47,400 FEET OF CSO STORAGE
TUNNEL, CONSOLIDATION SEWERS, AND
DEWATERING PUMP STATIONS. THIS PROJECT
ALSO INCLUDES MANAGEMENT SERVICES, FIELD
INVESTIGATIONS AND PRELIMINARY STUDIES.
MITIGATION OF CSO FLOWS INTO THE RIVER DES
PERES IS REQUIRED BY CONSENT DECREE,
NECESSITATING CONSTRUCTION OF A DEEP
STORAGE TUNNEL SYSTEM.
Wastewater FY21 &
FY22
Professional Services 1,135,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT,
PLANNING, ANALYSIS, AND DESIGN SERVICES
THROUGHOUT THE BISSELL, COLDWATER,
MISSOURI AND MERAMEC WATERSHEDS TO MEET
CONSENT DECREE REQUIREMENTS.
BUILDING BACKUPS AND OVERCHARGED SEWERS
ACTIVATING CONSTRUCTED SSOS.
Wastewater FY21 &
FY22
Professional Services 2,905,000
PROJECTS SERVING THE ENTIRE DISTRICT OR SPECIFIC AREAS. MAY NOT AFFECT ALL AREAS.
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 19
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT,
PLANNING, ANALYSIS, AND DESIGN SERVICES IN
THE LEMAY WATERSHED TO MEET CONSENT
DECREE REQUIREMENTS.
BUILDING BACKUPS AND OVERCHARGED SEWERS
ACTIVATING CONSTRUCTED SSOS.
Wastewater FY22 Professional Services 400,000
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR TANK, TREATMENT,
AND PUMP STATION PROJECTS THROUGHOUT
THE DISTRICT.
SYSTEM DEFICIENCIES REQUIRING CORRECTION
OR MITIGATION VIA THE CONSTRUCTION OF
STORAGE TANKS AND PUMP STATIONS, AND
TREATMENT FACILITY IMPROVEMENTS.
Wastewater FY21 &
FY22
Professional Services 11,300,000
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR THE LMRDP CSO
STORAGE TUNNEL (BROADWAY TO RDP TUBES),
AND THE JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS).
SYSTEM DEFICIENCIES REQUIRING CORRECTION
OR MITIGATION VIA TUNNEL CONSTRUCTION.
Wastewater FY21 &
FY22
Professional Services 6,000,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS
& LOWER MERAMEC SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
PERFORM AS NEEDED PROGRAM MANAGEMENT,
PLANNING, ANALYSIS, AND DESIGN SERVICES
FOR MAJOR WASTEWATER SYSTEM CONTROLS
TO MEET CONSENT DECREE REQUIREMENTS.
MAJOR WASTEWATER SYSTEM CONTROLS ARE
REQUIRED TO OBTAIN CONSENT DECREE
COMPLIANCE.
Wastewater FY21 &
FY22
Professional Services 1,675,000
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO
RDP TUBES)
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9
MILE LONG, 200 TO 250 FOOT DEEP STORAGE
TUNNEL WHICH FOLLOWS APPROXIMATELY THE
RIVER DES PERES ALIGNMENT, INCLUDING
SEVERAL CONNECTING TUNNELS, ACCESS
SHAFTS AND INTAKE STRUCTURES, IN THE LEMAY
WATERSHED.
MITIGATION OF CSO FLOWS INTO THE RIVER DES
PERES IS REQUIRED BY CONSENT DECREE,
NECESSITATING CONSTRUCTION OF A DEEP
STORAGE TUNNEL SYSTEM.
Wastewater FY21 Miscellaneous Services 350,000
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
PROVIDE CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES FOR THE DEER CREEK
TUNNEL & TRUNK SEWER, MALINE CREEK
STORAGE FACILITY, RDP TRIBUTARIES CSO
TUNNEL, UPPER RDP CSO STORAGE TUNNEL, AND
THE LOWER MERAMEC SYSTEM BAUMGARTNER
TO FENTON WWTF TUNNEL.
SYSTEM DEFICIENCIES REQUIRING CORRECTION
OR MITIGATION VIA TUNNEL CONSTRUCTION.
Wastewater FY21 &
FY22
Professional Services 12,700,000
12000 CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS (2020)
PERFORM CCTV OR PHYSICAL INSPECTION AND
CLEANING OF SELECTED SEWERS. SERVICES
MAY BE RENEWED THROUGH FY2022 BASED ON
PERFORMANCE.
FIELD INVESTIGATION OF SEWERS IS NEEDED TO
IDENTIFY PROBLEMS AND QUANTIFY REQUIRED
REPAIRS/IMPROVEMENTS AND CLEANING.
Wastewater FY21 &
FY22
Vendor Services 5,000,000
12004 STREAM FLOW WATER QUALITY SAMPLING (2020)PERFORM SAMPLING AND ANALYSIS OF STREAM
WATER QUALITY WITHIN MSD'S SERVICE AREA.
SERVICES MAY BE RENEWED THROUGH FY2022
BASED ON PERFORMANCE.
STREAM SAMPLING IS REQUIRED TO DOCUMENT
WATER QUALITY CHANGES FROM
IMPLEMENTATION OF THE CSO LTCP, SSO
ELIMINATIONS, & STORMWATER MANAGEMENT
PROGRAMS.
Unallocated FY21 &
FY22
Vendor Services 535,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 20
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12006 RADAR RAINFALL DATA (2020)INTEGRATE EXISTING RAIN GAUGE NETWORK
WITH RADAR IMAGING, FOR USE IN CONJUNCTION
WITH FLOW METERING, INFLOW/INFILTRATION
STUDIES, AND HYDRAULIC MODEL CALIBRATIONS.
SERVICES MAY BE RENEWED THROUGH FY2024
BASED ON PERFORMANCE.
PIPE FLOWS FROM INFLOW AND INFILTRATION
DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY
CALIBRATE HYDRAULIC SYSTEM MODELS.
Wastewater FY21 &
FY22
Vendor Services 300,000
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
RETAIN CONSTRUCTION MANAGEMENT
CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2021
BASED ON PERFORMANCE.
CONSTRUCTION MANAGEMENT NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY21 General Services - Construction
Inspection
3,000,000
12387 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
RETAIN CONSTRUCTION MANAGEMENT
CONSULTANT FOR AS NEEDED SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2023
BASED ON PERFORMANCE.
CONSTRUCTION MANAGEMENT NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEEDS THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY22 General Services - Construction
Inspection
3,500,000
12391 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY21 GSA - Geotechnical CIRP Funds 85,000
12392 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY21 GSA - Geotechnical CIRP Funds 85,000
12393 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY21 GSA - Geotechnical CIRP Funds 85,000
12397 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY &
SEWER DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2021 BASED ON
PERFORMANCE.
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL STAFF.
Wastewater FY21 GSA - (Design) CIRP Funds 550,000
12400 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2021) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED SEWER
AND CHANNEL DESIGN. SERVICES MAY BE
RENEWED THROUGH FY2022 BASED ON
PERFORMANCE.
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL STAFF.
Wastewater FY21 &
FY22
GSA - (Design) CIRP Funds 400,000
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY21 GSA - (Survey) CIRP Funds 50,000
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY21 GSA - (Survey) CIRP Funds 50,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 21
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY21 GSA - (Survey) CIRP Funds 50,000
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY21 GSA - (Survey) CIRP Funds 50,000
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2021 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY21 GSA - (Survey) CIRP Funds 50,000
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO
INCLUDE INFRASTRUCTURE SUCH AS SOFT
SEPARATION, GREEN INFRASTRUCTURE,
SEWERS, STRUCTURES, AND DETENTION BASINS.
INADEQUATE CITYSHED COMBINED SEWER
SYSTEM CAUSING SURFACE FLOODING AND
BUILDING BACKUPS.
Wastewater FY21 Professional Services 989,000
12695 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT
DESIGN (CONTRACT A)
DESIGN HARLEM BADEN WATERSHED SYSTEM
IMPROVEMENTS TO INCLUDE SEWER
SEPARATION, SEWER CONSTRUCTION, AND
SEWER REHABILITATION.
INADEQUATE COMBINED SEWER SYSTEM IN THE
HARLEM AND BADEN WATERSHEDS CAUSING
SURFACE FLOODING AND BUILDING BACKUPS.
Wastewater FY21 Professional Services 500,000
12697 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT A)
DESIGN PUMP STATION FACILITY IMPROVEMENTS
TO INCLUDE NEEDED REPAIR, RENOVATION,
RECONSTRUCTION, OR ELIMINATION.
AGING PUMP STATION FACILITIES ARE IN NEED
OF REPAIR, IMPROVEMENT, REPLACEMENT, OR
ELIMINATION.
Wastewater FY21 Professional Services 30,000
12699 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT C)
DESIGN PUMP STATION FACILITY IMPROVEMENTS
TO INCLUDE NEEDED REPAIRS, RENOVATIONS,
RECONSTRUCTION, OR ELIMINATION. PUMP
STATIONS P-408, P-417, P-448, P-734, AND P-735 TO
BE INCLUDED IN THIS WORK.
AGING PUMP STATION FACILITIES ARE IN NEED
OF REPAIR AND IMPROVEMENT.
Wastewater FY21 Professional Services 810,000
12759 FLOW METERING AND MONITORING (2017)CONDUCT FLOW METERING AND MONITORING OF
THE WASTEWATER SYSTEM TO COLLECT AND
ANALYZE DATA ON FLOWS AND SYSTEM
RESPONSE DURING WET WEATHER EVENTS. THIS
INFORMATION WILL BE USED TO CALIBRATE
HYDRAULIC MODELS TO DETERMINE IF PROJECTS
ARE REQUIRED.
COMPUTER MODELING OF THE SEWER SYSTEM
REQUIRES FLOW DATA IN ORDER TO BE
ACCURATELY CALIBRATED TO FIELD CONDITIONS.
Wastewater FY21 Vendor Services 2,500,000
12801 FLOW METERING AND MONITORING (2022)CONDUCT FLOW METERING AND MONITORING OF
THE WASTEWATER SYSTEM TO COLLECT AND
ANALYZE DATA ON FLOWS AND SYSTEM
RESPONSE DURING WET WEATHER EVENTS. THIS
INFORMATION WILL BE USED TO CALIBRATE
HYDRAULIC MODELS TO DETERMINE IF PROJECTS
ARE REQUIRED.
COMPUTER MODELING OF THE SEWER SYSTEM
REQUIRES FLOW DATA IN ORDER TO BE
ACCURATELY CALIBRATED TO FIELD CONDITIONS.
Wastewater FY22 Vendor Services 2,500,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 22
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
12818 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2021)
PROVIDE EASEMENT ACQUISITION FUNDING FOR
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM WASTEWATER PROJECTS.
IMPLEMENTATION OF THE CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
AND CONSENT DECREE, REQUIRE PROPERTY
RIGHTS ACQUISITION FOR EASEMENTS AND
PURCHASES.
Wastewater FY21 Property Rights Acquisition 2,400,000
12819 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2022)
PROVIDE EASEMENT ACQUISITION FUNDING FOR
CAPITAL IMPROVEMENT AND REPLACEMENT
PROGRAM WASTEWATER PROJECTS.
IMPLEMENTATION OF THE CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM
AND CONSENT DECREE, REQUIRE PROPERTY
RIGHTS ACQUISITION FOR EASEMENTS AND
PURCHASES.
Wastewater FY22 Property Rights Acquisition 2,000,000
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
RETAIN ENGINEERING FIRM FOR AS NEEDED
WATER QUALITY SUPPORT SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
WATER QUALITY EXPERTISE IS NEEDED TO
SUPPORT THE DISTRICT'S REGULATORY AND
LEGAL EFFORTS.
Stormwater FY21 &
FY22
GSA - (Planning) Operating Fund 200,000
12907 CRITICAL INFRASTRUCTURE ASSESSMENT AND
ASSET INVESTIGATION (2020)
PERFORM SERVICES SUCH AS FIELD
RECONNAISSANCE AND INSPECTION, MAP
UPDATES, WORK ORDER MANAGEMENT,
FLOODWALL GATE INSPECTIONS, SSO
MONITORING EQUIPMENT MAINTENANCE, AND
CCTV VIDEO REVIEW. SERVICES MAY BE
RENEWED THROUGH FY2022 BASED ON
PERFORMANCE.
INVESTIGATION NEEDED TO DETERMINE SEWER
CONDITIONS AND SYSTEM DEFECTS TO PROVIDE
THE BASIS FOR PREVENTATIVE MAINTENANCE
AND REHABILITATION ACTIVITIES.
Wastewater FY21 &
FY22
Vendor Services 3,400,000
12987 INFRASTRUCTURE REPAIRS (WASTEWATER) (2021)CONSTRUCT REPAIR OR REPLACEMENT OF
WASTEWATER INFRASTRUCTURE DISTRICTWIDE.
AGING AND DETERIORATING WASTEWATER
INFRASTRUCTURE IS IN NEED OF REPAIR AND/OR
REPLACEMENT.
Wastewater FY21 Work Order Repair Costs (Capital)8,000,000
12988 INFRASTRUCTURE REPAIRS (WASTEWATER) (2022)CONSTRUCT REPAIR OR REPLACEMENT OF
WASTEWATER INFRASTRUCTURE DISTRICTWIDE.
AGING AND DETERIORATING WASTEWATER
INFRASTRUCTURE IS IN NEED OF REPAIR AND/OR
REPLACEMENT.
Wastewater FY22 Work Order Repair Costs (Capital)7,000,000
12995 INFRASTRUCTURE REPAIRS (FACILITIES) (2021)CONSTRUCT REPAIR, REPLACEMENT, OR
IMPROVEMENT PROJECTS TO ADDRESS NEEDS
AT FACILITIES SUCH AS TREATMENT PLANTS AND
PUMP STATIONS.
FACILITIES HAVE NEEDS FOR REPAIRS OR
IMPROVEMENTS THAT POSE MAJOR
OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO
WAIT FOR CAPITAL PROJECT DELIVERY.
Wastewater FY21 Work Order Repair Costs (Capital)3,000,000
12996 INFRASTRUCTURE REPAIRS (FACILITIES) (2022)CONSTRUCT REPAIR, REPLACEMENT, OR
IMPROVEMENT PROJECTS TO ADDRESS NEEDS
AT FACILITIES SUCH AS TREATMENT PLANTS AND
PUMP STATIONS.
FACILITIES HAVE NEEDS FOR REPAIRS OR
IMPROVEMENTS THAT POSE MAJOR
OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO
WAIT FOR CAPITAL PROJECT DELIVERY.
Wastewater FY22 Work Order Repair Costs (Capital)3,000,000
13004 STORMWATER INFRASTRUCTURE REPAIRS (2021)CONSTRUCT REPAIR OR REPLACEMENT OF
STORMWATER INFRASTRUCTURE THROUGHOUT
THE DISTRICT.
AGING AND DETERIORATING STORMWATER
INFRASTRUCTURE IS IN NEED OF REPAIR AND/OR
REPLACEMENT.
Stormwater FY21 Work Order Repair Costs (Capital)5,000,000
13005 STORMWATER INFRASTRUCTURE REPAIRS (2022)CONSTRUCT REPAIR OR REPLACEMENT OF
STORMWATER INFRASTRUCTURE THROUGHOUT
THE DISTRICT.
AGING AND DETERIORATING STORMWATER
INFRASTRUCTURE IS IN NEED OF REPAIR AND
REPLACEMENT.
Stormwater FY22 Work Order Repair Costs (Capital)4,000,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 23
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13044 GENERAL SERVICES AGREEMENT - LANDSCAPE
DESIGN (2019)
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS
NEEDED DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2021 BASED ON
PERFORMANCE.
LANDSCAPE ARCHITECTURAL DESIGN SERVICES
ARE NEEDED TO SUPPORT PROJECTS
THROUGHOUT THE DISTRICT.
Unallocated FY21 GSA - (Design) Operating Funds 200,000
13059 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY &
SEWER DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2021 BASED ON
PERFORMANCE.
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL STAFF.
Wastewater FY21 GSA - (Design) CIRP Funds 200,000
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
APPRAISAL SERVICES ARE REQUIRED TO
SUPPORT THE DISTRICT'S CAPITAL PROGRAM.
Unallocated FY21 &
FY22
Appraisal Services 150,000
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
APPRAISAL SERVICES ARE REQUIRED TO
SUPPORT THE DISTRICT'S CAPITAL PROGRAM.
Unallocated FY21 &
FY22
Appraisal Services 150,000
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
APPRAISAL SERVICES ARE REQUIRED TO
SUPPORT THE DISTRICT'S CAPITAL PROGRAM.
Unallocated FY21 &
FY22
Appraisal Services 150,000
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
PERFORM AS NEEDED APPRAISAL SERVICES TO
SUPPORT THE DISTRICT'S PROGRAM. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
APPRAISAL SERVICES ARE REQUIRED TO
SUPPORT THE DISTRICT'S CAPITAL PROGRAM.
Unallocated FY21 &
FY22
Appraisal Services 150,000
13096 GENERAL SERVICES AGREEMENT - LANDSCAPE
DESIGN (2022)
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS
NEEDED DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2024 BASED ON
PERFORMANCE.
LANDSCAPE ARCHITECTURAL DESIGN SERVICES
ARE NEEDED TO SUPPORT PROJECTS
THROUGHOUT THE DISTRICT.
Unallocated FY22 GSA - (Design) Operating Funds 200,000
13098 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT A
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY &
SEWER DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL STAFF.
Wastewater FY22 GSA - (Design) CIRP Funds 450,000
13099 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT B
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY &
SEWER DESIGN SERVICES. SERVICES MAY BE
RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL STAFF.
Wastewater FY22 GSA - (Design) CIRP Funds 450,000
13102 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY22 GSA - Geotechnical CIRP Funds 85,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 24
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13103 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY22 GSA - Geotechnical CIRP Funds 85,000
13104 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
GEOTECHNICAL INVESTIGATION NEEDS TO
SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL
STAFF.
Wastewater FY22 GSA - Geotechnical CIRP Funds 85,000
13108 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY22 GSA - (Survey) CIRP Funds 50,000
13109 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY22 GSA - (Survey) CIRP Funds 50,000
13110 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY22 GSA - (Survey) CIRP Funds 50,000
13111 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY22 GSA - (Survey) CIRP Funds 50,000
13112 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY
SERVICES. SERVICES MAY BE RENEWED
THROUGH FY2023 BASED ON PERFORMANCE.
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS
THROUGHOUT THE DISTRICT EXCEED THE
CAPACITY OF INTERNAL SURVEY STAFF.
Wastewater FY22 GSA - (Survey) CIRP Funds 50,000
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
DESIGN STREAMBANK STABILIZATION
ENGINEERING SOLUTIONS IN VARIOUS OMCI
WATERSHEDS.
EROSION AT VARIOUS LOCATIONS THROUGHOUT
THE DISTRICT THREATENING STRUCTURES AND
ROADWAYS, AND DEGRADING WATER QUALITY.
Stormwater FY21 Professional Services 915,000
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
DESIGN STORM SEWERS, INLETS, AND OTHER
STRUCTURAL ENGINEERING SOLUTIONS IN
VARIOUS OMCIS.
FLOODING AT VARIOUS LOCATIONS
THROUGHOUT THE DISTRICT DUE TO
INADEQUATE STORM SEWER INFRASTRUCTURE.
Stormwater FY21 Professional Services 810,000
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT RAINSCAPING
PROGRAM
SMALL GRANT PROGRAM TO FUND
CONSTRUCTION AND ENCOURAGE THE USE OF
RAINSCAPING TECHNIQUES BY INDIVIDUAL
LANDOWNERS.
RAINSCAPING NEEDED TO ADDRESS WATER
QUALITY OF STORMWATER RUNOFF THROUGH
PUBLIC PARTICIPATION.
Stormwater FY21 &
FY22
Construction 400,000
13436 WET WEATHER OPTIMIZATION STUDY PERFORM WET WEATHER OPTIMIZATION STUDY
TO INCREASE THE LEVEL OF SERVICE OF
EXISTING AND PLANNED INFRASTRUCTURE.
INCLUDES MODELING AND ALTERNATIVES
ANALYSIS, AND SUPPORT FOR ESTABLISHING A
SENSOR NETWORK AND SCADA FOR ACTIVE
CONTROLS.
ACTIVE CONTROLS ON TUNNELS AND TANKS CAN
IMPROVE WATER QUALITY BY INCREASING THE
LEVEL OF SERVICE OF EXISTING
INFRASTRUCTURE AND PLANNED IMPROVEMENTS.
Wastewater FY21 &
FY22
Pre-Design Services 3,000,000
Metropolitan St. Louis Sewer District
FY 21 and FY 22 Capital Program Summary
Information per MSD's FY21 Final Budget 25
Project
Number Project Name Scope of Work Description of Problem Project Type Fiscal
Year Task Description FY21 & FY22
Budget Total
13467 SCADA SYSTEM UPGRADE CONSTRUCT SUPERVISORY CONTROL AND DATA
ACQUISITION (SCADA) IMPROVEMENTS TO ALLOW
FOR ACTIVE CONTROLS TO MANAGE WET
WEATHER FLOWS.
MONITORING AND AUTOMATION CAPABILITIES
NEEDED TO OPTIMIZE THE USE OF AVAILABLE
INFRASTRUCTURE, AND INCREASE LEVEL OF
SERVICE.
Wastewater FY21 Pre-Design Services 500,000
13467 SCADA SYSTEM UPGRADE CONSTRUCT SUPERVISORY CONTROL AND DATA
ACQUISITION (SCADA) IMPROVEMENTS TO ALLOW
FOR ACTIVE CONTROLS TO MANAGE WET
WEATHER FLOWS.
MONITORING AND AUTOMATION CAPABILITIES
NEEDED TO OPTIMIZE THE USE OF AVAILABLE
INFRASTRUCTURE, AND INCREASE LEVEL OF
SERVICE.
Wastewater FY22 Design Services 1,000,000
13474 EASEMENT ACQUISITION FOR DEER CREEK OMCI
PROJECTS (2021)
EASEMENT ACQUISITION APPROPRIATION FOR
STORMWATER PROJECTS TO BE FUNDED BY THE
DEER CREEK OMCI.
DEER CREEK OMCI STORMWATER PROJECTS
REQUIRE ACQUISITION OF PROPERTY RIGHTS TO
ENABLE CONSTRUCTION OF IMPROVEMENTS.
Stormwater FY22 Property Rights Acquisition 350,000
13475 EASEMENT ACQUISITION FOR UNIVERSITY CITY
OMCI PROJECTS (2021)
EASEMENT ACQUISITION APPROPRIATION FOR
STORMWATER PROJECTS TO BE FUNDED BY THE
UNIVERSITY CITY OMCI.
MALINE OMCI STORMWATER PROJECTS REQUIRE
ACQUISITION OF PROPERTY RIGHTS TO ENABLE
CONSTRUCTION OF IMPROVEMENTS.
Stormwater FY22 Property Rights Acquisition 75,000
13476 EASEMENT ACQUISITION FOR MALINE OMCI
PROJECTS (2021)
EASEMENT ACQUISITION APPROPRIATION FOR
STORMWATER PROJECTS TO BE FUNDED BY THE
MALINE CITY OMCI.
MALINE OMCI STORMWATER PROJECTS REQUIRE
ACQUISITION OF PROPERTY RIGHTS TO ENABLE
CONSTRUCTION OF IMPROVEMENTS.
Stormwater FY22 Property Rights Acquisition 80,000
13487 DEER CREEK OMCI REIMBURSEMENTS PROGRAM OFFER STORMWATER GRANTS TO
MUNICIPALITIES WITHIN THE DEER CREEK OMCI.
STORMWATER ISSUES IN THE DEER CREEK OMCI
TAXING SUBDISTRICT.
Stormwater FY21 &
FY22
Construction 3,853,790
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
OFFER STORMWATER GRANTS TO
MUNICIPALITIES WITHIN THE COLDWATER CREEK
OMCI.
STORMWATER ISSUES IN THE COLDWATER
CREEK OMCI TAXING SUBDISTRICT.
Stormwater FY21 &
FY22
Construction 1,991,768
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
OFFER STORMWATER GRANTS TO
MUNICIPALITIES WITHIN THE UNIVERSITY CITY
OMCI.
STORMWATER ISSUES IN THE UNIVERSITY CITY
OMCI TAXING SUBDISTRICT.
Stormwater FY21 &
FY22
Construction 906,308
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
OFFER STORMWATER GRANTS TO
MUNICIPALITIES WITHIN THE SUGAR CREEK OMCI.
STORMWATER ISSUES IN THE SUGAR CREEK
OMCI TAXING SUBDISTRICT.
Stormwater FY21 &
FY22
Construction 287,884
13491 SEMINARY OMCI REIMBURSEMENTS PROGRAM OFFER STORMWATER GRANTS TO
MUNICIPALITIES WITHIN THE SEMINARY OMCI.
STORMWATER ISSUES IN THE SEMINARY OMCI
TAXING SUBDISTRICT.
Stormwater FY21 Construction 243,670