Loading...
HomeMy Public PortalAbout1999_07_27_O021 The Town of Leesburg, . Virginia ORDINANCE NO. AN ORDINANCE: WHEREAS, Chesapeake Resources has requested warehouse facility on Lot 9 of Cardinal Industrial Park; and PRESENTED July 27, 1999 99-0-21 ADOPTED July 27, 1999 APPROVING SPECIAL EXCEPTION APPLICATION #SE-99-02, CARDINAL INDUSTRIAL PARK, LOT 9, MINI-WAREHOUSE FACILITY special exception approval for a mini- WHEREAS, the property is located in the I-1, Industrial Research Park Zoning District; and WHEREAS, a mini-warehouse facility is a special exception use in the I-1 zoning district; and WHEREAS, on June 17, 1999, the Planning Commission recommended conditional approval of this application; and WHEREAS, on July 13, 1999, the Town Council held a public heating; and WHEREAS, the proposed use meets the general review criteria as set forth in the Zoning Ordinance; and THEREFORE ORDAINED by the Town of Leesburg in Virginia as follows: SECTION I. Special exception application #SE-99-02, Cardinal Industrial Park, Lot 9, Mini- warehouse facility by Chesapeake Resources identified in the Loudoun County land records as Tax Map 48((3))9 as shown on the Special Exception Plan prepared by William H. Gordon & Associates, Inc., 5, 1999 and last revised on June 18, 1999 is hereby approved subject to the following dated May conditions: 1. Whenever feasible, equipment shall be located at ground level and effectively screened from the public right-of-way. If necessary to locate equipment on the roof of any building, such equipment shall be screened from the public right-of-way with the use of materials compatible with that of the building. The design of the screen shall be integrated with that of the building. Along the frontage of Trailview Boulevard, the fencing detailed in Exhibit A shall be required. The required landscaping along the frontage of Trailview Boulevard shall be a 10' wide buffer with one tree planted every 40'. -2- SPECIAL EXCEPTION APPLICATION #SE-99-02, CARDINAL INDUSTRIAL PARK, LOT 9, MINI- WAREHOUSE FACILITY 4. At the development plan stage, a grading plan will be required. 5. Public water, for domestic use and fire protection, and public sewer shall be extended to the site at no cost to the town. SECTION II. Approval of the special exception concept plan does not authorize modifications to any requirements of the Design and Construction Standards Manual, Subdivision and Land Development Regulations or Zoning Ordinance unless specifically set forth in this ordinance. SECTION III. PASSED this This ordinance shall be in effect upon its passage. 27m day of July, 1999 Clerk of Council O:SE9902 James'. Clem, Mayor Town of Leesburg