Loading...
HomeMy Public PortalAboutResolution 2015-07-02 Authorizing PSCo/Xcel Energy to Extend the Construction Work Hours for up tp 72-Hours for the Replacement of a High Pressure Natural Gas Transmission Line in the Town of Fraser TOWN OF FRASER RESOLUTION NO. 2015-07-02 A RESOLUTION AUTHORIZING PSCo/XCEL ENERGY TO EXTEND THE CONSTRUCTION WORK HOURS FOR UP TO 72-HOURS FOR THE REPLACEMENT OF A HIGH PRESSURE NATURAL GAS TRANSMISSION LINE IN THE TOWN OF FRASER. BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FRASER, COLORADO THAT: 1. The Town Board of Fraser, Colorado hereby authorizes Xcel Energy and their contractors to extend the permitted construction work hours from sunup to sunset to a 24-hour operation for not-to-exceed three (3) days, or 72-hours. 2. The extended work hours will allow Xcel Energy's contractor to provide a continuous pull of the new gas line to avoid a potential bore hole collapse. 3. This work will be performed during the months of July and August 2015. 4. The 24 hour work period will not be performed on Friday, Saturday and Sunday. READ, PASSED ON VOTE, AND ADOPTED BY THE BOARD OF TRUSTEES THIS 1St DAY OF JULY, 2015. Votes in favor: BOARD OF TRUSTEES OF THE Votes opposed: t TOWN OF FRASER, CO RADO Absent: Abstained: 6 BY: May • ATTEST CX/L 601e4 Town Clerk SEAL COLORPoO.