HomeMy Public PortalAbout15610 Scada System Upgrade (13467)ORDINANCE NO. 15610
AN ORDINANCE, appropriating Five Hundred Thousand Dollars ($500,000.00)
from the Sanitary Replacement Fund to be used for planning, design, and engineering during
construction phase services in Scada System Upgrade (13467) in various locations within the
District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 22010 with EMA, Inc. for
planning, design, and engineering during construction phase services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Five Hundred Thousand Dollars ($500,000.00) is hereby
appropriated from the Sanitary Replacement Fund to be used for planning, design, and engineering
during construction phase services in Scada System Upgrade (13467) in various locations within
the District.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22010
with EMA, Inc. for planning, design, and engineering during construction phase services in Scada
System Upgrade (13467) in various locations within the District; and said contract shall be
comprised of such other terms and conditions as are approved by the Office of the General Counsel
of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on February 11, 2021.