Loading...
HomeMy Public PortalAbout2014_05_13_O015 Land Development Fee Schedule Amendments for Stormwater -2- AN ORDINANCE: TO REVISE THE TOWN OF LEESBURG LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, AS AMENDED. Attachment "A" to the Town of Leesburg Land Development Review and Inspection Fee Schedule Stormwater Management Fees—Draft April 23, 2014 Stormwater Management Fees' INITIAL LAND-DISTURBING ACTIVITY: Total Fee Portion Paid to The following fees must be paid by the applicant to the Town prior to the DEQ2 issuance of the general permit defined in Town Code Section 14-19 and prior to the issuance of any grading,building,land-disturbing,or similar permit regulated in accordance with Town Code Section 14-23. When a site or sites has been purchased for development within a previously permitted common plan of development or sale,the applicant shall be subject to fees in accordance with the disturbed acreage of their site or sites. Persons whose coverage under the general permit has been revoked shall apply to the Virginia Department of Environmental Quality(DEQ)for an Individual Permit for Discharges of Stormwater from Construction Activities. General/Stormwater Management—Small Residential Activity(single family $209 $0 detached residential areas within or outside a common plan of development or sale,that is equal to or greater than one acre but less than five acres) General/Stormwater Management—Small Activity(areas within common plans $290 $81 of development or sale with land disturbance acreage less than 1 acre) ■ General/Stormwater Management—Small Activity(sites or areas within $2,700 $756 common plans of development or sale with land disturbance acreage equal or greater than 1 acre and less than 5 acres) General/Stormwater Management—Large Activity(sites or areas within $3,400 $952 common plans of development or sale with land disturbance acreage equal or greater than 5 acres and less than 10 acres) General/Stormwater Management—Large Activity(sites or areas within $4,500 $1,260 common plans of development or sale with land disturbance acreage equal or greater than 10 acres and less than 50 acres) General/Stormwater Management—Large Activity(sites or areas within $6,100 $1,708 common plans of development or sale with land disturbance acreage equal or greater than 50 acres and less than 100 acres) General/Stormwater Management—Large Activity(sites or areas within $9,600 $2,688 common plans of development or sale with land disturbance acreage equal or greater than 100 acres) -3- AN ORDINANCE: TO REVISE THE TOWN OF LEESBURG LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, AS AMENDED. MODIFICATIONS OR TRANSFERS: The following fees must be paid to the Town prior to the modification or transfer of general permit registration statements issued by the State Water Control Board. If the general permit modification results in changes to stormwater management plans that require additional review by the Town,such reviews shall be subject to the fee in this table. The fee assessed shall be based on the total disturbed acreage of the site. In addition to the modification fee,modifications resulting in an increase in total disturbed acreage shall pay the difference in the actual initial permit fee paid and the permit fee that would have been applied for the total disturbed acreage in accordance with initial land-disturbing activity table above. Fees shall not be assessed to the following: 1. Permittees who request minor modifications to general permits as defined in Town Code Section 14-19. Permit modifications at the request of the permittee resulting in changes to the stormwater management plan that require additional review by the director shall not be exempt. 2. Permittees whose general permits are modified or amended at the initiative of DEQ, excluding errors in the registration statement identified by the Town or errors related to the acreage of the site. General/Stormwater Management—Small Activity(areas within common plans $20 of development or sale with land disturbance acreage less than 1 acre) • General/Stormwater Management—Small Activity(sites or areas within $200 common plans of development or sale with land disturbance acreage equal or greater than 1 acre and less than 5 acres) General/Stormwater Management—Large Activity(sites or areas within $250 common plans of development or sale with land disturbance acreage equal or greater than 5 acres and less than 10 acres) General/Stormwater Management—Large Activity(sites or areas within $300 common plans of development or sale with land disturbance acreage equal or greater than 10 acres and less than 50 acres) General/Stormwater Management—Large Activity(sites or areas within $450 common plans of development or sale with land disturbance acreage equal or greater than 50 acres and less than 100 acres) { • General/Stormwater Management—Large Activity(sites or areas within $700 common plans of development or sale with land disturbance acreage equal or greater than 100 acres) PERMIT MAINTENANCE: General permit coverage maintenance fees shall be paid annually to the Town,by the anniversary date of general permit coverage. No permit will be reissued or automatically continued without payment of the required fee. General permit coverage maintenance fees shall be applied until the permit coverage is terminated. Permit maintenance fees shall apply to expired permits that have been administratively continued. General/Stormwater Management—Small Activity(areas within common plans $50 of development or sale with land disturbance acreage less than 1 acre) -4- AN ORDINANCE: TO REVISE THE TOWN OF LEESBURG LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, AS AMENDED. General/Stormwater Management—Small Activity(sites or areas within $400 common plans of development or sale with land disturbance acreage equal or greater than 1 acre and less than 5 acres) General/Stormwater Management—Large Activity(sites or areas within $500 common plans of development or sale with land disturbance acreage equal or greater than 5 acres and less than 10 acres) General/Stormwater Management—Large Activity(sites or areas within $650 j common plans of development or sale with land disturbance acreage equal or greater than 10 acres and less than 50 acres) General/Stormwater Management—Large Activity(sites or areas within $900 i common plans of development or sale with land disturbance acreage equal or greater than 50 acres and less than 100 acres) General/Stormwater Management—Large Activity(sites or areas within $1,400 common plans of development or sale with land disturbance acreage equal or greater than 100 acres) 'All incomplete payments will be deemed as nonpayments,and the applicant shall be notified of any incomplete payments. Interest shall be charged for late payments at the underpayment rate set forth in Code of Virginia§58.1- 15 and is calculated on a monthly basis at the applicable periodic rate. A 10%late payment fee shall be charged to any delinquent account,defined as over 90 days past due. The Town is entitled to all remedies under the Code of Virginia in collecting any past due amount. 2This is the portion of the total fee that is paid to the Virginia Department of Environmental Quality(DEQ). If the project is completely administered by DEQ such as may be the case for a state or federal project or projects covered by individual state permits,the entire applicant fee shall be paid to DEQ. SECTION II. The Town of Leesburg's Land Development Review and Inspection Fee Schedule(which modifies Site Plan Waiver Fees) shall become effective upon the date and at the time of its final passage. Attachment A to the Town of Leesburg's Land Development Review and Inspection Fee Schedule(which adds new Stormwater Management Fees) shall become effective July 1, 2014. SECTION III. If any provision of this Ordinance is declared invalid,the decision shall not affect the validity of the Ordinance as a whole or any remaining provisions of the Ordinance. -5- AN ORDINANCE: TO REVISE THE TOWN OF LEESBURG LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, AS AMENDED. PASSED this 13th day of May,2014. C. U tattd, Mayor Town of Leesburg ATTEST: 4 Clerk of Co P:\Ordinances\2014\0513 Land Development Fee Schedule amendment for Stormwater.doc The Town of Leesburg, Va irginia PRESENTED: May 13, 2014 ORDNANCE NO: 2014-0-015 ADOPTED: May 13, 2014 AN ORDINANCE: TO REVISE THE TOWN OF LEESBURG LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, AS AMENDED. The Town Council of the Town of Leesburg, Virginia, ordains: SECTION I. That THE TOWN OF LEESBURG'S LAND DEVELOPMENT REVIEW AND INSPECTION FEE SCHEDULE,November 30, 2010, be and the same hereby is amended to read as follows: Site-Ran-Waiver Site Plan Waiver $500.00 plus inspection costs for proposed public (Residential) improvements as noted below (up to 2 submissions) Type of Public Improvement Unit Rate Storm Sewer $4.00 per linear foot Water Main $1.90 per linear foot Curb&Gutter $1.25 per linear foot Sidewalk $1.50 per linear foot Sanitary Sewer $2.15 per linear foot Street $2.00 per linear foot Other Major Utility Facilities 1.5%of construction costs Site Plan Waiver $250.00 per each subsequent submission (Residential) (after second submission) Subsequent Submissions Site Plan Waiver $1,500.00 plus inspection costs for proposed public (Non-Residential) improvements as noted below (up to 2 submissions) Type of Public Improvement Unit Rate Storm Sewer $4.00 per linear foot Water Main $1.90 per linear foot Curb & Gutter $1.25 per linear foot Sidewalk $1.50 per linear foot Sanitary Sewer $2.15 per linear foot Street $2.00 per linear foot Other Major Facilities 1.5%of construction costs Site Plan Waiver $750.00 per each subsequent submission (Non-Residential) (after second submission) Subsequent Submissions Site Plan Waiver $500.00 (Non-residential) Si!!nature Sets