Loading...
HomeMy Public PortalAboutOCEANVIEW CT_1A.pdfU.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE OMB No. 1660-0008 Expiration Date: November 30, 2022 Important: Follow the instructions on pages 1-9. Copy ail pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance agent/company, and (3) budding owner. SECTION A — PROPERTY INFORMATION FOR INSURANCE COMPANY USE Al. Building Owner's Name JR Lane Holdings LLC Policy Number: A2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1A Ocean View Court Company NAIC Number. City State ZIP Code Tybee Island Georgia 31328 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) Lot 10A, Ocean View Subdivison, 5th G.M. District, City of Tybee Island, Chatham County, Georgia, PIN: 40003 10011 A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.) Residential A5. Latitude/Longitude: Lat. 32.01564 Long. -80.84274 Horizontal Datum: ❑ NAD 1927 x NAD 1983 A6. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. A7. Building Diagram Number 6 A8. For a building with a crawlspace or enclosure(s): a) Square footage of crawlspace or enclosure(s) 1,670 sq ft b) Number of permanent flood openings in the crawlspace or enclosure(s) within 1.0 foot above adjacent grade 34 c) Total net area of flood openings in A8.b 1,724 sq in d) Engineered flood openings? x❑ Yes ❑ No A9. For a building with an attached garage: a) Square footage of attached garage N/A sq ft b) Number of permanent flood openings in the attached garage within 1.0 foot above adjacent grade N/A c) Total net area of flood openings in A9.b N/A sq in d) Engineered flood openings? ❑ Yes x No SECTION B — FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1. NFIP Community Name & Community Number City of Tybee Island 135164 B2. County Name Chatham B3. State Georgia B4. Map/Panel Number 13051CO214 B5. Suffix G B6. FIRM Index Date 08-16-2018 B7. FIRM Panel Effective/ Revised Date 08-16-2018 B8, Flood Zone(s) AE B9. Base Flood E evation(s) (Zone AO, use Base Flood Depth) 10.0' B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item B9: ❑ FIS Profile x FIRM ❑ Community Determined ❑ Other/Source: B11. Indicate elevation datum used for BFE in Item B9: ❑ NGVD 1929 x NAVD 1988 ■ Other/Source: B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes E No Designation Date: ❑ CBRS • OPA FEMA Form 086-0-33 (12/19) Replaces all previous editions. Form Page 1 of 6 ELEVATION CERTIFICATE IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1A Ocean View Court Policy Number: City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number J — SECTION C — BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) C1. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Construction* J Finished Construction `A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations — Zones Al A30, AE, AH, A (with BFE), VE, V1 —V30, V (with BFE). AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO. Complete Items C2.a—h below according to the building diagram specified in Item A7. In Puerto Rico only, enter meters. Benchmark Utilized: Local Vertical Datum: NAVD 88 Indicate elevation datum used for the elevations in items a) through h) below. ❑ NGVD 1929 Q NAVD 1988 ❑ Other/Source: Datum used for building elevations must be the same as that used for the BFE. Check a) Top of bottom floor (including basement, crawlspace, or enclosure floor) 8.1 © the measurement used. feet ❑ meters b) Top the higher floor 18.5 x feet ❑ meters of next Bottom the lowest horizontal structural member (V Zones only) N/A ❑ feet ❑ meters c) of d) Attached slab) N/A 0 feet I. meters garage (top of e) Lowest elevation of machinery or equipment servicing the building 13.7 location in Comments) ©feet ❑meters (Describe type of equipment and f) Lowest adjacent (finished) next to building (LAG) 7.6 ❑x feet ❑ meters grade Highest adjacent (finished) grade next to building (HAG) 7.8 x❑ feet ❑ meters g) h) Lowest adjacent grade at lowest elevation of deck or stairs, including 7.7 p feet ❑meters structural support SECTION D — SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized I certify that the information on this Certificate represents my best efforts to interpret the data statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. Were latitude and longitude in Section A provided by a licensed land surveyor? ED Yes ■ by law to certify elevation information. available. I understand that any false No ❑ Check here if attachments. Certifier's Name License Number Don E. Taylor GA# 3417 0 R G / Title Professional Surveyor 3j �G\ST. 4 T Q. Company Name Coleman Company Inc Sd77 O \ • Address 1480 Chatham Parkway, Suite 100 l► - Off. Ljr City Savannah State ZIP Code + Georgia 31405 Signature j/ Date Telephone E. 04-13-2023 (912) 200-3041 Copy all pages of is evation Ce ' to and all attachments for (1) community official, (2) insurance agent/company, and (3) building owner. Comments (Intl ding type of e i ent and location, per C2(e), if applicable) A7: Property is lo ea of Limited Wave Action. A8: Enclosure is vented by (6) engineered vents and (28) non -engineered openings. Smart Vent Products, INC. Model# 1540-510. B9: A 1'(one foot) free board is required on all new construction by the City of Tybee Island Flood Damage Prevention Ordinance. C2: Benchmark was established using "EGPS" GPS base station network. Elevations shown are referenced to NAVD 88 (12). C2a: Elevation is bottom of the enclosure. C2b: Elevation is top of finished floor for living space. C2e: Lowest elevation of machinery servicing the building is the bottom of an electrical outlet. OMB No. 1660-0008 Expiration Date: November 30, 2022 FEMA Form 086-0-33 (12/19) Replaces all previous editions. ELEVATION CERTIFICATE OMB No. 1660-0008 Expiration Date: November 30, 2022 IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1A Ocean View Court Policy Number: City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number SECTION E — BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A WITHOUT BFE) For Zones AO and A (without BFE), complete Items E1 —E5. If the Certificate is intended to support a complete Sections A, B,and C. For Items E1 —E4, use natural grade, if available. Check the measurement enter meters. El. Provide elevation information for the following and check the appropriate boxes to show whether the highest adjacent grade (HAG) and the lowest adjacent grade (LAG). a) Top of bottom floor (including basement, LOMA or LOMR-F request, used. In Puerto Rico only, the elevation is above or below ❑ above or ❑ below the HAG. ❑ above or ❑ below the LAG. 9 (see pages 1-2 of Instructions), ❑ above or ❑ below the HAG. ❑ above or ❑ below the HAG. ❑ above or ❑ below the HAG. with the community's certify this information in Section G. crawlspace, or enclosure) is ❑ feet • meters b) Top of bottom floor (including basement, crawlspace, or enclosure) is ❑ feet ❑ meters E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or the next higher floor (elevation C2.b in the diagrams) of the building is ■ feet ❑ meters E3. Attached garage (top of slab) is ❑ feet ❑ meters E4. Top of platform of machinery and/or equipment servicing the building is ❑ feet ❑ meters E5. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must SECTION F — PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA-issued or community -issued BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. Property Owner or Owner's Authorized Representative's Name Address City State ZIP Code Signature Date Telephone Comments ❑ Check here if attachments. FEMA Form 086-0-33 (12/19) Replaces all previous editions. Form Page 3 of 6 ELEVATION CERTIFICATE IMPORTAPiT: In these spaces, copy the corresponding Information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt, Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1A Ocean View Court Policy Number City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number SECTION G -- COMMUNITY INFORMATION (OPTIONAL) The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used in Items G8 —G10. In Puerto Rico only, enter meters. G1. ❑ The Information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA-issued or community -issued BFE) or Zone AO. G3. ❑ The following information (Items G4 —G10) is provided for community floodplain management purposes. G4, Permit Number G5. Date Permit Issued G6. Date Certificate of Compliance/Occupancy Issued G7. This permit has been issued for: ❑ G8. Elevation of as -built lowest floor (including of the building: G9. BFE or (in Zone AO) depth of flooding at the G10. Community's design flood elevation: New Construction ❑ Substantial Improvement basement) ❑ feet ❑ feet ❑ feet II meters Datum building site: ❑ meters Datum ❑ meters Datum Local Official's Name Title Community Name Telephone Signature Date Comments (including type of equipment and location, per C2(e), if applicable) ❑ Check here if attachments. OMB No. 1660-0008 Expiration Date: November 30, 2022 FEMA Form 086-0-33 (12/19) Replaces all previous editions. Form Page 4 of 6 ELEVATION CERTIFICATE IMPORTANT: in these spaces, copy the corresponding Information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. IA Ocean View Court Policy Number City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number if using the Elevation Certificate to obtain NFIP flood insurance, affix at least 2 building photographs below according to the instructions for Item A6. Identify all photographs with date taken; "Front View" and "Rear View"; and, if required, "Right Side View" and "Left Side View." When applicable, photographs must show the foundation with representative examples of the flood openings or vents, as indicated in Section A8. If submitting more photographs than will fit on this page, use the Continuation Page. Ir--- -1 _ err_ ____r �' II U ilirr 1 .. . 1r r I, - � tt , Alil' . r o i , --{ . --_ _. _ h. ' ) l> -- r.' F. c, Photo One Caption FRONT VIEW 04-03-2023 Clear Photo One ii forotAPP— r• sr r�l Pt,aI Twa Photo Two Caption REAR VIEW 04-03-2023 Clear Photo Two BUILDING PHOTOGRAPHS See Instructions for Item A6. OMB No. 1660-0008 Expiration Date; November 30, 2022 FEMA Form 086-0-33 (12/19) Replaces all previous editions. Form Page 5 of 6 ELEVATION CERTIFICATE IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1A Ocean View Court Policy Number: City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number If submitting more photographs than will fit on the preceding page, affix the additional photographs below. Identify all photographs with: date taken; "Front View" and "Rear View"; and, if required, "Right Side View" and "Left Side View." When applicable, photographs must show the foundation with representative examples of the flood openings or vents, as indicated in Section A8. :• • -- • . MI • � ai Ff• p �, 1., r II � '^ 1 li M l� y YNB ,,• • •- - ._ - _ _.,. , • _ . _ ,,, _ _ . ....qr._ .._ 6..._ . -,... ,.......„.... _ , : ___._ _ Photo Moe; Photo Three Caption RIGHT VIEW 04-03-2023 Gear Photo Three rte"' - 1 ENI1 i1i1ll II 1lH'. r = - � Ill , • • • , __,-----1,:-. r�. 11 a' i. • ,� _ �t t r . ; -- � , 1' 111 I ft i e _ _ . • — i. ' ., I All a � ppp lit. \ 1 t Photo Facer Photo Four Caption LEFT VIEW 04-03-2023 Clear Photo Four BUILDING PHOTOGRAPHS Continuation Page OMB No. 1660-0008 Expiration Date: November 30, 2022 Form Page 6 FEMA Form 086-0-33 (12/19) Replaces all previous editions. ELEVATION CERTIFICATE AL/LA 1 IUNAL BUILDING PHOTOGRAPHS Continuation Page OMB No. 1660-0008 Expiration Date: November 30, 2018 IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 1 A Ocean View Court Policy Number: City State ZIP Code Tybee Island Georgia 31328 Company NAIC Number If submitting more photographs than will fit on the preceding page, affix the additional photographs below. Identify all photographs with: date taken; "Front View" and "Rear View"; and, if required, "Right Side View" and "Left Side View." When applicable. photographs must show the foundation with representative examples of the flood openings or vents, as indicated in Section A8. ,inm-- 11111114 Photo One Caption VENT 04-03-2023 1 11 I Y ` i 1 . Photo Two Caption VENTING 04-03-2023 FEMA Form 086-0-33 (7/15) Replaces all previous editions. Additional Photos ES ICC EVALUATION SERVICE Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-2074 ICC-ES I (800) 423-6587 1 (562) 699-0543 I www.icc-es.org Reissued 02/2021 This report is subject to renewal 02/2023. DIVISION: 08 00 00 —OPENINGS SECTION: 08 95 45— VENTS/FOUNDATION FLOOD VENTS REPORT HOLDER: SMART VENT PRODUCTS, INC. EVALUATION SUBJECT: SMART VENT0 AUTOMATIC FOUNDATION FLOOD VENTS; MODELS #1540-520; #1540-521; #1540-510; #1540-511; #1540-570; #1540-574; #1540-524; #1540-514; FLOOD VENT SEALING KIT #1540-526 itCCE:Th "2014 Recipient of Prestigious Western States Seismic Policy Coundl (WSSPC) Award in Excellence" A Subsidiary of cotaci 11111 Mail mitioanusua ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as to any finding or other matter in this report, or as to any product covered by the report. ANSI VT.PEIDTEo lSQ 1EC 17065 Prix/001C8400c0100.110dy 81000 Copyright © 20211CC Evaluation Service, LLC. All rights reserved. ES ICC-ES Evaluation Report ESR-2074 Reissued February 2021 This report is subject to renewal February 2023. www.icc-es.orq 1 (800) 423-6587 1 (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 08 00 00 —OPENINGS Section: 08 95 43--Vents/Foundation Flood Vents REPORT HOLDER: SMART VENT PRODUCTS, INC. EVALUATION SUBJECT: SMART VENT'° AUTOMATIC FOUNDATION FLOOD VENTS: MODELS #1540-520; #1540-521; #1540-510; #1540- 511; #1540.570; #1540-574; #1540-524; #1540514 FLOOD VENT SEALING KIT #1540526 1.0 EVALUATION SCOPE Compliance with the following codes: ▪ 2018, 2015, 2012, 2009 and 2006 International Building Code® (IBC) • 2018, 2015, 2012, 2009 and 2006 International Residential Code® (IRC) • 2018 International Energy Conservation Coda® (IECC) • 2013 Abu Dhabi International Building Code (ADIBC)t tike ADIBC is based on the 2009 IBC. 2009 IBC code sections referenced in this report are the same sections In the ADIBC. Properties evaluated: ▪ Physical operation • Water flow 2.0 USES The Smart Vent units are engineered mechanically operated flood vents (FVs) employed to equalize hydrostatic pressure on walls of enclosures subject to rising or falling flood waters. Certain models also allow natural ventilation. 3.0 DESCRIPTION 3.1 General: When subjected to rising water, the Smart Vente FVs internal floats are activated, then pivot open to allow flow in either direction to equalize water level and hydrostatic pressure from one side of the foundation to the other. The FV pivoting door is normally held in the closed position by a buoyant release device. When subjected to rising water, the buoyant release device causes the unit to unlatch, allowing the door to rotate out of the way and allow flow. The water level stabilizes, equalizing the lateral forces. Each unit is fabricated from stainless steel. Smart Vent° Automatic Foundation Flood Vents are available in various models and sizes as described in Table 1. The SmartVENTe Stacking Model #1540-511 and FloodVENTe Stacking Model #1540-521 units each contain two vertically arranged openings per unit. 3.2 Engineered Opening: The FVs comply with the design principle noted in Section 2.7.2.2 and Section 2.7.3 of ASCEISEI 24-14 [Section 2.6.2.2 of ASCEISEI 24-05 (2012, 2009, 2006 IBC and IRC)] for a maximum rate of rise and fall of 5.0 feet per hour (0.423 mm/s). in order to comply with the engineered opening requirement of ASCEJSEI 24, Smart Vent FVs must be installed in accordance with Section 4.0. 3.3 Ventilation: The SmartVENTe Model #1540-510 and SmartVENTe Overhead Door Model #1540-514 both have screen covers with 1/4 -inch -by -1/4 -inch (6.35 by 6.35 mm) openings, yielding 51 square inches (32 903 mm2) of net free area to supply natural ventilation. The SmartVENT® Stacking Model #1540-511 consists of two Model #1540-510 units in one assembly, and provides 102 square Inches (65 806 mm2) of net free area to supply natural ventilation. Other FVs recognized in this report do not offer natural ventilation. 3.4 Flood Vent Sealing Kit: The Flood Vent Sealing Kit Model #1540-526 is used with SmartVENTe Model #1540-520. It is a Womasote 440 Sound Barrier® (ESR-1374) insert with 21 — 2 -inch -by -2 - inch (51 mm x 51 mm) squares cut in it. See Figure 4. 4.0 DESIGN AND INSTALLATION 4.1 SmartVENTe and FloodVENTe: SmartVENT® and FloodVENTe are designed to be installed into walls or overhead doors of existing or new construction from the exterior side. Installation of the vents must be in accordance with the manufacturer's instructions, the applicable code and this report. Installation clips allow mounting in masonry and concrete walls of any thickness. In order to comply with the engineered opening design principle noted in Section 2.7.2.2 and 2.7.3 of ASCE/SEI 24-14 [Section 2.6.2.2 of ASCEISEI 24-05 (2012, 2009, 2006 IBC and IRC)], the Smart Vent® FVs must be installed as follows: • With a minimum of two openings on different sides of each enclosed area. ■ With a minimum of one FV for every 200 square ICC ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed as an endorsement of the subject of the report or a recommendation fbr its use There is no warranty by ICC Evaluation Service, LLC, express or implied. as to any fending or other matter in this report or as to any product covered by the report Copyright 2021 ICC Evaluation Service, LLC. All rights reserved. Mil la Page 1 of 5 ESR-2074 I Most Widely Accepted and Trusted Page 2 of 5 feet (18.6 m2) of enclosed area, except that the SmartVENT® Stacking Model #1540-511 and FloodVENT6 Stacking Model #1540-521 must be installed with a minimum of one FV for every 400 square feet (37.2 m2) of enclosed area. ■ Below the base flood elevation. In With the bottom of the FV located a maximum of 12 inches (305.4 mm) above the higher of the final grade or floor and finished exterior grade immediately under each opening. 4.2 Flood Vent Sealing Kit The Flood Vent Sealing Kit Model 1540-526 is used in conjunction with FloodVENTa Model #1540-520. When installed and tested in accordance with ASTM E283, the FV and Flood Vent Sealing Kit assembly have an alr leakage rata of less than 0.2 cubic feet per minute per lineal foot (18.56 1/min per lineal meter) at a pressure differential of 1 pound per square foot (50 Pa) based on 12.58 lineal feet (3.8 lineal meters) contained by the Flood Vent Sealing Kit. 5.0 CONDmONS OF USE The Smart Vents' FVs described in this report comply with, or are suitable alternatives to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 The Smart Vent® FVs must be installed in accordance with this report, the applicable code and the manufacturer's installation instructions. In the event of a conflict, the instructions in this report govern. 5.2 The Smart Vante FVs must not be used in the place of °breakaway walls" in coastal high hazard areas, but are permitted for use in conjunction with breakaway walls in other areas. 6.0 EVIDENCE SUBMITTED 6.1 Data in accordance with the ICC-ES Acceptance Criteria for Mechanically Operated Flood Vents (AC364), dated August 2015 (editorially revised October 2017). 6.2 Test report on air infiltration in accordance with ASTM E283. 7.0 IDENTIFICATION 7.1 The Smart VENT® models and the Flood Vent Seating Kit recognized in this report must be identified by a label bearing the manufacturer's name (Smartvent Products, Inc.), the model number, and the evaluation report number (ESR-2074). 7.2 The report holder's contact information is the following: SMART VENT PRODUCTS, INC. 430 ANDBRO DRIVE, UNIT 1 PITMAN, NEW JERSEY 08071 (877) 441-8368 www.smartvent.com info(E smartvent.cam TABLE 1 —MODEL SIZES MODEL NAME MODEL. NUMBER MODEL SIZE (In.) COVERAGE (sq. ft.) FloodVENT® 1540-520 153/4" X 73/4" 200 SmartVENT® 1540-510 153/4" X 73/4" 200 FloodVEN1'® Overhead Door 1540-524 153/4" X 73/4" 200 SmartVENT® Overhead Door 1540-514 153/4" X 73/4" 200 Wood Wall FloodVENT® 1540-570 14" X 8314" 200 Wood Wall FloodVENT'® Overhead Door 1540-574 14" X 83/4" 200 SmartVENT® Stacker 1540-511 16" X 16" 400 FloodVent® Stacker 1540-521 16" X 16" 400 For Si: 1 inch = 25.4 mm; 1 square foot = m2 1 MallaaSi7C.Jiiat•fliaa -.--3.s... u. 3....r.w. ■allaaaaaalfillfla v ftfa.- _.aMiMMeaa arlaa"a r.rau •�A4Afatl. IAN... aria AM a WOW ■allllalllaflf.laaAa....,..."a.arAUME M f M"ar aaaral 3lOUOR•MaaamffMallaaasaesueafavoa" -C� lWallaanaMM la"•-<ar.�...tgaQNYM Maaar:. milamra■ wa'.arm. -ltlaaan In��1 tlItl aatalaaaaaitiaar., .r 1 } .f9 . :'1 .. An. ms lll•fiflfaa"anutl"rUW•,, rr .. E"°a RMs aal"aa araaaa*■ UtlflR■S AW i11:aliaaiailfffi@r"^PP" -',--.•MMra""tlaa"n"°r""Mif ...Aim.- .Ia tla"raa"""ar■rrl■ . . D .0 Al J. 1 ACM MMa ■■ mama. caasA_�- FJGURE 1 —SMART VENT: MODEL 1540-510 ESR-2074 1 Most Widely Accepted and Trusted Page 3 of 5 FIGURE 2 —SMART VENT MODEL 1540-520 FIGURE 3 —SMART VENT: SHOWN WITH FLOOD DOOR PIVOTED OPEN FIGURE 4 —FLOOD VENT SEALING OUT ES 1CC-ES Evaluation Report ESR-2074 CBC and CRC Supplement Reissued February 2021 This report is subject to renewal February 2023. www.icc-es.orq 1 (800) 423.6587 1 (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 08 00 00 —OPENINGS Section: 08 86 43—Vents/Foundation Flood Vents REPORT HOLDER: SMART VENT PRODUCTS, INC. EVALUATION SUBJECT: SMART VENT* AUTOMATIC FOUNDATION FLOOD VENTS: MODELS #1540-520; #1540-521;41540-510; #1540-511; #1540- 570; #1540-574; #1540-524; #1540'514 FLOOD VENT SEALING KIT #1540.526 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indicate that Smart Vent° Automatic Foundation Flood Vents, described in ICC-ES evaluation report ESR-2074, have also been evaluated for compliance with codes noted below. Applicable code edition: ■ 2016 California Building Code (CBC) • 2016 California Residential Code (CRC) 2.0 CONCLUSIONS 2.1 CBC: The Smart Vent® Automatic Foundation Flood Vents, described in Sections 2.0 through 7.0 of the evaluation report ESR- 2074, comply with 2016 CBC Chapter 12, provided the design and installation are in accordance with the 2015 International Building Code* (IBC) provisions noted in the evaluation report and the additional requirements of CBC Chapters 12, 16 and 16A, as applicable. 2.2 CRC: The Smart Vent* Automatic Foundation Flood Vents, described in Sections 2.0 through 7.0 of the evaluation report ESR- 2074, comply with the 2016 CRC, provided the design and Installation are in accordance with the 2015 International Residential Code® (IRC) provisions noted in the evaluation report. This supplement expires concurrently with the evaluation report, reissued February 2021, ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied as to any finding or other matter in this repot; ores to any product covered by the report. Copyright @ 2021 ICC Evaluation Service, LLC. All rights reserved. tta ►ANS{ Page 4 of ES 1CC-ES Evaluation Report ESR-2074 FBC Supplement Reissued February 2021 This report is subject to renewal February 2023. www.icc-es.orq 1 (800) 423-6587 1 (562) 699.0543 A Subsidiary of the International Code Council® DIVISION: 08 00 00 —OPENINGS Section: 08 95 43—Vents/Foundation Flood Vents REPORT HOLDER: SMART VENT PRODUCTS, INC. EVALUATION SUBJECT: SMART VENT AUTOMATIC FOUNDATION FLOOD VENTS: MODELS #1540-520; #1540-521; #1540-510; #1540-511; #1540-570; #1540-574; #1540-524; #1540.514 FLOOD VENT SEALING KIT #1540.526 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indicate that Smart Vent° Automatic Foundation Flood Vents, described in ICC-ES evaluation report ESR-2074, have also been evaluated for compliance with the codes noted below. Applicable code editions: ▪ 2017 Florida Building Code —Building • 2017 Florida Building Code —Residential 2.0 CONCLUSIONS The Smart Vent® Automatic Foundation Flood Vents, described in Sections 2.0 through 7.0 of the evaluation report ESR-2074, comply with the Florida Building Code —Building and the FRC, provided the design and installation are in accordance with the 2015 International Building Code® provisions noted in the evaluation report. Use of the Smart Vent® Automatic Foundation Flood Vents has also been found to be in compliance with the High -Velocity Hurricane Zone provisions of the Florida Building Code —Building and the Florida Building Code —Residential . For products falling under Florida Rule 9N-3, verification that the report holder's quality assurance program is audited by a quality assurance entity approved by the Florida Building Commission for the type of inspections being conducted is the responsibility of an approved validation entity (or the code official when the report holder does riot possess an approval by the Commission). This supplement expires concurrently with the evaluation report, reissued February 2021. ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other earth' not specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its acs& There is no warranty by ICC Evaluation Service, LLC, express or implied as iw to any finding or other matter in this report or as to any pr odrect covered by the report Copyright 0 2021 ICC Evaluation Service, LLC. M rights reserved. Page 5of5 FEMA check list Building Permit Number ' I &6'' C Applicant's Name: our, A"ve,./ 4Q „I Owner's Name: jam(' Site Address, Tax#, Parcel#: Address: / 4 4crafriviece Telephone: Telephone: I. All development — Base Flood Elevation Data Provided: A. The as -built elevation certificate from a registered land surveyor or Professional engineer has been submitted? B. The lowest floor elevation is at or above the required lowest floor elevation? C. Electrical, heating, ventilation, plumbing, air conditioning equipment (including Duct work) and other service facilities are located above BFE or flood proofed? II. Development in Zone AE: A. Solid foundation perimeter walls located below BFE: 1. There are at least two (2) openings? 2. Square footage of enclosed area subject to flooding 3. Square inches of venting required 4. Square inches per opening (multiply 1 by w) 5. Number of required vents (3 above divided by 4 above) 6. Foundation contains the minimum number of vents? 7. The bottom of each opening is no higher than one (1) foot above grade? 8. Any cover on openings will permit the automatic flow of floodwaters in both directions? III. Development in Zones V, VE and V! -V30, VO (Coastal High Hazard Areas). A. Development location complies with all coastal setback requirements? B. Structure is securely anchored to pilings or columns and certification by a Registered, professional architect or engineer has been submitted? IYe or No or Noe cy- or No or No 6 10 or No 'e or No L'Y or No Yes or No Yes or No Reviewer's Name: Date reviewed: Local Administrator's Signature: City of Tybee Island 403 Butler Avenue-P.O. Box 2749 Tybee Island, Ga. 31328-2749 Date: 1``.2-Y `�