Loading...
HomeMy Public PortalAboutTHIRD ST_3 UNIT538.pdfCity of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail ❑ Fee c� Inspection Y" ` Pass Fail ❑ Fee Inspection I--- b Pass El Fail ❑ Fee Inspection I Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 538 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-045 $1,000.00 PERMIT #: 180348 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: 3 � 5� 5343 �g- 034 City of Tybee Island, Georgia 912-472-5030 Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: 41- Ca*" .P -O Name Mailing Address Telephone Owner Cat.VtMe-VAN tNP k-kraN 3 ' AV -P S W 1,c.,4+` 0 Home: Cell: 2'{'1- y332 Architect or Engineer (n,��,,,,�� CUF CXX 1-1VAL) 2F O &NP4, rii I i LA 31y1° Office: Cell: Contractor C'c '.\-- 3 U l I V S- %bo st t S' ITF C, ?,oft_ t W't X4'22 Office: 33'1- SOB" Cell: 313 - t..0 -k co$ ❑ Single Family ❑ Duplex M, Multi -Family z4 units ❑ * Commercial unit(s) Check al! that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: ?.0 t;w K c ` sty -D l rst . Q %(Lt t K- fb C IQc A E VC21:1-, kc vsL VW\ F -S Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: OM Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ¶et4 S `COI rj . Construction debris will be disposed by q*StJei L WASTE by means of p3M9a(E0.S . 1 understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tan Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ********************* BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. SignattAce for 'pt of Lead Paint, Asbestos, and BMP notices Date phsu b r*i Printed Name LIM 141) Gen. Contractor Permit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 jg -c)3f7 Owner's Name StAWIr VIN\v\cS w Contact Information Date Requested Date Needed Subcontractor 1/xo/f? Lttt ■a't*\ INTERNA"ZONAL CODE COUNCIL MEMBER Project Address 3 — 3✓ S-� • vL + 537 Scope of Work Inspector Date of Inspection Inspection C f eL. Inspection r (cu'v lj Inspection Inspection f3 Pass El Fail El Fee Pass ❑ Fail ❑ Fee Pass ❑ Fail ID Fee Pass ❑ Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 537 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-044 PROJECT VALUATION $1,000.00 PERMIT #: 180347 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: j 637 City of Tybee Island, Georgia 912-472-5030 Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT 5-1 PIN: T- (Q3 X-0(6 Name Mailing Address Telephone Owner 61,X ll`�C-47-'W ii P k- 1N 3 C� P s. -T. 'alt x-, l,sk.45 0 Home: Cell: 2I -Vi - `t332 Architect or Engineer /� ((11,,��,,,�� CUF Wla�' �'1 VAC) S'1ifki\ M-1 W.{ 3ILIKI Office: Cell: Contractor StiAlfi Cwt oviatvihi.,(5i.ullip 1 I V3 VS - b Elk i Scs VT F- C, Coact- C _ 31322 Office: 33°'1- S085 CeII: S ?? - lo-l9f3 ❑ Single Family ❑ Duplex l �$ Multi -Family 24 units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project �may 1 require Site Plan Approval. Details of Project: �C��(�t k� �l it Q �It�► �t ��"ti / � Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. orook Year Built: kcimak Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through 1-(3'441'S ` c L 1 . Construction debris will be disposed by .tMLAC. 1 E by means of A(Mf .( -% . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prfnted`Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure rrlay be fuiiger. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. VVdLef 1 d(.1 Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos 8, Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co - Construction Exit and Sd1 - Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa `. for r : pt of Lead Paint, Asbestos, and BMP notices Date (50 AN-1 Printed Name City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 rim Ass INTERNATIONAL CODE COUNCIL MEMBER Permit No. /V-0(”Co Date Requested Owner's Name Jc t..Wkf/v1 VU{14.S Date Needed T / /f? Gen. Contractor 11 Subcontractor Contact Information Project Address Scope of Work Inspector F Date of Inspection Inspection F -.le -G• Pass El Fail El Fee Inspection Pass ❑ Fail El Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee 3 - 3rd n r+ S3c,0 tcn 4`� F mom, F DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 536 SUM MERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-043 $1,000.00 PERMIT #: 180346 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: iM S l City of Tybee Island, Georgia 912-472-5030 Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: -660- -0L13 Name Mailing Address Telephone Owner <4- AN`C- N INP 1 P's. "3 'W ACLIP sV W6 tiS O Home: Cell: 241- IL1332 Architect or Engineer n�,� CUF Wit/40C '� 11 "R�1U QUO iNNIi i c 311-1 1i Office: Cell: Contractor SCIAlri CcP b C 1 t r3 ki S- 9bo t.P.Lx t Su 1-c... G o ca_ t C 31322 j�,' Office: 33°1- SO Cell: 313 - to -t 3 ❑ Single Family 0 Duplex M, Multi -Family 2.14 units * Commercial unit(s) Check all that apply O Discovery/Tearout ❑ Footprint Changes O additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: kciAl\m- 9P N c -S Q C4adt1t -Cb MAMA —Ed Estimated Cost of Construction: $ t 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Vg16ek Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa7ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through ¶St'3 4 S 1011....E51-5 . Construction debris will be disposed by . fk.) 1 1 t PCT by means of AQ , Lj . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prfnted`Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www. gaswcc.org/docs/field_ma nual_4ed. pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa . - for r -r --'pt of Lead Paint, Asbestos, and BMP notices Date Printed Name V t4f f J City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. [ v 3 % S Date Requested Owner's Name 5Wiwr xWc( S Date Needed 771g INTERNATIONAL CODE COUNCIL MEMBER Gen. Contractor cou- Coc�S--- Subcontractor Contact Information Project Address Scope of Work 33V -0‘r VI\ Inspector \ 1 '1 Date of Inspection Inspection T d U '2 ):-- v t• 1 Pass , Fail Fee /o N Oc, Inspection Pass Fail ❑ Fee Inspection �4 Pass Fail ® Fee Inspection Pass El Fail ❑ Fee ti 04 0 DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 535 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-042 $1,000.00 PERMIT #: 180345 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org o3fs Property Address: City of Tybee Island, Georgia 912-472-5030 Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT 53S PIN: r" 600111-* P-0 r;. - Name Mailing Address Telephone Owner Me' kN(?S V ' 3 'WC\ -P S. -s- 'Nb (,S O Home: Cell: 2.'1- y332 Architect or Engineer ' 1 n�(- CLIP D 1'1 V -AU Q 4� rwl clow 31y11 Office: Cell: Contractor SO-Alt Cwt CL "u V-16. 11 11.13 U S- C,o " `SN t Sm 1-M.G 2lz X1"322 Office: 33°1- SO Cell: 31 ; -'. '- $ ❑ Single Family ❑ Duplex l Multi -Family 24 units * Commercial unit(s) E Check all that apply Discovery/Tearout Footprint Changes additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: A•it-w e1 ( 5stL-p t (\sl, ?WA `Cb C, 4MX'EI CL4.1C ti. © NzF—s Estimated Cost of Construction: $ k 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: ‘qW)Ok Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `-($MIS `CO1LE'( . Construction debris will be disposed by 'ckk L4L. limptsvE by means of W E.41-S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. VV iL I IQl.: Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, T ype C or A. LAS51% Signatt#e for r "pt of Lead Paint, Asbestos, and BMP notices Date I Printed NRme) `rl' v City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector 7 1 Date of Inspection ?-13-- '\, 1' Inspection I E_' E F Pass 0 Fail D Fee Inspection Pass D Fail ❑ Fee Inspection Pass LJ Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES WORK LOCATION 3 THIRD ST UNIT 534 OWNER NAME SUMMERWINDS HOA ADDRESS 3 THIRD ST CITY, ST, ZIP TY BEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME SOUTH COAST CONTRACTING GROUP, ADDRESS 19 SOUTH LAKE DRIVE CITY STATE ZIP SAVANNAH GA 31410 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # P $ 65.00 4-0004-20-041 PROJECT VALUATION $1,000.00 PERMIT #: 180344 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: `(--c o o- V z8 Name Mailing Address Telephone Owner 44-XAMc" tAN tniC) 1-z>N '3 -Ask\cL-D s'T 'CAL 1,5 NO Home: Cell: 21'1- Lk$32. Architect or Engineer (1,�,�r c..� OAF lJ�.x' 'I 11 A( QUO SNP4 r.ita t 311-1r1 Office: CeII: Contractor C Lx-rm,roliram- C-: i It r3 v S— 450 El1/4SZ t Sv vs-F...C, tc z I < -1322 Office: 33'1— 5Oi:38 CeII: 313 — lo-Vb3 ❑ Single Family ❑ Duplex �$ Multi -Family 2.4 units �] * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `C6NA1.S 1-014,11 . Construction debris will be disposed by Q �,(r \1\11361E. by means of '•AQ CFALS . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: 4 2S�;. ..gnature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tan Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa . - for r- :- - pt of Lead Paint, Asbestos, and BMP notices Date Printed Nt ' y k' v yl2sl I4) City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested hi 1, r Owner's Name Date Needed // ! fr Gen. Contractor Subcontractor Contact Information Project Address Lk vti 53 3 Scope of Work V :tip ( -):-/Or Inspector Date of Inspection Inspection Pass Fail El Fee Inspection Pass ❑ Fail ® Fee Inspection Pass ® Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 533 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-040 PROJECT VALUATION $1,000.00 PERMIT #: 180343 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: ig—a3(3 City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT PIN: « Gooc(.. c7-41-0 Name Mailing Address Telephone Owner Cd-VAMe..(zW 1NC) ' -h3( \ NG' sz 'CN6F.G_ (iSc nrND Home: Cell: 2.141- L 1. Architect or Engineer �n1��- CUf 1,0(3gat, ��j 'RA1U Q O Jpihtpl 3IyP Office: Cell: Contractor SC)Xil Cc -- t. NG- C 4� (t\3 vS-Yo st Ski VI -F,- C, to dt- + C 3(-7-;"2.. Office: 33°1 -SO Cell: 313 - ti - M3 ❑ Single Family ❑ Duplex ►� Multi -Family 2.14 units ❑ Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: .-Nt-AmecL, C S'l-O 1('4lL , Q CX,1 1,17 ` b C, A T-, Estimated Cost of Construction: $ 11000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designa7ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through T&4 S 1-0112t5 . Construction debris will be disposed by �1�JC. 'f by means of ]UMci a -S . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Prfnted'Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://vvww.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signa 4re for r r'pt of Lead Paint, Asbestos, and BMP notices Date N \U v buccsit Printed City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested ?/M'M /f Owner's Name Date Needed ti/i Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee Inspection Pass Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 532 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-039 PROJECT VALUATION $1,000.00 PERMIT #: 180342 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT (-3- 2- PIN: Li— 664— ,P-0-63 Name Mailing Address Telephone Owner ccoi"LP&F`.f2-W 1n►PS t� 3 '1 Ack-(7 s. -N- 'Cali l� `'� Home: Cell: 2.1'1- L1332 Architect or Engineer /t nA _, - ft l �rj 'l �U 2 pO tp4'+Nl i LA 3Iycl Office: Cell: Contractor Ccec"- N6 - l t 13 U S- 2,o St t S's r C, tor Fdi- t (i-si 3M"2:2, Office: 33°1- S0e,5 Cell: 31`3 — le -4.4V> ❑ Single Family ❑ Duplex l Multi -Family 24 units * Commercial unit(s) Check all that apply O Discovery/Tearout O Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation 0 Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: ANt%lM eCl..d CSC i o l N VC" "Cb CO -AMA —Ed Estimated Cost of Construction: $ 1000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: ‘°1S \ Listed on National Historic Register or located within a National Historic District? Y / • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designs ion, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through 4T(...1.•3•4 Jolt. . Construction debris will be disposed by Q.Tr�I..0 NP'tfl by means of p Q tE tS . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signature Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ********************* Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://wvvw.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. L0511 tt• Signatre for r- . • pt of Lead Paint, Asbestos, and BMP notices Date Printed Name (-1N bcscatki1AN Est=.i.OaiVrkYep nS47 r _ 9 141 Permit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Date Requested Owner's Name ,t � I1 Date Needed Gen. Contractor LL (.Ork Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection Pass Fail El Fee it 7/q INTERNATIONAL CODE COUNCIL MEMBER 7/4/a - Inspection Pass Fail ❑ Fee Inspection Pass Inspection Fail El Fee Fail ❑ Fee DATE ISSUED: 04-30-2018 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUM BER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CI-IARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT STORM DAMAGES 3 THIRD ST UNIT 531 SUMMERWINDS HOA 3 THIRD ST TYBEE ISLAND GA 31328 SOUTH COAST CONTRACTING GROUP, 19 SOUTH LAKE DRIVE SAVANNAH GA 31410 P $ 65.00 4-0004-20-038 $1,000.00 PERMIT #: 180341 TOTAL BALANCE DUE: $ 65.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: ' I 2O (� 1 r k -o3�ll City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERIVIIT PIN: 600 6 Name Mailing Address Telephone Owner �`VAMF`' +NO'S k,ACIDIN. `3 'i�� s� ANAMX-- li b Home: Cell: 2'41"1- LM -62. Architect or Engineer ��� 11 12.4U lie -PAD SPVPktINt 3lLL\ Office: Cell: Contractor S(PtigiC �Nb C P 11.1-- US— cb0 SN t Ski g F C, 0 •dt. � 6____31S2.2. Office: 33°1- 5Oy8 Cell: 31`3 - lo`l.'o3 ❑ Single Family ❑ Duplex Multi -Family 2.4 units * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: `mss\i_o t r ?c40-4 vv `fib C t —F.� Estimated Cost of Construction: $ t 000 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: V-\SJk Listed on National Historic Register or located within a National Historic District? Y /© • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through `�[`(yk{S `[p\� . Construction debris will be disposed by � -�'E.4( N[ by means of pkj..kniTALA . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Pr nted Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signatrce for rsipt of Lead Paint, Asbestos, and BMP notices Date Printed NeISC UV -1` .1 4\251 14)