Loading...
HomeMy Public PortalAboutTHIRD ST_3-STORM.pdfPermit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Owner's Name Gen. Contractor Contact Information Project Address Scope of Work INTERNATIONAL CODE COUNCIL MEMBER Date Request d Date Need d Subcontr ctor Inspector Date of Inspection Inspection Inspection Inspection Inspection Pass El Fail ❑ Fee Pass Fail ❑ Fee Pass Fail ❑ Fee Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 528 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-030 PROJECT VALUATION $1,000.00 PERMIT #: 180340 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: / g - o3'1d City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: 6(5°1-- c26-636 Name Mailing Address Telephone Owner 43OMMC-[2-W 1N(? V P%. 3 -W1e -P s -v eNi F.G_ (,S NO Home: Cell: 2.41- L1332 Architect or Engineer A n _ 10(9 1—j -RAU � ,p r•i t c 3IyPot Office: Cell: Contractor s Co d' �1vb (.. l t rt ki S- cbo at Ski Y G Ko >n-1 WN 31322 Office: 33x1- Sogg, Cell: 3l3 — le -t9)$ ❑ Single Family ❑ Duplex Multi -Family 24 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout O Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation El Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: cz-- tC s_ VF -S Estimated Cost of Construction: $ t t 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: ‘clVk Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ` &91S `�oIL, S . Construction debris will be disposed by fi'a.0012-asiL. INACIE by means of Q ,�(._ . 1 understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap. Cost Ren Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa .° - for r-. -'pt of Lead Paint, Asbestos, and BMP notices Date buco Printed NamU r ut City of Tybee Island • Community Development Dept. aux Inspection Report 221 ection u*1 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Permit No. Owner's Name Gen. Contractor Contact Information Project Address Scope of Work Phone 912.472-5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Date Requested Date Needed Subcontractor y Inspector 7 ) 1 Date of Inspection '7 ` ),D Inspection Pass El Fail ❑ Fee 'Inspection Pass ❑ Fail Inspection I, Fee Pass D Fail ❑ Fee c.5_5 o Inspection Pass Fail Fee City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 .»a -1 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address - ' 1 Scope of Work Inspector Inspection Pass Fail ® Fee c-/ Date of Inspection Inspection Inspection c Inspection Pass/ ( Fail ❑ Fee Fail El Fee Fail ❑ Fee Javoi City of Tybee Island Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 1 ▪ II -u▪ miak INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Date Needed Owner's Name Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail Fee Inspection Pass ® Fail Fee Inspection Pass ® Fail Fee Inspection Pass 0 Fail Fee DATE ISSUED: 04-27-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 511 SUMMERW INDS 3 THIRD ST UNIT 511 TY BEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-022 PROJECT VALUATION $1,000.00 PERMIT #: 180328 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit this holder er agrees to hold the City of Tybee Island harmless on any construction covered by p it. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor wiiil`replace e cuur within paving and mgutter s of roken the date during iofn scon construction. This permit will be voided unless wo Signature of Building inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: If - 600 Lc- 2-0 -o 2— - Name Mailing Address Telephone Owner 4 tt- INP5 - P4. 3 st�c� VT e tki, (,S O Home: Cell: 21'1- L1332 Architect or Engineer ft (� �n1 ��,,- CLX " (i VAC) Q0:1,0 N 1 311-11 Office: Cell: Contractor St.3A144CQV LNG• CMG, 1 t l3 US.- coo ax t S'4 %TF G to m %___(. 4,--52.17.. Office: 3391-50646 Cell: W'— ? ❑ Single Family ❑ Duplex l Multi -Family 24 units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: ;�It't 1�1 '►1-41('�L Q Cgt- t 1T `� CC MA —E-- \.(p 9 \ t - Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. pOutifs Year Built: t" �a%' Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through T(.14 -11S `101 S . Construction debris will be disposed by Qom„[, w by means of T * kQ X --S . 1 understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Date Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. FEES TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. \SSt let. Signa . — for r c - "pt of Lead Paint, Asbestos, and BMP notices Date (5000M AN -3 Printed Name Permit No. City of Tybee Island • Community Deve • p ' nt Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybe Island, GA 31328 Phone 912.472-5032 • Fax 912. ► 86.9539 Owner's Name Gen. Contractor .ram s1%w Rasa INTERNATIONAL CODE COUNCIL MEMBER Date Requested Date Needed Subcontractor Contact Information Project Address Scope of Work Inspector t71 Inspection Date of Inspection Pass El Fail Inspection Pass Fee Fail ❑ Fee Inspection Pass 0 Fail ❑ Fee Inspection Pass Fail Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 512 SUIVIMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-023 PROJECT VALUATION $1,000.00 PERMIT #: 180329 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: Li -000 a?..3 Name Mailing Address Telephone Owner Me" t IMPS k-kaPc. 3 'iick \RV s"C" W ›,N O Home: Cell: 24'1- 4 -k3 -57 -- Architect or Engineer (n1, OAF l � 11 ' tV Q�pO SNINIVNIAV LA 311-1(41 Office: Cell: Contractor C wt Vb C13 -1i) 1 t \3 US- CND Ch4N i Sm t- C, o r.a- t C 31322 Office: 33°1-501:35 Cell: 313 —10-1.';a ❑ Single Family ❑ DuplexM, Multi -Family 2,,4 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout D Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: ?•FANW-AK\ KL, c kL-O t N6 ? F . -'t. It `fib Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: ‘ \' \ Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ton, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `[( I$ `Co1 c) . Construction debris will be disposed by O_iNed..,4,� WASTE. by means of QNT�-S . 1 understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prrnted`Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec_ Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signatti3re for r- -pt of Lead Paint, Asbestos, and BMP notices Date Printed Name City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 3132 Phone 912.472-5032 • Fax 912.786.9539 Permit No. Owner's Name . . Gen. Contractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass 0 Fail Fee Inspection Pass Fail ❑ Fee !ITERNAT IONAL CODE COUNCIL MEMBER Date Requested Date Needed Subcontractor Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 527 SUMMERWINDS HOA 3 THIRD ST TY BEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-031 $1,000.00 PERMIT #: 180339 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: i S -033Y 3 1AveD 52'1 City of Tybee Island, Georgia 912-472-5030 - Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: ('-'60000e(- 026-6131 Name Mailing Address Telephone Owner cxX"1MC`-C4N v '5. k Ps. 3 -ilck CL -P s't eN k.S.. 'IO Home: Cell: 24"1- X1332 Architect or Engineer (� ((►►,,��,�� CL-iF G . f '1rjL►v p C pd J ( 31141 Office: Cell: Contractor Cif u[w ►es &123—}P i l 13 U S- coo +act Sys 1TF C, Qa dt.1 A 31322 Office: 33'1- s 05 Cell: 313 —1o4,' 3 ❑ Single Family ❑ Duplex ,( Multi -Family 2"[ units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout O Footprint Changes ❑ additional square feet heated/cooled O Demolition or Relocation O Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: . t -,w "2s.S` „-o t Q % lv `-b CO -4(M_. n . a4 tc lsz. ©P -\ Estimated Cost of Construction: $ 11 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. i Year Built: V:Vek Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through T&'4 S "To I S . Construction debris will be disposed by 0E.(k)IIVAC. N 1i. by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prrnted`Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Permit Inspections Cap. Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. FEES TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. 9 ` LIM 141) Signa . - for r- . - pt of Lead Paint, Asbestos, and BMP notices Date Printed N `` "` Permit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • I.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 /' 337 INTERNATIONAL CODE COUNCIL MEMBER Date Requested Owner's Name JW/Yl'ter6 1/ c -S Date Needed Gen. Contractor Subcontractor Contact Information Project Address 3 rc� �--�, (.6(4 5;,.2.6 - Scope of Work ` ICY\ Inspector Date of Inspection Inspection ELec. Inspection S rnok Pass ID Fail EJ Fee Pass ® Fail Fee Inspection Pass I —'I Fail El Fee Inspection Pass Fail ❑ Fee Permit No. City of Tyree Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 (73'J / Date Requested Owner's Name cv..wLw,, kt,► \ &S Date Needed Gen. Contractor 5oc,. C O Subcontractor Contact Information Project Address 3 - Scope of Work Inspector Date of Inspection Inspection Pass Fail Fee joiqir /6 (06/ INTERNATIONAL CODE COUNCIL MEMBER Inspection Pass n Fail El Fee 0 Inspection Pass Fail ❑ Fee Inspection Pass ❑ Fail LJ Fee City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass El Fail ❑ Fee Inspection Pass Fail ❑ Fee Owner's Name Inspection Pass ® Fail El Fee Inspection Pass ❑ Fail Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 525 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-033 $1,000.00 PERMIT #: 180337 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org -6 33k Property Address: S2 City of Tybee Island, Georgia 912-472-5030 Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: t(--&7' -03_3 Name Mailing Address Telephone Owner Cipl` (AMC-tLW 1i•►(?S l- P% 'IN -kW -JP s'c 'w[ F.G _ l,s `'O Home: Cell: 241- `-l3S2. Architect or Engineer nA ��,,,,,�- C (F COc ' l'1 C) 12-0)0 se,rp,tiNm-t1 Lek ',11-1101 Office: Cell: Contractor C umuoiNG• Cam) l t \3 ki S- 4b0 E.RSx i Sq ge C, ,==. tit- t C -432.2 Office: 3361- S055 CeII: 313 — l0' 4 ❑ Single Family ❑ Duplex M, Multi -Family 24 units * Commercial unit(s) Check all That apply ❑ Discovery/Tearout ❑ Footprint Changes O additional square feet heated/cooled O Demolition or Relocati O Other 6-'0644 * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: ll cAgt;kil'KU CSC lilS1l--O l (' G% ?CLAM, 11Z 1 U CAA `c11 _, ©PorvgCSF--S Estimated Cost of Construction: $ 11000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. /rQtc�%, Year Built: tot Listed Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through el -c144 5 `C011 cj . Construction debris will be disposed by O A-VAA(. AS by means of }LWaCEV-S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. historic structure may be longer. Processing time for a Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Permit Inspections Gap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. FEES TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. L{IZsI (4b Signal for r "pt of Lead Paint, Asbestos, and BMP notices Date L (50CettitaNi Printed Name - • • City of Tybee Island • Community Development Dept "&IX Inspection Report m a* 403 Butler Ave. • P.O. Box 2749, • Tybee Island, GA 31328 •T•••=1- ERNATIO AL Phone 912.472-5032 • Fax 912.786.9539 CODECOUNCIL MEMBER Permit No. Owner's Name Gen. Contractor Contact Information Date Requested Date Needed Subcontractor Project Address ),k v * lQ Scope of Work Inspector Date of Inspection Inspection Pass Fail Fee Inspection Pass " Fail ❑ Fee Inspection Pass Il Fail El Fee Inspection 0,1 0 Pass Fail Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 526 SUMMERWINDS FIOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-032 $1,000.00 PERMIT #: 180338 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org -033q City of Tybee Island, y d, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: 5210 PIN: — OF Name Mailing Address Telephone Owner 4j` ANW-4L1N V•IPS i '3' sh\ACL-P S.-7 eN trsc ./ o Home: Cell: 241- 43'5.2 - Architect or Engineer n C L1 OS OAF t 1 12.t S td SNp r p t 3IL41el Office: Cell: Contractor C ST v 1 11'3 S- 450 .aSX t Ski III C, 0 Eit-1 ‘stli 3322 Office: 33°1- SOS Cell: 3l3 — lti--1 C ❑ Single Family O Duplex 2.4 Multi -Family units O * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation O Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: .t�t:v�ect� c L- 1 ? C ‘7 `Cb C l't -- Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Om Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: lr On -site restroom facilities will be provided through ` (34.1 S ` low.,vrs . Construction debris will be disposed by OTr�..hL 4i by means of �j.AQ , _ , . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.orgidocs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation rnust be compliant; steel of wood posts, post spacing, Type C or A. Signatt4re foriteQ.ipt of Lead Paint, Asbestos, and BMP notices Date tAssi 14i) Printed Name City of Tybee Island • Community Development Dep Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 3132 Phone 912.472-5032 • Fax 912.786.9539 Permit No. Date Requested Owner's Name Date Needed c" //_ 1 1 P Gen. Contractor Subcontractor Contact Information Project Address , 147 Scope of Work Inspector Date of Inspection Inspection Pass Fail ❑ Fee 516,16 INTERNATIONAL CODE COUNCIL MEMBER Inspection P11 p- Pass El Fail El Fee Inspection Pass 1: Fail ❑ Fee Inspection Pass Fail Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRDT ST UNIT 523 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-035 $1,000.00 PERMIT #: 180336 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: ycc-cerr, P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: Owner Architect or Engineer Contractor Name ci-XACKAZAN 11•1P CUF CcS ❑ Single Family ❑ Duplex M, Multi -Family 24 units * Commercial unit(s) sea e ra the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. ts City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Mailing Address y R.p w Q� s -t S P4k4N 1 141 Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled PIN: f O ?O 3� Telephone Home: Cell: 21'1- `♦332 Office: Cell: ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets o f 1 d d wings by a design professional and construction by a contractor with Details of Project: 1 Estimated Cost of Construction: $__j+()Da (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Mfai, Year Built: _ Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years ta e vabe iriouseto be listed on the tax incentive programse hile preserving the h tional Register. ritage th1 of Tybee Island.ou may be eligible to take advantage of • Also see the Tybee Island Land Development Code Article 14: Historic Preservation On -site restroom facilities will be provided through During construction: Construction debris will be disposed S lo, understand that I must comply with zoning flood by ?control da a realize t n fire shore rthecaide adequacy of drainage of this ordinances property so that surrounand dingaproperty is codes no way regulations. I rcted that I i edmust byensure Article Ie q Y adversely affected as required by Article16, impaired by this permittedeconseucfion•responsibility for any corrective actions that may be necessary to restore drainage p Date: 25 ` Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be Ion el.. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. LAZSI� Signa-for r-: pt of Lead Paint, Asbestos, and BMP notices Date ipcuus,A Printed Name Owner's Name Gen. Contractor Contact Information City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 El Inelh, RNATIQNAL CODE COUNCIL MEMBER Permit No. Date Requested Date Needed Subcontractor Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail El Fee Inspection Pass Fail ❑ Fee Inspection Pass i Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 522 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-036 $1,000.00 PERMIT #: 180335 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: "3 IMO 522 g�0 3 s -- City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: ' GG®L— 413Ce Name Mailing Address Telephone Owner CD` CAC ( tNP5 1 3 'WA -P s -t 'Cu6 (,,crhN'O Home: Cell: 2'-l'"1- Vm32 Architect or Engineer ft UUF � t'1 Vs 2�O Q,P N t ILA 311-119 Office: Cell: Contractor CcF � . (5('1 1 t t 12 U S- rbo .a4t t Ski IMF C, to m, ‘stli 2 . Office: 33°1-S055 Cell: 3Y—lostcj, ❑ Single Family ❑ DuplexM., Multi -Family z4 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: lv-k .(1A.,,CIA.,(\1cz.. VENT NV ---S ?CAM vv `Tb Co-'i()L A E. Estimated Cost of Construction: $ 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: 1 cryok Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designs ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ` -(y'1S 10 L' fS . Construction debris will be disposed by ' *J -XNAL Ij\IPtSTE. by means of jMQ�CF�Ct-_ I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit nurrrially takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap_ Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos 8, Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa + - for r- . - "pt of Lead Paint, Asbestos, and BMP notices Date yl2s1 l4v Printed Ni e Permit No. City of Tybee Island • Community Developme�ut Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.95 Innek INTERNATIONAL CODE COUNCIL MEMBER Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector ` Date of Inspection Inspection Pass Fail El Fee Inspection Pass D. Fail ® Fee Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee �y,�,t3►Lc,�� DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 521 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-037 PROJECT VALUATION $1,000.00 PERMIT #: 180334 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: 1g City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT -1X-S-21 PIN: 21' 6004 ,c2 --o —0 37 Name Mailing Address Telephone Owner �` MC`"« 11.1)) `Aq ps. 3 \ s -c W4 U 4' 4 O Horne: CeII: 241- 4 -13 -62 - Architect or Engineer /t �1 J1s CV11 X22 rl VA() P sNrlp,NNeNl i LA 31LIM Office: CeII: Contractor C 04-11€,P011Ab Cat 4) l \ \3 v s- coo E.P.Nt S' 1 V G .:::. ca- % C I% 4t32 Z, Office: 33°1-505B CeII: 313 — lifrlce ❑ Single Family ❑ Duplex Multi -Family 24 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout O Footprint Changes O additional square feet heated/cooled ❑ Demolition or Relocation 0 Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ 11000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: riic&ik Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ¶&i S `Colt j . Construction debris will be disposed by ' fthk-fi.A,C by means of T b.cf.(t-S . 1 understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: 1-125'i� Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date Permit Inspections t,ap. uost rcec. Water Tap Sewer Stub Eng. Fees Aid to Const. FEES TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/does/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa Printed Nme pt of Lead Paint, Asbestos, and BMP notices Date y12s1 I4b City of Tybee Island • Community Develop ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. Owner's Name Gen. Contractor Contact Information EMU* Mr. INTERNATIONAL CODE COUNCIL MEMBER Date Requested Date Needed Subcontractor Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection aia Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 517 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-028 $1,000.00 PERMIT #: 180333 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: Ig � 0 333 City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: - 6004- .07--o -65a-g' Name Mailing Address Telephone Owner CcOMMF41-W V�iPS VifibIN, ' W -P S.T W kr- O Home: Cell: 241- Ll$SZ Architect or Engineer � nA _ . CUF 1). f -IRAQ) p.Q i7 <<-PviPravri(-{ t /A 3ILIM Office: Cell: Contractor SO-Y1/4114 w Ct 0-tratAVANl- t l V3 v S- 230 sc i St's VT e C Qo dt- i V 3(3'2.2 Office: 3V1 -508t6 CeII: 313 — l0`-1ct3 ❑ Single Family ❑ Duplex 2.4 M, Multi -Family units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: gkvt-,wecL,cc ski -p t Nt ? aitt t It 'fib C ltf XE, Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: � Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ITC/44S `Cot cj . Construction debris will be disposed by 'Q. ,QuitL k.C, jMAS E by means of pLIMQYVAL-S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: 14 2S'1�b Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. FEES TOTAL Signa for r LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.orgidocs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. (-0,511% "pt of Lead Paint, Asbestos, and BMP notices Date pdcuLst ie Printed N me City of Tybee Island • Community Develo, ment D Inspection Report 403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. Owner's Name Gen. Contractor Contact Information Project Address Scope of Work Inspector 1 Date of Inspection Inspection Pass Fail El Fee Inspection Pass DI Fail ❑ Fee a & wawa milmma- INTERNATIONAL CODE COUNCIL MEMBER Date Requested Date Needed Subcontractor Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 516 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-027 PROJECT VALUATION $1,000.00 PERMIT #: 180332 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: % IMO�V SNP City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: 6°°(.." —0?-7 Name Address Telephone Owner -'M1-At N. tNc�S �-�1fh _Mailing k( 1,5�- `rp � Cell) 2.14-1- X1332 Architect or Engineer (► (n►��- CUNF 1'1 VAL) Q- 0 ►i ilv 1 LA 3I'- P Office: Cell: Contractor St3-0Cis �POIlyln- t L \3 kiS-'bO eie,xt S'4 tX F C Office: ca- 31322 33c1 -S0/35 Cell: 31`3 - le`io3 ❑ Single Family ❑ DuplexRI, ,, cc Multi -Family 2.14 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: t-�1�14 CSC -Ni,S‘l-O 1(6 ?wit aii..kciox-oct.. P tssF--S Estimated Cost of Construction: $ 1 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. p tirt+N. Year Built: 1'\�� Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ton, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: 1 On -site restroom facilities will be provided through ev S �oit S . Construction debris will be disposed by e(, P Cf� by means of pk.14.9bTFal-S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prfnted'Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa fork r"pt of Lead Paint, Asbestos, and BMP notices Date Printed Nme�v �(� l� v City of Tybee Island • Community Development ' - pt. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. Date Requested Owner's Fume Date Needed '17. -3 /1? Gen. Contractor Subcontractor :-*1 INTERNATIONAL CODE COUNCIL MEMBER Contact Information Project Address Scope of Work Inspector Inspection Date of Inspection Pass Ei Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection Pass Li Fail El Fee Inspection 010 Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 515 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-026 PROJECT VALUATION $1,000.00 PERMIT #: 180331 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: _7 - o-cX515 1p -0 331 City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: Z-(-0004-c)-6-0;-(e Name Mailing Address Telephone Owner Coot' CAC -0-W IN PS V 3 'W L -V s. -N -- Home: 'C\ M.X- U -O Cell: 241-L1332 Architect or Engineer CUF �1,� ,-� r'1 12-A QUO SNICsi\VM-t c., 3ILU \ Office: Cell: Contractor 1 Cq� avoulaiNl,C 11,1'3 v S- coo E.ast t Skil-CF C, to c i L�cr! -31322 Office: 33°1- 5O�,,'P Cell: 313 — lof-VoS ❑ Single Family ❑ Duplex ►.� Multi -Family 2-14 units ❑ Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: A•it-kKle OC. `;.5q-01(\k Q Vt 1 b C U E. C vtz_ 9P1/4-1-\ �►CZF-S Estimated Cost of Construction: $ ' 1 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: kgYj45k Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `T& l S 1011 %Cj . Construction debris will be disposed by OeitieL&C P 11. by means of p1/4.4A4 �-Ct-S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prfnted'Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://vvww.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa r - for r-: -'pt of Lead Paint, Asbestos, and BMP notices Date AlsN 651W Printed N ml it y`2sI I'� Permit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA Phone 912.472-5032 • Fax 912.786.9539 Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address 7/ Li - Scope of Work Inspector Date of Inspection , 1 Inspection Pass Fail Fee INTERNATIONAL CODE COUNCIL MEMBER Inspection Pass © Fail ❑ Fee Inspection Inspection 141 Pass Fail ❑ Fee Pass Fail OC:1 Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DANAGES 3 THIRD ST UNIT 514 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-025 PROJECT VALUATION $1,000.00 PERMIT #: 180330 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: 6-613.36 City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: 41' 066 (14-- _0 Name Mailing Address Telephone Owner ci-V-ANW.•-C11N 1A'C)S l 3 *1 C\c1-D s -c waA, . l.ski rN'O Home: Cell: 2.4.1- k-1332. Architect or Engineer nA _ C,UF CXX �- VAC) 12.0:24) 1 1 VAC)pt„fpn-t4 c 3IL%P Office: Cell: Contractor C � I G- C ,� t t V US- (bp asN t Sq IN F.- G Q a TIL t Cwt 3'1 22 Office: 33°1-50516 CeII: 313 — l4' -l9;3 ❑ Single Family 0 Duplex 2.4 , Multi -Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout O Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Aqt,ll\1 ecL, CSc t N6 ? C4t t 7 'Cb C WtVXE fk,(\m.. V+ b'czc�S Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: 161k Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `Tbt-14 `Cott Tj . Construction debris will be disposed by OEILIV LC NACTE., by means of oMQ`J� 1.CL-, . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit .normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right. Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co - Construction Exit and Sd1 - Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa - for r - pt of Lead Paint, Asbestos, and BMP notices Date mkx (5( -` Printed N e City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee