Loading...
HomeMy Public PortalAboutLockport Street Sidewalk Addendum #3-FinalRETURN WITH BID Printed 5/7/2020 Page 2 of 7 BLR 12200 (01/08/14) NOTICE TO BIDDERS County Will Local Public Agency Plainfield Section Number N/A Route 126 Sealed proposals for the improvement described below will be received at the office of The Village Clerk of Plainfield, 24401 West Lockport Street, Plainfield, IL 60544 until 10:00 a.m. on May 19, 2020 Address Time Date Sealed proposals will be opened and read publicly at the office of The Village Clerk of Plainfield 24401 West Lockport Street, Plainfield, IL 60544 at 10:00 a.m. on May 19, 2020 Address Time Date DESCRIPTION OF WORK Name Lockport Street and Indian Boundary Road DCEO Sidewalk Length: 3300 feet ( 0.63 miles) Location Lockport Street from Meadow Lane to Wallin Drive and along Indian Boundary Road to existing sidewalk. Proposed Improvement Sidewalk will be installed along south right-of-way of Lockport Street and Indian Boundary Road. Existing curb and gutter at Indian Boundary Road will be modified in accordance with ADA Standards. 1. Plans and proposal forms will be available to prospective bidders by contacting the Village of Plainfield (815) 436-3577 (contact Arlan Schattke or Scott Threewitt) for access information to QuestCDN. Prospective bidders must download the plans and proposal forms from the www.QuestCDN.com website for a nonrefundable fee to be considered an eligible bidder. Quest Project #6962011, www.QuestCDN.com may also be contacted at (952) 233-1632. Contractors must be IDOT prequalified to bid on this project. Address 2. Prequalification If checked, the 2 low bidders must file within 24 hours after the letting an “Affidavit of Availability” (Form BC 57), in duplicate, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work. One original shall be filed with the Awarding Authority and one original with the IDOT District Office. 3. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals. 4. The following BLR Forms shall be returned by the bidder to the Awarding Authority: a. BLR 12200: Local Public Agency Formal Contract Proposal b. BLR 12200a Schedule of Prices c. BLR 12230: Proposal Bid Bond (if applicable) 5. The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed and accepted or materials furnished according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided. 6. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in depth examination. The Awarding Authority will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. 7. The bidder shall take no advantage of any error or omission in the proposal and advertised contract. The Village of Plainfield will receive and accept bids ONLY through QuestCDN.com via their electronic VirtuBid online bid service. The Village of Plainfield will receive electronic bids online until 10:00 AM on May 19th, 2020. There will be a non-refundable fee for submitting a bid. See Section 1. below for QuestCDN project number and visit the QuestCDN website (www.questcdn.com) for access. RETURN WITH BID Printed 5/7/2020 Page 4 of 7 BLR 12200 (01/08/14) PROPOSAL County Will Local Public Agency Planfield Section Number N/A Route 126 1. Proposal of for the improvement of the above section by the construction of sidewalk installation at Lockport Street from Meadow Lane to Wallin Drive and along Indian Boundary Road to the existing sidewalk. a total distance of 3,300 feet, of which a distance of 3,300 feet, ( 0.63 miles) are to be improved. 2. The plans for the proposed work are those prepared by Strand Associates, Inc® and approved by the Village of Plainfield on April 2, 2020 3. The specifications referred to herein are those prepared by the Department of Transportation and designated as “Standard Specifications for Road and Bridge Construction” and the “Supplemental Specifications and Recurring Special Provisions” thereto, adopted and in effect on the date of invitation for bids. 4. The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the “Check Sheet for Recurring Special Provisions” contained in this proposal. 5. The undersigned agrees to complete the work by 7:30 p.m. on August 7, 2020 unless additional time is granted in accordance with the specifications. 6. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals, will be required. Bid Bonds will be allowed as a proposal guaranty. Accompanying this proposal is either a bid bond if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the specifications, made payable to: Village Treasurer of Plainfield The amount of the check is 5% of the bid amount ( ). 7. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full amount of the award. When a contract bond is not required, the proposal guaranty check will be held in lieu thereof. If this proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed that the Bid Bond or check shall be forfeited to the Awarding Authority. 8. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price. 9. A bid will be declared unacceptable if neither a unit price nor a total price is shown. 10. The undersigned submits herewith the schedule of prices on BLR 12200a covering the work to be performed under this contract. 11. The undersigned further agrees that if awarded the contract for the sections contained in the combinations on BLR 12200a, the work shall be in accordance with the requirements of each individual proposal for the multiple bid specified in the Schedule for Multiple Bids below. RETURN WITH BID County Local Public Agency Section Route $ Item No.Items Unit Quantity Total 1 TREE REMOVAL (6 TO 15 UNITS DIAMETER) UNIT 120 2 TREE REMOVAL (OVER 15 UNITS DIAMETER) UNIT 80 3 TREE ROOT PRUNING LSUM 1 4 TREE PRUNING LSUM 1 5 EXPLORATORY EXCAVATION EACH 2 6 EARTH EXCAVATION CU YD 655 7 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 300 8 TRENCH BACKFILL CU YD 15 9 RESTORATION - SEED LSUM 1 10 TREE, ACER X FREEMANII AUTUMN BLAZE (AUTUMN BLAZE FREEMAN MAPLE), 2" CALIPER, BALLED AND BURLAPPED EACH 9 11 TEMPORARY EROSION & SEDIMENT CONTROL LSUM 1 12 PERIMETER EROSION BARRIER FOOT 2,500 13 SUBBASE GRANULAR MATERIAL, TYPE B CU YD 300 14 SUBBASE GRANULAR MATERIAL, TYPE B 4" SQ YD 1,850 15 AGGREGATE SURFACE COURSE, TYPE B CU YD 15 16 HOT-MIX ASPHALT BASE COURSE, 8" SQ YD 136 17 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 15 18 PORTLAND CEMENT CONCRETE SIDEWALK 5-INCH SQ FT 16,500 19 PORTLAND CEMENT CONCRETE SIDEWALK 8-INCH SQ FT 150 20 DETECTABLE WARNINGS SQ FT 40 21 DRIVEWAY PAVEMENT REMOVAL SQ YD 26 22 COMBINATION CURB AND GUTTER REMOVAL FOOT 44 23 SIDEWALK REMOVAL SQ FT 51 24 TEMPORARY ACCESS (COMMERCIAL ENTRANCE) EACH 1 25 HOT-MIX ASPHALT REPLACEMENT OVER PATCHES TON 2 26 CLASS D PATCHES, TYPE I, 4 INCH SY YD 10 27 PIPE CULVERT REMOVAL FOOT 35 28 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 10" EACH 1 29 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12" EACH 2 30 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15" EACH 2 31 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24" EACH 2 32 CONCRETE END SECTION, STANDARD 542001, 24" 1:4 EACH 1 33 PIPE CULVERTS, CLASS A, TYPE 1 15" FOOT 31 34 PIPE CULVERTS, CLASS A, TYPE 1 24" FOOT 46 35 STORM SEWERS, RUBBER GASKET, CLASS A, TYPE 1 12" FOOT 45 36 PIPE UNDERDRAIN REMOVAL (SPECIAL) FOOT 31 37 REMOVE CONCRETE HEADWALLS FOR PIPE DRAINS EACH 5 38 CONCRETE HEADWALLS FOR PIPE DRAINS EACH 6 39 PIPE UNDERDRAINS 4" (SPECIAL) FOOT 65 40 PIPE UNDERDRAINS 10" (SPECIAL) FOOT 10 41 CONNECTION TO EXISTING PIPE UNDERDRAINS EACH 5 42 PIPE CAP GRATE 4" EACH 1 43 CATCH BASINS, TYPE C, TYPE 8 GRATE EACH 2 44 COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 FOOT 44 45 MOBILIZATION LSUM 1 46 TRAFFIC CONTROL & PROTECTION (SPECIAL) LSUM 1 47 RELOCATE SIGN ASSEMBLY - TYPE A EACH 1 48 RELOCATE SIGN PANEL - TYPE 1 SQ FT 9 49 THERMOPLASTIC PAVEMENT MARKING - LINE 6" FOOT 145 50 THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 25 51 REMOVE EXISTING FLARED END SECTION EACH 5 52 CONSTRUCTION LAYOUT LSUM 1 53 DRAINAGE UTILITY STRUCTURES TO BE ADJUSTED (SPECIAL) EACH 3 54 IDOT UTILITY PERMIT BOND LSUM 1 $10,000.00 55 CONTINGENCY ALLOWANCE LSUM 1 $10,000.00 A bid will be declared unacceptable if neither a unit price nor total price is shown. Will (For complete information covering these items, see plans and specifications) SCHEDULE OF PRICES N/A Plainfield Unit Price 126 $10,000.00 $10,000.00 Bidder's Proposal for making Entire Improvements Schedule for Single Bid Printed 5/7/2020 Page 5 of 7 BLR 12200a (Rev. 01/24/19) Contractor to complete online electronic bid form. Lockport St. and Indian Boundary Road DCEO Sidewalk Improvements Village of Plainfield Contract Number: 1-2020 Will County 5 COMPLETION DATE PLUS WORKING DAYS Revise Article 108.05 (b) of the Standard Specifications as follows: "When a completion date plus working days is specified, the Contractor shall complete all contract items and safely open all roadways to traffic by 7:30 P.M. on July 17, 2020, except as specified herein. The Contractor will be allowed to complete all clean-up work and punch list items within 5 working days after the completion date for opening the sidewalk and roadway to traffic. Under extenuating circumstances, the Engineer may direct that certain items of work, not affecting the safe opening of the roadway to traffic, may be completed within the working days allowed for clean-up work and punch list items. Temporary lane closures for this work may be allowed at the discretion of the Engineer. Article 108.09 or the Special Provision for “Failure to Complete the Work on Time”, if included in this contract, shall apply to both the completion date and the number of working days. PUBLIC CONVENIENCE AND SAFETY (DISTRICT 1) Effective: May 1, 2012 Revised: July 15, 2012 Add the following to the end of the fourth paragraph of Article 107.09: “If the holiday is on a Saturday or Sunday, and is legally observed on a Friday or Monday, the length of Holiday Period for Monday or Friday shall apply.” Add the following sentence after the Holiday Period table in the fourth paragraph of Article 107.09: “The Length of Holiday Period for Thanksgiving shall be from 5:00 AM the Wednesday prior to 11:59 PM the Sunday After” Delete the fifth paragraph of Article 107.09 of the Standard Specifications: “On weekends, excluding holidays, roadways with Average Daily Traffic of 25,000 or greater, all lanes shall be open to traffic from 3:00 P.M. Friday to midnight Sunday except where structure construction or major rehabilitation makes it impractical.” MAINTENANCE OF ROADWAYS Effective: September 30, 1985 Revised: November 1, 1996 Beginning on the date that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all repair work deemed necessary by the Engineer but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Engineer. 31, BDE SPECIAL PROVISIONS For the April 24, 2020 and June 12, 2020 Lettings The following special provisions indicated by a “check mark” are applicable to this contract and will be included by the Project Coordination and Implementation Section of the BD&E. An * indicates a new or revised special provision for the letting. File Name # Special Provision Title Effective Revised * 80099 1 Accessible Pedestrian Signals (APS) April 1, 2003 April 1, 2020 80274 2 Aggregate Subgrade Improvement April 1, 2012 April 1, 2016 80192 3 Automated Flagger Assistance Device Jan. 1, 2008 80173 4 Bituminous Materials Cost Adjustments Nov. 2, 2006 Aug. 1, 2017 80426 5 Bituminous Surface Treatment with Fog Seal Jan. 1, 2020 80241 6 Bridge Demolition Debris July 1, 2009 5026I 7 Building Removal-Case I (Non-Friable and Friable Asbestos) Sept. 1, 1990 April 1, 2010 5048I 8 Building Removal-Case II (Non-Friable Asbestos) Sept. 1, 1990 April 1, 2010 5049I 9 Building Removal-Case III (Friable Asbestos) Sept. 1, 1990 April 1, 2010 5053I 10 Building Removal-Case IV (No Asbestos) Sept. 1, 1990 April 1, 2010 80425 11 Cape Seal Jan. 1, 2020 80384 12 Compensable Delay Costs June 2, 2017 April 1, 2019 80198 13 Completion Date (via calendar days) April 1, 2008 80199 14 Completion Date (via calendar days) Plus Working Days April 1, 2008 80293 15 Concrete Box Culverts with Skews > 30 Degrees and April 1, 2012 July 1, 2016 Design Fills ≤ 5 Feet 80311 16 Concrete End Sections for Pipe Culverts Jan. 1, 2013 April 1, 2016 80277 17 Concrete Mix Design – Department Provided Jan. 1, 2012 April 1, 2016 80261 18 Construction Air Quality – Diesel Retrofit June 1, 2010 Nov. 1, 2014 80387 19 Contrast Preformed Plastic Pavement Marking Nov. 1, 2017 80029 20 Disadvantaged Business Enterprise Participation Sept. 1, 2000 March 2, 2019 80402 21 Disposal Fees Nov. 1, 2018 80378 22 Dowel Bar Inserter Jan. 1, 2017 Jan. 1, 2018 80405 23 Elastomeric Bearings Jan. 1, 2019 80421 24 Electric Service Installation Jan. 1, 2020 80415 25 Emulsified Asphalts Aug. 1, 2019 80423 26 Engineer’s Field Office and Laboratory Jan. 1, 2020 80388 27 Equipment Parking and Storage Nov. 1, 2017 80229 28 Fuel Cost Adjustment April 1, 2009 Aug. 1, 2017 80417 29 Geotechnical Fabric for Pipe Underdrains and French Drains Nov. 1, 2019 80420 30 Geotextile Retaining Walls Nov. 1, 2019 80304 31 Grooving for Recessed Pavement Markings Nov. 1, 2012 Nov. 1, 2017 80422 32 High Tension Cable Median Barrier Reflectors Jan. 1, 2020 80416 33 Hot-Mix Asphalt – Binder and Surface Course July 2, 2019 Nov. 1, 2019 80398 34 Hot-Mix Asphalt – Longitudinal Joint Sealant Aug. 1, 2018 Nov. 1, 2019 * 80406 35 Hot-Mix Asphalt – Mixture Design Verification and Production Jan. 1, 2019 Jan. 2, 2020 (Modified for I-FIT Data Collection) 80347 36 Hot-Mix Asphalt – Pay for Performance Using Percent Nov. 1, 2014 July 2, 2019 Within Limits – Jobsite Sampling 80383 37 Hot-Mix Asphalt – Quality Control for Performance April 1, 2017 July 2, 2019 80411 38 Luminaires, LED April 1, 2019 80393 39 Manholes, Valve Vaults, and Flat Slab Tops Jan. 1, 2018 March 1, 2019 80045 40 Material Transfer Device June 15, 1999 Aug. 1, 2014 80418 41 Mechanically Stabilized Earth Retaining Walls Nov. 1, 2019 80424 42 Micro-Surfacing and Slurry Sealing Jan. 1, 2020 * 80428 43 Mobilization April 1, 2020 80165 44 Moisture Cured Urethane Paint System Nov. 1, 2006 Jan. 1, 2010 80412 45 Obstruction Warning Luminaires, LED Aug. 1, 2019 80349 46 Pavement Marking Blackout Tape Nov. 1, 2014 April 1, 2016 CONCRETE END SECTIONS FOR PIPE CULVERTS (BDE) Effective: January 1, 2013 Revised: April 1, 2016 Description. This work shall consist of constructing cast-in-place concrete and precast concrete end sections for pipe culverts. These end sections are shown on the plans as Highway Standard 542001 or 542011. This work shall be according to Section 542 of the Standard Specifications except as modified herein. Materials. Materials shall be according to the following Articles of Division 1000 – Materials of the Standard Specifications. Item Article/Section (a) Portland Cement Concrete (Note 1) ........................................................................... 1020 (b) Precast Concrete End Sections (Note 2) (c) Coarse Aggregate (Note 3) ................................................................................... 1004.05 (d) Structural Steel (Note 4) ........................................................................................ 1006.04 (e) Anchor Bolts and Rods (Note 5) ........................................................................... 1006.09 (f) Reinforcement Bars .......................................................................................... 1006.10(a) (g) Nonshrink Grout .................................................................................................... 1024.02 (h) Chemical Adhesive Resin System ............................................................................. 1027 (i) Mastic Joint Sealer for Pipe ....................................................................................... 1055 (j) Hand Hole Plugs ................................................................................................... 1042.16 Note 1. Cast-in-place concrete end sections shall be Class SI, except the 14 day mix design shall have a compressive strength of 5000 psi (34,500 kPa) or a flexural strength of (800 psi) 5500 kPa and a minimum cement factor of 6.65 cwt/cu yd (395 kg/cu m). Note 2. Precast concrete end sections shall be according to Articles 1042.02 and 1042.03(b)(c)(d)(e) of the Standard Specifications. The concrete shall be Class PC according to Section 1020, and shall have a minimum compressive strength of 5000 psi (34,000 kPa) at 28 days. Joints between precast sections shall be produced with reinforced tongue and groove ends according to the requirements of ASTM C 1577. Note 3. The granular bedding placed below a precast concrete end section shall be gradation CA 6, CA 9, CA 10, CA 12, CA 17, CA 18, or CA 19. Note 4. All components of the culvert tie detail shall be galvanized according to the requirements of AASHTO M 111 or M 232 as applicable. Note 5. The anchor rods for the culvert ties shall be according to the requirements of ASTM F 1554, Grade 105 (Grade 725). CONSTRUCTION REQUIREMENTS The concrete end sections may be precast or cast-in-place construction. Toe walls shall be either precast or cast-in-place, and shall be in proper position and backfilled according to the applicable paragraphs of Article 502.10 of the Standard Specifications prior to the installation of the concrete end sections. If soil conditions permit, cast-in-place toe walls may be poured directly against the soil. When poured directly against the soil, the clear cover of the sides and bottom of the toe wall shall be increased to 3 in. (75 mm) by increasing the thickness of the toe wall. (a) Cast-In-Place Concrete End Sections. Cast-in-place concrete end sections shall be constructed according to the requirements of Section 503 of the Standard Specifications and as shown on the plans. (b) Precast Concrete End Sections. When the concrete end sections will be precast, shop drawings detailing the slab thickness and reinforcement layout shall be submitted to the Engineer for review and approval. The excavation and backfilling for precast concrete end sections shall be according to the requirements of Section 502 of the Standard Specifications, except a layer of granular bedding at least 6 in. (150 mm) in thickness shall be placed below the elevation of the bottom of the end section. The granular bedding shall extend a minimum of 2 ft (600 mm) beyond each side of the end section. Anchor rods connecting precast sections shall be brought to a snug tight condition followed by an additional 2/3 turn on one of the nuts. Match marks shall be provided on the bolt and nut to verify relative rotation between the bolt and the nut. When individual, precast end sections are placed side-by-side for a multi-pipe culvert installation, a 3 in. (75 mm) space shall be left between adjacent end section walls and the space(s) filled with Class SI concrete. Method of Measurement. This work will be measured for payment as each, with each end of each culvert being one each. Basis of Payment. This work will be paid for at the contract unit price per each for CONCRETE END SECTION, STANDARD 542001 or CONCRETE END SECTION, 542011, of the pipe diameter and slope specified. 80311 Printed 5/11/2020 Page 1 of 2 BLR 12325 (Rev. 4/07) Apprenticeship or Training Program Certification Route Lockport Street Sidewalk DCEO Return with Bid County Will Local Agency Village of Plainfield Section NA All contractors are required to complete the following certification: For this contract proposal or for all groups in this deliver and install proposal. For the following deliver and install groups in this material proposal: Illinois Department of Transportation policy, adopted in accordance with the provisions of the Illinois Highway Code, requires this contract to be awarded to the lowest responsive and responsible bidder. The award decision is subject to approval by the Department. In addition to all other responsibility factors, this contract or deliver and install proposal requires all bidders and all bidders’ subcontractors to disclose participation in apprenticeship or training programs that are (1) approved by and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders are required to complete the following certification: I. Except as provided in paragraph IV below, the undersigned bidder certifies that it is a participant, either as an individual or as part of a group program, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with its own employees. II. The undersigned bidder further certifies for work to be performed by subcontract that each of its subcontractors submitted for approval either (A) is, at the time of such bid, participating in an approved, applicable apprenticeship or training program; or (B) will, prior to commencement of performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the work of the subcontract. III. The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program sponsor holding the Certificate of Registration for all of the types of work or crafts in which the bidder is a participant and that will be performed with the bidder’s employees. Types of work or craft that will be subcontracted shall be included and listed as subcontract work. The list shall also indicate any type of work or craft job category for which there is no applicable apprenticeship or training program available. Printed 5/11/2020 Page 2 of 2 BLR 12325 (Rev. 4/07) IV. Except for any work identified above, any bidder or subcontractor that shall perform all or part of the work of the contract or deliver and install proposal solely by individual owners, partners or members and not by employees to whom the payment of prevailing rates of wages would be required, check the following box, and identify the owner/operator workforce and positions of ownership. The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification provision to be included in all approved subcontracts. The bidder is responsible for making a complete report and shall make certain that each type of work or craft job category that will be utilized on the project is accounted for and listed. The Department at any time before or after award may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of Labor evidencing such participation by the contractor and any or all of its subcontractors. In order to fulfill the participation requirement, it shall not be necessary that any applicable program sponsor be currently taking or that it will take applications for apprenticeship, training or employment during the performance of the work of this contract or deliver and install proposal. Bidder: By: (Signature) Address: Title: RETURN WITH BID Printed 5/11/2020 BLR 12326 (01/08/14) Affidavit of Illinois Business Office County Will Local Public Agency Village of Plainfield Section Number NA Route Lockport Street Sidewalk (DCEO) State of ) ) ss. County of ) I, of , , (Name of Affiant) (City of Affiant) (State of Affiant being first duly sworn upon oath, states as follows: 1. That I am the of . officer or position bidder 2. That I have personal knowledge of the facts herein stated. 3. That, if selected under this proposal, , will maintain a (bidder) business office in the State of Illinois which will be located in County, Illinois. 4. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by this proposal. 5. That this Affidavit is given as a requirement of state law as provided in Section 30-22(8) of the Illinois Procurement Code. (Signature) (Print Name of Affiant) This instrument was acknowledged before me on day of , . (SEAL) (Signature of Notary Public) LOCKPORT STREET SIDEWALK IMPROVEMENTSINDEX OF SHEETS, GENERAL NOTES,AND HIGHWAY STANDARDSIDOT DISTRICT ONE STANDARDS HIGHWAY STANDARDS TC13.DGN BD24.DGN BD07.DGN BD01.DGN 04/12/2016 12/15/2009 06/12/1996 09/06/2011 GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. DISTRICT ONE TYPICAL PAVEMENT MARKINSG CURB OR CURB AND GUTTER REMOVAL AND REPLACEMENT STORM SEWER CONNECTION TO EXISTING SEWER OF SHOULDER GREATER OR EQUAL TO 15' (4.5m) DRIVEWAY DETAIL - DISTANCE BETWEEN R.O.W. AND FACE OF CURB & EDGE LEGEND EXISTING STORM SEWER EXISTING CABLE TELEVISION EXISTING FIBER OPTIC EXISTING RIGHT OF WAY EXISTING GAS MAIN EXISTING FENCE EXISTING WATER MAIN EXISTING TELEPHONE EXISTING OVERHEAD AERIAL EXISTING FIRE HYDRANT EXISTING UTILITY POLE PROPOSED PIPE UNDERDRAIN EXISTING TREE EXISTING SHRUB EXISTING LIGHT POLE EXISTING MANHOLE EXISTING SIGN PROPOSED EROSION CONTROL EXISTING SANITARY SEWER FLARED END SECTION TREE OR SHRUB REMOVAL EXISTING UNDERGROUND ELECTRIC T SIDWALK REMOVAL/DRIVEWAY PAVEMENT REMOVAL PROPOSED STORM SEWER EXISTING PIPE CULVERT PROPOSED PIPE CULVERT PROPOSED CONCRETE HEADWALLS OR PIPE DRAINS GRADING PROPOSED PAVEMENT MARKING EXISTING EASEMENT PROPOSED EASEMENT INLET AND PIPE PROTECTION OR INLET FILTERS TEMPORARY DITCH CHECK 2 HOT-MIX ASPHALT MIXTURE REQUIREMENTS MIXTURE TYPE @ Ndes AIR VOIDS 4% @ 50 GYR. 4% @ 70 GYR. 4% @ 50 GYR.HOT-MIX ASPHALT BASE COURSE (HMA BINDER IL-19.0); 8" COMMERCIAL ENTRANCES FOR USE OF RECYCLED MATERIALS SEE SPECIAL PROVISIONS. PROVISIONS.DISTRICT I SPECIAL PROVISIONS. FOR HMA FULL DEPTH "AC TYPE" SEE SPECIALNON-POLYMERIZED HMA THE "AC TYPE" SHALL BE "PG 64-22" UNLESS MODIFIED BYTHE "AC TYPE" FOR POLYMERIZED HMA MIXES SHALL BE "SBS/SBR PG 76-22" AND FOR THE UNIT WEIGHT USED TO CALCULATE HOT-MIX ASPHALT MIXTURES IS 112 LBS/SQ YD/IN. 4% @ 70 GYR. HOT-MIX ASPHALT SURFACE COURSE, MIX "D", IL-9.5, N70; 2" CLASS D PATCH (HMA BINDER IL 19MM); 4" NOTES: CLASS D PATCHING, 6-INCH MATERIAL SHALL BE PAID FOR AS SUBBASE GRANULAR MATERIAL, TYPE B PER CUBIC YARD. SHALL BE PAID FOR AS REMOVAL AND DISPSOAL OF UNSUITABLE MATERIALS. REPLACEMENT CONSTRUCTING SUBBASE GRANULAR MATERIAL, TYPE B. IF UNDERCUT IS NECESSARY, IT SUBGRADE SHALL BE PROOF ROLLED IN THE PRESENCE OF ENGINEER PRIOR TO FOR USE OF RECYCLED MATERIALS SEE SPECIAL PROVISIONS. PROVISIONS. DISTRICT I SPECIAL PROVISIONS. FOR HMA FULL DEPTH "AC TYPE" SEE SPECIAL NON-POLYMERIZED HMA THE "AC TYPE" SHALL BE "PG 64-22" UNLESS MODIFIED BY THE "AC TYPE" FOR POLYMERIZED HMA MIXES SHALL BE "SBS/SBR PG 76-22" AND FOR THE UNIT WEIGHT USED TO CALCULATE HOT-MIX ASPHALT MIXTURES IS 112 LBS/SQ YD/IN. 4. 3. 2. 1. HOT-MIX ASPHALT SURFACE COURSE, MIX D, IL-9.5, N50; 2" PROPOSED SIGN / RELOCATED SIGN TRANSVERSE CONTRACTION JOINTS SHALL BE PLACED EVERY 5-FEET. " SHALL BE PLACED EVERY 50 FEET OR AS DETERMINED BY THE ENGINEER. 4 3EXPANSION JOINTS OR AS DETAILED ON THE PLANS. TRANSVERSE 8-INCHES 3ADDENDUM #34/30/20LAYOUT. THIS WORK SHALL BE INCLUDED IN THE COST OF CONSTRUCTION THE RIGHT TO MAKE REVISIONS TO THE SIDEWALK PLAN LOCATION. LOCATION FOR VILLAGE REVIEW PRIOR TO EXCAVATING. VILLAGE HAS CONTRACTOR SHALL PROVIDE LAYOUT OF PROPOSED SIDEWALK 18. 729001-01 728001-01 720006-04 720001-01 701901-08 701801-06 701701-10 701606-10 701601-09 701311-03 701306-04 701301-04 701011-04 701006-05 701001-02 606001-07 604036-03 602011-02 601001-05 542301-03 542001-06 442201-03 424001-11 280001-07 000001-07 APPLICATIONS OF TYPES A & B METAL POSTS (FOR SIGN MARKERS) TELESCOPING STEEL SIGN SUPPORT SIGN PANEL ERECTION DETAILS SIGN PANEL MOUNTING DETAILS TRAFFIC CONTROL DEVICES SIDEWALK, CORNER OR CROSSWALK CLOSURE URBAN LANE CLOSURE, MULTILANE INTERSECTION URBAN LANE CLOSURE, MULTILANE, 2W WITH MOUNTABLE MEDIAN URBAN LANE CLOSURE, MULTILANE, 1W OR 2W WITH NONTRAVERSABLE MEDIAN LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPER., FOR SPEEDS > 45 MPH LANE CLOSURE, 2L, 2W, MOVING OPERATIONS-DAY ONLY LANE CLOSURE, 2L, 2W, SHORT TIME OPERATIONS OFF-RD MOVING OPERATIONS 2L, 2W, DAY ONLY OFF-RD OPERATIONS, 2L, 2W, 15' (4.5m) TO 24" (600mm) FROM PAVEMENT EDGE OFF-RD OPERATIONS, 2L, 2W, MORE THAN 15' (4.5m) AWAY CONCRETE CURB TYPE B AND COMBINATION CONCRETE CURB AND GUTTER GRATE TYPE 8 CATCH BASIN TYPE C PIPE UNDERDRAINS PRECAST REINFORCED CONCRETE FLARED END SECTION CONCRETE END SECTIONS FOR PIPE CULVERTS 15" (375 mm) THRU 84" (2100 mm) DIA. CLASS C AND D PATCHES PERPENDICULAR CURB RAMPS FOR SIDEWALKS TEMPORARY EROSION CONTROL SYSTEMS STANDARD SYMBOLS, ABBREVIATIONS, AND PATTERNS 3 3 3766.005 MARC GRIGASVILLAGE OF PLAINFIELDWILL COUNTY, ILLINOIS SHEET JOB NO. PROJECT MGR.NO.REVISIONSDATE:A S S O C I A T E S ® S:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-GenNotes.dgn StevenB 5/7/2020 4:20:53 PM EXISTING LEGEND A C PROPOSED LEGEND B 5'EX ROWPR £ SIDEWALK1 APR £ SIDEWALKEX ROW1 3 PR £ SIDEWALKEX ROW 5' 1' 3 1.5% 1' 2.5' 1' 1'PR £ SIDEWALKEX ROW 5' 1' 1.5% 1' 1:4 PR PERM ESMNT 3' A 5' 1' 4' VARIES 5' 1' 5'EX ROWVARIES PR £ SIDEWALKLOCKPORT STREET SIDEWALK IMPROVEMENTSPROPOSED PLAN AND PROFILEINDIAN BOUNDARY ROADA2CB 213 A2CB 212 32 3A 221 INDIAN BOUNDARY ROAD PROPOSED TYPICAL SECTION INDIAN BOUNDARY ROAD PROPOSED TYPICAL SECTION 1.5% EARTH EXCAVATION. DISPOSE. INCLUDED IN THE COST OF UNDER PROPOSED SIDEWALK AND STRIP EXISTING TOP SOIL FULL WIDTH CURB AND GUTTER EXISTING COMBINATION CONCRETE EXISTING PAVEMENT EXISTING TOPSOIL, 12" * * * *** STA. 100+54.89 TO STA. 103+75.00 STA. 103+75.00 TO STA. 107+82.19 STA. 200+00.00 TO STA. 209+90.00 STA. 209+90.00 TO STA. 218+73.65 STA. 219+49.75 TO STA. 226+51.39 LOCKPORT STREET (IL RTE 126) PROPOSED TYPICAL SECTION LOCKPORT STREET (IL RTE 126) PROPOSED TYPICAL SECTION LOCKPORT STREET (IL RTE 126) PROPOSED TYPICAL SECTION +1.5%+1.5% FROM STA. 103+50.00 TO 104+00.00 + VARIES 3 1:4 MAXMAX1:4 MAX1:4 1:3 MAX 2 1 2 3 ++++++++SLOPE DIRECTION AS THE SIDEWALK CROSS SLOPED AT 1.5% MAX AT THE SAME ALL 1' EARTH TURF SHOULDERS SHALL BE SUBBASE GRANULAR MATERIAL, TYPE B 4" RESTORATION-SEED 5" OR 8" PORTLAND CEMENT CONCRETE SIDEWALK ADDENDUM #334/30/20 3 3 333 3 3 3 3766.005 MARC GRIGASVILLAGE OF PLAINFIELDWILL COUNTY, ILLINOIS SHEET JOB NO. PROJECT MGR.NO.REVISIONSDATE:A S S O C I A T E S ® S:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-Typicals.dgn StevenB 5/7/2020 2:02:15 PM MATCH LINE STA. 204+50.00600 605 610 615 620 625 630 635 595 600 605 610 615 620 625 630 635 595 0 20 SCALE IN FEET 40 60 LOCKPORT STREET SIDEWALK IMPROVEMENTSAT ALIGNMENT EX GROUND ELEV AT ALIGNMENT EX GROUND PROFILE MEADOW LANEEX PCC SIDEWALKMEADOW LANELOCKPORT STREETPROPOSED PLAN AND PROFILE8 LOCKPORT STREET (IL RTE 126) AT ALIGNMENT PR SIDEWALK ELEV 30.65'29.87'3.02'3.49'(TYP.)5'(TYP.)5'PCC SIDEWALK CONNECTED TO EX PR SIDEWALK PROFILE EX 24" PIPE CULVERT EX CONC. C&G EX AGG SHLD EX 24" PIPE CULVERT EX ROW (TYP.) STA. 204+50.00 STA. 200+00.00 TO PCC SIDEWALK 5-IN (INCLUDED IN COST OF NEW PIPE CULVERT) CONNECTION TO EXISTING PIPE CULVERT W. DOWNSTREAM INVERT = 521.02 E. UPSTREAM INVERT = 521.17 PIPE CULVERTS, CLASS A, TYPE 1 24" - 6 LF @ 2.5% REMOVE EXISTING FLARED END SECTION INV. 621.70 STA. 201+74.00, 18.00' LT CONCRETE HEADWALLS FOR PIPE DRAINS 27 LF @ 0.3% MIN PIPE UNDERDRAINS 4" (SPECIAL) NOTES 1. SEE NOTE 1 STA. 201+79.10, 7.90' RT PIPE CAP GRATE 4" (TYP.) BE INCLUDED IN COST OF PIPE CAPE GRATE. 90 DEGREE BEND AND RISER AS NECESSARY. FITTINGS AND RISER TO GRATE SHALL BE CONNECTED TO PROPOSED PIPE UNDERDRAIN WITH PIPE CAP GRATE TO BE FLUSH WITH FINISHED SURFACE. PIPE CAP REMOVAL LIMITS TO 6.7' RT PIPE UNDERDRAINS REMOVAL (SPECIAL) - 6 LF STA. 200+00.00 TO STA. 204+50.00 PERIMETER EROSION BARRIER DETERMINED BY ENGINEER. OF TREE PLANTINGS SHALL BE PR TREE (TYP) FINAL LOCATIONS EX SW X-SLOPE 2.0%3ADDENDUM #310' R 4/30/203 3 STA. 200+07.00 to 200+12.70, 9.90' LT CONCRETE END SECTION, STANDARD 542001, 24", 1:4 200+00 201 202 203 204 VPI STA. 200+33.29ELEVATION 622.65-2.56%+0.43%623.50VPI STA. 200+50.00ELEVATION 622.72+0.43%-2.19%VPI STA. 200+83.52ELEVATION 621.98-2.19%VPI STA. 201+00.00ELEVATION 622.10+0.70% +0.86%VPI STA. 201+50.00ELEVATION 622.53+0.86%+0.57%VPI STA. 202+00.00ELEVATION 622.82+0.57%-0.55%VPI STA. 202+31.70ELEVATION 622.64-0.55%+1.28%VPI STA. 202+50.00ELEVATION 622.88+1.28%+1.15%VPI STA. 203+00.00ELEVATION 623.45+1.15%+0.46%VPI STA. 203+50.00ELEVATION 623.68+0.46%-0.04%VPI STA. 204+00.00ELEVATION 623.66-0.04%-0.70%VPI STA. 204+50.00-0.70% 200+00 200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50622.56621.93622.36622.75622.81623.29623.73623.60623.24623.50622.72622.10622.53622.82622.88623.45623.68623.66623.31A S S O C I A T E S 3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD4:43:22 PMS:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-plan-Lockport-1.dgn StevenB 5/7/2020 WILL COUNTY, ILLINOIS 600 605 610 615 620 625 630 635 595 600 605 610 615 620 625 630 635 595 0 20 SCALE IN FEET 40 60 MATCH LINE STA. 204+50.00MATCH LINE STA. 210+00.00LOCKPORT STREET SIDEWALK IMPROVEMENTSAT ALIGNMENT EX GROUND ELEV AT ALIGNMENT EX GROUND PROFILE 9PROPOSED PLAN AND PROFILELOCKPORT STREET3.48'35.93'30.91'(TYP.)5'(TYP.)5'AT ALIGNMENT PR SIDEWALK ELEV PR SIDEWALK PROFILE EX AGG SHLD LOCKPORT STREET (IL RTE 126) STA. 210+00.00 STA. 204+50.00 TO PCC SIDEWALK 5-IN 3' EX ROW (TYP.) EX 18" PIPE CULVERT 4"8" EX BRICK PAVERS 5.4' LT TO 8.5' RT STA. 205+10.00 TO STA. 205+25.00, EXCAVATION) (INCLUDED IN COST OF EARTH PROPOSED ELEVATION OF SIDEWALK EXISTING RAISED EARTH MOUND TO CONTRACTOR SHALL REMOVE EXCAVATION) (INCLUDED IN THE COST OF EARTH FLUSH WITH EDGE OF SIDEWALK OF EXISTING BRICK PAVERS TO BE CONTRACTOR SHALL ADJUST ELEVATION STA. 204+50.00 TO STA. 210+00.00 PERIMETER EROSION BARRIER CONSTRUCTION LAYOUT) (INCLUDED IN COST OF AND FORMS FOR SIDEWALK. CONSTRUCTING SUBBASE EXISTING TREE PRIOR TO BENDING SIDEWALK AROUND TO FINALIZING ALIGNMENT CONSULT ENGINEER PRIOR CONTRACTOR SHALL DETERMINED BY ENGINEER. OF TREE PLANTINGS SHALL BE PR TREE (TYP) FINAL LOCATIONS R 10'4/30/20ADDENDUM #333 205+00 206 207 208 209 210+00 ELEVATION 623.31+0.18%VPI STA. 205+00.00ELEVATION 623.40+0.18%-0.37%VPI STA. 205+40.00ELEVATION 623.25-0.37%+3.20%VPI STA. 205+50.00ELEVATION 623.57+3.20%-0.33%VPI STA. 206+00.00ELEVATION 623.40-0.33%-0.53%VPI STA. 206+50.00ELEVATION 623.14-0.53%-0.64%VPI STA. 207+00.00ELEVATION 622.82-0.64%-0.21%VPI STA. 207+50.00ELEVATION 622.72-0.21%-0.84%VPI STA. 207+85.00ELEVATION 622.42-0.84%+2.07%VPI STA. 208+00.00ELEVATION 622.73+2.07%-0.02%VPI STA. 208+50.00ELEVATION 622.72-0.02%-0.45%VPI STA. 209+00.00ELEVATION 622.50-0.45%-0.24%VPI STA. 209+50.00ELEVATION 622.38-0.24%+0.01%VPI STA. 210+00.00+0.01% 204+50 205+00 205+50 206+00 206+50 207+00 207+50 208+00 208+50 209+00 209+50 210+00623.24623.35623.40623.24622.98622.65622.55622.57622.56622.33622.21621.77623.31623.40623.57623.40623.14622.82622.72622.73622.72622.50622.38622.38A S S O C I A T E S 3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD2:02:19 PMS:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-plan-Lockport-2.dgn StevenB 5/7/2020 WILL COUNTY, ILLINOIS MATCH LINE STA. 210+00.00600 605 610 615 620 625 630 635 595 600 605 610 615 620 625 630 635 595 0 20 SCALE IN FEET 40 60 LOCKPORT STREET SIDEWALK IMPROVEMENTSAT ALIGNMENT EX GROUND ELEV AT ALIGNMENT EX GROUND PROFILE 10PROPOSED PLAN AND PROFILELOCKPORT STREET26.79'23.73'15.06'(TYP.)5'(TYP.)5'1'AT ALIGNMENT PR SIDEWALK ELEV EX AGG SHLD STA. 215+50.00 STA. 210+00.00 TO PCC SIDEWALK 5-IN MATCH LINE STA. 215+50.00(BY OTHERS) RELOCATED FENCE TO BE EX 4" PVC SS EX 4" PVC SS EX 4" PVC SS PVC SS EX 10" PVC SS EX 4" EX ROW (TYP.) LOCKPORT STREET (IL RTE 126) 11 LF @ 0.3% MIN PIPE UNDERDRAINS 4" (SPECIAL) 11 LF @ 0.3% MIN PIPE UNDERDRAINS 4" (SPECIAL) INV. 621.25 INV. 621.25 INV. 621.25 11 LF @ 0.3% MIN PIPE UNDERDRAINS 4" (SPECIAL) 11 LF @ 0.3% MIN PIPE UNDERDRAINS 4" (SPECIAL) INV. 621.25 11 LF @ 0.3% MIN PIPE UNDERDRAINS 10" (SPECIAL) STA. 215+42.00, 9.48' LT FLARED END SECTIONS 15" PRECAST REINFORCED CONCRETE NOTES 1. 12"6"INV. 620.75 FOR PIPE DRAINS (TYP.) CONCRETE HEADWALLS E. DOWNSTREAM INVERT = 620.47 W. UPSTREAM INVERT = 620.44 PIPE CULVERTS, CLASS A, TYPE 1 15" - 17 LF @ 0.2% PR SIDEWALK PROFILE 36" 36" 12" 12" PIPE UNDERDRAINS REMOVAL (SPECIAL) - 5 LF REMOVE CONCRETE HEADWALLS FOR PIPE DRAIN PIPE UNDERDRAINS REMOVAL (SPECIAL) - 5 LF REMOVE CONCRETE HEADWALLS FOR PIPE DRAIN PIPE UNDERDRAINS REMOVAL (SPECIAL) - 5 LF REMOVE CONCRETE HEADWALLS FOR PIPE DRAIN PIPE UNDERDRAINS REMOVAL (SPECIAL) - 5 LF REMOVE CONCRETE HEADWALLS FOR PIPE DRAIN PIPE UNDERDRAINS REMOVAL (SPECIAL) - 5 LF REMOVE CONCRETE HEADWALLS FOR PIPE DRAINSEE NOTE 1 PIPE UNDERDRAIN (TYP.) CONNECTION OF EXISTING CONNECTION OF EXISTING PIPE UNDERDRAIN. PROPOSED SIDWALK. ALL FITTINGS SHALL BE INCLUDED IN THE COST OF SHALL BE USED AS NECESSARY TO LOWER PIPE UNDERDRAINS UNDERNEATH UNDERDRAIN WITH CLOSED SCREW CAP. PIPE 90 DEGREE ELBOW FITTINGS PIPE CLEANOUT TO BE INSTALLED AT CONNECTION TO EXISTING RELOCATED BY METRONET) EX HANDHOLE ( TO BE R 10'4/30/20ADDENDUM #33PR TREE (TYP) 3 FLARED END SECTIONS 10" PRECAST REINFORCED CONCRETE 3 210+00 211 212 213 214 215+00 T T T T T ELEVATION 622.38-0.54%VPI STA. 210+50.00ELEVATION 622.11-0.54%-0.05%VPI STA. 211+00.00ELEVATION 622.09-0.05%-0.39%VPI STA. 211+50.00ELEVATION 621.89-0.39%+1.12%VPI STA. 212+00.00ELEVATION 622.45+1.12%-0.48%VPI STA. 212+50.00ELEVATION 622.21-0.48%+0.52%VPI STA. 213+00.00ELEVATION 622.47+0.52%+0.06%VPI STA. 213+50.00ELEVATION 622.50+0.06%+0.32%VPI STA. 214+00.00ELEVATION 622.66+0.32%+0.82%VPI STA. 214+50.00ELEVATION 623.07+0.82%+0.32%VPI STA. 215+00.00ELEVATION 623.23+0.32%-2.38%VPI STA. 215+30.21ELEVATION 622.51-2.38%+3.34%VPI STA. 215+50.00+3.34% 210+00 210+50 211+00 211+50 212+00 212+50 213+00 213+50 214+00 214+50 215+00 215+50621.77621.69621.67621.52621.62621.49621.91621.90622.08622.75622.74622.86622.38622.11622.09621.89622.45622.21622.47622.50622.66623.07623.23623.17A S S O C I A T E S 3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD4:42:35 PMS:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-plan-Lockport-3.dgn StevenB 5/7/2020 WILL COUNTY, ILLINOIS MATCH LINE STA. 221+00.00600 605 610 615 620 625 630 635 595 600 605 610 615 620 625 630 635 595 0 20 SCALE IN FEET 40 60 LOCKPORT STREET SIDEWALK IMPROVEMENTSAT ALIGNMENT EX GROUND ELEV AT ALIGNMENT EX GROUND PROFILE EX CONC. C&G 11PROPOSED PLAN AND PROFILELOCKPORT STREET44.40'26.92'1'AT ALIGNMENT PR SIDEWALK ELEV PR SIDEWALK PROFILE EX AGG SHLD LOCKPORT STREET (IL RTE 126)MATCH LINE STA. 215+50.00STA. 221+00.00 STA. 219+46.45 TO PCC SIDEWALK 5-IN EX CONC. C&G EX AGG SHLD EX ROW (TYP.)4'(TYP.)5'(TYP.)5' 6'(11.5' RT) (25 LF) LINE 24" (WHITE) PVMT MARKING - THERMOPLASTIC WARNINGS (TYP.) DETECTABLE LINE 6" (WHITE) PVMT MARKING - THERMOPLASTIC CULVERT EX 24" PIPE CULVERT EX 24" PIPE CULVERT EX 14" PIPE CULVERT EX 14" PIPE PAVEMENT REMOVAL DRIVEWAY PAVEMENT RAMP DETAILS SEE CURB RAMP DETAILS SEE CURB PR. PERMANENT EASEMENT(TYP.)10'EX AGG CE (INCLUDED IN COST OF NEW PIPE CULVERT) CONNECTION TO EXISTING PIPE CULVERT (INCLUDED IN COST OF NEW PIPE CULVERT) CONNECTION TO EXISTING PIPE CULVERT DOWNSTREAM INVERT = 620.54 UPSTREAM INVERT = 620.51 PIPE CULVERTS, CLASS A, TYPE 1 15" - 14 LF @ 0.2% (INCLUDED IN COST OF NEW PIPE CULVERT) CONNECTION TO EXISTING PIPE CULVERT STA. 218+50.25, 9.13' LT FLARED END SECTIONS 24" PRECAST REINFORCED CONCRETE INV = 616.76 RIM = 622.35 STA. 218+50.00, 12.0' RT CATCH BASINS, TYPE C, TYPE 8 GRATE STA. 218+50.00, 8.0' LT FLARED END SECTIONS 12" PRECAST REINFORCED CONCRETE STA. 216+06.00, 7.93' LT FLARED END SECTIONS 15" PRECAST REINFORCED CONCRETE (INCLUDED IN COST OF NEW PIPE CULVERT) CONNECTION TO EXISTING PIPE CULVERT STA. 219+76.00, 13.17' LT FLARED END SECTIONS 24" PRECAST REINFORCED CONCRETE INDIAN BOUNDARY ROAD DRIVEWAY DETAIL OFF 0' STA. 215+89.93 OFF 6.20' LT STA. 215+89.93 OFF 21.34' LT STA. 216+04.93 OFF 27.34' LT STA. 216+04.93 OFF 0' STA. 215+59.93 OFF 5.93' LT STA. 215+59.93 OFF 20.79' LT STA. 215+44.93 OFF 26.75' LT STA. 215+44.93 EXISTING SANITARY SEWER EASEMENT25.0'STA. 215+89.93 TO STA. 218+75.54 STA. 215+50.00 TO STA. 215+59.93 PCC SIDEWALK 5-IN STA. 215+89.93 STA. 215+59.93 TO PCC SIDEWALK 8-IN E. DOWNSTREAM INVERT = 620.51 W. UPSTREAM INVERT = 620.58 PIPE CULVERTS, CLASS A, TYPE 1 24" - 20 LF @ 0.33% E. DOWNSTREAM INVERT = 620.13 W. UPSTREAM INVERT = 620.20 PIPE CULVERTS, CLASS A, TYPE 1 24" - 20 LF @ 0.33% 6'REMOVE EXISTING FLARED END SECTION REMOVE EXISTING FLARED END SECTION REMOVE EXISTING FLARED END SECTION REMOVE EXISTING FLARED END SECTION HMA CE DRIVEWAY GRADE DOWN AT 1:6 TO GRATE OR TOP OF FES (TYP.) BASIN AND INSTALLING STORM SEWER (2 EACH) UTILITIES PRIOR TO MANUFACTURING CATCH DEPTH, LOCATION, AND SIZE OF EXISTING EXPLORATORY EXCAVATION TO DETERMINE TREE PR STA. 219+44.00 TO STA. 221+00.00 PERIMETER EROSION BARRIER 215+94.22, 1.96' LT - TYPE 1 TO STA. RELOCATE SIGN PANEL 219+44.50, 13.17' RT - TYPE A TO STA. RELOCATE SIGN PANEL R 10' R 10'4/30/20ADDENDUM #333 3 3 W. DOWNSTREAM INVERT = 620.58 E. UPSTREAM INVERT = 620.68 TYPE 1 12" - 20 LF @ 0.5% STORM SEWERS, RUBBER GASKET, CLASS A, 3 216 217 218 219 220+00 221 107 T T ELEVATION 623.17+0.71%VPI STA. 215+75.00ELEVATION 623.35+0.71% -0.95%VPI STA. 216+00.00ELEVATION 623.11+0.02%VPI STA. 216+50.00ELEVATION 623.12+0.02%+0.94%VPI STA. 217+00.00ELEVATION 623.59+0.94%-0.22%VPI STA. 217+50.00ELEVATION 623.48-0.22%-1.32%VPI STA. 218+00.00ELEVATION 622.82-1.32%+0.61%VPI STA. 218+50.00ELEVATION 623.13+0.61%VPI STA. 218+72.19ELEVATION 623.99+3.90%VPI STA. 218+98.87ELEVATION 624.33+1.27%-0.89%VPI STA. 219+50.53ELEVATION 623.87-0.89%-0.67%VPI STA. 220+00.00ELEVATION 623.54-0.67%+0.24%VPI STA. 220+50.00ELEVATION 623.66+0.24%+0.18%VPI STA. 221+00.00+0.18% 215+50 216+00 216+50 217+00 217+50 218+00 218+50 219+00 219+50 220+00 220+50 221+00622.86622.82623.11623.25622.58622.65622.06624.33623.90623.47623.59623.59623.17623.11623.12623.59623.48622.82623.13624.32623.87623.54623.66623.75A S S O C I A T E S 3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD4:53:05 PMS:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-plan-Lockport-4.dgn StevenB 5/7/2020 WILL COUNTY, ILLINOIS 216 600 605 610 615 620 625 630 635 595 600 605 610 615 620 625 630 635 595 0 20 SCALE IN FEET 40 60 MATCH LINE STA. 221+00.00LOCKPORT STREET SIDEWALK IMPROVEMENTSAT ALIGNMENT EX GROUND ELEV AT ALIGNMENT EX GROUND PROFILE EX CONC. C&G PCC SIDEWALK CONNECTED TO EX EX PCC SIDEWALK 12PROPOSED PLAN AND PROFILELOCKPORT STREET43.94'27.08'4'4'(TYP.)5'(TYP.)5'EX AGG SHLD 10'LOCKPORT STREET (IL RTE 126) 10'PR. PERMANENT EASEMENT EX ROW (TYP.) PR SIDEWALK PROFILE AT ALIGNMENT PR SIDEWALK ELEV EX 24" PIPE CULVERT (BY OTHERS) RELOCATED SIGN TO BE EX 18" PIPE CULVERT EX FE INV = 616.82 RIM = 620.73 STA. 225+44.00, 14.0' RT CATCH BASINS, TYPE C, TYPE 8 GRATE STA. 225+44.00, 11.0' LT FLARED END SECTIONS 12" PRECAST REINFORCED CONCRETE 6" 6"6" 6"25.0'EXISTING SANITARY SEWER EASEMENT UPSTREAM INVERT = 618.72, DOWNSTREAM INVERT = 618.60 STORM SEWERS, RUBBER GASKET, CLASS A, TYPE 1 12" - 25 LF @ 0.5% INSTALLING STORM SEWER (1 EACH) TO MANUFACTURING CATCH BASIN AND DEPTH AND SIZE OF EXISTING GAS MAIN PRIOR EXPLORATORY EXCAVATION TO DETERMINE 10' 10' STA. 221+00.00 TO STA. 226+42.00 PERIMETER EROSION BARRIER STA. 221+00.00 TO STA. 226+51.39 PCC SIDEWALK 5-IN DETERMINED BY ENGINEER. OF TREE PLANTINGS SHALL BE PR TREE (TYP) FINAL LOCATIONS EX SW X-SLOPE 0.2% R 10'4/30/20ADDENDUM #333 221 222 223 224 225+00 226 ELEVATION 623.75+0.56%VPI STA. 221+50.00ELEVATION 624.03+0.56%-0.50%VPI STA. 222+00.00ELEVATION 623.78-0.50%-0.62%VPI STA. 222+50.00ELEVATION 623.47-0.62%-0.12%VPI STA. 223+00.00ELEVATION 623.41-0.12%+1.06%VPI STA. 223+50.00ELEVATION 623.94+1.06%-0.74%VPI STA. 224+00.00ELEVATION 623.57-0.74%-1.34%VPI STA. 224+50.00ELEVATION 622.90-1.34%-1.86%VPI STA. 225+00.00ELEVATION 621.97-1.86%-2.77%VPI STA. 225+44.48ELEVATION 620.74-2.77%+2.13%VPI STA. 225+69.32ELEVATION 621.27+2.13%+0.48%VPI STA. 226+30.28ELEVATION 621.56+0.48%+4.33%622.41221+00 221+50 222+00 222+50 223+00 223+50 224+00 224+50 225+00 225+50 226+00 226+50623.59623.87623.71623.40623.34623.87623.51622.73621.80620.69621.27622.39623.75624.03623.78623.47623.41623.94623.57622.90621.97620.86621.42622.41A S S O C I A T E S 3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD2:02:21 PMS:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-plan-Lockport-5.dgn StevenB 5/7/2020 WILL COUNTY, ILLINOIS PROPOSED SIDE CURB DETECTABLE WARNINGS LEGEND0.80%7.3% 7.7%1.4% 1.4 %1.6% 1.5%0.4%1.4 % 1.5 %4.6% 4.6% Q A B F D H J L P I N H G E F L M C B A S R Q J 0.3% 0.9%0.4%1.0% 1.0%1.4%0.5 %1.4 %0.8% 0.8% 3.6 %2.0 %3.8% 3.0% 0.6 %INDIAN BOUNDARY ROAD N O P D K I O K M EC STATION OFFSET ELEVATION A 218+50.00 0.00 623.12 B 218+58.26 0.00 623.50 C 218+66.54 0.00 623.62 D 218+71.64 0.00 623.99 E 218+71.26 -0.50 624.24 F 218+64.89 -6.66 624.28 G 218+65.77 -7.87 624.18 H 218+72.84 -0.90 623.99 I 218+74.54 5.00 624.07 J 218+76.21 5.12 624.07 K 218+77.14 8.06 624.14 L 218+75.68 8.42 624.45 M 218+74.75 5.50 624.40 N 218+71.64 5.00 624.03 O 218+66.54 5.00 623.64 P 218+58.26 5.00 623.58 Q 218+50.00 5.00 623.20 STATION OFFSET ELEVATION A 219+73.40 5.00 623.80 B 219+73.40 0.00 623.76 C 219+68.40 0.00 623.94 D 219+59.26 0.00 623.90 E 219+51.33 0.00 623.92 F 219+51.82 -0.50 624.10 G 219+55.73 -4.38 624.16 H 219+54.92 -5.17 623.98 I 219+50.49 -0.84 623.92 J 219+46.45 5.00 623.85 K 219+44.65 4.97 623.85 L 219+37.94 11.66 623.88 M 219+39.26 12.45 623.92 N 219+46.00 5.50 624.05 O 219+51.33 5.00 623.90 P 219+59.26 5.00 623.97 Q 219+55.72 8.54 624.12 R 219+68.40 10.00 624.09 S 219+68.40 5.00 623.90 INDIAN BOUNDARY ROAD LOCATION: LOCKPORT STREET AND INDIAN BOUNDARY ROAD SE CORNERLOCATION: LOCKPORT STREET AND INDIAN BOUNDARY ROAD SW CORNER G 3. 1' 10.0' 6.9' EX ROW PR EASEMENTEX ROW (IL RTE 126) LOCKPORT STREET (IL RTE 126) LOCKPORT STREET SIDEWALK DETAIL PLAN13 5.0'5.0' 8.2' 9.5' 6.2' 5.0'5.0' 5.0' 5.0'5.0' 4.8' TYPE B-6.12 (24 LF) COMBINATION CONCRETE CURB & GUTTER & GUTTER TYPE B-6.12 (20 LF) COMBINATION CONCRETE CURB LOCKPORT STREET - STA 218+50 TO 219+802.9' 5.1' AND PROFILES. OF SIDEWALK. SEE PLAN DITCH FROM LOW POINT GRADE SWALE DOWN TO CONTRACTOR SHALL 8.3'2.0'2.3'4.0'4.3' R S R 218+64.54 5.00 623.61 S 218+62.53 623.570 2.1'7.1'7.9'ADDENDUM #334/30/203 3 3 3 T 219+61.33 0.00 623.90T 3 219 220+003766.005 MARC GRIGASVILLAGE OF PLAINFIELDWILL COUNTY, ILLINOIS SHEET JOB NO. PROJECT MGR.NO.REVISIONSDATE:A S S O C I A T E S ® S:\JOL\3700--3799\3766\005\Drawings\CAD\Micros\CADD_Sheets\D12345-sht-ADAdetail-21900-SW-SE.dgn StevenB 5/7/2020 4:20:56 PM 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 202+00.00 615 615 620 620 625 625 630 630 635 635 202+50.00 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 203+00.00 615 615 620 620 625 625 630 630 635 635 203+50.00 202+00.00203+50.0023LOCKPORT STREET 4/30/20ADDENDUM #33 3 SHEETJOB NO.PROJECT MGR.NO.REVISIONS DATE:SteveØB5/7/20202:02:41 PMS:\JOL\3700--3799\3766\005\DrawiØgs\CAD\Mi cros\CADD_Sheets\D12345-sht-xsc-Lockport-1.dgØA S S O C I A T E S ®3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD WILL COUNTY, ILLINOIS LOCKPORT STREET SIDEWALK IMPROVEMENTS PROPOSED CROSS SECTIONSEX ROWC = 2.97 Sq. Ft. F = 0.00 Sq. Ft. -1.50%622.72622.82622.91EX ROWC = 3.39 Sq. Ft. F = 0.00 Sq. Ft. -1.50%622.78622.88622.97EX ROWC = 3.50 Sq. Ft. F = 0.00 Sq. Ft. -1.50%1:4623.24623.45623.54EX ROWC = 3.06 Sq. Ft. F = 0.00 Sq. Ft. -1.50%623.61623.66623.77-1.50% 00 00 55 55 1010 1010 1515 1515 2020 2020 610 610 615 615 620 620 625 625 630 630 210+00.00 615 615 620 620 625 625 630 630 635 635 210+50.00 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 211+00.00 615 615 620 620 625 625 630 630 635 635 211+50.00 210+00.00211+50.0027LOCKPORT STREET 3 4/30/20ADDENDUM #33 3 -1.50% 3 -1.50% SHEETJOB NO.PROJECT MGR.NO.REVISIONS DATE:SteveØB5/7/20202:02:43 PMS:\JOL\3700--3799\3766\005\DrawiØgs\CAD\Mi cros\CADD_Sheets\D12345-sht-xsc-Lockport-1.dgØA S S O C I A T E S ®3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD WILL COUNTY, ILLINOIS LOCKPORT STREET SIDEWALK IMPROVEMENTS PROPOSED CROSS SECTIONS C = 1.52 Sq. Ft. F = 0.26 Sq. Ft. -1.50%1:4621.24622.38622.45622.54EX ROWC = 2.19 Sq. Ft. F = 0.00 Sq. Ft. -1.50%1:4621.39622.11622.18622.28EX ROWC = 2.03 Sq. Ft. F = 0.00 Sq. Ft. -1.50%1:4621.33622.08622.16621.92-1.00%EX ROWC = 2.83 Sq. Ft. F = 0.00 Sq. Ft. -1.50%1:4621.23621.89621.97621.98 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 214+00.00 615 615 620 620 625 625 630 630 635 635 214+50.00 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 215+00.00 615 615 620 620 625 625 630 630 635 635 215+50.00 214+00.00215+50.0029LOCKPORT STREET 3 ADDENDUM #3 4/30/20 31:76.00% SHEETJOB NO.PROJECT MGR.NO.REVISIONS DATE:SteveØB5/7/20202:02:44 PMS:\JOL\3700--3799\3766\005\DrawiØgs\CAD\Mi cros\CADD_Sheets\D12345-sht-xsc-Lockport-1.dgØA S S O C I A T E S ®3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD WILL COUNTY, ILLINOIS LOCKPORT STREET SIDEWALK IMPROVEMENTS PROPOSED CROSS SECTIONSEX ROWC = 2.40 Sq. Ft. F = 0.33 Sq. Ft. -1.50%1:3621.10622.66622.73EX ROWC = 2.55 Sq. Ft. F = 0.01 Sq. Ft. -1.50%1:3621.02623.07623.15EX ROWC = 2.37 Sq. Ft. F = 0.92 Sq. Ft. -1.50% 1:3620.89623.23623.30EX ROWF = 0.00 Sq. Ft.623.17623.25C = 3.02 Sq. Ft.623.79 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 215+75.00 615 615 620 620 625 625 630 630 635 635 216+00.00 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 216+50.00 615 615 620 620 625 625 630 630 635 635 217+00.00 215+75.00217+00.0030LOCKPORT STREET 3 ADDENDUM #3 4/30/20 3 31:74.88%622.72623.83 SHEETJOB NO.PROJECT MGR.NO.REVISIONS DATE:SteveØB5/7/20202:02:44 PMS:\JOL\3700--3799\3766\005\DrawiØgs\CAD\Mi cros\CADD_Sheets\D12345-sht-xsc-Lockport-1.dgØA S S O C I A T E S ®3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD WILL COUNTY, ILLINOIS LOCKPORT STREET SIDEWALK IMPROVEMENTS PROPOSED CROSS SECTIONSEX ROWF = 0.00 Sq. Ft.623.35623.42C = 5.23 Sq. Ft.623.32-1.50%4.80%-0.52%EX ROWF = 0.00 Sq. Ft. -1.50%623.11623.18C = 3.01 Sq. Ft.EX ROWC = 3.75 Sq. Ft. F = 0.00 Sq. Ft. -1.50%1:3621.94623.12EX ROWC = 2.71 Sq. Ft. F = 0.02 Sq. Ft. -1.50%1:3622.07623.59623.66 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 220+00.00 00 00 55 55 1010 1010 1515 1515 2020 2020 615 615 620 620 625 625 630 630 635 635 220+50.00 615 615 620 620 625 625 630 630 635 635 221+00.00 219+51.33221+00.0032LOCKPORT STREET 3 ADDENDUM #3 4/30/20 3 SHEETJOB NO.PROJECT MGR.NO.REVISIONS DATE:SteveØB5/7/20202:02:45 PMS:\JOL\3700--3799\3766\005\DrawiØgs\CAD\Mi cros\CADD_Sheets\D12345-sht-xsc-Lockport-1.dgØA S S O C I A T E S ®3766.005 MARC GRIGAS VILLAGE OF PLAINFIELD WILL COUNTY, ILLINOIS LOCKPORT STREET SIDEWALK IMPROVEMENTS PROPOSED CROSS SECTIONSPR PERM ESMTEX ROWC = 2.80 Sq. Ft. F = 0.00 Sq. Ft. -1.50%623.54623.63623.31PR PERM ESMTEX ROWC = 3.49 Sq. Ft. F = 0.00 Sq. Ft. -1.50%623.66623.74PR PERM ESMTEX ROWC = 2.70 Sq. Ft. F = 0.00 Sq. Ft. -1.50%623.75623.83