Loading...
HomeMy Public PortalAboutORD15418 BILL NO. 2015-25 SPONSORED BY COUNCILMAN Scrivner ORDINANCE NO. I 5 p- I D AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A $2,816,590.00 AGREEMENT WITH HUTCHINS TELECOM, LLC, FOR THE BASIN 12 RELIEF SEWER PROJECT. BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: WHEREAS, Hutchins Telecom, LLC, has become the apparent lowest and best bidder on the Basin 12 Relief Sewer project. NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The bid of Hutchins Telecom, LLC is declared to be the lowest and best bid and is hereby accepted. Section 2. The Mayor and City Clerk are hereby authorized to execute a $2,816,590.00 agreement with name for the Basin 12 Relief Sewer project. Section 3. The agreement shall be substantially the same in form and content as that agreement attached hereto as Exhibit A. Section 4. This Ordinance shall be in full force and effect from and after the date of its passage and approval. nn-_ . � � Passed: 94f,1td- 91 A,, ,,--- Approved: ICalh �/C,- ai, 2-0i5 0-10/1.A2 -T� ,= ear; (.� , Presiding Officer Mayor Carrie Tergin ATTEST:--, = APPROVED AS TO FORM: V. —[4--a--:-:--9, ,,,,, ,,i w CityCl rk -.. City Counselor . .... - FINANCE DEPARTMENT PURCHASING DIVISION SUBJECT: Bid 2810 — Project 31113 Basin 12 Relief Sewer Public Works, Engineering Division/Wastewater, Opened June 30, 2015 RECOMMENDATION: Staff recommends award of the base bid to the lowest and best bid meeting specifications, Hutchins Telecom, LLC of Shepardsville, Kentucky, in the amount of $2,816,590.00. BIDS RECEIVED: Hutchins Telecom, LLC, Shepardsville, KY $2,816,590.00 Lehman Construction, LLC, California, MO $3,393,003.00 The project was advertised in News Tribune, posted on the city web site, sent to seven plan rooms the City's construction vendor list. Five bidders picked up plans. FISCAL NOTE: 64-986-57950 Basin 12 Relief Sewers Wastewater Budget 2014-2015 $ 3,426,795.23 Expended 601,240.09 Encumbered 4,407.22 Bid 2730 2,816,590.00 Balance $ 4,557.92 PAST PERFORMANCE: Hutchins Telecom, LLC has been awarded projects in the past and has completed the work as specified and bid. ATTACHMENTS - SUPPORTING DOCUMENTATION Signature t��.qs) r Works Di -ctor to If9nl:FIl! • • glaJitliil, 11t1. Department of Public Works Memorandum 320 E. McCarty Street•Jefferson City, Missouri 65101 • P 573-634-6410• F 573-634-6562 •www.leffcitymo.orq Date: June 30, 2015 To: Terry Stephenson, Purchasing Director, Finance From: David Bange, City Engineer `✓ ` / Subject: Basin 12 Relief Sewer Project No. 31113 Bid No. 2810 Public Works has completed a review of the bids opened at 1:30 P.M. on June 30, 2015 for the above noted project. As part of the review all the bids were tabulated to check for math errors and to compare unit price quotes of the various contractors. It was determined that the base bid Would be accepted. Attached to this memo is the tabulation of the two (2) bids that were received for the project, as well as a listing of the registered plan holders. Based on our review, we recommend acceptance of the base bid from the low bidder, Hutchins Telecom, LLC, 1281 East Bluelick Road, Shepardsville KY 40165. The total amount of the contract will be $2,816,590. The project will be expensed as follows: Hutchins Telecom, LLC ($2,816,590): Account Number: Amount Available: - Required: Remaining: 64-986-579500 $2,821,147.92 $2,816,590 $4,557.92 If you need any other information please feel free to contact me at extension 6433. DB:db Attachments: Bid Tabulation Sheet, Plan Holders List cc: Project file Writer's file mgp9 A ho u b b�iGlur�.�! - o m M Msr ea - mm m °— o NI 1I[If'IJHUII $ x ` ga a aal ; §r 11 1 - l ge N E��_� ��� mT. a ;asap RM riI 911111 YjypyymL5pEI i (] R e2 m0 MR84N �i ZyZn39A3gAA 1111111! WR 3; � E'11ddtl��E5 1��3122ilZ111111 82N N mFrydr° AAAA 1L11 a N N3� Iligg .H Z r N N as �s a. z a a mo I I z Ua as g ? s �1I < N n N X11 Q !� y r �I CC T�I T�I mm��11 I N � y 'ryTC(NN ( Y ( C C T K� 41 V1 (7 NN y �1T T OOm.�TTTTTTy)yy (/�<(TTT(N N � y El 8- ; -- u gm u - - .. u mp8„-- 8 m ti m m 8 mm ed�sN�uuu- -BB�GY'm�' a S S x o W ti oo ae » ... rrr r• a im Mil; « s & ;3 - . as :ssss�= 6EEIIII r:ggx�= i' p m W g $ g 8 NJ;8So « 8 8 8 8 N N8 88 8 88 8 «. 88888W8=28=88158$ 888mmm88 im A pm. accql ii " ". 7 mg mae a t r i l l to 00 g oo ar E raemaaemmmc mEtaccEm go m "N 0 a s g g g m O g a Y; isss flEEEE ' �° 8 8 8 88883oo _8 25 `d 8 8 8 *In 88 88 8 88 8 wr x"8_88_81" - - =$. ��8_8_b” 814,181L r-N 15 ! '� m " T p rs „„sU r „E g& r «a s « „ ra-t r m NR 8 8 8 888888 8 8 8 8 8 8 88 88 8 88 8 88 8 88888888888 88888888 8m r a » tEEmta" t m r r a « r EE &E ; sg r ao sa #;"trcr r.«-.agssrtt ao g g g ggggagg g g g e E § EE EE g Eg E =g gg�ggggggsE§gEgsg 8 8 8 888888 '8 8 8 8 8 8 8 88 88 8 88 8 88 8 88888888888 88888888 8 p e c y „e" p „ m g~ r « « - rasp r g r g a g asgsgg g g s s s o 5i HAI; I; g ga 1 iaaa�ggggg@ .g E g§ gm ; 8 8 8 888888. 8 8 8 8 8 8 88 88 8 88 8 88 8 88888888888 8 88888 8 L @ 5a a »p ey Lm_E rc 4ar g fsyC� 4p- m r �6 prp SyC�QgQ ppQp ��"",,fyc� p tu.p, rR „ PRA p q p f2 a § S ggaigg 531 C C 8 g 6 6 EE Ca G SS g EF 8 g3“.gg'S'a Agg a 343gg5 any n 8 8 8 888888 PI 8 8 8 8 8 8 88 88 8 88 8 88 8 88888888888 8 88888 8 A-10 Exbavatnn and Disposal of Unsuitable Material CY 5 538.23 $181.13 5200.00 51,000.00 $27.00 $135001 and Inste/21'on of granular fie and oversized rock rn for trance base A-11 Excavation and Disposal of Unsuitable Maadal CY 5 $38.23 5181.13 150000 $2,503.00 $1500 $7500 end tcsla!atcn of granular NI and geoteNe for trench base A-12 Grout-50 and Abandon Existing 8-Inch Sander), CY 2 $181.13 5362.25 $30000 $600.00 $120.00 $24000 Sewer _ A-13 Remove Existing Sanitary Manhole EA 1 51.23750 51,207.50 $1500.00 $1590.00 $1000.00 51.000.00 TOTAL ALTERNATE A $100,222.50 $153,13000 $117,060.00 I ALTERNATE 8-BELMONTIKERMAC STORMWATER IMPROVEMENT 8-1 Traffic Control 15 2 53622. $726100 $14.522.00 13.000.00 58.000.00 8-2 Removals LS 1 $6.037. $38.305.00 138.30500 $25,000.00 525,000.00 8-3 Street Replacement(8'thick Concrete) 5Y - 600 539,847.5 $163.00 $97,80000 - 5-4 Type Inlet(8'x 4) EA 1 56,641.2 57261.00 $7,281.00 $4,200.00 54,200.00 0-5 Type C Inlet(6'a 41 EA 5 525,659. 58,900 00 534,500.00 54.000.00 $2000000 B6 Type A Inlet(8 x 4) EA 1 $4,630. 56.100.00 58.100.00 52,800.0 52,800.00 0-7 Junction Box(4'x 4) EA 2 $8,452. $5,660.00 511,320.00 51,878.00 53,75600 B8 Be on Existing Culvert EA 1 53,622. 56,530.03 58,53000 53,50000 $3,500.00 13-9 30bo RCP Class Ill or ADS N-I2 HP IS 97.09 19,965.0 $28300 527,47647 5125.00 $12136.25 8-ID 24'01a RCP Class Ill or ADS N-12 HP LF 399.55 537,631.62 5167.00 586,724.85 $113.00 $45.149.15 B-11 15'do RCP Coss 111 or ADS N-12 HP LF 159.49 $13,480.8 5138.00 122,009. .xx.,L;A5BD00 -118,427.47 8-12 Concrete Drtveway Repbcement 5Y 140 513,524. 579.00 $11060.00 $7500 $10,60000 B-13 Cub and Gutter Replacement LF 640 523,184. $66.00 542,240.03 535.00 $22,400.00 8-14 Pnoteon end Restentnn of Sae LS 1 m56,037. 523,000.00 523,000.00 610,0X.00 110,00000 TOTAL ALTERNATE B 1202,535.21 $406,543.14 $131,511.67 I Alternate B-Rejected Alternate A-Rejected Alternate B-Rejected TOTAL CONTRACT WITH ACCEPTED ALTERNATES 52,656,500.00 $2,816,510.00 $3,513,003.00 'The consutlaig Engineer's Opinion of Cost has been adjusted by 20.75%wNcr reflects a noted Increase in project costs In the aftermath of the bankruptcy of J.C.Industries. DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 320 EAST McCARTY STREET JEFFERSON CITY, MISSOURI 65101 ACCOUNT NO. Change Order No. Two (2) Project No. 31113 Ord. No. 15418 Date: Job & Location: BASIN 12 RELIEF SEWER Contractor: Hutchins Telecom, LLC It is hereby mutually agreed that when this change order has been signed by the contracting parties, the following described changes in the work required by the contract shall be executed by the contractor without changing the terms of the contract except as herein stipulated and agreed. DESCRIPTION OF CHANGES: Adjust Final, Quantities Note: Item numbers prefixed with "EW" (Extra Work) are new line items to the contract. Quantity in Revised Amount of Item Quantity in Change Contract Overrun or No. Description Unit Contract Order Quantity Unit Price Underrun 1 Mobilization, Demobilization, Bonding, LS 1 0.05917 1.05917 $120,000.00 $7,100.40 2 Traffic Control LS 1 0.027 1.027 $28,500.00 $769.50 3 Rock Excavation (estimated quantity) CY 225 -160 65 $190.00 ($30,400.00) 4 Concrete Sidewalk Replacement SF 250 835.5 1085.5 $32.00 $26,736.00 5 Concrete Driveway Replacement SF 145 66.5 211.5 $41.00 $2,726.50 6 Curb and Gutter Replacement LF 175 299 474 $146.00 $43,654.00 7 Asphalt Roadway Replacement SY 390 1019 1409 $60.00 $61,140.00 8 Asphalt Roadway Concrete Patch SY 820 -578 242 $172.00 ($99,416.00) 14 4 -inch PVC sanitary sewer service lateral LF 85 184 269 $130.00 $23,920.00 15 8 -inch PVC sanitary sewer LF 626 -7.24 618.76 $130.00 ($941.20) 25 21" PVC Sanitary Sewer in 36" Steel LF 213 10 223 $1,550.00 $15,500.00 26 Sanitary Sewer Pipe Encasement LF 43 6 49 $150.00 $900.00 27 48" Diameter Precast Concrete Sanitary VF 423 1.51 424.51 $492.00 $742.92 28 48" Diameter Precast Concrete Sanitary EA 2 1 3 $8,000.00 $8,000.00 31 Topsoil, Fertilizer,Seed, Mulch and Initial AC 4.67 0.22 4.89 $18,500.00 $4,070.00 33 Temporary Erosion Control (Silt Fencing, LS 1 -0.15 0.85 $50,000.00 ($7,500.00) 34 Protection and Restoration of Site LS 1 0.09375 1.09375 $48,000.00 $4,500.00 35 Excavation and Disposal of Unsuitable CY 100 -100 0 $160.00 ($16,000.00) 36 Excavation and Disposal of Unsuitable LF 50 -50 0 $380.00 ($19,000.00) 38 Grout -fill and Abandon Existing 10 -inch CY 9 1 10 $223.00 $223.00 40 Grout -fill and Abandon Existing Sanitary EA 10 -1 9 $1,650.00 ($1,650.00) 41 Rip Rap SY 100 408 508 $95.00 $38,760.00 EW -1 8 -inch PVC sanitary sewer LF 494 4 498 $100.00 $400.00 EW -3 Asphalt Roadway Cone Patch SY 390 525 915 $30.00 $15,750.00 CONTRACTORS PROPOSAL FOR THE ABOVE DESCRIBED CHANGES: 1/We hereby agree to the modifications of the contract as described above and agree to furnish all materials and labor and perform all work in connection therewith in accordance with the requirements for similar work in existing contract except as otherwise stipulated herein, for the following considerations: Contract Amount - Add $79,985.12 (Seventy Nine Thousand Nine Hundred Eighty Five Dollars and Twelve Cents) to the Contract Amount Contract Time - There is no change to the Contract Time STATEMENT OF CONTRACT AMOUNT: ORIGINAL CONTRACT Amount $2,816,590.00 % Change Time 270 PREVIOUS APPROVED CHANGE ORDERS 459,068.00 -2.1% 0 TOTAL THIS CHANGE ORDER TOTAL OF ALL CHANGE ORDERS CONTRACT AMOUNT TO DATE Hutchins Telecom, LLC Recommended by: Verification of Encumbrance: Accepted by: Approved as to Form: $79,985.12 $20,917.12 2.8% 0 0.7% 0 Con ractor City Engirleer $2,837,507.12 270 Finance birector 1 41 Owner - City Administrator / M S/8 Date Date bate