HomeMy Public PortalAbout2008_07_08_O019 - BAR Time Limits
The Town of
Leesburg,
Virginia
PRESENTED: July 8. 2008
ORDINANCE NO: 2008-0-19
ADOPTED: July 8. 2008
AN ORDINANCE: TO AMEND SECTIONS 7.6.7 (DESIGN CRITERIA ON
APPEAL TO THE TOWN COUNCIL FOR THE H-2
DISTRICT), 3.10.5 (TO SET A TIME LIMITATION FOR THE
BOARD OF ARCHITECTURAL REVIEW TO ACT UPON AN
APPLICATION TO OBTAIN A HISTORIC DISRTICT PERMIT
IN THE H-l DISTRICT), AND 3.11.8 (TO SET A TIME
LIMITATION FOR THE BOARD OF ARCHITECTURAL
REVIEW TO ACT UPON AN APPLICATION TO OBTAIN A
CERTIFICATE OF APPROVAL IN THE H-2 DISTRICT) OF
THE LEESBURG ZONING ORDINANCE
The Town Council of Leesburg, Virginia, ordains as follows:
SECTION I. Section 7.6.7 (DESIGN CRITERIA ON APPEAL TO THE
COUNCIL FOR THE H-2 DISTRICT) of Article 7 (OVERLA Y AND SPECIAL
PURPOSE DISTRICTS) of the Zoning Ordinance of the Town of Leesburg, Virginia,
2003, as amended, be and the same is hereby amended to read as follows:
7.6.7 Design Criteria
The Board of Architectural Review (and on appeal, the Tovffl Council) shall find
that the application meets all of the following standards and criteria stated below
in approving applications filed under this section. These standards and criteria are
further defined in the H-2 Corridor Design Guidelines, dated January 23, 1990,
which are hereby adopted and shall be used by the Board of Architectural Review
in evaluating Certificates of Approval.
A. Whether or not the proposed external architectural features, represented
by the general design and arrangement, texture, color, line, mass,
- 2 -
AN ORDINANCE: TO AMEND SECTIONS 7.6.7 (DESIGN CRITERIA ON
APPEAL TO THE TOWN COUNCIL FOR THE H-2
DISTRICT), 3.10.5 (TO SET A TIME LIMITATION FOR THE
BOARD OF ARCHITECTURAL REVIEW TO ACT UPON AN
APPLICATION TO OBTAIN A HISTORIC DISTRICT PERMIT
IN THE H-l DISTRICT), AND 3.11.8 (TO SET A TIME
LIMITATION FOR THE BOARD OF ARCHITECTURAL
REVIEW TO ACT UPON AN APPLICATION TO OBTAIN A
CERTIFICATE OF APPROVAL IN THE H-2 DISTRICT) OF
THE LEESBURG ZONING ORDINANCE
dimension, material and lighting reflect desirable design for the Town of
Leesburg.
B. Whether or not the proposed structure, building or improvement is
compatible with well designed structures, acceptable to the Board of
Architectural Review in the vicinity of the proposed structure.
C. Whether or not proposed freestanding buildings use the same or
architecturally harmonious materials, color, texture and treatment for all
exterior walls; and in the case of partially freestanding buildings, whether
or not the same or architecturally harmonious materials, color, texture and
treatment are used on all portions of all exterior walls.
D. Whether or not the combination of architectural elements proposed for
a structure, building or improvement, in terms of design, line, mass,
dimension, color, material, texture, lighting, landscaping, roofline and
height conform to accepted architectural principles for permanent
buildings reflecting the character of Leesburg, as contrasted with
engineering standards designed to satisfy safety requirements only.
E. Whether or not the proposed structure, building or improvement, in
terms of design, material, texture, color, lighting, landscaping, dimension,
line, mass roof line and height, is designed to serve primarily as an
- 3 -
AN ORDINANCE: TO AMEND SECTIONS 7.6.7 (DESIGN CRITERIA ON
APPEAL TO THE TOWN COUNCIL FOR THE H-2
DISTRICT), 3.10.5 (TO SET A TIME LIMITATION FOR THE
BOARD OF ARCHITECTURAL REVIEW TO ACT UPON AN
APPLICATION TO OBTAIN A HISTORIC DISTRICT PERMIT
IN THE H-l DISTRICT), AND 3.11.8 (TO SET A TIME
LIMITATION FOR THE BOARD OF ARCHITECTURAL
REVIEW TO ACT UPON AN APPLICATION TO OBTAIN A
CERTIFICATE OF APPROVAL IN THE H-2 DISTRICT) OF
THE LEESBURG ZONING ORDINANCE
advertisement or commercial display, exhibits exterior characteristics
likely to deteriorate rapidly, would be of temporary or short-term
architectural or aesthetic acceptability, or would otherwise constitute a
reasonable foreseeable detriment to the attractiveness and stability of the
town's historic arterial corridors.
SECTION II. Section 3.1 0.5 (REVIEW OF PLANS IN A TIMELY MANNER
FOR HISTORIC DISTRICT PERMITS OF THE H-l HISTORIC OVERLAY
DISTRICT) of Article 3 (REVIEW AND APPROV AL PROCEDURES) ofthe Zoning
Ordinance of the Town of Leesburg, Virginia, 2003, as amended, be and the same is
hereby amended to read as follows:
3.10.5 Review of Plans in a Timely Manner
The Board of Architectural Review shall vote and announce its decision on any
matter properly before it at the conclusion of the public meeting on the matter,
unless the time is extended by mutual agreement between the Board of
Arehiteetural Review and the applieaflt, or unless the Board of .^Lrehiteetural
Review postpoaes the matter to its Flext publie meeting due to lack of
representatioFl on the part of the applicant.:. The Board of Architectural Review
shall render a final decision upon any matter properly before it within seventy-
five (75) days or less after the first public hearing on the matter. Any application
- 4 -
AN ORDINANCE: TO AMEND SECTIONS 7.6.7 (DESIGN CRITERIA ON
APPEAL TO THE TOWN COUNCIL FOR THE H-2
DISTRICT), 3.10.5 (TO SET A TIME LIMITATION FOR THE
BOARD OF ARCHITECTURAL REVIEW TO ACT UPON AN
APPLICATION TO OBTAIN A HISTORIC DISTRICT PERMIT
IN THE H-l DISTRICT), AND 3.11.8 (TO SET A TIME
LIMITATION FOR THE BOARD OF ARCHITECTURAL
REVIEW TO ACT UPON AN APPLICATION TO OBTAIN A
CERTIFICATE OF APPROVAL IN THE H-2 DISTRICT) OF
THE LEESBURG ZONING ORDINANCE
not acted upon within this 75 day period shall be deemed approved unless the
parties mutually agree to extend the action time beyond this 75 day period to a
date certain.
SECTION III. Section 3.11.8 (REVIEW OF PLANS IN A TIMELY MANNER
FOR ARCHITECTURAL CONTROL CERTIFICATES OF APPROVAL FOR THE H-2
CORRIDOR OVERLA Y DISTRICT) of Article 3 (REVIEW AND APPROV AL
PROCEDURES) of the Zoning Ordinance of the Town of Leesburg, Virginia, 2003, as
amended, be and the same is hereby amended to read as follows:
3.11.8 Review of Plans in a Timely Manner
The Board of Architectural Review shall vote and announce its decision on any
matter properly before it at the conclusion of the public meeting on the matter,
ooless the time is exteaded by mlttual agreement between the Board of
./\rchiteetural Revievl and the applicant, or unless the Board of .\rehiteetural
Re':iew postpoFles the matter to its next publie meeting dl:1e to laek of
represeBtation on the part of the applicant.:. The Board of Architectural Review
shall render a final decision upon any matter properly before it within seventy-
five (75) days or less after the first public hearing on the matter. Any application
not acted upon within this 75 day period shall be deemed approved unless the
- 5 -
AN ORDINANCE: TO AMEND SECTIONS 7.6.7 (DESIGN CRITERIA ON
APPEAL TO THE TOWN COUNCIL FOR THE H-2
DISTRICT), 3.10.5 (TO SET A TIME LIMITATION FOR THE
BOARD OF ARCHITECTURAL REVIEW TO ACT UPON AN
APPLICATION TO OBTAIN A HISTORIC DISTRICT PERMIT
IN THE H-l DISTRICT), AND 3.11.8 (TO SET A TIME
LIMITATION FOR THE BOARD OF ARCHITECTURAL
REVIEW TO ACT UPON AN APPLICATION TO OBTAIN A
CERTIFICATE OF APPROVAL IN THE H-2 DISTRICT) OF
THE LEESBURG ZONING ORDINANCE
parties mutually agree to extend the action time beyond this 75 day period to a
date certain.
SECTION VI. If any provision of this ordinance is declared invalid, the decision
shall not affect the validity of the ordinance as a whole or any remaining provisions of the
ordinance.
PASSED this 8th day of July 2008.
~~Il.'C~
~stattd,M~
Town of Leesburg