Loading...
HomeMy Public PortalAbout05.20.2015 Park Commission Packet - Park TourMEINNA AGENDA MEDINA PARK COMMISSION & CITY COUNCIL WEDNESDAY, MAY 20, 2015 at 5:30 P.M. Starts at City Hall, 2052 County Road 24 1) Call to Order • Meet at City Hall at 5:30 p.m. 2) Annual Tour of Parks • A bus will be waiting to take us to each of the stops listed below. a) Hamel Legion Park (5:45-6:15) b) Hunter Lions Park (6:15-6:25) c) Medina Lake Preserve (6:35-7:05) d) Maple Park (7:15-7:30) e) Walnut Park (Drive Past) f) Lakeshore Park (7:30-7:45) g) Tomann Preserve (7:50-8:10) h) Medina Morningside Park (time permitting) 3) Adjourn (approximately 8:30 p.m. at City Hall) Posted 5/13/2015 Page 1 of 1 MEMORANDUM TO: Medina Park Commission FROM: Jodi Gallup, Assistant to City Administrator DATE OF REPORT: May 13, 2015 DATE OF MEETING: May 20, 2015 SUBJECT: Park Commission Meeting Report Annual Park Tour Please arrive at City Hall no later than 5:25 p.m. so the bus can leave promptly at 5:30 p.m. to begin our Park Tour. Below is a list of our stops and items to take note of while visiting each park. Please bring this memo and the 2015 Capital Improvement Plan to the meeting to determine what projects should be completed. Hamel Legion Park (5:45 — 6:15 p.m.) We will plan to eat a picnic dinner at this park. The city will provide sandwiches and chips, but please bring your own water bottle or other beverage. • Need for parking lot improvements by the Paul Fortin Memorial baseball field and Inn Kahoots? • Look at Eagle Scout project items: concrete slabs, maintenance signs, flag pole, and monument. • Look at new trees planted throughout the park. • Need for trail lights or soccer nets? Hunter Lions Park (6:15 — 6:25 p.m.) • Need for wood chips and playground mats around playground? • Need for new picnic tables? • Walk to the nature area; discuss signage to invite residents to this part of the park. Medina Lake Preserve (6:35 — 7:05 p.m.) • Walk the trail and look at items that may need to be cleaned up. • Discuss location(s) for a sign listing the park's hours. The police have had some recent issues with minors in the park after hours, but there are no signs posted to notify them of the hours. • Discuss access issues. Maple Park (7:15 — 7:30 p.m.) • Need for updating the baseball area? • Need for soccer nets? • Need for a pavilion? Walnut Park (Drive Past) • Look through the bus window while driving past this small park area. Lakeshore Park (7:30 — 7:45 p.m.) • Look at erosion control issues. • Look at signage. • Need for additional playground features? " Need for tables and horseshoe pits on north side of park? Tomann Preserve (7:50  8:10 p.m.) " Walk the trail. " Discuss installing a plaque recognizing Terry Tomann. " Discuss obtaining access of the north east corner of the site. Medina Morningside Park (time permitting) " Need for soccer nets? " Need to improve baseball fields? " Need to bury power lines? 2014 DIP: DEPARTMENT 2015 - 2019 Capital Improvement Plan 2014 2015 2016 2017 2018 2019 Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source Tamarack North of Medina Overlay/Rehab $ 100,000 $ 80,000 Reserves/Bonds/Assessments Tamarack City Limits to CSAH 24 Rehab $ 435,671 $ 348,537 Reserves/Bonds/Assessments Clydesdale trail overlay 116 to 600 $ 35,000 $ 17,500 Reserves/Bonds/Assessments Morgan Rd. $ 30,000 $ 15,000 Reserves/Bonds/Assessments Independence Beach Overlay $ 200,000 $ 100,000 Reserves/Bonds/Assessments Tower Recon - Tower Drive Schedule A & K $ 617,101 $ 308,551 MSA/Bonds/Assessments Tower Recon - Hamel Road West Schedule B & L $ 385,705 $ 231,423 MSA/Bonds/Assessments Tower Recon - Hamel Road East Schedule C & M $ 375,765 $ 189,459 MSA/Bonds/Assessments Tower Recon - Kilkenny Lane Schedule D $ 34,395 $ 17,198 MSA/Bonds/Assessments Comanche Trail Overlay $ 27,125 $ 13,563 Reserves/Bonds/Assessments Chippewa Road West overlay $ 268,506 $ 214,805 Reserves/Bonds/Assessments Lakeview Road overlay $ 47,232 $ 23,616 Reserves/Bonds/Assessments Willow Drive Orono to 24 Overlay Reserves/Bonds/Assessments Willow Drive N of Chippewa overlay blacktop portion $ 59,000 $ 47,000 Reserves/Bonds/Assessments Wichita Trail overlay $ 125,086 $ 62,543 Reserves/Bonds/Assessments Tower Drive West of Pinto Overlay $ 30,000 $ 15,000 Reserves/Bonds/Assessments Iroquois Drive Overlay $ 26,000 $ 13,000 Reserves/Bonds/Assessments Willowbrook RD Split/Orono Road Bond Maplewood Drive Overlay $ 29,328 $ 14,664 Reserves/Bonds/Assessments Bobolink Road Overlay $ 86,326 $ 43,163 Reserves/Bonds/Assessments Morningside Road Overlay $ 100,654 $ 50,327 Reserves/Bonds/Assessments Elsinore Circle N of Morningside Rd Overlay $ 18,789 $ 9,395 Reserves/Bonds/Assessments Tuckborough/Hunter farms Addition overlay $ 297,643 $ 148,822 Reserves/Bonds/Assessments Townline Road CR11 to TH 55 Overlay $ 103,122 $ 41,249 Independence funds/Road Bonds/Assessments Hwy 55 & CSAH101 Signal upgrade $ 300,000 $ 75,000 Road Bonds/MSA Hwy 55 & CR 116 Whistleless Crossing $ 300,000 $ 300,000 Reserves/MSA Hwy 55 & CR 116 Intersection $ 30,000 $ 30,000 $ 2,620,000 $ 200,000 TH 55 Intersect Capital Impr Fund/Fed & State Match/MSA Roads Sub -total $ 566,149 $ 363,627 $ 2,352,323 $ 1,336,309 $ 638,793 $ 469,786 $ 184,086 $ 109,543 $ 2,881,097 $ 330,549 $ $ Tandem $ 225,000 $ 225,000 Equipment Bonds/Cap Equip Fund Crack Sealer $ 40,000 $ 40,000 Equipment Bonds/Cap Equip Fund Tanker $ 20,000 $ 20,000 Equipment Bonds/Cap Equip Fund 1984 Grader rehab $ 25,000 $ 25,000 Equipment Bonds/Cap Equip Fund Replace 2007 550 $ 60,000 $ 60,000 Equipment Bonds/Cap Equip Fund Air Compressor (40 % Parks) $ 18,000 $ 10,800 Equipment Bonds/Cap Equip Fund Sweeper $ 15,000 $ 15,000 Grant self propeled kick off broom $ 40,000 $ 40,000 Equipment Bonds/Cap Equip Fund Lift $ 13,000 $ 13,000 Grant Skid Steer Upgrade w/ Bucket $ 10,000 $ 10,000 $ 5,000 $ 5,000 Equipment Bonds/Cap Equip Fund Pickup Truck 3/4 Ton (50 % Parks) $ 40,000 $ 40,000 $ 30,000 $ 15,000 Equipment Bonds/Cap Equip Fund Tandem Trailer Equipment Bonds/Cap Equip Fund Single Axle Truck $ 185,000 $ 185,000 $ 220,000 $ 220,000 Equipment Bonds/Cap Equip Fund Loader $ 200,000 $ 200,000 Equipment Bonds/Cap Equip Fund Miscellaneous $ 2,500 $ 2,500 $ 2,500 $ 2,500 Equipment Bonds/Cap Equip Fund Public Works Sub -total $ 263,000 $ 263,000 $ 290,500 $ 283,300 $ 52,500 $ 37,500 $ 225,000 $ 225,000 $ 320,000 $ 320,000 $ Police $ PD Squad Cars $ 58,000 $ 58,000 $ 72,000 $ 72,000 $ 72,000 $ 72,000 $ 72,000 $ 72,000 $ 72,000 $ 72,000 $ 108,000 $ 108,000 Equipment Bonds/Cap Equip Fund PD Speed Trailers $ 17,000 $ 17,000 Equipment Bonds/Cap Equip Fund PD Squad Camera Fed Drug Forfeiture Fund PD Squad Portable Radios DWI Forfeiture Fund Portable Radios $ 22,000 $ 22,000 $ 27,000 $ 27,000 $ 27,000 $ 27,000 DWI Forfeiture Fund PD Squad Laptops/Software MDC $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 DWI Forfeiture Fund PD Card Reader System DWI Forfeiture Fund Electronics (New PD Facility) $ 15,000 $ 15,000 DWI Forfeiture Fund Workout Equipment $ 5,000 $ 5,000 $ 5,000 $ 5,000 D1N I Forfeiture Fund/ Excellence Award Digital Speed Signs $ 8,000 $ 8,000 Equipment Bonds/Cap Equip Fund Lexipold Policy Software $ 10,000 $ 10,000 Fed Drug Forfeiture Fund 2014 CIP: DEPARTMENT 2015 - 2019 Capital Improvement Plan 2014 2015 2016 2017 2018 2019 Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source Tasers S 5,000 $ 5,000 $ 5,000 $ 5,000 Equipment Bonds/Cap Equip Fund Side Arms $ 7,500 $ 7,500 DWI Forfeiture Fund Miscellaneous -Equip Fund S 2,000 $ 2,000 Equipment Bonds/Cap Equip Fund Miscellaneous- DWI Fund $ 7,500 $ 7,500 S 3,000 $ 3,000 $ 6,000 $ 6,000 $ 4,000 $ 4,000 DWI Forfeiture Fund Police Sub -total $ 107,500 $ 107,500 $ 134,000 $ 134,000 $ 145,000 $ 145,000 $ 86,000 $ 06,000 $ 89,500 $ 89,500 $ 108,000 $ 108,000 HAMEL SCBA Replacement funded by grants/other Mobile Radio Replacement funded by grants/other Lucas Tool $ 7,500 $ - Equipment Bonds/Cap Equip Fund Ongoing PPE Replacement 5 5,000 $ - S 5,000 $ - $ 10,000 $ - $ 10,000 $ - $ 10,000 $ - S 10,000 $ - Equipment Bonds/Cap Equip Fund Bldg - Exhaust Removal System Equipment Bonds/Cap Equip Fund Thermal Imaging Camera S 5,000 $ - Equipment Bonds/Cap Equip Fund Engine 11 Trash Line Equipment Bonds/Cap Equip Fund Hose - 1.75" & 2" S 6,000 $ - S 6,000 $ - Equipment Bonds/Cap Equip Fund Duly Officer Vehicle S 15,000 $ - Equipment Bonds/Cap Equip Fund Ranger Vehicle S 25,000 $ - Equipment Bonds/Cap Equip Fund Ell Rescue Tool Replacement funded by grants/other Defibrillator funded by grants/other Utility 11 Overhaul/retrofit $ 65,000 $ - Equipment Bonds/Cap Equip Fund Command Vehicle Replacement $ 20,000 $ - Equipment Bonds/Cap Equip Fund Engine 11 Refurbishment Equipment Bonds/Cap Equip Fund Air Lift Bag Replacement funded by grants/other Pumper/Tanker S 450,000 $ - Equipment Bonds/Cap Equip Fund Portable JAWS Tool funded by grants/other Bldg Improvement Annual Contract $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 60,000 Equipment Bonds/Cap Equip Fund Hamel Fire Sub -total $ 48,500 $ 60,000 $ 476,000 $ 60,000 $ 10,000 $ 60,000 $ 30,000 $ 60,000 $ 75,000 $ 60,000 $ 10,000 $ 60,000 Loretto Fire (Loretto) $ 17,839 $ 17,839 $ 18,000 $ 18,000 $ 19,000 $ 19,000 $ 20,000 $ 20,000 $ 21,000 $ 21,000 $ 22,000 $ 22,000 Equipment Bonds/Cap Equip Fund Fire (Long Lake) $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 Equipment Bonds/Cap Equip Fund Civil Defense Sirens Fire Sub -total $ 66,339 $ 77,839 $ 500,000 $ 84,000 $ 35,000 $ 85,000 $ 56,000 $ 86,000 $ 102,000 $ 87,000 $ 38,000 $ 88,000 1 Civil Defense Sub -total $ Administration/Data Processing " $ I$ 30,000 $ 30,000 I $ 30,000 $ 30,OOOI $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ I I Revolving Cap. Impr. Fund/ County Grant Vehicle City $ 20,000 I $ 20,000I Administration Sub -total $ 20,000 $ 20,000 $ $ - $ $ $ $ $ $ - $ $ I Equipment Bonds/Cap Equip Fund City Hall Repairs/Renovation $ 200,000 $ 200,000 $ 10,000 $ 10,000 $ 15,000 $ 15,000 $ 10,000 $ 10,000 $ 15,000 $ 15,000 $ 10,000 $ 10,000 Revolving Cap. Impr. Fund Community Building Repairs $ 25,000 $ 25,000 $ 10,000 $ 10,000 $ 15,000 $ 15,000 $ 10,000 $ 10,000 $ 15,000 $ 15,000 Revolving Cap. Impr. Fund PW//Police/City Hall Renovations Recharacterization from Water Bonds PW/PD Facility Roof Revolving Cap. Impr. Fund City Building Sub -total $ 200,000 $ 200,000 $ 35,000 $ 35,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 (high growth expectation) Independence Beach House Controls $ 35,000 $ 35,000 Water Capital Improvement Water Treatment Plant SCADA Upgrade $ 30,000 $ 30,000 Water Capital Improvement Water Treatment Plant Expansion $ 1,400,000 $ 1,400,000 Future Well#8/pump/controls $ 375,000 $ 375,000 Water Capital Improvement Pumphouse # 3 reconstruct/raw waterline $ 116,000 $ 116,000 Water Capital Improvement Generator Water Capital Improvement Utility Truck $ 80,000 $ 40,000 Water Capital Improvement Willow Dr Water Tower Rehab $ 180,000 $ 180,000 Water Capital Improvement Water Tower (and land acquisition) $ 2,600,000 $ 2,600,000 Future (2020-2023) Tower Recon - Hamel Road West Watermain $ 82,038 $ 41,019 Water Capital Imp/Assessments Tower Recon - Tower Dr WaterMain $ 136,715 $ 68,358 Water Capital Imp / Assessments Water Sub -total $ 736,000 $ 736,000 $ 218,753 $ 109,376 $ 80,000 $ 40,000 $ - $ $ 4,000,000 $ 4,000,000 $ 2 2014 DIP: DEPARTMENT 2015 - 2019 Capital Improvement Plan 2014 2015 2016 2017 2018 2019 Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source Generator (Foxberry or Ind Beach) $ 80,000 $ 80,000 Sewer Capital Improvement Sewer Pipe Cammera $ 12,000 $ 12,000 Sewer Capital Improvement Utility Truck $ 80,000 $ 40,000 Sewer Capital Improvement Vac & Jetter $ 30,000 $ 30,000 Equip fund-Sewer/Stormwater Extension - Others Assessments/Sewer Capital Gravity Sewer Replacement - Orono $ 60,000 $ 60,000 Sewer Capital Improvement-27.4 0 Tower Recon - Hamel Road West Sewer $ 46,500 $ 23,250 Sewer Capital Imp/Assess Tower Recon - Tower Dr Sewer $ 131,400 $ 65,700 Sewer Capital Imp/Assess Sewer Sub -total $ g0,000 $ 80,000 $ 219,900 $ 130,950 $ 140,000 $ 100,000 $ $ - $ Willow Dr. Water Quality (WQ) Improvements $ 20,000 $ 20,000 Road Bonds/ Assessments/ Storm Water Utility/ Grant Vac & Jetter $ 30,000 $ 30,000 Equip fund-Sewer/Stormwater Tower Recon - Tower Dr Storm Pond $ 350,000 $ 350,000 Storm Water Utility; Grants PW Facility WQ Improvements Elm Creek Watershed grants Loretto Wetland Restoration/Creation Storm Water Utility; Grants Lake Independence WQ Improvements $ 40,000 $ 14,000 $ 40,000 $ 14,000 $ 40,000 $ 14,000 Storm Water Utility; Grants Stream/Ditch restoration in MCWD area $ 55,000 $ 19,250 $ 55,000 $ 19,250 $ 55,000 $ 19,250 Storm Water Utility; Grants Wetland restoration in MCWD area $ 30,000 $ 10,500 $ 30,000 $ 10,500 $ 30,000 $ 10,500 Storm Water Utility; Grants ISTS Repair and Replacement $ 2,500 $ 875 $ 2,500 $ 875 $ 2,500 $ 875 Storm Water Utility Rain Garden Implementation Program $ 25,000 $ 8,750 $ 25,000 $ 8,750 $ 25,000 $ 8,750 SWU; Grants; Env. Fund Storm Water Sub -total $ 172,500 $ 73,375 $ 532,500 $ 433,375 $ 152,500 $ 53,375 $ Trails Tower Recon - Hamel Rd -Hunter to Pinto $ 100,000 $ 100,000 Developer/Park Dedication Fund Arrowhead Trail (without Land Acq) $ 150,000 $ 150,000 Park Dedication Fund/Grants General Landscaping -all parks $ 10,000 $ 10,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 Park Dedication Fund Small Equip/Improvements - all parks $ 40,000 $ 40,000 $ 20,000 $ 20,000 Park Dedication Fund Large Equipment Air Compressor(60% PW) $ 18,000 $ 7,200 Park Dedication Fund Pickup Truck 3/4 Ton (50% PW) $ 30,000 $ 15,000 Park Dedication Fund Hamel Legion Park _ Hawks Field/Parking Lot clean-up $ 60,000 $ 60,000 Park Dedication Fund Dugout Covers $ 20,000 $ - $ 20,000 $ - Grants/Donations Score Boards $ 20,000 $ - Grants/Donations Irrigation System -Ball Fields $ 15,000 $ 3,750 Park Dedication/Grants/Donations Trail Lights $ 3,000 $ 3,000 Park Dedication/Grants/Donations Holy Name Park _ Picnic Shelter $ 5,000 $ 5,000 Park Dedication Fund Hunter Lions Park Park Dedication Fund Bathrooms & Water Fountain $ 50,000 $ 12,500 Park Dedication Fund/Donations Playground Mats and Wood Chips $ 5,000 $ 5,000 Park Dedication Fund New Picnic Tables $ 4,000 $ 4,000 Park Dedication Fund Lakeshore Park _ Add Playground Features $ 8,000 $ 8,000 Park Dedication Fund Picnic tables and concrete pads $ 10,000 $ 10,000 Park Dedication Fund Horseshoe pits $ 2,000 $ 2,000 Park Dedication Fund Rainwater Nature Area Park Dedication Fund Bridge by New Trail $ 75,000 $ 75,000 Park Dedication Fund Maple Park _ Soccer Nets $ 3,000 $ 3,000 Park Dedication Fund Pavillion $ 20,000 $ 20,000 Park Dedication Fund Land Acquisitions - Parks/Open Space $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250.000 Park Dedication Fund/Grants Tomann Preserve - Park Development $ 20,000 $ 20,000 Park Dedication Fund The Park at Fields of Medina $ 350,000 $ 200,000 $ 20,000 $ 20,000 Park Dedication Fund Hockey Rink and lights (Location: TBD) $ 100.000 $ 100,000 Park Dedication Fund Parks Sub -total $ 650,000 $ 500,000 $ 630,000 $ 579,200 $ 542,000 $ 458,250 $ 377,000 $ 377,000 $ 257,000 $ 257,000 $ 257,000 $ 257,000 TOTAL: $ 2,861,488 $ 2,421,341 $ 4,942,976 $ 3,155,510 $ 1,840,793 $ 1,443,911 $ 953,086 $ 908,543 $ 7,674,597 $ 5,109,049 $ 428,000 $ 478,000 3