Loading...
HomeMy Public PortalAbout08-23-21 Agenda Work Session 101 E. Orange St., PO Box 429, Hillsborough, NC 27278 919-732-1270 | www.hillsboroughnc.gov | @HillsboroughGov BOARD OF COMMISSIONERS AGENDA | 1 of 1 Agenda BOARD OF COMMISSIONERS Remote work session 7 p.m. Aug. 23, 2021 Virtual meeting via YouTube Live Town of Hillsborough YouTube channel Due to current public health concerns, this meeting will be conducted remotely using Zoom. Please use the bookmark feature to navigate and view the item attachments. 1. Opening of the work session 2. Agenda changes and approval 3. Items for decision ― consent agenda A. Miscellaneous budget amendments and transfers B. Minutes – regular meeting June 14, 2021 (amended) C. Classification and pay amendment – reclassify chief water plant operator to plant maintenance mechanic I and title change for one water plant operator III to operator in responsible charge 4. In-depth discussion and topics A. Collection System Needs – update and recommended path forward to accommodating growth and needed sewer capacity and its impact on planning B. High Importance emails discussion 5. Other business 6. Committee updates and reports 7. Adjournment Interpreter services or special sound equipment for compliance with the American with Disabilities Act is available on request. If you are disabled and need assistance with reasonable accommodations, call the Town Clerk’s Office at 919-296-9443 a minimum of one business day in advance of the meeting. AGENDA ABSTRACT | 1 of 1 Agenda Abstract BOARD OF COMMISSIONERS Meeting date: Aug. 23, 2021 Department: Administration Public hearing: No Date of public hearing: N/A PRESENTER/INFORMATION CONTACT Emily Bradford, Budget Director ITEM TO BE CONSIDERED Subject: Miscellaneous budget amendments and transfers Attachments: Budget Changes Detail Report Brief summary: To adjust budgeted revenues and expenditures, where needed, due to changes that have occurred since budget adoption. Action requested: Consider approving budget amendments and transfers. ISSUE OVERVIEW Background information and issue summary: N/A Financial impacts: As indicated by each budget amendment. Staff recommendation and comments: To approve the attached list of budget amendments. For clerk’s use AGENDA ITEM: 3.A Consent agenda Regular agenda Closed session BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2021-2022 DATES: 08/23/2021 TO 08/23/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 10-00-9990-5300-000 CONTINGENCY 08/23/2021 400,000.00 -53,000.00To extend Isley contract through 9/21 23990 296,300.00EBRADFORD 10-10-4400-5300-459 C.S./ACCOUNTING ASSISTANCE 08/23/2021 1,000.00 53,000.00To extend Isley contract through 9/21 23989 54,000.00EBRADFORD 30-80-7220-5300-455 C.S./ENGINEERING 08/23/2021 27,500.00 17,000.00To re-est PO not rolled to FY22 23991 44,500.00EBRADFORD 30-80-8120-5300-145 MAINTENANCE - BUILDINGS 08/23/2021 6,000.00 18,866.00To reinstate funds for FY21 PO that didn't 23987 24,866.00EBRADFORD 30-80-9990-5300-000 CONTINGENCY 08/23/2021 400,000.00 -18,866.00To reinstate funds for FY21 PO that didn't 23988 381,134.00EBRADFORD 08/23/2021 400,000.00 -17,000.00To re-est PO not rolled to FY22 23992 364,134.00EBRADFORD 0.00 EBRADFORD 9:02:38AM08/18/2021 fl142r03 Page 1 of 1 GF- Contingency Accounting Utilities Admin. WTP WSF- Contingency AGENDA ABSTRACT | 1 of 1 Agenda Abstract BOARD OF COMMISSIONERS Meeting date: Aug. 23, 2021 Department: Administration Public hearing: No Date of public hearing: N/A PRESENTER/INFORMATION CONTACT Interim Town Clerk Sarah Kimrey ITEM TO BE CONSIDERED Subject: Minutes – regular meeting June 14, 2021 (amended) Attachments: Regular meeting June 14, 2021 (amended) Brief summary: None Action requested: Approve amended minutes of the Board of Commissioners regular meeting June 14, 2021 (added budget amendments report). ISSUE OVERVIEW Background information and issue summary: None Financial impacts: None Staff recommendation and comments: Approve amended minutes as presented. For clerk’s use AGENDA ITEM: 3.B Consent agenda Regular agenda Closed session Minutes Board of Commissioners Remote regular meeting 7 p.m. June 14, 2021 Virtual meeting via YouTube Live Town of Hillsborough YouTube channel Present: Mayor Jenn Weaver and commissioners Mark Bell, Robb English, Kathleen Ferguson, Matt Hughes, and Evelyn Lloyd Staff: Interim Human Resources Director Haley Bizzell, Budget Director Emily Bradford, Assistant to the Manager/Deputy Budget Director Jen Della Valle, Interim Town Clerk/Human Resources Technician Sarah Kimrey, Stormwater and Environmental Services Manager Terry Hackett, Police Chief Duane Hampton, Assistant Town Manager/Planning Director Margaret Hauth, Interim Public Works Director Dustin Hill, Town Attorney Bob Hornik, Town Manager Eric Peterson, Utilities Director Marie Strandwitz, Public Space Manager Stephanie Trueblood and Public Information Officer Catherine Wright Opening of the meeting Mayor Jenn Weaver called the meeting to order at 7:03 p.m. Interim Town Clerk and Human Resources Technician Sarah Kimrey called the roll and confirmed the presence of a quorum. 1. Public charge Weaver did not read the public charge. 2. Audience comments not related to the printed agenda There was none. 3. Agenda changes and approval The mayor noted a change sent by the budget director by email prior to the meeting regarding the Community Development Block Grant project ordinance and an associated budget amendment. She also noted a change sent by the deputy budget director earlier regarding amending the miscellaneous budget amendments with two additional amendments regarding an aerator blower. Motion: Commissioner Kathleen Ferguson moved to approve the amended agenda. Commissioner Mark Bell seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Commissioners Bell, Robb English, Ferguson, Matt Hughes and Evelyn Lloyd. Nays: 0. 4. Public hearings A. Request to close unopened right of way named Cole Avenue The mayor opened the public hearing. Assistant Town Manager and Planning Director Margaret Hauth said Cole Avenue is an unopened lane that separates property between two neighbors, serves no purpose, is unimproved and has no utilities. The closure was requested by one of the neighbors. Both neighbors were in June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 1 of 40 DRAFT attendance at the meeting. The property owner who made the request, Mark Rhoades, said the closure would allow the two neighbors to have a cleaner property line and would remove questions of maintenance responsibilities along the boundary. Hauth said the other neighbor, Christina Perrella, had noted in an email that she was planning to observe rather than participate in the meeting. The mayor asked for confirmation that both parties are amenable to the request. Hauth said she had not heard otherwise. Motion: Ferguson moved to close the public hearing. Bell seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. B. FY2022 budget public hearing Mayor Weaver opened the public hearing. A water and sewer customer, William Johnson, provided a brief presentation against increasing utility rates. His presentation included a comparison of rates with surrounding communities and a look at specific aspects of the town’s water and sewer fund. There were no other speakers. The mayor said the board received public comments from three other people via email. She summarized them: • Will Lane, who attended the town’s academy on operations, said he was glad to see funding for future sessions, thanked staff for making the budget document easy to understand, and said he wants to see the property tax rate stay the same. • Lavone Tucker expressed concerns about out-of-town water and sewer rates. The mayor noted that the town manager had responded to the email. • Michelle Jenkins was curious about the location for the proposed installation of a bench on Nash Street and had some questions about the installation. The mayor said the board also received a letter from Fairview Community Watch asking for signage to be changed to rename the community center in the neighborhood after Dorothy Johnson. Motion: Bell moved to close the public hearing. Ferguson seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. 5. Items for decision ― consent agenda A. Minutes 1. Joint Public Hearing April 15, 2021 2. Regular meeting May 10, 2021 3. Work session May 24, 2021 B. Miscellaneous budget amendments and transfers (revised item) C. Miscellaneous Tourism Board amendments and transfers D. Hillsborough Tourism Board FY2022 Budget Ordinance E. Proclamation Commemorating Juneteenth Independence Day F. Consistency statement and ordinance amending Unified Development Ordinance Sections 7.5 – limiting the requirement to combine nonconforming lots G. Consistency statement and ordinance amending Unified Development Ordinance Sections 5.1.6 and 5.1.7, Table of permissible uses H. Reclassification and pay amendment – utilities analyst position to civil engineer I. Deed restriction for all town parcels surrounding the West Fork Eno Reservoir June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 2 of 40 DRAFT J. Special event permit – road closure and sponsorship request for police service for Juneteenth March K. NC 86 Connector Study (Phase II) L. Community Development Block Grant (CDBG-CV) project ordinance and associated budget amendment (added item) Motion: Ferguson moved to approve all items on the amended consent agenda. Bell seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. 6. Items for decision ― regular agenda A. Consistency statement and ordinance amending Unified Development Ordinance Sections 5.2.9.2 and 6.3.1 – citizen request related to accessory dwelling units and setbacks Planning Director Margaret Hauth said she placed this request for text amendments on the regular agenda vs. the consent agenda because the Planning Board had a lot of discussion on it at the public hearing. She said the request is from a private property owner who would like to construct an accessory dwelling on the property. The ordinance does not allow accessory dwellings on private roads. The owner also would like to change the setback requirements of the property, which is zoned agricultural residential and has setbacks of 50 feet on all sides. The structures on this property are built closer to the property line already. The owner is asking to conform with setbacks in a nearby neighborhood, with a 40-foot setback in front and 30-foot setbacks on the other sides. Hauth said staff does its best to find options that don’t involve changing the ordinance since it is a solution that impacts the entire town. She said the Planning Board’s recommendation to allow accessory dwellings on private roads was not unanimous. She answered questions from the board. She said the property is on Burnside Drive and is one of a few agricultural residential areas serviced by town water and sewer. Most agricultural residential zoning is outside town limits, and the impact of the request would be very limited, especially for the setback issue. Hughes suggested separating the vote on setbacks and accessory dwelling units. There was additional discussion. Hauth noted a change in the setback would affect all land zoned agricultural residential. She said that properties with the designation include the mining area and some places in West Hillsborough and that mining is regulated by the state. She said the only other tool that could be used to grant the request is a variance, but there is no hardship in this case to justify a variance. Hauth said reducing the setback gives property owners more ability to use their lot. She said individual houses that would be impacted likely are a dozen or fewer; a lot of the land in areas without water and sewer service are not developed; and the town has almost no way to oversee property used for agricultural purposes in its extraterritorial jurisdiction. Motion: Hughes moved to approve ordinance change and consistency statement regarding setbacks. Lloyd seconded. Kimrey called the roll for voting. Vote: 3-1. Ayes: Bell, Ferguson, and Lloyd. Nays: Hughes. English lost connection and was unable to vote. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 3 of 40 DRAFT The board discussed the request to allow an accessory dwelling unit on a private road. The planning director said the applicant wants to build a garage with an apartment over it for a family member. She said the town greatly expanded the ability to have accessory dwelling units but the requirement to be on a public road has been in place for more than 30 years. Hauth said the Planning Board discussed whether a fixed distance could be set from a private road to allow accessory dwellings. The distance needed to allow the unit at this particular property is 300 feet, which would allow accessory dwellings on any private road in town. One of the Planning Board members was opposed to allowing the unit on a private road. Hauth answered questions from the board. She confirmed the private road is a gravel road. She said it is one of the oldest private roads in town and probably one of the more well-constructed ones, noting that garbage trucks do travel it. She said most of the new private roads built are to access deeper lots and most private roads in town are very short. Hauth said the Planning Board discussed looking at the standard of a private road and she was very hesitant to accept the option because town staff are not qualified to look at a road and determine whether it’s built to a certain standard and because the maintenance and standard for private roads is determined by the private owners. It was determined that a fair standard could not be implemented and the only option before the Planning Board was to allow accessory dwellings on private roads or don’t. In answering what the downside is to allowing accessory dwellings on private roads, Hauth said that not all private roads have been built in the last five years and some may not be well maintained or have a maintenance agreement among all the owners. She said the more people who live on a private road, the more pressure there will be also for the town to accept a road that would be a challenge. Hauth said staff have had conversations that private roads are a problem in the long run and perhaps they should not be allowed in town. The mayor noted that the town has already taken steps to make accessory dwelling units more accessible to people and that both parts of this request seem to do that. In this case, the dwelling would make it possible for an aging parent to live on site. For another person, renting out the unit could help produce funds to maintain the road. There was continued discussion about the assumption people have that private roads are public and subject to the same services as public roads and about the treatment of this private road. Hauth said the long tradition of garbage and recycling service on this road and the possibility of the road becoming public should be discussed separately. Motion: Bell moved to adopt the ordinance and consistency statement to allow accessory dwelling units on private roads. Lloyd seconded. Kimrey called the roll for voting. Vote: 3-2. Ayes: Bell, English and Lloyd. Nays: Ferguson, Hughes. B. Order closing unopened right of way named Cole Avenue Motion: Hughes moved to close unopened right of way named Cole Avenue. Ferguson seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 4 of 40 DRAFT C. Consistency statement and ordinance amending Unified Development Ordinance to be consistent with North Carolina General Statute 160D and assigned Special Use Permit review to the Board of Adjustment The planning director noted this item was discussed in April, at which time the board asked staff to check that the Board of Adjustment was comfortable with the new requirements. She said provisions that are more policy-based in the review of special use permits were discussed ― affordable housing, green building, water use and cultural resources. The Board of Adjustment members were willing to take those topics on when there are specific policies or plans that they can rely on when making related determinations. She said the draft language in this request does not include those topics but they could be addressed in the update to the Comprehensive Sustainability Plan and then be added to the Unified Development Ordinance. She said much of the changes are language and consistency changes, some clarification of administrative processes, and changes for consistency in formatting. She noted Section 6.20 of draft will be amended due to a typo. Town Attorney Bob Hornik said the most substantive change is moving special use permit review to the Board of Adjustment to review. All other changes really are to make processes and references match the North Carolina General Statute 160D, which is required by July 1. The mayor asked for clarification on the four items the Board of Adjustment wanted clarification on and what the impact would be in the interim while the town works on the Comprehensive Sustainability Plan. The planning director said the requirements are to ask an applicant how much water they will use, ask what green building standards will be used, have the applicant check whether any documented cultural resources are on the site, and ask the applicant to talk to the board about affordable housing. Hauth said to her recollection, there haven’t been any meaningful conditions placed on special use permits for any of the topics except affordable housing. She said the town did require Forest Ridge and maybe Collins Ridge to do some green building certificates within 30 days of their certificate of occupancy, but more of those provisions and requirements are becoming part of the state building code. She said the big gap in the interim would be with affordable housing as this board has requested affordable housing measures, such as donation of land or payment in lieu. Those measures only are triggered in projects with more than 20 dwellings. In the interim, there would not be that mechanism to have a conversation with the board about affordable housing. Hauth said in discussions with the Planning Board it was noted another round of amendments would be coming in October that would create some conditional zoning districts that address certain circumstances. She said conditional zoning would come to the board and the board would have the opportunity to have affordable housing discussions with applicants then. She noted that the town cannot automatically require that a project with X number of dwellings fall under conditional zoning. She said the board could give staff direction to find another mechanism to address affordable housing. There was discussion about whether special use permits should go to the Board of Adjustment or the town board. The planning director noted that it is not uncommon across the state for special use permits to go to the Board of Adjustment or Planning Board for approval. Bell reminded the board that Hughes had said in the initial discussion that the change in the special use permit process would make the commissioners pay more attention to how they make appointments to the Board of Adjustment. He suggested trying the proposed process for 6 months and then evaluating. He recalled that Hauth had said all the large tracts in the town’s jurisdiction are built out. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 5 of 40 DRAFT Hughes noted there is a benefit in having appointed board members make quasi-judicial decisions at each meeting vs. mixing quasi-judicial and legislative decision-making as there is a possibility of melding the two in their minds. The planning director urged the board to adopt the proposed ordinance tonight to be compliant with state law. She said she thinks staff can have a solution by the end of the calendar year for ensuring that affordable housing gets discussed at the appropriate level. She said staff will propose some conditional zoning districts that include very large-scale residential developments and mixed-use developments. This will allow for affordable housing conversations as conditional zoning will always come to the town board because it’s a legislative decision. She suggested the town also needs to think through the information it needs from applicants to ask for less upfront but still make an informed decision. Motion: Bell moved to amend consistency statement and ordinance. Hughes seconded. Ferguson asked for clarification that the change in process could be revisited. The planning director suggested adding a discussion to the board’s annual budgetary planning retreat. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. D. Second workshop on the FY22 Budget Budget Director Emily Bradford opened the work session and noted the abstract in the agenda packet includes the items noted for further discussion following the June 7 budget work session. Discussion started regarding a downtown parking study in which Hughes had suggested the town fund a larger portion of the study. The draft budget proposed $18,000 as the town’s contribution and $16,000 each from the Tourism Board and Tourism Development Authority. The planning director offered an alternative source of funds. She said the town receives planning funds from the metropolitan planning organization and the parking study would be an eligible expense. The town would have to pay 20% of the cost. She said use of the funds would have no impact on traffic requests. She also said the town has about a $250,000 balance, so the project’s scope could be increased. The $50,000 cost for the study is a plug figure, she said, adding that a $75,000 project would require $15,000 as the town’s share, which is less than the amount proposed in the draft budget. Board members were in agreement to pursue use of Metropolitan Planning Organization funds for the study. Motion: Hughes moved to change the allocation of the parking study to 50% from the Planning Department, 25% from the Tourism Development Authority and 25% from the Tourism Board. English seconded. Kimrey called the roll for voting. Vote: 4-1. Ayes: Bell, English, Hughes and Lloyd. Nays: Ferguson. The budget director confirmed that the parking study estimate would be changed to $75,000 and the cost would be split. The board discussed other items brought forth during the June 7 work session. It directed staff to: • Increase cleaning of park restrooms to four times a week once daily pandemic cleanings end. Prior to the pandemic, they were cleaned twice a week. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 6 of 40 DRAFT • Add $3,000 for cellular phone data analysis software for the Police Department. • Add $7,500 as an initial contribution from the town for a veterans memorial in Orange County. • Fund community reinvestment requests from the Exchange Club and Hillsborough Arts Council at the requested levels, $7,500 and $14,520 respectively. • Keep the proposed 3.25% merit raise for employees and add a $1,000 cost-of-living adjustment for the current fiscal year since no raises were given this fiscal year due to the pandemic. The board also discussed compensation for police officers to keep the town competitive amid significant increases to starting salaries in some area jurisdictions and a nationwide issue of early retirements, a shortage of candidates and an inability to fill vacancies. Town Manager Eric Peterson suggested increasing market rate adjustment funds to help cover potential adjustments for police officers and give time for staff to determine a proposal. He plans to provide a proposed amount for the increase at the June 28 meeting. The board also discussed the proposed property rates and fees. There was discussion on the need for funding for sustainability actions to meet the town’s clean energy goals, for taking care of employees, and for connectivity needs. The manager said he would bring some property tax rate options to the board’s next meeting. The utilities director said the Water and Sewer Advisory Committee’s work on examining rates regarding affordability and the differential charged for out-of-town customers was paused due to the pandemic. The town manager noted additional time also is needed to examine capital utility projects that need to be funded but aren’t in the budget because budget adoption must occur this month. The board directed staff to remove from the fee schedule the higher security deposit for water and sewer customers considered high risk for nonpayment. E. Hot topics for work session June 28, 2021 The board will further discuss the budget proposal and adopt a budget ordinance at the June 28 meeting. The planning director said she does not know if she can have a request to rename the community center in the Fairview neighborhood processed in time for the June 28 meeting. She said there is a process specified in the Code of Ordinances regarding naming structures. 7. Updates A. Board members Board members gave updates on the committees and boards on which they serve. B. Town manager There was none. C. Staff (written reports in agenda packet) There was none. 8. Adjournment Motion: Ferguson moved to adjourn at 10:01 p.m. Lloyd seconded. Kimrey called the roll for voting. Vote: 5-0. Ayes: Bell, English, Ferguson, Hughes and Lloyd. Nays: None. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 7 of 40 DRAFT Respectfully submitted, Sarah Kimrey Interim Town Clerk Staff support to the Board of Commissioners June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 8 of 40 DRAFT William Johnoson Presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 9 of 40 DRAFT William Johnoson Presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 10 of 40 DRAFT William Johnoson Presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 11 of 40 DRAFT William Johnoson Presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 12 of 40 DRAFT William Johnoson Presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 13 of 40 DRAFT William Johnson presentation June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 14 of 40 DRAFT From:Town of Hillsborough To:Jenn Weaver; Robb English; Evelyn Lloyd; Kathleen Ferguson; Mark Bell; Matt Hughes; Sarah Kimrey; Eric Peterson; Margaret Hauth Subject:Contact form message: DRaft FY22 budget comments Date:Monday, June 14, 2021 12:24:43 PM William Lang sent the message below via the Town of Hillsborough website “Contact Mayor and Commissioners” form. To respond, reply to this email or contact Wanted to send my comments on the draft FY22 town budget. Great work by our town staff for making the documents easy to read and understand. The mantra of “take care of what we have” is more important than ever which makes moving out of the Eno flood plain to higher ground important. Amazed and pleased that tax rate might be able to remain at current level given the stressors of the past year and last year’s concerns regarding holding the status quo. Fine with the increase in water and sewer as these are such important town services that I know we pay a lot of attention to regarding quality quantity and infrastructure maintenance. Excited to see included the line item for Hillsborough University the catalyst for me sharing my budget thoughts with you! Thoughtful and thought provoking town budget that shows us in good stead which I might say is supported by the future year budgeting (estimating) approach. Meets my test of: Where do we want to go? How will we know when we get there? and What will we measure along the way to make sure we are heading in the right direction? Thanks! Will June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 15 of 40 DRAFT From:Eric Peterson To: Jenn Weaver; Robb English; Evelyn Lloyd; Kathleen Ferguson; Mark Bell; Matt Hughes; Sarah Kimrey; Margaret Hauth Cc:Marie Strandwitz; Catherine Wright; Jen Della Valle; Emily Bradford Subject:RE: Contact form message: Water/Sewer Rate Increase, 6D on Agenda for June 14 Date:Monday, June 14, 2021 3:40:22 PM Dear Lavone Tucker, Thank you for taking the time to share you concerns and frustrations regarding water and sewer rates. You are correct that rates are unquestionably high for water and sewer service. You raise some excellent questions and points. The town has a frequently asked questions (FAQ) page that provides responses to some of the information you requested regarding minimum usage, justifications for higher out-of-town rates, and others: https://www.hillsboroughnc.gov/faqs/faq- water-and-sewer-rates/ Minimum Usage Water & sewer utilities charge either using a base rate or volumetric approach. The base charge approach means customers get charged a flat amount each month for those fixed costs that still must be paid for even if the customer doesn’t use any water or sewer. This includes costs for making the water and sewer service available, such as debt payments on the treatment plants or other system improvements. The calculations are complex and beyond my ability to explain. Utility billing consultants are usually brought in to calculate what those numbers should be. Thus, the customer is charged the base rate plus the actual water/sewer they used. This is approach the City of Durham uses. The volumetric approach is where a unit sets a minimum usage instead of a base rate plus any usage beyond that amount. As you referenced, Hillsborough’s minimum is 2,500 gallons per month. In North Carolina 54% of water systems use the same approach as Hillsborough, the other 46% use Durham’s approach, so it’s split about evenly. Each approach has it’s pros and cons. Hillsborough’s minimum usage was 3,000 per month. A four year process recommended by the Town’s Water & Sewer Advisory Committee to lower it to 2,500 was completed in 2016. The most typical minimum monthly usage amounts by utility systems are 2,000 and 3,000 per month, thus Hillsborough’s is in the middle. There’s more detail at the town’s website at this link: https://assets.hillsboroughnc.gov/media/documents/public/understanding-the-minimum-usage- charge.pdf The town will likely re-evaluate this practice again at some point in the future as it comes up for discussion and evaluation periodically. If a change occurred, it could be to either lower the minimum further as you suggested or to change to a base rate approach. Either way, it would require direction from the town board to re-evaluate the billing structure and hiring a consultant to generate these options. Higher Out-of-Town Rates As with many utility billing practices they can vary widely from jurisdiction to jurisdiction. Charging higher rates to out-of-town customers is a common practice across the country and North Carolina. Although, there are many places that don’t charge a different rate amount. Many others charge multipliers that are less or more than the double or 200% rate that’s common. For example, the City of Durham charges double or 200%. Some places charge as high as triple or 300%. Hillsborough’s multiplier is slightly less than Durham at 195%, but the overall charges are higher due to our rates. In June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 16 of 40 DRAFT North Carolina about 62% of water systems charge higher rates for out-of-town customers. The following link goes into more detail about this topic, such as rationales that have been cited in various places for charging higher out-of-town rates: https://assets.hillsboroughnc.gov/media/documents/public/understanding-in-town-and-out-of- town-rates.pdf One option to address this would be to see if your condominium development is interested in requesting annexation into the town limits. When this happens it’s a trade off of having water and sewer costs reduced almost in half compared to the additional costs of paying property taxes for town services like parks, streets, possibly solid waste collection if the streets are public, stormwater, and having the fire tax removed which saves the homeowners additional money. Some neighborhoods find after doing the calculations that it’s a savings to be annexed. Others find it’s less expensive to continue paying the higher rates and avoid paying taxes. Town staff can assist neighborhoods that are interested in annexation. Water & Sewer Advisory Committee (WSAC) The WSAC is a group of volunteer advisory board members that is composed of both out-of-town and in-town members. They provide policy guidance on various aspects of operating the town’s system, often making recommendations to the town board on rate, budget, operating, and other aspects of running the system. They meet periodically and welcome inquiries and participation from customers. The following link provides more information about this committee and how to get on one of their agendas: https://www.hillsboroughnc.gov/government/appointed-boards/water-and- sewer-advisory-committee/ Due to COVID they’ve been meeting remotely since last March, so hopefully with things appearing to get better they may start meeting in person again later this summer, which may be more convenient that interacting on Zoom. I’ve copied the Town’s Utilities Director Marie Strandwitz in case you want to get on one of their future agendas. Thank you again for taking the time to share thoughtful questions that touch on important concerns. I’m sure the town board will consider your comments as they regularly re-evaluate the impacts of rate structures and practices on customers. Sincerely, Eric Eric Peterson Eric Peterson (he,him,his) Town Manager Town of Hillsborough P O Box 429 June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 17 of 40 DRAFT 101 E. Orange Street Hillsborough, NC 27278 ( 919-296-9421 7 919-732-3921 E-Mail: eric.peterson@hillsboroughnc.gov Web: www.hillsboroughnc.gov **In accordance with the North Carolina general statutes, chapter 132, this email address is subject to North Carolina public records law. As such, please note that all inbound and outbound messages are subject to requests for review and may be disclosed to third parties. From: Town of Hillsborough <no-reply@hillsboroughmail.org> Sent: Sunday, June 13, 2021 10:07 PM To: Jenn Weaver <Jenn.Weaver@hillsboroughnc.gov>; Robb English <Robb.English@hillsboroughnc.gov>; Evelyn Lloyd <Evelyn.Lloyd@hillsboroughnc.gov>; Kathleen Ferguson <Kathleen.Ferguson@hillsboroughnc.gov>; Mark Bell <Mark.Bell@hillsboroughnc.gov>; Matt Hughes <matt.hughes@hillsboroughnc.gov>; Sarah Kimrey <Sarah.Kimrey@hillsboroughnc.gov>; Eric Peterson <Eric.Peterson@hillsboroughnc.gov>; Margaret Hauth <Margaret.Hauth@hillsboroughnc.gov> Subject: Contact form message: Water/Sewer Rate Increase, 6D on Agenda for June 14 Lavone Tucker sent the message below via the Town of Hillsborough website “Contact Mayor and Commissioners” form. To respond, reply to this email or contact I currently live in a condo on Orange Grove Rd, outside the city limits. I moved here in August 2019 and coming from Durham, I was shocked at the rates for water/sewer. What is particularly troublesome to me is how the Town can set a "minimum" water usage which results in some homes paying for gallons of water that are NOT used (and the sewage rate for those unused gallons). I have never heard of a utility charging customers for services that are, in fact, not provided. While some type of "minimum charge" would be acceptable to most, it should be far below 2,500 gal/mo. My usage varies from 1400 - 1800 gal/mo. To be "equitable", my suggestion is to charge per gallon (with a reasonable minimum) so that every household pays only for the gallons they use. Charging residents outside the City Limits double what residents pay in town is not equitable. I have heard the argument that in-town residents pay higher property taxes than those of us that live outside city limits. Yet, when one looks at the use of funds, no tax dollars are used for Water/Sewer costs, so this argument holds no water (pun intended). I would love a logical explanation for this discrimination. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 18 of 40 DRAFT From:Emily Bradford To:Sarah Kimrey Cc:Eric Peterson Subject:FW: Contact form message: Nash St. bench Date:Friday, June 11, 2021 11:25:18 AM From: Town of Hillsborough <no-reply@hillsboroughmail.org> Sent: Friday, June 11, 2021 10:03 AM To: Emily Bradford <Emily.Bradford@hillsboroughnc.gov> Subject: Contact form message: Nash St. bench Michelle Jenkins sent the message below via the Town of Hillsborough website “Contact Budget Office” form. To respond, reply to this email or contact Re: Nash St. bench Hello. Has area/location been narrowed down yet for bench placement? Purpose of bench? Consider midpoint of Nash or further south. Addition of the bench can be beneficial certainly. Expect placement will be useful, and also encourage moving along instead of loitering. From my experience with the bus stop bench installed near my residence, I have witnessed the benefit for bus patrons, but also loitering and litter. For example, individuals who come with blaring music to sit and just disrupt. Also, for idle gatherings. Hopefully, this bench will involve less of the latter. Please consider placement near midpoint of Nash, @ Alma, Hayes, or closer to S. Nash. Thank you. June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 19 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/14/2021 TO 06/14/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 74-00-3200-3800-350 MISCELLANEOUS 06/14/2021 0.00 689.00Adj to actual 20909 689.00EBRADFORD 74-00-3900-3900-000 FUND BALANCE APPROPRIATED 06/14/2021 49,646.00 5,311.00To cover potential yr-end overages 20910 60,107.00EBRADFORD 74-51-6250-5300-997 6% HOLDBACK 06/14/2021 18,000.00 6,000.00To cover potential yr-end overages 20911 24,000.00EBRADFORD 12,000.00 EBRADFORD 2:09:02PM06/07/2021 fl142r03 Page 1 of 1 APPROVED: 5/0 DATE: 6/14/21 VERIFIED: ___________________________________ June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 20 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/14/2021 TO 06/14/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 10-00-3800-3800-350 MISCELLANEOUS 06/14/2021 20,000.00 10,000.00King St. Sidewalk Project 20847 39,219.00EBRADFORD 10-00-3900-3900-000 FUND BALANCE APPROPRIATION 06/14/2021 551,313.00 6,000.00To cover rental generator 20913 1,085,809.89EBRADFORD 10-10-4200-5300-080 TRAINING/CONF./CONV. 06/14/2021 28,645.00 -775.00To cover translation services 20845 26,313.00EBRADFORD 10-10-4200-5300-320 SUPPLIES - OFFICE 06/14/2021 2,200.00 100.00To cover yr-end overages 20835 1,900.00EBRADFORD 10-10-4200-5300-454 C.S.-CATV/ASCAP-BMI/COD/TRANS/PAY S 06/14/2021 61,332.00 -100.00To cover yr-end overages 20836 61,232.00EBRADFORD 10-10-4200-5300-570 MISCELLANEOUS 06/14/2021 9,053.00 775.00To cover translation services 20846 8,622.00EBRADFORD 10-10-4400-5300-338 SUPPLIES - DATA PROCESSING 06/14/2021 1,200.00 -100.00To cover Debt Book 20915 1,100.00EBRADFORD 10-10-4400-5300-458 DATA PROCESSING SERVICES 06/14/2021 6,948.00 100.00To cover Debt Book 20914 18,559.00EBRADFORD 10-10-4900-5300-120 ADVERTISING 06/14/2021 1,500.00 500.00To cover yr-end overages 0 6,035.00EBRADFORD 06/14/2021 1,500.00 1,000.00To cover yr-end overages 20843 7,035.00EBRADFORD 10-10-4900-5300-570 MISCELLANEOUS 06/14/2021 2,500.00 -500.00To cover yr-end overages 0 41,616.00EBRADFORD 06/14/2021 2,500.00 -1,000.00To cover yr-end overages 20844 40,616.00EBRADFORD 10-20-5100-5300-458 DATA PROCESSING SERVICES 06/14/2021 13,983.00 1,300.00To cover simulator maint/support 20832 15,283.00EBRADFORD 10-20-5110-5300-330 SUPPLIES - DEPARTMENTAL 06/14/2021 15,500.00 3,000.00To cover ammunition 20829 42,729.16EBRADFORD 10-20-5110-5300-350 UNIFORMS 06/14/2021 9,360.00 -3,000.00To cover ammunition 20830 14,360.00EBRADFORD 10-20-5110-5700-741 CAPITAL - EQUIPMENT 06/14/2021 0.00 -1,300.00To cover simulator maint/support 20831 68,250.00EBRADFORD 10-30-5550-5300-351 RENTAL - EQUIPMENT 06/14/2021 0.00 6,000.00To cover rental generator 20912 6,000.00EBRADFORD 10-30-5600-5300-130 UTILITIES 06/14/2021 125,000.00 -9,000.00To cover garbage truck tax/tags 20825 128,855.17EBRADFORD 10-30-5600-5300-165 MAINTENANCE - INFRASTRUCTURE 06/14/2021 0.00 10,000.00King St. Sidewalk Project 20848 13,500.00EBRADFORD 10-30-5800-5700-740 CAPITAL - VEHICLES 06/14/2021 310,000.00 9,000.00To cover garbage truck tax/tags 20826 306,388.00EBRADFORD 30-80-7200-5300-571 SAFETY AWARDS PROGRAM 06/14/2021 0.00 250.00To cover cost of safety awards program 20850 4,303.00JDELLAVALL 30-80-7200-5300-580 CUSTOMER SERVICE & INNOVATION AWARD 06/14/2021 4,000.00 -250.00To cover cost of safety awards program 20849 3,750.00JDELLAVALL 30-80-7200-5350-610 SERVICE CHARGE - GOVERNING BODY EBRADFORD 7:29:37PM06/09/2021 fl142r03 Page 1 of 4 GF- Revenue GF- Revenue Admin. Admin. Admin. Admin. Accounting Accounting Planning Planning Police- Admin Police- Patrol Police- Patrol Police- Patrol Fleet Maint. Streets Streets Solid Waste Admin. of Enterprise Admin. of Enterprise Admin. of Enterprise June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 21 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/14/2021 TO 06/14/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 06/14/2021 138,952.00 -2,000.00To cover year-end overages 20851 136,952.00JDELLAVALL 30-80-7200-5350-611 SERVICE CHARGE - ADMINISTRATION 06/14/2021 794,099.00 -11,000.00To cover year-end overages 20855 783,099.00JDELLAVALL 30-80-7200-5350-612 SERVICE CHARGE - ACCOUNTING 06/14/2021 271,260.00 -4,000.00To cover year-end overages 20853 267,260.00JDELLAVALL 30-80-7200-5350-613 SERVICE CHARGE - FLEET MAINTENANCE 06/14/2021 205,609.00 2,000.00To cover year-end overages 20852 207,609.00JDELLAVALL 30-80-7200-5350-615 SERVICE CHARGE - SAFETY & RISK MGMT 06/14/2021 93,090.00 4,000.00To cover year-end overages 20854 97,090.00JDELLAVALL 30-80-7200-5350-616 SERVICE CHARGE-INFORMATION SERVICES 06/14/2021 271,256.00 11,000.00To cover year-end overages 20856 282,256.00JDELLAVALL 30-80-7220-5100-010 OVERTIME 06/14/2021 1,500.00 3,000.00To cover year-end overages 20858 4,500.00JDELLAVALL 30-80-7220-5100-020 SALARIES 06/14/2021 305,578.00 -3,000.00To cover year-end overages 20857 302,578.00JDELLAVALL 30-80-7220-5300-455 C.S./ENGINEERING 06/14/2021 127,500.00 -5,000.00To cover GIS work 20828 167,500.00EBRADFORD 06/14/2021 127,500.00 -3,371.00To cover year-end overages 20859 164,129.00JDELLAVALL 30-80-7220-5300-493 C.S./GIS 06/14/2021 15,000.00 5,000.00To cover GIS work 20827 26,858.75EBRADFORD 30-80-7220-5300-581 RECOGNITION PAY 06/14/2021 0.00 3,371.00To cover year-end overages 20860 3,371.00JDELLAVALL 30-80-7240-5100-010 OVERTIME COMPENSATION 06/14/2021 2,000.00 2,600.00To cover year-end overages 20862 4,600.00JDELLAVALL 30-80-7240-5125-060 HOSPITALIZATION 06/14/2021 63,414.00 -2,600.00To cover year-end overages 20861 60,814.00JDELLAVALL 30-80-7240-5125-061 LIFE/DISABILITY/VISION 06/14/2021 1,396.00 25.00To cover year-end overages 20864 1,421.00JDELLAVALL 30-80-7240-5127-070 RETIREMENT 06/14/2021 21,923.00 -25.00To cover year-end overages 20863 21,898.00JDELLAVALL 30-80-8120-5100-020 SALARIES 06/14/2021 398,633.00 22,000.00To cover year-end overages 20881 420,633.00JDELLAVALL 30-80-8120-5120-050 FICA 06/14/2021 32,408.00 3,500.00To cover year-end overages 20882 35,908.00JDELLAVALL 30-80-8120-5125-060 HOSPITALIZATION 06/14/2021 77,179.00 10.00To cover year-end overages 20866 77,189.00JDELLAVALL 30-80-8120-5127-070 RETIREMENT 06/14/2021 43,211.00 -10.00To cover year-end overages 20865 43,201.00JDELLAVALL 30-80-8120-5127-071 401(K) RETIREMENT SUPP. 06/14/2021 21,182.00 260.00To cover year-end overages 20868 21,442.00JDELLAVALL 30-80-8120-5300-130 UTILITIES 06/14/2021 82,500.00 -260.00To cover year-end overages 20867 74,433.00JDELLAVALL 30-80-8120-5300-570 MISCELLANEOUS EBRADFORD 7:29:37PM06/09/2021 fl142r03 Page 2 of 4 Admin. of Enterprise Admin. of Enterprise Admin. of Enerprise Admin. of Enterprise Admin. of Enterprise Utilities Admin. Utilities Admin. Utilities Admin. Utilities Admin. Utilities Admin. Billing & Collection Billing & Collection Billing & Collection Billing & Collection WTP WTP WTP WTP WTP WTP WTP June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 22 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/14/2021 TO 06/14/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 06/14/2021 1,200.00 -400.00To cover translation of water quality repor 20916 1,800.00JDELLAVALL 30-80-8120-5300-572 CONSUMER CONFIDENCE REPORT 06/14/2021 600.00 400.00To cover translation of water quality repor 20917 1,000.00JDELLAVALL 30-80-8140-5100-020 SALARIES 06/14/2021 314,813.00 53,000.00To cover year-end overages 20883 367,813.00JDELLAVALL 30-80-8140-5120-050 FICA 06/14/2021 25,039.00 3,000.00To cover year-end overages 20884 28,039.00JDELLAVALL 30-80-8140-5125-060 HOSPITALIZATION 06/14/2021 67,963.00 12,000.00To cover year-end overages 20885 79,963.00JDELLAVALL 30-80-8140-5125-061 LIFE/DISABILITY/VISION 06/14/2021 2,162.00 500.00To cover year-end overages 20886 2,662.00JDELLAVALL 30-80-8140-5125-062 DENTAL INSURANCE 06/14/2021 2,244.00 550.00To cover year-end overages 20887 2,794.00JDELLAVALL 30-80-8140-5127-070 RETIREMENT 06/14/2021 33,386.00 4,500.00To cover year-end overages 20888 37,886.00JDELLAVALL 30-80-8140-5127-071 401(K) RETIREMENT SUPP. 06/14/2021 16,366.00 3,500.00To cover year-end overages 20870 19,866.00JDELLAVALL 30-80-8140-5300-130 UTILITIES 06/14/2021 42,268.00 1,800.00To cover year-end overages 20871 44,068.00JDELLAVALL 30-80-8140-5300-310 GASOLINE 06/14/2021 23,345.00 -5,300.00To cover year-end overages 20869 15,045.00JDELLAVALL 30-80-8140-5300-330 SUPPLIES - DEPARTMENTAL 06/14/2021 100,000.00 -2,400.00To cover year-end overages 20872 95,173.00JDELLAVALL 30-80-8140-5300-336 NON-CAPITAL OUTLAY 06/14/2021 0.00 2,400.00To cover year-end overages 20873 2,400.00JDELLAVALL 30-80-8200-5100-020 SALARIES 06/14/2021 314,813.00 25,000.00To cover year-end overages 20889 339,813.00JDELLAVALL 30-80-8200-5120-050 FICA 06/14/2021 25,039.00 1,400.00To cover year-end overages 20890 26,439.00JDELLAVALL 30-80-8200-5125-060 HOSPITALIZATION 06/14/2021 67,963.00 8,500.00To cover year-end overages 20891 76,463.00JDELLAVALL 30-80-8200-5125-061 LIFE/DISABILITY/VISION 06/14/2021 2,162.00 200.00To cover year-end overages 20892 2,362.00JDELLAVALL 30-80-8200-5125-062 DENTAL INSURANCE 06/14/2021 2,244.00 300.00To cover year-end overages 20893 2,544.00JDELLAVALL 30-80-8200-5127-070 RETIREMENT 06/14/2021 33,386.00 1,800.00To cover year-end overages 20894 35,186.00JDELLAVALL 30-80-8200-5127-071 401(K) RETIREMENT SUPP. 06/14/2021 16,366.00 2,300.00To cover year-end overages 20875 18,666.00JDELLAVALL 30-80-8200-5300-110 TELEPHONE/INTERNET 06/14/2021 5,904.00 500.00To cover year-end overages 20877 6,557.00JDELLAVALL 30-80-8200-5300-130 UTILITIES 06/14/2021 53,573.00 -2,300.00To cover year-end overages 20874 51,273.00JDELLAVALL EBRADFORD 7:29:37PM06/09/2021 fl142r03 Page 3 of 4 WTP Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution Water Distribution WW Collection WW Collection WW Collection WW Collection WW Collection WW Collection WW Collection WW Collection WW Collection June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 23 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/14/2021 TO 06/14/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 30-80-8200-5300-310 GASOLINE 06/14/2021 16,723.00 -500.00To cover year-end overages 20876 19,223.00JDELLAVALL 30-80-8220-5127-071 401(K) RETIREMENT SUPP. 06/14/2021 18,186.00 600.00To cover year-end overages 20879 18,786.00JDELLAVALL 30-80-8220-5300-130 UTILITIES 06/14/2021 159,370.00 -600.00To cover year-end overages 20878 158,770.00JDELLAVALL 30-80-8220-5300-331 SUPPLIES - SAFETY 06/14/2021 1,950.00 2,820.00To cover fall protection device replacemen 20833 4,770.00EBRADFORD 30-80-8220-5300-473 MAINTENANCE CONTRACTS 06/14/2021 77,710.00 -2,820.00To cover fall protection device replacemen 20834 74,890.00EBRADFORD 30-80-9990-5300-000 CONTINGENCY 06/14/2021 300,000.00 -136,250.00To cover year-end overages 20880 44,688.00JDELLAVALL 32,000.00 EBRADFORD 7:29:37PM06/09/2021 fl142r03 Page 4 of 4 WW Collection WWTP WWTP WWTP WWTP WSF- Contingency APPROVED: 5/0 DATE: 6/14/21 VERIFIED: ___________________________________ June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 24 of 40 DRAFT BUDGET CHANGES REPORT TOWN OF HILLSBOROUGH FY 2020-2021 DATES: 06/15/2021 TO 06/15/2021 REFERENCE NUMBER DATE BUDGET CHANGE BUDGET ORIGINAL BUDGET AMENDEDCHANGE USER 10-00-3900-3900-000 FUND BALANCE APPROPRIATION 06/15/2021 551,313.00 5,700.00To cover generator repair & rental 20920 1,091,509.89EBRADFORD 10-30-5550-5300-158 MAINTENANCE - EQUIPMENT 06/15/2021 2,500.00 5,000.00To cover generator repair 20919 7,500.00EBRADFORD 10-30-5550-5300-351 RENTAL - EQUIPMENT 06/15/2021 0.00 700.00To cover generator rental 20918 6,700.00EBRADFORD 30-80-8220-5300-158 MAINTENANCE - EQUIPMENT 06/15/2021 65,710.00 10,500.00To cover aeration blower replacement 20931 129,528.00JDELLAVALL 30-80-8220-5300-473 MAINTENANCE CONTRACTS 06/15/2021 77,710.00 -10,500.00To cover aeration blower replacement 20930 64,390.00JDELLAVALL 11,400.00 JDELLAVALLE 12:13:46PM06/14/2021 fl142r03 Page 1 of 1 GF - Revenue Fleet Maint. Fleet Maint. WWTP WWTP APPROVED: 5/0 DATE: 6/14/21 VERIFIED: ___________________________________ June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 25 of 40 DRAFT Ordinance #20210614-5.D June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 26 of 40 DRAFT Proclamation #20210614-5.E June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 27 of 40 DRAFT Proclamation #20210614-5.E June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 28 of 40 DRAFT Town Board’s Statement per N.C. Gen. Stat. 160A-383 The Town of Hills borough Town Board has received and reviewed the application of planning staff to amend the Town of Hillsborough Unified Development Ordinance as follows (insert general description of proposed amendment): Sections 7.5 – limiting the requirement to combine nonconforming lots The Hillsborough Town Board has determined that the proposed action is consistent with the Town of Hillsborough’s comprehensive plan, and the Town Board’s proposed action on the amendment is reasonable and in the public interest for the following reason(s): This amendment supports the town’s on-going smart growth principles of encouraging more development with the urban core and available to existing infrastructure, as well as supporting affordable housing efforts. Adopted by the Town of Hillsborough Board of Commissioners this 14th day of June, 2021. ______________________________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 29 of 40 DRAFT AN ORDINANCE AMENDING THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF HILLSBOROUGH THE BOARD OF COMMISSIONERS OF THE TOWN OF HILLSBOROUGH ORDAINS: Section 1. The Unified Development Ordinance Section 7.5, Nonconforming Lots, is hereby amended to replace section 7.5.1 and 7.5.2 as follows: 7.5.1 COMBINATION OF CONTIGUOUS NONCONFORMING LOTS IN SINGLE OWNERSHIP Undeveloped nonconforming lots shall be combined to create less nonconforming lots when all of the following apply: a) the lots are held in single ownership at the time of permit application b) the lots have continuous street frontage c) one or more of the lots is less than 40 feet wide, when measured at the front setback line d) the lots are lots of record as defined by this ordinance, were created by a public taking action, or were created as a result of a court order. If the resultant lot is still nonconforming, it may be developed subject to Section 7.5.3, Nonconforming Lot Setback Requirements, as if the lot was created prior to February 17, 1986. 7.5.2 USE OF NONCONFORMING LOTS 7.5.2.1 Any single nonconforming lot of record may be developed, used, and occupied for the purposes defined by its zoning classification if combination with adjoining lots is not required under 7.5.1, Combination of Contiguous Nonconforming Lots in Single Ownership. 7.5.2.2 The setbacks for these lots shall be defined in Section 7.5.3, Nonconforming Lot Setback Requirements, as if the lot was created prior to February 17, 1986. Section 2. All provisions of any town ordinance in conflict with this ordinance are repealed. Section 3. This ordinance shall become effective upon adoption. The foregoing ordinance having been submitted to a vote, received the following vote and was duly adopted this 14th day of June, 2021. Ayes: 5 Noes: 0 Absent: 0 Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 30 of 40 DRAFT Town Board’s Statement per N.C. Gen. Stat. 160A-383 The Town of Hills borough Town Board has received and reviewed the application of planning staff to amend the Town of Hillsborough Unified Development Ordinance as follows (insert general description of proposed amendment): Sections 5.1.6 and 5.1.7 – permitted use tables The Hillsborough Town Board has determined that the proposed action is consistent with the Town of Hillsborough’s comprehensive plan, and the Town Board’s proposed action on the amendment is reasonable and in the public interest for the following reason(s): This amendment brings the ordinance into compliance with NCGS 160D requirements to no longer have conditional use permits. Other modernization amendments to processes and where uses are allowed were also included. Adopted by the Town of Hillsborough Board of Commissioners this 14th day of June, 2021. _____________ _________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 31 of 40 DRAFT AN ORDINANCE AMENDING THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF HILLSBOROUGH THE BOARD OF COMMISSIONERS OF THE TOWN OF HILLSBOROUGH ORDAINS: Section 1. The Unified Development Ordinance Section 5.1.6, Use Table for Residential districts and 5.1.7., Use Table for Non-residential districts are hereby replaced wits the attached tables. Section 2. Amend Section 9.2, definitions, to modify the definition for Building/Trade Contractor’s Office to read as follows: An establishment that serves as the base of operations for building contractors, plumbers, electricians, mechanical systems technicians, and the like. This use also includes other service type businesses dispatching to a work site including but not limited to exterminators, carpet cleaners, or mobile vehicle service with no on-site garage. This use may include office, on-site and off-site repair, and sale of related supplies and equipment. Outside storage of supplies, equipment, or vehicles that meet the definition of storage rather than parking is only permitted if the outdoor storage meets the requirements in Section 5.2 45. Section 3. All provisions of any town ordinance in conflict with this ordinance are repealed. Section 4. This ordinance shall become effective upon adoption. The foregoing ordinance having been submitted to a vote, received the following vote and was duly adopted this 14th day of June, 2021. Ayes: 5 Noes: Absent or Excused: Sarah E. Kimrey, Interim Town Clerk 5 0 0 June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 32 of 40 DRAFT June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 33 of 40 DRAFT June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 34 of 40 DRAFT Town Board’s Statement per N.C. Gen. Stat. 160A-383 The Town of Hills borough Town Board has received and reviewed the application of Samantha Johnson to amend the Town of Hillsborough Unified Development Ordinance as follows (insert general description of proposed amendment): Section 6.3.1 – to reduce setbacks in the Agricultural residential district The Hillsborough Town Board has determined that the proposed action is consistent with the Town of Hillsborough’s comprehensive plan, and the Town Board’s proposed action on the amendment is reasonable and in the public interest for the following reason(s): The requested amendments do not conflict with town goals and allow more dense development within the area served with public water and sewer. Adopted by the Town of Hillsborough Board of Commissioners this 14th day of June, 2021. ______________________________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 35 of 40 DRAFT AN ORDINANCE AMENDING THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF HILLSBOROUGH THE BOARD OF COMMISSIONERS OF THE TOWN OF HILLSBOROUGH ORDAINS: Section 1. The Unified Development Ordinance Section 6.3.1, Dimensional Requirements – Residential, is amended to establish side setbacks of thirty feet, rear setback of thirty feet, and front setback of forty feet for the Agricultural Residential District. Section 2. All provisions of any town ordinance in conflict with this ordinance are repealed. Section 3. This ordinance shall become effective upon adoption. The foregoing ordinance having been submitted to a vote, received the following vote and was duly adopted this 14th day of June, 2021. Ayes: 3 Noes: 1 Absent or Excused: 0 Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 36 of 40 DRAFT Town Board’s Statement per N.C. Gen. Stat. 160A-383 The Town of Hills borough Town Board has received and reviewed the application of Samantha Johnson to amend the Town of Hillsborough Unified Development Ordinance as follows (insert general description of proposed amendment): Section 5.2.9.2 – allow accessory dwellings on private roads The Hillsborough Town Board has determined that the proposed action is consistent with the Town of Hillsborough’s comprehensive plan, and the Town Board’s proposed action on the amendment is reasonable and in the public interest for the following reason(s): The requested amendments do not conflict with town goals and allow more dense development within the area served with public water and sewer. Adopted by the Town of Hillsborough Board of Commissioners this 14th day of June, 2021. ______________________________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 37 of 40 DRAFT AN ORDINANCE AMENDING THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF HILLSBOROUGH THE BOARD OF COMMISSIONERS OF THE TOWN OF HILLSBOROUGH ORDAINS: Section 1. The Unified Development Ordinance Section 5.2.9.2, Accessory dwelling within a principal single-family dwelling, is hereby amended to deleted provision “b” which requires the lot to have direct access to a public road. The section is renumbered to accommodate this deletion. Section 2. All provisions of any town ordinance in conflict with this ordinance are repealed. Section 3. This ordinance shall become effective upon adoption. The foregoing ordinance having been submitted to a vote, received the following vote and was duly adopted this 14th day of June, 2021. Ayes: 3 Noes: 2 Absent or Excused: 0 Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 38 of 40 DRAFT Town Board’s Statement per N.C. Gen. Stat. 160A-383 The Town of Hills borough Town Board has received and reviewed the application of planning staff to amend the Town of Hillsborough Unified Development Ordinance as follows (insert general description of proposed amendment): Entire ordinance rewrite to comply with North Carolina General Statutes 160D The Hillsborough Town Board has determined that the proposed action is consistent with the Town of Hillsborough’s comprehensive plan, and the Town Board’s proposed action on the amendment is reasonable and in the public interest for the following reason(s): This amendment brings the ordinance into compliance with NCGS 160D requirements Adopted by the Town of Hillsborough Board of Commissioners this 14th day of June, 2021. _____________ _________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 39 of 40 DRAFT AN ORDINANCE REPEALING THE TOWN OF HILLSBOROUGH 2011 UNIFIED DEVELOPMENT ORDINANCE (as amended) AND ADOPTING A UNIFIED DEVELOPMENT ORDINANCE CONSISTENT WITH NCGS 106-D. THE BOARD OF COMMISSIONERS OF THE TOWN OF HILLSBOROUGH ORDAINS: Section 1. The Unified Development Ordinance, originally adopted February 28, 2011 and subsequently amended, is hereby repealed. Section 2. The attached Unified Development Ordinance consisting of 9 sections, is hereby adopted to be consistent with new planning legislation in North Carolina General Statutes 160D. Section 4. All provisions of any town ordinance in conflict with this ordinance are repealed. Section 5. This ordinance shall become effective upon adoption. The foregoing ordinance having been submitted to a vote, received the following vote and was duly adopted this 14th day of June, 2021. Ayes: 5 Noes: 0 Absent or Excused: 0 _____________________________ Sarah E. Kimrey, Interim Town Clerk June 14, 2021 Board of Commissioners Regular Meeting Amended: ____________________ Page 40 of 40 DRAFT AGENDA ABSTRACT | 1 of 2 Agenda Abstract BOARD OF COMMISSIONERS Meeting date: Aug. 23, 2021 Department: Administration/HR Public hearing: No Date of public hearing: N/A PRESENTER/INFORMATION CONTACT Haley Bizzell, Interim Human Resources Director ITEM TO BE CONSIDERED Subject: Classification and pay amendment – reclassify the chief water plant operator position to plant maintenance mechanic I and title change for one water plant operator III to operator in responsible charge Attachments: 1. Current chief water plant operator position classification 2. Proposed plant maintenance mechanic I position classification 3. Proposed position classification for Operator in Responsible Charge Brief summary: The Water Treatment Plant has been operating without a chief operator since February 2021. The plant has continued to operate efficiently without someone in this position. As note, the former chief operator served as the Operator in Responsible Charge (ORC), a state mandated designation. When the chief operator position became vacant, Alton (Sam) Dunevant, a current Water Operator III, became the ORC and has carried forth these duties in an excellent manner and with a temporary pay increase to handle the extra duties. Utilities staff has identified a greater need for a plant maintenance mechanic to help with repairs and other maintenance around the aging Water Treatment Plant rather than a chief operator. Reclassifying the chief operator position, grade 9 (salary range $46,110-$73,775), to a plant maintenance mechanic I position, grade 4 (salary range $36,128-$57,805) will not have a significant financial impact. Changing Alton (Sam) Dunevant’s position title from an operator III to Operator in Responsible Charge will change the position from grade 6 (salary range $39,831-$63,730) to grade 7 (salary range $41,823-$66,916). The salary savings of reclassifying the chief operator position to grade 4, will allow the one water plant operator III position to be reclassified to Operator in Responsible Charge at grade 7. Action requested: Approve reclassification of the chief operator to plant maintenance mechanic I. Approve change in position/title and salary grade for Alton (Sam) Dunevant to Operator in Responsible Charge from operator III. ISSUE OVERVIEW Background information and issue summary: Please see above. Financial impacts: For clerk’s use AGENDA ITEM: 3.C Consent agenda Regular agenda Closed session AGENDA ABSTRACT | 2 of 2 This reclassification will not have a significant financial impact. There will be a small savings in salary with this reclassification from chief operator to a maintenance mechanic and Mr. Dunevant has received the increased salary since February 2021. Staff recommendation and comments: Approve classification and pay amendments as presented. Chief Water Plant Operator Class Code: 0909 TOWN OF HILLSBOROUGH Revision Date: Jan 22, 2021 SALARY RANGE $46,110.00 - $73,775.00 Annually GENERAL STATEMENT OF JOB: The purpose of this classification is to oversee the daily operations of the Town’s 3 MGD river water plant, conduct quality control checks of operations by running tests, maintain equipment and the building, and supervise other water plant operators and laboratory supervisor. This position answers to the Water Treatment Plant Superintendent. SPECIFIC DUTIES AND RESPONSIBILITIES: ESSENTIAL FUNCTIONS The following duties are representative of this position. The omission of specific statements of the duties does not exclude them from the classification if the work is similar, related, or a logical assignment for this classification. Other duties may be required and assigned. Prepares and/or processes various records and reports including daily log sheets, on- call sheet, water bath temperature log, incubator temperature log, pH standardization log, and autoclave worksheet; performs electronic reporting. Receives and/or reviews various records and reports including daily log sheets, raw and filter turbidity, maintenance records, and vehicle maintenance. May serve as Operator in Responsible Charge (ORC), in which case, prepare and maintain Standard Operating Procedures for the plant and perform required duties per state regulations. Recognizes and makes changes to equipment and treatment processes, checks, controls, and monitors plant equipment. Collects and analyzes water samples in the plant and distribution system to monitor water quality. Receives, unloads, and stores chemical shipments. Performs basic water plant maintenance and housekeeping; washes basins when needed; fills chemical storage tanks; backwashes filters; changes cylinders, manages alum ponds. Maintains inventory and assists with monitoring the budget and spending. Establishes relationships and contacts with product, chemical and maintenance vendors who can assist when needed. Dispatches line crews for leaks and locations. Supervises division operators and lab supervisor which involves such duties as instructing, assigning and reviewing work, maintaining standards, protocols and regulatory compliance, acting on employee problems, assisting with the selection of new employees, assisting with the appraisal of employee performance, providing input on promotions, discipline, termination and salary increases, processes timesheets, motivating and leading by example. Interacts and communicates with various groups and individuals, internal and external; responds to customer complaints. Covers emergencies and staff shortages in accordance with town policy. Fills in for the water plant superintendent or other operators when needed. Performs other related work as required. MINIMUM TRAINING AND EXPERIENCE: Education and Experience: Requires a High School Diploma and/or GED (Associate's Degree preferred) and 3 years of experience; or any equivalent combination of training and experience, which provides the required knowledge, skills, and abilities. Licensure, Certification, and Specialized Training: NC Driver's License NC Grade A Surface Water Treatment System Operator certification NC Class 2 Maintenance Technologist certification preferred NC Bacteriological Methods certification preferred Working Conditions and Physical Requirements: Must be physically able to operate a variety of equipment. Must be able to exert up to 110 pounds of force occasionally and/or up to 20 pounds of force frequently or constantly to lift, carry, push, pull or otherwise move objects. Must be able to lift and/or carry weights of 10 to 200 pounds. Must be able to walk, stand, bend, reach, climb and stoop. If ORC, meet the distance and time stipulations for the designation. Must be willing to work in office, within water plant and outdoors in varying climates. May be exposed to machinery with moving parts, hazardous and irritating chemicals, wet and dirty environments and enclosed spaces. Personal protective devices are required. PERFORMANCE INDICATORS: Knowledge: Methods, procedures and policies of the town, including town code, employee handbook, policy and procedure manuals, contracts, publications and reference texts, etc. Federal, state, and local laws and policies concerning water and sewer systems including NC General Statutes, NC Administrative Code, OSHA regulations, NC Department of Environmental Quality rules & regulations, and other codes, laws, and regulations. Operating principles and practices, and maintenance requirements of water systems, plant equipment and machinery utilized in water supply and treatment operations; principles of plumbing and hydraulics as related to water systems. Engineering, chemical, and bacteriological processes and practices related to water supply and treatment operations for a water plant with a river intake. Occupational hazards and safety precautions of utilities work. Mechanical maintenance and lubrication requirements of the equipment operated. Standard laboratory principles, techniques, terminology, and equipment. Administrative principles involved in developing, directing and supervising various programs and related activities. Principles and practices of supervision, organization, and public administration. Functions and interrelationships of town and other governmental agencies. Responsibilities of individuals directly supervised to ensure accurate and efficient completion of assignments. Skills: Strong organizational, management, human relations, interpersonal and technical skills. Strong written, computer and oral communication skills. Mathematical ability to handle required calculations. Supervisory experience. Use and maintain a variety of office equipment including calculator, computer, printer, shredder, copier, scanner, fax machine, telephone, and any other equipment as necessary to complete essential functions. Use and maintain a variety of equipment including power tools, mechanic tools, carpentry tools, spectrophotometer, PH probes, pumps/meters, mixer, autoclave, distiller, voltmeter, pallet jack, motor lift, and other hand/electrical/pneumatic tools. Use a variety of word processing, spreadsheet, database, or other system software, such as Microsoft Office, online monitoring systems, internet search engines, etc. Abilities: Plan and develop daily, short- and long-term goals; handle multiple assignments simultaneously. Produce quality work, which requires constant attention to detail. Analyze and recognize problems and potential problems with the plant or its personnel and recommend and/or implement appropriate solutions. Read, interpret, and apply policies, procedure, rules, regulations and other complex materials. Ensure compliance with all laws and regulations and control activities through effective supervision. Develop and administer plans and activities as required to maintain safe and effective operations. Assemble and analyze information and make written reports and documents in a clear, concise, and effective manner. Make repairs of equipment operated to ensure accuracy and redundancy. Determine or interpret work procedures for subordinates in assigning duties to them, maintaining harmonious relations among them, and promoting efficiency; offer instruction and advice regarding departmental policies, methods and regulations; perform employee evaluations and to make recommendations based on results. Establish and maintain effective working relationships, and effectively and timely communicate with other employees, elected officials, town management, advisory boards, business owners, and vendors; provide assistance and advice to various agencies, departments, and individuals. Work with the public in a professional manner and provide information and assistance, representing the town government in a positive light at all times. Perform required duties and responsibilities in extreme weather conditions. Perform duties and complete responsibilities under a degree of stress related to meeting tight deadlines; react calmly and quickly in emergencies. Use independent judgment and discretion in working with, or supervising various programs including the handling of emergency situations, determining procedures, setting priorities, setting schedules, maintaining standards, planning for future needs and resolving problems. Make swift, sound, and educated decisions. Maintain poise and reason in times of emergency or duress. OTHER REQUIREMENTS: Safety sensitive: This position is considered to be safety-sensitive and is subject to random drug testing. FLSA: This position is non-exempt under the Fair Labor Standards Act. DISCLAIMER: This job description is not an employment agreement or contract. Management has the exclusive right to alter this job description at any time without notice. Plant Mechanic I CLASS CODE: Revision Date: August 23, 2021 SALARY RANGE $36,128.00 - $57,805.00 Annually GENERAL STATEMENT OF JOB: The purpose of this classification is to perform semi-skilled to skilled work in the maintenance and repair of specialized machinery and equipment in a water or wastewater treatment plant. Employees in this classification repair pumps and machinery; repair pneumatic equipment; recommend needed repairs; weld and fabricate parts; make electrical and plumbing repairs; and inspect safety equipment. SPECIFIC DUTIES AND RESPONSIBILITIES: ESSENTIAL FUNCTIONS The following duties are representative of this position. The omission of specific statements of the duties does not exclude them from the classification if the work is similar, related, or a logical assignment for this classification. Other duties may be required and assigned. • Installs and repairs mechanical, hydraulic, and pneumatic equipment; makes minor repairs to electrical/electronic equipment; recommends needed major repairs to supervisor; makes plumbing repairs. • Performs and tracks preventative maintenance on plant equipment; ensures all plant equipment are in proper working order. • Inspects and ensures proper working safety equipment before use. • Operates a welder, drills, press drill, cutting torch, hand tools, electrical multimeter, mechanics’ tools, pickaxe, shovel, carpenters’ tools, crane, or other equipment as necessary to complete essential functions. • Serves on call, always, for emergencies. • May assist other maintenance technicians in their duties during staff shortages or emergencies. • Performs other related duties as required. MINIMUM TRAINING AND EXPERIENCE: Education and Experience: • High school diploma or GED. Must possess, or have the ability to possess within 1 year, a North Carolina Class I Maintenance Technologist Certification. Licensure, Certification, and Specialized Training: • NC Driver's License Working Conditions and Physical Requirements: • Physically able to perform semi-skilled to skilled work in the maintenance and repair of specialized machinery and equipment in a water treatment plant and in other Town facilities. • Exert up to 150 pounds of force occasionally, and/or up to 75 pounds of force frequently, and/or 25 pounds of force constantly to move objects. • Climb, reach, crawl, bend, stoop, etc. in the performance of job duties. Physical demand requirements are those for Medium Work to Heavy Work. • Occasional exposure to adverse environmental conditions, including temperature extremes, wetness/humidity, rain, machinery hazards, uneven terrain, skin irritants, toxic agents, dirt, dust, pollen, odors, electrical currents, unusual noise levels, etc. PERFORMANCE INDICATORS: Knowledge, Skills and Abilities to possess: • Methods, policies, and procedures of the Department as they pertain to the performance of duties of the Plant Mechanic. • Laws, ordinances, standards and regulations pertaining to the specific duties and responsibilities of the position (federal, state and local). • Methods, materials and equipment associated with maintenance work and used in a water or wastewater treatment plant and in other Town facilities. • Occupational hazards and safety precautions of the trade. • Comprehensive knowledge of the mechanical and grounds terminology utilized within the Department. • Ensuring safe and effective use of equipment and tools. • Mathematical ability to handle required calculations. • Read and interpret equipment manuals and technical materials pertaining to the responsibilities of the job. • Prepare simple records and reports in a timely manner. • Utilize common sense understanding and independent judgment in non-routine situations. • Is capable of and has knowledge of the levels of productivity and quality to be produced on the job and can meet such criteria accordingly. • Perform work effectively despite working conditions. • Quality of Work: Maintains high standards of accuracy in exercising duties and responsibilities. Exercises immediate remedial action to correct any quality deficiencies that occur in areas of responsibility. Maintains high quality communication and interaction with all Town departments and divisions, supervisor, co-workers, and the public. • Quantity of Work: Performs described "Specific Duties and Responsibilities" and related assignments efficiently and effectively to produce quantity of work which consistently meets standards and expectations of the Town. • Dependability: Assumes responsibility for completing assigned work. Completes assigned work within deadlines in accordance with directives, Town policy, standards and prescribed procedures. Remains accountable to assigned responsibilities in the technical, human and conceptual areas. • Attendance: Attends and remains at work regularly and adheres to Town policies and procedures regarding absences and tardiness. Provides adequate notice to higher management with respect to vacation time and time- off requests. • Initiative and Enthusiasm: Maintains an enthusiastic, self-reliant, and self-starting approach to meet job responsibilities and accountabilities. Strives to anticipate work to be done and initiates proper and acceptable direction for the completion of work with a minimum of supervision and instruction. • Judgment: Exercises analytical judgment in areas of responsibility. Identifies problems or situations as they occur and specifies decision objectives. Identifies or assists in identifying alternative solutions to problems or situations. Implements decisions in accordance with prescribed and effective policies and procedures and with a minimum of errors. Seeks expert or experienced advice where appropriate and researches problems, situations and alternatives before exercising judgment. • Cooperation: Accepts supervisory instruction and direction and strives to meet the goals and objectives of same. Questions such instruction and direction when clarification of results or consequences are justified, i.e., poor communications, variance with Town policy or procedures, etc. Offers suggestions and recommendations to encourage and improve cooperation between all staff persons and departments within the Town. • Relationships with Others: Shares knowledge with supervisors and staff for mutual benefit. Contributes to maintaining high morale among employees. Develops and maintains cooperative and courteous relationships inter- and intra-departmentally, and with external entities with whom the position interacts. Tactfully and effectively handles requests, suggestions and complaints in order to establish and maintain good will. Emphasizes the importance of maintaining a positive image. • Coordination of Work: Plans and organizes daily work routine. Establishes priorities for the completion of work in accordance with sound time-management methodology. Avoids duplication of effort. Estimates expected time of completion of elements of work and establishes a personal schedule accordingly. Attends required meetings, planning sessions and discussions on time. Implements work activity in accordance with priorities and estimated schedules. • Safety and Housekeeping: Adheres to all safety and housekeeping standards established by the Town and various regulatory agencies. Sees that the standards are not violated. Maintains a clean and orderly workplace. • Interpersonal Communication and Temperament: Speaking and/or signaling people to convey or exchange information. Includes receiving instructions, assignments, and/or directions from supervisor. Deal with people beyond giving and receiving instructions. Must be adaptable to performing under occasional levels of stress. Speak to people with poise, voice control, and confidence. • Verbal Aptitude: Requires the ability to record and deliver information, to explain procedures, to follow oral and written instructions. Must be able to communicate effectively and efficiently in standard English and electrical, mechanical, and engineering terminology. • Numerical Aptitude: Requires the ability to utilize mathematical formulas; to add and subtract; multiply and divide; and utilize decimals and percentages. • Form/Spatial Aptitude: Requires the ability to inspect items for proper length, width, and shape. • Use and maintain a variety of office equipment including calculator, computer, printer, shredder, copier, scanner, fax machine, telephone, and any other equipment as necessary to complete essential functions. • Use and maintain a variety of equipment including drills, press drill, cutting torch, jack hammer, hand tools, amperage probe, mechanics' tools, pickaxe, shovel, carpenters' tools, crane, or other equipment as necessary to complete essential functions. • Use a variety of word processing, spreadsheet, database, or other system software, such as Microsoft Office, asset management software, internet search engines, etc. • Data Conception: Compare and/or judge the readily observable, functional, structural, or compositional characteristics (whether similar or divergent from obvious standards) of data, people or things. • Language Ability: Read a variety of work orders, diagrams, records, etc. Requires the ability to prepare work orders, records, and reports using prescribed formats and conforming to all rules of punctuation, grammar, diction, and style. • Intelligence: Apply rational systems to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists; to interpret a variety of instructions furnished in written, oral, diagrammatic, or schedule form. • Motor Coordination: Coordinate hands and eyes rapidly and accurately in using power and hand tools. • Manual Dexterity: Handle a variety of items such as power and hand tools. Must have good eye/hand/foot coordination. • Color Discrimination and Visual Acuity: Differentiate colors and shades of color; requires the visual acuity to determine depth perception, peripheral vision, inspection for small parts; preparing and analyzing written or computer data, etc. OTHER REQUIREMENTS: Safety sensitive: This position is safety-sensitive and is subject to random drug testing. FLSA: This position is non-exempt under the Fair Labor Standards Act. DISCLAIMER: This job description is not an employment agreement or contract. Management has the exclusive right to alter this job description at any time without notice Close this window Water Plant Operator in Responsible Charge Class Code: 0612 TOWN OF HILLSBOROUGH Revision Date: August 23, 2021 SALARY RANGE $39,831.00 - $63,730.00 Annually GENERAL STATEMENT OF JOB: The purpose of this classification is to conduct the daily operations and maintenance of the town's water treatment plant in compliance with regulatory requirements, maintain the water quality and pressure for the system, and provide clean water to the customers. This position serves as the state mandated Operator in Responsible Charge (ORC) and reports directly to the Water Plant Superintendent. SPECIFIC DUTIES AND RESPONSIBILITIES: ESSENTIAL FUNCTIONS The following duties are representative of this position. The omission of specific statements of the duties does not exclude them from the classification if the work is similar, related, or a logical assignment for this classification. Other duties may be required and assigned. • Starts up and shuts down the water treatment plant. • Operates and monitors the functioning of pumps, motors, valves, chemical feeders, and related equipment; recognizes and makes needed adjustments to equipment and or treatment process. • Performs basic water plant maintenance and housekeeping; backwashes filters; fills chemical tanks and changes cylinders; drains and cleans sedimentation basins, troughs and flocculation basins; performs maintenance on chemical pumps, motors and piping; performs building and grounds maintenance. • Performs skilled preventive maintenance and/or adjustments on equipment, including repacking pumps, greasing pumps, adjusting pumps, overhauling and changing oil in pumps and chemical feeders; performs maintenance and repairs on the plumbing and piping system; maintains and repairs the chemical feed piping system; fills chemical tanks; performs minor maintenance and repair on plant facilities. • Collects and maintains accurate data; prepares and submits a variety of records, reports, charts, logs, etc. • Gathers samples for lab analysis; performs laboratory quality control testing, such as chlorine residual, Ph, temperature, hardness, turbidity, dissolved oxygen, alkalinity, fluoride, and other tests; performs water quality lab media in lab for use on water microbiological bacteria testing of samples; performs bench jar testing of raw water to optimize the plant's chemical dosage. • Adds chemicals in accordance with prescribed standards; receives and properly stores chemical shipments. • Deals with irate customers for water bills, water cut-offs, and broken lines; handles after hours complaints on nights, weekends, and holidays; dispatches proper personnel for line breaks, sewer spills, and pump stations; calls and records all water/sewer service calls and investigates customer’s water quality issues. • Conducts tours of the plant. • Maintains plant security on assigned shifts. • Serves as the Operator in Responsible Charge (ORC) and performs duties required of such designation. • Performs other related duties as required. MINIMUM TRAINING AND EXPERIENCE: Education and Experience: • Requires a High School Diploma and/or GED and 2.5 years of experience; or any equivalent combination of training and experience, which provides the required knowledge, skills, and abilities. Licensure, Certification, and Specialized Training: • NC Grade A Surface Water Treatment Operator certification • NC Bacteriological Methods certification, preferred Working Conditions and Physical Requirements: • Must be physically able to operate a variety of equipment. • Must be able to exert up to 100 pounds of force occasionally and/or in excess of fifty pounds of force frequently, and/or in excess of 20 pounds of force constantly to lift, carry, push, pull or otherwise move objects. Must be able to lift and/or carry weights of up to 100 pounds. • Must be able to walk, stand, bend, reach, climb and stoop. PERFORMANCE INDICATORS: Knowledge: • Methods, procedures and policies of the town, including town code, employee handbook, policy and procedure manuals, contracts, publications and reference texts, etc. • Methods, materials, tools and equipment used in drainage construction and maintenance work. • Federal, state, and local laws and policies concerning water systems and Operator in Responsible Charge duties, including NC General Statutes, NC Administrative Code, OSHA regulations, NC Department of Environmental Quality rules & regulations, Environmental Protection Agency, and other codes, laws, and regulations. • Operating principles, techniques, terminology and practices, and maintenance requirements of water systems, plant equipment and machinery utilized in water supply and treatment operations; principles of plumbing and hydraulics as related to water systems. • Chemical, and bacteriological laboratory analysis theories, processes and practices related to water supply and treatment operations. • Occupational hazards and safety precautions of water plant operations. Skills: • Strong leadership, organizational, interpersonal and technical skills. • Strong written and oral communication skills. • Mathematical ability to handle required calculations. • Use and maintain a variety of office equipment including calculator, computer, printer, shredder, copier, scanner, fax machine, telephone, and any other equipment as necessary to complete essential functions. • Use and maintain a variety of equipment including power tools, mechanic and/or carpentry tools, spectrophotometer, PH probes, incubator, pumps/meters, mixer, autoclave, distiller, voltmeter, pallet jack, motor lift, and other hand/electrical/pneumatic tools. • Use a variety of word processing, spreadsheet, database, or other system software, such as Microsoft Office suite, Mission Communications, internet search engines, etc. Abilities: • Plan and develop daily, short- and long-term goals; handle multiple assignments simultaneously. • Produce quality work, which requires constant attention to detail. • Prepare and submit state required operating reports in an accurate manner and on time. • Read, interpret, and apply policies, procedure, rules, regulations and other complex materials. • Work in a safe manner, following prescribed instruction. • Assemble and analyze information and make written reports and documents in a clear, concise, and effective manner. • Make necessary repairs of equipment operated. • Establish and maintain effective working relationships, and effectively communicate with other employees, elected officials, town management, advisory boards, business owners, and vendors; provide assistance and advice to various agencies, departments, and individuals. • Work with the public in a professional manner and provide information and assistance, representing the town government in a positive light at all times. • Perform required duties and responsibilities work in extreme weather conditions including smoke, dust, heat, cold, wetness, etc. • Perform duties and complete responsibilities under a degree of stress related to meeting tight deadlines; react calmly and quickly in emergencies. • Use independent judgment and discretion in working in performing routine tasks, maintaining standards, and resolving problems. OTHER REQUIREMENTS: Safety sensitive: This position is considered to be safety-sensitive and is subject to random drug testing. FLSA: This position is non-exempt under the Fair Labor Standards Act. DISCLAIMER: This job description is not an employment agreement or contract. Management has the exclusive right to alter this job description at any time without notice. AGENDA ABSTRACT | 1 of 2 Agenda Abstract BOARD OF COMMISSIONERS Meeting date: Aug. 23, 2021 Department: Utilities/Planning Public hearing: No Date of public hearing: N/A PRESENTER/INFORMATION CONTACT Marie Strandwitz, Utilities Director/Margaret Hauth, Planning Director ITEM TO BE CONSIDERED Subject: Collection System Needs – update and recommended path forward to accommodating growth and needed sewer capacity and its impact on planning Attachments: 1. Presentation 2. Phase 2 Model Report 3. Larger Map of Slide 17 Brief summary: An update of the Phase 2 Collection System Modeling report will be presented by utilities along with the planning department discussing impacts to growth decisions. A recommended path forward is included along with future questions to consider as the town moves through preparing guidance on growth, capacity, and financial support. Action requested: Adopt motion on recommended path forward (Slide 22) ISSUE OVERVIEW Background information and issue summary: The collection system has been modeled hydraulically over two phased tasks. The first task, called Phase 1, took current and anticipated growth and applied a static scenario using historical peak flow measurements at the wastewater treatment plant. The second task, called Phase 2, utilized actual flow measurements in the sewer pipes which captured various rainfall events. Then slightly revised growth projections were applied with a simulated rainfall period to evaluate the future impacts to the pipe capacity in accommodating the anticipated growth through 2040. Phase 1 report findings were presented to the board at the end of March 2021. The Phase 2 report findings will be presented at this workshop. The Phase 2 results confirm that significant improvements to the sewer pipes need to be performed under the 2040 (or sooner) scenario. Wet weather (leaking sewers) is a problem in the River pumping station sewer basin (the largest and oldest basin). Planned growth is a driver for improvements in the newer Elizabeth Brady pumping station sewer basin. These improvements will take time, money and are a guiding factor in future growth decisions for the town. Planning will discuss the impacts the report findings have on their efforts with the sustainability and growth plans. Both departments need some immediate direction as meetings regarding development plans and inquiries are occurring every day. There will need to be more refining of growth, capacity, and financial decisions in coming months. For clerk’s use AGENDA ITEM: 4.A Consent agenda Regular agenda Closed session AGENDA ABSTRACT | 2 of 2 Financial impacts: A motion on direction tonight does not commit any finances. However, the overall level of improvements required to accommodate growth will have significant financial impact. Future evaluation and discussion of the impact and funding mechanisms will need to occur. Staff recommendation and comments: Provide direction to utilities and planning on how to respond to developer inquiries now while other finer details and decisions are discussed later. 8/17/21 1 Collection System Needs Update and Recommended Path Forward to Accommodating Growth and Needed Sewer Capacity and its Impact to Planning Board of Commissioners August 23, 2020 Workshop K. Marie Strandwitz, PE, Utilities Director Margaret A. Hauth, Planning Director 1 Wastewater Stats §3.0 million gallon per day (mgd) wastewater treatment plant §Built in the early 1970’s, upgraded in 2012-2016 §May be nutrient limited to 2.2 mgd §Rolling average is 1.11 mgd §Initial sewer pipes installed prior to wastewater plant –went to river! §Pipes are vitrified clay, plastic, iron and some strange and outdated materials §Pipes range from 4” –24” §Main interceptors installed with wastewater treatment plant §Some spot evaluation and rehabilitation through lining over years, no upsizing 2 8/17/21 2 Last 12 Months WWTP Average Daily Flow 4.5 in of rain WWTP Permit Capacity 3.0 MGD (nutrient limit 2.2 MGD) 3 Sewer Basin Map The red line on the map reflects the Urban Services Boundary. The green line indicates the approximate division between the River pump station basin and the Elizabeth Brady Road pump station basin. Every project to the left of the line goes to River basin. Everything to the right goes to Elizabeth Brady basin (where we have sewer). 4 8/17/21 3 Modeling Lesson Recap §The wastewater entering the treatment plant consists of: §BASE FLOW –Actual sewage §INFLOW –Not sewage §INFILTRATION –Groundwater –not sewage §Inflow and infiltration is called I&I, or I/I §Difference between base flow and peak flow during storms can be I&I §I&I is bad, but it is everywhere §I&I is as much on the private side as the public side §PHASE 1 model was an estimate based on expected base flow and measured peak flow at the WWTP during a rainfall event and applied to estimated growth §PHASE 2 model went further to measure flow in pipes and development of a design storm applied to growth to determine problems and necessary pipe sizes to alleviate –we call this calibrated. §Modeling shows us within a certain accuracy how something acts now and will behave in the future under various scenarios. 5 Report and Planning Terminology §Committed means capacity is formally reserved through an executed extension contract, a building permit or state permit §Potential means in-town parcel, properly zoned, or had board action on a Special Use Permit or Master Plan (possibly even outdated) §Preliminary Inquiries means utilities or planning has received an inquiry about potential utility accessibility and development on a parcel §Could be in-town, out-of-town, or even out of Urban Service Boundary 6 8/17/21 4 Growth in Model The report does not include potential flow from the influx of Accessory Dwelling Units (ADUs), in-town redevelopment with higher density, all preliminary inquiries and new single- family residences (SFRs) that have been approved 7 Phase 1 Modeling Conclusions §Problems with main interceptor in River basin surcharging during significant rain events –right now §Surcharging means water getting above pipe diameter into manholes –filling up! §Necessary upsizing of Elizabeth Brady pumping station possibly by 2025 §Estimated cost (without River pumping station upgrade) is $18M §River pumping station upgrade from separate evaluation is $7M §Did not include actual I/I in flow estimate 8 8/17/21 5 Phase 2 Modeling Conclusions §Significantly more improvements needed in order to achieve the level of service criteria identified through 2040 §I&I is a problem in the River basin (pipes and pumps) §Lawndale basin is especially leaky §Proposed development is driving needed improvements for the Elizabeth Brady basin §Increased flows without improvements will increase the risk of sanitary sewer overflows in the Town 9 Phase 2 Improvements –River Basin and Others DIXIELAWNDALERIVER ELIZABETH BRADY 2040 planning horizon 10 8/17/21 6 Phase 2 Improvements – Elizabeth Brady Basin 2040 planning horizon 11 Opinion of Probable Cost * * Adds 15% to basin totals for mobilization and other general conditions 12 8/17/21 7 Report Prioritization of Recommendations §High Priority Improvements -NOW §River pumping station, Exchange Park Lane gravity sewers and River interceptor from Exchange Club to new River pumping station –rough estimate of $12M §Lawndale I/I study and rehabilitation –estimated $500K §Note that River PS land acquisition and design are budgeted, have some rehab budget for Lawndale, no funding for pipe upsizing or other I&I reduction §Medium Priority Improvements §Elizabeth Brady pumping station upgrade, remaining River basin gravity sewer improvements §Lower Priority Improvements §River basin pumping station and force main improvements after further evaluation, Elizabeth Brady gravity sewer monitoring and improvements if needed 13 This Means §There is no more capacity in the River basin due to I&I §The system is leaky (older part of town) §Can monitor growth in Elizabeth Brady basin, but will need to plan upgrades at some point §Scope and fee of actual improvements is unknown §Funding sources and rate impacts unknown §There are other capital projects to address §Little time to plan, permit, design and construct improvements §Possible interim solutions to explore for River basin 14 8/17/21 8 Committed Projects for Model (2020) §Some flow has come online since model data collected §Highlighted projects will or do discharge to River basin 15 Potential Projects for Model (2020) §Highlighted discharge to River basin §Some moved to committed table 16 8/17/21 9 Map of Expected Growth 17 This Impacts Planning §The availability of utilities and capacity drives growth. Most development inquiries start in the Planning Department and focus on utility availability. §The Future Land Use Plan is viewed as a decision-making guide internally, but as a commitment and promise by developers. §The Comprehensive Sustainability Plan will recommend changes in development patterns and attach priority or preference to certain locations. Our system cannot accommodate either. §The town has been welcoming development to share utility capital cost with more customers. That message is changing now that we understand the wastewater constraints in the collection system. 18 8/17/21 10 The Comprehensive Sustainability Plan is Underway §Redevelopment in the core is sustainable in the long run but requires constant investment in infrastructure. §Continued low density single family detached development is not sustainable and will require even more infrastructure investment in the long run. §Choices about future infrastructure investments will control the town’s future. 19 We Need a Message §Planning and Utilities need direction on responding to inquiries and developing options to move forward. Options: §Bring every serious inquiry before BOC on a case-by-case basis? §The traditional method which seems inefficient and ineffective §Identify priority projects or areas? §Ideally, yes. Better crafted as part of the Comprehensive Sustainability Plan §Formally pause on growth in River basin until improvements are made? §While the committed flow is not yet realized, we clearly risk sewer overflows during wet weather §Formal moratoria have consequences and designated processes §Development and redevelopment is on-going in the River basin. Can that be accommodated? 20 8/17/21 11 Future Questions (Not for Tonight) We realize this is a lot to process and may generate more questions like these: §Where is the balance of adding new users and accommodating growth to investing in infrastructure upgrades? §How much growth will we accommodate? What type? §What are our limits (no plant upgrades, limits of road infrastructure, keep within service boundary, adhere to planning documents)? §Will we make upgrades to address all potential projects through 2040 or only address those that are committed? §What is our timing? Do we pause? §Do we further investigate and reduce sources of I/I throughout the system in hopes we can avoid/reduce upgrades? §How do we keep rates stable? §How can growth pay for growth? §How much water and sewer capacity do we reserve as a buffer? To have water available to help our neighboring utilities in emergency situations (mutual aid)? §How do we allocate capacity and what are the reservation guidelines? 21 Recommended Path Forward for Tonight §Evaluate funding for River pumping station and interceptor evaluation and design §Perform pilot program in Lawndale basin and explore other interim projects to free capacity in River basin §Authorize utilities to indicate there is no current sewer capacity in River basin and explore options for future capacity allocation and funding §Includes potential cost share §Confirm the existing Urban Services Boundary will not be expanded §Confirm lack of support for satellite annexations §Prepare to identify priority development areas and discuss future questions soon §Will tie into planning documents and capital improvement plan 22 8/17/21 12 THANK YOU QUESTIONS AND DISCUSSION 23 Page Intentionally Left Blank Collection System Model – Wet Weather Calibration - Phase 2 Report Town of Hillsborough, NC Phase 2 Report May 2021 Prepared for Town of Hillsborough, NC P.O. Box 429 105 E. Corbin St Hillsborough, NC 27278-04229 Prepared by Merrick & Company 301 S McDowell St Suite 300, Charlotte, NC 28204 And Barton & Loguidice, DPC 116 Defense Highway, Suite 309 Annapolis, Maryland 21401 Page Intentionally Left Blank Town of Hillsborough, NC Phase 2 Report «ProjectNumber»/06.2021 - i - Barton & Loguidice, DPC Merrick & Company Table of Contents Table of Contents ............................................................................................................................... i EXECUTIVE SUMMARY ...................................................................................................................... 3 1.0 Introduction ......................................................................................................................... 6 2.0 Model Update ....................................................................................................................... 6 3.0 Sanitary Loading and Dry weather Flows ............................................................................... 6 4.0 Wet Weather Calibration ...................................................................................................... 6 4.1. Rainfall Event Selection....................................................................................................... 6 4.2. Rainfall Simulation and Hydrology ...................................................................................... 7 4.3. Calibration Results Summary .............................................................................................. 7 5.0 Design Rainfall Event............................................................................................................ 10 6.0 Future Development Flow Projections .................................................................................. 11 7.0 Proposed Improvements ...................................................................................................... 11 7.1. Improvements for 2040 Committed Flows ....................................................................... 12 7.2. Improvements for 2040 Committed & Potential Flows .................................................... 13 8.0 Cost Opinion ........................................................................................................................ 15 9.0 Conclusion and Recommendations ....................................................................................... 16 High Priority Improvements ........................................................................................................... 16 Medium Priority Improvements .................................................................................................... 17 Lower Priority Improvements ........................................................................................................ 17 Tables Table 1. Rainfall Event Summary .................................................................................................................. 7 Table 2. Calibration Results Summary .......................................................................................................... 9 Table 3. Summary of Proposed Development Flows .................................................................................. 11 Table 4. Level of Service Criteria ................................................................................................................. 11 Table 5. Pump Station Upgrades for 2040 Committed Future Flow ........................................................... 12 Table 6. Force Main Upgrades for 2040 Committed Future Flow .............................................................. 13 Table 7. Gravity Pipe Improvement Summary for 2040 Committed Future Flow ...................................... 13 Table 8. Pump Station Peak Hour Flows for 2040 Committed & Potential Future Flow ............................ 14 Table 9. Gravity Pipe Improvement Summary for 2040 Committed & Potential Future Flow ................... 15 Table 10. Cost Estimates ............................................................................................................................. 16 Figures Figure 1. Rainfall distribution for 2-year design storm ............................................................................... 10 Phase 2 Report Town of Hillsborough, NC Barton & Loguidice, DPC Merrick & Company - ii - «ProjectNumber»/06.2021 Appendices Appendix A – Dry Weather Flow Validation Results Appendix B – Calibration Results Appendix C – Future Development Flows Appendix D – Maps of Proposed Improvements Appendix E – Cost Analysis Detail Appendix F – Flow Monitoring Memorandum Town of Hillsborough, NC Phase 2 Report «ProjectNumber»/06.2021 - 3 - Barton & Loguidice, DPC Merrick & Company EXECUTIVE SUMMARY The Town of Hillsborough (Town) has an existing collection system which includes aging pipe especially in the older, historic areas. The Town has invested significantly in wastewater treatment needs in recent years, but a comprehensive capacity evaluation of the sewer system has not occurred in over 30 years. The Town wanted to better understand the system-wide sewer capacity especially considering the extensive growth projected to occur. New development across the Town is projected to result in almost double the daily sewer flows by 2040. The Town is striving to identify capacity improvement needs to plan for them in advance of the increased flows expected from development. In addition, aging infrastructure has caused increased wet-weather flows. Therefore, the Town is planning to incorporate capacity improvements into the capital improvement program. The purpose of this task is to identify the projects and budget costs needed to serve these increased flows. The Phase 1 study was completed in 2020 to evaluate the peak dry weather flows in the system and future growth needs. This Phase 2 study further evaluated wet weather flows through flow monitoring and data analysis, creating a calibrated wet weather model, and evaluating improvements based on updated flow projections. In conjunction with the flow monitoring portion of this study (Refer to Flow Monitoring Memorandum dated December 2020 in Appendix F), the hydraulic model was calibrated and analyzed for future flows under design storm conditions in order to assist the Town in planning capital improvement projects. The 2040 projected flows under a design storm were used to identify proposed improvements under two projected development conditions provided by the Town: “committed” and “potential” status. The growth projections included in this study are based on projects identified for open parcels with a concept proposed by a developer. There is some uncertainty in the level of “potential” development projects that will be realized by the 2040 timeframe. It is noted that the Town may experience higher density infill development in the future, which was not considered for this study. The level of service, summary of the results, and recommendations for proceeding are as follows: • Level of service: The level of service criteria set the performance requirements for the system under the design storm future flows. The level of service used for this analysis are identified below. Category Level of Service Criteria During Wet Weather SSO No SSOs Force Main 2 ft/s < Velocity < 10 ft/s; also reasonable TDH for pumps Pumping Station Conveys peak flow, multiple pumps may be operating simultaneously Manholes Minimum 2 ft of freeboard height, or no surcharging for shallow manholes Phase 2 Report Town of Hillsborough, NC Barton & Loguidice, DPC Merrick & Company - 4 - «ProjectNumber»/06.2021 • Summary of Phase II: Wet Weather results: The wet weather future flow improvements for each planning condition were determined by the design criteria and analysis of the calibrated model. Planning Condition Cost of Improvements* 2040 Committed Flows $36,670,000 2040 Committed and Potential Flows $42,740,000 *Includes the River PS costs; analyzed and provided by others • Recommendations: The results indicate that wet weather and future development would require significant improvements in order to achieve the level of service criteria identified for this study. I&I due to pipe age and condition is the key driver of improvements in the River/WWTP Raw Sewage PS basin, whereas development flows are the main concern for the Elizabeth Brady PS basin. The recommended implementation plan for addressing the system needs is listed below in order of highest to lowest priority. Without investment in capacity upgrades and/or I&I reduction, the increased flows will increase the risk of sanitary sewer overflows in the Town. 1. River PS Basin Priorities. The River PS basin and the River/WWTP Raw Sewage PS basin have capacity issues under existing wet weather conditions. Flow rates exceeding the design capacity of the pump station were measured during flow monitoring. In addition, surcharging occurred in the River interceptor. The River Basin improvements listed below are high priority and should be initiated as soon as practical after completion of this study in order to address existing deficiencies. a. River PS Upgrade – Concurrent study of the upgrade to the River PS is underway and should continue. The Town should proceed with this upgrade and accommodate the 2040 peak design storm flow from this study, either based on committed or committed and potential development. b. Exchange Park Lane Gravity Sewer Upgrade – This gravity sewer is ready for an upgrade due to capacity deficiency for both existing and proposed conditions. This project would be 2,250 LF of gravity sewer replacement to 15-inch (2040 Committed) or 18-inch diameter (2040 Committed + Potential Flows). c. River Interceptor – from Exchange Park Gravity Sewer to WWTP – This project would consist of 1,780 LF of 30-inch replacement and 2,280 LF of 36-inch replacement. It is recommended to size this interceptor for the most conservative flow condition, 2040 Committed and Potential Flow, due to this being the most downstream section in the system, unless I&I reduction improvements are made prior to the design. Town of Hillsborough, NC Phase 2 Report «ProjectNumber»/06.2021 - 5 - Barton & Loguidice, DPC Merrick & Company 2. The Lawndale PS has experienced overflows in the past (Data Review Memorandum, 2019), and high flow rates for the basin size were measured during recent flow monitoring. This basin is a relatively small size, with 105 connections and 7,420 LF of gravity pipe. This basin would be a good candidate for I&I reduction projects to minimize the scope of the upgrades included in this study. This is a high priority for I&I reduction or SSES projects. Upon completion of rehab of the gravity system, a study is recommended to confirm the effectiveness of I&I reduction and future pump station and force main needs. Performing this as a pilot study could give the Town an idea of the cost effectiveness of sewer rehab in the River PS basin to inform future decisions. 3. Elizabeth Brady PS Upgrade. The Elizabeth Brady PS has capacity issues under wet weather conditions which would be worsened with the proposed development flows. Capacity improvements for the pump station are a medium priority for both current and future flow conditions. 4. River PS Basin Gravity Sewer Improvements. The remaining gravity sewer improvements can be assessed upon completion of the Lawndale PS I&I pilot rehab project. Additional sewer rehab projects could be completed prior to gravity replacements pending the level of success in the Lawndale basin. 5. Pump Station and Force Main Improvements in River PS Basin. Several pump stations are included for improvement based on the level of service criteria used in this study. These include: Rencher Force Main, Churton Grove PS, Strouds Creek PS, and Corbinton Commons PS. These pump stations were not individually metered during the flow monitoring. A closer look at each of these facilities is recommended, including flow monitoring or review of operational data to better refine the needs of these facilities before design of any improvements. These are lower priority improvements. 6. The gravity sewer tributary to the Elizabeth Brady PS could have capacity issues depending on the level of development realized in the basin. This gravity sewer should be monitored and considered for future improvements. This is a lower priority improvement and can be coordinated with the schedule of development. Barton & Loguidice, DPC Merrick & Company - 6 - «ProjectNumber»/06.2021 1.0 INTRODUCTION The Town wanted to evaluate their existing sewer capacity due to the extensive growth projected from new development, which could result in almost double the daily sewer flows by the 2040 timeframe. The Town is striving to identify capacity improvement needs in advance of the increased flows expected from development. In addition, aging infrastructure has caused increased wet-weather flows. To adequately prepare for future development the Town is planning to incorporate capacity improvements into the capital improvement program. The purpose of this task is to identify the projects and budget costs needed to serve these increased flows. The Phase 1 study was completed in 2020 which evaluated the peak dry weather flows in the system and future growth. This Phase 2 study further evaluated wet weather flows through flow monitoring and data analysis, created a calibrated wet weather model, and evaluated improvements based on updated flow projections and a design storm. In conjunction with the flow monitoring portion of this study (Refer to Flow Monitoring Memorandum dated December 2020), the hydraulic model was calibrated and analyzed for future flows under design storm conditions to assist the Town in the planning of capital improvement projects. 2.0 MODEL UPDATE The dry weather flow model was created as described in the Collection System Model – Phase 1 Report, June 2020. The hydraulic model was updated to be able to analyze under extended period simulation and for wet weather conditions. The pump station and force main data was added into the model. The model was updated to include updated survey and facility information where new information was available to provide more accurate elevation data. 3.0 SANITARY LOADING AND DRY WEATHER FLOWS The average daily flows were updated to match the flow monitoring data, and diurnal patterns developed from flow monitoring were applied for each basin so the model would predict flow variation over time. A graph of dry weather flow results for each basin is provided in Appendix A. 4.0 WET WEATHER CALIBRATION 4.1. Rainfall Event Selection The Town’s rain data was reviewed in conjunction with the flow meter data to select events for calibration. A summary of the calibration events is indicated in the following Table 1. 65420403/06.2021 - 7 - Barton & Loguidice, DPC Table 1. Rainfall Event Summary Rainfall Dates Total Rainfall Depth (in) Peak Intensity (in/hr) Duration (hrs) 4/30/2020 1.84 0.84 20 5/18-22/2020 5.53 0.44 108 6/10-11/2020 1.73 0.72 30 Note: 1. The values presented above are for the Cemetery PS Rain Gauge. 4.2. Rainfall Simulation and Hydrology In addition to dry weather flow, rainfall derived inflow and infiltration (I&I) was also incorporated into the hydrologic and hydraulic model. Rainfall data from the rain gages was input directly into the model for hydrologic computations. Drainage areas were determined by dividing each sewer shed area across the manholes in the sewer shed. The drainage area and the unit hydrograph RTK method were used to simulate the I&I entering the sewer system at each manhole. The RTK parameters were adjusted during the calibration process to improve the model results as compared to the observed values. Wet weather flows consist of two types: inflow and infiltration, which make up I&I. Inflow is a rapid flow increase caused by direct connections such as roof drains, sump pumps, or storm drain connections. Many inflow sources are typically illicit connections, which can be remedied to reduce peak flows. Infiltration flow is due to leaks in the gravity sewer pipes, laterals, and manholes and often occurs with raising ground water level which varies seasonally and due to rainfall. 4.3. Calibration Results Summary The calibration criteria evaluated included volume and peak flow rate. The calibration goal was for the model to predict both volume and peak flow rate within a range of +/- 20% of the observed values. The calibration looks at both peak flow rates and total volume of flow during the event. In general, for a sanitary sewer, peak flow rate is the limiting factor of the pipe capacity that causes sanitary sewer overflow. A higher priority is given to flow rate when calibrating. Further, when calibrating to multiple events it can be challenging given the changes in hydrologic conditions between events. The goal is to reasonably match field measured values across multiple events. Table 2 below demonstrates that the goal was obtained for many of the results, but some areas were challenging to calibrate. In general, the model mimics the observed trends and peak flows across the flow meter basins. Therefore, the model was considered suitable to proceed with the design storm analysis and a good prediction of peak flows for planning purposes. Refer to Appendix B for graphs of each event and flow meter location. The results for FM-1 Dixie Ave PS have some variation, but the overall flow rates are very low at this pump station so a small flow difference results in a large percent difference. The Lawndale PS was challenging to calibrate due to much lower flows measured for the June event, including lower flow during dry periods. It is possible that groundwater infiltration is more significant in this basin, or there was an issue with the field collected data. Barton & Loguidice, DPC Merrick & Company - 8 - «ProjectNumber»/06.2021 The River/WWTP Raw Sewage PS contains an inlet channel with a weir gate that regulates the hydraulic grade. In order to calibrate the upstream FM-3 and nearby iTracker, the model was adjusted to account for the inlet channel elevation restriction. The model represents a simplified version, and thus some level fluctuations are seen in the model that are not observed in the measurements. This allowed the model to better match peak flow. Level data was also incorporated into the calibration process to assist with improving the model upstream of the flow meters. Available level data from the Town’s iTracker data collectors was used to supplement the flow calibration. The level graphs are included in Appendix B. 65420403/06.2021 - 9 - Barton & Loguidice, DPC Table 2. Calibration Results Summary Basin Event Date Modeled Volume (gallons) Observed Volume (gallons) Difference Modeled Peak Hour Flow (GPM) Observed Peak Hour Flow (GPM) Difference FM-1 Dixie Ave PS 4/30/2020 14,121 15,384 -8% 24 24 -1% 5/18/2020 54,083 98,118 -45% 20 34 -42% 6/10/2020 13,079 13,979 -6% 24 30 -22% Overall 81,284 127,482 -36% FM-2 Lawndale PS 4/30/2020 107,660 234,421 -54% 147 199 -26% 5/18/2020 306,597 629,752 -51% 144 199 -28% 6/10/2020 54,348 28,771 89% 126 58 117% Overall 468,605 892,944 -48% FM-3 River/ WWTP Raw Sewage PS 4/30/2020 3,250,672 3,242,253 0% 3,416 3,106 10% 5/18/2020 8,243,842 11,684,221 -29% 3,145 4,246 -26% 6/10/2020 2,244,476 1,763,882 27% 3,424 2,895 18% Overall 13,738,989 16,690,356 -18% FM-4 Elizabeth Brady PS 4/30/2020 514,222 521,997 -1% 767 657 17% 5/18/2020 1,950,500 2,658,810 -27% 739 914 -19% 6/10/2020 703,947 954,863 -26% 1,310 1,699 -23% Overall 3,168,669 4,135,670 -23% Barton & Loguidice, DPC Merrick & Company - 10 - «ProjectNumber»/06.2021 5.0 DESIGN RAINFALL EVENT The team evaluated options for a design rainfall event for the study. The design rainfall event ultimately selected was a 2-year return period, 24-hour duration storm, which is commonly used for a planning level event by many utilities. For this project, the team determined that a 2-year return period event would be a practical design storm. A greater storm would be more conservative in predicting peak flows, but that could also result in infrastructure that would be sized for infrequent events and oversized for normal operating conditions. The 2-year storm provides a reasonable balance by minimizing overflows, yet remaining feasible and reasonable for normal conditions. The 2-year return period, 24-hour storm for Hillsborough, NC has a total rainfall depth of 3.51 inches. The rainfall distribution to be used for the model was developed using the Soil Conservation Service (SCS) Type II distribution, which is applicable to Hillsborough’s geography. The peak intensity is 4.8 in/hr, which is greater than that observed from storms during the flow monitoring study, and is deemed to be conservative. A graph of the design rainfall distribution used for the analysis is included in Figure 1. Figure 1. Rainfall distribution for 2-year design storm 65420403/06.2021 - 11 - Barton & Loguidice, DPC 6.0 FUTURE DEVELOPMENT FLOW PROJECTIONS The Town refined the future flow projections and updated them after the Phase 1 study. The updated future flows provided by the Town are listed in the following Table 3. The 2040 projected flows were provided by the Town under two projected development conditions: “committed” and “potential”. The growth projections included in this study are based on projects identified for open parcels with a concept proposed by a developer. There is some uncertainty in the level of “potential” development projects that will be realized by the 2040 timeframe. It is noted that the Town may experience higher density infill development in the future, which was not considered for this study. For detail of each development, its associated average daily flow for model input, and the location, refer to Appendix C. The flows added to the 2040 Committed Future Flow Scenario and the 2040 Committed + Potential Future Flow Scenario used the same diurnal patterns as determined from the flow metering for each meter basin. Table 3. Summary of Proposed Development Flows Category 2040 Average Day Flow Increase (gpd) Committed Development 457,500 Potential Development 492,500 Total Flow Increase 950,000 Capacity improvements and upgrades could be limited by the Town’s permitted treatment capacity at the wastewater treatment plant (WWTP), and allowable nutrient levels. This could consequently limit proposed development. The 5-year average daily flow from the Phase I study was 1.05 MGD to the WWTP, which has a permitted capacity of 3.0 MGD. However, the annual average nutrient limitation is 2.2 MGD largely due to the total nitrogen concentration. 7.0 PROPOSED IMPROVEMENTS The model was analyzed under the future flow scenarios with the design storm, in order to identify deficiencies and define improvements. The improvements were initially selected from the results of the Phase 1 study. The capacity was also evaluated from the level of service criteria listed in the following Table 4. Table 4. Level of Service Criteria Category Level of Service Criteria During Wet Weather SSO No SSOs Force Main 2 ft/s < Velocity < 10 ft/s; also reasonable TDH for pumps Pumping Station Conveys peak flow, multiple pumps may be operating simultaneously Manholes Minimum 2 ft of freeboard height, or no surcharging for shallow manholes Barton & Loguidice, DPC Merrick & Company - 12 - «ProjectNumber»/06.2021 The level of service for peak dry weather flow identified for the Phase 1 Study included the pumping station conveying the peak flow under firm capacity (the largest pump out of service). For the wet weather peak flow, the team determined that multiple pumps could be operating simultaneously under design storm conditions. The level of service for peak dry weather flow identified for the Phase 1 Study included the design guideline of 60% full at peak dry weather flow condition. A peak factor of 2.83 was calculated based on population of the Town. Upon completion of the model calibration, the main driver of gravity pipe size in the River PS basin is the wet weather flow and the freeboard height in the manholes. However, the Elizabeth Brady PS basin has much lower wet weather inflow and infiltration. Therefore, the 60% full flow at peak dry weather flow results in more conservative pipe sizing than the minimum 2 ft of freeboard during the design storm. Therefore, the peak dry weather flow criteria was used for the pipe size selection for the Elizabeth Brady PS basin. In addition, the 2.83 peak factor was used for pump station capacity. 7.1. Improvements for 2040 Committed Flows The pumping station capacity and force mains were evaluated for the associated level of service. The pumping stations needing upgrades to achieve the level of service are listed in Table 5 with the associated peak hour flow under 2040 Committed Future Flow scenario. Pumping stations not included in the table were determined to have adequate capacity for the peak flow modeled. However, a select number of minor pumping stations were not analyzed in the model. Table 5. Pump Station Upgrades for 2040 Committed Future Flow PS Upgrades1,2,3 Existing Firm Capacity (gpm) Model 2040 Committed Peak Design Storm Flow (gpm) 2040 Committed PS Upgrade Design Flow (gpm) Lawndale 57 410 410 Churton Grove 426 930 930 Strouds Creek 251 427 427 Corbinton Commons 419 614 614 River 4000 7082 7082 Elizabeth Brady 900 15894 22304 Notes: 1. PS not evaluated include: Tiny Tots, Timbers TP, Oakdale, New Hope, Shelton Court. 2. Rencher PS is projected to have adequate capacity to accommodate peak flows if the force main is upgraded. 3. PS with adequate capacity for the model peak flows include: Dixie PS, Governor Burke PS, Cemetery PS, Cedar Creek PS, Patriot’s Pointe PS, Cedar Ridge HS PS, Gatemoore PS, Magnolia Place PS, Woods Edge Back PS, Woods Edge Front PS, Nazarene PS. 65420403/06.2021 - 13 - Barton & Loguidice, DPC 4. Elizabeth Brady recommended pipe size for 2040 Committed peak dry weather flow of 2230 gpm, based on average day flow and design peaking factor. The force mains were evaluated for velocity and total dynamic head (TDH) condition on the pump station. The Lawndale force main would result in velocity near 10 ft/s and high TDH (over 300 ft) under existing sizing. Therefore, an upgrade is proposed for wet weather flows. The Rencher force main would also result in velocity near 10 ft/s and high TDH (over 300 ft) under existing sizing. Therefore, an upgrade is proposed to accommodate wet weather flows. Table 6 lists the force main upgrades for the 2040 Committed Future Flow scenario. Table 6. Force Main Upgrades for 2040 Committed Future Flow Force Main Upgrades Existing Diameter (in) Proposed Diameter (in) Length of Replacement (LF) Lawndale 4 6 3,500 Rencher 4 6 3,500 The gravity system improvements were evaluated under the design storm future flow to accommodate the peak flow with at least 2 feet of freeboard in the gravity manholes. The scope of improvements for the gravity system is listed in the following Table 7. Table 7. Gravity Pipe Improvement Summary for 2040 Committed Future Flow Replacement Diameter (inches) Original Diameter (inches) Total Replacement Length (LF) - 8 10 12 16 18 21 - 12 8,158 663 8,821 15 986 986 18 1,260 948 2,208 21 2,791 2,791 24 2,244 2,244 30 359 1,176 904 2,438 36 2,280 2,280 Grand Total 8,158 2,909 948 359 6,210 3,184 21,768 7.2. Improvements for 2040 Committed & Potential Flows The 2040 Committed and Potential Flow scenario was also evaluated for the design storm to determine capacity upgrades necessary to attain the levels of service identified. The potential development flow resulted in increased upgrades and greater peak flows at multiple locations. Capacity issues were noted at the same pumping stations as the 2040 Committed Future Flow scenario, but with even greater flows Barton & Loguidice, DPC Merrick & Company - 14 - «ProjectNumber»/06.2021 at some facilities. A summary of the peak hour flows for the 2040 Committed and Potential Future Flow scenario is included in Table 8. Table 8. Pump Station Peak Hour Flows for 2040 Committed & Potential Future Flow Existing Firm Capacity (gpm) Model 2040 Committed + Potential Peak Design Storm Flow (gpm) 2040 Committed + Potential PS Upgrade Flow (gpm) Lawndale 57 410 410 Churton Grove 426 930 930 Strouds Creek 251 479 479 Corbinton Commons 419 739 739 River 4000 7237 7237 Elizabeth Brady 900 18684 26564 Notes: 1. PS not evaluated include: Tiny Tots, Timbers TP, Oakdale, New Hope, Shelton Court. 2. Rencher PS is projected to have adequate capacity to accommodate peak flows if the force main is upgraded. 3. PS with adequate capacity for the model peak flows include: Dixie PS, Governor Burke PS, Cemetery PS, Cedar Creek PS, Patriot’s Pointe PS, Cedar Ridge HS PS, Gatemoore PS, Magnolia Place PS, Woods Edge Back PS, Woods Edge Front PS, Nazarene PS. 4. Elizabeth Brady recommended pipe size for 2040 Committed & Potential peak dry weather flow of 2656 gpm, based on average day flow and design peaking factor. The force main upgrades listed in the 2040 Committed Future Flow scenario are also adequate for the 2040 Committed & Potential Future Flow scenario. No additional force main upgrades are anticipated to accommodate the potential flows. The scope of improvements for the gravity system are listed in the following Table 9. The improvements for the gravity pipe are cumulative, including all improvements for the 2040 Committed Flow scenario. 65420403/06.2021 - 15 - Barton & Loguidice, DPC Table 9. Gravity Pipe Improvement Summary for 2040 Committed & Potential Future Flow Replacement Diameter (inches) Original Diameter (inches) Total Replacement Length (LF) - 8 10 12 16 18 21 - 10 1,388 1,388 12 8821 8821 15 8,158 663 986 18 986 8,064 24 6,564 6,564 30 359 1,176 904 2,438 36 2,280 2,280 Grand Total 9,547 2,909 948 6,214 7,740 3,184 30,541 8.0 COST OPINION A cost estimate for the recommended improvements, across Hillsborough sewer system, are located in Appendix E. These the costs for all improvements, broken out by the 2040 Committed Flow and 2040 Committed & Potential Future Flow. Additionally, the Elizbeth Brady Basin, and River Pump Station Basin, were summarized separately. The improvements by basin are shown in Appendix D1 and D2 for the two 2040 flows. The cost analysis included several assumptions described as follows: • Where upsizing pipes occurred, all existing manholes were assumed to be replaced. • Unit rates of cost line items were taken from Phase 1 cost estimates and adjusted to 2021 costs per the Engineering News Record (ENR) Construction Cost Index (CCI). The CCI is typically used by municipalities as an inflation adjustment factor of market conditions based on labor and materials, and for this report is May 2021: 11989.91 • Additional costs were derived from bid tabs from project years (2017-2021) previously performed by Merrick and Company for sewer construction and for lift station and sewer pumping station construction. • Included in the unit rate are estimations of engineering design and construction services. These services include permitting, inspection fees, minor easements, and survey. An additional 15% was added for construction mobilization and general site work. • Pump Station upgrades include construction of an entirely new lift station with added pumps and new configuration and electrical design. • Rive Pump Station upgrade is being handled by another firm. Their cost estimate was provided by the Town of Hillsborough. No adjustments were made for flow. • A summary of the cost for the Wet Weather sanitary sewer improvements, both for Barton & Loguidice, DPC Merrick & Company - 16 - «ProjectNumber»/06.2021 2040 Committed and 2040 Committed & Proposed Flows, are shown in Table 10. The Elizabeth Brady basin improvements and the River basin improvements are shown separately, and then summed (and rounded up) for the total (All basins) cost. A detailed breakdown of the costs, by improvement, is provided in Appendix E. These are planning costs only, taken at this time. Before designing and constructing any of the proposed improvements, each project should be reviewed in detail and an additional cost estimate conducted to ensure pricing is current and reflects any new assumptions and additional information. Table 10. Cost Estimates BASIN 2040 Committed – COST 2040 Committed and Proposed – COST Elizabeth Brady $4,510,000 $9,270,000 River $20,810,000 $20,990,000 All Basins (no contingency) $29,330,000 $34,190,000 All Basins (25% contingency) $36,670,000 $42,740,000 9.0 CONCLUSION AND RECOMMENDATIONS The results indicate that the impacts of wet weather and future development would require significant improvements in order to achieve the level of service criteria identified for this study. I&I is the key driver of improvements in the River/WWTP Raw Sewage PS basin, whereas development flows are the main concern for the Elizabeth Brady PS basin. The recommended implementation plan for addressing the system needs is listed below in order of highest to lowest priority. Without investment in capacity upgrades and/or I&I reduction, the increased flows will increase the risk of sanitary sewer overflows in the Town. High Priority Improvements 1. River PS Basin Priorities. The River PS basin has capacity issues under existing wet weather conditions, with surcharging observed during wet weather during flow monitoring. In addition, the River/WWTP Raw Sewage PS has capacity issues for wet weather conditions. Flow rates exceeding the design capacity of the pump station were measured during flow monitoring. The River Basin improvements listed below are high priority and should be initiated at the completion of this study to address existing deficiencies. a. River PS Upgrade – Concurrent study of the upgrade to the River PS is underway and can continue. The Town should proceed with this upgrade and accommodate the 2040 peak design storm flow from this study, either based on committed or committed and potential development. 65420403/06.2021 - 17 - Barton & Loguidice, DPC b. Exchange Park Lane Gravity Sewer Upgrade – This gravity sewer is ready for an upgrade due to capacity deficiency for both existing and proposed conditions. This project would be 2,250 LF of gravity sewer replacement to 15-inch (2040 Committed) or 18-inch diameter (2040 Committed + Potential Flows). c. River Interceptor – from Exchange Park Gravity Sewer to WWTP – This project would consist of 1,780 LF of 30-inch replacement and 2,280 LF of 36-inch replacement. It is recommended to size this interceptor for the most conservative flow condition 2040 Committed and Potential Flow due to this being the most downstream in the system, unless I&I reduction improvements are made prior to the design. 2. The Lawndale PS has experienced overflows in the past (Data Review Memorandum, 2019), and high flow rates for the basin size were measured during recent flow monitoring. This basin is a relatively small size, with 105 connections and 7,420 LF of gravity pipe. This basin would be a good candidate for I&I reduction projects to minimize the scope of the upgrades included in this study. This is a high priority for I&I reduction or SSES projects. Upon completion of rehab of the gravity system, a study is recommended to confirm the effectiveness of I&I reduction and future pump station and force main needs. Performing this as a pilot study could give the Town an idea of the cost effectiveness of sewer rehab in the River PS basin to inform future decisions. Medium Priority Improvements 3. Elizabeth Brady PS Upgrade. The Elizabeth Brady PS has capacity issues under wet weather conditions which would be worsened with the proposed development flows. Capacity improvements for the pump station is a medium priority improvement, for both current and future flow conditions. 4. River PS Basin Gravity Sewer Improvements. The remaining gravity sewer improvements can be assessed upon completion of the Lawndale PS I&I pilot rehab project. Additional sewer rehab projects could be completed prior to gravity replacements pending the level of success at Lawndale. Lower Priority Improvements 5. Pump Station and Force Main Improvements in River PS Basin. Several pump stations are included for improvement based on the level of service criteria used in this study. These include: Rencher Force Main, Churton Grove PS, Strouds Creek PS, and Corbinton Commons PS. These pump stations were not individually metered during the flow monitoring. A closer look at each of these facilities is recommended, including flow monitoring or review of operational data to Barton & Loguidice, DPC Merrick & Company - 18 - «ProjectNumber»/06.2021 better refine the needs of these facilities before design of any improvements. These are lower priority improvements. 6. The gravity sewer tributary to the Elizabeth Brady PS could have capacity issues depending on the level of development realized in the basin. This gravity sewer should be monitored and considered for future improvements. This is a lower priority improvement and can be coordinated with the schedule of development. APPENDIX A Dry Weather Flow Validation Results Dixie PS (FM-1) Dry Weather Flow Validation SP-1280 - Existing Wet Weather Flow - Flow Dixie Avg FlowFlow (gpm ) 50.0 40.0 30.0 20.0 10.0 0.0 Time (hours) 24.0022.0020.0018.0016.0014.0012.0010.008.006.004.002.000.00 Lawndale PS (FM-2) Dry Weather Flow Validation SP-1369 - Existing Wet Weather Flow - Flow Observed Data - 1Flow (gpm ) 50.0 40.0 30.0 20.0 10.0 Time (hours) 24.0022.0020.0018.0016.0014.0012.0010.008.006.004.002.000.00 River/WWTP Raw Sewage PS (FM-3) Dry Weather Flow Validation SP-705 - Existing Dry Weather Diurnal - Flow Observed Data - 1Flow (gpm ) 750.0 700.0 650.0 600.0 550.0 500.0 450.0 400.0 350.0 300.0 250.0 200.0 150.0 100.0 50.0 0.0 Time (hours) 24.0022.0020.0018.0016.0014.0012.0010.008.006.004.002.000.00 Elizabeth Brady PS (FM-4) Dry Weather Flow Validation SP-2337 - Existing Wet Weather Flow - Flow Observed Data - 1Flow (gpm ) 750.0 700.0 650.0 600.0 550.0 500.0 450.0 400.0 350.0 300.0 250.0 200.0 150.0 100.0 50.0 0.0 Time (hours) 24.0022.0020.0018.0016.0014.0012.0010.008.006.004.002.000.00 APPENDIX B Calibration Results Dixie PS Flow (FM-1) - 4-30-2020 SP-1280 - Calibration #1 - Flow Dixie 4-30-2020Flow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Dixie PS Flow (FM-1) - 5-18-2020 SP-1280 - Calibration #2 - Flow Dixie Measured FlowFlow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Dixie PS Flow (FM-1) - 6-10-2020 SP-1280 - Calibration #3 - Flow Dixie Measured FlowFlow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Lawndale PS Flow (FM-2) - 4-30-2020 SP-1369 - Calibration #1 - Flow Observed Data - 1Flow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Lawndale PS Flow (FM-2) - 5-18-2020 SP-1369 - Calibration #2 - Flow Lawndale Measured FlowFlow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Lawndale PS Flow (FM-2) - 6-10-2020 SP-1369 - Calibration #3 - Flow Observed Data - 1Flow (gpm)250.0 225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 River / WWTP Raw Sewage PS Flow (FM-3) - 4-30-2020 CO-6 - Calibration #1 - Flow Observed Data - 1Flow (gpm)4,500.0 4,000.0 3,500.0 3,000.0 2,500.0 2,000.0 1,500.0 1,000.0 500.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 River / WWTP Raw Sewage PS Flow (FM-3) - 5-18-2020 CO-6 - Calibration #2 - Flow Observed Data - 1Flow (gpm)4,500.0 4,000.0 3,500.0 3,000.0 2,500.0 2,000.0 1,500.0 1,000.0 500.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 River / WWTP Raw Sewage PS Flow (FM-3) - 6-10-2020 CO-6 - Calibration #3 - Flow Observed Data - 1Flow (gpm)4,500.0 4,000.0 3,500.0 3,000.0 2,500.0 2,000.0 1,500.0 1,000.0 500.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Elizabeth Brady PS Flow (FM-4) - 4-30-2020 SP-2337 - Calibration #1 - Flow Observed Data - 1Flow (gpm)1,000.0 900.0 800.0 700.0 600.0 500.0 400.0 300.0 200.0 100.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Elizabeth Brady PS Flow (FM-4) - 5-18-2020 SP-2337 - Calibration #2 - Flow Observed Data - 1Flow (gpm)1,000.0 900.0 800.0 700.0 600.0 500.0 400.0 300.0 200.0 100.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 Elizabeth Brady PS Flow (FM-4) - 6-10-2020 SP-2337 - Calibration #3 - Flow Observed Data - 1Flow (gpm)2,500.0 2,250.0 2,000.0 1,750.0 1,500.0 1,250.0 1,000.0 750.0 500.0 250.0 0.0 Time (hours) 120.0096.0072.0048.0024.000.00 iT-3__SMH-562 Level_4/30 SMH-562 - Calibration #1 - Depth (In)SMH-562 - Calibration #1 - Depth (Out)Observed Data - 1Depth - Large (in)65.00 60.00 55.00 50.00 45.00 40.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 Time (hours) 120.0096.0072.0048.0024.000.00 iTracker-6 Level (SMH-1114 halfway upstream in River Basin Interceptor) - SMH-1114 - Calibration #1 - Depth (In)SMH-1114 - Calibration #1 - Depth (Maximum)Observed Data - 1Depth - Large (in)65.00 60.00 55.00 50.00 45.00 40.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 Time (hours) 120.0096.0072.0048.0024.000.00 iTracker-7 Level (SMH-1622 in Elizabeth Brady PS Basin) - 4-30-2020 SMH-1622 - Calibration #1 - Depth (In)SMH-1622 - Calibration #1 - Depth (Maximum)Observed Data - 1Depth - Large (in)65.00 60.00 55.00 50.00 45.00 40.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 Time (hours) 120.0096.0072.0048.0024.000.00 APPENDIX C Future Development Flows Future Development Flows Development Status Manhole Number Assigned Development Name Future Average Day Flow (gpd) Committed 2314 SW Quadrant I- 40/Old NC86 (Ind/Warehouse)108,000 Committed 2409 Waterstone - UNC Hospital (Bed wing)25,000 Committed 1527 Waterstone – DTCC (Edu)6,000 Committed 2324 Waterstone – MOB (Ofc)1,500 Committed 2791 Forest Ridge (SFR)14,500 Committed 2632 Fiori Hill (SFR)2,500 Committed 200 Collins Ridge (TH/SFR)230,000 Committed 1405 Collins Ridge (TH/SFR)13,000 Committed 646 Daphine Drive (SFR)2,500 Committed 563 East Village at Meadowlands (TH)17,500 Committed 2358 VIMA (SFR)1,000 Committed 2107 OC Northern Campus (govt)5,000 Committed 1393 Hillsborough Commons (dentist/food/retail)13,000 Committed 543 Leland Little Expansion (warehouse)10,500 Committed 2121 Combs Circle (SFR)1,000 Committed 1070 Spruce St (SFR)1,000 Committed 433 Mavis Tire (ret)5,500 Potential 1405 Train Station (govt/apts)72,000 Potential 241 Paliorous Property (mixed)32,000 Potential 220 Owl's Wood (apts)10,000 Potential 2616 Owl's Wood (apts)10,000 Potential 1489 Moren (apts)53,000 Potential 691 Gatewood Project (bar/retail)5,000 Potential 2023 Daniel Boon Redev. (mixed)39,000 Potential 2311 Bailey (lodging)10,000 Potential 2329 Brown 5,000 Potential 2333 Addison 21,500 Potential 1602 Waterstone (Retail)13,000 Potential 1602 Waterstone (Restaurant)27,000 Potential 1612 Waterstone (Bus/Ind)9,500 Development Status Manhole Number Assigned Development Name Future Average Day Flow (gpd) Potential 900/892/2022/857 Jones Avenue (11 SFR)3,000 Potential 1604 Shah (Hotel/retail)12,500 Potential 2130 Thalle III (flex)2,500 Potential 1406 Oakdale Village (Ret/Rest)9,000 Potential 1122 Meadowlands (Bus/Ind)20,000 Potential 518 Cornerstone (Bus/Ind)10,000 Potential 2723 Corbinton Commons (MAHS)37,000 Potential 1271 Moose Lodge Site (?)4,500 Potential 659 Johnson Parcels (SFRs)2,000 Potential 1498 Old Mill/Millstone Bus Park (lt. ind/office)16,000 Potential 2350 Torain St (SFR)1,500 Potential 1200 Rencher St (SFR)5,500 Potential Woods Edge Front PS NC 86 S near Waterstone 20,000 Potential 1612 Terry Parcel 42,000 NC 86 S Near Waterstone WWTP Shah Brown Moren Bailey Addison Owl's Wood Thalle III Owl's WoodCornerstone Meadowlands Daniel Boone Jones Avenue Jones Avenue Jones Avenue Jones Avenue Torain Street Rencher Street Oakdale Village Johnson Parcels Moose Lodge Site Gatewood Project Corbinton Commons Waterstone RTL/RST Paliorous Property Old Mill/Millstone Bus Park Terry Parcel/Waterstone Bus/In VIMA Fiori Hill Mavis Tire Forest Ridge Combs Circle Spruce Street Daphine Drive Collins Ridge Waterstone - MOB OC Northern Campus Hillsborough Commons Leland Little Expansion Waterstone - UNC Hospital SW Quadrant I-40/Old NC 86 East Village at Meadowlands Waterstone - DTCC, MF/T Home Collins Ridge / Train Station Figure C-1 Project No. 2267.001.001 µ 0 0.25 0.5Miles Town of Hillsborough 2040 Committed and Potential Development Locations 5/26/2021 North CarolinaOrange County Legend Existing Gravity Main Diameter (Inches) ≤6 ≤8 ≤12 ≤18 ≤24 >24 Committed and Potential Development Committed Developments Potential Developments APPENDIX D Maps of Proposed Improvements Elizabeth Brady PS Nazarene PS Lawndale PS Cemetery PS Alum Pond PS Coachwood PS Tiny Tots PS Gatemoore PS Northside PS Dixie Ave. PS Cedar Creek PS Rencher St. PS Shelton Ct. PS Timbers T.P. PS Oakdale T.P. PS Strouds Creek PS Churton Grove PS Governor Burke PS Magnolia Place PS New Hope School PS Woods Edge Back PS Woods Edge Front PS Patriot's Pointe PS Corbinton Commons PS WWTP Raw Sewage/River PS Cedar Ridge High School PS WWTP Figure D-1 Project No. 2267.001.001 µ 0 0.3 0.6Miles Town of Hillsborough 2040 Committed Flows Proposed Improvements 5/24/2021 North CarolinaOrange County Legend Pumping Stations Upgraded Capacity Pumping Stations Upgraded Proposed Gravity Main (Committed) Existing Gravity Main Upgraded Proposed Force Main Existing Force Main Elizabeth Brady PS Nazarene PS Lawndale PS Cemetery PS Alum Pond PS Coachwood PS Tiny Tots PS Gatemoore PS Northside PS Dixie Ave. PS Cedar Creek PS Rencher St. PS Shelton Ct. PS Timbers T.P. PS Oakdale T.P. PS Strouds Creek PS Churton Grove PS Governor Burke PS Magnolia Place PS New Hope School PS Woods Edge Back PS Woods Edge Front PS Patriot's Pointe PS Corbinton Commons PS WWTP Raw Sewage/River PS Cedar Ridge High School PS WWTP Figure D-2 Project No. 2267.001.001 µ 0 0.3 0.6Miles Town of Hillsborough 2040 Committed and Potential Flows Proposed Improvements 5/24/2021 North CarolinaOrange County Legend Pumping Stations Upgraded Capacity Pumping Stations Upgraded Proposed Gravity Main (Committed and Potential) Existing Gravity Main Upgraded Proposed Force Main Existing Force Main APPENDIX E Cost Analysis Detail Town of Hillsborough Collection System Model Merrick Engineering Hillsborough, NC May-21 No. Item Quantity 2040 Committed Quantity 2040 Committed & Proposed Units Unit Cost Total 2040 Committed Total 2040 Committed & Proposed 1 10" PVC SEWER 0 1,388 LF 250$ -$ 347,075$ 2 12" PVC SEWER 8,821 8,821 LF 290$ 2,558,177$ 2,558,177$ 3 15" PVC SEWER 986 986 LF 390$ 384,540$ 384,540$ 4 18" PVC SEWER 2,208 8,064 LF 530$ 1,170,240$ 4,273,761$ 5 21" PVC SEWER 2,791 2,791 LF 580$ 1,618,780$ 1,618,780$ 6 24" PVC SEWER 2,244 2,244 LF 630$ 1,413,720$ 1,413,720$ 7 30" PVC SEWER 2,438 2,438 LF 720$ 1,755,360$ 1,755,360$ 8 36" PVC SEWER 2280 2280 LF 740$ 1,687,200$ 1,687,200$ 9 6" FORCEMAIN 7000 7000 LF 130$ 910,000$ 910,000$ 10 MANHOLES (10" SEWER LINE) 0 8 EA 9,000$ -$ 72,000$ 11 MANHOLES (12" SEWER LINE) 42 42 EA 9,000$ 378,000$ 378,000$ 12 MANHOLES (15" SEWER LINE) 6 6 EA 12,600$ 75,600$ 75,600$ 13 MANHOLES (18" SEWER LINE) 12 22 EA 15,800$ 189,600$ 347,600$ 14 MANHOLES (21" SEWER LINE) 9 0 EA 19,000$ 171,000$ -$ 15 MANHOLES (24" SEWER LINE) 10 26 EA 21,000$ 210,000$ 546,000$ 16 MANHOLES (30" SEWER LINE) 12 12 EA 31,500$ 378,000$ 378,000$ 17 MANHOLES (36" SEWER LINE) 10 10 EA 63,000$ 630,000$ 630,000$ 18 LAWNDALE PS 410 410 EA 369,000$ 369,000$ 19 CHURTON GROVE PS 930 930 EA 940,000$ 940,000$ 20 STROUDS CREEK PS 427 479 EA 390,000$ 450,000$ 21 CORBINTON COMMONS PS 614 739 EA 600,000$ 730,000$ 22 RIVER PS 7082 7237 EA BY HAZEN 7,039,000$ 7,039,000$ 23 ELIZABETH BRADY PS 2230 2656 EA 2,630,000$ 2,820,000$ SUBTOTAL 25,500,000$ 29,730,000$ MOBILIZATION/GENERAL CONDITIONS % 15% 3,825,000$ 4,459,500$ 29,330,000$ 34,190,000$ CONTINGENCY % 25% 7,332,500$ 8,547,500$ 36,662,500$ 42,737,500$ TOTAL 36,670,000$ 42,740,000$ Town of Hillsborough Collection System Model Hillsborough, NC Used ENR May 2021 - 11989.91 2040 Committed Flow Elizabeth Brady PS Basin No.Item Quantity Units Unit Cost Total 1 12" PVC SEWER 238 LF 290$ 69,000$ 2 21" PVC SEWER 2791 LF 580$ 1,620,000$ 3 MANHOLES (12" SEWER LINE) 1 EA 9,000$ 9,000$ 4 MANHOLES (21" SEWER LINE) 9 EA 19,000$ 180,000$ 5 PUMP STATION UPGRADE 1 EA 2,630,000$ 2,630,000$ Subtotal 4,510,000$ 2040 Committed & Potential Flow Elizabeth Brady PS Basin No.Item Quantity Units Unit Cost Total 1 12" PVC SEWER 238 LF 290$ 69,000$ 2 18" PVC SEWER 5856 LF 530$ 3,110,000$ 3 24" PVC SEWER 4320 LF 640$ 2,770,000$ 4 MANHOLES (12" SEWER LINE) 1 EA 9,000$ 9,000$ 5 MANHOLES (18" SEWER LINE) 10 EA 15,800$ 158,000$ 6 MANHOLES (24" SEWER LINE) 16 EA 21,100$ 338,000$ 7 PUMP STATION UPGRADE 1 EA 2,820,000$ 2,820,000$ Subtotal 9,270,000$ Merrick Engineering May, 2021 Town of Hillsborough Collection System Model Hillsborough, NC Used ENR May 2021 - 11989.91 2040 Committed Flow River PS Basin No.Item Quantity Units Unit Cost Total 1 12" PVC SEWER 7854 LF 290$ 2,280,000$ 2 15" PVC SEWER 986 LF 390$ 384,000$ 3 18" PVC SEWER 2208 LF 530$ 1,170,000$ 4 24" PVC SEWER 2244 LF 630$ 1,410,000$ 5 30" PVC SEWER 2438 LF 720$ 1,760,000$ 6 36" PVC SEWER 2280 LF 740$ 1,690,000$ 7 MANHOLES (12" SEWER LINE) 41 EA 9,000$ 369,000$ 8 MANHOLES (15" SEWER LINE) 6 EA 12,600$ 76,000$ 9 MANHOLES (18" SEWER LINE) 12 EA 15,800$ 190,000$ 10 MANHOLES (24" SEWER LINE) 10 EA 21,000$ 210,000$ 11 MANHOLES (30" SEWER LINE) 12 EA 31,500$ 380,000$ 12 MANHOLES (36" SEWER LINE) 10 EA 63,000$ 630,000$ 13 LAWNDALE FORCEMAIN 6" 3500 LF 130$ 460,000$ 14 RENCHER FORCEMAIN (6") 3500 LF 130$ 460,000$ 15 LAWNDALE PS 1 EA 369,000$ 369,000$ 16 CHURTON GROVE PS 1 EA 940,000$ 940,000$ 17 STROUDS CREEK PS 1 EA 390,000$ 390,000$ 18 CORBINTON COMMONS PS 1 EA 600,000$ 600,000$ 19 RIVER PS (COST BY HAZEN)*1 EA 7,039,000$ 7,039,000$ Subtotal 20,810,000$ 2040 Committed & Potential Flow River PS Basin No.Item Quantity Units Unit Cost Total 1 12" PVC SEWER 7854 LF 290$ 2,280,000$ 2 15" PVC SEWER 986 LF 390$ 384,000$ 3 18" PVC SEWER 2208 LF 530$ 1,170,000$ 4 24" PVC SEWER 2244 LF 630$ 1,414,000$ 5 30" PVC SEWER 2438 LF 720$ 1,755,000$ 6 36" PVC SEWER 2280 LF 740$ 1,690,000$ 7 MANHOLES (12" SEWER LINE) 41 EA 9,000$ 369,000$ 8 MANHOLES (15" SEWER LINE) 6 EA 12,600$ 76,000$ 9 MANHOLES (18" SEWER LINE) 12 EA 15,800$ 190,000$ 10 MANHOLES (24" SEWER LINE) 10 EA 21,000$ 210,000$ 11 MANHOLES (30" SEWER LINE) 12 EA 31,500$ 378,000$ 12 MANHOLES (36" SEWER LINE) 10 EA 63,000$ 630,000$ 13 LAWNDALE FORCEMAIN 6" 3500 LF 130$ 460,000$ 14 RENCHER FORCEMAIN 6" 3500 LF 130$ 460,000$ 15 LAWNDALE PS 1 EA 369,000$ 369,000$ 16 CHURTON GROVE PS 1 EA 940,000$ 940,000$ 17 STROUDS CREEK PS 1 EA 450,000$ 450,000$ 18 CORBINTON COMMONS PS 1 EA 730,000$ 730,000$ RIVER PS (COST BY HAZEN)*1 EA 7,039,000$ 7,039,000$ Subtotal 20,990,000$ Merrick Engineering May, 2021 *Separate costs were not provided, therefore the same price is used for both the 2040 Committed Flow and the 2040 Committed & Potential Flow APPENDIX F Flow Monitoring Memorandum Hillsborough Flow Monitoring Memo 4 Memo To: Marie Strandwitz, Utility Director Town of Hillsborough Date: 12/10/20 From: John McLaughlin, P.E. David Kerr, P.E. Project No.: 65420403 Phase No.: 2 Re: Flow Monitoring Memorandum Introduction This memorandum provides a summary of the flow monitoring data collection and analysis portion of the hydraulic evaluation for the Town of Hillsborough. Flow monitoring was performed to better quantify existing flows in the Town’s collection system and understand wet weather peak flows. The flow monitoring data collected will be used to calibrate a wet weather hydraulic model. The hydraulic model will be used to identify improvements needed to accommodate wet weather flows and the planned growth due to development. Data Collection Two types of sensors were used for the monitoring within the sewer system: area-velocity flow meters and i- Trackers. The area-velocity meters measure the flow depth and the velocity of the fluid. This then is used to calculate the flow rate. The i-Trackers were used to supplement flow metering in the system at some additional locations. The i-Trackers measure flow depth, only, but can assist with understanding the extent of surcharging during a rainfall event. Flow data was collected from April 27, 2020 to August 6, 2020 at four locations in the system. In addition, i- Tracker data is available for some of that time period at 3 locations. Refer to Appendix A for a map of the flow meter and i-Tracker locations during the monitoring period. Some of the i-Trackers installed for supplemental monitoring encountered gauge errors such as battery power and data storage issues and were unavailable for some or all the flow monitoring period. Table 1 lists the flow monitoring locations for this study, while Table 2 lists the i-Tracker locations that were recording during the monitoring period. The Town measures rainfall at multiple locations. The following rainfall gauge locations will be used for the analysis, due to proximity to the flow monitoring basins: Strouds Creek PS, Cemetery PS, and Woods Edge Front PS. Town of Hillsborough Flow Monitoring Memorandum Page 2 Hillsborough Flow Monitoring Memo 4 Table 1. Flow Monitoring Location Summary Flow Meter Location Manhole ID Description Associated Rain Gauge 1 SAMH1250 8-inch, Dixie Ave PS Basin Strouds Creek 2 SAMH1216 8-inch, Lawndale PS Basin Cemetery 3 SAMH560 21-inch, River PS Basin Cemetery 4 SAMH2449 18-inch, Elizabeth Brady PS Basin Woods Edge Front Table 2. i-Tracker Location Summary i-Tracker Location Manhole ID Available Dates Description Associated Rain Gauge 3 SAMH562 4/27-5/13; 6/11- 6/24 21-inch, Near Flow Meter HB- 3 Cemetery 6 SAMH1114 3/4-5/18 18-inch, Upstream in River PS Basin, Gold Park Cemetery 7 SAMH1622 3/4-5/18 16-inch, Upstream in Elizabeth Brady PS Basin, Beckett’s Ridge Woods Edge Front Data Analysis The flow meter data was graphed in hydrographs to present the flow over time. Refer to Appendix B for the hydrographs and scatterplots of each flow meter location for the duration of the monitoring period. Surcharging (flow depth above pipe crown) was observed at flow meter location 2, 3, and 4 during the monitoring period. For each flow monitoring location, the average daily flow was determined and peak hourly wet weather flow was calculated. These values are summarized in the following Table 3. Additionally, the average and maximum depths measured in the i-Tracker data are presented in Town of Hillsborough Flow Monitoring Memorandum Page 3 Hillsborough Flow Monitoring Memo 4 Table 4. Table 3. Average and Peak Flow Summary Flow Meter Location Average Daily Flow (gpd) Peak Hourly Wet Weather Flow (gpm) Peak Hourly Wet Weather Flow (gpd) Peak Factor 1 7,839 38 54,720 7.0 2 27,193 200 288,000 10.6 3 728,666 4137 5,957,280 8.2 4 422,419 1393 2,005,920 4.7 Town of Hillsborough Flow Monitoring Memorandum Page 4 Hillsborough Flow Monitoring Memo 4 Table 4. i-Tracker Depth Summary Depth Gauge Location Average Depth (in) Peak Hourly Depth (in) Surcharged during Peak Depth? #3, SAMH562 7.1 43.3 Yes #6, SAMH1114 8.7 35.6 Yes #7, SAMH1622 2.2 4.6 No The flow data analysis shows greater peaking factors for the River PS basin than the Elizabeth Brady PS basin, which is as expected since the River PS area contains the oldest portions of the system, while Elizabeth Brady PS basin consists of newer sewer mains. The newer areas are understood to be in better condition, thus less inflow and infiltration would be expected. Diurnal Curve Development The following graphs present the average flow over the course of a 24-hour day. The graphs illustrate a typical diurnal pattern occurring throughout the flow monitoring locations. A morning and evening peak are observed in each graph, as well as the lowest flow occurring around 2:00 – 4:00 AM timeframe. The diurnal curves will be used for input into the extended period hydraulic model that will be analyzed for dry weather and wet weather conditions. Figure 1. Flow Meter HB-1 Average Flow 0 5 10 15 20 25 12 AM 1 AM 2 AM 3 AM 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PMFlow Rate (gpm)Time Flow Meter 1 Average Flow Town of Hillsborough Flow Monitoring Memorandum Page 5 Hillsborough Flow Monitoring Memo 4 Figure 2. Flow Meter HB-2 Average Flow Figure 3. Flow Meter HB-3 Average Flow 0 5 10 15 20 25 12 AM 1 AM 2 AM 3 AM 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PMFlow Rate (gpm)Time Flow Meter 2 Average Flow 0 100 200 300 400 500 600 700 12 AM 1 AM 2 AM 3 AM 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PMFlow Rate (gpm)Time Flow Meter 3 Average Flow Town of Hillsborough Flow Monitoring Memorandum Page 6 Hillsborough Flow Monitoring Memo 4 Figure 4. Flow Meter HB-4 Average Flow Calibration Events The rainfall and flow meter data were reviewed to determine suitable rainfall events for calibration. The following rainfall events were selected for calibration due to the largest rainfall events that resulted in increased flows at all the flow meter locations. The rainfall distribution is shown in the flow hydrograph plots included in Appendix B. Figure 5. Rainfall Event Summary Rainfall Dates Total Rainfall Depth (in) Peak Intensity (in/hr) Duration (hrs) 4/30/2020 1.84 0.84 20 5/18-22/2020 5.53 0.44 108 6/10-11/2020 1.73 0.72 30 Note: 1. The values presented above are for the Cemetery PS Rain Gauge. Summary In conclusion, the data collected is sufficient to provide a calibrated hydraulic model to better represent wet weather flow conditions. The flow data analysis shows greater peaking factors for the River PS basin than the Elizabeth Brady PS basin, which is as expected since the River PS area contains the oldest portions of the system, while Elizabeth Brady PS basin consists of newer sewer mains. The newer areas are understood to be in better condition, thus less inflow and infiltration would be expected. 0 100 200 300 400 500 600 700 12 AM 1 AM 2 AM 3 AM 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PMFlow Rate (gpm)Time Flow Meter 4 Average Flow #5, SAMH597 #3, SAMH560 #4, SAMH2449 #8, SAMH1722 #7, SAMH1622 #1, SAMH1250 #2, SAMH1216 #6, SAMH1114 River Elizabeth Brady Churton Grove Stroud's Creek Cemetery Lawndale Dixie Ave Corbinton Commons Governor Burke Rencher St Cedar Creek Gatemoore Patriot's Pointe Magnolia Place Cedar Ridge Nazarene Timbers TP Woods Edge Front Shelton Ct Woods Edge Back Coachwood New Hope WWTP Legend Pump Station Basins PS Cedar Creek Cedar Ridge Cemetery Churton Grove Coachwood Corbinton Commons Dixie Ave Elizabeth Brady Gatemoore Governor Burke Lawndale Magnolia Place Nazarene New Hope Patriot's Pointe Rencher St River Shelton Ct Stroud's Creek Timbers TP Woods Edge Back Woods Edge Front <all other values> Gravity Sewer Mains Diameter (inches) ≤6 ≤8 ≤12 ≤18 ≤24 Waste Water Treatment Plant Monitoring Locations Figure A-15 Project No. 2267.001.001 Town of Hillsborough Pumping Station Basins and Flow Monitor Locations 5/26/2020 North CarolinaOrange Countyµ0 0.50.25 Miles 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 10.00 10.00 20.00 30.00 40.00 50.00 60.00 4/27/20205/2/20205/7/20205/12/20205/17/20205/22/20205/27/20206/1/20206/6/20206/11/20206/16/20206/21/20206/26/20207/1/20207/6/20207/11/20207/16/20207/21/20207/26/20207/31/20208/5/2020Rain (in.)Flow (gpm)Date Flow Meter 1 Flow and Rainfall Data Flow (GPM) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60Level (in.)Velocity (fps) Flow Meter 1 Scattergraph - 8-inch Diameter 0 0.2 0.4 0.6 0.8 1 1.2 1.4 0.00 50.00 100.00 150.00 200.00 250.00 4/26/20205/1/20205/6/20205/11/20205/16/20205/21/20205/26/20205/31/20206/5/20206/10/20206/15/20206/20/20206/25/20206/30/20207/5/20207/10/20207/15/20207/20/20207/25/20207/30/20208/4/2020Rain (in.)Flow (gpm)Date Flow Meter 2 Flow and Rainfall Data Flow (gpm) 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00Level (in.)Velocity (fps) Flow Meter 2 Scattergraph - 8-inch Diameter 0 0.2 0.4 0.6 0.8 1 1.20 500 1000 1500 2000 2500 3000 3500 4000 4500 4/26/20205/1/20205/6/20205/11/20205/16/20205/21/20205/26/20205/31/20206/5/20206/10/20206/15/20206/20/20206/25/20206/30/20207/5/20207/10/20207/15/20207/20/20207/25/20207/30/20208/4/2020Rain (in.)Flow (gpm)Date Flow Meter 3 Flow and Rainfall Data Flow (gpm) 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50Level (in.)Velocity (fps) Flow Meter 3 Scattergraph - 21-inch Diameter 0 0.2 0.4 0.6 0.8 1 1.20 500 1000 1500 2000 2500 4/26/20205/1/20205/6/20205/11/20205/16/20205/21/20205/26/20205/31/20206/5/20206/10/20206/15/20206/20/20206/25/20206/30/20207/5/20207/10/20207/15/20207/20/20207/25/20207/30/20208/4/2020Rain (in.)Flow (gpm)Date Flow Meter 4 Flow and Rainfall Data Flow (gpm) 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00Level (in.)Velocity (fps) Flow Meter 4 Scattergraph - 18-inch Diameter I 85 I 4 0 U S 7 0NC 86NC 57MILLERUS 70A KIN G S T M AR Y S LAWRENCECHURTONO L D N C 1 0 OLD NC 86NASHDAVI S BALDWINORANGE GROVECOLEMANGWENQUEEN TRYON U N IO N LANNIEWAKEENOWEST HILLODE TURNERIV Y C O R N E L I U S LATIMER GOVERNOR BURKE CORB IN FAUCETTE MILL WALKER ORANGE JOYCERAINEYP O P L A R MARGA RET W ATERSTO NESPLIT RAILSUMMITLAKESHORENEW SHARON CHURCHHARPERFRANK PERRYREX REVERE T O R AI N HAYE S RIPPY SCOTSWOODMINNICK ODIEH I D D E N P R E S E R V E ALLENA N N BECKETTS RIDGE ROCKY FRIENDSHIP LONNIEJONESTUMBLING BROOKBROKEN JB Y R D S V I L L E F A RM GA T E DESTINYBELLVUE OAKC H U R T O N G R O V E FLETCHERCODYHILL JACO BS LOCUSTN EW H O PE CH UR CH DIVERSITY MEADOW WINDP H O E B E H O O T O W LNATEVA KAYMURRAYC A R O L IN A MITCHELLUPPERORANGE HIGH SCHOOL P OIN T E R SURRYLANDEAUCOLLEGE PARKFORRESTFIRE FLYTERRELL ALICE HERMITAGE CEDARPARKF O X H I L L F A R MRIVERCRAWFORDMC A D A MS OCCONEECHEEALMA TALON FARGORI VERSI DETIMBERSCARRIAGEOAK RIDGE ADAMSBARRACKSELIZABETH BRADYOLD OAKBUTTONWOOD OLD FORESTLATTALUTHERDOLLY S P RI NG L I L Y WELCHKIRKLAND SUMMEY THREE CREEKSENGLISH HILLHOLMAN DIXIE HASELLBLUESTONECENTRALI 4 0 W E XIT 2 6 1KING EDWARDS T O N E Y C R E E K OLD PLEASANT Y A T E S S E M I N O L E FI RSTR HIN E S T O R E Y W Y N G ATE WORKMANROSEWOOD PERCUSSIONDAYERIDDLE SAM TUCKERJAYMIDWAY GOVERNORI 40 W EXIT 259HIGHLAND FARM LO W ERHATTERLEI GHSHAWNEE I 85 N EXIT 165 MIJOSARMFIELD FIORI HILLRAMS TULIPTREESWEET GUMPAW PINEY GROVE CHURCHR ID G E POI NTEW A T K I N S WASHINGTONQUINCY COTTAGE BURNSIDE HAMPTON POINTE OAKHURSTSTROUDS CREEK WOODLAWN RENCHER C A V E L L WATKINS FARM C ALV IN RED HATSOUTHWINDL E E B Y R DHEMI LINNETLEE FOXSTILL BROOKI 85 S EXIT 165 BARTLETT QUAIL RIDGE BLACK WALNUT FARMOLD SOUTH STARMONT C HIL D S B E R G HOLTBLACKBURNHISTORIC KENNEDYB E N T O NSPARROW HAWKMEADOWLANDSMARKET HOUSEMARY E COOKHUDDLE G L A D Y S HAWK VIEWLORISHEL TONW Y N D F A L LLAURELDOUBLE OAK C E D A R S T O N E RED FOX E N O R I D G E TIMBER OAKCHAPMAN MOLLIET WISTED CORPORATE GRAPEVINEW H I C K E R BINFORDSTARFIREHICKORYTUPELO TWIN OAKSSHORTOLD HERITAGE F O R E M A NTHOMPSON SUMNERENSTONEH IL L S ID E B R IA N S JOANBUTTERFLYSPIRIT HILLCOURTKNOB HILLHIGHWOODSI 85 WAT E R S T O N E U S 7 0 LATIMER I 4 0 NC 86HASELLLegend Basin_Boundary Committed Nonresidential Committed Residential Potenial Nonresidential Potential Residential Preliminary Inquiries ¯ 1 inch = 2,250 feet Development Inquiries AGENDA ABSTRACT | 1 of 1 Agenda Abstract BOARD OF COMMISSIONERS Meeting date: Aug. 23, 2021 Department: Board Public hearing: No Date of public hearing: N/A PRESENTER/INFORMATION CONTACT Commissioner Mark Bell ITEM TO BE CONSIDERED Subject: High importance emails discussion Attachments: None Brief summary: Check in with board members and staff regarding preferred lines of communication when urgent/emergency issues arise so that everyone can stay informed, good ideas can be offered and relevant questions can be raised, yet not overwhelm each other with a high volume/unwieldy amount of communication. Action requested: Discuss and provide direction. ISSUE OVERVIEW Background information and issue summary: Please see above. Financial impacts: None Staff recommendation and comments: For clerk’s use AGENDA ITEM: 4.B Consent agenda Regular agenda Closed session